JP6125289B2 - Vertical pipe construction method and temporary jig device for vertical pipe construction - Google Patents

Vertical pipe construction method and temporary jig device for vertical pipe construction Download PDF

Info

Publication number
JP6125289B2
JP6125289B2 JP2013060026A JP2013060026A JP6125289B2 JP 6125289 B2 JP6125289 B2 JP 6125289B2 JP 2013060026 A JP2013060026 A JP 2013060026A JP 2013060026 A JP2013060026 A JP 2013060026A JP 6125289 B2 JP6125289 B2 JP 6125289B2
Authority
JP
Japan
Prior art keywords
pipe
floor
suspended
guide wire
flange
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2013060026A
Other languages
Japanese (ja)
Other versions
JP2014185445A (en
Inventor
陽治 岩田
陽治 岩田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sanki Engineering Co Ltd
Original Assignee
Sanki Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sanki Engineering Co Ltd filed Critical Sanki Engineering Co Ltd
Priority to JP2013060026A priority Critical patent/JP6125289B2/en
Publication of JP2014185445A publication Critical patent/JP2014185445A/en
Application granted granted Critical
Publication of JP6125289B2 publication Critical patent/JP6125289B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Description

本発明は、建物のパイプシャフト内に設けられる立管の施工方法及び立管施工のための仮設治具装置に関するものである。   The present invention relates to a method for installing a standing pipe provided in a pipe shaft of a building and a temporary jig device for the standing pipe construction.

多層階を有する事務所ビル、商業施設、集合住宅などのビル等の建物において、例えば、地階・地下階に受水槽を有する給水配管、地下階に設置される冷凍機など熱源と各階に設置される空調機とで熱媒として循環される冷水や温水を搬送する冷水配管や温水配管、冷凍機の排熱を屋外に設置した大気と熱交換する冷却塔へ水で熱を授受させる冷却水を搬送する冷却水配管など、水や蒸気を搬送する配管を縦方向に延ばす立管を、意匠上のため居住者から見えないよう壁で仕切られたパイプシャフト内に設置することが一般的である。このパイプシャフトは、居室に利用できる面積を減ずるものなので、出来るだけ平面積が小さくなるよう、内部の配管を、施工上必要な間隔だけ確保して並設する形が常である。それぞれの建物の防火区画の考え方により、パイプシャフト内に耐火床をそれぞれの階ごと設置して床貫通部を耐火処理する場合も、壁を区画として考え、パイプシャフト内を階ごとに仕切らず一体の区画とし、各階の壁で貫通耐火処理する竪穴区画の場合もある。どちらの場合も、パイプシャフト内は、施工時以外は特に人が立ち入る必要がないため、小さな開口である点検口などが出入り口となっている場合が多い。また、一体区画としているシャフトの場合は、人が出入りする階層が限られ、そこには転落防止策が施され、パイプシャフト内の作業性は著しく制限される。   In buildings such as office buildings, commercial facilities, and apartment buildings with multiple floors, for example, water supply pipes with water tanks in the basement and basement floors, heat sources such as refrigerators installed in the basement floors, and installed on each floor Cooling water or hot water piping that transports chilled water or hot water circulated as a heat medium with the air conditioner, and cooling water that exchanges heat with water to the cooling tower that exchanges the exhaust heat of the refrigerator with the atmosphere installed outdoors. It is common to install vertical pipes that extend water and steam pipes in the vertical direction, such as cooling water pipes to be transported, in pipe shafts that are partitioned by walls so that they cannot be seen by residents for design reasons. . Since this pipe shaft reduces the area that can be used in the living room, the internal piping is usually arranged side by side with an interval necessary for construction so that the flat area is as small as possible. Even if fire floors are installed in the pipe shaft for each floor by the fire prevention section of each building, and the floor penetration is fireproofed, the wall is considered as a partition and the pipe shaft is not divided into floors. There are also cases of pit pits with through fireproofing on the walls of each floor. In both cases, there is no need for a person to enter the pipe shaft except during construction, so there are many cases where an inspection port, which is a small opening, serves as an entrance. Further, in the case of a shaft as an integral section, the level of entry and exit of people is limited, and there are measures to prevent falling, and workability within the pipe shaft is significantly limited.

従来、ビル等の建物において上下階に連通するパイプシャフト内に立管を設置する場合、立管を構成する管材を各階ごとに搬入したり、上階から管材を吊り下ろして下階に搬入したり、下階から管材を押し上げて上階に搬入したりする方法が知られており(例えば、特許文献1等参照。)、建物等の状況に応じて、好適な方法が採用される。   Conventionally, when installing a vertical pipe in a pipe shaft that communicates with the upper and lower floors of a building such as a building, the pipe material constituting the vertical pipe is carried into each floor, or the pipe material is suspended from the upper floor and carried into the lower floor. Or, a method of pushing up the pipe material from the lower floor and carrying it into the upper floor is known (see, for example, Patent Document 1), and a suitable method is adopted depending on the situation of the building or the like.

特許第3575881号公報Japanese Patent No. 3575881

ところで、立管を構成する管材を、ウインチ等を備える吊り下ろし手段を使用して、建物の屋上や最上階等から下の階に吊り下ろして搬入する場合には、管材を吊り下ろし手段のロープやチェーンで玉掛けし吊り下ろしていく途中で、管材が比較的大きく揺れてしまうことが懸念される。この場合、吊られた管材が、パイプシャフト内に存在するその他の設備等(例えば、パイプシャフト内のシャフトを形成する壁内面、パイプシャフト内の床スラブ・床材及び箱抜きした貫通部枠、又は、立管設置のためにパイプシャフト内に設けられた仮設足場や、別の立管等)に接触し、管材の搬入がそこで滞ってしまったり、接触に起因して損傷等を起こしてしまったりするおそれがある。従って、かかる不具合を回避するべく、吊り下ろし手段によって吊り下ろされている管材が通過するだけとなる途中階においても、吊られた管材の動作を介助するための作業員を配備する等の必要が生じてしまい、作業性の低下やコストの増大等を招くおそれがある。   By the way, when the pipe material constituting the vertical pipe is suspended from the rooftop or the top floor of the building to the lower floor using a suspension means equipped with a winch or the like, the rope of the means for hanging the pipe material is suspended. In the middle of hanging and hanging with a chain, there is a concern that the pipe material will shake relatively large. In this case, the suspended pipe material is other equipment or the like existing in the pipe shaft (for example, the wall inner surface forming the shaft in the pipe shaft, the floor slab / floor material in the pipe shaft, and the boxed penetrating part frame, Or the temporary scaffolding provided in the pipe shaft for the installation of the vertical pipe, or another vertical pipe, etc.), the pipe material will be brought in there, or damage may be caused by the contact There is a risk of falling. Therefore, in order to avoid such a problem, it is necessary to provide a worker for assisting the operation of the suspended pipe material even in the middle floor where the pipe material suspended by the hanging means only passes. This may occur, leading to a decrease in workability and an increase in cost.

本発明は上記例示した問題点等を解決するためになされたものであって、その目的は、立管を構成する管材の搬入をよりスムースに行うことのできる立管の施工方法及び立管施工のための仮設治具装置を提供することにある。   The present invention has been made to solve the above-described problems and the like, and the purpose thereof is a vertical pipe construction method and a vertical pipe construction capable of smoothly carrying in a pipe material constituting the vertical pipe. It is in providing the temporary jig apparatus for.

以下、上記課題等を解決するのに適した各手段につき項分けして説明する。なお、必要に応じて対応する手段に特有の作用効果等を付記する。   In the following, each means suitable for solving the above-described problems will be described in terms of items. In addition, the effect etc. peculiar to the means to respond | correspond as needed are added.

手段1.建物のパイプシャフト内に立管の設置工事を行う階のうち最上階以上の階又は塔屋において、立管を構成する管材を吊り下ろし可能な吊り下ろし手段を設置し、前記吊り下ろし手段のロープ又はチェーンの下端に設けられた係止具に前記管材を連結して、当該管材を対象の設置階まで吊り下ろし、接続先と接続する立管の施工方法であって、
前記管材を吊り下ろす際には、
両端部にフランジが形成された前記管材の一端部に対して着脱自在に取付けられ、前記吊り下ろし手段の前記係止具に対して着脱自在に連結される、前記管材の一端部に装着された際には管材の中心軸延長に位置する係止部を備えた連結部材と、
パイプシャフト内において、前記吊り下ろし手段から、パイプシャフト内に立管の設置工事を行う階のうち最下階以下の階にかけて鉛直に緊張状態で延在するガイドワイヤと、
一端が前記管材の前記フランジ、前記係止具、又は、前記係止部に連結され、他端が前記ガイドワイヤに対して上下に摺動可能に係止される介助手段と
を用い、
さらに、前記連結部材は、
前記管材の開口部を閉塞するようにして、前記フランジに開設された周囲孔に対してボルトにより着脱自在に連結されるとともに、中央部に取付孔が形成された閉止フランジと、前記閉止フランジの前記取付孔に対応して前記閉止フランジに取付けられるアイボルトとを備えており、
前記連結部材を取付けた前記管材を前記吊り下ろし手段により吊下げ状態とすることで、前記吊り下ろし手段の前記ロープ又はチェーンと、前記管材の中心軸とを、鉛直方向に延びる同一の仮想直線上に位置させ、
前記介助手段によって、前記吊り下ろし手段により前記吊下げ状態とされた前記管材と、前記ガイドワイヤとの間を摺動可能に係止して、前記管材を前記ガイドワイヤに沿って設置階まで吊り下ろすことを特徴とする立管の施工方法。
Means 1. A suspension means capable of suspending the pipe material constituting the standing pipe is installed in the floor or tower of the top floor or higher among the floors where the standing pipe is installed in the pipe shaft of the building, and the rope of the suspension means or The pipe is connected to a locking tool provided at the lower end of the chain, the pipe is suspended to the target installation floor, and a vertical pipe construction method for connecting to a connection destination,
When hanging the pipe,
Attached to one end portion of the tube material, which is detachably attached to one end portion of the tube material having flanges formed at both ends, and is detachably connected to the locking tool of the suspension means. On the occasion, a connecting member provided with a locking part located in the central axis extension of the pipe,
In the pipe shaft, from the suspension means, a guide wire extending in a tension state vertically to the floor below the lowest floor among the floors where the standing pipe is installed in the pipe shaft,
One end is connected to the flange of the tube, the locking tool, or the locking portion, and the other end is slidably locked up and down with respect to the guide wire.
Furthermore, the connecting member is
A closing flange having a mounting hole formed in a central portion thereof, which is detachably connected by a bolt to a peripheral hole formed in the flange so as to close the opening of the pipe, and the closing flange An eyebolt attached to the closing flange corresponding to the mounting hole,
By suspending the pipe member to which the connecting member is attached by the suspension means, the rope or chain of the suspension means and the central axis of the pipe material are on the same virtual straight line extending in the vertical direction. Located in
The assistance means slidably engages between the guide wire and the tube material suspended by the suspension means, and the tube material is suspended along the guide wire to the installation floor. A vertical pipe construction method characterized by lowering.

手段1によれば、パイプシャフト内において立管の設置工事を行う階を貫通して鉛直に張られたガイドワイヤ、及び、管材とガイドワイヤとの間を摺動可能に係止する介助手段を設けることによって、吊り下ろし手段に吊るされた管材をガイドワイヤに沿って吊り下ろしていくことができる。このため、管材を吊り下ろしていく際に、管材が比較的大きく揺れてしまう(軌道を比較的大きく逸脱してしまう)ことを防止することができ、吊り下ろされる管材がパイプシャフト内に存在するその他の設備等(別の立管や配管用の足場等)に接触してしまうといった事態を回避することができる。   According to the means 1, the guide wire vertically stretched through the floor where the standing pipe is installed in the pipe shaft, and the assisting means for slidably locking between the pipe material and the guide wire are provided. By providing, the pipe material suspended by the suspension means can be suspended along the guide wire. For this reason, it is possible to prevent the pipe material from shaking relatively large (relatively deviating from the track) when the pipe material is suspended, and the pipe material to be suspended exists in the pipe shaft. It is possible to avoid a situation in which it comes into contact with other equipment (another vertical pipe, a scaffold for piping, etc.).

さらに、管材が吊り下ろし手段に吊られた状態では、吊り下ろし手段のロープ又はチェーンと、管材の中心軸とが、鉛直方向に延びる同一の仮想直線上に位置することとなる。このため、管材がバランス良く吊り下ろし手段に吊られている状態となり、管材を下降させる際に、管材が揺れてしまうといったこと自体を抑制することができる。   Furthermore, in a state where the pipe material is hung on the hanging means, the rope or chain of the hanging means and the central axis of the pipe material are located on the same virtual straight line extending in the vertical direction. For this reason, it will be in the state where the pipe material is suspended by the suspension means with good balance, and when the pipe material is lowered, it can be suppressed that the pipe material is shaken.

従って、管材の姿勢を安定させた状態でほぼ鉛直に吊り下ろしていくことができ、管材を確実、かつ、比較的スムースに目的の設置階まで搬入することができる。結果として、吊り下ろし手段の設置階と、該吊り下ろし手段によって吊り下ろされている管材を搬入する階との間の途中階において、吊られた管材の動作を介助する(管材の揺れを止めて下階へ送る)ための作業員を配備する等しなくても済み、作業性の向上やコストの抑制等を図ることができる。   Therefore, the pipe can be suspended substantially vertically with the posture of the pipe stabilized, and the pipe can be reliably and relatively smoothly carried to the target installation floor. As a result, in the middle floor between the floor where the hanging means is installed and the floor where the pipe material suspended by the hanging means is carried in, the operation of the suspended pipe material is assisted (stopping the shaking of the pipe material). There is no need to deploy workers for sending to the lower floor, and workability can be improved and costs can be reduced.

また、日本国内で使用される管材(パイプ及びフランジ)に関しては、基本的に日本工業規格(JIS)に適合したものが使用・流通されており、管の使用用途、内部を搬送する流体圧力、及び、管の材質などから規格化されていて、また、フランジの中央開口を内実した閉止フランジも、管側と同じ厚さ、周囲孔径及び数、フランジ面の当たり方などJISに適合するように製作される。 In addition, pipe materials (pipes and flanges) used in Japan are basically used and distributed in conformity with the Japanese Industrial Standards (JIS). In addition, the closed flange that is standardized from the material of the pipe, etc., and the center opening of the flange is solid so that it conforms to JIS, such as the same thickness as the pipe side, the diameter and number of holes around the pipe, and how to hit the flange surface Produced.

そこで、本手段のように、閉止フランジの中央部、すなわち、閉止フランジの重心位置に対して、これまた、例えば、JISB1168に機械器具吊り下げ用途に規定されているような規格品のアイボルトを取付けるための、例えば、雌ねじが螺設されたり、アイボルトの雄ねじ外径よりも大径な単なる取付孔を形成し、閉止フランジにアイボルトを螺着したり、ナットで締結したりして取付けた連結部材を用意する。そして、当該連結部材を管材に取付けることで、管材を、その中心軸の延長線上で吊り下ろし手段によって吊るすことができるようになる。従って、管材を吊り下ろし手段でバランス良く吊り下ろすことができるといった上記作用効果が確実に奏されることとなる。 Therefore, as in the case of the present means 1 , a standardized eyebolt as defined in JIS B 1168 for suspending machinery is used with respect to the center portion of the closing flange, that is, the center of gravity position of the closing flange. For attachment, for example, a female screw is screwed or a simple mounting hole larger than the outer diameter of the eyebolt's male screw is formed, and the eyebolt is screwed to the closing flange or fastened with a nut. Prepare members. And by attaching the said connection member to a pipe material, it becomes possible to hang a pipe material by the hanging means on the extension line of the central axis. Therefore, the above-mentioned effect of being able to hang the pipe material in a well-balanced manner by the suspending means is surely exhibited.

さらに、連結部材は、閉止フランジに取付孔を形成してアイボルトを取付けることで構成できることから、十分な強度を確保することのできる連結部材を比較的簡単に得ることができる。従って、連結部材の製作に関する作業性の向上、コストの抑制等を図ることができる。加えて、連結部材と、管材との取付に関しても、位置が合致するフランジの周囲孔をボルトで締結する取付となるため、確実かつスムースに行うことができる。   Furthermore, since the connecting member can be configured by forming an attachment hole in the closing flange and attaching the eyebolt, a connecting member that can ensure sufficient strength can be obtained relatively easily. Accordingly, it is possible to improve the workability related to the production of the connecting member and to suppress the cost. In addition, the attachment between the connecting member and the pipe material can be reliably and smoothly performed because the attachment is performed by fastening the peripheral hole of the flange whose position matches with the bolt.

手段.前記吊り下ろし手段は、
立管の設置工事を行う階のうち最上階以上の階又は塔屋の床レベルから立設されるか、又は、立管の設置工事を行う階のうち最上階以上の階又は塔屋の天井梁から吊設される支持台と、
パイプシャフト内に並設される複数の立管の並び方向へ前記支持台の下部に延設されるトロリーレールと、
前記トロリーレールの延長方向へ移動可能に当該トロリーレールから吊り下げられるトロリーと
を備え、
前記介助手段によって、前記吊り下ろし手段により前記吊下げ状態とされた前記管材と、前記ガイドワイヤとの間を摺動可能に係止して、
前記ガイドワイヤに沿って設置階まで吊り下ろされた前記管材を、
前記介助手段の係止を解除した後、
前記設置階レベルのパイプシャフト内で、立管の並び方向に沿って前記吊下げ状態のまま所定の立管設置位置へ水平移動する
ことを特徴とする手段1に記載の立管の施工方法。
Means 2 . The hanging means is
From the floors of the top floors or towers that are installed on the pipes, or from the floor level of the towers, or from the floors of the floors that are installed on the pipes or from the ceiling beams of the towers A suspended support base;
A trolley rail extending to the lower part of the support base in the direction in which a plurality of vertical pipes arranged in parallel in the pipe shaft;
A trolley suspended from the trolley rail so as to be movable in the extension direction of the trolley rail,
The assistance means slidably engages between the guide wire and the tube material that has been suspended by the suspension means,
The pipe material suspended along the guide wire to the installation floor,
After unlocking the assistance means,
The vertical pipe construction method according to means 1, wherein the pipe is horizontally moved to a predetermined vertical pipe installation position in the suspended state along the vertical pipe arrangement direction in the pipe shaft at the installation floor level.

手段によれば、パイプシャフト内に並設されるべき各立管について、ガイドワイヤ設置位置よりも遠い立管設置位置の配管毎に施工を完了させていけば、吊下げ状態とされた管材と、施工済の立管との干渉を避けることができる。従って、多数の立管をパイプシャフト内に並設設置する施工を安全かつ効率的に遂行することができる。 According to the means 2 , for each vertical pipe to be arranged in parallel in the pipe shaft, if construction is completed for each pipe at a vertical pipe installation position farther than the guide wire installation position, the pipe material in a suspended state And interference with the installed standpipe can be avoided. Therefore, it is possible to safely and efficiently perform the construction in which a large number of standing pipes are installed side by side in the pipe shaft.

手段3.建物のパイプシャフト内に立管の設置工事を行う階のうち最上階以上の階又は塔屋において、立管を構成する管材を吊り下ろし可能な吊り下ろし手段を設置し、前記吊り下ろし手段のロープ又はチェーンの下端に設けられた係止具に前記管材を連結して、当該管材を対象の設置階まで吊り下ろし、接続先と接続する立管施工のための仮設治具装置であって、
前記管材を吊り下ろすための、
両端部にフランジが形成された前記管材の一端部に対して、前記管材の開口部を閉塞するようにして前記フランジに開設された周囲孔に対してボルトにより着脱自在に連結して取付けられる中央部に取付孔が形成された閉止フランジと、前記吊り下ろし手段の前記係止具に対して着脱自在に連結される、前記管材の一端部に装着された際には、前記閉止フランジの前記取付孔に対応して前記閉止フランジに取付けられるアイボルトからなる管材の中心軸延長に位置する係止部を備えた連結部材と、
パイプシャフト内において、前記吊り下ろし手段から、パイプシャフト内に立管の設置工事を行う階のうち最下階以下の階にかけて鉛直に緊張状態で延在するガイドワイヤと、
一端が前記管材の前記フランジ、前記係止具、又は、前記係止部に連結され、他端が前記ガイドワイヤに対して上下に摺動可能に係止される介助手段と
を備え、
前記連結部材を取付けた前記管材を前記吊り下ろし手段により吊下げ状態とすることで、前記吊り下ろし手段の前記ロープ又はチェーンと、前記管材の中心軸とを、鉛直方向に延びる同一の仮想直線上に位置させて、
前記吊り下ろし手段により前記吊下げ状態とされた前記管材と、前記ガイドワイヤとの間を前記介助手段により摺動可能に係止し、前記管材を前記ガイドワイヤに沿って設置階まで吊り下ろすことが可能である
ことを特徴とする立管施工のための仮設治具装置。
Means 3. A suspension means capable of suspending the pipe material constituting the standing pipe is installed in the floor or tower of the top floor or higher among the floors where the standing pipe is installed in the pipe shaft of the building, and the rope of the suspension means or It is a temporary jig device for standing pipe construction that connects the pipe material to a locking tool provided at the lower end of the chain, suspends the pipe material to the target installation floor, and connects to the connection destination.
For hanging the pipe,
And to one end of the tube member having a flange at both ends, mounted coupled detachably by bolts to the surrounding hole which is opened so as to close the opening of the tube member to the flange center a blind flange mounting hole is formed in part, are detachably connected to the locking means of the hanging down means, when attached to one end of the tube material, the attachment of the blind flange a connecting member having a locking portion corresponding to the hole located at the center axis extending in the tube consisting of eye bolt attached to the blind flange,
In the pipe shaft, from the suspension means, a guide wire extending in a tension state vertically to the floor below the lowest floor among the floors where the standing pipe is installed in the pipe shaft,
One end is connected to the flange of the tube, the locking tool, or the locking portion, and the other end includes an assisting means locked to the guide wire so as to be slidable up and down.
By suspending the pipe member to which the connecting member is attached by the suspension means, the rope or chain of the suspension means and the central axis of the pipe material are on the same virtual straight line extending in the vertical direction. Located in
The pipe member suspended by the suspension means and the guide wire are slidably locked by the assistance means, and the pipe material is suspended along the guide wire to the installation floor. This is a temporary jig device for standing pipe construction.

手段によれば、手段1と同様な作用効果を奏する。 According to the means 3 , the same effects as the means 1 can be obtained.

手段4.前記吊り下ろし手段は、Means 4. The hanging means is
立管の設置工事を行う階のうち最上階以上の階又は塔屋の床レベルから立設されるか、又は、立管の設置工事を行う階のうち最上階以上の階又は塔屋の天井梁から吊設される支持台と、From the floors of the top floors or towers that are installed on the pipes, or from the floor level of the towers, or from the floors of the floors that are installed on the pipes or from the ceiling beams of the towers A suspended support base;
パイプシャフト内に並設される複数の立管の並び方向へ前記支持台の下部に延設されるトロリーレールと、A trolley rail extending to the lower part of the support base in the direction in which a plurality of vertical pipes arranged in parallel in the pipe shaft;
前記トロリーレールの延長方向へ移動可能に当該トロリーレールから吊り下げられるトロリーとA trolley suspended from the trolley rail so as to be movable in an extension direction of the trolley rail;
を備え、With
前記管材を前記ガイドワイヤに沿って設置階まで吊下ろし前記介助手段を解除した後、After lifting the tube along the guide wire to the installation floor and releasing the assistance means,
前記設置階レベルのパイプシャフト内で、立管の並び方向に沿って前記吊下げ状態のまま所定の立管設置位置へ水平移動可能であるWithin the pipe floor of the installation floor level, it is possible to move horizontally to a predetermined vertical pipe installation position in the suspended state along the vertical pipe arrangement direction.
ことを特徴とする手段3に記載の立管施工のための仮設治具装置。The temporary jig apparatus for standing pipe construction of the means 3 characterized by the above-mentioned.
手段4によれば、手段2と同様な作用効果を奏する。According to the means 4, the same operational effects as the means 2 can be obtained.

立管工事の概略を説明するための説明図である。It is explanatory drawing for demonstrating the outline of a vertical pipe construction. 吊り下ろし装置に吊られた管材等を示す正面図である。It is a front view which shows the pipe material etc. which were suspended by the suspension apparatus. 連結部材等を示す分解斜視図である。It is a disassembled perspective view which shows a connection member. ガイドワイヤの概略構成を示す説明図である。It is explanatory drawing which shows schematic structure of a guide wire.

以下、一実施形態について、図面を参照しつつ説明する。図1に示すように、本実施形態では、既存のビルディング1において上下階に連通するパイプシャフト2内に立管3の設置を行うべく、立管3を構成する管材4を上階から下階に吊り下ろして搬入する方法を採用している。本実施形態の管材4は、円筒形のパイプ5と、パイプ5の両端部に形成された円環状のフランジ6とを備えている。   Hereinafter, an embodiment will be described with reference to the drawings. As shown in FIG. 1, in this embodiment, in order to install the vertical pipe 3 in the pipe shaft 2 communicating with the upper and lower floors in the existing building 1, the pipe material 4 constituting the vertical pipe 3 is arranged from the upper floor to the lower floor. The method of hanging and carrying in is adopted. The tube material 4 of the present embodiment includes a cylindrical pipe 5 and annular flanges 6 formed at both ends of the pipe 5.

本実施形態の施工現場となるビルディング1は、パイプシャフト2内が吹き抜けとなっている。つまり、防火区画として竪穴区画となっている場合である。このため、管材4同士を接続する工事を行うために、各階の床スラブ7(図1の梁型の上部が床スラブ7の上面)からパイプシャフト2内に張り出させるようにして仮設足場8を設けている。   In the building 1 which is the construction site of the present embodiment, the inside of the pipe shaft 2 is blown away. That is, it is a case where it is a pothole section as a fire prevention section. For this reason, in order to connect the pipe members 4 to each other, a temporary scaffold 8 is provided so as to project into the pipe shaft 2 from the floor slab 7 of each floor (the upper part of the beam type in FIG. 1 is the upper surface of the floor slab 7). Is provided.

パイプシャフト2内に立管3の設置工事を行う階のうち最上階の仮設足場8、若しくは、その1階層上の仮設足場8には、立管3を構成する管材4を吊り下ろし可能な吊り下ろし装置11が設置される。図1において、立管3の設置工事を行う階のうち最上階の床レベルの仮設足場8に吊り下ろし装置11が設置されているとすると、最上階は床面すぐ上から水平方向へ横引き管として施工されることとなり、図1において、立管3の設置工事を行う階のうち最上階の1階層上の仮設足場8に吊り下ろし装置11が設置されているとすると、最上階は天井面より吊られた形で水平方向へ横引き管として施工されることとなる。   Among the floors where the vertical pipe 3 is installed in the pipe shaft 2, a suspension that can suspend the pipe material 4 constituting the vertical pipe 3 is suspended from the temporary scaffold 8 on the uppermost floor or the temporary scaffold 8 on the first floor. A lowering device 11 is installed. In FIG. 1, if a hanging device 11 is installed on a temporary scaffold 8 at the floor level of the top floor among the floors where the vertical pipe 3 is installed, the top floor is horizontally pulled from just above the floor surface in the horizontal direction. In FIG. 1, if the suspension device 11 is installed on the temporary scaffold 8 on the first floor of the top floor among the floors where the vertical pipe 3 is installed, the top floor is a ceiling. It will be constructed as a horizontal pipe in the horizontal direction in a form suspended from the surface.

吊り下ろし装置11は、仮設足場8において管材4を通すために設けられた開口部8aを跨ぐようにして設置される略門型の支持台12と、支持台12に吊り支えられた電動ホイスト15とを備えている。ちなみに、本実施形態では、電動ホイスト15が、トロリー13及びトロリーレール14(H形鋼)を介して、支持台12に支持されている。本実施形態では、複数の管材4を次々接続して、パイプシャフト2の内壁などから張り出される図示しない支持金物により並設されて複数の立管3となるが、図1においてはその複数の立管3を並設する方向が、紙面奥行き方向となっていて、トロリーレール14は図1の紙面奥行き方向、つまり、立管3の並設方向に延長するように設置されている。これにより、電動ホイスト15、ひいては、電動ホイスト15に吊られた管材4を、水平方向(図1の紙面奥行き方向)にスライドさせることもできる。また、本実施形態では、吊り下ろし装置11が吊り下ろし手段を構成する。   The suspension device 11 includes a substantially gate-shaped support base 12 that is installed so as to straddle an opening 8 a provided for passing the pipe material 4 in the temporary scaffold 8, and an electric hoist 15 that is supported by the support base 12. And. Incidentally, in this embodiment, the electric hoist 15 is supported by the support stand 12 via the trolley 13 and the trolley rail 14 (H-shaped steel). In the present embodiment, a plurality of pipes 4 are connected one after another, and are arranged in parallel by a support metal (not shown) protruding from the inner wall of the pipe shaft 2 to form a plurality of standing pipes 3. In FIG. The direction in which the upright tubes 3 are arranged in parallel is the depth direction of the paper surface, and the trolley rail 14 is installed so as to extend in the depth direction of the paper surface of FIG. Thereby, the electric hoist 15 and by extension, the pipe material 4 hung on the electric hoist 15 can also be slid in the horizontal direction (the depth direction in FIG. 1). In the present embodiment, the hanging device 11 constitutes a hanging means.

さらに、電動ホイスト15のワイヤロープ16の下端には、係止具としてのフック17が設けられている。そして、詳しくは後述するが、当該フック17に管材4を連結して、管材4を対象の設置階まで吊り下ろし、接続先(立管3を構成する別の管材4)と接続するようになっている。   Furthermore, a hook 17 as a locking tool is provided at the lower end of the wire rope 16 of the electric hoist 15. As will be described in detail later, the pipe material 4 is connected to the hook 17, the pipe material 4 is suspended to the target installation floor, and connected to the connection destination (another pipe material 4 constituting the standing pipe 3). ing.

また、図2、図3に示すように、本実施形態では、管材4を吊り下ろし装置11で吊るすために、管材4の一端部に対して連結部材21が取付けられる。連結部材21は、管材4の開口部を閉塞するようにして、フランジ6に開設された周囲孔(ボルト孔)6aに対してボルト20によって着脱自在に連結される中央開口を内実された閉止フランジ22と、閉止フランジ22の中央部に取付けられるアイボルト23とを備えている。連結部材21の閉止フランジ22は、管材4のフランジ6と外径が同じ円盤状をなしており、その中央部、すなわち、閉止フランジ22の重心位置において取付孔22aが形成されている。   In addition, as shown in FIGS. 2 and 3, in the present embodiment, a connecting member 21 is attached to one end portion of the tube material 4 in order to suspend the tube material 4 by the hanging device 11. The connecting member 21 closes the opening of the pipe member 4 and is a closed flange that has a central opening that is detachably connected by a bolt 20 to a peripheral hole (bolt hole) 6a formed in the flange 6. 22 and an eyebolt 23 attached to the central portion of the closing flange 22. The closing flange 22 of the connecting member 21 has a disk shape having the same outer diameter as that of the flange 6 of the tube material 4, and a mounting hole 22 a is formed at the center thereof, that is, at the center of gravity of the closing flange 22.

そして、アイボルト23のねじ部分を閉止フランジ22の取付孔22aに挿通し、挿通先のねじ部分にナット23a(図2参照)を螺合する。以上のようにして、閉止フランジ22とアイボルト23とが固定され、連結部材21が構成される。また、廻り止めは必要になるが、閉止フランジ22の取付孔22aに雌ねじを螺設し、アイボルト23の雄ねじを螺合してしっかり弛まないように締め込むような構成としてもよい。   Then, the threaded portion of the eyebolt 23 is inserted into the mounting hole 22a of the closing flange 22, and the nut 23a (see FIG. 2) is screwed into the threaded portion of the insertion destination. As described above, the closing flange 22 and the eyebolt 23 are fixed, and the connecting member 21 is configured. Further, although it is necessary to prevent rotation, a configuration may be adopted in which a female screw is screwed into the mounting hole 22a of the closing flange 22 and the male screw of the eyebolt 23 is screwed and tightened so as not to loosen.

加えて、閉止フランジ22には、フランジ6の周囲孔6aと位置合わせされてボルト20で固定される周囲孔22bが形成されている。連結部材21を管材4に取付けた場合、アイボルト23は、管材4の中心軸の延長線上に位置することとなる。このため、連結部材21を介して管材4を電動ホイスト15のフック17に連結することで、管材4を傾けることなく(鉛直姿勢のまま)吊るすことができるようになっている。尚、本実施形態では、アイボルト23のリング部分に電動ホイスト15のフック17を直接係止するのではなく、シャックル26を介在させて、連結している。本実施形態では、アイボルト23(特にリング部分)が係止部に相当し、シャックル26がフック17とともに係止具を構成する。   In addition, the closing flange 22 is formed with a peripheral hole 22 b that is aligned with the peripheral hole 6 a of the flange 6 and is fixed by the bolt 20. When the connecting member 21 is attached to the tube material 4, the eyebolt 23 is positioned on the extension line of the central axis of the tube material 4. For this reason, by connecting the pipe member 4 to the hook 17 of the electric hoist 15 via the connecting member 21, the pipe member 4 can be suspended without being inclined (in a vertical posture). In the present embodiment, the hook 17 of the electric hoist 15 is not directly locked to the ring portion of the eyebolt 23 but is connected via the shackle 26. In the present embodiment, the eyebolt 23 (particularly the ring portion) corresponds to a locking portion, and the shackle 26 and the hook 17 constitute a locking tool.

また、図4に示すように、本実施形態では、パイプシャフト2内において、吊り下ろし装置11の設置階から、パイプシャフト2内に立管3の設置工事を行う階のうち最下階にかけて鉛直に緊張状態で延在するガイドワイヤ31が設けられている。本実施形態では、ガイドワイヤ31の上端は、吊り下ろし装置11の支持台12に設けられたトロリーレール14(H形鋼)に対して、トロリー13の移動の邪魔にならない位置に、クランプ32等を介して連結されている。一方、ガイドワイヤ31の下端は、パイプシャフト2内に立管3の設置工事を行う階のうち最下階(図4の下部)にある仮設足場8の開口周縁部を構成するH形鋼34(通常は、立管3の重量をある程度下支えするための強度を有する梁背を有するH形鋼で、建築躯体側の梁から直接受けられている。)の下方から、押し付けられた単管36に対してガイドワイヤ31を緊張状態として張設するためのレバーブロック(登録商標)37等を介して連結されている。前記H形鋼34の下方において、ガイドワイヤ31を緊張状態とする前に、単管36が落下しないように単管36をクランプ35で締結しておくが、レバーブロック37による緊張は、単管36の撓みによりいなすようにして、クランプ35には緊張力がかからないようにしておくことが有利である。   Further, as shown in FIG. 4, in the present embodiment, in the pipe shaft 2, the vertical direction extends from the installation floor of the hanging device 11 to the lowest floor among the floors where the pipe 3 is installed in the pipe shaft 2. A guide wire 31 extending in a tension state is provided. In the present embodiment, the upper end of the guide wire 31 is located at a position that does not interfere with the movement of the trolley 13 with respect to the trolley rail 14 (H-shaped steel) provided on the support base 12 of the hanging device 11. It is connected through. On the other hand, the lower end of the guide wire 31 is an H-section steel 34 constituting the opening peripheral portion of the temporary scaffold 8 on the lowest floor (lower part in FIG. 4) among the floors where the pipe 3 is installed in the pipe shaft 2. (Usually, it is an H-shaped steel with a beam back having a strength for supporting the weight of the vertical pipe 3 to some extent and is directly received from the beam on the building frame side.) The guide wire 31 is connected via a lever block (registered trademark) 37 and the like for tensioning the guide wire 31. Below the H-shaped steel 34, before the guide wire 31 is put in a tensioned state, the single pipe 36 is fastened with a clamp 35 so that the single pipe 36 does not fall. It is advantageous to keep the clamp 35 free from tension by being bent by 36.

仮設足場8の開口部8a、つまり、複数の立管3を並設する場所において、ガイドワイヤ31を図1の紙面奥行き方向の開口部8a端部に設置することで、開口部8aのもう一端から順に立管3を並設するようにトロリー13を移動しながら設置すれば、数多くの立管3を安全に効率よく設置することができる。また、ガイドワイヤ31を図1の紙面奥行き方向の開口部8a中央部に設置しても、開口部8aの両端部から振り分けて端から順に立管3を並設するようにトロリー13を移動しながら設置すれば、数多くの立管3を安全に効率よく設置することができる。   The guide wire 31 is installed at the end of the opening 8a in the depth direction of FIG. 1 at the opening 8a of the temporary scaffold 8, that is, the place where the plurality of standing pipes 3 are arranged side by side. If the trolley 13 is moved and installed so that the vertical pipes 3 are arranged in order, a large number of vertical pipes 3 can be installed safely and efficiently. In addition, even if the guide wire 31 is installed at the center of the opening 8a in the depth direction of the sheet of FIG. 1, the trolley 13 is moved so that the upright tubes 3 are arranged side by side from the both ends of the opening 8a. If installed, many vertical pipes 3 can be installed safely and efficiently.

さらに、図2、図3に示すように、本実施形態では、吊り下ろし装置11により吊下げ状態とされた管材4と、ガイドワイヤ31との間を連結して、管材4をガイドワイヤ31に沿って設置階まで吊り下ろすための介助手段としての介助具41が用いられる。介助具41は、両端が環状に構成された(圧縮止め加工された)補助ワイヤ42と、補助ワイヤ42の両端をまとめて引っ掛けるカラビナ43とを備えている。   Further, as shown in FIGS. 2 and 3, in this embodiment, the pipe 4 is connected to the guide wire 31 by connecting the pipe 4 and the guide wire 31 that are suspended by the suspension device 11. An assisting tool 41 is used as an assisting means for hanging along the installation floor. The support tool 41 includes an auxiliary wire 42 having both ends formed in an annular shape (compressed with compression), and a carabiner 43 that hooks both ends of the auxiliary wire 42 together.

本実施形態では、管材4の上部及び下部をそれぞれ支持するべく、2つの介助具41が使用される。すなわち、管材4の上部に対応しては、補助ワイヤ42をシャックル26に挿通してから、補助ワイヤ42の両端をカラビナ43に引っ掛けるとともに、該カラビナ43をガイドワイヤ31に引っ掛ける。さらに、管材4の下部に対応しては、補助ワイヤ42をフランジ6の周囲孔6aに挿通してから、補助ワイヤ42の両端をカラビナ43に引っ掛けるとともに、該カラビナ43をガイドワイヤ31に引っ掛ける。このように、介助具41によって、管材4とガイドワイヤ31との間を繋ぐことにより、管材4がガイドワイヤ31によって上下に摺動可能に支持される(下降動作がガイドされる)こととなる。尚、本実施形態では、連結部材21、ガイドワイヤ31、及び、介助具41によって、立管施工のための仮設治具装置が構成されている。   In the present embodiment, two aids 41 are used to support the upper part and the lower part of the tube material 4 respectively. That is, for the upper part of the tube material 4, the auxiliary wire 42 is inserted through the shackle 26, and then both ends of the auxiliary wire 42 are hooked on the carabiner 43 and the carabiner 43 is hooked on the guide wire 31. Further, in correspondence with the lower portion of the pipe material 4, the auxiliary wire 42 is inserted into the peripheral hole 6 a of the flange 6, and then both ends of the auxiliary wire 42 are hooked on the carabiner 43 and the carabiner 43 is hooked on the guide wire 31. Thus, by connecting between the pipe material 4 and the guide wire 31 by the aid 41, the pipe material 4 is supported by the guide wire 31 so as to be slidable in the vertical direction (downward movement is guided). . In the present embodiment, the connecting member 21, the guide wire 31, and the assistance tool 41 constitute a temporary jig device for standing pipe construction.

次に、立管3の施工方法について説明する。まず、吹き抜けとなっているパイプシャフト2内において、立管3の工事が予定されている階、すなわち、管材4同士の接続作業を行う階ごとに、立管3工事用として仮設足場8を設ける。この仮設足場8は、スラブなどの耐火構造である必要はないが、後述するように作業者がこの上で作業するので、歩行に適する強度及び墜落しないような構造とし、立管3の設置位置には開口部8aが鋼材で縁を補強して設置され、立管3の支持を一部開口部8aやその周辺から取る。この仮設足場8は、配管設置後もパイプシャフト2内に本設置しておいてもよい。   Next, the construction method of the vertical pipe 3 will be described. First, a temporary scaffold 8 is provided for the construction of the vertical pipe 3 on the floor where the construction of the vertical pipe 3 is planned, that is, on the floor where the pipe materials 4 are connected to each other, in the pipe shaft 2 that is in the atrium. . The temporary scaffold 8 does not have to be a fireproof structure such as a slab, but since the worker works on it as described later, the structure is suitable for walking and does not fall, and the installation position of the vertical pipe 3 The opening 8a is installed by reinforcing the edge with a steel material, and the support of the vertical pipe 3 is partially taken from the opening 8a and its periphery. The temporary scaffold 8 may be permanently installed in the pipe shaft 2 even after the piping is installed.

続いて、立管3の工事を行う階のうち最上階に吊り下ろし装置11を設置する。さらに、吊り下ろし装置11の支持台12から、立管3の工事を行う階のうち最下階にかけて、各階に設置された仮設足場8の開口部8aを介して、鉛直にガイドワイヤ31を張る。   Subsequently, the hanging device 11 is installed on the top floor among the floors where the vertical pipe 3 is to be constructed. Further, the guide wire 31 is stretched vertically from the support 12 of the hanging device 11 to the lowest floor among the floors where the vertical pipe 3 is to be constructed, through the opening 8a of the temporary scaffold 8 installed on each floor. .

その後、立管3を構成する管材4を吊り下ろし装置11の設置階に搬入するとともに、該管材4を吊り下ろし装置11に吊下げる。すなわち、管材4のフランジ6に対して、連結部材21をボルト20で連結し、連結部材21のアイボルト23を、シャックル26を介して、電動ホイスト15のフック17に連結する。   Thereafter, the pipe material 4 constituting the standing pipe 3 is suspended and carried into the installation floor of the apparatus 11, and the pipe material 4 is suspended and suspended from the apparatus 11. That is, the connecting member 21 is connected to the flange 6 of the pipe member 4 with the bolt 20, and the eye bolt 23 of the connecting member 21 is connected to the hook 17 of the electric hoist 15 through the shackle 26.

さらに、2つの介助具41を用意して、シャックル26とガイドワイヤ31との間、及び、管材4の下側のフランジ6の周囲孔6aとガイドワイヤ31との間を介助具41で繋ぐ。尚、本実施形態では、介助具41により管材4とガイドワイヤ31との間を繋ぐ前と後とで、管材4とガイドワイヤ31との間の距離が変化しないようになっている。   Further, two assisting tools 41 are prepared, and the assisting tool 41 connects between the shackle 26 and the guide wire 31 and between the peripheral hole 6 a of the flange 6 on the lower side of the pipe 4 and the guide wire 31. In the present embodiment, the distance between the tube material 4 and the guide wire 31 does not change before and after the tube material 4 and the guide wire 31 are connected by the aid 41.

以上のように、管材4を吊り下ろし装置11に吊ってから、電動ホイスト15でワイヤロープ16を送り出していき、管材4を下降させていく。このとき、管材4は、その中心軸が、ワイヤロープ16と同一の仮想直線上に延びるようにして鉛直に吊られており、ほぼ姿勢を保ちながらほぼ鉛直に安定状態で下降していく。さらに、万一、ワイヤロープ16が揺れるような事態が発生したとしても、介助具41を介してガイドワイヤ31に支持されている管材4が大きく揺れるようなことはなく、従って、管材4が仮設足場8の開口部8aを外れたり、周りに接触したりするといった事態は生じない。   As described above, after the pipe member 4 is hung on the hanging device 11, the wire rope 16 is sent out by the electric hoist 15 and the pipe member 4 is lowered. At this time, the pipe 4 is suspended vertically so that its central axis extends on the same virtual straight line as that of the wire rope 16, and descends in a substantially vertical state while maintaining a substantially posture. Furthermore, even if a situation in which the wire rope 16 is swayed, the tube material 4 supported by the guide wire 31 via the assisting tool 41 is not greatly swayed. Therefore, the tube material 4 is temporarily installed. There is no situation in which the opening 8a of the scaffold 8 comes off or contacts the surroundings.

そして、管材4を目的の階まで搬入し、管材4下側のフランジ6に付いている介助具41をフランジ6から取外し、該管材4の下部と、既に敷設されている管材4とを接続する。その後、連結部材21を管材4から取外す。さらに、シャックル26についている介助具41をガイドワイヤ31から外すとともに、管材4下側に付いていた介助具41をシャックル26に付けて、ワイヤロープ16を巻き上げる。   And the pipe material 4 is carried in to the target floor, the assistance tool 41 attached to the flange 6 on the lower side of the pipe material 4 is removed from the flange 6, and the lower part of the pipe material 4 and the pipe material 4 already laid are connected. . Thereafter, the connecting member 21 is removed from the pipe material 4. Further, the support tool 41 attached to the shackle 26 is removed from the guide wire 31, and the support tool 41 attached to the lower side of the pipe material 4 is attached to the shackle 26, and the wire rope 16 is wound up.

以降、管材4が吊り下ろし装置11の設置階まで組み上がるまで、かかる作業を繰り返し、吊り下ろし装置11の設置階に設置される管材4の上部と、対応する配管とを接続する。その後、ガイドワイヤ31、吊り下ろし装置11、及び、仮設足場8等を撤去し、立管3の施工が完了する。   Thereafter, this operation is repeated until the pipe material 4 is assembled up to the installation floor of the hanging device 11, and the upper part of the pipe material 4 installed on the installation floor of the hanging device 11 is connected to the corresponding piping. Thereafter, the guide wire 31, the hanging device 11, the temporary scaffolding 8 and the like are removed, and the construction of the standing pipe 3 is completed.

以上詳述したように、本実施形態では、パイプシャフト2内において立管3の設置工事を行う階を貫通して鉛直に張られたガイドワイヤ31、及び、管材4とガイドワイヤ31との間を繋ぐ介助具41を設けることによって、吊り下ろし装置11に吊るされた管材4をガイドワイヤ31に沿って吊り下ろしていくことができる。このため、管材4を吊り下ろしていく際に、管材4が比較的大きく揺れてしまう(軌道を比較的大きく逸脱してしまう)ことを防止することができ、吊り下ろされる管材4がパイプシャフト2内に存在するその他の設備等(例えば、別の立管や仮設足場8、パイプシャフト2内のシャフトを形成する壁内面、パイプシャフト2内の床スラブ7・床材及び箱抜きした貫通部枠等)に接触してしまうといった事態を回避することができる。   As described in detail above, in the present embodiment, the guide wire 31 that extends vertically through the floor where the pipe 3 is installed in the pipe shaft 2, and the space between the pipe material 4 and the guide wire 31. By providing the assisting tool 41 that connects the pipes 4, the pipe member 4 suspended on the suspension device 11 can be suspended along the guide wire 31. For this reason, when the pipe material 4 is suspended, it is possible to prevent the pipe material 4 from shaking relatively large (relatively deviating from the trajectory). Other equipment, etc. existing in the inside (for example, another vertical pipe or temporary scaffold 8, the inner surface of the wall forming the shaft in the pipe shaft 2, the floor slab 7 in the pipe shaft 2, the floor material, and the boxed through portion frame Etc.) can be avoided.

さらに、管材4に連結部材21を取付けることにより、電動ホイスト15のフック17によって、管材4を当該管材4の中心軸の延長線上で支持することが可能になる。これにより、管材4が吊り下ろし装置11に吊られた状態では、吊り下ろし装置11のワイヤロープ16と、管材4の中心軸とが、鉛直方向に延びる同一の仮想直線上に位置することとなる。このため、管材4がバランス良く吊り下ろし装置11に吊られている状態となり、管材4を下降させる際に、管材4が揺れてしまうといったこと自体を抑制することができる。   Furthermore, by attaching the connecting member 21 to the pipe member 4, the pipe member 4 can be supported on the extension line of the central axis of the pipe member 4 by the hook 17 of the electric hoist 15. Thereby, in the state in which the pipe material 4 is hung on the hanging device 11, the wire rope 16 of the hanging device 11 and the central axis of the pipe material 4 are positioned on the same virtual straight line extending in the vertical direction. . For this reason, it will be in the state where the pipe material 4 was suspended by the suspension apparatus 11 with sufficient balance, and when the pipe material 4 is lowered | hung, it can suppress that the pipe material 4 shakes itself.

従って、管材の姿勢を安定させた状態でほぼ鉛直に吊り下ろしていくことができ、管材4を確実、かつ、比較的スムースに目的の設置階まで搬入することができる。結果として、吊り下ろし装置11の設置階と、該吊り下ろし装置11によって吊り下ろされている管材4を搬入する階との間の途中階において、吊られた管材4の動作を介助する(管材4の揺れを止めて下階へ送る)ための作業員を配備する等しなくても済み、作業性の向上やコストの抑制等を図ることができる。   Therefore, the tube material can be suspended substantially vertically with the posture of the tube material stabilized, and the tube material 4 can be reliably and smoothly carried to the target installation floor. As a result, the operation of the suspended pipe material 4 is assisted on the intermediate floor between the installation floor of the suspension apparatus 11 and the floor into which the pipe material 4 suspended by the suspension apparatus 11 is loaded (pipe material 4 It is not necessary to deploy a worker to stop the shaking and send it to the lower floor), and it is possible to improve workability and reduce costs.

また、日本国内で使用される管材4のパイプ5やフランジ6に関しては、基本的に日本工業規格(JIS)に適合したものが使用・流通されており、管の使用用途、内部を搬送する流体圧力、及び、管の材質などから規格化されていて、また、フランジ6に対応するフランジの中央開口を内実した閉止フランジ22も、管側と同じ厚さ、周囲孔6aの径及び数、フランジ面の当たり方などJISに適合するように製作される。さらに、連結部材21は、閉止フランジ22の中央部、すなわち、閉止フランジ22の重心位置に対して、これまた、例えば、JISB1168に機械器具吊り下げ用途に規定されているような、規格品のアイボルト23を取付けることで構成できることから、十分な強度を確保することのできる連結部材21を比較的簡単に得ることができる。従って、連結部材21の製作に関する作業性の向上、コストの抑制等を図ることができる。加えて、連結部材21と、管材4との取付に関しても、位置が合致するフランジ6の周囲孔6aと、閉止フランジ22の周囲孔22bとをボルト20で締結する取付となるため、確実かつスムースに行うことができる。   In addition, pipes 5 and flanges 6 of pipes 4 used in Japan are basically used and distributed in conformity with Japanese Industrial Standards (JIS). The closed flange 22 that is standardized from the pressure, the material of the pipe, and the like, and the center opening of the flange corresponding to the flange 6 is also the same thickness as the pipe side, the diameter and number of the peripheral holes 6a, the flange Manufactured to conform to JIS, such as how to hit the surface. Further, the connecting member 21 is a standard eyebolt as defined in JIS B 1168 for hanging a machine tool with respect to the center portion of the closing flange 22, that is, the center of gravity of the closing flange 22. Since it can comprise by attaching 23, the connection member 21 which can ensure sufficient intensity | strength can be obtained comparatively easily. Therefore, it is possible to improve the workability related to the production of the connecting member 21 and to reduce the cost. In addition, regarding the attachment of the connecting member 21 and the pipe member 4, since the peripheral hole 6 a of the flange 6 and the peripheral hole 22 b of the closing flange 22 that are matched in position are fastened with the bolts 20, reliable and smooth. Can be done.

尚、上記実施形態の記載内容に限定されず、例えば次のように実施してもよい。勿論、以下において例示しない他の応用例、変更例も当然可能である。   In addition, it is not limited to the description content of the said embodiment, For example, you may implement as follows. Of course, other application examples and modification examples not illustrated below are also possible.

(a)上記実施形態では、パイプシャフト2内が吹き抜けとなっているが、パイプシャフト2内にも床スラブ7が存在する現場に適用してもよい。また、上記実施形態の吊り下ろし装置11は、仮設足場8の開口部8aを跨ぐようにして設置される略門型の支持台12を備え、該支持台12にトロリーレール14、トロリー13、及び、電動ホイスト15を支持させる構成となっているが、例えば、支持台12及びトロリーレール14を設ける代わりに、吊り下ろし装置11の設置階の天井梁にトロリー13を取付けて、該トロリー13に電動ホイスト15を支持させるように構成してもよい。加えて、トロリー13を省略することも可能である。   (A) In the above embodiment, the inside of the pipe shaft 2 is blown out. However, the present invention may be applied to a site where the floor slab 7 is also present in the pipe shaft 2. The suspension device 11 of the above embodiment includes a substantially gate-shaped support base 12 installed so as to straddle the opening 8a of the temporary scaffold 8, and the support base 12 has a trolley rail 14, a trolley 13, and The electric hoist 15 is configured to be supported. For example, instead of providing the support 12 and the trolley rail 14, the trolley 13 is attached to the ceiling beam on the installation floor of the hanging device 11, and the trolley 13 is electrically driven. You may comprise so that the hoist 15 may be supported. In addition, the trolley 13 can be omitted.

尚、上記実施形態では、吊り下ろし装置11が、パイプシャフト2内に立管3の設置工事を行う階のうち最上階、若しくは、その1階上に設置されることとなっているが、例えば、建物の最上階まで立管工事を行うような場合等において、吊り下ろし装置11を塔屋にしてもよい。   In the above embodiment, the hanging device 11 is installed on the uppermost floor or the first floor among the floors where the pipe 3 is installed in the pipe shaft 2. The hanging device 11 may be a tower in cases such as when pipe work is performed up to the top floor of the building.

(b)上記実施形態では、2つの介助具41を用いて、管材4の上部及び下部をガイドワイヤ31に支持させるように構成されているが、上下の介助具41のうちどちらか一方だけを設けることとしてもよい。但し、上記実施形態のように、管材4が(極力離間した)2箇所でガイドワイヤ31に支持されることで、吊り下ろし装置11に吊られた状態の管材4の揺れを防止するといった作用効果がより一層奏されることとなる。   (B) In the above-described embodiment, the guide wire 31 is configured to support the upper and lower portions of the pipe material 4 using the two assistance tools 41, but only one of the upper and lower assistance tools 41 is supported. It is good also as providing. However, as in the above embodiment, the tubular material 4 is supported by the guide wire 31 at two locations (as far apart as possible), thereby preventing the tubular material 4 suspended in the hanging device 11 from shaking. Will be played even more.

(c)また、電動ホイスト15と連結部材21との間の連結や、管材4及び連結部材21とガイドワイヤ31との間の連結に使用される部材の具体的な構成や形状、連結位置等は特に限定されるものではなく、安全かつ着脱自在に連結可能であれば、別の構成を採用してもよい。例えば、上記実施形態では、連結部材21のアイボルト23を、電動ホイスト15のフック17で直接吊るのではなく、シャックル26を介在させているが、アイボルト23のリング部分が、前記フック17及び介助具41の補助ワイヤ42を挿通させるために十分な内径を有する場合には、シャックル26を省略することも可能である。さらに、上記実施形態では、補助ワイヤ42をシャックル26に挿通させて、管材4とガイドワイヤ31との間を繋ぐように構成されているが、例えば、補助ワイヤ42をアイボルト23のリング部分に挿通させたり、補助ワイヤ42をフック17に挿通させたりすることで、管材4とガイドワイヤ31との間を繋ぐように構成してもよい。また、例えば、補助ワイヤの両端にカラビナが設けられた介助具を使用してもよい。   (C) In addition, the specific configuration and shape of the members used for the connection between the electric hoist 15 and the connection member 21 and the connection between the pipe member 4 and the connection member 21 and the guide wire 31, the connection position, etc. Is not particularly limited, and another configuration may be adopted as long as it can be connected safely and detachably. For example, in the above embodiment, the eyebolt 23 of the connecting member 21 is not directly hung by the hook 17 of the electric hoist 15 but the shackle 26 is interposed, but the ring portion of the eyebolt 23 is connected to the hook 17 and the assisting tool. The shackle 26 may be omitted if the inner diameter is sufficient to allow the 41 auxiliary wires 42 to pass therethrough. Furthermore, in the above-described embodiment, the auxiliary wire 42 is inserted into the shackle 26 to connect between the tube material 4 and the guide wire 31. For example, the auxiliary wire 42 is inserted into the ring portion of the eyebolt 23. Alternatively, the tube 4 and the guide wire 31 may be connected by inserting the auxiliary wire 42 through the hook 17. For example, you may use the assistance tool in which the carabiner was provided in the both ends of the auxiliary wire.

1…ビルディング、2…パイプシャフト、3…立管、4…管材、6…フランジ、8…仮設足場、11…吊り下ろし装置、12…支持台、15…電動ホイスト、16…ワイヤロープ、17…フック、20…ボルト、21…連結部材、22…閉止フランジ、22a…取付孔、23…アイボルト、31…ガイドワイヤ、41…介助具。
DESCRIPTION OF SYMBOLS 1 ... Building, 2 ... Pipe shaft, 3 ... Standing pipe, 4 ... Pipe material, 6 ... Flange, 8 ... Temporary scaffolding, 11 ... Suspension apparatus, 12 ... Support stand, 15 ... Electric hoist, 16 ... Wire rope, 17 ... Hook, 20 ... bolt, 21 ... connecting member, 22 ... closing flange, 22a ... mounting hole, 23 ... eye bolt, 31 ... guide wire, 41 ... aid.

Claims (4)

建物のパイプシャフト内に立管の設置工事を行う階のうち最上階以上の階又は塔屋において、立管を構成する管材を吊り下ろし可能な吊り下ろし手段を設置し、前記吊り下ろし手段のロープ又はチェーンの下端に設けられた係止具に前記管材を連結して、当該管材を対象の設置階まで吊り下ろし、接続先と接続する立管の施工方法であって、
前記管材を吊り下ろす際には、
両端部にフランジが形成された前記管材の一端部に対して着脱自在に取付けられ、前記吊り下ろし手段の前記係止具に対して着脱自在に連結される、前記管材の一端部に装着された際には管材の中心軸延長に位置する係止部を備えた連結部材と、
パイプシャフト内において、前記吊り下ろし手段から、パイプシャフト内に立管の設置工事を行う階のうち最下階以下の階にかけて鉛直に緊張状態で延在するガイドワイヤと、
一端が前記管材の前記フランジ、前記係止具、又は、前記係止部に連結され、他端が前記ガイドワイヤに対して上下に摺動可能に係止される介助手段と
を用い、
さらに、前記連結部材は、
前記管材の開口部を閉塞するようにして、前記フランジに開設された周囲孔に対してボルトにより着脱自在に連結されるとともに、中央部に取付孔が形成された閉止フランジと、前記閉止フランジの前記取付孔に対応して前記閉止フランジに取付けられるアイボルトとを備えており、
前記連結部材を取付けた前記管材を前記吊り下ろし手段により吊下げ状態とすることで、前記吊り下ろし手段の前記ロープ又はチェーンと、前記管材の中心軸とを、鉛直方向に延びる同一の仮想直線上に位置させ、
前記介助手段によって、前記吊り下ろし手段により前記吊下げ状態とされた前記管材と、前記ガイドワイヤとの間を摺動可能に係止して、前記管材を前記ガイドワイヤに沿って設置階まで吊り下ろすことを特徴とする立管の施工方法。
A suspension means capable of suspending the pipe material constituting the standing pipe is installed in the floor or tower of the top floor or higher among the floors where the standing pipe is installed in the pipe shaft of the building, and the rope of the suspension means or The pipe is connected to a locking tool provided at the lower end of the chain, the pipe is suspended to the target installation floor, and a vertical pipe construction method for connecting to a connection destination,
When hanging the pipe,
Attached to one end portion of the tube material, which is detachably attached to one end portion of the tube material having flanges formed at both ends, and is detachably connected to the locking tool of the suspension means. On the occasion, a connecting member provided with a locking part located in the central axis extension of the pipe,
In the pipe shaft, from the suspension means, a guide wire extending in a tension state vertically to the floor below the lowest floor among the floors where the standing pipe is installed in the pipe shaft,
One end is connected to the flange of the tube, the locking tool, or the locking portion, and the other end is slidably locked up and down with respect to the guide wire.
Furthermore, the connecting member is
A closing flange having a mounting hole formed in a central portion thereof, which is detachably connected by a bolt to a peripheral hole formed in the flange so as to close the opening of the pipe, and the closing flange An eyebolt attached to the closing flange corresponding to the mounting hole,
By suspending the pipe member to which the connecting member is attached by the suspension means, the rope or chain of the suspension means and the central axis of the pipe material are on the same virtual straight line extending in the vertical direction. Located in
The assistance means slidably engages between the guide wire and the tube material suspended by the suspension means, and the tube material is suspended along the guide wire to the installation floor. A vertical pipe construction method characterized by lowering.
前記吊り下ろし手段は、
立管の設置工事を行う階のうち最上階以上の階又は塔屋の床レベルから立設されるか、
又は、立管の設置工事を行う階のうち最上階以上の階又は塔屋の天井梁から吊設される支持台と、
パイプシャフト内に並設される複数の立管の並び方向へ前記支持台の下部に延設されるトロリーレールと、
前記トロリーレールの延長方向へ移動可能に当該トロリーレールから吊り下げられるトロリーと
を備え、
前記介助手段によって、前記吊り下ろし手段により前記吊下げ状態とされた前記管材と、前記ガイドワイヤとの間を摺動可能に係止して、
前記ガイドワイヤに沿って設置階まで吊り下ろされた前記管材を、
前記介助手段の係止を解除した後、
前記設置階レベルのパイプシャフト内で、立管の並び方向に沿って前記吊下げ状態のまま所定の立管設置位置へ水平移動する
ことを特徴とする請求項1に記載の立管の施工方法。
The hanging means is
Is it erected from the floor level of the top floor or the tower floor of the floor where the installation work of the vertical pipe is done,
Or, a support stand suspended from the ceiling beam of the floor above the top floor or the tower in the floor where the installation work of the vertical pipe is performed,
A trolley rail extending to the lower part of the support base in the direction in which a plurality of vertical pipes arranged in parallel in the pipe shaft;
A trolley suspended from the trolley rail so as to be movable in the extension direction of the trolley rail,
The assistance means slidably engages between the guide wire and the tube material that has been suspended by the suspension means,
The pipe material suspended along the guide wire to the installation floor,
After unlocking the assistance means,
2. The vertical pipe construction method according to claim 1, wherein the vertical pipe is horizontally moved to a predetermined vertical pipe installation position in the suspended state along the vertical pipe arrangement direction in the pipe shaft at the installation floor level. .
建物のパイプシャフト内に立管の設置工事を行う階のうち最上階以上の階又は塔屋において、立管を構成する管材を吊り下ろし可能な吊り下ろし手段を設置し、前記吊り下ろし手段のロープ又はチェーンの下端に設けられた係止具に前記管材を連結して、当該管材を対象の設置階まで吊り下ろし、接続先と接続する立管施工のための仮設治具装置であって、
前記管材を吊り下ろすための、
両端部にフランジが形成された前記管材の一端部に対して、前記管材の開口部を閉塞するようにして前記フランジに開設された周囲孔に対してボルトにより着脱自在に連結して取付けられる中央部に取付孔が形成された閉止フランジと、前記吊り下ろし手段の前記係止具に対して着脱自在に連結される、前記管材の一端部に装着された際には、前記閉止フランジの前記取付孔に対応して前記閉止フランジに取付けられるアイボルトからなる管材の中心軸延長に位置する係止部を備えた連結部材と、
パイプシャフト内において、前記吊り下ろし手段から、パイプシャフト内に立管の設置工事を行う階のうち最下階以下の階にかけて鉛直に緊張状態で延在するガイドワイヤと、
一端が前記管材の前記フランジ、前記係止具、又は、前記係止部に連結され、他端が前記ガイドワイヤに対して上下に摺動可能に係止される介助手段と
を備え、
前記連結部材を取付けた前記管材を前記吊り下ろし手段により吊下げ状態とすることで、前記吊り下ろし手段の前記ロープ又はチェーンと、前記管材の中心軸とを、鉛直方向に延びる同一の仮想直線上に位置させて、
前記吊り下ろし手段により前記吊下げ状態とされた前記管材と、前記ガイドワイヤとの間を前記介助手段により摺動可能に係止し、前記管材を前記ガイドワイヤに沿って設置階まで吊り下ろすことが可能である
ことを特徴とする立管施工のための仮設治具装置。
A suspension means capable of suspending the pipe material constituting the standing pipe is installed in the floor or tower of the top floor or higher among the floors where the standing pipe is installed in the pipe shaft of the building, and the rope of the suspension means or It is a temporary jig device for standing pipe construction that connects the pipe material to a locking tool provided at the lower end of the chain, suspends the pipe material to the target installation floor, and connects to the connection destination.
For hanging the pipe,
And to one end of the tube member having a flange at both ends, mounted coupled detachably by bolts to the surrounding hole which is opened so as to close the opening of the tube member to the flange center a blind flange mounting hole is formed in part, are detachably connected to the locking means of the hanging down means, when attached to one end of the tube material, the attachment of the blind flange a connecting member having a locking portion corresponding to the hole located at the center axis extending in the tube consisting of eye bolt attached to the blind flange,
In the pipe shaft, from the suspension means, a guide wire extending in a tension state vertically to the floor below the lowest floor among the floors where the standing pipe is installed in the pipe shaft,
One end is connected to the flange of the tube, the locking tool, or the locking portion, and the other end includes an assisting means locked to the guide wire so as to be slidable up and down.
By suspending the pipe member to which the connecting member is attached by the suspension means, the rope or chain of the suspension means and the central axis of the pipe material are on the same virtual straight line extending in the vertical direction. Located in
The pipe member suspended by the suspension means and the guide wire are slidably locked by the assistance means, and the pipe material is suspended along the guide wire to the installation floor. This is a temporary jig device for standing pipe construction.
前記吊り下ろし手段は、The hanging means is
立管の設置工事を行う階のうち最上階以上の階又は塔屋の床レベルから立設されるか、又は、立管の設置工事を行う階のうち最上階以上の階又は塔屋の天井梁から吊設される支持台と、From the floors of the top floors or towers that are installed on the pipes, or from the floor level of the towers, or from the floors of the floors that are installed on the pipes or from the ceiling beams of the towers A suspended support base;
パイプシャフト内に並設される複数の立管の並び方向へ前記支持台の下部に延設されるトロリーレールと、A trolley rail extending to the lower part of the support base in the direction in which a plurality of vertical pipes arranged in parallel in the pipe shaft;
前記トロリーレールの延長方向へ移動可能に当該トロリーレールから吊り下げられるトロリーとA trolley suspended from the trolley rail so as to be movable in an extension direction of the trolley rail;
を備え、With
前記管材を前記ガイドワイヤに沿って設置階まで吊下ろし前記介助手段を解除した後、After lifting the tube along the guide wire to the installation floor and releasing the assistance means,
前記設置階レベルのパイプシャフト内で、立管の並び方向に沿って前記吊下げ状態のまま所定の立管設置位置へ水平移動可能であるWithin the pipe floor of the installation floor level, it is possible to move horizontally to a predetermined vertical pipe installation position in the suspended state along the vertical pipe arrangement direction.
ことを特徴とする請求項3に記載の立管施工のための仮設治具装置。The temporary jig apparatus for standing pipe construction of Claim 3 characterized by the above-mentioned.
JP2013060026A 2013-03-22 2013-03-22 Vertical pipe construction method and temporary jig device for vertical pipe construction Active JP6125289B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2013060026A JP6125289B2 (en) 2013-03-22 2013-03-22 Vertical pipe construction method and temporary jig device for vertical pipe construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2013060026A JP6125289B2 (en) 2013-03-22 2013-03-22 Vertical pipe construction method and temporary jig device for vertical pipe construction

Publications (2)

Publication Number Publication Date
JP2014185445A JP2014185445A (en) 2014-10-02
JP6125289B2 true JP6125289B2 (en) 2017-05-10

Family

ID=51833269

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2013060026A Active JP6125289B2 (en) 2013-03-22 2013-03-22 Vertical pipe construction method and temporary jig device for vertical pipe construction

Country Status (1)

Country Link
JP (1) JP6125289B2 (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105798491A (en) * 2016-03-23 2016-07-27 中冶建工集团有限公司 Welding construction method for steel pipe column casings of steel pipe column
CN107387869B (en) * 2017-08-14 2023-04-18 新奥新能源工程技术有限公司 Electric elevator device for indoor vertical pipe and method for mounting gas pipeline by using same
CN114182790A (en) * 2021-11-25 2022-03-15 中铁建设集团华东工程有限公司 Construction method of tube well vertical tube in super high-rise building engineering
CN114060617B (en) * 2022-01-14 2022-03-29 南通鹏亚精密机械科技有限公司 Support frame with hand-operated power-assisted structure for cement conveying equipment and implementation method thereof
CN115654214B (en) * 2022-11-29 2023-03-10 北京建工集团有限责任公司 Sliding type vertical pipe support and construction method thereof

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3781155B2 (en) * 1998-05-22 2006-05-31 日立プラント建設株式会社 Pipe suspension guide
JP4369025B2 (en) * 2000-08-04 2009-11-18 高砂熱学工業株式会社 Method for constructing a steel pipe and a lifting device used in the method
JP2008248664A (en) * 2007-03-30 2008-10-16 Shimizu Corp Hoisting method of curtain wall

Also Published As

Publication number Publication date
JP2014185445A (en) 2014-10-02

Similar Documents

Publication Publication Date Title
JP6125289B2 (en) Vertical pipe construction method and temporary jig device for vertical pipe construction
JP3185620U (en) Equipment fall prevention structure
CN111764629A (en) Method for mounting and dismounting inclined roof hanging basket without counterweight
CN108868139A (en) A kind of method of furred ceiling
JP2019052477A (en) Safety device for temporary scaffold
JP6338308B1 (en) Support
JP2009174156A (en) Temporary guide device for gondola, and temporarily guiding method
WO2023193403A1 (en) Row pipe bundle hoisting tooling and construction method therefor
JP6151528B2 (en) Air conditioning unit construction method
WO2007066667A1 (en) Elevator weight temporary placing device and weight installation method
JPH05178561A (en) Installation method for guide rail for elevator
JP2023129823A (en) Piping unit, working carriage, and construction method
KR20130043139A (en) Suspended scaffolding and platform
CN209815482U (en) Overhead hoist of aerated block
JP5635856B2 (en) Removal method of floor slab penetration of existing pipe
CN209907698U (en) Combined suspended ceiling
JP6121367B2 (en) Hanging material and wall construction method
JP7414242B2 (en) Piping unit, work trolley, and construction method
JP7376371B2 (en) Duct construction method
CN107387869B (en) Electric elevator device for indoor vertical pipe and method for mounting gas pipeline by using same
CN217630757U (en) Building furred ceiling connection structure
JP2009041307A (en) Support frame, method of setting the same, and building
CN214034838U (en) Novel suspension type turnover material platform for building
JP5382443B2 (en) How to renew an elevator
JP2012067521A (en) Guide member for vertical pipe construction and vertical pipe construction method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20151105

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20160830

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20160913

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20161111

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20170404

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20170405

R150 Certificate of patent or registration of utility model

Ref document number: 6125289

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250