JP6179474B2 - Elevator parts replacement cycle calculation device - Google Patents

Elevator parts replacement cycle calculation device Download PDF

Info

Publication number
JP6179474B2
JP6179474B2 JP2014152715A JP2014152715A JP6179474B2 JP 6179474 B2 JP6179474 B2 JP 6179474B2 JP 2014152715 A JP2014152715 A JP 2014152715A JP 2014152715 A JP2014152715 A JP 2014152715A JP 6179474 B2 JP6179474 B2 JP 6179474B2
Authority
JP
Japan
Prior art keywords
replacement
period
contract
elevator
maintenance contract
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2014152715A
Other languages
Japanese (ja)
Other versions
JP2016031578A (en
Inventor
洋昭 木村
洋昭 木村
真弘 掛野
真弘 掛野
恒次 阪田
恒次 阪田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Mitsubishi Electric Building Techno-Service Co Ltd
Original Assignee
Mitsubishi Electric Corp
Mitsubishi Electric Building Techno-Service Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp, Mitsubishi Electric Building Techno-Service Co Ltd filed Critical Mitsubishi Electric Corp
Priority to JP2014152715A priority Critical patent/JP6179474B2/en
Publication of JP2016031578A publication Critical patent/JP2016031578A/en
Application granted granted Critical
Publication of JP6179474B2 publication Critical patent/JP6179474B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Maintenance And Inspection Apparatuses For Elevators (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

この発明は、昇降機の部品の取替周期算出装置に関する。   The present invention relates to a part replacement period calculation apparatus for an elevator.

例えば、特許文献1には、部品の取替周期算出装置が記載されている。基本的な取替周期算出装置は、部品を利用した装置の稼働開始時点から当該部品の取替周期算時点までの取替履歴が判明していることを前提として当該部品の取替周期を算出する。   For example, Patent Literature 1 describes a component replacement period calculation device. The basic replacement cycle calculation device calculates the replacement cycle of a part on the assumption that the replacement history from the start of operation of the device using the part to the replacement cycle calculation time of the part is known. To do.

特開2009−266029号公報JP 2009-266029 A

しかしながら、エレベータ等の昇降機においては、保守会社が管理者の意向によって変更されることもある。この場合、変更後の保守会社は、昇降機の稼働開始時点から一定期間における当該部品の取替履歴を把握していない。このため、基本的な取替周期算出装置が利用された場合、部品の取替周期が誤って算出され得る。   However, in an elevator such as an elevator, a maintenance company may be changed according to the intention of an administrator. In this case, the maintenance company after the change does not grasp the replacement history of the part in a certain period from the start of the elevator operation. For this reason, when a basic replacement period calculation device is used, the replacement period of parts can be calculated erroneously.

この発明は、上述の課題を解決するためになされた。この発明の目的は、昇降機の稼働開始時点から当該部品の取替周期算時点までの当該部品の取替履歴の一部を把握していなくても当該部品の取替周期を適切に算出することができる昇降機の部品の取替周期算出装置を提供することである。   The present invention has been made to solve the above-described problems. The object of the present invention is to appropriately calculate the replacement cycle of the part even if the part replacement history from the start of the elevator operation to the replacement cycle calculation time of the part is not grasped. It is providing the replacement period calculation apparatus of the components of the elevator which can do.

この発明に係る昇降機の部品の取替周期算出装置は、取替周期の算出対象となる部品が利用された昇降機の契約の推移を契約履歴から抽出する契約推移抽出部と、前記契約推移抽出部により契約の推移を抽出された昇降機について、保守契約期間中の当該部品の取替時期を取替履歴から抽出する取替履歴抽出部と、前記取替履歴抽出部により抽出された取替時期に基づいて、契約の推移のパターンに応じて当該部品の取替周期を算出する取替周期算出部と、を備えた。
An elevator parts replacement cycle calculating device according to the present invention includes a contract transition extracting unit that extracts, from a contract history, a contract transition of an elevator in which a part for which a replacement period is to be calculated, and the contract transition extracting unit For the elevator from which the transition of the contract is extracted by the replacement history extraction unit that extracts the replacement time of the part during the maintenance contract period from the replacement history, and the replacement time extracted by the replacement history extraction unit And a replacement cycle calculation unit that calculates a replacement cycle of the part in accordance with a contract transition pattern .

この発明によれば、部品の取替周期は、昇降機の未契約期間を除外して算出される。このため、昇降機の稼働開始時点から当該部品の取替周期算時点までの当該部品の取替履歴の一部を把握していなくても当該部品の取替周期を適切に算出することができる。   According to the present invention, the part replacement period is calculated excluding the non-contracted period of the elevator. For this reason, even if it does not grasp a part of the replacement history of the part from the operation start time of the elevator to the replacement period calculation time of the part, the replacement period of the part can be appropriately calculated.

この発明の実施の形態1における昇降機の部品の取替周期算出装置のブロック図である。It is a block diagram of the replacement period calculation apparatus of the components of the elevator in Embodiment 1 of this invention. この発明の実施の形態1における昇降機の部品の取替周期算出装置による契約の推移の分類を説明するための図である。It is a figure for demonstrating the classification | category of the transition of a contract by the replacement period calculation apparatus of the elevator parts in Embodiment 1 of this invention. この発明の実施の形態1における昇降機の部品の取替周期算出装置を利用しないで得られた部品の取替周期を説明するための図である。It is a figure for demonstrating the replacement period of the components obtained without utilizing the replacement period calculation apparatus of the components of the elevator in Embodiment 1 of this invention. この発明の実施の形態1における昇降機の部品の取替周期算出装置による部品の取替周期の計算方法を説明するための図である。It is a figure for demonstrating the calculation method of the replacement period of the components by the replacement period calculation apparatus of the components of the elevator in Embodiment 1 of this invention. この発明の実施の形態1における昇降機の部品の取替周期算出装置による部品の取替周期の計算方法を説明するための図である。It is a figure for demonstrating the calculation method of the replacement period of the components by the replacement period calculation apparatus of the components of the elevator in Embodiment 1 of this invention. この発明の実施の形態1における昇降機の部品の取替周期算出装置の動作を説明するためのフローチャートである。It is a flowchart for demonstrating operation | movement of the replacement period calculation apparatus of the components of the elevator in Embodiment 1 of this invention. この発明の実施の形態1における昇降機の部品の取替周期算出装置の動作を説明するためのフローチャートである。It is a flowchart for demonstrating operation | movement of the replacement period calculation apparatus of the components of the elevator in Embodiment 1 of this invention.

この発明を実施するための形態について添付の図面に従って説明する。なお、各図中、同一又は相当する部分には同一の符号が付される。当該部分の重複説明は適宜に簡略化ないし省略される。   A mode for carrying out the invention will be described with reference to the accompanying drawings. In addition, the same code | symbol is attached | subjected to the part which is the same or it corresponds in each figure. The overlapping explanation of the part is appropriately simplified or omitted.

実施の形態1.
図1はこの発明の実施の形態1における昇降機の部品の取替周期算出装置のブロック図である。
Embodiment 1 FIG.
FIG. 1 is a block diagram of a part replacement period calculation device for an elevator according to Embodiment 1 of the present invention.

図1において、第1記憶装置1は、複数の昇降機の各々における契約履歴を記憶する。例えば、第1記憶装置1は、複数のエレベータの各々における契約履歴を記憶する。例えば、第1記憶装置1は、複数の乗客コンベアの各々における契約履歴を記憶する。   In FIG. 1, the 1st memory | storage device 1 memorize | stores the contract log | history in each of several elevator. For example, the first storage device 1 stores a contract history in each of a plurality of elevators. For example, the 1st memory | storage device 1 memorize | stores the contract log | history in each of several passenger conveyors.

第2記憶装置2は、複数の昇降機の各々に利用されている部品の取替履歴を記憶する。例えば、第2記憶装置2は、複数のエレベータの各々に利用されている部品の取替履歴を記憶する。例えば、第2記憶装置2は、複数の乗客コンベアの各々に利用されている部品の取替履歴を記憶する。   The 2nd memory | storage device 2 memorize | stores the replacement | exchange history of the components utilized for each of several elevators. For example, the second storage device 2 stores a replacement history of parts used for each of the plurality of elevators. For example, the 2nd memory | storage device 2 memorize | stores the replacement | exchange log | history of the components currently utilized for each of several passenger conveyors.

例えば、表示装置3は、液晶モニタからなる。表示装置3は、外部からの指令に応じた映像を映すように設けられる。   For example, the display device 3 includes a liquid crystal monitor. The display device 3 is provided so as to project an image according to a command from the outside.

取替周期算出装置4は、契約推移抽出部4aと取替履歴抽出部4bと取替周期算出部4cと表示制御部4dとを備える。   The replacement cycle calculation device 4 includes a contract transition extraction unit 4a, a replacement history extraction unit 4b, a replacement cycle calculation unit 4c, and a display control unit 4d.

契約推移抽出部4aは、第1記憶装置1に接続される。契約推移抽出部4aは、取替周期の算出対象となる部品が利用された昇降機の各々の契約の推移を第1記憶装置1の契約履歴から抽出する。例えば、契約推移抽出部4aは、昇降機の機種Xの部品Yが指定された際に機種Xの各々の契約の推移を抽出する。   The contract transition extraction unit 4 a is connected to the first storage device 1. The contract transition extraction unit 4a extracts the transition of each contract of the elevator in which the part for which the replacement period is calculated is extracted from the contract history of the first storage device 1. For example, the contract transition extraction unit 4a extracts the transition of each contract of the model X when the part Y of the model X of the elevator is designated.

取替履歴抽出部4bは、第2記憶装置2に接続される。取替履歴抽出部4bは、契約推移抽出部4aにより契約の推移を抽出された昇降機の各々について、保守契約期間中の当該部品の取替時期を第2記憶装置2の取替履歴から抽出する。   The replacement history extraction unit 4 b is connected to the second storage device 2. The replacement history extraction unit 4b extracts, from each replacement history in the second storage device 2, the replacement timing of the relevant part during the maintenance contract period for each of the elevators whose contract transitions have been extracted by the contract transition extraction unit 4a. .

取替周期算出部4cは、昇降機の各々に関して取替履歴抽出部4bにより抽出された当該部品の取替時期の分布に基づいて当該部品の取替周期を算出する。この際、取替周期算出部4cは、契約推移抽出部4aにより契約の推移を抽出された昇降機の各々について未契約期間を除外して当該部品の取替周期を算出する。取替周期算出部4cは、昇降機の各々における当該部品の取替周期に統計的手法を用いることにより当該部品の総合的な取替周期を算出する。   The replacement cycle calculation unit 4c calculates the replacement cycle of the part based on the distribution of replacement times of the part extracted by the replacement history extraction unit 4b for each of the elevators. At this time, the replacement cycle calculation unit 4c calculates the replacement cycle of the part excluding the non-contracted period for each of the elevators whose contract transitions are extracted by the contract transition extraction unit 4a. The replacement period calculation unit 4c calculates a total replacement period of the part by using a statistical method for the replacement period of the part in each of the elevators.

表示制御部4dは、表示装置3に接続される。表示制御部4dは、取替周期算出部4cによる算出結果を表示装置3に表示させる。例えば、表示制御部4dは、昇降機の各々における当該部品の取替周期を当該昇降機の記号に対応付けて表示装置3に表示させる。例えば、表示制御部4dは、当該部品の総合的な取替周期を当該部品の記号に対応付けて表示装置3に表示させる。   The display control unit 4 d is connected to the display device 3. The display control unit 4d causes the display device 3 to display the calculation result by the replacement period calculation unit 4c. For example, the display control unit 4d causes the display device 3 to display the replacement period of the part in each elevator in association with the symbol of the elevator. For example, the display control unit 4d causes the display device 3 to display the total replacement period of the component in association with the symbol of the component.

次に、図2を用いて、契約推移抽出部4aによる契約の推移の分類を説明する。
図2はこの発明の実施の形態1における昇降機の部品の取替周期算出装置による契約の推移の分類を説明するための図である。
Next, the classification of contract transitions by the contract transition extraction unit 4a will be described with reference to FIG.
FIG. 2 is a diagram for explaining the classification of contract transitions by the elevator part replacement period calculation apparatus according to Embodiment 1 of the present invention.

契約推移抽出部4aは、現時点の保守会社aの視点に立った際の昇降機の保守契約の有無に基づいて昇降機の稼動開始時点から部品の取替周期算出時点までの契約の推移を分類する。例えば、契約推移抽出部4aは、昇降機の稼動開始時点から部品の取替周期算出時点までの契約の推移を第1推移から第8推移に分類する。   The contract transition extraction unit 4a classifies contract transitions from the start of elevator operation to the time for calculating the replacement period of parts based on the presence or absence of the elevator maintenance contract from the viewpoint of the current maintenance company a. For example, the contract transition extraction unit 4a classifies the transition of the contract from the start of the elevator operation to the part replacement cycle calculation time from the first transition to the eighth transition.

例えば、第1推移においては、昇降機の稼動開始時点である1987年から部品の取替周期算出時点である2013年までの間が保守契約期間である。   For example, in the first transition, the maintenance contract period is from 1987, which is the operation start time of the elevator, to 2013, which is the component replacement cycle calculation time point.

例えば、第2推移においては、昇降機の稼動開始時点である1987年から部品の取替周期算出時点である2013年までの間が未契約期間である。未契約期間は、保守会社aが保守契約していない期間である。例えば、保守会社bが保守契約している期間も、保守会社aに対しては未契約期間となる。   For example, in the second transition, the non-contracted period is from 1987, which is the operation start time of the elevator, to 2013, which is the component replacement cycle calculation time point. The non-contract period is a period in which the maintenance company a does not have a maintenance contract. For example, the period in which the maintenance company b has a maintenance contract is also a non-contracted period for the maintenance company a.

例えば、第3推移においては、昇降機の稼動開始時点である1987年から1998年までの間が未契約期間である。1998年から部品の取替周期算出時点である2013年までの間が保守契約期間Aである。   For example, in the third transition, the non-contracted period is from 1987 to 1998, which is the operation start time of the elevator. The maintenance contract period A is from 1998 to 2013, which is the time point for calculating the replacement period of parts.

例えば、第4推移においては、昇降機の稼動開始時点である1987年から1998年までの間が未契約期間である。1998年から2005年までの間が保守契約期間Bである。2005年から部品の取替周期算出時点である2013年までの間が未契約期間である。   For example, in the fourth transition, the period from 1987 to 1998, which is the starting point of the elevator operation, is the non-contract period. The period from 1998 to 2005 is the maintenance contract period B. The non-contract period is from 2005 to 2013, which is the time point for calculating the replacement period of parts.

例えば、第5推移においては、昇降機の稼動開始時点の一定期間は、未契約期間である。部品の取替周期算出時点の期間は、未契約期間である。これらの未契約期間の間においては、保守契約期間と未契約期間とが繰り返される。図2においては、昇降機の稼動開始時点である1987年から1996年までの間が未契約期間である。1996年から1998年までの間が保守契約期間Cである。1998年から2002年までの間が未契約期間である。2002年から2005年までの間が保守契約期間Dである。2005年から部品の取替周期算出時点である2013年までの間が未契約期間である。   For example, in the fifth transition, the certain period of time when the elevator starts operation is an uncontracted period. The period at the time of calculating the part replacement cycle is an uncontracted period. During these non-contract periods, the maintenance contract period and the non-contract period are repeated. In FIG. 2, the period from 1987 to 1996, which is the time when the elevator is started, is the non-contract period. The period from 1996 to 1998 is the maintenance contract period C. The period from 1998 to 2002 is the unsigned period. The maintenance contract period D is from 2002 to 2005. The non-contract period is from 2005 to 2013, which is the time point for calculating the replacement period of parts.

例えば、第6推移においては、昇降機の稼動開始時点である1987年から1998年までの間が保守契約期間Eである。1998年から部品の取替周期算出時点である2013年までの間が未契約期間である。   For example, in the sixth transition, the maintenance contract period E is from 1987 to 1998, which is the operation start time of the elevator. The non-contracted period is from 1998 to 2013, which is the time point for calculating the replacement period of parts.

例えば、第7推移においては、昇降機の稼動開始時点である1987年から1998年までの間が保守契約期間Fである。1998年から2005年までの間が未契約期間である。2005年から部品の取替周期算出時点である2013年までの間が保守契約期間Gである。   For example, in the seventh transition, the maintenance contract period F is from 1987 to 1998, which is the operation start time of the elevator. The period from 1998 to 2005 is the unsigned period. The maintenance contract period G is from 2005 to 2013, which is the time point for calculating the replacement period of parts.

例えば、第8推移においては、昇降機の稼動開始時点の一定期間は、保守契約期間である。部品の取替周期算出時点の期間は、保守契約期間である。これらの保守契約期間の間においては、未契約期間と保守契約期間とが繰り返される。図2においては、昇降機の稼動開始時点である1987年から1996年までの間が保守契約期間Hである。1996年から1998年までの間が未契約期間である。1998年から2002年までの間が保守契約期間Iである。2002年から2005年までの間が未契約期間である。2005年から部品の取替周期算出時点である2013年までの間が保守契約期間Jである。   For example, in the eighth transition, the certain period of time when the elevator starts operation is a maintenance contract period. The period when the part replacement cycle is calculated is a maintenance contract period. During these maintenance contract periods, the non-contract period and the maintenance contract period are repeated. In FIG. 2, the maintenance contract period H is from 1987 to 1996 when the elevator starts operation. The period from 1996 to 1998 is an unsigned period. The period from 1998 to 2002 is the maintenance contract period I. The period from 2002 to 2005 is the unsigned period. The maintenance contract period J is from 2005 to 2013, which is the time point for calculating the part replacement cycle.

次に、図3を用いて、未契約期間を除外しないで算出した部品の取替周期を説明する。
図3はこの発明の実施の形態1における昇降機の部品の取替周期算出装置を利用しないで得られた部品の取替周期を説明するための図である。
Next, the part replacement cycle calculated without excluding the non-contracted period will be described with reference to FIG.
FIG. 3 is a diagram for explaining a component replacement cycle obtained without using the elevator component replacement cycle calculation apparatus according to Embodiment 1 of the present invention.

図3は、図2の第7推移において部品の取替周期が誤って計算される例を示す。   FIG. 3 shows an example in which the part replacement period is erroneously calculated in the seventh transition of FIG.

例えば、第1誤りパターンでは、部品は、保守契約期間Fに取り替えられていない。部品は、未契約期間に保守会社bによって取り替えられている。部品は、保守契約期間Gに取り替えられていない。この場合、第2記憶装置2は、未契約期間の取替履歴を記憶していない。その結果、当該部品の取替周期は、1987年から2013年までの期間として誤って算出される。   For example, in the first error pattern, the part is not replaced in the maintenance contract period F. The parts have been replaced by the maintenance company b during the non-contract period. The part has not been replaced in the maintenance contract period G. In this case, the second storage device 2 does not store the replacement history of the non-contract period. As a result, the replacement period of the part is erroneously calculated as a period from 1987 to 2013.

例えば、第2誤りパターンでは、部品は、保守契約期間Fに取り替えられていない。部品は、未契約期間に保守会社bによって取り替えられている。部品は、保守契約期間Gの2006年に取り替えられている。この場合、第2記憶装置2は、未契約期間の取替履歴を記憶していない。その結果、当該部品の取替周期は、1987年から2006年までの期間として誤って算出される。   For example, in the second error pattern, the part is not replaced in the maintenance contract period F. The parts have been replaced by the maintenance company b during the non-contract period. Parts have been replaced in the maintenance contract period G, 2006. In this case, the second storage device 2 does not store the replacement history of the non-contract period. As a result, the replacement period of the part is erroneously calculated as a period from 1987 to 2006.

例えば、第3誤りパターンでは、部品は、保守契約期間Fの1992年に取り替えられている。部品は、未契約期間に保守会社bによって取り替えられている。部品は、保守契約期間Gの2006年に取り替えられている。この場合、第2記憶装置2は、未契約期間の取替履歴を記憶していない。その結果、当該部品の取替周期は、1992年から2006年までの期間として誤って算出される。   For example, in the third error pattern, the part is replaced in 1992 of the maintenance contract period F. The parts have been replaced by the maintenance company b during the non-contract period. Parts have been replaced in the maintenance contract period G, 2006. In this case, the second storage device 2 does not store the replacement history of the non-contract period. As a result, the replacement period of the part is erroneously calculated as a period from 1992 to 2006.

次に、図4を用いて、図2の第3推移から第5推移の場合における部品の取替周期の計算方法を説明する。
図4はこの発明の実施の形態1における昇降機の部品の取替周期算出装置による部品の取替周期の計算方法を説明するための図である。
Next, with reference to FIG. 4, a method for calculating a component replacement period in the case of the third transition to the fifth transition in FIG. 2 will be described.
FIG. 4 is a diagram for explaining a method for calculating a part replacement period by the elevator part replacement period calculation apparatus according to Embodiment 1 of the present invention.

例えば、第1パターンでは、第2記憶装置2は、部品が2006年のみに取り替えられたとの履歴を記憶する。この場合、取替周期算出部4cは、2006年から2013年までの期間を当該部品の取替周期として算出する。   For example, in the first pattern, the second storage device 2 stores a history that a part has been replaced only in 2006. In this case, the replacement cycle calculation unit 4c calculates a period from 2006 to 2013 as the replacement cycle of the part.

例えば、第2パターンでは、第2記憶装置2は、部品が2006年と2010年とに取り替えられたとの履歴を記憶する。この場合、取替周期算出部4cは、2006年から2010年までの期間を当該部品の取替周期として算出する。   For example, in the second pattern, the second storage device 2 stores a history that the parts have been replaced between 2006 and 2010. In this case, the replacement cycle calculation unit 4c calculates a period from 2006 to 2010 as the replacement cycle of the part.

例えば、第3パターンでは、第2記憶装置2は、部品が2006年と2007年と2010年とに取り替えられたとの履歴を記憶する。この場合、取替周期算出部4cは、2007年から2010年までの期間を当該部品の取替周期として算出する。   For example, in the third pattern, the second storage device 2 stores a history that the parts have been replaced in 2006, 2007, and 2010. In this case, the replacement cycle calculation unit 4c calculates a period from 2007 to 2010 as the replacement cycle of the part.

例えば、第4パターンでは、第2記憶装置2は、部品が取り替えられたとの履歴を記憶していない。この場合、取替周期算出部4cは、当該部品の取替周期を抽出しない。   For example, in the fourth pattern, the second storage device 2 does not store a history that a part has been replaced. In this case, the replacement cycle calculation unit 4c does not extract the replacement cycle of the part.

次に、図5を用いて、図2の第6推移から第8推移の場合における部品の取替周期の計算方法を説明する。
図5はこの発明の実施の形態1における昇降機の部品の取替周期算出装置による部品の取替周期の計算方法を説明するための図である。
Next, with reference to FIG. 5, a method for calculating a component replacement period in the case of the sixth transition to the eighth transition in FIG. 2 will be described.
FIG. 5 is a diagram for explaining a method for calculating a part replacement period by the part replacement period calculation apparatus for an elevator according to Embodiment 1 of the present invention.

例えば、第5パターンでは、第2記憶装置2は、部品が2006年のみに取り替えられたとの履歴を記憶する。この場合、取替周期算出部4cは、2006年から2013年までの期間を当該部品の取替周期として算出する。   For example, in the fifth pattern, the second storage device 2 stores a history that a part has been replaced only in 2006. In this case, the replacement cycle calculation unit 4c calculates a period from 2006 to 2013 as the replacement cycle of the part.

例えば、第6パターンでは、第2記憶装置2は、部品が2006年と2008年とに取り替えられたとの履歴を記憶する。この場合、取替周期算出部4cは、2006年から2008年までの期間を当該部品の取替周期として算出する。   For example, in the sixth pattern, the second storage device 2 stores a history that the parts have been replaced between 2006 and 2008. In this case, the replacement cycle calculation unit 4c calculates the period from 2006 to 2008 as the replacement cycle of the part.

例えば、第7パターンでは、第2記憶装置2は、部品が2006年と2008年と2010年とに取り替えられたとの履歴を記憶する。この場合、取替周期算出部4cは、2008年から2010年までの期間を当該部品の取替周期として算出する。   For example, in the seventh pattern, the second storage device 2 stores a history that the parts have been replaced in 2006, 2008, and 2010. In this case, the replacement cycle calculation unit 4c calculates a period from 2008 to 2010 as the replacement cycle of the part.

例えば、第8パターンでは、第2記憶装置2は、部品が取り替えられたとの履歴を記憶していない。この場合、取替周期算出部4cは、1987年から1998年までの保守契約期間Fを当該部品の取替周期として算出する。   For example, in the eighth pattern, the second storage device 2 does not store a history that a part has been replaced. In this case, the replacement cycle calculation unit 4c calculates the maintenance contract period F from 1987 to 1998 as the replacement cycle of the part.

例えば、第9パターンでは、第2記憶装置2は、部品が保守契約期間Fの1992年のみに取り替えられたとの履歴を記憶する。この場合、取替周期算出部4cは、1987年から1992年までの期間を当該部品の取替周期として算出する。   For example, in the ninth pattern, the second storage device 2 stores a history that the part has been replaced only in the maintenance contract period F 1992. In this case, the replacement cycle calculation unit 4c calculates a period from 1987 to 1992 as the replacement cycle of the part.

次に、図6を用いて、図2の契約の第3推移から第5推移の場合における取替周期算出装置4の動作を説明する。
図6はこの発明の実施の形態1における昇降機の部品の取替周期算出装置の動作を説明するためのフローチャートである。
Next, the operation of the replacement period calculation device 4 in the case of the third transition to the fifth transition of the contract in FIG. 2 will be described using FIG.
FIG. 6 is a flowchart for explaining the operation of the part replacement period calculating device for the elevator according to Embodiment 1 of the present invention.

ステップS1では、取替履歴抽出部4bは、部品の取替周期算出時点に最も近い保守契約期間から走査を開始する。ステップS2に進み、取替履歴抽出部4bは、当該部品に関して3件以上の取替時期を抽出したか否かを判定する。   In step S1, the replacement history extraction unit 4b starts scanning from the maintenance contract period closest to the part replacement cycle calculation time point. In step S2, the replacement history extraction unit 4b determines whether or not three or more replacement times have been extracted for the part.

ステップS2で3件以上の取替時期が抽出された場合は、ステップS3に進む。ステップS3では、取替周期算出部4cは、当該部品の取替周期を第3パターンで算出する。その後、動作が終了する。   If three or more replacement times are extracted in step S2, the process proceeds to step S3. In step S3, the replacement cycle calculation unit 4c calculates the replacement cycle of the part in the third pattern. Thereafter, the operation ends.

ステップS2で3件以上の取替時期が抽出されない場合は、ステップS4に進む。ステップS4では、取替履歴抽出部4bは、全保守契約期間の走査が完了したか否かを判定する。   If three or more replacement times are not extracted in step S2, the process proceeds to step S4. In step S4, the replacement history extraction unit 4b determines whether or not scanning of all maintenance contract periods has been completed.

ステップS4で全保守契約期間の走査が完了していない場合は、ステップS5に進む。ステップS5では、取替履歴抽出部4bは、残りの保守契約期間において部品の取替周期算出時点に最も近い保守契約期間を次の保守契約期間として走査する。その後、ステップS2以降の動作が繰り返される。   If scanning of the entire maintenance contract period is not completed in step S4, the process proceeds to step S5. In step S5, the replacement history extraction unit 4b scans the maintenance contract period closest to the part replacement period calculation time as the next maintenance contract period in the remaining maintenance contract period. Thereafter, the operations after step S2 are repeated.

ステップS4で全保守契約期間の走査が完了した場合は、ステップS6に進む。ステップS6では、取替履歴抽出部4bは、部品の取替周期算出時点に最も近い保守契約期間から走査を開始する。ステップS7では、取替履歴抽出部4bは、当該部品に関して2件の取替時期を抽出したか否かを判定する。   If scanning of the entire maintenance contract period is completed in step S4, the process proceeds to step S6. In step S6, the replacement history extraction unit 4b starts scanning from the maintenance contract period closest to the part replacement cycle calculation time point. In step S7, the replacement history extraction unit 4b determines whether two replacement times have been extracted for the part.

ステップS7で2件の取替時期が抽出された場合は、ステップS8に進む。ステップS8では、取替周期算出部4cは、当該部品の取替周期を第2パターンで算出する。その後、動作が終了する。   If two replacement times are extracted in step S7, the process proceeds to step S8. In step S8, the replacement cycle calculation unit 4c calculates the replacement cycle of the part in the second pattern. Thereafter, the operation ends.

ステップS7で2件の取替時期が抽出されない場合は、ステップS9に進む。ステップS9では、取替履歴抽出部4bは、全保守契約期間の走査が完了したか否かを判定する。   If two replacement times are not extracted in step S7, the process proceeds to step S9. In step S9, the replacement history extraction unit 4b determines whether or not scanning of all maintenance contract periods has been completed.

ステップS9で全保守契約期間の走査が完了していない場合は、ステップS10に進む。ステップS10では、取替履歴抽出部4bは、残りの保守契約期間において部品の取替周期の算出時点に最も近い保守契約期間を次の保守契約期間として走査する。その後、ステップS7以降の動作が繰り返される。   If scanning of the entire maintenance contract period is not completed in step S9, the process proceeds to step S10. In step S10, the replacement history extraction unit 4b scans the maintenance contract period closest to the calculation time of the part replacement period in the remaining maintenance contract period as the next maintenance contract period. Thereafter, the operations after step S7 are repeated.

ステップS9で全保守契約期間の走査が完了した場合は、ステップS11に進む。ステップS11では、取替履歴抽出部4bは、部品の取替周期算出時点に最も近い保守契約期間から走査を開始する。ステップS12では、取替履歴抽出部4bは、当該部品に関して1件の取替時期を抽出したか否かを判定する。   If scanning of all maintenance contract periods is completed in step S9, the process proceeds to step S11. In step S11, the replacement history extraction unit 4b starts scanning from the maintenance contract period closest to the part replacement cycle calculation time point. In step S12, the replacement history extraction unit 4b determines whether one replacement time has been extracted for the part.

ステップS12で1件の取替時期が抽出された場合は、ステップS13に進む。ステップS13では、取替周期算出部4cは、当該部品の取替周期を第1パターンで算出する。その後、動作が終了する。   If one replacement time is extracted in step S12, the process proceeds to step S13. In step S13, the replacement cycle calculation unit 4c calculates the replacement cycle of the part in the first pattern. Thereafter, the operation ends.

ステップS12で1件の取替時期が抽出されない場合は、ステップS14に進む。ステップS14では、取替履歴抽出部4bは、全保守契約期間の走査が完了したか否かを判定する。   If one replacement time is not extracted in step S12, the process proceeds to step S14. In step S <b> 14, the replacement history extraction unit 4 b determines whether scanning for all maintenance contract periods has been completed.

ステップS14で全保守契約期間の走査が完了していない場合は、ステップS15に進む。ステップS15では、取替履歴抽出部4bは、残りの保守契約期間において部品の取替周期の算出時点に最も近い保守契約期間を次の保守契約期間として走査する。その後、ステップS12以降の動作が繰り返される。   If scanning of the entire maintenance contract period is not completed in step S14, the process proceeds to step S15. In step S15, the replacement history extraction unit 4b scans the maintenance contract period closest to the calculation time of the part replacement period in the remaining maintenance contract period as the next maintenance contract period. Thereafter, the operations after step S12 are repeated.

ステップS14で全保守契約期間の走査が完了した場合は、ステップS16に進む。ステップS16では、取替周期算出部4cは、当該部品の取替履歴が第4パターンであるとして当該部品の取替周期を算出しない。その後、動作が終了する。   If scanning of the entire maintenance contract period is completed in step S14, the process proceeds to step S16. In step S16, the replacement cycle calculation unit 4c does not calculate the replacement cycle of the part on the assumption that the replacement history of the part is the fourth pattern. Thereafter, the operation ends.

次に、図7を用いて、図2の契約の第6推移から第8推移の場合における取替周期算出装置4の動作を説明する。
図7はこの発明の実施の形態1における昇降機の部品の取替周期算出装置の動作を説明するためのフローチャートである。
Next, the operation of the replacement period calculation device 4 in the case of the sixth transition to the eighth transition of the contract in FIG. 2 will be described using FIG.
FIG. 7 is a flowchart for explaining the operation of the part replacement period calculating device for the elevator according to Embodiment 1 of the present invention.

ステップS21では、取替履歴抽出部4bは、部品の取替周期算出時点に最も近い保守契約期間から走査を開始する。ステップS22に進み、取替履歴抽出部4bは、当該部品に関して3件以上の取替時期を抽出したか否かを判定する。   In step S21, the replacement history extraction unit 4b starts scanning from the maintenance contract period closest to the part replacement cycle calculation time point. In step S22, the replacement history extraction unit 4b determines whether or not three or more replacement times have been extracted for the part.

ステップS22で3件以上の取替時期が抽出された場合は、ステップS23に進む。ステップS23では、取替周期算出部4cは、当該部品の取替周期を第7パターンで算出する。その後、動作が終了する。   If three or more replacement times are extracted in step S22, the process proceeds to step S23. In step S23, the replacement cycle calculation unit 4c calculates the replacement cycle of the part in the seventh pattern. Thereafter, the operation ends.

ステップS22で3件以上の取替時期が抽出されない場合は、ステップS24に進む。ステップS24では、取替履歴抽出部4bは、全保守契約期間の走査が完了したか否かを判定する。   If three or more replacement times are not extracted in step S22, the process proceeds to step S24. In step S24, the replacement history extraction unit 4b determines whether or not scanning of all maintenance contract periods has been completed.

ステップS24で全保守契約期間の走査が完了していない場合は、ステップS25に進む。ステップS25では、取替履歴抽出部4bは、残りの保守契約期間において部品の取替周期算出時点に最も近い保守契約期間を次の保守契約期間として走査する。その後、ステップS22以降の動作が繰り返される。   If scanning of the entire maintenance contract period is not completed in step S24, the process proceeds to step S25. In step S25, the replacement history extraction unit 4b scans the maintenance contract period closest to the part replacement period calculation time as the next maintenance contract period in the remaining maintenance contract period. Thereafter, the operations after step S22 are repeated.

ステップS24で全保守契約期間の走査が完了した場合は、ステップS26に進む。ステップS26では、取替履歴抽出部4bは、部品の取替周期算出時点に最も近い保守契約期間から走査を開始する。ステップS27では、取替履歴抽出部4bは、当該部品に関して2件の取替時期を抽出したか否かを判定する。   If scanning of the entire maintenance contract period is completed in step S24, the process proceeds to step S26. In step S26, the replacement history extraction unit 4b starts scanning from the maintenance contract period closest to the part replacement cycle calculation time point. In step S27, the replacement history extraction unit 4b determines whether two replacement times have been extracted for the part.

ステップS27で2件の取替時期が抽出された場合は、ステップS28に進む。ステップS28では、取替周期算出部4cは、当該部品の取替周期を第6パターンで算出する。その後、動作が終了する。   If two replacement times are extracted in step S27, the process proceeds to step S28. In step S28, the replacement cycle calculation unit 4c calculates the replacement cycle of the part in the sixth pattern. Thereafter, the operation ends.

ステップS27で2件の取替時期が抽出されない場合は、ステップS29に進む。ステップS29では、取替履歴抽出部4bは、全保守契約期間の走査が完了したか否かを判定する。   If two replacement times are not extracted in step S27, the process proceeds to step S29. In step S29, the replacement history extraction unit 4b determines whether or not scanning of all maintenance contract periods has been completed.

ステップS29で全保守契約期間の走査が完了していない場合は、ステップS30に進む。ステップS30では、取替履歴抽出部4bは、残りの保守契約期間において部品の取替周期算出時点に最も近い保守契約期間を次の保守契約期間として走査する。その後、ステップS27以降の動作が繰り返される。   If scanning of the entire maintenance contract period is not completed in step S29, the process proceeds to step S30. In step S30, the replacement history extraction unit 4b scans the maintenance contract period closest to the part replacement period calculation time as the next maintenance contract period in the remaining maintenance contract period. Thereafter, the operations after step S27 are repeated.

ステップS29で全保守契約期間の走査が完了した場合は、ステップS31に進む。ステップS31では、取替履歴抽出部4bは、部品の取替周期算出時点に最も近い保守契約期間から走査を開始する。ステップS32では、取替履歴抽出部4bは、当該部品に関して1件の取替時期を抽出したか否かを判定する。   If scanning of the entire maintenance contract period is completed in step S29, the process proceeds to step S31. In step S31, the replacement history extraction unit 4b starts scanning from the maintenance contract period closest to the part replacement cycle calculation time point. In step S32, the replacement history extraction unit 4b determines whether one replacement time has been extracted for the part.

ステップS32で1件の取替時期が抽出された場合は、ステップS33に進む。ステップS33では、取替周期算出部4cは、1件の取替時期が抽出された期間が再契約期間であるか否かを判定する。具体的には、取替周期算出部4cは、1件の取替時期が抽出された期間が未契約期間の後の保守契約期間であるか否かを判定する。   If one replacement time is extracted in step S32, the process proceeds to step S33. In step S33, the replacement period calculation unit 4c determines whether or not the period in which one replacement time is extracted is a re-contract period. Specifically, the replacement period calculation unit 4c determines whether or not the period in which one replacement time is extracted is a maintenance contract period after the non-contract period.

ステップS33で1件の取替時期が抽出された期間が再契約期間である場合は、ステップS34に進む。ステップS34では、取替周期算出部4cは、当該部品の取替周期を第5パターンで算出する。その後、動作が終了する。   When the period in which one replacement time is extracted in step S33 is a re-contract period, the process proceeds to step S34. In step S34, the replacement cycle calculation unit 4c calculates the replacement cycle of the part in the fifth pattern. Thereafter, the operation ends.

ステップS33で1件の取替時期が抽出された期間が再契約期間でない場合は、ステップS35に進む。ステップS35では、取替周期算出部4cは、当該部品の取替周期を第9パターンで算出する。その後、動作が終了する。   If the period in which one replacement time is extracted in step S33 is not a re-contract period, the process proceeds to step S35. In step S35, the replacement cycle calculation unit 4c calculates the replacement cycle of the part in the ninth pattern. Thereafter, the operation ends.

ステップS32で1件の取替時期が抽出されない場合は、ステップS36に進む。ステップS36では、取替履歴抽出部4bは、全保守契約期間の走査が完了したか否かを判定する。   If one replacement time is not extracted in step S32, the process proceeds to step S36. In step S36, the replacement history extraction unit 4b determines whether or not scanning of all maintenance contract periods has been completed.

ステップS36で全保守契約期間の走査が完了していない場合は、ステップS37に進む。ステップS37では、取替履歴抽出部4bは、残りの保守契約期間において部品の取替周期算出時点に最も近い保守契約期間を次の保守契約期間として走査する。その後、ステップS32以降の動作が繰り返される。   If scanning of the entire maintenance contract period is not completed in step S36, the process proceeds to step S37. In step S37, the replacement history extraction unit 4b scans the maintenance contract period closest to the part replacement period calculation time in the remaining maintenance contract period as the next maintenance contract period. Thereafter, the operations after step S32 are repeated.

ステップS36で全保守契約期間の走査が完了した場合は、ステップS38では、取替周期算出部4cは、第8パターンで当該部品の取替周期を算出する。その後、動作が終了する。   When scanning of all maintenance contract periods is completed in step S36, in step S38, the replacement cycle calculation unit 4c calculates the replacement cycle of the part in the eighth pattern. Thereafter, the operation ends.

以上で説明した実施の形態1によれば、部品の取替周期は、昇降機の未契約期間を除外して算出される。このため、昇降機の稼働開始時点から当該部品の取替周期算時点までの当該部品の取替履歴の一部を把握していなくても当該部品の取替周期を適切に算出することができる。そして適切に算出した昇降機の各々における当該部品の取替周期に対して、統計的手法を用いることにより当該部品の総合的な取替周期を算出する。この場合、妥当な周期で部品を交換することができる。その結果、部品の破損による昇降機の動作不良を減らすことができる。   According to Embodiment 1 demonstrated above, the replacement | exchange period of components is calculated excluding the non-contract period of an elevator. For this reason, even if it does not grasp a part of the replacement history of the part from the operation start time of the elevator to the replacement period calculation time of the part, the replacement period of the part can be appropriately calculated. Then, a total replacement period of the part is calculated by using a statistical method with respect to the replacement period of the part in each of the elevators calculated appropriately. In this case, parts can be exchanged at a reasonable cycle. As a result, the malfunction of the elevator due to the breakage of parts can be reduced.

また、部品の取替時期は、取替履歴抽出部4bにより正確に抽出される。このため、当該部品の取替周期を正確に算出することができる。   Further, the replacement time of the parts is accurately extracted by the replacement history extraction unit 4b. For this reason, the replacement period of the component can be accurately calculated.

また、保守契約期間中において当該部品に関して3件以上の取替時期が抽出された場合は、当該部品の取替周期は、直近の2件の取替時期の間の期間となる。このため、昇降機の現時点の状態に即して当該部品の取替周期を算出することができる。   If three or more replacement times are extracted for the part during the maintenance contract period, the replacement period of the part is a period between the two most recent replacement times. For this reason, it is possible to calculate the replacement period of the part according to the current state of the elevator.

また、保守契約期間中において当該部品に関して2件の取替時期が抽出された場合は、当該部品の取替周期は、当該2件の取替時期の間の期間となる。このため、実際の取替時期に基づいて当該部品の取替周期を算出することができる。   If two replacement times are extracted for the part during the maintenance contract period, the replacement period of the part is a period between the two replacement times. For this reason, the replacement period of the part can be calculated based on the actual replacement time.

また、現保守契約期間中において当該部品に関して1件の取替時期が抽出された場合は、当該部品の取替周期は、当該1件の取替時期と現時点との間となる。このため、取替時期が1件だけ抽出された場合でも当該部品の取替周期を算出することができる。   In addition, when one replacement period is extracted for the part during the current maintenance contract period, the replacement period of the part is between the replacement period and the current time. For this reason, even when only one replacement time is extracted, the replacement period of the part can be calculated.

また、現保守契約期間の前に保守契約期間が抽出されず、現保守契約期間中において当該部品の取替時期が抽出されない場合は、当該部品の取替周期は算出されない。このため、当該部品の取替周期の算出値が実際の取替周期と大きく異なる結果となることを防止できる。   Further, if the maintenance contract period is not extracted before the current maintenance contract period and the replacement time of the part is not extracted during the current maintenance contract period, the replacement period of the part is not calculated. For this reason, it can prevent that the calculated value of the replacement period of the said part becomes a result greatly different from an actual replacement period.

また、未契約期間の前に昇降機の稼働開始時点からの保守契約期間が抽出され、全保守契約期間中において当該部品の取替時期が抽出されない場合は、当該部品の取替周期は、昇降機の稼働開始時点からの保守契約期間となる。このため、実際の取替時期が抽出されなくても、当該部品の取替周期を算出することができる。   In addition, if the maintenance contract period from the start of the elevator operation is extracted before the non-contract period and the replacement timing of the part is not extracted during the entire maintenance contract period, the replacement period of the part is Maintenance contract period from the start of operation. For this reason, even if the actual replacement time is not extracted, the replacement period of the part can be calculated.

また、現保守契約期間中において当該部品の取替時期が抽出されずに昇降機の稼働開始時点からの保守契約期間において当該部品に関して1件の取替時期が抽出された場合は、当該部品の取替周期は、昇降機の稼働開始時点と当該1件の取替時期との間の期間となる。このため、取替時期が1件だけ抽出された場合でも当該部品の取替周期を算出することができる。   In addition, if one replacement period is extracted for the relevant part during the maintenance contract period from the start of elevator operation without extracting the replacement period during the current maintenance contract period, The replacement cycle is a period between the operation start time of the elevator and the one replacement time. For this reason, even when only one replacement time is extracted, the replacement period of the part can be calculated.

なお、昇降機以外の機器に取替周期算出装置4を適用してもよい。この場合も、昇降機以外の機器の稼働開始時点から当該部品の取替周期算時点までの当該部品の取替履歴の一部を把握していなくても当該部品の取替周期を適切に算出することができる。   In addition, you may apply the replacement period calculation apparatus 4 to apparatuses other than an elevator. Even in this case, the replacement cycle of the part is appropriately calculated even if a part of the replacement history of the part from the start of operation of the equipment other than the elevator to the time of calculating the replacement period of the part is not grasped be able to.

1 第1記憶装置、 2 第2記憶装置、 3 表示装置、 4 取替周期算出装置、 4a 契約推移抽出部、 4b 取替履歴抽出部、 4c 取替周期算出部、 4d 表示制御部   DESCRIPTION OF SYMBOLS 1 1st memory | storage device, 2 2nd memory | storage device, 3 Display apparatus, 4 Replacement period calculation apparatus, 4a Contract transition extraction part, 4b Replacement history extraction part, 4c Replacement period calculation part, 4d Display control part

Claims (7)

取替周期の算出対象となる部品が利用された昇降機の契約の推移を契約履歴から抽出する契約推移抽出部と、
前記契約推移抽出部により契約の推移を抽出された昇降機について、保守契約期間中の当該部品の取替時期を取替履歴から抽出する取替履歴抽出部と、
前記取替履歴抽出部により抽出された取替時期に基づいて、契約の推移のパターンに応じて当該部品の取替周期を算出する取替周期算出部と、
を備えた昇降機の部品の取替周期算出装置。
A contract transition extraction unit that extracts the transition of the contract of the elevator in which the part for which the replacement period is calculated is extracted from the contract history;
About the elevator from which the transition of the contract is extracted by the contract transition extraction unit, a replacement history extraction unit that extracts the replacement time of the part during the maintenance contract period from the replacement history;
Based on the replacement time extracted by the replacement history extracting unit, a replacement cycle calculating unit that calculates a replacement cycle of the part according to a contract transition pattern ;
Elevator parts replacement period calculating device.
前記取替周期算出部は、前記取替履歴抽出部が保守契約期間中において当該部品に関して3件以上の取替時期を抽出した場合は、直近の2件の取替時期の間の期間を当該部品の取替周期として算出する請求項に記載の昇降機の部品の取替周期算出装置。 When the replacement history extraction unit extracts three or more replacement times for the part during the maintenance contract period, the replacement period calculation unit determines the period between the two most recent replacement times. The parts replacement period calculation device for an elevator according to claim 1 , wherein the part replacement period is calculated as a part replacement period. 前記取替周期算出部は、前記取替履歴抽出部が保守契約期間中において当該部品に関して2件の取替時期を抽出した場合は、当該2件の取替時期の間の期間を当該部品の取替周期として算出する請求項または請求項に記載の昇降機の部品の取替周期算出装置。 When the replacement history extraction unit extracts two replacement times for the part during the maintenance contract period, the replacement period calculation unit calculates a period between the two replacement times. The apparatus according to claim 1 or 2 , wherein the replacement period is calculated as a replacement period. 前記取替周期算出部は、前記取替履歴抽出部が現保守契約期間中において当該部品に関して1件の取替時期を抽出した場合は、当該1件の取替時期と現時点との間の期間を当該部品の取替周期として算出する請求項から請求項のいずれか一項に記載の昇降機の部品の取替周期算出装置。 When the replacement history extraction unit has extracted one replacement time for the part during the current maintenance contract period, the replacement period calculation unit is a period between the replacement time and the current time. the replacement cycle calculating unit parts of the elevator according to claims 1 to calculate to any one of claims 3 as replacement cycles of the parts. 前記取替周期算出部は、前記契約推移抽出部が現保守契約期間の前に保守契約期間を抽出せず、前記取替履歴抽出部が現保守契約期間中において当該部品に関して取替時期を抽出しない場合は、当該部品の取替周期を算出しない請求項から請求項のいずれか一項に記載の昇降機の部品の取替周期算出装置。 The replacement cycle calculation unit does not extract the maintenance contract period before the current maintenance contract period, and the replacement history extraction unit extracts the replacement time for the part during the current maintenance contract period. If not, the component replacement cycle calculation device according to any one of claims 1 to 4 , wherein the component replacement cycle is not calculated. 前記取替周期算出部は、前記契約推移抽出部が現保守契約期間の前に未契約期間を抽出して当該未契約期間の前に前記昇降機の稼働開始時点からの保守契約期間を抽出し、前記取替履歴抽出部が現保守契約期間中において当該部品に関して取替時期を抽出せずに未契約期間の前の保守契約期間において当該部品に関して取替時期を抽出しない場合は、未契約期間の前の保守契約期間を当該部品の取替周期として算出する請求項から請求項のいずれか一項に記載の昇降機の部品の取替周期算出装置。 The replacement cycle calculation unit extracts the maintenance contract period from the operation start time of the elevator before the uncontracted period by the contract transition extraction unit extracting the non-contracted period before the current maintenance contract period, If the replacement history extraction unit does not extract the replacement time for the part during the current maintenance contract period and does not extract the replacement time for the part in the maintenance contract period before the non-contracted period, before maintenance contract term replacement period calculating device parts of the elevator according to claims 1 to calculate to any one of claims 5 as replacement cycle of the component. 前記取替周期算出部は、前記契約推移抽出部が現保守契約期間の前に未契約期間を抽出して当該未契約期間の前に前記昇降機の稼働開始時点からの保守契約期間を抽出し、前記取替履歴抽出部が現保守契約期間中において当該部品に関して取替時期を抽出せずに前記昇降機の稼働開始時点からの保守契約期間において当該部品に関して1件の取替時期を抽出した場合は、前記昇降機の稼働開始時点と当該1件の取替時期との間の期間を当該部品の取替周期として算出する請求項から請求項のいずれか一項に記載の昇降機の部品の取替周期算出装置。 The replacement cycle calculation unit extracts the maintenance contract period from the operation start time of the elevator before the uncontracted period by the contract transition extraction unit extracting the non-contracted period before the current maintenance contract period, When the replacement history extraction unit does not extract the replacement time for the part during the current maintenance contract period, but extracts one replacement time for the part in the maintenance contract period from the start of operation of the elevator , collected parts of the elevator according to the period between the operation start time and replacement timing of the 1 of the elevator in any one of claims 1 to 6 for calculating a replacement cycle of the component Replacement cycle calculation device.
JP2014152715A 2014-07-28 2014-07-28 Elevator parts replacement cycle calculation device Expired - Fee Related JP6179474B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2014152715A JP6179474B2 (en) 2014-07-28 2014-07-28 Elevator parts replacement cycle calculation device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2014152715A JP6179474B2 (en) 2014-07-28 2014-07-28 Elevator parts replacement cycle calculation device

Publications (2)

Publication Number Publication Date
JP2016031578A JP2016031578A (en) 2016-03-07
JP6179474B2 true JP6179474B2 (en) 2017-08-16

Family

ID=55441936

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2014152715A Expired - Fee Related JP6179474B2 (en) 2014-07-28 2014-07-28 Elevator parts replacement cycle calculation device

Country Status (1)

Country Link
JP (1) JP6179474B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6718415B2 (en) * 2017-06-26 2020-07-08 株式会社日立ビルシステム Parts replacement prediction device, parts replacement prediction system, parts replacement prediction method

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3035092B2 (en) * 1992-09-28 2000-04-17 株式会社日立ビルシステム Elevator operation data collection device
JP2003104639A (en) * 2001-09-28 2003-04-09 Toshiba Elevator Co Ltd Method, system and server for reserving elevator inspection
JP2003238041A (en) * 2002-02-14 2003-08-27 Hitachi Building Systems Co Ltd Elevator maintenance device
JP2003327366A (en) * 2002-05-10 2003-11-19 Hitachi Building Systems Co Ltd Preventive maintenance system of elevator
JP4932188B2 (en) * 2005-07-22 2012-05-16 Necフィールディング株式会社 Maintenance management system, maintenance management method, and maintenance management program
JP5082469B2 (en) * 2007-01-30 2012-11-28 フジテック株式会社 Elevator automatic inspection system
JP2009003502A (en) * 2007-06-19 2009-01-08 Marusei Co Ltd System for preparing renewal-replacement plan table for equipment and component of building
JP2009155041A (en) * 2007-12-26 2009-07-16 Toshiba Elevator Co Ltd Automatic replacement schedule system for elevator life-limited component and automatic replacement schedule method for elevator life-limited component

Also Published As

Publication number Publication date
JP2016031578A (en) 2016-03-07

Similar Documents

Publication Publication Date Title
MX2018006090A (en) Casting equipment and management method for mold fabrication data for mold and melt state data for melt in casting equipment.
JP2015018553A5 (en)
JP2015011722A5 (en)
WO2012118285A3 (en) Control panel and laundry machine having the same, further method for controlling the same
JP6179474B2 (en) Elevator parts replacement cycle calculation device
CN103997514A (en) File parallel transmission method and system
CN105138245B (en) A kind of duplicate removal treatment method and device of intelligent terminal screenshot picture
WO2014193548A3 (en) Method for iteratively modifying a display image using a mask layer
KR102344464B1 (en) Method of detecting abnormal part learning of device through artificial intelligence
EP3101802A3 (en) Method for controlling multiple motors
JP2012159868A (en) Programming device of programmable logic controller
CN104021499B (en) Semiconductor manufacturing control method
KR102626306B1 (en) Controlling apparatus, and method of producing article
RU2016121683A (en) METHOD FOR MANAGING A SET OF MEASURING MACHINES AND A DEVICE ASSEMBLY CONTAINING AT LEAST TWO MEASURING MACHINES
KR20170026802A (en) Apparatus and Method for managing quality of process management
CN107689877A (en) A kind of parameter regulation means and device
JP2013152595A5 (en)
JP6464899B2 (en) Multivariable predictive control system
CN106873355A (en) A kind of selection of multipriority maintenance test instruction with control law instruction and changing method
CN105681069A (en) CLI (Command-Line Interface) configuration command response method and device
CN104698960A (en) Data exchange technology for automatic control system of hydraulic press
JP6089837B2 (en) Updating method of control computer in control computer system
CN109885018A (en) A kind of management method of the expert think tank system towards mental package equipment
JPWO2015145523A1 (en) Error handling system
CHEN et al. Production scheduling of steelmaking-continuous casting integrated hybridizing constraint satisfaction and genetic optimization

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20160603

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20170302

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20170314

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20170413

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20170620

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20170703

R150 Certificate of patent or registration of utility model

Ref document number: 6179474

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees