JP6628642B2 - Hot water supply system - Google Patents

Hot water supply system Download PDF

Info

Publication number
JP6628642B2
JP6628642B2 JP2016042038A JP2016042038A JP6628642B2 JP 6628642 B2 JP6628642 B2 JP 6628642B2 JP 2016042038 A JP2016042038 A JP 2016042038A JP 2016042038 A JP2016042038 A JP 2016042038A JP 6628642 B2 JP6628642 B2 JP 6628642B2
Authority
JP
Japan
Prior art keywords
hot water
water storage
storage tank
boiling
filling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2016042038A
Other languages
Japanese (ja)
Other versions
JP2017156062A (en
Inventor
伸行 赤木
伸行 赤木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Rinnai Corp
Original Assignee
Rinnai Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Rinnai Corp filed Critical Rinnai Corp
Priority to JP2016042038A priority Critical patent/JP6628642B2/en
Publication of JP2017156062A publication Critical patent/JP2017156062A/en
Application granted granted Critical
Publication of JP6628642B2 publication Critical patent/JP6628642B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Control For Baths (AREA)
  • Heat-Pump Type And Storage Water Heaters (AREA)

Description

本発明は、加熱源として、貯湯タンク内の水を沸き上げるヒートポンプと瞬間加熱式の補助熱源機とを備えたハイブリッド方式の給湯システムに関する。   The present invention relates to a hybrid hot water supply system including, as heating sources, a heat pump for boiling water in a hot water storage tank and an instantaneous heating type auxiliary heat source device.

従来、貯湯タンク内の湯水を加熱するヒートポンプと、貯湯タンクに接続された出湯管を流通する湯水を加熱する瞬間加熱式の補助熱源機とを備えたいわゆるハイブリッド方式の給湯システムが知られている(例えば、特許文献1参照)。   BACKGROUND ART Conventionally, a so-called hybrid hot water supply system including a heat pump that heats hot water in a hot water storage tank and an instantaneous heating type auxiliary heat source device that heats hot water flowing through a tapping pipe connected to the hot water storage tank is known. (For example, see Patent Document 1).

特許文献1に記載された給湯システムにおいては、1日(0時〜24時)単位の過去の湯の使用状況に基づいて、貯湯タンク内の水の沸き上げをこれから行う当日における、最初の湯の供給が開始される時刻(給湯開始時刻)、浴槽への湯張りが開始される時刻(湯張り開始時刻)、及び最後の湯の供給が終了する時刻(給湯終了時刻)を想定している。   In the hot water supply system described in Patent Literature 1, the first hot water on the day when the water in the hot water storage tank is to be boiled based on the past hot water usage on a daily (0:00 to 24:00) basis. The time when the supply of water is started (hot water supply start time), the time when hot water filling into the bathtub is started (hot water filling start time), and the time when the last hot water supply ends (hot water supply end time) are assumed. .

そして、このようにして想定した給湯開始時刻及び湯張り開始時刻に貯湯タンク内の水の沸き上げが終了するように、ヒートポンプによる貯湯タンク内の水の加熱を開始すると共に、給湯終了時刻よりも所定時間前の時刻以降はヒートポンプを停止させている。   Then, the heating of the water in the hot water storage tank by the heat pump is started so that the boiling of the water in the hot water storage tank ends at the hot water supply start time and the hot water filling start time assumed in this way, and the water supply end time is shorter than the hot water supply end time. After the time before the predetermined time, the heat pump is stopped.

特開2013−224762号公報JP 2013-224762 A

特許文献1に記載された給湯システムによれば、過去の湯の使用状況に基づく比較的簡単な制御方法によって、貯湯タンク内の水を適切なタイミングで沸き上げて給湯を行うことが期待できるが、ハイブリッド方式の給湯システムにおいては、ヒートポンプ及び補助熱源機の組合せによって、よりランニングコストが低い給湯を行うことが望まれている。   According to the hot water supply system described in Patent Literature 1, it is expected that the water in the hot water storage tank can be heated at an appropriate timing to supply hot water by a relatively simple control method based on past hot water usage. In a hybrid hot water supply system, it is desired that hot water supply with lower running cost be performed by a combination of a heat pump and an auxiliary heat source device.

本発明はかかる背景に鑑みてなされたものであり、ヒートポンプ及び補助熱源機の組合せによって、よりランニングコストが低い給湯を行うことができる給湯システムを提供することを目的とする。   The present invention has been made in view of such a background, and an object of the present invention is to provide a hot water supply system capable of supplying hot water with lower running cost by a combination of a heat pump and an auxiliary heat source device.

本発明の給湯システムは、
下部に給水管が接続されると共に上部に出湯管が接続され、前記給水管から供給される水が貯められる貯湯タンクと、
前記貯湯タンクの下部と上部を接続したタンク循環路と、
前記貯湯タンクの下部に貯まった湯水を、前記タンク循環路を介して前記貯湯タンクの上部に循環させるタンク循環ポンプと、
前記タンク循環路を流通する湯水を加熱するヒートポンプと、
前記貯湯タンク内の貯湯量を認識する貯湯量認識部と、
前記貯湯タンクから前記出湯管への湯水の流通を検出する水量センサと、
前記出湯管から供給される湯水の温度を検出する出湯温度センサと、
前記出湯管を流通する湯水を加熱する瞬間加熱式の補助熱源機と、
前記補助熱源機による加熱箇所よりも下流側で前記出湯管から分岐して浴槽に連通した湯張り管と、
前記湯張り管を開閉する湯張り弁と、
使用者による湯張り開始操作に応じて、前記湯張り弁を開弁して前記貯湯タンク内の湯水を前記湯張り管を介して前記浴槽に供給する湯張り運転を実行する湯張り制御部と、
前記水量センサにより前記貯湯タンクから前記出湯管への湯水の流通が検出され、且つ、前記出湯温度センサの検出温度が所定の目標給湯温度よりも低いときに、前記補助熱源機を作動させる補助熱源機制御部と、
当日の前記湯張り運転が開始される想定時刻である湯張り開始想定時刻を設定する湯張り開始想定時刻設定部と、
前記湯張り開始想定時刻よりも第1所定時間前に、前記タンク循環ポンプを作動させると共に前記ヒートポンプを第1能力で作動させて、前記貯湯タンク内の湯水を加熱する第1沸き上げ運転を開始し、前記湯張り制御部による前記湯張り運転の実行中に、前記貯湯量認識部により認識される前記貯湯タンクの貯湯量が第1貯湯量以下になったときには、前記タンク循環ポンプを作動させると共に、前記ヒートポンプを前記第1能力よりも前記タンク循環路を流通する湯水に対する加熱量が多く且つエネルギー効率が低い第2能力で作動させて、前記貯湯タンク内の湯水を加熱する第2沸き上げ運転を実行する沸き上げ制御部と
を備え
前記沸き上げ制御部は、前記湯張り制御部による前記湯張り運転の実行中に、前記貯湯量認識部により認識される前記貯湯タンク内の貯湯量が前記第1貯湯量以下になったときに、前記第2沸き上げ運転を第2所定時間実行し、その後は前記第1沸き上げ運転に切り替えることを特徴とする。
The hot water supply system of the present invention
A hot water storage tank in which a water supply pipe is connected to a lower part and a tapping pipe is connected to an upper part, and water supplied from the water supply pipe is stored,
A tank circulation path connecting the lower part and the upper part of the hot water storage tank,
A tank circulation pump that circulates hot water stored in a lower portion of the hot water storage tank to an upper portion of the hot water storage tank through the tank circulation path,
A heat pump that heats hot water flowing through the tank circulation path,
A hot water storage amount recognition unit that recognizes the amount of hot water stored in the hot water storage tank,
A water amount sensor that detects the flow of hot water from the hot water storage tank to the tapping pipe;
A tapping temperature sensor for detecting the temperature of tap water supplied from the tapping pipe,
An instantaneous heating type auxiliary heat source device for heating hot water flowing through the tapping pipe,
A filling pipe branched from the tapping pipe downstream of the heating point by the auxiliary heat source unit and communicated with the bathtub,
A filling valve for opening and closing the filling pipe,
A filling control unit that executes a filling operation in which the filling valve is opened and the hot water in the hot water storage tank is supplied to the bathtub through the filling tube in response to a filling operation by a user. ,
An auxiliary heat source that activates the auxiliary heat source device when a flow of hot water from the hot water storage tank to the hot water pipe is detected by the water amount sensor and the detected temperature of the hot water temperature sensor is lower than a predetermined target hot water supply temperature; Machine control unit,
A hot water filling start time setting unit that sets a hot water filling start time that is an assumed time at which the hot water operation is started on the day,
A first boiling operation for heating the hot water in the hot water storage tank by operating the tank circulation pump and operating the heat pump at a first capacity before a first predetermined time before the estimated hot water filling time. Then, when the hot water storage amount recognized by the hot water storage amount recognition unit becomes less than or equal to the first hot water storage amount during the execution of the hot water filling operation by the hot water filling control unit, the tank circulation pump is operated. In addition, the heat pump is operated with a second capacity having a higher heating amount for the hot water flowing through the tank circulation path than the first capacity and a lower energy efficiency to heat the hot water in the hot water storage tank. A boiling control unit for executing the operation ,
The boiling control unit, when the hot water storage operation is being performed by the hot water control unit, when the hot water storage amount in the hot water storage tank recognized by the hot water storage amount recognition unit becomes equal to or less than the first hot water storage amount. The second boiling operation is performed for a second predetermined time, and thereafter, the operation is switched to the first boiling operation .

かかる本発明の給湯システムにおいては、貯湯タンク内の湯水がヒートポンプにより加熱されて沸き上げられ、貯湯タンクの湯切れが生じても補助熱源機の作動によって出湯管からの給湯を継続することができる。   In the hot water supply system of the present invention, the hot water in the hot water storage tank is heated by the heat pump and boiled, and even if the hot water tank runs out of water, the auxiliary heat source unit can continue to supply hot water from the hot water supply pipe. .

また、湯張り開始想定時刻設定部により湯張り開始想定時刻が設定され、沸き上げ制御部は、湯張り開始想定時刻よりも第1所定時間前に、ヒートポンプを第2能力よりもエネルギー効率が良い第1能力で作動させる第1沸き上げ運転を開始する。これにより、湯張り開始想定時刻までに貯湯タンク内の湯水を効率良く沸き上げて、湯張り運転の開始に備えることができる。また、湯張り運転が開始されて貯湯タンク内の貯湯量が第1貯湯量以下になった時点で、沸き上げ制御部は、ヒートポンプを第1能力よりもタンク循環路を流通する湯水に対する加熱量が多い第2能力で作動させる第2沸き上げ運転を実行する。これにより、貯湯タンク内の湯水を速やかに加熱すると共に、ヒートポンプよりもエネルギー効率が低くランニングコストが高価な瞬間加熱式の補助熱源機の作動時間を短縮して、湯張り運転のランニングコストの低減を図ることができる。   Also, the estimated filling time is set by the estimated filling time setting unit, and the boiling control unit sets the heat pump to have a higher energy efficiency than the second capacity before the first specified time before the estimated filling time. A first boiling operation operated with the first capacity is started. Thus, the hot water in the hot water storage tank can be efficiently boiled by the estimated hot water filling time to prepare for the start of the hot water filling operation. Further, when the hot water filling operation is started and the hot water storage amount in the hot water storage tank becomes equal to or less than the first hot water storage amount, the boiling controller controls the heat pump to heat the hot water flowing through the tank circulation path more than the first capacity. The second boiling operation which is operated with the second capacity, which is often performed, is executed. As a result, the hot water in the hot water storage tank is quickly heated, and the operating time of the instantaneous heating type auxiliary heat source unit, which has lower energy efficiency and higher running cost than the heat pump, is shortened, and the running cost of hot water filling operation is reduced. Can be achieved.

なお、本発明における当日は、湯張り開始想定時刻及び給湯開始想定時刻に基づく貯湯タンク内の湯水の計画的な沸き上げがこれから行われる日を意味する。   In the present invention, the day means the day when the scheduled boiling of the hot water in the hot water storage tank based on the estimated hot water filling start time and the estimated hot water supply start time will be performed.

さらに、第2沸き上げ運転の実行により、貯湯タンク内の貯湯量がある程度確保された状況になった時点で、第2沸き上げ運転から第1沸き上げ運転に切り替えることによって、ヒートポンプのエネルギー効率が第1沸き上げ運転よりも低い第2沸き上げ運転の実行時間を短縮して、ランニングコストの低減を図ることができる。 Furthermore, when the second boiling operation is executed and the amount of hot water stored in the hot water storage tank reaches a certain level, the energy efficiency of the heat pump is switched by switching from the second boiling operation to the first boiling operation. The execution time of the second boiling operation, which is lower than the first boiling operation, can be shortened, and the running cost can be reduced.

