JP6215422B1 - Articulated block suspension - Google Patents

Articulated block suspension Download PDF

Info

Publication number
JP6215422B1
JP6215422B1 JP2016176059A JP2016176059A JP6215422B1 JP 6215422 B1 JP6215422 B1 JP 6215422B1 JP 2016176059 A JP2016176059 A JP 2016176059A JP 2016176059 A JP2016176059 A JP 2016176059A JP 6215422 B1 JP6215422 B1 JP 6215422B1
Authority
JP
Japan
Prior art keywords
block
suspension
articulated
wire
wires
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2016176059A
Other languages
Japanese (ja)
Other versions
JP2018039630A (en
Inventor
正尚 渡邉
正尚 渡邉
Original Assignee
株式会社セキヤ
シダチョー建設株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社セキヤ, シダチョー建設株式会社 filed Critical 株式会社セキヤ
Priority to JP2016176059A priority Critical patent/JP6215422B1/en
Application granted granted Critical
Publication of JP6215422B1 publication Critical patent/JP6215422B1/en
Publication of JP2018039630A publication Critical patent/JP2018039630A/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

【課題】玉掛けワイヤー11を付設した長尺体1から複数の適宜長さのブロック吊りワイヤー12を垂設して、連節ブロックに装着する差込杆及び回動ストッパーを備えた吊り具本体2を前記ブロック吊りワイヤー12に連結して、クレー機械でブロックを集積箇所の設置個所に運搬してブロック設置を行う連節ブロック用吊り具において、クレーン機械に旋回運搬によるブロックの揺れが生じても、正確な設置作業を実現できる吊り具を提供する。【解決手段】長尺体1と吊り具本体2の間にブロック吊りワイヤー12が所定間隔で貫通する間隔保持体3を介装すると共に、間隔保持体3を吊り具本体2の頂部又は頂部近傍で衝突係止され且つ長尺体1の近傍位置での長尺体1に吊り下げ連結可能に設けてなる【選択図】図2A lifting device main body having an insertion rod and a rotation stopper for mounting a plurality of block suspension wires of an appropriate length from a long body provided with a slinging wire to attach to a joint block. Is connected to the block suspension wire 12, and the block is suspended by the crane transporting in the crane machine in the articulated block suspension tool in which the block is installed by transporting the block to the installation location of the accumulation place by the clay machine. To provide a lifting device that can achieve accurate installation work. An interval holding body 3 in which a block hanging wire 12 penetrates at a predetermined interval is interposed between a long body 1 and a hanging body 2 and the interval holding body 3 is attached to the top of the hanging body 2 or in the vicinity of the top. And is provided so as to be able to be suspended and connected to the long body 1 in the vicinity of the long body 1 [Selection] FIG.

Description

本発明は、河川の護岸工事、法面被覆工事等に採用される連節ブロック張工に使用する吊り具に関するものである。   The present invention relates to a hanging tool used for articulated block extension work employed in river revetment work, slope covering work, and the like.

連節ブロックは、千鳥配置して鉄筋(結束線)で連結して固定配置されるものであるが、連節ブロックは相応の重量(単体で数十kg)があるので、クレーン機械で吊り上げて所定の設置個所に運搬設置する。   The articulated block is arranged in a staggered manner and connected and fixed by reinforcing bars (tie wires). The articulated block has a corresponding weight (several tens of kg), so it can be lifted by a crane machine. Transport and install at the specified installation location.

前記の吊り上げ運搬に際して、適宜な吊り具を使用するものであり、当該吊り具は吊り具本体と吊り具本体をクレーン機械で吊下げ可能とする鎖体等の吊下げ用部材で構成されており、吊り具本体は連節ブロックの連結用透孔に差し入れる差込杆と差込杆が差し込まれたブロックを抑える回動ストッパーを備える。   In the lifting and transporting, an appropriate lifting tool is used, and the lifting tool is composed of a lifting member body and a suspension member such as a chain that can be suspended by a crane machine. The hanger body is provided with an insertion rod inserted into the connecting hole of the articulated block and a rotation stopper for suppressing the block into which the insertion rod is inserted.

特に作業の効率化のために複数のブロックを一括して吊り上げ配置する吊り具も提案されている。例えば特許文献1(特開平9−202586号公報)の図10には、玉掛けワイヤーを付設した長尺体(H鋼)に、6本の鎖体で吊り具本体を吊下げた器具が開示されている。   In particular, in order to improve work efficiency, a hanging tool that suspends and arranges a plurality of blocks has been proposed. For example, FIG. 10 of Patent Document 1 (Japanese Patent Laid-Open No. 9-202586) discloses an instrument in which a suspension body is suspended by six chains on a long body (H steel) provided with a sling wire. ing.

また特許文献2(特開2008−222411号公報)には、単体の吊り具本体を採用せずに、長尺体に複数の差込縦杆及び回動ストッパーを設けた器具が示されている。   Further, Patent Document 2 (Japanese Patent Application Laid-Open No. 2008-222411) discloses an instrument in which a long body is provided with a plurality of insertion vertical hooks and a rotation stopper without adopting a single hanger body. .

特開平9−202586号公報。JP-A-9-202586. 特開2008−222411号公報。Japanese Patent Application Laid-Open No. 2008-222411.

特許文献1に示されているような複数の吊り具本体を並べて吊下げる構造を採用した場合は、器具自体の構造が簡易であり且つ運搬元となるブロック集積箇所で連節ブロックが正確に整列していなくとも連節ブロックへの吊り具本体の装着が容易であるが、設置作業に際して吊下げられている各連節ブロックがバラバラに揺れると、正確な位置決めが煩瑣である。   When adopting a structure that suspends a plurality of suspension tool bodies as shown in Patent Document 1, the structure of the device itself is simple and the articulated blocks are accurately aligned at the block accumulation location that is the transportation source. Even if it is not, it is easy to mount the hanger body to the articulated block. However, if each articulated block suspended during the installation work shakes apart, accurate positioning is troublesome.

また一方特許文献2に示されている複数の差込杆を備えた器具では、器具の製造が煩瑣であると共に、集積箇所において予め設置配列と一致した整列を行っておく必要があり、作業全体の効率を考慮すると必ずしも便利な器具とは言えない。   On the other hand, in the instrument provided with a plurality of plugs shown in Patent Document 2, the manufacture of the instrument is cumbersome, and it is necessary to perform an alignment that coincides with the installation arrangement in advance at the collection location, and the entire work Considering the efficiency of this, it is not necessarily a useful instrument.

そこで本発明は、集積箇所での連節ブロックの装着作業並びに工事箇所での設置作業を正確に且つ容易に行うことができる吊り具を提案したものである。   In view of this, the present invention proposes a hanging tool capable of accurately and easily performing the mounting work of the articulated block at the accumulation location and the installation work at the construction location.

本発明の請求項1記載に係る連節ブロック用吊り具は、玉掛けワイヤーを付設した長尺体から複数の適宜長さのブロック吊りワイヤーを垂設して、連節ブロックに装着する差込杆及び回動ストッパーを備えた吊り具本体を前記ブロック吊りワイヤーに連結してなる連節ブロック用吊り具において、長尺体と吊り具本体の間に前記各ブロック吊りワイヤーが所定間隔で貫通する間隔保持体を介装すると共に、前記間隔保持体が吊り具本体頂部又は頂部近傍で衝突係止され且つ長尺体近傍位置での長尺体に吊り下げ連結可能に設けてられてなることを特徴とするものである。   The articulated block lifting device according to claim 1 of the present invention is a plug that is attached to a articulated block by suspending a plurality of appropriately suspending wires from a long body provided with a sling wire. In addition, in the articulated block hanger formed by connecting a hanger body provided with a rotation stopper to the block hanger wire, each block hanger wire penetrates at a predetermined interval between the elongated body and the hanger body. In addition to interposing a holding body, the interval holding body is provided to be collision-locked at the top of the hanger body or in the vicinity of the top and to be connected to the long body at a position near the long body. It is what.

而して前記の吊り具は、玉掛けワイヤーにクレーンフックを引掛けて連節ブロックを集積箇所から設置個所にクレーン機械による吊り上げ運搬を行なうものであり、間隔保持体は前記の運搬設置作業に際して、長尺体の近傍位置での吊り上げ連結状態と、前記連結状態を解除した衝突係止状態を切り替えて使用するものである。   Thus, the above-mentioned lifting tool is used to hang a crane hook on a sling wire and lift and convey the articulated block from the accumulation location to the installation location by a crane machine. It is used by switching between a lifting connection state in the vicinity of the long body and a collision locking state in which the connection state is released.

連節ブロックの運搬開始前に、間隔保持体は吊り上げ連結状態として、吊り具本体をブロック集積箇所に移動させ、ブロック吊りワイヤーが緩む高さまでおろし、吊り具本体を連接ブロックに装着する。次に間隔保持体を地上まで下して長尺体との連結を解除し、当該状態で連節ブロックの吊り上げ運搬を行う。前記運搬作業に際して間隔保持体は連結状態が解除されているので、連節ブロック吊り上げ作業に伴って吊り具本体の位置又はその近傍まで下がり、衝突して係止される。   Prior to the start of transportation of the articulated block, the spacing body is in a lifted and connected state, the hanger body is moved to the block stacking position, lowered to a height where the block hanger wire is loosened, and the hanger body is attached to the connecting block. Next, the distance holding body is lowered to the ground to release the connection with the long body, and the articulated block is lifted and transported in this state. Since the connection state of the interval holding body is released during the transporting operation, the interval holding member is lowered to the position of the lifting tool main body or the vicinity thereof with the lifting operation of the articulated block, and is collided and locked.

従って連節ブロックの吊り上げ運搬においては、吊り具本体(=連節ブロック)が間隔保持体によって一定の間隔を保持され、そのままの状態で設置個所においてクレーンで下すと、各連節ブロックは所定位置に設置されることになる。そして連節ブロックの設置を終了すると一旦ブロック吊りワイヤーを緩めて、下がった長尺体に間隔保持体を吊り上げ連結状態として吊り上げ、未だブロック吊りワイヤーが緩んでいるときに設置したブロックから吊り具本体を取り外し、ブロック集積箇所に吊り上げ移動して次のブロックの運搬設置作業に移る。   Therefore, when lifting and transporting articulated blocks, the articulated body (= articulated block) is held at a fixed distance by the distance holder, and if it is lowered with a crane at the installation location, Will be installed. When the articulated block has been installed, once the block suspension wire is loosened, the distance holder is lifted and connected to the lowered long body, and the suspension body is removed from the block that was installed when the block suspension wire was still loose. Is removed, lifted to the block accumulation point and moved to the next block transportation and installation work.

また本発明の請求項2記載の連節ブロック用吊り具は、特にブロック吊りワイヤーを等価間隔の6本とするもので、ブロック3個を同時に運搬設置作業することができ、また両端を除いて4本を使用してブロック2個の同時作業を行うことができる。   In addition, the articulated block suspension tool according to claim 2 of the present invention is particularly designed with six block suspension wires with an equivalent interval, and can carry and install three blocks at the same time, except for both ends. Four blocks can be used to work on two blocks simultaneously.

また本発明の請求項3記載の連節ブロック用吊り具は、間隔保持体の中央位置にブロック吊りワイヤーの間隔を調整する長さ調整機構を設けてなるもので、ブロック運搬設置作業においてブロック間距離を調整することでブロックの曲線配置に対応できる。   In addition, the articulated block suspension tool according to claim 3 of the present invention is provided with a length adjusting mechanism for adjusting the distance between the block suspension wires at the center position of the distance holding body. By adjusting the distance, it is possible to correspond to the curve arrangement of the block.

また本発明の請求項4記載の連節ブロック用吊り具は、間隔保持体の衝突係止構造を、吊り具本体のワイヤー連結箇所が嵌合係止する係止孔を設けて構成したもので、間隔保持体の吊下げ連結を解除した状態でブロック吊り上げ作業を行うと、係止孔に吊り金具本体の頂部が嵌入して自然に係止状態となる。   In addition, the articulated block lifting device according to claim 4 of the present invention is configured by providing a collision locking structure of the spacing member with a locking hole for fitting and locking the wire connecting portion of the lifting device main body. When the block lifting operation is performed in a state in which the suspension connection of the distance holding body is released, the top portion of the hanging metal fitting body is fitted into the locking hole and is naturally locked.

本発明の構成は上記のとおりで、長尺体に複数の連節ブロックを吊下げるワイヤーを設けた吊り具において、途中にワイヤーの間隔保持体を介装するという簡易な構造で、クレーン運搬状態のまま正確な整列設置が可能となり、作業能率を高めるものである。   The configuration of the present invention is as described above, and in a lifting device provided with a wire for suspending a plurality of articulated blocks on a long body, a simple structure in which a wire spacing holder is interposed in the middle, and a crane carrying state As a result, it is possible to accurately align and improve the work efficiency.

本発明の実施形態の正面図。The front view of the embodiment of the present invention. 同図(ブロック吊り上げ状態)。The figure (block lifted state). 同要部斜視図。FIG. 同作業状態説明図(ブロック装着前)。Explanatory drawing of the work state (before block mounting). 同図(ブロック装着状態)で(イ)は側面図(ロ)は斜視図。In the figure (block mounted state), (a) is a side view (b) is a perspective view. 同間隔保持体の係止状態の説明図。Explanatory drawing of the latching state of the space | interval holding body. 同正面図(ブロック吊り上げ状態の別例)。The front view (another example of a block lifting state).

次に本発明の実施形態につて説明する。実施形態に示した連節ブロック用吊り具は、例えばA型と称される平面視十文字形状の連節ブロック(以下「ブロック」という)Aを対象とし、3個吊り又は2個吊りに本発明を適用する例を示したもので、基本的に長尺体1と吊り具本体2と間隔保持体3で構成され、前記部材を吊り下げワイヤー等で連結してなるものである。   Next, embodiments of the present invention will be described. The articulated block suspension shown in the embodiment is directed to a articulated block A in plan view (hereinafter referred to as a “block”) A called A-type, and the present invention is adapted to suspend three or two. Is basically composed of a long body 1, a hanger body 2, and a spacing body 3, and the members are connected by a hanging wire or the like.

長尺体1は、適宜な規格のH鋼(規格表示150×75×5×7mm)で形成された適宜な長さ(3個吊り用として5m)のもので、上面に玉掛けワイヤー11を連結してクレーン機械Bでの吊り上げ運搬を可能としたものである。   The long body 1 is of an appropriate length (5 m for hanging three) made of an appropriate standard H steel (standard indication 150 × 75 × 5 × 7 mm), and a sling wire 11 is connected to the upper surface. Thus, the crane machine B can be lifted and transported.

長尺体1の下面には、6本のブロック吊りワイヤー(以下「ブロックワイヤー」という)12と、間隔保持体3を吊下げる保持体フック13を垂設している。ブロックワイヤー12は、3個のブロックAの設置間隔に対応するブロックAの連結用透孔の位置と一致する間隔で設けたもので、長さを2m程度とし、下端に吊り具本体2を連結したものである。また保持体フック13は、長尺体1の左右対象箇所に2カ所以上設けたもので、約30〜40cm垂下する長さで、先端が後述する間隔保持体3の鉤受部32に着脱可能な構造に設けたものである。   On the lower surface of the long body 1, six block suspension wires (hereinafter referred to as “block wires”) 12 and a retainer hook 13 that suspends the spacing member 3 are suspended. The block wires 12 are provided at intervals corresponding to the positions of the connecting through holes of the block A corresponding to the installation intervals of the three blocks A. The length of the block wire 12 is about 2 m, and the hanger body 2 is connected to the lower end. It is a thing. Also, the holding body hooks 13 are provided at two or more places on the left and right target portions of the long body 1 and have a length depending on about 30 to 40 cm, and the tip can be attached to and detached from the collar receiving portion 32 of the interval holding body 3 described later. It is provided in a simple structure.

吊り具本体2は、縦板板状の吊支部21の下端からブロックAの連結用透孔に挿入可能な構造の差込杆22を前方に突設し、差込杆22の上方に前記差込杆22の上方に鉤状ストッパー部23を回動自在に枢結して突設したものである。また特に吊支部21の上端には山形状通し孔24を形成してブロックワイヤー12の下端を連結してなる。   The lifting device body 2 has an insertion rod 22 having a structure that can be inserted into the connecting through hole of the block A from the lower end of the vertical plate-like suspension support portion 21 and projects above the insertion rod 22. A hook-like stopper portion 23 is pivotally connected to the upper side of the insert rod 22 so as to be rotatable. In particular, a mountain-shaped through hole 24 is formed at the upper end of the suspension support portion 21 to connect the lower end of the block wire 12.

間隔保持体3は、長尺体1の長さと対応した長さの角形鋼管長方形(規格表示4.5×150×80)で形成したもので、ブロックワイヤー12の間隔を保持するために、ブロックワイヤー12が貫通する通過孔31を設けて長尺体1と吊り具本体2の上下間に介装する。特に前記通過孔31の下側通過孔31aは、吊り具本体2の上端部分(ブロックワイヤー12を連結した山形状通し孔24の部分)が嵌合する大きさ及び形状に形成する。   The interval holding body 3 is formed of a rectangular steel pipe rectangle having a length corresponding to the length of the long body 1 (standard indication 4.5 × 150 × 80). In order to hold the interval between the block wires 12, A passage hole 31 through which the wire 12 passes is provided and interposed between the upper and lower parts of the elongated body 1 and the hanger body 2. In particular, the lower passage hole 31a of the passage hole 31 is formed in such a size and shape that the upper end portion of the hanger body 2 (the portion of the mountain-shaped through hole 24 connecting the block wires 12) is fitted.

また上面には、保持体フック13を掛け止めする鉤受部32を設け、中央位置に長さ調整機構部33を設ける。この長さ調整機構部33は、例えば間欠的に複数の連結孔331を備えた角柱体332を間隔保持体3に抜き差し自在に挿着すると共に、間隔保持体3にボルト孔333を設け、角柱体332と間隔保持体3を貫通するボルト334にナット335を螺合して構成したものである。   On the upper surface, a hook receiving portion 32 for holding the holder hook 13 is provided, and a length adjusting mechanism portion 33 is provided at the center position. For example, the length adjusting mechanism unit 33 intermittently inserts a prismatic body 332 having a plurality of connecting holes 331 into the spacing holder 3 so as to be freely detachable, and also provides bolt holes 333 in the spacing holder 3. A nut 335 is screwed into a bolt 334 penetrating the body 332 and the interval holding body 3.

次に前記の吊り具を使用してブロックAを集積箇所から設置個所に運搬して設置する作業について説明する。   Next, the operation of transporting and installing the block A from the accumulation location to the installation location using the above-described lifting tool will be described.

吊り具は、玉掛けワイヤー11をクレーン機械Bのクレーンフックに連結して、長尺体1を常時吊り下げた状態で各作業を行うもので、ブロックAの運搬設置作業開始前に、長尺体1を下げて間隔保持体3の鉤受部32に保持体フック13を掛け止めしておく。そして吊り具全体を吊り上げた状態でブロック集積箇所に移動させる(図4:運搬作業開始状態・設置作業終了状態)。   The lifting tool is a device that connects the sling wire 11 to the crane hook of the crane machine B and performs each work in a state where the long body 1 is constantly suspended. 1 is lowered and the holder hook 13 is hooked on the hook receiving portion 32 of the interval holder 3. Then, the entire suspension is lifted and moved to the block stacking location (FIG. 4: transport work start state / installation work end state).

そこで吊り具本体2のブロックAへの装着作業を行えるように、ブロックワイヤー12が十分緩む高さまで下げて、吊り具本体2をブロックAに装着する。   Therefore, the suspension wire body 2 is attached to the block A by lowering the block wire 12 to a height at which the block wire 12 is sufficiently loosened so that the attachment work of the suspension body 2 to the block A can be performed.

次に間隔保持体3を地上まで下して鉤受部32から保持体フック13を外してブロックAの吊り上げ運搬を行う。この作業時には間隔保持体3は自由落下状態であるので、吊り具持ち上げに伴って間隔保持体3は吊り具本体2に近接して最終的に衝突することになる。   Next, the distance holding body 3 is lowered to the ground, the holding body hook 13 is removed from the hook receiving portion 32, and the block A is lifted and transported. At this time, the interval holding body 3 is in a free-fall state, so that the interval holding body 3 collides with the lifting device main body 2 and finally collides with lifting of the lifting device.

間隔保持体3が吊り具本体2に衝突すると、間隔保持体3の自重で下側通過孔(係止孔)31aに吊り具本体2の頂部が嵌合して、保持間隔体3は吊り具本体2に係止されることになる(図5,6)。   When the interval holder 3 collides with the hanger body 2, the top of the hanger body 2 is fitted to the lower passage hole (locking hole) 31a by the weight of the interval holder 3, and the holding interval body 3 becomes the hanger. The main body 2 is locked (FIGS. 5 and 6).

前記の間隔保持体3と吊り具本体2が係止状態でブロック設置個所まで吊り上げ運搬され、そのまま設置個所にブロックを下ろして設置する。即ち吊り具本体2(=連節ブロックA)が間隔保持体3によって一定の間隔を保持されているので、ブロックAが横ずれを生ずることなく一定の間隔を保って運搬され設置される。   The distance holding body 3 and the lifting tool body 2 are lifted and transported to the block installation location in the locked state, and the block is lowered and installed at the installation location. That is, since the hanger body 2 (= joint block A) is held at a constant interval by the interval holder 3, the block A is transported and installed at a constant interval without causing lateral displacement.

ブロックAの設置作業を終了すると、長尺体1を保持体フック13の掛け止め可能な高さまで下げ、保持体フック13を鉤受部32に掛け止めして引き上げ、間隔保持体3が邪魔にならない状態まで吊り上げた後、設置されたブロックAから吊り具本体2を取り外し、そして吊り具全体を吊り上げてブロック集積箇所まだ旋回移動して次回の運搬作業に入る。   When the installation work of the block A is finished, the long body 1 is lowered to a height at which the holder hook 13 can be hooked, the holder hook 13 is hooked on the hook receiving portion 32 and pulled up, and the interval holder 3 becomes an obstacle. After lifting up to a state where it does not become necessary, the lifting tool main body 2 is removed from the installed block A, and the entire lifting tool is lifted, and the block stacking portion is still swiveled to start the next transport operation.

このように本吊り具は、複数のブロックAの旋回運搬作業において、間隔保持体3で吊り具本体2の位置が一定に保持されるので、ブロックの揺れによる間隔変更が生じないので、そのまま設置作業を行うことができるものである。   As described above, since the position of the hanger body 2 is held constant by the interval holding body 3 in the swivel transportation work of the plurality of blocks A, the hanger is installed as it is because the interval does not change due to the shaking of the block. It can do work.

また上記説明は1回で3個のブロックAの運搬設置作業の例で説明したが、上記実施形態では、2個のブロックAの運搬も可能であり、その際にはブロックワイヤー12(吊り具本体2)の両端部分を除いた4本で2個のブロックの吊り上げを行うことで実施できる(図7)。   Moreover, although the said description demonstrated in the example of the conveyance installation operation | work of the three blocks A at once, in the said embodiment, the conveyance of two blocks A is also possible, and in that case, the block wire 12 (suspender) It can be carried out by lifting two blocks with four pieces excluding both ends of the main body 2) (FIG. 7).

特にブロックAの設置が曲面配置の場合には、平面配置の場合とは異なるブロック間隔となるので、その際には長さ調整機構部33による調整(角柱体332の挿入長の変更)で対応することができる。   In particular, when the block A is arranged in a curved surface, the block spacing differs from that in the case of the planar arrangement. In this case, adjustment by the length adjustment mechanism unit 33 (change of the insertion length of the prismatic body 332) is supported. can do.

例えば間隔保持体3と吊り具本体2の係止も、係止孔(下側通過孔31a)の嵌合係止に限らず、単なる衝突係止で可能であり、或いは吊り具本体2の頂部近傍のブロックワイヤー12に適宜なストッパー用の突出部分を設けて衝突係止する構成であっても良い。   For example, the locking of the gap holder 3 and the hanger body 2 is not limited to the engagement locking of the locking hole (lower passage hole 31a), and can be performed by simple collision locking, or the top of the hanger body 2 A configuration may be adopted in which an appropriate stopper protruding portion is provided on the nearby block wire 12 to perform collision locking.

更に吊り具本体2の構成は全く任意であり、ブロックAが着脱装着可能な構造であれば良いし、その構造も使用対象の連節ブロックの規格・形状に対応すれば良いものであり、1回の運搬設置作業のブロック数に対応する吊り具とすることも任意であり、当該作業ブロック数に応じて各部材の数や寸法構成を定めても良いものである。   Further, the configuration of the lifting device body 2 is completely arbitrary, and any structure may be used as long as the block A can be attached and detached. The structure may correspond to the standard / shape of the articulated block to be used. It is also optional to use a lifting tool corresponding to the number of blocks for a single transport installation work, and the number of members and the size configuration may be determined according to the number of work blocks.

1 長尺体
11 玉掛けワイヤー
12 ブロック(吊り)ワイヤー
13 保持体フック
2 吊り具本体
21 吊支部
22 差込杆
23 鉤状スットパー部
24 山形状通し孔
3 間隔保持体
31 通過孔
31a 下側通過孔(係止孔)
32 鉤受部
33 長さ調整機構部
331 連結孔
332 角柱体
333 ボルト孔
334 ボルト
335 ナット
DESCRIPTION OF SYMBOLS 1 Long body 11 Sling wire 12 Block (hanging) wire 13 Holding body hook 2 Suspension tool main body 21 Suspension support part 22 Insertion hook 23 Saddle-like stopper part 24 Mountain-shaped through-hole 3 Space | interval holding body 31 Passing hole 31a Lower passing hole (Locking hole)
32 鉤 receiving portion 33 length adjusting mechanism portion 331 connecting hole 332 prismatic body 333 bolt hole 334 bolt 335 nut

Claims (4)

玉掛けワイヤーを付設した長尺体から複数の適宜長さのブロック吊りワイヤーを垂設して、連節ブロックに装着する差込杆及び回動ストッパーを備えた吊り具本体を前記ブロック吊りワイヤーに連結してなる連節ブロック用吊り具において、長尺体と吊り具本体の間に前記各ブロック吊りワイヤーが所定間隔で貫通する間隔保持体を介装すると共に、前記間隔保持体が吊り具本体頂部又は頂部近傍で衝突係止され且つ長尺体近傍位置での長尺体に吊り下げ連結可能に設けられてなることを特徴とする連節ブロック用吊り具。   A plurality of block suspension wires with appropriate lengths are suspended from a long body provided with sling wires, and the main body of the suspension equipped with an insertion rod and a rotation stopper attached to the articulated block is connected to the block suspension wire. In the articulated block hanger, an interval holding body through which each of the block hanging wires penetrates at a predetermined interval is interposed between the long body and the hanger body, and the interval holding body is a top portion of the hanger body. Alternatively, the articulated block suspension device is provided so as to be able to be suspended and connected to a long body in the vicinity of the long body by being collided and locked near the top. ブロック吊りワイヤーが等間隔の6本である請求項1記載の連節ブロック用吊り具。   The suspension tool for articulated blocks according to claim 1, wherein the number of the block suspension wires is six at regular intervals. 間隔保持体の中央位置にブロック吊りワイヤーの間隔を調整する長さ調整機構を設けてなる請求項1又は2記載の連節ブロック用吊り具。   The articulated block suspension tool according to claim 1 or 2, wherein a length adjusting mechanism for adjusting the distance between the block suspension wires is provided at a central position of the distance holder. 間隔保持体の衝突係止構造を、吊り具本体のワイヤー連結箇所が嵌合係止する係止孔を設けて構成した請求項1乃至3記載の何れかの連節ブロック用吊り具。   4. The articulated block suspension device according to any one of claims 1 to 3, wherein the collision retaining structure of the spacing member is provided with an engagement hole in which a wire connection portion of the suspension device is fitted and locked.
JP2016176059A 2016-09-09 2016-09-09 Articulated block suspension Active JP6215422B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2016176059A JP6215422B1 (en) 2016-09-09 2016-09-09 Articulated block suspension

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2016176059A JP6215422B1 (en) 2016-09-09 2016-09-09 Articulated block suspension

Publications (2)

Publication Number Publication Date
JP6215422B1 true JP6215422B1 (en) 2017-10-18
JP2018039630A JP2018039630A (en) 2018-03-15

Family

ID=60107333

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2016176059A Active JP6215422B1 (en) 2016-09-09 2016-09-09 Articulated block suspension

Country Status (1)

Country Link
JP (1) JP6215422B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110482397A (en) * 2019-08-29 2019-11-22 重庆光明消防设备厂 Timber hoisting fixture
CN112758814A (en) * 2020-12-29 2021-05-07 中国航空工业集团公司西安飞机设计研究所 Container hoisting switching device

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6549348B2 (en) * 2012-11-06 2019-07-24 三星電子株式会社Samsung Electronics Co.,Ltd. Polarized film, antireflective film and display device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62275991A (en) * 1986-05-23 1987-11-30 日本板硝子株式会社 Push-force regulator for sling
JPH0158589U (en) * 1987-10-06 1989-04-12
JPH01162479U (en) * 1988-04-27 1989-11-13
JPH0813448A (en) * 1994-06-28 1996-01-16 Ken Ichimura Hanging tool for block
JPH08198579A (en) * 1994-11-21 1996-08-06 Iwata:Kk Hanger for block work execution and work execution method using this hanger

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62275991A (en) * 1986-05-23 1987-11-30 日本板硝子株式会社 Push-force regulator for sling
JPH0158589U (en) * 1987-10-06 1989-04-12
JPH01162479U (en) * 1988-04-27 1989-11-13
JPH0813448A (en) * 1994-06-28 1996-01-16 Ken Ichimura Hanging tool for block
JPH08198579A (en) * 1994-11-21 1996-08-06 Iwata:Kk Hanger for block work execution and work execution method using this hanger

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110482397A (en) * 2019-08-29 2019-11-22 重庆光明消防设备厂 Timber hoisting fixture
CN112758814A (en) * 2020-12-29 2021-05-07 中国航空工业集团公司西安飞机设计研究所 Container hoisting switching device

Also Published As

Publication number Publication date
JP2018039630A (en) 2018-03-15

Similar Documents

Publication Publication Date Title
JP6215422B1 (en) Articulated block suspension
JP6207789B1 (en) Floor construction method, floor slab unit lifting device, and floor slab unit lifting device
JP3213486U (en) Board lifting structure
JPH08133661A (en) Concrete block lifting means
JP2006096476A (en) Hoisting accessory
WO2007067527A3 (en) Hanging system
JP2015086032A (en) Palette hoisting auxiliary tool
JP6649623B2 (en) Hose holding device for construction machinery
JP7338552B2 (en) Single tube pipe hanging tool for safety belt attachment, safety belt attachment
CN209815482U (en) Overhead hoist of aerated block
KR100665627B1 (en) Protecting falling for lifesaving rope
JP4695475B2 (en) Work jig for steel tower dismantling
KR20130024455A (en) Jig for welder transport
KR100797415B1 (en) Hook for carrying and installing utility pole under-bracing
JP2007308289A (en) Block lifting method and device
KR20130020382A (en) Hoist jig of bollard
JP6105240B2 (en) Scaffolding for transmission lines
JP3232447U (en) Antenna mounting base rod
JP4669672B2 (en) Hanging jig
JPH01150691A (en) Method of laying slope-face block
JP2512649Y2 (en) U-shaped groove suspender
JPS60188292A (en) Lifting hook for concrete board
CN212050147U (en) Porous type balance hanger template
CN202967857U (en) Lifting appliance for lifting irregular equipment
JP3105356U (en) Inclined suspension

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20170821

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20170912

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20170920

R150 Certificate of patent or registration of utility model

Ref document number: 6215422

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250