JP6607533B2 - Work method for building exterior - Google Patents

Work method for building exterior Download PDF

Info

Publication number
JP6607533B2
JP6607533B2 JP2018152159A JP2018152159A JP6607533B2 JP 6607533 B2 JP6607533 B2 JP 6607533B2 JP 2018152159 A JP2018152159 A JP 2018152159A JP 2018152159 A JP2018152159 A JP 2018152159A JP 6607533 B2 JP6607533 B2 JP 6607533B2
Authority
JP
Japan
Prior art keywords
rope
hanging
inlet
building
pulley
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2018152159A
Other languages
Japanese (ja)
Other versions
JP2019190263A (en
Inventor
健二 小倉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
KENTECH SYSTEMS LIMITED
Original Assignee
KENTECH SYSTEMS LIMITED
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by KENTECH SYSTEMS LIMITED filed Critical KENTECH SYSTEMS LIMITED
Publication of JP2019190263A publication Critical patent/JP2019190263A/en
Application granted granted Critical
Publication of JP6607533B2 publication Critical patent/JP6607533B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Description

本発明は建物外面に対する作業方法に係り、とくにマンション、ビル等の建築物の新築・改修・点検・清掃等に好適な建物外面に対する作業方法に関する。   The present invention relates to a working method for a building outer surface, and more particularly, to a working method for a building outer surface suitable for new construction, repair, inspection, cleaning, and the like of a building such as a condominium and a building.

従来から高層ビルの外壁補修・清掃等は、足場の構築が困難であったり、多大なコストが掛かることから、屋上から昇降自在に吊り下げたゴンドラ装置に作業員が乗って作業を行っていた。作業員の乗った状態のゴンドラ装置は重量がかなり重く、大掛かりな昇降装置が必要となるなど設備上の負担が大きい欠点があった。   Conventionally, repairing and cleaning the outer walls of high-rise buildings has been difficult because it is difficult to build a scaffold and it costs a lot of money, so workers have been working on gondola equipment that can be lifted up and down from the rooftop. . The gondola device with the worker on it is very heavy and has a drawback in that it requires a large lifting device and places a heavy burden on the equipment.

本発明は上記した従来技術の問題に鑑みなされたもので、設備上の負担が少なくて済む建物外面に対する作業方法を提供することを、その目的とする。   The present invention has been made in view of the above-described problems of the prior art, and an object of the present invention is to provide a working method for the outer surface of a building that requires less burden on facilities.

請求項1記載の発明では、
建物の屋上から作業者が安全ロープに吊り下がりながら建物外面に対する作業を行う方法であって、
建物屋上のパラペットに固定した支持具から垂らした吊り下げロープに、建物外面に沿って昇降自在で、上方が開口した箱形の吊り下げ式養生装置を吊り下げ、
この吊り下げ式養生装置は吊り下げロープに登降自在に取り付けたロープ牽引装置により吊持するようにし、
作業者は安全ロープに体重を支持された状態で吊り下げ式養生装置の中または上方で建物外面に対する作業をし、
作業者が作業位置を上または下に移動するに連れて、ロープ牽引装置により吊り下げ式養生装置を上または下に移動するようにし
ロープ牽引装置は、回転式電動工具の回転力を受けて登高動作可能とし、
更に、ロープ牽引装置は、
回転式電動工具の出力軸を着脱自在に連結可能な入力軸と、吊り下げロープを着脱自在に巻き掛け可能なプーリと結合された出力軸を有し、入力軸に加えられた回転を減速して出力軸に伝達する差動減速式の減速手段と、
減速手段が装着された支持体と、
支持体に設けられて、プーリに巻き掛けられる吊り下げロープの入口と出口を形成する入口部及び出口部と、
減速手段または支持体に設けられて、吊り下げロープ入口側の外部への引き出しの制限・制限解除をする制限手段と、
を備えたこと、
を特徴としている。
請求項2記載の発明では、
建物の屋上から作業者が安全ロープに吊り下がりながら建物外面に対する作業を行う方法であって、
建物屋上のパラペットに固定した支持具から垂らした吊り下げロープに、建物外面に沿って昇降自在で、上方が開口した箱形の吊り下げ式養生装置を吊り下げ、
この吊り下げ式養生装置は吊り下げロープに登降自在に取り付けたロープ牽引装置により吊持するようにし、
作業者は安全ロープに体重を支持された状態で吊り下げ式養生装置の中または上方で建物外面に対する作業をし、
作業者が作業位置を上または下に移動するに連れて、ロープ牽引装置により吊り下げ式養生装置を上または下に移動するようにし、
ロープ牽引装置は、回転式電動工具の回転力を受けて登高動作可能とし、
更に、ロープ牽引装置は、
回転式電動工具の出力軸を着脱自在に連結可能な入力軸と、ロープを着脱自在に巻き掛け可能なプーリと結合された出力軸を有し、入力軸に加えられた回転を減速して出力軸に伝達する差動減速式の減速手段と、
減速手段が装着された支持体と、
支持体に設けられて、プーリに巻き掛けられるロープの入口と出口を形成する入口部及び出口部と、
入口部及び出口部とプーリの間に設けられて、入口側ロープと出口側ロープを分離する分離部と、
減速手段または支持体に設けられて、吊り下げロープ入口側の外部への引き出しの制限・制限解除をする制限手段と、
を備え、
入口部と出口部には入口通路部と出口通路部が形成されるとともに、入口通路部と出口通路部が対向するようにして、入口部と出口部が間隔を開けて対向配置されており、
入口部と出口部の間隔を開けた隙間を通して、外部と入口通路部の間でロープを出し入れしたり、外部と出口通路部の間でロープを出し入れ可能に形成されていること、
を特徴としている。
請求項1、2において、入口部と出口部に形成された入口通路部と出口通路部は半割円柱状としても良い。また請求項2において、分離部をプーリのロープを巻き掛ける溝の中に遊挿させても良い。
請求項3記載の発明では、
建物の屋上から作業者が安全ロープに吊り下がりながら建物外面に対する作業を行う方法であって、
建物屋上のパラペットに固定した支持具から垂らした吊り下げロープに、建物外面に沿って昇降自在で、上方が開口した箱形の吊り下げ式養生装置を吊り下げ、
この吊り下げ式養生装置は吊り下げロープに登降自在に取り付けたロープ牽引装置により吊持するようにし、
作業者は安全ロープに体重を支持された状態で吊り下げ式養生装置の中または上方で建物外面に対する作業をし、
作業者が作業位置を上または下に移動するに連れて、ロープ牽引装置により吊り下げ式養生装置を上または下に移動するようにし、
ロープ牽引装置は、回転式電動工具の回転力を受けて登高動作可能とし、
更に、ロープ牽引装置は、
回転式電動工具の出力軸を着脱自在に連結可能な入力軸と、ロープを着脱自在に巻き掛け可能なプーリと結合された出力軸を有し、入力軸に加えられた回転を減速して出力軸に伝達する差動減速式の減速手段と、
減速手段が装着された支持体と、
支持体に設けられて、プーリに巻き掛けられるロープの入口と出口を形成する入口部及び出口部と、
減速手段または支持体に設けられて、吊り下げロープ入口側の外部への引き出しの制限・制限解除をする制限手段と、
を備え、
制限手段は、
プーリと出口部の間のロープが通る経路に配備されてロープが当接するロープ当接部と、
ロープが入口部から外側に引き出される方向へ移動しようとするとき、ロープ当接部に当接したロープに食い込んで移動を制限し、反対方向へ移動しようとする際は、ロープから離間して移動を許容するように構成されたカムと、
カムをロープに食い込む方向へ付勢する付勢手段と、
カムをロープから離間させて制限を解除する解除手段と、
を含み、
ロープ当接部がプーリのロープを巻き掛ける溝の中に遊挿されていること、
を特徴としている。
請求項3において、ロープ当接部のロープが当接する外側面にロープ溝を形成しても良い。また、入口部と出口部に形成した入口通路部と出口通路部が対向するようにして、入口部と出口部を間隔を開けて対向配置し、入口部と出口部の間隔を開けた隙間を通して、外部と入口通路部の間でロープを出し入れしたり、外部と出口通路部の間でロープを出し入れ可能に形成しても良い。また、入口部と出口部に形成した入口通路部と出口通路部を半割円柱状としても良い。また、入口部及び出口部とプーリの間に、入口側ロープと出口側ロープを分離する分離部を設け、このロープ当接部を分離部と一体にして備えても良い。
請求項4記載の発明では、
建物の屋上から作業者が安全ロープに吊り下がりながら建物外面に対する作業を行う方法であって、
建物屋上のパラペットに固定した支持具から垂らした吊り下げロープに、建物外面に沿って昇降自在で、上方が開口した箱形の吊り下げ式養生装置を吊り下げ、
この吊り下げ式養生装置は吊り下げロープに登降自在に取り付けたロープ牽引装置により吊持するようにし、
作業者は安全ロープに体重を支持された状態で吊り下げ式養生装置の中または上方で建物外面に対する作業をし、
作業者が作業位置を上または下に移動するに連れて、ロープ牽引装置により吊り下げ式養生装置を上または下に移動するようにし、
ロープ牽引装置は、回転式電動工具の回転力を受けて登高動作可能とし、
更に、ロープ牽引装置は、
回転式電動工具の出力軸を着脱自在に連結可能な入力軸と、ロープを着脱自在に巻き掛け可能なプーリと結合された出力軸を有し、入力軸に加えられた回転を減速して出力軸に伝達する差動減速式の減速手段と、
減速手段が装着された支持体と、
支持体に設けられて、プーリに巻き掛けられるロープの入口と出口を形成する入口部及び出口部と、
減速手段または支持体に設けられて、吊り下げロープ入口側の外部への引き出しの制限・制限解除をする制限手段と、
入口部及び出口部とプーリの間に設けられて、入口側ロープと出口側ロープを分離する分離部と、
支持体に設けられて、プーリの前面または前面と側面を開閉自在に覆うプーリカバーと、
プーリカバーを閉状態にロックしたり、ロック解除したりするロック手段と、を備え、
入口部と出口部には入口通路部と出口通路部が形成されるとともに、入口通路部と出口通路部が対向するようにして、入口部と出口部が間隔を開けて対向配置されており、
入口部と出口部の間隔を開けた隙間を通して、外部と入口通路部の間でロープを出し入れしたり、外部と出口通路部の間でロープを出し入れ可能に形成されており、
プーリカバーは、プーリの入口部及び出口部とは反対側を開閉軸として、入口部及び出口部側を開閉可能になっており、
プーリカバーに、閉状態にロックされたとき入口部と出口部の間の隙間に入り、ロープが入口通路部または出口通路部から外れるのを邪魔する邪魔部を設けたこと、
を特徴としている。
請求項4において、入口部と出口部に形成された入口通路部と出口通路部は半割円柱状としても良い。
請求項5記載の発明では、
建物の屋上から作業者が安全ロープに吊り下がりながら建物外面に対する作業を行う方法であって、
建物屋上のパラペットに固定した支持具から垂らした吊り下げロープに、建物外面に沿って昇降自在で、上方が開口した箱形の吊り下げ式養生装置を吊り下げ、
ロープ昇降装置により吊り下げロープを昇降させて吊り下げ式養生装置を昇降可能とし、
作業者は安全ロープに体重を支持された状態で吊り下げ式養生装置の中または上方で建物外面に対する作業をし、
作業者の作業位置が上または下に移動するに連れて、ロープ昇降装置により吊り下げ式養生装置を上または下に移動するようにし、
ロープ昇降装置は、回転式電動工具の回転力を受けて吊り下げロープの上昇を可能とし、
更に、ロープ昇降装置は、
回転式電動工具の出力軸を着脱自在に連結可能な入力軸と、吊り下げロープを着脱自在に巻き掛け可能なプーリと結合された出力軸を有し、入力軸に加えられた回転を減速して出力軸に伝達する差動減速式の減速手段と、
減速手段が装着された支持体と、
支持体に設けられて、プーリに巻き掛けられる吊り下げロープの入口と出口を形成する入口部及び出口部と、
減速手段または支持体に設けられて、吊り下げロープ入口側の外部への引き出しの制限・制限解除をする制限手段と、
を備えたこと、
を特徴としている
求項6記載の発明では、
建物の屋上から作業者が安全ロープに吊り下がりながら建物外面に対する作業を行う方法であって、
建物屋上のパラペットに固定した支持具から垂らした吊り下げロープに、建物外面に沿って昇降自在で、上方が開口した箱形の吊り下げ式養生装置を吊り下げ、
ロープ昇降装置により吊り下げロープを昇降させて吊り下げ式養生装置を昇降可能とし、
作業者は安全ロープに体重を支持された状態で吊り下げ式養生装置の中または上方で建物外面に対する作業をし、
作業者の作業位置が上または下に移動するに連れて、ロープ昇降装置により吊り下げ式養生装置を上または下に移動するようにし、
ロープ昇降装置は、回転式電動工具の回転力を受けて吊り下げロープの上昇を可能とし、
更に、ロープ昇降装置は、
回転式電動工具の出力軸を着脱自在に連結可能な入力軸と、ロープを着脱自在に巻き掛け可能なプーリと結合された出力軸を有し、入力軸に加えられた回転を減速して出力軸に
伝達する差動減速式の減速手段と、
減速手段が装着された支持体と、
支持体に設けられて、プーリに巻き掛けられるロープの入口と出口を形成する入口部及び出口部と、
入口部及び出口部とプーリの間に設けられて、入口側ロープと出口側ロープを分離する分離部と、
減速手段または支持体に設けられて、吊り下げロープ入口側の外部への引き出しの制限・制限解除をする制限手段と、
を備え、
入口部と出口部には入口通路部と出口通路部が形成されるとともに、入口通路部と出口通路部が対向するようにして、入口部と出口部が間隔を開けて対向配置されており、
入口部と出口部の間隔を開けた隙間を通して、外部と入口通路部の間でロープを出し入れしたり、外部と出口通路部の間でロープを出し入れ可能に形成されていること、
を特徴としている。
請求項5、6において、入口部と出口部に形成された入口通路部と出口通路部は半割円柱状としても良い。また請求項6において、分離部をプーリのロープを巻き掛ける溝の中に遊挿させても良い。
請求項7記載の発明では、
建物の屋上から作業者が安全ロープに吊り下がりながら建物外面に対する作業を行う方法であって、
建物屋上のパラペットに固定した支持具から垂らした吊り下げロープに、建物外面に沿って昇降自在で、上方が開口した箱形の吊り下げ式養生装置を吊り下げ、
ロープ昇降装置により吊り下げロープを昇降させて吊り下げ式養生装置を昇降可能とし、
作業者は安全ロープに体重を支持された状態で吊り下げ式養生装置の中または上方で建物外面に対する作業をし、
作業者の作業位置が上または下に移動するに連れて、ロープ昇降装置により吊り下げ式養生装置を上または下に移動するようにし、
ロープ昇降装置は、回転式電動工具の回転力を受けて吊り下げロープの上昇を可能とし、
更に、ロープ昇降装置は、
回転式電動工具の出力軸を着脱自在に連結可能な入力軸と、ロープを着脱自在に巻き掛け可能なプーリと結合された出力軸を有し、入力軸に加えられた回転を減速して出力軸に伝達する差動減速式の減速手段と、
減速手段が装着された支持体と、
支持体に設けられて、プーリに巻き掛けられるロープの入口と出口を形成する入口部及び出口部と、
減速手段または支持体に設けられて、吊り下げロープ入口側の外部への引き出しの制限・制限解除をする制限手段と、
を備え、
制限手段は、
プーリと出口部の間のロープが通る経路に配備されてロープが当接するロープ当接部と、
ロープが入口部から外側に引き出される方向へ移動しようとするとき、ロープ当接部に当接したロープに食い込んで移動を制限し、反対方向へ移動しようとする際は、ロープから離間して移動を許容するように構成されたカムと、
カムをロープに食い込む方向へ付勢する付勢手段と、
カムをロープから離間させて制限を解除する解除手段と、
を含み、
ロープ当接部がプーリのロープを巻き掛ける溝の中に遊挿されていること、
を特徴としている。
請求項7において、ロープ当接部のロープが当接する外側面にロープ溝を形成しても良い。また、入口部と出口部に形成した入口通路部と出口通路部が対向するようにして、入口部と出口部を間隔を開けて対向配置し、入口部と出口部の間隔を開けた隙間を通して、外部と入口通路部の間でロープを出し入れしたり、外部と出口通路部の間でロープを出し入れ可能に形成しても良い。また、入口部と出口部に形成した入口通路部と出口通路部を半割円柱状としても良い。また、入口部及び出口部とプーリの間に、入口側ロープと出口側ロープを分離する分離部を設け、このロープ当接部を分離部と一体にして備えても良い。
請求項8記載の発明では、
建物の屋上から作業者が安全ロープに吊り下がりながら建物外面に対する作業を行う方法であって、
建物屋上のパラペットに固定した支持具から垂らした吊り下げロープに、建物外面に沿って昇降自在で、上方が開口した箱形の吊り下げ式養生装置を吊り下げ、
ロープ昇降装置により吊り下げロープを昇降させて吊り下げ式養生装置を昇降可能とし、
作業者は安全ロープに体重を支持された状態で吊り下げ式養生装置の中または上方で建物外面に対する作業をし、
作業者の作業位置が上または下に移動するに連れて、ロープ昇降装置により吊り下げ式養生装置を上または下に移動するようにし、
ロープ昇降装置は、回転式電動工具の回転力を受けて吊り下げロープの上昇を可能とし、
更に、ロープ昇降装置は、
回転式電動工具の出力軸を着脱自在に連結可能な入力軸と、ロープを着脱自在に巻き掛け可能なプーリと結合された出力軸を有し、入力軸に加えられた回転を減速して出力軸に伝達する差動減速式の減速手段と、
減速手段が装着された支持体と、
支持体に設けられて、プーリに巻き掛けられるロープの入口と出口を形成する入口部及び出口部と、
減速手段または支持体に設けられて、吊り下げロープ入口側の外部への引き出しの制限・制限解除をする制限手段と、
入口部及び出口部とプーリの間に設けられて、入口側ロープと出口側ロープを分離する分離部と、
支持体に設けられて、プーリの前面または前面と側面を開閉自在に覆うプーリカバーと、
プーリカバーを閉状態にロックしたり、ロック解除したりするロック手段と、を備え、
入口部と出口部には入口通路部と出口通路部が形成されるとともに、入口通路部と出口通路部が対向するようにして、入口部と出口部が間隔を開けて対向配置されており、
入口部と出口部の間隔を開けた隙間を通して、外部と入口通路部の間でロープを出し入れしたり、外部と出口通路部の間でロープを出し入れ可能に形成されており、
プーリカバーは、プーリの入口部及び出口部とは反対側を開閉軸として、入口部及び出口部側を開閉可能になっており、
プーリカバーに、閉状態にロックされたとき入口部と出口部の間の隙間に入り、ロープが入口通路部または出口通路部から外れるのを邪魔する邪魔部を設けたこと、
を特徴としている
請求項8において、入口部と出口部に形成された入口通路部と出口通路部は半割円柱状としても良い。
In invention of Claim 1,
A method in which an operator works on the exterior of a building while hanging from a safety rope from the roof of the building,
A hanging rope hanging from a support fixed to the parapet on the roof of the building can be raised and lowered along the outer surface of the building, and a box-type hanging curing device with an open top is suspended.
This suspension type curing device is to be suspended by a rope towing device attached to the suspension rope so as to be able to climb up and down,
The operator works on the exterior of the building in or above the hanging curing device with the weight supported by the safety rope,
As the worker moves up or down the working position, so as to move up or down hanging curing device by a rope traction device,
The rope traction device is capable of climbing operation in response to the rotational force of the rotary power tool,
Furthermore, the rope traction device
It has an input shaft that can be detachably connected to the output shaft of a rotary electric tool, and an output shaft that is coupled to a pulley that can be removably wrapped with a hanging rope, and reduces the rotation applied to the input shaft. Differential deceleration type deceleration means that transmits to the output shaft,
A support on which speed reduction means is mounted;
An inlet portion and an outlet portion provided on the support body and forming an inlet and an outlet of a hanging rope wound around a pulley;
Limiting means provided on the speed reduction means or the support body for limiting / releasing the extension to the outside on the suspension rope inlet side;
Having
It is characterized by.
In invention of Claim 2,
A method in which an operator works on the exterior of a building while hanging from a safety rope from the roof of the building,
A hanging rope hanging from a support fixed to the parapet on the roof of the building can be raised and lowered along the outer surface of the building, and a box-type hanging curing device with an open top is suspended.
This suspension type curing device is to be suspended by a rope towing device attached to the suspension rope so as to be able to climb up and down,
The operator works on the exterior of the building in or above the hanging curing device with the weight supported by the safety rope,
As the operator moves the work position up or down, the suspension type curing device is moved up or down by the rope pulling device,
The rope traction device is capable of climbing operation in response to the rotational force of the rotary power tool,
Furthermore, the rope traction device
It has an input shaft that can be detachably connected to the output shaft of a rotary power tool, and an output shaft that is coupled to a pulley that can be detachably wrapped with a rope, and outputs by reducing the rotation applied to the input shaft. A differential deceleration type deceleration means that transmits to the shaft;
A support on which speed reduction means is mounted;
An inlet portion and an outlet portion that are provided on the support and form an inlet and an outlet of a rope wound around a pulley;
A separation portion provided between the inlet and outlet portions and the pulley, and separating the inlet side rope and the outlet side rope;
Limiting means provided on the speed reduction means or the support body for limiting / releasing the extension to the outside on the suspension rope inlet side;
With
An inlet passage portion and an outlet passage portion are formed in the inlet portion and the outlet portion, and the inlet portion and the outlet portion are arranged to face each other with an interval therebetween so that the inlet passage portion and the outlet passage portion face each other.
The rope is formed so that the rope can be taken in and out between the outside and the inlet passage part through the gap between the inlet part and the outlet part, and the rope can be taken in and out between the outside and the outlet passage part.
It is characterized by.
In Claims 1 and 2, the inlet passage portion and the outlet passage portion formed in the inlet portion and the outlet portion may have a half columnar shape. Further, in claim 2, the separating portion may be loosely inserted into a groove around which the pulley rope is wound.
In invention of Claim 3,
A method in which an operator works on the exterior of a building while hanging from a safety rope from the roof of the building,
A hanging rope hanging from a support fixed to the parapet on the roof of the building can be raised and lowered along the outer surface of the building, and a box-type hanging curing device with an open top is suspended.
This suspension type curing device is to be suspended by a rope towing device attached to the suspension rope so as to be able to climb up and down,
The operator works on the exterior of the building in or above the hanging curing device with the weight supported by the safety rope,
As the operator moves the work position up or down, the suspension type curing device is moved up or down by the rope pulling device,
The rope traction device is capable of climbing operation in response to the rotational force of the rotary power tool,
Furthermore, the rope traction device
It has an input shaft that can be detachably connected to the output shaft of a rotary power tool, and an output shaft that is coupled to a pulley that can be detachably wrapped with a rope, and outputs by reducing the rotation applied to the input shaft. A differential deceleration type deceleration means that transmits to the shaft;
A support on which speed reduction means is mounted;
An inlet portion and an outlet portion that are provided on the support and form an inlet and an outlet of a rope wound around a pulley;
Limiting means provided on the speed reduction means or the support body for limiting / releasing the extension to the outside on the suspension rope inlet side;
With
The limiting means is
A rope abutting portion that is arranged in a path through which the rope between the pulley and the outlet portion passes and the rope abuts;
When the rope tries to move in the direction of being pulled out from the entrance, it will bite into the rope abutting on the rope abutment and restrict the movement, and when trying to move in the opposite direction, move away from the rope. A cam configured to allow
An urging means for urging the cam in a direction to bite into the rope;
Release means for releasing the restriction by separating the cam from the rope;
Including
The rope contact part is loosely inserted in the groove around which the pulley rope is wound,
It is characterized by.
In Claim 3, you may form a rope groove in the outer surface where the rope of a rope contact part contacts. In addition, the inlet passage and the outlet passage formed at the inlet and outlet are opposed to each other, the inlet and the outlet are arranged to face each other, and the gap between the inlet and the outlet is opened. The rope may be inserted and removed between the outside and the entrance passage portion, or the rope can be taken in and out between the outside and the exit passage portion. Moreover, it is good also considering the entrance channel part and exit channel | path part formed in the entrance part and the exit part as a half cylinder shape. Further, a separation part for separating the inlet side rope and the outlet side rope may be provided between the inlet part and the outlet part and the pulley, and the rope contact part may be provided integrally with the separation part.
In invention of Claim 4,
A method in which an operator works on the exterior of a building while hanging from a safety rope from the roof of the building,
A hanging rope hanging from a support fixed to the parapet on the roof of the building can be raised and lowered along the outer surface of the building, and a box-type hanging curing device with an open top is suspended.
This suspension type curing device is to be suspended by a rope towing device attached to the suspension rope so as to be able to climb up and down,
The operator works on the exterior of the building in or above the hanging curing device with the weight supported by the safety rope,
As the operator moves the work position up or down, the rope-type pulling device moves the hanging curing device up or down,
The rope traction device is capable of climbing operation in response to the rotational force of the rotary power tool,
Furthermore, the rope traction device
It has an input shaft that can be detachably connected to the output shaft of a rotary power tool, and an output shaft that is coupled to a pulley that can be detachably wrapped with a rope, and outputs by reducing the rotation applied to the input shaft. A differential deceleration type deceleration means that transmits to the shaft;
A support on which speed reduction means is mounted;
An inlet portion and an outlet portion that are provided on the support and form an inlet and an outlet of a rope wound around a pulley;
Limiting means provided on the speed reduction means or the support body for limiting / releasing the extension to the outside on the suspension rope inlet side;
A separation portion provided between the inlet and outlet portions and the pulley, and separating the inlet side rope and the outlet side rope;
A pulley cover provided on the support and covering the front or front and side surfaces of the pulley so as to be freely opened and closed;
Locking means for locking or unlocking the pulley cover in a closed state,
An inlet passage portion and an outlet passage portion are formed in the inlet portion and the outlet portion, and the inlet portion and the outlet portion are arranged to face each other with an interval therebetween so that the inlet passage portion and the outlet passage portion face each other.
It is formed so that the rope can be taken in and out between the outside and the entrance passage part, and the rope can be taken in and out between the outside and the exit passage part through the gap between the entrance part and the exit part,
The pulley cover can be opened and closed on the side opposite to the inlet and outlet of the pulley with the opening and closing shaft on the inlet and outlet sides,
When the pulley cover is locked in the closed state, the pulley cover enters a gap between the inlet portion and the outlet portion, and a baffle portion that prevents the rope from coming off the inlet passage portion or the outlet passage portion is provided.
It is characterized by.
According to a fourth aspect of the present invention, the inlet passage portion and the outlet passage portion formed in the inlet portion and the outlet portion may have a half cylinder shape.
In invention of Claim 5,
A method in which an operator works on the exterior of a building while hanging from a safety rope from the roof of the building,
A hanging rope hanging from a support fixed to the parapet on the roof of the building can be raised and lowered along the outer surface of the building, and a box-type hanging curing device with an open top is suspended.
It is possible to raise and lower the hanging type curing device by raising and lowering the hanging rope with the rope lifting device,
The operator works on the exterior of the building in or above the hanging curing device with the weight supported by the safety rope,
As the operator's work position moves up or down, the suspension type curing device is moved up or down by the rope lifting device,
The rope elevating device enables the lifting rope to be lifted by receiving the rotational force of the rotary power tool,
Furthermore, the rope lifting device
It has an input shaft that can be detachably connected to the output shaft of a rotary electric tool, and an output shaft that is coupled to a pulley that can be removably wrapped with a hanging rope, and reduces the rotation applied to the input shaft. Differential deceleration type deceleration means that transmits to the output shaft,
A support on which speed reduction means is mounted;
An inlet portion and an outlet portion provided on the support body and forming an inlet and an outlet of a hanging rope wound around a pulley;
Limiting means provided on the speed reduction means or the support body for limiting / releasing the extension to the outside on the suspension rope inlet side;
Having
It is characterized by .
In the invention Motomeko 6,
A method in which an operator works on the exterior of a building while hanging from a safety rope from the roof of the building,
A hanging rope hanging from a support fixed to the parapet on the roof of the building can be raised and lowered along the outer surface of the building, and a box-type hanging curing device with an open top is suspended.
It is possible to raise and lower the hanging type curing device by raising and lowering the hanging rope with the rope lifting device,
The operator works on the exterior of the building in or above the hanging curing device with the weight supported by the safety rope,
As the operator's work position moves up or down, the suspension type curing device is moved up or down by the rope lifting device,
The rope elevating device enables the lifting rope to be lifted by receiving the rotational force of the rotary power tool,
Furthermore, the rope lifting device
It has an input shaft that can be detachably connected to the output shaft of a rotary power tool, and an output shaft that is coupled to a pulley that can be detachably wrapped with a rope, and outputs by reducing the rotation applied to the input shaft. On the axis
A differential speed reducing means for transmitting,
A support on which speed reduction means is mounted;
An inlet portion and an outlet portion that are provided on the support and form an inlet and an outlet of a rope wound around a pulley;
A separation portion provided between the inlet and outlet portions and the pulley, and separating the inlet side rope and the outlet side rope;
Limiting means provided on the speed reduction means or the support body for limiting / releasing the extension to the outside on the suspension rope inlet side;
With
An inlet passage portion and an outlet passage portion are formed in the inlet portion and the outlet portion, and the inlet portion and the outlet portion are arranged to face each other with an interval therebetween so that the inlet passage portion and the outlet passage portion face each other.
The rope is formed so that the rope can be taken in and out between the outside and the inlet passage part through the gap between the inlet part and the outlet part, and the rope can be taken in and out between the outside and the outlet passage part.
It is characterized by.
In Claims 5 and 6, the inlet passage portion and the outlet passage portion formed in the inlet portion and the outlet portion may have a half columnar shape. Further, in claim 6, the separating portion may be loosely inserted into a groove around which a pulley rope is wound.
In invention of Claim 7,
A method in which an operator works on the exterior of a building while hanging from a safety rope from the roof of the building,
A hanging rope hanging from a support fixed to the parapet on the roof of the building can be raised and lowered along the outer surface of the building, and a box-type hanging curing device with an open top is suspended.
It is possible to raise and lower the hanging type curing device by raising and lowering the hanging rope with the rope lifting device,
The operator works on the exterior of the building in or above the hanging curing device with the weight supported by the safety rope,
As the operator's work position moves up or down, the suspension type curing device is moved up or down by the rope lifting device,
The rope elevating device enables the lifting rope to be lifted by receiving the rotational force of the rotary power tool,
Furthermore, the rope lifting device
It has an input shaft that can be detachably connected to the output shaft of a rotary power tool, and an output shaft that is coupled to a pulley that can be detachably wrapped with a rope, and outputs by reducing the rotation applied to the input shaft. A differential deceleration type deceleration means that transmits to the shaft;
A support on which speed reduction means is mounted;
An inlet portion and an outlet portion that are provided on the support and form an inlet and an outlet of a rope wound around a pulley;
Limiting means provided on the speed reduction means or the support body for limiting / releasing the extension to the outside on the suspension rope inlet side;
With
The limiting means is
A rope abutting portion that is arranged in a path through which the rope between the pulley and the outlet portion passes and the rope abuts;
When the rope tries to move in the direction of being pulled out from the entrance, it will bite into the rope abutting on the rope abutment and restrict the movement, and when trying to move in the opposite direction, move away from the rope. A cam configured to allow
An urging means for urging the cam in a direction to bite into the rope;
Release means for releasing the restriction by separating the cam from the rope;
Including
The rope contact part is loosely inserted in the groove around which the pulley rope is wound,
It is characterized by.
In Claim 7, you may form a rope groove in the outer surface where the rope of a rope contact part contacts. In addition, the inlet passage and the outlet passage formed at the inlet and outlet are opposed to each other, the inlet and the outlet are arranged to face each other, and the gap between the inlet and the outlet is opened. The rope may be inserted and removed between the outside and the entrance passage portion, or the rope can be taken in and out between the outside and the exit passage portion. Moreover, it is good also considering the entrance channel part and exit channel | path part formed in the entrance part and the exit part as a half cylinder shape. Further, a separation part for separating the inlet side rope and the outlet side rope may be provided between the inlet part and the outlet part and the pulley, and the rope contact part may be provided integrally with the separation part.
In invention of Claim 8,
A method in which an operator works on the exterior of a building while hanging from a safety rope from the roof of the building,
A hanging rope hanging from a support fixed to the parapet on the roof of the building can be raised and lowered along the outer surface of the building, and a box-type hanging curing device with an open top is suspended.
It is possible to raise and lower the hanging type curing device by raising and lowering the hanging rope with the rope lifting device,
The operator works on the exterior of the building in or above the hanging curing device with the weight supported by the safety rope,
As the operator's work position moves up or down, the suspension type curing device is moved up or down by the rope lifting device,
The rope elevating device enables the lifting rope to be lifted by receiving the rotational force of the rotary power tool,
Furthermore, the rope lifting device
It has an input shaft that can be detachably connected to the output shaft of a rotary power tool, and an output shaft that is coupled to a pulley that can be detachably wrapped with a rope, and outputs by reducing the rotation applied to the input shaft. A differential deceleration type deceleration means that transmits to the shaft;
A support on which speed reduction means is mounted;
An inlet portion and an outlet portion that are provided on the support and form an inlet and an outlet of a rope wound around a pulley;
Limiting means provided on the speed reduction means or the support body for limiting / releasing the extension to the outside on the suspension rope inlet side;
A separation portion provided between the inlet and outlet portions and the pulley, and separating the inlet side rope and the outlet side rope;
A pulley cover provided on the support and covering the front or front and side surfaces of the pulley so as to be freely opened and closed;
Locking means for locking or unlocking the pulley cover in a closed state,
An inlet passage portion and an outlet passage portion are formed in the inlet portion and the outlet portion, and the inlet portion and the outlet portion are arranged to face each other with an interval therebetween so that the inlet passage portion and the outlet passage portion face each other.
It is formed so that the rope can be taken in and out between the outside and the entrance passage part, and the rope can be taken in and out between the outside and the exit passage part through the gap between the entrance part and the exit part,
The pulley cover can be opened and closed on the side opposite to the inlet and outlet of the pulley with the opening and closing shaft on the inlet and outlet sides,
When the pulley cover is locked in the closed state, the pulley cover enters a gap between the inlet portion and the outlet portion, and a baffle portion that prevents the rope from coming off the inlet passage portion or the outlet passage portion is provided.
It is characterized by .
In claim 8, the inlet passage portion and the outlet passage portion formed in the inlet portion and the outlet portion may have a half-column shape.

本発明によれば、作業者が建物屋上から下がった安全ロープに支持されて建物外面に対する作業を行うに際し、吊り下げ式養生装置の中または上方で作業を行うことができ、作業で生じた壁・補修部材等の破片や道具等の落下を防止できる。また、吊り下げ式養生装置に作業者の体重を掛けないので、吊り下げ式養生装置、支持具、ロープ牽引装置、ロープ昇降装置等をそれほど頑強・大型にする必要はなく、設備負担が少なくて済む。
また、ロープ牽引装置は作業者が携帯する電動工具により登高動作をさせることができ、作業者が手動で吊り上げ式養生装置を上昇させなくて済み、作業負担が少ない。
また、ロープ牽引装置またはロープ昇降装置に、小型で減速比の大きな差動減速式の減速手段を用いたことにより、制限手段を解除した状態でプーリを逆転させながら吊り下げロープを入口側から外側に引き出す際、緩行動作を行わせることができる。
また他の発明によれば、ロープ牽引装置またはロープ昇降装置の入口部及び出口部とプーリの間に吊り下げロープの入口側ロープと出口側ロープを分離する分離部を設けたので、プーリの正転時に出口側ロープがプーリの入口側に巻き込まれたり、プーリの逆転時に入口側ロープがプーリの出口側に巻き込まれるのを防止できる。また、入口部と出口部に入口通路部と出口通路部を形成し、入口通路部と出口通路部が対向するようにして、入口部と出口部を間隔を開けて対向配置し、入口部と出口部の間隔を開けた隙間を通して外部と入口通路部の間で吊り下げロープを出し入れしたり、外部と出口通路部の間で吊り下げロープを出し入れ可能に形成したので、プーリへの吊り下げロープの装填・取り外しが容易になる。
また他の発明によれば、プーリの前面または前面と側面を開閉自在に覆うプーリカバーを備えた場合に、プーリカバーに、閉状態にロックされたとき入口部と出口部の間の隙間に入り吊り下げロープが入口部または出口部から外れるのを邪魔する邪魔部を設けたので、使用中に吊り下げロープが入口部または出口部から外れてプーリカバーを不用意に開放するのを防止できる
According to the present invention, when an operator works on a building outer surface supported by a safety rope lowered from the building roof, the worker can work in or above the hanging type curing device, and the wall generated by the work・ Prevents falling of debris such as repair parts and tools. In addition, since the weight of the operator is not applied to the hanging type curing device, it is not necessary to make the hanging type curing device, support tool, rope towing device , rope lifting device, etc. so strong and large, and the equipment burden is small. That's it.
Further, the rope pulling device can be lifted by an electric tool carried by the operator, and the operator does not have to manually lift the lifting type curing device, and the work load is small.
In addition, the rope pulling device or the rope lifting device uses a small differential reduction type deceleration unit with a large reduction ratio, so that the suspension rope is moved outward from the inlet side while the pulley is reversed with the limiting unit released. When pulling out, it is possible to perform slowing action.
According to another invention, the separating portion for separating the inlet side rope and the outlet side rope of the suspended rope is provided between the inlet portion and the outlet portion of the rope pulling device or the rope lifting device and the pulley. It is possible to prevent the outlet side rope from being caught on the inlet side of the pulley during the rotation, and the inlet side rope from being caught on the outlet side of the pulley during the reverse rotation of the pulley. Further, an inlet passage portion and an outlet passage portion are formed at the inlet portion and the outlet portion, the inlet passage portion and the outlet passage portion are opposed to each other, and the inlet portion and the outlet portion are arranged to face each other with a gap therebetween. The suspension rope can be pulled in and out between the outside and the entrance passage section through the gap between the exit sections, and the suspension rope can be inserted and removed between the exterior and the exit passage section. It becomes easy to load and remove.
According to another invention, when a pulley cover that covers the front surface or the front surface and the side surface of the pulley in an openable / closable manner is provided, the pulley cover enters the gap between the inlet portion and the outlet portion when locked in the closed state. Since the baffle portion that prevents the suspension rope from coming off from the entrance portion or the exit portion is provided, it is possible to prevent the suspension rope from coming off from the entrance portion or the exit portion during use and inadvertently opening the pulley cover .

本発明の第1実施例に係る建物外面に対する作業方法の説明図である(実施例1)。It is explanatory drawing of the working method with respect to the building outer surface which concerns on 1st Example of this invention (Example 1). 図1中の吊り下げ式養生装置の外観斜視図である。It is an external appearance perspective view of the suspension type curing apparatus in FIG. 図2中の登降装置の前面を開放した状態を示す正面図である。It is a front view which shows the state which open | released the front surface of the climbing apparatus in FIG. 図3の背面図である。FIG. 4 is a rear view of FIG. 3. 図3の左側面図である。FIG. 4 is a left side view of FIG. 3. 図3の登降装置の前面を閉塞した状態を示す正面図である。It is a front view which shows the state which obstruct | occluded the front surface of the climbing apparatus of FIG. 図3中のカムの組み立て図である。FIG. 4 is an assembly diagram of the cam in FIG. 3. 図3の登降装置のカムの動作説明図である。It is operation | movement explanatory drawing of the cam of the climbing apparatus of FIG. 図3の登降装置のカムの動作説明図である。It is operation | movement explanatory drawing of the cam of the climbing apparatus of FIG. 図3の登降装置のカムの動作説明図である。It is operation | movement explanatory drawing of the cam of the climbing apparatus of FIG. 図3の登降装置のカムの動作説明図である。It is operation | movement explanatory drawing of the cam of the climbing apparatus of FIG. 図3の登降装置の使用方法の説明図である。It is explanatory drawing of the usage method of the climbing apparatus of FIG. 図3の登降装置の使用方法の説明図である。It is explanatory drawing of the usage method of the climbing apparatus of FIG. 図3の登降装置の使用方法の説明図である。It is explanatory drawing of the usage method of the climbing apparatus of FIG. 図3の登降装置の使用方法の説明図である。It is explanatory drawing of the usage method of the climbing apparatus of FIG. 図1中の登降装置に代えて使用可能なロープ牽引装置の外観斜視図である。It is an external appearance perspective view of the rope pulling apparatus which can be used instead of the climbing apparatus in FIG. 図16のロープ牽引装置の正面図である。It is a front view of the rope pulling apparatus of FIG. 図16のロープ牽引装置の側面図である。It is a side view of the rope pulling apparatus of FIG. 図16のロープ牽引装置の平面図である。It is a top view of the rope pulling apparatus of FIG. 図16のロープ牽引装置の背面図である。It is a rear view of the rope pulling apparatus of FIG. 図16のロープ牽引装置のプーリカバーとヒンジ部を省略した斜視図である。It is the perspective view which abbreviate | omitted the pulley cover and hinge part of the rope pulling apparatus of FIG. 図16のロープ牽引装置のプーリカバーを省略した側面図である。It is a side view which abbreviate | omitted the pulley cover of the rope pulling apparatus of FIG. 図16のロープ牽引装置のプーリカバーとプーリを省略した斜視図である。It is the perspective view which abbreviate | omitted the pulley cover and pulley of the rope pulling apparatus of FIG. 図24(1)はプーリカバーをロックするロック部材の斜視図、(2)は正面図、(3)は平面図、(4)は側面図である。FIG. 24 (1) is a perspective view of a locking member that locks the pulley cover, (2) is a front view, (3) is a plan view, and (4) is a side view. 図16のロープ牽引装置の外蓋を省略した背面図である。It is the rear view which abbreviate | omitted the outer cover of the rope pulling apparatus of FIG. 図25中の制限手段の構成を示す一部省略した拡大図である。FIG. 26 is a partially omitted enlarged view showing the configuration of the limiting means in FIG. 25. 図26の制限手段の作用説明図である。FIG. 27 is an operation explanatory diagram of the limiting unit of FIG. 26. 図28(1)はロープ牽引装置を駆動する充電式電動ドライバの説明図、(2)は(1)のXXVIII-XXVIII'線に沿った断面図である。FIG. 28 (1) is an explanatory view of a rechargeable electric driver for driving the rope traction device, and (2) is a sectional view taken along line XXVIII-XXVIII ′ of (1). 図29(1)はロープ牽引装置を駆動する手動式回転工具の説明図、(2)は(1)のXXIX-XXIX'線に沿った断面図である。FIG. 29 (1) is an explanatory view of a manual rotary tool for driving the rope traction device, and (2) is a cross-sectional view taken along the line XXIX-XXIX ′ of (1). 図16のロープ牽引装置の使用方法の説明図である。It is explanatory drawing of the usage method of the rope pulling apparatus of FIG. 図16のロープ牽引装置の変形例を示す正面図である。It is a front view which shows the modification of the rope pulling apparatus of FIG. 図31の平面図である。FIG. 32 is a plan view of FIG. 31. 図16のロープ牽引装置の他の変形例を示す正面図である。It is a front view which shows the other modification of the rope pulling apparatus of FIG. 図33のロープ牽引装置の使用方法の説明図であり、プーリカバーを省略してある。る。It is explanatory drawing of the usage method of the rope pulling apparatus of FIG. 33, and the pulley cover is abbreviate | omitted. The 図33のロープ牽引装置の使用方法の説明図である。It is explanatory drawing of the usage method of the rope pulling apparatus of FIG. 図16のロープ牽引装置の更に他の変形例を示す一部破断した正面図である。FIG. 17 is a partially broken front view showing still another modification of the rope traction device of FIG. 16. 図36のロープ牽引装置のプーリカバーを省略した正面図である。It is the front view which abbreviate | omitted the pulley cover of the rope pulling apparatus of FIG. 図36のロープ牽引装置の使用方法の説明図であり、プーリカバーを省略してある。It is explanatory drawing of the usage method of the rope pulling apparatus of FIG. 36, and the pulley cover is abbreviate | omitted. 図36のロープ牽引装置の使用方法の説明図であり、プーリカバーを省略してある。It is explanatory drawing of the usage method of the rope pulling apparatus of FIG. 36, and the pulley cover is abbreviate | omitted. 第1実施例の変形例に係る建物外面に対する作業方法の説明図である。It is explanatory drawing of the working method with respect to the building outer surface which concerns on the modification of 1st Example. 第1実施例の変形例に係る建物外面に対する作業方法の説明図である。It is explanatory drawing of the working method with respect to the building outer surface which concerns on the modification of 1st Example. 本発明の第2実施例に係る建物外面に対する作業方法の説明図である(実施例2)。It is explanatory drawing of the working method with respect to the building outer surface which concerns on 2nd Example of this invention (Example 2). 第2実施例に係る作業方法の準備手順の説明図である。It is explanatory drawing of the preparation procedure of the working method which concerns on 2nd Example. 第2実施例に係る作業方法の準備手順の説明図である。It is explanatory drawing of the preparation procedure of the working method which concerns on 2nd Example. 第2実施例に係る作業方法の準備手順の説明図である。It is explanatory drawing of the preparation procedure of the working method which concerns on 2nd Example. 第2実施例に係る作業方法の準備手順の説明図である。It is explanatory drawing of the preparation procedure of the working method which concerns on 2nd Example. 第2実施例に係る作業方法の準備手順の説明図である。It is explanatory drawing of the preparation procedure of the working method which concerns on 2nd Example. 第2実施例の変形例に係る建物外面に対する作業方法の説明図である。It is explanatory drawing of the working method with respect to the building outer surface which concerns on the modification of 2nd Example.

以下、本発明の最良の形態を実施例に基づき説明する。   Hereinafter, the best mode of the present invention will be described based on examples.

図1乃至図7を参照して本発明に係る建物外面に対する作業方法の実施例を説明する。図1は本発明に係る建物外面に対する作業方法の説明図、図2は図1中の吊り下げ式養生装置の外観斜視図、図3乃至図15は図2中の登降装置の説明図である。
図1において、100は建物であり、二人の作業者A、Bが安全ロープに吊り下げられながら建物100の外面に対する塗装等の保守・修繕作業を行う(「ロープアクセス技術」と呼ばれる)。101と102は一端側が建物1の屋上に支点確保されるとともに、他端側がパラペット103を越えて屋上から垂下されたメイン側とバックアップ側の安全ロープであり、メイン側の安全ロープ101に取り付けた図示しない昇降器具(アッセンダー、ディッセンダーなど)に作業者Aの装着した安全帯から延設されたメイン側のランヤード先端のフックが掛着されて作業者Aの荷重が支持される。一方、バックアップ側の安全ロープ102に取り付けた図示しない墜落防止器具(アサップなど)に作業者Aの装着した安全帯から延設されたバックアップ側のランヤード先端のフックが掛着されて作業者Aの墜落防止が図られる。
With reference to FIG. 1 thru | or FIG. 7, the Example of the working method with respect to the building outer surface which concerns on this invention is described. FIG. 1 is an explanatory view of a working method for a building outer surface according to the present invention, FIG. 2 is an external perspective view of a hanging type curing apparatus in FIG. 1, and FIGS. 3 to 15 are explanatory views of a climbing apparatus in FIG. .
In FIG. 1, reference numeral 100 denotes a building, and two workers A and B perform maintenance and repair work such as painting on the outer surface of the building 100 while being suspended from a safety rope (referred to as “rope access technology”). 101 and 102 are safety ropes on the main side and the backup side, one end side of which is secured on the roof of the building 1 and the other end is suspended from the roof over the parapet 103 and attached to the safety rope 101 on the main side. A hook at the tip of the lanyard on the main side extended from a safety belt worn by the worker A is hooked on a lifting / lowering device (ascender, descender, etc.) (not shown) to support the load of the worker A. On the other hand, a hook at the tip of the lanyard on the backup side extended from the safety belt worn by the worker A is hooked on a fall prevention device (such as an asap) (not shown) attached to the safety rope 102 on the backup side. Fall prevention is achieved.

104と105は一端側が建物1の屋上に支点確保されるとともに、他端側がパラペット103を越えて屋上から垂下されたメイン側とバックアップ側の安全ロープであり、メイン側の安全ロープ104に取り付けた図示しない昇降器具(アッセンダー、ディッセンダーなど)に作業者Bの装着した安全帯から延設されたメイン側のランヤード先端のフックが掛着されて作業者Bの荷重が支持される。一方、バックアップ側の安全ロープ105に取り付けた図示しない墜落防止器具(アサップなど)に作業者Bの装着した安全帯から延設されたバックアップ側のランヤード先端のフックが掛着されて作業者Bの墜落防止が図られる。   104 and 105 are one side secured on the roof of the building 1 and the other end is a safety rope on the main side and the backup side hanging from the roof over the parapet 103 and attached to the safety rope 104 on the main side. A hook at the tip of the lanyard on the main side extended from a safety belt worn by the worker B is hooked on an elevator (not shown) such as an ascender or a descender to support the load of the worker B. On the other hand, a hook at the tip of the lanyard on the backup side extended from the safety belt attached to the worker B is hooked on a fall prevention device (such as an asap) (not shown) attached to the safety rope 105 on the backup side. Fall prevention is achieved.

110と111は、パラペット103に着脱自在に固定されるとともにパラペット103より建物外側方向へ延設された支持具であり、各々、先端近くに吊り下げロープ(ここでは繊維ロープとする)112と113の上端が懸吊されている。120は上方が開口した横長で箱形の吊り下げ式養生装置であり、作業者A、Bが建物1の外面に対し作業している途中で、作業道具や補修部材等を地上に落下させてしまうのを防止するためのものである。支持具110、111の間隔は吊り下げ式養生装置120の横幅とほぼ同じである。   Reference numerals 110 and 111 denote support members that are detachably fixed to the parapet 103 and extend from the parapet 103 toward the outside of the building. Hanging ropes (here, fiber ropes) 112 and 113 are provided near the ends. The upper end of is suspended. 120 is a horizontally long and box-shaped hanging type curing device that is open on the upper side. While the workers A and B are working on the outer surface of the building 1, work tools and repair members are dropped on the ground. It is for preventing it. The distance between the support tools 110 and 111 is substantially the same as the lateral width of the hanging type curing device 120.

吊り下げ式養生装置120は図2に示す如く、鋼製またはアルミ製で上方に開口し、横幅が3乃至5m程度、高さが50乃至80cm程度、前後方向が1乃至1.5m程度の横長箱形の装置本体121と、装置本体121の上に起立状態と倒伏状態とに折り畳み自在に装着されて、建物100の外面に向いた方向を前方として、装置本体121の上側空間の左右側面と背面を養生シートでコの字状に囲って養生を行う囲い養生部122と、装置本体121の内、建物100の外面側である前面壁123の左右端部の上下に装着されて建物100の外面に当接して回転自在なガイドローラ124と、前面壁123の上端縁に左右方向に沿って装着されて斜め上向きに配設された鋼製またはアルミ製で横長の落下防止板125を備えている。ガイドローラ124が建物1の外面に当接した状態のとき、落下防止板125の建物寄りの先端は建物100の外面に僅かな間隔で近接する。装置本体121の底面の四隅にはキャスター(図示せず)が装着されている。   As shown in FIG. 2, the suspension type curing device 120 is made of steel or aluminum and opens upward. The horizontal length is about 3 to 5 m, the height is about 50 to 80 cm, and the longitudinal direction is about 1 to 1.5 m. A box-shaped device main body 121, and a device mounted on the device main body 121 so as to be foldable in a standing state and a lying state; An enclosure curing unit 122 that performs curing by enclosing the back surface in a U-shape with a curing sheet, and the upper and lower ends of the front wall 123 that is the outer surface side of the building 100 in the apparatus main body 121 are mounted on the top and bottom of the building 100. A guide roller 124 that is rotatable in contact with the outer surface, and a horizontally-long fall prevention plate 125 made of steel or aluminum that is mounted on the upper edge of the front wall 123 along the left-right direction and is disposed obliquely upward. Yes. When the guide roller 124 is in contact with the outer surface of the building 1, the tip of the fall prevention plate 125 near the building approaches the outer surface of the building 100 with a slight gap. Casters (not shown) are attached to the four corners of the bottom surface of the apparatus main body 121.

囲い養生部122は、高さが50乃至80cm程度であり、装置本体121の背面壁126の上端縁にヒンジ127により起伏自在に装着された背面シート養生部128と、左側面壁129の上端縁にヒンジ127により起伏自在に装着された左面シート養生部130と、右側面壁131の上端縁にヒンジ127により起伏自在に装着された右面シート養生部132とから成る。
背面シート養生部128はヒンジ127を介して背面壁126に装着された鋼製またはアルミ製の枠体133と枠体133に張設された養生シート(メッシュシート)134からなり、左面シート養生部130はヒンジ127を介して左側面壁129に装着された鋼製またはアルミ製の枠体135と枠体135に張設された養生シート(メッシュシート)136からなり、右面シート養生部132はヒンジ127を介して右側面壁131に装着された鋼製またはアルミ製の枠体137と枠体137に張設された養生シート(メッシュシート)138からなる。
The enclosure curing unit 122 has a height of about 50 to 80 cm, and is attached to the upper end edge of the rear wall 126 of the apparatus main body 121 by a hinge 127 so as to be raised and lowered, and to the upper end edge of the left side wall 129. The left side sheet curing part 130 is mounted up and down freely by a hinge 127, and the right side sheet curing part 132 is mounted on the upper edge of the right side wall 131 so as to be able to move up and down.
The back sheet curing unit 128 includes a steel or aluminum frame 133 attached to the back wall 126 via a hinge 127 and a curing sheet (mesh sheet) 134 stretched on the frame 133, and a left sheet curing unit. 130 is composed of a steel or aluminum frame 135 attached to the left side wall 129 via a hinge 127 and a curing sheet (mesh sheet) 136 stretched on the frame 135, and the right sheet curing unit 132 is a hinge 127. A steel or aluminum frame 137 mounted on the right side wall 131 and a curing sheet (mesh sheet) 138 stretched on the frame 137.

起立状態の背面シート養生部128の枠体133の左端部に突設されたピン139に板状の留め金具140の端部が回動自在に軸支されており、枠体133の右端部に突設されたピン141に板状の留め金具142の端部が回動自在に軸支されている。また、起立状態の左面シート養生部130の枠体135の背面寄り端部にピン143が突設されており、起立状態の右面シート養生部132の枠体137の背面寄り端部にピン144が突設されている。ピン143に留め金具1140のピン孔(図示せず)を着脱自在に嵌合し、ピン144に留め金具142のピン孔(図示せず)を着脱自在に嵌合することにより、背面シート養生部128、左面シート養生部130、右面シート養生部132を装置本体121の上側に起立させることができる。反対に、ピン143、144から留め金具140、142を外すことにより、各背面シート養生部128、左面シート養生部130、右面シート養生部132を装置本体120の背面壁126の外側、左側面壁129の外側、右側面壁130の外側に倒伏させることができる(図1の矢印参照)。   The end of the plate-like fastener 140 is pivotally supported by a pin 139 projecting from the left end of the frame 133 of the rear sheet curing unit 128 in the upright state, and is supported at the right end of the frame 133. An end of a plate-like fastener 142 is pivotally supported by the projecting pin 141 so as to be rotatable. In addition, a pin 143 protrudes from the rear end of the frame 135 of the left-side sheet curing unit 130 in the standing state, and a pin 144 extends from the rear end of the frame 137 of the right-side sheet curing unit 132 in the standing state. Projected. A pin hole (not shown) of the clasp 1140 is detachably fitted to the pin 143, and a pin hole (not shown) of the clasp 142 is detachably fitted to the pin 144, whereby the back sheet curing unit 128, the left side sheet curing unit 130, and the right side sheet curing unit 132 can be erected on the upper side of the apparatus main body 121. On the other hand, by removing the fasteners 140 and 142 from the pins 143 and 144, the back sheet curing unit 128, the left sheet curing unit 130, and the right sheet curing unit 132 are connected to the outside and left side wall 129 of the back wall 126 of the apparatus main body 120. Can fall on the outside of the right side wall 130 (see the arrow in FIG. 1).

装置本体121の左側上端近く内側の前後の隅にはロープ取り付け板145、146が固着されており、装置本体121の右側上端近く内側の前後の隅にはロープ取り付け板147、148が固着されている。各ロープ取り付け板145乃至148にはロープ取り付け孔149が穿設されている。
一方、左側の支持具110から懸吊された吊り下げロープ112の内、吊り下げ式養生装置120の左端の上端近くに登降装置1が取り付けられており、この登降装置1に着脱自在に掛着したカラビナ2に懸吊された2本のロープ(繊維ロープまたはワイヤロープ)3、4が左側のロープ取り付け板145、146のロープ取り付け孔149に取り付けられている。同様に、右側の支持具111から懸吊された吊り下げロープ113の内、吊り下げ式養生装置20の右端の上端近くに、登降装置5が取り付けられており、この登降装置5に着脱自在に掛着したカラビナ6に懸吊された2本のロープ7、8が右側のロープ取り付け板147、148のロープ取り付け孔149に取り付けられている。
Rope attachment plates 145 and 146 are fixed to the inner front and rear corners near the upper left end of the apparatus main body 121, and rope attachment plates 147 and 148 are fixed to the inner front and rear corners near the upper right end of the apparatus main body 121. Yes. A rope attachment hole 149 is formed in each rope attachment plate 145 to 148.
On the other hand, among the hanging ropes 112 suspended from the left support tool 110, the climbing device 1 is attached near the upper end of the left end of the hanging type curing device 120, and is detachably attached to the climbing device 1. Two ropes (fiber ropes or wire ropes) 3 and 4 suspended from the carabiner 2 are attached to the rope attachment holes 149 of the left rope attachment plates 145 and 146. Similarly, the climbing device 5 is attached near the upper end of the right end of the hanging type curing device 20 among the hanging ropes 113 suspended from the right support 111. The climbing device 5 is detachable from the climbing device 5. Two ropes 7 and 8 suspended from the carabiner 6 that is hooked are attached to the rope attachment holes 149 of the right rope attachment plates 147 and 148.

登降装置1、5は作業員A、Bが操作して吊り下げ式養生装置120を任意の高さ位置に昇降させるためのものであり、上昇は作業員A、Bの携帯する電動ドライバの動力で行い、下降は吊り下げ式養生装置120の重量を利用して行うようになっている。登降装置1、5はこの実施例では本願発明者が先に出願した特開2017−158816号の登高器と同じ構成であり、以下詳述する。   The climbing devices 1 and 5 are operated by the workers A and B to raise and lower the suspension type curing device 120 to an arbitrary height position. The lowering is performed using the weight of the hanging type curing device 120. In this embodiment, the climbing devices 1 and 5 have the same configuration as that of the climber disclosed in Japanese Patent Application Laid-Open No. 2017-158816, which was previously filed by the present inventor, and will be described in detail below.

登降装置1、5の内、登降装置1の構成を図3乃至図7に示す。
図3は登降装置1の前面を開放した状態を示す正面図、図4は図3の登降装置1の背面図、図5は図3の登降装置1の左側面図、図6は図3の登降装置1の前面を閉塞した状態を示す正面図、図7は図3中のカムの組み立て図である。
これらの図において、1は動力式の登降装置であり、作業者A、Bが携帯する充電式の電動ドライバにより駆動力を得て吊り下げロープ112(図12参照)を任意の高さ位置に登高可能になっている。
Of the climbing devices 1 and 5, the configuration of the climbing device 1 is shown in FIGS.
3 is a front view showing a state in which the front surface of the climbing device 1 is opened, FIG. 4 is a rear view of the climbing device 1 in FIG. 3, FIG. 5 is a left side view of the climbing device 1 in FIG. FIG. 7 is an assembled view of the cam in FIG. 3. FIG.
In these drawings, reference numeral 1 denotes a power climbing device, which obtains a driving force from a rechargeable electric driver carried by the workers A and B to bring the hanging rope 112 (see FIG. 12) to an arbitrary height position. Climbing is possible.

登降装置1は背面側に縦に長い略六角形状の支持部材としての固定プレート10を備えており、この固定プレート10は背面部11の上端部の左右両側が前面側に湾曲されて、背面部11から一定距離おいて前面側の左右両上隅部分を覆うように設けられたアーム部12、13と、背面部11の上端の中央部分からL字状に折曲されて背面部11と平行に一定距離おいて固定プレート10の中央付近まで延設された前側支持部14を有している。固定プレート10の背面部11の中央と前側支持部14の下端部との間に支軸15が固着されており、この支軸15にプーリ16が回転自在に軸支されている。プーリ16は着脱自在に巻き掛けられる吊り下げロープ112を周方向へ移動させる機能を有する。   The ascending / descending apparatus 1 is provided with a fixed plate 10 as a substantially hexagonal support member that is vertically long on the back side. The fixed plate 10 is curved at the left and right sides of the upper end portion of the back surface portion 11 to the front surface side. 11 is provided to cover the left and right upper corners on the front side at a certain distance from the front part 11, and is bent in an L shape from the central part of the upper end of the rear part 11 and parallel to the rear part 11. And a front support portion 14 extending to the vicinity of the center of the fixed plate 10 at a certain distance. A support shaft 15 is fixed between the center of the back surface portion 11 of the fixed plate 10 and the lower end portion of the front support portion 14, and a pulley 16 is rotatably supported on the support shaft 15. The pulley 16 has a function of moving the suspension rope 112 that is detachably wound in the circumferential direction.

固定プレート10の背面部11の上端部中央と前側支持部14の上端部との間に、充電式の電動ドライバの出力軸(図5の符号150、151参照)を着脱自在に結合可能で、電動ドライバ150から回転力が入力される入力軸17が回転自在かつ支軸15と平行に軸支されている。入力軸17は六角軸の形状を有し、電動ドライバ150の出力軸であるチャック部151を着脱自在に装着可能である。入力軸17はプーリ16の外周より半径方向外側に配置されている。プーリ16にはプーリ16の外径より大きい径の歯車18が同軸上に一体化されており、プーリ16と一体的に回転する(なお、歯車18の外径はプーリ16の外径と同一または小さくても良い)。入力軸17には歯車18と歯合する小径の歯車19が同軸上に一体化されている。これらの歯車18、19により、入力軸17に加えられた回転力を減速してプーリ16に伝達する歯車伝達機構20が構成されている。   An output shaft (see reference numerals 150 and 151 in FIG. 5) of the rechargeable electric driver can be detachably coupled between the center of the upper end of the back surface 11 of the fixed plate 10 and the upper end of the front support 14. An input shaft 17 to which rotational force is input from the electric driver 150 is rotatably supported in parallel with the support shaft 15. The input shaft 17 has a hexagonal shaft shape, and a chuck portion 151 that is an output shaft of the electric driver 150 can be detachably mounted. The input shaft 17 is disposed radially outward from the outer periphery of the pulley 16. A gear 18 having a diameter larger than the outer diameter of the pulley 16 is coaxially integrated with the pulley 16 and rotates integrally with the pulley 16 (the outer diameter of the gear 18 is the same as the outer diameter of the pulley 16 or It can be small). A small-diameter gear 19 that meshes with the gear 18 is coaxially integrated with the input shaft 17. These gears 18, 19 constitute a gear transmission mechanism 20 that decelerates the rotational force applied to the input shaft 17 and transmits it to the pulley 16.

固定プレート10の前面側の内、アーム部12、13と前側支持部14以外の部分は吊り下げロープ112を登降装置1の前面側からプーリ16に着脱自在とする開放部30となっている。前側支持部14の上部の左右両端と固定プレート10の背面部11の間には、吊り下げロープ112が入力軸17、歯車19と接触しないようにするためのガイド板31、32が背面部11から垂設して設けられている。また、左右のアーム部12、13と固定プレート10の背面部11の間には吊り下げロープ112の侵入進路と脱出進路を案内するガイドローラ33、34がガイド板31、32から距離をおいて回転自在に軸支されている。ガイドローラ33とガイド板31の間の空間により吊り下げロープ112を登降装置1の外部からプーリ16へ案内するロープ入口通路35が形成されており、ガイドローラ34とガイド板32の間の空間により吊り下げロープ112をプーリ16から登降装置1の外部へ案内するロープ出口通路36が形成されている。アーム部12の先端縁37とガイド板31の間、アーム部13の先端縁38とガイド板23の間には吊り下げロープ112を登降装置1の前面側からロープ入口通路35、ロープ出口通路36へ挿脱可能な隙間S1、S2が空いている。   Of the front surface side of the fixed plate 10, portions other than the arm portions 12 and 13 and the front support portion 14 are open portions 30 that allow the suspension rope 112 to be attached to and detached from the pulley 16 from the front surface side of the climbing device 1. Between the left and right ends of the upper part of the front support portion 14 and the back surface portion 11 of the fixed plate 10, guide plates 31 and 32 for preventing the suspension rope 112 from contacting the input shaft 17 and the gear 19 are provided on the back surface portion 11. It is provided vertically. In addition, guide rollers 33 and 34 for guiding the ingress and egress routes of the suspension rope 112 are spaced from the guide plates 31 and 32 between the left and right arm portions 12 and 13 and the back surface portion 11 of the fixed plate 10. It is pivotally supported. The space between the guide roller 33 and the guide plate 31 forms a rope entrance passage 35 that guides the suspension rope 112 from the outside of the climbing device 1 to the pulley 16, and the space between the guide roller 34 and the guide plate 32 A rope outlet passage 36 for guiding the suspension rope 112 from the pulley 16 to the outside of the climbing device 1 is formed. Hanging ropes 112 are provided between the leading edge 37 of the arm portion 12 and the guide plate 31 and between the leading edge 38 of the arm portion 13 and the guide plate 23 from the front side of the climbing device 1. Clearances S1 and S2 that can be inserted and removed are vacant.

固定プレート10の背面部11の下端部で、プーリ16及び歯車18の下方にはカラビナ掛着用の穴40が空いた円筒状の支軸41が背面部11から垂直に装着されている。支軸41の前端部には固定プレート10の前面側の開放部30を閉塞・開放する可動の閉塞部材としてのガードプレート42が回動自在に軸支されている。ガードプレート42は略洋ナシ形に形成されており、開放部30を閉塞した状態から180度回動させたときの上端部が支軸41に軸支されている(図3参照)。ガードプレート42は開放部30を閉塞する位置に回動したとき、開放部30の背面に前側支持部14の前面が近接する(図6参照)。プーリ16の支軸15の前面側にはプッシュボタン43が装備されており、このプッシュボタン43の先端部は円柱凸形に形成されており、前側支持部14より前方に突出して設けられている(図5参照)。プッシュボタン43は図示しないコイルバネにより前方へ付勢されており、先端部を指で登降装置1の背面方向へ押圧することで、前側支持部14と略同一の高さまで押し込み可能となっており、指を放すと元の突出状態に復帰する。   At the lower end of the back surface portion 11 of the fixed plate 10, a cylindrical support shaft 41 with a carabiner hooking hole 40 is vertically mounted from the back surface portion 11 below the pulley 16 and the gear 18. A guard plate 42 as a movable closing member that closes and opens the opening 30 on the front side of the fixed plate 10 is pivotally supported at the front end of the support shaft 41. The guard plate 42 is formed in a substantially pear shape, and the upper end portion when the opening portion 30 is rotated 180 degrees from the closed state is pivotally supported by the support shaft 41 (see FIG. 3). When the guard plate 42 is rotated to a position where the opening portion 30 is closed, the front surface of the front support portion 14 comes close to the back surface of the opening portion 30 (see FIG. 6). A push button 43 is provided on the front surface side of the support shaft 15 of the pulley 16, and a tip end portion of the push button 43 is formed in a cylindrical convex shape and is provided to protrude forward from the front support portion 14. (See FIG. 5). The push button 43 is urged forward by a coil spring (not shown), and can be pushed to substantially the same height as the front support portion 14 by pressing the tip portion toward the back of the climbing device 1 with a finger. Release the finger to return to the original protruding state.

ガードプレート42の中央付近には開放部30を覆う位置に回動したときにプッシュボタン43に係合する半楕円状の係合穴部44が形成されている。また、下方へ回動して開状態にあるガードプレート42の係合穴部44の右端からガードプレート42の右端縁まで断面がドーム状に前方へ膨出されるとともに正面視が部分円環状に形成された膨出部45が設けられている。膨出部45はプッシュボタン43をガードプレート42の外側から係合穴部44まで通過可能とする。係合穴部44の図3における上側と下側及び左側を囲むようにして、硬質ゴムから成る横向きU字状の保護部材46が被着されている。保護部材46は作業者が復帰状態にあるプッシュボタン43を押圧するときの段差感を軽減するものであり、この保護部材46の断面は山形に形成されている。図6に示す如くガードプレート42を開放部30を閉塞する位置に移動したとき、係合穴部44の内、膨出部45と反対側の端縁47が押し込み状態または復帰状態にあるプッシュボタン43と係合するようになっており、ガードプレート32の図6における反時計方向への回動規制がなされる。また、膨出部45の内、係合穴部44の側の端縁48が前方復帰状態にあるプッシュボタン43と係合するようになっており、ガードプレート32の図6における時計方向への回動規制がなされる。   Near the center of the guard plate 42 is formed a semi-elliptical engagement hole 44 that engages with the push button 43 when rotated to a position covering the opening 30. Further, the cross section bulges forward in a dome shape from the right end of the engagement hole 44 of the guard plate 42 in the open state by rotating downward, and the front view is formed in a partial annular shape. The bulging part 45 made is provided. The bulging portion 45 allows the push button 43 to pass from the outside of the guard plate 42 to the engagement hole 44. A laterally U-shaped protective member 46 made of hard rubber is attached so as to surround the upper side, the lower side and the left side in FIG. The protective member 46 reduces a feeling of a step when the operator presses the push button 43 in the return state, and the cross section of the protective member 46 is formed in a mountain shape. As shown in FIG. 6, when the guard plate 42 is moved to a position to close the opening 30, the push button in which the edge 47 on the opposite side of the bulging portion 45 in the engagement hole 44 is in the pushed-in state or the return state. 43, and the rotation of the guard plate 32 in the counterclockwise direction in FIG. 6 is restricted. Further, the edge 48 on the side of the engagement hole 44 in the bulging portion 45 is adapted to engage with the push button 43 in the forward return state, and the guard plate 32 in the clockwise direction in FIG. The rotation is restricted.

支軸41にはカム50が回動自在に軸支されている。カム50はプーリ16にに対して接近・離間自在に軸支されており、吊り下げロープ112に対し登降装置1が下降方向へ移動しようとするとき(吊り下げロープ112とともにプーリ16が図3の時計方向へ移動しようとするとき)、平面視略円弧状で断面が窪んだロープ接触部51が吊り下げロープ112に食い込む方向(図3の反時計方向)に回動して移動を阻止し、吊り下げロープ112に対し登降装置1が登高方向へ移動しようとするとき(吊り下げロープ112とともにプーリ16が図3の反時計方向へ移動しようとするとき)、ロープ接触部51がプーリ16から離間する方向(図3の時計方向)に回動して、吊り下げロープ112とともにプーリ16が図3の反時計方向へ移動するのを許容するように構成されている。
ロープ接触部51の窪んだロープ接触面51Aには吊り下げロープ112がプーリ16とともに時計方向へ移動しようとする際にロープ表面に刺さって移動を阻止する多数の歯52が突設されている(図5参照)。カム50の支軸41寄りの内周部には部分円環状の溝50Aが刻設されており、この溝50Aにカム50を常時、図3の反時計方向でプーリ16に接近する方向へ付勢する付勢手段としての引っ張りコイルバネ50Bが内蔵されている。引っ張りコイルバネ50Bは図3の左端が支軸41に固定されており、右端がカム50に固定されている。固定プレート10の背面部11には引っ張りコイルバネ50Bに付勢されたカム50の復帰方向移動を制限するストッパピン53が植設されており、ロープ接触部51の先端部がプーリ16の内径に接する位置以上には図3の反時計方向へ回動しないようになっている。
A cam 50 is rotatably supported on the support shaft 41. The cam 50 is pivotally supported so as to be able to approach and separate from the pulley 16, and when the climbing device 1 is about to move downward with respect to the suspension rope 112 (the pulley 16 together with the suspension rope 112 is shown in FIG. 3). When the rope contact portion 51 having a substantially arc shape in plan view and having a recessed cross section is rotated in a direction (counterclockwise in FIG. 3) to bite into the hanging rope 112, the movement is prevented. When the ascending / descending apparatus 1 tries to move in the climbing direction with respect to the hanging rope 112 (when the pulley 16 moves together with the hanging rope 112 in the counterclockwise direction in FIG. 3), the rope contact portion 51 is separated from the pulley 16. It is configured to rotate in the direction (clockwise in FIG. 3) to allow the pulley 16 together with the hanging rope 112 to move in the counterclockwise direction in FIG.
On the rope contact surface 51A of the rope contact portion 51, a large number of teeth 52 projecting from the rope surface to prevent the suspension rope 112 from moving when the hanging rope 112 is about to move together with the pulley 16 in the clockwise direction. (See FIG. 5). A partially annular groove 50A is formed in the inner peripheral portion of the cam 50 near the support shaft 41, and the cam 50 is always attached to the groove 50A in the direction of approaching the pulley 16 in the counterclockwise direction of FIG. A tension coil spring 50B as a biasing means for biasing is incorporated. The tension coil spring 50 </ b> B has a left end in FIG. 3 fixed to the support shaft 41 and a right end fixed to the cam 50. A stopper pin 53 for restricting the movement of the cam 50 biased by the tension coil spring 50 </ b> B in the return direction is planted on the back surface portion 11 of the fixed plate 10, and the tip end portion of the rope contact portion 51 contacts the inner diameter of the pulley 16. Beyond the position, it does not rotate counterclockwise in FIG.

カム50の内、ロープ接触部51の先端寄りの後側には、ロープ接触部51をプーリ16や吊り下げロープ112から離間させる操作を行なうための操作部材54がロープ接触部51から略垂直な後方へ直線的に延設されたレール状のスライド案内部55にスライド自在に装備されている(図7(1)参照)。操作部材54は下部に断面コ字状の凹部54Aが形成されており、凹部54Aがスライド案内部55に跨るようにしてスライド自在に装備されている。スライド案内部55には長孔56が形成されており、操作部材54は前端部に植設されたピン57が長孔56に嵌合した状態でスライド案内部55に沿って前後に直線的にスライド可能になっている(図7(2)参照)。
スライド案内部55の長孔56にはピン57と長孔56の後端の間に圧縮コイルバネ58(図3参照)が介装されており、操作部材54を常時、ロープ接触部51の先端部寄りに付勢している。操作部材54は先端側に設けられた指掛け部59に親指を掛け、支軸41を中心とする図3の時計方向へ押圧することでカム50をプーリ16から離間する方向に回動させたり、指掛け部59をスライド案内部55に沿ってロープ接触部51の先端部から見て垂直な後方へ押圧することで、カム50に対し操作部材54を後方(図3の斜め下方、図7(2)の矢印A参照)へスライドさせたりできる。
An operation member 54 for performing an operation of moving the rope contact portion 51 away from the pulley 16 and the hanging rope 112 is substantially perpendicular to the rope contact portion 51 on the rear side of the cam 50 near the tip of the rope contact portion 51. It is slidably mounted on a rail-shaped slide guide portion 55 that extends linearly rearward (see FIG. 7A). The operation member 54 has a concave portion 54 </ b> A having a U-shaped cross section at the lower portion, and is slidably provided so that the concave portion 54 </ b> A straddles the slide guide portion 55. A long hole 56 is formed in the slide guide portion 55, and the operation member 54 is linearly moved back and forth along the slide guide portion 55 in a state where a pin 57 implanted in the front end portion is fitted in the long hole 56. It is slidable (see FIG. 7 (2)).
A compression coil spring 58 (see FIG. 3) is interposed in the long hole 56 of the slide guide portion 55 between the pin 57 and the rear end of the long hole 56, and the operation member 54 is always attached to the distal end portion of the rope contact portion 51. It is energizing to the side. The operation member 54 hangs the cam 50 in a direction away from the pulley 16 by placing a thumb on a finger hooking portion 59 provided on the distal end side and pressing it clockwise in FIG. By pressing the finger hook portion 59 along the slide guide portion 55 in the vertical rearward direction when viewed from the tip end portion of the rope contact portion 51, the operation member 54 is moved backward (obliquely downward in FIG. 3, FIG. )) (See arrow A).

ピン57の図3における背面側の端部は固定プレート10の背面外側へ突出されている(図5参照)。固定プレート10の背面部11には図4に示す如く、支軸41を中心に略円弧状に延設されてピン57を遊挿可能な案内孔60が刻設されている。案内孔60にはスライド案内部55の先端寄り(ロープ接触部51の先端部寄り)に在る操作部材54を支軸41を中心とした図3の時計方向(図4の反時計方向)へ押圧し、カム50をプーリ16から離間する方向に回動させたとき、途中からピン57に当接して操作部材54をスライド案内部55に沿ってロープ接触部51の先端部から見て垂直な後方へスライドさせる直線案内部61と(図4、図8、図9参照)、この直線案内部61の後端から略90度外向き(支軸41の半径方向外側向き)に切除されてピン57を係止可能なピン係止部62が設けられている(図10参照)。従って、スライド案内部55の先端寄りに在る操作部材54を支軸41を中心とした時計方向へ押圧すると、最終的にピン57がピン係止部62に係止させることができ、ロープ接触部51とプーリ16の間に大きな隙間があいて吊り下げロープ112をプーリ16に着脱可能となる(図10参照)。
係止状態から、操作部材54をスライド案内部55に沿ってロープ接触部51の先端部から見て垂直な後方へ押圧することで係止状態を解除することができ(図11参照)、操作部材54をスライド案内部55の前端側に戻し、指を放すことで引っ張りコイルバネ50Bによりカム50を図3の反時計方向へ復帰させることができる(図12参照)。スライド案内部55、長孔56、ピン57、圧縮コイルバネ58、案内孔60、直線案内部61、ピン係止部62により、カム50をプーリ16からの離間位置にロックしたり、ロック解除したりするロック手段が構成されている。
The end of the pin 57 on the back side in FIG. 3 protrudes to the outside of the back of the fixed plate 10 (see FIG. 5). As shown in FIG. 4, a guide hole 60 is formed in the back surface portion 11 of the fixed plate 10 so as to extend in a substantially arc shape around the support shaft 41 and allow the pin 57 to be freely inserted. In the guide hole 60, the operation member 54 located near the tip of the slide guide portion 55 (near the tip of the rope contact portion 51) is clockwise in FIG. 3 (counterclockwise in FIG. 4) around the support shaft 41. When the cam 50 is rotated in the direction away from the pulley 16, the operation member 54 is brought into contact with the pin 57 from the middle, and the operation member 54 is perpendicular to the end of the rope contact portion 51 along the slide guide portion 55. A linear guide 61 that slides backward (see FIGS. 4, 8, and 9); a pin that is cut from the rear end of the linear guide 61 approximately 90 degrees outward (toward the radial direction of the support shaft 41); The pin latching | locking part 62 which can latch 57 is provided (refer FIG. 10). Accordingly, when the operation member 54 located near the tip of the slide guide portion 55 is pressed clockwise around the support shaft 41, the pin 57 can be finally locked to the pin locking portion 62, and the rope contact There is a large gap between the portion 51 and the pulley 16, and the hanging rope 112 can be attached to and detached from the pulley 16 (see FIG. 10).
From the locked state, the locked state can be released by pressing the operating member 54 along the slide guide portion 55 in the vertical direction when viewed from the tip of the rope contact portion 51 (see FIG. 11). By returning the member 54 to the front end side of the slide guide portion 55 and releasing the finger, the cam 50 can be returned in the counterclockwise direction of FIG. 3 by the tension coil spring 50B (see FIG. 12). The cam 50 is locked at a position away from the pulley 16 or unlocked by the slide guide portion 55, the long hole 56, the pin 57, the compression coil spring 58, the guide hole 60, the linear guide portion 61, and the pin locking portion 62. The locking means is configured.

図6の如く登降装置1の前面を閉塞したガードプレート42を時計方向へ回動すると開放部30が空き、操作部材54が露出して作業者が操作可能となる。またプーリ16が露出し、吊り下げロープ112を登降装置1の前面側からプーリ16に巻き掛けるとともに、吊り下げロープ112の内、プーリ16の両側から延びた部分をロープ入口通路35、ロープ出口通路36に挿入することで、吊り下げロープ2の装填ができる。   As shown in FIG. 6, when the guard plate 42 with the front surface of the climbing device 1 closed is rotated in the clockwise direction, the opening 30 is vacant and the operation member 54 is exposed so that the operator can operate. Further, the pulley 16 is exposed, and the hanging rope 112 is wound around the pulley 16 from the front side of the climbing device 1, and the portions of the hanging rope 112 that extend from both sides of the pulley 16 are the rope inlet passage 35 and the rope outlet passage. The suspension rope 2 can be loaded by inserting it into 36.

図8乃至図15を参照して登降装置1への吊り下げロープ112の取り付け方法を説明する。予め、図6に示す如くガードプレート42が固定プレート10の開放部30を閉塞した状態にあり、またプッシュボタン43はガードプレート42の係合穴部44の端縁47と膨出部45の端縁48に係合可能な高さに突出しているものとする。また、カム50が引っ張りコイルバネ50Bに付勢されてプーリ16に接近した位置に復帰しており、操作部材54も圧縮コイルバネ58に付勢されてロープ接触部51の先端寄りに復帰した状態にあるものとする。   With reference to FIG. 8 thru | or FIG. 15, the attachment method of the hanging rope 112 to the climbing apparatus 1 is demonstrated. As shown in FIG. 6, the guard plate 42 is in a state of closing the open portion 30 of the fixed plate 10 in advance, and the push button 43 is connected to the end edge 47 of the engagement hole portion 44 of the guard plate 42 and the end of the bulging portion 45. It is assumed that it protrudes to a height that can be engaged with the edge 48. Further, the cam 50 is urged by the tension coil spring 50B and returned to a position close to the pulley 16, and the operation member 54 is also urged by the compression coil spring 58 and returned to the end of the rope contact portion 51. Shall.

登降装置1に吊り下げロープ112を取り付ける際、プッシュボタン43を押圧して押し込み、ガードプレート42を図6の時計方向に回動して膨出部45の背面側をプッシュボタン43を通過させ、開放部30を前方に露出させる(図3、図4参照)。プッシュボタン43は図示しないコイルバネに付勢されて元の突出状態に復帰する。続いて、操作部材54の指掛け部59に親指を掛け図3の時計方向に押圧して回動させ、ピン57が案内孔60の直線案内部61に当接したところで(図8参照。なお、図8乃至図11は背面図である)、操作部材54を図8の反時計方向及びスライド案内部55の後方へ押圧し(図8の矢印B、図9の矢印C参照)、ピン57がピン係止部62を過ぎたところで(図10の矢印D、E参照)、図10の反時計方向への押圧は続けながらスライド案内部55の前方へ移動させ、ピン係止部62にピン57が当接したところで親指を離す。操作部材54は圧縮コイルバネ58によりスライド案内部55の前方へ付勢されるので、ピン57はピン係止部62に係止状態となり、カム50のロープ接触部51がプーリ16から離間する(図11の矢印F参照)。   When attaching the hanging rope 112 to the climbing device 1, the push button 43 is pressed and pushed, the guard plate 42 is rotated clockwise in FIG. 6, and the push button 43 passes through the back side of the bulging portion 45, The opening 30 is exposed forward (see FIGS. 3 and 4). The push button 43 is urged by a coil spring (not shown) to return to the original protruding state. Subsequently, a thumb is placed on the finger rest portion 59 of the operation member 54 and pressed and rotated clockwise in FIG. 3, and when the pin 57 comes into contact with the linear guide portion 61 of the guide hole 60 (see FIG. 8, see FIG. 8). 8 to 11 are rear views), and the operation member 54 is pressed counterclockwise in FIG. 8 and rearward of the slide guide portion 55 (see arrow B in FIG. 8 and arrow C in FIG. 9). After passing the locking portion 62 (see arrows D and E in FIG. 10), the pin 57 is moved to the pin locking portion 62 while moving in the forward direction of the slide guide portion 55 while continuing to press in the counterclockwise direction in FIG. Release your thumb when it comes into contact. Since the operation member 54 is urged forward of the slide guide portion 55 by the compression coil spring 58, the pin 57 is locked to the pin locking portion 62, and the rope contact portion 51 of the cam 50 is separated from the pulley 16 (FIG. 11 arrow F).

次に、登降装置1の開放部30の前側から吊り下げロープ112をプーリ16に巻き掛け、支点に近い吊り下げロープ112の上側112aをガイド板31とガイドローラ33の間のロープ入口通路35に挿入し、支点から遠い吊り下げロープ112の下側112bをガイド板32とガイドローラ34の間のロープ出口通路36に挿入する。しかるのち、操作部材54の指掛け部59に親指を掛け、スライド案内部55の後方へ押圧しピン57をピン係止部62から外し、更に、操作部材54を図11の時計方向へ回動させながら親指を離す。カム50は引っ張りコイルバネ50Bに付勢されて図11の時計方向に復帰し、ロープ接触部51が吊り下げロープ112に接触する。操作部材54は圧縮コイルバネ58に付勢されてスライド案内部55の先端寄りに復帰する(図12参照。なお、図12乃至図15は登降装置1を正面側から見た図である)。   Next, the suspension rope 112 is wound around the pulley 16 from the front side of the opening part 30 of the climbing device 1, and the upper side 112 a of the suspension rope 112 close to the fulcrum is connected to the rope entrance passage 35 between the guide plate 31 and the guide roller 33. Insert the lower side 112b of the suspension rope 112 far from the fulcrum into the rope outlet passage 36 between the guide plate 32 and the guide roller 34. After that, a thumb is placed on the finger hooking portion 59 of the operation member 54, and the pin 57 is removed from the pin locking portion 62 by pushing the slide guide portion 55 rearward. Further, the operation member 54 is rotated clockwise in FIG. Release your thumb. The cam 50 is biased by the tension coil spring 50 </ b> B and returns to the clockwise direction in FIG. 11, and the rope contact portion 51 contacts the hanging rope 112. The operation member 54 is biased by the compression coil spring 58 and returns to the vicinity of the tip of the slide guide portion 55 (see FIG. 12. Note that FIGS. 12 to 15 are views of the climbing device 1 viewed from the front side).

次に、ガードプレート42を図12の反時計方向に回動して膨出部45の一端側から背面側にプッシュボタン43を通過させていき(図12の矢印G、図13の矢印H参照)、途中でプッシュボタン43を僅かに押し込ませながら他端側の端縁48から係合孔部44に露出させる。プッシュボタン43は元の復帰状態に戻り、ガードプレート42を開放部30を閉塞する位置に固定する(図14参照)。吊り下げロープ112の下側112bは登降装置1の下方へ垂らす。   Next, the guard plate 42 is rotated counterclockwise in FIG. 12, and the push button 43 is passed from one end side to the back side of the bulging portion 45 (see arrow G in FIG. 12, arrow H in FIG. 13). ) While pushing the push button 43 slightly in the middle, it is exposed to the engagement hole 44 from the end edge 48 on the other end side. The push button 43 returns to the original return state, and fixes the guard plate 42 at a position where the opening 30 is closed (see FIG. 14). The lower side 112b of the hanging rope 112 hangs downward from the climbing device 1.

登降装置5も登降装置1と全く同様に構成されており、吊り下げロープ113に対し登降装置1で説明したのと同様の方法で取り付けることができる。
登降装置1の支軸41のカラビナ掛着用の穴40にカラビナ2を着脱自在に掛装し、カラビナ2にワイヤロープ3と4の一端側のフック(図示せず)を懸吊し、ワイヤロープ3と4の他端側のフック(図示せず)を吊り下げ式養生装置120の装置本体121の左上端部に固着したロープ取り付け板145、146に掛着する(図2参照)。同様に登降装置5の支軸41のカラビナ掛着用の穴40にカラビナ6を着脱自在に掛装し、カラビナ6にワイヤロープ3と4の一端側のフック(図示せず)を懸吊し、ワイヤロープ7と8の他端側のフック(図示せず)を吊り下げ式養生装置120の装置本体121の右上端部に固着したロープ取り付け板147、148に掛着することにより(図2参照)、一組の登降装置1、5を用いて吊り下げ式養生装置120の昇降が可能となる。
なお、カラビナ2、6は上下に長いタイプとし、操作部材54の操作等のためにガードプレート42を開ける場合に、カラビナ2、6の内側の隙間を通しながらガードプレート42を大きく回転させて、操作部材54の指掛け部59に指掛け可能とする。
The climbing device 5 is also configured in exactly the same way as the climbing device 1, and can be attached to the hanging rope 113 by the same method as described in the climbing device 1.
The carabiner 2 is removably attached to the carabiner hooking hole 40 of the support shaft 41 of the climbing device 1, and hooks (not shown) on one end side of the wire ropes 3 and 4 are suspended on the carabiner 2, and the wire rope The hooks (not shown) on the other end side of 3 and 4 are hooked to the rope attachment plates 145 and 146 fixed to the upper left end portion of the device main body 121 of the hanging type curing device 120 (see FIG. 2). Similarly, the carabiner 6 is removably attached to the carabiner hooking hole 40 of the support shaft 41 of the climbing device 5, and hooks (not shown) on one end side of the wire ropes 3 and 4 are suspended from the carabiner 6. By hooking hooks (not shown) on the other end side of the wire ropes 7 and 8 to rope attachment plates 147 and 148 fixed to the upper right end portion of the apparatus main body 121 of the hanging type curing device 120 (see FIG. 2). ), The hanging type curing device 120 can be lifted and lowered using a pair of climbing devices 1 and 5.
The carabiners 2 and 6 are vertically long, and when the guard plate 42 is opened for the operation of the operation member 54, the guard plate 42 is greatly rotated while passing through the gaps inside the carabiners 2 and 6, The finger can be hooked on the finger hook 59 of the operation member 54.

登降装置1、5にロープ3と4、7と8を介して吊り下げ式養生装置120の荷重が掛かっているとき(地面から浮いた状態)、吊り下げロープ112の上側112aと113の上側113aに張力が掛かって、プーリ16に図14の時計方向の回転力が生じるが、この際、カム50にプーリ16に接近する方向の回転力が生じ、ロープ接触部51がロープ2に食い込んで挟圧するとともに歯52がロープ表面に刺さってプーリ16の回転が拘束される。このため、吊り下げロープ112、113に対し登降装置1、5が下降することはない。   When the load of the suspension type curing device 120 is applied to the climbing devices 1 and 5 via the ropes 3 and 4, 7 and 8 (floating from the ground), the upper side 112 a of the hanging rope 112 and the upper side 113 a of the 113 14 is generated in the pulley 16 in the clockwise direction in FIG. 14. At this time, a rotational force in the direction of approaching the pulley 16 is generated in the cam 50, and the rope contact portion 51 bites into the rope 2 and is pinched. At the same time, the teeth 52 are stuck in the rope surface and the rotation of the pulley 16 is restricted. For this reason, the ascending / descending apparatuses 1 and 5 do not descend with respect to the hanging ropes 112 and 113.

吊り下げ式養生装置120を上昇させたい場合、左側の作業者Aが自身の携帯した電動ドライバ150の出力軸としてのチャック151に登降装置1の入力軸17を嵌合して締結し(図5参照)、電動ドライバ150を図15の時計方向に回転させる。すると、電動ドライバ150の回転力が伝達機構20により減速されてプーリ16が図15の反時計方向に回転し、吊り下げロープ112をプーリ16の周方向に沿って反時計方向へ移動させる。このとき、カム50はプーリ16から離間する方向の力を受けるので、プーリ16は回転を拘束されず、吊り下げロープ112を継続的に反時計方向(登降装置1の登高方向)へ移動させる。   When it is desired to raise the suspension type curing device 120, the worker A on the left side fits and fastens the input shaft 17 of the climbing device 1 to the chuck 151 as the output shaft of the electric driver 150 carried by himself / herself (FIG. 5). Reference), the electric driver 150 is rotated clockwise in FIG. Then, the rotational force of the electric driver 150 is decelerated by the transmission mechanism 20 and the pulley 16 rotates counterclockwise in FIG. 15, and the suspension rope 112 is moved counterclockwise along the circumferential direction of the pulley 16. At this time, since the cam 50 receives a force in a direction away from the pulley 16, the pulley 16 is not restrained from rotating, and the suspension rope 112 is continuously moved in the counterclockwise direction (the climbing direction of the climbing device 1).

作業者Aと平行して、右側の作業者Bが自身が携帯した電動ドライバ150の出力軸としてのチャック151に登降装置5の入力軸17を嵌合して締結し(図5参照)、電動ドライバ150を図15の時計方向に回転させることで、吊り下げロープ113を継続的に反時計方向(登降装置5の登高方向)へ移動させることができる。
これにより、作業者A、Bは吊り下げ式養生装置120をほぼ水平に保ちながら吊り下げロープ112、113に沿って上昇させることができる。所望の高さ位置で電動ドライバ150を停止させれば、上昇を止めることができる。このとき吊り下げ式養生装置120の荷重で吊り下げロープ112の上側112aと113の上側113aに張力が掛かってプーリ16に時計方向の回転力が生じるが、カム50のロープ接触部51がロープ2を挟圧してプーリ16の回転が拘束される。このため、吊り下げロープ112、113に対し登降装置1、5が下降することはない。
なお、作業者AとBが交互に電動ドライバ150により登降装置1と5を登高させても良い。
In parallel with the worker A, the worker B on the right side fits and fastens the input shaft 17 of the climbing device 5 to the chuck 151 as the output shaft of the electric driver 150 carried by himself (see FIG. 5). By rotating the driver 150 clockwise in FIG. 15, the hanging rope 113 can be continuously moved in the counterclockwise direction (the climbing direction of the climbing device 5).
Thereby, the workers A and B can raise the suspension type curing device 120 along the suspension ropes 112 and 113 while keeping the suspension type curing device 120 substantially horizontal. If the electric driver 150 is stopped at a desired height position, the rise can be stopped. At this time, tension is applied to the upper side 112a of the suspension rope 112 and the upper side 113a of the suspension rope 112 by the load of the suspension type curing device 120, and a clockwise rotational force is generated in the pulley 16, but the rope contact portion 51 of the cam 50 is The rotation of the pulley 16 is constrained by clamping. For this reason, the ascending / descending apparatuses 1 and 5 do not descend with respect to the hanging ropes 112 and 113.
The workers A and B may alternately lift the climbing devices 1 and 5 by the electric driver 150.

これと反対に、吊り下げ式養生装置120を下降させたい場合、左の作業者Aが登降装置1のプッシュボタン43を押してガードプレート42を大きく開け、操作部材54の指掛け部59に親指を掛けて図3の時計方向に回動したり、プーリ16と離間する方向に引いたりすることでカム50による吊り下げロープ112の挟圧を緩め、吊り下げ式養生装置120の自重によりプーリ16を図3の時計方向へ回転させながら登降装置1を吊り下げロープ112に対して降下させる。   On the other hand, when the suspension type curing device 120 is to be lowered, the worker A on the left presses the push button 43 of the climbing device 1 to open the guard plate 42 widely, and puts his thumb on the finger rest 59 of the operation member 54. 3 is rotated clockwise or pulled away from the pulley 16 to loosen the holding pressure of the suspension rope 112 by the cam 50, and the pulley 16 is moved by the weight of the suspension type curing device 120. 3, the ascending / descending apparatus 1 is lowered with respect to the hanging rope 112 while rotating clockwise.

平行して作業者Bが登降装置5のプッシュボタン43を押してガードプレート42を大きく開け、操作部材54の指掛け部59に親指を掛け図3の時計方向に回動したり、プーリ16と離間する方向に引いたりすることでカム50による吊り下げロープ113の挟圧を緩め、吊り下げ式養生装置120の自重によりプーリ16を図3の時計方向へ回転させながら登降装置5を吊り下げロープ113に対して降下させる。
これにより、作業者A、Bは吊り下げ式養生装置120をほぼ水平に保ちながら吊り下げロープ112、113に沿って下降させることができる。所望の高さ位置で操作部材54を解放し、カム50により吊り下げロープ112、113を挟圧させれば、下降を止めることができる。
なお、作業者AとBが交互に登降装置1と5を下降させても良い。
In parallel, the operator B pushes the push button 43 of the ascending / descending apparatus 5 to open the guard plate 42 widely, puts his thumb on the finger-hooking portion 59 of the operation member 54, rotates in the clockwise direction in FIG. The lifting device 5 is moved relative to the hanging rope 113 while the pulley 16 is rotated in the clockwise direction in FIG. 3 by the weight of the hanging type curing device 120 by loosening the holding pressure of the hanging rope 113 by the cam 50. Descent.
Thereby, the workers A and B can be lowered along the suspension ropes 112 and 113 while keeping the suspension type curing device 120 substantially horizontal. If the operation member 54 is released at a desired height and the suspension ropes 112 and 113 are clamped by the cam 50, the descent can be stopped.
In addition, the workers A and B may lower the climbing devices 1 and 5 alternately.

次に、図1を参照して建物1の外面に対する作業方法を説明する。
予め、建物100の屋上のパラペット103に、吊り下げ式養生装置120の横幅と同じ間隔で2つの支持具110、111が装着されており、各先端部に懸吊された吊り下げロープ112、113が地上まで垂れ下がっており、また、屋上に支点確保された作業者A用のメイン側とバックアップ側の安全ロープ101と102、作業者B用のメイン側とバックアップ側の安全ロープ104と105がパラペット103を乗り越えて地上近くまで垂れ下がっているものとする。
Next, a working method for the outer surface of the building 1 will be described with reference to FIG.
In advance, two support tools 110 and 111 are attached to the parapet 103 on the roof of the building 100 at the same interval as the width of the suspension type curing device 120, and the suspension ropes 112 and 113 suspended from the respective end portions. The safety ropes 101 and 102 on the main side and the backup side for the worker A, and the safety ropes 104 and 105 on the main side and the backup side for the worker B are parapets. It is assumed that it is overhanging 103 and hangs near the ground.

地上において、作業者A、B等は、図1の如く組み立てた吊り下げ式養生装置120を支持具110、111の直下に設置し、吊り下げロープ112に登降装置1を取り付け、この登降装置1の穴40に掛装したカラビナ2に一端側を懸吊したロープ3、4の他端側をロープ取り付け板145、146に掛着する。また、吊り下げロープ113に登降装置5を取り付け、この登降装置5の穴40に掛装したカラビナ6に一端側を懸吊したロープ6、7の他端側をロープ取り付け板147、148に掛着する。この際、吊り下げ式養生装置120は地上から数十cm乃至1m程度浮かし、荷重が登降装置1、5に掛かるようにする。吊り下げロープ112、113の下側112a、113aは装置本体121の中に垂れるようにする。   On the ground, the workers A, B, etc. install the suspension type curing device 120 assembled as shown in FIG. 1 directly below the support members 110, 111, attach the climbing device 1 to the hanging rope 112, and this climbing device 1 The other ends of the ropes 3 and 4 suspended at one end on the carabiner 2 hanging on the holes 40 are hooked on the rope attachment plates 145 and 146. Further, the climbing device 5 is attached to the hanging rope 113, and the other ends of the ropes 6 and 7 suspended from the carabiner 6 hung in the hole 40 of the climbing device 5 are hooked to the rope mounting plates 147 and 148. To wear. At this time, the suspension type curing device 120 floats about several tens of cm to 1 m from the ground so that the load is applied to the climbing devices 1 and 5. The lower sides 112 a and 113 a of the hanging ropes 112 and 113 are allowed to hang inside the apparatus main body 121.

次に、建物100の屋上において、作業者Aが自身に装着した安全帯のメイン側のランヤードを安全ロープ101に取着した昇降器具(図示せず)に掛着し、バックアップ側のランヤードを安全ロープ102に取着した墜落防止器具(図示せず)に掛着し、パラペット103を越えて建物100の外面に沿って安全ロープ101に吊り下がりながら吊り下げ式養生装置120の中またはすぐ上まで降下する。作業者Aと平行して、作業者Bも自身に装着した安全帯のメイン側のランヤードを安全ロープ104に取着した昇降器具(図示せず)に掛着し、バックアップ側のランヤードを安全ロープ105に取着した墜落防止器具(図示せず)に掛着し、パラペット103を越えて建物100の外面に沿って安全ロープ101に吊り下がりながら吊り下げ式養生装置120の中またはすぐ上まで降下する。   Next, on the roof of the building 100, the lanyard on the main side of the safety belt attached to the worker A is hooked on a lifting device (not shown) attached to the safety rope 101, and the lanyard on the backup side is secured. Hang on a fall prevention device (not shown) attached to the rope 102 and pass through the parapet 103 and hang on the safety rope 101 along the outer surface of the building 100 to the inside or just above the hanging type curing device 120 Descend. In parallel with worker A, worker B also attaches the lanyard on the main side of the safety belt attached to himself / her to a lifting device (not shown) attached to safety rope 104, and uses the safety lanyard on the backup side as the safety rope. Hang on a fall prevention device (not shown) attached to 105 and descend to the inside of the hanging type curing device 120 or just above the parapet 103 while hanging on the safety rope 101 along the outer surface of the building 100. To do.

作業者A、Bは吊り下げ式養生装置120に体重が全く掛からないか殆ど掛からないようにし、安全ロープ101と102、104、105の下側が装置本体121の中に垂れるようにし、両手が落下防止板125の上で囲い養生部122の建物側開口に来る位置で建物100の外面に対する点検・補修等の作業を行う。作業で生じた補修部材や壁等の破片等は囲い養生部122や落下防止板125に当たって装置本体121に落下したり、直接、装置本体121の中に落下したりして、吊り下げ式養生装置120の外部への落下、飛散が防止される。また、誤って作業道具を落とした場合も、装置本体121の床152に載るので、地上への落下が防止される。   Workers A and B make sure that no weight is applied to the hanging type curing device 120, and the lower sides of the safety ropes 101, 102, 104, and 105 are suspended in the device main body 121, and both hands are dropped. Work such as inspection and repair on the outer surface of the building 100 is performed at a position on the prevention plate 125 at the building side opening of the enclosure curing unit 122. A repairing device or a debris such as a wall generated by the operation hits the enclosure curing unit 122 or the fall prevention plate 125 and falls to the apparatus main body 121 or directly falls into the apparatus main body 121 to be suspended. The falling and scattering of 120 to the outside are prevented. Further, even when the work tool is accidentally dropped, it falls on the floor 152 of the apparatus main body 121, so that it is prevented from dropping to the ground.

建物100に対し、今回作業時の1つ上の作業範囲へ移動したい場合、作業者A、Bは安全ロープ101と102、104と105に取り付けた昇降器具と墜落防止器具の位置を上方へ少し移動し登高するとともに、登降装置1、5を各々が携帯する電動ドライバ150により登高方向へ少し駆動し、吊り下げ式養生装置120を吊り下げロープ112、113に沿って少し上昇させ、1つ上の作業範囲に移動させる(両手が落下防止板125の上で囲い養生部122の建物側開口の高さ位置に来るようにする)。移動の前後や移動中、作業員A、Bは吊り下げ式養生装置120に体重が全く掛からないか殆ど掛からないようにする。上昇高さが足りないときは、作業者A、Bの登高と吊り下げ式養生装置120の上昇を何度か繰り返す。そして、建物100の外面の内、前回作業時の少し上側に対して補修等の作業を行う。
以下、同様にして、吊り下げ式養生装置120に囲まれた中での建物100の外面に対する補修等の作業と、作業者A、Bの登高及び吊り下げ式養生装置120の上昇とを繰り返しながら、建物100の外面に対する補修等の作業を地上側から屋上まで行っていく。
When it is desired to move the building 100 to the upper working range at the time of the current work, the workers A and B slightly move the positions of the lifting and falling devices attached to the safety ropes 101 and 102, 104 and 105 upward. While moving and climbing, the climbing devices 1 and 5 are slightly driven in the climbing direction by the electric driver 150 carried by each, and the suspension type curing device 120 is slightly lifted along the suspension ropes 112 and 113 to move up one level. (Both hands are placed on the fall prevention plate 125 at the height position of the building-side opening of the curing unit 122). Before and after the movement and during the movement, the workers A and B make sure that the weight is not applied to the suspension type curing device 120 at all. When the rising height is insufficient, the climbing height of the workers A and B and the lifting of the hanging type curing device 120 are repeated several times. Then, a repair work or the like is performed on the outer surface of the building 100 slightly above the previous work.
Hereinafter, in the same manner, while repeating the work such as repairing the outer surface of the building 100 surrounded by the suspension type curing device 120, the height of the workers A and B and the lifting of the suspension type curing device 120. The work such as repair on the outer surface of the building 100 is performed from the ground side to the rooftop.

若し、途中で建物100の少し下方へ作業位置を変更したい場合、作業者A、Bは安全ロープ101と102、104と105に取り付けた昇降器具と墜落防止器具の位置を下方へ少し移動することで所望の高さ位置へ下降する。また、登降装置1、5のガードプレート42を大きく開け、操作部材54の指掛け部59に親指を掛け図3の時計方向に回動したり、プーリ16と離間する方向に引いたりすることでカム50による吊り下げロープ112、113の挟圧を緩め、吊り下げ式養生装置120の自重によりプーリ16を図3の時計方向へ回転させながら登降装置5を吊り下げロープ112、113に対して降下させる。所望の高さ位置に降下したところで、操作部材54の操作を止めてカム50により吊り下げロープ112、113を挟圧させて降下を停止させ、ガードプレート42を閉じる(両手が落下防止板125の上で囲い養生部122の建物側開口の高さ位置に来るようにする)。この際も、作業者A、Bは吊り下げ式養生装置120に体重が全く掛からないか殆ど掛からないようにする。下降高さが足りないときは、作業者A、Bの降下と吊り下げ式養生装置120の降下を何度か繰り返す。そして、建物100の外面の内、前回作業時の少し下側に対して補修等の作業を行う。   If it is desired to change the work position slightly below the building 100 on the way, the workers A and B slightly move the positions of the lifting and falling devices attached to the safety ropes 101 and 102, 104 and 105 downward. To descend to the desired height position. Further, the guard plate 42 of the ascending / descending apparatuses 1 and 5 is opened widely, the thumb 50 is put on the finger-hooking portion 59 of the operation member 54, and the cam 50 is rotated in the clockwise direction in FIG. The lifting pressure of the suspension ropes 112 and 113 is relaxed, and the lifting device 5 is lowered with respect to the suspension ropes 112 and 113 while rotating the pulley 16 in the clockwise direction in FIG. When the operation member 54 is lowered to a desired height position, the operation member 54 is stopped, the suspension ropes 112 and 113 are clamped by the cam 50 to stop the descent, and the guard plate 42 is closed (both hands hold the drop prevention plate 125). The height of the building-side opening of the enclosure curing unit 122 is set above). Also at this time, the workers A and B make sure that the weight is not applied to the hanging type curing device 120 at all. When the descending height is insufficient, the descending of the workers A and B and the descending of the hanging type curing device 120 are repeated several times. Then, work such as repair is performed on the outer side of the building 100 slightly below the previous work.

なお最初に、吊り下げ式養生装置120を屋上近くまで上昇させておけば、吊り下げ式養生装置120に囲まれた中または吊り下げ式養生装置120の上方での建物100の外面に対する補修等の作業と、作業者A、Bの降下及び吊り下げ式養生装置120の降下とを繰り返しながら、建物100の外面に対する補修等の作業を屋上側から行うこともできる。   First, if the suspension type curing device 120 is raised to near the rooftop, the outer surface of the building 100 inside the suspension type curing device 120 or above the suspension type curing device 120 is repaired. While repeating the work, the lowering of the workers A and B, and the lowering of the suspension type curing device 120, work such as repairing the outer surface of the building 100 can be performed from the roof side.

この実施例によれば、作業者A、Bが建物100の屋上から垂れ下がった安全ロープ101と102、104と105に支持されて建物100の外面に対する補修等の作業を行うのに際して、吊り下げ式養生装置120に囲まれた中で作業を行うことができる。作業で生じた補修部材や壁等の破片等は囲い養生部122や落下防止板125に当たって装置本体121に落下したり、直接、装置本体121の中に落下したりして、吊り下げ式養生装置120の外部への落下、飛散が防止される。また、誤って作業道具を落とした場合も、装置本体121の床152(図1参照)に載るので、地上への落下が防止される。
また、吊り下げ式養生装置120には作業者A、Bの体重が掛からない為、吊り下げ式養生装置120や支持具110、111を頑強にする必要がなく登降装置1、5などを含めた設備負担が少なくて済む。
また、登降装置1、5は作業者A、Bが携帯する電動ドライバ150により登高動作をさせることができ、作業者A、Bが手動で吊り上げ式養生装置120を登高させなくて済み、作業負担が少ない。電動ドライバ150は各種作業用に携帯する通常工具であり、特別な駆動源を用意したり携帯したりする負担もない。電動ドライバ150は充電式なので、電源コードを引き回す煩わしさもない。また、建物100の屋上や支持具110、111へのロープ昇降装置の設置が不要となる。
According to this embodiment, when the workers A and B are supported by the safety ropes 101 and 102, 104 and 105 hanging from the roof of the building 100 and perform work such as repairing the outer surface of the building 100, the suspension type is used. Work can be performed while being surrounded by the curing device 120. A repairing device or a debris such as a wall generated by the operation hits the enclosure curing unit 122 or the fall prevention plate 125 and falls to the apparatus main body 121 or directly falls into the apparatus main body 121 to be suspended. The falling and scattering of 120 to the outside are prevented. Further, even when the work tool is accidentally dropped, it falls on the floor 152 (see FIG. 1) of the apparatus main body 121, so that it is prevented from falling to the ground.
In addition, since the weights of the workers A and B are not applied to the suspension type curing device 120, it is not necessary to make the suspension type curing device 120 and the support tools 110 and 111 robust, and the climbing devices 1 and 5 are included. Less burden on equipment.
Further, the climbing devices 1 and 5 can be lifted by the electric driver 150 carried by the workers A and B, so that the workers A and B do not have to manually lift the lifting type curing device 120, and the work load Less is. The electric screwdriver 150 is a normal tool carried for various operations, and there is no burden of preparing or carrying a special drive source. Since the electric driver 150 is rechargeable, there is no hassle of routing the power cord. Further, it is not necessary to install a rope lifting device on the roof of the building 100 or on the supports 110 and 111.

なお、上記した実施例では建物の外面に対する作業を作業者A、Bの二人で行う場合につき説明したが、一人の作業者が左右2つの登降装置を操作することで、一人で作業することもできる。
また、囲い養生部は、養生シートに代えて養生ネットを枠体に張設して形成しても良く、或いは、囲い養生部自体を省略しても良い。
また、上記した実施例では登降装置を駆動する電動工具として電動ドライバを例に挙げたが、本発明は何らこれに限定されず、電動ドリルなど、他の回転式電動工具であっても良い。また、充電式でない電動工具を用いても良い。また、操作部材はスライド案内部に沿ってスライド自在としたが、カムに固定した構成としても良い。また、入力軸に六角ビットを着脱自在に結合可能な六角ビット穴を形成しておき、六角ビット付の回転式電動工具を用いて六角ビットを回転式電動工具の出力軸として入力軸に結合して回転させるようにしても良い。
In the above-described embodiment, the case where two workers A and B perform the work on the outer surface of the building has been described. However, one worker can work alone by operating the left and right climbing devices. You can also.
Further, the enclosure curing unit may be formed by stretching a curing net on the frame instead of the curing sheet, or the enclosure curing unit itself may be omitted.
In the above-described embodiment, an electric driver is used as an example of the electric tool for driving the climbing device. However, the present invention is not limited to this, and other rotary electric tools such as an electric drill may be used. Moreover, you may use the electric tool which is not rechargeable. Further, although the operation member is slidable along the slide guide portion, the operation member may be fixed to the cam. In addition, a hexagonal bit hole is formed on the input shaft so that the hexagonal bit can be removably attached, and the rotary power tool with a hexagonal bit is used to connect the hexagonal bit to the input shaft as the output shaft of the rotary power tool. You may make it rotate.

また、上記した実施例では入力軸に加えられた回転力を大小2つの歯車で構成された歯車伝達機構によりプーリに伝達させるようにしたが、差動減速機構により伝達するようにしても良い。差動減速機構を備え、図1中の登降装置に代えて使用可能なロープ牽引装置の例を図16乃至図27に示す。
図16乃至図20はロープ牽引装置の外観斜視図、正面図、側面図、平面図、背面図、図21はロープ牽引装置のプーリカバーとヒンジ部を省略した斜視図、図22はロープ牽引装置のプーリカバーを省略した側面図、図23はロープ牽引装置のプーリカバーとプーリを省略した斜視図、図24(1)はプーリカバーをロックするロック部材の斜視図、(2)は正面図、(3)は平面図、(4)は側面図、図25はロープ牽引装置中の制限手段の構成図、図26は制限手段の一部省略した拡大図、図27は制限手段の作用説明図である。
In the above-described embodiment, the rotational force applied to the input shaft is transmitted to the pulley by the gear transmission mechanism constituted by two large and small gears, but may be transmitted by the differential reduction mechanism. Examples of a rope traction device that includes a differential reduction mechanism and can be used in place of the climbing device in FIG. 1 are shown in FIGS.
16 to 20 are external perspective views, a front view, a side view, a plan view, a rear view, FIG. 21 is a perspective view in which the pulley cover and the hinge portion of the rope pulling device are omitted, and FIG. 22 is a rope pulling device. 23 is a side view in which the pulley cover is omitted, FIG. 23 is a perspective view in which the pulley cover of the rope pulling device and the pulley are omitted, FIG. 24 (1) is a perspective view of a lock member that locks the pulley cover, and (2) is a front view. (3) is a plan view, (4) is a side view, FIG. 25 is a block diagram of the limiting means in the rope traction device, FIG. 26 is an enlarged view of a part of the limiting means, and FIG. It is.

これらの図において、501は登降装置としての動力式のロープ牽引装置であり、作業者が携帯する充電式電動ドライバにより駆動力を得て吊り下げロープ(図30の符号112、113参照)を牽引可能になっている。ロープ牽引装置501の内、502 はアルミ製でプレート形の支持体であり、中央近くに円形の開口503、下側にロープ取り付け部としてのロープ取り付け孔504が形成されている。505は支持体502の背面側に装着された円柱形(パンケーキ形)の減速装置であり、入力軸と出力軸が同軸の差動減速機構を備えた円柱形(パンケーキ形)の減速装置本体506、減速装置本体506を入力軸507と出力軸508を除いて密閉するアルミ製の密閉ケース509、密閉ケース509の背面側に装備されて入力軸507の逆転を制限することにより、ロープの入口側の引き戻しを制限する制限手段510、密閉ケース509の背面の周端部に装着されて制限手段510の主要部を密閉するアルミ製で皿形の外蓋511を含む。なお制限手段510については後述する。外蓋511の中央に形成された開口512に入力軸507が露出している。   In these figures, reference numeral 501 denotes a power rope pulling device as a climbing device, which pulls a hanging rope (see reference numerals 112 and 113 in FIG. 30) by obtaining driving force from a rechargeable electric driver carried by an operator. It is possible. Of the rope traction device 501, reference numeral 502 denotes an aluminum plate-like support body, which has a circular opening 503 near the center and a rope attachment hole 504 as a rope attachment portion on the lower side. Reference numeral 505 denotes a columnar (pancake type) reduction device mounted on the back side of the support 502, and a columnar (pancake type) reduction device provided with a differential reduction mechanism having a coaxial input shaft and output shaft. A main body 506, an aluminum sealing case 509 that seals the speed reducer main body 506 except for the input shaft 507 and the output shaft 508, and a reverse side of the input shaft 507 are provided on the back side of the sealing case 509 to restrict the reverse rotation of the rope. Limiting means 510 for limiting pulling back on the inlet side, and an aluminum-made dish-shaped outer lid 511 that is attached to the peripheral end portion of the back surface of the sealing case 509 and seals the main part of the limiting means 510. The restricting means 510 will be described later. The input shaft 507 is exposed in an opening 512 formed in the center of the outer lid 511.

入力軸507は円柱状の軸孔513にキー溝514が設けられており、図28に示す如く、充電式電動ドライバ515の出力軸としてのチャック516に、キー溝517付きの円柱状のシャンク518を取り付け、キー519をキー溝514、517に嵌合しながら軸孔513にシャンク518を差し込んで連結し、充電式電動ドライバ515を駆動することで、入力軸507を回転可能となっている。出力軸508は支持体502の開口503から支持体502の正面側に突出しており(図23参照)、端部に後述するプーリが結合されている。   The input shaft 507 is provided with a keyway 514 in a cylindrical shaft hole 513. As shown in FIG. 28, a cylindrical shank 518 with a keyway 517 is attached to a chuck 516 as an output shaft of the rechargeable electric driver 515. , The shank 518 is inserted into and connected to the shaft hole 513 while fitting the key 519 into the key grooves 514 and 517, and the rechargeable electric driver 515 is driven, whereby the input shaft 507 can be rotated. The output shaft 508 protrudes from the opening 503 of the support 502 to the front side of the support 502 (see FIG. 23), and a pulley described later is coupled to the end.

減速装置本体506は、サイクロイド減速機構またはトロコイド減速機構による減速比の大きい差動減速機構を内蔵し、入力軸507の回転を減速して出力軸508に伝達する。ここでは一例として減速装置本体506は、入力軸507と出力軸508が反対方向に回転するタイプとし、ロープ牽引装置501の正面側から見て、入力軸507が時計方向に回転し、出力軸508が反時計方向に回転する方向を正転方向とする。減速装置本体506には、例えば入出力軸が同軸な転動ボール式減速機、ローラサイクロイド式減速機などを用いることができる。   The reduction gear main body 506 incorporates a differential reduction mechanism having a large reduction ratio by a cycloid reduction mechanism or a trochoid reduction mechanism, and reduces the rotation of the input shaft 507 and transmits it to the output shaft 508. Here, as an example, the speed reducer main body 506 is a type in which the input shaft 507 and the output shaft 508 rotate in opposite directions, and when viewed from the front side of the rope traction device 501, the input shaft 507 rotates clockwise, and the output shaft 508 The direction that rotates counterclockwise is defined as the forward rotation direction. For the reduction gear main body 506, for example, a rolling ball type reduction gear having a coaxial input / output shaft, a roller cycloid reduction gear, or the like can be used.

520は支持体502の正面側に装備されたアルミ製のプーリであり、減速装置505の出力軸508に結合されている。プーリ520は図21、図22に示す如く吊り下げロープ(ここでは繊維ロープ)が巻き掛けられるH字溝521の対向する内面522、523に、放射状に配列された多数の歯状突起524、524、・・と525、525・・が対向して設けられている。歯状突起524・・、525・・は断面が山形であり、内径寄りから外径寄りに掛けて高さが徐々に低くなっている(なお、内径寄りから外径寄りに掛けて高さを同一としても良い。更にH字溝をV字溝に代えても良い)。   Reference numeral 520 denotes an aluminum pulley mounted on the front side of the support body 502, and is coupled to the output shaft 508 of the reduction gear 505. As shown in FIGS. 21 and 22, the pulley 520 has a large number of tooth-like protrusions 524 and 524 arranged radially on opposing inner surfaces 522 and 523 of an H-shaped groove 521 around which a suspension rope (here, a fiber rope) is wound. , .. and 525, 525,. The tooth-like protrusions 524, 525,... Have a mountain-shaped cross section, and the height gradually decreases from the inner diameter side to the outer diameter side. The H-shaped groove may be replaced with a V-shaped groove).

530は支持体502の正面側の内、プーリ520の上側に装着されたアルミ製のロープガイドであり、この内、531はプーリ520の上方に間隔を開けて設けられて、プーリ520に一周弱巻き掛けられる吊り下げロープの入口と出口を形成するロープ出入口部であり、間隔を開けて左右に対向して対称に設けられた入口部532と出口部533を含む。入口部532、出口部533は支持体502から逆L字状に立ち上がるようにして設けられており、内側に半割円柱状の入口通路部534、出口通路部535が形成されている。入口部532、出口部533のプーリ520寄りは、一段細く形成されて後述するプーリカバーの上端部が嵌合可能な被嵌合部536、537を成す。これら被嵌合部536、537の内、入口通路部534、出口通路部535の前側(図21の上側)でかつプーリ520寄りの端部に、後述するプーリカバーに装備されたロック部材の係合爪が着脱自在に係合する係合溝538、539が刻設されている。   Reference numeral 530 denotes an aluminum rope guide mounted on the upper side of the pulley 520 on the front side of the support body 502. Among these, 531 is provided above the pulley 520 with a space therebetween, and the pulley 520 is slightly less than one round. It is a rope entrance / exit part that forms an entrance and an exit of a hanging rope to be wound, and includes an entrance part 532 and an exit part 533 that are provided symmetrically so as to be opposed to the left and right sides. The inlet portion 532 and the outlet portion 533 are provided so as to rise in an inverted L shape from the support body 502, and a half-cylindrical inlet passage portion 534 and an outlet passage portion 535 are formed inside. Near the pulley 520 of the inlet portion 532 and the outlet portion 533 are formed to be fitted portions 536 and 537 that are formed one step narrower and can be fitted with an upper end portion of a pulley cover described later. Of these fitted portions 536, 537, the engagement of a lock member mounted on a pulley cover, which will be described later, on the front side (upper side in FIG. 21) of the inlet passage portion 534 and the outlet passage portion 535 and on the end near the pulley 520. Engagement grooves 538 and 539 are provided in which the claws are detachably engaged.

540はロープガイド530の内、ロープ出入口部531とプーリ520の間に設けられた分離部であり、プーリ520に巻き掛けられる吊り下げロープの入口側と出口側を分離する。分離部540は側面視がL字状に形成されており、上半分の左右端面が傾斜面541、542となっており、下半分の嘴状部543がプーリ520のH字溝521の中に遊挿されている。吊り下げロープをロープ牽引装置501に装填する際、吊り下げロープの入口側を入口部532、出口部533の間の隙間544から入口通路部534に挿入し、分離部540の左側を通してプーリ520に一周弱巻き掛け、吊り下げロープの出口側を分離部540の右側を通し、入口部532、出口部533の間の隙間544から出口通路部535に挿入するようにする(図30参照)。   Reference numeral 540 denotes a separating portion provided between the rope entrance / exit portion 531 and the pulley 520 in the rope guide 530, and separates the entrance side and the exit side of the hanging rope wound around the pulley 520. The separation part 540 is formed in an L shape when viewed from the side, the left and right end surfaces of the upper half are inclined surfaces 541 and 542, and the lower half flange part 543 is in the H-shaped groove 521 of the pulley 520. It is loosely inserted. When the suspension rope is loaded into the rope traction device 501, the entrance side of the suspension rope is inserted into the entrance passage portion 534 through the gap 544 between the entrance portion 532 and the exit portion 533, and the pulley 520 passes through the left side of the separation portion 540. Wrap slightly around the loop, pass the exit side of the suspension rope through the right side of the separation part 540, and insert it into the exit passage part 535 from the gap 544 between the entrance part 532 and the exit part 533 (see FIG. 30).

550はプーリ520の前面及び側面を開閉自在に覆うプラスチック製で蓋型のプーリカバーであり、下端部が支持体502の正面側の内、プーリ520の図30におけるすぐ下に前方へ突設して設けられたヒンジ部551に回動自在に軸支されている。プーリカバー550の上端部は図17の上方へ延設された断面コ字状の嵌合部552となっており、ロープ出入口部531の被嵌合部536、537の外側に嵌脱自在に嵌合可能になっている。   Reference numeral 550 denotes a plastic lid-type pulley cover that covers the front and side surfaces of the pulley 520 so that it can be opened and closed. The lower end of the pulley 520 protrudes forward from the front side of the support 502 just below the pulley 520 in FIG. Is pivotally supported by a hinge portion 551 provided. The upper end portion of the pulley cover 550 is a fitting portion 552 having a U-shaped cross section that extends upward in FIG. 17, and is detachably fitted to the outside of the fitted portions 536 and 537 of the rope entrance / exit portion 531. Is possible.

553はプーリカバー550の嵌合部552の背面側に図17の上下方向(図24(1)の矢印a方向とb方向参照)へ一定範囲でスライド自在に備えられたプラスチック製のロック部材であり、プーリカバー550の背面側に設けられた図示しないバネ座とロック部材553との間に介装された左右一対の圧縮バネ554、555により常時、上方(係合溝538、539に向かうロック方向)に付勢されている。プーリカバー550の上端近くに長孔556が刻設されており、ロック部材553から前方へ突設された操作部557が長孔556に遊嵌されて先端部がプーリカバー550の外面より外側に突出している。ロック部材553の図24(2)における上端部には断面が三角形の係止爪558が形成されている。ロック部材553を圧縮バネ554、555のバネ力に抗して図17の下方向へ移動したときは係止爪558が被嵌合部536、537の下端より図17の下方に退避し、プーリカバー550を図18の矢印c、dの回動方向へ開閉可能となる。ロック部材553を図17の下方に押し下げながら、プーリカバー550を閉じて嵌合部552を被嵌合部536、537に嵌め、ロック部材553の押下を解放すると圧縮バネ554、555に付勢されて図17の上方へ移動し、係止爪558が係合溝538、539に係合して閉状態にロックする。   Reference numeral 553 denotes a plastic locking member provided on the back side of the fitting portion 552 of the pulley cover 550 so as to be slidable within a certain range in the vertical direction of FIG. 17 (see the directions of arrows a and b in FIG. 24 (1)). And a pair of left and right compression springs 554 and 555 interposed between a spring seat (not shown) provided on the back side of the pulley cover 550 and the lock member 553, and always locked upward (locked toward the engagement grooves 538 and 539). Direction). A long hole 556 is engraved near the upper end of the pulley cover 550, and an operation portion 557 protruding forward from the lock member 553 is loosely fitted into the long hole 556 so that the tip end is outside the outer surface of the pulley cover 550. It protrudes. A locking claw 558 having a triangular cross section is formed at the upper end of the locking member 553 in FIG. When the lock member 553 is moved downward in FIG. 17 against the spring force of the compression springs 554 and 555, the locking claw 558 is retracted downward from the lower ends of the fitted portions 536 and 537 in FIG. The cover 550 can be opened and closed in the rotation direction of arrows c and d in FIG. The pulley cover 550 is closed while the lock member 553 is pushed downward in FIG. 17, the fitting portion 552 is fitted into the fitted portions 536 and 537, and when the pressing of the lock member 553 is released, the compression springs 554 and 555 are biased. Then, the locking claw 558 engages with the engagement grooves 538 and 539 and locks in the closed state.

制限手段510は、図25、図26に示す如く、減速装置本体506の入力軸507に結合されて、吊り下げロープが入口部532からプーリ520へ牽引される方向(図31の矢印e参照)への回転を許容し、反対方向(図30の矢印f参照)への回転を拘束して吊り下げロープが入口部532から外部に引き出されるのを制限するラチェット機構560と、ラチェット機構560による制限を解除する解除手段561とから成る。ラチェット機構560は、ケース509の背面側で入力軸507に嵌着された大径のラチェット歯車562、ケース509の背面に回動自在に軸支された回動軸563に嵌着されて先端部がラチェット歯車562に対し進退する方向に回動し、ラチェット歯車562の回転方向を一方向(入力軸507、出力軸508、プーリ520が正転する方向であり、図25において、入力軸507が反時計方向へ回転する方向)のみ許容し、反対方向への回転を制限する歯止め564、歯止め564の先端部とケース509の背面に装着されたバネ座565の間に介装されて、歯止め564の先端部をラチェット歯車562の方向へ付勢する圧縮コイルバネ566を含む(なお、圧縮コイルバネは板バネに置き換えても良い)。   25 and 26, the limiting means 510 is coupled to the input shaft 507 of the speed reducer main body 506, and the suspension rope is pulled from the inlet 532 to the pulley 520 (see arrow e in FIG. 31). The ratchet mechanism 560 that restricts the suspension rope from being pulled out from the inlet portion 532 by restricting the rotation in the opposite direction (see arrow f in FIG. 30) and the restriction by the ratchet mechanism 560. And release means 561 for releasing. The ratchet mechanism 560 is fitted to a large-diameter ratchet gear 562 fitted to the input shaft 507 on the back side of the case 509 and a turning shaft 563 pivotally supported on the back side of the case 509 to be attached to the front end portion. Is rotated in a direction that advances and retreats with respect to the ratchet gear 562, and the rotation direction of the ratchet gear 562 is one direction (the direction in which the input shaft 507, the output shaft 508, and the pulley 520 rotate forward. In FIG. Only in the counterclockwise direction), and is interposed between the pawl 564 that restricts the rotation in the opposite direction, the tip of the pawl 564, and the spring seat 565 mounted on the back surface of the case 509, and the pawl 564. A compression coil spring 566 that urges the front end portion of the shaft toward the ratchet gear 562 (the compression coil spring may be replaced by a leaf spring).

一方、解除手段561は、歯止め564の後端部に形成された被押圧部567、ケース509の背面の内、歯止め564の被押圧部567の近くに回動自在に軸支された回動軸568に嵌着されたプラスチック製で略しずく形の押圧部材569、外蓋511に穿設された挿通孔570を通して外側に延設された回動軸568の先端部に装着されて回転制限の解除操作を行うプラスチック製の操作つまみ571を含む(図20参照)。押圧部材569には回動軸568の近くから嘴状に突設して形成されて押圧部材569の回動により被押圧部567に接近し、被押圧部567を押圧したり、離間して押圧を解除する押圧部572、押圧部材569の内、回動軸568から見て押圧部572の反対側に形成された弾性変形可能な部分円環部573、部分円環部573の外周の途中から半径方向外側へ山形に突設された係合突起574を有している。ケース509の背面には係合突起574が回動軸568を中心にして回動し、第1、第2の2つのポジションP1、P2に来た時に係合する2つの係合凹部575、576が形成されている。係合突起574が回動により係合凹部575、576の縁部577、578に当接すると部分円環部573が楕円状に弾性変形し、縁部577、578を通過して係合凹部575、576に係合すると元の形状に復元する。   On the other hand, the release means 561 is a rotating shaft that is pivotally supported near the pressed portion 567 of the pawl 564 among the pressed portion 567 formed at the rear end of the pawl 564 and the back surface of the case 509. The rotation restriction is released by being attached to the distal end portion of the rotation shaft 568 extending outward through the insertion member 570 formed in the outer lid 511 and the pressing member 569 made of plastic substantially fitted to the 568. A plastic operation knob 571 for operation is included (see FIG. 20). The pressing member 569 is formed so as to project in a hook shape from the vicinity of the rotation shaft 568, approaches the pressed portion 567 by the rotation of the pressing member 569, and presses the pressed portion 567 or presses it away. Among the pressing portion 572 and the pressing member 569 for releasing the elastic member, the elastically deformable partial annular portion 573 formed on the opposite side of the pressing portion 572 when viewed from the rotation shaft 568 and the partial annular portion 573 from the middle of the outer periphery. It has an engaging projection 574 protruding in a mountain shape outward in the radial direction. On the back surface of the case 509, an engagement protrusion 574 rotates about the rotation shaft 568, and two engagement recesses 575 and 576 that are engaged when the first and second positions P1 and P2 are reached. Is formed. When the engagement protrusion 574 abuts on the edges 577 and 578 of the engagement recesses 575 and 576 by rotation, the partial annular portion 573 is elastically deformed into an elliptical shape, passes through the edges 577 and 578, and is engaged with the engagement recess 575. When engaged with 576, the original shape is restored.

ラチェット機構560による回転方向の制限を働かせたい場合、操作つまみ571を第1のポジションP1に回動すると押圧部572が被押圧部567から離れるとともに係合突起574が係合凹部575に係合し、操作つまみ571から手を離しても、操作つまみ571、押圧部材569は第1のポジションP1に固定される。歯止め564は圧縮コイルバネ566に付勢されて先端部がラチェット歯車562に噛合し、入力軸507の正転方向への回転のみ許容される(図26参照)。
反対に、ラチェット機構560による回転方向の制限を解除したい場合、操作つまみ571を第2のポジションP2に回動すると押圧部572が被押圧部567を押圧するとともに係合突起574が係合凹部576に係合し、操作つまみ571から手を離しても、操作つまみ571、押圧部材569は第2のポジションP2に固定される。歯止め564は先端部がラチェット歯車562から退避し、入力軸507の回転制限が解除されて、正逆いずれにも回転が許容される(図27の矢印g、h参照)。
When it is desired to limit the rotation direction by the ratchet mechanism 560, when the operation knob 571 is rotated to the first position P1, the pressing portion 572 is separated from the pressed portion 567 and the engaging protrusion 574 is engaged with the engaging recess 575. Even when the operation knob 571 is released, the operation knob 571 and the pressing member 569 are fixed at the first position P1. The pawl 564 is urged by the compression coil spring 566 and the tip part meshes with the ratchet gear 562, and only the input shaft 507 is allowed to rotate in the forward rotation direction (see FIG. 26).
On the other hand, when the restriction of the rotation direction by the ratchet mechanism 560 is to be released, when the operation knob 571 is rotated to the second position P2, the pressing portion 572 presses the pressed portion 567 and the engaging protrusion 574 is engaged with the engaging recess 576. Even when the operation knob 571 is released and the hand is released from the operation knob 571, the operation knob 571 and the pressing member 569 are fixed at the second position P2. The tip of the pawl 564 is retracted from the ratchet gear 562, the rotation restriction of the input shaft 507 is released, and the rotation is allowed in both forward and reverse directions (see arrows g and h in FIG. 27).

580、581は支持体502の図17における右上の表裏に設けられたアルミ製の掛け止め部であり、支持体502の表裏に垂直に植設されたロープ巻き掛け棒582、583と、ロープ巻き掛け棒582、583の先端に装着されてロープ巻き掛け棒582、583からロープが外れるのを阻止する菱形のストッパ584、585から成る。
図16に示すロープ牽引装置501では支持体502、密閉ケース509、外蓋511、プーリ520、ロープガイド530、巻き掛け部580、581はアルミ製としたが、ステンレス鋼など他の金属製としても良い。
Reference numerals 580 and 581 denote aluminum latching portions provided on the upper and lower surfaces of the support 502 in FIG. 17, and rope winding rods 582 and 583 that are vertically installed on the front and back of the support 502, It comprises diamond-shaped stoppers 584 and 585 that are attached to the ends of the hanging rods 582 and 583 and prevent the rope from coming off the rope winding rods 582 and 583.
In the rope traction device 501 shown in FIG. 16, the support 502, the sealing case 509, the outer lid 511, the pulley 520, the rope guide 530, and the winding portions 580 and 581 are made of aluminum, but other metal such as stainless steel may be used. good.

図28の符号515はロープ牽引装置501を電動で回転駆動するための電動回転工具としての充電式電動ドライバであり、チャック516に、キー溝517付きの円柱状のシャンク518を取り付けて使用する。図29の符号590はロープ牽引装置501を手動で回転駆動するための手動式回転工具であり、入力軸507の軸孔513に挿脱自在でキー溝514に嵌合する突起部591を備えた回転軸部592と、回転軸部592に装着されたL字状のハンドル部593から成る。   Reference numeral 515 in FIG. 28 denotes a rechargeable electric screwdriver as an electric rotary tool for electrically driving the rope traction device 501, and the chuck 516 is used by attaching a cylindrical shank 518 with a keyway 517. Reference numeral 590 in FIG. 29 is a manual rotary tool for manually rotating the rope traction device 501, and includes a protrusion 591 that can be inserted into and removed from the shaft hole 513 of the input shaft 507 and fits into the key groove 514. The rotary shaft portion 592 and an L-shaped handle portion 593 attached to the rotary shaft portion 592 are included.

図1の左右2つの登降装置1、5を2つのロープ牽引装置501に置き換えることで、第1実施例と同様にして、充電式電動ドライバ515を用いて吊り下げ式養生装置120を上昇させたり、吊り下げ式養生装置120の自重を利用して降下させたりすることができる。
吊り下げロープ112に対する登降装置1の代わりのロープ牽引装置501の装填方法を説明すると、プーリカバー550が閉じ、操作つまみ571が第1のポジションP1に固定したロープ牽引装置501のロック部材53を図17の下方(図24(1)矢印b方向)へ押し下げ、係合爪558を係合溝538、539から離間してロックを外し、プーリカバー550を図18の矢印c方向へ開放する。
By replacing the two left and right climbing devices 1 and 5 in FIG. 1 with two rope pulling devices 501, the suspension type curing device 120 can be raised using the rechargeable electric driver 515 in the same manner as in the first embodiment. It can be lowered using its own weight of the hanging type curing device 120.
A method of loading the rope pulling device 501 instead of the climbing device 1 to the hanging rope 112 will be described. The lock member 53 of the rope pulling device 501 in which the pulley cover 550 is closed and the operation knob 571 is fixed at the first position P1 is illustrated. 17 is pushed downward (in the direction of arrow b in FIG. 24 (1)), the engaging claw 558 is separated from the engaging grooves 538 and 539 to be unlocked, and the pulley cover 550 is opened in the direction of arrow c in FIG.

吊り下げロープ112の下端側をロープ牽引装置501の入口部532と出口部533の間の隙間544から入口通路部534に挿入し、分離部540の左側を通してプーリ520に一周弱巻き掛け、分離部540の右側を通して入口部532と出口部533の隙間544から出口通路部535に挿入したのち(図30参照)、掛け止め部580、581に巻き掛けて掛け止める。そして、ロック部材553を図17の下方(図24(1)の矢印b方向)に押し下げながらプーリカバー550を閉じ(図18の矢印d参照)、嵌合部552を被勘合部536、537に嵌合する。ロック部材553の押し下げを解放すると、圧縮バネ554、555によりロック部材553が図17の上方(図24(1)の矢印A方向)に付勢されて、係合爪558が係合溝538、539内に係合してロックする。これにより、吊り下げロープ112の装填が完了する。   The lower end side of the suspension rope 112 is inserted into the inlet passage portion 534 through the gap 544 between the inlet portion 532 and the outlet portion 533 of the rope traction device 501, and is slightly wound around the pulley 520 through the left side of the separation portion 540. After being inserted into the outlet passage portion 535 from the gap 544 between the inlet portion 532 and the outlet portion 533 through the right side of 540 (see FIG. 30), it is wound around the latching portions 580 and 581 and latched. Then, the pulley cover 550 is closed while pushing down the lock member 553 downward in FIG. 17 (in the direction of arrow b in FIG. 24 (1)) (see arrow d in FIG. 18), and the fitting portion 552 is engaged with the mated portions 536 and 537. Mating. When the push-down of the lock member 553 is released, the lock member 553 is urged upward by the compression springs 554 and 555 in the direction of arrow A in FIG. 539 engages and locks. Thereby, the loading of the hanging rope 112 is completed.

ロープ牽引装置501のロープ取り付け孔504に着脱自在に掛着したカラビナ(図17の符号595参照)に懸吊した2本のロープ(繊維ロープまたはワイヤロープ)3、4を吊り下げ式養生装置120の左側のロープ取り付け板145、146のロープ取り付け孔149に取り付ける。右側の吊り下げロープ113の下端側にも同様にして登降装置5の代わりのロープ牽引装置501を装填するとともに、ロープ取り付け孔504と吊り下げ式養生装置120の右側のロープ取り付け板147、148のロープ取り付け孔149の間に2本のロープ(繊維ロープまたはワイヤロープ)7、8を取り付ける。吊り下げロープ112、113の出口側ロープ112b、113bは吊り下げ式養生装置120の装置本体121の中に垂れるようにする。
吊り下げ式養生装置120を地上から数十cm乃至1m程度浮かして荷重が左右のロープ牽引装置501に掛かるようにすると、吊り下げロープ112、113の入口側ロープ112a、113aに入口部532から上方外側へ引っ張る方向の力が掛かり、プーリ520が逆転方向に回転しようとするが、ラチェット機構560の歯止め564の先端部がラチェット歯車562に係合して入力軸507の回転を制限するので、プーリ520は回転せず、吊り下げロープ112、113の入口側ロープ112a、113aが外部に引き出され、ロープ牽引装置501、吊り下げ式養生装置120が降下するのが阻止される。
Two ropes (fiber ropes or wire ropes) 3 and 4 suspended from a carabiner (see reference numeral 595 in FIG. 17) detachably attached to a rope attachment hole 504 of the rope traction device 501 are suspended. Are attached to the rope attachment holes 149 of the left rope attachment plates 145 and 146. Similarly, the rope pulling device 501 instead of the climbing device 5 is loaded on the lower end side of the right hanging rope 113, and the rope attaching holes 504 and the right rope attaching plates 147 and 148 of the hanging type curing device 120 are installed. Two ropes (fiber rope or wire rope) 7 and 8 are attached between the rope attachment holes 149. The exit side ropes 112 b and 113 b of the suspension ropes 112 and 113 are allowed to hang down in the apparatus main body 121 of the suspension type curing apparatus 120.
When the suspension type curing device 120 is lifted about several tens of centimeters to 1 m from the ground so that the load is applied to the left and right rope pulling devices 501, the entrance side ropes 112a and 113a of the suspension ropes 112 and 113 are moved upward from the entrance portion 532. The pulley 520 tries to rotate in the reverse direction by applying a force in the direction of pulling outward, but the tip of the pawl 564 of the ratchet mechanism 560 engages with the ratchet gear 562 to limit the rotation of the input shaft 507. 520 does not rotate, the entrance side ropes 112a and 113a of the suspension ropes 112 and 113 are pulled out, and the rope pulling device 501 and the suspension type curing device 120 are prevented from descending.

建物外面に対する作業開始したい場合、建物100の屋上において、作業者Aが自身に装着した安全帯のメイン側のランヤードを安全ロープ101に取着した昇降器具(図示せず)に掛着し、バックアップ側のランヤードを安全ロープ102に取着した墜落防止器具(図示せず)に掛着し、パラペット103を越えて建物100の外面に沿って安全ロープ101に吊り下がりながら吊り下げ式養生装置120の中またはすぐ上まで降下する。作業者Aと平行して、作業者Bも自身に装着した安全帯のメイン側のランヤードを安全ロープ104に取着した昇降器具(図示せず)に掛着し、バックアップ側のランヤードを安全ロープ105に取着した墜落防止器具(図示せず)に掛着し、パラペット103を越えて建物100の外面に沿って安全ロープ101に吊り下がりながら吊り下げ式養生装置120の中またはすぐ上まで降下する。   To start work on the exterior of the building, on the roof of the building 100, the worker A attaches the lanyard on the main side of the safety belt attached to himself / her to the lifting / lowering device (not shown) attached to the safety rope 101 and backs up. The lanyard on the side is attached to a fall prevention device (not shown) attached to the safety rope 102, and is suspended from the safety rope 101 along the outer surface of the building 100 across the parapet 103 while Descent to the middle or just above. In parallel with worker A, worker B also attaches the lanyard on the main side of the safety belt attached to himself / her to a lifting device (not shown) attached to safety rope 104, and uses the safety lanyard on the backup side as the safety rope. Hang on a fall prevention device (not shown) attached to 105 and descend to the inside of the hanging type curing device 120 or just above the parapet 103 while hanging on the safety rope 101 along the outer surface of the building 100. To do.

作業者A、Bは吊り下げ式養生装置120に体重が全く掛からないか殆ど掛からないようにし、安全ロープ101と102、104、105の下側が装置本体121の中に垂れるようにし、両手が落下防止板125の上で囲い養生部122の建物側開口に来る位置で建物100の外面に対する点検・補修等の作業を行う。
建物100に対し、今回作業時の1つ上の作業範囲へ移動する場合、作業者A、Bは安全ロープ101と102、104と105に取り付けた昇降器具と墜落防止器具の位置を上方へ少し移動し登高する。そして、作業者A、Bは各々が携帯する充電式電動ドライバ515により左右のロープ牽引装置501の入力軸507を正転駆動し、吊り下げ式養生装置120を吊り下げロープ112、113に沿って少し上昇させ、1つ上の作業範囲に移動させる(両手が落下防止板125の上で囲い養生部122の建物側開口の高さ位置に来るようにする)。
Workers A and B make sure that no weight is applied to the hanging type curing device 120, and the lower sides of the safety ropes 101, 102, 104, and 105 are suspended in the device main body 121, and both hands are dropped. Work such as inspection / repair on the outer surface of the building 100 is performed at a position on the prevention plate 125 at the building-side opening of the enclosure curing unit 122.
When moving to the work range one level higher than that at the time of the current work with respect to the building 100, the workers A and B slightly raise the positions of the lifting and falling devices and the fall prevention devices attached to the safety ropes 101 and 102, 104 and 105. Move and climb. Then, the workers A and B drive the forward rotation of the input shaft 507 of the left and right rope traction devices 501 by the rechargeable electric driver 515 carried by each, and the suspension type curing device 120 is suspended along the suspension ropes 112 and 113. Slightly raise and move to the work area one level above (both hands are placed on the fall prevention plate 125 so that they are at the height of the building-side opening of the curing unit 122).

具体的には作業者A(B)はロープ牽引装置501に装填された吊り下げロープ112(113)の出口側ロープ112b(113b)を掛け止め部580、581から外し、操作つまみ571は第1のポジションP1に固定されたままとする。図28(1)に示す如く、充電式電動ドライバ515のチャック516に、キー溝517付きの円柱状のシャンク518を取り付け、キー519をロープ牽引装置501の入力軸507のキー溝514、517に嵌合しながら軸孔513にシャンク518を差し込んで連結し、充電式電動ドライバ515を正転方向に駆動する。
ロープ牽引装置501ではラチェット機構560が入力軸507の正転を許容しているので、入力軸507が正転し、減速装置本体506で減速されて出力軸508に伝達され、出力軸508に結合されたプーリ520が図30の反時計方向へ回転する。これにより、吊り下げロープ112(113)の入口側が入口通路部534と分離部540の左側を通ってプーリ520の左上部に引き込まれ、一周弱回ってプーリ520の右上部から分離部540の右側と出口通路部535を通って外部に出る。この結果、吊り下げ式養生装置120は地上近くから上昇していく。
Specifically, the worker A (B) removes the exit side rope 112b (113b) of the hanging rope 112 (113) loaded in the rope pulling device 501 from the latching portions 580 and 581, and the operation knob 571 is the first. The position P1 remains fixed. As shown in FIG. 28 (1), a cylindrical shank 518 with a keyway 517 is attached to a chuck 516 of a rechargeable electric driver 515, and the key 519 is attached to the keyways 514 and 517 of the input shaft 507 of the rope traction device 501. The shank 518 is inserted and connected to the shaft hole 513 while being fitted, and the rechargeable electric driver 515 is driven in the forward rotation direction.
In the rope traction device 501, the ratchet mechanism 560 allows the input shaft 507 to rotate forward, so the input shaft 507 rotates forward, is decelerated by the speed reducer body 506, is transmitted to the output shaft 508, and is coupled to the output shaft 508. The pulley 520 thus rotated rotates counterclockwise in FIG. As a result, the inlet side of the suspension rope 112 (113) is drawn into the upper left portion of the pulley 520 through the left side of the inlet passage portion 534 and the separation portion 540, and slightly turns around the right side of the separation portion 540 from the upper right portion of the pulley 520. And exits through the exit passage portion 535. As a result, the suspension type curing device 120 rises from near the ground.

所望高さに達したところで、充電式電動ドライバ515によるロープ牽引装置501の駆動を停止する。すると、吊り下げロープ112(113)の入口側ロープ112a(113a)が吊り下げ式養生装置120の荷重でロープ牽引装置501から見て上方へ引っ張られるが、ラチェット機構560が入力軸507の逆転を制限してプーリ520の逆転を拘束しているので、吊り下げロープ112(113)がロープ牽引装置501の入口側から外側方向へ引き出されるのが阻止される。従って、吊り下げ式養生装置120は所望高さで停止した状態となる。   When the desired height is reached, the driving of the rope traction device 501 by the rechargeable electric driver 515 is stopped. Then, the entrance side rope 112a (113a) of the suspension rope 112 (113) is pulled upward as viewed from the rope traction device 501 by the load of the suspension type curing device 120, but the ratchet mechanism 560 rotates the input shaft 507 in the reverse direction. Since the reverse rotation of the pulley 520 is restricted and the suspension rope 112 (113) is prevented from being pulled out from the entrance side of the rope traction device 501 in the outward direction. Therefore, the suspension type curing device 120 is stopped at a desired height.

なお、移動の前後や移動中、作業員A、Bは吊り下げ式養生装置120に体重が全く掛からないか殆ど掛からないようにする。上昇高さが足りないときは、作業者A、Bの登高と吊り下げ式養生装置120の上昇を何度か繰り返す。そして、建物100の外面の内、前回作業時の少し上側に対して補修等の作業を行う。
以下、同様にして、吊り下げ式養生装置120に囲まれた中での建物100の外面に対する補修等の作業と、作業者A、Bの登高及び吊り下げ式養生装置120の上昇とを繰り返しながら、建物100の外面に対する補修等の作業を地上側から屋上まで行っていく。
It should be noted that the workers A and B do not apply any weight to the hanging type curing device 120 before or after the movement or during the movement. When the rising height is insufficient, the climbing height of the workers A and B and the lifting of the hanging type curing device 120 are repeated several times. Then, a repair work or the like is performed on the outer surface of the building 100 slightly above the previous work.
Hereinafter, in the same manner, while repeating the work such as repairing the outer surface of the building 100 surrounded by the suspension type curing device 120, the height of the workers A and B and the lifting of the suspension type curing device 120. The work such as repair on the outer surface of the building 100 is performed from the ground side to the rooftop.

若し、途中で建物100の少し下方へ作業位置を変更したい場合、作業者A、Bは安全ロープ101と102、104と105に取り付けた昇降器具と墜落防止器具の位置を下方へ少し移動することで所望の高さ位置へ下降する。そして、作業者A、Bは各々、左右のロープ牽引装置501のラチェット機構60の制限を解除し、プーリ520を逆転させながら吊り下げ式養生装置120の自重で吊り下げロープ112、113に沿って少し下降させる。
具体的には、まず吊り下げロープ112(113)の出口側ロープ112b(113b)を掛け止め部580、581に巻き掛けてプーリ側に引き戻されないように固定する。次に、ロープ牽引装置501のラチェット機構560による回転制限を解除するため、操作つまみ571を第2のポジションP2へ回して係合突起574を係合凹部576に係合させて固定させるのであるが、ロープ牽引装置501、吊り下げ式養生装置501の荷重によりロープ牽引装置501から見て上方へ強く引っ張られた入口側ロープ112a(113a)がプーリ520を時計方向へ付勢しているため、ラチェット歯車562が歯止め564の先端部を強く押圧し、歯止め564が回動し難くなっている。
If it is desired to change the work position slightly below the building 100 on the way, the workers A and B slightly move the positions of the lifting and falling devices attached to the safety ropes 101 and 102, 104 and 105 downward. To descend to the desired height position. Then, each of the workers A and B releases the restriction of the ratchet mechanism 60 of the left and right rope traction devices 501, and along the suspension ropes 112 and 113 by the own weight of the suspension type curing device 120 while reversing the pulley 520. Lower it a little.
Specifically, the exit side rope 112b (113b) of the hanging rope 112 (113) is first wound around the latching portions 580 and 581 and fixed so as not to be pulled back to the pulley side. Next, in order to release the rotation restriction by the ratchet mechanism 560 of the rope traction device 501, the operation knob 571 is turned to the second position P <b> 2 to engage the engagement protrusion 574 with the engagement recess 576 and fix it. The rope traction device 501 and the suspension-type curing device 501 load the rope 520 so that the entrance-side rope 112a (113a) pulled strongly upward as viewed from the rope traction device 501 urges the pulley 520 clockwise. The gear 562 strongly presses the tip of the pawl 564, and the pawl 564 is difficult to rotate.

そこで、図29(1)に示す如く、手動式回転工具590の突起591を入力軸507のキー溝514に嵌合しながら軸孔513に回転軸部592を挿入する。そして、ハンドル部593を図29(1)の反時計方向(正転方向)に回して歯止め564に対するラチェット歯車562の押圧を緩めながら、操作つまみ571を第2のポジションP2へ回して係合突起574を係合凹部576に係合させて固定させる。これにより、歯止め564がラチェット歯車562から離間し、入力軸507の回転制限が解除される。   Therefore, as shown in FIG. 29 (1), the rotary shaft portion 592 is inserted into the shaft hole 513 while fitting the protrusion 591 of the manual rotary tool 590 into the key groove 514 of the input shaft 507. Then, while rotating the handle portion 593 in the counterclockwise direction (forward rotation direction) of FIG. 29A to loosen the pressure of the ratchet gear 562 against the pawl 564, the operation knob 571 is rotated to the second position P2 to engage the protrusion. 574 is engaged with the engagement recess 576 and fixed. Thereby, the pawl 564 is separated from the ratchet gear 562, and the rotation restriction of the input shaft 507 is released.

この状態で、出口側ロープ112b(113b)を手で掴み、ロープ牽引装置501の掛け止め部580、581から外したあと、出口側ロープ112b(113b)の把持力を弱めると、入口側ロープ112a(113a)の引っ張り力でプーリ520が図30の時計方向へ回転し、出口側ロープ112b(113b)が入口側へ引き戻されていく。この際、減速装置本体506の差動減速機構が大きな負荷となるので、吊り下げロープ112(113)は入口部532から外部へゆっくり引き出されて、吊り下げ式養生装置120がゆっくり下がる。吊り下げロープ112(113)の出口側ロープ112b(113b)を掛け止め部580、581に押接すれば、摩擦ブレーキを掛けてよりゆっくり下降させることもできる。
所望高さまで下がったところで、出口側ロープ112b(113b)を掛け止め部580、581に掛け止め、操作つまみ571を第1のポジションP1に変える。下降高さが足りないときは、作業者A、Bの降下と吊り下げ式養生装置120の降下を何度か繰り返せば良い。そして、建物100の外面の内、前回作業時の少し下側に対して補修等の作業を行う。
なお最初に、吊り下げ式養生装置120を屋上近くまで上昇させておけば、建物100の外面に対する補修等の作業と、作業者A、Bの降下及び吊り下げ式養生装置120の降下とを繰り返しながら、建物100の外面に対する補修等の作業を屋上側から行うこともできる。
In this state, when the outlet side rope 112b (113b) is grasped by hand and removed from the latching portions 580 and 581 of the rope traction device 501, the inlet side rope 112a is reduced when the gripping force of the outlet side rope 112b (113b) is weakened. The pulley 520 rotates in the clockwise direction in FIG. 30 by the pulling force of (113a), and the outlet side rope 112b (113b) is pulled back to the inlet side. At this time, since the differential speed reduction mechanism of the speed reducer main body 506 becomes a large load, the suspension rope 112 (113) is slowly pulled out from the inlet portion 532, and the suspension type curing device 120 is slowly lowered. If the exit-side rope 112b (113b) of the suspension rope 112 (113) is pressed against the latching portions 580 and 581, it can be lowered more slowly by applying a friction brake.
When the height is lowered to the desired height, the outlet side rope 112b (113b) is hooked on the hooking portions 580 and 581 and the operation knob 571 is changed to the first position P1. When the descending height is insufficient, the descending of the workers A and B and the descending of the hanging type curing device 120 may be repeated several times. Then, work such as repair is performed on the outer side of the building 100 slightly below the previous work.
First, if the suspension type curing device 120 is raised to near the rooftop, the repair work for the outer surface of the building 100, the lowering of the workers A and B, and the lowering of the suspension type curing device 120 are repeated. However, it is also possible to perform work such as repair on the outer surface of the building 100 from the roof side.

図16に示したロープ牽引装置501によれば、回転式電動工具を駆動源として吊り下げロープ112、113を牽引し、吊り下げ式養生装置120の昇降ができるのでロープ牽引装置501に駆動源を組み込む必要がなく、またプーリ520に巻き掛けて牽引するので巻き取りドラムが不要であり、全体として装置を小型にできる。また、回転式電動工具には電動ドライバ515など、作業用に携帯する通常の工具を用いることができ、特別な駆動源を用意する手間が掛からない。回転式電動工具を充電式とすれば電源コードを引き回す煩わしさもない。
また、小型で減速比の大きな差動減速式の減速装置本体506を用いたことにより、制限手段510を解除した状態でプーリ520を逆転させながら吊り下げロープ112、113を入口部532から外側に引き出させ、吊り下げ式養生装置120を下降させる際、緩行動作を行わせることができる。
また、ロープ出入口部531を間隔を開けて対向配置された入口部532及び出口部533から構成し、入口部532と出口部533の間の隙間544を通して外部と入口部532の間で吊り下げロープ112、113を出し入れしたり、外部と出口部533の間で吊り下げロープ112、113を出し入れ可能に形成したので、プーリ520への吊り下げロープ112、113の装填・取り外しが容易になる。
また、ロープ出入口部531をプーリ520から間隔を開けて設けるとともに、ロープ出入口部531とプーリ520の間に入口側ロープ112a、113aと出口側ロープ112b、113bを分離する分離部540を設けたので、プーリ520の正転時に出口側ロープ112b、113bがプーリ520の入口側に巻き込まれたり、プーリ520の逆転時に入口側ロープ112a、113aがプーリ520の出口側に巻き込まれるのを防止できる。
また、支持体502に、吊り下げロープ112、113を巻き掛けて止める掛け止め部580、581を備えたので、吊り下げロープ112、113の入口側に張力が掛かった状態で制限手段510による制限を解除し、入口側ロープ112a、113aを入口部532から上方外側へ移動させて吊り下げ式養生装置120を下降させたい場合に、予め、出口側ロープ112b、113bを掛け止め部580、581に巻き掛けて掛け止めておくことにより、制限手段510を解除した際に急に入口側ロープ112a、113aが入口部532から上方外側へ引き出されないようにできる。また、掛け止め部580、581に摺接させながら移動させることで、摩擦ブレーキを効かせることもできる。
また、制限手段510による入口部532から上方外側へのロープ移動の制限を解除したい場合に、手動式回転工具590を用いて減速装置本体506の入力軸507を手動で正転させてプーリ520をゆっくり正転させながら操作つまみ571により解除操作をすることで、容易に解除することができる。
According to the rope traction device 501 shown in FIG. 16, the suspension ropes 112 and 113 can be pulled by using the rotary electric tool as a drive source, and the suspension type curing device 120 can be raised and lowered. There is no need to incorporate it, and since it is wound around the pulley 520 and pulled, no take-up drum is required, and the apparatus can be made compact as a whole. In addition, a normal tool carried for work such as an electric driver 515 can be used as the rotary electric tool, and there is no need to prepare a special drive source. If the rotary electric tool is rechargeable, there is no need to bother the power cord.
Further, by using the differential reduction type reduction gear main body 506 that is small and has a large reduction ratio, the suspension ropes 112 and 113 are moved outward from the inlet portion 532 while the pulley 520 is reversed with the restriction means 510 released. When the suspension type curing device 120 is pulled out and lowered, a slowing operation can be performed.
In addition, the rope entrance / exit part 531 is composed of an entrance part 532 and an exit part 533 that are arranged to face each other with a gap, and a rope suspended between the outside and the entrance part 532 through a gap 544 between the entrance part 532 and the exit part 533. 112 and 113 can be taken in and out, and the suspension ropes 112 and 113 can be inserted and removed between the outside and the outlet portion 533, so that the suspension ropes 112 and 113 can be easily loaded into and removed from the pulley 520.
In addition, the rope entrance / exit part 531 is provided at a distance from the pulley 520, and the separation part 540 for separating the entrance side ropes 112a, 113a and the exit side ropes 112b, 113b is provided between the rope entrance / exit part 531 and the pulley 520. Further, it is possible to prevent the outlet side ropes 112b and 113b from being wound around the inlet side of the pulley 520 during the forward rotation of the pulley 520, and the inlet side ropes 112a and 113a from being caught into the outlet side of the pulley 520 when the pulley 520 is rotated in reverse.
In addition, since the suspension members 580 and 581 are provided on the support body 502 so that the suspension ropes 112 and 113 are wound and stopped, the restriction by the restriction means 510 is performed while tension is applied to the entrance side of the suspension ropes 112 and 113. , And when the suspension type curing device 120 is to be lowered by moving the entrance side ropes 112a and 113a upward and outward from the entrance part 532, the exit side ropes 112b and 113b are previously attached to the latching parts 580 and 581. By winding and retaining, it is possible to prevent the inlet side ropes 112a and 113a from being suddenly pulled out upward and outward from the inlet portion 532 when the restricting means 510 is released. In addition, the friction brake can be applied by moving the latching portions 580 and 581 while making sliding contact.
Further, when it is desired to cancel the restriction of the rope movement from the inlet 532 to the upper outside by the restricting means 510, the input shaft 507 of the speed reducer main body 506 is manually rotated forward by using the manual rotary tool 590 so that the pulley 520 is moved. It can be easily released by performing a release operation with the operation knob 571 while slowly rotating forward.

なお、図16に示したロープ牽引装置では回転式電動工具として充電式電動ドライバを挙げたが、本発明は何らこれに限定されず、電動ドリルなど、他の回転式電動工具であっても良い。また、充電式でない電動工具を用いても良い。
また図16に示したロープ牽引装置では、吊り下げロープの装填後、入口部と出口部の間には隙間が空いているが、図31、図32のロープ牽引装置501Aに示す如く、プーリカバー550Aの嵌合部を上方へ延設して、入口部532Aと出口部533Aの上端まで嵌合可能とし、プーリカバー550Aの上方延長部の背面側に、入口部532Aと出口部533Aの間の隙間544Aを塞ぎ、入口部532Aの入口通路部534に挿入された入口側ロープが隙間544Aへずれるのを邪魔したり、出口部533Aの出口通路部535に挿入された出口側ロープが隙間544Aへずれるのを邪魔する邪魔部586を突設しても良い。邪魔部586により、ロープ牽引装置501Aの使用中に、吊り下げロープが入口部532Aと出口部533Aの隙間544Aにずれ、プーリカバー550Aの上端部背面に衝突して不用意に開放させてしまうのを防止できる。
また図16のロープ牽引装置では、歯止めを圧縮コイルバネによりラチェット歯車の方向へ付勢するようにしたが、板バネ、トーションバネなどにより付勢するようにしても良い。また、装填された吊り下げロープが入口側から引き戻されるのを制限する制限手段を差動減速装置本体の入力軸側に設ける場合を例に挙げて説明したが、出力軸側に設けるようにしても良い。
In the rope traction device shown in FIG. 16, the rechargeable electric driver is cited as the rotary electric tool. However, the present invention is not limited to this, and other rotary electric tools such as an electric drill may be used. . Moreover, you may use the electric tool which is not rechargeable.
In the rope traction device shown in FIG. 16, there is a gap between the inlet portion and the outlet portion after the hanging rope is loaded. However, as shown in the rope traction device 501A in FIGS. The fitting portion of 550A is extended upward so that it can be fitted to the upper ends of the inlet portion 532A and the outlet portion 533A, and between the inlet portion 532A and the outlet portion 533A on the back side of the upper extension portion of the pulley cover 550A. The gap 544A is blocked and the entrance-side rope inserted into the entrance passage 534 of the entrance 532A is prevented from shifting to the gap 544A, or the exit-side rope inserted into the exit passage 535 of the exit 533A is directed to the gap 544A. You may project the baffle part 586 which disturbs shifting. When the rope traction device 501A is in use, the hindering portion 586 causes the suspension rope to be shifted to the gap 544A between the inlet portion 532A and the outlet portion 533A, and collides with the rear surface of the upper end portion of the pulley cover 550A to be inadvertently opened. Can be prevented.
In the rope traction device shown in FIG. 16, the pawl is urged in the direction of the ratchet gear by the compression coil spring, but may be urged by a plate spring, a torsion spring, or the like. Moreover, although the case where the limiting means for restricting the loaded suspension rope from being pulled back from the inlet side is provided on the input shaft side of the differential speed reducer main body has been described as an example, it should be provided on the output shaft side. Also good.

更に、制限手段はラチェット機構に代えて、吊り下げロープが入口部から外側に引き出される方向へ移動しようとするとき吊り下げロープに食い込んで移動を制限し、反対方向へ移動しようとする際は、吊り下げロープから離間して移動を許容するように構成されたカムと、カムを吊り下げロープに食い込む方向へ付勢する付勢手段と、カムを吊り下げロープから離間させて制限を解除する解除手段を含む構成としても良い。   Further, the restricting means replaces the ratchet mechanism, and when the suspension rope tries to move in a direction to be pulled out from the entrance portion, the restriction means bites into the suspension rope and restricts the movement, and when trying to move in the opposite direction, Cam configured to allow movement away from the suspension rope, biasing means for biasing the cam in the direction of biting the suspension rope, and release for releasing the restriction by separating the cam from the suspension rope It is good also as a structure containing a means.

カム式の制限手段の具体例の一つを図33に示す。図340のロープ牽引装置501Bでは支持体502Bの上部が上方へ延設されており、正面側にカム式の制限手段600が装着されている。制限手段600の内、601は支持体502Bの上端部の正面側に装着された支持プレートであり、左側部がU字状に折り曲げられて内側にロープ当接部としてのロープ挿通部602が形成された折り曲げ部603、右側部がU字状に折り曲げられて回動軸604が回転自在に装着された折り曲げ部605となっている。ロープ挿通部602はロープ牽引装置501Bに装填される吊り下げロープの入口側の経路に沿って配備されており、入口部532の入口通路部534に対し直線的に配置されている。回動軸604には外周部606に多数の歯607が突設されたカム608の基端部が嵌着されている。カム608は回動軸604を回動中心としてロープ挿通部602に挿通された吊り下げロープに対し接近する方向(図33の矢印i参照)と、離間する方向(図33の矢印j参照)に回動可能となっている。回動軸604とカム608の間には、カム608を常時、図33の時計方向へ付勢するゼンマイバネ(図示せず)が介装されている。   One specific example of the cam-type limiting means is shown in FIG. In the rope traction device 501B of FIG. 340, the upper portion of the support body 502B extends upward, and a cam-type limiting means 600 is mounted on the front side. Of the restricting means 600, reference numeral 601 denotes a support plate mounted on the front side of the upper end portion of the support body 502B, and the left side portion is bent into a U shape to form a rope insertion portion 602 as a rope contact portion on the inside. The bent portion 603 is formed into a bent portion 605 in which the right side portion is bent in a U shape and the rotating shaft 604 is rotatably mounted. The rope insertion part 602 is arranged along the path on the inlet side of the suspension rope loaded in the rope pulling device 501B, and is arranged linearly with respect to the inlet passage part 534 of the inlet part 532. The rotation shaft 604 is fitted with a base end portion of a cam 608 having a large number of teeth 607 protruding from an outer peripheral portion 606. The cam 608 approaches the suspension rope inserted through the rope insertion part 602 with the rotation shaft 604 as the center of rotation (see arrow i in FIG. 33) and moves away (see arrow j in FIG. 33). It can be turned. A mainspring spring (not shown) that constantly biases the cam 608 clockwise in FIG. 33 is interposed between the rotation shaft 604 and the cam 608.

カム608の真ん中近くに回動軸609が回転自在に装着されており、この回動軸609にL字状の解除操作部材610の基端部が嵌着されている。解除操作部材610の角部には支持体602Bの前方へ突出した円柱状の操作突起611が装着されており、操作突起611を指で操作することで回動軸609を中心として解除操作部材610を回動自在になっている(図33の矢印k、l参照)。解除操作部材610の先端側はJ字状に折曲されて支持プレート601の折り曲げ部605の外側に係脱自在に係合する係合部612となっている。回動軸609と解除操作部材610の間には、解除操作部材610を常時、図33の反時計方向へ付勢するゼンマイバネ(図示せず)が介装されている。   A rotating shaft 609 is rotatably mounted near the center of the cam 608, and a base end portion of an L-shaped release operation member 610 is fitted to the rotating shaft 609. A columnar operation protrusion 611 that protrudes forward of the support 602B is attached to a corner portion of the release operation member 610, and the release operation member 610 centering on the rotation shaft 609 by operating the operation protrusion 611 with a finger. Is freely rotatable (see arrows k and l in FIG. 33). The distal end side of the release operation member 610 is bent into a J shape, and is an engaging portion 612 that is detachably engaged with the outside of the bent portion 605 of the support plate 601. A mainspring spring (not shown) that constantly biases the release operation member 610 in the counterclockwise direction of FIG. 33 is interposed between the rotation shaft 609 and the release operation member 610.

図33のロープ牽引装置501Bへの吊り下げロープ装填方法を説明すると、まず制限手段600の操作突起611を指で操作し、カム608の回動と解除操作部材610の回動を平行して行い、図34の如く係合部612を折り曲げ部605の外側に係合しておく。プーリカバー550を開いて吊り下げロープ112(113)の一端側を制限手段600のロープ挿通部602に挿通し、更に入口部532と出口部533の間の隙間544から入口通路部534に挿入し、分離部540の左側を通してプーリ520に一周弱巻き掛け、分離部540の右側を通して入口部532と出口部533の隙間544から出口通路部535に挿入したのち(図34参照)、掛け止め部580、581に巻き掛けて掛け止める。   The method of loading the hanging rope onto the rope traction device 501B of FIG. 33 will be described. First, the operation protrusion 611 of the limiting means 600 is operated with a finger, and the cam 608 and the release operation member 610 are rotated in parallel. 34, the engaging portion 612 is engaged with the outside of the bent portion 605. The pulley cover 550 is opened and one end of the suspension rope 112 (113) is inserted into the rope insertion portion 602 of the restricting means 600, and further inserted into the inlet passage portion 534 through the gap 544 between the inlet portion 532 and the outlet portion 533. Then, the pulley 520 is slightly wound around the pulley 520 through the left side of the separating portion 540, and inserted into the outlet passage portion 535 through the right side of the separating portion 540 through the gap 544 between the inlet portion 532 and the outlet portion 533 (see FIG. 34), and then the latching portion 580. , Wrap around 581 and hang.

そしてプーリカバー550を閉じるとともに、解除操作部材610の操作突起611を指で操作し、係合部612の係合を外し、カム608の回動と解除操作部材610の回動を平行して行い、カム608を吊り下げロープ112(113)に接近させて指を離す。カム608はゼンマイバネにより外周部606がロープ挿通部602に挿通されたロープ方向に付勢されて吊り下げロープ112(113)に押接する。ロープ挿通部602の出口側で吊り下げロープ112(113)が下方(図35の矢印r参照)へ引っ張られたとき、カム608に反時計方向の外力が加わるが、外周部606が吊り下げロープ112(113)から離間する方向なのでカム608は容易に反時計方向へ回動し、入口側ロープ112a(113a)のプーリ方向への移動が許容される。反対に、ロープ挿通部602の入口側で吊り下げロープ112(113)が上方(図35の矢印s参照)へ引っ張られたとき、カム608に時計方向の外力が加わるが、外周部606が吊り下げロープ112(113)に接近する方向なのでカム608は吊り下げロープ112(113)に食い込んで移動を制限する(吊り下げロープ112(113)がロープ挿通部602とカム608に挟持される)。   Then, the pulley cover 550 is closed, and the operation protrusion 611 of the release operation member 610 is operated with a finger to disengage the engagement portion 612, and the cam 608 and the release operation member 610 are rotated in parallel. Then, the cam 608 is brought close to the hanging rope 112 (113) and the finger is released. The cam 608 is urged in the direction of the rope in which the outer peripheral portion 606 is inserted into the rope insertion portion 602 by the spring, and presses against the hanging rope 112 (113). When the suspension rope 112 (113) is pulled downward (see arrow r in FIG. 35) on the exit side of the rope insertion portion 602, an external force in the counterclockwise direction is applied to the cam 608, but the outer peripheral portion 606 is a suspension rope. Since the cam 608 is easily rotated counterclockwise because the direction is away from 112 (113), movement of the inlet side rope 112a (113a) in the pulley direction is allowed. Conversely, when the hanging rope 112 (113) is pulled upward (see arrow s in FIG. 35) on the entrance side of the rope insertion portion 602, an external force in the clockwise direction is applied to the cam 608, but the outer peripheral portion 606 is suspended. Since the cam 608 is in the direction approaching the lowering rope 112 (113), the cam 608 bites into the lowering rope 112 (113) and restricts the movement (the lowering rope 112 (113) is sandwiched between the rope insertion part 602 and the cam 608).

吊り下げ式養生装置120を上昇させるために吊り下げロープ112(113)の牽引を開始する場合、巻き掛け部580、581から出口側ロープ112b(113b)を外し、充電式電動ドライバ515により入力軸507を正転させる。すると、プーリ520が正転し、このとき制限手段600が吊り下げロープ112(113)の移動を許容している方向なので入口側ロープ112a(113a)はプーリ520により円滑に牽引され、吊り下げロープ112、113に沿ってロープ牽引装置501B、吊り下げ式養生装置120が上昇する。
吊り下げロープ112(113)の牽引を停止したい場合、充電式電動ドライバ515による入力軸507の駆動を停止する。吊り下げ式養生装置120とロープ牽引装置501Bの自重によりロープ挿通部602の入口側でロープ牽引装置501Bから見て吊り下げロープ112(113)が上方へ引っ張られると、カム608に時計方向の外力が加わるが、外周部606が吊り下げロープ112(113)に接近する方向なのでカム608は吊り下げロープ112(113)に食い込んで移動を制限する。従って、出口側ロープ112b(113b)が入口側に引き戻されてロープ牽引装置501B、吊り下げ式養生装置120が下降することはない。
ロープ牽引装置501Bと吊り下げ式養生装置120の自重を受けて入口側ロープ112a(113a)がロープ牽引装置501Bから見て図35の上方へ引っ張られた状態で、引っ張られている方向へ引き戻してロープ牽引装置501B、吊り下げ式養生装置120を下降させたい場合、出口側ロープ112b(113b)を掛け止め部580、581に巻き掛けて掛け止めておき、入力軸507に手動式回転工具590を結合して正転し、吊り下げロープ112(113)に対するカム608の食い込みをゆるめ、制限手段600の操作突起611を指で操作し、カム608の回動と解除操作部材610の回動を平行して行い、図34の如く係合部612を折り曲げ部605の外側に係合する。そして、掛け止め部580、581から外した出口側ロープ112b(113b)を把持する把持力を弱めると、入口側ロープ112a(113a)の引っ張り力でプーリ520が逆転し、出口側ロープ112b(113b)が入口側へ引き戻されていき、吊り下げロープ112(113)をロープ牽引装置501B、吊り下げ式養生装置120が下降していく。
In order to start pulling the suspension rope 112 (113) in order to raise the suspension type curing device 120, the exit side rope 112b (113b) is removed from the winding portions 580 and 581, and the rechargeable electric driver 515 inputs the input shaft. 507 is rotated forward. Then, since the pulley 520 rotates in the forward direction, and the restricting means 600 allows the suspension rope 112 (113) to move at this time, the entrance side rope 112a (113a) is smoothly pulled by the pulley 520, and the suspension rope The rope traction device 501 </ b> B and the suspension type curing device 120 rise along the lines 112 and 113.
When it is desired to stop towing the hanging rope 112 (113), the driving of the input shaft 507 by the rechargeable electric driver 515 is stopped. When the suspension rope 112 (113) is pulled upward as viewed from the rope traction device 501B on the entrance side of the rope insertion portion 602 by the weight of the suspension type curing device 120 and the rope traction device 501B, an external force in the clockwise direction is applied to the cam 608. However, since the outer peripheral portion 606 is in a direction approaching the hanging rope 112 (113), the cam 608 bites into the hanging rope 112 (113) and restricts movement. Therefore, the exit side rope 112b (113b) is not pulled back to the entrance side, and the rope traction device 501B and the suspension type curing device 120 are not lowered.
In response to the weight of the rope pulling device 501B and the suspension type curing device 120, the entrance side rope 112a (113a) is pulled upward in FIG. 35 as viewed from the rope pulling device 501B and pulled back in the pulling direction. When the rope pulling device 501B and the suspension type curing device 120 are to be lowered, the exit side rope 112b (113b) is wrapped around the latching portions 580 and 581 and latched, and the manual rotary tool 590 is attached to the input shaft 507. Coupling and rotating forward, the cam 608 bites into the hanging rope 112 (113) is loosened, the operation projection 611 of the limiting means 600 is operated with a finger, and the cam 608 and the release operation member 610 rotate in parallel. Then, the engaging portion 612 is engaged with the outside of the bent portion 605 as shown in FIG. When the gripping force for gripping the outlet side rope 112b (113b) removed from the latching portions 580 and 581 is weakened, the pulley 520 is reversed by the pulling force of the inlet side rope 112a (113a), and the outlet side rope 112b (113b). ) Is pulled back to the entrance side, and the rope pulling device 501B and the hanging type curing device 120 are lowered by the hanging rope 112 (113).

図33の変形例によれば、ラチェット機構を用いずに、吊り下げロープ112(113)の牽引による上昇中や停止中に出口側ロープ112b(113b)が引き戻されてロープ牽引装置501Bが下降するのを制限することができ、また吊り下げロープ112(113)の入口側を引き出して下降させたい場合に制限を解除することもできる。また、支持体502Bの内、入口部532よりも入口側に制限手段600のロープ挿通部602を配設したので、入口側でのロープ通路が長くなり、プーリ520への吊り下げロープ112(113)の案内をより円滑に行うことができる。   33, without using the ratchet mechanism, the rope traction device 501B is lowered by pulling back the exit side rope 112b (113b) while the suspension rope 112 (113) is being pulled up or stopped. In addition, it is also possible to release the restriction when it is desired to pull out and lower the entrance side of the hanging rope 112 (113). Further, since the rope insertion portion 602 of the restricting means 600 is disposed on the inlet side of the support body 502B from the inlet portion 532, the rope passage on the inlet side becomes longer, and the rope 112 (113) suspended from the pulley 520 is extended. ) Can be performed more smoothly.

カム式の制限手段の他の具体例を図36、図37に示す。図36、図37のロープ牽引装置501Cでは支持体502Cの正面側右上部で、出口部533とプーリ520と掛け止め部580の間に、カム式の制限手段700が装着されている。制限手段700の内、701は支持体502Cの正面側の右上部に装着された支持プレートであり、右側部がU字状に折り曲げられて内側に回動軸704が回転自在に装着された折り曲げ部705となっている。回動軸704には外周部706に多数の歯707が突設されたカム708の基端部が嵌着されている。カム708は回動軸704を回動中心として後述するロープ当接部のロープ溝に通されたロープに対し接近する方向と、離間する方向に回動可能となっている(図37の矢印m、n参照)。回動軸704とカム708の間には、カム708を常時、図36、図37の反時計方向へ付勢するゼンマイバネ(図示せず)が介装されている。   Other specific examples of the cam type limiting means are shown in FIGS. In the rope traction device 501C of FIGS. 36 and 37, a cam-type limiting means 700 is mounted between the outlet portion 533, the pulley 520, and the latching portion 580 at the upper right portion on the front side of the support body 502C. Of the restricting means 700, reference numeral 701 denotes a support plate attached to the upper right portion on the front side of the support 502C. The support plate is bent such that the right portion is bent in a U shape and the rotation shaft 704 is rotatably attached to the inside. Part 705. The rotation shaft 704 is fitted with a base end portion of a cam 708 having a large number of teeth 707 protruding from an outer peripheral portion 706. The cam 708 is rotatable about a rotation shaft 704 as a rotation center in a direction approaching and separating from a rope passed through a rope groove of a rope contact portion described later (arrow m in FIG. 37). , N). A mainspring spring (not shown) that urges the cam 708 in the counterclockwise direction in FIGS. 36 and 37 is interposed between the rotating shaft 704 and the cam 708.

カム708の真ん中近くに回動軸709が回転自在に装着されており、この回動軸709にL字状の解除操作部材710の基端部が嵌着されている。解除操作部材710の角部には支持体502Cの前方へ突出した円柱状の操作突起711が装着されており、操作突起711を指で操作することで回動軸709を中心として解除操作部材710を回動自在になっている(図37の矢印o、q参照)。解除操作部材710の先端側はJ字状に折曲されて支持プレート701の折り曲げ部705の外側に係脱自在に係合する係合部712となっていいる。回動軸709と解除操作部材710の間には、解除操作部材710を常時、図36、図37の時計方向へ付勢するゼンマイバネ(図示せず)が介装されている。   A rotating shaft 709 is rotatably mounted near the center of the cam 708, and a base end portion of an L-shaped release operation member 710 is fitted to the rotating shaft 709. A columnar operation projection 711 protruding forward of the support body 502C is attached to a corner portion of the release operation member 710. By operating the operation projection 711 with a finger, the release operation member 710 is centered on the rotation shaft 709. (See arrows o and q in FIG. 37). The distal end side of the release operation member 710 is an engagement portion 712 that is bent in a J-shape and is detachably engaged with the outside of the bent portion 705 of the support plate 701. A mainspring (not shown) that constantly biases the release operation member 710 in the clockwise direction of FIGS. 36 and 37 is interposed between the rotation shaft 709 and the release operation member 710.

分離部540Cは図36、図37の右側が斜め下方向へ鷲鼻状に延設されてプーリ520のH字溝521の中に遊挿されたロープ当接部545となっており、ロープ当接部545の外側面側に断面が円弧状のロープ溝546が形成されている。プーリカバー550Cは、図36の右上部分の側面に開口800が形成されており、カム708と解除操作部材710が回動してもプーリカバー550Cと干渉しないようになっている。   The separation part 540C is a rope abutment part 545 that is extended in a slanting nose shape on the right side in FIGS. 36 and 37 and loosely inserted into the H-shaped groove 521 of the pulley 520. A rope groove 546 having an arcuate cross section is formed on the outer surface side of the portion 545. The pulley cover 550C has an opening 800 formed on the side surface in the upper right part of FIG. 36 so that the pulley cover 550C does not interfere with the pulley cover 550C even if the cam 708 and the release operation member 710 rotate.

図36、図37の如く構成されたロープ牽引装置501Cへの吊り下げロープ装填方法を説明すると、まず制限手段700の操作突起711を指で操作し、カム708の回動と解除操作部材710の回動を平行して行い、図38の如く係合部712を折り曲げ部705の外側に係合しておく。プーリカバー550Cを開いて吊り下げロープ112(113)の一端側を入口部532と出口部533の間の隙間544から入口通路部534に挿入し、分離部540Cの左側を通してプーリ520に一周弱巻き掛け、分離部540Cのロープ案内部545のロープ溝546に嵌め、入口部532と出口部533の隙間544から出口通路部535に挿入したのち(図38参照)、掛け止め部580、581に巻き掛けて掛け止める。   36 and 37, the suspension rope loading method to the rope traction device 501C will be described. First, the operation protrusion 711 of the limiting means 700 is operated with a finger, and the cam 708 is rotated and released. The rotation is performed in parallel, and the engaging portion 712 is engaged with the outside of the bent portion 705 as shown in FIG. The pulley cover 550C is opened, and one end of the hanging rope 112 (113) is inserted into the inlet passage 534 through the gap 544 between the inlet 532 and the outlet 533, and is slightly wound around the pulley 520 through the left side of the separating portion 540C. Hang, fit into the rope groove 546 of the rope guide portion 545 of the separation portion 540C, insert into the outlet passage portion 535 through the gap 544 between the inlet portion 532 and the outlet portion 533 (see FIG. 38), and then wind around the hooking portions 580 and 581 Multiply it.

そしてプーリカバー550Cを閉じるとともに、解除操作部材710の操作突起711を指で操作し、係合部712の係合を外し、カム708の回動と解除操作部材710の回動を平行して行い、カム708を吊り下げロープ112(113)に接近させて指を離す。カム708はゼンマイバネにより外周部706がロープ方向に回動付勢されて吊り下げロープ112(113)をロープ当接部545に押接する(図39参照)。吊り下げロープ112(113)にプーリ520のロープ出口近く(ロープ溝546の入口近く)から出口部533に向かう方向(図39の矢印t参照)の力が掛かっているとき、カム708に時計方向の外力が加わるが、外周部706がロープ溝546に嵌った吊り下げロープ112(113)から離間する方向なのでカム708は容易に時計方向へ回動し、出口側ロープ112b(113b)の出口部533から外側方向への移動が許容される。反対に、吊り下げロープ112(113)に入口部532から図39の上方へ引っ張る方向(矢印U参照)の力が掛かったとき、カム708に反時計方向の外力が加わるが、外周部706がロープ溝546に嵌った吊り下げロープ112(113)に接近する方向なのでカム708は外周部706が吊り下げロープ112(113)に食い込んで移動を制限するがカム708とロープ当接部545の間に挟持される)。   Then, the pulley cover 550C is closed and the operation protrusion 711 of the release operation member 710 is operated with a finger to disengage the engagement portion 712, and the rotation of the cam 708 and the release operation member 710 are performed in parallel. Then, the cam 708 is brought close to the hanging rope 112 (113) and the finger is released. In the cam 708, the outer peripheral portion 706 is urged to rotate in the rope direction by the spring, and the hanging rope 112 (113) is pressed against the rope contact portion 545 (see FIG. 39). When a force is applied to the suspension rope 112 (113) from the vicinity of the rope outlet of the pulley 520 (near the entrance of the rope groove 546) toward the outlet 533 (see the arrow t in FIG. 39), the cam 708 is rotated clockwise. However, since the outer peripheral portion 706 is away from the suspension rope 112 (113) fitted in the rope groove 546, the cam 708 easily rotates clockwise, and the outlet portion of the outlet side rope 112b (113b) Movement in the outward direction from 533 is allowed. On the other hand, when a force in the direction of pulling upward from FIG. 39 (see arrow U) is applied to the hanging rope 112 (113) from the inlet 532, an external force in the counterclockwise direction is applied to the cam 708. Since the direction of the cam 708 approaches the suspension rope 112 (113) fitted in the rope groove 546, the outer peripheral portion 706 bites into the suspension rope 112 (113) and restricts the movement, but between the cam 708 and the rope contact portion 545. Pinched).

吊り下げ式養生装置120を上昇させるために吊り下げロープ112(113)の牽引を開始する場合、巻き掛け部580、581から出口側ロープ112b(113b)を外し、充電式電動ドライバ515により入力軸507を正転させる。すると、プーリ520が正転し、このとき制限手段700が吊り下げロープ112(113)の移動を許容している方向なので入口側ロープ112a(113a)はプーリ520により円滑に牽引され、吊り下げロープ112(113)に沿ってロープ牽引装置501C、吊り下げ式養生装置120が上昇する。
吊り下げロープ112(113)の牽引を停止したい場合、充電式電動ドライバ515による入力軸507の駆動を停止する。吊り下げ式養生装置120、ロープ牽引装置501Cの自重により、入口側ロープ112a(113a)がロープ牽引装置501Cから見て入口部532の上方へ引っ張られると、ロープ当接部545のロープ溝546に嵌った出口側ロープ112b(113b)はプーリ520の方向へ引っ張られてカム708に反時計方向の外力が加わるが、外周部706が吊り下げロープ112(113)に接近する方向なのでカム708は吊り下げロープ112(113)に食い込んで移動を制限する。従って、出口側ロープ112b(113b)が入口側に引き戻されてロープ牽引装置501C、吊り下げ式養生装置120が下降することはない。
ロープ牽引装置501C、吊り下げ式養生装置120の自重を受けて入口側ロープ112a(113a)が図39の上方へ引っ張れた状態で、引っ張られている方向へ引き戻してロープ牽引装置501Cを下降させたい場合、出口側ロープ112b(113b)を掛け止め部580、581に巻き掛けて掛け止めておき、入力軸507に手動式回転工具590を結合して正転し、吊り下げロープ112(113)に対するカム708の食い込みをゆるめ、制限手段700の操作突起711を指で操作し、カム708の回動と解除操作部材710の回動を平行して行い、図38の如く係合部712を折り曲げ部705の外側に係合する。そして、掛け止め部580、581から外した出口側ロープ112b(113b)を把持する把持力を弱めると、入口側ロープ112a(113a)の引っ張り力でプーリ520が逆転し、出口側ロープ112b(113b)が入口側へ引き戻されていき、吊り下げロープ112(113)をロープ牽引装置501C、吊り下げ式養生装置120が下降していく。
In order to start pulling the suspension rope 112 (113) in order to raise the suspension type curing device 120, the exit side rope 112b (113b) is removed from the winding portions 580 and 581, and the rechargeable electric driver 515 inputs the input shaft. 507 is rotated forward. Then, the pulley 520 rotates in the forward direction, and at this time, the restricting means 700 permits the movement of the hanging rope 112 (113), so the inlet side rope 112a (113a) is smoothly pulled by the pulley 520, and the hanging rope The rope traction device 501C and the suspension type curing device 120 rise along 112 (113).
When it is desired to stop towing the hanging rope 112 (113), the driving of the input shaft 507 by the rechargeable electric driver 515 is stopped. When the entrance side rope 112a (113a) is pulled upward from the entrance portion 532 when viewed from the rope traction device 501C by the weight of the suspension type curing device 120 and the rope traction device 501C, the rope 546C is inserted into the rope groove 546 of the rope contact portion 545. The fitted exit-side rope 112b (113b) is pulled in the direction of the pulley 520 and a counterclockwise external force is applied to the cam 708, but the cam 708 is suspended because the outer peripheral portion 706 approaches the suspension rope 112 (113). The movement is restricted by cutting into the lowering rope 112 (113). Therefore, the exit side rope 112b (113b) is not pulled back to the entrance side, and the rope traction device 501C and the suspension type curing device 120 are not lowered.
In the state where the rope traction device 501C and the suspension type curing device 120 receive their own weights and the inlet side rope 112a (113a) is pulled upward in FIG. 39, the rope traction device 501C is lowered by pulling back in the pulling direction. In this case, the exit-side rope 112b (113b) is wrapped around the latching portions 580 and 581 and latched, and the manual rotation tool 590 is coupled to the input shaft 507 to perform normal rotation, and the suspension rope 112 (113) is rotated. The cam 708 is loosened, the operation protrusion 711 of the limiting means 700 is operated with a finger, the cam 708 is rotated and the release operation member 710 is rotated in parallel, and the engaging portion 712 is bent as shown in FIG. 705 engages outside. When the gripping force for gripping the outlet side rope 112b (113b) removed from the latching portions 580 and 581 is weakened, the pulley 520 is reversed by the pulling force of the inlet side rope 112a (113a), and the outlet side rope 112b (113b). ) Is pulled back to the entrance side, and the rope pulling device 501C and the hanging type curing device 120 are lowered by the hanging rope 112 (113).

図36、図37の変形例によってもラチェット機構を用いずに、吊り下げロープ112(113)の牽引による上昇中や停止中に出口側ロープ112b(113b)が引き戻されるのを制限することができ、また吊り下げロープ112(113)の入口側を引き出して下降させたい場合に制限を解除することもできる。また、支持体502Cの内、出口部533、プーリ520、掛け止め部580の間に制限手段700を装備したので、装置が大きくならずに済む。また、吊り下げロープ112(113)をロープ当接部545とカム708により挟持するようにしたので、吊り下げロープ112(113)の入口側が引き出される方向(ロープ牽引装置501Cが下降する方向)への移動を確実に制限することができる。
なお、制限手段700を入口部532とプーリ520の間に装備するようにしても良い(この場合、分離部の図36、図37における左側を斜め下方向へ延設してロープ当接部とすれば良い)。
36 and 37, it is possible to restrict the return side rope 112b (113b) from being pulled back while the suspension rope 112 (113) is being lifted or stopped without using the ratchet mechanism. In addition, the restriction can be released when it is desired to pull out and lower the entrance side of the hanging rope 112 (113). Further, since the limiting means 700 is provided between the outlet portion 533, the pulley 520, and the latching portion 580 in the support body 502C, the apparatus does not have to be large. In addition, since the suspension rope 112 (113) is sandwiched between the rope contact portion 545 and the cam 708, the entrance side of the suspension rope 112 (113) is pulled out (the direction in which the rope traction device 501C is lowered). Can be reliably restricted.
The restricting means 700 may be provided between the inlet portion 532 and the pulley 520 (in this case, the left side in FIGS. 36 and 37 of the separating portion is extended obliquely downward to form the rope contact portion. Just do it).

また、上記した第1実施例では吊り下げ式養生装置の昇降を2つの登降装置により行うようにしたが、登降装置の代わりに、吊り下げロープの昇降を行うウインチ等のロープ昇降装置(図16乃至図39で説明した各種のロープ牽引装置を含む)を屋上または支持具または地上等に配備して行っても良い。
例えば図16に示すロープ牽引装置501を2台、屋上に配備する場合、図40、図41に示す如く、建物100の屋上の内、補修対象側のパラペット103に2つの支持具201、207を設置し、パラペット103と反対側のパラペット900に4つのロープ固定具901乃至904を設置しておく(なお、図40では安全ロープ101、102、104、105は省略してある)。屋上に配置した第3の作業者はプーリカバー550が閉じ、操作つまみ571がP1ポジションに固定した2つのロープ牽引装置501−1と501−2、2本の吊り下げロープ200、206を用意し、ロープ牽引装置501−1のロック部材553を図17の下方(図24(1)矢印a方向)へ押し下げ、係合爪558を係合溝538、539から離間してロックを外し、プーリカバー550を図18の矢印c方向へ開放する。
In the first embodiment, the lifting type curing device is lifted and lowered by two climbing devices. Instead of the lifting device, a rope lifting device such as a winch that lifts and lowers the hanging rope (FIG. 16). Thru various rope towing devices described in FIG. 39) may be provided on the rooftop, on a support, or on the ground.
For example, when two rope traction devices 501 shown in FIG. 16 are deployed on the roof, as shown in FIGS. 40 and 41, two support tools 201 and 207 are attached to the parapet 103 on the repair target side in the roof of the building 100. The four rope fixtures 901 to 904 are installed on the parapet 900 opposite to the parapet 103 (note that the safety ropes 101, 102, 104, and 105 are omitted in FIG. 40). The third worker arranged on the roof prepared two rope pulling devices 501-1 and 501-2 and two hanging ropes 200, 206 with the pulley cover 550 closed and the operation knob 571 fixed at the P1 position. Then, the lock member 553 of the rope pulling device 501-1 is pushed downward in the direction of FIG. 17 (in the direction of arrow a in FIG. 24 (1)), the engagement claw 558 is separated from the engagement grooves 538 and 539, and the lock is released. 550 is opened in the direction of arrow c in FIG.

吊り下げロープ200の一端側をロープ牽引装置501−1の入口部532と出口部533の間の隙間544から入口通路535に挿入し、分離部540の左側を通してプーリ520に一周弱巻き掛け、分離部540の右側を通して入口部532と出口部533の隙間544から出口通路部535に挿入したのち(図30参照)、掛け止め部580、581に巻き掛けて掛け止める。そして、ロック部材553を図17の下方(図24(1)矢印b参照)に押し下げながらプーリカバー550を閉じ、嵌合部552を被勘合部536、537に嵌合する。ロック部材553の押し下げを解放すると、圧縮バネ554、555によりロック部材553が上方に付勢されて、係合爪558が係合溝538、539内に係合してロックする。
吊り下げロープ206も同様にしてロープ牽引装置501−2に装填する。
One end of the hanging rope 200 is inserted into the inlet passage 535 through the gap 544 between the inlet 532 and the outlet 533 of the rope pulling device 501-1, and is slightly wound around the pulley 520 through the left side of the separating part 540 and separated. After being inserted into the outlet passage portion 535 through the gap 544 between the inlet portion 532 and the outlet portion 533 through the right side of the portion 540 (see FIG. 30), it is wrapped around the latching portions 580 and 581 and latched. Then, the pulley cover 550 is closed while the lock member 553 is pushed downward in FIG. 17 (see arrow b in FIG. 24 (1)), and the fitting portion 552 is fitted to the mated portions 536 and 537. When the depression of the lock member 553 is released, the lock member 553 is biased upward by the compression springs 554 and 555, and the engagement claws 558 are engaged and locked in the engagement grooves 538 and 539.
Similarly, the hanging rope 206 is loaded into the rope pulling device 501-2.

ロープ牽引装置501−1のロープ取り付け孔4とロープ固定具901、902の間に2本のロープ905、906を張設し、ロープ牽引装置501−2のロープ取り付け孔4とロープ固定具903、904の間に2本のロープ907、908を張設し、支点確保する。吊り下げロープ200の他端側を支持具201の立設支柱202に設けたシーブ203、先端シーブ204に巻き掛けて地上に垂らす。同様に、吊り下げロープ206の他端側を支持具207の立設支柱208に設けたシーブ209、先端シーブ210に巻き掛けて地上に垂らす。
地上側の作業者は、吊り下げロープ200の下端にカラビナ205を介して二本のロープ3、4の一端側を連結し、ロープ3、4の他端側を吊り下げ式養生装置120の装置本体121の左側の2つのロープ取り付け板145、146に取着する。同様に吊り下げロープ206の下端にカラビナ211を介して二本のロープ7、8の一端側を連結し、ロープ7、8の他端側を装置本体121の右側の2つのロープ取り付け板147、148に取着する。
Two ropes 905 and 906 are stretched between the rope attachment hole 4 of the rope traction device 501-1 and the rope fixtures 901 and 902, and the rope attachment hole 4 and the rope fixture 903 of the rope traction device 501-2. Two ropes 907 and 908 are stretched between 904 to secure a fulcrum. The other end of the suspension rope 200 is wrapped around a sheave 203 and a tip sheave 204 provided on the upright support column 202 of the support 201 and hung on the ground. Similarly, the other end side of the suspension rope 206 is wound around the sheave 209 and the tip sheave 210 provided on the standing column 208 of the support 207 and hung on the ground.
The operator on the ground side connects one end side of the two ropes 3 and 4 to the lower end of the suspension rope 200 via the carabiner 205, and the other end side of the ropes 3 and 4 is a device of the suspension type curing device 120. Attached to the two rope attachment plates 145 and 146 on the left side of the main body 121. Similarly, one end side of the two ropes 7 and 8 is connected to the lower end of the suspension rope 206 via the carabiner 211, and the other end side of the ropes 7 and 8 is connected to the two rope attachment plates 147 on the right side of the apparatus main body 121. Attach to 148.

吊り下げ式養生装置120を上昇させたい場合、屋上に配置した作業者が制限手段510を逆転制限状態にしたロープ牽引装置501−1、501−2を充電式電動ドライバ515で正転駆動し、吊り下げロープ200、206の入口側ロープ200a、206aを出口部534の側へ牽引すればよい。反対に、吊り下げ式養生装置120を下降させたい場合、ロープ牽引装置501−1、501−2の制限手段510を解除状態とし、出口側ロープ200b、206bを掴んだ手を少し緩め、吊り下げ式養生装置120の荷重で入口側ロープ200a、206aに掛かるパラペット103方向への引っ張り力により、プーリ520を逆転させ、入口側ロープ200a、206aを入口部534の外側方向(パラペットへ103方向)へ引き戻させれば良い。
図40、41のようにしても、作業者A、Bは吊り下げ式養生装置120に作業者の体重を掛けないようにして作業できるので、吊り下げ式養生装置120、支持具201、207、ロープ牽引装置501−1、501−2をそれほど大型・頑強にする必要がなく、設備負担が少なくて済む。また、商用電源の無い屋上でも吊り下げロープ200、206の牽引が可能である。
なお、ロープ牽引装置501−1、501−2は図31、図33、図36のロープ牽引装置501A、501B、501Cとしても良い。また、ウインチ等、他のロープ昇降装置に置き換えても良い。
また、2つのロープ牽引装置を一台で2本の吊り下げロープ200、206を連動して繰り出し、引き上げ可能なロープ牽引装置等のロープ昇降装置に置き換えても良い。
When it is desired to raise the suspension type curing device 120, the operator placed on the roof drives the rope traction devices 501-1 and 501-2 with the limiting means 510 in the reverse rotation restricted state by the rechargeable electric driver 515, and What is necessary is just to pull the entrance side ropes 200a and 206a of the suspension ropes 200 and 206 to the exit part 534 side. On the other hand, when the suspension type curing device 120 is to be lowered, the restriction means 510 of the rope traction devices 501-1 and 501-2 is released, the hand holding the exit side ropes 200b and 206b is slightly loosened and suspended. Pulling force in the direction of the parapet 103 applied to the inlet side ropes 200a and 206a by the load of the type curing device 120 reverses the pulley 520, and the inlet side ropes 200a and 206a are moved outwardly of the inlet part 534 (to the parapet 103 direction). Just pull back.
40 and 41, since the workers A and B can work without putting the weight of the worker on the suspension type curing device 120, the suspension type curing device 120, the support tools 201, 207, The rope traction devices 501-1 and 501-2 do not need to be so large and robust, and the equipment burden can be reduced. In addition, the suspension ropes 200 and 206 can be pulled even on a rooftop without a commercial power source.
The rope traction devices 501-1 and 501-2 may be the rope traction devices 501A, 501B, and 501C shown in FIGS. 31, 33, and 36. Moreover, you may replace with other rope raising / lowering apparatuses, such as a winch.
Alternatively, the two rope pulling devices may be replaced by a rope lifting device such as a rope pulling device that can be pulled up and pulled up in conjunction with the two hanging ropes 200 and 206.

ウインチ等のロープ昇降装置を地上に設置する場合は、例えばパラペットに左右間隔をあけて取着した2つの支持具の各々の先端近くに滑車を懸吊し、一端側が地上に設置した左側用と右側用のロープ昇降装置(図示せず)に接続された2本の吊り下げロープを各々、左右の滑車に巻き掛けるとともに、2本の吊り下げロープの他端側をカラビナとロープを介して吊り下げ式養生装置の左右に連結すれば良い。吊り下げ式養生装置を昇降させたい場合、地上に配置した第3の作業者がロープ昇降装置を昇降稼動して、吊り下げロープを昇降すればよい。或いは、建物外面の補修等を行う作業者A、Bが遠隔操作で昇降稼動をしても良い。
このように、ロープ昇降装置を用いて吊り下げロープを昇降可能とすることにより、第1実施例の如く登降装置と電動工具の組み合わせで昇降させるよりも作業者の負担が軽減する。また建物外面に対する作業を屋上側から行いたい場合に、迅速に吊り下げ式養生装置を地上から上昇させて屋上近くに設置することができる。
When installing a rope lifting device such as a winch on the ground, for example, for the left side where a pulley is suspended near the tip of each of the two supports attached to the parapet with a left and right spacing, and one end is installed on the ground. Two hanging ropes connected to the right rope lifting device (not shown) are respectively wound around the left and right pulleys, and the other ends of the two hanging ropes are suspended via the carabiner and the rope. What is necessary is just to connect with the right and left of a lowering type curing apparatus. When it is desired to raise and lower the suspension type curing device, a third operator arranged on the ground may raise and lower the suspension rope by operating the rope lifting device. Alternatively, the workers A and B who repair the outer surface of the building may move up and down by remote control.
Thus, by making it possible to raise and lower the suspension rope using the rope elevating device, the burden on the operator is reduced compared to raising and lowering with a combination of the elevating device and the electric tool as in the first embodiment. Moreover, when it is desired to perform work on the outer surface of the building from the roof side, the suspension type curing device can be quickly raised from the ground and installed near the roof.

次に、図42乃至図47を参照して本発明に係る建物外面に対する作業方法の第2実施例を説明する。図42は本発明に係る建物外面に対する作業方法の説明図、図43乃至図47は準備手順の説明図であり、なお、図1と同一の構成部分には同一の符号が付してある。
第1実施例では吊り下げ式養生装置だけ用いて養生を行う場合を説明したが、第2実施例は吊り下げ式養生装置と吊り下げ式の養生シートを組み合わせ、吊り下げ式養生装置と吊り下げ式の養生シートを別々に、吊り下げロープを手で操作して上下に昇降可能としたものである。例えば吊り下げ式養生装置を地上近くに設置し、建物の屋上近くから吊り下げ式養生装置まで建物との間に作業空間を空けて吊り下げ式の養生シートを配設し、作業者は屋上から建物と吊り下げ式の養生シートの間に入って、かつ吊り下げ式養生装置の中または上方でロープアクセス技術により建物外面に対する作業を行うことができる。
Next, a second embodiment of the working method for the building outer surface according to the present invention will be described with reference to FIGS. FIG. 42 is an explanatory view of a working method for the building outer surface according to the present invention, and FIGS. 43 to 47 are explanatory views of the preparation procedure.
In the first embodiment, the case where the curing is performed using only the hanging type curing device has been described, but in the second example, the hanging type curing device and the hanging type curing sheet are combined, and the hanging type curing device and the hanging type are suspended. Each type of curing sheet can be moved up and down separately by manually operating the hanging rope. For example, a hanging type curing device is installed near the ground, a working space is provided between the building from near the rooftop to the hanging type curing device, and a hanging type curing sheet is installed. Work can be performed on the exterior of the building by rope access technology between the building and the hanging curing sheet and in or above the hanging curing device.

図42において、220と221は、パラペット103に着脱自在に固定されるとともにパラペット103より建物外側方向へ延設された支持具であり、吊り下げ式養生装置120の横幅と同じ間隔を空けて取着されている。支持具220、221の先端近くと先端に滑車222と223、224と225が懸吊されており、滑車222と224に吊り下げ式養生装置120を吊るす吊り下げロープ226と227、滑車223と225に養生シート(メッシュシート)250を吊るす吊り下げロープ228と229が巻装されている。滑車222、224から垂れ下がった吊り下げロープ226、227の一端側にカラビナ205、211が掛着されており、カラビナ205、211に上端側が掛着された2本ずつのロープ3と4、7と8の下端側がロープ取り付け板145と146、147と148に取着されている。吊り下げロープ226、227の他端側は、吊り下げ式養生装置120が地上からある高さだけ引き上げられた状態で地上に固定されている。   In FIG. 42, reference numerals 220 and 221 denote support members that are detachably fixed to the parapet 103 and extend from the parapet 103 toward the outside of the building, and are taken at the same interval as the lateral width of the suspension type curing device 120. It is worn. Pulleys 222 and 223, 224 and 225 are suspended near and at the tip of the support tools 220 and 221. Suspension ropes 226 and 227 for hanging the suspension type curing device 120 on the pulleys 222 and 224, and pulleys 223 and 225, respectively. Suspension ropes 228 and 229 for suspending a curing sheet (mesh sheet) 250 are wound around. Carabiners 205 and 211 are hooked on one end side of the hanging ropes 226 and 227 hanging from the pulleys 222 and 224, and two ropes 3 and 4 and 7 are hooked on the carabiners 205 and 211, respectively. 8 is attached to the rope attachment plates 145 and 146, 147 and 148. The other ends of the suspension ropes 226 and 227 are fixed to the ground in a state where the suspension type curing device 120 is pulled up by a certain height from the ground.

滑車223と225に巻装された吊り下げロープ228と229の一端側に、吊り下げ式養生装置120の横幅と略同一の長さを有し、水平方向に延設された横杆251の両端近くが取着されている。横杆251には長方形状の養生シート250の上端の内、左側端部と右側端部を除く中央部分が取着されている。養生シート250は上下方向の長さが建物100の高さとほぼ同じで、横幅が吊り下げ式養生装置120の横幅に、前後方向の奥行きの2倍を足した長さとほぼ同じである。吊り下げロープ228と229の他端側は、養生シート250の上端が滑車223、225の近くまで引き上げた状態で地上に固定されている。   At both ends of the suspension ropes 228 and 229 wound around the pulleys 223 and 225, both ends of a horizontal bar 251 having a length substantially the same as the lateral width of the suspension type curing device 120 and extending in the horizontal direction Nearby is attached. Of the upper end of the rectangular curing sheet 250, the horizontal portion 251 is attached with a central portion excluding the left end portion and the right end portion. The length of the curing sheet 250 is substantially the same as the height of the building 100, and the width is substantially the same as the width of the hanging curing device 120 plus the depth in the front-rear direction. The other ends of the suspension ropes 228 and 229 are fixed to the ground with the upper end of the curing sheet 250 being pulled up to the vicinity of the pulleys 223 and 225.

養生シート250の内、横杆251の左側端部の上端は支持具220に沿って建物100の方向に折り曲げられて左端が支持具220の建物100寄りに着脱自在に取着されている。同様に養生シート250の内、横杆251の右側端部の上端は支持具221に沿って建物100の方向に折り曲げられて右端が支持具221の建物100寄りに着脱自在に取着されている。養生シート250の下部は吊り下げ式養生装置120の中に収納されて固定されている。   Of the curing sheet 250, the upper end of the left side end portion of the horizontal bar 251 is bent along the support tool 220 toward the building 100, and the left end is detachably attached to the support tool 220 near the building 100. Similarly, in the curing sheet 250, the upper end of the right end portion of the reed 251 is bent in the direction of the building 100 along the support member 221, and the right end is detachably attached to the support member 221 near the building 100. . The lower part of the curing sheet 250 is housed and fixed in the hanging curing apparatus 120.

建物100の屋上に支点確保された作業者A用のメイン側とバックアップ側の安全ロープ101と102、作業者B用のメイン側とバックアップ側の安全ロープ104と105がパラペット103を乗り越えて地上近くまで垂れ下がっており、下部が吊り下げ式養生装置120の中に入っている。作業者Aは自身に装着した安全帯のメイン側のランヤードを安全ロープ101に取着した昇降器具(図示せず)に掛着し、バックアップ側のランヤードを安全ロープ102に取着した墜落防止器具(図示せず)に掛着し、パラペット103を越えて建物100の外面に沿って安全ロープ101に吊り下がり補修等の作業を行う。作業者Bも自身に装着した安全帯のメイン側のランヤードを安全ロープ104に取着した昇降器具(図示せず)に掛着し、バックアップ側のランヤードを安全ロープ105に取着した墜落防止器具(図示せず)に掛着し、パラペット103を越えて建物100の外面に沿って安全ロープ101に吊り下がり補修等の作業を行う。   Safety ropes 101 and 102 for the main side and backup side for worker A secured on the roof of the building 100, and safety ropes 104 and 105 for the main side and backup side for worker B pass over the parapet 103 and are near the ground. The lower part is in the hanging type curing device 120. The worker A attaches the lanyard on the main side of the safety belt attached to himself / herself to a lifting / lowering device (not shown) attached to the safety rope 101, and the fall prevention device attached to the safety rope 102 on the backup side lanyard (Not shown) is suspended, suspended over the safety rope 101 along the outer surface of the building 100 over the parapet 103, and repairing work is performed. The worker B also attaches the lanyard on the main side of the safety belt attached to himself / herself to a lifting / lowering device (not shown) attached to the safety rope 104, and the fall prevention device attaches the lanyard on the backup side to the safety rope 105. (Not shown) is suspended, suspended over the safety rope 101 along the outer surface of the building 100 over the parapet 103, and repairing work is performed.

次に、第2実施例の作用につき説明する。
ここでは建物100は5、6階建てであり、吊り下げ式養生装置120を地上より高い位置(例えば2階の高さ)に設置して吊り下げ式養生装置120の下を人が通れるようにし、作業者が屋上側から吊り下げ式養生装置120の高さまでロープアクセス技術により補修等の作業を行う場合を例にして説明する。
予め建物100の屋上のパラペット103に、吊り下げ式養生装置120の横幅と同じ間隔で装着された2つの支持具220、221の各先端近くと先端に懸吊した滑車222と223、224と225に吊り下げロープ226と228、227と229が巻装済みであり、屋上に支点確保された4本の安全ロープ101、102、104、105がパラペット103を超えて地上近くまで垂れ下がっているものとする。
Next, the operation of the second embodiment will be described.
Here, the building 100 has five or six stories, and the suspension type curing device 120 is installed at a position higher than the ground (for example, the height of the second floor) so that people can pass under the suspension type curing device 120. An example will be described in which a worker performs repair work or the like by rope access technology from the roof top to the height of the hanging type curing device 120.
Pulleys 222 and 223, 224 and 225 suspended in front of and near the tips of the two supports 220 and 221 mounted in advance on the parapet 103 on the roof of the building 100 at the same interval as the width of the hanging type curing device 120. Suspension ropes 226, 228, 227, and 229 are already wound, and the four safety ropes 101, 102, 104, and 105 secured on the roof are suspended over the parapet 103 and close to the ground. To do.

(1)準備
作業者A、Bは地上で吊り下げ式養生装置装置120を支持具220、221の直下へ移動し、吊り下げロープ226の一方の下端にカラビナ205を掛着し、2本のロープ3、4の上端をカラビナ205に掛着し、下端をロープ取り付け板145、146に掛着する。同様に、吊り下げロープ227の一方の下端にカラビナ211を掛着し、2本のロープ7、8の上端をカラビナ211に掛着し、下端をロープ取り付け板147、148に掛着する(図43参照)。
(1) Preparation Workers A and B move the suspension-type curing device 120 on the ground directly below the supports 220 and 221, and attach the carabiner 205 to one lower end of the suspension rope 226. The upper ends of the ropes 3 and 4 are hooked to the carabiner 205, and the lower ends are hooked to the rope attachment plates 145 and 146. Similarly, the carabiner 211 is hooked to one lower end of the hanging rope 227, the upper ends of the two ropes 7 and 8 are hooked to the carabiner 211, and the lower ends are hooked to the rope attachment plates 147 and 148 (see FIG. 43).

次に、養生シート250を吊り下げ式養生装置120の中に入れ下端を装置本体121に固定するとともに、上端に取着された横杆251を背面シート養生部128の枠体133の上に載せる。吊り下げロープ228の一端側を横杆251の左端近くに取着し、吊り下げロープ229の一端側を横杆251の右端近くに取着する(図44参照)。   Next, the curing sheet 250 is put into the hanging curing apparatus 120 and the lower end is fixed to the apparatus main body 121, and the horizontal bar 251 attached to the upper end is placed on the frame 133 of the back sheet curing unit 128. . One end side of the hanging rope 228 is attached near the left end of the reed 251, and one end side of the hanging rope 229 is attached near the right end of the reed 251 (see FIG. 44).

作業者A、Bは各々、吊り下げロープ226、227の他端側を下方へ引っ張り、吊り下げ式養生装置120を例えば2階の高さまで上げ、吊り下げロープ226、227の他端側を地上に固定する(図45参照)。続いて、作業者A、Bは各々、吊り下げロープ228、229の他端側を下方へ引っ張り、養生シート250の上端を支持具220、221の滑車223、225近くまで引き上げ、吊り下げロープ228、229の他端側を地上に固定する(図46、図47参照)。
この後、作業者A、Bは屋上へ移動し、養生シート250の左上隅と右上隅を各々支持具220、221の内、建物100寄りに取着する。これにより、建物100の外面の外側で吊り下げ式養生装置120の上方の空間が養生シート250に囲まれるようにして養生される(図47参照)。
Each of the workers A and B pulls the other end side of the suspension ropes 226 and 227 downward, raises the suspension type curing device 120 to, for example, the height of the second floor, and sets the other end side of the suspension ropes 226 and 227 to the ground. (See FIG. 45). Subsequently, each of the workers A and B pulls the other end side of the suspension ropes 228 and 229 downward, pulls the upper end of the curing sheet 250 up to the vicinity of the pulleys 223 and 225 of the support members 220 and 221, and the suspension rope 228. 229 is fixed to the ground (see FIGS. 46 and 47).
Thereafter, the workers A and B move to the roof, and attach the upper left corner and the upper right corner of the curing sheet 250 to the side of the building 100 in the support tools 220 and 221, respectively. Thereby, it cures so that the space above the suspension type curing device 120 outside the outer surface of the building 100 is surrounded by the curing sheet 250 (see FIG. 47).

(2)補修等の作業
屋上で作業者Aは自身に装着した安全帯のメイン側のランヤードを安全ロープ101に取着した昇降器具(図示せず)に掛着し、バックアップ側のランヤードを安全ロープ102に取着した墜落防止器具(図示せず)に掛着し、吊り下げ式養生装置120の上方でパラペット103を乗り越え、建物100の外面と養生シート250の間の空間に入り、安全ロープ101に吊り下がりながら建物100の屋上側から吊り下げ式養生装置120まで順に外面に対する補修等の作業を行っていく。作業者Bも自身に装着した安全帯のメイン側のランヤードを安全ロープ104に取着した昇降器具(図示せず)に掛着し、バックアップ側のランヤードを安全ロープ105に取着した墜落防止器具(図示せず)に掛着し、吊り下げ式養生装置120の上方位置でパラペット103を乗り越え、建物100の外面と養生シート250の間の空間に入り、安全ロープ104に吊り下がりながら建物100の屋上側から吊り下げ式養生装置120まで順に外面に対する補修等の作業を行っていく(図42参照)。
(2) Work such as repair Worker A on the roof hooks the safety lanyard on the main side of the safety belt attached to the lifting device (not shown) attached to the safety rope 101 to secure the lanyard on the backup side. Hang on a fall prevention device (not shown) attached to the rope 102, get over the parapet 103 above the suspension type curing device 120, enter the space between the outer surface of the building 100 and the curing sheet 250, and a safety rope While hanging on 101, work such as repair on the outer surface is sequentially performed from the roof side of the building 100 to the hanging type curing device 120. The worker B also attaches the lanyard on the main side of the safety belt attached to himself / herself to a lifting / lowering device (not shown) attached to the safety rope 104, and the fall prevention device attaches the lanyard on the backup side to the safety rope 105. (Not shown), climbs over the parapet 103 above the suspension type curing device 120, enters the space between the outer surface of the building 100 and the curing sheet 250, and hangs on the safety rope 104 while Work such as repair on the outer surface is sequentially performed from the roof side to the hanging type curing device 120 (see FIG. 42).

作業で生じた補修部材や壁等の破片等や誤って落とした作業道具は、養生シート250に当たって吊り下げ式養生装置120の中に落下したり、直接吊り下げ式養生装置120の中に落下したりして、養生シート250の外側や地上への落下、飛散が防止される。
なお、作業が吊り下げ式養生装置120に近づいた場合でも、作業者A、Bは体重が吊り下げ式養生装置120に殆ど掛からないようにする。
作業が終われば、作業者A、Bは吊り下げ式養生装置120の脇から地上へ降り、吊り下げロープ226、227の地上側の固定を外して吊り下げ式養生装置120を地上に降ろし、吊り下げロープ228、229の地上側の固定を外して養生シート250を吊り下げ式養生装置120に降ろす。
Repair members, debris, etc. generated by the work or accidentally dropped work tools hit the curing sheet 250 and fall into the suspension type curing device 120 or directly into the suspension type curing device 120. As a result, the outside of the curing sheet 250 and the fall or scattering to the ground are prevented.
Even when the work approaches the suspension type curing device 120, the workers A and B make sure that their weight hardly hangs on the suspension type curing device 120.
When the work is completed, the workers A and B descend from the side of the suspension type curing device 120 to the ground, remove the suspension ropes 226 and 227 from the ground side, lower the suspension type curing device 120 to the ground, and suspend them. The fixing of the lowering ropes 228 and 229 on the ground side is removed, and the curing sheet 250 is lowered to the hanging type curing device 120.

この第2実施例によれば、作業者A、Bが建物100の屋上から垂れ下がった安全ロープ101と102、104と105に支持されて建物100の屋上側から地上側に向けて順に建物100の外面に対する補修等の作業を行うのに際して、下方に設置した吊り下げ式養生装置120と、建物100の外面の屋上近くから吊り下げ式養生装置120まで建物100の外面との間に作業空間をあけながら配設した養生シート250で囲まれた中で作業を行うことができる。屋上近くから吊り下げ式養生装置120までの間で作業しているときに、壁や補修部材等の破片等、誤って落下させた作業工具は養生シート250に当たって吊り下げ式装置120の中に落下したり、直接、吊り下げ式養生装置120の中に落下するので、養生シート250の外側や地上への落下、飛散が防止される。
また、補修等の作業中に吊り下げ式養生装置120を昇降させないので、作業を迅速に進めることができる。
また、吊り下げ式養生装置120には作業者A、Bの体重が掛からない為、吊り下げ式養生装置120や支持具220、221を頑強にする必要がなく、また吊り下げ式養生装置120の重量が軽量で済むので手動で昇降することができ、設備負担が少なくて済む。
According to the second embodiment, workers A and B are supported by safety ropes 101 and 102, 104 and 105 hanging from the roof of the building 100, and the buildings 100 are sequentially installed from the roof to the ground. When performing work such as repair on the outer surface, a work space is opened between the hanging type curing device 120 installed below and the outer surface of the building 100 from the vicinity of the roof on the outer surface of the building 100 to the hanging type curing device 120. However, the work can be performed while being surrounded by the curing sheet 250 arranged. When working from near the rooftop to the hanging type curing device 120, work tools that have been accidentally dropped, such as debris such as walls and repair members, hit the curing sheet 250 and fall into the hanging type device 120. Or dropped directly into the hanging type curing device 120, the falling or scattering of the curing sheet 250 to the outside or the ground is prevented.
In addition, since the hanging type curing device 120 is not lifted or lowered during work such as repair, the work can be rapidly advanced.
Further, since the weights of the workers A and B are not applied to the suspension type curing device 120, it is not necessary to make the suspension type curing device 120 and the support members 220 and 221 robust, and the suspension type curing device 120 can be used. Since the weight is light, it can be moved up and down manually, and the equipment burden can be reduced.

なお、上記した第2実施例では、吊り下げ式の養生シート(メッシュシート)を用いたが吊り下げ式の養生ネットに置き換えても良い。
また、吊り下げ式養生装置を建物の地上寄りに設置する場合を例に挙げて説明したが、建物の屋上寄りや、高さ方向の中ほどに設置し、養生シートを屋上近くから吊り下げ式養生装置まで配設するようにしても良い。
また、作業対象範囲が屋上より下方の場合などには、養生シートの上端を必ずしも屋上近くまで上昇させる必要はなく、建物外面との間に作業空間を空けながら、吊り下げ式養生装置の上方の所望高さから吊り下げ式養生装置まで配設するようにしても良い。また、養生シートの下端側を吊り下げ式養生装置の中に固定する代わりに、吊り下げ式養生装置の外に出し、地上近くまたは地上から一定高さ位置に固定するようにしても良い。
建物の外面に対する作業空間を確保しながら吊り下げ式養生装置の上方から吊り下げ式養生装置近くまで、または吊り下げ式養生装置の上方から吊り下げ式養生装置の下方まで養生シートまたは養生ネットを配設することにより、吊り下げ式養生装置の上方で作業しているときに壁や補修部材等の破片や作業道具等を落下させても、建物の周囲への飛散を防止できる。
In the second embodiment described above, a hanging type curing sheet (mesh sheet) is used, but it may be replaced with a hanging type curing net.
In addition, the case where the suspension type curing device is installed near the ground of the building has been described as an example, but it is installed near the roof of the building or in the middle of the height direction, and the curing sheet is suspended from the roof. You may make it arrange | position to a curing apparatus.
In addition, when the work target range is below the rooftop, it is not always necessary to raise the upper end of the curing sheet to the vicinity of the rooftop, leaving a work space between the building exterior and the upper part of the suspension-type curing device. You may make it arrange | position from a desired height to a suspension type curing device. Further, instead of fixing the lower end side of the curing sheet in the hanging type curing apparatus, the curing sheet may be taken out of the hanging type curing apparatus and fixed at a certain height position near the ground or from the ground.
Place a curing sheet or curing net from the top of the suspension-type curing device to the vicinity of the suspension-type curing device, or from the top of the suspension-type curing device to the bottom of the suspension-type curing device, while ensuring a working space for the exterior of the building. By installing, even if fragments such as walls and repair members, work tools, etc. are dropped when working above the suspension type curing device, scattering around the building can be prevented.

また上記した第2実施例では吊り下げ式養生装置と養生シートの昇降を手動で行うようにしたが、吊り下げロープの昇降を行うウインチ、図16等に示したロープ牽引装置等のロープ昇降装置を屋上または支持具または地上等に設置して行っても良い。
4台のロープ昇降装置を屋上に設置する場合、例えば図48に示す如く、一端側を左側用の第1のロープ昇降装置(図示せず)に接続した左側の吊り下げロープ300を左側の支持具301の立設支柱302に設けたシーブ303と先端近くに設けたシーブ304に巻き掛けながら下方へ垂下し、吊り下げロープ300の下端にカラビナ205を介して二本のロープ3、4の一端側を連結し、ロープ3、4の他端側を装置本体121の左側の2つのロープ取り付け板145、146に取着する。同様に一端側を右側用の第2のロープ昇降装置(図示せず)に接続した右側の吊り下げロープ305を右側の支持具306の立設支柱307に設けたシーブ308と先端に設けたシーブ309に巻き掛けながら下方へ垂下し、吊り下げロープ305の下端にカラビナ211を介して二本のロープ7、8の一端側を連結し、ロープ7、8の他端側を装置本体121の右側の2つのロープ取り付け板147、148に取着する。
In the second embodiment described above, the lifting type curing device and the curing sheet are manually raised and lowered. However, the winch for raising and lowering the hanging rope, the rope lifting device such as the rope pulling device shown in FIG. May be installed on the rooftop, on a support or on the ground.
When four rope lifting devices are installed on the roof, for example, as shown in FIG. 48, the left hanging rope 300 having one end connected to the left first rope lifting device (not shown) is supported on the left side. One of the two ropes 3 and 4 is suspended from the lower end of the hanging rope 300 via the carabiner 205 while hanging around the sheave 303 provided on the standing column 302 of the tool 301 and the sheave 304 provided near the tip. The other ends of the ropes 3 and 4 are attached to the two rope attachment plates 145 and 146 on the left side of the apparatus main body 121. Similarly, a right hanging rope 305 having one end connected to a second rope lifting device (not shown) for the right side and a sheave 308 provided on the upright column 307 of the right support 306 and a sheave provided on the tip. The rope hangs downward while being wound around the wire 309, connects one end of the two ropes 7 and 8 to the lower end of the hanging rope 305 via the carabiner 211, and connects the other end of the ropes 7 and 8 to the right side of the apparatus main body 121. Are attached to the two rope attachment plates 147 and 148.

また、一端側を左側用の第3のロープ昇降装置(図示せず)に接続した左側の吊り下げロープ311を左側の支持具301の立設支柱302に設けたシーブ312と先端近くに設けたシーブ313に巻き掛けながら下方へ垂下し、吊り下げロープ311の下端に養生シート250の横杆251の左端部を取着する。同様に一端側を右側用の第4のロープ昇降装置(図示せず)に接続した右側の吊り下げロープ314を右側の支持具306の立設支柱307に設けたシーブ315と先端に設けたシーブ316に巻き掛けながら下方へ垂下し、吊り下げロープ314の下端に横杆251の右端部を取着する。   In addition, a left hanging rope 311 having one end connected to a third rope lifting device (not shown) for the left side is provided near the sheave 312 provided on the upright column 302 of the left support 301 and the tip. While hanging around the sheave 313, it hangs downward and attaches the left end of the reed 251 of the curing sheet 250 to the lower end of the hanging rope 311. Similarly, a sheave 315 provided on the upright column 307 of the right support 306 and a sheave provided on the tip of the right hanging rope 314 having one end connected to a fourth rope lifting device (not shown) for the right side. While hanging around 316, it hangs downward and attaches the right end of the reed 251 to the lower end of the hanging rope 314.

吊り下げ式養生装置120を昇降させたい場合、屋上に配置した第3の作業者が第1、第2のロープ昇降装置を昇降稼動して、吊り下げロープ300、305を昇降すればよい。或いは、建物外面の補修等を行う作業者A、Bが遠隔操作で昇降稼動をしても良い。同様に、養生シート250の上端を昇降させたい場合、屋上に配置した第3の作業者が第3、第4のロープ昇降装置を昇降稼動して、吊り下げロープ311、314を昇降すればよい。或いは、建物外面の補修等を行う作業者A、Bが遠隔操作で昇降稼動をしても良い。
このようにしても、作業者A、Bは吊り下げ式養生装置に作業者の体重を掛けないようにできるので、吊り下げ式養生装置120、支持具301、306、第1乃至第4のロープ昇降装置をそれほど大型・頑強にする必要がなく、設備負担が少なくて済む。
なお、第1、第2のロープ昇降装置に代えて一台で2本の吊り下げロープ300、305を連動して繰り出し、引き上げ可能なロープ昇降装置を用いても良く、第3、第4のロープ昇降装置に代えて一台で2本の吊り下げロープ311、314を連動して繰り出し、引き上げ可能なロープ昇降装置を用いても良い。
When it is desired to raise and lower the suspension type curing device 120, a third operator disposed on the roof may raise and lower the suspension ropes 300 and 305 by moving up and down the first and second rope lifting devices. Alternatively, the workers A and B who repair the outer surface of the building may move up and down by remote control. Similarly, when it is desired to raise and lower the upper end of the curing sheet 250, a third operator arranged on the roof may raise and lower the hanging ropes 311 and 314 by moving up and down the third and fourth rope lifting devices. . Alternatively, the workers A and B who repair the outer surface of the building may move up and down by remote control.
Even in this case, since the workers A and B can keep the weight of the worker from being applied to the suspension type curing device, the suspension type curing device 120, the support tools 301 and 306, and the first to fourth ropes. The lifting device does not need to be so large and robust, and the equipment burden is small.
Instead of the first and second rope lifting devices, a rope lifting device capable of feeding and lifting the two hanging ropes 300, 305 in conjunction with each other may be used. Instead of the rope lifting device, a rope lifting device capable of feeding and lifting the two hanging ropes 311 and 314 in conjunction with each other may be used.

ウインチ、ロープ牽引装置等のロープ昇降装置を地上に設置する場合は、図42中の吊り下げロープ226乃至229の地上固定側を各々、第1乃至第4のロープ昇降装置(図示せず)に接続すれば良い。吊り下げ式養生装置120を昇降させたい場合、地上に配置した第3の作業者が第1、第2のロープ昇降装置を昇降稼動して、吊り下げロープ226、227の吊り下げ式養生装置120側(カラビナ205、211側)を昇降すればよい。或いは、建物外面の補修等を行う作業者A、Bが遠隔操作で昇降稼動をしても良い。吊り下げ式の養生シート250を昇降させたい場合、地上に配置した第3の作業者が第3、第4のロープ昇降装置を昇降稼動して、吊り下げロープ228、229側(横杆251側)を昇降すればよい。或いは、建物外面の補修等を行う作業者A、Bが遠隔操作で昇降稼動をしても良い。   When rope lifting devices such as winches and rope pulling devices are installed on the ground, the ground fixing sides of the suspension ropes 226 to 229 in FIG. 42 are respectively used as first to fourth rope lifting devices (not shown). Just connect. When it is desired to raise and lower the suspension type curing device 120, a third operator arranged on the ground moves up and down the first and second rope lifting devices, and the suspension type curing device 120 of the suspension ropes 226 and 227 is operated. What is necessary is just to raise / lower the side (carabiner 205, 211 side). Alternatively, the workers A and B who repair the outer surface of the building may move up and down by remote control. When the hanging type curing sheet 250 is to be raised and lowered, the third operator arranged on the ground moves up and down the third and fourth rope lifting devices, and the hanging ropes 228 and 229 side (the side 251 side) ). Alternatively, the workers A and B who repair the outer surface of the building may move up and down by remote control.

このように、ロープ昇降装置を用いて吊り下げ式養生装置を吊るす吊り下げロープと、養生シートを吊るす吊り下げロープを別個に昇降可能とすることにより、高層の建物の屋上寄りや、高さ方向の中ほどに吊り下げ式養生装置を設置し、養生シートを屋上近くから吊り下げ式養生装置まで、或いは吊り下げ式養生装置の上方の所望高さから吊り下げ式養生装置まで配設したい場合に、迅速に吊り下げ式養生装置を所望高さに設置し、かつ、養生シートを所望範囲に配設することかできる。これらの場合に、養生シートの下部を吊り下げ式養生装置の外に出しておき、下端を地上近くに固定しておいても良い。
また、高層の建物の屋上側からの作業の進行に連れて吊り下げ式養生装置を順次降下させたい場合も、ロープ昇降装置を用いることにより、吊り下げ式養生装置に養生シートを載せて屋上近くへ迅速に上昇させたあと、建物外面に対する補修作業の進行とともに、養生シートの上端は支持具の近くに維持したまま吊り下げ式養生装置を降下させることで、養生シートの下部が吊り下げ式養生装置から引き出されて自然に屋上近くから吊り下げ式養生装置までの範囲に養生シートが配設させることができる。この場合も、養生シートの下部を吊り下げ式養生装置の外に出しておき、下端を地上近くに固定しておいても良い。
In this way, by making it possible to lift and lower the suspension rope that suspends the suspension type curing device using the rope lifting device and the suspension rope that suspends the curing sheet separately, the roof side of a high-rise building and the height direction If you want to install a suspension type curing device in the middle and place a curing sheet from near the roof to the hanging type curing device, or from the desired height above the hanging type curing device to the hanging type curing device The suspension type curing device can be quickly installed at a desired height, and the curing sheet can be arranged in a desired range. In these cases, the lower part of the curing sheet may be taken out of the hanging type curing apparatus, and the lower end may be fixed near the ground.
Also, when you want to lower the hanging type curing device sequentially as the work progresses from the roof of a high-rise building, use a rope lifting device to place a curing sheet on the hanging type curing device and close to the roof As the repair work progresses to the exterior of the building, the lower part of the curing sheet is lowered by lowering the hanging curing device while keeping the upper end of the curing sheet close to the support. The curing sheet can be arranged in the range from the rooftop to the suspended curing device that is pulled out from the device. Also in this case, the lower part of the curing sheet may be taken out of the hanging type curing apparatus, and the lower end may be fixed near the ground.

本発明は、マンション、ビル等の建築物の新築・改修・点検・清掃等の建物外面に対する各種作業に適用できる。   INDUSTRIAL APPLICABILITY The present invention can be applied to various operations on the building outer surface such as new construction, repair, inspection, and cleaning of buildings such as apartments and buildings.

1、5 登降装置
100建物
101、102、104、105 安全ロープ
103 パラペット
110、111 支持具
112、113 吊り下げロープ
120 吊り下げ式養生装置
1, 5 climbing device 100 building 101, 102, 104, 105 safety rope 103 parapet 110, 111 support 112, 113 suspension rope 120 suspension type curing device

Claims (8)

建物の屋上から作業者が安全ロープに吊り下がりながら建物外面に対する作業を行う方法であって、
建物屋上のパラペットに固定した支持具から垂らした吊り下げロープに、建物外面に沿って昇降自在で、上方が開口した箱形の吊り下げ式養生装置を吊り下げ、
この吊り下げ式養生装置は吊り下げロープに登降自在に取り付けたロープ牽引装置により吊持するようにし、
作業者は安全ロープに体重を支持された状態で吊り下げ式養生装置の中または上方で建物外面に対する作業をし、
作業者が作業位置を上または下に移動するに連れて、ロープ牽引装置により吊り下げ式養生装置を上または下に移動するようにし
ロープ牽引装置は、回転式電動工具の回転力を受けて登高動作可能とし、
更に、ロープ牽引装置は、
回転式電動工具の出力軸を着脱自在に連結可能な入力軸と、吊り下げロープを着脱自在に巻き掛け可能なプーリと結合された出力軸を有し、入力軸に加えられた回転を減速して出力軸に伝達する差動減速式の減速手段と、
減速手段が装着された支持体と、
支持体に設けられて、プーリに巻き掛けられる吊り下げロープの入口と出口を形成する入口部及び出口部と、
減速手段または支持体に設けられて、吊り下げロープ入口側の外部への引き出しの制限・制限解除をする制限手段と、
を備えたこと、
を特徴とする建物外面に対する作業方法。
A method in which an operator works on the exterior of a building while hanging from a safety rope from the roof of the building,
A hanging rope hanging from a support fixed to the parapet on the roof of the building can be raised and lowered along the outer surface of the building, and a box-type hanging curing device with an open top is suspended.
This suspension type curing device is to be suspended by a rope towing device attached to the suspension rope so as to be able to climb up and down,
The operator works on the exterior of the building in or above the hanging curing device with the weight supported by the safety rope,
As the worker moves up or down the working position, so as to move up or down hanging curing device by a rope traction device,
The rope traction device is capable of climbing operation in response to the rotational force of the rotary power tool,
Furthermore, the rope traction device
It has an input shaft that can be detachably connected to the output shaft of a rotary electric tool, and an output shaft that is coupled to a pulley that can be removably wrapped with a hanging rope, and reduces the rotation applied to the input shaft. Differential deceleration type deceleration means that transmits to the output shaft,
A support on which speed reduction means is mounted;
An inlet portion and an outlet portion provided on the support body and forming an inlet and an outlet of a hanging rope wound around a pulley;
Limiting means provided on the speed reduction means or the support body for limiting / releasing the extension to the outside on the suspension rope inlet side;
Having
Working method for building exterior characterized by
建物の屋上から作業者が安全ロープに吊り下がりながら建物外面に対する作業を行う方法であって、
建物屋上のパラペットに固定した支持具から垂らした吊り下げロープに、建物外面に沿って昇降自在で、上方が開口した箱形の吊り下げ式養生装置を吊り下げ、
この吊り下げ式養生装置は吊り下げロープに登降自在に取り付けたロープ牽引装置により吊持するようにし、
作業者は安全ロープに体重を支持された状態で吊り下げ式養生装置の中または上方で建物外面に対する作業をし、
作業者が作業位置を上または下に移動するに連れて、ロープ牽引装置により吊り下げ式養生装置を上または下に移動するようにし、
ロープ牽引装置は、回転式電動工具の回転力を受けて登高動作可能とし、
更に、ロープ牽引装置は、
回転式電動工具の出力軸を着脱自在に連結可能な入力軸と、ロープを着脱自在に巻き掛け可能なプーリと結合された出力軸を有し、入力軸に加えられた回転を減速して出力軸に伝達する差動減速式の減速手段と、
減速手段が装着された支持体と、
支持体に設けられて、プーリに巻き掛けられるロープの入口と出口を形成する入口部及び出口部と、
入口部及び出口部とプーリの間に設けられて、入口側ロープと出口側ロープを分離する分離部と、
減速手段または支持体に設けられて、吊り下げロープ入口側の外部への引き出しの制限・制限解除をする制限手段と、
を備え、
入口部と出口部には入口通路部と出口通路部が形成されるとともに、入口通路部と出口通路部が対向するようにして、入口部と出口部が間隔を開けて対向配置されており、
入口部と出口部の間隔を開けた隙間を通して、外部と入口通路部の間でロープを出し入れしたり、外部と出口通路部の間でロープを出し入れ可能に形成されていること、
を特徴とする建物外面に対する作業方法。
A method in which an operator works on the exterior of a building while hanging from a safety rope from the roof of the building,
A hanging rope hanging from a support fixed to the parapet on the roof of the building can be raised and lowered along the outer surface of the building, and a box-type hanging curing device with an open top is suspended.
This suspension type curing device is to be suspended by a rope towing device attached to the suspension rope so as to be able to climb up and down,
The operator works on the exterior of the building in or above the hanging curing device with the weight supported by the safety rope,
As the operator moves the work position up or down, the rope-type pulling device moves the hanging curing device up or down,
The rope traction device is capable of climbing operation in response to the rotational force of the rotary power tool,
Furthermore, the rope traction device
It has an input shaft that can be detachably connected to the output shaft of a rotary power tool, and an output shaft that is coupled to a pulley that can be detachably wrapped with a rope, and outputs by reducing the rotation applied to the input shaft. A differential deceleration type deceleration means that transmits to the shaft;
A support on which speed reduction means is mounted;
An inlet portion and an outlet portion that are provided on the support and form an inlet and an outlet of a rope wound around a pulley;
A separation portion provided between the inlet and outlet portions and the pulley, and separating the inlet side rope and the outlet side rope;
Limiting means provided on the speed reduction means or the support body for limiting / releasing the extension to the outside on the suspension rope inlet side;
With
An inlet passage portion and an outlet passage portion are formed in the inlet portion and the outlet portion, and the inlet portion and the outlet portion are arranged to face each other with an interval therebetween so that the inlet passage portion and the outlet passage portion face each other.
The rope is formed so that the rope can be taken in and out between the outside and the inlet passage part through the gap between the inlet part and the outlet part, and the rope can be taken in and out between the outside and the outlet passage part.
Working methods for Ken Monogaimen said.
建物の屋上から作業者が安全ロープに吊り下がりながら建物外面に対する作業を行う方法であって、
建物屋上のパラペットに固定した支持具から垂らした吊り下げロープに、建物外面に沿って昇降自在で、上方が開口した箱形の吊り下げ式養生装置を吊り下げ、
この吊り下げ式養生装置は吊り下げロープに登降自在に取り付けたロープ牽引装置により吊持するようにし、
作業者は安全ロープに体重を支持された状態で吊り下げ式養生装置の中または上方で建物外面に対する作業をし、
作業者が作業位置を上または下に移動するに連れて、ロープ牽引装置により吊り下げ式養生装置を上または下に移動するようにし、
ロープ牽引装置は、回転式電動工具の回転力を受けて登高動作可能とし、
更に、ロープ牽引装置は、
回転式電動工具の出力軸を着脱自在に連結可能な入力軸と、ロープを着脱自在に巻き掛け可能なプーリと結合された出力軸を有し、入力軸に加えられた回転を減速して出力軸に伝達する差動減速式の減速手段と、
減速手段が装着された支持体と、
支持体に設けられて、プーリに巻き掛けられるロープの入口と出口を形成する入口部及び出口部と、
減速手段または支持体に設けられて、吊り下げロープ入口側の外部への引き出しの制限・制限解除をする制限手段と、
を備え、
制限手段は、
プーリと出口部の間のロープが通る経路に配備されてロープが当接するロープ当接部と、
ロープが入口部から外側に引き出される方向へ移動しようとするとき、ロープ当接部に当接したロープに食い込んで移動を制限し、反対方向へ移動しようとする際は、ロープから離間して移動を許容するように構成されたカムと、
カムをロープに食い込む方向へ付勢する付勢手段と、
カムをロープから離間させて制限を解除する解除手段と、
を含み、
ロープ当接部がプーリのロープを巻き掛ける溝の中に遊挿されていること、
を特徴とする建物外面に対する作業方法。
A method in which an operator works on the exterior of a building while hanging from a safety rope from the roof of the building,
A hanging rope hanging from a support fixed to the parapet on the roof of the building can be raised and lowered along the outer surface of the building, and a box-type hanging curing device with an open top is suspended.
This suspension type curing device is to be suspended by a rope towing device attached to the suspension rope so as to be able to climb up and down,
The operator works on the exterior of the building in or above the hanging curing device with the weight supported by the safety rope,
As the operator moves the work position up or down, the rope-type pulling device moves the hanging curing device up or down,
The rope traction device is capable of climbing operation in response to the rotational force of the rotary power tool,
Furthermore, the rope traction device
It has an input shaft that can be detachably connected to the output shaft of a rotary power tool, and an output shaft that is coupled to a pulley that can be detachably wrapped with a rope, and outputs by reducing the rotation applied to the input shaft. A differential deceleration type deceleration means that transmits to the shaft;
A support on which speed reduction means is mounted;
An inlet portion and an outlet portion that are provided on the support and form an inlet and an outlet of a rope wound around a pulley;
Limiting means provided on the speed reduction means or the support body for limiting / releasing the extension to the outside on the suspension rope inlet side;
With
The limiting means is
A rope abutting portion that is arranged in a path through which the rope between the pulley and the outlet portion passes and the rope abuts;
When the rope tries to move in the direction of being pulled out from the entrance, it will bite into the rope abutting on the rope abutment and restrict the movement, and when trying to move in the opposite direction, move away from the rope. A cam configured to allow
An urging means for urging the cam in a direction to bite into the rope;
Release means for releasing the restriction by separating the cam from the rope;
Including
The rope contact part is loosely inserted in the groove around which the pulley rope is wound,
Working methods for Ken Monogaimen said.
建物の屋上から作業者が安全ロープに吊り下がりながら建物外面に対する作業を行う方法であって、
建物屋上のパラペットに固定した支持具から垂らした吊り下げロープに、建物外面に沿って昇降自在で、上方が開口した箱形の吊り下げ式養生装置を吊り下げ、
この吊り下げ式養生装置は吊り下げロープに登降自在に取り付けたロープ牽引装置により吊持するようにし、
作業者は安全ロープに体重を支持された状態で吊り下げ式養生装置の中または上方で建物外面に対する作業をし、
作業者が作業位置を上または下に移動するに連れて、ロープ牽引装置により吊り下げ式養生装置を上または下に移動するようにし、
ロープ牽引装置は、回転式電動工具の回転力を受けて登高動作可能とし、
更に、ロープ牽引装置は、
回転式電動工具の出力軸を着脱自在に連結可能な入力軸と、ロープを着脱自在に巻き掛け可能なプーリと結合された出力軸を有し、入力軸に加えられた回転を減速して出力軸に伝達する差動減速式の減速手段と、
減速手段が装着された支持体と、
支持体に設けられて、プーリに巻き掛けられるロープの入口と出口を形成する入口部及び出口部と、
減速手段または支持体に設けられて、吊り下げロープ入口側の外部への引き出しの制限・制限解除をする制限手段と、
入口部及び出口部とプーリの間に設けられて、入口側ロープと出口側ロープを分離する分離部と、
支持体に設けられて、プーリの前面または前面と側面を開閉自在に覆うプーリカバーと、
プーリカバーを閉状態にロックしたり、ロック解除したりするロック手段と、を備え、
入口部と出口部には入口通路部と出口通路部が形成されるとともに、入口通路部と出口通路部が対向するようにして、入口部と出口部が間隔を開けて対向配置されており、
入口部と出口部の間隔を開けた隙間を通して、外部と入口通路部の間でロープを出し入れしたり、外部と出口通路部の間でロープを出し入れ可能に形成されており、
プーリカバーは、プーリの入口部及び出口部とは反対側を開閉軸として、入口部及び出口部側を開閉可能になっており、
プーリカバーに、閉状態にロックされたとき入口部と出口部の間の隙間に入り、ロープが入口通路部または出口通路部から外れるのを邪魔する邪魔部を設けたこと、
を特徴とする建物外面に対する作業方法。
A method in which an operator works on the exterior of a building while hanging from a safety rope from the roof of the building,
A hanging rope hanging from a support fixed to the parapet on the roof of the building can be raised and lowered along the outer surface of the building, and a box-type hanging curing device with an open top is suspended.
This suspension type curing device is to be suspended by a rope towing device attached to the suspension rope so as to be able to climb up and down,
The operator works on the exterior of the building in or above the hanging curing device with the weight supported by the safety rope,
As the operator moves the work position up or down, the rope-type pulling device moves the hanging curing device up or down,
The rope traction device is capable of climbing operation in response to the rotational force of the rotary power tool,
Furthermore, the rope traction device
It has an input shaft that can be detachably connected to the output shaft of a rotary power tool, and an output shaft that is coupled to a pulley that can be detachably wrapped with a rope, and outputs by reducing the rotation applied to the input shaft. A differential deceleration type deceleration means that transmits to the shaft;
A support on which speed reduction means is mounted;
An inlet portion and an outlet portion that are provided on the support and form an inlet and an outlet of a rope wound around a pulley;
Limiting means provided on the speed reduction means or the support body for limiting / releasing the extension to the outside on the suspension rope inlet side;
A separation portion provided between the inlet and outlet portions and the pulley, and separating the inlet side rope and the outlet side rope;
A pulley cover provided on the support and covering the front or front and side surfaces of the pulley so as to be freely opened and closed;
Locking means for locking or unlocking the pulley cover in a closed state,
An inlet passage portion and an outlet passage portion are formed in the inlet portion and the outlet portion, and the inlet portion and the outlet portion are arranged to face each other with an interval therebetween so that the inlet passage portion and the outlet passage portion face each other.
It is formed so that the rope can be taken in and out between the outside and the entrance passage part, and the rope can be taken in and out between the outside and the exit passage part through the gap between the entrance part and the exit part,
The pulley cover can be opened and closed on the side opposite to the inlet and outlet of the pulley with the opening and closing shaft on the inlet and outlet sides,
When the pulley cover is locked in the closed state, the pulley cover enters a gap between the inlet portion and the outlet portion, and a baffle portion that prevents the rope from coming off the inlet passage portion or the outlet passage portion is provided.
Working methods for Ken Monogaimen said.
建物の屋上から作業者が安全ロープに吊り下がりながら建物外面に対する作業を行う方法であって、
建物屋上のパラペットに固定した支持具から垂らした吊り下げロープに、建物外面に沿って昇降自在で、上方が開口した箱形の吊り下げ式養生装置を吊り下げ、
ロープ昇降装置により吊り下げロープを昇降させて吊り下げ式養生装置を昇降可能とし、
作業者は安全ロープに体重を支持された状態で吊り下げ式養生装置の中または上方で建物外面に対する作業をし、
作業者の作業位置が上または下に移動するに連れて、ロープ昇降装置により吊り下げ式養生装置を上または下に移動するようにし、
ロープ昇降装置は、回転式電動工具の回転力を受けて吊り下げロープの上昇を可能とし、
更に、ロープ昇降装置は、
回転式電動工具の出力軸を着脱自在に連結可能な入力軸と、吊り下げロープを着脱自在に巻き掛け可能なプーリと結合された出力軸を有し、入力軸に加えられた回転を減速して出力軸に伝達する差動減速式の減速手段と、
減速手段が装着された支持体と、
支持体に設けられて、プーリに巻き掛けられる吊り下げロープの入口と出口を形成する入口部及び出口部と、
減速手段または支持体に設けられて、吊り下げロープ入口側の外部への引き出しの制限・制限解除をする制限手段と、
を備えたこと、
を特徴とする建物外面に対する作業方法。
A method in which an operator works on the exterior of a building while hanging from a safety rope from the roof of the building,
A hanging rope hanging from a support fixed to the parapet on the roof of the building can be raised and lowered along the outer surface of the building, and a box-type hanging curing device with an open top is suspended.
It is possible to raise and lower the hanging type curing device by raising and lowering the hanging rope with the rope lifting device,
The operator works on the exterior of the building in or above the hanging curing device with the weight supported by the safety rope,
As the operator's work position moves up or down, the suspension type curing device is moved up or down by the rope lifting device,
The rope elevating device enables the lifting rope to be lifted by receiving the rotational force of the rotary power tool,
Furthermore, the rope lifting device
It has an input shaft that can be detachably connected to the output shaft of a rotary electric tool, and an output shaft that is coupled to a pulley that can be removably wrapped with a hanging rope, and reduces the rotation applied to the input shaft. Differential deceleration type deceleration means that transmits to the output shaft,
A support on which speed reduction means is mounted;
An inlet portion and an outlet portion provided on the support body and forming an inlet and an outlet of a hanging rope wound around a pulley;
Limiting means provided on the speed reduction means or the support body for limiting / releasing the extension to the outside on the suspension rope inlet side;
Having
Working methods for Ken Monogaimen said.
建物の屋上から作業者が安全ロープに吊り下がりながら建物外面に対する作業を行う方法であって、
建物屋上のパラペットに固定した支持具から垂らした吊り下げロープに、建物外面に沿って昇降自在で、上方が開口した箱形の吊り下げ式養生装置を吊り下げ、
ロープ昇降装置により吊り下げロープを昇降させて吊り下げ式養生装置を昇降可能とし、
作業者は安全ロープに体重を支持された状態で吊り下げ式養生装置の中または上方で建物外面に対する作業をし、
作業者の作業位置が上または下に移動するに連れて、ロープ昇降装置により吊り下げ式養生装置を上または下に移動するようにし、
ロープ昇降装置は、回転式電動工具の回転力を受けて吊り下げロープの上昇を可能とし、
更に、ロープ昇降装置は、
回転式電動工具の出力軸を着脱自在に連結可能な入力軸と、ロープを着脱自在に巻き掛け可能なプーリと結合された出力軸を有し、入力軸に加えられた回転を減速して出力軸に
伝達する差動減速式の減速手段と、
減速手段が装着された支持体と、
支持体に設けられて、プーリに巻き掛けられるロープの入口と出口を形成する入口部及び出口部と、
入口部及び出口部とプーリの間に設けられて、入口側ロープと出口側ロープを分離する分離部と、
減速手段または支持体に設けられて、吊り下げロープ入口側の外部への引き出しの制限・制限解除をする制限手段と、
を備え、
入口部と出口部には入口通路部と出口通路部が形成されるとともに、入口通路部と出口通路部が対向するようにして、入口部と出口部が間隔を開けて対向配置されており、
入口部と出口部の間隔を開けた隙間を通して、外部と入口通路部の間でロープを出し入れしたり、外部と出口通路部の間でロープを出し入れ可能に形成されていること、
を特徴とする建物外面に対する作業方法。
A method in which an operator works on the exterior of a building while hanging from a safety rope from the roof of the building,
A hanging rope hanging from a support fixed to the parapet on the roof of the building can be raised and lowered along the outer surface of the building, and a box-type hanging curing device with an open top is suspended.
It is possible to raise and lower the hanging type curing device by raising and lowering the hanging rope with the rope lifting device,
The operator works on the exterior of the building in or above the hanging curing device with the weight supported by the safety rope,
As the operator's work position moves up or down, the suspension type curing device is moved up or down by the rope lifting device,
The rope elevating device enables the lifting rope to be lifted by receiving the rotational force of the rotary power tool,
Furthermore, the rope lifting device
It has an input shaft that can be detachably connected to the output shaft of a rotary power tool, and an output shaft that is coupled to a pulley that can be detachably wrapped with a rope, and outputs by reducing the rotation applied to the input shaft. On the axis
A differential speed reducing means for transmitting,
A support on which speed reduction means is mounted;
An inlet portion and an outlet portion that are provided on the support and form an inlet and an outlet of a rope wound around a pulley;
A separation portion provided between the inlet and outlet portions and the pulley, and separating the inlet side rope and the outlet side rope;
Limiting means provided on the speed reduction means or the support body for limiting / releasing the extension to the outside on the suspension rope inlet side;
With
An inlet passage portion and an outlet passage portion are formed in the inlet portion and the outlet portion, and the inlet portion and the outlet portion are arranged to face each other with an interval therebetween so that the inlet passage portion and the outlet passage portion face each other.
The rope is formed so that the rope can be taken in and out between the outside and the inlet passage part through the gap between the inlet part and the outlet part, and the rope can be taken in and out between the outside and the outlet passage part.
Working methods for Ken Monogaimen said.
建物の屋上から作業者が安全ロープに吊り下がりながら建物外面に対する作業を行う方法であって、
建物屋上のパラペットに固定した支持具から垂らした吊り下げロープに、建物外面に沿って昇降自在で、上方が開口した箱形の吊り下げ式養生装置を吊り下げ、
ロープ昇降装置により吊り下げロープを昇降させて吊り下げ式養生装置を昇降可能とし、
作業者は安全ロープに体重を支持された状態で吊り下げ式養生装置の中または上方で建物外面に対する作業をし、
作業者の作業位置が上または下に移動するに連れて、ロープ昇降装置により吊り下げ式養生装置を上または下に移動するようにし、
ロープ昇降装置は、回転式電動工具の回転力を受けて吊り下げロープの上昇を可能とし、
更に、ロープ昇降装置は、
回転式電動工具の出力軸を着脱自在に連結可能な入力軸と、ロープを着脱自在に巻き掛け可能なプーリと結合された出力軸を有し、入力軸に加えられた回転を減速して出力軸に伝達する差動減速式の減速手段と、
減速手段が装着された支持体と、
支持体に設けられて、プーリに巻き掛けられるロープの入口と出口を形成する入口部及び出口部と、
減速手段または支持体に設けられて、吊り下げロープ入口側の外部への引き出しの制限・制限解除をする制限手段と、
を備え、
制限手段は、
プーリと出口部の間のロープが通る経路に配備されてロープが当接するロープ当接部と、
ロープが入口部から外側に引き出される方向へ移動しようとするとき、ロープ当接部に当接したロープに食い込んで移動を制限し、反対方向へ移動しようとする際は、ロープから離間して移動を許容するように構成されたカムと、
カムをロープに食い込む方向へ付勢する付勢手段と、
カムをロープから離間させて制限を解除する解除手段と、
を含み、
ロープ当接部がプーリのロープを巻き掛ける溝の中に遊挿されていること、
を特徴とする建物外面に対する作業方法。
A method in which an operator works on the exterior of a building while hanging from a safety rope from the roof of the building,
A hanging rope hanging from a support fixed to the parapet on the roof of the building can be raised and lowered along the outer surface of the building, and a box-type hanging curing device with an open top is suspended.
It is possible to raise and lower the hanging type curing device by raising and lowering the hanging rope with the rope lifting device,
The operator works on the exterior of the building in or above the hanging curing device with the weight supported by the safety rope,
As the operator's work position moves up or down, the suspension type curing device is moved up or down by the rope lifting device,
The rope elevating device enables the lifting rope to be lifted by receiving the rotational force of the rotary power tool,
Furthermore, the rope lifting device
It has an input shaft that can be detachably connected to the output shaft of a rotary power tool, and an output shaft that is coupled to a pulley that can be detachably wrapped with a rope, and outputs by reducing the rotation applied to the input shaft. A differential deceleration type deceleration means that transmits to the shaft;
A support on which speed reduction means is mounted;
An inlet portion and an outlet portion that are provided on the support and form an inlet and an outlet of a rope wound around a pulley;
Limiting means provided on the speed reduction means or the support body for limiting / releasing the extension to the outside on the suspension rope inlet side;
With
The limiting means is
A rope abutting portion that is arranged in a path through which the rope between the pulley and the outlet portion passes and the rope abuts;
When the rope tries to move in the direction of being pulled out from the entrance, it will bite into the rope abutting on the rope abutment and restrict the movement, and when trying to move in the opposite direction, move away from the rope. A cam configured to allow
An urging means for urging the cam in a direction to bite into the rope;
Release means for releasing the restriction by separating the cam from the rope;
Including
The rope contact part is loosely inserted in the groove around which the pulley rope is wound,
Working methods for Ken Monogaimen said.
建物の屋上から作業者が安全ロープに吊り下がりながら建物外面に対する作業を行う方法であって、
建物屋上のパラペットに固定した支持具から垂らした吊り下げロープに、建物外面に沿って昇降自在で、上方が開口した箱形の吊り下げ式養生装置を吊り下げ、
ロープ昇降装置により吊り下げロープを昇降させて吊り下げ式養生装置を昇降可能とし、
作業者は安全ロープに体重を支持された状態で吊り下げ式養生装置の中または上方で建物外面に対する作業をし、
作業者の作業位置が上または下に移動するに連れて、ロープ昇降装置により吊り下げ式養生装置を上または下に移動するようにし、
ロープ昇降装置は、回転式電動工具の回転力を受けて吊り下げロープの上昇を可能とし、
更に、ロープ昇降装置は、
回転式電動工具の出力軸を着脱自在に連結可能な入力軸と、ロープを着脱自在に巻き掛け可能なプーリと結合された出力軸を有し、入力軸に加えられた回転を減速して出力軸に伝達する差動減速式の減速手段と、
減速手段が装着された支持体と、
支持体に設けられて、プーリに巻き掛けられるロープの入口と出口を形成する入口部及び出口部と、
減速手段または支持体に設けられて、吊り下げロープ入口側の外部への引き出しの制限・制限解除をする制限手段と、
入口部及び出口部とプーリの間に設けられて、入口側ロープと出口側ロープを分離する分離部と、
支持体に設けられて、プーリの前面または前面と側面を開閉自在に覆うプーリカバーと、
プーリカバーを閉状態にロックしたり、ロック解除したりするロック手段と、を備え、
入口部と出口部には入口通路部と出口通路部が形成されるとともに、入口通路部と出口通路部が対向するようにして、入口部と出口部が間隔を開けて対向配置されており、
入口部と出口部の間隔を開けた隙間を通して、外部と入口通路部の間でロープを出し入れしたり、外部と出口通路部の間でロープを出し入れ可能に形成されており、
プーリカバーは、プーリの入口部及び出口部とは反対側を開閉軸として、入口部及び出口部側を開閉可能になっており、
プーリカバーに、閉状態にロックされたとき入口部と出口部の間の隙間に入り、ロープが入口通路部または出口通路部から外れるのを邪魔する邪魔部を設けたこと、
を特徴とする建物外面に対する作業方法。
A method in which an operator works on the exterior of a building while hanging from a safety rope from the roof of the building,
A hanging rope hanging from a support fixed to the parapet on the roof of the building can be raised and lowered along the outer surface of the building, and a box-type hanging curing device with an open top is suspended.
It is possible to raise and lower the hanging type curing device by raising and lowering the hanging rope with the rope lifting device,
The operator works on the exterior of the building in or above the hanging curing device with the weight supported by the safety rope,
As the operator's work position moves up or down, the suspension type curing device is moved up or down by the rope lifting device,
The rope elevating device enables the lifting rope to be lifted by receiving the rotational force of the rotary power tool,
Furthermore, the rope lifting device
It has an input shaft that can be detachably connected to the output shaft of a rotary power tool, and an output shaft that is coupled to a pulley that can be detachably wrapped with a rope, and outputs by reducing the rotation applied to the input shaft. A differential deceleration type deceleration means that transmits to the shaft;
A support on which speed reduction means is mounted;
An inlet portion and an outlet portion that are provided on the support and form an inlet and an outlet of a rope wound around a pulley;
Limiting means provided on the speed reduction means or the support body for limiting / releasing the extension to the outside on the suspension rope inlet side;
A separation portion provided between the inlet and outlet portions and the pulley, and separating the inlet side rope and the outlet side rope;
A pulley cover provided on the support and covering the front or front and side surfaces of the pulley so as to be freely opened and closed;
Locking means for locking or unlocking the pulley cover in a closed state,
An inlet passage portion and an outlet passage portion are formed in the inlet portion and the outlet portion, and the inlet portion and the outlet portion are arranged to face each other with an interval therebetween so that the inlet passage portion and the outlet passage portion face each other.
It is formed so that the rope can be taken in and out between the outside and the entrance passage part, and the rope can be taken in and out between the outside and the exit passage part through the gap between the entrance part and the exit part,
The pulley cover can be opened and closed on the side opposite to the inlet and outlet of the pulley with the opening and closing shaft on the inlet and outlet sides,
When the pulley cover is locked in the closed state, the pulley cover enters a gap between the inlet portion and the outlet portion, and a baffle portion that prevents the rope from coming off the inlet passage portion or the outlet passage portion is provided.
Working methods for Ken Monogaimen said.
JP2018152159A 2018-04-21 2018-08-12 Work method for building exterior Active JP6607533B2 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2018081930 2018-04-21
JP2018081930 2018-04-21

Publications (2)

Publication Number Publication Date
JP2019190263A JP2019190263A (en) 2019-10-31
JP6607533B2 true JP6607533B2 (en) 2019-11-20

Family

ID=68389513

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2018152159A Active JP6607533B2 (en) 2018-04-21 2018-08-12 Work method for building exterior

Country Status (1)

Country Link
JP (1) JP6607533B2 (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111005548A (en) * 2019-12-24 2020-04-14 上海市机械施工集团有限公司 Construction method and system
CN113216667B (en) * 2021-05-14 2022-07-19 南通市建筑装饰装璜有限公司 Movable architectural decoration protection network installation component
CN115341746A (en) * 2022-06-01 2022-11-15 桂林航天工业学院 Lift protection fixing device for civil engineering
CN115974584B (en) * 2022-12-16 2024-01-30 中国建筑一局(集团)有限公司 Concrete maintenance device and maintenance method
CN116101950B (en) * 2023-03-29 2023-07-28 中国水利水电第四工程局有限公司 Mechanical hanging basket for building loading
CN116411699B (en) * 2023-06-09 2023-10-20 中铁建工集团有限公司 Oblique hanging basket for curtain wall construction and installation method thereof

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0694723B2 (en) * 1989-06-01 1994-11-24 日本ビソー株式式社 Temporary construction method for work suspension scaffolding
JPH0736001Y2 (en) * 1989-08-01 1995-08-16 日本ビソー株式会社 Detachable lifting device
US5607143A (en) * 1995-01-04 1997-03-04 Regal; Everet B. Tree stand winch apparatus and method
JP3052246B2 (en) * 1995-07-27 2000-06-12 株式会社関東管財 Fall prevention device for wall work
JPH1096326A (en) * 1996-09-20 1998-04-14 Nihon Bisoh Co Ltd Protecting hanging floor plate construction
SE521204C2 (en) * 1997-11-06 2003-10-07 Act Safe Systems Ab Climbing device
JP2002061386A (en) * 2000-08-22 2002-02-28 Taisei Corp Gondola device with curing net
JP4789462B2 (en) * 2004-12-27 2011-10-12 中国電力株式会社 Electric equipment lifting device
JP2007154546A (en) * 2005-12-06 2007-06-21 Tkl:Kk Gondola type suspended scaffold
JP5591369B1 (en) * 2013-04-04 2014-09-17 リノ・ハピア株式会社 Seismic reinforcement construction method and gondola device for seismic reinforcement construction
JP6056113B1 (en) * 2016-03-09 2017-01-11 有限会社ケンテックシステムズ Climber

Also Published As

Publication number Publication date
JP2019190263A (en) 2019-10-31

Similar Documents

Publication Publication Date Title
JP6607533B2 (en) Work method for building exterior
US11697965B2 (en) Ladder safely mechanisms
US4923037A (en) Fall arrest device
CA2804735A1 (en) Device and method for protection during ascent
WO2017155076A1 (en) Ascender
EP0876987A1 (en) Outside up-down elevator
US20130240811A1 (en) Rope grip apparatus
KR20190060641A (en) Cordless safety blind
KR20110127349A (en) Escaping apparatus for emergency evacuation
JP6507463B1 (en) Rope pulling device
US4632218A (en) Sliding descent device
US933685A (en) Fire-escape.
KR20070015237A (en) Driving gear of skyscraper fire suppression and life structure elevator
KR102321581B1 (en) Self driving emergency escaping apparatus
JPH08121059A (en) Winding method and device of manual-type heavy shutter
CN218961614U (en) Rescue knapsack
CN110980475A (en) Automatic lift prevents falling fire ladder
US444670A (en) Henry c
KR102507199B1 (en) Fall prevention belts for railroad vehicle doors
KR20180070016A (en) Elevators for emergency evacuation of high-rise buildings
JPH0725963Y2 (en) Emergency evacuation device
RU33017U1 (en) Rescue device for evacuating people from high-altitude objects
TWM591978U (en) Assembly structure of device capable of locking and releasing rope
TWM532502U (en) Driving structure of window curtain winding
JPS5977867A (en) Escape apparatus for refuse

Legal Events

Date Code Title Description
A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20180814

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20190309

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20190310

A871 Explanation of circumstances concerning accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A871

Effective date: 20190310

A975 Report on accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A971005

Effective date: 20190403

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20190516

A601 Written request for extension of time

Free format text: JAPANESE INTERMEDIATE CODE: A601

Effective date: 20190712

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20190903

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20191008

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20191014

R150 Certificate of patent or registration of utility model

Ref document number: 6607533

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150