また、本発明の給湯システムは、
下部に給水管が接続されると共に上部に出湯管が接続され、前記給水管から供給される水が貯められる貯湯タンクと、
前記貯湯タンクの下部と上部を接続したタンク循環路と、
前記貯湯タンクの下部に貯まった湯水を、前記タンク循環路を介して前記貯湯タンクの上部に循環させるタンク循環ポンプと、
前記タンク循環路を流通する湯水を加熱するヒートポンプと、
前記貯湯タンク内の貯湯量を認識する貯湯量認識部と、
前記貯湯タンクから前記出湯管への湯水の流通を検出する水量センサと、
前記出湯管から供給される湯水の温度を検出する出湯温度センサと、
前記出湯管を流通する湯水を加熱する瞬間加熱式の補助熱源機と、
前記補助熱源機による加熱箇所よりも下流側で前記出湯管から分岐して浴槽に連通した湯張り管と、
前記湯張り管を開閉する湯張り弁と、
使用者による湯張り開始操作に応じて、前記湯張り弁を開弁して前記貯湯タンク内の湯水を前記湯張り管を介して前記浴槽に供給する湯張り運転を実行する湯張り制御部と、
前記水量センサにより前記貯湯タンクから前記出湯管への湯水の流通が検出され、且つ、前記出湯温度センサの検出温度が所定の目標給湯温度よりも低いときに、前記補助熱源機を作動させる補助熱源機制御部と、
当日の前記湯張り運転が開始される想定時刻である湯張り開始想定時刻を設定する湯張り開始想定時刻設定部と、
前記湯張り開始想定時刻よりも第1所定時間前に、前記タンク循環ポンプを作動させると共に前記ヒートポンプを第1能力で作動させて、前記貯湯タンク内の湯水を加熱する第1沸き上げ運転を開始し、前記湯張り制御部による前記湯張り運転の実行中に、前記貯湯量認識部により認識される前記貯湯タンクの貯湯量が第1貯湯量以下になったときには、前記タンク循環ポンプを作動させると共に、前記ヒートポンプを前記第1能力よりも前記タンク循環路を流通する湯水に対する加熱量が多く且つエネルギー効率が低い第2能力で作動させて、前記貯湯タンク内の湯水を加熱する第2沸き上げ運転を実行する沸き上げ制御部と、
当日の湯の使用が終了する想定時刻である給湯終了想定時刻を設定する給湯終了想定時刻設定部とを備え、
前記沸き上げ制御部は、前記給湯終了想定時刻よりも第3所定時間前の沸き上げ運転終了時刻以降は、翌日まで前記ヒートポンプを停止し、前記湯張り制御部による前記湯張り運転が前記沸き上げ運転終了時刻よりも第4所定時間前の時刻以前に開始されたときに限定して、前記第2沸き上げ運転を実行し、前記湯張り制御部による前記湯張り運転が前記沸き上げ運転終了時刻よりも前記第4所定時間前の時刻後に開始されたときには、前記第1沸き上げ運転のみを実行することを特徴とする。
Further, the hot water supply system of the present invention
A hot water storage tank in which a water supply pipe is connected to a lower part and a tapping pipe is connected to an upper part, and water supplied from the water supply pipe is stored,
A tank circulation path connecting the lower part and the upper part of the hot water storage tank,
A tank circulation pump that circulates hot water stored in a lower portion of the hot water storage tank to an upper portion of the hot water storage tank through the tank circulation path,
A heat pump that heats hot water flowing through the tank circulation path,
A hot water storage amount recognition unit that recognizes the amount of hot water stored in the hot water storage tank,
A water amount sensor that detects the flow of hot water from the hot water storage tank to the tapping pipe;
A tapping temperature sensor for detecting the temperature of tap water supplied from the tapping pipe,
An instantaneous heating type auxiliary heat source device for heating hot water flowing through the tapping pipe,
A filling pipe branched from the tapping pipe downstream of the heating point by the auxiliary heat source unit and communicated with the bathtub,
A filling valve for opening and closing the filling pipe,
A filling control unit that executes a filling operation in which the filling valve is opened and the hot water in the hot water storage tank is supplied to the bathtub through the filling tube in response to a filling operation by a user. ,
An auxiliary heat source that activates the auxiliary heat source device when a flow of hot water from the hot water storage tank to the hot water pipe is detected by the water amount sensor and the detected temperature of the hot water temperature sensor is lower than a predetermined target hot water supply temperature; Machine control unit,
A hot water filling start time setting unit that sets a hot water filling start time that is an assumed time at which the hot water operation is started on the day,
A first boiling operation for heating the hot water in the hot water storage tank by operating the tank circulation pump and operating the heat pump at a first capacity before a first predetermined time before the estimated hot water filling time. Then, when the hot water storage amount recognized by the hot water storage amount recognition unit becomes less than or equal to the first hot water storage amount during the execution of the hot water filling operation by the hot water filling control unit, the tank circulation pump is operated. In addition, the heat pump is operated with a second capacity having a higher heating amount for the hot water flowing through the tank circulation path than the first capacity and a lower energy efficiency to heat the hot water in the hot water storage tank. A boiling control unit for performing operation,
And a hot water supply end assumed time setting unit for use on the day of hot water to set the hot water supply end assumed time is an expected time to finish,
The boiling control unit stops the heat pump until the next day after the boiling operation end time that is the third predetermined time before the hot water supply end estimated time, and the hot water operation by the hot water control unit starts the boiling operation. The second boiling operation is performed only when started before a time that is a fourth predetermined time before the operation end time, and the filling operation by the filling controller is performed at the boiling operation end time. When started after a time earlier than the fourth predetermined time, only the first boiling operation is performed.

この構成によれば、沸き上げ運転終了時刻よりも第4所定時間前の時刻後に、湯張り運転が開始されたときには、第2沸き上げ運転に切り替えても、間もなく沸き上げ運転終了時刻になってヒートポンプが停止するため、貯湯タンクの湯切れが生じて補助熱源機が作動する可能性が高い。   According to this configuration, when the hot water filling operation is started after the time that is the fourth predetermined time before the boiling operation end time, even if the operation is switched to the second boiling operation, the boiling operation end time will soon be reached. Since the heat pump stops, there is a high possibility that the hot water tank runs out of water and the auxiliary heat source unit operates.

そこで、この場合には、第2沸き上げ運転への切り替えを行わずに第1沸き上げ運転を継続することによって、第2沸き上げ運転に切り替えて第2沸き上げ運転を短時間実行することによるヒートポンプのエネルギー効率の低下を抑制することができる。   Therefore, in this case, the first heating operation is continued without switching to the second heating operation, thereby switching to the second heating operation and executing the second heating operation for a short time. A decrease in the energy efficiency of the heat pump can be suppressed.

また、当日の湯の使用が開始される想定時刻である給湯開始想定時刻を設定する給湯開始想定時刻設定部を備え、
前記沸き上げ制御部は、前記給湯開始想定時刻よりも第5所定時間前に、前記タンク循環ポンプを作動させると共に、前記ヒートポンプを第3能力で作動させて、前記貯湯タンク内の湯水を加熱する第3沸き上げ運転を開始し、該第3沸き上げ運転の実行中に、前記水量センサにより前記貯湯タンクから前記出湯管への湯水の流通が検出されたときには、前記タンク循環ポンプを作動させると共に、前記ヒートポンプを前記第3能力よりも前記タンク循環路を流通する湯水に対する加熱量が多い第4能力で作動させて、前記貯湯タンク内の湯水を加熱する第4沸き上げ運転に切り替えることを特徴とする。
In addition, a hot water supply start time setting unit that sets a hot water supply start time that is an assumed time when the use of hot water on the day is started,
The boiling control unit heats the hot water in the hot water storage tank by operating the tank circulation pump and operating the heat pump at a third capacity before a fifth predetermined time before the hot water supply start estimated time. A third boiling operation is started, and when the flow of hot water from the hot water storage tank to the tapping pipe is detected by the water amount sensor during the execution of the third boiling operation, the tank circulation pump is operated. Operating the heat pump with a fourth capacity in which the amount of heating of the hot water flowing through the tank circulation path is larger than the third capacity, and switching to a fourth boiling operation for heating the hot water in the hot water storage tank. And

この構成によれば、給湯開始想定時刻より第5所定時間前から第3沸き上げ運転を実行しているときに、水量センサにより貯湯タンクから出湯管への湯水の流通が検出されたときに、第3沸き上げ運転よりも出湯管を流通する湯水に対する加熱量が多くなる第4沸き上げ運転に切り替えることによって、貯湯タンク内の湯水を速やかに加熱して湯の使用に対応することができる。これにより、補助熱源機の作動を抑制して、給湯のランニングコストの低減を図ることができる。   According to this configuration, when the third boiling operation is being performed from the fifth predetermined time before the estimated hot water supply time, when the flow of hot water from the hot water storage tank to the hot water pipe is detected by the water amount sensor, By switching to the fourth boiling operation in which the amount of heating of the hot water flowing through the tapping pipe is larger than that in the third boiling operation, the hot water in the hot water storage tank can be quickly heated to cope with the use of hot water. Thereby, the operation of the auxiliary heat source unit can be suppressed, and the running cost of hot water supply can be reduced.

また、前記沸き上げ制御部は、前記第3沸き上げ運転の実行中に前記水量センサにより前記貯湯タンクから前記出湯管への湯水の流通が検出されて、前記第4沸き上げ運転に切り替えた後、前記貯湯量認識部により認識される前記貯湯タンク内の貯湯量が第2貯湯量以上になった時点で、前記第3沸き上げ運転に戻すことを特徴とする。   In addition, the boiling control unit may be configured to detect the flow of hot water from the hot water storage tank to the tapping pipe by the water amount sensor during execution of the third boiling operation, and to switch to the fourth boiling operation. When the hot water storage amount in the hot water storage tank recognized by the hot water storage amount recognition unit becomes equal to or greater than the second hot water storage amount, the operation returns to the third boiling operation.

この構成によれば、第4沸き上げ運転の実行により、貯湯タンク内の貯湯量が第2貯湯量以上になった後は、第3沸き上げ運転に戻される。これにより、貯湯タンク内の湯水の沸き上げが、ヒートポンプのエネルギー効率が第3沸き上げ運転よりも低い第4沸き上げ運転によって実行される時間を短縮して、ランニングコストの低減を図ることができる。   According to this configuration, after the amount of hot water stored in the hot water storage tank becomes equal to or more than the second hot water storage amount by performing the fourth boiling operation, the operation is returned to the third boiling operation. Thus, the time for boiling the hot water in the hot water storage tank by the fourth boiling operation in which the energy efficiency of the heat pump is lower than the third boiling operation can be shortened, and the running cost can be reduced. .

また、前記沸き上げ制御部は、前記第3沸き上げ運転の実行中に前記水量センサにより前記貯湯タンクから前記出湯管への湯水の流通が検出されて、前記第4沸き上げ運転に切り替えた後、第6所定時間が経過した時点で、前記第3沸き上げ運転に戻すことを特徴とする。   In addition, the boiling control unit may be configured to detect the flow of hot water from the hot water storage tank to the tapping pipe by the water amount sensor during execution of the third boiling operation, and to switch to the fourth boiling operation. When the sixth predetermined time has elapsed, the operation is returned to the third boiling operation.

この構成によれば、第4沸き上げ運転の第6所定時間の実行により、貯湯タンク内の貯湯量がある程度増加した後は、第3沸き上げ運転に戻される。これにより、貯湯タンク内の湯水の沸き上げが、ヒートポンプのエネルギー効率が第3沸き上げ運転よりも低い第4沸き上げ運転によって実行される時間を短縮して、ランニングコストの低減を図ることができる。   According to this configuration, after the amount of hot water stored in the hot water storage tank is increased to some extent by the execution of the sixth predetermined time of the fourth boiling operation, the operation is returned to the third boiling operation. Thus, the time for boiling the hot water in the hot water storage tank by the fourth boiling operation in which the energy efficiency of the heat pump is lower than the third boiling operation can be shortened, and the running cost can be reduced. .

また、前記沸き上げ制御部は、前記第3沸き上げ運転の実行中であって、前記第3沸き上げ運転の開始から第7所定時間以内に、前記水量センサにより前記貯湯タンクから前記出湯管への湯水の流通が検出されたときに限定して、前記第4沸き上げ運転への切り替えを行い、前記第3沸き上げ運転の開始から前記第7所定時間が経過した後に、前記水量センサにより前記貯湯タンクから前記出湯管への湯水の流通が検出されたときには、前記第4沸き上げ運転への切り替えを行わずに、前記第3沸き上げ運転を継続することを特徴とする。   In addition, the boiling control unit is performing the third boiling operation, and within a seventh predetermined time from the start of the third boiling operation, the water amount sensor detects the water amount from the hot water storage tank to the tapping pipe. Only when the flow of hot and cold water is detected, switching to the fourth boiling operation is performed, and after the seventh predetermined time has elapsed from the start of the third boiling operation, the water amount sensor is used. When the flow of hot water from the hot water storage tank to the tapping pipe is detected, the third boiling operation is continued without switching to the fourth boiling operation.

この構成によれば、第3沸き上げ運転の第7所定時間の実行により、貯湯タンク内にある程度の湯が貯められた後は、第4沸き上げ運転への切り替えを行わずに第3沸き上げ運転を継続することによって、第4沸き上げ運転への切り替えと第4沸き上げ運転の短時間の実行によるヒートポンプのエネルギー効率の低下を防止することができる。   According to this configuration, after a certain amount of hot water is stored in the hot water storage tank by performing the seventh predetermined time period of the third boiling operation, the third boiling operation is performed without switching to the fourth boiling operation. By continuing the operation, it is possible to prevent the energy efficiency of the heat pump from being reduced due to the switching to the fourth heating operation and the short-time execution of the fourth heating operation.

また、前記沸き上げ制御部は、前記第3沸き上げ運転の実行中であって、前記貯湯量認識部により認識される前記貯湯タンク内の貯湯量が第3貯湯量以下である状態で、前記水量センサにより前記貯湯タンクから前記出湯管への湯水の流通が検出されたときに限定して、前記第4沸き上げ運転への切り替えを行い、前記貯湯量認識部により認識される前記貯湯タンク内の貯湯量が前記第3貯湯量よりも多い状態で、前記水量センサにより前記貯湯タンクから前記出湯管への湯水の流通が検出されたときには、前記第4沸き上げ運転への切り替えを行わずに、前記第3沸き上げ運転を継続することを特徴とする。   Further, the boiling control unit is performing the third boiling operation, and in a state where the hot water storage amount in the hot water storage tank recognized by the hot water storage amount recognition unit is equal to or less than the third hot water storage amount, Switching to the fourth boiling operation is performed only when the flow of hot water from the hot water storage tank to the hot water pipe is detected by the water amount sensor, and the hot water storage tank is recognized by the hot water storage amount recognition unit. When the hot water storage amount is larger than the third hot water storage amount and the flow of hot water from the hot water storage tank to the tapping pipe is detected by the water amount sensor, the switching to the fourth boiling operation is not performed. And the third boiling operation is continued.

この構成によれば、第3沸き上げ運転の実行により、貯湯タンク内の貯湯量が既に第3貯定量よりも多くなっているときには、第4沸き上げ運転への切り替えを行わずに第3沸き上げ運転を継続することによって、第4沸き上げ運転への切り替えと第4沸き上げ運転の短時間の実行によるヒートポンプのエネルギー効率の低下を防止することができる。   According to this configuration, when the amount of hot water stored in the hot water storage tank is already larger than the third storage amount by performing the third boiling operation, the third boiling operation is not performed without switching to the fourth boiling operation. By continuing the heating operation, it is possible to prevent the energy efficiency of the heat pump from being reduced due to the switching to the fourth heating operation and the short-time execution of the fourth heating operation.

給湯システムの構成図。The block diagram of a hot-water supply system. 沸き上げ運転のフローチャート。The flowchart of a boiling operation. 湯張り運転中の沸き上げ運転のフローチャート。4 is a flowchart of a boiling operation during the hot water filling operation. 給湯開始想定時刻に基づく沸き上げ運転のフローチャート。The flowchart of the boiling operation based on the hot water supply start estimated time. 沸き上げ運転の実行タイミングと、湯の使用状況を示した第1の説明図。The 1st explanatory view showing the execution timing of the boiling operation, and the use condition of hot water. 沸き上げ運転の実行タイミングと、湯の使用状況を示した第2の説明図。The 2nd explanatory view showing the execution timing of the boiling operation, and the use condition of hot water. 沸き上げ運転の実行タイミングと、湯の使用状況を示した第3の説明図。The 3rd explanatory view showing the execution timing of the boiling operation, and the use condition of hot water.

本発明の実施形態について、図1〜図7を参照して説明する。   An embodiment of the present invention will be described with reference to FIGS.

[1.給湯システムの構成]
図1を参照して、本実施形態の給湯システム1は、貯湯ユニット10、ヒートポンプユニット50、補助熱源機80、及び、給湯システム1の全体的な作動を制御するコントローラ120を備えて構成されたハイブリッド方式の給湯システムである。
[1. Configuration of hot water supply system]
Referring to FIG. 1, hot water supply system 1 of the present embodiment includes hot water storage unit 10, heat pump unit 50, auxiliary heat source device 80, and controller 120 that controls the overall operation of hot water supply system 1. This is a hybrid hot water supply system.

なお、図1では、給湯システム1のコントローラとして一つのコントローラ120を示したが、貯湯ユニット10のコントローラと、ヒートポンプユニット50のコントローラと、補助熱源機80のコントローラを個別に備え、各コントローラ間の通信によって、給湯システム1の全体的な作動を制御する構成としてもよい。   Although FIG. 1 shows one controller 120 as a controller of hot water supply system 1, a controller of hot water storage unit 10, a controller of heat pump unit 50, and a controller of auxiliary heat source unit 80 are separately provided, and The overall operation of the hot water supply system 1 may be controlled by communication.

貯湯ユニット10は、貯湯タンク11、給水管12、出湯管13等を備えている。貯湯タンク11は内部に湯を保温して貯め、高さ方向に略等間隔で配置されて、各高さでの貯湯タンク11内の湯水の温度th2〜th5を検出するタンク表面温度センサ14〜17と、貯湯タンク11の上部に配置されて貯湯タンク11から出湯管13に供給される湯水の温度th1を検出するタンク中温度センサ26が設けられている。   The hot water storage unit 10 includes a hot water storage tank 11, a water supply pipe 12, a tapping pipe 13, and the like. Hot water storage tank 11 stores and retains hot water therein at substantially equal intervals in the height direction, and has tank surface temperature sensors 14 to 14 for detecting temperatures th2 to th5 of hot water in hot water storage tank 11 at each height. 17 and an in-tank temperature sensor 26 which is disposed above the hot water storage tank 11 and detects the temperature th1 of hot water supplied from the hot water storage tank 11 to the tapping pipe 13.

また、貯湯タンク11の上部と下部を接続するタンク循環路41の貯湯タンク11の下部との接続箇所の付近には、貯湯タンク11の下部に貯められた湯水の温度th6を検出するタンク下部温度センサ42が設けられている。また、貯湯タンク11の底部には、作業者の手動操作により開弁される排水弁18が設けられている。   A tank lower temperature for detecting the temperature th6 of the hot water stored in the lower part of the hot water storage tank 11 is provided near a connection point of the tank circulation path 41 connecting the upper part and the lower part of the hot water storage tank 11 with the lower part of the hot water storage tank 11. A sensor 42 is provided. At the bottom of the hot water storage tank 11, a drain valve 18 that is opened by manual operation of an operator is provided.

給水管12は、一端が給水口30を介して図示しない上水道に接続され、他端が貯湯タンク11の下部に接続されて、貯湯タンク11内の下部に水を供給する。給水管12には、貯湯タンク11の内圧が過大になることを防止するための減圧弁19と、給水管12から貯湯タンク11への方向のみの通水を可能にして、貯湯タンク11から給水管12側への湯水の流出を阻止する第1湯側逆止弁20が設けられている。   One end of the water supply pipe 12 is connected to a water supply (not shown) via a water supply port 30, and the other end is connected to a lower part of the hot water storage tank 11 to supply water to a lower part in the hot water storage tank 11. The water supply pipe 12 is provided with a pressure-reducing valve 19 for preventing the internal pressure of the hot water storage tank 11 from becoming excessive, and water is allowed to flow only from the water supply pipe 12 to the hot water storage tank 11. A first hot-water-side check valve 20 for preventing outflow of hot water to the pipe 12 is provided.

給水管12から分岐した給水バイパス管34は、給湯混合弁21を介して接続箇所Xで出湯管13に連通しており、給湯混合弁21によって貯湯タンク11から出湯管13に供給される湯水と給水バイパス管34から出湯管13に供給される水との混合比が変更される。   The water supply bypass pipe 34 branched from the water supply pipe 12 communicates with the tapping pipe 13 at the connection point X via the hot water supply mixing valve 21, and the hot water supplied from the hot water storage tank 11 to the tapping pipe 13 by the hot water supply mixing valve 21. The mixing ratio with the water supplied from the water supply bypass pipe 34 to the tapping pipe 13 is changed.

給水バイパス管34には、給水バイパス管34に供給される水の温度Tw(以下、給水温度Twという)を検出する給水温度センサ22と、給水バイパス管34を流通する水の流量Fwを検出する水側流量センサ23と、給水バイパス管34から出湯管13への方向のみの通水を可能にして、出湯管13から給水バイパス管34側への湯水の流出を阻止する水側逆止弁24とが設けられている。   The feedwater bypass pipe 34 has a feedwater temperature sensor 22 that detects the temperature Tw (hereinafter, referred to as feedwater temperature Tw) of the water supplied to the feedwater bypass pipe 34 and a flow rate Fw of the water flowing through the feedwater bypass pipe 34. A water-side flow sensor 23 and a water-side check valve 24 that allows water to flow only in the direction from the water supply bypass pipe 34 to the tapping pipe 13 and prevents the flow of hot water from the tapping pipe 13 to the feedwater bypass pipe 34. Are provided.

出湯管13は、一端が給湯口31に接続され、他端が貯湯タンク11の上部に接続されている。貯湯タンク11の上部に貯められた湯水は、出湯管13から給湯口31を介して図示しない給湯栓(台所、洗面所、浴室のカランやシャワー等)に供給される。出湯管13には、貯湯タンク11から出湯管13への方向のみの通水を可能にして、出湯管13から貯湯タンク11側への湯水の流入を阻止する第2湯側逆止弁25と、貯湯タンク11から出湯管13に供給される湯水の流量Fhを検出する湯側流量センサ27とが設けられている。   The tapping pipe 13 has one end connected to the hot water supply port 31 and the other end connected to an upper portion of the hot water storage tank 11. The hot water stored in the upper part of the hot water storage tank 11 is supplied from a hot water supply pipe 13 to a hot water tap (not shown) (a kitchen, a washroom, a bathroom curan or a shower, etc.) via a hot water supply port 31. A second hot-water check valve 25 that allows water to flow only in the direction from the hot-water storage tank 11 to the hot-water supply pipe 13 to the hot-water storage pipe 11 to prevent the flow of hot water from the hot-water supply pipe 13 to the hot-water storage tank 11 side. And a hot water side flow sensor 27 for detecting a flow rate Fh of hot water supplied from the hot water storage tank 11 to the hot water pipe 13.

補助熱源機80は、出湯管13の給水バイパス管34との接続箇所Xよりも下流側の途中に設けられ、貯湯ユニット10には、補助熱源機80をバイパスして、補助熱源機80の下流側と上流側の出湯管13を連通する出湯バイパス管33と、出湯バイパス管33を開閉する出湯バイパス弁29とが設けられている。   The auxiliary heat source device 80 is provided at a location downstream of the connection point X of the tapping pipe 13 with the water supply bypass pipe 34, and the hot water storage unit 10 bypasses the auxiliary heat source device 80 and is located downstream of the auxiliary heat source device 80. A hot-water bypass pipe 33 that connects the hot-water tap pipe 13 on the upstream side and a hot-water tapping valve 33 that opens and closes the hot-water bypass pipe 33 is provided.

出湯管13の出湯バイパス管33との分岐箇所Yと給湯混合弁21との間に、給湯混合弁21を介して出湯管13に供給される湯水の温度Tmを検出する混合温度センサ28が設けられ、出湯管13の出湯バイパス管33との合流箇所Zと給湯口31との間に、給湯口31から出湯される湯水の温度を検出する給湯温度センサ32が設けられている。   Between the branch point Y of the tapping pipe 13 and the tapping bypass pipe 33 and the hot water supply mixing valve 21, a mixing temperature sensor 28 for detecting the temperature Tm of hot water supplied to the tapping pipe 13 via the hot water supply mixing valve 21 is provided. A hot water supply temperature sensor 32 for detecting the temperature of hot water discharged from hot water supply port 31 is provided between hot water supply port 31 and junction Z of hot water supply pipe 13 with hot water bypass pipe 33.

貯湯ユニット10に備えられた各センサの検出信号は、コントローラ120に入力される。また、コントローラ120から出力される制御信号によって、給湯混合弁21と出湯バイパス弁29の作動が制御される。   The detection signal of each sensor provided in hot water storage unit 10 is input to controller 120. The operation of the hot water supply mixing valve 21 and the hot water bypass valve 29 is controlled by a control signal output from the controller 120.

次に、ヒートポンプユニット50は、貯湯タンク11内の湯水をタンク循環路41を介して循環させて加熱するものであり、屋外に設置されている。ヒートポンプユニット50は、熱媒体(ハイドロフルオロカーボン(HFC)等の代替フロン、二酸化炭素等)が封入されたヒートポンプ循環路52により接続された蒸発器53、圧縮機54、ヒートポンプ熱交換器55(凝縮器)、及び膨張弁56により構成されたヒートポンプ51を有している。   Next, the heat pump unit 50 circulates the hot water in the hot water storage tank 11 through the tank circulation path 41 to heat it, and is installed outdoors. The heat pump unit 50 includes an evaporator 53, a compressor 54, and a heat pump heat exchanger 55 (condenser) connected by a heat pump circuit 52 in which a heat medium (an alternative fluorocarbon such as hydrofluorocarbon (HFC) or carbon dioxide) is sealed. ), And a heat pump 51 constituted by an expansion valve 56.

蒸発器53は、ファン60の回転により供給される空気(外気)とヒートポンプ循環路52内を流通する熱媒体との間で熱交換を行う。圧縮機54は、蒸発器53から吐出された熱媒体を圧縮して高圧・高温とし、ヒートポンプ熱交換器55に送出する。膨張弁56は、圧縮機54で加圧された熱媒体の圧力を開放する。   The evaporator 53 performs heat exchange between air (outside air) supplied by rotation of the fan 60 and a heat medium flowing in the heat pump circulation path 52. The compressor 54 compresses the heat medium discharged from the evaporator 53 to a high pressure and high temperature, and sends the heat medium to the heat pump heat exchanger 55. The expansion valve 56 releases the pressure of the heat medium pressurized by the compressor 54.

除霜弁61は膨張弁56をバイパスして設けられており、圧縮機54から送出される熱媒体により蒸発器53を除霜する。ヒートポンプ循環路52の膨張弁56の上流側及び下流側、圧縮機54の上流側及び下流側には、ヒートポンプ循環路52内を流通する熱媒体の温度を検出する熱媒体温度センサ62,63,64,65が、それぞれ設けられている。また、蒸発器53には、蒸発器53に吸入される空気の温度Toutを検出する周囲温度センサ67が設けられている。   The defrost valve 61 is provided so as to bypass the expansion valve 56, and defrosts the evaporator 53 with the heat medium sent from the compressor 54. Heat medium temperature sensors 62, 63 for detecting the temperature of the heat medium flowing in the heat pump circulation path 52 are provided upstream and downstream of the expansion valve 56 of the heat pump circulation path 52 and upstream and downstream of the compressor 54. 64 and 65 are provided respectively. Further, the evaporator 53 is provided with an ambient temperature sensor 67 for detecting the temperature Tout of the air taken into the evaporator 53.

ヒートポンプ熱交換器55はタンク循環路41と接続され、圧縮機54により高圧・高温とされた熱媒体と、タンク循環路41内を流通する湯水との熱交換により、タンク循環路41内を流通する湯水を加熱する。タンク循環路41には、貯湯タンク11内の湯水をタンク循環路41を介して循環させるためのタンク循環ポンプ66が設けられている。   The heat pump heat exchanger 55 is connected to the tank circulation path 41, and circulates in the tank circulation path 41 by heat exchange between the heat medium of high pressure and high temperature by the compressor 54 and hot water flowing in the tank circulation path 41. Heat the hot water. The tank circulation path 41 is provided with a tank circulation pump 66 for circulating the hot water in the hot water storage tank 11 through the tank circulation path 41.

貯湯タンク11内の下部に貯まった湯水は、タンク循環ポンプ66によりタンク循環路41に導かれ、ヒートポンプ熱交換器55で所定温度(沸き上げ温度)まで加熱されて貯湯タンク11の上部に戻される。これにより、所定温度の湯が、貯湯タンク11の上部から順次積層して貯められる。   Hot water stored in the lower part of the hot water storage tank 11 is guided to the tank circulation path 41 by the tank circulation pump 66, heated to a predetermined temperature (boiling temperature) by the heat pump heat exchanger 55, and returned to the upper part of the hot water storage tank 11. . As a result, hot water of a predetermined temperature is sequentially stacked and stored from above the hot water storage tank 11.

なお、タンク循環路41のヒートポンプ熱交換器55の上流側及び下流側には、タンク循環路41内を流通する湯水の温度を検出する湯温度センサ68,69が設けられている。また、ヒートポンプ熱交換器55には、その内部で凝縮する熱媒体の凝縮温度を検出する凝縮温度センサ57が設けられている。   On the upstream and downstream sides of the heat pump heat exchanger 55 in the tank circulation path 41, hot water temperature sensors 68 and 69 for detecting the temperature of hot and cold water flowing in the tank circulation path 41 are provided. The heat pump heat exchanger 55 is provided with a condensing temperature sensor 57 for detecting the condensing temperature of the heat medium condensing inside.

ヒートポンプユニット50に備えられた各センサの検出信号は、コントローラ120に入力される。また、コントローラ120から出力される制御信号によって、圧縮機54、膨張弁56、タンク循環ポンプ66、及びファン60の作動が制御される。   The detection signal of each sensor provided in the heat pump unit 50 is input to the controller 120. Further, the operation of the compressor 54, the expansion valve 56, the tank circulation pump 66, and the fan 60 is controlled by a control signal output from the controller 120.

次に、補助熱源機80は、出湯管13を流通する湯水を加熱するものであり、缶体87内に収容された給湯バーナ81及び給湯バーナ81により加熱される給湯熱交換器82等を備えている。   Next, the auxiliary heat source device 80 is for heating hot water flowing through the tapping pipe 13 and includes a hot water supply burner 81 housed in a can 87 and a hot water supply heat exchanger 82 heated by the hot water supply burner 81. ing.

出湯管13の給湯熱交換器82の配置箇所よりも下流側の箇所に、浴槽105に連通した湯張り管100が接続されている。湯張り管100には、湯張り管100を開閉する湯張り弁103が設けられており、コントローラ120は、湯張り弁103を開弁することによって、出湯管13から湯張り管100を介して浴槽105に湯を供給する。   The hot water supply pipe 100 communicating with the bathtub 105 is connected to a location on the tapping pipe 13 downstream of the location of the hot water supply heat exchanger 82. The filling pipe 100 is provided with a filling valve 103 for opening and closing the filling pipe 100, and the controller 120 opens the filling valve 103, so that the filling pipe 13 is opened via the filling pipe 100. Hot water is supplied to bathtub 105.

給湯バーナ81には、図示しないガス供給管から燃料ガスが供給されると共に、図示しない燃焼ファンにより燃焼用空気が供給される。コントローラ120は、給湯バーナ81に供給する燃料ガスと燃焼用空気の流量を調節して、給湯バーナ81の燃焼量を制御する。   Fuel gas is supplied to the hot water supply burner 81 from a gas supply pipe (not shown), and combustion air is supplied by a combustion fan (not shown). The controller 120 controls the amount of combustion of the hot water supply burner 81 by adjusting the flow rates of the fuel gas and the combustion air supplied to the hot water supply burner 81.

給湯熱交換器82は、出湯管13の途中に接続されており、給湯バーナ81の燃焼熱によって、内部を流通する湯水を加熱する。出湯管13には、上流側から順に、止水弁93と水量センサ88が設けられている。給湯熱交換器82の上流側と下流側は、熱源バイパス管89により連通されており、熱源バイパス管89には、熱源バイパス管89の開度を調節するための熱源バイパス弁90が設けられている。出湯管13の給湯熱交換器82の出口付近には熱交出湯温度センサ91が設けられ、出湯管13の熱源バイパス管89との接続箇所の下流側には熱源出湯温度センサ92(本発明の出湯温度センサに相当する)が設けられている。   The hot water supply heat exchanger 82 is connected in the middle of the hot water supply pipe 13, and heats hot and cold water flowing inside by the combustion heat of the hot water supply burner 81. The tapping pipe 13 is provided with a water stop valve 93 and a water amount sensor 88 in order from the upstream side. The upstream side and the downstream side of the hot water supply heat exchanger 82 are connected by a heat source bypass pipe 89, and the heat source bypass pipe 89 is provided with a heat source bypass valve 90 for adjusting the opening degree of the heat source bypass pipe 89. I have. A heat exchange hot water temperature sensor 91 is provided near the outlet of the hot water supply heat exchanger 82 of the hot water supply pipe 13, and a heat source hot water temperature sensor 92 (the present invention) is provided downstream of the connection point of the hot water supply pipe 13 with the heat source bypass pipe 89. Is provided.

この構成により、貯湯タンク11内に湯が無いとき(湯切れ状態であるとき)に、給水管12から貯湯タンク11及び給水バイパス管34を介して出湯管13に供給される水が、給湯熱交換器82により加熱されて湯となり、熱源バイパス管89からの水と混合されて、目標給湯温度の湯が給湯口31から供給されるようになっている。   With this configuration, when there is no hot water in the hot water storage tank 11 (when the hot water is out of water), the water supplied from the water supply pipe 12 to the hot water supply pipe 13 via the hot water storage tank 11 and the water supply bypass pipe 34 generates hot water. The hot water is heated by the exchanger 82 and mixed with water from the heat source bypass pipe 89, so that hot water at the target hot water supply temperature is supplied from the hot water supply port 31.

補助熱源機80に備えられた各センサの検出信号は、コントローラ120に入力される。また、コントローラ120から出力される制御信号によって、給湯バーナ81、熱源バイパス弁90、及び湯張り弁103の作動が制御される。   A detection signal of each sensor provided in the auxiliary heat source device 80 is input to the controller 120. The operation of the hot water supply burner 81, the heat source bypass valve 90, and the filling valve 103 is controlled by a control signal output from the controller 120.

コントローラ120は、図示しないCPU,メモリ等により構成された電子回路ユニットであり、メモリに保持された給湯システム1の制御用プログラムを、CPUで実行することによって、給湯制御部121、湯張り制御部122、沸き上げ制御部123、貯湯量認識部124、給湯開始想定時刻設定部125、湯張り開始想定時刻設定部126、及び給湯終了想定時刻設定部127として機能する。   The controller 120 is an electronic circuit unit composed of a CPU, a memory, and the like (not shown). The controller 120 executes a control program for the hot water supply system 1 stored in the memory by the CPU, so that the hot water supply control unit 121 and the filling control unit are provided. 122, a boiling water control unit 123, a hot water storage amount recognition unit 124, a hot water supply start time setting unit 125, a hot water filling start time setting unit 126, and a hot water supply end time setting unit 127 function.

コントローラ120は、通信ケーブル130によりリモコン140と接続されている。リモコン140は、給湯システム1の運転状況や運転条件の設定等を表示するための表示器141と、各種スイッチが設けられたスイッチ部142とを備えている。給湯システム1の使用者は、リモコン140のスイッチ部142を操作することによって、給湯口31からの給湯温度(目標給湯温度)の設定や、湯張り運転における浴槽105への給湯温度(目標湯張り温度)及び湯張り量(目標湯張り量)の設定等を行う。   The controller 120 is connected to the remote controller 140 via a communication cable 130. The remote controller 140 includes a display 141 for displaying the operating status of the hot water supply system 1, setting of operating conditions, and the like, and a switch unit 142 provided with various switches. The user of the hot water supply system 1 operates the switch section 142 of the remote control 140 to set the hot water supply temperature (target hot water supply temperature) from the hot water supply port 31 and to set the hot water supply temperature to the bathtub 105 in the hot water filling operation (target hot water filling). The temperature and the filling amount (target filling amount) are set.

給湯制御部121は、貯湯タンク11の湯切れが生じていない状態で、水側流量センサ23により下限流量以上の通水が検出されている場合には、混合温度センサ28又は給湯温度センサ32の検出温度が目標給湯温度となるように、給湯混合弁21の分配比を調節する混合温調制御を行う。このとき、給湯制御部121は、湯張り弁103が開弁して浴槽105への給湯が行われているときは出湯バイパス弁29を閉弁し、湯張り弁103が閉弁しているときには出湯バイパス弁29を開弁する。   The hot water supply control unit 121 detects the mixing temperature sensor 28 or the hot water supply temperature sensor 32 when the hot water storage tank 11 has not run out of hot water and the water-side flow sensor 23 detects the flow of water equal to or more than the lower limit flow rate. Mixing temperature control is performed to adjust the distribution ratio of hot water mixing valve 21 so that the detected temperature becomes the target hot water supply temperature. At this time, hot water supply control section 121 closes hot water bypass valve 29 when hot water filling valve 103 is opened and hot water supply to bathtub 105 is being performed, and when hot water filling valve 103 is closed. The hot water bypass valve 29 is opened.

また、給湯制御部121は、貯湯タンク11の湯切れが生じている状態で、水側流量センサ23により下限流量以上の通水が検出されている場合には、出湯バイパス弁29を閉弁する。そして、水量センサ88により下限流量以上の通水が検出されているときに、熱源出湯温度センサ92の検出温度が目標給湯温度となるように、給湯バーナ81の燃焼量を調節する加熱温調制御を実行する。給湯制御部121が、このように加熱温調制御を実行する構成は、本発明の補助熱源機制御部に相当する。   Hot water supply control unit 121 closes hot water supply bypass valve 29 when hot water storage tank 11 is running out of hot water and water flow rate equal to or higher than the lower limit flow rate is detected by water side flow sensor 23. . Heating temperature control for adjusting the combustion amount of the hot water supply burner 81 so that the detected temperature of the heat source hot water temperature sensor 92 becomes the target hot water supply temperature when the water flow sensor 88 detects the flow of water equal to or more than the lower limit flow rate. Execute The configuration in which the hot water supply control unit 121 executes the heating temperature adjustment control in this way corresponds to the auxiliary heat source device control unit of the present invention.

湯張り制御部122は、リモコン140のスイッチ部142により、湯張りを指示する操作(湯張り開始操作)がなされたとき、或は予め設定された予約時刻に浴槽105への湯張りが終了するように、湯張り弁103を開弁して出湯管13から湯張り管100を介して浴槽105に目標湯張り量分の湯を供給する湯張り運転を実行する。湯張り制御部122は、目標湯張り温度を目標給湯温度に設定して、湯張り運転を実行する。   The bath filling control unit 122 finishes filling the bath tub 105 when the operation of instructing the filling (the filling operation) is performed by the switch unit 142 of the remote control 140 or at a preset reservation time. Thus, the filling operation is performed in which the filling valve 103 is opened to supply the target filling amount of hot water from the tapping pipe 13 to the bathtub 105 via the filling pipe 100. The hot water controller 122 sets the target hot water temperature to the target hot water supply temperature and executes the hot water operation.

貯湯量認識部124は、タンク中温度センサ26及びタンク表面温度センサ14〜17の検出温度を監視することによって、貯湯タンク11に貯められた湯の量(貯湯量)を認識する。なお、貯湯タンク11の沸き上げが終了した状態(満蓄状態)での貯湯タンク11内の総湯量(=貯湯タンク11の容量)から、貯湯タンク11から出湯管13への湯の供給流量(湯側流量センサ27により検出される)の積算値を減算することによって、或は貯湯タンク11から出湯管への給湯時間から想定される給湯量を減算することによって貯湯量を認識する構成としてもよい。   The hot water storage amount recognition unit 124 recognizes the amount of hot water (hot water storage amount) stored in the hot water storage tank 11 by monitoring the detected temperatures of the in-tank temperature sensor 26 and the tank surface temperature sensors 14 to 17. From the total amount of hot water in hot water storage tank 11 (= capacity of hot water storage tank 11) in a state where boiling of hot water storage tank 11 has been completed (full storage state), the flow rate of hot water supplied from hot water storage tank 11 to hot water supply pipe 13 (= The hot water storage amount may be recognized by subtracting the integrated value of the hot water side flow sensor 27) or by subtracting the estimated hot water supply amount from the hot water supply time from the hot water storage tank 11 to the tapping pipe. Good.

沸き上げ制御部123は、貯湯量認識部124により認識される貯湯タンク11内の湯の残量が下限量以下になったときに、タンク循環ポンプ66とヒートポンプ51を作動させて、貯湯タンク11内の湯水を、設定された給湯温度に応じた例えば45℃まで加熱する沸き上げ運転を実行する。   The boiling controller 123 activates the tank circulation pump 66 and the heat pump 51 when the remaining amount of hot water in the hot water storage tank 11 recognized by the hot water storage amount recognition unit 124 becomes equal to or less than the lower limit, and the hot water storage tank 11 A boiling operation is performed in which the hot and cold water is heated to, for example, 45 ° C. in accordance with the set hot water supply temperature.

また、沸き上げ制御部123は、湯の使用が想定される時間帯に備えて貯湯タンク11内の貯湯量を確保するために、計画的な貯湯タンク11内の湯水の沸き上げを実行する。   In addition, boiling controller 123 executes planned boiling of hot water in hot water storage tank 11 in order to secure the amount of hot water stored in hot water storage tank 11 in preparation for a time slot in which hot water is expected to be used.

[2.計画的な貯湯タンク内の湯水の沸き上げ]
次に、図2〜図4に示したフローチャートに従って、貯湯タンク11内の湯水の計画的な沸き上げの実行について説明する。
[2. Planned boiling of hot water in hot water storage tank]
Next, according to the flowcharts shown in FIGS. 2 to 4, execution of the planned boiling of the hot water in the hot water storage tank 11 will be described.

図2を参照して、コントローラ120は、STEP1で現在時刻(図示しない計時回路により認識される)が日付更新タイミング(2時)になったか否かを判断する。そして、現在時刻が日付更新タイミングになったときにSTEP2に進む。   Referring to FIG. 2, controller 120 determines in STEP 1 whether the current time (recognized by a clock circuit (not shown)) has reached the date update timing (2 o'clock). When the current time reaches the date update timing, the process proceeds to STEP2.

STEP2は、給湯開始想定時刻設定部125、湯張り開始想定時刻設定部126、及び給湯終了想定時刻設定部127による処理である。コントローラ120は、過去の湯の使用状況のデータ(給湯状況データ)を1日(0時〜24時)単位で記憶しており、給湯開始想定時刻設定部125は、給湯状況データに基づいて、当日(これから計画的な沸き上げ運転を実行する日)における湯の使用が開始されると想定される時刻である、給湯開始想定時刻S1を設定する。   STEP 2 is a process performed by the estimated hot water supply start time setting unit 125, the estimated hot water filling start time setting unit 126, and the estimated hot water supply end time setting unit 127. The controller 120 stores past hot water usage status data (hot water supply status data) in units of one day (0:00 to 24:00), and the hot water supply start estimated time setting unit 125 performs the processing based on the hot water supply status data. An estimated hot water supply start time S1, which is a time at which the use of hot water is assumed to be started on the day (a day when the planned boiling operation is to be executed) is set.

同様に、湯張り開始想定時刻設定部126は、給湯状況データに基づいて、当日において湯張り運転が開始されると想定される時刻である、湯張り開始想定時刻B1を設定する。また、給湯終了想定時刻設定部127は、給湯状況データに基づいて、当日において湯の使用が終了すると想定される時刻である給湯終了想定時刻G1を設定する。   Similarly, the estimated filling time setting unit 126 sets the estimated filling start time B1, which is the time at which the filling operation is assumed to be started on the day, based on the hot water supply status data. Further, hot water supply end time setting section 127 sets hot water supply end time G1, which is a time at which use of hot water is assumed to end on the day, based on the hot water supply status data.

ここで、図5は、横軸を共通の時間軸として、上段に縦軸をヒートポンプ51の能力に設定して、1日(0時〜24時)の時間帯における沸き上げ運転の実行タイミングを示し、下段に縦軸を給湯流量(水量センサ88により検出される)に設定して、1日(0時〜24時)の時間帯における湯の使用量(給湯流量)を例示したものである。図5の例では、2時が日付の更新タイミングに設定され、給湯開始想定時刻S1が6時、湯張り開始想定時刻B1が20時、給湯終了想定時刻G1が24時に設定されている。   Here, in FIG. 5, the horizontal axis is a common time axis, the vertical axis is set to the capacity of the heat pump 51 in the upper part, and the execution timing of the boiling operation in the time zone of one day (0:00 to 24:00) is shown. In the lower part of the figure, the vertical axis is set to the hot water supply flow rate (detected by the water amount sensor 88), and the amount of hot water used (hot water supply flow rate) in the time zone of one day (0:00 to 24:00) is illustrated. . In the example of FIG. 5, 2:00 is set as the date update timing, hot water supply start time S1 is 6:00, hot water filling start time B1 is 20:00, and hot water supply end time G1 is 24:00.

図2のSTEP3〜STEP8は、沸き上げ制御部123による処理である。沸き上げ制御部123は、STEP3で、現在時刻が給湯開始想定時刻S1よりもα(本発明の第5所定時間に相当する)だけ前の時刻S0(図5参照)になるのを待ってSTEP4に進み、第1沸き上げ運転(本発明の第1沸き上げ運転及び第3沸き上げ運転に相当する)を実行して貯湯タンク11内の湯水を沸き上げる。   STEP3 to STEP8 in FIG. 2 are processing by the boiling control unit 123. Boiling control unit 123 waits in STEP 3 for the current time to reach time S0 (see FIG. 5) that is earlier by α (corresponding to the fifth predetermined time of the present invention) than hot water supply start estimated time S1 and then proceeds to STEP4. Then, the first boiling operation (corresponding to the first boiling operation and the third boiling operation of the present invention) is executed to boil the hot water in the hot water storage tank 11.

ここで、第1沸き上げ運転は、タンク循環ポンプ66を作動させると共に、ヒートポンプ51を第1能力A1(本発明の第1能力及び第3能力に相当する)で作動させることによって、貯湯タンク11内の湯水を加熱する。この場合、タンク循環ポンプ66による湯水の循環流量は、湯温度センサ69の検出温度が沸き上げ温度となるように調節される。また、αは給湯開始想定時刻S1に貯湯タンク11内の湯水の沸き上げが完了するように設定される。   Here, the first boiling operation is performed by operating the tank circulation pump 66 and operating the heat pump 51 at the first capacity A1 (corresponding to the first capacity and the third capacity of the present invention). Heat the hot water inside. In this case, the circulation flow rate of hot water by the tank circulation pump 66 is adjusted so that the temperature detected by the hot water temperature sensor 69 becomes the boiling temperature. Α is set such that boiling of hot water in hot water storage tank 11 is completed at hot water supply start estimated time S1.

なお、本実施形態では、STEP4で実行される給湯開始想定時刻S1に基づく沸き上げと、後述するSTEP6で実行される湯張り開始想定時刻B1に基づく沸き上げとを、共にヒートポンプ51の能力を第1能力A1とする第1沸き上げ運転により行っているが、ヒートポンプ51の能力を異ならせてもよい。   In the present embodiment, both the heating based on the estimated hot water supply start time S1 executed in STEP 4 and the heating based on the estimated hot water filling start time B1 executed in STEP 6, which will be described later, depend on the capacity of the heat pump 51. Although the first boiling operation is performed with one capacity A1, the capacity of the heat pump 51 may be changed.

この場合、給湯開始想定時刻S1に基づく沸き上げを行うときのヒートポンプ51の能力は本発明の第3能力に相当して、第3能力での沸き上げ運転は本発明の第3沸き上げ運転に相当する。また、湯張り開始想定時刻B1に基づく沸き上げを行うときのヒートポンプ51の能力は本発明の第1能力に相当して、第1能力による沸き上げ運転は本発明の第1沸き上げ運転に相当する。   In this case, the capacity of the heat pump 51 when performing the heating based on the estimated hot water supply start time S1 corresponds to the third capacity of the present invention, and the heating operation with the third capacity corresponds to the third heating operation of the present invention. Equivalent to. Further, the capacity of the heat pump 51 when performing boiling based on the estimated filling time B1 corresponds to the first capacity of the present invention, and the boiling operation based on the first capacity corresponds to the first boiling operation of the present invention. I do.

STEP4で第1沸き上げ運転による貯湯タンク11内の湯水の沸き上げが終了するとSTEP5に進む。そして、沸き上げ制御部123は、STEP5で現在時刻が湯張り開始想定時刻B1よりもβ(本発明の第1所定時間に相当する)だけ前の時刻B0(図5参照)になるのを待ってSTEP6に進み、第1沸き上げ運転を実行して貯湯タンク11内の湯水を沸き上げる。ここで、βは湯張り開始想定時刻B1に貯湯タンク11内の湯水の沸き上げが完了するように設定される。   When the boiling of the hot water in the hot water storage tank 11 by the first boiling operation is completed in STEP4, the process proceeds to STEP5. Then, the boiling control unit 123 waits in STEP5 for the current time to become the time B0 (see FIG. 5) that is β (corresponding to the first predetermined time of the present invention) earlier than the estimated hot water filling time B1. Then, the process proceeds to STEP6, where the first boiling operation is executed to boil the hot water in the hot water storage tank 11. Here, β is set so that the boiling of the hot water in the hot water storage tank 11 is completed at the estimated hot water filling time B1.

次のSTEP7で、現在時刻が給湯終了想定時刻G1よりもγ(本発明の第3所定時間に想定する)だけ前の時刻G0(沸き上げ運転終了時刻)になるのを待ってSTEP8に進み、沸き上げ制御部123は、翌日までヒートポンプ51を停止状態に維持する。   In the next STEP7, the process waits until the current time reaches a time G0 (boiling operation end time) that is γ (assumed in the third predetermined time of the present invention) earlier than the hot water supply end estimated time G1, and proceeds to STEP8. Boiling control unit 123 keeps heat pump 51 stopped until the next day.

図5に示した例では、6時頃(起床〜朝食の時間帯)、12時前後(昼食の時間帯)、20時頃(湯張り〜入浴の時間帯)、24時頃(就寝前の時間帯)に湯が使用されている。   In the example shown in FIG. 5, around 6:00 (wake up to breakfast), around 12:00 (lunch time), around 20:00 (hot water to bath time), around 24:00 (before going to bed) Hot water is used during the time period).

[3.湯張り運転に伴う貯湯タンク内の湯水の沸き上げ]
次に、図3に示したフローチャートに従って、湯張り運転に伴って沸き上げ制御部123により実行される貯湯タンク11内の湯水の沸き上げの処理について説明する。
[3. Boiling of hot water in hot water storage tank with hot water filling operation]
Next, a process of boiling hot water in the hot water storage tank 11 performed by the boiling control unit 123 in accordance with the hot water filling operation will be described with reference to the flowchart shown in FIG.

沸き上げ制御部123は、図3のSTEP10で、湯張り運転中であるか否かを判断する。そして、湯張り運転中であるときにSTEP11に進み、沸き上げ制御部123は、貯湯量認識部124により認識される貯湯タンク11内の貯湯量が第1貯湯量以下であるか否かを判断する。貯湯タンク11内の貯湯量が第1貯湯量以下であるときはSTEP12に進み、貯湯タンク11内の貯湯量が第1貯湯量よりも多いときにはSTEP10に戻る。   Boiling control unit 123 determines whether or not the filling operation is being performed in STEP 10 of FIG. Then, when the hot water filling operation is being performed, the process proceeds to STEP 11, and the boiling control unit 123 determines whether or not the hot water storage amount in the hot water storage tank 11 recognized by the hot water storage amount recognition unit 124 is equal to or less than the first hot water storage amount. I do. When the amount of hot water stored in the hot water storage tank 11 is equal to or less than the first hot water storage amount, the process proceeds to STEP 12, and when the amount of hot water stored in the hot water storage tank 11 is larger than the first hot water storage amount, the process returns to STEP 10.

ここで、第1貯湯量は、貯湯タンク11から出湯管13への湯の供給に応じて、貯湯タンク11の下部に給水管12が水が供給されて、ヒートポンプ51による沸き上げのエネルギー効率が所定レベル以上になる状況を想定して設定される。   Here, in accordance with the supply of hot water from hot water storage tank 11 to hot water supply pipe 13, water is supplied to water supply pipe 12 at a lower portion of hot water storage tank 11, and the energy efficiency of boiling by heat pump 51 is reduced. It is set assuming a situation where the level is equal to or higher than a predetermined level.

STEP12で、沸き上げ制御部123は、現在時刻が沸き上げ運転終了時刻G0よりもe(本発明の第4所定時間に相当する)以前であるか否かを判断する。そして、現在時刻が沸き上げ運転終了時刻G0よりもe以前であるときはSTEP13に進み、現在時刻が沸き上げ運転終了時刻G0よりもe以前でないときにはSTEP20に分岐する。   In STEP 12, the boiling control unit 123 determines whether the current time is before e (corresponding to the fourth predetermined time of the present invention) before the boiling operation end time G0. When the current time is earlier than the boiling operation end time G0 by e, the process proceeds to STEP13, and when the current time is not earlier than the boiling operation end time G0 by e, the process branches to STEP20.

STEP13で、沸き上げ制御部123は、タンク循環ポンプ66を作動させると共に、ヒートポンプ51を第2能力A2で作動させて、貯湯タンク11内の湯水を沸き上げる第2沸き上げ運転を実行する。ここで、第2能力A2は、第1能力A1よりもタンク循環路41を流通する湯水に付与する加熱量が多く、且つヒートポンプ51のエネルギー効率が低くなる。   In STEP13, the boiling control unit 123 operates the tank circulation pump 66 and operates the heat pump 51 at the second capacity A2 to execute the second boiling operation for boiling the hot water in the hot water storage tank 11. Here, the second capacity A2 has a larger heating amount applied to the hot and cold water flowing through the tank circulation path 41 than the first capacity A1, and the energy efficiency of the heat pump 51 is lower.

なお、ヒートポンプ51のエネルギー効率は、例えば成績係数COP(加熱量/消費電力)により表される。   The energy efficiency of the heat pump 51 is represented by, for example, a coefficient of performance COP (heating amount / power consumption).

このように、湯張り運転中に貯湯タンク11の湯切れが生じたときに、ヒートポンプ51を第1能力A1よりも加熱量が多い第2能力A2で作動させる第2沸き上げ運転を実行することによって、貯湯タンク11内の湯水の沸き上げ速度を速くして、補助熱源機80が作動する時間の短縮を図ることができる。そして、これにより、ヒートポンプ51よりもランニングコストが高い補助熱源機80の作動時間を短縮して、湯張り運転に要するランニングコストを低減することができる。   As described above, when the hot water storage tank 11 runs out of hot water during the filling operation, the second pumping operation of operating the heat pump 51 with the second capacity A2 having a larger heating amount than the first capacity A1 is performed. Thereby, the boiling speed of hot water in hot water storage tank 11 can be increased, and the time during which auxiliary heat source device 80 operates can be reduced. Thus, the operating time of the auxiliary heat source device 80, which has a higher running cost than the heat pump 51, can be shortened, and the running cost required for the filling operation can be reduced.

図5は、第1沸き上げ運転により貯湯タンク11内の湯水の沸き上げが完了した後に、湯張り運転が開始され、貯湯タンク11内の貯湯量が第1貯湯量以下になって第2沸き上げ運転が実行された場合を示している。図5の例では、貯湯タンク11内の湯水の沸き上げが完了するまで、ヒートポンプ51の能力を第2能力A2とした第2沸き上げ運転を継続している。   FIG. 5 shows that the filling operation is started after the boiling of the hot water in the hot water storage tank 11 is completed by the first boiling operation, and the amount of hot water stored in the hot water storage tank 11 becomes equal to or less than the first hot water storage amount and the second boiling operation is performed. This shows a case where a raising operation is performed. In the example of FIG. 5, the second boiling operation in which the capacity of the heat pump 51 is set to the second capacity A2 is continued until the boiling of the hot water in the hot water storage tank 11 is completed.

それに対して、図3のフローチャートでは、STEP13で第2沸き上げ運転を開始した後、沸き上げ制御部123は、STEP14でT1(本発明の第2所定時間に相当する)の経過を待ってSTEP15に進み、第2沸き上げ運転から第1沸き上げ運転に切り替えて貯湯タンク11内の湯水を沸き上げ、STEP16に進んで処理を終了する。   On the other hand, in the flowchart of FIG. 3, after starting the second boiling operation in STEP13, the boiling control unit 123 waits for the elapse of T1 (corresponding to the second predetermined time of the present invention) in STEP14, and then proceeds to STEP15. Then, the process is switched from the second heating operation to the first heating operation to heat the hot water in the hot water storage tank 11, and the process proceeds to STEP16 to end the process.

図6は、このように湯張り運転に伴う沸き上げを、最初のT1の期間(20時の直後〜t3)は第2沸き上げ運転を実行し、T1が経過した後は第1沸き上げ運転に切り替えて行う場合を示している。第2沸き上げ運転を、最初のT1の期間に限定して実行することによって、貯湯タンク11内の湯水の沸き上げを速やかに行うと共に、湯張りがある程度進み、或は湯張りが終了して貯湯タンク11内の湯水の沸き上げを速やかに行う必要がなくなった後は、ヒートポンプ51のエネルギー効率を上げて貯湯タンク11内の湯水の沸き上げに要するランニングコストの低減を図ることができる。   FIG. 6 shows the boiling operation accompanying the hot water filling operation, the second boiling operation during the first T1 period (immediately after 20:00 to t3), and the first boiling operation after the elapse of T1. Is performed by switching to. By performing the second boiling operation only during the first period of T1, the boiling water in the hot water storage tank 11 is quickly raised and the filling is advanced to some extent, or the filling is terminated. After the boiling of the hot water in the hot water storage tank 11 becomes unnecessary, the energy efficiency of the heat pump 51 can be increased to reduce the running cost required for boiling the hot water in the hot water storage tank 11.

また、STEP12からSTEP20に分岐した場合には、沸き上げ制御部123は、第1沸き上げ運転を実行して貯湯タンク内の湯水を沸き上げ、STEP16に進んで処理をする。この場合は、第2沸き上げ運転は実行されない。   When the process branches from STEP 12 to STEP 20, the boiling control unit 123 executes the first boiling operation to boil the hot water in the hot water storage tank, and proceeds to STEP 16 to perform processing. In this case, the second boiling operation is not performed.

図7は、このように湯張り運転に伴う沸き上げを、第1沸き上げ運転のみによって行った場合を示している。図7の例では、湯張り運転が開始された時刻t5が、沸き上げ運転終了時刻G0よりもe以前ではないので、ヒートポンプ51を第1能力A1で作動させる第1沸き上げ運転が短時間だけ実行され、沸き上げ運転終了時刻G0で第1沸き上げ運転が終了している。この場合は、ヒートポンプ51を作動させて沸き上げ運転を行う時間が短いため、湯張り運転により貯湯タンク11の湯切れが生じるタイミングが速くなり、補助熱源機80を作動させて湯張り運転を行う時間が長くなる。   FIG. 7 shows a case in which the boiling with the hot water filling operation is performed only by the first boiling operation. In the example of FIG. 7, since the time t5 at which the hot water filling operation is started is not before e before the boiling operation end time G0, the first boiling operation for operating the heat pump 51 at the first capacity A1 is only performed for a short time. The first boiling operation has been completed at the boiling operation end time G0. In this case, since the time for operating the heat pump 51 and performing the boiling operation is short, the timing at which the hot water storage tank 11 runs out of hot water due to the hot water filling operation is accelerated, and the hot water filling operation is performed by operating the auxiliary heat source device 80. The time gets longer.

このように、補助熱源機80を作動させて湯張り運転を行う時間が長くなる場合に、第2沸き上げ運転を短時間実行しても、ヒートポンプ51の加熱量アップにより得られる効果は低い。そこで、第1沸き上げ運転を行うことで、給湯のトータルのランニングコストの低減を図ることができる。   As described above, when the time for performing the filling operation by operating the auxiliary heat source device 80 is long, even if the second boiling operation is performed for a short time, the effect obtained by increasing the heating amount of the heat pump 51 is low. Therefore, by performing the first boiling operation, the total running cost of hot water supply can be reduced.

[4.給湯開始想定時刻に基づく貯湯タンク内の湯水の沸き上げ]
次に、図4に示したフローチャートに従って、沸き上げ制御部123により実行される給湯開始想定時刻S1に基づく貯湯タンク11内の湯水の沸き上げの処理について説明する。
[4. Boiling of hot water in hot water storage tank based on estimated hot water supply start time]
Next, the process of boiling hot water in hot water storage tank 11 based on estimated hot water supply start time S1 executed by boiling control unit 123 will be described with reference to the flowchart shown in FIG.

図4のSTEP30で、沸き上げ制御部123は、給湯開始想定時刻S1に基づく第1沸き上げ運転の実行中であるか否かを判断し、第1沸き上げ運転の実行中であるときはSTEP31に進む。STEP31で、沸き上げ制御部123は、水量センサ88の検出流量Fmが下限流量以上であるか否か(貯湯タンク11から出湯管13への湯水の流通が検出されているか否か)を判断し、検出流量Fmが下限流量以上であるときはSTEP32に進み、検出流量Fmが下限流量未満であるときにはSTEP30に戻る。   In STEP 30 of FIG. 4, boiling control section 123 determines whether or not the first boiling operation is being performed based on hot water supply start estimated time S <b> 1, and when the first boiling operation is being performed, STEP 31. Proceed to. In STEP 31, the boiling control unit 123 determines whether or not the detected flow rate Fm of the water amount sensor 88 is equal to or more than the lower limit flow rate (whether or not the flow of hot water from the hot water storage tank 11 to the hot water pipe 13 is detected). If the detected flow rate Fm is equal to or greater than the lower limit flow rate, the process proceeds to STEP 32, and if the detected flow rate Fm is less than the lower limit flow rate, the process returns to STEP 30.

STEP32で、沸き上げ制御部123は、第1沸き上げ運転を開始した時刻S0から、d(本発明の第7所定時間に相当する)以上経過しているか否かを判断する。そして、第1沸き上げ運転を開始した時刻S0からd以上経過しておらず、貯湯タンク11内の湯水の沸き上げがあまり進んでいないと判断できるときはSTEP33に進み、第2沸き上げ運転に切り替える。   In STEP32, the boiling control unit 123 determines whether or not d (corresponding to the seventh predetermined time of the present invention) has elapsed from the time S0 when the first boiling operation was started. If the time d has not elapsed since the time S0 when the first boiling operation was started, and it can be determined that the boiling of the hot water in the hot water storage tank 11 has not progressed so much, the process proceeds to STEP 33, and the process proceeds to the second boiling operation. Switch.

続くSTEP34でT2(本発明の第6所定時間に相当する)が経過するのを待ってSTEP35に進み、沸き上げ制御部123は、第2沸き上げ運転から第1沸き上げ運転に戻して貯湯タンク11内の湯水の沸き上げを完了させ、STEP36に進んで処理を終了する。   In step 34, the process waits until T2 (corresponding to the sixth predetermined time of the present invention) elapses, and proceeds to step 35, in which the boiling control unit 123 returns from the second boiling operation to the first boiling operation and returns to the hot water storage tank. The boiling of the hot water in 11 is completed, and the process proceeds to STEP 36 to end the process.

図6は、このように、S0でヒートポンプ51を第1能力A1で作動させる第1沸き上げ運転が開始された後、S0からdが経過する前のt1で湯の使用が開始された場合を例示している。図6では、t1でヒートポンプ51を第2能力A2で作動させる第2沸き上げ運転に切り替えられ、t1からT2が経過したt2で第1沸き上げ運転に戻されている。   FIG. 6 illustrates a case where the use of hot water is started at t1 before the lapse of d from S0 after the first boiling operation in which the heat pump 51 is operated at the first capacity A1 is started at S0. It is illustrated. In FIG. 6, the operation is switched to the second heating operation in which the heat pump 51 is operated at the second capacity A2 at t1, and the operation is returned to the first heating operation at t2 when T2 has elapsed from t1.

このように、S0で第1沸き上げ運転を開始した後、貯湯タンク11内の湯水の沸き上げが完了する前に湯の使用が開始されたときに、第2沸き上げ運転に切り替えることによって、貯湯タンク11内の湯水を速やかに加熱することによって、補助熱源機80が作動することを抑制して、給湯のランニングコストの低減を図ることができる。   As described above, by switching to the second boiling operation when the use of hot water is started before the boiling of the hot water in the hot water storage tank 11 is completed after the first boiling operation is started in S0, By quickly heating the hot water in the hot water storage tank 11, the operation of the auxiliary heat source device 80 is suppressed, and the running cost of hot water supply can be reduced.

また、貯湯タンク11内の湯水の沸き上げがある程度進んだt2で、第2沸き上げ運転から第1沸き上げ運転に戻すことにより、ヒートポンプ51のエネルギー効率を上げて、貯湯タンク11内の湯水の沸き上げのランニングコストの低減を図ることができる。   Further, at time t2 when the boiling of the hot water in the hot water storage tank 11 has advanced to some extent, the energy efficiency of the heat pump 51 is increased by returning from the second boiling operation to the first boiling operation, and the hot water in the hot water storage tank 11 is increased. The running cost of boiling can be reduced.

一方、STEP32で、第1沸き上げ運転を開始した時刻S0からd以上経過しているときにはSTEP40に分岐し、沸き上げ制御部123は、第1沸き上げ運転を継続して貯湯タンク11内の湯水を沸き上げを完了させ、STEP36に進んで処理を終了する。   On the other hand, in STEP 32, when d or more has elapsed from the time S0 at which the first boiling operation was started, the process branches to STEP 40, and the boiling control unit 123 continues the first boiling operation to keep the water in the hot water storage tank 11 hot. Is completed, and the process proceeds to STEP 36 to end the process.

図7は、このように、S0でヒートポンプ51を第1能力A1で作動させる第1沸き上げ運転が開始された後、S0からd以上経過したt4で湯の使用が開始された場合を例示している。図7では、t4で湯の使用が開始されても第2沸き上げ運転に切り替わらず、第1沸き上げ運転が継続して実行されている。   FIG. 7 illustrates a case where the use of hot water is started at t4 after d or more has elapsed from S0 after the first boiling operation in which the heat pump 51 is operated at the first capacity A1 is started at S0. ing. In FIG. 7, even if the use of hot water is started at t4, the first boiling operation is continuously performed without switching to the second boiling operation.

このように、S0で第1沸き上げ運転を開始した後、d以上経過して貯湯タンク11内の湯水の沸き上げがある程度進んだ状態で、湯の使用が開始されたときには、既に沸き上げられた貯湯タンク11の湯で給湯に対応することが可能であると想定される。そこで、この場合は、第2沸き上げ運転への切り替えを行わずに、第1沸き上げ運転を継続することによって、第2沸き上げ運転への切り替えに伴うヒートポンプ51のエネルギー効率の低下を回避して、給湯のランニングコストを低減することができる。   As described above, after the first boiling operation is started in S0, when the use of the hot water in the hot water storage tank 11 is advanced to a certain extent after the elapse of d or more and the use of the hot water is started, the water is already heated. It is assumed that the hot water in the hot water storage tank 11 can support hot water supply. Therefore, in this case, by lowering the energy efficiency of the heat pump 51 due to the switching to the second boiling operation, the first boiling operation is continued without switching to the second boiling operation. Thus, the running cost of hot water supply can be reduced.

なお、本実施形態では、図3のSTEP12〜STEP13における湯張り運転中の沸き上げと、図4のSTEP32〜STEP33における給湯開始想定時刻S1に基づく沸き上げ中に湯の使用が開始された場合の沸き上げとを、共にヒートポンプ51の能力を第2能力A2とする第2沸き上げ運転により行っているが、ヒートポンプ51の能力を異ならせてもよい。   Note that, in the present embodiment, the case where the use of hot water is started during boiling in the hot water filling operation in STEP12 to STEP13 in FIG. 3 and during the heating based on the estimated hot water supply start time S1 in STEP32 to STEP33 in FIG. The heating is performed by the second heating operation in which the capacity of the heat pump 51 is set to the second capacity A2, but the capacity of the heat pump 51 may be changed.

この場合、図3のSTEP12〜STEP13により沸き上げを行うときのヒートポンプ51の能力は本発明の第2能力に相当して、第2能力での沸き上げ運転は本発明の第2沸き上げ運転に相当する。また、図4のSTEP32〜STEP33により沸き上げを行うときのヒートポンプ51の能力は本発明の第4能力に相当し、第4能力による沸き上げ運転は本発明の第4沸き上げ運転に相当する。   In this case, the capacity of the heat pump 51 when performing the boiling according to STEP12 to STEP13 of FIG. 3 corresponds to the second capacity of the present invention, and the boiling operation with the second capacity is the same as the second boiling operation of the present invention. Equivalent to. Further, the capacity of the heat pump 51 when performing the boiling according to STEP32 to STEP33 in FIG. 4 corresponds to the fourth capacity of the present invention, and the boiling operation based on the fourth capacity corresponds to the fourth boiling operation of the present invention.

[5.他の実施形態]
上記実施形態では、図4のSTEP32で、第1沸き上げ運転の開始時刻S0からdが経過する前に湯の使用が開始されたときに、第2沸き上げ運転に切り替えるようにしたが、貯湯量認識部124により認識される貯湯タンク11内の貯湯量が第3貯湯量以上になる前に湯の使用が開始されたときに、第2沸き上げ運転に切り替えるようにしてもよい。
[5. Other Embodiments]
In the above embodiment, when the use of hot water is started before d has elapsed from the start time S0 of the first boiling operation in STEP32 of FIG. 4, the operation is switched to the second boiling operation. When the use of hot water is started before the amount of hot water in the hot water storage tank 11 recognized by the amount recognizing unit 124 becomes equal to or more than the third hot water storage amount, the operation may be switched to the second boiling operation.

また、上記実施形態では、図4のSTEP34で、第2沸き上げ運転の実行時間がT2以上になった時点で、第1沸き上げ運転に戻すようにしたが、貯湯量認識部124により認識される貯湯タンク11内の貯湯量が第2貯湯量以上になった時点で、第1沸き上げ運転に戻すようにしてもよい。   Further, in the above embodiment, in STEP 34 of FIG. 4, when the execution time of the second boiling operation is equal to or longer than T2, the operation is returned to the first boiling operation. When the hot water storage amount in the hot water storage tank 11 becomes equal to or more than the second hot water storage amount, the operation may be returned to the first boiling operation.

また、上記実施形態では、本発明の補助熱源機として燃料ガスを燃焼させる給湯バーナ81を加熱源とする補助熱源機80を示したが、石油バーナ、電気ヒータ等を加熱源とする瞬間加熱式の補助熱源機を用いてもよい。   Further, in the above-described embodiment, the auxiliary heat source device 80 using the hot water supply burner 81 for burning fuel gas as a heating source as the auxiliary heat source device of the present invention is described, but an instantaneous heating type using a petroleum burner, an electric heater or the like as a heating source is described. May be used.

また、上記実施形態では、本発明のヒートポンプとしてヒートポンプユニット50を示したが、この構成に限らず、タンク循環路を流通する水を加熱するヒートポンプユニットであって、可変能力式のヒートポンプユニットであれば、本発明の適用が可能である。   Further, in the above-described embodiment, the heat pump unit 50 is shown as the heat pump of the present invention. However, the heat pump unit is not limited to this configuration. For example, the present invention can be applied.

1…給湯システム、10…貯湯ユニット、11…貯湯タンク、12…給水管、13…出湯管、41…タンク循環路、50…ヒートポンプユニット、51…ヒートポンプ、66…タンク循環ポンプ、80…補助熱源機、88…水量センサ、100…湯張り管、103…湯張り弁、105…浴槽、120…コントローラ、121…給湯制御部、122…湯張り制御部、123…沸き上げ制御部、124…貯湯量認識部、125…給湯開始想定時刻設定部、126…湯張り開始想定時刻設定部、127…給湯終了想定時刻設定部。   DESCRIPTION OF SYMBOLS 1 ... Hot water supply system, 10 ... Hot water storage unit, 11 ... Hot water storage tank, 12 ... Water supply pipe, 13 ... Hot water supply pipe, 41 ... Tank circulation path, 50 ... Heat pump unit, 51 ... Heat pump, 66 ... Tank circulation pump, 80 ... Auxiliary heat source Machine 88 water sensor, 100 hot water pipe, 103 hot water filling valve, 105 bathtub, 120 controller, 121 hot water supply control section, 122 hot water control section, 123 hot water control section, 124 hot water storage Amount recognizing unit, 125: hot water supply start time setting unit, 126: hot water filling start time setting unit, 127: hot water supply end time setting unit.

Claims (7)

下部に給水管が接続されると共に上部に出湯管が接続され、前記給水管から供給される水が貯められる貯湯タンクと、
前記貯湯タンクの下部と上部を接続したタンク循環路と、
前記貯湯タンクの下部に貯まった湯水を、前記タンク循環路を介して前記貯湯タンクの上部に循環させるタンク循環ポンプと、
前記タンク循環路を流通する湯水を加熱するヒートポンプと、
前記貯湯タンク内の貯湯量を認識する貯湯量認識部と、
前記貯湯タンクから前記出湯管への湯水の流通を検出する水量センサと、
前記出湯管から供給される湯水の温度を検出する出湯温度センサと、
前記出湯管を流通する湯水を加熱する瞬間加熱式の補助熱源機と、
前記補助熱源機による加熱箇所よりも下流側で前記出湯管から分岐して浴槽に連通した湯張り管と、
前記湯張り管を開閉する湯張り弁と、
使用者による湯張り開始操作に応じて、前記湯張り弁を開弁して前記貯湯タンク内の湯水を前記湯張り管を介して前記浴槽に供給する湯張り運転を実行する湯張り制御部と、
前記水量センサにより前記貯湯タンクから前記出湯管への湯水の流通が検出され、且つ、前記出湯温度センサの検出温度が所定の目標給湯温度よりも低いときに、前記補助熱源機を作動させる補助熱源機制御部と、
当日の前記湯張り運転が開始される想定時刻である湯張り開始想定時刻を設定する湯張り開始想定時刻設定部と、
前記湯張り開始想定時刻よりも第1所定時間前に、前記タンク循環ポンプを作動させると共に前記ヒートポンプを第1能力で作動させて、前記貯湯タンク内の湯水を加熱する第1沸き上げ運転を開始し、前記湯張り制御部による前記湯張り運転の実行中に、前記貯湯量認識部により認識される前記貯湯タンクの貯湯量が第1貯湯量以下になったときには、前記タンク循環ポンプを作動させると共に、前記ヒートポンプを前記第1能力よりも前記タンク循環路を流通する湯水に対する加熱量が多く且つエネルギー効率が低い第2能力で作動させて、前記貯湯タンク内の湯水を加熱する第2沸き上げ運転を実行する沸き上げ制御部と
を備え
前記沸き上げ制御部は、前記湯張り制御部による前記湯張り運転の実行中に、前記貯湯量認識部により認識される前記貯湯タンク内の貯湯量が前記第1貯湯量以下になったときに、前記第2沸き上げ運転を第2所定時間実行し、その後は前記第1沸き上げ運転に切り替えることを特徴とする給湯システム。
A hot water storage tank in which a water supply pipe is connected to a lower part and a tapping pipe is connected to an upper part, and water supplied from the water supply pipe is stored,
A tank circulation path connecting the lower part and the upper part of the hot water storage tank,
A tank circulation pump that circulates hot water stored in a lower portion of the hot water storage tank to an upper portion of the hot water storage tank through the tank circulation path,
A heat pump that heats hot water flowing through the tank circulation path,
A hot water storage amount recognition unit that recognizes the amount of hot water stored in the hot water storage tank,
A water amount sensor that detects the flow of hot water from the hot water storage tank to the tapping pipe;
A tapping temperature sensor for detecting the temperature of tap water supplied from the tapping pipe,
An instantaneous heating type auxiliary heat source device for heating hot water flowing through the tapping pipe,
A filling pipe branched from the tapping pipe downstream of the heating point by the auxiliary heat source unit and communicated with the bathtub,
A filling valve for opening and closing the filling pipe,
A filling control unit that executes a filling operation in which the filling valve is opened and the hot water in the hot water storage tank is supplied to the bathtub through the filling tube in response to a filling operation by a user. ,
An auxiliary heat source that activates the auxiliary heat source device when a flow of hot water from the hot water storage tank to the hot water pipe is detected by the water amount sensor and the detected temperature of the hot water temperature sensor is lower than a predetermined target hot water supply temperature; Machine control unit,
A hot water filling start time setting unit that sets a hot water filling start time that is an assumed time at which the hot water operation is started on the day,
A first boiling operation for heating the hot water in the hot water storage tank by operating the tank circulation pump and operating the heat pump at a first capacity before a first predetermined time before the estimated hot water filling time. Then, when the hot water storage amount recognized by the hot water storage amount recognition unit becomes less than or equal to the first hot water storage amount during the execution of the hot water filling operation by the hot water filling control unit, the tank circulation pump is operated. In addition, the heat pump is operated with a second capacity having a higher heating amount for the hot water flowing through the tank circulation path than the first capacity and a lower energy efficiency to heat the hot water in the hot water storage tank. A boiling control unit for executing the operation ,
The boiling control unit, when the hot water storage operation is being performed by the hot water control unit, when the hot water storage amount in the hot water storage tank recognized by the hot water storage amount recognition unit becomes equal to or less than the first hot water storage amount. Hot water supply system , wherein the second heating operation is performed for a second predetermined time, and thereafter, the operation is switched to the first heating operation.
下部に給水管が接続されると共に上部に出湯管が接続され、前記給水管から供給される水が貯められる貯湯タンクと、A hot water storage tank in which a water supply pipe is connected to a lower part and a tapping pipe is connected to an upper part, and water supplied from the water supply pipe is stored,
前記貯湯タンクの下部と上部を接続したタンク循環路と、A tank circulation path connecting the lower part and the upper part of the hot water storage tank,
前記貯湯タンクの下部に貯まった湯水を、前記タンク循環路を介して前記貯湯タンクの上部に循環させるタンク循環ポンプと、A tank circulation pump that circulates hot water stored in a lower portion of the hot water storage tank to an upper portion of the hot water storage tank through the tank circulation path,
前記タンク循環路を流通する湯水を加熱するヒートポンプと、A heat pump that heats hot water flowing through the tank circulation path,
前記貯湯タンク内の貯湯量を認識する貯湯量認識部と、A hot water storage amount recognition unit that recognizes the amount of hot water stored in the hot water storage tank,
前記貯湯タンクから前記出湯管への湯水の流通を検出する水量センサと、A water amount sensor that detects the flow of hot water from the hot water storage tank to the tapping pipe;
前記出湯管から供給される湯水の温度を検出する出湯温度センサと、A tapping temperature sensor for detecting the temperature of tap water supplied from the tapping pipe,
前記出湯管を流通する湯水を加熱する瞬間加熱式の補助熱源機と、An instantaneous heating type auxiliary heat source device for heating hot water flowing through the tapping pipe,
前記補助熱源機による加熱箇所よりも下流側で前記出湯管から分岐して浴槽に連通した湯張り管と、A filling pipe branched from the tapping pipe downstream of the heating point by the auxiliary heat source unit and communicated with the bathtub,
前記湯張り管を開閉する湯張り弁と、A filling valve for opening and closing the filling pipe,
使用者による湯張り開始操作に応じて、前記湯張り弁を開弁して前記貯湯タンク内の湯水を前記湯張り管を介して前記浴槽に供給する湯張り運転を実行する湯張り制御部と、A filling control unit that executes a filling operation in which the filling valve is opened and the hot water in the hot water storage tank is supplied to the bathtub through the filling tube in response to a filling operation by a user. ,
前記水量センサにより前記貯湯タンクから前記出湯管への湯水の流通が検出され、且つ、前記出湯温度センサの検出温度が所定の目標給湯温度よりも低いときに、前記補助熱源機を作動させる補助熱源機制御部と、An auxiliary heat source that activates the auxiliary heat source device when a flow of hot water from the hot water storage tank to the hot water pipe is detected by the water amount sensor and the detected temperature of the hot water temperature sensor is lower than a predetermined target hot water supply temperature; Machine control unit,
当日の前記湯張り運転が開始される想定時刻である湯張り開始想定時刻を設定する湯張り開始想定時刻設定部と、A hot water filling start time setting unit that sets a hot water filling start time that is an assumed time at which the hot water operation is started on the day;
前記湯張り開始想定時刻よりも第1所定時間前に、前記タンク循環ポンプを作動させると共に前記ヒートポンプを第1能力で作動させて、前記貯湯タンク内の湯水を加熱する第1沸き上げ運転を開始し、前記湯張り制御部による前記湯張り運転の実行中に、前記貯湯量認識部により認識される前記貯湯タンクの貯湯量が第1貯湯量以下になったときには、前記タンク循環ポンプを作動させると共に、前記ヒートポンプを前記第1能力よりも前記タンク循環路を流通する湯水に対する加熱量が多く且つエネルギー効率が低い第2能力で作動させて、前記貯湯タンク内の湯水を加熱する第2沸き上げ運転を実行する沸き上げ制御部と、A first boiling operation for heating the hot water in the hot water storage tank by operating the tank circulation pump and operating the heat pump at a first capacity before a first predetermined time before the estimated hot water filling time. Then, when the hot water storage amount recognized by the hot water storage amount recognition unit becomes less than or equal to the first hot water storage amount during the execution of the hot water filling operation by the hot water filling control unit, the tank circulation pump is operated. In addition, the second pump that heats the hot water in the hot water storage tank by operating the heat pump with the second power having a larger heating amount for the hot water flowing through the tank circulation path than the first capacity and having a lower energy efficiency. A boiling control unit for performing operation,
当日の湯の使用が終了する想定時刻である給湯終了想定時刻を設定する給湯終了想定時刻設定部とA hot water supply end time setting unit that sets a hot water supply end time that is an assumed time at which the use of hot water on the day ends.
を備え、With
前記沸き上げ制御部は、前記給湯終了想定時刻よりも第3所定時間前の沸き上げ運転終了時刻以降は、翌日まで前記ヒートポンプを停止し、前記湯張り制御部による前記湯張り運転が前記沸き上げ運転終了時刻よりも第4所定時間前の時刻以前に開始されたときに限定して、前記第2沸き上げ運転を実行し、前記湯張り制御部による前記湯張り運転が前記沸き上げ運転終了時刻よりも前記第4所定時間前の時刻後に開始されたときには、前記第1沸き上げ運転のみを実行することを特徴とする給湯システム。The boiling control unit stops the heat pump until the next day after the boiling operation end time that is the third predetermined time before the hot water supply end estimated time, and the hot water operation by the hot water control unit starts the boiling operation. The second boiling operation is performed only when started before a time that is a fourth predetermined time before the operation end time, and the filling operation by the filling controller is performed at the boiling operation end time. The hot water supply system according to claim 1, wherein when started after a time earlier than the fourth predetermined time, only the first boiling operation is performed.
請求項1又は2に記載の給湯システムにおいて、
当日の湯の使用が開始される想定時刻である給湯開始想定時刻を設定する給湯開始想定時刻設定部を備え、
前記沸き上げ制御部は、前記給湯開始想定時刻よりも第5所定時間前に、前記タンク循環ポンプを作動させると共に、前記ヒートポンプを第3能力で作動させて、前記貯湯タンク内の湯水を加熱する第3沸き上げ運転を開始し、該第3沸き上げ運転の実行中に、前記水量センサにより前記貯湯タンクから前記出湯管への湯水の流通が検出されたときには、前記タンク循環ポンプを作動させると共に、前記ヒートポンプを前記第3能力よりも前記タンク循環路を流通する湯水に対する加熱量が多い第4能力で作動させて、前記貯湯タンク内の湯水を加熱する第4沸き上げ運転に切り替えることを特徴とする給湯システム。
In the hot water supply system according to claim 1 or 2 ,
A hot water supply start time setting unit that sets a hot water start start time that is an assumed time at which use of hot water is started on the day,
The boiling control unit heats the hot water in the hot water storage tank by operating the tank circulation pump and operating the heat pump at a third capacity before a fifth predetermined time before the hot water supply start estimated time. A third boiling operation is started, and when the flow of hot water from the hot water storage tank to the tapping pipe is detected by the water amount sensor during the execution of the third boiling operation, the tank circulation pump is operated. Operating the heat pump with a fourth capacity in which the amount of heating of the hot water flowing through the tank circulation path is larger than the third capacity, and switching to a fourth boiling operation for heating the hot water in the hot water storage tank. And hot water supply system.
請求項3に記載の給湯システムにおいて、
前記沸き上げ制御部は、前記第3沸き上げ運転の実行中に前記水量センサにより前記貯湯タンクから前記出湯管への湯水の流通が検出されて、前記第4沸き上げ運転に切り替えた後、前記貯湯量認識部により認識される前記貯湯タンク内の貯湯量が第2貯湯量以上になった時点で、前記第3沸き上げ運転に戻すことを特徴とする給湯システム。
The hot water supply system according to claim 3 ,
The boiling control unit detects the flow of hot water from the hot water storage tank to the tapping pipe by the water amount sensor during execution of the third boiling operation, and switches to the fourth boiling operation. A hot water supply system comprising: returning to the third boiling operation when the hot water storage amount in the hot water storage tank recognized by the hot water storage amount recognition unit becomes equal to or greater than a second hot water storage amount.
請求項3に記載の給湯システムにおいて、
前記沸き上げ制御部は、前記第3沸き上げ運転の実行中に前記水量センサにより前記貯湯タンクから前記出湯管への湯水の流通が検出されて、前記第4沸き上げ運転に切り替えた後、第6所定時間が経過した時点で、前記第3沸き上げ運転に戻すことを特徴とする給湯システム。
The hot water supply system according to claim 3 ,
The boiling control unit detects the flow of hot water from the hot water storage tank to the tapping pipe by the water amount sensor during the execution of the third boiling operation, and switches to the fourth boiling operation. (6) The hot water supply system, wherein the operation returns to the third boiling operation when a predetermined time has elapsed.
請求項から請求項のうちいずれか1項に記載の給湯システムにおいて、
前記沸き上げ制御部は、前記第3沸き上げ運転の実行中であって、前記第3沸き上げ運転の開始から第7所定時間以内に、前記水量センサにより前記貯湯タンクから前記出湯管への湯水の流通が検出されたときに限定して、前記第4沸き上げ運転への切り替えを行い、前記第3沸き上げ運転の開始から前記第7所定時間が経過した後に、前記水量センサにより前記貯湯タンクから前記出湯管への湯水の流通が検出されたときには、前記第4沸き上げ運転への切り替えを行わずに、前記第3沸き上げ運転を継続することを特徴とする給湯システム。
In the hot water supply system according to any one of claims 3 to 5 ,
The boiling control unit is performing the third boiling operation, and within a seventh predetermined time from the start of the third boiling operation, using the water amount sensor to supply the hot water from the hot water storage tank to the hot water pipe. Switching to the fourth boiling operation is performed only when the flow of water is detected, and after the seventh predetermined time has elapsed from the start of the third boiling operation, the hot water storage tank is detected by the water amount sensor. And when the flow of hot water to the hot water supply pipe is detected, the third heating operation is continued without switching to the fourth heating operation.
請求項から請求項のうちいずれか1項に記載の給湯システムにおいて、
前記沸き上げ制御部は、前記第3沸き上げ運転の実行中であって、前記貯湯量認識部により認識される前記貯湯タンク内の貯湯量が第3貯湯量以下である状態で、前記水量センサにより前記貯湯タンクから前記出湯管への湯水の流通が検出されたときに限定して、前記第4沸き上げ運転への切り替えを行い、前記貯湯量認識部により認識される前記貯湯タンク内の貯湯量が前記第3貯湯量よりも多い状態で、前記水量センサにより前記貯湯タンクから前記出湯管への湯水の流通が検出されたときには、前記第4沸き上げ運転への切り替えを行わずに、前記第3沸き上げ運転を継続することを特徴とする給湯システム。
In the hot water supply system according to any one of claims 3 to 5 ,
The boiling control unit may be configured to execute the third boiling operation, wherein the hot water storage amount in the hot water storage tank recognized by the hot water storage amount recognition unit is equal to or less than the third hot water storage amount. Only when the flow of hot water from the hot water storage tank to the hot water supply pipe is detected is switched to the fourth boiling operation, and the hot water storage in the hot water storage tank recognized by the hot water storage amount recognition unit is performed. When the flow rate of the hot water from the hot water storage tank to the tapping pipe is detected by the water amount sensor in a state where the amount is larger than the third hot water storage amount, the switch to the fourth boiling operation is not performed, A hot water supply system wherein the third boiling operation is continued.
JP2016042038A 2016-03-04 2016-03-04 Hot water supply system Active JP6628642B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2016042038A JP6628642B2 (en) 2016-03-04 2016-03-04 Hot water supply system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2016042038A JP6628642B2 (en) 2016-03-04 2016-03-04 Hot water supply system

Publications (2)

Publication Number Publication Date
JP2017156062A JP2017156062A (en) 2017-09-07
JP6628642B2 true JP6628642B2 (en) 2020-01-15

Family

ID=59809525

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2016042038A Active JP6628642B2 (en) 2016-03-04 2016-03-04 Hot water supply system

Country Status (1)

Country Link
JP (1) JP6628642B2 (en)

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006084120A (en) * 2004-09-16 2006-03-30 Matsushita Electric Ind Co Ltd Hot water storage water heater
JP5026191B2 (en) * 2007-08-17 2012-09-12 株式会社コロナ Heat pump water heater
JP2011163659A (en) * 2010-02-09 2011-08-25 Sharp Corp Hot water supply system
JP5882119B2 (en) * 2012-04-19 2016-03-09 リンナイ株式会社 Hot water storage water heater
JP5899037B2 (en) * 2012-04-20 2016-04-06 リンナイ株式会社 Hot water system

Also Published As

Publication number Publication date
JP2017156062A (en) 2017-09-07

Similar Documents

Publication Publication Date Title
JP4893070B2 (en) Return hot water recovery method and hot water supply system
KR101467088B1 (en) Storage type hot water supply device
JP5712197B2 (en) Heat pump heat source system
JP6017837B2 (en) Hot water storage hot water supply system
KR101436241B1 (en) Heat pump heat source system
JP6628643B2 (en) Hot water supply system
JP5866226B2 (en) Water heater
JP5925035B2 (en) Heat pump heat source system
JP2018004128A (en) Hot water supply system
JP6628642B2 (en) Hot water supply system
JP6682002B2 (en) Hot water storage type water heater, hot water supply method and program
KR20150092159A (en) Heat pump heat supply system
JP2009204249A (en) Water heater
JP5979042B2 (en) Water heater
JP6625813B2 (en) Hot water storage system
JP5638480B2 (en) Heat source equipment
JP2009186070A (en) Storage type hot-water supply device
JP6004715B2 (en) Heat pump heat source system
JP5833062B2 (en) Hot water system
JP2013036709A (en) Water heating apparatus
JP2013032892A (en) Hot water supply apparatus
JP2006138513A (en) Heat pump type hot water supply heating device
JP6500802B2 (en) Hot water storage type water heater
JP5919492B2 (en) Water heater
JP4670862B2 (en) Hot water system

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20181121

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20190822

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20190903

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20191024

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20191112

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20191203

R150 Certificate of patent or registration of utility model

Ref document number: 6628642

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250