JP6400959B2 - Bolt removing tool and bolt removing method - Google Patents

Bolt removing tool and bolt removing method Download PDF

Info

Publication number
JP6400959B2
JP6400959B2 JP2014136706A JP2014136706A JP6400959B2 JP 6400959 B2 JP6400959 B2 JP 6400959B2 JP 2014136706 A JP2014136706 A JP 2014136706A JP 2014136706 A JP2014136706 A JP 2014136706A JP 6400959 B2 JP6400959 B2 JP 6400959B2
Authority
JP
Japan
Prior art keywords
bolt
hole
guide
drill bit
mounting hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2014136706A
Other languages
Japanese (ja)
Other versions
JP2016014263A (en
Inventor
朋彦 大久保
朋彦 大久保
健太 奥田
健太 奥田
芳雄 植松
芳雄 植松
光 森田
光 森田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
East Japan Railway Co
Original Assignee
East Japan Railway Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by East Japan Railway Co filed Critical East Japan Railway Co
Priority to JP2014136706A priority Critical patent/JP6400959B2/en
Publication of JP2016014263A publication Critical patent/JP2016014263A/en
Application granted granted Critical
Publication of JP6400959B2 publication Critical patent/JP6400959B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Machines For Laying And Maintaining Railways (AREA)
  • Hand Tools For Fitting Together And Separating, Or Other Hand Tools (AREA)

Description

本発明は、レールを固定するボルトが折損した場合に、当該ボルトの除去に用いるボルト除去工具および当該ボルトを除去するボルト除去方法に関する。   The present invention relates to a bolt removing tool used for removing a bolt and a bolt removing method for removing the bolt when a bolt for fixing a rail is broken.

枕木やスラブ軌道などの敷設面(以下、単に「枕木」という。)に敷設されるレールを固定するためのレール締結装置が知られている。具体的には、レール締結装置は、例えば、レールの下側フランジ部を押圧する板ばねが設けられており、この板ばねをボルトで締結することで、レールを枕木に固定する(特許文献1参照)。   There is known a rail fastening device for fixing a rail laid on a laying surface such as a sleeper or a slab track (hereinafter simply referred to as “sleeper”). Specifically, the rail fastening device is provided with, for example, a leaf spring that presses the lower flange portion of the rail, and the rail is fixed to the sleeper by fastening the leaf spring with a bolt (Patent Document 1). reference).

特開2014−15733号公報JP 2014-15733 A

ところで、経年劣化等によって、レールを固定しているボルトが折損してしまうことがある。折損したボルトは新しいボルトに交換する必要があるが、折損したボルト、特に枕木内で折損したボルトは、除去が難しい。そのため、従来、ボルトを周りごと刳り貫く手法や、枕木本体を交換する手法が採用されている。
しかしながら、ボルトを周りごと刳り貫く手法は、コア抜き等の特殊な技術と機械が必要であるという問題がある。
また、枕木本体を交換する手法は、コストや手間がかかるという問題がある。さらに、枕木の交換は、夏季の場合に道床を緩める作業となるので、張り出し事故のリスクがあるという問題もある。
By the way, the bolt fixing the rail may break due to aging or the like. Broken bolts need to be replaced with new bolts, but broken bolts, particularly bolts broken in sleepers, are difficult to remove. For this reason, conventionally, a method of piercing the entire bolt or a method of replacing the sleeper main body has been adopted.
However, there is a problem that the technique of piercing the entire bolt requires a special technique such as core removal and a machine.
In addition, there is a problem that the method of replacing the sleeper main body is costly and troublesome. Furthermore, the replacement of sleepers is a work of loosening the road bed in the summer, and there is a problem that there is a risk of an overhang accident.

本発明は、以上のような事情に鑑みてなされたものであり、レールを固定するボルトが折損した場合に、当該ボルトの除去に用いるボルト除去工具および当該ボルトを除去するボルト除去方法であって、当該ボルトの簡便な除去を実現可能なボルト除去工具およびボルト除去方法を提供することを目的とする。   The present invention has been made in view of the above circumstances, and is a bolt removing tool used for removing the bolt and a bolt removing method for removing the bolt when the bolt for fixing the rail is broken. An object of the present invention is to provide a bolt removing tool and a bolt removing method capable of realizing simple removal of the bolt.

前記課題を解決するために、本発明のボルト除去システムは、
レールを固定するボルトが折損した場合に当該ボルトの除去に用いるボルト除去工具であって、
前記ボルトとは逆方向のネジ部を有するエキストラクタを取り付けるための取付穴を前記ボルトに形成するドリルビットをガイドするガイド治具と、
前記レールに固定可能であり、前記ガイド治具を位置調整可能に支持する支持金具と、
を備え、
前記ガイド治具は、
前記ボルトの中心軸に沿って前記取付穴が形成されるように前記ドリルビットをガイドし、
前記取付穴を形成するための取付穴形成用ドリルビットと、前記取付穴形成用ドリルビットよりも径が小さく、当該取付穴形成用ドリルビットを用いた前記取付穴の形成を容易にする予備穴を形成するための予備穴形成用ドリルビットと、の双方をガイド可能である
In order to solve the above-described problem, the bolt removing system of the present invention includes:
A bolt removing tool used for removing the bolt when the bolt for fixing the rail is broken,
A guide jig for guiding a drill bit that forms a mounting hole in the bolt for mounting an extractor having a screw portion in a direction opposite to the bolt;
A support bracket that can be fixed to the rail and supports the guide jig so that the position thereof can be adjusted;
With
The guide jig is
Guiding the drill bit so that the mounting hole is formed along a central axis of the bolt ;
A mounting hole forming drill bit for forming the mounting hole and a spare hole having a diameter smaller than that of the mounting hole forming drill bit and facilitating formation of the mounting hole using the mounting hole forming drill bit It is possible to guide both the preliminary hole forming drill bit for forming the .

したがって、エキストラクタを取り付けるための取付穴を簡単に精度よく形成することができるので、レールを固定するボルトが折損して軸部のみが枕木内に残留した場合でも、当該残留部分を簡便に除去することができる。すなわち、レールを固定するボルトが折損した場合に、当該ボルトを簡便に除去することができる。   Therefore, the mounting holes for attaching the extractor can be easily and accurately formed, so even if the bolt that fixes the rail breaks and only the shaft part remains in the sleeper, the remaining part can be easily removed. can do. That is, when the bolt that fixes the rail breaks, the bolt can be easily removed.

また、取付穴形成用ドリルビットとして超硬ドリルビットを用いたり、取付穴形成用ドリルビットを回転させる回転工具として高出力の回転工具を用いたりしなくても、エキストラクタを取り付けるための取付穴を簡単に精度よく形成することができる。 Also , mounting holes for mounting the extractor without using a carbide drill bit as the mounting hole forming drill bit or using a high-power rotary tool as the rotating tool for rotating the mounting hole forming drill bit. Can be formed easily and accurately.

また、好ましくは、前記支持金具は、前記ガイド治具を回転自在に支持し、
前記ガイド治具には、前記予備穴形成用ドリルビットをガイドする第一ガイド孔と、前記取付穴形成用ドリルビットをガイドする第二ガイド孔と、が設けられており、
前記第一ガイド孔の中心軸と前記ガイド治具の回転軸との間隔と、前記第二ガイド孔の中心軸と前記ガイド治具の回転軸との間隔と、は同一であるように構成する。
Preferably, the support fitting rotatably supports the guide jig,
The guide jig is provided with a first guide hole for guiding the preliminary hole forming drill bit, and a second guide hole for guiding the mounting hole forming drill bit,
The distance between the center axis of the first guide hole and the rotation axis of the guide jig is the same as the distance between the center axis of the second guide hole and the rotation axis of the guide jig. .

このように構成することによって、第一ガイド孔の中心軸がボルトの中心軸に一致した状態でガイド治具を回転させるだけで、第二ガイド孔の中心軸をボルトの中心軸に一致させることができるので、第二ガイド孔の位置調整を簡単に行うことができる。   By configuring in this way, the center axis of the second guide hole can be made to coincide with the center axis of the bolt only by rotating the guide jig in a state where the center axis of the first guide hole coincides with the center axis of the bolt. Therefore, it is possible to easily adjust the position of the second guide hole.

また、本発明のボルト除去方法は、
前記ボルト除去工具を用いて、レールを固定するボルトが折損した場合に当該ボルトを除去するボルト除去方法であって、
前記ボルト除去工具を前記レールに固定する固定ステップと、
次いで、前記ガイド治具にガイドされた前記予備穴形成用ドリルビットを用いて前記ボルトに前記予備穴を形成する予備穴形成ステップと、
次いで、前記ガイド治具にガイドされた前記取付穴形成用ドリルビットを用いて前記予備穴を拡径することによって、前記ボルトに前記取付穴を形成する取付穴形成ステップと、
次いで、前記取付穴に前記エキストラクタを取り付ける取付ステップと、
次いで、前記エキストラクタにハンドルを取り付けて、当該エキストラクタを締める方向に回転させる回転ステップと、
を有する。
The bolt removing method of the present invention is
A bolt removing method for removing the bolt when the bolt for fixing the rail is broken using the bolt removing tool,
A fixing step of fixing the bolt removing tool to the rail;
Next, a preliminary hole forming step of forming the preliminary hole in the bolt using the preliminary hole forming drill bit guided by the guide jig;
Then, the mounting hole forming step of forming the mounting hole in the bolt by expanding the preliminary hole diameter using the mounting hole forming drill bit guided by the guide jig;
Next, an attachment step of attaching the extractor to the attachment hole;
Next, a rotation step of attaching a handle to the extractor and rotating the extractor in a tightening direction;
Have

したがって、エキストラクタを取り付けるための取付穴を簡単に精度よく形成することができるので、レールを固定するボルトが折損して軸部のみが枕木内に残留した場合でも、当該残留部分を簡便に除去することができる。すなわち、レールを固定するボルトが折損した場合に、当該ボルトを簡便に除去することができる。   Therefore, the mounting holes for attaching the extractor can be easily and accurately formed, so even if the bolt that fixes the rail breaks and only the shaft part remains in the sleeper, the remaining part can be easily removed. can do. That is, when the bolt that fixes the rail breaks, the bolt can be easily removed.

また、好ましくは、前記固定ステップの前に、前記ボルトの折損面を平坦にする平坦化ステップを行うように構成する。   Preferably, a flattening step for flattening the broken surface of the bolt is performed before the fixing step.

このように構成することによって、予備穴や取付穴を形成しやすくすることができる。   By comprising in this way, it can be made easy to form a preliminary | backup hole and an attachment hole.

本発明によれば、レールを固定するボルトが折損した場合に、当該ボルトを簡便に除去することができる。   According to the present invention, when the bolt for fixing the rail is broken, the bolt can be easily removed.

本実施形態にかかるボルト除去工具の平面図である。It is a top view of the bolt removal tool concerning this embodiment. 本実施形態にかかるボルト除去工具の正面図である。It is a front view of the bolt removal tool concerning this embodiment. 図1のIII−III線における断面図である。It is sectional drawing in the III-III line of FIG. 「第一ガイド孔が最も外側に位置した状態」を説明するための図であって、(a)は平面図であり、(b)は断面図である。It is a figure for demonstrating "the state where the 1st guide hole was located in the outermost side", (a) is a top view, (b) is sectional drawing. 「第二ガイド孔が最も外側に位置した状態」を説明するための図であって、(a)は平面図であり、(b)は断面図である。It is a figure for demonstrating "the state where the 2nd guide hole was located on the outermost side", (a) is a top view, (b) is sectional drawing. 平坦化ステップを説明するための図である。It is a figure for demonstrating the planarization step. 印付けステップを説明するための図である。It is a figure for demonstrating a marking step. 予備穴形成ステップを説明するための図である。It is a figure for demonstrating a preliminary hole formation step. 取付穴形成ステップを説明するための図である。It is a figure for demonstrating an attachment hole formation step. 取付ステップを説明するための図である。It is a figure for demonstrating an attachment step. 回転ステップを説明するための図である。It is a figure for demonstrating a rotation step. 本実施形態にかかるボルト除去工具およびボルト除去方法を用いて、枕木からボルトを除去した状態を示す図である。It is a figure which shows the state which removed the volt | bolt from the sleeper using the volt | bolt removal tool and volt | bolt removal method concerning this embodiment.

図面を参照しつつ、本発明にかかるボルト除去工具およびボルト除去方法の実施形態について説明する。なお、以下に述べる実施形態には、本発明を実施するために技術的に好ましい種々の限定が付されているが、本発明の範囲を以下の実施形態および図示例に限定するものではない。
以下の説明では、レールRの延在方向を前後方向、レールRの高さ方向を上下方向とし、前後方向と上下方向との双方に直交する方向を左右方向とする。
Embodiments of a bolt removing tool and a bolt removing method according to the present invention will be described with reference to the drawings. The embodiments described below are given various technically preferable limitations for carrying out the present invention, but the scope of the present invention is not limited to the following embodiments and illustrated examples.
In the following description, the extending direction of the rail R is the front-rear direction, the height direction of the rail R is the up-down direction, and the direction orthogonal to both the front-rear direction and the up-down direction is the left-right direction.

<ボルト除去工具>
まず、本実施形態にかかるボルト除去工具について説明する。
図1は、本実施形態にかかるボルト除去工具1の平面図(上面図)であり、図2は、本実施形態にかかるボルト除去工具1の正面図(前面図)である。また、図3は、図1のIII−III線における断面図である。
ボルト除去工具1は、図1〜図3に示すように、ボルトBとは逆方向のネジ部を有するエキストラクタ6を取り付けるための取付穴BcをボルトBに形成するドリルビット4,5をガイドするガイド治具50と、レールRに固定可能であり、ガイド治具50を位置調整可能に支持する支持金具100と、を備えて構成される。このボルト除去工具1を用いれば、鉄道線路を構成するレールRを固定するボルトBが折損して、当該ボルトBの軸部のみが、PC枕木等の枕木M内に残留した場合でも、当該残留部分を簡便に除去することができる。
<Bolt removal tool>
First, the bolt removing tool according to this embodiment will be described.
FIG. 1 is a plan view (top view) of a bolt removing tool 1 according to the present embodiment, and FIG. 2 is a front view (front view) of the bolt removing tool 1 according to the present embodiment. 3 is a cross-sectional view taken along line III-III in FIG.
As shown in FIGS. 1 to 3, the bolt removing tool 1 guides drill bits 4 and 5 that form a mounting hole Bc in the bolt B for mounting an extractor 6 having a threaded portion opposite to the bolt B. And a support fitting 100 that can be fixed to the rail R and supports the guide jig 50 so that the position of the guide jig 50 can be adjusted. If this bolt removal tool 1 is used, even if the bolt B that fixes the rail R constituting the railway track breaks and only the shaft portion of the bolt B remains in the sleeper M such as a PC sleeper, the residual The part can be easily removed.

支持金具100は、当該支持金具100をレールRに対して位置決めするための位置決め部材110と、当該支持金具100をレールRに固定するための固定部材120と、位置決め部材110に対し左右方向にスライド可能に取り付けられたスライド部材130と、スライド部材130に取り付けられた治具受部材140と、を備えて構成される。支持金具100は、例えば、50Nレールと60kgレールとの双方に固定可能に構成されている。   The support fitting 100 slides in the left-right direction with respect to the positioning member 110 for positioning the support fitting 100 with respect to the rail R, a fixing member 120 for fixing the support fitting 100 to the rail R, and the positioning member 110. The slide member 130 is attached to the slide member 130 and the jig receiving member 140 is attached to the slide member 130. The support fitting 100 is configured to be fixable to both a 50N rail and a 60 kg rail, for example.

位置決め部材110は、矩形板状をなし長手方向が前後方向に沿った状態でレールR上に載置される上面部111と、上面部111の左端面のうちの前端部および後端部から下側に向けて垂直に延出する左側面部112,112と、上面部111の右端面のうちの前端部および後端部から下側に向けて垂直に延出する右側面部113,113と、からなる。
互いに対向する左側面部112と右側面部113との間隔は、レールRの頭部の幅とほぼ同一となるように設定されている。そして、位置決め部材110は、上面部111がレールR上に載置された状態で、前側の左側面部112と右側面部113とでレールRの頭部を挟むとともに、後側の左側面部112と右側面部113とでレールRの頭部を挟むことによって、支持金具100をレールRに対して上下方向および左右方向に位置決めすることができる。
The positioning member 110 is formed in a rectangular plate shape, and the upper surface portion 111 placed on the rail R in a state in which the longitudinal direction is along the front-rear direction, and the front end portion and the rear end portion of the left end surface of the upper surface portion 111 are located below Left side surface portions 112, 112 extending vertically toward the side, and right side surface portions 113, 113 extending vertically downward from the front end portion and the rear end portion of the right end surface of the upper surface portion 111, Become.
The distance between the left side surface portion 112 and the right side surface portion 113 facing each other is set to be substantially the same as the width of the head of the rail R. The positioning member 110 sandwiches the head of the rail R between the front left side surface 112 and the right side surface 113 with the upper surface portion 111 placed on the rail R, and the rear left side surface 112 and the right side. By sandwiching the head of the rail R with the surface portion 113, the support fitting 100 can be positioned with respect to the rail R in the vertical direction and the horizontal direction.

また、位置決め部材110の上面部111の中央部には、当該上面部111から上側に向けて垂直に突出するスクリュー軸111aが設けられている。そして、位置決め部材110には、スクリュー軸111aに螺合するスライド部材押え部114aを長手方向一端に有する操作レバー114が取り付けられている。   Further, a screw shaft 111 a that protrudes vertically upward from the upper surface portion 111 is provided at the center of the upper surface portion 111 of the positioning member 110. The positioning member 110 is provided with an operation lever 114 having a slide member pressing portion 114a screwed to the screw shaft 111a at one end in the longitudinal direction.

固定部材120は、位置決め部材110の上面部111の前後方向一端部(図では前端部)に連結されたクランプである。
具体的には、固定部材120は、左右対称に開閉する一対のアーム部121,121と、アーム部121,121を開閉させるネジ部122と、を主に備えて構成される。ネジ部122を、一方向に回転させるとアーム部121,121が開いてゆき、他方向に回転させるとアーム部121,121が閉まってゆく。そして、ネジ部122を他方向に回転できなくなるまで回転させることによって、アーム部121,121でレールRの頭部を挟んだ状態を維持して、レールRに支持金具100を固定するように構成されている。
The fixing member 120 is a clamp connected to one end portion in the front-rear direction (front end portion in the drawing) of the upper surface portion 111 of the positioning member 110.
Specifically, the fixing member 120 mainly includes a pair of arm portions 121 and 121 that open and close symmetrically and a screw portion 122 that opens and closes the arm portions 121 and 121. When the screw portion 122 is rotated in one direction, the arm portions 121 and 121 are opened, and when the screw portion 122 is rotated in the other direction, the arm portions 121 and 121 are closed. Then, by rotating the screw part 122 until it cannot be rotated in the other direction, the state in which the head of the rail R is sandwiched between the arm parts 121 and 121 is maintained, and the support fitting 100 is fixed to the rail R. Has been.

スライド部材130は、矩形板状をなし長手方向が左右方向に沿った状態で位置決め部材110の上面部111上に載置される載置部131と、載置部131の左右方向一端部(図では左端部)から下側に向けて垂直に延出する延出部132と、からなる。   The slide member 130 has a rectangular plate shape and a placement portion 131 placed on the upper surface portion 111 of the positioning member 110 in a state where the longitudinal direction is along the left-right direction, and one end portion in the left-right direction of the placement portion 131 (see FIG. The left end portion) extends vertically downward from the left end portion.

スライド部材130の載置部131の前後方向中央部には、左右方向に長尺な長孔131aが形成されている。この長孔131aには、位置決め部材110のスクリュー軸111aが挿通可能であり、載置部131は、長孔131aにスクリュー軸111aが挿通された状態で、位置決め部材110の上面部111と操作レバー114のスライド部材押え部114aとの間に介在している。そして、操作レバー114を、スクリュー軸111aを中心に一方向に回動させることで、上面部111とスライド部材押え部114aとの間隔が広がって、スライド部材130が左右方向にスライド自在になる。スライド部材130にはガイド治具50を受ける治具受部材140が取り付けられているので、スライド部材130をスライドさせることによって、ガイド治具50が、レールRの延在方向(前後方向)に対して垂直方向(左右方向)にスライド移動するので、ガイド治具50の左右方向の位置調整をすることができる。
また、操作レバー114を、スクリュー軸111aを中心に他方向に回動させることで、上面部111とスライド部材押え部114aとの間隔が狭まってゆき、操作レバー114を他方向に回動できなくなるまで回動させることによって、上面部111とスライド部材押え部114aとで載置部131を挟んだ状態を維持して、スライド部材130をスライド不能にするように構成されている。
A long hole 131a elongated in the left-right direction is formed at the center in the front-rear direction of the placement portion 131 of the slide member 130. The screw shaft 111a of the positioning member 110 can be inserted into the long hole 131a, and the mounting portion 131 is connected to the upper surface portion 111 of the positioning member 110 and the operation lever in a state where the screw shaft 111a is inserted into the long hole 131a. It is interposed between the 114 slide member pressing portions 114a. Then, by rotating the operation lever 114 in one direction around the screw shaft 111a, the interval between the upper surface portion 111 and the slide member pressing portion 114a is widened, and the slide member 130 is slidable in the left-right direction. Since the jig receiving member 140 for receiving the guide jig 50 is attached to the slide member 130, the guide jig 50 is moved relative to the extending direction (front-rear direction) of the rail R by sliding the slide member 130. Therefore, the position of the guide jig 50 in the left-right direction can be adjusted.
Further, by rotating the operation lever 114 in the other direction around the screw shaft 111a, the interval between the upper surface portion 111 and the slide member pressing portion 114a is reduced, and the operation lever 114 cannot be rotated in the other direction. The slide member 130 is made non-slidable by maintaining the state where the mounting portion 131 is sandwiched between the upper surface portion 111 and the slide member pressing portion 114a.

スライド部材130の延出部132は、図3に示すように、レールRの側面にほぼ沿うように、前後方向に対して垂直に切った断面がL字状をなしている。具体的には、延出部132は、当該延出部132の先端部(すなわち、載置部131に接続する端部とは反対側の端部)が外側(図では左側)に折れ曲がっている。   As shown in FIG. 3, the extending portion 132 of the slide member 130 has an L-shaped cross section cut perpendicularly to the front-rear direction so as to be substantially along the side surface of the rail R. Specifically, the extension portion 132 has a distal end portion (that is, an end portion opposite to the end portion connected to the placement portion 131) of the extension portion 132 bent outward (left side in the drawing). .

治具受部材140は、スライド部材130の延出部132の先端部に取り付けられている。具体的には、治具受部材140は、図1〜図3に示すように、延出部132の先端部上に載置された状態で当該先端部にビス止めされているビス止め部141と、ガイド治具50と係合する係合部143と、ビス止め部141と係合部143とを連結する連結部142と、からなる。
治具受部材140は、図3に示すように、レールRの下側フランジ部の側面にほぼ沿うように、スライド部材130の延出部132の先端部上に載置されたビス止め部141の左右方向一端部(図では左端部)から、連結部142が下側に向けて垂直に延出し、当該連結部142の下端部から、係合部143がビス止め部141とは反対側(図では左側)に向けて垂直に延出している。
The jig receiving member 140 is attached to the distal end portion of the extending portion 132 of the slide member 130. Specifically, as shown in FIGS. 1 to 3, the jig receiving member 140 is screwed to the distal end portion with the screw retaining portion 141 being placed on the distal end portion of the extending portion 132. And an engaging portion 143 that engages with the guide jig 50, and a connecting portion 142 that connects the screw stopper 141 and the engaging portion 143.
As shown in FIG. 3, the jig receiving member 140 is a screw-fastening portion 141 placed on the distal end portion of the extending portion 132 of the slide member 130 so as to substantially follow the side surface of the lower flange portion of the rail R. From one end of the left and right direction (left end in the figure), the connecting portion 142 extends vertically downward, and from the lower end of the connecting portion 142, the engaging portion 143 is opposite to the screwing portion 141 ( It extends vertically toward the left side in the figure.

図1および図3に示すように、治具受部材140の係合部143には、ガイド治具50の円盤部51の径とほぼ同じ径の、上下方向に沿って貫通する開口143aが形成されている。
また、係合部143には、先端が開口143aの周面から突出するボールプランジャー144が内蔵されている。
As shown in FIGS. 1 and 3, the engaging portion 143 of the jig receiving member 140 is formed with an opening 143 a that penetrates in the vertical direction and has the same diameter as the disk portion 51 of the guide jig 50. Has been.
The engaging portion 143 incorporates a ball plunger 144 whose tip protrudes from the peripheral surface of the opening 143a.

ガイド治具50は、取付穴Bcを形成するための取付穴形成用ドリルビット5と、取付穴形成用ドリルビット5よりも径が小さく、当該取付穴形成用ドリルビット5を用いた取付穴Bcの形成を容易にする予備穴Bbを形成するための予備穴形成用ドリルビット4と、の双方を、ボルトBの中心軸に沿って穴Bb,Bcが形成されるようにガイドできるよう構成されている。
予備穴形成用ドリルビット4および取付穴形成用ドリルビット5は、らせん状の溝が形成されたドリル刃部を有する金属用のドリルビットであり、ドリルドライバやインパクトドライバなどの電動回転工具に取り付けて使用する。
The guide jig 50 has a mounting hole forming drill bit 5 for forming the mounting hole Bc and a diameter smaller than the mounting hole forming drill bit 5, and the mounting hole Bc using the mounting hole forming drill bit 5. Both of the preliminary hole forming drill bit 4 for forming the preliminary hole Bb for facilitating the formation of the hole Bb can be guided so as to form the holes Bb and Bc along the central axis of the bolt B. ing.
The pre-hole forming drill bit 4 and the mounting hole forming drill bit 5 are metal drill bits having a drill blade portion in which a spiral groove is formed, and are attached to an electric rotary tool such as a drill driver or an impact driver. To use.

ドリル刃部の径が小さいドリルビットほど、ボルトに対する圧力が高くなる。よって、ボルトBに、径の大きな穴を直に形成する場合よりも、径の小さな穴を形成し、その後、その穴を拡径することによって径の大きな穴を形成する場合の方が、効率よく径の大きな穴を形成することができる。よって、本実施形態では、まず、取付穴形成用ドリルビット5よりも径の小さい予備穴形成用ドリルビット4を用いて予備穴Bbを形成し、その後、取付穴形成用ドリルビット5で予備穴Bbを拡径することによって、ボルトBに取付穴Bcを形成する。   The smaller the drill bit diameter, the higher the pressure on the bolt. Therefore, it is more efficient to form a hole with a small diameter than by directly forming a hole with a large diameter in the bolt B and then forming a hole with a large diameter by expanding the hole. A hole with a large diameter can be formed well. Therefore, in this embodiment, first, the preliminary hole Bb is formed by using the preliminary hole forming drill bit 4 having a diameter smaller than that of the mounting hole forming drill bit 5, and then the preliminary hole is formed by the mounting hole forming drill bit 5. A mounting hole Bc is formed in the bolt B by expanding the diameter of Bb.

なお、本実施形態では、ボルトBの胴部の直径が約10mmであり、予備穴形成用ドリルビット4としてドリル刃部の直径が5mmのドリルビットを用い、取付穴形成用ドリルビット5としてドリル刃部の直径が8.5mmのドリルビットを用いる場合を例に説明するが、取付穴形成用ドリルビット5の直径は、ボルトBに取付穴Bcを形成できるのであれば、適宜任意に変更可能である。また、予備穴形成用ドリルビット4の直径は、取付穴形成用ドリルビット5の直径よりも小さく、かつ、汎用の電動回転工具によってボルトBに予備穴Bbを形成できるのであれば、適宜任意に変更可能である。   In this embodiment, the diameter of the body of the bolt B is about 10 mm, a drill bit having a drill blade diameter of 5 mm is used as the preliminary hole forming drill bit 4, and a drill is used as the mounting hole forming drill bit 5. The case where a drill bit having a blade diameter of 8.5 mm is used will be described as an example, but the diameter of the drill hole 5 for mounting holes can be arbitrarily changed as long as the mounting hole Bc can be formed in the bolt B. It is. Further, the diameter of the preliminary hole forming drill bit 4 is smaller than the diameter of the mounting hole forming drill bit 5 and can be arbitrarily arbitrarily selected as long as the preliminary hole Bb can be formed in the bolt B with a general-purpose electric rotary tool. It can be changed.

具体的には、ガイド治具50は、ドリルビット4,5をガイドするガイド孔50a,50bが形成された円盤部51と、円盤部51の中心軸方向一端部に設けられ円盤部51の側面よりも半径方向に突出するフランジ部52と、からなる。
ガイド治具50は、フランジ部52を上側に向け円盤部51の中心軸が上下方向に沿った状態で、治具受部材140の開口143aの上方から当該開口143aに挿入されることによって、円盤部51の中心軸を中心に回転自在に治具受部材140に支持される。したがって、円盤部51の中心軸が、ガイド治具50の回転軸となる。
Specifically, the guide jig 50 includes a disk part 51 in which guide holes 50 a and 50 b for guiding the drill bits 4 and 5 are formed, and a side surface of the disk part 51 provided at one end in the central axis direction of the disk part 51. And a flange portion 52 protruding in the radial direction.
The guide jig 50 is inserted into the opening 143a from above the opening 143a of the jig receiving member 140 in a state where the center axis of the disk part 51 is along the vertical direction with the flange portion 52 facing upward. The jig receiving member 140 is supported so as to be rotatable about the central axis of the portion 51. Therefore, the central axis of the disk portion 51 becomes the rotation axis of the guide jig 50.

円盤部51には、径が異なる2つのガイド孔、具体的には予備穴形成用ドリルビット4をガイドする第一ガイド孔50aと、取付穴形成用ドリルビット5をガイドする第二ガイド孔50bと、が設けられている。ガイド孔50a,50bは、ガイド治具50の回転軸方向に沿って貫通する貫通孔である。本実施形態では、第一ガイド孔50aの直径が5mmまたは5mmよりも若干大きく、第二ガイド孔50bの直径が8.5mmまたは8.5mmよりも若干大きい場合を例に説明するが、第一ガイド孔50aの直径は、当該第一ガイド孔50aに挿通される予備穴形成用ドリルビット4の直径に応じて適宜任意に変更可能である。また、第二ガイド孔50bの直径は、当該第二ガイド孔50bに挿通される取付穴形成用ドリルビット5の直径に応じて適宜任意に変更可能である。
第一ガイド孔50aの中心軸とガイド治具50の回転軸との間隔と、第二ガイド孔50bの中心軸とガイド治具50の回転軸との間隔と、は同一に設定されている。具体的には、本実施形態の場合、第一ガイド孔50aの中心軸と第二ガイド孔50bの中心軸とは、ガイド治具50の回転軸に対して線対称に配置されている。
The disk portion 51 has two guide holes with different diameters, specifically, a first guide hole 50a for guiding the preliminary hole forming drill bit 4 and a second guide hole 50b for guiding the mounting hole forming drill bit 5. And are provided. The guide holes 50 a and 50 b are through holes that penetrate along the direction of the rotation axis of the guide jig 50. In the present embodiment, the case where the diameter of the first guide hole 50a is slightly larger than 5 mm or 5 mm and the diameter of the second guide hole 50b is slightly larger than 8.5 mm or 8.5 mm will be described as an example. The diameter of the guide hole 50a can be arbitrarily arbitrarily changed according to the diameter of the preliminary hole forming drill bit 4 inserted through the first guide hole 50a. Moreover, the diameter of the second guide hole 50b can be arbitrarily changed as appropriate according to the diameter of the mounting hole forming drill bit 5 inserted through the second guide hole 50b.
The distance between the central axis of the first guide hole 50a and the rotation axis of the guide jig 50 and the distance between the central axis of the second guide hole 50b and the rotation axis of the guide jig 50 are set to be the same. Specifically, in the present embodiment, the central axis of the first guide hole 50 a and the central axis of the second guide hole 50 b are arranged symmetrically with respect to the rotation axis of the guide jig 50.

以下、図4に示すように、第一ガイド孔50aの中心軸と第二ガイド孔50bの中心軸とがガイド治具50の回転軸に対して左右対象となり、かつ、第一ガイド孔50aが第二ガイド孔50bよりも外側(図では左側)にある状態のことを、「第一ガイド孔50aが最も外側に位置した状態」という。
また、図5に示すように、第一ガイド孔50aの中心軸と第二ガイド孔50bの中心軸とがガイド治具50の回転軸に対して左右対象となり、かつ、第二ガイド孔50bが第一ガイド孔50aよりも外側(図では左側)にある状態のことを、「第二ガイド孔50bが最も外側に位置した状態」という。
Hereinafter, as shown in FIG. 4, the center axis of the first guide hole 50a and the center axis of the second guide hole 50b are the left and right objects with respect to the rotation axis of the guide jig 50, and the first guide hole 50a is The state outside the second guide hole 50b (left side in the figure) is referred to as “the state where the first guide hole 50a is located on the outermost side”.
Further, as shown in FIG. 5, the central axis of the first guide hole 50a and the central axis of the second guide hole 50b are the left and right objects with respect to the rotation axis of the guide jig 50, and the second guide hole 50b is The state outside the first guide hole 50a (the left side in the figure) is referred to as “the state where the second guide hole 50b is located on the outermost side”.

図4に示すように、第一ガイド孔50aが最も外側に位置した状態である場合に、円盤部51の側面のうち、治具受部材140に内蔵されているボールプランジャー144の先端と対向する部分には、第一凹部51aが形成されている。
また、図5に示すように、第二ガイド孔50bが最も外側に位置した状態である場合に、円盤部51の側面のうち、治具受部材140に内蔵されているボールプランジャー144の先端と対向する部分には、第二凹部51bが形成されている。
したがって、第一ガイド孔50aが最も外側に位置した状態である場合には、ボールプランジャー144の先端が第一凹部51aに嵌まるため、フランジ部52に触ってガイド治具50を回転させる操作を行うユーザにクリック感を与えることができるとともに、第一ガイド孔50aの位置決めをすることができる。
また、第二ガイド孔50bが最も外側に位置した状態である場合には、ボールプランジャー144の先端が第二凹部51bに嵌まるため、フランジ部52に触ってガイド治具50を回転させる操作を行うユーザにクリック感を与えることができるとともに、第二ガイド孔50bの位置決めをすることができる。
As shown in FIG. 4, when the first guide hole 50 a is located on the outermost side, it faces the tip of the ball plunger 144 built in the jig receiving member 140 on the side surface of the disk portion 51. A first recess 51a is formed in the portion to be performed.
Further, as shown in FIG. 5, when the second guide hole 50 b is located on the outermost side, the tip of the ball plunger 144 built in the jig receiving member 140 among the side surfaces of the disk portion 51. A second concave portion 51b is formed in a portion facing.
Therefore, when the first guide hole 50a is in the outermost position, the tip of the ball plunger 144 fits into the first recess 51a, and therefore the operation of rotating the guide jig 50 by touching the flange portion 52. A click feeling can be given to the user who performs the operation, and the first guide hole 50a can be positioned.
Further, when the second guide hole 50b is in the outermost position, the tip of the ball plunger 144 fits into the second recess 51b, and therefore the operation of rotating the guide jig 50 by touching the flange portion 52. A click feeling can be given to the user who performs the operation, and the second guide hole 50b can be positioned.

<ボルト除去方法>
次に、本実施形態にかかるボルト除去方法について説明する。
本実施形態にかかるボルト除去方法は、(1)平坦化ステップ、(2)印付けステップ、(3)固定ステップ、(4)予備穴形成ステップ、(5)取付穴形成ステップ、(6)取付ステップ、および(7)回転ステップを有する。このボルト除去方法を用いれば、鉄道線路を構成するレールRを固定するボルトBが折損して、当該ボルトBの軸部のみが、PC枕木等の枕木M内に残留した場合でも、当該残留部分を簡便に除去することができる。
レールRを固定するボルトBは、通常、枕木Mに埋め込まれた埋込栓Nにねじ込まれている。
<Bolt removal method>
Next, the bolt removal method according to the present embodiment will be described.
The bolt removing method according to the present embodiment includes (1) flattening step, (2) marking step, (3) fixing step, (4) preliminary hole forming step, (5) mounting hole forming step, and (6) mounting. And (7) a rotation step. If this bolt removal method is used, even if the bolt B that fixes the rail R constituting the railway track breaks and only the shaft portion of the bolt B remains in the sleeper M such as a PC sleeper, the remaining portion Can be easily removed.
A bolt B for fixing the rail R is usually screwed into an embedded plug N embedded in a sleeper M.

(1)平坦化ステップ
平坦化ステップでは、ボルトBの折損面を平坦にする。
具体的には、例えば、図6に示すように、当て金2をボルトBの折損面に当てて、当該当て金2の頭部をハンマー(図示省略)で叩くことによって、ボルトBの折損面を平坦にする。このようにしてボルトBの折損面を平坦にすることによって、予備穴Bbや取付穴Bcが形成しやすくなるだけでなく、ボルトBを叩くことで、当該ボルトBの埋込栓Nに対する固着力を緩める効果が期待できる。
(1) Flattening step In the flattening step, the broken surface of the bolt B is flattened.
Specifically, for example, as shown in FIG. 6, the broken surface of the bolt B is obtained by hitting the head 2 of the stopper 2 with a hammer (not shown) by placing the stopper 2 against the broken surface of the bolt B. To flatten. By flattening the broken surface of the bolt B in this way, not only can the preliminary hole Bb and the mounting hole Bc be easily formed, but also by fixing the bolt B to the embedded plug N, The effect of relaxing can be expected.

(2)印付けステップ
印付けステップでは、ボルトBの折損面の中心に印Baを付ける。
具体的には、例えば、図7に示すように、ポンチ3をボルトBの折損面の中心に当てて、当該ポンチ3の頭部をハンマー(図示省略)で叩くことによって、ボルトBの折損面の中心に印Baを付ける。
(2) Marking step In the marking step, the mark Ba is marked at the center of the broken surface of the bolt B.
Specifically, for example, as shown in FIG. 7, the punch 3 is brought into contact with the center of the broken surface of the bolt B, and the head of the punch 3 is hit with a hammer (not shown). The mark Ba is attached to the center of

(3)固定ステップ
固定ステップでは、ボルト除去工具1をレールRに固定する。
具体的には、ボルト除去工具1をレールRに設置して、固定部材120でレールRに固定する。その際、レールRの右側に除去したいボルトBがある場合には、ガイド治具50がレールRの右側に配置されるように、レールRの左側に除去したいボルトBがある場合には、図1に示すようにガイド治具50がレールRの左側に配置されるように、ボルト除去工具1をレールRに設置する。
(3) Fixing step In the fixing step, the bolt removing tool 1 is fixed to the rail R.
Specifically, the bolt removing tool 1 is installed on the rail R and fixed to the rail R by the fixing member 120. At that time, when there is a bolt B to be removed on the right side of the rail R, when there is a bolt B to be removed on the left side of the rail R so that the guide jig 50 is arranged on the right side of the rail R, 1, the bolt removing tool 1 is installed on the rail R so that the guide jig 50 is arranged on the left side of the rail R.

(4)予備穴形成ステップ
予備穴形成ステップでは、ガイド治具50にガイドされた予備穴形成用ドリルビット4を用いてボルトBに予備穴Bbを形成する。
具体的には、まず、第一ガイド孔50aが最も外側に位置した状態でない場合には、ボルト除去工具1のガイド治具50を回転させて第一ガイド孔50aが最も外側に位置した状態にする。そして、例えば第一ガイド孔50aを上から覗き込みながら、ボルトBの折損面に付けた印Baを目安として、第一ガイド孔50aの中心軸がボルトBの中心軸にほぼ一致するように、スライド部材130をスライドさせてガイド治具50の位置を調整する。そして、ガイド治具50の位置調整が済んだら、操作レバー114を締めてスライド部材130をスライドできない状態に固定する。
(4) Preliminary hole forming step In the preliminary hole forming step, the preliminary hole Bb is formed in the bolt B by using the preliminary hole forming drill bit 4 guided by the guide jig 50.
Specifically, first, when the first guide hole 50a is not in the outermost position, the guide jig 50 of the bolt removing tool 1 is rotated so that the first guide hole 50a is in the outermost position. To do. Then, for example, while looking into the first guide hole 50a from above, using the mark Ba on the broken surface of the bolt B as a guide, the central axis of the first guide hole 50a substantially coincides with the central axis of the bolt B. The position of the guide jig 50 is adjusted by sliding the slide member 130. When the position adjustment of the guide jig 50 is completed, the operation lever 114 is tightened to fix the slide member 130 in a state where it cannot slide.

次いで、図8に示すように、電動回転工具(図示省略)に予備穴形成用ドリルビット4を取り付けて、その予備穴形成用ドリルビット4を第一ガイド孔50aに挿通する。そして、予備穴形成用ドリルビット4を回転させてボルトBに予備穴Bbを形成する。なお、電動回転工具は、発電機が不要で持ち運びやすい等の観点から、コードレスであることが好ましい。   Next, as shown in FIG. 8, the preliminary hole forming drill bit 4 is attached to an electric rotary tool (not shown), and the preliminary hole forming drill bit 4 is inserted into the first guide hole 50a. Then, the preliminary hole forming drill bit 4 is rotated to form the preliminary hole Bb in the bolt B. The electric rotary tool is preferably cordless from the viewpoint of not requiring a generator and being easy to carry.

(5)取付穴形成ステップ
取付穴形成ステップでは、ガイド治具50にガイドされた取付穴形成用ドリルビット5を用いて予備穴Bbを拡径することによって、ボルトBに取付穴Bcを形成する。
具体的には、まず、ボルト除去工具1のガイド治具50を回転させて第二ガイド孔50bが最も外側に位置した状態にする。本実施形態の場合、第一ガイド孔50aの中心軸とガイド治具50の回転軸との間隔と、第二ガイド孔50bの中心軸とガイド治具50の回転軸との間隔と、が同一であるので、第一ガイド孔50aの中心軸がボルトBの中心軸にほぼ一致している場合にガイド治具50を回転させて第二ガイド孔50bが最も外側に位置した状態にするだけで、第二ガイド孔50bの中心軸をボルトBの中心軸にほぼ一致させることができる。
次いで、図9に示すように、電動回転工具(図示省略)に取り付けるドリルビットを予備穴形成用ドリルビット4から取付穴形成用ドリルビット5に交換して、その取付穴形成用ドリルビット5を第二ガイド孔50bに挿通する。そして、取付穴形成用ドリルビット5を回転させてボルトBに形成されている予備穴Bbを拡径することによって、ボルトBに取付穴Bcを形成する。
(5) Mounting hole forming step In the mounting hole forming step, the mounting hole Bc is formed in the bolt B by enlarging the preliminary hole Bb using the mounting hole forming drill bit 5 guided by the guide jig 50. .
Specifically, first, the guide jig 50 of the bolt removing tool 1 is rotated so that the second guide hole 50b is positioned on the outermost side. In the present embodiment, the distance between the central axis of the first guide hole 50a and the rotation axis of the guide jig 50 is the same as the distance between the central axis of the second guide hole 50b and the rotation axis of the guide jig 50. Therefore, when the central axis of the first guide hole 50a substantially coincides with the central axis of the bolt B, the guide jig 50 is rotated so that the second guide hole 50b is positioned on the outermost side. The central axis of the second guide hole 50b can be made substantially coincident with the central axis of the bolt B.
Next, as shown in FIG. 9, the drill bit to be attached to the electric rotary tool (not shown) is exchanged from the preliminary hole forming drill bit 4 to the mounting hole forming drill bit 5. It passes through the second guide hole 50b. Then, the mounting hole Bc is formed in the bolt B by rotating the mounting hole forming drill bit 5 and expanding the diameter of the preliminary hole Bb formed in the bolt B.

前述したように、本実施形態では、スライド部材130および治具受部材140が、レールRの側面にほぼ沿っているが、これは、ガイド治具50を、レールRに近い位置(具体的には、レールRを固定するボルトBの上方となる位置)であり、かつ、枕木Mにより近い位置に配置するためである。これによって、第一ガイド孔50aの中心軸をボルトBの中心軸にほぼ一致させる作業や、ドリルビット4,5で穴Bb,Bcを形成する作業が行いやすくなる。   As described above, in the present embodiment, the slide member 130 and the jig receiving member 140 are substantially along the side surface of the rail R. However, this means that the guide jig 50 is positioned close to the rail R (specifically, Is a position above the bolt B that fixes the rail R) and is positioned closer to the sleeper M. This facilitates the operation of making the central axis of the first guide hole 50a substantially coincide with the central axis of the bolt B and the operation of forming the holes Bb and Bc with the drill bits 4 and 5.

(6)取付ステップ
取付ステップでは、取付穴Bcにエキストラクタ6を取り付ける。
具体的には、例えば、ハンマーを用いてエキストラクタ6をボルトBに形成された取付穴Bcに打ち込むことによって、図10に示すように、取付穴Bcにエキストラクタ6を取り付ける。
(6) Attachment step In the attachment step, the extractor 6 is attached to the attachment hole Bc.
Specifically, for example, by using a hammer to drive the extractor 6 into the mounting hole Bc formed in the bolt B, the extractor 6 is attached to the mounting hole Bc as shown in FIG.

(7)回転ステップ
回転ステップでは、図11に示すように、エキストラクタ6にハンドル7を取り付けて、当該エキストラクタ6を締める方向(すなわち、ボルトBを緩める方向)に回転させる。これにより、図12に示すように、枕木MからボルトBを除去することができる。
なお、このようにして折損したボルトを枕木から除去することによって、ボルト1本あたり5分程度で、ボルトを除去できることが確認できた。目標時間としてボルト1本あたり20分を設定していたが、この目標時間よりも短い時間で、折損したボルトを枕木から除去することができた。
また、このようにして折損したボルトを枕木から除去した後、折損したボルトがねじ込まれていた部分に新しいボルトをねじ込むことによって、当該新しいボルトでレールを固定できることが確認できた。これにより、枕木や埋込栓が損傷することなく、折損したボルトを除去できることが分かった。
(7) Rotation step In the rotation step, as shown in FIG. 11, the handle 7 is attached to the extractor 6 and rotated in the direction in which the extractor 6 is tightened (that is, the direction in which the bolt B is loosened). Thereby, as shown in FIG. 12, the bolt B can be removed from the sleeper M.
It was confirmed that the bolts could be removed in about 5 minutes per bolt by removing the broken bolts from the sleepers. Although the target time was set to 20 minutes per bolt, the broken bolt could be removed from the sleeper in a time shorter than the target time.
Moreover, after removing the broken bolt from the sleepers in this way, it was confirmed that the rail could be fixed with the new bolt by screwing a new bolt into the portion where the broken bolt was screwed. As a result, it was found that the broken bolt could be removed without damaging the sleepers or the embedded plug.

以上説明した本実施形態のボルト除去工具1によれば、レールRを固定するボルトBが折損した場合に当該ボルトBの除去に用いるボルト除去工具であって、ボルトBとは逆方向のネジ部を有するエキストラクタ6を取り付けるための取付穴BcをボルトBに形成するドリルビット4,5をガイドするガイド治具50と、レールRに固定可能であり、ガイド治具50を位置調整可能に支持する支持金具100と、を備え、ガイド治具50は、ボルトBの中心軸に沿って取付穴Bcが形成されるようにドリルビット4,5をガイドするように構成されている。   According to the bolt removal tool 1 of the present embodiment described above, when the bolt B that fixes the rail R is broken, the bolt removal tool is used to remove the bolt B, and the screw portion is in the opposite direction to the bolt B. The guide jig 50 for guiding the drill bits 4 and 5 for forming the mounting hole Bc in the bolt B for attaching the extractor 6 having a guide and the rail R can be fixed, and the guide jig 50 is supported so that the position can be adjusted. The guide jig 50 is configured to guide the drill bits 4 and 5 so that the attachment hole Bc is formed along the central axis of the bolt B.

したがって、エキストラクタ6を取り付けるための取付穴Bcを簡単に精度よく形成することができるので、レールRを固定するボルトBが折損して軸部のみが枕木M内に残留した場合でも、当該残留部分を簡便に除去することができる。すなわち、レールRを固定するボルトBが折損した場合に、当該ボルトBを簡便に除去することができる。
なお、支持金具100は、ガイド治具50を、レールRの延在方向に対して垂直方向(左右方向)に位置調整可能に支持するものに限ることはなく、レールRの延在方向(前後方向)に位置調整可能に支持するものであってもよいし、レールRの高さ方向(上下方向)に位置調整可能に支持するものであってもよいし、複数方向に位置調整可能に支持するものであってもよい。
Therefore, since the mounting hole Bc for mounting the extractor 6 can be easily and accurately formed, even if the bolt B for fixing the rail R breaks and only the shaft portion remains in the sleeper M, the residual The part can be easily removed. That is, when the bolt B that fixes the rail R is broken, the bolt B can be easily removed.
Note that the support metal fitting 100 is not limited to the one that supports the guide jig 50 so that the position of the guide jig 50 can be adjusted in the direction perpendicular to the extension direction of the rail R (left-right direction). Direction), the position can be adjusted in the height direction (vertical direction) of the rail R, or the position can be adjusted in multiple directions. You may do.

また、本実施形態のボルト除去工具1によれば、ガイド治具50は、取付穴Bcを形成するための取付穴形成用ドリルビット5と、取付穴形成用ドリルビット5よりも径が小さく、当該取付穴形成用ドリルビット5を用いた取付穴Bcの形成を容易にする予備穴Bbを形成するための予備穴形成用ドリルビット4と、の双方をガイド可能であるように構成することが可能である。   Further, according to the bolt removing tool 1 of the present embodiment, the guide jig 50 has a smaller diameter than the mounting hole forming drill bit 5 for forming the mounting hole Bc and the mounting hole forming drill bit 5, Both the preliminary hole forming drill bit 4 for forming the preliminary hole Bb for facilitating the formation of the mounting hole Bc using the mounting hole forming drill bit 5 can be configured to be guided. Is possible.

このように構成することによって、取付穴形成用ドリルビット5として超硬ドリルビットを用いたり、取付穴形成用ドリルビット5を回転させる回転工具として高出力の回転工具を用いたりしなくても、エキストラクタ6を取り付けるための取付穴Bcを簡単に精度よく形成することができる。すなわち、取付穴Bcを効率よく形成することができる。   By configuring in this way, a carbide drill bit is used as the mounting hole forming drill bit 5 or a high output rotating tool is not used as a rotating tool for rotating the mounting hole forming drill bit 5. The attachment hole Bc for attaching the extractor 6 can be easily and accurately formed. That is, the attachment hole Bc can be formed efficiently.

また、本実施形態のボルト除去工具1によれば、支持金具100は、ガイド治具50を回転自在に支持し、ガイド治具50には、予備穴形成用ドリルビット4をガイドする第一ガイド孔50aと、取付穴形成用ドリルビット5をガイドする第二ガイド孔50bと、が設けられており、第一ガイド孔50aの中心軸とガイド治具50の回転軸との間隔と、第二ガイド孔50bの中心軸とガイド治具50の回転軸との間隔と、は同一であるように構成することが可能である。   Further, according to the bolt removing tool 1 of the present embodiment, the support fitting 100 rotatably supports the guide jig 50, and the guide jig 50 guides the preliminary hole forming drill bit 4 to the first guide. A hole 50a and a second guide hole 50b that guides the mounting hole forming drill bit 5 are provided, and the distance between the center axis of the first guide hole 50a and the rotation axis of the guide jig 50, and the second The distance between the center axis of the guide hole 50b and the rotation axis of the guide jig 50 can be configured to be the same.

このように構成することによって、第一ガイド孔50aの中心軸がボルトBの中心軸に一致した状態でガイド治具50を回転させるだけで、第二ガイド孔50bの中心軸をボルトBの中心軸に一致させることができるので、第二ガイド孔50bの位置調整を簡単に行うことができる。
なお、ガイド治具50は、2つのガイド孔が形成されたものに限ることはなく、1つのガイド孔が形成されたものであってもよいし、3つ以上のガイド孔が形成されたものであってもよい。ガイド治具50が、3つ以上のガイド孔が形成されたものであり、かつ、支持金具100によって回転自在に支持されている場合には、各ガイド孔の中心軸とガイド治具50の回転軸との間隔が、それぞれ同一であるように構成することで、一のガイド孔の中心軸がボルトBの中心軸に一致した状態でガイド治具50を回転させるだけで、他のガイド孔の中心軸をボルトBの中心軸に一致させることができる。
With this configuration, the center axis of the second guide hole 50b is set to the center of the bolt B only by rotating the guide jig 50 in a state where the center axis of the first guide hole 50a coincides with the center axis of the bolt B. Since it can be made to correspond to an axis | shaft, the position adjustment of the 2nd guide hole 50b can be performed easily.
The guide jig 50 is not limited to one having two guide holes, and may be one having one guide hole, or one having three or more guide holes. It may be. When the guide jig 50 is formed with three or more guide holes and is rotatably supported by the support fitting 100, the rotation of the guide jig 50 and the center axis of each guide hole By configuring the distances between the guide holes 50 to be the same, the guide jig 50 can be rotated only with the center axis of one guide hole aligned with the center axis of the bolt B. The central axis can coincide with the central axis of the bolt B.

また、以上説明した本実施形態のボルト除去方法によれば、ボルト除去工具1を用いて、レールRを固定するボルトBが折損した場合に当該ボルトBを除去するボルト除去方法であって、ボルト除去工具1をレールRに固定する固定ステップと、次いで、ガイド治具50にガイドされた予備穴形成用ドリルビット4を用いてボルトBに予備穴Bbを形成する予備穴形成ステップと、次いで、ガイド治具50にガイドされた取付穴形成用ドリルビット5を用いて予備穴Bbを拡径することによって、ボルトBに取付穴Bcを形成する取付穴形成ステップと、次いで、取付穴Bcにエキストラクタ6を取り付ける取付ステップと、次いで、エキストラクタ6にハンドル7を取り付けて、当該エキストラクタ6を締める方向に回転させる回転ステップと、を有している。   Moreover, according to the bolt removal method of this embodiment demonstrated above, it is a bolt removal method which removes the said volt | bolt B, when the volt | bolt B which fixes the rail R is broken using the volt | bolt removal tool 1, A fixing step of fixing the removal tool 1 to the rail R, then a preliminary hole forming step of forming a preliminary hole Bb in the bolt B using the preliminary hole forming drill bit 4 guided by the guide jig 50; A mounting hole forming step for forming the mounting hole Bc in the bolt B by expanding the spare hole Bb using the mounting hole forming drill bit 5 guided by the guide jig 50, and then extracting the mounting hole Bc. An attachment step for attaching the tractor 6, and then a rotation step for attaching the handle 7 to the extractor 6 and rotating the extractor 6 in the tightening direction. And, the has.

したがって、エキストラクタ6を取り付けるための取付穴Bcを簡単に精度よく形成することができるので、レールRを固定するボルトBが折損して軸部のみが枕木M内に残留した場合でも、当該残留部分を簡便に除去することができる。すなわち、レールRを固定するボルトBが折損した場合に、当該ボルトBを簡便に除去することができる。   Therefore, since the mounting hole Bc for mounting the extractor 6 can be easily and accurately formed, even if the bolt B for fixing the rail R breaks and only the shaft portion remains in the sleeper M, the residual The part can be easily removed. That is, when the bolt B that fixes the rail R is broken, the bolt B can be easily removed.

また、本実施形態のボルト除去方法によれば、固定ステップの前に、ボルトBの折損面を平坦にする平坦化ステップを行うように構成することが可能である。   Further, according to the bolt removing method of the present embodiment, it is possible to perform a flattening step for flattening the broken surface of the bolt B before the fixing step.

このように構成することによって、予備穴Bbや取付穴Bcを形成しやすくすることができる。   By configuring in this way, the preliminary hole Bb and the mounting hole Bc can be easily formed.

なお、以上本発明の実施形態について説明したが、本発明は、かかる実施形態に限定されず、その要旨を逸脱しない範囲で、種々変形が可能であることは言うまでもない。   Although the embodiments of the present invention have been described above, the present invention is not limited to such embodiments, and various modifications can be made without departing from the scope of the present invention.

1 ボルト除去工具
4 予備穴形成用ドリルビット
5 取付穴形成用ドリルビット
6 エキストラクタ
7 ハンドル
50 ガイド治具
50a 第一ガイド孔
50b 第二ガイド孔
100 支持金具
B ボルト
Bb 予備穴
Bc 取付穴
R レール
1 Bolt removal tool 4 Preliminary hole forming drill bit 5 Mounting hole forming drill bit 6 Extractor 7 Handle 50 Guide jig 50a First guide hole 50b Second guide hole 100 Support bracket B Bolt Bb Preliminary hole Bc Mounting hole R Rail

Claims (4)

レールを固定するボルトが折損した場合に当該ボルトの除去に用いるボルト除去工具であって、
前記ボルトとは逆方向のネジ部を有するエキストラクタを取り付けるための取付穴を前記ボルトに形成するドリルビットをガイドするガイド治具と、
前記レールに固定可能であり、前記ガイド治具を位置調整可能に支持する支持金具と、
を備え、
前記ガイド治具は、
前記ボルトの中心軸に沿って前記取付穴が形成されるように前記ドリルビットをガイドし、
前記取付穴を形成するための取付穴形成用ドリルビットと、前記取付穴形成用ドリルビットよりも径が小さく、当該取付穴形成用ドリルビットを用いた前記取付穴の形成を容易にする予備穴を形成するための予備穴形成用ドリルビットと、の双方をガイド可能であることを特徴とするボルト除去工具。
A bolt removing tool used for removing the bolt when the bolt for fixing the rail is broken,
A guide jig for guiding a drill bit that forms a mounting hole in the bolt for mounting an extractor having a screw portion in a direction opposite to the bolt;
A support bracket that can be fixed to the rail and supports the guide jig so that the position thereof can be adjusted;
With
The guide jig is
Guiding the drill bit so that the mounting hole is formed along a central axis of the bolt ;
A mounting hole forming drill bit for forming the mounting hole and a spare hole having a diameter smaller than that of the mounting hole forming drill bit and facilitating formation of the mounting hole using the mounting hole forming drill bit A bolt removing tool characterized by being capable of guiding both a pre-drilling drill bit for forming a hole .
前記支持金具は、前記ガイド治具を回転自在に支持し、
前記ガイド治具には、前記予備穴形成用ドリルビットをガイドする第一ガイド孔と、前記取付穴形成用ドリルビットをガイドする第二ガイド孔と、が設けられており、
前記第一ガイド孔の中心軸と前記ガイド治具の回転軸との間隔と、前記第二ガイド孔の中心軸と前記ガイド治具の回転軸との間隔と、は同一であることを特徴とする請求項に記載のボルト除去工具。
The support bracket rotatably supports the guide jig,
The guide jig is provided with a first guide hole for guiding the preliminary hole forming drill bit, and a second guide hole for guiding the mounting hole forming drill bit,
The distance between the center axis of the first guide hole and the rotation axis of the guide jig is the same as the distance between the center axis of the second guide hole and the rotation axis of the guide jig. The bolt removing tool according to claim 1 .
請求項に記載のボルト除去工具を用いて、レールを固定するボルトが折損した場合に当該ボルトを除去するボルト除去方法であって、
前記ボルト除去工具を前記レールに固定する固定ステップと、
次いで、前記ガイド治具にガイドされた前記予備穴形成用ドリルビットを用いて前記ボルトに前記予備穴を形成する予備穴形成ステップと、
次いで、前記ガイド治具にガイドされた前記取付穴形成用ドリルビットを用いて前記予備穴を拡径することによって、前記ボルトに前記取付穴を形成する取付穴形成ステップと、
次いで、前記取付穴に前記エキストラクタを取り付ける取付ステップと、
次いで、前記エキストラクタにハンドルを取り付けて、当該エキストラクタを締める方向に回転させる回転ステップと、
を有することを特徴とするボルト除去方法。
A bolt removing method for removing the bolt when the bolt for fixing the rail is broken using the bolt removing tool according to claim 1 ,
A fixing step of fixing the bolt removing tool to the rail;
Next, a preliminary hole forming step of forming the preliminary hole in the bolt using the preliminary hole forming drill bit guided by the guide jig;
Then, the mounting hole forming step of forming the mounting hole in the bolt by expanding the preliminary hole diameter using the mounting hole forming drill bit guided by the guide jig;
Next, an attachment step of attaching the extractor to the attachment hole;
Next, a rotation step of attaching a handle to the extractor and rotating the extractor in a tightening direction;
The bolt removal method characterized by having.
前記固定ステップの前に、前記ボルトの折損面を平坦にする平坦化ステップを行うことを特徴とする請求項に記載のボルト除去方法。 The bolt removing method according to claim 3 , wherein a flattening step of flattening a broken surface of the bolt is performed before the fixing step.
JP2014136706A 2014-07-02 2014-07-02 Bolt removing tool and bolt removing method Expired - Fee Related JP6400959B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2014136706A JP6400959B2 (en) 2014-07-02 2014-07-02 Bolt removing tool and bolt removing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2014136706A JP6400959B2 (en) 2014-07-02 2014-07-02 Bolt removing tool and bolt removing method

Publications (2)

Publication Number Publication Date
JP2016014263A JP2016014263A (en) 2016-01-28
JP6400959B2 true JP6400959B2 (en) 2018-10-03

Family

ID=55230660

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2014136706A Expired - Fee Related JP6400959B2 (en) 2014-07-02 2014-07-02 Bolt removing tool and bolt removing method

Country Status (1)

Country Link
JP (1) JP6400959B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7019145B2 (en) * 2018-03-30 2022-02-15 東日本旅客鉄道株式会社 Railroad rail lifting device
KR102225694B1 (en) * 2020-07-16 2021-03-12 이성씨엔아이 주식회사 RTD temperature sensor removal device

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3775020A (en) * 1972-01-31 1973-11-27 Stanley Works Drill guide
US4759666A (en) * 1986-11-12 1988-07-26 Grab Joseph A Drill guides and apparatus for holding same
JPH0282413U (en) * 1988-12-13 1990-06-26
JP2005336928A (en) * 2004-05-28 2005-12-08 Makita Corp Method for removing broken bolt and tool for removing broken bolt
JP2011000648A (en) * 2009-06-16 2011-01-06 Chugoku Electric Power Co Inc:The Shaft member removing tool and method for removing shaft member
JP2011255455A (en) * 2010-06-09 2011-12-22 Chugoku Electric Power Co Inc:The Screw removing tool
JP2013221289A (en) * 2012-04-16 2013-10-28 Hankyu Hanshin Railway Technologies Kk Method for taking out residual broken bolt

Also Published As

Publication number Publication date
JP2016014263A (en) 2016-01-28

Similar Documents

Publication Publication Date Title
US20160108583A1 (en) Apparatus and system for securing a cutting device
JP6400959B2 (en) Bolt removing tool and bolt removing method
CN204584334U (en) A kind of handle bore nailing machine
CN102015171A (en) Rotary-driven tool for cutting machining with a cutting body
US20100183390A1 (en) Cutting Knife For Chip-Removing Cutting Tools With Breaking Notch
CN106042093A (en) Positioning hole punching device
EP2113324A3 (en) System and apparatus for removing failed fasteners
US7229237B1 (en) Tool for removing an object from a workpiece
CN214187022U (en) Combined deep hole internal thread steel wire thread insert mounting and dismounting tool
CN202162416U (en) A pinhole locating tool
KR20200120392A (en) Flat tie cutting apparatus and its cutting method
CN203403678U (en) External corner lock for building
CN204353820U (en) Belt pulley fixed axis tool for drilling
JP2005336928A (en) Method for removing broken bolt and tool for removing broken bolt
KR101369465B1 (en) A hammer wood both side cutting device for the piano hammer head
JP2015214806A (en) Drill fixation tool
CA2942415A1 (en) Retaining pin installation/removal tool and method
CN201702620U (en) Tap and milling cutter combined grinder
CN205889419U (en) Location trompil device
CN203831394U (en) Steel plate cutting auxiliary tool
KR20120125725A (en) Device and method for mounting line-mark
US1962241A (en) Boring tool
CN209319416U (en) Automobile component installation drill bit for abrasive machine repairs fixture
JP3183541U (en) Drilling fixture
CN203883423U (en) Shockproof hammer

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20170517

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20180316

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20180410

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20180530

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20180807

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20180906

R150 Certificate of patent or registration of utility model

Ref document number: 6400959

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees