JP6596988B2 JP2015133542A JP2015133542A JP6596988B2 JP 6596988 B2 JP6596988 B2 JP 6596988B2 JP 2015133542 A JP2015133542 A JP 2015133542A JP 2015133542 A JP2015133542 A JP 2015133542A JP 6596988 B2 JP6596988 B2 JP 6596988B2
Authority
JP
Japan
Prior art keywords
power
value
function
target value
storage device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2015133542A
Other languages
Japanese (ja)
Other versions
JP2017017893A (en
Inventor
章弘 大井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fuji Electric Co Ltd
Original Assignee
Fuji Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fuji Electric Co Ltd filed Critical Fuji Electric Co Ltd
Priority to JP2015133542A priority Critical patent/JP6596988B2/en
Publication of JP2017017893A publication Critical patent/JP2017017893A/en
Application granted granted Critical
Publication of JP6596988B2 publication Critical patent/JP6596988B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)

Description

本発明は、電力貯蔵装置の制御装置、電力貯蔵装置の制御装置の制御方法及びプログラムに関する。   The present invention relates to a control device for a power storage device, a control method for the control device for the power storage device, and a program.

近年、風力や太陽光などの再生可能エネルギーを用いた発電設備の導入が各地で進められている。しかしながらこのような再生可能エネルギーを用いた発電設備は、気象条件の影響を受けて発電量が変動するため、周波数や電力潮流、電圧などの電力系統における様々な物理量を変動させ、電力の品質を低下させるおそれがある。   In recent years, the introduction of power generation facilities using renewable energy such as wind power and sunlight has been promoted in various places. However, since power generation facilities using such renewable energy fluctuate due to the influence of weather conditions, various physical quantities in the power system such as frequency, power flow, and voltage are fluctuated to improve power quality. May decrease.

そのため、蓄電池やフライホイール等の電力貯蔵装置を設置することで電力系統における有効電力及び無効電力を制御し、電力系統の安定化を図る取り組みが進められている(例えば特許文献1参照)。   Therefore, efforts are being made to stabilize the power system by controlling active power and reactive power in the power system by installing a power storage device such as a storage battery or a flywheel (see, for example, Patent Document 1).

特開2012−19667号公報JP 2012-19667 A

しかしながら、電力系統における周波数や潮流は、有効電力を制御することによって制御することができるが無効電力の影響も受けて変動し、他方、電力系統における電圧は、無効電力を制御することによって制御することができるが有効電力の影響も受けて変動する。   However, the frequency and power flow in the power system can be controlled by controlling the active power, but fluctuate under the influence of the reactive power, while the voltage in the power system is controlled by controlling the reactive power. However, it fluctuates under the influence of active power.

そのため、電力貯蔵装置を用いて電力系統の周波数や潮流、電圧等の複数種類の物理量を正確に制御することは容易ではない。   Therefore, it is not easy to accurately control a plurality of types of physical quantities such as the frequency, power flow, and voltage of the power system using the power storage device.

本発明はこのような課題を鑑みてなされたものであり、電力系統の周波数や潮流、電圧等の複数種類の物理量をより正確に制御することが可能な電力貯蔵装置の制御装置、電力貯蔵装置の制御装置の制御方法及びプログラムを提供することを一つの目的とする。   The present invention has been made in view of such problems, and a control device for a power storage device and a power storage device capable of more accurately controlling a plurality of types of physical quantities such as frequency, power flow, and voltage of a power system. It is an object to provide a control method and program for the control device.

上記課題を解決するための手段の一つは、電力系統に連系する電力貯蔵装置を制御する制御装置であって、前記電力系統における第1物理量を第1目標値に制御するべく前記電力貯蔵装置が出力すべき有効電力の目標値を前記第1物理量と前記第1目標値との差分から算出可能な第1関数を用いて、前記有効電力の目標値を算出し、前記電力系統における第2物理量を第2目標値に制御するべく前記電力貯蔵装置が出力すべき無効電力の目標値を前記第2物理量と前記第2目標値との差分から算出可能な第2関数を用いて、前記無効電力の目標値を算出する電力算出部と、前記電力貯蔵装置が前記無効電力を出力することにより生ずる前記第1物理量の変動を打ち消すような前記有効電力の補正値を前記無効電力の目標値から算出可能な第3関数を用いて、前記有効電力の補正量を算出し、前記電力貯蔵装置が前記有効電力を出力することにより生ずる前記第2物理量の変動を打ち消すような前記無効電力の補正値を前記有効電力の目標値から算出可能な第4関数を用いて、前記無効電力の補正量を算出する電力補正部と、前記有効電力の目標値を前記有効電力の補正値によって補正して算出した有効電力の指令値と、前記無効電力の目標値を前記無効電力の補正値によって補正して算出した無効電力の指令値と、を前記電力貯蔵装置に出力する指令値出力部と、を備え、前記第3関数は、前記電力貯蔵装置が前記有効電力の指令値に応じた有効電力を出力することにより見込まれる前記第1物理量の計算値を、前記有効電力の指令値から算出可能な第5関数と、前記電力貯蔵装置が前記無効電力の指令値に応じた無効電力を出力することにより見込まれる前記第1物理量の変動量を、前記無効電力の指令値から算出可能な第6関数と、を用いて定められる。 One of means for solving the above problem is a control device for controlling a power storage device linked to the power system, wherein the power storage is performed so as to control the first physical quantity in the power system to a first target value. Using the first function that can calculate the target value of the active power to be output from the device from the difference between the first physical quantity and the first target value, the target value of the active power is calculated, Using a second function capable of calculating a target value of reactive power to be output by the power storage device to control two physical quantities to a second target value from a difference between the second physical quantity and the second target value, A power calculation unit that calculates a target value of reactive power; and a correction value of the active power that cancels a variation in the first physical quantity caused by the power storage device outputting the reactive power. The third that can be calculated from With several, the calculated correction amount of active power, the power storage device of the active power correction value of the reactive power which cancels the variation of the second physical quantity caused by outputting the effective power A power correction unit that calculates a correction amount of the reactive power using a fourth function that can be calculated from the target value, and an active power command that is calculated by correcting the target value of the active power with the correction value of the active power And a command value output unit that outputs a reactive power target value calculated by correcting the reactive power target value with the reactive power correction value to the power storage device, and the third function Is a fifth function that can calculate a calculated value of the first physical quantity that is expected when the power storage device outputs active power corresponding to the command value of the active power from the command value of the active power, and Power storage device The variation of expected the first physical quantity by outputting a reactive power corresponding to the command value of the reactive power, and a sixth function that can be calculated from the command value of the reactive power, Ru determined using.

その他、本願が開示する課題、及びその解決方法は、発明を実施するための形態の欄の記載、及び図面の記載等により明らかにされる。   In addition, the problems disclosed by the present application and the solutions thereof will be clarified by the description in the column of the embodiment for carrying out the invention and the description of the drawings.

本発明によれば、電力系統の周波数や潮流、電圧等の複数種類の物理量をより正確に制御することが可能となる。   According to the present invention, it is possible to more accurately control a plurality of types of physical quantities such as the frequency, power flow, and voltage of the power system.

実施形態に係る電力系統の構成を示す図である。It is a figure which shows the structure of the electric power grid | system which concerns on embodiment. 実施形態に係る電力貯蔵装置の構成を示す図である。It is a figure which shows the structure of the electric power storage apparatus which concerns on embodiment. 実施形態に係る制御装置の構成を示す図である。It is a figure which shows the structure of the control apparatus which concerns on embodiment. 実施形態に係る制御装置の構成を示す図である。It is a figure which shows the structure of the control apparatus which concerns on embodiment. 実施形態に係る記憶装置の構成を示す図である。It is a figure which shows the structure of the memory | storage device which concerns on embodiment. 実施形態に係るブロック線図を示す図である。It is a figure which shows the block diagram which concerns on embodiment. 実施形態に係る制御装置の処理の流れを示すフローチャートである。It is a flowchart which shows the flow of a process of the control apparatus which concerns on embodiment. 実施形態に係る制御装置の処理の流れを示すフローチャートである。It is a flowchart which shows the flow of a process of the control apparatus which concerns on embodiment. 実施形態に係るブロック線図を示す図である。It is a figure which shows the block diagram which concerns on embodiment.

本明細書および添付図面の記載により、少なくとも以下の事項が明らかとなる。   At least the following matters will become apparent from the description of this specification and the accompanying drawings.

==電力系統==
図1に一例として示すように、本実施形態に係る電力系統400は、発電設備410(G)、送配電線430(Z1、Z2)、母線420(n1、n2、n3)、負荷440、及び計測器450を有して構成されている。
== Power system ==
As shown in FIG. 1 as an example, the power system 400 according to the present embodiment includes a power generation facility 410 (G), a power transmission / distribution line 430 (Z1, Z2), a bus 420 (n1, n2, n3), a load 440, and A measuring instrument 450 is included.

発電設備410は、電力エネルギーを生成する電力源であり、水力発電設備や原子力発電設備、火力発電設備、太陽光発電設備、風力発電設備などにより構成される。   The power generation facility 410 is a power source that generates power energy, and includes a hydroelectric power generation facility, a nuclear power generation facility, a thermal power generation facility, a solar power generation facility, a wind power generation facility, and the like.

また母線420は、発電所や変電所に設けられる。   The bus 420 is provided at a power plant or a substation.

負荷440は、発電設備410から供給される電力を利用して動作する工場や家庭等における電気機器である。   The load 440 is an electrical device in a factory or home that operates using the power supplied from the power generation facility 410.

計測器450は、電力系統400に設置され、電力系統400における電力の状態に応じて変動する物理量(周波数や電圧、潮流など)を計測する機器である。本実施形態では、計測器450は所定時間毎(例えば15分毎や1時間毎)に母線(n3)420における周波数(第1物理量)及び電圧(第2物理量)を計測し、後述する制御装置100に送信している。   The measuring instrument 450 is a device that is installed in the power system 400 and measures physical quantities (frequency, voltage, power flow, etc.) that vary depending on the state of power in the power system 400. In the present embodiment, the measuring instrument 450 measures the frequency (first physical quantity) and voltage (second physical quantity) on the bus (n3) 420 every predetermined time (for example, every 15 minutes or every hour), and a control device described later 100.

計測器450は、周波数や電圧を計測するものに限らず、負荷440の電力消費量や、送配電線430を流れる電流、力率等、その他様々な物理量を計測するものであってもよい。   The measuring instrument 450 is not limited to measuring the frequency and voltage, but may measure various other physical quantities such as the power consumption of the load 440, the current flowing through the transmission and distribution line 430, and the power factor.

また図1には示されていないが、電力系統400は、電力の位相を制御する調相設備や変圧器、開閉器などの様々な設備を有して構成されている。   Although not shown in FIG. 1, the electric power system 400 is configured to include various facilities such as phase adjusting equipment for controlling the phase of electric power, a transformer, and a switch.

==電力貯蔵装置==
電力貯蔵装置200は、電力系統400と連系し、電力系統400から得た電力エネルギーを蓄積し取り出すことが可能な装置である。電力貯蔵装置200は、例えば蓄電池やフライホイール、キャパシタなど、様々な方式の装置によって構成することができる。電力貯蔵装置200の構成を図2に示す。
== Power storage device ==
The power storage device 200 is a device that is connected to the power system 400 and can accumulate and extract power energy obtained from the power system 400. The power storage device 200 can be configured by various types of devices such as a storage battery, a flywheel, and a capacitor. The configuration of the power storage device 200 is shown in FIG.

電力貯蔵装置200は、双方向コンバータ210及びエネルギー貯蔵部220を有して構成される。   The power storage device 200 includes a bidirectional converter 210 and an energy storage unit 220.

エネルギー貯蔵部220は、電力系統400から取得した電気エネルギーを、元の電気エネルギーに復元可能な状態で貯蔵する装置である。エネルギー貯蔵部220は、ナトリウム硫黄電池、鉛電池、レドックスフロー電池などの各種の化学反応を利用した電池により構成することができる。あるいはエネルギー貯蔵部220は電気二重層キャパシタにより構成することができる。またあるいは、エネルギー貯蔵部220は電力エネルギーを回転エネルギーの形で貯蔵可能なフライホイールにより構成することができる。   The energy storage unit 220 is a device that stores electrical energy acquired from the power system 400 in a state where it can be restored to the original electrical energy. The energy storage unit 220 can be configured by a battery using various chemical reactions such as a sodium sulfur battery, a lead battery, or a redox flow battery. Alternatively, the energy storage unit 220 can be configured by an electric double layer capacitor. Alternatively, the energy storage unit 220 may be a flywheel that can store electric power energy in the form of rotational energy.

双方向コンバータ210は、電力系統400とエネルギー貯蔵部220との間でエネルギーの変換及び授受を行う。双方向コンバータ210は、後述する制御装置100からの指令(有効電力の指令値、無効電力の指令値)に従って、指定された量の有効電力及び無効電力を出力する。   Bidirectional converter 210 performs energy conversion and exchange between power system 400 and energy storage unit 220. Bidirectional converter 210 outputs specified amounts of active power and reactive power in accordance with commands (active power command value, reactive power command value) from control device 100 described later.

有効電力の指令値及び無効電力の指令値が正の値である場合には、本実施形態に係る双方向コンバータ210は、電力貯蔵装置200から電力系統400に対して有効電力及び無効電力を供給するように動作し、有効電力の指令値及び無効電力の指令値が負の値である場合には、電力系統400から電力貯蔵装置200に有効電力及び無効電力を取り込むように動作する。   When the command value of active power and the command value of reactive power are positive values, bidirectional converter 210 according to the present embodiment supplies active power and reactive power from power storage device 200 to power system 400. When the active power command value and the reactive power command value are negative values, the power storage device 200 operates to take in the active power and the reactive power.

変圧器300は、母線420(n3)と電力貯蔵装置200との間の電圧を変換する。   Transformer 300 converts the voltage between bus 420 (n3) and power storage device 200.

==制御装置==
本実施形態に係る制御装置100は、電力系統400における電力の状態に応じて変動する第1物理量(例えば周波数)と、第2物理量(例えば電圧)と、をそれぞれ所定の目標値(第1目標値、第2目標値)に制御するべく、電力貯蔵装置200から出力する有効電力及び無効電力を制御する情報処理装置である。
== Control device ==
The control device 100 according to the present embodiment sets a first physical quantity (for example, a frequency) and a second physical quantity (for example, a voltage), which vary according to the state of power in the power system 400, to predetermined target values (first target). Value, second target value) to control the active power and reactive power output from the power storage device 200.

本実施形態に係る制御装置100の全体構成を図3及び図4に示す。図3は、制御装置100の機能構成を説明するための図であり、図4は、制御装置100のハードウェア構成を説明するための図である。   3 and 4 show the overall configuration of the control device 100 according to the present embodiment. FIG. 3 is a diagram for explaining a functional configuration of the control device 100, and FIG. 4 is a diagram for explaining a hardware configuration of the control device 100.

<ハードウェア構成>
図4に示すように、本実施形態に係る制御装置100は、CPU(Central Processing Unit)110、メモリ120、通信装置130、記憶装置140、入力装置150、出力装置160及び記録媒体読取装置170を有して構成されるコンピュータである。
<Hardware configuration>
As shown in FIG. 4, the control device 100 according to the present embodiment includes a CPU (Central Processing Unit) 110, a memory 120, a communication device 130, a storage device 140, an input device 150, an output device 160, and a recording medium reading device 170. It is the computer which has and is comprised.

CPU110は制御装置100の全体の制御を司るもので、記憶装置140に記憶される本実施形態に係る各種の動作を行うためのコードから構成される制御プログラム600をメモリ120に読み出して実行することにより、制御装置100としての各種機能を実現する。   The CPU 110 is responsible for overall control of the control device 100, and reads out and executes the control program 600 composed of codes for performing various operations according to the present embodiment stored in the storage device 140 to the memory 120. Thus, various functions as the control device 100 are realized.

例えば、詳細は後述するが、CPU110により制御プログラム600が実行され、メモリ120や通信装置130、記憶装置140等のハードウェア機器と協働することにより、図3に示した計測値取得部101(第1計測値取得部101a、第2計測値取得部101b)、演算部102(有効電力算出部102a、無効電力算出部102b、有効電力補正部102c、無効電力補正部102d、第1指令値算出部102e、第2指令値算出部102f、第1差分算出部107a、第2差分算出部107b)、記憶部103、関数更新部104(第1関数更新部104a、第2関数更新部104b、第3関数更新部104c、第4関数更新部104d)、予測値算出部105(第1予測値算出部105a、第2予測値算出部105b)、指令値出力部106などが実現される。   For example, although details will be described later, the control program 600 is executed by the CPU 110 and cooperates with hardware devices such as the memory 120, the communication device 130, and the storage device 140, so that the measurement value acquisition unit 101 ( First measurement value acquisition unit 101a, second measurement value acquisition unit 101b), calculation unit 102 (active power calculation unit 102a, reactive power calculation unit 102b, active power correction unit 102c, reactive power correction unit 102d, first command value calculation Unit 102e, second command value calculation unit 102f, first difference calculation unit 107a, second difference calculation unit 107b), storage unit 103, function update unit 104 (first function update unit 104a, second function update unit 104b, second 3 function updating unit 104c, fourth function updating unit 104d), predicted value calculating unit 105 (first predicted value calculating unit 105a, second predicted value calculating unit 105b), Such as the value output unit 106 are realized.

メモリ120は例えば半導体記憶装置により構成することができる。   The memory 120 can be configured by a semiconductor memory device, for example.

通信装置130は、ネットワークカードなどのネットワークインタフェースである。通信装置130は、インターネットやLAN(Local Area Network)などのネットワークを介して他のコンピュータからデータを受信し、受信したデータを記憶装置140やメモリ120に記憶する。また通信装置130は、記憶装置140やメモリ120に記憶されているデータを、ネットワークを介して他のコンピュータへ送信する。   The communication device 130 is a network interface such as a network card. The communication device 130 receives data from another computer via a network such as the Internet or a LAN (Local Area Network), and stores the received data in the storage device 140 or the memory 120. Further, the communication device 130 transmits data stored in the storage device 140 or the memory 120 to another computer via the network.

入力装置150は、操作スイッチやキーボード、マウス、マイク等の装置であり、制御装置100の操作者による情報の入力を受け付けるための装置である。出力装置160は、LCD(Liquid Crystal Display)や表示ランプ、各種表示メータ、プリンタ、スピーカ等の装置であり、情報を出力するための装置である。   The input device 150 is a device such as an operation switch, a keyboard, a mouse, or a microphone, and is a device for accepting input of information by an operator of the control device 100. The output device 160 is a device such as an LCD (Liquid Crystal Display), a display lamp, various display meters, a printer, and a speaker, and is a device for outputting information.

記憶装置140は、例えばハードディスク装置や半導体記憶装置等により構成することができる。記憶装置140は、各種プログラムやデータ、テーブル等を記憶するための記憶領域を提供する装置である。図5に、記憶装置140に制御プログラム600、伝達関数700〜709、第1目標値710、第2目標値720、系統情報730が記憶されている様子を示す。   The storage device 140 can be constituted by, for example, a hard disk device or a semiconductor storage device. The storage device 140 is a device that provides a storage area for storing various programs, data, tables, and the like. FIG. 5 shows a state in which a control program 600, transfer functions 700 to 709, a first target value 710, a second target value 720, and system information 730 are stored in the storage device 140.

なお、制御プログラム600や伝達関数700〜709、第1目標値710、第2目標値720、系統情報730は、記録媒体読取装置170を用いて、記録媒体(各種の光ディスクや磁気ディスク、半導体メモリ等)800から記憶装置140に読み出すことで、制御装置100に格納されるようにすることもできるし、入力装置150から、あるいは通信装置130を介して通信可能に接続される他のコンピュータから取得することで、制御装置100に格納されるようにすることもできる。   The control program 600, transfer functions 700 to 709, the first target value 710, the second target value 720, and the system information 730 are recorded on a recording medium (various optical disks, magnetic disks, semiconductor memories) using the recording medium reader 170. Etc.) It can be stored in the control device 100 by reading it from the storage device 140 from 800, or it can be obtained from the input device 150 or from another computer that is communicably connected via the communication device 130. By doing so, it can be stored in the control device 100.

伝達関数700〜709は、制御装置100が電力貯蔵装置200に対して出力する有効電力の指令値及び無効電力の指令値を算出する際に使用する関数である。なお本実施形態に係る伝達関数700〜709は、与えられたデータの値から目的とするデータの値を算出することが可能なデータ変換要素であり、複素数領域で定義される数式に限られず、実時間領域で定義される数式であってもよいし、データテーブルやリストが含まれていても良い。   The transfer functions 700 to 709 are functions used when calculating the active power command value and the reactive power command value output from the control device 100 to the power storage device 200. Note that the transfer functions 700 to 709 according to the present embodiment are data conversion elements that can calculate the value of target data from given data values, and are not limited to mathematical expressions defined in the complex number domain. It may be a mathematical formula defined in the real time domain, or may include a data table or a list.

第1目標値710は、電力系統400における周波数(第1物理量)の目標値である。   The first target value 710 is a target value for the frequency (first physical quantity) in the power system 400.

第2目標値720は、電力系統400における電圧(第2物理量)の目標値である。   The second target value 720 is a target value of the voltage (second physical quantity) in the power system 400.

系統情報730は、例えば、電力系統400における送配電線430の長さや線路インピーダンス、負荷440の位置や有効電力及び無効電力、発電設備410の位置や出力電力等を含む、電力系統400に関するデータである。   The system information 730 is data relating to the power system 400 including, for example, the length and line impedance of the transmission / distribution line 430 in the power system 400, the position and active power and reactive power of the load 440, the position and output power of the power generation facility 410, and the like. is there.

<ブロック線図>
次に図6を参照しながら、本実施形態に係る制御装置100が、電力貯蔵装置200に対して出力する有効電力の指令値及び無効電力の指令値を求めるために用いるブロック線図について説明する。
<Block diagram>
Next, referring to FIG. 6, a block diagram used by the control device 100 according to the present embodiment to obtain a command value for active power and a command value for reactive power output to the power storage device 200 will be described. .

なお図6に示すブロック線図は、電力系統400、電力貯蔵装置200及び制御装置100からなる制御モデルを表したものである。そして制御装置100は、記憶装置140に記憶されている伝達関数700〜709や第1目標値710、第2目標値720、系統情報730等のデータを用いながら制御プログラム600を実行することによってこの制御モデルに従う各種の演算を行ない、電力貯蔵装置200に対して出力する有効電力の指令値及び無効電力の指令値を算出する。   The block diagram illustrated in FIG. 6 represents a control model including the power system 400, the power storage device 200, and the control device 100. The control device 100 executes this control program 600 by using the transfer functions 700 to 709, the first target value 710, the second target value 720, the system information 730, and the like stored in the storage device 140. Various calculations according to the control model are performed, and command values for active power and reactive power output to the power storage device 200 are calculated.

図6において、制御装置100が電力貯蔵装置200に対して出力する有効電力の指令値及び無効電力の指令値は、それぞれPr及びQrで示されている。   In FIG. 6, the command value of active power and the command value of reactive power output from the control device 100 to the power storage device 200 are indicated by Pr and Qr, respectively.

そしてこれらの有効電力の指令値Pr及び無効電力の指令値Qrに応じて、電力貯蔵装置200は、電力系統400に対してPb及びQbで示される有効電力及び無効電力を出力する。そしてこれによって、電力系統400の周波数(第1物理量)はF’になり、電圧(第2物理量)はV’になる。   The power storage device 200 outputs active power and reactive power indicated by Pb and Qb to the power system 400 in accordance with the active power command value Pr and reactive power command value Qr. As a result, the frequency (first physical quantity) of the power system 400 becomes F ′ and the voltage (second physical quantity) becomes V ′.

なお本実施形態に係る電力貯蔵装置200は、有効電力の指令値Prに等しい有効電力Pbを出力し、無効電力の指令値Qrに等しい無効電力Qbを出力するものとしている。   The power storage device 200 according to the present embodiment outputs active power Pb equal to the active power command value Pr and outputs reactive power Qb equal to the reactive power command value Qr.

電力系統400は、第5伝達関数705(G11)、第6伝達関数706(G12)、第7伝達関数707(G22)、第8伝達関数708(G21)、第1予測値算出部105a、第2予測値算出部105bによって表される。   The power system 400 includes a fifth transfer function 705 (G11), a sixth transfer function 706 (G12), a seventh transfer function 707 (G22), an eighth transfer function 708 (G21), a first predicted value calculation unit 105a, 2 is represented by the predicted value calculation unit 105b.

第5伝達関数705(G11)は、電力貯蔵装置200が有効電力の指令値Prに応じた有効電力Pbを出力することにより見込まれる電力系統400の周波数(第1物理量)の計算値を算出可能な関数である。   The fifth transfer function 705 (G11) can calculate a calculated value of the frequency (first physical quantity) of the power system 400 expected when the power storage device 200 outputs the active power Pb corresponding to the command value Pr of the active power. Function.

第6伝達関数706(G12)は、電力貯蔵装置200が無効電力の指令値Qrに応じた無効電力Qbを出力することにより生ずることが見込まれる電力系統400の周波数(第1物理量)の変動量を算出可能な関数である。   The sixth transfer function 706 (G12) is a fluctuation amount of the frequency (first physical quantity) of the power system 400 that is expected to be generated when the power storage device 200 outputs the reactive power Qb corresponding to the reactive power command value Qr. Is a function that can calculate

第1予測値算出部105aは、上記周波数の計算値を上記周波数の変動量によって補正(本実施形態では加算)して、電力系統400の周波数の予測値F’を算出する。   The first predicted value calculation unit 105a corrects the calculated value of the frequency with the amount of fluctuation of the frequency (added in the present embodiment) to calculate a predicted value F ′ of the frequency of the power system 400.

第7伝達関数707(G22)は、電力貯蔵装置200が無効電力の指令値Qrに応じた無効電力Qbを出力することにより見込まれる電力系統400の電圧(第2物理量)の計算値を算出可能な関数である。   The seventh transfer function 707 (G22) can calculate a calculated value of the voltage (second physical quantity) of the power system 400 that is expected when the power storage device 200 outputs the reactive power Qb according to the reactive power command value Qr. Function.

第8伝達関数708(G21)は、電力貯蔵装置200が有効電力の指令値Prに応じた有効電力Pbを出力することにより生ずることが見込まれる電力系統400の電圧(第2物理量)の変動量を算出可能な関数である。   The eighth transfer function 708 (G21) is a fluctuation amount of the voltage (second physical quantity) of the power system 400 that is expected to be generated when the power storage device 200 outputs the active power Pb corresponding to the command value Pr of the active power. Is a function that can calculate

第2予測値算出部105bは、上記電圧の計算値を上記電圧の変動量によって補正(本実施形態では加算)して、電力系統400の電圧の予測値V’を算出する。   The second predicted value calculation unit 105b corrects the calculated value of the voltage with the amount of fluctuation of the voltage (added in the present embodiment) to calculate a predicted value V ′ of the voltage of the power system 400.

このように、電力系統400は、電力貯蔵装置200から有効電力Pbが出力されると、電力系統400の周波数が変動するのみならず電圧も変動し、電力貯蔵装置200から無効電力Qbが出力されると、電力系統400の電圧が変動するのみならず周波数も変動する。   As described above, when the active power Pb is output from the power storage device 200, the power system 400 not only changes the frequency of the power system 400 but also the voltage, and the reactive power Qb is output from the power storage device 200. Then, not only the voltage of the electric power system 400 fluctuates but also the frequency fluctuates.

つまり、電力系統400において、周波数を制御しようとして電力貯蔵装置200から出力される有効電力Pbを制御すると電力系統400の電圧も影響を受けて変動し、電圧を制御しようとして電力貯蔵装置200から出力される無効電力Qbを制御すると電力系統400の周波数も影響を受けて変動する。   That is, in the power system 400, when the active power Pb output from the power storage device 200 is controlled in order to control the frequency, the voltage of the power system 400 also varies due to the influence, and the output from the power storage device 200 tries to control the voltage. When the reactive power Qb to be controlled is controlled, the frequency of the power system 400 is also affected and varies.

本実施形態に係る制御装置100は、このような干渉を取り去るために、以下に記載する第3伝達関数703(C1)及び第4伝達関数704(C2)を用いて、電力貯蔵装置200が出力すべき有効電力の指令値Pr及び無効電力の指令値Qrを算出している。これにより、電力系統400の周波数や潮流、電圧等の複数種類の物理量をより正確に制御することが可能になる。   In order to remove such interference, the control apparatus 100 according to the present embodiment uses the third transfer function 703 (C1) and the fourth transfer function 704 (C2) described below to output the power storage apparatus 200. The active power command value Pr and the reactive power command value Qr to be calculated are calculated. This makes it possible to more accurately control a plurality of types of physical quantities such as the frequency, power flow, and voltage of the power system 400.

具体的に説明すると、まず、制御装置100のブロック線図は、第1差分算出部107a、第2差分算出部107b、第1伝達関数701(K1)、第2伝達関数702(K2)、第3伝達関数703(C1)、第4伝達関数704(C2)、第1指令値算出部102e、第2指令値算出部102fにより表される。   Specifically, first, the block diagram of the control device 100 includes a first difference calculation unit 107a, a second difference calculation unit 107b, a first transfer function 701 (K1), a second transfer function 702 (K2), The third transfer function 703 (C1), the fourth transfer function 704 (C2), the first command value calculation unit 102e, and the second command value calculation unit 102f.

第1差分算出部107aは、電力系統400における周波数の計測値Fと、目標周波数(第1目標値)710との差分ΔFを算出する。   The first difference calculation unit 107 a calculates a difference ΔF between the frequency measurement value F in the power system 400 and the target frequency (first target value) 710.

また第2差分算出部107bは、電力系統400における電圧の計測値Vと、目標電圧(第2目標値)720との差分ΔVを算出する。   The second difference calculation unit 107b calculates a difference ΔV between the voltage measurement value V in the power system 400 and the target voltage (second target value) 720.

第1伝達関数701(K1)は、周波数の差分ΔFから、電力貯蔵装置200が出力すべき有効電力の目標値である有効電力目標値を算出する関数である。   The first transfer function 701 (K1) is a function that calculates an active power target value that is a target value of active power that the power storage device 200 should output from the frequency difference ΔF.

第2伝達関数702(K2)は、電圧の差分ΔVから、電力貯蔵装置200が出力すべき無効電力の目標値である無効電力目標値を算出する関数である。   The second transfer function 702 (K2) is a function that calculates a reactive power target value that is a target value of reactive power that the power storage device 200 should output from the voltage difference ΔV.

第1伝達関数701(K1)及び第2伝達関数702(K2)は、例えば記憶装置140に記憶されている系統情報730を用いて設計される。   The first transfer function 701 (K1) and the second transfer function 702 (K2) are designed using the system information 730 stored in the storage device 140, for example.

第3伝達関数703(C1)は、電力系統400の周波数を有効電力Pbによって制御する場合における無効電力Qbからの干渉を取り除くための関数である。具体的には、第3伝達関数703(C1)は、第2伝達関数702(K2)によって算出された無効電力目標値を用いて、第1伝達関数701(K1)によって算出された有効電力目標値に対する補正量である有効電力補正値を算出する。   The third transfer function 703 (C1) is a function for removing interference from the reactive power Qb when the frequency of the power system 400 is controlled by the active power Pb. Specifically, the third transfer function 703 (C1) uses the reactive power target value calculated by the second transfer function 702 (K2), and the active power target calculated by the first transfer function 701 (K1). An active power correction value that is a correction amount for the value is calculated.

第4伝達関数704(C2)は、上記電力系統400の電圧を無効電力Qbによって制御する場合における有効電力Pbからの干渉を取り除くための関数である。具体的には、第4伝達関数704(C2)は、第1伝達関数701(K1)によって算出された有効電力目標値を用いて、第2伝達関数702(K2)によって算出された無効電力目標値に対する補正量である無効電力補正値を算出する。   The fourth transfer function 704 (C2) is a function for removing interference from the active power Pb when the voltage of the power system 400 is controlled by the reactive power Qb. Specifically, the fourth transfer function 704 (C2) uses the active power target value calculated by the first transfer function 701 (K1) and uses the reactive power target calculated by the second transfer function 702 (K2). A reactive power correction value that is a correction amount for the value is calculated.

第1指令値算出部102eは、有効電力目標値を有効電力補正値によって補正(本実施形態では加算)して、電力貯蔵装置200に対する有効電力の指令値Prを算出する。   The first command value calculation unit 102e corrects the active power target value with the active power correction value (added in the present embodiment), and calculates the command value Pr of the active power for the power storage device 200.

第2指令値算出部102fは、無効電力目標値を無効電力補正値によって補正(本実施形態では加算)して、電力貯蔵装置200に対する無効電力の指令値Qrを算出する。   The second command value calculation unit 102f calculates the reactive power command value Qr for the power storage device 200 by correcting (adding in this embodiment) the reactive power target value with the reactive power correction value.

そして制御装置100は、電力貯蔵装置200に対して出力すべき有効電力の指令値Pr及び無効電力Qrの指令値を算出する。   Then, the control device 100 calculates a command value Pr for the active power and a command value for the reactive power Qr to be output to the power storage device 200.

このように、本実施形態に係る制御装置100は、第1伝達関数701〜第4伝達関数704を用いて有効電力の指令値Pr及び無効電力Qrの指令値を算出するようにしているため、電直貯蔵装置200や電力系統400の特性が変化した場合であっても、第1伝達関数701〜第4伝達関数704を変更することによって、迅速かつ柔軟に対応することができ、電力系統400の目標周波数や目標電圧を維持するように制御を続けることができる。   As described above, the control device 100 according to the present embodiment calculates the command value Pr of the active power and the command value of the reactive power Qr using the first transfer function 701 to the fourth transfer function 704. Even when the characteristics of the direct storage device 200 and the power system 400 change, it is possible to respond quickly and flexibly by changing the first transfer function 701 to the fourth transfer function 704, and the power system 400 The control can be continued so as to maintain the target frequency and target voltage.

次に、上記干渉を取り除くための第3伝達関数703(C1)及び第4伝達関数704(C2)について具体的に説明する。   Next, the third transfer function 703 (C1) and the fourth transfer function 704 (C2) for removing the interference will be specifically described.

まず、図3に示すブロック線図から、以下の(式1)〜(式6)が成り立つ。   First, the following (Formula 1) to (Formula 6) hold from the block diagram shown in FIG.

Pr=(K1×ΔF)+(C1×K2×ΔV) …(式1)
Qr=(C2×K1×ΔF)+(K2×ΔV) …(式2)
F’=(G11×Pb)+(G12×Qb) …(式3)
V’=(G21×Pb)+(G22×Qb) …(式4)
Pb=Pr …(式5)
Qb=Qr …(式6)
(式1)〜(式6)からPr、Pb、Qr、Qbを消去すると、(式7)〜(式8)が得られる。
Pr = (K1 × ΔF) + (C1 × K2 × ΔV) (Formula 1)
Qr = (C2 × K1 × ΔF) + (K2 × ΔV) (Formula 2)
F ′ = (G11 × Pb) + (G12 × Qb) (Formula 3)
V ′ = (G21 × Pb) + (G22 × Qb) (Formula 4)
Pb = Pr (Formula 5)
Qb = Qr (Formula 6)
When Pr, Pb, Qr, and Qb are deleted from (Expression 1) to (Expression 6), (Expression 7) to (Expression 8) are obtained.

F’=(G11+G12×C2)×(K1×ΔF)+(G11×C1+G12)×(K2×ΔV) …(式7)
V’=(G21+G22×C2)×(K1×ΔF)+(G21×C1+G22)×(K2×ΔV) …(式8)
干渉がなくなるためには(式9)〜(式10)が成り立つ必要がある。そして(式9)〜(式10)をC1、C2について解くことにより、C1及びC2を(式11)〜(式12)のように求めることができる。
F ′ = (G11 + G12 × C2) × (K1 × ΔF) + (G11 × C1 + G12) × (K2 × ΔV) (Expression 7)
V ′ = (G21 + G22 × C2) × (K1 × ΔF) + (G21 × C1 + G22) × (K2 × ΔV) (Equation 8)
In order to eliminate the interference, (Expression 9) to (Expression 10) must be satisfied. Then, by solving (Equation 9) to (Equation 10) for C1 and C2, C1 and C2 can be obtained as (Equation 11) to (Equation 12).

(G11×C1+G12)=0 …(式9)
(G21+G22×C2)=0 …(式10)
C1=-G12/G11 …(式11)
C2=-G21/G22 …(式12)
つまり、第3伝達関数703(C1)及び第4伝達関数704(C2)は、電力系統400の伝達関数である第5伝達関数705(G11)〜第8伝達関数708(G21)を求めることにより、確定させることができる。
(G11 × C1 + G12) = 0 ... (Formula 9)
(G21 + G22 × C2) = 0 ... (Formula 10)
C1 = -G12 / G11 (Formula 11)
C2 = -G21 / G22 (Formula 12)
That is, the third transfer function 703 (C1) and the fourth transfer function 704 (C2) are obtained by obtaining the fifth transfer function 705 (G11) to the eighth transfer function 708 (G21) which are transfer functions of the power system 400. Can be confirmed.

なお、第5伝達関数705(G11)〜第8伝達関数708(G21)は、後述するように、既知のシステム同定技術を用いることによって求めることが可能である。   The fifth transfer function 705 (G11) to the eighth transfer function 708 (G21) can be obtained by using a known system identification technique as will be described later.

本実施形態に係る制御装置100は、このようにして定めた第3伝達関数703(C1)及び第4伝達関数704(C2)を制御モデルに組み込むことによって、電力貯蔵装置200が出力すべき有効電力の指令値Pr及び無効電力の指令値Qrを算出している。このため、電力貯蔵装置200が有効電力Pb及び無効電力Qbを出力する際に電力系統400の周波数や潮流、電圧に生ずる干渉を取り去ることが可能となり、電力系統400の周波数や潮流、電圧等の複数種類の物理量をより正確に制御することを可能にしている。   The control device 100 according to the present embodiment incorporates the third transfer function 703 (C1) and the fourth transfer function 704 (C2) determined in this way into the control model, thereby enabling the power storage device 200 to output The power command value Pr and the reactive power command value Qr are calculated. For this reason, when the power storage device 200 outputs the active power Pb and the reactive power Qb, it is possible to remove interference generated in the frequency, power flow, and voltage of the power system 400, and the frequency, power flow, voltage, and the like of the power system 400 can be removed. This makes it possible to control a plurality of types of physical quantities more accurately.

<電力貯蔵装置の制御機能>
次に、図3及び図6〜図7等を参照しながら、本実施形態に係る制御装置100が有する電力貯蔵装置200の制御機能及び動作について説明する。
<Control function of power storage device>
Next, the control function and operation of the power storage device 200 included in the control device 100 according to the present embodiment will be described with reference to FIG. 3 and FIGS.

図3に示すように、制御装置100は、計測値取得部101、演算部102および指令値出力部106を有して構成される。   As shown in FIG. 3, the control device 100 includes a measurement value acquisition unit 101, a calculation unit 102, and a command value output unit 106.

そして演算部102には、第1差分算出部107a、第2差分算出部107b、有効電力算出部102a、無効電力算出部102b、有効電力補正部102c、無効電力補正部102d、第1指令値算出部102e、第2指令値算出部102fが含まれる。   The calculation unit 102 includes a first difference calculation unit 107a, a second difference calculation unit 107b, an active power calculation unit 102a, a reactive power calculation unit 102b, an active power correction unit 102c, a reactive power correction unit 102d, and a first command value calculation. A unit 102e and a second command value calculation unit 102f are included.

なお有効電力算出部102aには、第1伝達関数701(K1)が含まれる。また無効電力算出部102bには第2伝達関数702(K2)が含まれる。有効電力補正部102cには第3伝達関数703(C1)が含まれる。無効電力補正部102dには第4伝達関数704(C2)が含まれる。   The active power calculation unit 102a includes a first transfer function 701 (K1). The reactive power calculation unit 102b includes a second transfer function 702 (K2). The active power correction unit 102c includes a third transfer function 703 (C1). The reactive power correction unit 102d includes a fourth transfer function 704 (C2).

計測値取得部101は、計測器450によって計測された電力系統400における周波数(第1物理量)の計測値Fと、電圧(第2物理量)の計測値Vを取得する。   The measurement value acquisition unit 101 acquires the measurement value F of the frequency (first physical quantity) and the measurement value V of the voltage (second physical quantity) in the power system 400 measured by the measuring instrument 450.

具体的には、計測値取得部101は、第1計測値取得部101aと第2計測値取得部101bとを有し、第1計測値取得部101aは電力系統400における周波数(第1物理量)の計測値Fを取得し、第2計測値取得部101bは電力系統400における電圧(第2物理量)の計測値Vを取得する。   Specifically, the measurement value acquisition unit 101 includes a first measurement value acquisition unit 101a and a second measurement value acquisition unit 101b, and the first measurement value acquisition unit 101a has a frequency (first physical quantity) in the power system 400. The second measured value acquisition unit 101b acquires the measured value V of the voltage (second physical quantity) in the power system 400.

そして第1差分算出部107aは、周波数の計測値Fと、目標周波数(第1目標値)710との差分ΔFを算出する。   Then, the first difference calculation unit 107 a calculates a difference ΔF between the frequency measurement value F and the target frequency (first target value) 710.

また第2差分算出部107bは、電圧の計測値Vと、目標電圧(第2目標値)720との差分ΔVを算出する。   The second difference calculation unit 107b calculates a difference ΔV between the voltage measurement value V and the target voltage (second target value) 720.

そして有効電力算出部102aは、第1伝達関数701(K1)を用いて、上記周波数の差分ΔFから、電力貯蔵装置200が出力すべき有効電力の目標値である有効電力目標値を算出する。電力貯蔵装置200が有効電力目標値に応じた有効電力を出力することによって、電力系統400の周波数を第1目標値710に近づけることができる。   Then, the active power calculation unit 102a uses the first transfer function 701 (K1) to calculate an active power target value that is a target value of active power that the power storage device 200 should output from the frequency difference ΔF. When the power storage device 200 outputs active power corresponding to the active power target value, the frequency of the power system 400 can be brought close to the first target value 710.

一方、無効電力算出部102bは、第2伝達関数702(K2)を用いて、上記電圧の差分ΔVから、電力貯蔵装置200が出力すべき無効電力の目標値である無効電力目標値を算出する。電力貯蔵装置200が無効電力目標値に応じた有効電力を出力することによって、電力系統400の電圧を第2目標値720に近づけることができる。   On the other hand, the reactive power calculation unit 102b uses the second transfer function 702 (K2) to calculate a reactive power target value that is a target value of reactive power that the power storage device 200 should output from the voltage difference ΔV. . When the power storage device 200 outputs active power corresponding to the reactive power target value, the voltage of the power system 400 can be brought close to the second target value 720.

ただし上述したように、電力系統400の周波数は、電力貯蔵装置200が出力する有効電力によって変動するだけでなく、電力貯蔵装置200が無効電力を出力することによっても影響を受けて変動する。   However, as described above, the frequency of the power system 400 not only varies depending on the active power output from the power storage device 200 but also varies depending on the influence of the power storage device 200 outputting reactive power.

同様に、電力系統400の電圧は、電力貯蔵装置200が出力する無効電力によって変動するだけでなく、電力貯蔵装置200が有効電力を出力することによっても影響を受けて変動する。   Similarly, the voltage of the power system 400 fluctuates not only by the reactive power output by the power storage device 200 but also varies by being affected by the power storage device 200 outputting active power.

このため、本実施形態に係る制御装置100は、有効電力算出部102aが算出した有効電力目標値を、別途、有効電力補正部102cによって算出された有効電力補正値によって補正した後に、電力貯蔵装置200に対して有効電力指令値Prとして出力する。   Therefore, the control device 100 according to the present embodiment corrects the active power target value calculated by the active power calculation unit 102a with the active power correction value calculated by the active power correction unit 102c separately, and then stores the power storage device. 200 is output as an active power command value Pr.

同様に、制御装置100は、無効電力算出部102bが算出した無効電力目標値を、別途、無効電力補正部102dによって算出された無効電力補正値によって補正した後に、電力貯蔵装置200に対して、無効電力指令値Qrとして出力する。   Similarly, the control device 100 separately corrects the reactive power target value calculated by the reactive power calculation unit 102b with the reactive power correction value calculated by the reactive power correction unit 102d, The reactive power command value Qr is output.

有効電力補正部102cは、上述したように、有効電力算出部102aが算出した有効電力目標値に対する補正量である有効電力補正値を算出する。具体的には、有効電力補正部102cは、第3伝達関数703を用いて、無効電力算出部102bが算出した無効電力目標値から有効電力補正値を算出する。このようにして、電力貯蔵装置200が無効電力を出力することにより生ずる電力系統400の周波数の変動を相殺することが可能となる。   As described above, the active power correction unit 102c calculates an active power correction value that is a correction amount for the active power target value calculated by the active power calculation unit 102a. Specifically, the active power correction unit 102c uses the third transfer function 703 to calculate the active power correction value from the reactive power target value calculated by the reactive power calculation unit 102b. In this way, it is possible to cancel out fluctuations in the frequency of the power system 400 caused by the power storage device 200 outputting reactive power.

同様に、無効電力補正部102dは、無効電力算出部102bが算出した無効電力目標値に対する補正量である無効電力補正値を算出する。具体的には、無効電力補正部102dは、第4伝達関数704を用いて、有効電力算出部102aが算出した有効電力目標値から無効電力補正値を算出する。このようにして、電力貯蔵装置200が有効電力を出力することにより生ずる電力系統400の電圧の変動を相殺することが可能となる。   Similarly, the reactive power correction unit 102d calculates a reactive power correction value that is a correction amount for the reactive power target value calculated by the reactive power calculation unit 102b. Specifically, the reactive power correction unit 102d calculates a reactive power correction value from the active power target value calculated by the active power calculation unit 102a using the fourth transfer function 704. In this way, it is possible to cancel out fluctuations in the voltage of the electric power system 400 caused by the power storage device 200 outputting active power.

第1指令値算出部102eは、有効電力目標値を有効電力補正値によって補正(本実施形態では加算)して、電力貯蔵装置200に対する有効電力の指令値Prを算出する。   The first command value calculation unit 102e corrects the active power target value with the active power correction value (added in the present embodiment), and calculates the command value Pr of the active power for the power storage device 200.

第2指令値算出部102fは、無効電力目標値を無効電力補正値によって補正(本実施形態では加算)して、電力貯蔵装置200に対する無効電力の指令値Qrを算出する。   The second command value calculation unit 102f calculates the reactive power command value Qr for the power storage device 200 by correcting (adding in this embodiment) the reactive power target value with the reactive power correction value.

そして図3に示す指令値出力部106は、このようにして算出された有効電力の指令値Pr及び無効電力の指令値Qrを、電力貯蔵装置200に出力する。   The command value output unit 106 shown in FIG. 3 outputs the command value Pr for active power and the command value Qr for reactive power calculated in this way to the power storage device 200.

本実施形態に係る制御装置100は、このようにして定めた有効電力補正部102c、無効電力補正部102dを用いて、電力貯蔵装置200が出力すべき有効電力の指令値Pr及び無効電力の指令値Qrを算出している。このため、電力貯蔵装置200が有効電力Pb及び無効電力Qbを出力する際に電力系統400の周波数や潮流、電圧に生ずる干渉を取り去ることが可能となり、電力系統400の周波数や潮流、電圧等の複数種類の物理量をより正確に制御することを可能にしている。   The control device 100 according to the present embodiment uses the active power correction unit 102c and the reactive power correction unit 102d determined as described above to use the active power command value Pr and the reactive power command that the power storage device 200 should output. The value Qr is calculated. For this reason, when the power storage device 200 outputs the active power Pb and the reactive power Qb, it is possible to remove interference generated in the frequency, power flow, and voltage of the power system 400, and the frequency, power flow, voltage, etc. of the power system 400 can be removed. This makes it possible to control a plurality of types of physical quantities more accurately.

なお計測値取得部101は、所定期間毎に(例えば1時間毎に)、周波数の計測値Fと電圧の計測値Vを取得しているが、本実施形態に係る制御装置100は、計測値取得部101がこれらの計測値を取得する毎に、有効電力の指令値Pr及び無効電力の指令値Qrを新たに算出して、電力貯蔵装置200に出力している。   The measurement value acquisition unit 101 acquires the frequency measurement value F and the voltage measurement value V every predetermined period (for example, every hour). However, the control device 100 according to the present embodiment uses the measurement value Each time the acquisition unit 101 acquires these measurement values, the active power command value Pr and the reactive power command value Qr are newly calculated and output to the power storage device 200.

このような態様によって、電力系統400における電力の最新の状態に応じて、電力貯蔵装置200に対して最適な有効電力の指令値Pr及び無効電力の指令値Qrを継続的に出力することが可能になる。   According to such an aspect, it is possible to continuously output the optimum active power command value Pr and reactive power command value Qr to the power storage device 200 according to the latest state of the power in the power system 400. become.

なお、もちろん、制御装置100が有効電力の指令値Pr及び無効電力の指令値Qrを算出するタイミングは、周波数の計測値Fと電圧の計測値Vを取得するタイミングと同じでなくてもよい。   Of course, the timing at which the control device 100 calculates the active power command value Pr and the reactive power command value Qr may not be the same as the timing at which the frequency measurement value F and the voltage measurement value V are acquired.

次に本実施形態に係る制御装置100の制御方法について図7のフローチャート参照しながら説明する。   Next, a control method of the control device 100 according to the present embodiment will be described with reference to the flowchart of FIG.

まず、計測値取得部101は、計測器450によって計測された電力系統400における周波数(第1物理量)の計測値Fと、電圧(第2物理量)の計測値Vを取得する(S1000)。   First, the measured value acquisition unit 101 acquires the measured value F of the frequency (first physical quantity) and the measured value V of the voltage (second physical quantity) in the power system 400 measured by the measuring instrument 450 (S1000).

そして有効電力算出部102aは、第1伝達関数701(K1)を用いて、周波数の計測値Fと目標周波数(第1目標値)710との差分ΔFから、電力貯蔵装置200が出力すべき有効電力の目標値である有効電力目標値を算出する。同様に無効電力算出部102bは、第2伝達関数702(K2)を用いて、電圧の計測値Vと、目標電圧(第2目標値)720との差分ΔVから、電力貯蔵装置200が出力すべき無効電力の目標値である無効電力目標値を算出する(S1010)。   Then, the active power calculation unit 102a uses the first transfer function 701 (K1) to calculate the effective power to be output from the power storage device 200 from the difference ΔF between the frequency measurement value F and the target frequency (first target value) 710. An active power target value that is a power target value is calculated. Similarly, the reactive power calculation unit 102b uses the second transfer function 702 (K2) to output the power storage device 200 from the difference ΔV between the voltage measurement value V and the target voltage (second target value) 720. A reactive power target value that is a target value of the reactive power to be calculated is calculated (S1010).

そして有効電力補正部102cは、第3伝達関数703を用いて、無効電力算出部102bによって算出された無効電力目標値から有効電力補正値を算出する。同様に、無効電力補正部102dは、第4伝達関数704を用いて、有効電力算出部102aによって算出された有効電力目標値から無効電力補正値を算出する(S1020)。   Then, the active power correction unit 102c uses the third transfer function 703 to calculate an active power correction value from the reactive power target value calculated by the reactive power calculation unit 102b. Similarly, the reactive power correction unit 102d uses the fourth transfer function 704 to calculate a reactive power correction value from the active power target value calculated by the active power calculation unit 102a (S1020).

そして第1指令値算出部102eは、有効電力目標値を有効電力補正値によって補正(本実施形態では加算)して、電力貯蔵装置200に対する有効電力の指令値Prを算出する。同様に、第2指令値算出部102fは、無効電力目標値を無効電力補正値によって補正(本実施形態では加算)して、電力貯蔵装置200に対する無効電力の指令値Qrを算出する(S1030)。   Then, the first command value calculation unit 102e corrects the active power target value with the active power correction value (addition in the present embodiment), and calculates the active power command value Pr for the power storage device 200. Similarly, the second command value calculation unit 102f corrects the reactive power target value with the reactive power correction value (added in the present embodiment), and calculates the reactive power command value Qr for the power storage device 200 (S1030). .

そして指令値出力部106は、有効電力の指令値Pr及び無効電力の指令値Qrを、電力貯蔵装置200に出力する(S1040)。   Then, the command value output unit 106 outputs the command value Pr for active power and the command value Qr for reactive power to the power storage device 200 (S1040).

このような方法で制御装置100を制御することによって、電力貯蔵装置200が有効電力Pb及び無効電力Qbを出力する際に電力系統400の周波数や潮流、電圧に生ずる干渉を取り去ることが可能となり、電力系統400の周波数や潮流、電圧等の複数種類の物理量をより正確に制御することが可能になる。   By controlling the control device 100 in such a manner, it is possible to remove interference generated in the frequency, power flow, and voltage of the power system 400 when the power storage device 200 outputs the active power Pb and the reactive power Qb. It is possible to more accurately control a plurality of types of physical quantities such as the frequency, power flow, and voltage of the power system 400.

<伝達関数の更新機能>
次に、図3、図6及び図8等を参照しながら、本実施形態に係る制御装置100が有する伝達関数の更新機能及び動作について説明する。
<Update function of transfer function>
Next, the transfer function update function and operation of the control device 100 according to the present embodiment will be described with reference to FIGS. 3, 6, and 8.

図3に示すように、制御装置100は、計測値取得部101、及び関数更新部(第1関数更新部104a、第2関数更新部104b、第3関数更新部104c、第4関数更新部104d)104を有して構成される。   As illustrated in FIG. 3, the control device 100 includes a measurement value acquisition unit 101 and a function update unit (first function update unit 104a, second function update unit 104b, third function update unit 104c, and fourth function update unit 104d. ) 104.

上述したように、計測値取得部101は、所定時間毎に(例えば1時間毎に)計測器450によって計測された電力系統400における周波数(第1物理量)の計測値Fと、電圧(第2物理量)の計測値Vを取得している。   As described above, the measurement value acquisition unit 101 uses the measurement value F of the frequency (first physical quantity) in the power system 400 measured by the measuring instrument 450 every predetermined time (for example, every hour) and the voltage (second). Measurement value V of (physical quantity) is acquired.

また指令値出力部106も、所定時間毎に(例えば1時間毎に)有効電力の指令値Pr及び無効電力の指令値Qrを、電力貯蔵装置200に出力している。   The command value output unit 106 also outputs a command value Pr for active power and a command value Qr for reactive power to the power storage device 200 at predetermined time intervals (for example, every hour).

このとき、第1関数更新部104aは、例えば既知のシステム同定技術を用いることによって、所定期間内(例えば過去1か月間)の有効電力の指令値Pr及び無効電力の指令値Qrの履歴と、同一所定期間内(例えば過去1か月間)の周波数の計測値Fの履歴と、を用いて第5伝達関数705(G11)、第6伝達関数706(G12)の制御パラメータを更新する。   At this time, the first function updating unit 104a, for example, by using a known system identification technique, the history of the command value Pr of active power and the command value Qr of reactive power within a predetermined period (for example, the past month), The control parameters of the fifth transfer function 705 (G11) and the sixth transfer function 706 (G12) are updated using the history of the measurement value F of the frequency within the same predetermined period (for example, the past month).

例えば第1関数更新部104aは、周波数の計測値Fを目的変数とし、有効電力の指令値Pr及び無効電力の指令値Qrを説明変数とし、第5伝達関数705(G11)と第6伝達関数706(G12)との和を回帰式とした回帰分析を行うことによって、第5伝達関数705(G11)と第6伝達関数706(G12)の制御パラメータを更新する。   For example, the first function updating unit 104a uses the frequency measurement value F as an objective variable, the active power command value Pr and the reactive power command value Qr as explanatory variables, and uses the fifth transfer function 705 (G11) and the sixth transfer function. The control parameters of the fifth transfer function 705 (G11) and the sixth transfer function 706 (G12) are updated by performing regression analysis using the sum of 706 (G12) as a regression equation.

そして第2関数更新部104bは、(式11)に、更新された第5伝達関数705(G11)及び第6伝達関数706(G12)を代入することによって、第3伝達関数703(C1)を更新する。   Then, the second function updating unit 104b substitutes the updated fifth transfer function 705 (G11) and sixth transfer function 706 (G12) into (Equation 11), thereby obtaining the third transfer function 703 (C1). Update.

同様に、第3関数更新部104cは、システム同定技術を用いることによって、所定期間内(例えば過去1か月間)の有効電力の指令値Pr及び無効電力の指令値Qrの履歴と、同一指定期間内(例えば過去1か月間)の電圧の計測値Vの履歴と、を用いて第7伝達関数707(G22)、第8伝達関数708(G21)の制御パラメータを更新する。   Similarly, the third function updating unit 104c uses the system identification technique to record the active power command value Pr and the reactive power command value Qr within a predetermined period (for example, the past one month) and the same specified period. The control parameters of the seventh transfer function 707 (G22) and the eighth transfer function 708 (G21) are updated using the history of the measured value V of the voltage (for example, for the past month).

そして第4関数更新部104dは、(式12)に、更新された第7伝達関数707(G22)及び第8伝達関数708(G21)を代入することによって、第4伝達関数704(C2)を更新する。   Then, the fourth function updating unit 104d substitutes the updated seventh transfer function 707 (G22) and eighth transfer function 708 (G21) into (Equation 12), thereby obtaining the fourth transfer function 704 (C2). Update.

このようにして本実施形態に係る制御装置100は、電力貯蔵装置200が有効電力Pb及び無効電力Qbを出力する際に電力系統400の周波数や潮流、電圧に生ずる干渉を打ち消すような補正値を算出するための第3伝達関数703(C1)及び第4伝達関数704(C2)を更新する。このような態様によって、本実施形態に係る制御装置100は、より正確に電力系統400の周波数や潮流、電圧等の複数種類の物理量を制御することを可能にすることができる。   In this way, the control device 100 according to the present embodiment has a correction value that cancels interference generated in the frequency, power flow, and voltage of the power system 400 when the power storage device 200 outputs the active power Pb and the reactive power Qb. The third transfer function 703 (C1) and the fourth transfer function 704 (C2) for calculation are updated. With such an aspect, the control device 100 according to the present embodiment can more accurately control a plurality of types of physical quantities such as the frequency, power flow, and voltage of the power system 400.

また制御装置100は、1週間ごとや1か月ごと、あるいは1年毎のように定期的に、あるいはオペレータによって指示された不定期のタイミングで、第3伝達関数703(C1)及び第4伝達関数704(C2)を更新するようにしても良い。このような態様により、電力系統400の電気的特性(G11〜G22)が経時変化する場合であっても、電力系統400の複数種類の物理量に対する制御を高精度に継続することが可能になる。   In addition, the control device 100 performs the third transfer function 703 (C1) and the fourth transfer at regular intervals, such as every week, every month, every year, or at irregular times designated by the operator. The function 704 (C2) may be updated. According to such an aspect, even when the electrical characteristics (G11 to G22) of the power system 400 change with time, it is possible to continue the control for a plurality of types of physical quantities of the power system 400 with high accuracy.

また電力系統400の周波数や潮流、電圧に生ずる干渉を取り去るための第3伝達関数703(C1)及び第4伝達関数704(C2)を事前に設計することができない場合であっても、電力貯蔵装置200の運用を開始した後に干渉を取り去るような柔軟な運用を行うことも可能となる。   Further, even when the third transfer function 703 (C1) and the fourth transfer function 704 (C2) for removing the interference generated in the frequency, power flow, and voltage of the power system 400 cannot be designed in advance, the power storage It is also possible to perform a flexible operation such as removing the interference after the operation of the apparatus 200 is started.

次に本実施形態に係る制御装置100の制御方法について、図8のフローチャート参照しながら説明する。   Next, a control method of the control device 100 according to the present embodiment will be described with reference to the flowchart of FIG.

まず、計測値取得部101は、計測器450によって計測された電力系統400における周波数の計測値Fと、電圧の計測値Vを取得する(S2000)。   First, the measurement value acquisition unit 101 acquires a frequency measurement value F and a voltage measurement value V in the power system 400 measured by the measuring instrument 450 (S2000).

そして関数更新部104は、所定期間内の有効電力の指令値Pr及び無効電力の指令値Qrと、同一の所定期間内の周波数の計測値F及び電圧の計測値Vと、を用いて、例えばシステム同定技術によって、第5伝達関数705(G11)〜第8伝達関数708(G21)を更新する(S2010)。   The function updating unit 104 uses the active power command value Pr and reactive power command value Qr within a predetermined period, and the frequency measurement value F and voltage measurement value V within the same predetermined period, for example, The fifth transfer function 705 (G11) to the eighth transfer function 708 (G21) are updated by the system identification technique (S2010).

そして関数更新部104は、(式11)及び(式12)に従って、第3伝達関数703(C1)及び第4伝達関数704(C2)を更新する(S2020)。   Then, the function updating unit 104 updates the third transfer function 703 (C1) and the fourth transfer function 704 (C2) according to (Expression 11) and (Expression 12) (S2020).

このように制御装置100を制御することによって、電力系統400の電気的特性(G11〜G22)が経時変化する場合であっても、電力系統400の複数種類の物理量に対する制御を高精度に継続することが可能になる。   By controlling the control device 100 in this way, even when the electrical characteristics (G11 to G22) of the power system 400 change with time, control over a plurality of types of physical quantities of the power system 400 is continued with high accuracy. It becomes possible.

==他の実施形態==
制御装置100は、図9に示すブロック線図によって、電力貯蔵装置200に対して出力する有効電力の指令値及び無効電力の指令値を算出するようにしてもよい。
== Other Embodiments ==
The control device 100 may calculate a command value for active power and a command value for reactive power output to the power storage device 200 according to the block diagram shown in FIG.

図9に示すブロック線図は、図6に示したブロック線図に対して、第9伝達関数740(D1)及び第10伝達関数741(D2)が追加されている。   In the block diagram shown in FIG. 9, a ninth transfer function 740 (D1) and a tenth transfer function 741 (D2) are added to the block diagram shown in FIG.

第9伝達関数740(D1)は、有効電力に対応した変動対応コントローラとして機能する。また第10伝達関数741(D2)は、無効電力に対応した変動対応コントローラとして機能する。   The ninth transfer function 740 (D1) functions as a fluctuation corresponding controller corresponding to the active power. In addition, the tenth transfer function 741 (D2) functions as a fluctuation corresponding controller corresponding to reactive power.

第9伝達関数740(D1)及び第10伝達関数741(D2)は、第1伝達関数701(K1)や第2伝達関数702(K2)と同様に、例えば記憶装置140に記憶されている系統情報730を用いて設計される。   Similarly to the first transfer function 701 (K1) and the second transfer function 702 (K2), the ninth transfer function 740 (D1) and the tenth transfer function 741 (D2) are stored in the storage device 140, for example. Designed using information 730.

そしてこの場合、電力貯蔵装置200が出力すべき有効電力の目標値である有効電力目標値は、周波数の差分ΔFを、第1伝達関数701(K1)と第9伝達関数740(D1)で演算することで算出される。また無効電力目標値は、電圧の差分ΔVを、第2伝達関数702(K2)と第10伝達関数741(D2)で演算することで算出される。   In this case, the active power target value, which is the target value of the active power to be output by the power storage device 200, is calculated by calculating the frequency difference ΔF using the first transfer function 701 (K1) and the ninth transfer function 740 (D1). It is calculated by doing. The reactive power target value is calculated by calculating the voltage difference ΔV using the second transfer function 702 (K2) and the tenth transfer function 741 (D2).

そして第1指令値算出部102eは、この有効電力目標値を、第3伝達関数703(C1)によって算出された有効電力補正値によって補正(本実施形態では加算)して、電力貯蔵装置200に対する有効電力の指令値Prを算出する。   Then, the first command value calculation unit 102e corrects (adds in this embodiment) the active power target value with the active power correction value calculated by the third transfer function 703 (C1), and outputs the target value to the power storage device 200. A command value Pr for active power is calculated.

第2指令値算出部102fは、無効電力目標値を、第4伝達関数704(C2)によって算出された無効電力補正値によって補正(本実施形態では加算)して、電力貯蔵装置200に対する無効電力の指令値Qrを算出する。   The second command value calculation unit 102f corrects (adds in this embodiment) the reactive power target value with the reactive power correction value calculated by the fourth transfer function 704 (C2), and reacts the reactive power with respect to the power storage device 200. Command value Qr is calculated.

次に、図9に示すブロック線図を用いる場合の第3伝達関数703(C1)及び第4伝達関数704(C2)について具体的に説明する。   Next, the third transfer function 703 (C1) and the fourth transfer function 704 (C2) when the block diagram shown in FIG. 9 is used will be specifically described.

まず、図9に示すブロック線図から、以下の(式13)〜(式18)が成り立つ。   First, from the block diagram shown in FIG. 9, the following (Expression 13) to (Expression 18) hold.

Pr=(D1×K1×ΔF)+(C1×K2×ΔV) …(式13)
Qr=(C2×K1×ΔF)+(D2×K2×ΔV) …(式14)
F’=(G11×Pb)+(G12×Qb) …(式15)
V’=(G21×Pb)+(G22×Qb) …(式16)
Pb=Pr …(式17)
Qb=Qr …(式18)
(式13)〜(式18)からPr、Pb、Qr、Qbを消去すると、(式19)〜(式20)が得られる。
Pr = (D1 × K1 × ΔF) + (C1 × K2 × ΔV) (Formula 13)
Qr = (C2 × K1 × ΔF) + (D2 × K2 × ΔV) (Formula 14)
F ′ = (G11 × Pb) + (G12 × Qb) (Formula 15)
V ′ = (G21 × Pb) + (G22 × Qb) (Formula 16)
Pb = Pr (Formula 17)
Qb = Qr (Formula 18)
When Pr, Pb, Qr, and Qb are deleted from (Expression 13) to (Expression 18), (Expression 19) to (Expression 20) are obtained.

F’=(G11×D1+G12×C2)×(K1×ΔF)+(G11×C1+G12×D2)×(K2×ΔV) …(式19)
V’=(G21×D1+G22×C2)×(K1×ΔF)+(G21×C1+G22×D2)×(K2×ΔV) …(式20)
干渉がなくなるためには(式21)〜(式22)が成り立つ必要がある。そして(式21)〜(式22)をC1、C2について解くことにより、C1及びC2を(式23)〜(式24)のように求めることができる。
F ′ = (G11 × D1 + G12 × C2) × (K1 × ΔF) + (G11 × C1 + G12 × D2) × (K2 × ΔV) (Equation 19)
V ′ = (G21 × D1 + G22 × C2) × (K1 × ΔF) + (G21 × C1 + G22 × D2) × (K2 × ΔV) (Equation 20)
In order to eliminate interference, (Expression 21) to (Expression 22) must be satisfied. Then, by solving (Equation 21) to (Equation 22) for C1 and C2, C1 and C2 can be obtained as (Equation 23) to (Equation 24).

(G11×C1+G12×D2)=0 …(式21)
(G21×D1+G22×C2)=0 …(式22)
C1=-(G12×D2)/G11 …(式23)
C2=-(G21×D1)/G22 …(式24)
つまり、第3伝達関数703(C1)及び第4伝達関数704(C2)は、電力系統400の伝達関数である第5伝達関数705(G11)〜第8伝達関数708(G21)、第9伝達関数740(D1)、及び第10伝達関数741(D2)を求めることにより、確定させることができる。
(G11 × C1 + G12 × D2) = 0 (Formula 21)
(G21 × D1 + G22 × C2) = 0… (Formula 22)
C1 =-(G12 × D2) / G11 (Equation 23)
C2 =-(G21 × D1) / G22 (Formula 24)
That is, the third transfer function 703 (C1) and the fourth transfer function 704 (C2) are the fifth transfer function 705 (G11) to the eighth transfer function 708 (G21), which are transfer functions of the power system 400, and the ninth transfer function. This can be determined by obtaining the function 740 (D1) and the tenth transfer function 741 (D2).

本実施形態においても、第5伝達関数705(G11)〜第8伝達関数708(G21)は、上述したように、既知のシステム同定技術を用いることによって求めることが可能である。   Also in the present embodiment, the fifth transfer function 705 (G11) to the eighth transfer function 708 (G21) can be obtained by using a known system identification technique as described above.

そのため、本実施形態に係る制御装置100の場合も、このようにして定めた第3伝達関数703(C1)及び第4伝達関数704(C2)を制御モデルに組み込むことによって、電力貯蔵装置200が出力すべき有効電力の指令値Pr及び無効電力の指令値Qrを算出することができる。そして、電力貯蔵装置200が有効電力Pb及び無効電力Qbを出力する際に電力系統400の周波数や潮流、電圧に生ずる干渉を取り去ることが可能となり、電力系統400の周波数や潮流、電圧等の複数種類の物理量をより正確に制御することが可能になる。   Therefore, also in the case of the control device 100 according to the present embodiment, the power storage device 200 is configured by incorporating the third transfer function 703 (C1) and the fourth transfer function 704 (C2) thus determined in the control model. The command value Pr for the active power to be output and the command value Qr for the reactive power can be calculated. Then, when the power storage device 200 outputs the active power Pb and the reactive power Qb, it is possible to remove interference generated in the frequency, power flow, and voltage of the power system 400. It becomes possible to control the physical quantity of the type more accurately.

以上説明したように、本実施形態に係る制御装置100、制御装置100の制御方法及び制御プログラム600によれば、電力系統400の周波数や潮流、電圧等の複数種類の物理量に生ずる干渉を取り除き、電力系統400をより正確に制御することが可能となる。   As described above, according to the control device 100, the control method of the control device 100, and the control program 600 according to the present embodiment, interference generated in a plurality of types of physical quantities such as the frequency, power flow, and voltage of the power system 400 is removed. It becomes possible to control the electric power system 400 more accurately.

そしてまた、電力系統400における電力の品質維持向上や、そのための労力軽減を図ることが可能となる。   In addition, it is possible to improve and maintain the quality of power in the power system 400 and reduce labor for that purpose.

なお上述した実施の形態は本発明の理解を容易にするためのものであり、本発明を限定して解釈するためのものではない。本発明はその趣旨を逸脱することなく変更、改良され得るとともに、本発明にはその等価物も含まれる。   The embodiments described above are for facilitating the understanding of the present invention, and are not intended to limit the present invention. The present invention can be changed and improved without departing from the gist thereof, and equivalents thereof are also included in the present invention.

100 制御装置
101 計測値取得部
102 演算部
103 記憶部
104 関数更新部
105 予測値算出部
106 指令値出力部
107 差分算出部
110 CPU
120 メモリ
130 通信装置
140 記憶装置
150 入力装置
160 出力装置
170 記録媒体読取装置
200 電力貯蔵装置
210 双方向コンバータ
220 エネルギー貯蔵部
300 変圧器
400 電力系統
410 発電設備
420 母線
430 送配電線
440 負荷
450 計測器
600 制御プログラム
700〜709 伝達関数
710 第1目標値
720 第2目標値
730 系統情報
740〜741 伝達関数
800 記録媒体
DESCRIPTION OF SYMBOLS 100 Control apparatus 101 Measurement value acquisition part 102 Operation part 103 Storage part 104 Function update part 105 Predicted value calculation part 106 Command value output part 107 Difference calculation part 110 CPU
120 Memory 130 Communication Device 140 Storage Device 150 Input Device 160 Output Device 170 Recording Medium Reading Device 200 Power Storage Device 210 Bidirectional Converter 220 Energy Storage Unit 300 Transformer 400 Electric Power System 410 Power Generation Equipment 420 Bus 430 Transmission / Distribution Electric Wire 440 Load 450 Measurement 600 Control program 700 to 709 Transfer function 710 First target value 720 Second target value 730 System information 740 to 741 Transfer function 800 Recording medium

Claims (8)

電力系統に連系する電力貯蔵装置を制御する制御装置であって、
前記電力系統における第1物理量を第1目標値に制御するべく前記電力貯蔵装置が出力すべき有効電力の目標値を前記第1物理量と前記第1目標値との差分から算出可能な第1関数を用いて、前記有効電力の目標値を算出し、前記電力系統における第2物理量を第2目標値に制御するべく前記電力貯蔵装置が出力すべき無効電力の目標値を前記第2物理量と前記第2目標値との差分から算出可能な第2関数を用いて、前記無効電力の目標値を算出する電力算出部と、
前記電力貯蔵装置が前記無効電力を出力することにより生ずる前記第1物理量の変動を打ち消すような前記有効電力の補正値を前記無効電力の目標値から算出可能な第3関数を用いて、前記有効電力の補正量を算出し、前記電力貯蔵装置が前記有効電力を出力することにより生ずる前記第2物理量の変動を打ち消すような前記無効電力の補正値を前記有効電力の目標値から算出可能な第4関数を用いて、前記無効電力の補正量を算出する電力補正部と、
前記有効電力の目標値を前記有効電力の補正値によって補正して算出した有効電力の指令値と、前記無効電力の目標値を前記無効電力の補正値によって補正して算出した無効電力の指令値と、を前記電力貯蔵装置に出力する指令値出力部と、
を備え
前記第3関数は、前記電力貯蔵装置が前記有効電力の指令値に応じた有効電力を出力することにより見込まれる前記第1物理量の計算値を、前記有効電力の指令値から算出可能な第5関数と、前記電力貯蔵装置が前記無効電力の指令値に応じた無効電力を出力することにより見込まれる前記第1物理量の変動量を、前記無効電力の指令値から算出可能な第6関数と、を用いて定められることを特徴とする制御装置。
A control device for controlling a power storage device linked to a power system,
A first function capable of calculating a target value of active power to be output by the power storage device to control a first physical quantity in the power system to a first target value from a difference between the first physical quantity and the first target value. The target value of the reactive power to be output by the power storage device in order to control the second physical quantity in the power system to the second target value is calculated using the second physical quantity and the second physical quantity. A power calculator that calculates a target value of the reactive power using a second function that can be calculated from a difference from the second target value ;
Using the third function that can calculate the correction value of the active power from the target value of the reactive power so as to cancel the fluctuation of the first physical quantity caused by the power storage device outputting the reactive power. A correction amount of power is calculated, and a correction value of the reactive power that cancels the fluctuation of the second physical quantity caused by the power storage device outputting the active power can be calculated from the target value of the active power. A power correction unit that calculates a correction amount of the reactive power using four functions ;
A command value of active power calculated by correcting the target value of active power with the correction value of active power, and a command value of reactive power calculated by correcting the target value of reactive power with the correction value of reactive power A command value output unit for outputting to the power storage device,
Equipped with a,
The third function is a fifth function capable of calculating a calculated value of the first physical quantity that is expected when the power storage device outputs active power corresponding to the command value of the active power from the command value of the active power. A sixth function capable of calculating from the command value of the reactive power, a function, and a fluctuation amount of the first physical quantity that is expected when the power storage device outputs the reactive power according to the reactive power command value; control device according to claim Rukoto determined using.
請求項1に記載の制御装置であって、
前記電力系統に設置される計測器によって計測された前記第1物理量の計測値を取得する第1計測値取得部と、
前記指令値出力部が過去の所定期間内に前記電力貯蔵装置に出力した前記有効電力の指令値及び前記無効電力の指令値の履歴と、前記所定期間における前記第1物理量の計測値の履歴と、を用いて、前記第5関数及び前記第6関数を更新する第1関数更新部と、
更新された前記第5関数及び前記第6関数を用いて、前記第3関数を更新する第2関数更新部と、
を備えることを特徴とする制御装置。
The control device according to claim 1 ,
A first measurement value acquisition unit for acquiring a measurement value of the first physical quantity measured by a measuring instrument installed in the power system;
A history of the command value of the active power and the command value of the reactive power output to the power storage device by the command value output unit within a predetermined period in the past, and a history of the measurement value of the first physical quantity in the predetermined period; And a first function updating unit that updates the fifth function and the sixth function,
A second function updating unit that updates the third function using the updated fifth function and the sixth function;
A control device comprising:
電力系統に連系する電力貯蔵装置を制御する制御装置であって、
前記電力系統における第1物理量を第1目標値に制御するべく前記電力貯蔵装置が出力すべき有効電力の目標値を前記第1物理量と前記第1目標値との差分から算出可能な第1関数を用いて、前記有効電力の目標値を算出し、前記電力系統における第2物理量を第2目標値に制御するべく前記電力貯蔵装置が出力すべき無効電力の目標値を前記第2物理量と前記第2目標値との差分から算出可能な第2関数を用いて、前記無効電力の目標値を算出する電力算出部と、
前記電力貯蔵装置が前記無効電力を出力することにより生ずる前記第1物理量の変動を打ち消すような前記有効電力の補正値を前記無効電力の目標値から算出可能な第3関数を用いて、前記有効電力の補正量を算出し、前記電力貯蔵装置が前記有効電力を出力することにより生ずる前記第2物理量の変動を打ち消すような前記無効電力の補正値を前記有効電力の目標値から算出可能な第4関数を用いて、前記無効電力の補正量を算出する電力補正部と、
前記有効電力の目標値を前記有効電力の補正値によって補正して算出した有効電力の指令値と、前記無効電力の目標値を前記無効電力の補正値によって補正して算出した無効電力の指令値と、を前記電力貯蔵装置に出力する指令値出力部と、
を備え
前記第4関数は、前記電力貯蔵装置が前記無効電力の指令値に応じた無効電力を出力することにより見込まれる前記第2物理量の計算値を、前記無効電力の指令値から算出可能な第7関数と、前記電力貯蔵装置が前記有効電力の指令値に応じた有効電力を出力することにより見込まれる前記第2物理量の変動量を、前記有効電力の指令値から算出可能な第8関数と、を用いて定められることを特徴とする制御装置。
A control device for controlling a power storage device linked to a power system,
A first function capable of calculating a target value of active power to be output by the power storage device to control a first physical quantity in the power system to a first target value from a difference between the first physical quantity and the first target value. The target value of the reactive power to be output by the power storage device in order to control the second physical quantity in the power system to the second target value is calculated using the second physical quantity and the second physical quantity. A power calculator that calculates a target value of the reactive power using a second function that can be calculated from a difference from the second target value ;
Using the third function that can calculate the correction value of the active power from the target value of the reactive power so as to cancel the fluctuation of the first physical quantity caused by the power storage device outputting the reactive power. A correction amount of power is calculated, and a correction value of the reactive power that cancels the fluctuation of the second physical quantity caused by the power storage device outputting the active power can be calculated from the target value of the active power. A power correction unit that calculates a correction amount of the reactive power using four functions ;
A command value of active power calculated by correcting the target value of active power with the correction value of active power, and a command value of reactive power calculated by correcting the target value of reactive power with the correction value of reactive power A command value output unit for outputting to the power storage device,
Equipped with a,
The fourth function is a seventh function that can calculate a calculated value of the second physical quantity expected from the reactive power command value output from the reactive power command value from the reactive power command value. An eighth function capable of calculating from the command value of the active power, a function, and a fluctuation amount of the second physical quantity that is expected when the power storage device outputs the active power according to the command value of the active power; control device according to claim Rukoto determined using.
請求項3に記載の制御装置であって、
前記電力系統に設置される計測器によって計測された前記第2物理量の計測値を取得する第2計測値取得部と、
前記指令値出力部が過去の所定期間内に前記電力貯蔵装置に出力した前記有効電力の指令値及び前記無効電力の指令値の履歴と、前記所定期間における前記第2物理量の計測値の履歴と、を用いて、前記第7関数及び前記第8関数を更新する第3関数更新部と、
更新された前記第7関数及び前記第8関数を用いて、前記第4関数を更新する第4関数更新部と、
を備えることを特徴とする制御装置。
The control device according to claim 3 ,
A second measurement value acquisition unit for acquiring a measurement value of the second physical quantity measured by a measuring instrument installed in the power system;
A history of the command value of the active power and the command value of the reactive power output by the command value output unit to the power storage device within a predetermined period in the past, and a history of the measurement value of the second physical quantity in the predetermined period, And a third function updating unit for updating the seventh function and the eighth function,
A fourth function updating unit that updates the fourth function using the updated seventh function and the eighth function;
A control device comprising:
電力系統に連系する電力貯蔵装置の制御装置の制御方法であって、
前記制御装置が、前記電力系統における第1物理量を第1目標値に制御するべく前記電力貯蔵装置が出力すべき有効電力の目標値を前記第1物理量と前記第1目標値との差分から算出可能な第1関数を用いて、前記有効電力の目標値を算出し、前記電力系統における第2物理量を第2目標値に制御するべく前記電力貯蔵装置が出力すべき無効電力の目標値を前記第2物理量と前記第2目標値との差分から算出可能な第2関数を用いて、前記無効電力の目標値を算出し、
前記制御装置が、前記電力貯蔵装置が前記無効電力を出力することにより生ずる前記第1物理量の変動を打ち消すような前記有効電力の補正値を前記無効電力の目標値から算出可能な第3関数を用いて、前記有効電力の補正量を算出し、前記電力貯蔵装置が前記有効電力を出力することにより生ずる前記第2物理量の変動を打ち消すような前記無効電力の補正値を前記有効電力の目標値から算出可能な第4関数を用いて、前記無効電力の補正量を算出し、
前記制御装置が、前記有効電力の目標値を前記有効電力の補正値によって補正して算出した有効電力の指令値と、前記無効電力の目標値を前記無効電力の補正値によって補正して算出した無効電力の指令値と、を前記電力貯蔵装置に出力し、
前記制御装置が、前記電力貯蔵装置が前記有効電力の指令値に応じた有効電力を出力することにより見込まれる前記第1物理量の計算値を、前記有効電力の指令値から算出可能な第5関数と、前記電力貯蔵装置が前記無効電力の指令値に応じた無効電力を出力することにより見込まれる前記第1物理量の変動量を、前記無効電力の指令値から算出可能な第6関数と、を用いて前記第3関数を定める
ことを特徴とする制御装置の制御方法。
A control method of a control device of a power storage device linked to a power system,
The control device calculates a target value of active power to be output from the power storage device to control the first physical quantity in the power system to a first target value from a difference between the first physical quantity and the first target value. using a first function possible, the calculated target value of the active power, the target value of the reactive power to be output by the power storage device to control the second physical quantity in the power system to the second target value Using the second function that can be calculated from the difference between the second physical quantity and the second target value, the target value of the reactive power is calculated,
A third function capable of calculating a correction value of the active power from the target value of the reactive power so as to cancel the fluctuation of the first physical quantity caused by the output of the reactive power by the power storage device ; used, the calculated correction amount of active power, the power storage device is the target value of the active power correction value of the reactive power which cancels the variation of the second physical quantity caused by outputting the effective power The reactive power correction amount is calculated using a fourth function that can be calculated from
The control device calculates the active power command value calculated by correcting the active power target value using the active power correction value and the reactive power target value corrected using the reactive power correction value. A reactive power command value is output to the power storage device ,
A fifth function that allows the control device to calculate a calculated value of the first physical quantity that is expected when the power storage device outputs active power corresponding to the command value of the active power from the command value of the active power. And a sixth function that can calculate a fluctuation amount of the first physical quantity that is expected when the power storage device outputs reactive power corresponding to the reactive power command value from the reactive power command value. A control method for a control device, wherein the third function is determined by using the third function .
電力系統に連系する電力貯蔵装置を制御する制御装置に、
前記電力系統における第1物理量を第1目標値に制御するべく前記電力貯蔵装置が出力すべき有効電力の目標値を前記第1物理量と前記第1目標値との差分から算出可能な第1関数を用いて、前記有効電力の目標値を算出し、前記電力系統における第2物理量を第2目標値に制御するべく前記電力貯蔵装置が出力すべき無効電力の目標値を前記第2物理量と前記第2目標値との差分から算出可能な第2関数を用いて、前記無効電力の目標値を算出する機能と、
前記電力貯蔵装置が前記無効電力を出力することにより生ずる前記第1物理量の変動を打ち消すような前記有効電力の補正値を前記無効電力の目標値から算出可能な第3関数を用いて、前記有効電力の補正量を算出し、前記電力貯蔵装置が前記有効電力を出力することにより生ずる前記第2物理量の変動を打ち消すような前記無効電力の補正値を前記有効電力の目標値から算出可能な第4関数を用いて、前記無効電力の補正量を算出する機能と、
前記有効電力の目標値を前記有効電力の補正値によって補正して算出した有効電力の指令値と、前記無効電力の目標値を前記無効電力の補正値によって補正して算出した無効電力の指令値と、を前記電力貯蔵装置に出力する機能と、
前記電力貯蔵装置が前記有効電力の指令値に応じた有効電力を出力することにより見込まれる前記第1物理量の計算値を、前記有効電力の指令値から算出可能な第5関数と、前記電力貯蔵装置が前記無効電力の指令値に応じた無効電力を出力することにより見込まれる前記第1物理量の変動量を、前記無効電力の指令値から算出可能な第6関数と、を用いて前記第3関数を定める機能と、
を実現するためのプログラム。
In the control device that controls the power storage device linked to the power system,
A first function capable of calculating a target value of active power to be output by the power storage device to control a first physical quantity in the power system to a first target value from a difference between the first physical quantity and the first target value. The target value of the reactive power to be output by the power storage device in order to control the second physical quantity in the power system to the second target value is calculated using the second physical quantity and the second physical quantity. A function of calculating a target value of the reactive power using a second function that can be calculated from a difference from the second target value ;
Using the third function that can calculate the correction value of the active power from the target value of the reactive power so as to cancel the fluctuation of the first physical quantity caused by the power storage device outputting the reactive power. A correction amount of power is calculated, and a correction value of the reactive power that cancels the fluctuation of the second physical quantity caused by the power storage device outputting the active power can be calculated from the target value of the active power. A function of calculating a correction amount of the reactive power using four functions ;
A command value of active power calculated by correcting the target value of active power with the correction value of active power, and a command value of reactive power calculated by correcting the target value of reactive power with the correction value of reactive power And a function of outputting to the power storage device,
A fifth function capable of calculating a calculated value of the first physical quantity that is expected when the power storage device outputs active power corresponding to the command value of the active power from the command value of the active power; and the power storage A sixth function capable of calculating a fluctuation amount of the first physical quantity that is expected when the device outputs reactive power corresponding to the reactive power command value, using the sixth function that can be calculated from the reactive power command value. A function to define a function;
Program to realize.
電力系統に連系する電力貯蔵装置の制御装置の制御方法であって、  A control method of a control device of a power storage device linked to a power system,
前記制御装置が、前記電力系統における第1物理量を第1目標値に制御するべく前記電力貯蔵装置が出力すべき有効電力の目標値を前記第1物理量と前記第1目標値との差分から算出可能な第1関数を用いて、前記有効電力の目標値を算出し、前記電力系統における第2物理量を第2目標値に制御するべく前記電力貯蔵装置が出力すべき無効電力の目標値を前記第2物理量と前記第2目標値との差分から算出可能な第2関数を用いて、前記無効電力の目標値を算出し、  The control device calculates a target value of active power to be output from the power storage device to control the first physical quantity in the power system to a first target value from a difference between the first physical quantity and the first target value. The active power target value is calculated using a possible first function, and the reactive power target value to be output by the power storage device to control the second physical quantity in the power system to the second target value is Using the second function that can be calculated from the difference between the second physical quantity and the second target value, the target value of the reactive power is calculated,
前記制御装置が、前記電力貯蔵装置が前記無効電力を出力することにより生ずる前記第1物理量の変動を打ち消すような前記有効電力の補正値を前記無効電力の目標値から算出可能な第3関数を用いて、前記有効電力の補正量を算出し、前記電力貯蔵装置が前記有効電力を出力することにより生ずる前記第2物理量の変動を打ち消すような前記無効電力の補正値を前記有効電力の目標値から算出可能な第4関数を用いて、前記無効電力の補正量を算出し、  A third function capable of calculating a correction value of the active power from the target value of the reactive power so as to cancel the fluctuation of the first physical quantity caused by the output of the reactive power by the power storage device; A correction amount of the reactive power that is used to calculate a correction amount of the active power and cancel the fluctuation of the second physical quantity caused by the power storage device outputting the active power. The reactive power correction amount is calculated using a fourth function that can be calculated from
前記制御装置が、前記有効電力の目標値を前記有効電力の補正値によって補正して算出した有効電力の指令値と、前記無効電力の目標値を前記無効電力の補正値によって補正して算出した無効電力の指令値と、を前記電力貯蔵装置に出力し、  The control device calculates the active power command value calculated by correcting the active power target value using the active power correction value and the reactive power target value corrected using the reactive power correction value. A reactive power command value is output to the power storage device,
前記制御装置が、前記電力貯蔵装置が前記無効電力の指令値に応じた無効電力を出力することにより見込まれる前記第2物理量の計算値を、前記無効電力の指令値から算出可能な第7関数と、前記電力貯蔵装置が前記有効電力の指令値に応じた有効電力を出力することにより見込まれる前記第2物理量の変動量を、前記有効電力の指令値から算出可能な第8関数と、を用いて前記第4関数を定める  A seventh function that allows the control device to calculate a calculated value of the second physical quantity expected from the reactive power command value output by the power storage device from the reactive power command value; And an eighth function capable of calculating a fluctuation amount of the second physical quantity that is expected when the power storage device outputs active power corresponding to the command value of the active power from the command value of the active power. To determine the fourth function
ことを特徴とする制御装置の制御方法。The control method of the control apparatus characterized by the above-mentioned.
電力系統に連系する電力貯蔵装置を制御する制御装置に、  In the control device that controls the power storage device linked to the power system,
前記電力系統における第1物理量を第1目標値に制御するべく前記電力貯蔵装置が出力すべき有効電力の目標値を前記第1物理量と前記第1目標値との差分から算出可能な第1関数を用いて、前記有効電力の目標値を算出し、前記電力系統における第2物理量を第2目標値に制御するべく前記電力貯蔵装置が出力すべき無効電力の目標値を前記第2物理量と前記第2目標値との差分から算出可能な第2関数を用いて、前記無効電力の目標値を算出する機能と、  A first function capable of calculating a target value of active power to be output by the power storage device to control a first physical quantity in the power system to a first target value from a difference between the first physical quantity and the first target value. The target value of the reactive power to be output by the power storage device in order to control the second physical quantity in the power system to the second target value is calculated using the second physical quantity and the second physical quantity. A function of calculating a target value of the reactive power using a second function that can be calculated from a difference from the second target value;
前記電力貯蔵装置が前記無効電力を出力することにより生ずる前記第1物理量の変動を打ち消すような前記有効電力の補正値を前記無効電力の目標値から算出可能な第3関数を用いて、前記有効電力の補正量を算出し、前記電力貯蔵装置が前記有効電力を出力することにより生ずる前記第2物理量の変動を打ち消すような前記無効電力の補正値を前記有効電力の目標値から算出可能な第4関数を用いて、前記無効電力の補正量を算出する機能と、  Using the third function that can calculate the correction value of the active power from the target value of the reactive power so as to cancel the fluctuation of the first physical quantity caused by the power storage device outputting the reactive power. A correction amount of power is calculated, and a correction value of the reactive power that cancels the fluctuation of the second physical quantity caused by the power storage device outputting the active power can be calculated from the target value of the active power. A function of calculating a correction amount of the reactive power using four functions;
前記有効電力の目標値を前記有効電力の補正値によって補正して算出した有効電力の指令値と、前記無効電力の目標値を前記無効電力の補正値によって補正して算出した無効電力の指令値と、を前記電力貯蔵装置に出力する機能と、  A command value of active power calculated by correcting the target value of active power with the correction value of active power, and a command value of reactive power calculated by correcting the target value of reactive power with the correction value of reactive power And a function of outputting to the power storage device,
前記電力貯蔵装置が前記無効電力の指令値に応じた無効電力を出力することにより見込まれる前記第2物理量の計算値を、前記無効電力の指令値から算出可能な第7関数と、前記電力貯蔵装置が前記有効電力の指令値に応じた有効電力を出力することにより見込まれる前記第2物理量の変動量を、前記有効電力の指令値から算出可能な第8関数と、を用いて前記第4関数を定める機能と、  A seventh function capable of calculating from the reactive power command value a calculated value of the second physical quantity expected when the power storage device outputs reactive power according to the reactive power command value; An eighth function capable of calculating a fluctuation amount of the second physical quantity that is expected when the device outputs an active power corresponding to the command value of the active power, using an eighth function that can be calculated from the command value of the active power. A function to define a function;
を実現するためのプログラム。Program to realize.
JP2015133542A 2015-07-02 2015-07-02 Control device for power storage device, control method for control device for power storage device, and program Active JP6596988B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2015133542A JP6596988B2 (en) 2015-07-02 2015-07-02 Control device for power storage device, control method for control device for power storage device, and program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2015133542A JP6596988B2 (en) 2015-07-02 2015-07-02 Control device for power storage device, control method for control device for power storage device, and program

Publications (2)

Publication Number Publication Date
JP2017017893A JP2017017893A (en) 2017-01-19
JP6596988B2 true JP6596988B2 (en) 2019-10-30

Family

ID=57831237

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2015133542A Active JP6596988B2 (en) 2015-07-02 2015-07-02 Control device for power storage device, control method for control device for power storage device, and program

Country Status (1)

Country Link
JP (1) JP6596988B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7016599B1 (en) 2020-08-05 2022-02-07 西芝電機株式会社 Power generation device control method
JP7044191B1 (en) 2021-07-09 2022-03-30 富士電機株式会社 Distributed power management equipment, distributed power management methods and distributed power management programs
CN116418014B (en) * 2023-06-07 2023-08-22 坎德拉(深圳)新能源科技有限公司 Control method, system controller and medium of grid-connected power generation system

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS59149773A (en) * 1983-02-10 1984-08-27 Toshiba Corp Controller for self-excited power converter
JPH06245536A (en) * 1993-02-23 1994-09-02 Fuji Electric Co Ltd Control parameter adjuster for system link inverter
JP4588178B2 (en) * 2000-07-17 2010-11-24 株式会社キューヘン Power converter control device for power storage device
JP2006254660A (en) * 2005-03-14 2006-09-21 Tokyo Electric Power Co Inc:The Distributed power unit
JP5644396B2 (en) * 2010-08-06 2014-12-24 株式会社明電舎 Harmonic current suppression device and harmonic current suppression method for power converter
JP2013009556A (en) * 2011-06-27 2013-01-10 Nec Corp Voltage sensitivity measurement system, power device control system, terminal device, information processing device, and method and program of the same
CN104104221B (en) * 2013-04-11 2017-05-17 通用电气公司 Energy conversion system having active and reactive power decoupling compensation mechanism and method

Also Published As

Publication number Publication date
JP2017017893A (en) 2017-01-19

Similar Documents

Publication Publication Date Title
Lai et al. Comprehensive review of the dynamic thermal rating system for sustainable electrical power systems
JP4705563B2 (en) Distribution system state estimation device, state estimation method and program thereof
JP5886407B1 (en) Prediction device
US9507367B2 (en) Method and system for dynamic stochastic optimal electric power flow control
CN102269124B (en) Ultra-short term wind power station generated power forecasting system
US9921602B2 (en) Methods of computing steady-state voltage stability margins of power systems
JP6515640B2 (en) Tidal current calculation apparatus, tidal current calculation method, and program
JP6596988B2 (en) Control device for power storage device, control method for control device for power storage device, and program
Shrestha et al. Frequency stability issues and research opportunities in converter dominated power system
CN110705771B (en) Method and device for predicting and optimizing generation power of new energy of regional power grid
JP5989754B2 (en) Prediction device
WO2012114582A1 (en) Voltage control apparatus
Sharma et al. Optimal fractional-order tilted-integral-derivative controller for frequency stabilization in hybrid power system using salp swarm algorithm
JP5078128B2 (en) Operation method, prediction error compensation device, meteorological power generation planning device, and program
JP2017153345A (en) Method and system for dynamic state estimation of power distribution system
JP2015109737A (en) Power distribution system monitoring device
JP6086875B2 (en) Power generation amount prediction device and power generation amount prediction method
CN102914693A (en) Maximum power point tracker
JP2016073156A (en) Power generation amount prediction device, power generation amount prediction method, and program
US20160146864A1 (en) Power System Monitoring and Control Apparatus, and Power System Monitoring and Control Method
CN114336739A (en) Energy storage power configuration method and system of optical storage power station based on cloud edge cooperation
JP2012143098A (en) Power consumption prediction system, and control method of power consumption prediction system
Pathak et al. Generation rate constraints physical identification and modeling in AGC of multi-area power systems
US20240088655A1 (en) Methods and systems for controlling a chp device in a microgrid
JP6524824B2 (en) Control device of power storage device, control method of control device of power storage device, and program

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20180614

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20190327

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20190409

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20190604

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20190903

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20190916

R150 Certificate of patent or registration of utility model

Ref document number: 6596988

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250