JP6599428B2 - グリッドの異常重大度を表す現場でのセンサ応答データパターンを分類するためのシステム及び方法 - Google Patents
グリッドの異常重大度を表す現場でのセンサ応答データパターンを分類するためのシステム及び方法 Download PDFInfo
- Publication number
- JP6599428B2 JP6599428B2 JP2017502618A JP2017502618A JP6599428B2 JP 6599428 B2 JP6599428 B2 JP 6599428B2 JP 2017502618 A JP2017502618 A JP 2017502618A JP 2017502618 A JP2017502618 A JP 2017502618A JP 6599428 B2 JP6599428 B2 JP 6599428B2
- Authority
- JP
- Japan
- Prior art keywords
- sensor
- signal injection
- grid
- data
- signal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B13/00—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion
- G05B13/02—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric
- G05B13/04—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric involving the use of models or simulators
- G05B13/042—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric involving the use of models or simulators in which a parameter or coefficient is automatically adjusted to optimise the performance
- G05B13/045—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric involving the use of models or simulators in which a parameter or coefficient is automatically adjusted to optimise the performance using a perturbation signal
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Health & Medical Sciences (AREA)
- Economics (AREA)
- General Physics & Mathematics (AREA)
- Physics & Mathematics (AREA)
- General Health & Medical Sciences (AREA)
- Theoretical Computer Science (AREA)
- Marketing (AREA)
- Primary Health Care (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- Water Supply & Treatment (AREA)
- General Business, Economics & Management (AREA)
- Public Health (AREA)
- Human Resources & Organizations (AREA)
- Artificial Intelligence (AREA)
- Computer Vision & Pattern Recognition (AREA)
- Evolutionary Computation (AREA)
- Medical Informatics (AREA)
- Software Systems (AREA)
- Automation & Control Theory (AREA)
- Testing And Monitoring For Control Systems (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Investigating Or Analysing Biological Materials (AREA)
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US201462025617P | 2014-07-17 | 2014-07-17 | |
| US62/025,617 | 2014-07-17 | ||
| PCT/US2015/040359 WO2016011014A1 (en) | 2014-07-17 | 2015-07-14 | Systems and methods for classifying in-situ sensor response data patterns representative of grid pathology severity |
Publications (3)
| Publication Number | Publication Date |
|---|---|
| JP2017524325A JP2017524325A (ja) | 2017-08-24 |
| JP2017524325A5 JP2017524325A5 (enExample) | 2018-08-23 |
| JP6599428B2 true JP6599428B2 (ja) | 2019-10-30 |
Family
ID=55078979
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2017502618A Active JP6599428B2 (ja) | 2014-07-17 | 2015-07-14 | グリッドの異常重大度を表す現場でのセンサ応答データパターンを分類するためのシステム及び方法 |
Country Status (8)
| Country | Link |
|---|---|
| US (1) | US10698371B2 (enExample) |
| EP (1) | EP3170141B1 (enExample) |
| JP (1) | JP6599428B2 (enExample) |
| CN (1) | CN106537443B (enExample) |
| BR (1) | BR112017000875A2 (enExample) |
| CA (1) | CA2955033A1 (enExample) |
| TW (1) | TW201626315A (enExample) |
| WO (1) | WO2016011014A1 (enExample) |
Families Citing this family (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US10324459B2 (en) * | 2016-10-11 | 2019-06-18 | International Business Machines Corporation | System, method and computer program product for fault detection and location in power grid |
| WO2018087639A1 (en) * | 2016-11-10 | 2018-05-17 | 3M Innovative Properties Company | Systems and methods for supervision of local analytics |
| US10163242B2 (en) * | 2017-01-31 | 2018-12-25 | Gordon Todd Jagerson, Jr. | Energy grid data platform |
| WO2019089550A1 (en) * | 2017-10-31 | 2019-05-09 | Once Labs Inc. | Automated feedback-driven prognosis system and method |
| EP3717886A4 (en) | 2017-12-01 | 2021-08-25 | 3M Innovative Properties Company | CAUSAL ANALYSIS FOR DRIVE TRAIN MANAGEMENT |
| EP3938969A1 (en) * | 2019-03-15 | 2022-01-19 | 3M Innovative Properties Company | Determining causal models for controlling environments |
| CN109798386A (zh) * | 2019-03-18 | 2019-05-24 | 北京天正高科智能科技有限公司 | 一种电动阀控制系统及其控制方法 |
| US11375677B2 (en) * | 2019-06-19 | 2022-07-05 | Max Safai | Fluid conservation system and methods of use |
| US12031733B2 (en) * | 2019-12-17 | 2024-07-09 | Tignis, Inc. | Method for physical system anomaly detection |
| CN115066658B (zh) * | 2020-02-28 | 2024-05-24 | 3M创新有限公司 | 用于高级模型预测控制的深度因果学习 |
Family Cites Families (36)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3942168A (en) * | 1975-01-31 | 1976-03-02 | Westinghouse Electric Corporation | Distribution network power line communication system |
| US7272518B2 (en) * | 2005-07-01 | 2007-09-18 | Square D Company | Automated hierarchy classification in utility monitoring systems |
| US7349815B2 (en) * | 2005-07-01 | 2008-03-25 | Square D Company | Automated integration of data in utility monitoring systems |
| WO2007087537A2 (en) | 2006-01-23 | 2007-08-02 | The Trustees Of Columbia University In The City Of New York | System and method for grading electricity distribution network feeders susceptible to impending failure |
| US7795877B2 (en) * | 2006-11-02 | 2010-09-14 | Current Technologies, Llc | Power line communication and power distribution parameter measurement system and method |
| US7991512B2 (en) | 2007-08-28 | 2011-08-02 | General Electric Company | Hybrid robust predictive optimization method of power system dispatch |
| US7821156B2 (en) | 2008-02-07 | 2010-10-26 | International Business Machines Corporation | System and methods for scheduling power usage |
| US8121741B2 (en) * | 2008-05-09 | 2012-02-21 | International Business Machines Corporation | Intelligent monitoring of an electrical utility grid |
| WO2009136975A2 (en) | 2008-05-09 | 2009-11-12 | Accenture Global Services Gmbh | Method and system for managing a power grid |
| CA2725065A1 (en) * | 2008-05-20 | 2009-11-26 | Live Meters, Inc. | Remote monitoring and control system comprising mesh and time synchronization technology |
| US8234016B2 (en) | 2008-09-03 | 2012-07-31 | International Business Machines Corporation | Power metadata transfer over power lines |
| US8788415B2 (en) | 2008-09-29 | 2014-07-22 | Battelle Memorial Institute | Using one-way communications in a market-based resource allocation system |
| US20100102936A1 (en) | 2008-10-27 | 2010-04-29 | Lucent Technologies Inc. | Remotely controllable power switch of an appliance and methods of employing the same |
| US20100177450A1 (en) | 2009-01-12 | 2010-07-15 | Grid Logic | Method and devices for stabilizing electric grid power |
| US8103388B2 (en) | 2009-01-29 | 2012-01-24 | International Business Machines Corporation | System for prediction and communication of environmentally induced power useage limitation |
| WO2010138906A1 (en) | 2009-05-28 | 2010-12-02 | The Trustees Of Columbia University In The City Of Newyork | Capital asset planning system |
| US20100306014A1 (en) | 2009-06-01 | 2010-12-02 | Consolidated Edison Company | Utility service component reliability and management |
| US8738546B2 (en) | 2009-11-10 | 2014-05-27 | International Business Machines Corporation | Self-organizing energy pricing |
| US8249756B2 (en) | 2009-11-23 | 2012-08-21 | International Business Machines Corporation | Method, device and system for responsive load management using frequency regulation credits |
| US8494826B2 (en) | 2010-01-13 | 2013-07-23 | The United States Postal Service | Systems and methods for analyzing equipment failures and maintenance schedules |
| US8583405B2 (en) | 2010-05-11 | 2013-11-12 | Maggie Chow | Contingency analysis information for utility service network |
| US8600572B2 (en) | 2010-05-27 | 2013-12-03 | International Business Machines Corporation | Smarter-grid: method to forecast electric energy production and utilization subject to uncertain environmental variables |
| US8504214B2 (en) | 2010-06-18 | 2013-08-06 | General Electric Company | Self-healing power grid and method thereof |
| EP2593844A4 (en) | 2010-07-16 | 2017-05-31 | The Trustees of Columbia University in the City of New York | Machine learning for power grids |
| CN103180693A (zh) | 2010-08-10 | 2013-06-26 | 胜赛斯美国公司 | 包括负载识别数据处理器的电力公用事业电表 |
| US20140032187A1 (en) | 2010-11-04 | 2014-01-30 | Siemens Corporation | Stochastic state estimation for smart grids |
| US8589198B2 (en) | 2010-11-18 | 2013-11-19 | General Electric Company | Methods and systems involving power system grid management |
| US20120155557A1 (en) | 2010-12-17 | 2012-06-21 | General Electric Company | System and method for power grid communication |
| US8972067B2 (en) * | 2011-05-11 | 2015-03-03 | General Electric Company | System and method for optimizing plant operations |
| CN103765988B (zh) | 2011-08-17 | 2016-02-10 | 皇家飞利浦有限公司 | 用于在dc照明和电力网格上进行定位的方法和系统 |
| US20130077367A1 (en) | 2011-09-23 | 2013-03-28 | Huibin Zhu | Systems and methods for use in grid fault event control |
| US20130191052A1 (en) | 2012-01-23 | 2013-07-25 | Steven J. Fernandez | Real-time simulation of power grid disruption |
| US8930284B2 (en) | 2012-01-25 | 2015-01-06 | Siemens Aktiengesellschaft | Extended system average interruption duration index (ESAIDI) metric to assess the system reliability impact of distribution automation failures |
| US9293949B2 (en) | 2012-02-06 | 2016-03-22 | Montana Tech Of The University Of Montana | Electric power grid signal processing methods, oscillatory mode estimation methods and mode shape estimation methods |
| US9507367B2 (en) | 2012-04-09 | 2016-11-29 | Clemson University | Method and system for dynamic stochastic optimal electric power flow control |
| US9778629B2 (en) | 2012-11-28 | 2017-10-03 | Clemson University | Situational awareness / situational intelligence system and method for analyzing, monitoring, predicting and controlling electric power systems |
-
2015
- 2015-07-14 CN CN201580038774.6A patent/CN106537443B/zh active Active
- 2015-07-14 JP JP2017502618A patent/JP6599428B2/ja active Active
- 2015-07-14 CA CA2955033A patent/CA2955033A1/en not_active Abandoned
- 2015-07-14 EP EP15822140.8A patent/EP3170141B1/en active Active
- 2015-07-14 BR BR112017000875A patent/BR112017000875A2/pt not_active IP Right Cessation
- 2015-07-14 US US15/324,763 patent/US10698371B2/en active Active
- 2015-07-14 WO PCT/US2015/040359 patent/WO2016011014A1/en not_active Ceased
- 2015-07-16 TW TW104123124A patent/TW201626315A/zh unknown
Also Published As
| Publication number | Publication date |
|---|---|
| TW201626315A (zh) | 2016-07-16 |
| BR112017000875A2 (pt) | 2017-12-05 |
| US20170205781A1 (en) | 2017-07-20 |
| JP2017524325A (ja) | 2017-08-24 |
| EP3170141A1 (en) | 2017-05-24 |
| EP3170141B1 (en) | 2020-09-02 |
| EP3170141A4 (en) | 2017-12-20 |
| CA2955033A1 (en) | 2016-01-21 |
| CN106537443A (zh) | 2017-03-22 |
| US10698371B2 (en) | 2020-06-30 |
| CN106537443B (zh) | 2020-10-16 |
| WO2016011014A1 (en) | 2016-01-21 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP6599428B2 (ja) | グリッドの異常重大度を表す現場でのセンサ応答データパターンを分類するためのシステム及び方法 | |
| CN107111844B (zh) | 用于选择网格动作以改善网格结果的系统和方法 | |
| Wan et al. | Literature review of data analytics for leak detection in water distribution networks: A focus on pressure and flow smart sensors | |
| JP6298214B2 (ja) | ユーティリティグリッド内での信号注入テストパターンの予想効用を最大化するためのシステム及び方法 | |
| CN116647819B (zh) | 基于传感器网络的仪器能耗监测方法及系统 | |
| US10637238B2 (en) | Systems and methods for coordinating signal injections to understand and maintain orthogonality among signal injections patterns in utility grids | |
| CN117082105A (zh) | 一种绿色智慧医院设施监控系统及方法 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20180713 |
|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20180713 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20190426 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20190528 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20190809 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20190903 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20191002 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 6599428 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |