JP6358701B2 - Building process management server and building process management system - Google Patents
Building process management server and building process management system Download PDFInfo
- Publication number
- JP6358701B2 JP6358701B2 JP2014199273A JP2014199273A JP6358701B2 JP 6358701 B2 JP6358701 B2 JP 6358701B2 JP 2014199273 A JP2014199273 A JP 2014199273A JP 2014199273 A JP2014199273 A JP 2014199273A JP 6358701 B2 JP6358701 B2 JP 6358701B2
- Authority
- JP
- Japan
- Prior art keywords
- data
- labor
- site
- building
- worker
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims description 145
- 230000008569 process Effects 0.000 title claims description 144
- 238000010276 construction Methods 0.000 claims description 45
- 125000002066 L-histidyl group Chemical group [H]N1C([H])=NC(C([H])([H])[C@](C(=O)[*])([H])N([H])[H])=C1[H] 0.000 description 9
- 230000008859 change Effects 0.000 description 8
- 238000003384 imaging method Methods 0.000 description 6
- 230000000284 resting effect Effects 0.000 description 6
- 238000004891 communication Methods 0.000 description 5
- 230000005540 biological transmission Effects 0.000 description 4
- 230000006870 function Effects 0.000 description 4
- 230000002787 reinforcement Effects 0.000 description 3
- 230000004044 response Effects 0.000 description 3
- 230000008901 benefit Effects 0.000 description 2
- 238000009430 construction management Methods 0.000 description 2
- 230000003203 everyday effect Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000004973 liquid crystal related substance Substances 0.000 description 1
- 238000004886 process control Methods 0.000 description 1
- 238000012797 qualification Methods 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
- 210000003462 vein Anatomy 0.000 description 1
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Description
本発明は、建築物の工程を管理するサーバ及びシステムに関する。 The present invention relates to a server and a system for managing a building process.
従来から、住宅やビル等の建築物の施行状況を管理するシステムが提案されている。 Conventionally, a system for managing the enforcement status of a building such as a house or a building has been proposed.
特許文献1には、建築工事における施工業者のミスや手抜きを防止することを目的としたシステムが記載されている。複数の工程からなる建築工事における各工程が終了したときに、該終了した工程を識別する情報と、該終了時における建築工事現場を撮影した画像データとを施工業者担当者端末から管理サーバに送信し、管理サーバでこれらのデータを受信して記録する。 Patent Document 1 describes a system aimed at preventing a contractor's mistakes and omissions in building work. When each process in a construction work consisting of a plurality of processes is completed, information for identifying the completed process and image data of the construction work site at the time of completion are transmitted from the contractor person in charge terminal to the management server The management server receives and records these data.
特許文献2には、施主、監理者及び施工業者を含めた総合的な建築物の施工管理システムを提供することを目的としたシステムが記載されている。システム管理サーバは、情報を処理するためのコンピュータ部と、情報を記録するためのサーバ部とを備え、サーバ部は、施工工事に関する情報を登録する記録データベースと、施工工事の承認情報を登録する承認記録データベースとを有し、施工工事段階において、施主側端末装置、監理者側端末装置及び施工業者側端末装置からの個別承認信号を受信すると、承認判定手段は、施主、監理者及び施工業者の三者が承認したと判定して合意承認信号を生成し、記録データベースの承認された施工工事情報が承認記録データベースに登録される。 Patent Document 2 describes a system for providing a comprehensive construction management system including a client, a supervisor, and a contractor. The system management server includes a computer unit for processing information and a server unit for recording information. The server unit registers a record database for registering information related to construction work and registration information for construction work. When receiving an individual approval signal from the owner-side terminal device, the supervisor-side terminal device, and the contractor-side terminal device in the construction phase, the approval judgment means is the owner, supervisor, and contractor. It is determined that the three parties have approved, an agreement approval signal is generated, and construction work information approved in the record database is registered in the approval record database.
しかしながら、建築物の工程管理には、単に、建築物の施工状況のみならず、建築現場で作業する現場作業者の労務管理も必要である。現場作業者の労務管理とは、今建築現場に誰がいるのか、その現場作業者は何時からそこにいるのか、現場作業者が何時間休憩をとったか、現場作業者がいつ帰ったか等を管理者が正確に把握し、問題があればそれを是正することであるが、1人の管理者が複数の建築現場を担当している場合、担当する建築現場全てに管理者が直接行って管理することは現実的に不可能である。建築現場における現場作業者の労務管理を正しく把握できないことは、現場作業者の勤務時間の算出等が正確に行えないだけでなく、不適切な労務状況を招く一因ともなり得る。従って、施工状況のみならず、現場作業者の労務管理も同時に管理することができるシステムが望まれている。 However, building process management requires not only the construction status of the building but also labor management of site workers working at the building site. On-site labor management means managing who is currently on the construction site, when the site worker has been there, how many hours the site worker has taken a break, and when the site worker has returned. If a manager is in charge of multiple construction sites, the manager goes directly to all the construction sites in charge and manages them. It is practically impossible to do. Failure to correctly grasp the labor management of field workers at a construction site can not only accurately calculate the working hours of field workers, but can also cause an inappropriate labor situation. Therefore, there is a demand for a system that can simultaneously manage not only the construction status but also the labor management of field workers.
本発明の目的は、建築物の施工状況を管理すると同時に、簡易かつ確実に現場作業者の労務管理も行うことができるサーバ及びシステムを提供することにある。 An object of the present invention is to provide a server and a system capable of managing the construction status of a building and simultaneously performing labor management of a site worker easily and reliably.
本発明は、建築現場の現場作業者の労務データ、及び建築現場の撮影データを取得する端末から送信された前記労務データ及び前記撮影データを受信する受信手段と、建築現場の工程データを記憶する記憶手段と、前記工程データと、前記受信手段で受信した前記労務データ及び前記撮影データを対応付けた工程管理表を作成する制御手段と、前記工程管理表を表示し、前記工程管理表において工程及び日付が指定された場合に、指定された工程及び日付に対応する前記労務データ及び前記撮影データを表示する表示手段とを備えることを特徴とする。 The present invention stores labor data of a construction site worker, receiving means for receiving the labor data and the shooting data transmitted from a terminal for acquiring the shooting data of the building site, and process data of the building site. a storage unit, wherein the step data, and a control means for generating a process control table the associating labor data and the imaging data received by said receiving means, and displays the process management table, step in the process management table And display means for displaying the labor data and the photographing data corresponding to the designated process and date when the date is designated .
本発明の1つの実施形態では、前記表示手段は、前記工程データとして、工程と日付を規定した表を表示するとともに、前記労務データ及び前記撮影データが存在する工程及び日付をハイライト表示し、ユーザからの操作に応じて前記労務データ及び前記撮影データを表示する。 In one embodiment of the present invention, the display means displays a table defining the process and date as the process data, and highlights the process and date in which the labor data and the shooting data exist, The labor data and the photographing data are displayed according to an operation from the user.
また、本発明は、建築現場に設置され、建築現場の現場作業者の労務データ、及び建築現場の撮影データを取得して送信する端末と、前記端末から送信された前記労務データ及び前記撮影データを受信する建築物工程管理サーバとを備え、前記建築物工程管理サーバは、前記建築現場の工程データを記憶する記憶手段と、前記工程データと、前記端末から受信した前記労務データ及び前記撮影データを対応付けた工程管理表データを作成する制御手段と、前記工程管理表データを表示し、前記工程管理表において工程及び日付が指定された場合に、指定された工程及び日付に対応する前記労務データ及び前記撮影データを表示する表示手段とを備えることを特徴とする。 Further, the present invention is a terminal installed on a construction site and acquiring and transmitting labor data of site workers on the construction site and shooting data of the building site, and the labor data and the shooting data transmitted from the terminal. The building process management server includes storage means for storing the process data of the building site, the process data, the labor data and the photographing data received from the terminal. Control process for creating process management table data in association with the process management table data, and displaying the process management table data, and when the process and date are specified in the process management table, the labor corresponding to the specified process and date And display means for displaying the data and the photographing data .
本発明の1つの実施形態では、前記表示手段は、前記工程データとして、工程と日付を規定した表を表示するとともに、前記労務データ及び前記撮影データが存在する工程及び日付をハイライト表示し、ユーザからの操作に応じて前記労務データ及び前記撮影データを表示する。 In one embodiment of the present invention, the display means displays a table defining the process and date as the process data, and highlights the process and date in which the labor data and the shooting data exist, The labor data and the photographing data are displayed according to an operation from the user.
本発明によれば、建築物の施工状況を管理すると同時に、簡易かつ確実に現場作業者の労務管理も行うことができる。 ADVANTAGE OF THE INVENTION According to this invention, the construction management of a building can be managed and the labor management of a field worker can also be performed easily and reliably.
以下、図面に基づき本発明の実施形態について説明する。 Hereinafter, embodiments of the present invention will be described with reference to the drawings.
図1は、本実施形態に係る建築物工程管理システムの構成図である。建築物工程管理システムは、住宅あるいは集合住宅、商業・工業施設等の建築現場に配置される携帯端末としてのタブレット端末12および管理サーバ(建築物工程管理サーバ)14を含んで構成される。タブレット端末12および管理サーバ14は、インターネット16を介して通信可能に接続される。 FIG. 1 is a configuration diagram of a building process management system according to the present embodiment. The building process management system is configured to include a tablet terminal 12 and a management server (building process management server) 14 as portable terminals arranged at a building site such as a house, a housing complex, a commercial / industrial facility, or the like. The tablet terminal 12 and the management server 14 are communicably connected via the Internet 16.
タブレット端末12は、現場作業者の出勤状態を取得する。出勤状態とは、例えば建築現場に入場中(出勤中)、休憩中、あるいは建築現場から退場した状態(帰宅)等を含み、現場作業者が取り得る出退勤に関する各状態を意味する。また、タブレット端末12は、現場の施工状況を示す撮影データ(現場写真)を取得する。 The tablet terminal 12 acquires the attendance status of the field worker. The attendance state means, for example, each state relating to attendance / leaving that can be taken by a site worker, including entering the construction site (during work), resting, leaving the construction site (returning home), and the like. In addition, the tablet terminal 12 acquires shooting data (site photo) indicating the construction status of the site.
タブレット端末12は、一般的なタブレット端末同様に、近傍に存在するWi−Fiルータあるいは3GやLTE等の携帯電話回線を介してインターネット16に接続するための通信部22、液晶パネルなどの表示部24、表示部24上のタッチパネルあるいはタブレット端末12上に設けられるスイッチやボタンなどを含む入力部26、音声を出力するスピーカ28、写真を撮影して画像データを得るデジタルカメラ機能部30、RAMあるいはROMなどで構成されタブレット端末12で動作するプログラムあるいはタブレット端末12内で処理されるデータなどを記憶する記憶部32、およびタブレット端末12全体の制御を行うCPU34を含んで構成される。 The tablet terminal 12 includes a communication unit 22 for connecting to the Internet 16 via a Wi-Fi router or a mobile phone line such as 3G or LTE, and a display unit such as a liquid crystal panel, as in a general tablet terminal 24, a touch panel on the display unit 24 or an input unit 26 including switches and buttons provided on the tablet terminal 12, a speaker 28 for outputting sound, a digital camera function unit 30 for taking a picture to obtain image data, a RAM or The storage unit 32 stores a program configured by a ROM or the like and operating on the tablet terminal 12 or data processed in the tablet terminal 12, and a CPU 34 that controls the entire tablet terminal 12.
記憶部32には、入退場管理アプリケーション36が予めインストールされている。本実施形態では、現場作業者は、タブレット端末12上において入退場管理アプリケーション36を実行することで自己の出勤状態をタブレット端末12に入力する。建築現場に入場してきた現場作業者は、まずタブレット端末12の電源を入れ、入退場管理アプリケーション36を実行する。そして、表示部24に表示される入退場管理アプリケーション36の画面に従って、自己を特定する名前タグを入場前の状態に初期表示させる。記憶部32には、管理サーバ14から送信された、現場作業者データベースに記憶された現場作業者データが記憶されており、入退場管理アプリケーション36は、ユーザの入力操作に応じて記憶部32から現場作業者データを読み出し、現場作業者を特定するデータとして名前タグを作成し、これを入場前の状態に表示する。そして、ユーザは、工事現場に入場して工事を開始する際に、入退場管理アプリケーション36上における自己の出勤状態を「入場前」から「入場中」に変更する。入退場管理アプリケーション36上において出勤状態が変更されると、出勤状態を入力した現場作業者、変更後の状態(「入場中」)を示す出勤状態データ、および出勤状態が変更された時刻を示す時刻データが対応付けられ、記憶部32に記憶されるとともに管理サーバ14へ送信される。記憶部32は、フラッシュメモリ等の不揮発性メモリであることが望ましいが、これに限定されない。 An entrance / exit management application 36 is installed in the storage unit 32 in advance. In the present embodiment, the site worker inputs his / her attendance state to the tablet terminal 12 by executing the entrance / exit management application 36 on the tablet terminal 12. A site worker who has entered the construction site first turns on the tablet terminal 12 and executes the entrance / exit management application 36. Then, according to the screen of the entrance / exit management application 36 displayed on the display unit 24, the name tag for identifying itself is initially displayed in the state before entrance. The storage unit 32 stores field worker data transmitted from the management server 14 and stored in the site worker database, and the entrance / exit management application 36 receives information from the storage unit 32 in response to a user input operation. The field worker data is read, a name tag is created as data for identifying the field worker, and this is displayed in a state before entering. When the user enters the construction site and starts construction, the user changes his / her attendance status on the entrance / exit management application 36 from “before entering” to “entering”. When the attendance status is changed on the entrance / exit management application 36, the on-site worker who has input the attendance status, the attendance status data indicating the changed status ("entering"), and the time when the attendance status is changed are indicated. The time data is associated and stored in the storage unit 32 and transmitted to the management server 14. The storage unit 32 is preferably a non-volatile memory such as a flash memory, but is not limited thereto.
タブレット端末12において入退場管理アプリケーション36が実行されると、表示部24には複数のエリアが表示される。各エリアは、現場作業者が取り得る各出勤状態に対応するものである。例えば、表示画面には、第1エリアとして入場前(出勤前)を示す入場前エリア、第2エリアとして入場中(勤務中)を示す入場中エリア、第3エリアとして休憩中を示す休憩中エリア、第4エリアとして退場(帰宅)を示す退場エリアの4つのエリアが表示される。また、各エリアには、それぞれの状態を示すアイコンが表示される。すなわち、入場前エリアには特定のアイコンは表示されないが、入場中エリアには工事中であることを示すアイコンが表示され、休憩中エリアには椅子に座っているアイコンが表示され、退場エリアには乗車しているアイコンが表示される。勿論、これらのアイコンは任意に変更可能である。 When the entrance / exit management application 36 is executed on the tablet terminal 12, a plurality of areas are displayed on the display unit 24. Each area corresponds to each attendance state that a field worker can take. For example, on the display screen, the first area is a pre-entry area indicating before entry (before work), the second area is an admission area indicating that the admission is in progress (working), and the third area is a break area indicating that the break is in progress The four areas of the exit area indicating exit (return home) are displayed as the fourth area. In each area, icons indicating the respective states are displayed. In other words, a specific icon is not displayed in the pre-entry area, but an icon indicating that construction is in progress is displayed in the entrance area, an icon sitting on a chair is displayed in the rest area, and an exit area is displayed. Will display the icon of the boarding. Of course, these icons can be arbitrarily changed.
また、表示画面の上部には、一覧呼び出しボタンが表示される。ユーザがこの一覧呼び出しボタンを操作すると、CPU34は、この操作に応じて記憶部32にアクセスし、記憶部32に記憶されている現場作業者の所属する会社の一覧データを取得し、会社名のリストをプルダウンメニューで表示する。そして、ユーザがプルダウンメニューからいずれかの会社を選択すると、CPU34は、その会社に属する現場作業者データを取得し、現場作業者の名前が記載された名前タグの一覧を入場前エリアに表示する。例えば、一覧呼び出しボタンを操作して複数の会社から特定の会社CAを選択すると、当該会社CAに属する現場作業者a,b,c,d,e,fの名前タグが入場前エリアに一覧表示される。より具体的には、現場作業者データに現場作業者の名前「特許一郎」が含まれている場合、CPU34は、「特許一郎」と記載された矩形状の名前タグの画像データを作成して入場前エリアに表示する。 In addition, a list call button is displayed at the top of the display screen. When the user operates this list call button, the CPU 34 accesses the storage unit 32 in response to this operation, acquires the list data of the company to which the field worker belongs stored in the storage unit 32, and stores the company name. Display the list in a pull-down menu. When the user selects any company from the pull-down menu, the CPU 34 acquires the field worker data belonging to the company and displays a list of name tags in which the names of the field workers are described in the pre-entry area. . For example, when a specific company CA is selected from a plurality of companies by operating the list call button, the name tags of field workers a, b, c, d, e, and f belonging to the company CA are displayed in a list in the pre-entry area. Is done. More specifically, when the field worker's name “Patent Ichiro” is included in the field worker data, the CPU 34 creates image data of a rectangular name tag described as “Patent Ichiro”. Display in the pre-entry area.
入場前エリアに名前タグが表示された現場作業者がその出勤状態を入場前から入場中に変更したい場合は、入場前エリア内に表示されている自己の名前タグを画面上において指や特定のペンでドラッグし、入場中エリアに移動させる。CPU34は、このドラッグ操作を検出し、名前タグを入場前エリアから入場中エリアに移動させる。また、この際、CPU34は、名前タグが入場中エリアに移動したときの時刻を取得し、当該名前タグに名前と併せて表示される。「特許一郎 9:00」の如くである。CPU34は、出勤状態が変更されると、出勤状態が変更された現場作業者を示す現場作業者データ、変更後の出勤状態を示す状態データ、及び出勤状態が変更された時刻(入場開始時刻又は工事開始時刻)を示す時刻データを互いに対応付けて記憶部32に記憶する。また、CPU34は、記憶部32に記憶されたこれらのデータを労務データとして管理サーバ14に送信する。 If a field worker whose name tag is displayed in the pre-entry area wants to change his / her attendance status from before admission to admission, he / she can change his / her name tag displayed in the pre-entrance area Drag with a pen to move to the area you are entering. The CPU 34 detects this drag operation and moves the name tag from the pre-entry area to the entering area. At this time, the CPU 34 obtains the time when the name tag moves to the entering area, and displays the name tag together with the name. It is like "Patent Ichiro 9:00". When the attendance status is changed, the CPU 34 changes the on-site worker data indicating the on-site worker whose attendance status has been changed, the status data indicating the changed attendance status, and the time when the attendance status is changed (entrance start time or Time data indicating the construction start time) is stored in the storage unit 32 in association with each other. Further, the CPU 34 transmits these data stored in the storage unit 32 to the management server 14 as labor data.
入場中エリアに名前タグが表示された現場作業者がその出勤状態を入場中から休憩中に変更したい場合は、同様に、入場中エリア内に表示されている自己の名前タグを画面上において指や特定のペンでドラッグし、休憩中エリアに移動させる。CPU34は、このドラッグ操作を検出し、名前タグを入場中エリアから休憩中エリアに移動させる。また、この際、CPU34は、名前タグが休憩中エリアに移動したときの時刻を取得し、当該名前タグに名前と併せて表示される。「特許一郎 12:00」の如くである。CPU34は、出勤状態が変更されると、出勤状態が変更された現場作業者を示す現場作業者データ、変更後の出勤状態を示す状態データ、及び出勤状態が変更された時刻を示す時刻データ(休憩開始時刻)を互いに対応付けて記憶部32に記憶する。また、CPU34は、記憶部32に記憶されたこれらのデータを労務データとして管理サーバ14に送信する。 If a field worker whose name tag is displayed in the entrance area wants to change his / her attendance status from entering to resting, similarly, point his / her name tag displayed in the entering area on the screen. Or drag with a specific pen to move to the resting area. The CPU 34 detects this drag operation and moves the name tag from the entering area to the resting area. At this time, the CPU 34 acquires the time when the name tag moves to the resting area, and displays the name tag together with the name. It is like "Patent Ichiro 12:00". When the attendance state is changed, the CPU 34 performs on-site worker data indicating the on-site worker whose attendance state has been changed, state data indicating the attendance state after the change, and time data indicating the time when the attendance state has been changed ( (Rest start time) are stored in the storage unit 32 in association with each other. Further, the CPU 34 transmits these data stored in the storage unit 32 to the management server 14 as labor data.
休憩が終わると、現場作業者は、休憩中エリアに表示されている自己の名前タグを画面上において指でドラッグし、入場中エリアに再び移動させる。すると、CPU34は、このドラック操作を検出して、名前タグを入場中エリアに表示するとともに、名前タグが移動された時の時刻を当該名前タグに併せて表示する。また、出勤状態が変更された現場作業者を示す現場作業者データ、変更後の出勤状態を示す状態データ、及び出勤状態が変更された時刻(休憩終了時刻)を示す時刻データを互いに対応付けて記憶部32に記憶し、これらのデータを労務データとして管理サーバ14に送信する。 When the break is over, the site worker drags his / her name tag displayed in the resting area with his / her finger on the screen and moves it again to the entering area. Then, the CPU 34 detects this drag operation, displays the name tag in the entering area, and displays the time when the name tag is moved together with the name tag. Also, the field worker data indicating the field worker whose attendance state has been changed, the state data indicating the attendance state after the change, and the time data indicating the time when the attendance state has been changed (rest end time) are associated with each other. It memorize | stores in the memory | storage part 32, These data are transmitted to the management server 14 as labor data.
入場中エリアに名前タグが表示された現場作業者が退場する場合、入場中エリアに表示されている自己の名前タグを画面上においてドラッグし、退場エリアに移動させる。すると、名前タグは退場エリアに表示され、名前タグが移動された時の時刻が当該名前タグに表示される。CPU34は、出勤状態が変更された現場作業者を示す現場作業者データ、変更後の出勤状態を示す状態データ、及び出勤状態が変更された時刻を示す時刻データ(退場時刻又は工事終了時刻)を互いに対応付けて記憶部32に記憶する。また、CPU34は、記憶部32に記憶されたこれらのデータを労務データとして管理サーバ14に送信する。 When an on-site worker whose name tag is displayed in the entrance area exits, his / her name tag displayed in the entrance area is dragged on the screen and moved to the exit area. Then, the name tag is displayed in the exit area, and the time when the name tag is moved is displayed on the name tag. The CPU 34 stores on-site worker data indicating the on-site worker whose attendance status has been changed, status data indicating the attendance status after the change, and time data (exit time or construction end time) indicating the time when the attendance status has been changed. The data are stored in the storage unit 32 in association with each other. Further, the CPU 34 transmits these data stored in the storage unit 32 to the management server 14 as labor data.
なお、時刻データの取得は、タブレット端末12に設定された時間情報に基づいて取得するようにしてもよいが、時刻の改ざんを防止するため管理サーバ14において管理されている時間情報に基づいて取得してもよい。出勤状態が変更された現場作業者を示すデータ、変更後の出勤状態を示す状態データ、および出勤状態が変更された時刻を示す時刻データからなる労務データは、管理サーバ14の出勤状態データベース46に記憶される。CPU34は、記憶部32に記憶された、出勤状態が変更された現場作業者を示す現場作業者データ、変更後の出勤状態を示す状態データ、及び出勤状態が変更された時刻を示す時刻データを管理サーバ14に送信するが、その送信タイミングは、その都度の他、1日の作業の終わりの所定の時刻タイミング(例えば19:00)にまとめて送信してもよい。 The time data may be acquired based on the time information set in the tablet terminal 12, but acquired based on the time information managed in the management server 14 in order to prevent the time from being falsified. May be. Labor data including data indicating the field worker whose attendance status has been changed, status data indicating the attendance status after the change, and time data indicating the time when the attendance status was changed is stored in the attendance status database 46 of the management server 14. Remembered. The CPU 34 stores the field worker data indicating the field worker whose attendance state has been changed, the state data indicating the attendance state after the change, and the time data indicating the time when the attendance state has been changed, which is stored in the storage unit 32. The data is transmitted to the management server 14, but the transmission timing may be collectively transmitted at a predetermined time timing (for example, 19:00) at the end of the day's work in addition to each time.
1日の作業が全て終わり、全ての現場作業者の名前タグが退場エリア88に表示された場合、その直後、あるいは所定の時刻タイミングでCPU34は表示画面をクリアする。
以上のようにして、入場時刻、休憩時刻及び休憩時間、退場時刻が自動的に管理サーバ14に送信され収集されることで、現場作業者の労務データが作成される。例えば、所定日の所定工程において、
現場作業者a:
入場時刻 8:25
休憩時刻 12:00
休憩時間 60分
退場時刻 17:25
現場作業者b:
入場時刻 9:00
休憩時刻 11:45
休憩時間 45分
退場時刻 17:30
等の労務データが作成される。
When all work for one day is completed and the name tags of all field workers are displayed in the exit area 88, the CPU 34 clears the display screen immediately thereafter or at a predetermined time.
As described above, the entry time, the break time, the break time, and the exit time are automatically transmitted to the management server 14 and collected, so that labor data of the field worker is created. For example, in a predetermined process on a predetermined day,
Field worker a:
Admission time 8:25
Break time 12:00
Break time 60 minutes Exit time 17:25
Field worker b:
Admission time 9:00
Break time 11:45
Break time 45 minutes Exit time 17:30
Labor data such as are created.
既述したように、工程毎に担当すべき現場作業者は変更し得るから、タブレット端末12のCPU34は、工程毎に現場作業者データを管理し、ある工程が終了した場合には当該工程に関わる現場作業者データを自動的に消去することが望ましい。具体的には、工程Pa及び工程Pbが存在し、工程Paに関わる現場作業者がa,b,cであり、次の工程Pbに関わる現場作業者がu,v,wである場合、工程Paが終了するまでは、CPU34は、現場作業者a,b,cの名前タグを毎日繰り返し入場前エリアに表示するが、工程paが完了して工程pbに移行する当日には、現場作業者a,b,cのデータを記憶部32から消去し、工程pbが完了するまでは現場作業者u,v,wの名前タグを毎日繰り返し入場前エリアに表示する。管理サーバ14で建築現場の各工程管理を実行している場合、工程Paが完了したタイミングでタブレット端末12に工程paの完了信号を送信し、CPU34はこの完了信号を受信すると、これをトリガとして工程Paに関わる現場作業者のデータを記憶部32から消去すればよい。 As described above, since the field worker to be in charge of each process can be changed, the CPU 34 of the tablet terminal 12 manages the field worker data for each process, and when a certain process is completed, the process is performed. It is desirable to automatically delete the relevant field worker data. Specifically, when the process Pa and the process Pb exist, the field workers related to the process Pa are a, b, c, and the field workers related to the next process Pb are u, v, w, Until Pa is completed, the CPU 34 repeatedly displays the name tags of the field workers a, b and c every day in the pre-entry area, but on the day when the process pa is completed and the process moves to the process pb, The data of a, b, and c are deleted from the storage unit 32, and the name tags of the field workers u, v, and w are repeatedly displayed every day in the pre-entry area until the process pb is completed. When each process management of the construction site is executed by the management server 14, the completion signal of the process pa is transmitted to the tablet terminal 12 at the timing when the process Pa is completed, and when the CPU 34 receives this completion signal, this is used as a trigger. What is necessary is just to delete the data of the field worker in connection with the process Pa from the storage unit 32.
タブレット端末12は、現場作業者を認証する認証部をさらに有していてもよい。認証方法は、顔面認証、指紋認証、声紋認証、静脈認証等である。 The tablet terminal 12 may further include an authentication unit that authenticates the field worker. Authentication methods include face authentication, fingerprint authentication, voiceprint authentication, vein authentication, and the like.
また、タブレット端末12のデジタルカメラ機能部30は、現場の撮影データを取得して管理サーバ14に送信する。撮影データには、データ名と日付データがメタデータとして付加される。さらに、撮影に係る工程を特定するデータを付加してもよい。撮影タイミングは、現場作業者が自己で判断する他、管理サーバ14からの指示に基づいて決定してもよい。 The digital camera function unit 30 of the tablet terminal 12 acquires on-site shooting data and transmits it to the management server 14. A data name and date data are added to the photographing data as metadata. Furthermore, data for specifying a process related to photographing may be added. The shooting timing may be determined based on an instruction from the management server 14 as well as being determined by the site worker himself.
タブレット端末12は、取得した労務データ及び撮影データを管理サーバ14に送信するが、これらのデータの送信タイミングは非同期でよい。例えば、撮影データの送信は撮影直後とし、労務データの送信も労務データの取得直後とする等である。勿論、労務データ及び撮影データをともに記憶部32に記憶しておき、1日の終わりの所定時刻タイミングでこれらのデータを同時に管理サーバ14に送信してもよい。 The tablet terminal 12 transmits the acquired labor data and imaging data to the management server 14, but the transmission timing of these data may be asynchronous. For example, transmission of imaging data is performed immediately after imaging, and transmission of labor data is also performed immediately after acquisition of labor data. Of course, both the labor data and the photographing data may be stored in the storage unit 32, and these data may be simultaneously transmitted to the management server 14 at a predetermined time timing at the end of the day.
他方、管理サーバ14は、建築現場で作業を行う現場作業者を管理する管理会社内あるいはクラウド上など、建築現場から離れた場所に設置される。管理サーバ14は、インターネット16を介しタブレット端末12と通信を行うための通信部40、ハードディスクやRAMあるいはROMなどで構成され、出勤状態データベース46、工程データベース48、現場作業者データベース、および管理サーバ14内で処理されるデータ等が記憶される記憶部42、並びに管理サーバ14全体の制御を行うCPU44を含んで構成される。本実施形態では、管理サーバ14は、1つの建築現場における現場作業者の勤務状況を管理しているが、複数の建築現場における現場作業者の勤務状況を管理するようにしてもよい。 On the other hand, the management server 14 is installed in a place away from the building site, such as in a management company that manages site workers who work on the building site or on the cloud. The management server 14 includes a communication unit 40 for communicating with the tablet terminal 12 via the Internet 16, a hard disk, a RAM, or a ROM, and the attendance status database 46, the process database 48, the field worker database, and the management server 14. A storage unit 42 that stores data to be processed therein and a CPU 44 that controls the entire management server 14 are configured. In the present embodiment, the management server 14 manages the working conditions of the field workers at one building site, but may manage the working conditions of the field workers at a plurality of building sites.
出勤状態データベース46には、タブレット端末12から送信された、建築現場における現場作業者の勤務状況を示すデータ、すなわち労務データが記憶される。当該データは、現場作業者を示すユーザデータ、当該現場作業者の出勤状態を示す状態データ、および当該出勤状態に変更された時刻を示す時刻データを含む。管理サーバ14は、タブレット端末12からこれらのデータが送信される度に、出勤状態データベース46の新レコードとして追加する。 The attendance status database 46 stores data indicating the work status of field workers at the construction site, that is, labor data, transmitted from the tablet terminal 12. The data includes user data indicating an on-site worker, state data indicating an attendance state of the on-site worker, and time data indicating a time at which the attendance state is changed. The management server 14 adds a new record in the attendance status database 46 each time such data is transmitted from the tablet terminal 12.
工程データベース48は、建築現場における工程データと、各工程においてタブレット端末12から送信された撮影データが記憶される。工程データは、各工程とその工程が実行されるべき日付(期間)から構成される。 The process database 48 stores process data at the construction site and photographing data transmitted from the tablet terminal 12 in each process. The process data includes each process and a date (period) on which the process is to be executed.
現場作業者データベース50は、現場作業者を特定するデータと、当該データが示す現場作業者が有する資格、および当該データが示す現場作業者を識別する認証データが記憶される。これらのデータは、管理者等によって予め作成されて現場作業者データベース50に記憶される。現場作業者を特定するデータ、すなわち現場作業者データは、所定のタイミングでタブレット端末12に送信され、上記のように名前タグを生成し表示するために用いられる。 The field worker database 50 stores data for identifying a field worker, qualifications possessed by the field worker indicated by the data, and authentication data for identifying the field worker indicated by the data. These data are created in advance by an administrator or the like and stored in the field worker database 50. Data for identifying a field worker, that is, field worker data is transmitted to the tablet terminal 12 at a predetermined timing, and is used to generate and display a name tag as described above.
現場作業者は、工事の工程毎に異なるのが通常である。例えば、基礎工事の工程における現場作業者と、建方の工程における現場作業者と、内装の工程における現場作業者は互いに異なる。従って、記憶部42は、現場作業者データを工程毎に分類して記憶する。また、現場作業者は、通常はいずれかの会社に所属しているため、現場作業者を会社毎に分類して記憶してもよい。例えば、以下の如くである。
基礎工程
A工務店
作業者a、作業者b、作業者c
B工務店
作業者o、作業者p、作業者q
建方工程
C工務店
作業者s、作業者t、作業者u
内装工程
D工務店
作業者x、作業者y、作業者z
On-site workers usually differ for each construction process. For example, the field worker in the foundation construction process, the field worker in the construction process, and the field worker in the interior process are different from each other. Therefore, the memory | storage part 42 classify | categorizes and stores field worker data for every process. Further, since the field worker usually belongs to any company, the field worker may be classified and stored for each company. For example, it is as follows.
Basic process A construction worker worker a, worker b, worker c
Worker B, worker o, worker p, worker q
Construction process C contractor worker s, worker t, worker u
Interior process D construction shop worker x, worker y, worker z
なお、実際の建築現場では、複数の工程をこなし、かつ、特定の会社に属しない現場作業者も存在し得る(一人親方)。このような現場作業者には、管理者が特定のIDを割り振り、記憶部42はIDと対応づけて当該現場作業者を記憶する。 In an actual construction site, there may be a field worker who performs a plurality of processes and does not belong to a specific company (single parent). The manager assigns a specific ID to such a field worker, and the storage unit 42 stores the field worker in association with the ID.
CPU44は、現場作業者データベース50に記憶されている現場作業者データを通信部40、インターネット16を介してタブレット端末12に送信し、タブレット端末12から受信した、現場作業者の労務データを出勤状態データベース46に記憶するとともに、撮影データを工程データベース48に記憶する。CPU44は、さらに、工程データベース48及び出勤状態データベース46にアクセスし、工程データベース48に記憶されている工程データと撮影データ、及び出勤状態データベース46に記憶されている労務データを互いに対応付けて工程管理表を作成する。工程管理表は、工程と当該工程における現場作業者の労務データと当該工程において取得された撮影データを互いに対応付けて規定される表であり、望ましくは階層構造で作成される。すなわち、第1階層では工程とその日付(期間)との関係が表形式(工程表)で規定され、第1階層の下の第2階層では工程とその日付に対応付けて労務データと撮影データが規定される。労務データと撮影データは、互いに別階層で規定されていてもよいが、同じ階層として同時に表示されるのが望ましい。 The CPU 44 transmits the field worker data stored in the field worker database 50 to the tablet terminal 12 via the communication unit 40 and the Internet 16, and receives the worker data of the field worker received from the tablet terminal 12 in the attendance state. The image data is stored in the process database 48 while being stored in the database 46. Further, the CPU 44 accesses the process database 48 and the attendance status database 46, and associates the process data stored in the process database 48 with the photographing data and the labor data stored in the attendance status database 46 to manage the process. Create a table. The process management table is a table that is defined by associating the process, the labor data of the field worker in the process and the photographing data acquired in the process, and is preferably created in a hierarchical structure. That is, the relationship between the process and its date (period) is defined in a table format (process table) in the first hierarchy, and labor data and photographing data are associated with the process and the date in the second hierarchy below the first hierarchy. Is defined. Although the labor data and the photographing data may be defined in different layers, it is desirable to display them simultaneously as the same layer.
表示部52は、管理サーバ14の操作者の操作に応じ、CPU44により作成された工程管理表を表示する。 The display unit 52 displays the process management table created by the CPU 44 in accordance with the operation of the operator of the management server 14.
図2は、工程データベース48に記憶される工程表の一例である。建築物毎に、各工程の日時や期間を規定したものである。例えば、建築物Aは、4月上旬に基礎工事が開始され、4月下旬に基礎工事が完了する。その後、5月下旬まで建方工事が行われ、5月下旬から6月中旬まで内装工事、6月下旬から7月下旬まで外観工事が行われる。また、建築物Cは、4月上旬から5月上旬まで造成工事、5月下旬から6月中旬まで基礎工事、6月下旬から7月下旬まで建方工事が行われる。造成工事や基礎工事、建方工事、内装工事、外観工事等の各工程は、それぞれ複数の作業から構成され、例えば基礎工事では配筋、外周基礎、間仕切り基礎、鉄筋施工、基礎断熱施工等から構成される。各作業時の所定タイミング、例えば各作業の開始時及び終了時に、現場作業者はタブレット端末12のデジタルカメラ機能部30を用いて施工部分を撮影し、撮影データを管理サーバ14に送信する。管理サーバ14のCPU44は、受信した撮影データを、工程表の各工程に対応付けて工程データベース48に記憶する。対応付けは、撮影データにメタデータとして付加されている日時データを用いてもよく、あるいは作業を特定する特定データが付加されていればこの特定データを用いてもよい。管理サーバ14がタブレット端末12に対して撮影を指示する場合には、その指示に応じてタブレット端末12から送信された撮影データを当該指示に係る作業に対応付ければよい。 FIG. 2 is an example of a process table stored in the process database 48. For each building, the date and time of each process are specified. For example, building A starts foundation work in early April and completes foundation work in late April. After that, construction work will be carried out from late May, interior work from late May to mid June, and exterior work from late June to late July. Building C will be constructed from early April to early May, foundation work from late May to mid June, and construction work from late June to late July. Each process, such as creation work, foundation work, construction work, interior work, exterior work, etc., is composed of multiple works. Composed. At a predetermined timing at each work, for example, at the start and end of each work, the site worker photographs the construction portion using the digital camera function unit 30 of the tablet terminal 12 and transmits the photographed data to the management server 14. The CPU 44 of the management server 14 stores the received shooting data in the process database 48 in association with each process in the process table. The date and time data added as metadata to the shooting data may be used for the association, or this specific data may be used if specific data specifying the work is added. When the management server 14 instructs the tablet terminal 12 to shoot, the shooting data transmitted from the tablet terminal 12 in accordance with the instruction may be associated with the work related to the instruction.
図3は、管理サーバ14の処理フローチャートである。 FIG. 3 is a process flowchart of the management server 14.
管理サーバ14のCPU44は、タブレット端末12から労務データを受信したか否かを判定する(S101)。タブレット端末12から労務データを受信すると、受信した労務データを出勤状態データベース46に記憶する(S102)。また、労務データを受信していない場合には、次に撮影データを受信したか否かを判定する(S103)。タブレット端末12から撮影データを受信すると、受信した撮影データを工程データベース48の工程に対応付けて記憶する(S104)。以上の処理を繰り返すことで、労務データと撮影データが順次蓄積される。 The CPU 44 of the management server 14 determines whether labor data has been received from the tablet terminal 12 (S101). When the labor data is received from the tablet terminal 12, the received labor data is stored in the attendance status database 46 (S102). If labor data has not been received, it is next determined whether or not imaging data has been received (S103). When shooting data is received from the tablet terminal 12, the received shooting data is stored in association with the process in the process database 48 (S104). By repeating the above processing, labor data and photographing data are sequentially accumulated.
次に、CPU44は、ユーザからの指示に応じ、あるいは所定タイミングに出勤状態データベース46及び工程データベース48にアクセスし、記憶されている労務データと撮影データを読み出して、これらのデータを工程に対応付けて工程データベース48に記憶する。すなわち、工程データベースの工程をキーとして、工程と撮影データと労務データとが互いに対応付けて工程データベース48に記憶される(S105)。 Next, the CPU 44 accesses the attendance status database 46 and the process database 48 in response to an instruction from the user or at a predetermined timing, reads out the stored labor data and photographing data, and associates these data with the processes. And stored in the process database 48. That is, using the process in the process database as a key, the process, shooting data, and labor data are stored in the process database 48 in association with each other (S105).
例えば、基礎工事の配筋工事に現場作業者a及び現場作業者bが従事し、現場作業者aは9:00に入場し17:00に退場し、現場作業者bは9:30に入場し16:30に退場したものとする。また、作業開始時に建築現場の所定部位を撮影して撮影データとして写真P1を管理サーバ14に送信し、作業終了時に同じ部位を撮影して撮影データとして写真P2を管理サーバ14に送信したものとする。この場合、工程データベース48には、
「基礎工事の配筋工事」のデータ
と
「現場作業者a:入場9:00 退場17:00
現場作業者b:入場9:30 退場16:30」のデータ
と
「写真P1、写真P2」のデータ
が互いに対応付けて記憶される。言い換えれば、基礎工事の配筋工事のメタデータとして、現場作業者の労務データと現場作業者により撮影されたその工程の撮影データが付加されて記憶されるといえる。
For example, field worker a and field worker b are engaged in the reinforcement work for foundation work, field worker a enters at 9:00 and leaves at 17:00, and field worker b enters at 9:30. Suppose you leave at 16:30. Also, when a predetermined part of the building site is photographed at the start of work and photograph P1 is transmitted to the management server 14 as photographing data, and the same part is photographed at the end of work and photograph P2 is transmitted to the management server 14 as photographing data. To do. In this case, the process database 48 includes
Data on “bar arrangements for foundation work” and “site worker a: entrance 9:00, exit 17:00
On-site worker b: Admission 9:30 Exit 16:30 "and" Photo P1, Photo P2 "data are stored in association with each other. In other words, it can be said that the labor data of the field worker and the photographing data of the process photographed by the field worker are added and stored as the metadata of the reinforcement work of the foundation work.
次に、CPU44は、ユーザからの指示に応じ、工程データベース48にアクセスして、互いに対応付けされた工程と労務データと撮影データを読み出し、これらの対応付けデータを用いて工程管理表を作成し(S106)、表示部52に表示する(S107)。 Next, the CPU 44 accesses the process database 48 in accordance with an instruction from the user, reads out the process, labor data, and photographing data associated with each other, and creates a process management table using these association data. (S106) and display on the display unit 52 (S107).
図4は、CPU44により作成され表示部52に表示される工程管理表の一例を示す。列には基礎工事の各工程が表示され、行には日付が表示される。労務データ及び撮影データが存在する日はハイライト表示され、このハイライト表示によりユーザはその工程のその日の労務データ及び撮影データが対応付けて存在していることを容易に視認できる。 FIG. 4 shows an example of a process management table created by the CPU 44 and displayed on the display unit 52. The column displays each process of foundation work, and the row displays the date. The day when the labor data and the shooting data exist is highlighted, and the highlight display allows the user to easily recognize that the labor data and shooting data of the day in the process are associated with each other.
ハイライト表示された工程及び日をマウスでクリック、あるいは表示部52がタッチパネルで構成されている場合に工程及び日をタッチ操作すると、CPU44はこの操作を検知し、その工程のその日に対応付けされている労務データ及び撮影データを工程データベース48から読み出して表上に重畳表示する。図では、「配属 スリーブの配筋補強」工程の4日がハイライト表示されているためユーザがこれをクリックした場合に、当該工程の当該日に対応付けされている労務データとして現場作業者2名の入場時刻と退場時刻がそれぞれ表示され、かつ、その上に、当該工程の当該日に撮影された3枚の写真が表示されている。3枚の写真のそれぞれには、そのデータ名と撮影日時が表示される。ユーザは、これらを視認することで、労務状況と施工状況を同時に確認することができる。 When the highlighted process and date are clicked with the mouse, or when the display unit 52 is configured with a touch panel and the process and date are touched, the CPU 44 detects this operation and associates it with that day of the process. The labor data and photographing data that are being read out are read from the process database 48 and superimposed on the table. In the figure, when the user clicks on the 4th day of the “reinforcing sleeve reinforcement” process, when the user clicks on it, the field worker 2 is shown as labor data associated with that day of the process. The name entry time and exit time are displayed, respectively, and three photographs taken on that day of the process are displayed thereon. In each of the three photos, the data name and shooting date and time are displayed. By visually recognizing these, the user can confirm the labor situation and the construction situation at the same time.
労務データと撮影データを対応付けて同時に表示する利点は以下の通りである。すなわち、例えば労務データ上では現場作業者が2名作業を行っているはずであるが、撮影データ(写真)にはそれより多い人数が撮影されている場合には、問題が生じていることがわかる。また、労務データ上では17:00に退場しているはずであるが、撮影データ(写真)の時刻が17:00以降となっている場合には、やはり問題が生じていることがわかる。さらに、労務データ上は規定の時間だけ作業に従事しているはずであるが、本来得られるであろう撮影データよりも極端に撮影データの数が少ない場合にも、やはり問題が生じていることがわかる。本実施形態における、工程と労務データと撮影データの対応付けの効果は明らかであろう。 The advantages of simultaneously displaying labor data and photographing data in association with each other are as follows. That is, for example, two workers on the field should be working on the labor data, but if a larger number of people are photographed in the photographing data (photograph), there may be a problem. Recognize. Further, although it should have left at 17:00 on the labor data, it can be seen that there is still a problem when the time of the shooting data (photograph) is after 17:00. Furthermore, although labor data should have been working for a specified time, there is still a problem even when the number of shooting data is extremely smaller than the shooting data that would be originally obtained. I understand. The effect of associating the process, labor data, and imaging data in this embodiment will be clear.
以上、本発明の実施形態について説明したが、本発明はこれに限定されず、種々の変形が可能である。 As mentioned above, although embodiment of this invention was described, this invention is not limited to this, A various deformation | transformation is possible.
例えば、本実施形態では、現場作業者の労務データを出勤状態データベース46に記憶しているが、これに代えて工程データベース48に記憶してもよい。労務データを工程データベース48に記憶する際には、工程に対応付けて記憶すればよい。 For example, in the present embodiment, the labor worker's labor data is stored in the attendance status database 46, but may be stored in the process database 48 instead. When the labor data is stored in the process database 48, it may be stored in association with the process.
12 タブレット端末(携帯端末)、14 管理サーバ、16 インターネット、22 通信部、24 表示部、26 入力部、28 スピーカ、30 デジタルカメラ機能部、32 記憶部、36 入退場管理アプリケーション、40 通信部、42 記憶部、44 CPU、46 出勤状態データベース、48 工程データベース、50 現場作業者データベース、52 表示部。
12 tablet terminal (mobile terminal), 14 management server, 16 internet, 22 communication unit, 24 display unit, 26 input unit, 28 speaker, 30 digital camera function unit, 32 storage unit, 36 entrance / exit management application, 40 communication unit, 42 storage units, 44 CPU, 46 attendance status database, 48 process database, 50 field worker database, 52 display unit.
Claims (4)
建築現場の工程データを記憶する記憶手段と、
前記工程データと、前記受信手段で受信した前記労務データ及び前記撮影データを対応付けた工程管理表を作成する制御手段と、
前記工程管理表を表示し、前記工程管理表において工程及び日付が指定された場合に、指定された工程及び日付に対応する前記労務データ及び前記撮影データを表示する表示手段と、
を備えることを特徴とする建築物工程管理サーバ。 Receiving means for receiving the labor data and the shooting data transmitted from a terminal that acquires the construction data of the site worker of the building site and the shooting data of the building site;
Storage means for storing construction site process data;
Control means for creating a process management table in which the process data is associated with the labor data received by the receiving means and the photographing data;
Displaying the process management table, and when the process and date are specified in the process management table, display means for displaying the labor data and the photographing data corresponding to the specified process and date ;
A building process management server comprising:
前記表示手段は、
前記工程データとして、工程と日付を規定した表を表示するとともに、前記労務データ及び前記撮影データが存在する工程及び日付をハイライト表示し、ユーザからの操作に応じて前記労務データ及び前記撮影データを表示する
ことを特徴とする建築物工程管理サーバ。 In the building process management server according to claim 1,
The display means includes
As the process data, a table defining the process and date is displayed, and the process and date on which the labor data and the shooting data exist are highlighted, and the labor data and the shooting data are displayed according to an operation from the user. The building process management server characterized by displaying.
前記端末から送信された前記労務データ及び前記撮影データを受信する建築物工程管理サーバと、
を備え、
前記建築物工程管理サーバは、
前記建築現場の工程データを記憶する記憶手段と、
前記工程データと、前記端末から受信した前記労務データ及び前記撮影データを対応付けた工程管理表を作成する制御手段と、
前記工程管理表を表示し、前記工程管理表において工程及び日付が指定された場合に、指定された工程及び日付に対応する前記労務データ及び前記撮影データを表示する表示手段と、
を備えることを特徴とする建築物工程管理システム。 A terminal that is installed at a construction site and acquires and transmits labor data of site workers at the construction site and shooting data of the construction site;
A building process management server for receiving the labor data and the photographing data transmitted from the terminal;
With
The building process management server
Storage means for storing process data of the building site;
Control means for creating a process management table in which the process data, the labor data received from the terminal and the photographing data are associated with each other;
Displaying the process management table, and when the process and date are specified in the process management table, display means for displaying the labor data and the photographing data corresponding to the specified process and date ;
A building process management system comprising:
前記表示手段は、
前記工程データとして、工程と日付を規定した表を表示するとともに、前記労務データ及び前記撮影データが存在する工程及び日付をハイライト表示し、ユーザからの操作に応じて前記労務データ及び前記撮影データを表示する
ことを特徴とする建築物工程管理システム。 In the building process management system according to claim 3,
The display means includes
As the process data, a table defining the process and date is displayed, and the process and date on which the labor data and the shooting data exist are highlighted, and the labor data and the shooting data are displayed according to an operation from the user. The building process management system characterized by displaying.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2014199273A JP6358701B2 (en) | 2014-09-29 | 2014-09-29 | Building process management server and building process management system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2014199273A JP6358701B2 (en) | 2014-09-29 | 2014-09-29 | Building process management server and building process management system |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2016071553A JP2016071553A (en) | 2016-05-09 |
JP6358701B2 true JP6358701B2 (en) | 2018-07-18 |
Family
ID=55866907
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2014199273A Active JP6358701B2 (en) | 2014-09-29 | 2014-09-29 | Building process management server and building process management system |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP6358701B2 (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP7041551B2 (en) * | 2018-02-27 | 2022-03-24 | 前田建設工業株式会社 | Construction process management system and construction process management method |
JP6601829B1 (en) * | 2019-02-26 | 2019-11-06 | 有限会社ケイエスアイ | Construction labor management system |
WO2022202408A1 (en) * | 2021-03-23 | 2022-09-29 | ギアヌーヴ株式会社 | Construction site terminal, labor management system, and labor management application |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2005326965A (en) * | 2004-05-12 | 2005-11-24 | Ohbayashi Corp | Construction site management system |
JP4850973B1 (en) * | 2010-09-14 | 2012-01-11 | ギアヌーヴ株式会社 | Construction site labor management system and server |
JP5747886B2 (en) * | 2012-09-20 | 2015-07-15 | カシオ計算機株式会社 | Image management apparatus and program |
JP5835780B2 (en) * | 2013-01-21 | 2015-12-24 | 株式会社Booth | Construction site photography program |
-
2014
- 2014-09-29 JP JP2014199273A patent/JP6358701B2/en active Active
Also Published As
Publication number | Publication date |
---|---|
JP2016071553A (en) | 2016-05-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9064290B2 (en) | Method for inspecting a physical asset | |
KR101762622B1 (en) | Method for managing construction information by recording a location based photo on plan | |
US10991058B2 (en) | Inspection system and related methods | |
US11016648B2 (en) | Systems and methods for entity visualization and management with an entity node editor | |
JP5867881B2 (en) | Field management device and system | |
US20130018688A1 (en) | Updating a calendar or task status via telephony | |
JP5994979B2 (en) | Work information registration device and work information management system | |
JP2011198109A (en) | Id management method, id management system, and id management program | |
US20180089765A1 (en) | Image tagging for capturing information in a transaction | |
JP6358701B2 (en) | Building process management server and building process management system | |
JP2020071814A (en) | Information processing device, control program of information processing device, and communication terminal | |
JP6881797B1 (en) | Site photo management system, site photo management method, site photo management device, and site photo management program | |
JP6389092B2 (en) | Labor management equipment | |
JP6371081B2 (en) | Program and work management system | |
JP7338200B2 (en) | Maintenance method and maintenance server | |
JP6631362B2 (en) | Information processing apparatus, information processing method, and program | |
JP6674979B2 (en) | Program, server and work management system | |
US20190180042A1 (en) | Image display device, image display control device, and image display control method | |
JP2015132985A (en) | Meeting setting system | |
JP6688707B2 (en) | Work capacity detection system | |
JP6522416B2 (en) | Business communication system and computer program | |
JP2017122975A (en) | Information processing apparatus, information processing method, and program | |
US20130044220A1 (en) | Method and system for enabling remote inspection communication and documentation | |
JP2022089217A (en) | Site information management device, site information management system, site information management method, and site information management program | |
JP2022179561A (en) | Information processing device, information processing system and information processing method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20170704 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20180508 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20180524 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20180605 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20180615 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 6358701 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |