JP6604979B2 - Elastic ballast track laying apparatus and elastic ballast track laying method - Google Patents

Elastic ballast track laying apparatus and elastic ballast track laying method Download PDF

Info

Publication number
JP6604979B2
JP6604979B2 JP2017005609A JP2017005609A JP6604979B2 JP 6604979 B2 JP6604979 B2 JP 6604979B2 JP 2017005609 A JP2017005609 A JP 2017005609A JP 2017005609 A JP2017005609 A JP 2017005609A JP 6604979 B2 JP6604979 B2 JP 6604979B2
Authority
JP
Japan
Prior art keywords
track
support
unit
height
adjusting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2017005609A
Other languages
Japanese (ja)
Other versions
JP2018115440A (en
Inventor
讓 渡邉
春義 佐藤
滋 長谷川
範明 高橋
哲郎 丸山
龍二 佐藤
Original Assignee
第一建設工業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 第一建設工業株式会社 filed Critical 第一建設工業株式会社
Priority to JP2017005609A priority Critical patent/JP6604979B2/en
Publication of JP2018115440A publication Critical patent/JP2018115440A/en
Application granted granted Critical
Publication of JP6604979B2 publication Critical patent/JP6604979B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Machines For Laying And Maintaining Railways (AREA)

Description

本発明は、弾性バラスト軌道を敷設する際に使用する弾性バラスト軌道敷設装置及び弾性バラスト軌道敷設方法に関する。   The present invention relates to an elastic ballast track laying device and an elastic ballast track laying method used when laying an elastic ballast track.

近年、弾性材を介してマクラギをコンクリート上に設置し、軌道の周囲に吸音バラストを敷き詰めた弾性バラスト軌道が用いられている(特許文献1参照)。弾性バラスト軌道は、通常のバラスト軌道と同等の低騒音及び低振動性能を有する。これに加えて、弾性バラスト軌道は、マクラギを線路方向及び線路直角方向に移動しないように固定するため、軌道変位が少なくなり、メンテナンスを低減することが可能となる。その結果、弾性バラスト軌道は、ライフサイクルコストを大幅に低減することができる。   In recent years, an elastic ballast track in which sleepers are installed on concrete via an elastic material and sound-absorbing ballast is spread around the track has been used (see Patent Document 1). The elastic ballast track has low noise and vibration performance equivalent to those of a normal ballast track. In addition, the elastic ballast track fixes sleepers so as not to move in the line direction and the direction perpendicular to the line, so that the track displacement is reduced and maintenance can be reduced. As a result, the elastic ballast track can greatly reduce the life cycle cost.

特開2016−008456号公報JP, 2006-008456, A

弾性バラスト軌道は、専用の装置によって敷設される。しかしながら、弾性バラスト軌道を敷設する場所は、すべて一定の環境ではない。例えば降雪地方では、高さを調整するコンクリートを、通常の弾性バラスト軌道よりも高くして対応する必要がある。また、コーナー等に軌道を敷設する場合、それぞれの軌道の高さ及び角度を変更する必要がある。   The elastic ballast track is laid by a dedicated device. However, the place where the elastic ballast track is laid is not always a fixed environment. For example, in a snowy region, it is necessary to cope with a concrete whose height is adjusted higher than a normal elastic ballast track. Moreover, when laying tracks at corners or the like, it is necessary to change the height and angle of each track.

従来の弾性バラスト軌道を敷設する装置は、軌道の高さ調整と軌道の横ずれ防止をそれぞれ別々の装置で行うものであった。したがって、軌道の高さ調整の装置と軌道の横ずれ防止の装置を、敷設する場所に応じて、それぞれセッティングしなければならなかった。   A conventional device for laying an elastic ballast track is one in which the height of the track is adjusted and the lateral displacement of the track is prevented by separate devices. Therefore, the device for adjusting the height of the track and the device for preventing the lateral deviation of the track had to be set according to the place where the track was laid.

本発明の目的は、敷設する環境及び場所に応じて迅速的確に軌道を敷設することが可能な弾性バラスト軌道敷設装置及び弾性バラスト軌道敷設方法を提供することである。   An object of the present invention is to provide an elastic ballast track laying device and an elastic ballast track laying method capable of laying a track quickly and accurately in accordance with the environment and place of laying.

本発明の一実施形態にかかる弾性バラスト軌道敷設装置は、
軌道及び前記軌道を載置する弾性バラストを備える軌きょうを、高さ調整台を介して基礎に設置する弾性バラスト軌道敷設装置であって、
前記高さ調整台の両外側に離れて位置する支持部と、
前記支持部に支持され、前記軌道を載置する軌道載置部と、
前記支持部に支持され、前記軌道載置部の移動を規制する規制部と、
前記支持部に支持され、前記軌道載置部の高さを調整する高さ調整部と、
前記軌道載置部に支持され、前記軌道の横ずれを調整する横ずれ調整部と、
を備え
前記支持部、前記規制部、前記高さ調整部及び前記横ずれ調整部は、前記軌道の両外側に位置するようにそれぞれ設置され、
前記軌道載置部は、前記軌道の下方で前記軌道に交差するように、前記支持部、前記規制部及び前記高さ調整部に支持される梁部を有し、
前記支持部は、
前記規制部及び前記高さ調整部が取り付けられる支持板と、
前記支持板を支持する支柱と、
前記支柱に回転可能に連結されて前記基礎に取り付けられる支柱基部と、
前記支柱と共に前記支持板を支持する補助脚と、
前記支持板及び前記支柱に取り付けられ、前記補助脚を回転可能に連結する補助脚取付部と、
前記補助脚に回転可能に連結されて前記基礎に取り付けられる補助脚基部と、
を有する
ことを特徴とする。
An elastic ballast track laying device according to an embodiment of the present invention is
An elastic ballast track laying device for installing a track provided with a track and an elastic ballast for placing the track on a foundation via a height adjustment table,
A support portion positioned on both outer sides of the height adjustment table ;
A track mounting unit supported by the support unit and mounting the track;
A regulation unit supported by the support unit and regulating movement of the track mounting unit;
A height adjustment unit that is supported by the support unit and adjusts the height of the track mounting unit;
A lateral deviation adjustment unit that is supported by the trajectory mounting part and adjusts lateral deviation of the trajectory;
Equipped with a,
The support part, the restriction part, the height adjustment part and the lateral deviation adjustment part are respectively installed so as to be located on both outer sides of the track,
The track mounting portion has a beam portion supported by the support portion, the restriction portion, and the height adjustment portion so as to intersect the track below the track,
The support part is
A support plate to which the restricting portion and the height adjusting portion are attached;
A column supporting the support plate;
A strut base rotatably coupled to the strut and attached to the foundation;
An auxiliary leg that supports the support plate together with the support;
An auxiliary leg attachment portion attached to the support plate and the support column and rotatably connecting the auxiliary leg;
An auxiliary leg base rotatably connected to the auxiliary leg and attached to the foundation;
It is characterized by having .

本発明の一実施形態にかかる弾性バラスト軌道敷設装置では、
前記軌道載置部は、前記梁部の両端側において軌道方向に向けて前記梁部から両側にそれぞれ突出する突出部
前記規制部は、
前記突出部と共に前記梁部の移動方向を規制する案内部と、
前記突出部と前記案内部に係合し、前記梁部の位置を決める位置決め部と、
を有する
ことを特徴とする。
In the elastic ballast track laying device according to one embodiment of the present invention,
The track mounting portion is a protruding portion that protrudes from the beam portion toward both sides toward the track direction at both ends of the beam portion.
A guide portion for restricting a moving direction of the beam portion together with the protruding portion;
A positioning portion that engages with the protruding portion and the guide portion and determines the position of the beam portion;
It is characterized by having.

本発明の一実施形態にかかる弾性バラスト軌道敷設装置では、
前記軌道載置部は、前記梁部の両端側においてネジが形成されるネジ部を有し、
前記高さ調整部は、
前記ネジ部と螺合し、前記梁部の高さを調整する高さ調整ボルトと、
前記高さ調整ボルトの移動を規制する高さ調整受け部と、
を有する
ことを特徴とする。
In the elastic ballast track laying device according to one embodiment of the present invention,
The track mounting part has a screw part in which a screw is formed on both ends of the beam part,
The height adjuster is
A height adjustment bolt that is screwed into the screw portion and adjusts the height of the beam portion;
A height adjustment receiving portion for restricting movement of the height adjustment bolt;
It is characterized by having.

本発明の一実施形態にかかる弾性バラスト軌道敷設装置では、
前記横ずれ調整部は、
前記梁部の上方において前記軌道の両外側にそれぞれ設置されるナット支持部と、
前記ナット支持部に支持される横ずれ調整ナットと、
前記横ずれ調整ナットに螺合し、前記軌道の横ずれを調整する横ずれ調整ボルトと、
を有する
ことを特徴とする。
In the elastic ballast track laying device according to one embodiment of the present invention,
The lateral deviation adjusting unit is
Nut support portions respectively installed on both outer sides of the track above the beam portion;
A lateral deviation adjusting nut supported by the nut support;
A lateral displacement adjustment bolt that is screwed into the lateral displacement adjustment nut and adjusts lateral displacement of the track,
It is characterized by having.

本発明の一実施形態にかかる弾性バラスト軌道敷設方法は、
軌道及び前記軌道を載置する弾性バラストを備える軌きょうを、高さ調整台を介して基礎に設置する弾性バラスト軌道敷設方法であって、
前記高さ調整台の両外側に離れて位置する支持部と、
前記支持部に支持され、前記軌道を載置する軌道載置部と、
前記支持部に支持され、前記軌道載置部の移動を規制する規制部と、
前記支持部に支持され、前記軌道載置部の高さを調整する高さ調整部と、
前記軌道載置部に支持され、前記軌道の横ずれを調整する横ずれ調整部と、
を備え
前記支持部、前記規制部、前記高さ調整部及び前記横ずれ調整部は、前記軌道の両外側に位置するようにそれぞれ設置され、
前記軌道載置部は、前記軌道の下方で前記軌道に交差するように、前記支持部、前記規制部及び前記高さ調整部に支持される梁部を有し、
前記支持部は、
前記規制部及び前記高さ調整部が取り付けられる支持板と、
前記支持板を支持する支柱と、
前記支柱に回転可能に連結されて前記基礎に取り付けられる支柱基部と、
前記支柱と共に前記支持板を支持する補助脚と、
前記支持板及び前記支柱に取り付けられ、前記補助脚を回転可能に連結する補助脚取付部と、
前記補助脚に回転可能に連結されて前記基礎に取り付けられる補助脚基部と、
を有する
弾性バラスト軌道敷設装置を用い、
前記支持部及び前記弾性マクラギを前記基礎に並べ、
前記支持部を前記基礎に取り付け、
前記規制部及び前記高さ調整部を前記支持部に取り付け、
前記支持部又は前記高さ調整部に前記軌道載置部を置き、
前記軌道を前記軌道載置部に置き、
前記軌道と前記弾性マクラギを組み立てて、前記軌きょうを形成し、
前記高さ調整部によって前記軌道載置部の高さを調整し、
前記横ずれ調整部によって前記軌道の横ずれを調整し、
前記高さ調整部及び前記横ずれ調整部による調整が終了した後、前記軌道載置部を前記規制部に対して位置決めし、
前記軌きょうを支持する前記高さ調整台を前記支持部より内側に打設する
各工程を有する
ことを特徴とする。
An elastic ballast track laying method according to an embodiment of the present invention is as follows.
An elastic ballast track laying method in which a rail provided with a track and an elastic ballast on which the track is mounted is installed on a foundation via a height adjusting table,
A support portion positioned on both outer sides of the height adjustment table ;
A track mounting unit supported by the support unit and mounting the track;
A regulation unit supported by the support unit and regulating movement of the track mounting unit;
A height adjustment unit that is supported by the support unit and adjusts the height of the track mounting unit;
A lateral deviation adjustment unit that is supported by the trajectory mounting part and adjusts lateral deviation of the trajectory;
Equipped with a,
The support part, the restriction part, the height adjustment part and the lateral deviation adjustment part are respectively installed so as to be located on both outer sides of the track,
The track mounting portion has a beam portion supported by the support portion, the restriction portion, and the height adjustment portion so as to intersect the track below the track,
The support part is
A support plate to which the restricting portion and the height adjusting portion are attached;
A column supporting the support plate;
A strut base rotatably coupled to the strut and attached to the foundation;
An auxiliary leg that supports the support plate together with the support;
An auxiliary leg attachment portion attached to the support plate and the support column and rotatably connecting the auxiliary leg;
An auxiliary leg base rotatably connected to the auxiliary leg and attached to the foundation;
Using an elastic ballast track laying device,
Arrange the support and the elastic sleeper on the foundation,
Attaching the support to the foundation;
The restriction part and the height adjustment part are attached to the support part,
Place the track mounting part on the support part or the height adjustment part,
Place the track on the track mounting unit,
Assembling the track and the elastic sleeper to form the track,
Adjusting the height of the track mounting portion by the height adjusting portion;
Adjust the lateral deviation of the orbit by the lateral deviation adjustment unit,
After the adjustment by the height adjustment unit and the lateral deviation adjustment unit is completed, the track mounting unit is positioned with respect to the regulation unit,
It has each process which drives the height adjustment stand which supports the railing inside the support part .

本発明の一実施形態にかかる弾性バラスト軌道敷設方法は、
前記支持部を前記基礎に取り付ける工程では、前記支持部の支柱を鉛直方向に調整し、
前記高さ調整部によって前記軌道載置部の高さを調整する工程では、前記高さ調整部の高さ調整ボルトを前記軌道載置部の梁部に形成されたネジ部に対して回転させることによって前記梁部の高さを調整し、
前記横ずれ調整部によって前記軌道の横ずれを調整する工程では、前記横ずれ調整部の横ずれ調整ボルトを前記梁部に取り付けられた横ずれ調整ナットに対して回転させることによって前記軌道の横ずれを調整する
ことを特徴とする。
An elastic ballast track laying method according to an embodiment of the present invention is as follows.
In the step of attaching the support part to the foundation, the support pillars are adjusted in the vertical direction,
In the step of adjusting the height of the track mounting portion by the height adjusting portion, the height adjusting bolt of the height adjusting portion is rotated with respect to the screw portion formed on the beam portion of the track mounting portion. Adjusting the height of the beam part by
In the step of adjusting the lateral deviation of the track by the lateral deviation adjusting unit, the lateral deviation of the track is adjusted by rotating a lateral deviation adjusting bolt of the lateral deviation adjusting unit with respect to a lateral deviation adjusting nut attached to the beam portion. Features.

本発明の一実施形態にかかる弾性バラスト軌道敷設方法は、
前記軌道の敷設後、前記規制部、前記高さ調整部及び前記横ずれ調整部を前記軌道載置部から外し、
前記軌道載置部を前記軌道の下方から引き抜き、
前記規制部及び前記高さ調整部を前記支持部から取り外し、
前記支持部を前記基礎から取り外す
ことを特徴とする。
An elastic ballast track laying method according to an embodiment of the present invention is as follows.
After laying the track, remove the regulating portion, the height adjusting portion and the lateral displacement adjusting portion from the track mounting portion,
Pull out the track mounting part from below the track,
Removing the regulating part and the height adjusting part from the support part;
The support part is removed from the foundation.

本発明に係る一実施形態によれば、敷設する環境及び場所に応じて迅速的確に軌道を敷設することが可能となる。   According to an embodiment of the present invention, it is possible to lay a track quickly and accurately in accordance with the environment and place of laying.

本発明にかかる一実施形態の弾性バラスト軌道敷設装置の正面図を示す。1 is a front view of an elastic ballast track laying device according to an embodiment of the present invention. 本発明にかかる一実施形態の弾性バラスト軌道敷設装置の上面図を示す。The top view of the elastic ballast track laying device of one embodiment concerning the present invention is shown. 図1の一部を拡大した図を示す。The figure which expanded a part of FIG. 1 is shown. 図2の一部を拡大した図を示す。The figure which expanded a part of FIG. 2 is shown. 本発明にかかる一実施形態の弾性バラスト軌道敷設装置の支持部を設置した図を示す。The figure which installed the support part of the elastic ballast track | line laying apparatus of one Embodiment concerning this invention is shown. 本発明にかかる一実施形態の弾性バラスト軌道敷設装置の支持部の設置過程を示す。The installation process of the support part of the elastic ballast track | line laying apparatus of one Embodiment concerning this invention is shown. 本発明にかかる一実施形態の弾性バラスト軌道敷設装置の軌道載置部を設置した図を示す。The figure which installed the track mounting part of the elastic ballast track laying device of one embodiment concerning the present invention is shown. 本発明にかかる一実施形態の弾性バラスト軌道敷設装置の軌道を設置した図を示す。The figure which installed the track of the elastic ballast track laying device of one embodiment concerning the present invention is shown. 本発明にかかる一実施形態の弾性バラスト軌道敷設装置の軌道を調整する状態を示す。The state which adjusts the track of the elastic ballast track laying device of one embodiment concerning the present invention is shown. 本発明にかかる一実施形態の弾性バラスト軌道敷設装置による調整後に高さ調整台を打設した状態を示す。The state which laid the height adjustment stand after adjustment by the elastic ballast track | orbit laying apparatus of one Embodiment concerning this invention is shown. 本発明にかかる一実施形態の弾性バラスト軌道敷設装置の梁部を撤去した状態を示す。The state which removed the beam part of the elastic ballast track | line laying apparatus of one Embodiment concerning this invention is shown. 本発明にかかる一実施形態の弾性バラスト軌道敷設装置を撤去した状態を示す。The state which removed the elastic ballast track laying device of one embodiment concerning the present invention is shown.

以下、本発明にかかる一実施形態の弾性バラスト軌道敷設装置1及び弾性バラスト軌道敷設方法について、説明する。本実施形態の弾性バラスト軌道敷設装置1は、軌道R及び軌道Rを載置する弾性バラスト11を備える軌きょう10を、高さ調整台12を介して基礎Cに設置する。なお、本実施形態の高さ調整台12は、コンクリートによって形成されているが、他の材料によって形成されてもよい。また、本実施形態の基礎Cは、コンクリートによって形成されているが、地面又は他の材料によって形成されてもよい。   Hereinafter, an elastic ballast track laying device 1 and an elastic ballast track laying method according to an embodiment of the present invention will be described. The elastic ballast track laying apparatus 1 according to the present embodiment installs a rail 10 including a track R and an elastic ballast 11 on which the track R is placed, on a foundation C via a height adjustment base 12. In addition, although the height adjustment stand 12 of this embodiment is formed with concrete, you may form with another material. Moreover, although the foundation C of this embodiment is formed of concrete, it may be formed of the ground or other materials.

図1は、本発明にかかる一実施形態の弾性バラスト軌道敷設装置1の正面図を示す。図2は、本発明にかかる一実施形態の弾性バラスト軌道敷設装置1の上面図を示す。   FIG. 1 shows a front view of an elastic ballast track laying device 1 according to an embodiment of the present invention. FIG. 2 shows a top view of the elastic ballast track laying device 1 according to one embodiment of the present invention.

本発明にかかる一実施形態の弾性バラスト軌道敷設装置1は、少なくとも、支持部2と、支持部2に支持され、敷設される軌道を載置する軌道載置部3と、支持部2に支持され、軌道載置部3の移動を規制する規制部4と、支持部2に支持され、軌道載置部3の高さを調整する高さ調整部5と、軌道載置部3に支持され、軌道Rの横ずれを調整する横ずれ調整部6と、を備える。   An elastic ballast track laying device 1 according to an embodiment of the present invention includes at least a support portion 2, a track placement portion 3 that is supported by the support portion 2 and places a track to be laid, and is supported by the support portion 2. Are supported by the regulating unit 4 that regulates the movement of the track mounting unit 3, the height adjusting unit 5 that adjusts the height of the track mounting unit 3, and the track mounting unit 3. A lateral deviation adjusting unit 6 that adjusts the lateral deviation of the track R.

支持部2、規制部4、高さ調整部5及び横ずれ調整部6は、敷設される軌道Rの略直角方向の両外側にそれぞれ設置される。軌道載置部3は、軌道Rの下方で軌道Rに交差するように、支持部2、規制部4及び高さ調整部5に支持される。支持部2は、下方を基礎Cに取り付けられ、規制部4及び高さ調整部5を支持する。なお、軌道載置部3は、支持部2に直接的に支持されてもよく、高さ調整部5を介して支持部2に間接的に支持されてもよい。   The support part 2, the restriction part 4, the height adjustment part 5, and the lateral deviation adjustment part 6 are respectively installed on both outer sides in a substantially perpendicular direction of the track R to be laid. The track placement unit 3 is supported by the support unit 2, the regulation unit 4, and the height adjustment unit 5 so as to intersect the track R below the track R. The support part 2 is attached to the foundation C at the lower side and supports the restriction part 4 and the height adjustment part 5. The track mounting part 3 may be directly supported by the support part 2 or indirectly supported by the support part 2 via the height adjustment part 5.

図3は、図1の一部を拡大した図を示す。図4は、図2の一部を拡大した図を示す。   FIG. 3 shows an enlarged view of a part of FIG. FIG. 4 shows an enlarged view of a part of FIG.

支持部2は、規制部4及び高さ調整部5が取り付けられる支持板21と、支持板21を支持する支柱22と、支柱22に回転可能に連結されて基礎Cに取り付けられる支柱基部23と、支柱22と共に支持板21を支持する補助脚24と、支持板21及び支柱22に取り付けられ、補助脚24を回転可能に連結する補助脚取付部25と、補助脚24に回転可能に連結されて基礎Cに取り付けられる補助脚基部26と、を有する。   The support unit 2 includes a support plate 21 to which the restriction unit 4 and the height adjustment unit 5 are attached, a support column 22 that supports the support plate 21, and a support base unit 23 that is rotatably connected to the support column 22 and attached to the foundation C. Auxiliary legs 24 that support the support plate 21 together with the support posts 22, attached to the support plates 21 and the support posts 22, and attached to the support legs 21 so as to be rotatable, and attached to the support legs 24 so as to be rotatable. And an auxiliary leg base 26 attached to the foundation C.

支持板21は、上方に支持する規制部4、高さ調整部5及び軌道載置部3を支持する板状の部材が好ましい。本実施形態の支持板21は、板状の金属から形成される。また、軌道載置部3を昇降させる際に使用することが可能なジャッキJを載置するのに十分な面積を有することが好ましい。   The support plate 21 is preferably a plate-like member that supports the restriction portion 4, the height adjustment portion 5, and the track placement portion 3 that are supported upward. The support plate 21 of this embodiment is formed from a plate-like metal. Moreover, it is preferable that it has an area sufficient to mount the jack J which can be used when raising / lowering the track mounting part 3.

支柱22は、軌道載置部3を支持可能な強度を有し、支持板21を下方から支持する。本実施形態の支柱22は、H型鋼から形成され、強度を有すると共に軽量化を図っている。支柱22の下端は、支柱基部23に対して回転可能に連結される。   The support column 22 has a strength capable of supporting the track mounting portion 3 and supports the support plate 21 from below. The support column 22 of this embodiment is formed of H-shaped steel, has strength, and is lightweight. The lower end of the column 22 is rotatably connected to the column base 23.

支柱基部23は、上方を支柱22の下端に対して回転可能に連結され、下方をアンカー23a等によって基礎Cに取り付けられる。したがって、基礎Cが排水勾配又はカント角を持っている場合であっても、支柱22を鉛直方向に設定することが可能となる。   The column base 23 is rotatably connected to the lower end of the column 22 on the upper side, and attached to the foundation C on the lower side by an anchor 23a or the like. Therefore, even if the foundation C has a drainage gradient or a cant angle, the support column 22 can be set in the vertical direction.

補助脚24は、支柱22と共に軌道載置部3を下方から支持する。補助脚24は、支柱22に対して角度を変更可能である。本実施形態の補助脚24は、L型鋼から形成され、強度を有すると共に軽量化を図っている。   The auxiliary leg 24 supports the track mounting part 3 from below together with the column 22. The angle of the auxiliary leg 24 can be changed with respect to the column 22. The auxiliary leg 24 of the present embodiment is made of L-shaped steel, has strength and is lightweight.

補助脚取付部25は、支持板21及び支柱22に固着され、補助脚24を移動可能に取り付ける。本実施形態では、補助脚取付部25に一端側の支持点Pにおいて、ボルト等によって回転可能に補助脚24が取り付けられる。補助脚取付部25には、支持点Pを中心とした円弧状の長孔が形成される。補助脚24に取り付けられたボルト等を長孔に挿通することによって、補助脚24は、支持点Pを中心として回転可能な構造となる。   The auxiliary leg attaching part 25 is fixed to the support plate 21 and the support column 22 and attaches the auxiliary leg 24 to be movable. In this embodiment, the auxiliary leg 24 is attached to the auxiliary leg attaching portion 25 at a support point P on one end side so as to be rotatable by a bolt or the like. The auxiliary leg mounting portion 25 is formed with an arc-shaped long hole with the support point P as the center. By inserting a bolt or the like attached to the auxiliary leg 24 through the elongated hole, the auxiliary leg 24 has a structure that can rotate around the support point P.

補助脚基部26は、上方を補助脚24の下端に対して回転可能に連結され、下方をアンカー26a等によって基礎Cに取り付けられる。したがって、基礎Cが排水勾配又はカント角を持っている場合であっても、補助脚24を所定の角度に設定することが可能となる。   The auxiliary leg base 26 is rotatably connected to the lower end of the auxiliary leg 24 on the upper side, and attached to the foundation C by an anchor 26a or the like on the lower side. Therefore, even if the foundation C has a drainage gradient or a cant angle, the auxiliary leg 24 can be set to a predetermined angle.

軌道載置部3は、敷設される軌道Rが載置される梁部31と、梁部31の両端側において軌道方向の両側にそれぞれ突出する突出部32と、梁部31の両端側においてネジが形成されるネジ部33と、を有する。   The track mounting portion 3 includes a beam portion 31 on which the track R to be laid is mounted, a projecting portion 32 that protrudes on both sides in the track direction on both ends of the beam portion 31, and a screw on both ends of the beam portion 31. And a threaded portion 33 formed.

梁部31は、軌道Rを下方から支持する。本実施形態の梁部31は、H型鋼から形成され、強度を有すると共に軽量化を図っている。   The beam portion 31 supports the track R from below. The beam portion 31 of the present embodiment is formed of H-shaped steel, has strength, and is lightweight.

突出部32は、梁部31の両端側において軌道方向に向けて梁部31から両側に突出する。本実施形態の突出部32は、後述する規制部4の案内部41を挟むように突出する。したがって、本実施形態の突出部32は、梁部31の両端側で軌道方向の両側にそれぞれ2つずつで、あわせて8つ形成される。なお、突出部32は、必ず設ける必要はない。   The protruding portion 32 protrudes from the beam portion 31 to both sides toward the track direction on both end sides of the beam portion 31. The protrusion part 32 of this embodiment protrudes so that the guide part 41 of the control part 4 mentioned later may be pinched | interposed. Therefore, two projecting portions 32 of the present embodiment are formed on the both end sides of the beam portion 31, two on each side in the track direction, and eight in total. Note that the protrusion 32 is not necessarily provided.

ネジ部33は、後述する高さ調整部5の高さ調整ボルト51に螺合するように梁部31の両端側にそれぞれ形成される。本実施形態のネジ部33は、梁部31を上下方向に貫通するように形成される。   The threaded portion 33 is formed on each end of the beam portion 31 so as to be screwed into a height adjusting bolt 51 of the height adjusting portion 5 described later. The screw part 33 of the present embodiment is formed so as to penetrate the beam part 31 in the vertical direction.

規制部4は、突出部32と共に梁部31の移動方向を規制する案内部41と、突出部32と案内部41に係合し、梁部31の位置を決める位置決め部42と、を有する。   The restricting portion 4 includes a guide portion 41 that restricts the moving direction of the beam portion 31 together with the projecting portion 32, and a positioning portion 42 that engages with the projecting portion 32 and the guide portion 41 and determines the position of the beam portion 31.

案内部41は、支持板21から上方に向けて取り付けられる。本実施形態の案内部41は、軌道方向に間隔をあけた2つの部材を含み、梁部31を軌道方向に少し間隔をあけて挟む。したがって、案内部41は、梁部31の移動を上下方向及び軌道に対して略直角方向に規制する。本実施形態の案内部41は、C型鋼から形成され、強度を有すると共に軽量化を図っている。   The guide portion 41 is attached upward from the support plate 21. The guide part 41 of this embodiment includes two members spaced apart in the orbit direction, and sandwiches the beam part 31 with a slight gap in the orbit direction. Therefore, the guide part 41 restricts the movement of the beam part 31 in the vertical direction and in a direction substantially perpendicular to the track. The guide part 41 of this embodiment is formed from C-type steel, has strength and is lightweight.

位置決め部42は、案内部41に対して梁部31を移動不能にする。本実施形態の位置決め部42は、案内部41と、梁部31から突出する突出部32と、の間に打ち込まれる楔から形成される。   The positioning part 42 makes the beam part 31 immovable with respect to the guide part 41. The positioning part 42 of the present embodiment is formed by a wedge driven between the guide part 41 and the protruding part 32 protruding from the beam part 31.

高さ調整部5は、ネジ部33と螺合し、軌道載置部3の梁部31の高さを調整する高さ調整ボルト51と、高さ調整ボルト51の移動を規制する高さ調整受け部52と、を有する。   The height adjustment unit 5 is screwed with the screw unit 33 to adjust the height of the beam unit 31 of the track mounting unit 3 and the height adjustment unit that regulates the movement of the height adjustment bolt 51. Receiving portion 52.

本実施形態では、高さ調整ボルト51は、下端を高さ調整受け部52で回転可能且つ移動不能に支持され、梁部31に形成されたネジ部33に螺合している。高さ調整受け部52は、支持板21に対してボルト等によって下方を支持され、上端で高さ調整ボルト51を支持している。したがって、高さ調整ボルト51を回転させることによって、梁部31及び軌きょう10が上下に移動する。   In the present embodiment, the height adjustment bolt 51 is supported by the height adjustment receiving portion 52 so as to be rotatable and immovable, and is screwed into a screw portion 33 formed on the beam portion 31. The height adjustment receiving portion 52 is supported below the support plate 21 by bolts or the like, and supports the height adjustment bolt 51 at the upper end. Therefore, by rotating the height adjustment bolt 51, the beam portion 31 and the rail 10 move up and down.

なお、高さ調整受け部52は、必ず設置するものではなく、軌道Rを設置する高さに応じて使用すればよい。高さ調整受け部52を設置しない場合には、高さ調整ボルト51は、支持板21で回転可能且つ移動不能に支持される。   The height adjustment receiving portion 52 is not necessarily installed, and may be used according to the height at which the track R is installed. When the height adjustment receiving portion 52 is not installed, the height adjustment bolt 51 is supported by the support plate 21 so as to be rotatable and immovable.

横ずれ調整部6は、軌道Rの横ずれを調整する横ずれ調整ボルト61と、梁部31の上方において敷設される軌道Rの略直角方向の両外側にそれぞれ設置されるナット支持部62と、ナット支持部62に支持され横ずれ調整ボルト61と螺合する横ずれ調整ナット63と、を有する。   The lateral displacement adjusting unit 6 includes lateral displacement adjusting bolts 61 that adjust lateral displacement of the track R, nut support portions 62 that are respectively installed on both outer sides of the track R that is laid above the beam portion 31, and nut supports. A lateral displacement adjustment nut 63 supported by the portion 62 and screwed into the lateral displacement adjustment bolt 61.

横ずれ調整ボルト61は、横ずれ調整ナット63に螺合される。したがって、横ずれ調整ボルト61を回転させると軌道Rに直角又は略直角な方向に移動する。ナット支持部62は、横ずれ調整ボルト61に螺合される横ずれ調整ナット63を支持する。本実施形態のナット支持部62は、梁部31の上方に取り外し可能に、ボルトによって取り付けられる。横ずれ調整ナット63は、横ずれ調整ボルト61が軌道に直角又は略直角な方向に移動するように、ナット支持部62に固着される。   The lateral deviation adjusting bolt 61 is screwed to the lateral deviation adjusting nut 63. Accordingly, when the lateral displacement adjusting bolt 61 is rotated, the lateral displacement adjusting bolt 61 moves in a direction perpendicular to or substantially perpendicular to the track R. The nut support portion 62 supports a lateral deviation adjustment nut 63 that is screwed into the lateral deviation adjustment bolt 61. The nut support part 62 of this embodiment is removably attached to the upper part of the beam part 31 with a bolt. The lateral displacement adjusting nut 63 is fixed to the nut support portion 62 so that the lateral displacement adjusting bolt 61 moves in a direction perpendicular or substantially perpendicular to the track.

横ずれ調整ボルト61の先端は軌道Rに接触することができる。したがって、横ずれ調整ボルト61を回転させることによって、軌道R及び軌きょう10が水平方向に移動する。   The tip of the lateral displacement adjusting bolt 61 can contact the track R. Accordingly, by rotating the lateral deviation adjusting bolt 61, the track R and the rail 10 move in the horizontal direction.

なお、ナット支持部62は、梁部31の上下どちらの面にも取り付けられるようにすることが好ましい。梁部31の上下どちらかの面に荷重による歪みで塑性変形等が生じた場合、逆の面を使用することが可能となる。   The nut support portion 62 is preferably attached to either the upper or lower surface of the beam portion 31. When plastic deformation or the like occurs due to strain due to a load on either of the upper and lower surfaces of the beam portion 31, the opposite surface can be used.

このような弾性バラスト軌道敷設装置1によって、敷設する環境及び場所に応じて迅速的確に軌道Rを敷設することが可能となる。また、弾性バラスト軌道敷設装置1は繰り返し使用することができ、施工コストを低減させることが可能となる。   With such an elastic ballast track laying device 1, it is possible to lay the track R quickly and accurately according to the environment and place of laying. In addition, the elastic ballast track laying device 1 can be used repeatedly, and the construction cost can be reduced.

次に、弾性バラスト軌道敷設装置1を用いた弾性バラスト軌道敷設方法について説明する。   Next, an elastic ballast track laying method using the elastic ballast track laying device 1 will be described.

図5は、本発明にかかる一実施形態の弾性バラスト軌道敷設装置1の支持部2を設置した図を示す。図6は、本発明にかかる一実施形態の弾性バラスト軌道敷設装置1の支持部2の設置過程を示す。図6(a)は支持部2の設置前の状態、図6(b)は持部2の設置前の状態を示す。   FIG. 5 shows a view in which the support part 2 of the elastic ballast track laying device 1 according to the embodiment of the present invention is installed. FIG. 6 shows an installation process of the support portion 2 of the elastic ballast track laying device 1 according to the embodiment of the present invention. FIG. 6A shows a state before the support portion 2 is installed, and FIG. 6B shows a state before the support portion 2 is installed.

まず、支持部2及び弾性マクラギ11を運搬し、基礎C上に並べる。支持部2及び弾性マクラギ11は、図5に示すように、それぞれ一定の間隔ごとに並べて置くことが好ましい。この時点では、図6(a)に示すように、支持部2の支柱22は、傾斜した状態で置かれている。   First, the support part 2 and the elastic sleeper 11 are transported and arranged on the foundation C. As shown in FIG. 5, the support portion 2 and the elastic sleeper 11 are preferably arranged at regular intervals. At this time, as shown in FIG. 6A, the support column 22 of the support portion 2 is placed in an inclined state.

続いて、図6(b)に示すように、支持部2の支柱22が鉛直方向Vに平行になるように調整する。支柱22の角度の調整は、補助脚24の角度によって調整する。支柱22を鉛直方向に調整した後、補助脚24を補助脚取付部25及び補助脚基部26に対してボルト等によって取り付ける。続いて、支柱基部23と補助脚基部26をアンカー等によって基礎Cに取り付ける。   Subsequently, as shown in FIG. 6B, adjustment is made so that the support column 22 of the support portion 2 is parallel to the vertical direction V. The angle of the column 22 is adjusted according to the angle of the auxiliary leg 24. After adjusting the support column 22 in the vertical direction, the auxiliary leg 24 is attached to the auxiliary leg attachment part 25 and the auxiliary leg base part 26 with bolts or the like. Subsequently, the support base 23 and the auxiliary leg base 26 are attached to the foundation C by an anchor or the like.

図7は、本発明にかかる一実施形態の弾性バラスト軌道敷設装置1の軌道載置部3を設置した図を示す。   FIG. 7 shows a view in which the track mounting part 3 of the elastic ballast track laying device 1 according to the embodiment of the present invention is installed.

次に、規制部4の案内部41及び高さ調整部5の高さ調整受け部52を支持部2にボルト等によって取り付ける。続いて、支持板21又は高さ調整受け部52に梁部31を仮置きする。仮置きの際は、図4に示すように、梁部31が案内部41に挟まれ、且つ、案内部41が突出部32に挟まれるように置く。また、高さ調整ボルト52を梁部31のネジ部33に螺合してもよい。なお、この時点で、梁部31の高さを、予め設置される軌道Rの高さにあわせておいてもよい。   Next, the guide part 41 of the restriction part 4 and the height adjustment receiving part 52 of the height adjustment part 5 are attached to the support part 2 with bolts or the like. Subsequently, the beam portion 31 is temporarily placed on the support plate 21 or the height adjustment receiving portion 52. In the temporary placement, as shown in FIG. 4, the beam portion 31 is placed between the guide portions 41 and the guide portion 41 is placed between the protruding portions 32. Further, the height adjusting bolt 52 may be screwed into the threaded portion 33 of the beam portion 31. At this time, the height of the beam portion 31 may be matched with the height of the track R that is installed in advance.

図8は、本発明にかかる一実施形態の弾性バラスト軌道敷設装置1の軌道Rを設置した図を示す。   FIG. 8 shows a diagram in which the track R of the elastic ballast track laying device 1 according to the embodiment of the present invention is installed.

次に、軌道Rを梁部31の上方に仮置きする。続いて、軌道Rと弾性マクラギ11を組み立てて、軌きょう10を形成する。すなわち、この段階では、軌きょう10は、梁部31に吊されているような状態となる。   Next, the track R is temporarily placed above the beam portion 31. Subsequently, the rail 10 and the elastic sleeper 11 are assembled to form the rail 10. That is, at this stage, the rail 10 is in a state of being suspended from the beam portion 31.

図9は、本発明にかかる一実施形態の弾性バラスト軌道敷設装置1の軌道Rを調整する状態を示す。   FIG. 9 shows a state in which the track R of the elastic ballast track laying device 1 according to the embodiment of the present invention is adjusted.

次に、軌道R及び軌きょう10の位置を調整する。軌道R及び軌きょう10の位置調整は、高さ調整部5及び横ずれ調整部6により行う。   Next, the positions of the track R and the track 10 are adjusted. The position adjustment of the track R and the rail 10 is performed by the height adjusting unit 5 and the lateral deviation adjusting unit 6.

高さ調整部5は、軌道載置部3の梁部31を介して軌道R及び軌きょう10の高さを調整する。梁部31の高さの調整は、高さ調整ボルト51を回転させることによって行う。高さ調整ボルト51は、高さ調整受け部52によって移動が規制されている。したがって、高さ調整ボルト51を回転させると、高さ調整ボルト51はその場で回転し、ネジ部33で螺合している梁部31が上下方向Hに移動する。梁部31の高さは、ゲージ等によって確認すればよい。なお、高さ調整の際に図1に示したジャッキJを使用した後、高さ調整ボルト51を回転させてもよい。   The height adjusting unit 5 adjusts the height of the track R and the rail 10 via the beam portion 31 of the track mounting unit 3. The height of the beam portion 31 is adjusted by rotating the height adjustment bolt 51. The movement of the height adjustment bolt 51 is restricted by the height adjustment receiving portion 52. Therefore, when the height adjustment bolt 51 is rotated, the height adjustment bolt 51 rotates on the spot, and the beam portion 31 screwed by the screw portion 33 moves in the vertical direction H. What is necessary is just to confirm the height of the beam part 31 with a gauge etc. FIG. Note that the height adjustment bolt 51 may be rotated after using the jack J shown in FIG.

高さ調整部5は、軌道Rを挟んで、両側に設置されている。したがって、一方の高さ調整部5と他方の高さ調整部5をそれぞれ同じ高さに調整すれば、軌道に直角な方向で、軌きょう10は水平状態となる。また、一方の高さ調整部5と他方の高さ調整部5をそれぞれ異なる高さに調整すれば、軌道に直角な方向で、軌きょう10は傾斜状態となる。   The height adjusting unit 5 is installed on both sides of the track R. Therefore, if one height adjustment part 5 and the other height adjustment part 5 are each adjusted to the same height, the rail 10 will be in a horizontal state in a direction perpendicular to the track. Moreover, if one height adjusting part 5 and the other height adjusting part 5 are adjusted to different heights, the rail 10 is inclined in a direction perpendicular to the track.

横ずれ調整部6は、軌道Rに接触して軌道R及び軌きょう10の横ずれを調整する。軌道R及び軌きょう10の横ずれ調整は、横ずれ調整ボルト61を回転させることによって行う。横ずれ調整ボルト61は、梁部31に取り付けられた横ずれ調整ナット63に螺合されている。したがって、横ずれ調整ボルト61を回転させると、横ずれ調整ボルト61が軌道Rに対して直角又は略直角な方向に押圧する。   The lateral deviation adjusting unit 6 is in contact with the track R and adjusts the lateral deviation of the track R and the rail 10. The lateral displacement adjustment of the track R and the rail 10 is performed by rotating the lateral displacement adjustment bolt 61. The lateral deviation adjusting bolt 61 is screwed into a lateral deviation adjusting nut 63 attached to the beam portion 31. Therefore, when the lateral deviation adjusting bolt 61 is rotated, the lateral deviation adjusting bolt 61 is pressed in a direction perpendicular or substantially perpendicular to the track R.

横ずれ調整部6は、軌道Rを挟んで、両側に設置されている。したがって、軌道Rを押圧する方向へ一方の横ずれ調整ボルト61を締め込み、軌道Rから離間する方向へ他方の横ずれ調整ボルト61を緩解させれば、一方側から他方側へ軌きょう10が移動する。また、軌道Rを押圧する方向へ他方の横ずれ調整ボルト61を締め込み、軌道Rから離間する方向へ一方の横ずれ調整ボルト61を緩解させれば、他方側から一方側へ軌きょう10が移動する。   The lateral deviation adjusting units 6 are installed on both sides of the track R. Therefore, if one lateral displacement adjustment bolt 61 is tightened in the direction in which the track R is pressed and the other lateral displacement adjustment bolt 61 is loosened in a direction away from the track R, the rail 10 moves from one side to the other. . Further, when the other lateral displacement adjusting bolt 61 is tightened in the direction in which the track R is pressed and the one lateral displacement adjusting bolt 61 is loosened in the direction away from the track R, the rail 10 moves from the other side to the one side. .

高さ調整部5及び横ずれ調整部6による調整が終了した後、位置決め部42によって、梁部31を規制部4に対して位置決めする。本実施形態では、位置決め部42としての楔を、案内部41と、梁部31から突出する突出部32と、の間に打ち込むことにより位置決めを行う。   After the adjustment by the height adjusting unit 5 and the lateral deviation adjusting unit 6 is completed, the beam unit 31 is positioned with respect to the regulating unit 4 by the positioning unit 42. In the present embodiment, positioning is performed by driving a wedge as the positioning portion 42 between the guide portion 41 and the protruding portion 32 protruding from the beam portion 31.

図10は、本発明にかかる一実施形態の弾性バラスト軌道敷設装置1による調整後に高さ調整台12を打設した状態を示す。   FIG. 10 shows a state in which the height adjustment base 12 is placed after adjustment by the elastic ballast track laying device 1 according to one embodiment of the present invention.

弾性バラスト軌道敷設装置1による調整後、軌きょう10の下方に高さ調整台12を打設する。本実施形態の高さ調整台12は、それぞれの軌道Rの下方に打設される。高さ調整台12は、弾性マクラギ11が横ずれしないように、軌道Rに直角な方向で両側から弾性マクラギ11を支持するように打設されることが好ましい。また、高さ調整台12と弾性マクラギ11の上下方向の間には、弾性材13を挟むことが好ましい。   After the adjustment by the elastic ballast track laying device 1, the height adjustment stand 12 is placed below the rail 10. The height adjustment stand 12 of this embodiment is placed below each track R. The height adjusting table 12 is preferably placed so as to support the elastic sleeper 11 from both sides in a direction perpendicular to the track R so that the elastic sleeper 11 does not laterally shift. Further, it is preferable to sandwich the elastic material 13 between the height adjusting table 12 and the elastic sleeper 11 in the vertical direction.

図11は、本発明にかかる一実施形態の弾性バラスト軌道敷設装置1の梁部31を撤去した状態を示す。   FIG. 11 shows a state where the beam portion 31 of the elastic ballast track laying device 1 according to the embodiment of the present invention is removed.

高さ調整台12を打設した後、弾性バラスト軌道敷設装置1を撤去する。軌きょう10は、高さ調整台12及び弾性材13によって支持されている。したがって、弾性バラスト軌道敷設装置1を撤去する際は、規制部4の位置決め部42、高さ調整部5の高さ調整ボルト51及び横ずれ調整部6を梁部31から外し、梁部31を軌道Rの下方から引き抜けばよい。   After placing the height adjusting table 12, the elastic ballast track laying device 1 is removed. The rail 10 is supported by a height adjusting table 12 and an elastic material 13. Therefore, when removing the elastic ballast track laying device 1, the positioning portion 42 of the restricting portion 4, the height adjusting bolt 51 of the height adjusting portion 5 and the lateral displacement adjusting portion 6 are removed from the beam portion 31, and the beam portion 31 is tracked. It can be pulled out from below R.

図12は、本発明にかかる一実施形態の弾性バラスト軌道敷設装置1を撤去した状態を示す。   FIG. 12 shows a state where the elastic ballast track laying device 1 according to the embodiment of the present invention is removed.

その後、規制部4及び高さ調整受け部52を支持部2から取り外す。最後に、支柱基部23及び補助脚基部26を基礎Cから取り外す。取り外した後の基礎Cに残るアンカー23a,26aの孔は、コンクリート等で埋めておくとよい。また、消音バラストBを基礎Cの上方に撒くと、騒音を低減でき、好ましい。   Thereafter, the restriction portion 4 and the height adjustment receiving portion 52 are removed from the support portion 2. Finally, the support base 23 and the auxiliary leg base 26 are removed from the foundation C. The holes of the anchors 23a and 26a remaining on the foundation C after being removed may be filled with concrete or the like. Further, it is preferable to spread the muffler ballast B above the foundation C because noise can be reduced.

以上、本実施形態の弾性バラスト軌道敷設装置1は、弾性バラスト軌道敷設装置1は、軌道R及び軌道Rを載置する弾性バラスト11を備える軌きょう10を、高さ調整台12を介して基礎に設置する弾性バラスト軌道敷設装置1であって、支持部2と、支持部2に支持され、軌道Rを載置する軌道載置部3と、支持部2に支持され、軌道載置部3の移動を規制する規制部4と、支持部2に支持され、軌道載置部3の高さを調整する高さ調整部5と、軌道載置部3に支持され、軌道Rの横ずれを調整する横ずれ調整部6と、を備える。したがって、弾性バラスト軌道敷設装置1によれば、敷設する環境及び場所に応じて迅速的確に軌道Rを敷設することが可能となる。また、弾性バラスト軌道敷設装置1は繰り返し使用することができ、施工コストを低減させることが可能となる。   As described above, the elastic ballast track laying device 1 according to the present embodiment is based on the rail 10 including the track R and the elastic ballast 11 on which the track R is mounted via the height adjustment base 12. 1 is an elastic ballast track laying device 1 installed on a track, a support unit 2, a track mounting unit 3 supported by the support unit 2 and mounting a track R, and supported by the support unit 2, and the track mounting unit 3 A regulation unit 4 that regulates the movement of the track, a height adjustment unit 5 that is supported by the support unit 2 and adjusts the height of the track mounting unit 3, and is supported by the track mounting unit 3 to adjust the lateral deviation of the track R A lateral deviation adjusting unit 6. Therefore, according to the elastic ballast track laying device 1, it is possible to lay the track R quickly and accurately according to the environment and place where the ballast is laid. Further, the elastic ballast track laying device 1 can be used repeatedly, and the construction cost can be reduced.

本実施形態の弾性バラスト軌道敷設装置1では、支持部2、規制部4、高さ調整部5及び横ずれ調整部6は、軌道Rの両外側に位置するようにそれぞれ設置され、軌道載置部3は、R軌道の下方で軌道Rに交差するように、支持部2、規制部4及び高さ調整部3に支持される梁部31を有する。したがって、弾性バラスト軌道敷設装置1を安定して設置することができ、より迅速的確に軌道を敷設することが可能となる。   In the elastic ballast track laying device 1 according to the present embodiment, the support portion 2, the restriction portion 4, the height adjustment portion 5, and the lateral displacement adjustment portion 6 are respectively installed so as to be located on both outer sides of the track R, and the track placement portion. 3 has a beam portion 31 supported by the support portion 2, the restriction portion 4, and the height adjustment portion 3 so as to intersect the track R below the R track. Therefore, the elastic ballast track laying device 1 can be stably installed, and the track can be laid more quickly and accurately.

本実施形態の弾性バラスト軌道敷設装置1では、支持部2は、規制部4及び高さ調整部5が取り付けられる支持板21と、支持板21を支持する支柱22と、支柱22に回転可能に連結されて基礎Cに取り付けられる支柱基部23と、支柱22と共に支持板21を支持する補助脚24と、支持板21及び支柱22に取り付けられ、補助脚24を回転可能に連結する補助脚取付部25と、補助脚24に回転可能に連結されて基礎Cに取り付けられる補助脚基部26と、を有する。したがって、支柱22を鉛直方向に設置することができるので、弾性バラスト軌道敷設装置1をさらに安定して設置することができ、より迅速的確に軌道を敷設することが可能となる。   In the elastic ballast track laying device 1 of the present embodiment, the support unit 2 is rotatable to the support plate 21 to which the regulating unit 4 and the height adjusting unit 5 are attached, the support column 22 that supports the support plate 21, and the support column 22. A support base 23 connected to the base C and attached to the foundation C, an auxiliary leg 24 supporting the support plate 21 together with the support 22, and an auxiliary leg attaching part attached to the support plate 21 and the support 22 and rotatably connecting the auxiliary leg 24. 25 and an auxiliary leg base portion 26 rotatably connected to the auxiliary leg 24 and attached to the foundation C. Therefore, since the support column 22 can be installed in the vertical direction, the elastic ballast track laying device 1 can be installed more stably, and the track can be laid more quickly and accurately.

本実施形態の弾性バラスト軌道敷設装置1では、軌道載置部3は、梁部31の両端側において軌道方向に向けて梁部31から両側にそれぞれ突出する突出部32を有し、規制部4は、突出部32と共に梁部31の移動方向を規制する案内部41と、突出部32と案内部41に係合し、梁部31の位置を決める位置決め部42と、を有する。したがって、軌道載置部3を規制部4に対して強固に取り付けることができるので、弾性バラスト軌道敷設装置1をさらに安定して設置することができ、より迅速的確に軌道を敷設することが可能となる。   In the elastic ballast track laying device 1 according to the present embodiment, the track mounting portion 3 has projecting portions 32 that protrude from the beam portion 31 to both sides toward the track direction at both ends of the beam portion 31, respectively. Includes a guide portion 41 that restricts the movement direction of the beam portion 31 together with the protrusion portion 32, and a positioning portion 42 that engages with the protrusion portion 32 and the guide portion 41 and determines the position of the beam portion 31. Therefore, since the track mounting part 3 can be firmly attached to the restricting part 4, the elastic ballast track laying device 1 can be installed more stably, and the track can be laid more quickly and accurately. It becomes.

本実施形態の弾性バラスト軌道敷設装置1では、軌道載置部3は、梁部31の両端側においてネジが形成されるネジ部33を有し、高さ調整部5は、ネジ部33と螺合し、梁部31の高さを調整する高さ調整ボルト51と、高さ調整ボルト51の移動を規制する高さ調整受け部52と、を有する。したがって、弾性バラスト軌道敷設装置1の高さ調整の精度を向上させることが可能となる。   In the elastic ballast track laying device 1 of the present embodiment, the track mounting portion 3 has screw portions 33 in which screws are formed on both ends of the beam portion 31, and the height adjusting portion 5 is screwed with the screw portion 33. The height adjustment bolt 51 for adjusting the height of the beam portion 31 and the height adjustment receiving portion 52 for restricting the movement of the height adjustment bolt 51 are provided. Therefore, it is possible to improve the accuracy of height adjustment of the elastic ballast track laying device 1.

本実施形態の弾性バラスト軌道敷設装置1では、横ずれ調整部6は、梁部31の上方において軌道Rの両外側にそれぞれ設置されるナット支持部62と、ナット支持部62に支持される横ずれ調整ナット63と、横ずれ調整ナット63に螺合し、軌道Rの横ずれを調整する横ずれ調整ボルト61と、を有する。したがって、弾性バラスト軌道敷設装置1の横ずれ調整の精度を向上させることが可能となる。   In the elastic ballast track laying device 1 according to the present embodiment, the lateral deviation adjusting unit 6 includes a nut support unit 62 installed on both outer sides of the track R above the beam unit 31 and a lateral deviation adjustment supported by the nut support unit 62. A nut 63 and a lateral displacement adjusting bolt 61 that is screwed into the lateral displacement adjusting nut 63 and adjusts the lateral displacement of the track R are provided. Therefore, it is possible to improve the accuracy of the lateral deviation adjustment of the elastic ballast track laying device 1.

本実施形態の弾性バラスト軌道敷設方法は、軌道R及び軌道Rを載置する弾性バラスト11を備える軌きょう10を、高さ調整台12を介して基礎に設置する弾性バラスト軌道敷設方法であって、支持部2と、支持部2に支持され、軌道Rを載置する軌道載置部3と、支持部2に支持され、軌道載置部3の移動を規制する規制部4と、支持部2に支持され、軌道載置部3の高さを調整する高さ調整部5と、軌道載置部3に支持され、軌道Rの横ずれを調整する横ずれ調整部6と、を備える弾性バラスト軌道敷設装置1を用い、支持部2及び弾性マクラギ11を基礎Cに並べ、支持部2を基礎Cに取り付け、規制部4及び高さ調整部5を支持部2に取り付け、支持部2又は高さ調整部5に軌道載置部3を置き、軌道Rを軌道載置部3に置き、軌道Rと弾性マクラギ11を組み立てて、軌きょう10を形成し、高さ調整部5によって軌道載置部3の高さを調整し、横ずれ調整部6によって軌道Rの横ずれを調整し、高さ調整部5及び横ずれ調整部6による調整が終了した後、軌道載置部3を規制部4に対して位置決めし、軌きょう10を支持する高さ調整台12を打設する各工程を有する。したがって、弾性バラスト軌道敷設方法によれば、敷設する環境及び場所に応じて迅速的確に軌道を敷設することが可能となる。   The elastic ballast track laying method according to the present embodiment is an elastic ballast track laying method in which a rail 10 including a track R and an elastic ballast 11 on which the track R is placed is installed on a foundation via a height adjustment base 12. The support unit 2, the track mounting unit 3 supported by the support unit 2 and mounting the track R, the regulation unit 4 supported by the support unit 2 and restricting the movement of the track mounting unit 3, and the support unit 2, an elastic ballast track that includes a height adjustment unit 5 that adjusts the height of the track mounting unit 3 and a lateral shift adjustment unit 6 that is supported by the track mounting unit 3 and adjusts the lateral shift of the track R. Using the laying device 1, the support part 2 and the elastic sleeper 11 are arranged on the base C, the support part 2 is attached to the base C, the restriction part 4 and the height adjustment part 5 are attached to the support part 2, and the support part 2 or height The track placement unit 3 is placed on the adjustment unit 5, the track R is placed on the track placement unit 3, and the track is placed. R and the elastic sleeper 11 are assembled to form the rail 10, the height adjusting unit 5 adjusts the height of the track mounting unit 3, the lateral shift adjusting unit 6 adjusts the lateral shift of the track R, and the height adjustment After the adjustment by the part 5 and the lateral deviation adjusting part 6 is completed, the track mounting part 3 is positioned with respect to the restricting part 4 and each step of placing the height adjusting table 12 that supports the rail 10 is provided. Therefore, according to the elastic ballast track laying method, it is possible to lay the track quickly and accurately in accordance with the environment and place of laying.

本実施形態の弾性バラスト軌道敷設方法は、支持部2を基礎Cに取り付ける工程では、支持部2の支柱22を鉛直方向に調整し、高さ調整部5によって軌道載置部3の高さを調整する工程では、高さ調整部5の高さ調整ボルト51を軌道載置部3の梁部31に形成されたネジ部33に対して回転させることによって梁部31の高さを調整し、横ずれ調整部6によって軌道Rの横ずれを調整する工程では、横ずれ調整部6の横ずれ調整ボルト61を梁部31に取り付けられた横ずれ調整ナット63に対して回転させることによって軌道Rの横ずれを調整する。したがって、弾性バラスト軌道敷設装置1の高さ調整及び横ずれ調整の精度を向上させることが可能となる。   In the elastic ballast track laying method of the present embodiment, in the step of attaching the support portion 2 to the foundation C, the struts 22 of the support portion 2 are adjusted in the vertical direction, and the height of the track mounting portion 3 is adjusted by the height adjustment portion 5. In the adjusting step, the height of the beam 31 is adjusted by rotating the height adjusting bolt 51 of the height adjusting unit 5 with respect to the screw portion 33 formed on the beam 31 of the track mounting unit 3. In the step of adjusting the lateral deviation of the track R by the lateral deviation adjusting unit 6, the lateral deviation of the track R is adjusted by rotating the lateral deviation adjusting bolt 61 of the lateral deviation adjusting unit 6 with respect to the lateral deviation adjusting nut 63 attached to the beam portion 31. . Therefore, it is possible to improve the accuracy of height adjustment and lateral deviation adjustment of the elastic ballast track laying device 1.

本実施形態の弾性バラスト軌道敷設方法は、軌道Rの敷設後、規制部4、高さ調整部5及び横ずれ調整部6を軌道載置部3から外し、軌道載置部3を軌道Rの下方から引き抜き、規制部4及び高さ調整部5を支持部2から取り外し、支持部2を基礎Cから取り外す。   In the elastic ballast track laying method according to the present embodiment, after the track R is laid, the restricting portion 4, the height adjusting portion 5 and the lateral deviation adjusting portion 6 are removed from the track placing portion 3, and the track placing portion 3 is placed below the track R. Then, the regulating portion 4 and the height adjusting portion 5 are removed from the support portion 2, and the support portion 2 is removed from the foundation C.

なお、ここまで本発明の種々の実施形態について説明したが、本発明はこれらの実施形態のみに限られるものではなく、それぞれの実施形態の構成を適宜組み合わせて構成した実施形態も本発明の範疇となるものである。   Although various embodiments of the present invention have been described so far, the present invention is not limited only to these embodiments, and embodiments configured by appropriately combining the configurations of the respective embodiments are also within the scope of the present invention. It will be.

1…弾性バラスト軌道敷設装置
2…支持部
21…支持板
22…支柱
23…支柱基部
24…補助脚
25…補助脚基部
3…軌道載置部
31…梁部
32…突出部
33…ネジ部
4…規制部
41…案内部
42…位置決め部
5…高さ調整部
51…高さ調整ボルト
52…高さ調整受け部
6…横ずれ調整部
61…横ずれ調整ボルト
62…ナット支持部
63…調整ナット
R…軌道
10…軌きょう
11…弾性バラスト
12…高さ調整台
13…弾性材
C…基礎
B…消音バラスト
DESCRIPTION OF SYMBOLS 1 ... Elastic ballast track | orbit laying apparatus 2 ... Support part 21 ... Support plate 22 ... Column 23 ... Column base 24 ... Auxiliary leg 25 ... Auxiliary leg base 3 ... Track mounting part 31 ... Beam part 32 ... Projection part 33 ... Screw part 4 ... Regulator 41 ... Guiding part 42 ... Positioning part 5 ... Height adjustment part 51 ... Height adjustment bolt 52 ... Height adjustment receiving part 6 ... Side adjustment part 61 ... Side adjustment bolt 62 ... Nut support part 63 ... Adjustment nut R ... orbit 10 ... gauge 11 ... elastic ballast 12 ... height adjustment base 13 ... elastic material C ... foundation B ... mute ballast

Claims (7)

軌道及び前記軌道を載置する弾性バラストを備える軌きょうを、高さ調整台を介して基礎に設置する弾性バラスト軌道敷設装置であって、
前記高さ調整台の両外側に離れて位置する支持部と、
前記支持部に支持され、前記軌道を載置する軌道載置部と、
前記支持部に支持され、前記軌道載置部の移動を規制する規制部と、
前記支持部に支持され、前記軌道載置部の高さを調整する高さ調整部と、
前記軌道載置部に支持され、前記軌道の横ずれを調整する横ずれ調整部と、
を備え
前記支持部、前記規制部、前記高さ調整部及び前記横ずれ調整部は、前記軌道の両外側に位置するようにそれぞれ設置され、
前記軌道載置部は、前記軌道の下方で前記軌道に交差するように、前記支持部、前記規制部及び前記高さ調整部に支持される梁部を有し、
前記支持部は、
前記規制部及び前記高さ調整部が取り付けられる支持板と、
前記支持板を支持する支柱と、
前記支柱に回転可能に連結されて前記基礎に取り付けられる支柱基部と、
前記支柱と共に前記支持板を支持する補助脚と、
前記支持板及び前記支柱に取り付けられ、前記補助脚を回転可能に連結する補助脚取付部と、
前記補助脚に回転可能に連結されて前記基礎に取り付けられる補助脚基部と、
を有する
ことを特徴とする弾性バラスト軌道敷設装置。
An elastic ballast track laying device for installing a track provided with a track and an elastic ballast for placing the track on a foundation via a height adjustment table,
A support portion positioned on both outer sides of the height adjustment table ;
A track mounting unit supported by the support unit and mounting the track;
A regulation unit supported by the support unit and regulating movement of the track mounting unit;
A height adjustment unit that is supported by the support unit and adjusts the height of the track mounting unit;
A lateral deviation adjustment unit that is supported by the trajectory mounting part and adjusts lateral deviation of the trajectory;
Equipped with a,
The support part, the restriction part, the height adjustment part and the lateral deviation adjustment part are respectively installed so as to be located on both outer sides of the track,
The track mounting portion has a beam portion supported by the support portion, the restriction portion, and the height adjustment portion so as to intersect the track below the track,
The support part is
A support plate to which the restricting portion and the height adjusting portion are attached;
A column supporting the support plate;
A strut base rotatably coupled to the strut and attached to the foundation;
An auxiliary leg that supports the support plate together with the support;
An auxiliary leg attachment portion attached to the support plate and the support column and rotatably connecting the auxiliary leg;
An auxiliary leg base rotatably connected to the auxiliary leg and attached to the foundation;
An elastic ballast track laying device comprising:
前記軌道載置部は、前記梁部の両端側において軌道方向に向けて前記梁部から両側にそれぞれ突出する突出部を有し、
前記規制部は、
前記突出部と共に前記梁部の移動方向を規制する案内部と、
前記突出部と前記案内部に係合し、前記梁部の位置を決める位置決め部と、
を有する
ことを特徴とする請求項に記載の弾性バラスト軌道敷設装置。
The track mounting portion has protrusions that protrude from the beam portion on both sides toward the track direction at both ends of the beam portion,
The regulation part is
A guide portion for restricting a moving direction of the beam portion together with the protruding portion;
A positioning portion that engages with the protruding portion and the guide portion and determines the position of the beam portion;
The elastic ballast track laying device according to claim 1 , comprising:
前記軌道載置部は、前記梁部の両端側においてネジが形成されるネジ部を有し、
前記高さ調整部は、
前記ネジ部と螺合し、前記梁部の高さを調整する高さ調整ボルトと、
前記高さ調整ボルトの移動を規制する高さ調整受け部と、
を有する
ことを特徴とする請求項1又は2に記載の弾性バラスト軌道敷設装置。
The track mounting part has a screw part in which a screw is formed on both ends of the beam part,
The height adjuster is
A height adjustment bolt that is screwed into the screw portion and adjusts the height of the beam portion;
A height adjustment receiving portion for restricting movement of the height adjustment bolt;
The elastic ballast track laying device according to claim 1 or 2 , characterized by comprising:
前記横ずれ調整部は、
前記梁部の上方において前記軌道の両外側にそれぞれ設置されるナット支持部と、
前記ナット支持部に支持される横ずれ調整ナットと、
前記横ずれ調整ナットに螺合し、前記軌道の横ずれを調整する横ずれ調整ボルトと、
を有する
ことを特徴とする請求項1乃至3のいずれか1項に記載の弾性バラスト軌道敷設装置。
The lateral deviation adjusting unit is
Nut support portions respectively installed on both outer sides of the track above the beam portion;
A lateral deviation adjusting nut supported by the nut support;
A lateral displacement adjustment bolt that is screwed into the lateral displacement adjustment nut and adjusts lateral displacement of the track,
The elastic ballast track laying device according to claim 1 , wherein the elastic ballast track laying device is provided.
軌道及び前記軌道を載置する弾性バラストを備える軌きょうを、高さ調整台を介して基礎に設置する弾性バラスト軌道敷設方法であって、
前記高さ調整台の両外側に離れて位置する支持部と、
前記支持部に支持され、前記軌道を載置する軌道載置部と、
前記支持部に支持され、前記軌道載置部の移動を規制する規制部と、
前記支持部に支持され、前記軌道載置部の高さを調整する高さ調整部と、
前記軌道載置部に支持され、前記軌道の横ずれを調整する横ずれ調整部と、
を備え
前記支持部、前記規制部、前記高さ調整部及び前記横ずれ調整部は、前記軌道の両外側に位置するようにそれぞれ設置され、
前記軌道載置部は、前記軌道の下方で前記軌道に交差するように、前記支持部、前記規制部及び前記高さ調整部に支持される梁部を有し、
前記支持部は、
前記規制部及び前記高さ調整部が取り付けられる支持板と、
前記支持板を支持する支柱と、
前記支柱に回転可能に連結されて前記基礎に取り付けられる支柱基部と、
前記支柱と共に前記支持板を支持する補助脚と、
前記支持板及び前記支柱に取り付けられ、前記補助脚を回転可能に連結する補助脚取付部と、
前記補助脚に回転可能に連結されて前記基礎に取り付けられる補助脚基部と、
を有する
弾性バラスト軌道敷設装置を用い、
前記支持部及び前記弾性マクラギを前記基礎に並べ、
前記支持部を前記基礎に取り付け、
前記規制部及び前記高さ調整部を前記支持部に取り付け、
前記支持部又は前記高さ調整部に前記軌道載置部を置き、
前記軌道を前記軌道載置部に置き、
前記軌道と前記弾性マクラギを組み立てて、前記軌きょうを形成し、
前記高さ調整部によって前記軌道載置部の高さを調整し、
前記横ずれ調整部によって前記軌道の横ずれを調整し、
前記高さ調整部及び前記横ずれ調整部による調整が終了した後、前記軌道載置部を前記規制部に対して位置決めし、
前記軌きょうを支持する前記高さ調整台を前記支持部より内側に打設する
各工程を有する
ことを特徴とする弾性バラスト軌道敷設方法。
An elastic ballast track laying method in which a rail provided with a track and an elastic ballast on which the track is mounted is installed on a foundation via a height adjusting table,
A support portion positioned on both outer sides of the height adjustment table ;
A track mounting unit supported by the support unit and mounting the track;
A regulation unit supported by the support unit and regulating movement of the track mounting unit;
A height adjustment unit that is supported by the support unit and adjusts the height of the track mounting unit;
A lateral deviation adjustment unit that is supported by the trajectory mounting part and adjusts lateral deviation of the trajectory;
Equipped with a,
The support part, the restriction part, the height adjustment part and the lateral deviation adjustment part are respectively installed so as to be located on both outer sides of the track,
The track mounting portion has a beam portion supported by the support portion, the restriction portion, and the height adjustment portion so as to intersect the track below the track,
The support part is
A support plate to which the restricting portion and the height adjusting portion are attached;
A column supporting the support plate;
A strut base rotatably coupled to the strut and attached to the foundation;
An auxiliary leg that supports the support plate together with the support;
An auxiliary leg attachment portion attached to the support plate and the support column and rotatably connecting the auxiliary leg;
An auxiliary leg base rotatably connected to the auxiliary leg and attached to the foundation;
Using an elastic ballast track laying device,
Arrange the support and the elastic sleeper on the foundation,
Attaching the support to the foundation;
The restriction part and the height adjustment part are attached to the support part,
Place the track mounting part on the support part or the height adjustment part,
Place the track on the track mounting unit,
Assembling the track and the elastic sleeper to form the track,
Adjusting the height of the track mounting portion by the height adjusting portion;
Adjust the lateral deviation of the orbit by the lateral deviation adjustment unit,
After the adjustment by the height adjustment unit and the lateral deviation adjustment unit is completed, the track mounting unit is positioned with respect to the regulation unit,
An elastic ballast track laying method comprising the steps of driving the height adjusting table for supporting the rail inward from the support portion .
前記支持部を前記基礎に取り付ける工程では、前記支持部の支柱を鉛直方向に調整し、
前記高さ調整部によって前記軌道載置部の高さを調整する工程では、前記高さ調整部の高さ調整ボルトを前記軌道載置部の梁部に形成されたネジ部に対して回転させることによって前記梁部の高さを調整し、
前記横ずれ調整部によって前記軌道の横ずれを調整する工程では、前記横ずれ調整部の横ずれ調整ボルトを前記梁部に取り付けられた横ずれ調整ナットに対して回転させることによって前記軌道の横ずれを調整する
ことを特徴とする請求項に記載の弾性バラスト軌道敷設方法。
In the step of attaching the support part to the foundation, the support pillars are adjusted in the vertical direction,
In the step of adjusting the height of the track mounting portion by the height adjusting portion, the height adjusting bolt of the height adjusting portion is rotated with respect to the screw portion formed on the beam portion of the track mounting portion. Adjusting the height of the beam part by
In the step of adjusting the lateral deviation of the track by the lateral deviation adjusting unit, the lateral deviation of the track is adjusted by rotating a lateral deviation adjusting bolt of the lateral deviation adjusting unit with respect to a lateral deviation adjusting nut attached to the beam portion. The elastic ballast track laying method according to claim 5 , wherein the ballast track is laid.
前記軌道の敷設後、前記規制部、前記高さ調整部及び前記横ずれ調整部を前記軌道載置部から外し、
前記軌道載置部を前記軌道の下方から引き抜き、
前記規制部及び前記高さ調整部を前記支持部から取り外し、
前記支持部を前記基礎から取り外す
ことを特徴とする請求項5又は6に記載の弾性バラスト軌道敷設方法。
After laying the track, remove the regulating portion, the height adjusting portion and the lateral displacement adjusting portion from the track mounting portion,
Pull out the track mounting part from below the track,
Removing the regulating part and the height adjusting part from the support part;
The elastic ballast track laying method according to claim 5 or 6 , wherein the support portion is removed from the foundation.
JP2017005609A 2017-01-17 2017-01-17 Elastic ballast track laying apparatus and elastic ballast track laying method Expired - Fee Related JP6604979B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2017005609A JP6604979B2 (en) 2017-01-17 2017-01-17 Elastic ballast track laying apparatus and elastic ballast track laying method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2017005609A JP6604979B2 (en) 2017-01-17 2017-01-17 Elastic ballast track laying apparatus and elastic ballast track laying method

Publications (2)

Publication Number Publication Date
JP2018115440A JP2018115440A (en) 2018-07-26
JP6604979B2 true JP6604979B2 (en) 2019-11-13

Family

ID=62983611

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2017005609A Expired - Fee Related JP6604979B2 (en) 2017-01-17 2017-01-17 Elastic ballast track laying apparatus and elastic ballast track laying method

Country Status (1)

Country Link
JP (1) JP6604979B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114575258B (en) * 2022-03-07 2022-10-11 山东高速路桥国际工程有限公司 Bridge bent cap construction method in riding railway line environment

Also Published As

Publication number Publication date
JP2018115440A (en) 2018-07-26

Similar Documents

Publication Publication Date Title
US7938379B2 (en) Three axis adjustable mounting system
KR101040102B1 (en) Establishment method of own extra prize train track rail
CN102433935B (en) Mounting and positioning rack for shock isolation supporting seat
JP2011106262A (en) Alignment frame
GB2559872A (en) Balcony structures
JP2016220326A (en) Cradle for solar battery module and photovoltaic power generation device
JP6604979B2 (en) Elastic ballast track laying apparatus and elastic ballast track laying method
US20090188177A1 (en) Method and apparatus for raising buildings
KR20180109531A (en) Grounding Stone Assembly Having Position Adjustable Bracket
JP4096188B2 (en) Rail holder and rail laying method using the holder
JP6045741B1 (en) Solar panel construction method
CN202370098U (en) Positioning frame for mounting shock-insulation support
JP3659766B2 (en) Surface plate construction method and apparatus for building pillars
KR20060075912A (en) Ball washer used machine lebel adjusting device
AU2021310686A1 (en) Slab track adjustment plate and method of installation
CN112282074A (en) Adjusting device for embedded part and construction method thereof
JP2020105881A (en) Anchor bolt support device and assembly method for the same
JP6512428B2 (en) Connection structure between pile foundation and frame
JP4911823B2 (en) Anchor frame anchoring structure
JP7323433B2 (en) Pedestal height adjustment method and pedestal height adjustment device
CN220102319U (en) Height-adjustable pipeline bracket suitable for sloping roof
CN217580582U (en) Building shock insulation support mounting structure
JP2019196659A (en) Flap gate and method for installing the same
JP7266388B2 (en) Fire extinguisher stand, fire extinguisher
CN216947667U (en) Track levelness adjusting and fixing device

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20190416

A871 Explanation of circumstances concerning accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A871

Effective date: 20190416

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20190711

A975 Report on accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A971005

Effective date: 20190711

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20190717

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20190829

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20191009

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20191015

R150 Certificate of patent or registration of utility model

Ref document number: 6604979

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees