JP6345741B2 - Design method and manufacturing method of pile head joint - Google Patents

Design method and manufacturing method of pile head joint Download PDF

Info

Publication number
JP6345741B2
JP6345741B2 JP2016164732A JP2016164732A JP6345741B2 JP 6345741 B2 JP6345741 B2 JP 6345741B2 JP 2016164732 A JP2016164732 A JP 2016164732A JP 2016164732 A JP2016164732 A JP 2016164732A JP 6345741 B2 JP6345741 B2 JP 6345741B2
Authority
JP
Japan
Prior art keywords
pile head
bending moment
allowable bending
reinforcing bar
joint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2016164732A
Other languages
Japanese (ja)
Other versions
JP2018031204A (en
Inventor
本間 裕介
裕介 本間
真平 板東
真平 板東
田中 秀宣
秀宣 田中
知子 藤田
知子 藤田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Senqcia Corp
Japan Pile Corp
Original Assignee
Senqcia Corp
Japan Pile Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Senqcia Corp, Japan Pile Corp filed Critical Senqcia Corp
Priority to JP2016164732A priority Critical patent/JP6345741B2/en
Publication of JP2018031204A publication Critical patent/JP2018031204A/en
Application granted granted Critical
Publication of JP6345741B2 publication Critical patent/JP6345741B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Description

本開示は、杭頭接合部の設計方法及び製造方法に関する。   The present disclosure relates to a method for designing and manufacturing a pile head joint.

上部構造を支持する杭基礎は、一般的に、複数の杭と、杭の上端部(杭頭部)を囲むように設けられるパイルキャップやフーチングのような基礎コンクリート部とを有している。杭頭部と基礎コンクリート部との接続を強化するために、例えば、特許文献1が開示するように、接合部材及び補強筋が用いられる。杭頭部、接合部材、補強筋及び基礎コンクリート部は、杭頭接合部を構成する。   The pile foundation that supports the superstructure generally has a plurality of piles and a foundation concrete portion such as a pile cap or a footing that is provided so as to surround the upper end portion (pile head) of the pile. In order to strengthen the connection between the pile head portion and the foundation concrete portion, for example, as disclosed in Patent Document 1, a joining member and a reinforcing bar are used. A pile head, a joining member, a reinforcing bar, and a foundation concrete part constitute a pile head joined part.

より詳しくは、特許文献1が開示する杭頭接合部では、杭頭部の外周面に複数の接合部材が周方向に間隔をあけて取り付けられる。接合部材は、杭頭部の軸線方向に相互に離間した下板部及び上板部を有し、接合部材の下板部に補強筋の螺子部が結合される。補強筋の軸部は接合部材の上板部の挿通部を通過して延び、杭頭部の端面から上方に突出している。
特許文献1が開示する杭頭接合部では、基礎コンクリート部が上板部を上方へ押し上げ力にて押すことにより、補強筋に螺子部が螺子加工によって形成されていても、杭頭部と基礎コンクリート部の接合を効果的に補強することができる。
More specifically, in the pile head joint portion disclosed in Patent Document 1, a plurality of joint members are attached to the outer peripheral surface of the pile head at intervals in the circumferential direction. The joining member has a lower plate portion and an upper plate portion that are separated from each other in the axial direction of the pile head portion, and a screw portion of a reinforcing bar is coupled to the lower plate portion of the joining member. The shaft portion of the reinforcing bar extends through the insertion portion of the upper plate portion of the joining member and protrudes upward from the end surface of the pile head.
In the pile head joint portion disclosed in Patent Document 1, the foundation concrete portion pushes the upper plate portion upward with a force, and even if the screw portion is formed on the reinforcing bar by screw machining, the pile head portion and the foundation The joint of the concrete part can be effectively reinforced.

特開2015−34458号公報JP 2015-34458 A

本発明者等が検討したところ、特許文献1が開示する杭頭接合部においては、基礎コンクリート部のひび割れの有無や、接合部材の上板部の降伏の有無に応じて、杭頭接合部の許容曲げモーメントを場合分けして算定する必要があることが判明した。このような場合分けの必要性について、特許文献1には何ら記載はない。
場合分けをして杭頭接合部の許容曲げモーメントを的確に把握すれば、杭頭部に発生する曲げモーメントに確実に耐えることができるように、杭頭部、接合部材、補強筋及び基礎コンクリート部の仕様を決定することができるとともに、仕様が過剰になることを抑制することができる。この結果として、杭頭接合部の許容曲げモーメントを場合分けして算定することにより、低コストで十分な許容曲げモーメントを確保することが可能となる。
When the present inventors examined, in the pile head joint part which patent document 1 discloses, according to the presence or absence of the crack of a foundation concrete part, and the presence or absence of the yield of the upper board part of a joining member, the pile head joint part of It was found that it was necessary to calculate the allowable bending moment for each case. There is no description in Patent Document 1 regarding the necessity of such case classification.
The pile heads, joint members, reinforcement bars and foundation concrete can be used to ensure that the bending moments generated at the pile heads can be reliably endured if the allowable bending moments at the pile head joints are accurately grasped. It is possible to determine the specifications of the part and to suppress the specification from becoming excessive. As a result, it is possible to ensure a sufficient allowable bending moment at low cost by calculating the allowable bending moment of the pile head joint according to the case.

上述の事情に鑑みて、本発明の少なくとも一実施形態の目的は、杭頭部の軸線方向に相互に離間した下側突起部及び上側突起部を有する接合部材が杭頭部の外周面に取り付けられ、該下側突起部に螺子部が結合された補強筋の軸部に対し基礎コンクリート部が付着している杭頭接合部において、十分な大きさの許容曲げモーメントを低コストな仕様で実現可能とする杭頭接合部の設計方法及び製造方法を提供することにある。   In view of the above circumstances, the object of at least one embodiment of the present invention is to attach a joining member having a lower protrusion and an upper protrusion spaced apart from each other in the axial direction of the pile head to the outer peripheral surface of the pile head. In the pile head joint where the foundation concrete part is attached to the shaft part of the reinforcing bar with the screw part connected to the lower protrusion, a sufficiently large allowable bending moment can be realized at low cost. It is providing the design method and manufacturing method of a pile head junction which make it possible.

(1)本発明の少なくとも一実施形態に係る杭頭接合部の設計方法は、
杭頭部と、
前記杭頭部の外周面に固定された複数の接合部材と、
前記杭頭部に対し前記接合部材を介してそれぞれ取り付けられた複数の補強筋と、
前記杭頭部、前記複数の接合部材、及び、前記複数の補強筋を囲む、コンクリートによって構成された基礎コンクリート部と、を備え、
前記補強筋は、
表面に凹凸を有する軸部と、
前記軸部の一端側に連なり前記軸部よりも小さい断面積を有する螺子部と、を有し、
前記接合部材は、
前記杭頭部の外周面に固定された下側突起部と、
前記杭頭部の外周面に固定された上側突起部であって、前記杭頭部の軸線方向にて前記下側突起部の上方に配置された上側突起部と、を有し、
前記補強筋の螺子部は前記下側突起部に結合され、
前記補強筋の軸部は、前記杭頭部の軸線方向にて前記下側突起部と前記上側突起部との間を延びるとともに、前記杭頭部の端面から上方に突出して延在している、
杭頭接合部の設計方法において、
前記杭頭部、前記接合部材、前記補強筋及び前記基礎コンクリート部の仕様を選択する仕様選択工程と、
前記仕様選択工程にて選択された仕様に基づいて、前記杭頭接合部の許容曲げモーメントを算定する許容曲げモーメント算定工程と、
前記許容曲げモーメントに基づいて、前記仕様選択工程にて選択された仕様の適否を判定する仕様適否判定工程と、を備え、
前記許容曲げモーメント算定工程において、
前記杭頭部の端面から上方に突出する前記補強筋の軸部の部分を囲む基礎コンクリート部の部分と、前記下側突起部と前記上側突起部との間を延びる前記補強筋の軸部の部分を囲む前記基礎コンクリート部の部分との間に、ひび割れが生じると仮定し、
前記補強筋の前記軸部の引っ張り降伏強さを考慮する一方、前記接合部材から前記基礎コンクリート部に作用する抵抗を無視して前記許容曲げモーメントを算定する。
(1) A method for designing a pile head joint according to at least one embodiment of the present invention includes:
A pile head,
A plurality of joining members fixed to the outer peripheral surface of the pile head;
A plurality of reinforcing bars respectively attached to the pile head via the joining member;
A foundation concrete portion constituted by concrete surrounding the pile head, the plurality of joining members, and the plurality of reinforcing bars,
The reinforcing bars are
A shaft portion having irregularities on the surface;
A screw portion connected to one end side of the shaft portion and having a smaller cross-sectional area than the shaft portion, and
The joining member is
A lower protrusion fixed to the outer peripheral surface of the pile head;
An upper protrusion fixed to the outer peripheral surface of the pile head, and an upper protrusion disposed above the lower protrusion in the axial direction of the pile head;
A screw portion of the reinforcing bar is coupled to the lower protrusion,
The shaft portion of the reinforcing bar extends between the lower protrusion portion and the upper protrusion portion in the axial direction of the pile head portion, and protrudes upward from the end surface of the pile head portion. ,
In the design method of the pile head joint,
A specification selection step of selecting specifications of the pile head, the joining member, the reinforcing bar, and the foundation concrete part;
Based on the specification selected in the specification selection step, an allowable bending moment calculation step for calculating an allowable bending moment of the pile head joint,
A specification suitability determination step for determining suitability of the specification selected in the specification selection step based on the allowable bending moment, and
In the allowable bending moment calculation step,
A portion of a foundation concrete portion surrounding a portion of a shaft portion of the reinforcing bar protruding upward from an end surface of the pile head, and a shaft portion of the reinforcing bar extending between the lower protrusion portion and the upper protrusion portion. Assuming that cracks occur between the part of the foundation concrete part surrounding the part,
While considering the tensile yield strength of the shaft portion of the reinforcing bar, the allowable bending moment is calculated ignoring the resistance acting on the foundation concrete portion from the joint member.

上記構成(1)によれば、基礎コンクリート部にひび割れが生じると仮定した場合に、補強筋の軸部の引っ張り降伏強さを考慮する一方、接合部材から基礎コンクリート部に作用する抵抗を無視して許容曲げモーメントを算定することで、許容曲げモーメントを的確に算定することができる。この結果として、上記構成(1)によれば、十分な大きさの許容曲げモーメントを有する杭頭接合部を低コストな仕様で実現可能である。   According to the above configuration (1), when it is assumed that cracks occur in the foundation concrete part, while considering the tensile yield strength of the shaft part of the reinforcing bar, the resistance acting on the foundation concrete part from the joining member is ignored. By calculating the allowable bending moment, the allowable bending moment can be accurately calculated. As a result, according to the configuration (1), it is possible to realize a pile head joint having a sufficiently large allowable bending moment with low-cost specifications.

(2)本発明の少なくとも一実施形態に係る杭頭接合部の設計方法は、
杭頭部と、
前記杭頭部の外周面に固定された複数の接合部材と、
前記杭頭部に対し前記接合部材を介してそれぞれ取り付けられた複数の補強筋と、
前記杭頭部、前記複数の接合部材、及び、前記複数の補強筋を囲む、コンクリートによって構成された基礎コンクリート部と、を備え、
前記補強筋は、
表面に凹凸を有する軸部と、
前記軸部の一端側に連なり前記軸部よりも小さい断面積を有する螺子部と、を有し、
前記接合部材は、
前記杭頭部の外周面に固定された下側突起部と、
前記杭頭部の外周面に固定された上側突起部であって、前記杭頭部の軸線方向にて前記下側突起部の上方に配置された上側突起部と、を有し、
前記補強筋の螺子部は前記下側突起部に結合され、
前記補強筋は、前記杭頭部の軸線方向にて前記下側突起部と前記上側突起部との間を延びるとともに、前記杭頭部の端面から上方に突出して延在している、
杭頭接合部の設計方法において、
前記杭頭部、前記接合部材、前記補強筋及び前記基礎コンクリート部の仕様を選択する仕様選択工程と、
前記仕様選択工程にて選択された仕様に基づいて、前記杭頭接合部の許容曲げモーメントを算定する許容曲げモーメント算定工程と、
前記許容曲げモーメントに基づいて、前記仕様選択工程にて選択された仕様の適否を判定する仕様適否判定工程と、を備え、
前記許容曲げモーメント算定工程において、
前記杭頭部の端面から上方に突出する前記補強筋の軸部の部分を囲む基礎コンクリート部の部分と、前記下側突起部と前記上側突起部との間を延びる前記補強筋の軸部の部分を囲む前記基礎コンクリート部の部分との間に、ひび割れが生じないと仮定し、
前記補強筋の前記螺子部の引っ張り降伏強さを考慮するとともに、前記接合部材から前記基礎コンクリート部に作用する抵抗を考慮して前記許容曲げモーメントを算定する。
(2) A method for designing a pile head joint according to at least one embodiment of the present invention,
A pile head,
A plurality of joining members fixed to the outer peripheral surface of the pile head;
A plurality of reinforcing bars respectively attached to the pile head via the joining member;
A foundation concrete portion constituted by concrete surrounding the pile head, the plurality of joining members, and the plurality of reinforcing bars,
The reinforcing bar is
A shaft portion having irregularities on the surface;
A screw portion connected to one end side of the shaft portion and having a smaller cross-sectional area than the shaft portion, and
The joining member is
A lower protrusion fixed to the outer peripheral surface of the pile head;
An upper protrusion fixed to the outer peripheral surface of the pile head, and an upper protrusion disposed above the lower protrusion in the axial direction of the pile head;
A screw portion of the reinforcing bar is coupled to the lower protrusion,
The reinforcing bar extends between the lower protrusion and the upper protrusion in the axial direction of the pile head, and extends upward from an end surface of the pile head.
In the design method of the pile head joint,
A specification selection step of selecting specifications of the pile head, the joining member, the reinforcing bar, and the foundation concrete part;
Based on the specification selected in the specification selection step, an allowable bending moment calculation step for calculating an allowable bending moment of the pile head joint,
A specification suitability determination step for determining suitability of the specification selected in the specification selection step based on the allowable bending moment, and
In the allowable bending moment calculation step,
A portion of a foundation concrete portion surrounding a portion of a shaft portion of the reinforcing bar protruding upward from an end surface of the pile head, and a shaft portion of the reinforcing bar extending between the lower protrusion portion and the upper protrusion portion. Assuming that no cracks occur between the foundation concrete part surrounding the part,
The allowable bending moment is calculated in consideration of the tensile yield strength of the screw portion of the reinforcing bar and the resistance acting on the foundation concrete portion from the joining member.

上記構成(2)によれば、基礎コンクリート部にひび割れが生じないと仮定した場合に、補強筋の螺子部の引っ張り降伏強さを考慮するとともに、接合部材から基礎コンクリート部に作用する抵抗を考慮して許容曲げモーメントを算定することで、許容曲げモーメントを的確に算定することができる。この結果として、上記構成(2)によれば、十分な大きさの許容曲げモーメントを有する杭頭接合部を低コストな仕様で実現可能である。   According to the above configuration (2), when it is assumed that no cracks are generated in the foundation concrete part, the tensile yield strength of the screw part of the reinforcing bar is taken into consideration, and the resistance acting on the foundation concrete part from the joining member is taken into consideration. By calculating the allowable bending moment, the allowable bending moment can be accurately calculated. As a result, according to the configuration (2), a pile head joint having a sufficiently large allowable bending moment can be realized with low-cost specifications.

(3)本発明の少なくとも一実施形態に係る杭頭接合部の設計方法は、
杭頭部と、
前記杭頭部の外周面に固定された複数の接合部材と、
前記杭頭部に対し前記接合部材を介してそれぞれ取り付けられた複数の補強筋と、
前記杭頭部、前記複数の接合部材、及び、前記複数の補強筋を囲む、コンクリートによって構成された基礎コンクリート部と、を備え、
前記補強筋は、
表面に凹凸を有する軸部と、
前記軸部の下端側に連なり前記軸部よりも小さい断面積を有する螺子部と、を有し、
前記接合部材は、
前記杭頭部の外周面に固定された下側突起部と、
前記杭頭部の外周面に固定された上側突起部であって、前記杭頭部の軸線方向にて前記下側突起部の上方に配置された上側突起部と、を有し、
前記補強筋の螺子部は前記下側突起部に結合され、
前記補強筋は、前記杭頭部の軸線方向にて前記下側突起部と前記上側突起部との間を延びるとともに、前記杭頭部の端面から上方に突出して延在している、
杭頭接合部の設計方法において、
前記杭頭部、前記接合部材、前記補強筋及び前記基礎コンクリート部の仕様を選択する仕様選択工程と、
前記仕様選択工程にて選択された仕様に基づいて、前記杭頭接合部の許容曲げモーメントを算定する許容曲げモーメント算定工程と、
前記許容曲げモーメントに基づいて、前記仕様選択工程にて選択された仕様の適否を判定する仕様適否判定工程と、を備え、
前記許容曲げモーメント算定工程は、
前記補強筋の前記螺子部の引っ張り降伏強さを考慮するとともに、前記接合部材から前記基礎コンクリート部に作用する抵抗を考慮して前記許容曲げモーメントとしての第1許容曲げモーメントを算定する第1許容曲げモーメント算定工程と、
前記補強筋の前記軸部の引っ張り降伏強さを考慮する一方、前記接合部材から前記基礎コンクリート部に作用する抵抗を無視して前記許容曲げモーメントとしての第2許容曲げモーメントを算定する第2許容曲げモーメント算定工程と、
前記第1許容曲げモーメントと前記第2許容曲げモーメントを比較し、前記第1許容曲げモーメントと前記第2許容曲げモーメントのうち小さい方を前記許容曲げモーメントとして選択する許容曲げモーメント選択工程と、を含む。
(3) A method for designing a pile head joint according to at least one embodiment of the present invention,
A pile head,
A plurality of joining members fixed to the outer peripheral surface of the pile head;
A plurality of reinforcing bars respectively attached to the pile head via the joining member;
A foundation concrete portion constituted by concrete surrounding the pile head, the plurality of joining members, and the plurality of reinforcing bars,
The reinforcing bar is
A shaft portion having irregularities on the surface;
A screw portion connected to the lower end side of the shaft portion and having a smaller cross-sectional area than the shaft portion, and
The joining member is
A lower protrusion fixed to the outer peripheral surface of the pile head;
An upper protrusion fixed to the outer peripheral surface of the pile head, and an upper protrusion disposed above the lower protrusion in the axial direction of the pile head;
A screw portion of the reinforcing bar is coupled to the lower protrusion,
The reinforcing bar extends between the lower protrusion and the upper protrusion in the axial direction of the pile head, and extends upward from an end surface of the pile head.
In the design method of the pile head joint,
A specification selection step of selecting specifications of the pile head, the joining member, the reinforcing bar, and the foundation concrete part;
Based on the specification selected in the specification selection step, an allowable bending moment calculation step for calculating an allowable bending moment of the pile head joint,
A specification suitability determination step for determining suitability of the specification selected in the specification selection step based on the allowable bending moment, and
The allowable bending moment calculation step includes:
Considering the tensile yield strength of the screw portion of the reinforcing bar and calculating the first allowable bending moment as the allowable bending moment in consideration of the resistance acting on the foundation concrete portion from the joint member Bending moment calculation process;
While considering the tensile yield strength of the shaft portion of the reinforcing bar, the second permissible bending moment is calculated as the permissible bending moment ignoring the resistance acting on the foundation concrete portion from the joining member Bending moment calculation process;
An allowable bending moment selection step of comparing the first allowable bending moment and the second allowable bending moment and selecting a smaller one of the first allowable bending moment and the second allowable bending moment as the allowable bending moment; Including.

上記構成(3)によれば、第1許容曲げモーメントと第2許容曲げモーメントのうち小さい方を許容曲げモーメントとして選択することで、基礎コンクリート部におけるひび割れの発生の有無に係わらずに、安全を見込んで、十分な大きさの許容曲げモーメントを有する杭頭接合部を低コストな仕様で実現可能である。   According to the configuration (3), by selecting the smaller one of the first allowable bending moment and the second allowable bending moment as the allowable bending moment, safety can be ensured regardless of whether or not cracks have occurred in the foundation concrete portion. It is possible to realize a pile head joint having a sufficiently large allowable bending moment with low cost specifications.

(4)幾つかの実施形態では、上記構成(3)において、
前記許容曲げモーメント選択工程において、前記上側突起部の降伏強さが前記軸部の引っ張り降伏強さと前記螺子部の引っ張り降伏強さとの差よりも小さい場合、前記第1許容曲げモーメントが前記許容曲げモーメントとして選択される。
(4) In some embodiments, in the configuration (3),
In the allowable bending moment selection step, when the yield strength of the upper protrusion is smaller than the difference between the tensile yield strength of the shaft portion and the tensile yield strength of the screw portion, the first allowable bending moment is the allowable bending moment. Selected as a moment.

上記構成(4)によれば、上側突起部の降伏強さが補強筋の軸部の引っ張り降伏強さと螺子部の引っ張り降伏強さとの差よりも小さい場合、第1許容曲げモーメントが許容曲げモーメントとして選択される。つまり、上側突起部の降伏強さが補強筋の軸部の引っ張り降伏強さと螺子部の引っ張り降伏強さとの差よりも小さい場合、上側突起部が降伏してしまい、第1許容曲げモーメントの方が小さくなると判断して、第1許容曲げモーメントを許容曲げモーメントとして選択する。これにより、上記構成(4)によれば、安全を見込んで、許容曲げモーメントを的確に算定することができ、十分な大きさの許容曲げモーメントを有する杭頭接合部を低コストな仕様で実現可能である。   According to the configuration (4), when the yield strength of the upper protrusion is smaller than the difference between the tensile yield strength of the shaft portion of the reinforcing bar and the tensile yield strength of the screw portion, the first allowable bending moment is the allowable bending moment. Selected as. That is, when the yield strength of the upper protrusion is smaller than the difference between the tensile yield strength of the shaft portion of the reinforcing bar and the tensile yield strength of the screw portion, the upper protrusion yields, and the first allowable bending moment Therefore, the first allowable bending moment is selected as the allowable bending moment. As a result, according to the above configuration (4), it is possible to accurately calculate the allowable bending moment in anticipation of safety, and to realize a pile head joint having a sufficiently large allowable bending moment with low-cost specifications. Is possible.

(5)幾つかの実施形態では、上記構成(1)乃至(4)の何れか1つにおいて、
前記仕様適否判定工程は、
前記許容曲げモーメント及び前記許容曲げモーメントに対応する前記杭頭部の回転角に基づいて、前記杭頭接合部の弾性回転剛性を演算する弾性回転剛性演算工程と、
前記杭頭部に軸方向圧縮力が作用していないという条件下において、前記杭頭接合部の弾性回転剛性を考慮して、前記杭頭部に対し想定水平力が作用したときに前記杭頭部に発生する発生曲げモーメントを演算する発生曲げモーメント演算工程と、
前記発生曲げモーメント演算工程にて演算された発生曲げモーメントが、前記許容曲げモーメントよりも小さいか否かを判定する曲げモーメント比較判定工程と、を含み、
前記杭頭部、前記接合部材、前記補強筋及び前記基礎コンクリート部の仕様が適当であると判定する条件の1つは、前記曲げモーメント比較判定工程において、前記発生曲げモーメントが、前記許容曲げモーメントよりも小さいと判定されることである。
(5) In some embodiments, in any one of the configurations (1) to (4),
The specification suitability determination step includes
Based on the rotation angle of the pile head corresponding to the allowable bending moment and the allowable bending moment, an elastic rotation stiffness calculation step of calculating the elastic rotation stiffness of the pile head joint,
The pile head when an assumed horizontal force is applied to the pile head in consideration of the elastic rotational rigidity of the pile head joint, under the condition that no axial compression force is applied to the pile head. The generated bending moment calculation process for calculating the generated bending moment generated in the part,
A bending moment comparison and determination step for determining whether or not the generated bending moment calculated in the generated bending moment calculation step is smaller than the allowable bending moment,
One of the conditions for determining that the specifications of the pile head, the joining member, the reinforcing bar, and the foundation concrete part are appropriate is that the generated bending moment is the allowable bending moment in the bending moment comparison determining step. It is determined that it is smaller than.

従来、補強筋に基礎コンクリート部が付着している杭頭接合部の場合、杭頭接合部にて発生する発生曲げモーメントは、固定度が1であるとして算定されていた。ここで、固定度は、日本建築学会の「建築基礎構造設計指針」に従い、杭頭を完全固定とした時に生じる杭頭曲げモーメントM0fに対する、半固定時に生じる杭頭曲げモーメントMの比M/M0fとして定義される。杭頭ピンの場合、M=0であるので固定度は0、杭頭固定(剛接合)の場合、M=M0fであるので固定度は1になる。杭頭半剛接合では、固定度をαとすると、0.0<α<1.0となる。
この点、本発明者等が検討したところ、補強筋に基礎コンクリート部が付着している場合であっても、固定度を1とせずに発生曲げモーメントを算定してもよい場合、即ち、弾性回転剛性を考慮して発生曲げモーメントを算定してもよい場合が存在することがわかった。具体的には、杭頭部に軸方向圧縮力が作用していないときには、固定度を1とせずに算定してもよいことがわかった。
そこで、上記構成(5)では、杭頭部に軸方向圧縮力が作用していないという条件下で、杭頭接合部の弾性回転剛性を考慮して、杭頭部に対し想定水平力が作用したときに杭頭部に発生する発生曲げモーメントを演算している。このように、杭頭接合部の弾性回転剛性を考慮することで、固定度を1よりも小さくすることができ、杭頭部の発生曲げモーメントを小さくすることができる。これにより、杭頭部に軸方向圧縮力が作用していないという条件下で、発生曲げモーメントを小さくすることができ、許容曲げモーメントよりも発生曲げモーメントを小さくすることができる。この結果として、上記構成(5)によれば、杭頭発生曲げモーメントに対して十分な大きさの許容曲げモーメントを有する杭頭接合部を低コストな仕様で実現可能である。
Conventionally, in the case of a pile head joint in which the foundation concrete portion is attached to the reinforcing bar, the generated bending moment generated at the pile head joint has been calculated as having a fixing degree of 1. Here, the degree of fixation is the ratio M of the pile head bending moment M 0 that occurs when semi-fixed to the pile head bending moment M 0f that occurs when the pile head is completely fixed, according to the “Building Foundation Structure Design Guidelines” of the Architectural Institute of Japan. Defined as 0 / M 0f . In the case of a pile head pin, M 0 = 0, so the fixing degree is 0, and in the case of pile head fixing (rigid connection), M 0 = M 0f , so the fixing degree is 1. In the pile head semi-rigid joint, if the fixing degree is α, 0.0 <α <1.0.
In view of this point, the present inventors have examined that even when the foundation concrete portion is attached to the reinforcing bar, the generated bending moment may be calculated without setting the fixing degree to 1, that is, the elasticity. It was found that there is a case where the generated bending moment may be calculated in consideration of the rotational rigidity. Specifically, it was found that when the axial compressive force is not acting on the pile head, the fixing degree may be calculated without being set to 1.
Therefore, in the above configuration (5), an assumed horizontal force acts on the pile head in consideration of the elastic rotational rigidity of the pile head joint, under the condition that no axial compressive force acts on the pile head. The generated bending moment generated at the pile head is calculated. Thus, by considering the elastic rotational rigidity of the pile head joint, the degree of fixation can be made smaller than 1, and the generated bending moment of the pile head can be reduced. Accordingly, the generated bending moment can be reduced under the condition that the axial compressive force is not applied to the pile head, and the generated bending moment can be made smaller than the allowable bending moment. As a result, according to the configuration (5), it is possible to realize a pile head joint having an allowable bending moment that is sufficiently large with respect to the pile head generated bending moment with low-cost specifications.

(6)幾つかの実施形態では、上記構成(3)又は(4)において、
前記仕様適否判定工程は、
前記第1許容曲げモーメント及び前記第2許容曲げモーメントのうち大きい方と前記許容曲げモーメントに対応する前記杭頭部の回転角に基づいて、前記杭頭接合部の弾性回転剛性を演算する弾性回転剛性演算工程と、
前記杭頭部に軸方向圧縮力が作用していないという条件下において、前記杭頭接合部の弾性回転剛性を考慮して、前記杭頭部に対し想定水平力が作用したときに前記杭頭部に発生する発生曲げモーメントを演算する発生曲げモーメント演算工程と、
前記発生曲げモーメント演算工程にて演算された杭頭部の発生曲げモーメントが、前記許容曲げモーメントよりも小さいか否かを判定する曲げモーメント比較判定工程と、を含み、
前記杭頭部、前記接合部材、前記補強筋及び前記基礎コンクリート部の仕様が適当であると判定する条件の1つは、前記曲げモーメント比較判定工程において、前記発生曲げモーメントが、前記許容曲げモーメントよりも小さいと判定されることである。
(6) In some embodiments, in the configuration (3) or (4),
The specification suitability determination step includes
Elastic rotation for calculating the elastic rotational rigidity of the pile head joint based on the larger of the first allowable bending moment and the second allowable bending moment and the rotation angle of the pile head corresponding to the allowable bending moment Stiffness calculation process;
The pile head when an assumed horizontal force is applied to the pile head in consideration of the elastic rotational rigidity of the pile head joint, under the condition that no axial compression force is applied to the pile head. The generated bending moment calculation process for calculating the generated bending moment generated in the part,
A bending moment comparison determination step of determining whether or not the generated bending moment of the pile head calculated in the generated bending moment calculation step is smaller than the allowable bending moment,
One of the conditions for determining that the specifications of the pile head, the joining member, the reinforcing bar, and the foundation concrete part are appropriate is that the generated bending moment is the allowable bending moment in the bending moment comparison determining step. It is determined that it is smaller than.

上記構成(6)によれば、上記構成(5)の場合と同様、杭頭部に軸方向圧縮力が作用していないという条件下で、発生曲げモーメントを小さくすることができ、許容曲げモーメントよりも発生曲げモーメントを小さくすることができる。
一方、弾性回転剛性が過小に評価された場合、すなわち、固定度が過小に評価された場合、演算される杭頭部の発生曲げモーメントが過小になってしまう。このような発生曲げモーメントと許容曲げモーメントとを比較した場合、比較結果の妥当性に問題が生じる虞がある。
この点、上記構成(6)によれば、第1許容曲げモーメント及び第2許容曲げモーメントのうち、大きい方に対応する杭頭部の回転角に基づいて、杭頭接合部の弾性回転剛性を演算するので、弾性回転剛性の大きさが過小に評価されることが防止される。この結果として、上記構成(6)によれば、発生曲げモーメントと許容曲げモーメントとを比較したときの結果の妥当性が担保され、十分な大きさの許容曲げモーメントを有する杭頭接合部を低コストな仕様で確実に実現可能である。
According to the above configuration (6), as in the case of the above configuration (5), the generated bending moment can be reduced under the condition that the axial compressive force is not applied to the pile head, and the allowable bending moment. The generated bending moment can be made smaller.
On the other hand, when the elastic rotational rigidity is evaluated as being underestimated, that is, when the degree of fixing is evaluated as being underestimated, the calculated bending moment of the pile head is too small. When such a generated bending moment and an allowable bending moment are compared, there is a possibility that a problem may arise in the validity of the comparison result.
In this respect, according to the configuration (6), the elastic rotational rigidity of the pile head joint is determined based on the rotation angle of the pile head corresponding to the larger one of the first allowable bending moment and the second allowable bending moment. Since it calculates, it is prevented that the magnitude | size of elastic rotational rigidity is evaluated too small. As a result, according to the above configuration (6), the validity of the result when the generated bending moment and the allowable bending moment are compared is ensured, and the pile head joint having a sufficiently large allowable bending moment is reduced. It can be reliably realized with low cost specifications.

(7)幾つかの実施形態では、上記構成(5)又は(6)において、
前記弾性回転剛性演算工程は、前記補強筋の軸部に対する前記基礎コンクリート部の付着を考慮して前記補強筋のうち引っ張り側の補強筋の伸び量を算定する工程を含む。
(7) In some embodiments, in the configuration (5) or (6),
The elastic rotational rigidity calculation step includes a step of calculating an extension amount of the reinforcing reinforcement on the tension side among the reinforcing bars in consideration of adhesion of the foundation concrete portion to the shaft portion of the reinforcing bars.

伸び量が過大に算定された場合、杭頭部の回転角が過大に評価され、杭頭接合部の弾性回転剛性が過小に評価される。弾性回転剛性が過小に評価された場合、すなわち、固定度が過小に評価された場合、演算される発生曲げモーメントが過小になってしまう。このような発生曲げモーメントと許容曲げモーメントとを比較した場合、比較結果の妥当性に問題が生じる虞がある。
この点、上記構成(7)によれば、補強筋の軸部に対する基礎コンクリート部の付着を考慮して補強筋の伸び量を算定するので、伸び量が過大に算定されることが防止される。この結果として、上記構成(7)によれば、発生曲げモーメントと許容曲げモーメントとを比較したときの結果の妥当性が担保され、十分な大きさの許容曲げモーメントを有する杭頭接合部を低コストな仕様で確実に実現可能である。
When the amount of elongation is calculated excessively, the rotation angle of the pile head is overestimated, and the elastic rotational rigidity of the pile head joint is underestimated. When the elastic rotational rigidity is evaluated as being underestimated, that is, when the fixing degree is evaluated as being underestimated, the calculated bending moment is too small. When such a generated bending moment and an allowable bending moment are compared, there is a possibility that a problem may arise in the validity of the comparison result.
In this respect, according to the above configuration (7), the amount of extension of the reinforcing bar is calculated in consideration of the adhesion of the foundation concrete portion to the shaft portion of the reinforcing bar, thereby preventing the extension amount from being excessively calculated. . As a result, according to the configuration (7), the validity of the result when the generated bending moment and the allowable bending moment are compared is ensured, and the pile head joint having a sufficiently large allowable bending moment is reduced. It can be reliably realized with low cost specifications.

(8)幾つかの実施形態では、上記構成(5)乃至(7)の何れか1つにおいて、
前記杭頭接合部の弾性回転剛性を無視して演算される、前記杭頭部に対し前記想定水平力が作用したときに前記杭頭部に発生する剛接合発生曲げモーメントが、前記許容曲げモーメントよりも大きいか否かを判定する剛接合発生曲げモーメント比較判定工程を更に含み、
前記杭頭部、前記接合部材、前記補強筋及び前記基礎コンクリート部の仕様が適当であると判定する条件の1つは、前記剛接合発生曲げモーメント比較判定工程において、前記剛接合発生曲げモーメントが、前記許容曲げモーメントよりも大きいと判定されることである。
(8) In some embodiments, in any one of the configurations (5) to (7),
The bending bending moment generated at the pile head when the assumed horizontal force is applied to the pile head, calculated by ignoring the elastic rotational rigidity of the pile head joint, is the allowable bending moment. Further comprising a rigid joint occurrence bending moment comparison and determination step of determining whether or not greater than
One of the conditions for determining that the specifications of the pile head, the joint member, the reinforcing bar, and the foundation concrete part are appropriate is that the rigid joint generated bending moment is determined in the rigid joint generated bending moment comparison determination step. It is determined that the allowable bending moment is greater than the allowable bending moment.

上記構成(8)によれば、杭頭部の回転角を無視して演算した剛接合発生曲げモーメントが許容曲げモーメントよりも大きいときに、杭頭部、接合部材、補強筋及び基礎コンクリート部の仕様が適当であると判定されるので、杭頭部、接合部材、補強筋及び基礎コンクリート部の仕様が過剰になることが防止される。この結果として、上記構成(8)によれば、十分な大きさの許容曲げモーメントを有する杭頭接合部を低コストな仕様で確実に実現可能である。   According to the above configuration (8), when the bending moment generated by ignoring the rotation angle of the pile head is larger than the allowable bending moment, the pile head, the joining member, the reinforcing bar, and the foundation concrete portion Since it is determined that the specification is appropriate, it is possible to prevent the specification of the pile head, the joining member, the reinforcing bar, and the foundation concrete portion from becoming excessive. As a result, according to the configuration (8), a pile head joint having a sufficiently large allowable bending moment can be reliably realized with low-cost specifications.

(9)幾つかの実施形態では、上記構成(1)乃至(8)の何れか1つにおいて、
前記許容曲げモーメント算定工程において、
前記杭頭部の端部から上方に突出する前記補強筋と前記補強筋を囲む基礎コンクリート部の抵抗曲げモーメントは、前記杭頭部の端面を含む仮想RC断面が負担する曲げモーメントと仮定し、
前記杭頭部の直径をDpとし、
前記仮想RC断面の直径をDとし、
前記杭頭部の軸線方向にて下側突起部から上側突起部の上端までの間で、基礎コンクリート部が補強筋の軸部に付着している長さをLeとしたときに、次式:
Dp+Le≦D≦Dp+2Le
で表される関係を満たすように前記仮想RC断面の直径Dを設定し、算定する。
(9) In some embodiments, in any one of the configurations (1) to (8),
In the allowable bending moment calculation step,
It is assumed that the resistance bending moment of the reinforcing concrete projecting upward from the end of the pile head and the foundation concrete portion surrounding the reinforcement is the bending moment borne by the virtual RC section including the end face of the pile head,
The diameter of the pile head is Dp,
The diameter of the virtual RC cross section is D,
When the length of the foundation concrete portion attached to the shaft portion of the reinforcing bar between the lower protrusion portion and the upper end of the upper protrusion portion in the axial direction of the pile head is defined as Le:
Dp + Le ≦ D ≦ Dp + 2Le
The diameter D of the virtual RC cross section is set so as to satisfy the relationship represented by

上記構成(9)によれば、前記杭頭部の端部から上方に突出する前記補強筋と前記補強筋を囲む基礎コンクリート部の抵抗曲げモーメントは、杭頭部の端面を含む仮想RC断面が負担する曲げモーメントと仮定し、次式:
Dp+Le≦D≦Dp+2Le
で表される関係を満たすように仮想RC断面の直径Dを設定するので、仮想RC断面径の大きさを従来よりも大きく設定可能である。仮想RC断面径が大きいほど、基礎コンクリート部や杭頭部に作用する応力を小さくすることができ、許容曲げモーメントを大きく算定することができる。この結果として、上記構成(9)によれば、十分な大きさの許容曲げモーメントを有する杭頭接合部を低コストな仕様で実現可能である。
According to the said structure (9), the resistance bending moment of the foundation concrete part surrounding the said reinforcement and the reinforcement reinforcement which protrudes upwards from the edge part of the said pile head is the virtual RC cross section containing the end surface of a pile head. Assuming the bending moment to bear, the following formula:
Dp + Le ≦ D ≦ Dp + 2Le
Since the diameter D of the virtual RC cross section is set so as to satisfy the relationship expressed by:, the size of the virtual RC cross section diameter can be set larger than in the past. The larger the virtual RC cross-sectional diameter, the smaller the stress acting on the foundation concrete part and the pile head, and the greater the allowable bending moment can be calculated. As a result, according to the configuration (9), a pile head joint having a sufficiently large allowable bending moment can be realized with low-cost specifications.

(10)幾つかの実施形態では、上記構成(1)乃至(9)の何れか1つにおいて、
前記許容曲げモーメントが前記発生曲げモーメントに近付くように、前記仕様選択工程と、前記許容曲げモーメント算定工程と、前記仕様適否判定工程とを繰り返す。
(10) In some embodiments, in any one of the configurations (1) to (9),
The specification selection step, the allowable bending moment calculation step, and the specification suitability determination step are repeated so that the allowable bending moment approaches the generated bending moment.

上記構成(10)によれば、仕様選択工程、許容曲げモーメント算定工程、及び、仕様適否判定工程を繰り返すことで、より大きな許容曲げモーメントを有する杭頭接合部を低コストな仕様で実現可能である。   According to the configuration (10), a pile head joint having a larger allowable bending moment can be realized at a low cost by repeating the specification selection process, the allowable bending moment calculation process, and the specification suitability determination process. is there.

(11)本発明の少なくとも一実施形態に係る杭頭接合部の製造方法は、
上記構成(1)乃至(10)の何れか1項に記載の杭頭接合部の設計方法によって適当であると判定された前記杭頭部、前記接合部材、前記補強筋及び前記基礎コンクリート部の仕様に基づいて、前記杭頭接合部を構築する杭頭接合部構築工程を備える。
(11) A method for manufacturing a pile head joint according to at least one embodiment of the present invention,
Of the pile head, the joint member, the reinforcing bar, and the foundation concrete part determined to be appropriate by the method for designing a pile head joint according to any one of the above configurations (1) to (10) A pile head joint construction step for constructing the pile head joint is provided based on the specifications.

上記構成(11)によれば、上記構成(1)乃至(10)の何れか1つの杭頭接合部の設計方法によって杭頭部、接合部材、補強筋及び基礎コンクリート部の仕様が選択されるので、十分な大きさの許容曲げモーメントを有する杭頭接合部を低コストな仕様で実現可能である。   According to the said structure (11), the specification of a pile head, a joining member, a reinforcing bar, and a foundation concrete part is selected by the design method of any one pile head joint part of the said structure (1) thru | or (10). Therefore, a pile head joint having a sufficiently large allowable bending moment can be realized with low-cost specifications.

本発明の少なくとも一実施形態によれば、杭頭部の軸線方向に相互に離間した下側突起部及び上側突起部を有する接合部材が杭頭部の外周面に取り付けられ、該下側突起部に螺子部が結合された異形鉄筋の軸部に対し基礎コンクリート部が付着している杭頭接合部において、十分な大きさの許容曲げモーメントを低コストな仕様で実現可能とする杭頭接合部の設計方法及び製造方法が提供される。   According to at least one embodiment of the present invention, a joining member having a lower projection and an upper projection spaced apart from each other in the axial direction of the pile head is attached to the outer peripheral surface of the pile head, and the lower projection Pile head joint that can realize a sufficiently large allowable bending moment with low-cost specifications in the pile head joint where the foundation concrete part is attached to the shaft of the deformed reinforcing bar with the threaded part A design method and a manufacturing method are provided.

構造体の概略的な構成を示す図である。It is a figure which shows schematic structure of a structure. 杭頭接合部を説明するための図である。It is a figure for demonstrating a pile head junction part. 図2中の杭頭部、接合部材、補強筋及び定着体を概略的に示す図であり、左半分は側面図、右半分は断面図である。It is a figure which shows schematically the pile head in FIG. 2, a joining member, a reinforcing bar, and a fixing body, A left half is a side view, A right half is sectional drawing. 接合部材を概略的に示す図であり、(a)は正面図、(b)は側面図、(c)は上面図、そして、(d)は下面図である。It is a figure which shows a joining member schematically, (a) is a front view, (b) is a side view, (c) is a top view, (d) is a bottom view. 補強筋を概略的に示す側面図である。It is a side view which shows a reinforcing bar roughly. 杭頭部、接合部材及び補強筋の一部を概略的に示す断面図である。It is sectional drawing which shows a pile head, a joining member, and a part of reinforcing bar roughly. 杭頭部の一部及び接合部材を概略的に示す上面図である。It is a top view which shows a part of pile head part, and a joining member schematically. 第1実施形態に係る杭頭接合部の設計方法の手順を概略的に示すフローチャートである。It is a flowchart which shows roughly the procedure of the design method of the pile head junction part which concerns on 1st Embodiment. 許容曲げモーメントを算定するための抵抗機構モデルを説明するための図であり、(a)は機構I、(b)は機構II、そして(c)は機構IIIを説明するための図である。It is a figure for demonstrating the resistance mechanism model for calculating an allowable bending moment, (a) is the mechanism I, (b) is the mechanism II, (c) is a figure for demonstrating the mechanism III. ひび割れが発生している状態Bにおいて、補強筋の軸部の引っ張り降伏強さを考慮することができる理由を説明するための図である。It is a figure for demonstrating the reason which can consider the tensile yield strength of the axial part of a reinforcing bar in the state B in which the crack has generate | occur | produced. 杭頭接合部における支圧効果による基礎コンクリート部の耐力増加を説明するための図である。It is a figure for demonstrating the proof stress increase of the foundation concrete part by the bearing effect in a pile head junction part. 杭頭接合部における偏心圧縮状態での支圧効果による基礎コンクリート部の耐力増加を説明するための図である。It is a figure for demonstrating the proof stress increase of the foundation concrete part by the bearing effect in the eccentric compression state in a pile head junction part. 杭頭接合部の水平加力試験装置を概略的に示す図である。It is a figure which shows roughly the horizontal force test apparatus of a pile head junction part. 図13の水平加力試験装置により杭頭接合部に作用させられる水平加力の印加パターンを示すグラフである。It is a graph which shows the application pattern of the horizontal force made to act on a pile head junction part by the horizontal force test apparatus of FIG. 水平加力試験装置を用いた水平加力試験後に杭頭接合部の基礎コンクリート部を斫り、基礎コンクリート部の内部状況を撮影した写真である。It is the photograph which picked up the foundation concrete part of a pile head joint part after a horizontal force test using a horizontal force test device, and photographed the internal condition of a foundation concrete part. 水平加力試験装置を用いた水平加力試験後に杭頭接合部の基礎コンクリート部を斫り、基礎コンクリート部の内部状況を撮影した写真である。It is the photograph which picked up the foundation concrete part of a pile head joint part after a horizontal force test using a horizontal force test device, and photographed the internal condition of a foundation concrete part. 水平加力試験装置を用いた水平加力試験後に杭頭接合部の基礎コンクリート部を斫り、基礎コンクリート部の内部状況を撮影した写真である。It is the photograph which picked up the foundation concrete part of a pile head joint part after a horizontal force test using a horizontal force test device, and photographed the internal condition of a foundation concrete part. 水平加力試験装置を用いた水平加力試験後に杭頭接合部の基礎コンクリート部を斫り、基礎コンクリート部の内部状況を撮影した写真である。It is the photograph which picked up the foundation concrete part of a pile head joint part after a horizontal force test using a horizontal force test device, and photographed the internal condition of a foundation concrete part. 基礎コンクリート部内のひび割れの発生状況から、仮想RC断面径Dを設定したことを説明するための図である。It is a figure for demonstrating that virtual RC section diameter D was set up from the occurrence situation of a crack in a foundation concrete part. 〔数1〕〜〔数3〕中の記号を説明するための図である。It is a figure for demonstrating the symbol in [Formula 1]-[Formula 3]. 〔数4〕中の記号を説明するための図である。It is a figure for demonstrating the symbol in [Formula 4]. ひび割れが発生していない状態Aの場合に、補強筋断面強度の決定位置が、ひび割れが発生している状態Bの場合と異なることを説明するための図である。It is a figure for demonstrating that the determination position of a reinforcing bar cross-sectional strength differs in the case of the state A in which the crack has generate | occur | produced from the case of the state B in which the crack has generate | occur | produced. 第3実施形態に係る杭頭接合部の設計方法における許容曲げモーメント算定工程の概略的な手順を示すフローチャートである。It is a flowchart which shows the schematic procedure of the allowable bending moment calculation process in the design method of the pile head junction part which concerns on 3rd Embodiment. Cc≧Tby-Tsyである場合における、許容曲げモーメント選択工程の概略的な手順を示すフローチャートである。It is a flowchart which shows the schematic procedure of the allowable bending moment selection process in the case of Cc ≧ Tby−Tsy. 第4実施形態に係る杭頭接合部の設計方法における仕様適否判定工程の概略的な手順を示すフローチャートである。It is a flowchart which shows the schematic procedure of the specification suitability determination process in the design method of the pile head junction part which concerns on 4th Embodiment. 〔数5〕及び〔数6〕中の記号を説明するための図である。It is a figure for demonstrating the symbol in [Equation 5] and [Equation 6]. ひび割れが発生している状態Bの場合における、補強筋に作用する力の杭頭部の軸線方向での分布を示すグラフである。It is a graph which shows the distribution in the axial direction of the pile head of the force which acts on a reinforcing bar in the case of the state B in which the crack has generate | occur | produced. ひび割れが発生していない状態Aの場合における、補強筋に作用する力の杭頭部の軸線方向での分布を示すグラフである。It is a graph which shows the distribution in the axial direction of the pile head of the force which acts on a reinforcing bar in the case of the state A where the crack has not generate | occur | produced. 第5実施形態に係る杭頭接合部の設計方法の概略的な手順を示すフローチャートである。It is a flowchart which shows the schematic procedure of the design method of the pile head junction part which concerns on 5th Embodiment. 第6実施形態に係る杭頭接合部の設計方法の概略的な手順を示すフローチャートである。It is a flowchart which shows the schematic procedure of the design method of the pile head junction part which concerns on 6th Embodiment. 第7実施形態に係る杭頭接合部の設計方法及び第8実施形態に係る杭頭接合部の製造方法の概略的な手順を示すフローチャートである。It is a flowchart which shows the schematic procedure of the manufacturing method of the pile head junction which concerns on the design method of the pile head junction which concerns on 7th Embodiment, and 8th Embodiment. 杭応力一体解析に用いられた杭配置を説明するための図である。It is a figure for demonstrating the pile arrangement | positioning used for the pile stress integrated analysis. 杭応力一体解析の解析結果を示すグラフであり、N値=3.0のときの杭P1のNM曲線を示すグラフである。It is a graph which shows the analysis result of pile stress integrated analysis, and is a graph which shows the NM curve of pile P1 when N value = 3.0. 杭応力一体解析の解析結果を示すグラフであり、N値=1.0のときの杭P1のNM曲線を示すグラフである。It is a graph which shows the analysis result of pile stress integrated analysis, and is a graph which shows the NM curve of pile P1 when N value = 1.0. 杭応力一体解析の解析結果を示すグラフであり、N値=1.0のときの杭P2のNM曲線を示すグラフである。It is a graph which shows the analysis result of pile stress integrated analysis, and is a graph which shows the NM curve of the pile P2 when N value = 1.0. 第1実施形態に係る杭頭接合部の設計方法により設計可能な他の杭頭接合部の杭頭部、接合部材、補強筋及び仕切部材の一部を概略的に示す断面図である。It is sectional drawing which shows roughly the pile head of the other pile head joint part which can be designed with the design method of the pile head joint part which concerns on 1st Embodiment, a joining member, a reinforcing bar, and a part of partition member. 仕切部材を概略的に示す図であり、(a)は正面図、(b)は側面図、そして、(c)は上面図である。It is a figure which shows a partition member schematically, (a) is a front view, (b) is a side view, (c) is a top view. 杭頭部、接合部材及び仕切部材を概略的に示す上面図である。It is a top view which shows a pile head, a joining member, and a partition member roughly. 図38の一部を拡大して示す図である。It is a figure which expands and shows a part of FIG. 仕切部材の作用効果を説明するための図である。It is a figure for demonstrating the effect of a partition member. 第1実施形態に係る杭頭接合部の設計方法により設計可能な他の杭頭接合部の杭頭部、接合部材、補強筋及び仕切部材の一部を概略的に示す図であり、左半分は側面図、右半分は断面図である。It is a figure which shows roughly the pile head of the other pile head joint part which can be designed with the design method of the pile head joint part which concerns on 1st Embodiment, a joining member, a reinforcing bar, and a part of partition member, The left half Is a side view, and the right half is a cross-sectional view. 杭頭部、接合部材及び仕切部材を概略的に示す上面図である。It is a top view which shows a pile head, a joining member, and a partition member roughly. 仕切部材の概略的な構成を示す図であって、(a)は上面図であり、(b)は縦断面図である。It is a figure which shows schematic structure of a partition member, Comprising: (a) is a top view, (b) is a longitudinal cross-sectional view.

以下、添付図面を参照して本発明の幾つかの実施形態について説明する。ただし、実施形態として記載されている又は図面に示されている構成部品の寸法、材質、形状、その相対的配置等は、本発明の範囲をこれに限定する趣旨ではなく、単なる説明例にすぎない。
例えば、「ある方向に」、「ある方向に沿って」、「平行」、「直交」、「中心」、「同心」或いは「同軸」等の相対的或いは絶対的な配置を表す表現は、厳密にそのような配置を表すのみならず、公差、若しくは、同じ機能が得られる程度の角度や距離をもって相対的に変位している状態も表すものとする。
例えば、「同一」、「等しい」及び「均質」等の物事が等しい状態であることを表す表現は、厳密に等しい状態を表すのみならず、公差、若しくは、同じ機能が得られる程度の差が存在している状態も表すものとする。
例えば、四角形状や円筒形状等の形状を表す表現は、幾何学的に厳密な意味での四角形状や円筒形状等の形状を表すのみならず、同じ効果が得られる範囲で、凹凸部や面取り部等を含む形状も表すものとする。
一方、一の構成要素を「備える」、「具える」、「具備する」、「含む」、又は、「有する」という表現は、他の構成要素の存在を除外する排他的な表現ではない。
Hereinafter, some embodiments of the present invention will be described with reference to the accompanying drawings. However, the dimensions, materials, shapes, relative arrangements, etc. of the components described in the embodiments or shown in the drawings are not intended to limit the scope of the present invention, but are merely illustrative examples. Absent.
For example, expressions expressing relative or absolute arrangements such as “in a certain direction”, “along a certain direction”, “parallel”, “orthogonal”, “center”, “concentric” or “coaxial” are strictly In addition to such an arrangement, it is also possible to represent a state of relative displacement with an angle or a distance such that tolerance or the same function can be obtained.
For example, an expression indicating that things such as “identical”, “equal”, and “homogeneous” are in an equal state not only represents an exactly equal state, but also has a tolerance or a difference that can provide the same function. It also represents the existing state.
For example, expressions representing shapes such as quadrangular shapes and cylindrical shapes represent not only geometrically strict shapes such as quadrangular shapes and cylindrical shapes, but also irregularities and chamfers as long as the same effects can be obtained. A shape including a part or the like is also expressed.
On the other hand, the expressions “comprising”, “comprising”, “comprising”, “including”, or “having” one constituent element are not exclusive expressions for excluding the existence of the other constituent elements.

以下、本発明の実施形態に係る杭頭接合部の設計方法及び製造方法について説明するが、その前提として、設計対象の杭頭接合部の一例についてまず説明する。   Hereinafter, although the design method and manufacturing method of the pile head junction part which concern on embodiment of this invention are demonstrated, an example of the pile head junction part of a design object is demonstrated first as the premise.

〔杭頭接合部の構成〕
図1は、構造体1の概略的な構成を示す図である。構造体1は、複数の杭2と、複数の杭2の杭頭部の各々に接合されたパイルキャップ4aと、パイルキャップ4a同士を連結する梁5と、パイルキャップ4aを介して杭2によって支持された上部構造6と有する。杭2、パイルキャップ4a及び梁5は、上部構造6を支持するための杭基礎8を構成している。
なお、杭基礎8は、パイルキャップ4aに代えて、フーチングを有していてもよい。以下では、パイルキャップ4aやフーチングを基礎コンクリート部4とも称する。
[Configuration of pile head joint]
FIG. 1 is a diagram illustrating a schematic configuration of the structure 1. The structure 1 includes a plurality of piles 2, a pile cap 4a joined to each of the pile heads of the plurality of piles 2, a beam 5 connecting the pile caps 4a, and the pile 2 via the pile cap 4a. With a supported superstructure 6. The pile 2, the pile cap 4 a and the beam 5 constitute a pile foundation 8 for supporting the upper structure 6.
The pile foundation 8 may have a footing instead of the pile cap 4a. Hereinafter, the pile cap 4a and the footing are also referred to as a foundation concrete portion 4.

図2は、杭頭接合部10を説明するための図である。図3は、図2中の杭頭部、接合部材、補強筋(定着筋)及び定着体を概略的に示す図であり、左半分は側面図、右半分は断面図である。図4は、接合部材を概略的に示す図であり、(a)は正面図、(b)は側面図、(c)は上面図、そして、(d)は下面図である。図5は、補強筋を概略的に示す側面図である。図6は、杭頭部、接合部材及び補強筋の一部を概略的に示す断面図である。図7は、杭頭部の一部及び接合部材を概略的に示す上面図である。   FIG. 2 is a diagram for explaining the pile head joint 10. FIG. 3 is a diagram schematically showing a pile head, a joining member, a reinforcing bar (fixing bar), and a fixing body in FIG. 2, in which the left half is a side view and the right half is a cross-sectional view. 4A and 4B are diagrams schematically showing the joining member, in which FIG. 4A is a front view, FIG. 4B is a side view, FIG. 4C is a top view, and FIG. 4D is a bottom view. FIG. 5 is a side view schematically showing a reinforcing bar. FIG. 6 is a cross-sectional view schematically showing a part of a pile head, a joining member, and a reinforcing bar. FIG. 7 is a top view schematically showing a part of a pile head and a joining member.

図1〜図7に示したように、杭頭接合部10は、杭2の上端部(杭頭部)12と、複数の接合部材14と、複数の補強筋16と、基礎コンクリート部4とを備えている。
杭2は、場所打ち杭であっても既製杭であってもよい。ただし、円筒形状の杭頭部12の外周面には、接合部材14が溶接によって固定される。このため、場所打ち杭の場合には、杭2は鋼管コンクリート杭である。また、既製杭の場合には、杭2は、鋼管杭(SPP杭)若しくは外殻鋼管付きコンクリート杭(SC杭)であるか、又は、上端部に鋼製の補強バンドが取り付けられているコンクリート杭、例えば、鉄筋コンクリート杭(RC杭)、プレストレストコンクリート杭(PC杭,PRC杭)、若しくは、高強度プレストレストコンクリート杭(PHC杭)等である。
本実施形態では、杭2は、SC杭であり、コンクリートによって構成された円筒形状のコンクリート部17と、コンクリート部17の両端を覆う金属製の端板18と、コンクリート部17の外周面を覆う外殻鋼管19とを有する。端板18は環形状を有し、外殻鋼管19に対して溶接されている。
As shown in FIGS. 1 to 7, the pile head joint portion 10 includes an upper end portion (pile head portion) 12 of the pile 2, a plurality of joining members 14, a plurality of reinforcing bars 16, and a foundation concrete portion 4. It has.
The pile 2 may be a cast-in-place pile or a ready-made pile. However, the joining member 14 is fixed to the outer peripheral surface of the cylindrical pile head 12 by welding. For this reason, in the case of a cast-in-place pile, the pile 2 is a steel pipe concrete pile. In the case of a ready-made pile, the pile 2 is a steel pipe pile (SPP pile) or a concrete pile with an outer shell steel pipe (SC pile), or a concrete having a steel reinforcing band attached to the upper end. Pile, for example, reinforced concrete pile (RC pile), prestressed concrete pile (PC pile, PRC pile), or high strength prestressed concrete pile (PHC pile).
In this embodiment, the pile 2 is an SC pile and covers a cylindrical concrete portion 17 made of concrete, a metal end plate 18 covering both ends of the concrete portion 17, and an outer peripheral surface of the concrete portion 17. And an outer shell steel pipe 19. The end plate 18 has an annular shape and is welded to the outer shell steel pipe 19.

複数の接合部材(ジョイントカプラ)14は、金属製であり、杭頭部12の周方向に間隔をおいて、杭頭部12の外周面に溶接によって固定されている。
複数の補強筋16は、金属製であり、杭頭部12に対し接合部材14を介してそれぞれ取り付けられている。
基礎コンクリート部4は、コンクリートによって構成され、杭頭部12、複数の接合部材14、及び、複数の補強筋16を囲んでいる。
なお図示しないけれども、基礎コンクリート部4内には、割裂防止筋や、梁5の主筋等が配置されていてもよい。
The plurality of joining members (joint couplers) 14 are made of metal, and are fixed to the outer peripheral surface of the pile head 12 by welding at intervals in the circumferential direction of the pile head 12.
The plurality of reinforcing bars 16 are made of metal and are respectively attached to the pile heads 12 via the joining members 14.
The foundation concrete portion 4 is made of concrete and surrounds the pile head 12, the plurality of joining members 14, and the plurality of reinforcing bars 16.
In addition, although not shown in figure, in the foundation concrete part 4, the split reinforcement, the main reinforcement of the beam 5, etc. may be arrange | positioned.

ここで、補強筋16は、表面に凹凸を有する軸部20と、軸部20の一端側に連なり軸部20よりも小さい断面積を有する螺子部21と、を有する。なお、補強筋16は、軸部20の両側に螺子部21を有していてもよい。この場合、補強筋16の上端側の螺子部21に定着体22としてのナットが螺合されていてもよい。
例えば、補強筋16として、図5に示したような異形鉄筋を用いることができる。
Here, the reinforcing bar 16 includes a shaft portion 20 having an uneven surface, and a screw portion 21 that is connected to one end side of the shaft portion 20 and has a smaller cross-sectional area than the shaft portion 20. The reinforcing bar 16 may have screw parts 21 on both sides of the shaft part 20. In this case, a nut as the fixing body 22 may be screwed to the screw portion 21 on the upper end side of the reinforcing bar 16.
For example, a deformed bar as shown in FIG. 5 can be used as the reinforcing bar 16.

接合部材14は、下側突起部23と上側突起部24とを有する。下側突起部23及び上側突起部24は、杭頭部12の外周面に溶接によって固定され、杭頭部12の外周面から側方に突出している。そして、上側突起部24は、杭頭部12の軸線方向にて下側突起部23の上方に配置されている。例えば、杭頭部12の軸線方向にて、上側突起部24の上面の位置が、杭頭部12の上端面の位置に一致するように、接合部材14は杭頭部12の外周面に溶接される。   The bonding member 14 includes a lower protrusion 23 and an upper protrusion 24. The lower protrusion 23 and the upper protrusion 24 are fixed to the outer peripheral surface of the pile head 12 by welding, and protrude laterally from the outer peripheral surface of the pile head 12. The upper protrusion 24 is disposed above the lower protrusion 23 in the axial direction of the pile head 12. For example, the joining member 14 is welded to the outer peripheral surface of the pile head 12 so that the position of the upper surface of the upper protrusion 24 matches the position of the upper end surface of the pile head 12 in the axial direction of the pile head 12. Is done.

補強筋16の螺子部21は下側突起部23に結合されている。例えば、図4に示したように、下側突起部23に螺子孔26が形成され、螺子部21は螺子孔26に螺合される。或いは、図示しないけれども、下側突起部23には貫通孔が形成され、下側突起部23の下側に、貫通孔と同軸にてナットが溶接される。この場合、ナットを下側突起部23の一部と見なすことができ、ナットに螺子部21を螺合することにより、下側突起部23に螺子部21が螺合されていると見なすことができる。   The screw portion 21 of the reinforcing bar 16 is coupled to the lower protrusion 23. For example, as shown in FIG. 4, a screw hole 26 is formed in the lower protrusion 23, and the screw part 21 is screwed into the screw hole 26. Or although not shown in figure, a through-hole is formed in the lower side projection part 23, and a nut is welded on the lower side of the lower side projection part 23 coaxially with a through-hole. In this case, the nut can be regarded as a part of the lower protrusion 23, and the screw 21 can be regarded as being screwed into the lower protrusion 23 by screwing the screw 21 into the nut. it can.

補強筋16の軸部20は、杭頭部12の軸線方向にて下側突起部23と上側突起部24との間を延びるとともに、上側突起部24及び杭頭部12の端面から上方に突出して延在している。
従って、上側突起部24は、補強筋16の通過を許容するような形状を有している。一方で、上側突起部24は、下側突起部23と上側突起部24との間を延びる補強筋16の軸部20の部分に付着した基礎コンクリート部4の部分と、杭頭部12の軸線方向にて係合するように構成されている。
例えば、図4に示したように、上側突起部24は、補強筋16の通過を許容する切り欠き28が形成されたフォーク部29を有し、フォーク部29は、軸部20に付着したコンクリート部4の一部と杭頭部12の軸線方向にて係合するように構成されている。
The shaft portion 20 of the reinforcing bar 16 extends between the lower projection portion 23 and the upper projection portion 24 in the axial direction of the pile head portion 12 and projects upward from the end surfaces of the upper projection portion 24 and the pile head portion 12. It is extended.
Therefore, the upper protrusion 24 has a shape that allows the reinforcing bars 16 to pass therethrough. On the other hand, the upper protruding portion 24 includes the portion of the foundation concrete portion 4 attached to the portion of the shaft portion 20 of the reinforcing bar 16 extending between the lower protruding portion 23 and the upper protruding portion 24, and the axis of the pile head portion 12. It is configured to engage in a direction.
For example, as shown in FIG. 4, the upper protruding portion 24 has a fork portion 29 in which a notch 28 that allows passage of the reinforcing bars 16 is formed. The fork portion 29 is concrete attached to the shaft portion 20. It is comprised so that a part of part 4 and the pile head part 12 may be engaged in the axial direction.

好ましくは、接合部材14は、下側突起部23及び上側突起部24と一体に形成された連結部30と、2つの補強ビーム部32と、2つの補強リブ部34とを更に有する。
連結部30は、杭頭部12の軸線方向及び周方向に延びる板形状を有し、下側突起部23と上側突起部24を相互に連結している。連結部30は、杭頭部12側に、杭頭部12の外周面に沿って配置可能な湾曲面35を有する。
補強ビーム部32は、杭頭部12の軸線方向に延び、角柱形状を有している。補強ビーム部32は、杭頭部12の周方向にて連結部30の両側に一体に形成されている。補強ビーム部32は、下側突起部23と上側突起部24との間を延びている。
補強リブ部34は、補強ビーム部32と下側突起部23との間に形成される隅に一体に形成されている。
Preferably, the joining member 14 further includes a connecting portion 30 formed integrally with the lower protrusion 23 and the upper protrusion 24, two reinforcing beam portions 32, and two reinforcing rib portions 34.
The connecting portion 30 has a plate shape extending in the axial direction and the circumferential direction of the pile head portion 12, and connects the lower protruding portion 23 and the upper protruding portion 24 to each other. The connection part 30 has the curved surface 35 which can be arrange | positioned along the outer peripheral surface of the pile head 12 on the pile head 12 side.
The reinforcing beam portion 32 extends in the axial direction of the pile head portion 12 and has a prismatic shape. The reinforcing beam portion 32 is integrally formed on both sides of the connecting portion 30 in the circumferential direction of the pile head portion 12. The reinforcing beam portion 32 extends between the lower protrusion 23 and the upper protrusion 24.
The reinforcing rib portion 34 is integrally formed at a corner formed between the reinforcing beam portion 32 and the lower protrusion 23.

好ましくは、図7に示したように、杭頭部12の周方向にて連結部30の両側が、杭頭部12の外周面に溶接される。そのために、杭頭部12の周方向にて連結部30の両側には、杭頭部12の外周面に対し傾斜した開先面36が設けられ、開先面36と杭頭部12の外周面との間に溶接ビード38が形成される。好ましくは、開先面36及び溶接ビード38は、杭頭部12の軸線方向にて、下側突起部23から上側突起部24まで延びている。
なお、接合部材14の形状は上述したものに限定されることはなく、例えば、特開2015−34458号公報に記載された接合部材を用いることができる。
Preferably, as shown in FIG. 7, both sides of the connecting portion 30 are welded to the outer peripheral surface of the pile head 12 in the circumferential direction of the pile head 12. Therefore, a groove surface 36 inclined with respect to the outer peripheral surface of the pile head 12 is provided on both sides of the connecting portion 30 in the circumferential direction of the pile head 12, and the outer periphery of the groove surface 36 and the pile head 12 is provided. A weld bead 38 is formed between the surfaces. Preferably, the groove surface 36 and the weld bead 38 extend from the lower protrusion 23 to the upper protrusion 24 in the axial direction of the pile head 12.
In addition, the shape of the joining member 14 is not limited to what was mentioned above, For example, the joining member described in Unexamined-Japanese-Patent No. 2015-34458 can be used.

〔第1実施形態に係る杭頭接合部の設計方法〕
図8は、第1実施形態に係る杭頭接合部の設計方法の手順を概略的に示すフローチャートである。図9は、許容曲げモーメントを算定するための抵抗機構モデルを説明するための図である。
図8に示したように、杭頭接合部の設計方法は、仕様選択工程S1と、許容曲げモーメント算定工程S2と、仕様適否判定工程S3とを備えている。
[Method of designing a pile head joint according to the first embodiment]
FIG. 8 is a flowchart schematically showing a procedure of a method for designing a pile head joint according to the first embodiment. FIG. 9 is a diagram for explaining a resistance mechanism model for calculating an allowable bending moment.
As shown in FIG. 8, the design method of the pile head joint includes a specification selection step S1, an allowable bending moment calculation step S2, and a specification suitability determination step S3.

仕様選択工程S1では、杭頭部12、接合部材14、補強筋16及び基礎コンクリート部4の仕様が選択される。杭頭部12の仕様とは、杭2の仕様であり、杭径、杭種及び材質等である。接合部材14の仕様とは、接合部材14の形状、寸法及び材質等である。補強筋16の仕様とは、補強筋16の形状、寸法及び材質等である。基礎コンクリート部4の仕様とは、基礎コンクリート部4の形状、寸法及び材質等である。   In the specification selection step S1, the specifications of the pile head 12, the joining member 14, the reinforcing bar 16, and the foundation concrete portion 4 are selected. The specification of the pile head 12 is the specification of the pile 2 and includes a pile diameter, a pile type, a material, and the like. The specifications of the joining member 14 are the shape, size, material, and the like of the joining member 14. The specifications of the reinforcing bar 16 are the shape, size, material, and the like of the reinforcing bar 16. The specifications of the foundation concrete portion 4 are the shape, dimensions, material, and the like of the foundation concrete portion 4.

許容曲げモーメント算定工程S2では、仕様選択工程S1にて選択された仕様に基づいて、杭頭接合部10の許容曲げモーメント(短期許容曲げモーメント)sMaが算定される。
仕様適否判定工程S3では、許容曲げモーメントsMaに基づいて、仕様選択工程S1にて選択された仕様の適否が判定される。例えば仕様適否判定工程S3では、許容曲げモーメントsMaと杭頭部の発生曲げモーメントMとを比較し、発生曲げモーメントMが許容曲げモーメントsMaよりも小さければ、選択された仕様が適当であると判定される。
In the allowable bending moment calculating step S2, the allowable bending moment (short-term allowable bending moment) sMa of the pile head joint 10 is calculated based on the specification selected in the specification selecting step S1.
In the specification suitability determination step S3, the suitability of the specification selected in the specification selection step S1 is determined based on the allowable bending moment sMa. For example, in specifications properness determining step S3, by comparing the generated bending moment M 0 of the allowable bending moment SMA and pile head, is smaller than generating the bending allowable moment M 0 bending moment SMA, it is appropriate selected specifications It is determined.

ここで、許容曲げモーメント算定工程S2では、図9に示した抵抗機構モデルに基づいて、許容曲げモーメントsMaを算定する。杭頭接合部10に剪断力Qが作用し、曲げモーメントMが発生した場合、以下の機構I,II,IIIが適宜組み合わさり、曲げモーメントMに抵抗すると考えられる。   Here, in the allowable bending moment calculation step S2, the allowable bending moment sMa is calculated based on the resistance mechanism model shown in FIG. When a shearing force Q acts on the pile head joint 10 and a bending moment M is generated, it is considered that the following mechanisms I, II, and III are appropriately combined to resist the bending moment M.

機構Iは、図9(a)に示したように、補強筋16を主筋とみなす仮想RC断面としての抵抗であり、補強筋16及び杭頭部12に作用する圧縮力C、並びに、補強筋16に作用する引っ張り力Tに対する抵抗である。機構Iによる許容曲げモーメントsMaの成分を、以下では第1許容曲げモーメント成分sMa1とも称する。
機構IIは、図9(b)に示したように、基礎コンクリート部4から杭頭部12の外周面に作用する圧縮力Cに対する抵抗である。機構IIによる許容曲げモーメントsMaの成分を、以下では第2許容曲げモーメント成分sMa2とも称する。
機構IIIは、図9(c)に示したように、基礎コンクリート部4から接合部材14の凹凸に作用する圧縮力Cに対する抵抗である。機構IIIによる許容曲げモーメントsMaの成分を、以下では第3許容曲げモーメント成分sMa3とも称する。
As shown in FIG. 9A, the mechanism I is a resistance as a virtual RC cross section in which the reinforcing bar 16 is regarded as the main bar, and the compression force C acting on the reinforcing bar 16 and the pile head 12 and the reinforcing bar. 16 is a resistance against a pulling force T acting on 16. Hereinafter, the component of the allowable bending moment sMa by the mechanism I is also referred to as a first allowable bending moment component sMa1.
The mechanism II is a resistance against the compressive force C acting on the outer peripheral surface of the pile head 12 from the foundation concrete portion 4 as shown in FIG. Hereinafter, the component of the allowable bending moment sMa by the mechanism II is also referred to as a second allowable bending moment component sMa2.
The mechanism III is resistance to the compressive force C acting on the unevenness of the joining member 14 from the basic concrete portion 4 as shown in FIG. Hereinafter, the component of the allowable bending moment sMa by the mechanism III is also referred to as a third allowable bending moment component sMa3.

そして、本実施形態の許容曲げモーメント算定工程S2では、杭頭部12の端面から上方に突出する補強筋16の軸部20の部分を囲む基礎コンクリート部4の上側部分40と、下側突起部23と上側突起部24との間を延びる補強筋の軸部20の部分を囲む基礎コンクリート部4の下側部分42との間に、ひび割れ44が生じていると仮定する(図9(a)参照)。ひび割れ44は、典型的には、上側突起部24から斜め45度下方に向かって延びる。このため、ひび割れ44を斜めひび割れ44とも称する。
なお以下の説明では、ひび割れ44が生じていない状態を「状態A」とも称し、ひび割れ44が生じている状態を「状態B」とも称する。本実施形態では、状態Bであると仮定する。
And in the allowable bending moment calculation step S2 of the present embodiment, the upper portion 40 of the foundation concrete portion 4 surrounding the portion of the shaft portion 20 of the reinforcing bar 16 protruding upward from the end face of the pile head portion 12, and the lower protrusion portion It is assumed that a crack 44 has occurred between the lower portion 42 of the foundation concrete portion 4 surrounding the portion of the reinforcing bar shaft portion 20 extending between the upper projection portion 24 and the upper projection portion 24 (FIG. 9A). reference). The crack 44 typically extends downward from the upper protrusion 24 obliquely by 45 degrees. For this reason, the crack 44 is also referred to as an oblique crack 44.
In the following description, a state where no crack 44 is generated is also referred to as “state A”, and a state where the crack 44 is generated is also referred to as “state B”. In the present embodiment, it is assumed that the state is B.

状態Bの場合、ひび割れ44の存在によって、抵抗機構モデル中の機構IIIに期待することはできず、機構IIIに基づく抵抗を無視する必要がある。
一方、ひび割れ44の有無にかかわらずに、機構Iとして、補強筋16の引っ張り降伏強さを考慮する必要があるが、ひび割れ44が存在する場合には、補強筋16の引っ張り降伏強さとして、補強筋16の軸部20の引っ張り降伏強さを考慮することができる。軸部20の断面積は螺子部21の断面積よりも大きく、軸部20の引っ張り降伏強さは螺子部21の引っ張り降伏強さよりも大きい。このため、補強筋16の軸部20の引っ張り降伏強さを考慮することができることは、許容曲げモーメントsMaの算定にあたり有利に働く。
In the state B, due to the presence of the crack 44, the mechanism III in the resistance mechanism model cannot be expected, and the resistance based on the mechanism III needs to be ignored.
On the other hand, it is necessary to consider the tensile yield strength of the reinforcing bar 16 as the mechanism I regardless of the presence or absence of the crack 44, but when the crack 44 exists, the tensile yield strength of the reinforcing bar 16 is The tensile yield strength of the shaft portion 20 of the reinforcing bar 16 can be considered. The cross-sectional area of the shaft portion 20 is larger than the cross-sectional area of the screw portion 21, and the tensile yield strength of the shaft portion 20 is larger than the tensile yield strength of the screw portion 21. For this reason, the fact that the tensile yield strength of the shaft portion 20 of the reinforcing bar 16 can be taken into account works advantageously in calculating the allowable bending moment sMa.

図10は、状態Bにおいて、補強筋16の軸部20の引っ張り降伏強さTbyを考慮することができる理由を説明するための図である。ひび割れ44が発生した場合、ひび割れ44より下方にて補強筋16に基礎コンクリート部4の下側部分42が付着していることから、付着による抵抗力Fsbの発生を見込むことができる。そして、通常、抵抗力Fsbと螺子部21の引っ張り降伏強さTsyの和(Fsb+Tsy)が、軸部20の引っ張り降伏強さTby以上になるように設計されるので、軸部20の引っ張り降伏強さTbyまで、補強筋16が耐えることができる。   FIG. 10 is a diagram for explaining the reason why the tensile yield strength Tby of the shaft portion 20 of the reinforcing bar 16 can be considered in the state B. When the crack 44 is generated, since the lower portion 42 of the foundation concrete portion 4 is attached to the reinforcing bar 16 below the crack 44, the generation of the resistance force Fsb due to the attachment can be expected. In general, the sum (Fsb + Tsy) of the resistance force Fsb and the tensile yield strength Tsy of the screw portion 21 is designed to be equal to or greater than the tensile yield strength Tby of the shaft portion 20, so that the tensile yield strength of the shaft portion 20 is increased. Reinforcing bars 16 can withstand up to Tby.

このため、本実施形態の許容曲げモーメント算定工程S2では、杭頭部12の端部から上方に突出する補強筋16と補強筋16を囲む基礎コンクリート部4の抵抗を算定する際には、補強筋16の軸部20の引っ張り降伏強さTbyを考慮する一方、接合部材14から基礎コンクリート部4に作用する抵抗を無視して許容曲げモーメントsMaを算定する。つまり、許容曲げモーメントsMaとして、第1許容曲げモーメント成分sMa1を算定する。
なお、引っ張り降伏強さTbyを考慮して許容曲げモーメントsMaを算定するとは、具体的には、引っ張り降伏強さTbyを変数として直接又は間接的に含む関数を用いて許容曲げモーメントsMaを算定することを意味する。
For this reason, in the allowable bending moment calculation step S <b> 2 of the present embodiment, when calculating the reinforcing bar 16 protruding upward from the end of the pile head 12 and the resistance of the foundation concrete portion 4 surrounding the reinforcing bar 16, While considering the tensile yield strength Tby of the shaft portion 20 of the bar 16, the allowable bending moment sMa is calculated ignoring the resistance acting on the foundation concrete portion 4 from the joining member 14. That is, the first allowable bending moment component sMa1 is calculated as the allowable bending moment sMa.
The calculation of the allowable bending moment sMa in consideration of the tensile yield strength Tby is, specifically, the calculation of the allowable bending moment sMa using a function that directly or indirectly includes the tensile yield strength Tby as a variable. Means that.

上述した杭頭接合部の設計方法によれば、基礎コンクリート部4にひび割れ44が生じると仮定した場合、即ち状態Bの場合に、補強筋16の軸部20の引っ張り降伏強さTbyを考慮する一方、接合部材14から基礎コンクリート部4に作用する抵抗を無視して許容曲げモーメントsMaを算定することで、許容曲げモーメントsMaを的確に算定することができる。この結果として、上記した杭頭接合部の設計方法によれば、十分な大きさの許容曲げモーメントsMaを有する杭頭接合部10を低コストな仕様で実現可能である。   According to the design method for the pile head joint described above, when it is assumed that the crack 44 is generated in the foundation concrete portion 4, that is, in the state B, the tensile yield strength Tby of the shaft portion 20 of the reinforcing bar 16 is considered. On the other hand, the allowable bending moment sMa can be accurately calculated by calculating the allowable bending moment sMa while ignoring the resistance acting on the foundation concrete portion 4 from the joining member 14. As a result, according to the above-described pile head joint design method, the pile head joint 10 having a sufficiently large allowable bending moment sMa can be realized with low-cost specifications.

なお、上記した杭頭接合部の設計方法においては、機構IIに基づく抵抗を考慮してもしなくてもよい。機構IIに基づく抵抗を考慮する場合、許容曲げモーメントsMaとして、第1許容曲げモーメント成分sMa1と第2許容曲げモーメント成分sMa2の和(sMa1+sMa2)を算定すればよい。このように、機構IIに基づく抵抗を考慮すれば、許容曲げモーメントsMaが大きくなり、杭頭部12、接合部材14、補強筋16及び基礎コンクリート部4の仕様を抑制することができる。一方、機構IIに基づく抵抗を考慮しなければ、許容曲げモーメントsMaが小さくなり、安全率を見込むことができる。   In addition, in the design method of a pile head junction part mentioned above, it is not necessary to consider the resistance based on the mechanism II. When considering the resistance based on the mechanism II, the sum (sMa1 + sMa2) of the first allowable bending moment component sMa1 and the second allowable bending moment component sMa2 may be calculated as the allowable bending moment sMa. Thus, if the resistance based on the mechanism II is taken into consideration, the allowable bending moment sMa is increased, and the specifications of the pile head 12, the joining member 14, the reinforcing bar 16, and the foundation concrete portion 4 can be suppressed. On the other hand, if the resistance based on the mechanism II is not taken into consideration, the allowable bending moment sMa becomes small, and a safety factor can be expected.

以下、図9(a)〜(c)に示した機構I〜IIIについて詳細に説明する。
〔機構I〕
機構Iに基づく抵抗は、杭頭部12に生じる圧縮力Cと補強筋16の引張力Tによる抵抗である。ここで、図11に示したように、杭頭接合部10は、杭断面積Acよりも大きな基礎コンクリート部4(パイルキャップ4a)のコンクリートを圧縮する。このため、局部支圧効果により、杭頭接合部10が接するコンクリートの圧縮耐力fcが上昇する。パイルキャップ断面積(支承面積)Aと杭断面積(支圧面積)Acの比は5倍以上であり、純圧縮状態で2倍以上の支圧効果が見込める。なお、支圧効果により、コンクリートの圧縮耐力fcは、(A/Ac)0.5倍となる。
Hereinafter, the mechanisms I to III shown in FIGS. 9A to 9C will be described in detail.
[Mechanism I]
The resistance based on the mechanism I is a resistance due to the compressive force C generated in the pile head 12 and the tensile force T of the reinforcing bar 16. Here, as shown in FIG. 11, the pile head joint part 10 compresses the concrete of the foundation concrete part 4 (pile cap 4a) larger than the pile cross-sectional area Ac. For this reason, the compressive proof stress fc of the concrete which the pile head junction part 10 contact | connects rises by the local bearing effect. Pile cap cross-sectional area (support area) A 0 and Kuidan area (Bearing area) Ac ratio is 5 times or more, Bearing effect of more than twice the expected pure compression. Note that due to the bearing effect, the compressive yield strength fc of the concrete is (A 0 / Ac) 0.5 times.

そして、図12に示したように、曲げによる偏心圧縮状態を考慮すると、支圧面積Ac’は杭断面積Acよりも小さくなり、更に支圧効果が大きくなる。
機構Iに基づく抵抗、即ち第1許容曲げモーメント成分sMa1の算出に際し、支圧効果による耐力上昇を、本実施形態では、仮想RC断面径Dを拡大することによって取り入れる。
本実施形態のように、杭頭接合部10の短期許容曲げモーメントsMaの算定の際、補強筋16が引張力Tに抵抗し、仮想のRC断面を有する円柱体が基礎コンクリート部4内に発生する圧縮力Cを負担すると考えることは一般的である。
And as shown in FIG. 12, when the eccentric compression state by bending is considered, bearing pressure area Ac 'becomes smaller than pile cross-sectional area Ac, and also a bearing effect becomes large.
In calculating the resistance based on the mechanism I, that is, the first allowable bending moment component sMa1, an increase in yield strength due to the bearing effect is taken into account in the present embodiment by enlarging the virtual RC sectional diameter D.
As in this embodiment, when calculating the short-term allowable bending moment sMa of the pile head joint 10, the reinforcing bar 16 resists the tensile force T, and a cylindrical body having a virtual RC cross section is generated in the foundation concrete part 4. It is common to assume that the compressive force C is borne.

本実施形態のような主筋定着方式による杭頭接合工法の場合、日本建築学会「建築基礎構造設計指針(1988)」や社団法人 道路協会「杭基礎設計便覧 平成18年度改訂版」に記載のある、杭径に200mmを加えた直径Dを有する仮想RC断面として杭頭接合部の断面照査を行う方法が一般的である。最近では、平成24年3月に改訂された社団法人 道路協会「道路橋示方書・同解説 IV下部構造編」において、仮想RC断面の直径Dを杭径Dpに0.25Dp+100mm(加算径は最大400mm)を加えた径として照査する方法が示されている。社団法人道路協会では仮想RC断面の直径Dの見直し改訂がなされている。そこで、本実施形態において許容曲げモーメントsMaを算出する際にも、仮想RC断面を仮定した杭頭接合部10の断面照査方法を採用することができる。   In the case of the pile head joint method using the main reinforcement method as in this embodiment, it is described in the Architectural Institute of Japan “Guideline for Structural Design of Architectural Buildings (1988)” or Road Association “Pile Foundation Design Handbook 2006 Revised Edition”. A method of performing cross-sectional inspection of a pile head joint as a virtual RC cross section having a diameter D obtained by adding 200 mm to the pile diameter is common. Recently, in the Road Association “Road Bridge Specification / Explanation IV Substructure” revised in March 2012, the diameter D of the virtual RC cross section is set to 0.25Dp + 100mm to the pile diameter Dp. A method of checking as a diameter with 400 mm) added is shown. The Japan Road Association is reviewing and revising the diameter D of the virtual RC cross section. Therefore, also when calculating the allowable bending moment sMa in the present embodiment, it is possible to employ a cross-sectional verification method for the pile head joint 10 assuming a virtual RC cross-section.

ここで、図13は、杭頭接合部10の水平加力試験装置50を概略的に示しており、図14は、水平加力の印加パターンを示している。水平加力試験装置50は、アクチュエータ51によって水平力を加えることができ、水平方向変位d1を計測可能である。図14に示されているグラフの縦軸の部材角は、水平方向変位d1を杭頭から加力点までの距離である1600で除した値(d1/1600)である。また、水平加力試験装置50は、鉛直変位d2,d3を測定可能である。   Here, FIG. 13 schematically shows a horizontal force test apparatus 50 for the pile head joint 10, and FIG. 14 shows a horizontal force application pattern. The horizontal force test apparatus 50 can apply a horizontal force by the actuator 51 and can measure the horizontal displacement d1. The member angle on the vertical axis of the graph shown in FIG. 14 is a value (d1 / 1600) obtained by dividing the horizontal displacement d1 by 1600, which is the distance from the pile head to the applied point. Further, the horizontal force test apparatus 50 can measure the vertical displacements d2 and d3.

図15〜図18は、水平加力試験装置50を用いた水平加力試験後に杭頭接合部10の基礎コンクリート部4を斫り、基礎コンクリート部4の内部状況を撮影した写真である。そして、図19は、基礎コンクリート部4内のひび割れの発生状況から、仮想RC断面径Dを設定したことを説明するための図である。
なお、図13〜図19において、杭頭接合部10の上下方向は、水平加力試験装置50の構成の関係から反転している。
15 to 18 are photographs in which the foundation concrete portion 4 of the pile head joint portion 10 is beaten after the horizontal force test using the horizontal force test apparatus 50 and the internal state of the foundation concrete portion 4 is photographed. And FIG. 19 is a figure for demonstrating that the virtual RC cross-sectional diameter D was set from the generation | occurrence | production state of the crack in the foundation concrete part 4. FIG.
In addition, in FIGS. 13-19, the up-down direction of the pile head junction part 10 is reversed from the relationship of the structure of the horizontal force test apparatus 50. FIG.

図15〜図18に示したように、水平加力試験後、基礎コンクリート部4の内部には、下側突起部23から約45度の角度で斜め下方に延びるひび割れ52が発生している。そこで、下側突起部23から上側突起部24の上端までの間で、基礎コンクリート部4が補強筋16の軸部20に付着している長さ(以下、有効付着長さとも称する)をLeとしたときに、仮想RC断面の直径Dの最大値として、杭径Dpに2Leを足した値を設定することとした。つまり、補強筋16が引張力に抵抗し、基礎コンクリート部4内に発生する圧縮力は仮想RC断面径D(ただしD=Dp+2Le)を有する円柱体が負担するものとした。   As shown in FIGS. 15 to 18, after the horizontal force test, a crack 52 extending obliquely downward from the lower protrusion 23 at an angle of about 45 degrees is generated inside the foundation concrete portion 4. Therefore, a length (hereinafter also referred to as an effective adhesion length) in which the foundation concrete portion 4 adheres to the shaft portion 20 of the reinforcing bar 16 between the lower projection 23 and the upper end of the upper projection 24 is denoted by Le. In this case, a value obtained by adding 2Le to the pile diameter Dp is set as the maximum value of the diameter D of the virtual RC cross section. That is, the reinforcing bars 16 resist the tensile force, and the compressive force generated in the foundation concrete portion 4 is assumed to be borne by the cylindrical body having the virtual RC cross-sectional diameter D (where D = Dp + 2Le).

好ましくは、仮想RC断面の直径Dと杭径Dpとの間において、次式:
Dp+Le≦D≦Dp+2Le
で示される関係が成立するよう、直径Dが選択される。
より好ましくは、仮想RC断面の直径Dと杭径Dpとの間において、次式:
Dp+1.5Le≦D≦Dp+2Le
で示される関係が成立するよう、直径Dが選択される。
なお例えば、有効付着長さLeは、140mm以上200mm以下である。
Preferably, between the diameter D of the virtual RC cross section and the pile diameter Dp, the following formula:
Dp + Le ≦ D ≦ Dp + 2Le
The diameter D is selected so that the relationship indicated by
More preferably, between the diameter D of the virtual RC cross section and the pile diameter Dp, the following formula:
Dp + 1.5Le ≦ D ≦ Dp + 2Le
The diameter D is selected so that the relationship indicated by
For example, the effective adhesion length Le is 140 mm or more and 200 mm or less.

仮想RC断面の直径Dをこのように選択することで、仮想RC断面径Dの大きさを従来よりも大きく設定可能である。仮想RC断面径Dが大きいほど、基礎コンクリート部4や杭頭部12に作用する応力を小さくすることができ、許容曲げモーメントsMaを大きく算定することができる。この結果として、上記構成によれば、十分な大きさの許容曲げモーメントsMaを有する杭頭接合部を低コストな仕様で実現可能である。   By selecting the diameter D of the virtual RC cross section in this way, the size of the virtual RC cross section diameter D can be set larger than the conventional one. As the virtual RC sectional diameter D is larger, the stress acting on the foundation concrete portion 4 and the pile head portion 12 can be reduced, and the allowable bending moment sMa can be calculated larger. As a result, according to the above configuration, a pile head joint having a sufficiently large allowable bending moment sMa can be realized with low-cost specifications.

そして、機構Iによる第1短期許容曲げモーメント成分sMa1は、日本建築学会「鉄筋コンクリート構造計算規準・同解説(2010)」を参考にして、以下のようにして算定することができる。
許容軸力Naに対する杭頭接合部10の第1許容曲げモーメント成分sMa1は、以下の〔数1〕に示す式によって求めることができる。そして、仮想RC断面の許容軸力Naは、N〜Nのうちいずれか小さい方による。
Then, the first short-term allowable bending moment component sMa1 by mechanism I can be calculated as follows with reference to the Architectural Institute of Japan “Reinforced Concrete Structure Calculation Standards / Description (2010)”.
The first allowable bending moment component sMa1 of the pile head joint 10 with respect to the allowable axial force Na can be obtained by the following equation [Formula 1]. And the allowable axial force Na of a virtual RC cross section depends on the smaller one of N 1 to N 3 .

Figure 0006345741
Figure 0006345741

なお、仮想RC断面におけるコンクリート部分の断面1次モーメントScnおよび断面2次モーメントIcnは以下の〔数2〕に示す式による。   In addition, the cross-section primary moment Scn and the cross-section secondary moment Icn of the concrete portion in the virtual RC cross section are based on the following equation (2).

Figure 0006345741
Figure 0006345741

中立軸に関する断面1次モーメントSnおよび断面2次モーメントInは以下の〔数3〕に示す式による。   The cross-sectional primary moment Sn and the cross-sectional secondary moment In regarding the neutral axis are expressed by the following equation (3).

Figure 0006345741
Figure 0006345741

なお、式中の記号は、それぞれ以下のものを表しており、図20はこれらの記号の詳細を示している。ひび割れ44が発生している状態Bでは、〔数3〕に示される式中において、補強筋1本の公称断面積aとして、補強筋16の軸部20の公称断面積が用いられる。
:補強筋1本の公称断面積(mm
D :仮想RC断面の直径(mm)
:補強筋の配置直径(mm)
:圧縮縁から圧縮側補強筋の重心までの距離(mm)
:引張縁から引張側補強筋の重心までの距離(mm)
:基礎コンクリート部の許容圧縮応力度(N/mm
:補強筋の許容圧縮応力度または許容引張応力度(N/mm
cn:圧縮コンクリート面が作る中立軸に対する断面2次モーメント(mm
:中立軸に対する断面2次モーメント(mm
sa1:第1短期許容曲げモーメント成分(N・mm)
:ヤング係数比
R :仮想RC断面の半径(mm)
:補強筋の配置半径(mm)
cn:圧縮コンクリート面が作る中立軸に対する断面1次モーメント
:中立軸に対する断面1次モーメント(mm
:仮想RC断面の図心から中立軸までの距離(mm)
θ:円形断面において中立軸位置を定める角度(rad)
θ:補強筋位置の配置角度(rad)
In addition, the symbol in a formula represents the following, respectively, and FIG. 20 has shown the detail of these symbols. In the state B where the crack 44 is generated, the nominal cross-sectional area of the shaft portion 20 of the reinforcing bar 16 is used as the nominal cross-sectional area a b of one reinforcing bar in the equation shown in [Equation 3].
a b : nominal cross-sectional area of one reinforcing bar (mm 2 )
D: Diameter of virtual RC cross section (mm)
D b : Reinforcing bar arrangement diameter (mm)
d c : Distance from the compression edge to the center of gravity of the compression side reinforcing bar (mm)
d t : distance from the tension edge to the center of gravity of the tension side reinforcing bar (mm)
f c : Allowable compressive stress level of foundation concrete part (N / mm 2 )
f b : allowable compressive stress level or allowable tensile stress level (N / mm 2 ) of the reinforcing bar
I cn : secondary moment of inertia (mm 4 ) with respect to neutral axis created by compressed concrete surface
I n : Sectional moment of inertia relative to the neutral axis (mm 4 )
s M a1 : First short-term allowable bending moment component (N · mm)
n e : Young's modulus ratio R: Radius of virtual RC cross section (mm)
R b : Reinforcing bar arrangement radius (mm)
S cn : Cross section primary moment with respect to neutral axis created by compressed concrete surface S n : Cross section primary moment with respect to neutral axis (mm 3 )
X 0 : Distance from the centroid of the virtual RC section to the neutral axis (mm)
θ: angle (rad) defining the neutral axis position in a circular cross section
θ i : Reinforcing bar position arrangement angle (rad)

〔機構II〕
機構IIによる第2短期許容曲げモーメント成分sMa2は、基礎コンクリート部4の支圧抵抗によるものであり、以下の〔数4〕に示す式により算出可能である。機構IIの支圧強度σとしては、RC構造の許容圧縮応力度である2/3・Fを用いることができる。
ただし、支圧強度σに対し、杭2が埋め込まれているパイルキャップ4aの拘束効果による圧縮強度の上昇を加味してもよい。
また、許容曲げモーメント算定工程S2においては、第2短期許容曲げモーメント成分sMa2を考慮してもしなくてもよい。
なお、図21は、式中の記号の詳細を示している。
[Mechanism II]
The second short-term allowable bending moment component sMa2 by the mechanism II is due to the bearing resistance of the foundation concrete portion 4, and can be calculated by the following equation [Formula 4]. As the bearing pressure strength σ c of the mechanism II, 2/3 · F c which is an allowable compressive stress degree of the RC structure can be used.
However, with respect to bearing capacity sigma c, it may be taken into consideration an increase in compressive strength due to restraint effect of the pile cap 4a which pile 2 is embedded.
In addition, in the allowable bending moment calculation step S2, the second short-term allowable bending moment component sMa2 may or may not be considered.
FIG. 21 shows details of symbols in the formula.

Figure 0006345741
Figure 0006345741

〔機構III〕
機構IIIによる第3短期許容曲げモーメント成分sMa3は、〔数1〕に示した式において、補強筋16の許容引張耐力を接合部材14の凹凸による圧縮強度Cに置き換えて日本建築学会「鉄筋コンクリート構造計算規準・同解説(2010)」を参考にして算出することができる(RCでは、短期許容時にコンクリートの局部的な塑性化を許容している)。接合部材14の凹凸の圧縮反力の強度は、コンクリートの支圧破壊によって決まると考えられる(この場合、接合部材14からの斜めひび割れ44は発生しない。補強筋16の降伏ひずみは、コンクリート圧縮降伏ひずみよりも大きい)。
ただし、第3短期許容曲げモーメント成分sMa3は、杭頭接合部10に斜めひび割れ44が発生していると仮定される場合、許容曲げモーメント算定工程S2において無視される。
また、機構IIIによる抵抗を見込む場合、接合部材14は圧縮力Cに対して降伏しないよう設計される。
[Mechanism III]
Third short-term permissible bending moment component sMa3 by mechanism III, in Formula shown in equation (1), replacing the allowable tensile strength of reinforcement 16 in the compressive strength C c due to unevenness of the bonding member 14 AIJ "reinforced concrete structure It can be calculated with reference to “Calculation Criteria / Comment (2010)” (RC allows local plasticization of concrete when it is allowed for a short time). It is considered that the strength of the compressive reaction force of the unevenness of the joining member 14 is determined by the bearing failure of the concrete (in this case, the oblique crack 44 from the joining member 14 does not occur. The yield strain of the reinforcing bar 16 is the compressive yield of the concrete. Greater than strain).
However, the third short-term allowable bending moment component sMa3 is ignored in the allowable bending moment calculation step S2 when it is assumed that the oblique crack 44 is generated in the pile head joint 10.
Also, if the expected resistance by mechanisms III, the joining member 14 is designed so as not to yield the compression force C c.

〔第2実施形態に係る杭頭接合部の設計方法〕
以下、第2実施形態に係る杭頭接合部の設計方法について説明する。なお、以下の実施形態の説明では、上述した実施形態と異なる点を中心に説明し、同一又は類似の構成については、説明を省略又は簡略化する。
[Method of designing a pile head joint according to the second embodiment]
Hereinafter, a method for designing a pile head joint according to the second embodiment will be described. In the following description of the embodiments, differences from the above-described embodiment will be mainly described, and description of the same or similar configurations will be omitted or simplified.

第2実施形態に係る杭頭接合部の設計方法は、許容曲げモーメント算定工程S2において、
・杭頭部12の端面から上方に突出する補強筋16の軸部20の部分を囲む基礎コンクリート部4の上側部分40と、下側突起部23と上側突起部24との間を延びる補強筋16の軸部20の部分を囲む基礎コンクリート部4の下側部分42との間に、ひび割れ44が生じないと仮定し、
・杭頭部12の端部から上方に突出する補強筋16と補強筋16を囲む基礎コンクリート部4の抵抗を算定する際には、補強筋16の螺子部21の引っ張り降伏強さTsyを考慮するとともに、接合部材14から基礎コンクリート部4に作用する抵抗を考慮して許容曲げモーメントsMaを算定する
という点において、第1実施形態に係る杭頭接合部の設計方法と異なっている。
In the design method of the pile head joint according to the second embodiment, in the allowable bending moment calculation step S2,
A reinforcing bar extending between the upper part 40 of the foundation concrete part 4 surrounding the part of the shaft part 20 of the reinforcing bar 16 protruding upward from the end face of the pile head part 12, and the lower protruding part 23 and the upper protruding part 24. Assuming that no crack 44 occurs between the lower portion 42 of the foundation concrete portion 4 surrounding the portion of the sixteen shaft portions 20,
-When calculating the resistance of the reinforcing bar 16 protruding upward from the end of the pile head 12 and the resistance of the foundation concrete part 4 surrounding the reinforcing bar 16, the tensile yield strength Tsy of the screw part 21 of the reinforcing bar 16 is taken into consideration. In addition, the allowable bending moment sMa is calculated in consideration of the resistance acting on the foundation concrete portion 4 from the joining member 14, which is different from the method for designing the pile head joint according to the first embodiment.

つまり、第2実施形態では、ひび割れ44が発生していない状態Aであると仮定し、機構Iによる第1’許容曲げモーメント成分sMa1’、機構IIIによる第3許容曲げモーメント成分sMa3が考慮される。つまり、許容曲げモーメントsMaとして、第1’許容曲げモーメント成分sMa1’と第3許容曲げモーメント成分sMa3の和(sMa1’+sMa3)が算定される。
なお、第1’許容曲げモーメント成分sMa1’の算定方法は、〔数3〕に示される式中において、補強筋1本の公称断面積aとして、補強筋16の螺子部21の公称断面積が用いられる点においてのみ、第1許容曲げモーメント成分sMa1の算定方法と異なっている。
一方、機構IIによる第2許容曲げモーメント成分sMa2については、第1実施形態の場合と同様、考慮してもしなくてもよい。
That is, in the second embodiment, it is assumed that the crack 44 does not occur, and the first 'allowable bending moment component sMa1' by the mechanism I and the third allowable bending moment component sMa3 by the mechanism III are considered. . That is, as the allowable bending moment sMa, the sum (sMa1 ′ + sMa3) of the first allowable bending moment component sMa1 ′ and the third allowable bending moment component sMa3 is calculated.
The calculation method of the first 'allowable bending moment component sMa1' is as follows. In the equation shown in [Equation 3], the nominal sectional area of the screw portion 21 of the reinforcing bar 16 is defined as the nominal sectional area ab of one reinforcing bar. Is different from the calculation method of the first allowable bending moment component sMa1 only in that is used.
On the other hand, the second allowable bending moment component sMa2 by the mechanism II may or may not be considered as in the case of the first embodiment.

ここで、図22は、補強筋断面強度の決定位置が第1実施形態の場合(図10参照)と異なることを説明するための図である。ひび割れ44が発生していない状態Aでは、状態Bの場合のように基礎コンクリート部4からの抵抗力Fsbに期待することができない。このため、補強筋16の引っ張り降伏強度として、螺子部21の引っ張り降伏強さTsyを考慮する必要があり、そのために、〔数3〕に示す式において、補強筋1本の公称断面積aとして、補強筋16の螺子部21の公称断面積が用いられる。 Here, FIG. 22 is a diagram for explaining that the determination position of the reinforcing bar cross-sectional strength is different from that in the first embodiment (see FIG. 10). In the state A where the crack 44 is not generated, the resistance force Fsb from the foundation concrete part 4 cannot be expected as in the case of the state B. For this reason, it is necessary to consider the tensile yield strength Tsy of the screw portion 21 as the tensile yield strength of the reinforcing bar 16, and therefore, in the equation shown in [Equation 3], the nominal cross-sectional area a b of one reinforcing bar As the nominal cross-sectional area of the screw portion 21 of the reinforcing bar 16 is used.

上記した第2実施形態に係る杭頭接合部の設計方法によれば、基礎コンクリート部4にひび割れ44が生じないと仮定した場合に、即ち状態Aの場合に、補強筋16の螺子部21の引っ張り降伏強さTsyを考慮するとともに、接合部材14から基礎コンクリート部4に作用する抵抗を考慮して許容曲げモーメントsMaを算定することで、許容曲げモーメントsMaを的確に算定することができる。この結果として、第2実施形態に係る杭頭接合部の設計方法によれば、十分な大きさの許容曲げモーメントsMaを有する杭頭接合部10を低コストな仕様で実現可能である。
なお、引っ張り降伏強さTsy及び接合部材14から基礎コンクリート部4に作用する抵抗を考慮して許容曲げモーメントsMaを算定するとは、具体的には、引っ張り降伏強さTsyを変数として直接又は間接的に含む関数、及び、接合部材14から基礎コンクリート部4に作用する抵抗を変数として直接又は間接的に含む関数を用いて、許容曲げモーメントsMaを算定することを意味する。
According to the design method of the pile head joint portion according to the second embodiment described above, when it is assumed that no crack 44 is generated in the foundation concrete portion 4, that is, in the case of the state A, the screw portion 21 of the reinforcing bar 16. The allowable bending moment sMa can be accurately calculated by considering the tensile yield strength Tsy and calculating the allowable bending moment sMa in consideration of the resistance acting on the foundation concrete portion 4 from the joining member 14. As a result, according to the pile head joint design method according to the second embodiment, the pile head joint 10 having a sufficiently large allowable bending moment sMa can be realized with low-cost specifications.
Note that calculating the allowable bending moment sMa in consideration of the tensile yield strength Tsy and the resistance acting on the foundation concrete portion 4 from the joint member 14 is specifically, directly or indirectly using the tensile yield strength Tsy as a variable. It is meant that the allowable bending moment sMa is calculated using the function included in the above and the function including the resistance acting on the foundation concrete portion 4 from the joining member 14 directly or indirectly as a variable.

〔第3実施形態に係る杭頭接合部の設計方法〕
以下、第3実施形態に係る杭頭接合部の設計方法について説明する。
第3実施形態に係る杭頭接合部の設計方法は、許容曲げモーメント算定工程S2において、第1実施形態及び第2実施形態に係る杭頭接合部の設計方法と異なっている。図23は、第3実施形態に係る杭頭接合部の設計方法における許容曲げモーメント算定工程S2の概略的な手順を示すフローチャートである。
[Pile head joint design method according to the third embodiment]
Hereinafter, a method for designing a pile head joint according to the third embodiment will be described.
The design method of the pile head joint according to the third embodiment is different from the design method of the pile head joint according to the first embodiment and the second embodiment in the allowable bending moment calculation step S2. FIG. 23 is a flowchart showing a schematic procedure of an allowable bending moment calculation step S2 in the method for designing a pile head joint according to the third embodiment.

図23に示したように、第3実施形態に係る杭頭接合部の設計方法における許容曲げモーメント算定工程S2は、第1許容曲げモーメント算定工程S4、第2許容曲げモーメント算定工程S5及び許容曲げモーメント選択工程S6を有している。
第1許容曲げモーメント算定工程S4では、補強筋16の螺子部21の引っ張り降伏強さTsyを考慮するとともに、接合部材14から基礎コンクリート部4に作用する抵抗を考慮して許容曲げモーメントsMaとしての第1許容曲げモーメントsMaAを算定する。第1許容曲げモーメントsMaAは、上述した第2実施形態の杭頭接合部の設計方法によって算定される許容曲げモーメントsMaである。
As shown in FIG. 23, the allowable bending moment calculating step S2 in the pile head joint design method according to the third embodiment includes the first allowable bending moment calculating step S4, the second allowable bending moment calculating step S5, and the allowable bending moment. It has a moment selection step S6.
In the first allowable bending moment calculating step S4, the tensile yield strength Tsy of the screw portion 21 of the reinforcing bar 16 is considered, and the resistance acting on the foundation concrete portion 4 from the joint member 14 is taken into consideration as the allowable bending moment sMa. A first allowable bending moment sMaA is calculated. 1st permissible bending moment sMaA is permissible bending moment sMa calculated by the design method of the pile head joint part of a 2nd embodiment mentioned above.

第2許容曲げモーメント算定工程S5では、補強筋16の軸部20の引っ張り降伏強さTbyを考慮する一方、接合部材14から基礎コンクリート部4に作用する抵抗を無視して許容曲げモーメントsMaとしての第2許容曲げモーメントsMaBを算定する。第2許容曲げモーメントsMaBは、上述した第1実施形態の杭頭接合部の設計方法によって算定される許容曲げモーメントsMaである。   In the second allowable bending moment calculating step S5, the tensile yield strength Tby of the shaft portion 20 of the reinforcing bar 16 is considered, while the resistance acting on the foundation concrete portion 4 from the joining member 14 is ignored and the allowable bending moment sMa is determined. A second allowable bending moment sMaB is calculated. The second allowable bending moment sMaB is the allowable bending moment sMa calculated by the above-described pile head joint design method according to the first embodiment.

そして、許容曲げモーメント選択工程S6では、第1許容曲げモーメントsMaAと第2許容曲げモーメントsMaBを比較し、第1許容曲げモーメントsMaAと第2許容曲げモーメントsMaBのうち小さい方を許容曲げモーメントsMaとして選択する。   In the allowable bending moment selection step S6, the first allowable bending moment sMaA and the second allowable bending moment sMaB are compared, and the smaller of the first allowable bending moment sMaA and the second allowable bending moment sMaB is set as the allowable bending moment sMa. select.

上記した第3実施形態に係る杭頭接合部の設計方法によれば、第1許容曲げモーメントsMaAと第2許容曲げモーメントsMaBのうち小さい方を許容曲げモーメントsMaとして選択することで、ひび割れ44の発生の有無に係わらずに、安全を見込んで、十分な大きさの許容曲げモーメントを有する杭頭接合部10を低コストな仕様で実現可能である。   According to the method for designing a pile head joint according to the third embodiment described above, by selecting the smaller one of the first allowable bending moment sMaA and the second allowable bending moment sMaB as the allowable bending moment sMa, Regardless of the occurrence or non-occurrence, it is possible to realize the pile head joint 10 having a sufficiently large allowable bending moment with a low cost specification in anticipation of safety.

好ましくは、機構IIIにより基礎コンクリート部4から接合部材14に作用する圧縮強度Ccは、補強筋16の軸部20の降伏強さTbyと軸部20の降伏強さTsyとの差よりも大きくなるように設定される(Cc≧Tby-Tsy)。図24は、このような場合(Cc≧Tby-Tsy)における、許容曲げモーメント選択工程S6の概略的な手順を示している。
許容曲げモーメント選択工程S6は、降伏判定工程S7と、第1許容曲げモーメント選択工程S8と、第2許容曲げモーメント選択工程S9とを有している。
降伏判定工程S7では、基礎コンクリート部4から上側突起部24に作用する圧縮力Ccによって、上側突起部24が降伏するか否か判定される。
Preferably, the compressive strength Cc acting on the joining member 14 from the foundation concrete portion 4 by the mechanism III is larger than the difference between the yield strength Tby of the shaft portion 20 of the reinforcing bar 16 and the yield strength Tsy of the shaft portion 20. (Cc ≧ Tby−Tsy). FIG. 24 shows a schematic procedure of the allowable bending moment selection step S6 in such a case (Cc ≧ Tby−Tsy).
The allowable bending moment selection step S6 includes a yield determination step S7, a first allowable bending moment selection step S8, and a second allowable bending moment selection step S9.
In the yield determination step S <b> 7, it is determined whether or not the upper protruding portion 24 yields by the compressive force Cc acting on the upper protruding portion 24 from the foundation concrete portion 4.

降伏判定工程S7での判定の結果、上側突起部24が降伏すると判定された場合、第1許容曲げモーメント選択工程S8が実行される。第1許容曲げモーメント選択工程S8では、許容曲げモーメントsMaとして、第1許容曲げモーメントsMaAが選択される。
一方、降伏判定工程S7での判定の結果、上側突起部24が降伏しないと判定された場合、第2許容曲げモーメント選択工程S9が実行される。第2許容曲げモーメント選択工程S9では、許容曲げモーメントsMaとして、第2許容曲げモーメントsMaBが選択される。
As a result of the determination in the yield determination step S7, when it is determined that the upper projection 24 yields, a first allowable bending moment selection step S8 is executed. In the first allowable bending moment selection step S8, the first allowable bending moment sMaA is selected as the allowable bending moment sMa.
On the other hand, as a result of the determination in the yield determination step S7, when it is determined that the upper protrusion 24 does not yield, the second allowable bending moment selection step S9 is executed. In the second allowable bending moment selection step S9, the second allowable bending moment sMaB is selected as the allowable bending moment sMa.

上記構成によれば、上側突起部24の降伏強さが補強筋16の軸部20の引っ張り降伏強さTbyと螺子部21の引っ張り降伏強さTsyとの差よりも小さい場合、第1許容曲げモーメントsMaAが許容曲げモーメントsMaとして選択される。つまり、上側突起部24の降伏強さが補強筋16の軸部20の引っ張り降伏強さTbyと螺子部21の引っ張り降伏強さTsyとの差よりも小さい場合、上側突起部24が降伏してしまい、第1許容曲げモーメントsMaAの方が小さくなると判断して、第1許容曲げモーメントsMaAを許容曲げモーメントsMaとして選択する。これにより、上記構成によれば、安全を見込んで、許容曲げモーメントsMaを的確に算定することができ、十分な大きさの許容曲げモーメントを有する杭頭接合部10を低コストな仕様で実現可能である。   According to the above configuration, when the yield strength of the upper protrusion 24 is smaller than the difference between the tensile yield strength Tby of the shaft portion 20 of the reinforcing bar 16 and the tensile yield strength Tsy of the screw portion 21, the first allowable bending is performed. Moment sMaA is selected as the allowable bending moment sMa. That is, when the yield strength of the upper projection 24 is smaller than the difference between the tensile yield strength Tby of the shaft portion 20 of the reinforcing bar 16 and the tensile yield strength Tsy of the screw portion 21, the upper projection 24 yields. Therefore, it is determined that the first allowable bending moment sMaA is smaller, and the first allowable bending moment sMaA is selected as the allowable bending moment sMa. Thereby, according to the above configuration, it is possible to accurately calculate the allowable bending moment sMa in anticipation of safety, and to realize the pile head joint portion 10 having a sufficiently large allowable bending moment with low-cost specifications. It is.

〔第4実施形態に係る杭頭接合部の設計方法〕
以下、第4実施形態に係る杭頭接合部の設計方法について説明する。第4実施形態に係る杭頭接合部の設計方法は、仕様適否判定工程S3において、弾性回転剛性Kを考慮して発生曲げモーメントMθを演算する点において、第1実施形態〜第3実施形態の杭頭接合部の設計方法と異なっている。
図25は、第4実施形態に係る杭頭接合部の設計方法における仕様適否判定工程S3の概略的な手順を示している。仕様適否判定工程S3は、弾性回転剛性演算工程S10、発生曲げモーメント演算工程S11及び曲げモーメント比較判定工程S12を有している。
[Pile head joint design method according to the fourth embodiment]
Hereinafter, a method for designing a pile head joint according to the fourth embodiment will be described. Design method of pile joint according to the fourth embodiment, the specification in appropriateness determination step S3, in that for calculating the occurrence bending moment M theta in consideration of the elastic rotation stiffness K 0, the first embodiment to the third embodiment It is different from the design method of the pile head joint of the form.
FIG. 25 shows a schematic procedure of the specification suitability determination step S3 in the pile head joint design method according to the fourth embodiment. The specification suitability determination step S3 includes an elastic rotational rigidity calculation step S10, a generated bending moment calculation step S11, and a bending moment comparison determination step S12.

弾性回転剛性演算工程S10では、許容曲げモーメントsMa及び許容曲げモーメントsMaに対応する杭頭部12の回転角(杭頭回転角)θに基づいて、杭頭接合部10の弾性回転剛性Kを演算する。この際、以下の様に、杭頭接合部10に作用する軸力の範囲毎に場合分けして、弾性回転剛性Kを算出する。
・0<軸力である場合
弾性回転剛性Kを考慮しない(固定度α=1とする)。
・軸力≦0である場合
弾性回転剛性Kを以下の〔数5〕に示す式によって算出する。
In the elastic rotational stiffness calculation step S10, the elastic rotational stiffness K 0 of the pile head joint 10 is determined based on the allowable bending moment sMa and the rotational angle (pile head rotational angle) θ 0 of the pile head 12 corresponding to the allowable bending moment sMa. Is calculated. At this time, the elastic rotational rigidity K 0 is calculated for each range of the axial force acting on the pile head joint 10 as follows.
When 0 <Axial force, elastic rotational rigidity K 0 is not considered (fixed degree α 0 = 1).
When Axial Force ≦ 0 The elastic rotational rigidity K 0 is calculated by the following equation [Formula 5].

Figure 0006345741
Figure 0006345741

杭頭回転角θは、状態Bの場合、補強筋16の断面強度の決定位置(図10参照)に応じて、以下の〔数6〕に示す式により求めることができる。なお、図26は、式中の記号の詳細を示している。〔数6〕では、0.5sfa・ψb・lb及び0.5sfa・ψb・lbが、基礎コンクリート部4の付着により軸部20に作用する抵抗をそれぞれ表している。当該抵抗は、断面強度の決定位置からの距離に比例して増加し、当該抵抗によって、軸部20に作用する引っ張り力が、断面強度の決定位置からの距離に応じて低減又は打ち消される。この結果として、杭頭部12の軸線方向での力の分布は、図27に示したようになり、図27中のハッチングを付した領域の面積を(a・Eb)で除すことにより、伸び量δbを求めることができる。 In the state B, the pile head rotation angle θ 0 can be obtained by the following equation (6) according to the position of the reinforcing bar 16 where the cross-sectional strength is determined (see FIG. 10). FIG. 26 shows details of symbols in the formula. In [Expression 6], 0.5 sfa · ψb · lb 1 and 0.5 sfa · ψb · lb 2 represent resistances acting on the shaft portion 20 due to adhesion of the foundation concrete portion 4, respectively. The resistance increases in proportion to the distance from the position at which the cross-sectional strength is determined, and the tensile force acting on the shaft portion 20 is reduced or canceled according to the distance from the position at which the cross-sectional strength is determined. As a result, the distribution of force in the axial direction of the pile head 12 is as shown in FIG. 27, and the area of the hatched area in FIG. 27 is divided by ( ab · Eb). The elongation amount δb can be obtained.

Figure 0006345741
Figure 0006345741

なお上記〔数6〕中のTyについては、補強筋16の軸部20の引っ張り降伏強さTbyを用いることができる。また、Tyとして、軸部20の引っ張り降伏強さTbyに0〜1の係数を乗じたものを用いてもよい。   In addition, about Ty in said [Formula 6], the tensile yield strength Tby of the axial part 20 of the reinforcing bar 16 can be used. Moreover, you may use what multiplied the coefficient of 0-1 to the tensile yield strength Tby of the axial part 20 as Ty.

一方、杭頭回転角θは、状態Aの場合、補強筋16の断面強度の決定位置(図22参照)に応じて、以下の〔数7〕に示す式により求めることができる。〔数7〕では、0.5sfa・ψb・(lb+lb)が、基礎コンクリート部4の付着により軸部20に作用する抵抗を表している。当該抵抗は、断面強度の決定位置からの距離に比例して増加し、当該抵抗によって、軸部20に作用する引っ張り力が、断面強度の決定位置からの距離に応じて低減又は打ち消される。この結果として、杭頭部12の軸線方向での力の分布は、図28に示したようになり、図28中のハッチングを付した領域の面積を(a・Eb)で除すことにより、伸び量δbを求めることができる。 On the other hand, in the state A, the pile head rotation angle θ 0 can be obtained by the following equation (7) according to the position where the cross-sectional strength of the reinforcing bar 16 is determined (see FIG. 22). In [Expression 7], 0.5 sfa · ψb · (lb 1 + lb 2 ) represents the resistance acting on the shaft portion 20 due to the adhesion of the foundation concrete portion 4. The resistance increases in proportion to the distance from the position at which the cross-sectional strength is determined, and the tensile force acting on the shaft portion 20 is reduced or canceled according to the distance from the position at which the cross-sectional strength is determined. As a result, the force distribution in the axial direction of the pile head 12 is as shown in FIG. 28, and the area of the hatched area in FIG. 28 is divided by ( ab · Eb). The elongation amount δb can be obtained.

Figure 0006345741
Figure 0006345741

なお上記〔数7〕中のTyについては、補強筋16の螺子部21の引っ張り降伏強さTsyを用いることができる。また、Tyとして、螺子部21の引っ張り降伏強さTsyに0〜1の係数を乗じたものを用いてもよい。   As for Ty in [Expression 7], the tensile yield strength Tsy of the screw portion 21 of the reinforcing bar 16 can be used. Further, as Ty, a value obtained by multiplying the tensile yield strength Tsy of the screw portion 21 by a coefficient of 0 to 1 may be used.

発生曲げモーメント演算工程S11では、杭頭部12に軸方向圧縮力が作用していないという条件下(軸力≦0)において、杭頭接合部10の弾性回転剛性Kを考慮して、杭頭部12に対し想定水平力Hが作用したときに、杭頭部12に発生する発生曲げモーメントMθを演算する。そのために、以下の〔数8〕に示す式のように、弾性回転剛性Kを用いて弾性時の固定度αを求める。そして、水平力Hが作用したときに発生する曲げモーメント(剛接合発生曲げモーメント)Mに、固定度αを乗じることによって、発生曲げモーメントMθを求める。 In the generated bending moment calculation step S11, under the condition that the axial compression force is not acting on the pile head 12 (axial force ≦ 0), the pile is considered in consideration of the elastic rotational rigidity K 0 of the pile head joint 10. When an assumed horizontal force H is applied to the head 12, a generated bending moment M θ generated in the pile head 12 is calculated. For this purpose, the elastic degree of elasticity α 0 is obtained using the elastic rotational rigidity K 0 as shown in the following [Equation 8]. Then, the generated bending moment M θ is obtained by multiplying the bending moment (rigid joint generated bending moment) M 0 generated when the horizontal force H is applied by the fixed degree α 0 .

Figure 0006345741
Figure 0006345741

曲げモーメント比較判定工程S12では、発生曲げモーメント演算工程S11にて演算された発生曲げモーメントMθが、許容曲げモーメントsMaよりも小さいか否かを判定する。判定の結果、発生曲げモーメントMθが許容曲げモーメントsMaよりも小さければ(sMa>Mθ)、仕様選択工程S1にて選択された、杭頭部12、接合部材14、補強筋16及び基礎コンクリート部4の仕様が適当であると判定し、発生曲げモーメントMθが許容曲げモーメントsMa以上であれば(sMa≦Mθ)、仕様が不適当であると判定する。つまり、杭頭部12、接合部材14、補強筋16及び基礎コンクリート部4の仕様が適当であると判定される条件の1つは、発生曲げモーメントMθが許容曲げモーメントsMaよりも小さい(sMa>Mθ)ということである。 In bending moment comparison judgment step S12, it generates bending moment calculation step S11 generated bending moment M theta computed at determines whether less than the allowable bending moment SMA. Result of the determination, is smaller than generating the bending moment M theta allowable bending moment sMa (sMa> M θ), selected in the specification selection step S1, pile head 12, the bonding member 14, reinforcement 16 and foundation concrete specifications of part 4 is determined to be appropriate, determines if the generated bending moment M theta allowable bending moment SMA or (sMa ≦ M θ), specification to be inappropriate. In other words, pile head 12, the bonding member 14, one of the conditions specification of reinforcement 16 and the foundation concrete portion 4 is determined to be appropriate, generates bending moment M theta is less than the allowable bending moment SMA (SMA > M θ ).

なお、Lは最外縁の補強筋から回転中心Oまでの距離(回転半径)であるが、図26に示したように、簡便的に、圧縮側の杭頭部12の端から引張側の補強筋16の中心までの距離と同じ値に設定してもよく、杭径Dpと同じ値に設定されてもよい。回転半径Lは、通常、圧縮側の杭頭部12の端から引張側の補強筋16の中心までの距離や、杭径Dpよりも小さく、回転半径Lを大きめに設定すれば、安全を見込むことができる。勿論、シミュレーション又は実験によって、回転半径Lをより正確に求めてもよい。 Note that L 0 is the distance (rotation radius) from the outermost reinforcing bar to the rotation center O, but as shown in FIG. 26, it is simply from the end of the pile head 12 on the compression side to the tension side. It may be set to the same value as the distance to the center of the reinforcing bar 16, or may be set to the same value as the pile diameter Dp. The turning radius L 0 is usually smaller than the distance from the end of the pile head 12 on the compression side to the center of the reinforcing bar 16 on the tension side or the pile diameter Dp, and if the turning radius L 0 is set larger, it is safe. Can be expected. Of course, the turning radius L 0 may be obtained more accurately by simulation or experiment.

従来、補強筋16に基礎コンクリート部4が付着している杭頭接合部10の場合、杭頭部12にて発生する発生曲げモーメントMθは、固定度αが1であるとして算定されていた(Mθ=M)。
この点、本発明者等が検討したところ、補強筋16に基礎コンクリート部4が付着している場合であっても、固定度αを1とせずに発生曲げモーメントMθを算定してもよい場合、即ち、弾性回転剛性Kを考慮して発生曲げモーメントMθを算定してもよい場合が存在することがわかった。具体的には、杭頭部12に軸方向圧縮力が作用していないときには、固定度αを1とせずに算定してもよいことがわかった。
Conventionally, in the case of the pile head joint portion 10 in which the foundation concrete portion 4 is adhered to the reinforcing bar 16, the generated bending moment M θ generated at the pile head portion 12 is calculated on the assumption that the fixing degree α 0 is 1. (M θ = M 0 ).
In this regard, the present inventors etc. studied, even when the reinforcement 16 is foundation concrete portion 4 are attached, even when calculating the bending moment M theta generate fixed degree alpha 0 without 1 If good, that is, it was found that if the elastic rotational stiffness K 0 may be calculated occurrence bending moment M theta in consideration exists. Specifically, it has been found that when the axial compressive force is not acting on the pile head 12, the fixing degree α 0 may be calculated without being set to 1.

そこで、第4実施形態に係る杭頭接合部の設計方法では、杭頭部12に軸方向圧縮力が作用していないという条件下で、杭頭接合部10の弾性回転剛性Kを考慮して、杭頭部12に対し想定水平力Hが作用したときに杭頭部12に発生する発生曲げモーメントMθを演算している。このように、杭頭接合部10の弾性回転剛性Kを考慮することで、固定度αを1よりも小さくすることができ、発生曲げモーメントMθを小さくすることができる。これにより、杭頭部12に軸方向圧縮力が作用していないという条件下で、発生曲げモーメントMθを小さくすることができ、許容曲げモーメントsMaよりも発生曲げモーメントMθを小さくすることができる。この結果として、第4実施形態に係る杭頭接合部の設計方法によれば、十分な大きさの許容曲げモーメントsMaを有する杭頭接合部10を低コストな仕様で実現可能である。 Therefore, in the method for designing a pile head joint according to the fourth embodiment, the elastic rotational rigidity K 0 of the pile head joint 10 is taken into account under the condition that no axial compressive force acts on the pile head 12. Te, and it calculates the occurrence bending moment M theta occurring pile head 12 when assuming the horizontal force H to pile head 12 is applied. Thus, by considering the elastic rotational rigidity K 0 of the pile head joint 10, the fixing degree α 0 can be made smaller than 1, and the generated bending moment M θ can be made smaller. Thus, under the condition that the axial compressive force on the pile head 12 is not acting, it is possible to reduce the occurrence bending moment M theta, is possible to reduce the bending moment M theta generation than the allowable bending moment sMa it can. As a result, according to the method for designing a pile head joint according to the fourth embodiment, the pile head joint 10 having a sufficiently large allowable bending moment sMa can be realized with low-cost specifications.

なお、杭基礎8の設計で用いられる解析手法として、地盤を離散化したバネ要素、杭2を梁要素に置換した多層地盤解析モデルによる手法と半無限一様地盤中の弾性支承梁の解による手法(Changの方法)がある。前者は詳細法、後者は簡易法として位置づけられる。詳細法の場合には、直接、杭頭接合部10に回転バネを設けることで、弾性回転剛性を評価することが可能である。一方、簡易法では、杭頭接合部10の弾性回転剛性を考慮するためには、固定度αを導入することが必要になる。杭頭固定度αの算定方法にはいくつかの算定方法があるが、上述した第4実施形態では、〔数8〕に示した式を用いることによって、弾性支承梁の解に関係づける手法によって杭頭固定度αを算出している。
このような事情からすれば、弾性回転剛性Kは、〔数8〕に示した式以外を用いても評価可能であり、他の簡易法のみならず、詳細法によっても評価可能である。
The analysis method used in the design of the pile foundation 8 includes a spring element with discrete ground, a multi-layer ground analysis model in which the pile 2 is replaced with a beam element, and a solution of elastic bearing beams in a semi-infinite uniform ground. There is a method (Chang's method). The former is positioned as a detailed method and the latter as a simplified method. In the case of the detailed method, it is possible to evaluate the elastic rotational rigidity by providing a rotary spring directly on the pile head joint 10. On the other hand, in the simple method, in order to consider the elastic rotational rigidity of the pile head joint 10, it is necessary to introduce a fixing degree α 0 . There are several calculation methods for calculating the pile head fixing degree α 0 , but in the fourth embodiment described above, a method related to the solution of the elastic bearing beam by using the equation shown in [Equation 8]. Is used to calculate the pile head fixing degree α 0 .
Under such circumstances, the elastic rotational rigidity K 0 can be evaluated by using a formula other than that shown in [Equation 8], and can be evaluated not only by another simple method but also by a detailed method.

〔第5実施形態に係る杭頭接合部の設計方法〕
以下、第5実施形態に係る杭頭接合部の設計方法について説明する。第5実施形態に係る杭頭接合部の設計方法は、仕様適否判定工程S3において、第1許容曲げモーメントsMaA及び第2許容曲げモーメントsMaBのうち大きい方を用いて弾性回転剛性Kを演算する点において、第4実施形態の杭頭接合部の設計方法と異なっている。
図29は、第5実施形態に係る杭頭接合部の設計方法の概略的な手順を示すフローチャートである。第5実施形態に係る杭頭接合部の設計方法は、第1許容曲げモーメントsMaA及び第2許容曲げモーメントsMaBのうち大きい方(最大許容曲げモーメント:sMah=max(sMaA,sMaB))を選択する工程S13を更に有している。そして、弾性回転剛性演算工程S10’にて、最大許容曲げモーメントsMahを杭頭回転角θで除して、弾性回転剛性Kを演算する。
[Pile head joint design method according to the fifth embodiment]
Hereinafter, a method for designing a pile head joint according to the fifth embodiment will be described. Design method of pile joint according to the fifth embodiment, in the specification appropriateness determination step S3, and calculates the elastic rotational stiffness K 0 with the larger one of the first allowable bending moment sMaA and second allowable bending moment sMaB In the point, it differs from the design method of the pile head junction part of 4th Embodiment.
FIG. 29 is a flowchart showing a schematic procedure of a method for designing a pile head joint according to the fifth embodiment. The pile head joint design method according to the fifth embodiment selects the larger one of the first allowable bending moment sMaA and the second allowable bending moment sMaB (maximum allowable bending moment: sMah = max (sMaA, sMaB)). Step S13 is further included. Then, an elastic rotational stiffness calculation step S10 ', by dividing the maximum allowable bending moment sMah in pile rotation angle theta 0, computes the elastic rotational stiffness K 0.

上記した第5実施形態に係る杭頭接合部の設計方法によれば、第4実施形態の場合と同様、杭頭部12に軸方向圧縮力が作用していないという条件下で、発生曲げモーメントMθを小さくすることができ、許容曲げモーメントsMaよりも発生曲げモーメントMθを小さくすることができる。
一方、弾性回転剛性Kが過小に評価された場合、すなわち、固定度αが過小に評価された場合、演算される発生曲げモーメントMθが過小になってしまう。このような発生曲げモーメントMθと許容曲げモーメントsMaとを比較した場合、比較結果の妥当性に問題が生じる虞がある。
この点、上記した第5実施形態に係る杭頭接合部の設計方法によれば、第1許容曲げモーメントsMaA及び第2許容曲げモーメントsMaBのうち大きい方である最大許容曲げモーメントsMahと杭頭部12の回転角θに基づいて、杭頭接合部10の弾性回転剛性Kを演算するので、弾性回転剛性Kの大きさが過小に評価されることが防止される。この結果として、第5実施形態に係る杭頭接合部の設計方法によれば、発生曲げモーメントMθと許容曲げモーメントsMaとを比較したときの結果の妥当性が担保され、十分な大きさの許容曲げモーメントsMaを有する杭頭接合部10を低コストな仕様で確実に実現可能である。
好ましくは、最大許容曲げモーメントsMahは、機構I、II及びIIIの全てを累加した許容曲げモーメントである。つまり最大許容曲げモーメントsMahは、第1許容曲げモーメント成分sMa1、第2許容曲げモーメント成分sMa2及び第3許容曲げモーメント成分sMa3の和である。
According to the method for designing a pile head joint according to the fifth embodiment described above, as in the case of the fourth embodiment, the bending moment generated under the condition that no axial compressive force is acting on the pile head 12. it is possible to reduce the M theta, it is possible to reduce the bending moment M theta generation than the allowable bending moment SMA.
On the other hand, when the elastic rotational rigidity K 0 is evaluated as being underestimated, that is, when the fixing degree α 0 is evaluated as being underestimated, the calculated generated bending moment M θ is too small. When comparing the such generated bending moment M theta an allowable bending moment SMA, there is a fear that there is a problem in the validity of the comparison result.
In this regard, according to the method for designing a pile head joint according to the above-described fifth embodiment, the maximum allowable bending moment sMah and the pile head which is the larger of the first allowable bending moment sMaA and the second allowable bending moment sMaB. Since the elastic rotational rigidity K 0 of the pile head joint 10 is calculated based on the rotational angle θ 0 of 12, the magnitude of the elastic rotational rigidity K 0 is prevented from being evaluated too low. As a result, according to the design method of the pile joint according to the fifth embodiment, the result of the validity collateral when comparing generated bending moment M theta and allowable bending moment SMA, large enough The pile head joint 10 having the allowable bending moment sMa can be reliably realized with low-cost specifications.
Preferably, the maximum allowable bending moment sMah is an allowable bending moment obtained by accumulating all of the mechanisms I, II, and III. That is, the maximum allowable bending moment sMah is the sum of the first allowable bending moment component sMa1, the second allowable bending moment component sMa2, and the third allowable bending moment component sMa3.

好ましくは、弾性回転剛性演算工程S10,S10’は、上記した〔数6〕又は〔数7〕に示したように、補強筋16の軸部20に対する基礎コンクリート部4の付着を考慮して、引っ張り側に位置する補強筋16の伸び量δbを算定する工程を含んでいる。   Preferably, in the elastic rotational rigidity calculation steps S10 and S10 ′, as shown in the above [Equation 6] or [Equation 7], the adhesion of the foundation concrete portion 4 to the shaft portion 20 of the reinforcing bar 16 is considered. It includes a step of calculating the amount of elongation δb of the reinforcing bar 16 located on the pull side.

伸び量δbが過大に算定された場合、杭頭部12の回転角θが過大に評価され、杭頭接合部10の弾性回転剛性Kが過小に評価される。弾性回転剛性Kが過小に評価された場合、すなわち、固定度αが過小に評価された場合、演算される発生曲げモーメントMθが過小になってしまう。このような発生曲げモーメントMθと許容曲げモーメントsMaとを比較した場合、比較結果の妥当性に問題が生じる虞がある。
この点、上記構成によれば、補強筋16の軸部20に対する基礎コンクリート部4の付着を考慮して補強筋16の伸び量δbを算定するので、伸び量δbが過大に算定されることが防止される。この結果として、上記構成によれば、発生曲げモーメントMθと許容曲げモーメントsMaとを比較したときの結果の妥当性が担保され、十分な大きさの許容曲げモーメントsMaを有する杭頭接合部10を低コストな仕様で確実に実現可能である。
When the elongation amount δb is calculated excessively, the rotation angle θ 0 of the pile head 12 is evaluated excessively, and the elastic rotational rigidity K 0 of the pile head joint 10 is evaluated excessively. When the elastic rotational stiffness K 0 is evaluated as being underestimated, that is, when the fixing degree α 0 is evaluated as being underestimated, the calculated bending moment M θ is too small. When comparing the such generated bending moment M theta an allowable bending moment SMA, there is a fear that there is a problem in the validity of the comparison result.
In this regard, according to the above configuration, the elongation amount δb of the reinforcing bar 16 is calculated in consideration of the adhesion of the foundation concrete portion 4 to the shaft portion 20 of the reinforcing bar 16, and therefore the elongation amount δb may be excessively calculated. Is prevented. As a result, according to the above arrangement, the validity of results when comparing generated bending moment M theta allowable bending moment sMa is secured, pile head joint 10 with acceptable bending moment sMa large enough Can be reliably realized with low-cost specifications.

〔第6実施形態に係る杭頭接合部の設計方法〕
以下、第6実施形態に係る杭頭接合部の設計方法について説明する。第6実施形態に係る杭頭接合部の設計方法は、仕様適否判定工程S3において、杭頭回転角θを考慮せずに求められる曲げモーメント(剛接合発生曲げモーメント)Mと許容曲げモーメントsMaとを比較する点において、第4実施形態の杭頭接合部の設計方法と異なっている。
図30は、第6実施形態に係る杭頭接合部の設計方法の概略的な手順を示すフローチャートである。第6実施形態に係る杭頭接合部の設計方法は、剛接合発生曲げモーメント比較判定工程S14を更に備えている。剛接合発生曲げモーメント比較判定工程S14では、杭頭接合部10の弾性回転剛性Kを無視して演算される、杭頭部12に対し想定水平力Hが作用したときに杭頭部12に発生する剛接合発生曲げモーメントMが、許容曲げモーメントsMaよりも大きいか否かを判定する。
そして、杭頭部12、接合部材14、補強筋16及び基礎コンクリート部4の仕様が適当であると判定する条件の1つは、剛接合発生曲げモーメント比較判定工程S14において、剛接合発生曲げモーメントMが、許容曲げモーメントsMaよりも大きいと判定されることである。
[Pile head joint design method according to the sixth embodiment]
Hereinafter, a method for designing a pile head joint according to the sixth embodiment will be described. The design method of the pile head joint according to the sixth embodiment is that the bending moment (rigid joint generated bending moment) M 0 and the allowable bending moment obtained without considering the pile head rotation angle θ 0 in the specification suitability determination step S3. In the point which compares sMa, it differs from the design method of the pile head junction part of 4th Embodiment.
FIG. 30 is a flowchart showing a schematic procedure of a method for designing a pile head joint according to the sixth embodiment. The pile head joint design method according to the sixth embodiment further includes a rigid joint occurrence bending moment comparison determination step S14. In rigid connections generated bending moment comparison judgment step S14, it is calculated by ignoring the elastic rotational stiffness K 0 of the pile head joint 10, to the pile head 12 when assuming the horizontal force H is applied to the pile head 12 is rigidly joined generate the bending moment M 0 for generating determines whether greater than the allowable bending moment SMA.
One of the conditions for determining that the specifications of the pile head 12, the joining member 14, the reinforcing bar 16, and the foundation concrete portion 4 are appropriate is that the rigid joint generated bending moment is determined in the rigid joint generated bending moment comparison determination step S <b> 14. It is determined that M 0 is larger than the allowable bending moment sMa.

上記した第6実施形態に係る杭頭接合部の設計方法によれば、杭頭部12の回転角θを無視して演算した剛接合発生曲げモーメントMが許容曲げモーメントsMaよりも大きいときに、杭頭部12、接合部材14、補強筋16及び基礎コンクリート部4の仕様が適当であると判定されるので、杭頭部12、接合部材14、補強筋16及び基礎コンクリート部4の仕様が過剰になることが防止される。この結果として、第6実施形態に係る杭頭接合部の設計方法によれば、十分な大きさの許容曲げモーメントsMaを有する杭頭接合部10を低コストな仕様で確実に実現可能である。 According to the method for designing a pile head joint according to the sixth embodiment described above, when the rigid joint generated bending moment M 0 calculated by ignoring the rotation angle θ 0 of the pile head 12 is larger than the allowable bending moment sMa. Since it is determined that the specifications of the pile head 12, the joining member 14, the reinforcing bar 16 and the foundation concrete part 4 are appropriate, the specifications of the pile head 12, the joining member 14, the reinforcing bar 16 and the foundation concrete part 4 are determined. Is prevented from becoming excessive. As a result, according to the method for designing a pile head joint according to the sixth embodiment, the pile head joint 10 having a sufficiently large allowable bending moment sMa can be reliably realized with low-cost specifications.

〔第7実施形態に係る杭頭接合部の設計方法〕
以下、第7実施形態に係る杭頭接合部の設計方法について説明する。第7実施形態に係る杭頭接合部の設計方法は、許容曲げモーメントsMaが発生曲げモーメントMθに近付くように、仕様選択工程S1と、許容曲げモーメント算定工程S2と、仕様適否判定工程S3とを繰り返す点において、第1乃至第6実施形態に係る杭頭接合部の設計方法と異なっている。
好ましくは、図31に示したように、発生曲げモーメントMθが許容曲げモーメントsMaより小さくなるまで、仕様選択工程S1、許容曲げモーメント算定工程S2及び仕様適否判定工程S3が繰り返される。
より好ましくは、剛接合発生曲げモーメントMが許容曲げモーメントsMaより大きくなるまで、仕様選択工程S1、許容曲げモーメント算定工程S2及び仕様適否判定工程S3が繰り返される。
[Pile head joint design method according to the seventh embodiment]
Hereinafter, a method for designing a pile head joint according to the seventh embodiment will be described. Design method of pile joint according to the seventh embodiment, as allowable bending moment sMa approaches bending moment M theta occurs, the specification selection step S1, the allowable bending moment calculation step S2, the specification appropriateness determination process S3 In the point which repeats, it differs from the design method of the pile head junction part which concerns on 1st thru | or 6th embodiment.
Preferably, as shown in FIG. 31, until the evolution bending moment M theta is less than the allowable bending moment SMA, specification selection step S1, the allowable bending moment calculation step S2 and specifications appropriateness determination step S3 is repeated.
More preferably, rigid to the joining generating the bending moment M 0 becomes larger than the allowable bending moment SMA, specification selection step S1, the allowable bending moment calculation step S2 and specifications appropriateness determination step S3 is repeated.

〔第8実施形態に係る杭頭接合部の製造方法〕
以下、第8実施形態に係る杭頭接合部の製造方法について説明する。第8実施形態に係る杭頭接合部の製造方法は、図31に示したように、上述した第1乃至第7実施形態の何れか一つに係る杭頭接合部の設計方法によって適当であると判定された杭頭部12、接合部材14、補強筋16及び基礎コンクリート部4の仕様に基づいて、杭頭接合部10を構築する杭頭接合部構築工程S16を備えている。
杭頭接合部構築工程S16は、少なくとも、地盤へ杭2を建て込み、杭頭部12の外周面に接合部材14を溶接し、接合部材14に補強筋16を結合し、そして、杭頭部12周辺へコンクリートを打設する工程を備えている。
[Method for Manufacturing Pile Head Joint According to Eighth Embodiment]
Hereinafter, the manufacturing method of the pile head junction part concerning an 8th embodiment is explained. The method for manufacturing a pile head joint according to the eighth embodiment is appropriate according to the method for designing a pile head joint according to any one of the first to seventh embodiments described above, as shown in FIG. The pile head joint construction step S16 for constructing the pile head joint 10 is provided based on the specifications of the pile head 12, the joint member 14, the reinforcing bars 16, and the foundation concrete part 4 determined as follows.
In the pile head joint construction step S16, at least the pile 2 is built in the ground, the joint member 14 is welded to the outer peripheral surface of the pile head 12, the reinforcing bar 16 is joined to the joint member 14, and the pile head 12 is provided with a step of placing concrete around the periphery.

第8実施形態に係る杭頭接合部の製造方法によれば、上述した第1乃至第7実施形態の何れか一つに係る杭頭接合部の設計方法によって適当であると判定された杭頭部12、接合部材14、補強筋16及び基礎コンクリート部4の仕様に基づいて杭頭接合部10が構築されるので、十分な大きさの許容曲げモーメントsMaを有する杭頭接合部10を低コストな仕様で実現可能である。   According to the method for manufacturing a pile head joint according to the eighth embodiment, the pile head determined to be appropriate by the method for designing a pile head joint according to any one of the first to seventh embodiments described above. Since the pile head joint portion 10 is constructed based on the specifications of the portion 12, the joining member 14, the reinforcing bar 16, and the foundation concrete portion 4, the pile head joint portion 10 having a sufficiently large allowable bending moment sMa is reduced in cost. Can be realized with various specifications.

〔実施例〕
1.許容曲げモーメント及び弾性回転剛性の妥当性の確認
杭頭接合部の曲げ性能の検証と設計方法の妥当性の確認を目的として、繰り返し杭頭水平加力試験を実施した。
1)試験方法と試験体の諸元
試験体の諸元を表1に示し、杭頭接合部10の水平加力試験装置50を図13に示す。試験は、杭径(φ400とφ600)、軸力(0kNと1500kN)、補強筋の径(D35とD41)および補強筋の本数(6本と10本)を検証パラメータにとり、計6体実施した。杭は、外殻鋼管巻きコンクリート杭(SC杭)を模擬したコンクリート充填鋼管とした。鋼管には、同径におけるSC杭の壁厚相当の端板を設けており、鋼管の内部には基礎コンクリート部と同じコンクリートを打設(充填)した。コンクリート充填鋼管は杭頭接合部の破壊より先行して破壊が生じないような仕様となっている。
なお、接合部材内における補強筋の歪み分布を測定するため、各補強筋に複数の歪みゲージを取り付けた。
また、杭頭部の回転角θを測定し、弾性回転剛性Kの実験値eKを求めるため、鉛直変位d2,d3を測定した。
〔Example〕
1. Confirmation of validity of allowable bending moment and elastic rotational stiffness Repeated pile head horizontal force tests were conducted to verify the bending performance of pile head joints and the validity of the design method.
1) Test method and specifications of test body Table 1 shows the specifications of the test body, and FIG. 13 shows a horizontal force test apparatus 50 for the pile head joint 10. The test was carried out in a total of 6 pieces, taking the pile diameter (φ400 and φ600), axial force (0 kN and 1500 kN), reinforcing bar diameter (D35 and D41) and the number of reinforcing bars (6 and 10) as verification parameters. . The pile was a concrete-filled steel pipe simulating an outer shell steel pipe wound concrete pile (SC pile). The steel pipe was provided with an end plate corresponding to the wall thickness of the SC pile having the same diameter, and the same concrete as the foundation concrete portion was placed (filled) inside the steel pipe. The concrete-filled steel pipe is designed so that it does not break before the pile head joint breaks.
In order to measure the strain distribution of the reinforcing bars in the joining member, a plurality of strain gauges were attached to each reinforcing bar.
Further, the vertical displacements d2 and d3 were measured in order to measure the rotation angle θ 0 of the pile head and to obtain the experimental value eK 0 of the elastic rotational rigidity K 0 .

図13に示したように、杭の上部は、基礎コンクリート面から100mm上方の位置より角鋼管を設けて、高力アンカー接合により水平加力試験装置50へと接合した。試験体の製作方法としては、杭を上側、基礎コンクリート部を下側に配置して型枠を組み、杭内の所定の高さまでコンクリートを打設した。コンクリート養生後、角鋼管のフランジ位置で無収縮モルタルを打設した。
そして、各試験体に対し、図14に示した水平加力パターンにて水平加力を行った。
As shown in FIG. 13, the upper part of the pile was joined to the horizontal force test device 50 by high-strength anchor joining by providing a square steel pipe from a position 100 mm above the foundation concrete surface. As a manufacturing method of the test body, the pile was placed on the upper side, the foundation concrete part was placed on the lower side, the formwork was assembled, and the concrete was cast to a predetermined height in the pile. After concrete curing, non-shrink mortar was cast at the flange position of the square steel pipe.
And with respect to each test body, horizontal force was performed with the horizontal force pattern shown in FIG.

Figure 0006345741
Figure 0006345741

2)試験結果
(1)許容曲げモーメント
試験結果から求められた許容曲げモーメントの実験値Meと、機構I,II,IIIに基づいて求められた許容曲げモーメントsMa(計算値)を表2に示す。
2) Test result (1) Allowable bending moment Table 2 shows the experimental value Me of the allowable bending moment obtained from the test result and the allowable bending moment sMa (calculated value) obtained based on the mechanisms I, II, and III. .

Figure 0006345741
Figure 0006345741

表2に示したように、試験体3は、斜めひび割れの発生よりも補強筋螺子部降伏が先行した試験体である。短期許容曲げモーメントの実験値と計算値の比は、1.12〜1.50(平均1.28)であり、機構I,II,IIIに基づいて短期許容曲げモーメントを的確に算定可能であることがわかる。
なお、計算値は、実験値よりも小さい。これは、機構IIの抵抗力が支圧効果により上昇する影響や、埋め込まれた杭周囲の摩擦抵抗を考慮していない影響であると考えられる。計算値が実験値よりも小さいことは、安全を見込んでいることになり、好ましいことであると考えられる。
As shown in Table 2, the test body 3 is a test body in which yielding of the reinforcing bar screw portion preceded the occurrence of oblique cracking. The ratio between the experimental value and the calculated value of the short-term allowable bending moment is 1.12 to 1.50 (average 1.28), and the short-term allowable bending moment can be accurately calculated based on the mechanisms I, II, and III. I understand that.
The calculated value is smaller than the experimental value. This is considered to be an effect that the resistance force of the mechanism II increases due to the bearing pressure effect and an effect that does not consider the frictional resistance around the embedded pile. It is considered preferable that the calculated value is smaller than the experimental value because safety is expected.

(2)弾性回転剛性
表3に、弾性回転剛性Kの計算値cKと実験時の短期許容曲げモーメント(設計値)時の回転剛性eKを比較して示す。表中の固定度αは、杭頭完全固定の場合の杭頭曲げモーメントの理論解と杭頭の回転剛性を考慮した場合の同値の比を定義しており、地盤のN値=1.0として上記〔数8〕に示した式より求めた値である。表3より以下のことがわかる。
(i)実験で得られた短期許容時の回転剛性eKに対する計算で得られた弾性回転剛性cKの比は、1.00〜2.85である。
(ii)実験で得られた固定度αに対する計算で得られた弾性固定度αの比は1.00〜1.16である。
(iii)実験で得られた固定度αに対する計算で得られた弾性固定度αの比が概ね1.0を上回っているため、計算で得られた弾性回転剛性cKを考慮して演算された発生曲げモーメントMθは、設計時に安全側の評価を与えることが確認できる。
(2) the elastic rotational stiffness Table 3 shows a comparison of the rotational stiffness eK 0 when short allowable bending moment at the time of the experiment and calculated cK 0 of elastic rotational stiffness K 0 (design value). The fixed degree α 0 in the table defines the ratio of the equivalent value when considering the theoretical solution of the pile head bending moment when the pile head is completely fixed and the rotational rigidity of the pile head, and the N value of the ground = 1. 0 is a value obtained from the equation shown in the above [Equation 8]. Table 3 shows the following.
(I) The ratio of the elastic rotational stiffness cK 0 obtained by the calculation to the rotational stiffness eK 0 at the short-term tolerance obtained in the experiment is 1.00 to 2.85.
(Ii) The ratio of the elastic fixing degree α 0 obtained by the calculation to the fixing degree α 0 obtained in the experiment is 1.00 to 1.16.
(Iii) Since the ratio of the elastic fixing degree α 0 obtained by the calculation with respect to the fixing degree α 0 obtained by the experiment is substantially higher than 1.0, the elastic rotational rigidity cK 0 obtained by the calculation is taken into consideration. It can be confirmed that the calculated generated bending moment gives a safety evaluation at the time of design.

Figure 0006345741
Figure 0006345741

2.許容曲げモーメント、仮想RC断面径及び弾性回転剛性の有効性の確認
1)杭応力一体解析
接合部材を用いた杭頭接合部における杭応力一体解析を以下の条件で行った。
(1)建物
上部構造:RC構造12F規模
杭配置:12m×36m(1×6スパン)(図32参照)
(2)設計用軸力
設計用軸力を以下の表4に示す。
2. Confirmation of effectiveness of allowable bending moment, virtual RC cross-sectional diameter and elastic rotational stiffness 1) Pile stress integrated analysis Pile stress integrated analysis at pile head joints using joint members was performed under the following conditions.
(1) Building Superstructure: RC structure 12F scale Pile arrangement: 12 m x 36 m (1 x 6 span) (See Fig. 32)
(2) Design axial force Table 4 shows the design axial force.

Figure 0006345741
Figure 0006345741

(3)設計用外力
上部および基礎部分の水平力:66000×0.15=9900kN
基礎自重の水平力:1862×0.1=186kN
設計用外力10100kN
(4)地盤条件
地盤条件、杭諸元、補強筋諸元を以下の表5〜表7にそれぞれ示す。
なお、地盤条件として、深度0〜8mのN値が1又は3の2つのケースを設定し、それぞれのケース毎に杭諸元及び補強筋諸元を選択した。また、表7には、杭頭変位、杭頭曲げ、及びせん断力も示す。
(3) External force for design Horizontal force of upper part and foundation part: 66000 × 0.15 = 9900kN
Horizontal force of basic weight: 1862 × 0.1 = 186kN
External force for design 10100kN
(4) Ground conditions The ground conditions, pile specifications, and reinforcing bar specifications are shown in Tables 5 to 7 below.
As ground conditions, two cases with an N value of 1 or 3 at a depth of 0 to 8 m were set, and pile specifications and reinforcing bar specifications were selected for each case. Table 7 also shows pile head displacement, pile head bending, and shear force.

Figure 0006345741
Figure 0006345741
Figure 0006345741
Figure 0006345741
Figure 0006345741
Figure 0006345741

(5)解析方法
・引抜が生じている箇所は固定度0.9と仮定して弾性回転剛性を算出。それ以外の箇所は、固定度0.999と見なして、弾性回転剛性を算出。
・四隅(Y1−X1等)の短期変動軸力は、パイルキャップ自重を含む長期軸力の130%として設定。中柱は低減。
・表層地盤N値を1.0と3.0で実施。
(6)解析結果
図33は、N値=3.0のときの杭P1のNM曲線を示している。図34は、N値=1.0のときの杭P1のNM曲線を示している。図35は、N値=1.0のときの杭P2のNM曲線を示している。
(i)図33及び図34に示したように、圧縮力が0未満の範囲において、弾性回転剛性を考慮して発生曲げモーメントMθを演算することにより、発生曲げモーメントMθを短期許容曲げモーメントsMaよりも小さくすることができることがわかる。
(ii)図35に示したように、常時圧縮力が作用する杭P2においても、補強筋の仕様(軸部径)を適宜選択することにより、発生曲げモーメントMθを短期許容曲げモーメントsMaよりも小さくすることができることがわかる。
なお、図35では、補強筋の軸部径がD41の場合に、発生曲げモーメントMθが短期許容曲げモーメントsMaよりも小さくなっているが、この前提として、仮想RC断面径Dを考慮したことに留意しなければならない。仮想RC断面径Dを考慮したことにより、機構Iによる第1許容曲げモーメント成分sMa1を大きくすることができ、ひいては許容曲げモーメントsMaを大きくすることができている。この前提の下、補強筋の軸部径がD41の場合に、発生曲げモーメントMθが短期許容曲げモーメントsMaよりも小さくなっている。
(5) Analytical method ・ The elastic rotation stiffness is calculated assuming that the location where the pull-out has occurred is fixed at 0.9. The other parts are regarded as having a fixed degree of 0.999, and the elastic rotational rigidity is calculated.
・ The short-term variable axial force at the four corners (Y1-X1 etc.) is set as 130% of the long-term axial force including the pile cap weight. The center pillar is reduced.
・ Surface layer ground N value is 1.0 and 3.0.
(6) Analysis Result FIG. 33 shows an NM curve of the pile P1 when the N value = 3.0. FIG. 34 shows an NM curve of the pile P1 when the N value = 1.0. FIG. 35 shows an NM curve of the pile P2 when the N value = 1.0.
(I) As shown in FIGS. 33 and 34, in a range where the compressive force is less than 0, the generated bending moment is calculated in consideration of the elastic rotational rigidity, thereby reducing the generated bending moment in the short-term allowable bending. It can be seen that the moment sMa can be made smaller.
As shown in (ii) Figure 35, also in the piles P2 constantly compressive force acts, by selecting the specification of Reinforcement (the shank diameter) appropriate, generates bending moment M theta than short allowable bending moment sMa It can be seen that it can be made smaller.
In FIG. 35, when the shaft portion diameter of reinforcement is D41, it generates bending moment M theta is but smaller than the short-term permissible bending moment SMA, which as this assumption, considering virtual RC sectional diameter D You must keep in mind. Considering the virtual RC cross-sectional diameter D, the first allowable bending moment component sMa1 by the mechanism I can be increased, and as a result, the allowable bending moment sMa can be increased. Under this assumption, the shank diameter of the reinforcement is in the case of D41, generating bending moment M theta is smaller than the short-term permissible bending moment SMA.

本発明は上述した実施形態に限定されることはなく、上述した実施形態に変形を加えた形態や、これらの形態を適宜組み合わせた形態も含む。
例えば、上述した杭頭接合部の設計方法によれば、上述した杭頭接合部10以外の杭頭接合部も設計可能である。図36は、第1実施形態に係る杭頭接合部の設計方法により設計可能な杭頭接合部100aの一部を概略的に示している。
杭頭接合部100aは、接合部材14に対応して複数の仕切部材102aを更に有する点において、杭頭接合部10と異なっている。
仕切部材102aは、図37に示したように樋形状(溝形状)を有し、例えばU字形状の断面形状を有する。仕切部材102aは、一対の長方形の側壁(第1側壁)104と、第1側壁104同士を相互に繋ぐ半円筒形状の側壁(第2側壁)106とを有する。図38及び図39に示したように、第1側壁104は、杭頭部12の周方向にて対応する接合部材14の両側に配置され、接合部材14を間に挟んで相互に平行に配置される。第1側壁104の側縁が杭頭部12の外周面に溶接、例えばスポット溶接や点付け溶接、されることによって、仕切部材102aは杭頭部12に固定される。第2側壁106は、接合部材14を間に挟んで杭頭部12の外周面と対向して配置される。
The present invention is not limited to the above-described embodiments, and includes forms obtained by modifying the above-described embodiments and forms obtained by appropriately combining these forms.
For example, according to the method for designing a pile head joint described above, a pile head joint other than the above-described pile head joint 10 can also be designed. FIG. 36 schematically shows a part of a pile head joint 100a that can be designed by the method for designing a pile head joint according to the first embodiment.
The pile head joint portion 100 a is different from the pile head joint portion 10 in that the pile head joint portion 100 a further includes a plurality of partition members 102 a corresponding to the joint member 14.
The partition member 102a has a bowl shape (groove shape) as shown in FIG. 37, for example, a U-shaped cross-sectional shape. The partition member 102a has a pair of rectangular side walls (first side walls) 104 and a semi-cylindrical side wall (second side wall) 106 that connects the first side walls 104 to each other. As shown in FIGS. 38 and 39, the first side walls 104 are arranged on both sides of the corresponding joining member 14 in the circumferential direction of the pile head 12, and are arranged in parallel with each other with the joining member 14 interposed therebetween. Is done. The partition member 102 a is fixed to the pile head 12 by welding the side edge of the first side wall 104 to the outer peripheral surface of the pile head 12, for example, spot welding or spot welding. The second side wall 106 is disposed to face the outer peripheral surface of the pile head 12 with the joining member 14 interposed therebetween.

第1側壁104及び第2側壁106は、接合部材14、及び、下側突起23と上側突起24の上端面との間を延びる軸部20の部分(接合部材内部分)20aから側方に離れて配置されており、仕切部材102aの内側、即ち、第1側壁104及び第2側壁106と接合部材内部分20aとの間には空間が存在する。当該空間には基礎コンクリート部4を構成するコンクリートが充填される。
なお、仕切部材16aの内側の空間が狭く、コンクリートが充填され難い場合には、基礎コンクリート部4のコンクリートの打設の前に、モルタルやグラウト等の硬化性材料を仕切部材102aの内側に充填してもよい。
The first side wall 104 and the second side wall 106 are laterally separated from the joining member 14 and the portion 20a of the shaft portion 20 (the joining member inner portion) 20a extending between the lower projection 23 and the upper end surface of the upper projection 24. There is a space inside the partition member 102a, that is, between the first side wall 104 and the second side wall 106 and the joining member inner portion 20a. The space is filled with concrete constituting the foundation concrete portion 4.
In addition, when the space inside the partition member 16a is narrow and it is difficult to fill with concrete, the hardener material such as mortar and grout is filled inside the partition member 102a before placing concrete in the foundation concrete portion 4. May be.

上述した杭頭接合部100aによれば、1つの仕切部材102aが、対応する1つの補強筋16の軸部20の接合部材内部分20aの側方に配置される1つの仕切壁108を構成しており、軸部20の接合部材内部分20aの側方にて、基礎コンクリート部4を補強筋16の径方向にて内側と外側とに仕切ることができる。このように基礎コンクリート部4を仕切ることによって、図40に示したように、補強筋16の径方向にて、軸部20の接合部材内部分20aに付着した基礎コンクリート部4の部分(付着部分(近位部分))110と、仕切壁108の外側の基礎コンクリート部4の部分(遠位部分)112との間の接続が遮断される。これにより、杭頭接合部100aに曲げモーメントが作用したときに、基礎コンクリート部4の付着部分110が、遠位部分112に対し相対変位し易く、図40に示したように、付着部分110から上側突起部24に作用する力(付着による抵抗力)Fsbが発生する。   According to the pile head joint portion 100a described above, one partition member 102a constitutes one partition wall 108 disposed on the side of the joint member inner portion 20a of the shaft portion 20 of the corresponding one reinforcing bar 16. The foundation concrete portion 4 can be partitioned into the inner side and the outer side in the radial direction of the reinforcing bar 16 at the side of the joint member inner portion 20 a of the shaft portion 20. By partitioning the foundation concrete portion 4 in this way, as shown in FIG. 40, the portion of the foundation concrete portion 4 (attachment portion) attached to the joint member inner portion 20 a of the shaft portion 20 in the radial direction of the reinforcing bar 16. (Proximal part)) 110 and the connection (distal part) 112 of the foundation concrete part 4 outside the partition wall 108 are cut off. Thereby, when a bending moment acts on the pile head joint part 100a, the adhesion part 110 of the foundation concrete part 4 is easy to be relatively displaced with respect to the distal part 112, and as shown in FIG. A force (resistance force due to adhesion) Fsb acting on the upper protrusion 24 is generated.

これにより、許容曲げモーメントsMaの算定に際し、螺子部21の引っ張り降伏強度Tsyに加えて、抵抗力Fsbを考慮することができるようになるが、通常、Tby≦Tsy+Fsbで示される関係が成立する。この結果として、許容曲げモーメントsMaの算定の際、基礎コンクリート部4におけるひび割れ発生の有無にかかわらずに、補強筋16の軸部20の引っ張り降伏強度Tbyを考慮することが可能となり、許容曲げモーメントを容易に算定することが可能となる。つまり、許容曲げモーメントsMaとして、第2許容曲げモーメントsMaBを算定可能となり、第1実施形態に係る杭頭接合部の設計方法を採用可能となる。   As a result, in calculating the allowable bending moment sMa, the resistance force Fsb can be considered in addition to the tensile yield strength Tsy of the screw portion 21, but the relationship represented by Tby ≦ Tsy + Fsb is usually established. As a result, when calculating the allowable bending moment sMa, it is possible to consider the tensile yield strength Tby of the shaft portion 20 of the reinforcing bar 16 regardless of whether or not cracking has occurred in the foundation concrete portion 4, and the allowable bending moment. Can be easily calculated. That is, the second allowable bending moment sMaB can be calculated as the allowable bending moment sMa, and the pile head joint design method according to the first embodiment can be employed.

図41は、第1実施形態に係る杭頭接合部の設計方法により設計可能な杭頭接合部100bの一部を概略的に示している。
杭頭接合部100bは、複数の仕切部材102aに代えて、仕切部材102bを有する点において、杭頭接合部100aと異なっている。
図41〜図43に示したように、仕切部材102bは、円筒形状の周壁114を有しおり、周壁114は、所定の空間を存して、杭頭部12を囲むように配置されている。そして、周壁114は、複数の接合部材14及び複数の補強筋16の接合部材内部分20aを一括して囲むように配置されており、複数の接合部材14及び複数の補強筋16の接合部材内部分20aの側方に配置された1つの仕切壁116を構成している。
FIG. 41 schematically shows a part of a pile head joint 100b that can be designed by the method for designing a pile head joint according to the first embodiment.
The pile head joint portion 100b is different from the pile head joint portion 100a in that it has a partition member 102b instead of the plurality of partition members 102a.
As shown in FIGS. 41 to 43, the partition member 102 b has a cylindrical peripheral wall 114, and the peripheral wall 114 is arranged so as to surround the pile head 12 with a predetermined space. The peripheral wall 114 is disposed so as to collectively surround the joint member inner portions 20a of the plurality of joining members 14 and the plurality of reinforcing bars 16, and within the joint members of the plurality of joining members 14 and the plurality of reinforcing bars 16. One partition wall 116 disposed on the side of the portion 20a is formed.

上述した杭頭接合部100bによれば、杭頭部12を囲むように配置された周壁114によって、補強筋16の径方向にて、基礎コンクリート部4の付着部分110と、基礎コンクリート部4の遠位部分112との間の接続を簡単な構成で遮断することができる。   According to the above-described pile head joint portion 100b, the peripheral wall 114 disposed so as to surround the pile head portion 12 and the attached portion 110 of the foundation concrete portion 4 and the foundation concrete portion 4 in the radial direction of the reinforcing bar 16 The connection with the distal portion 112 can be interrupted with a simple configuration.

好ましくは、図41〜図43に示したように、仕切部材102bは、周壁114の上端に連なり、杭頭部12の端面に沿って配置される環状板118を有している。環状板118は、補強筋16が挿通される複数の開口120を有する。
上記構成によれば、環状板118を杭頭部12の端面上に配置することで、仕切壁116を容易に配置することができる。なお、例えば、環状板118をボルト(不図示)によって杭頭部12に固定することによって、仕切部材102bを杭頭部12に対し容易に固定することができる。
Preferably, as illustrated in FIGS. 41 to 43, the partition member 102 b includes an annular plate 118 that is continuous with the upper end of the peripheral wall 114 and is disposed along the end surface of the pile head 12. The annular plate 118 has a plurality of openings 120 through which the reinforcing bars 16 are inserted.
According to the said structure, the partition wall 116 can be arrange | positioned easily by arrange | positioning the cyclic | annular board 118 on the end surface of the pile head part 12. FIG. For example, the partition member 102b can be easily fixed to the pile head 12 by fixing the annular plate 118 to the pile head 12 with a bolt (not shown).

最後に、上述した実施形態に係る杭頭接合部の設計方法は、方法に係る発明であったが、本発明によれば、物の発明として、当該方法をコンピュータに実行させるためのプログラムも提供可能であるのは勿論である。   Finally, the method for designing a pile head joint according to the above-described embodiment is an invention related to the method. However, according to the present invention, a program for causing a computer to execute the method is also provided as an invention of an object. Of course it is possible.

1 構造体
2 杭
4 基礎コンクリート部
4a パイルキャップ
5 梁
6 上部構造
8 杭基礎
10,100a,100b 杭頭接合部
12 杭頭部
14 接合部材(ジョイントカプラ)
16 補強筋
17 コンクリート部
18 端板
19 外殻鋼管
20 軸部
20a 接合部材内部分
21 螺子部
22 定着体
23 下側突起部
24 上側突起部
26 螺子孔
28 切り欠き
29 フォーク部
30 連結部
32 補強ビーム部
34 補強リブ部
35 湾曲面
36 開先面
38 溶接ビード
40 上側部分
42 下側部分
44 ひび割れ
50 水平加力試験装置
51 アクチュエータ
52 ひび割れ
102a,102b 仕切部材
104 第1側壁
106 第2側壁
108 仕切壁
110 付着部分(近位部分)
112 遠位部分
114 周壁
116 仕切壁
118 環状板
120 開口
DESCRIPTION OF SYMBOLS 1 Structure 2 Pile 4 Foundation concrete part 4a Pile cap 5 Beam 6 Superstructure 8 Pile foundation 10,100a, 100b Pile head joint 12 Pile head 14 Joint member (joint coupler)
16 Reinforcing bar 17 Concrete part 18 End plate 19 Outer steel pipe 20 Shaft part 20a Joining member inner part 21 Screw part 22 Fixing body 23 Lower projection part 24 Upper projection part 26 Screw hole 28 Notch 29 Fork part 30 Connecting part 32 Reinforcement Beam portion 34 Reinforcing rib portion 35 Curved surface 36 Groove surface 38 Weld bead 40 Upper portion 42 Lower portion 44 Crack 50 Horizontal force test device 51 Actuator 52 Crack 102a, 102b Partition member 104 First side wall 106 Second side wall 108 Partition Wall 110 attachment part (proximal part)
112 Distal portion 114 Peripheral wall 116 Partition wall 118 Annular plate 120 Opening

Claims (11)

杭頭部と、
前記杭頭部の外周面に固定された複数の接合部材と、
前記杭頭部に対し前記接合部材を介してそれぞれ取り付けられた複数の補強筋と、
前記杭頭部、前記複数の接合部材、及び、前記複数の補強筋を囲む、コンクリートによって構成された基礎コンクリート部と、を備え、
前記補強筋は、
表面に凹凸を有する軸部と、
前記軸部の一端側に連なり前記軸部よりも小さい断面積を有する螺子部と、を有し、
前記接合部材は、
前記杭頭部の外周面に固定された下側突起部と、
前記杭頭部の外周面に固定された上側突起部であって、前記杭頭部の軸線方向にて前記下側突起部の上方に配置された上側突起部と、を有し、
前記補強筋の螺子部は前記下側突起部に結合され、
前記補強筋の軸部は、前記杭頭部の軸線方向にて前記下側突起部と前記上側突起部との間を延びるとともに、前記杭頭部の端面から上方に突出して延在している、
杭頭接合部の設計方法において、
前記杭頭部、前記接合部材、前記補強筋及び前記基礎コンクリート部の仕様を選択する仕様選択工程と、
前記仕様選択工程にて選択された仕様に基づいて、前記杭頭接合部の許容曲げモーメントを算定する許容曲げモーメント算定工程と、
前記許容曲げモーメントに基づいて、前記仕様選択工程にて選択された仕様の適否を判定する仕様適否判定工程と、を備え、
前記許容曲げモーメント算定工程において、
前記杭頭部の端面から上方に突出する前記補強筋の軸部の部分を囲む基礎コンクリート部の部分と、前記下側突起部と前記上側突起部との間を延びる前記補強筋の軸部の部分を囲む前記基礎コンクリート部の部分との間に、ひび割れが生じると仮定し、
前記補強筋の前記軸部の引っ張り降伏強さを考慮する一方、前記接合部材から前記基礎コンクリート部に作用する抵抗を無視して前記許容曲げモーメントを算定する
ことを特徴とする杭頭接合部の設計方法。
A pile head,
A plurality of joining members fixed to the outer peripheral surface of the pile head;
A plurality of reinforcing bars respectively attached to the pile head via the joining member;
A foundation concrete portion constituted by concrete surrounding the pile head, the plurality of joining members, and the plurality of reinforcing bars,
The reinforcing bar is
A shaft portion having irregularities on the surface;
A screw portion connected to one end side of the shaft portion and having a smaller cross-sectional area than the shaft portion, and
The joining member is
A lower protrusion fixed to the outer peripheral surface of the pile head;
An upper protrusion fixed to the outer peripheral surface of the pile head, and an upper protrusion disposed above the lower protrusion in the axial direction of the pile head;
A screw portion of the reinforcing bar is coupled to the lower protrusion,
The shaft portion of the reinforcing bar extends between the lower protrusion portion and the upper protrusion portion in the axial direction of the pile head portion, and protrudes upward from the end surface of the pile head portion. ,
In the design method of the pile head joint,
A specification selection step of selecting specifications of the pile head, the joining member, the reinforcing bar, and the foundation concrete part;
Based on the specification selected in the specification selection step, an allowable bending moment calculation step for calculating an allowable bending moment of the pile head joint,
A specification suitability determination step for determining suitability of the specification selected in the specification selection step based on the allowable bending moment, and
In the allowable bending moment calculation step,
A portion of a foundation concrete portion surrounding a portion of a shaft portion of the reinforcing bar protruding upward from an end surface of the pile head, and a shaft portion of the reinforcing bar extending between the lower protrusion portion and the upper protrusion portion. Assuming that cracks occur between the part of the foundation concrete part surrounding the part,
While taking into account the tensile yield strength of the shaft portion of the reinforcing bar, the allowable bending moment is calculated by ignoring the resistance acting on the foundation concrete portion from the joint member. Design method.
杭頭部と、
前記杭頭部の外周面に固定された複数の接合部材と、
前記杭頭部に対し前記接合部材を介してそれぞれ取り付けられた複数の補強筋と、
前記杭頭部、前記複数の接合部材、及び、前記複数の補強筋を囲む、コンクリートによって構成された基礎コンクリート部と、を備え、
前記補強筋は、
表面に凹凸を有する軸部と、
前記軸部の一端側に連なり前記軸部よりも小さい断面積を有する螺子部と、を有し、
前記接合部材は、
前記杭頭部の外周面に固定された下側突起部と、
前記杭頭部の外周面に固定された上側突起部であって、前記杭頭部の軸線方向にて前記下側突起部の上方に配置された上側突起部と、を有し、
前記補強筋の螺子部は前記下側突起部に結合され、
前記補強筋は、前記杭頭部の軸線方向にて前記下側突起部と前記上側突起部との間を延びるとともに、前記杭頭部の端面から上方に突出して延在している、
杭頭接合部の設計方法において、
前記杭頭部、前記接合部材、前記補強筋及び前記基礎コンクリート部の仕様を選択する仕様選択工程と、
前記仕様選択工程にて選択された仕様に基づいて、前記杭頭接合部の許容曲げモーメントを算定する許容曲げモーメント算定工程と、
前記許容曲げモーメントに基づいて、前記仕様選択工程にて選択された仕様の適否を判定する仕様適否判定工程と、を備え、
前記許容曲げモーメント算定工程において、
前記杭頭部の端面から上方に突出する前記補強筋の軸部の部分を囲む基礎コンクリート部の部分と、前記下側突起部と前記上側突起部との間を延びる前記補強筋の軸部の部分を囲む前記基礎コンクリート部の部分との間に、ひび割れが生じないと仮定し、
前記補強筋の前記螺子部の引っ張り降伏強さを考慮するとともに、前記接合部材から前記基礎コンクリート部に作用する抵抗を考慮して前記許容曲げモーメントを算定する
ことを特徴とする杭頭接合部の設計方法。
A pile head,
A plurality of joining members fixed to the outer peripheral surface of the pile head;
A plurality of reinforcing bars respectively attached to the pile head via the joining member;
A foundation concrete portion constituted by concrete surrounding the pile head, the plurality of joining members, and the plurality of reinforcing bars,
The reinforcing bar is
A shaft portion having irregularities on the surface;
A screw portion connected to one end side of the shaft portion and having a smaller cross-sectional area than the shaft portion, and
The joining member is
A lower protrusion fixed to the outer peripheral surface of the pile head;
An upper protrusion fixed to the outer peripheral surface of the pile head, and an upper protrusion disposed above the lower protrusion in the axial direction of the pile head;
A screw portion of the reinforcing bar is coupled to the lower protrusion,
The reinforcing bar extends between the lower protrusion and the upper protrusion in the axial direction of the pile head, and extends upward from an end surface of the pile head.
In the design method of the pile head joint,
A specification selection step of selecting specifications of the pile head, the joining member, the reinforcing bar, and the foundation concrete part;
Based on the specification selected in the specification selection step, an allowable bending moment calculation step for calculating an allowable bending moment of the pile head joint,
A specification suitability determination step for determining suitability of the specification selected in the specification selection step based on the allowable bending moment, and
In the allowable bending moment calculation step,
A portion of a foundation concrete portion surrounding a portion of a shaft portion of the reinforcing bar protruding upward from an end surface of the pile head, and a shaft portion of the reinforcing bar extending between the lower protrusion portion and the upper protrusion portion. Assuming that no cracks occur between the foundation concrete part surrounding the part,
Considering the tensile yield strength of the screw part of the reinforcing bar and calculating the allowable bending moment in consideration of the resistance acting on the foundation concrete part from the joint member, Design method.
杭頭部と、
前記杭頭部の外周面に固定された複数の接合部材と、
前記杭頭部に対し前記接合部材を介してそれぞれ取り付けられた複数の補強筋と、
前記杭頭部、前記複数の接合部材、及び、前記複数の補強筋を囲む、コンクリートによって構成された基礎コンクリート部と、を備え、
前記補強筋は、
表面に凹凸を有する軸部と、
前記軸部の下端側に連なり前記軸部よりも小さい断面積を有する螺子部と、を有し、
前記接合部材は、
前記杭頭部の外周面に固定された下側突起部と、
前記杭頭部の外周面に固定された上側突起部であって、前記杭頭部の軸線方向にて前記下側突起部の上方に配置された上側突起部と、を有し、
前記補強筋の螺子部は前記下側突起部に結合され、
前記補強筋は、前記杭頭部の軸線方向にて前記下側突起部と前記上側突起部との間を延びるとともに、前記杭頭部の端面から上方に突出して延在している、
杭頭接合部の設計方法において、
前記杭頭部、前記接合部材、前記補強筋及び前記基礎コンクリート部の仕様を選択する仕様選択工程と、
前記仕様選択工程にて選択された仕様に基づいて、前記杭頭接合部の許容曲げモーメントを算定する許容曲げモーメント算定工程と、
前記許容曲げモーメントに基づいて、前記仕様選択工程にて選択された仕様の適否を判定する仕様適否判定工程と、を備え、
前記許容曲げモーメント算定工程は、
前記補強筋の前記螺子部の引っ張り降伏強さを考慮するとともに、前記接合部材から前記基礎コンクリート部に作用する抵抗を考慮して前記許容曲げモーメントとしての第1許容曲げモーメントを算定する第1許容曲げモーメント算定工程と、
前記補強筋の前記軸部の引っ張り降伏強さを考慮する一方、前記接合部材から前記基礎コンクリート部に作用する抵抗を無視して前記許容曲げモーメントとしての第2許容曲げモーメントを算定する第2許容曲げモーメント算定工程と、
前記第1許容曲げモーメントと前記第2許容曲げモーメントを比較し、前記第1許容曲げモーメントと前記第2許容曲げモーメントのうち小さい方を前記許容曲げモーメントとして選択する許容曲げモーメント選択工程と、を含む
ことを特徴とする杭頭接合部の設計方法。
A pile head,
A plurality of joining members fixed to the outer peripheral surface of the pile head;
A plurality of reinforcing bars respectively attached to the pile head via the joining member;
A foundation concrete portion constituted by concrete surrounding the pile head, the plurality of joining members, and the plurality of reinforcing bars,
The reinforcing bar is
A shaft portion having irregularities on the surface;
A screw portion connected to the lower end side of the shaft portion and having a smaller cross-sectional area than the shaft portion, and
The joining member is
A lower protrusion fixed to the outer peripheral surface of the pile head;
An upper protrusion fixed to the outer peripheral surface of the pile head, and an upper protrusion disposed above the lower protrusion in the axial direction of the pile head;
A screw portion of the reinforcing bar is coupled to the lower protrusion,
The reinforcing bar extends between the lower protrusion and the upper protrusion in the axial direction of the pile head, and extends upward from an end surface of the pile head.
In the design method of the pile head joint,
A specification selection step of selecting specifications of the pile head, the joining member, the reinforcing bar, and the foundation concrete part;
Based on the specification selected in the specification selection step, an allowable bending moment calculation step for calculating an allowable bending moment of the pile head joint,
A specification suitability determination step for determining suitability of the specification selected in the specification selection step based on the allowable bending moment, and
The allowable bending moment calculation step includes:
Considering the tensile yield strength of the screw portion of the reinforcing bar and calculating the first allowable bending moment as the allowable bending moment in consideration of the resistance acting on the foundation concrete portion from the joint member Bending moment calculation process;
While considering the tensile yield strength of the shaft portion of the reinforcing bar, the second permissible bending moment is calculated as the permissible bending moment ignoring the resistance acting on the foundation concrete portion from the joining member Bending moment calculation process;
An allowable bending moment selection step of comparing the first allowable bending moment and the second allowable bending moment and selecting a smaller one of the first allowable bending moment and the second allowable bending moment as the allowable bending moment; A method for designing a pile head joint, comprising:
前記許容曲げモーメント選択工程において、前記上側突起部の降伏強さが前記軸部の引っ張り降伏強さと前記螺子部の引っ張り降伏強さとの差よりも小さい場合、前記第1許容曲げモーメントが前記許容曲げモーメントとして選択される
ことを特徴とする請求項3に記載の杭頭接合部の設計方法。
In the allowable bending moment selection step, when the yield strength of the upper protrusion is smaller than the difference between the tensile yield strength of the shaft portion and the tensile yield strength of the screw portion, the first allowable bending moment is the allowable bending moment. The pile head joint design method according to claim 3, wherein the pile head joint is selected as a moment.
前記仕様適否判定工程は、
前記許容曲げモーメント及び前記許容曲げモーメントに対応する前記杭頭部の回転角に基づいて、前記杭頭接合部の弾性回転剛性を演算する弾性回転剛性演算工程と、
前記杭頭部に軸方向圧縮力が作用していないという条件下において、前記杭頭接合部の弾性回転剛性を考慮して、前記杭頭部に対し想定水平力が作用したときに前記杭頭部に発生する発生曲げモーメントを演算する発生曲げモーメント演算工程と、
前記発生曲げモーメント演算工程にて演算された発生曲げモーメントが、前記許容曲げモーメントよりも小さいか否かを判定する曲げモーメント比較判定工程と、を含み、
前記杭頭部、前記接合部材、前記補強筋及び前記基礎コンクリート部の仕様が適当であると判定する条件の1つは、前記曲げモーメント比較判定工程において、前記発生曲げモーメントが、前記許容曲げモーメントよりも小さいと判定されることである、
ことを特徴とする請求項1乃至4の何れか1項に記載の杭頭接合部の設計方法。
The specification suitability determination step includes
Based on the rotation angle of the pile head corresponding to the allowable bending moment and the allowable bending moment, an elastic rotation stiffness calculation step of calculating the elastic rotation stiffness of the pile head joint,
The pile head when an assumed horizontal force is applied to the pile head in consideration of the elastic rotational rigidity of the pile head joint, under the condition that no axial compression force is applied to the pile head. The generated bending moment calculation process for calculating the generated bending moment generated in the part,
A bending moment comparison and determination step for determining whether or not the generated bending moment calculated in the generated bending moment calculation step is smaller than the allowable bending moment,
One of the conditions for determining that the specifications of the pile head, the joining member, the reinforcing bar, and the foundation concrete part are appropriate is that the generated bending moment is the allowable bending moment in the bending moment comparison determining step. Is determined to be smaller than the
The design method of the pile head junction part of any one of Claims 1 thru | or 4 characterized by the above-mentioned.
前記仕様適否判定工程は、
前記第1許容曲げモーメント及び前記第2許容曲げモーメントのうち大きい方と前記許容曲げモーメントに対応する前記杭頭部の回転角に基づいて、前記杭頭接合部の弾性回転剛性を演算する弾性回転剛性演算工程と、
前記杭頭部に軸方向圧縮力が作用していないという条件下において、前記杭頭接合部の弾性回転剛性を考慮して、前記杭頭部に対し想定水平力が作用したときに前記杭頭部に発生する発生曲げモーメントを演算する発生曲げモーメント演算工程と、
前記発生曲げモーメント演算工程にて演算された杭頭部の発生曲げモーメントが、前記許容曲げモーメントよりも小さいか否かを判定する曲げモーメント比較判定工程と、を含み、
前記杭頭部、前記接合部材、前記補強筋及び前記基礎コンクリート部の仕様が適当であると判定する条件の1つは、前記曲げモーメント比較判定工程において、前記発生曲げモーメントが、前記許容曲げモーメントよりも小さいと判定されることである、
ことを特徴とする請求項3又は4に記載の杭頭接合部の設計方法。
The specification suitability determination step includes
Elastic rotation for calculating the elastic rotational rigidity of the pile head joint based on the larger of the first allowable bending moment and the second allowable bending moment and the rotation angle of the pile head corresponding to the allowable bending moment Stiffness calculation process;
The pile head when an assumed horizontal force is applied to the pile head in consideration of the elastic rotational rigidity of the pile head joint, under the condition that no axial compression force is applied to the pile head. The generated bending moment calculation process for calculating the generated bending moment generated in the part,
A bending moment comparison determination step of determining whether or not the generated bending moment of the pile head calculated in the generated bending moment calculation step is smaller than the allowable bending moment,
One of the conditions for determining that the specifications of the pile head, the joining member, the reinforcing bar, and the foundation concrete part are appropriate is that the generated bending moment is the allowable bending moment in the bending moment comparison determining step. Is determined to be smaller than the
The pile head joint design method according to claim 3 or 4, characterized in that
前記弾性回転剛性演算工程は、前記補強筋の軸部に対する前記基礎コンクリート部の付着を考慮して前記補強筋のうち引っ張り側に位置する補強筋の伸び量を算定する工程を含む、
ことを特徴とする請求項5又は6に記載の杭頭接合部の設計方法。
The elastic rotational rigidity calculation step includes a step of calculating an extension amount of a reinforcing bar located on a tension side among the reinforcing bars in consideration of adhesion of the foundation concrete portion to a shaft portion of the reinforcing bar,
The pile head joint design method according to claim 5 or 6, characterized in that
前記杭頭接合部の弾性回転剛性を無視して演算される、前記杭頭部に対し前記想定水平力が作用したときに前記杭頭部に発生する剛接合発生曲げモーメントが、前記許容曲げモーメントよりも大きいか否かを判定する剛接合発生曲げモーメント比較判定工程を更に含み、
前記杭頭部、前記接合部材、前記補強筋及び前記基礎コンクリート部の仕様が適当であると判定する条件の1つは、前記剛接合発生曲げモーメント比較判定工程において、前記剛接合発生曲げモーメントが、前記許容曲げモーメントよりも大きいと判定されることである、
ことを特徴とする請求項5乃至7の何れか1項に記載の杭頭接合部の設計方法。
The bending bending moment generated at the pile head when the assumed horizontal force is applied to the pile head, calculated by ignoring the elastic rotational rigidity of the pile head joint, is the allowable bending moment. Further comprising a rigid joint occurrence bending moment comparison and determination step of determining whether or not greater than
One of the conditions for determining that the specifications of the pile head, the joint member, the reinforcing bar, and the foundation concrete part are appropriate is that the rigid joint generated bending moment is determined in the rigid joint generated bending moment comparison determination step. , Is determined to be greater than the allowable bending moment.
The method for designing a pile head joint according to any one of claims 5 to 7.
前記許容曲げモーメント算定工程において、
前記杭頭部の端部から上方に突出する前記補強筋と前記補強筋を囲む基礎コンクリート部の抵抗曲げモーメントは、前記杭頭部の端面を含む仮想RC断面が負担する曲げモーメントと仮定し、
前記杭頭部の直径をDpとし、
前記仮想RC断面の直径をDとし、
前記杭頭部の軸線方向にて下側突起部から上側突起部の上端までの間で、基礎コンクリート部が補強筋の軸部に付着している長さをLeとしたときに、次式:
Dp+Le≦D≦Dp+2Le
で表される関係を満たすように前記仮想RC断面の直径Dを設定し、算定する
ことを特徴とする請求項1乃至8の何れか1項に記載の杭頭接合部の設計方法。
In the allowable bending moment calculation step,
It is assumed that the resistance bending moment of the reinforcing concrete projecting upward from the end of the pile head and the foundation concrete portion surrounding the reinforcement is the bending moment borne by the virtual RC section including the end face of the pile head,
The diameter of the pile head is Dp,
The diameter of the virtual RC cross section is D,
When the length of the foundation concrete portion attached to the shaft portion of the reinforcing bar between the lower protrusion portion and the upper end of the upper protrusion portion in the axial direction of the pile head is defined as Le:
Dp + Le ≦ D ≦ Dp + 2Le
The method for designing a pile head joint according to any one of claims 1 to 8, wherein the diameter D of the virtual RC cross section is set and calculated so as to satisfy the relationship represented by:
前記許容曲げモーメントが前記発生曲げモーメントに近付くように、前記仕様選択工程と、前記許容曲げモーメント算定工程と、前記仕様適否判定工程とを繰り返すことを特徴とする請求項1乃至9の何れか1項に記載の杭頭接合部の設計方法。   10. The method according to claim 1, wherein the specification selection step, the allowable bending moment calculation step, and the specification suitability determination step are repeated so that the allowable bending moment approaches the generated bending moment. The design method of the pile head joint part as described in a term. 請求項1乃至10の何れか1項に記載の杭頭接合部の設計方法によって適当であると判定された前記杭頭部、前記接合部材、前記補強筋及び前記基礎コンクリート部の仕様に基づいて、前記杭頭接合部を構築する杭頭接合部構築工程を備えることを特徴とする杭頭接合部の製造方法。   Based on the specifications of the pile head, the joint member, the reinforcing bar, and the foundation concrete part determined to be appropriate by the method for designing a pile head joint according to any one of claims 1 to 10. A method for manufacturing a pile head joint comprising a pile head joint construction step for constructing the pile head joint.
JP2016164732A 2016-08-25 2016-08-25 Design method and manufacturing method of pile head joint Active JP6345741B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2016164732A JP6345741B2 (en) 2016-08-25 2016-08-25 Design method and manufacturing method of pile head joint

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2016164732A JP6345741B2 (en) 2016-08-25 2016-08-25 Design method and manufacturing method of pile head joint

Related Child Applications (1)

Application Number Title Priority Date Filing Date
JP2018098991A Division JP6505291B2 (en) 2018-05-23 2018-05-23 Design method of pile head joint and calculation method of allowable bending moment

Publications (2)

Publication Number Publication Date
JP2018031204A JP2018031204A (en) 2018-03-01
JP6345741B2 true JP6345741B2 (en) 2018-06-20

Family

ID=61302852

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2016164732A Active JP6345741B2 (en) 2016-08-25 2016-08-25 Design method and manufacturing method of pile head joint

Country Status (1)

Country Link
JP (1) JP6345741B2 (en)

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FI20022235A (en) * 2002-12-19 2002-12-19 Rautaruukki Oyj Foundation of a transversely loaded tower
JP6381070B2 (en) * 2013-07-09 2018-08-29 センクシア株式会社 Pile head joint structure

Also Published As

Publication number Publication date
JP2018031204A (en) 2018-03-01

Similar Documents

Publication Publication Date Title
Ding et al. Prefabricated connection for steel beam and concrete-filled steel tube column
KR102571298B1 (en) Method of introducing prestress to beam-column joint in triaxial compression
JP6004558B1 (en) Seismic reinforcement structure for structures
TWI759947B (en) Method of introducing prestress to beam-column joint of pc structure in triaxial compression
JP6505291B2 (en) Design method of pile head joint and calculation method of allowable bending moment
Alzeni Cyclic inelastic behavior of concrete filled sandwich panel walls subjected to in-plane flexure
JP6345741B2 (en) Design method and manufacturing method of pile head joint
JP6440659B2 (en) Design method and manufacturing method of pile head joint
TW201739994A (en) Column-beam joint structure and steel reinforced concrete column
JP6585146B2 (en) Pile head joint design method and construction method
Uang et al. Seismic design of steel structures
JP5847147B2 (en) Seismic design system for concrete structures, seismic design method, seismic design program, and construction method
Yang et al. Behaviour of Building Structures Subjected to Progressive Collapse
JP7432479B2 (en) reinforced concrete wall structure
Diab Behaviour of Helical Pile connectors for New Foundations
JP2020094478A (en) Earthquake proof repair method of existing structure
Honeck et al. Practical design and detailing of steel column base plates
Gomez Behavior and design of column base connections
JP2004100304A (en) Pile-head joint structure
Ajith et al. Hysteresis performance of through bolted connections in steel beam to circular CFST column
JP2011021433A (en) Cone-type failure portion-reinforcing structure, building with the same, and method for computing increment of failure strength
JP2021107619A (en) Building structure and method for forming building structure
JP7393619B2 (en) Column-beam joint structure and design method for column-beam joints
Fenwick et al. Design of floors containing precast units in multi-storey buildings
JP7210354B2 (en) Reinforced concrete beam structure

Legal Events

Date Code Title Description
TRDD Decision of grant or rejection written
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20180411

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20180424

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20180523

R150 Certificate of patent or registration of utility model

Ref document number: 6345741

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313115

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350