JP6089091B1 - Elevator hoist installation jig and elevator hoist installation method - Google Patents

Elevator hoist installation jig and elevator hoist installation method Download PDF

Info

Publication number
JP6089091B1
JP6089091B1 JP2015238843A JP2015238843A JP6089091B1 JP 6089091 B1 JP6089091 B1 JP 6089091B1 JP 2015238843 A JP2015238843 A JP 2015238843A JP 2015238843 A JP2015238843 A JP 2015238843A JP 6089091 B1 JP6089091 B1 JP 6089091B1
Authority
JP
Japan
Prior art keywords
jig
hoisting machine
elevator
machine
hoistway
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2015238843A
Other languages
Japanese (ja)
Other versions
JP2017105562A (en
Inventor
智樹 飯島
智樹 飯島
太亮 木村
太亮 木村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Elevator and Building Systems Corp
Original Assignee
Toshiba Elevator Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Elevator Co Ltd filed Critical Toshiba Elevator Co Ltd
Priority to JP2015238843A priority Critical patent/JP6089091B1/en
Application granted granted Critical
Publication of JP6089091B1 publication Critical patent/JP6089091B1/en
Publication of JP2017105562A publication Critical patent/JP2017105562A/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

【課題】昇降路の上部への巻上機の設置作業の効率を向上させて作業時間を短縮させることができるエレベータ巻上機の設置治具を提供する。【解決手段】実施の形態によるエレベータ用巻上機の設置治具20は、治具本体21と、治具本体21に設けられ、揚重機10に吊り下げられる被吊下部22と、治具本体21に設けられ、エレベータ巻上機6bを吊り下げる巻上機吊下部23と、治具本体21から上方に突出し、互いに離間して、昇降路2の天井に当接可能な2つの突出部24と、を備えている。被吊下部22は、一方の突出部24から他方の突出部25に向かう方向に直交する方向であって水平方向で見たときに、一方の突出部24と他方の突出部24との間に配置されている。【選択図】図3The present invention provides an elevator hoisting machine installation jig capable of improving the efficiency of installation work of a hoisting machine on the upper part of a hoistway and shortening the working time. An elevator hoist installation jig 20 according to an embodiment includes a jig main body 21, a suspended lower portion 22 provided on the jig main body 21 and suspended from the lifting machine 10, and a jig main body. 21 and two protrusions 24 projecting upward from the jig body 21 and being spaced apart from each other and capable of contacting the ceiling of the hoistway 2. And. The suspended lower part 22 is a direction perpendicular to the direction from one projecting part 24 to the other projecting part 25 and when viewed in the horizontal direction, between the one projecting part 24 and the other projecting part 24. Has been placed. [Selection] Figure 3

Description

本発明の実施の形態は、エレベータ巻上機の設置治具およびエレベータ巻上機の設置方法に関する。   Embodiments of the present invention relate to an elevator hoist installation jig and an elevator hoist installation method.

機械室に既設巻上機が設置されていたエレベータ装置をリニューアルする際に、既設巻上機を撤去して、新設巻上機を、機械室ではなく昇降路の上部に設置する場合がある。この場合、昇降路の上部の側壁に、アンカーボルトを用いてブラケットが固定され、固定されたブラケットにビームを介して新設巻上機が設置される。   When renewing an elevator apparatus in which an existing hoisting machine has been installed in the machine room, the existing hoisting machine may be removed and the new hoisting machine may be installed in the upper part of the hoistway instead of the machine room. In this case, a bracket is fixed to the upper side wall of the hoistway using anchor bolts, and a new hoisting machine is installed on the fixed bracket via a beam.

特開2011−51742号公報JP 2011-51742 A 特開2012−56678号公報JP 2012-56678 A

しかしながら、昇降路の上部に新設巻上機を設置するための作業には多大な労力が費やされ、作業効率の向上が困難になっているという問題があった。この場合、新設巻上機を設置するために要する作業時間が増大し得る。   However, the work for installing the new hoisting machine on the upper part of the hoistway has a problem that much labor is expended and it is difficult to improve the working efficiency. In this case, the work time required for installing the new hoisting machine can be increased.

本発明は、このような点を考慮してなされたものであり、昇降路の上部への巻上機の設置作業の効率を向上させて作業時間を短縮させることができるエレベータ巻上機の設置治具およびエレベータ巻上機の設置方法を提供することを目的とする。   The present invention has been made in consideration of the above points, and the installation of an elevator hoisting machine capable of improving the efficiency of the hoisting machine installation work on the upper part of the hoistway and reducing the working time. It aims at providing the installation method of a jig | tool and an elevator hoisting machine.

実施の形態によるエレベータ巻上機の設置治具は、揚重機に吊り下げられるとともにエレベータ巻上機を吊り下げて、エレベータの機械室よりも下方に設けられた昇降路の上部に、揚重機によってエレベータ巻上機を揚重して設置するためのものである。このエレベータ巻上機の設置治具は、治具本体と、治具本体に設けられ、揚重機に吊り下げられる被吊下部と、治具本体に設けられ、エレベータ巻上機を吊り下げる巻上機吊下部と、治具本体から上方に突出し、互いに離間して、昇降路の天井に当接可能な2つの突出部と、を備えている。被吊下部は、一方の突出部から他方の突出部に向かう方向に直交する方向であって水平方向で見たときに、一方の突出部と他方の突出部との間に配置されている。   The elevator hoisting machine installation jig according to the embodiment is suspended by the lifting machine and the elevator hoisting machine is hung by the lifting machine at the upper part of the hoistway provided below the elevator machine room. It is for lifting and installing an elevator hoist. The elevator hoist installation jig includes a jig main body, a suspended lower part provided on the jig main body and suspended from the lifting machine, and a hoisting machine provided on the jig main body to suspend the elevator hoisting machine. A machine suspension lower part and two protrusions protruding upward from the jig main body and spaced apart from each other and capable of contacting the ceiling of the hoistway are provided. The suspended lower portion is disposed between one projecting portion and the other projecting portion when viewed in the horizontal direction in a direction orthogonal to the direction from one projecting portion toward the other projecting portion.

また、実施の形態によるエレベータ巻上機の設置方法は、エレベータの機械室よりも下方に設けられた昇降路の上部に、エレベータ巻上機を揚重して設置するためのものである。このエレベータ巻上機の設置方法は、上方に突出する2つの突出部を有する設置治具を揚重機に吊り下げるとともに、設置治具にエレベータ巻上機を吊り下げる工程と、設置治具を揚重機によって上昇させて、設置治具の2つの突出部を昇降路の天井に当接させる工程と、を備えている。2つの突出部が昇降路の天井に当接した状態で、エレベータ巻上機が昇降路内の設置位置に設置される。設置されたエレベータ巻上機から設置治具が取り外される。   Further, the elevator hoisting machine installation method according to the embodiment is for lifting and installing the elevator hoisting machine on the upper part of the hoistway provided below the elevator machine room. In this elevator hoist installation method, an installation jig having two projecting portions projecting upward is suspended from a lifting machine, the elevator hoist is suspended from the installation jig, and the installation jig is lifted. A step of raising by a heavy machine and bringing the two protrusions of the installation jig into contact with the ceiling of the hoistway. The elevator hoisting machine is installed at the installation position in the hoistway in a state where the two protrusions are in contact with the ceiling of the hoistway. The installation jig is removed from the installed elevator hoist.

図1は、本発明の第1の実施の形態におけるリニューアル前のエレベータ装置の概略構成を示す図である。FIG. 1 is a diagram showing a schematic configuration of an elevator apparatus before renewal according to the first embodiment of the present invention. 図2は、本発明の第1の実施の形態におけるリニューアル後のエレベータ装置の概略構成を示す図である。FIG. 2 is a diagram showing a schematic configuration of the elevator apparatus after the renewal according to the first embodiment of the present invention. 図3は、図2の新設巻上機を揚重して設置するための設置治具を示す図である。FIG. 3 is a view showing an installation jig for lifting and installing the new hoisting machine of FIG. 図4(a)〜(d)は、図2の新設巻上機の設置方法を説明するための概略図である。4 (a) to 4 (d) are schematic views for explaining the installation method of the new hoisting machine shown in FIG. 図5は、本発明の第2の実施の形態における設置治具を示す図である。FIG. 5 is a view showing an installation jig according to the second embodiment of the present invention. 図6(a)は、本発明の第3の実施の形態における突出部を示す正面図であり、図6(b)は、図6(a)に示す突出部の側面図である。Fig.6 (a) is a front view which shows the protrusion part in the 3rd Embodiment of this invention, FIG.6 (b) is a side view of the protrusion part shown to Fig.6 (a). 図7は、本発明の第4の実施の形態における突出部を示す斜視図である。FIG. 7 is a perspective view showing a protrusion in the fourth embodiment of the present invention. 図8は、本発明の第5の実施の形態における設置治具を示す正面断面図である。FIG. 8 is a front sectional view showing an installation jig according to the fifth embodiment of the present invention. 図9は、図8に示す設置治具の側面断面図である。FIG. 9 is a side sectional view of the installation jig shown in FIG. 図10は、本発明の第5の実施の形態における設置治具を示す平面図である。FIG. 10 is a plan view showing an installation jig according to the fifth embodiment of the present invention. 図11は、図10に示す設置治具を示す側面断面図である。11 is a side cross-sectional view showing the installation jig shown in FIG.

以下、図面を参照して本発明の実施の形態におけるエレベータ巻上機の設置治具およびエレベータ巻上機の設置方法について説明する。   Hereinafter, an elevator hoist installation jig and an elevator hoist installation method according to an embodiment of the present invention will be described with reference to the drawings.

(第1の実施の形態)
図1乃至図4を用いて、第1の実施の形態におけるエレベータ巻上機の設置治具およびエレベータ巻上機の設置方法について説明する。ここでは、まず、本実施の形態によるエレベータ巻上機の設置治具およびエレベータ巻上機の設置方法を好適に適用し得るリニューアル前後のエレベータ装置の構成について図1および図2を用いて説明する。
(First embodiment)
The elevator hoist installation jig and the elevator hoist installation method according to the first embodiment will be described with reference to FIGS. 1 to 4. Here, first, the configuration of the elevator apparatus before and after the renewal to which the elevator hoisting machine installation jig and the elevator hoisting machine installation method according to the present embodiment can be suitably applied will be described with reference to FIGS. 1 and 2. .

図1には、リニューアル前のエレベータ装置1aが示されている。図1に示すように、エレベータ装置1aは、昇降路2内を昇降可能な乗りかご3と、乗りかご3に既設主ロープ4aを介して連結された釣合錘5と、既設主ロープ4aを介して乗りかご3及び釣合錘5を昇降させる既設巻上機6aと、を備えている。このうち既設巻上機6aは、昇降路2よりも上方に設けられた機械室7に設置されている。既設主ロープ4aは、既設巻上機6aに連結された既設トラクションシーブ8aに巻き掛けられている。このような構成において、既設巻上機6が既設トラクションシーブ8aを回転駆動することにより、既設主ロープ4aが巻き上げられ、乗りかご3および釣合錘5がそれぞれ昇降する。なお、図1においては、便宜上、既設主ロープ4のうち乗りかご3の側の部分の図示は省略している。後述する図2においても同様である。   FIG. 1 shows an elevator apparatus 1a before renewal. As shown in FIG. 1, an elevator apparatus 1a includes a car 3 that can be raised and lowered in a hoistway 2, a counterweight 5 that is connected to the car 3 via an existing main rope 4a, and an existing main rope 4a. And an existing hoisting machine 6a for raising and lowering the car 3 and the counterweight 5. Among these, the existing hoisting machine 6 a is installed in a machine room 7 provided above the hoistway 2. The existing main rope 4a is wound around the existing traction sheave 8a connected to the existing hoisting machine 6a. In such a configuration, when the existing hoisting machine 6 rotationally drives the existing traction sheave 8a, the existing main rope 4a is wound up, and the car 3 and the counterweight 5 are raised and lowered, respectively. In FIG. 1, the illustration of the portion of the existing main rope 4 on the side of the car 3 is omitted for convenience. The same applies to FIG. 2 described later.

次に、リニューアル後のエレベータ装置1bについて図2を用いて説明する。図2に示すように、リニューアル後のエレベータ装置1bでは、機械室7に設置されていた既設巻上機6aおよび既設主ロープ4a(図1参照)が撤去されている。この既設巻上機6aの代替えとして、機械室7ではなく、昇降路2の上部に新設巻上機6bが設置されている。この新設巻上機6bは、昇降路2の側壁にアンカーボルトを用いて固定されたブラケット(何れも図示せず)に、ビーム9を介して設置されている。なお、図示しないが、乗りかご3用のガイドレールと釣合錘5用のガイドレールに、鋼材により一体的に構成されたやぐらが取り付けられ、このやぐらに、マシンベッドを介して新設巻上機6bが設置される場合もある。新設巻上機6bには新設トラクションシーブ8bが連結されており、新設トラクションシーブ8bには、新設主ロープ4bが巻き掛けられている。新設主ロープ4bは、乗りかご3および釣合錘5に連結されている。このような構成において、新設巻上機6bが新設トラクションシーブ8bを回転駆動することにより、新設主ロープ4bが巻き上げられ、乗りかご3および釣合錘5がそれぞれ昇降する。   Next, the elevator apparatus 1b after renewal will be described with reference to FIG. As shown in FIG. 2, in the elevator apparatus 1b after the renewal, the existing hoisting machine 6a and the existing main rope 4a (see FIG. 1) installed in the machine room 7 are removed. As an alternative to the existing hoisting machine 6a, a new hoisting machine 6b is installed not in the machine room 7 but in the upper part of the hoistway 2. The newly installed hoist 6b is installed via a beam 9 on a bracket (none of which is shown) fixed to the side wall of the hoistway 2 using anchor bolts. Although not shown in the figure, a tower made of steel material is attached to the guide rail for the car 3 and the guide rail for the counterweight 5, and a new hoisting machine is attached to the tower through a machine bed. 6b may be installed. A new traction sheave 8b is connected to the new hoisting machine 6b, and a new main rope 4b is wound around the new traction sheave 8b. The new main rope 4 b is connected to the car 3 and the counterweight 5. In such a configuration, the newly installed hoisting machine 6b rotationally drives the newly installed traction sheave 8b, whereby the newly installed main rope 4b is wound up, and the car 3 and the counterweight 5 are respectively moved up and down.

本実施の形態におけるエレベータ巻上機の設置治具および設置方法は、図1に示すエレベータ装置1aから、図2に示すエレベータ装置1bにリニューアルする場合、とりわけ、昇降路2の上部に新設巻上機6bを揚重して設置する場合に好適に適用され得る。   The elevator hoisting machine installation jig and installation method according to the present embodiment is the case where the elevator device 1a shown in FIG. 1 is renewed to the elevator device 1b shown in FIG. This can be suitably applied when the machine 6b is lifted and installed.

次に、図3を用いて、本実施の形態によるエレベータ巻上機の設置治具(以下、単に設置治具と記す)について説明する。設置治具20は、揚重機10に吊り下げられるとともに新設巻上機6b(エレベータ巻上機)を吊り下げて、エレベータの機械室7よりも下方に設けられた昇降路2の上部に、揚重機10によって新設巻上機6bを揚重して設置するための治具である。   Next, an installation jig (hereinafter simply referred to as an installation jig) for the elevator hoisting machine according to the present embodiment will be described with reference to FIG. The installation jig 20 is hung on the lifting machine 10 and a new hoisting machine 6b (elevator hoisting machine) is hung on the hoistway 2 provided below the machine room 7 of the elevator. This is a jig for lifting and installing the new hoisting machine 6b by the heavy machine 10.

図3に示すように、本実施の形態による設置治具20は、治具本体21と、治具本体20の上面に設けられた被吊下部22と、を備えている。このうち治具本体21は、後述する突出部24が昇降路2の天井2a(機械室7の床)に当接した場合に水平方向に延びるような矩形状に形成されている。この場合、治具本体21は、例えば、角パイプ状の部材によって形成することができ、または、2つの溝形鋼を向かい合わせて互いに溶接して角パイプ状に形成することができる。なお、図3においては、後述する当接部24が昇降路2の天井2aと離間しているにもかかわらず、便宜上、治具本体21が水平に配置されている状態を示している(後述する図5も同様)。この状態において、本実施の形態による治具本体21は、その長手方向が水平方向に延びるように矩形状に形成されている。そして、本明細書においては、「上部」、「下部」、「上方」などの方向を示す用語は、設置治具20が、図3に示すような状態に配置されている場合を想定して使用するものとする。   As shown in FIG. 3, the installation jig 20 according to the present embodiment includes a jig main body 21 and a suspended lower portion 22 provided on the upper surface of the jig main body 20. Among these, the jig body 21 is formed in a rectangular shape that extends in the horizontal direction when a projecting portion 24 to be described later contacts the ceiling 2a of the hoistway 2 (the floor of the machine room 7). In this case, the jig body 21 can be formed by, for example, a square pipe-shaped member, or can be formed in a square pipe shape by welding two groove steels facing each other. Note that FIG. 3 shows a state in which the jig main body 21 is horizontally disposed for the sake of convenience, although a contact portion 24 described later is separated from the ceiling 2a of the hoistway 2 (described later). The same applies to FIG. 5). In this state, the jig body 21 according to the present embodiment is formed in a rectangular shape so that its longitudinal direction extends in the horizontal direction. In the present specification, terms indicating directions such as “upper”, “lower”, and “upper” are based on the assumption that the installation jig 20 is arranged in the state shown in FIG. Shall be used.

被吊下部22は、揚重機10に吊り下げられるように構成されている。本実施の形態においては、被吊下部22は、揚重機10に揚重機側チェーン11(揚重機側吊下部材)を介して連結されている。揚重機10は、昇降路2よりも上方に設けられた機械室7内に設置されている。揚重機側チェーン11は、昇降路2の天井2a(機械室7の床)に設けられた主ロープ用孔13を通過していることが好適である。この主ロープ用孔13は、図1に示すリニューアル前のエレベータ装置1aにおいて、機械室7内に設置されていた既設巻上機6aが巻き上げていた既設主ロープ4aが通過していた孔となっている。   The suspended lower part 22 is configured to be suspended from the lifting machine 10. In the present embodiment, the suspended lower part 22 is connected to the lifting machine 10 via a lifting machine side chain 11 (lifting machine side suspension member). The lifting machine 10 is installed in a machine room 7 provided above the hoistway 2. It is preferable that the lifting machine side chain 11 passes through a main rope hole 13 provided in the ceiling 2a of the hoistway 2 (the floor of the machine room 7). The main rope hole 13 is a hole through which the existing main rope 4a, which has been wound up by the existing hoisting machine 6a installed in the machine room 7, in the elevator apparatus 1a before renewal shown in FIG. ing.

治具本体21の下面には、新設巻上機6bを吊り下げる巻上機吊下部23が設けられている。新設巻上機6bは、巻上機側チェーン12(巻上機側吊下部材)を介して巻上機吊下部23に連結されて、設置治具20に吊り下げられるようになっている。   The lower surface of the jig body 21 is provided with a hoisting machine suspension 23 for suspending the new hoisting machine 6b. The newly installed hoisting machine 6b is connected to the hoisting machine suspension 23 via the hoisting machine side chain 12 (hoisting machine side hanging member) and is suspended from the installation jig 20.

治具本体20の上面から、2つの突出部24が上方に突出している。これらの突出部24は、設置治具20が昇降路2の上部に揚重された場合に、昇降路2の天井2aに当接可能になっている。より具体的には、突出部24の上面24aが天井2aに当接し得る。2つの突出部24は、水平方向に互いに離間しており、図3に示す形態では、治具本体21の長手方向の両端部に配置されている。   Two protrusions 24 protrude upward from the upper surface of the jig body 20. These protrusions 24 can come into contact with the ceiling 2 a of the hoistway 2 when the installation jig 20 is lifted on the upper part of the hoistway 2. More specifically, the upper surface 24a of the protrusion 24 can abut on the ceiling 2a. The two protrusions 24 are spaced apart from each other in the horizontal direction, and are arranged at both ends in the longitudinal direction of the jig body 21 in the form shown in FIG.

被吊下部22は、一方の突出部24から他方の突出部24に向かう方向(図3における左右方向)に直交する方向であって水平方向で見たときに、一方の突出部24と他方の突出部24との間に配置されている。すなわち、図3の紙面に垂直な方向で見たときに、被吊下部22は、2つの突出部24の間に配置されている。そして、被吊下部22は、治具本体21の水平方向中心からずれた位置(図3に示す形態では中心から右側にずれた位置)に配置されている。   The suspended lower part 22 is a direction perpendicular to the direction from the one projecting part 24 to the other projecting part 24 (the left-right direction in FIG. 3), and when viewed in the horizontal direction, the one projecting part 24 and the other projecting part 22 It arrange | positions between the protrusion parts 24. FIG. That is, the suspended lower part 22 is disposed between the two protrusions 24 when viewed in a direction perpendicular to the paper surface of FIG. The suspended lower part 22 is arranged at a position shifted from the horizontal center of the jig body 21 (position shifted from the center to the right side in the embodiment shown in FIG. 3).

巻上機吊下部23は、治具本体21の一方(図3に示す形態では右側)の端部に配置されている。図3に示す形態では、治具本体21の右側の端部に配置された突出部24よりも下方に配置されている。   The hoisting machine suspending portion 23 is disposed at one end of the jig body 21 (on the right side in the embodiment shown in FIG. 3). In the form shown in FIG. 3, the jig body 21 is disposed below the protrusion 24 disposed at the right end.

次に、このように構成からなる本実施の形態における作用について説明する。ここでは、図1に示すエレベータ装置1aから、図2に示すエレベータ装置1bにリニューアルする際に、昇降路2の上部に新設巻上機6bを揚重して設置する設置方法について説明する。   Next, the operation of the present embodiment configured as described above will be described. Here, an installation method for lifting and installing the new hoisting machine 6b on the upper part of the hoistway 2 when the elevator apparatus 1a shown in FIG. 1 is renewed to the elevator apparatus 1b shown in FIG.

まず、図3に示すように、機械室7内に揚重機10が設置される。なお、機械室7に設置されていた既設巻上機6a(図1参照)と、既設巻上機6aが巻き上げていた既設主ロープ4aとは、この揚重機10を設置する時点ですでに撤去されていることが好適である。   First, as shown in FIG. 3, the lifting machine 10 is installed in the machine room 7. The existing hoisting machine 6a (see FIG. 1) installed in the machine room 7 and the existing main rope 4a wound up by the existing hoisting machine 6a have already been removed at the time of installing the lifting machine 10. It is preferred that

続いて、設置治具20が揚重機10に吊り下げられるとともに、設置治具20に新設巻上機6bが吊り下げられる。   Subsequently, the installation jig 20 is suspended from the lifting machine 10, and the new hoisting machine 6 b is suspended from the installation jig 20.

この場合、まず、上方に突出する2つの突出部24を有する設置治具20を準備する。   In this case, first, an installation jig 20 having two projecting portions 24 projecting upward is prepared.

続いて、設置治具20の被吊下部22が、揚重機10に揚重機側チェーン11を介して連結される。このことにより、設置治具20が揚重機10に吊り下げられる。この際、揚重機側チェーン11は、昇降路2の天井2aに設けられた、エレベータ装置1aの既設主ロープ4aが通過していた主ロープ用孔13を通過することが好適である。一方、設置治具20の巻上機吊下部23に、巻上機側チェーン12を介して新設巻上機6bが連結される。このことにより、設置治具20に新設巻上機6bが吊り下げられる。   Subsequently, the suspended lower part 22 of the installation jig 20 is connected to the lifting machine 10 via the lifting machine side chain 11. As a result, the installation jig 20 is suspended from the lifting machine 10. At this time, it is preferable that the lifting machine side chain 11 passes through the main rope hole 13 provided in the ceiling 2a of the hoistway 2 through which the existing main rope 4a of the elevator apparatus 1a has passed. On the other hand, the newly installed hoisting machine 6 b is connected to the hoisting machine suspension 23 of the installation jig 20 via the hoisting machine side chain 12. As a result, the new hoisting machine 6 b is suspended from the installation jig 20.

設置治具20が揚重機10に吊り下げられるとともに設置治具20に新設巻上機6bが吊り下げられた後、設置治具20および新設巻上機6bが揚重機10によって上昇して、設置治具20の2つの突出部24が昇降路2の天井2aに当接する。   After the installation jig 20 is suspended from the lifting machine 10 and the new hoisting machine 6b is suspended from the installation jig 20, the installation jig 20 and the new hoisting machine 6b are raised by the hoisting machine 10 and installed. The two protrusions 24 of the jig 20 abut on the ceiling 2 a of the hoistway 2.

この場合、まず、設置治具20の2つの突出部24のうちの一方の突出部24が昇降路2の天井2aに当接するまでは、設置治具20が揚重機10から上方に向く力を受けて、設置治具20および新設巻上機6bは上昇する。この間、設置治具20の治具本体21は、図4(a)に示すように、巻上機吊下部23の側の端部が、新設巻上機6bの重さによって下方に位置づけられるように傾く。このように傾いた状態で設置治具20および新設巻上機6bが上昇していくと、図4(b)に示すように、一方(図4に示す左側)の突出部24が昇降路2の天井2aに当接する。当該一方の突出部24が天井2aに当接した後においても、設置治具20は揚重機10から上方に向く力を受ける。このことにより、図4(c)に示すように、天井2aに当接した左側の突出部24と天井2aとの接点を支点にして、設置治具20が図4における反時計回りの方向に回動する。このため、設置治具20の治具本体21の傾きが徐々に小さくなっていき、新設巻上機6bは更に上昇する。その後、図4(d)に示すように、他方(図4に示す右側)の突出部24が昇降路2の天井2aに当接する。このことにより、2つの突出部24が天井2aに当接し、設置治具20の回動が停止する。また、新設巻上機6bが昇降路2の上部に達し、新設巻上機6bの上昇が停止する。   In this case, first, until one of the two protrusions 24 of the installation jig 20 comes into contact with the ceiling 2 a of the hoistway 2, the installation jig 20 has a force to be directed upward from the lifting machine 10. In response, the installation jig 20 and the new hoisting machine 6b rise. During this time, as shown in FIG. 4A, the jig body 21 of the installation jig 20 is positioned so that the end of the hoisting machine suspension 23 side is positioned downward by the weight of the new hoisting machine 6b. Lean on. When the installation jig 20 and the new hoisting machine 6b are lifted in such a tilted state, as shown in FIG. 4 (b), one (left side shown in FIG. 4) protruding portion 24 becomes the hoistway 2. Abuts on the ceiling 2a. Even after the one projecting portion 24 comes into contact with the ceiling 2a, the installation jig 20 receives the upward force from the lifting machine 10. As a result, as shown in FIG. 4C, the installation jig 20 is rotated in the counterclockwise direction in FIG. 4 with the contact point between the left protruding portion 24 in contact with the ceiling 2a and the ceiling 2a as a fulcrum. Rotate. For this reason, the inclination of the jig main body 21 of the installation jig 20 gradually decreases, and the new hoisting machine 6b further rises. Thereafter, as shown in FIG. 4D, the other (right side shown in FIG. 4) protrusion 24 comes into contact with the ceiling 2 a of the hoistway 2. As a result, the two protrusions 24 come into contact with the ceiling 2a, and the rotation of the installation jig 20 is stopped. Further, the new hoisting machine 6b reaches the upper part of the hoistway 2, and the ascent of the new hoisting machine 6b stops.

その後、2つの突出部24が昇降路2の天井2aに当接した状態で、新設巻上機6bが昇降路2の設置位置に設置される。より具体的には、昇降路2の側壁には、アンカーボルトを用いて固定されたブラケットにビーム9が予め固定されている。昇降路2の上部に達した新設巻上機6bは、設置治具20に吊り下げられた状態で、このビーム9上に移動される。2つの突出部24が天井2aに当接した状態においても、設置治具20は揚重機10から上方に向く力を受けている。このことにより、昇降路2の上部に達した設置治具20および新設巻上機6bの姿勢を安定化させることができる。ビーム9上に移動した新設巻上機6bは、ビーム9に取り付けられる。このようにして、新設巻上機6bが設置位置に設置される。   Thereafter, the new hoisting machine 6b is installed at the installation position of the hoistway 2 in a state where the two protrusions 24 are in contact with the ceiling 2a of the hoistway 2. More specifically, the beam 9 is fixed in advance on a side wall of the hoistway 2 to a bracket fixed using anchor bolts. The new hoisting machine 6b that has reached the upper part of the hoistway 2 is moved onto the beam 9 while being suspended from the installation jig 20. Even in a state where the two protruding portions 24 are in contact with the ceiling 2a, the installation jig 20 receives a force directed upward from the lifting machine 10. Thereby, the attitude | position of the installation jig | tool 20 and the new winding machine 6b which reached the upper part of the hoistway 2 can be stabilized. The new hoisting machine 6 b that has moved onto the beam 9 is attached to the beam 9. In this way, the new hoisting machine 6b is installed at the installation position.

新設巻上機6bが設置位置に設置された後、設置治具20が新設巻上機6bから取り外される。より具体的には、巻上機側チェーン12が新設巻上機6bから取り外される。そして、巻上機側チェーン12、設置治具20および揚重機側チェーン11が撤去されて、揚重機10が撤去される。   After the new hoisting machine 6b is installed at the installation position, the installation jig 20 is removed from the new hoisting machine 6b. More specifically, the hoisting machine side chain 12 is removed from the newly installed hoisting machine 6b. Then, the hoisting machine side chain 12, the installation jig 20, and the lifting machine side chain 11 are removed, and the lifting machine 10 is removed.

このようにして、新設巻上機6bが昇降路2の上部に揚重されて設置され、新設巻上機6bの設置作業が終了する。   In this way, the new hoisting machine 6b is lifted and installed on the upper part of the hoistway 2, and the installation work of the new hoisting machine 6b is completed.

このように本実施の形態によれば、設置治具20が、治具本体21から上方に突出する2つの突出部24を有している。このことにより、新設巻上機6bを吊り下げた設置治具20が昇降路2の上部に達した場合に、2つの突出部24を昇降路2の天井2aに当接させることができる。これら2つの突出部24を天井2aに当接させた状態で、設置治具20が揚重機10から上方に向く力を受けることにより、設置治具20の姿勢を安定化させることができる。このため、昇降路2の上部に達した設置治具20および新設巻上機6bの姿勢を安定化させることができる。この結果、昇降路2の上部への新設巻上機6bの設置作業の効率を向上させて作業時間を短縮させることができる。とりわけ、昇降路2の上部に達した設置治具20および新設巻上機6bの姿勢を安定化させることができるため、新設巻上機6bを設置位置にスムースに移動させることができる。このため、昇降路2の上部への新設巻上機6bの設置作業の効率を向上させることができる。   Thus, according to the present embodiment, the installation jig 20 has the two protruding portions 24 protruding upward from the jig main body 21. Thus, when the installation jig 20 that suspends the newly installed hoisting machine 6b reaches the upper part of the hoistway 2, the two protruding portions 24 can be brought into contact with the ceiling 2a of the hoistway 2. The posture of the installation jig 20 can be stabilized when the installation jig 20 receives the upward force from the lifting machine 10 in a state where the two protrusions 24 are in contact with the ceiling 2a. For this reason, the attitude | position of the installation jig | tool 20 and the new winding machine 6b which reached the upper part of the hoistway 2 can be stabilized. As a result, the efficiency of installing the new hoisting machine 6b on the upper part of the hoistway 2 can be improved and the working time can be shortened. In particular, since the posture of the installation jig 20 and the new hoisting machine 6b reaching the upper part of the hoistway 2 can be stabilized, the new hoisting machine 6b can be smoothly moved to the installation position. For this reason, the efficiency of the installation work of the newly installed hoisting machine 6b in the upper part of the hoistway 2 can be improved.

また、本実施の形態によれば、設置治具20を揚重機10に連結する揚重機側チェーン11は、昇降路2の天井2aに設けられた、リニューアル前のエレベータ装置1aの既設主ロープ4aが通過していた主ロープ用孔13を通過している。このことにより、天井2aに、揚重機側チェーン11を通過させるために、新たに孔を設けることを不要にできる。このため、昇降路2の上部への新設巻上機6bの設置作業の効率を向上させて、作業時間を短縮させることができる。   Moreover, according to this Embodiment, the lifting machine side chain 11 which connects the installation jig 20 to the lifting machine 10 is provided in the ceiling 2a of the hoistway 2, and the existing main rope 4a of the elevator apparatus 1a before renewal. Has passed through the main rope hole 13. This eliminates the need for providing a new hole in the ceiling 2a in order to allow the lifting machine side chain 11 to pass therethrough. For this reason, the efficiency of the installation work of the newly installed hoist 6b on the upper part of the hoistway 2 can be improved, and the work time can be shortened.

なお、上述した本実施の形態においては、設置治具20に新設巻上機6bを吊り下げた後、設置治具20の2つの突出部24のうちの一方が昇降路2の天井2aに当接する例について説明した。しかしながら、このことに限られることはなく、設置治具20に新設巻上機6bが吊り下げられる前に、2つの突出部24のうちの一方の突出部24を、天井2aに当接するようにしてもよい。すなわち、新設巻上機6bを、昇降路2の底部ではなく、上部またはその近傍から昇降路2内に搬入する場合がある。この場合には、図4(b)に示すように一方の突出部24を天井2aに当接させた後、設置治具20に新設巻上機6bが吊り下げられるようにしてもよい。この状態において、設置治具20が揚重機10から上方に向く力を受けることにより、図4(c)に示すように設置治具20が回動して新設巻上機6bを上昇させることができ、昇降路2の上部への新設巻上機6bの設置作業の効率を向上させることができる。   In the present embodiment described above, after the new hoisting machine 6b is suspended from the installation jig 20, one of the two protrusions 24 of the installation jig 20 contacts the ceiling 2a of the hoistway 2. The contact example has been described. However, the present invention is not limited to this. Before the new hoisting machine 6b is suspended from the installation jig 20, one of the two protrusions 24 is brought into contact with the ceiling 2a. May be. That is, the new hoisting machine 6b may be carried into the hoistway 2 not from the bottom of the hoistway 2 but from the upper part or the vicinity thereof. In this case, as shown in FIG. 4B, the new hoisting machine 6 b may be suspended from the installation jig 20 after one projecting portion 24 is brought into contact with the ceiling 2 a. In this state, when the installation jig 20 receives a force directed upward from the lifting machine 10, the installation jig 20 rotates to raise the new hoisting machine 6 b as shown in FIG. It is possible to improve the efficiency of installation work of the new hoisting machine 6b on the upper part of the hoistway 2.

(第2の実施の形態)
次に、図5を用いて、本発明の第2の実施の形態におけるエレベータ巻上機の設置治具およびエレベータ巻上機の設置方法について説明する。
(Second Embodiment)
Next, an elevator hoist installation jig and an elevator hoist installation method according to the second embodiment of the present invention will be described with reference to FIG.

図5に示す第2の実施の形態においては、治具本体の両端部に、昇降路の側壁に当接する振れ止め部材が設けられている点が主に異なり、他の構成は、図1乃至図4に示す第1の実施の形態と略同一である。なお、図5において、図1乃至図4に示す第1の実施の形態と同一部分には同一符号を付して詳細な説明は省略する。   The second embodiment shown in FIG. 5 is mainly different in that a steadying member that contacts the side wall of the hoistway is provided at both ends of the jig main body. This is substantially the same as the first embodiment shown in FIG. In FIG. 5, the same parts as those of the first embodiment shown in FIGS. 1 to 4 are denoted by the same reference numerals, and detailed description thereof is omitted.

図5に示すように、本実施の形態においては、治具本体21の両端部に、昇降路2の側壁2bに当接する振れ止め部材30が設けられている。この振れ止め部材30は、治具本体21に対して取り外し可能に取り付けられていることが好適である。この場合、振れ止め部材30は、設置治具20の2つの突出部24が昇降路2の天井2aに当接した後に治具本体21に取り付けることができる。このことにより、設置治具20および新設巻上機6bを上昇させている間、治具本体21から振れ止め部材30を取り外しておくことができ、設置治具20および新設巻上機6bをスムースに上昇させることが可能になる。   As shown in FIG. 5, in the present embodiment, an anti-sway member 30 that contacts the side wall 2 b of the hoistway 2 is provided at both ends of the jig body 21. It is preferable that this steadying member 30 is detachably attached to the jig body 21. In this case, the steadying member 30 can be attached to the jig body 21 after the two protrusions 24 of the installation jig 20 abut on the ceiling 2a of the hoistway 2. Accordingly, the steadying member 30 can be removed from the jig body 21 while the installation jig 20 and the new hoisting machine 6b are raised, and the installation jig 20 and the new hoisting machine 6b can be smoothly moved. It becomes possible to raise it.

振れ止め部材30の長さが調節可能に構成されていることが好適である。このことにより、設置治具20の2つの突出部24が昇降路2の天井2aに当接した後に、治具本体21と昇降路2の側壁2bとの間の距離に応じて、振れ止め部材30の長さを調整することができる。このため、振れ止め部材30を昇降路2の側壁2bにより一層確実に当接させることができ、設置治具20および新設巻上機6bの姿勢をより一層安定化させることができる。   It is preferable that the length of the steady rest member 30 is configured to be adjustable. As a result, after the two projecting portions 24 of the installation jig 20 abut on the ceiling 2a of the hoistway 2, the steadying member depends on the distance between the jig body 21 and the side wall 2b of the hoistway 2. The length of 30 can be adjusted. For this reason, the steadying member 30 can be contact | abutted more reliably by the side wall 2b of the hoistway 2, and the attitude | position of the installation jig 20 and the newly installed hoisting machine 6b can be stabilized further.

振れ止め部材30は、治具本体21の長手方向(図5における左右方向)の両端部に取り付けられていればよいが、これに限られることはない。例えば、治具本体21の前後方向(奥行き方向)に取り付けられるようにしてもよい。この場合においても、設置治具20の振れ止めを行うことができ、設置治具20の姿勢を安定化させることができる。   The steadying member 30 may be attached to both ends of the jig body 21 in the longitudinal direction (left and right direction in FIG. 5), but is not limited thereto. For example, the jig body 21 may be attached in the front-rear direction (depth direction). Also in this case, the installation jig 20 can be steady, and the posture of the installation jig 20 can be stabilized.

このように本実施の形態によれば、治具本体21の両端部に、昇降路2の側壁2bに当接する振れ止め部材30が設けられている。このことにより、新設巻上機6bを吊り下げた設置治具20が振れる(揺れる)ことを防止できる。このため、設置治具20の姿勢をより一層安定化させることができる。この結果、昇降路2の上部への新設巻上機6bの設置作業の効率をより一層向上させて作業時間をより一層短縮させることができる。   As described above, according to the present embodiment, the steadying member 30 that abuts against the side wall 2 b of the hoistway 2 is provided at both ends of the jig main body 21. As a result, it is possible to prevent the installation jig 20 from which the newly installed hoist 6b is suspended from shaking (shaking). For this reason, the attitude | position of the installation jig | tool 20 can be stabilized further. As a result, the efficiency of the installation work of the new hoisting machine 6b above the hoistway 2 can be further improved, and the work time can be further shortened.

なお、上述した本実施の形態においては、振れ止め部材30が、治具本体21に取り外し可能に取り付けられている例について説明した。しかしながら、このことに限られることはなく、振れ止め部材30は、治具本体21の内部に装着されていてもよい。この場合、設置治具20の2つの突出部24が昇降路2の天井2aに当接した後に、振れ止め部材30が、昇降路2の側壁2bの側に進出して当該側壁2bに当接するようにしてもよい。   In the above-described embodiment, the example in which the steadying member 30 is detachably attached to the jig body 21 has been described. However, the present invention is not limited to this, and the steadying member 30 may be mounted inside the jig main body 21. In this case, after the two protrusions 24 of the installation jig 20 come into contact with the ceiling 2a of the hoistway 2, the steady member 30 advances to the side wall 2b of the hoistway 2 and comes into contact with the side wall 2b. You may do it.

(第3の実施の形態)
次に、図6を用いて、本発明の第3の実施の形態におけるエレベータ巻上機の設置治具およびエレベータ巻上機の設置方法について説明する。
(Third embodiment)
Next, an elevator hoist installation jig and an elevator hoist installation method according to the third embodiment of the present invention will be described with reference to FIG.

図6に示す第3の実施の形態においては、突出部の高さが別々に調節可能になっている点が主に異なり、他の構成は、図1乃至図4に示す第1の実施の形態と略同一である。なお、図6において、図1乃至図4に示す第1の実施の形態と同一部分には同一符号を付して詳細な説明は省略する。   The third embodiment shown in FIG. 6 is mainly different in that the height of the protruding portion can be adjusted separately, and the other configuration is the same as that of the first embodiment shown in FIGS. It is almost the same as the form. In FIG. 6, the same parts as those of the first embodiment shown in FIGS. 1 to 4 are denoted by the same reference numerals, and detailed description thereof is omitted.

図6(a)、(b)に示すように、本実施の形態においては、設置治具20の突出部24の各々の高さは、別々に調節可能になっている。   As shown in FIGS. 6A and 6B, in the present embodiment, the height of each protrusion 24 of the installation jig 20 can be adjusted separately.

より具体的には、図6(a)、(b)に示すように、突出部24は、治具本体21の側に設けられた本体側部材41と、昇降路2の天井2aの側に設けられた天井側部材42と、を有している。このうち本体側部材41および天井側部材42は、パイプ状(好適には角パイプ状)に形成されていることが好適である。そして、本体側部材41内に、天井側部材42の少なくとも一部が収容され、本体側部材41と天井側部材42とが互いに摺動可能になっている。天井側部材42を天井2aの側に進出させたり、本体側部材41内に後退させたりすることにより、突出部24の高さが調節可能になっている。より具体的には、本体側部材41と天井側部材42は、ピン43によって固定されている。本体側部材41には、このピン43が貫通して装着されるピン孔44が設けられており、天井側部材42には同様のピン孔45が複数設けられている。このことにより、本体側部材41のピン孔44の位置と、天井側部材42の一のピン孔45の位置とを合せてピン43を装着することによって、突出部24の高さを所望の高さに調節することができる。   More specifically, as shown in FIGS. 6A and 6B, the protrusion 24 is provided on the main body side member 41 provided on the jig main body 21 side and the ceiling 2 a side of the hoistway 2. And a ceiling-side member 42 provided. Among these, the main body side member 41 and the ceiling side member 42 are preferably formed in a pipe shape (preferably a square pipe shape). And at least one part of the ceiling side member 42 is accommodated in the main body side member 41, and the main body side member 41 and the ceiling side member 42 are mutually slidable. The height of the projecting portion 24 can be adjusted by moving the ceiling side member 42 toward the ceiling 2a or retracting the ceiling side member 42 into the main body side member 41. More specifically, the main body side member 41 and the ceiling side member 42 are fixed by pins 43. The main body side member 41 is provided with pin holes 44 through which the pins 43 are inserted, and the ceiling side member 42 is provided with a plurality of similar pin holes 45. As a result, the height of the projecting portion 24 is set to a desired height by mounting the pin 43 by matching the position of the pin hole 44 of the main body side member 41 with the position of the pin hole 45 of the ceiling side member 42. Can be adjusted.

本体側部材41がパイプ状に形成されているため、本体側部材41の下面には、本体側板46が取り付けられている。このことにより、パイプ状の本体側部材41を、治具本体21に容易かつ確実に取り付けることが可能になっている。また、天井側部材42もパイプ状に形成されているため、天井側部材42の上面には、天井側板47が取り付けられている。このことにより、この天井側板47が、昇降路2の天井2aに当接し、治具本体21の姿勢の安定化を図っている。   Since the main body side member 41 is formed in a pipe shape, a main body side plate 46 is attached to the lower surface of the main body side member 41. Thus, the pipe-shaped main body side member 41 can be easily and reliably attached to the jig main body 21. Further, since the ceiling side member 42 is also formed in a pipe shape, a ceiling side plate 47 is attached to the upper surface of the ceiling side member 42. As a result, the ceiling side plate 47 abuts on the ceiling 2a of the hoistway 2 to stabilize the posture of the jig body 21.

このように本実施の形態によれば、設置治具20の突出部24の各々の高さが、別々に調整可能になっている。このことにより、2つの突出部24を昇降路2の天井2aに当接する際に、各突出部24の高さを別々に調整することができる。このため、天井2aに凹凸が形成されている場合であっても、設置治具20の治具本体21を水平方向に向けることができる。このため、昇降路2の上部への新設巻上機6bの設置作業の効率をより一層向上させることができる。   Thus, according to this Embodiment, each height of the protrusion part 24 of the installation jig 20 can be adjusted separately. Accordingly, when the two protrusions 24 are brought into contact with the ceiling 2a of the hoistway 2, the height of each protrusion 24 can be adjusted separately. For this reason, even if unevenness is formed on the ceiling 2a, the jig body 21 of the installation jig 20 can be oriented in the horizontal direction. For this reason, the efficiency of the installation work of the newly installed hoist 6b on the upper part of the hoistway 2 can be further improved.

なお、上述した本実施の形態においては、本体側部材41内に、天井側部材42の少なくとも一部が収容されている例について説明した。しかしながら、このことに限られることはなく、天井側部材42内に、本体側部材41の少なくとも一部が収容されるようにしてもよい。また、天井側部材42のピン孔45が複数設けられている例について説明したが、これに限られることはなく、本体側部材41のピン孔44が複数設けられていてもよい。更に言えば、突出部24の高さが調節可能であれば、突出部24の構成は任意である。   In the above-described embodiment, an example in which at least a part of the ceiling side member 42 is accommodated in the main body side member 41 has been described. However, the present invention is not limited to this, and at least a part of the main body side member 41 may be accommodated in the ceiling side member 42. Moreover, although the example in which the pin hole 45 of the ceiling side member 42 was provided with two or more was demonstrated, it is not restricted to this, The pin hole 44 of the main body side member 41 may be provided with two or more. Furthermore, if the height of the protrusion 24 is adjustable, the structure of the protrusion 24 is arbitrary.

(第4の実施の形態)
次に、図7を用いて、本発明の第4の実施の形態におけるエレベータ巻上機の設置治具およびエレベータ巻上機の設置方法について説明する。
(Fourth embodiment)
Next, an elevator hoist installation jig and an elevator hoist installation method according to the fourth embodiment of the present invention will be described with reference to FIG.

図7に示す第4の実施の形態においては、突出部が、別々に高さを調節可能な複数の突出部分割体を有している点が主に異なり、他の構成は、図1乃至図4に示す第1の実施の形態と略同一である。なお、図7において、図1乃至図4に示す第1の実施の形態と同一部分には同一符号を付して詳細な説明は省略する。   The fourth embodiment shown in FIG. 7 is mainly different in that the projecting portion has a plurality of projecting portion divided bodies whose heights can be adjusted separately. This is substantially the same as the first embodiment shown in FIG. In FIG. 7, the same parts as those of the first embodiment shown in FIGS. 1 to 4 are denoted by the same reference numerals, and detailed description thereof is omitted.

図7に示すように、本実施の形態においては、設置治具20の突出部24の各々は、互いに離間した複数の(ここでは4つ)突出部分割体50を有している。突出部分割体50の各々の高さは、別々に調節可能になっている。   As shown in FIG. 7, in the present embodiment, each of the projecting portions 24 of the installation jig 20 has a plurality of (here, four) projecting portion divided bodies 50 that are separated from each other. The height of each of the protruding portion divided bodies 50 can be adjusted separately.

より具体的には、図7に示すように、突出部分割体50は、治具本体21の側に設けられた本体側分割部材51と、昇降路2の天井2aの側に設けられた天井側分割部材52と、を含んでいる。このうち本体側分割部材51および天井側分割部材52は、パイプ状(好適には角パイプ状)に形成されていることが好適である。そして、本体側分割部材51内に、天井側分割部材52の少なくとも一部が収容され、本体側分割部材51と天井側分割部材52とが互いに摺動可能になっている。天井側分割部材52を天井2aの側に進出させたり、本体側分割部材51内に後退させたりすることにより、突出部分割体50の高さが調節可能になっている。より具体的には、本体側分割部材51と天井側分割部材52は、ピン53によって固定されている。本体側分割部材51には、このピン53が貫通して装着されるピン孔54が設けられており、天井側分割部材52には同様のピン孔55が複数設けられている。このことにより、本体側分割部材51のピン孔54の位置と、天井側分割部材52の一のピン孔55の位置とを合せてピン53を装着することによって、突出部分割体50の高さを所望の高さに調節することができる。   More specifically, as shown in FIG. 7, the projecting portion split body 50 includes a main body side split member 51 provided on the jig main body 21 side and a ceiling provided on the ceiling 2 a side of the hoistway 2. Side split member 52. Among these, the main body side dividing member 51 and the ceiling side dividing member 52 are preferably formed in a pipe shape (preferably a square pipe shape). And at least one part of the ceiling side division member 52 is accommodated in the main body side division member 51, and the main body side division member 51 and the ceiling side division member 52 are mutually slidable. The height of the projecting part split body 50 can be adjusted by moving the ceiling side split member 52 toward the ceiling 2a or by retracting it into the main body side split member 51. More specifically, the main body side dividing member 51 and the ceiling side dividing member 52 are fixed by pins 53. The main body side split member 51 is provided with pin holes 54 through which the pins 53 are inserted, and the ceiling side split member 52 is provided with a plurality of similar pin holes 55. Accordingly, the height of the projecting part divided body 50 is obtained by mounting the pin 53 by matching the position of the pin hole 54 of the main body side dividing member 51 and the position of the pin hole 55 of the ceiling side dividing member 52. Can be adjusted to a desired height.

一の突出部24の4つの突出部分割体50は、単一の本体側板56に取り付けられている。このことにより、パイプ状の突出部分割体50を、治具本体21に容易かつ確実に取り付けることが可能になっている。一方、突出部分割体50には、図6に示すような天井側板47は取り付けられていない。   The four projecting part divided bodies 50 of one projecting part 24 are attached to a single main body side plate 56. Thus, the pipe-like protruding portion divided body 50 can be easily and reliably attached to the jig main body 21. On the other hand, the ceiling side plate 47 as shown in FIG.

このように本実施の形態によれば、設置治具20の各突出部24の突出部分割体50の各々の高さが、別々に調整可能になっている。このことにより、2つの突出部24を昇降路2の天井2aに当接する際に、各突出部24の高さ、とりわけ各突出部分割体50の高さを別々に調整することができる。このため、天井2aに、比較的細かい凹凸が形成されている場合であっても、設置治具20の治具本体21を水平方向に向けることができる。このため、昇降路2の上部への新設巻上機6bの設置作業の効率をより一層向上させることができる。   Thus, according to this Embodiment, each height of the protrusion part division body 50 of each protrusion part 24 of the installation jig 20 can be adjusted separately. Accordingly, when the two projecting portions 24 are brought into contact with the ceiling 2a of the hoistway 2, the height of each projecting portion 24, particularly the height of each projecting portion divided body 50, can be adjusted separately. For this reason, even if it is a case where the comparatively fine unevenness | corrugation is formed in the ceiling 2a, the jig | tool main body 21 of the installation jig | tool 20 can be turned to a horizontal direction. For this reason, the efficiency of the installation work of the newly installed hoist 6b on the upper part of the hoistway 2 can be further improved.

なお、上述した本実施の形態においては、本体側分割部材51内に、天井側分割部材52の少なくとも一部が収容されている例について説明した。しかしながら、このことに限られることはなく、天井側分割部材52内に、本体側分割部材51の少なくとも一部が収容されるようにしてもよい。また、天井側分割部材52のピン孔55が複数設けられている例について説明したが、これに限られることはなく、本体側分割部材51のピン孔54が複数設けられていてもよい。更に言えば、突出部分割体50の高さが調節可能であれば、突出部分割体50の構成は任意である。   In addition, in this Embodiment mentioned above, the example in which at least one part of the ceiling side division member 52 was accommodated in the main body side division member 51 was demonstrated. However, the present invention is not limited to this, and at least a part of the main body side dividing member 51 may be accommodated in the ceiling side dividing member 52. Moreover, although the example in which the pin hole 55 of the ceiling side division member 52 was provided with two or more was demonstrated, it is not restricted to this, The pin hole 54 of the main body side division member 51 may be provided with two or more. Furthermore, as long as the height of the protruding part divided body 50 is adjustable, the structure of the protruding part divided body 50 is arbitrary.

(第5の実施の形態)
次に、図8および図9を用いて、本発明の第5の実施の形態におけるエレベータ巻上機の設置治具およびエレベータ巻上機の設置方法について説明する。
(Fifth embodiment)
Next, an elevator hoist installation jig and an elevator hoist installation method according to the fifth embodiment of the present invention will be described with reference to FIGS. 8 and 9.

図8および図9に示す第5の実施の形態においては、巻上機吊下部が、治具本体に対して水平方向に移動可能である点が主に異なり、他の構成は、図1乃至図4に示す第1の実施の形態と略同一である。なお、図8および図9において、図1乃至図4に示す第1の実施の形態と同一部分には同一符号を付して詳細な説明は省略する。   The fifth embodiment shown in FIGS. 8 and 9 is mainly different in that the hoisting machine suspension is movable in the horizontal direction with respect to the jig body. This is substantially the same as the first embodiment shown in FIG. 8 and 9, the same parts as those in the first embodiment shown in FIGS. 1 to 4 are denoted by the same reference numerals, and detailed description thereof is omitted.

図8および図9に示すように、本実施の形態においては、設置治具20の巻上機吊下部23は、治具本体21に対して水平方向に移動可能になっている。図8に示す形態では、巻上機吊下部23は、巻上機吊下部23に設けられたローラ62によって、治具本体21に対して移動可能になっている。   As shown in FIGS. 8 and 9, in the present embodiment, the hoisting machine suspension 23 of the installation jig 20 is movable in the horizontal direction with respect to the jig body 21. In the form shown in FIG. 8, the hoisting machine suspension 23 is movable with respect to the jig main body 21 by a roller 62 provided on the hoisting machine suspension 23.

より具体的には、図8および図9に示すように、巻上機吊下部23は、角パイプ状に形成された治具本体21の下部21aを貫通し、治具本体21の外側から内側に延びている。治具本体21の下部21aには、図9に示すように、治具本体21の長手方向(図9における紙面に垂直な方向)に延びるスリット60が設けられており、このスリット60を巻上機吊下部23が貫通している。この巻上機吊下部23の内側の部分に、ローラ支持板61を介してローラ62が回転可能に設けられている。一方、治具本体21の内面には、ローラ62を案内するローラガイド63が設けられている。ローラガイド63は、治具本体21の長手方向に、スリット60に沿うように延びている。このようにして、ローラガイド63上をローラ62が転動することにより、巻上機吊下部23は、治具本体21に対して水平方向に移動することができる。なお、巻上機吊下部23が、治具本体21に対して水平方向に移動可能であれば、移動可能とする構成は、図8および図9に示す構成に限られることはない。   More specifically, as shown in FIGS. 8 and 9, the hoisting machine suspension 23 penetrates the lower part 21 a of the jig body 21 formed in a square pipe shape and extends from the outside of the jig body 21 to the inside. It extends to. As shown in FIG. 9, a slit 60 extending in the longitudinal direction of the jig body 21 (direction perpendicular to the paper surface in FIG. 9) is provided in the lower portion 21 a of the jig body 21. The machine suspension 23 penetrates. A roller 62 is rotatably provided on a portion inside the hoisting machine suspension 23 via a roller support plate 61. On the other hand, a roller guide 63 for guiding the roller 62 is provided on the inner surface of the jig body 21. The roller guide 63 extends along the slit 60 in the longitudinal direction of the jig body 21. Thus, the roller 62 rolls on the roller guide 63, whereby the hoisting machine suspension 23 can move in the horizontal direction with respect to the jig body 21. In addition, as long as the hoisting machine suspension 23 is movable in the horizontal direction with respect to the jig main body 21, the movable configuration is not limited to the configurations illustrated in FIGS.

このように本実施の形態によれば、設置治具20の巻上機吊下部23は、治具本体21に対して水平方向に移動可能になっている。このことにより、2つの突出部24が昇降路2の天井2aに当接した後、新設巻上機6bを治具本体21に対してスムースに水平方向に移動させることができる。このため、新設巻上機6bを設置位置に容易に移動させることができ、昇降路2の上部への新設巻上機6bの設置作業の効率をより一層向上させることができる。   As described above, according to the present embodiment, the hoisting machine hanging portion 23 of the installation jig 20 is movable in the horizontal direction with respect to the jig main body 21. Thus, after the two projecting portions 24 abut against the ceiling 2a of the hoistway 2, the new hoisting machine 6b can be smoothly moved in the horizontal direction with respect to the jig body 21. For this reason, the new hoisting machine 6b can be easily moved to the installation position, and the efficiency of the installation work of the new hoisting machine 6b on the upper part of the hoistway 2 can be further improved.

(第6の実施の形態)
次に、図10および図11を用いて、本発明の第6の実施の形態におけるエレベータ巻上機の設置治具およびエレベータ巻上機の設置方法について説明する。
(Sixth embodiment)
Next, an elevator hoist installation jig and an elevator hoist installation method according to the sixth embodiment of the present invention will be described with reference to FIGS. 10 and 11.

図10および図11に示す第6の実施の形態においては、治具本体は、被吊下部に対して水平方向に回転可能である点が主に異なり、他の構成は、図1乃至図4に示す第1の実施の形態と略同一である。なお、図10および図11において、図1乃至図4に示す第1の実施の形態と同一部分には同一符号を付して詳細な説明は省略する。   In the sixth embodiment shown in FIGS. 10 and 11, the jig main body is mainly different in that it can be rotated in the horizontal direction with respect to the suspended lower part, and the other configurations are the same as those in FIGS. This is substantially the same as the first embodiment shown in FIG. 10 and 11, the same parts as those of the first embodiment shown in FIGS. 1 to 4 are denoted by the same reference numerals, and detailed description thereof is omitted.

図10および図11に示すように、設置治具20の治具本体21は、被吊下部22に対して水平方向に回転可能になっている。   As shown in FIGS. 10 and 11, the jig body 21 of the installation jig 20 is rotatable in the horizontal direction with respect to the suspended lower part 22.

より具体的には、図11に示すように、治具本体20の上部21bにベアリング70が設けられている。このベアリング70は、治具本体21の内側側に配置されている。そして、ベアリング70の外輪は治具本体21に嵌着され、被吊下部22から下方に延びるシャフト(図示せず)が、ベアリング70の内輪に嵌着されている。このようにして、治具本体21は、被吊下部22に対して水平方向に(上下方向に延びる軸を中心に)回転することができる。なお、治具本体21が、被吊下部22に対して水平方向に回転可能であれば、回転可能とする構成は、図10および図11に示す構成に限られることはない。   More specifically, as shown in FIG. 11, a bearing 70 is provided on the upper portion 21 b of the jig body 20. The bearing 70 is disposed on the inner side of the jig main body 21. The outer ring of the bearing 70 is fitted to the jig body 21, and a shaft (not shown) extending downward from the suspended lower part 22 is fitted to the inner ring of the bearing 70. In this way, the jig body 21 can rotate in the horizontal direction (centering on the axis extending in the vertical direction) with respect to the suspended lower part 22. In addition, as long as the jig main body 21 can rotate in the horizontal direction with respect to the suspended lower part 22, the configuration that allows rotation is not limited to the configuration illustrated in FIGS. 10 and 11.

このように本実施の形態によれば、治具本体21は、被吊下部22に対して水平方向に回転可能になっている。このことにより、2つの突出部24が昇降路2の天井2aに当接した後、新設巻上機6bを被吊下部22に対してスムースに水平方向に2次元的に移動させることができる。このため、新設巻上機6bを設置位置に容易に移動させることができ、昇降路2の上部への新設熱巻上機6bの設置作業の効率をより一層向上させることができる。   Thus, according to the present embodiment, the jig main body 21 is rotatable in the horizontal direction with respect to the suspended lower portion 22. Thus, after the two protrusions 24 come into contact with the ceiling 2a of the hoistway 2, the new hoisting machine 6b can be moved smoothly and horizontally in the horizontal direction with respect to the suspended lower part 22. For this reason, the new hoisting machine 6b can be easily moved to the installation position, and the efficiency of the installation work of the new hot hoisting machine 6b on the upper part of the hoistway 2 can be further improved.

以上述べた実施の形態によれば、昇降路の上部への巻上機の設置作業の効率を向上させて作業時間を短縮させることができる。   According to the embodiment described above, the efficiency of installation work of the hoisting machine on the upper part of the hoistway can be improved and the working time can be shortened.

本発明のいくつかの実施の形態を説明したが、これらの実施の形態は、例として提示したものであり、発明の範囲を限定することは意図していない。これら新規な実施形態は、その他の様々な形態で実施されることが可能であり、発明の要旨を逸脱しない範囲で、種々の省略、置き換え、変更を行うことができる。これら実施の形態やその変形は、発明の範囲や要旨に含まれるとともに、特許請求の範囲に記載された発明とその均等の範囲に含まれる。また、当然のことながら、本発明の要旨の範囲内で、これらの実施の形態を、部分的に適宜組み合わせることも可能である。   Although several embodiments of the present invention have been described, these embodiments are presented as examples and are not intended to limit the scope of the invention. These novel embodiments can be implemented in various other forms, and various omissions, replacements, and changes can be made without departing from the scope of the invention. These embodiments and modifications thereof are included in the scope and gist of the invention, and are included in the invention described in the claims and the equivalents thereof. Moreover, as a matter of course, these embodiments can be partially combined as appropriate within the scope of the present invention.

2a・・・天井、2b・・・側壁、4a・・・既設主ロープ、6a・・・既設巻上機、6b・・・新設巻上機、7・・・機械室、10・・・揚重機、11・・・揚重機側チェーン、13・・・主ロープ用孔、20・・・設置治具、21・・・治具本体、22・・・被吊下部、23・・・巻上機吊下部、24・・・突出部、30・・・振れ止め部材、50・・・突出部分割体、 2a ... ceiling, 2b ... side wall, 4a ... existing main rope, 6a ... existing hoisting machine, 6b ... new hoisting machine, 7 ... machine room, 10 ... lifting Heavy machine, 11 ... Lifting machine side chain, 13 ... Main rope hole, 20 ... Installation jig, 21 ... Jig body, 22 ... Suspended lower part, 23 ... Hoisting Machine suspension lower part, 24 ... Projection part, 30 ... Stabilization member, 50 ... Projection part division body,

Claims (9)

揚重機に吊り下げられるとともにエレベータ巻上機を吊り下げて、エレベータの機械室よりも下方に設けられた昇降路の上部に、前記揚重機によって前記エレベータ巻上機を揚重して設置するためのエレベータ巻上機の設置治具であって、治具本体と、前記治具本体に設けられ、前記揚重機に吊り下げられる被吊下部と、前記治具本体に設けられ、前記エレベータ巻上機を吊り下げる巻上機吊下部と、前記治具本体から上方に突出し、互いに離間して、前記昇降路の天井に当接可能な2つの突出部と、を備え、前記被吊下部は、一方の前記突出部から他方の前記突出部に向かう方向に直交する方向であって水平方向で見たときに、一方の前記突出部と他方の前記突出部との間に配置されていることを特徴とするエレベータ巻上機の設置治具。   In order to suspend the elevator hoist and lift the elevator hoist, and to lift and install the elevator hoist with the hoist on the hoistway provided below the elevator machine room An elevator hoisting machine installation jig comprising: a jig main body; a suspended lower portion provided on the jig main body and suspended on the lifting machine; provided on the jig main body; A hoisting machine hanging part for suspending the machine, and two projecting parts protruding upward from the jig main body, spaced apart from each other and capable of coming into contact with the ceiling of the hoistway, When viewed in a horizontal direction in a direction perpendicular to the direction from one of the protrusions to the other of the protrusions, the protrusion is disposed between the one protrusion and the other protrusion. Installation jig for elevator hoisting machine. 前記治具本体の両端部に設けられ、前記昇降路の側壁に当接する一対の振れ止め部材を更に備えたことを特徴とする請求項1に記載のエレベータ巻上機の設置治具。   2. The elevator hoist installation jig according to claim 1, further comprising a pair of steadying members provided at both ends of the jig body and abutting against a side wall of the hoistway. 前記突出部の各々の高さは、別々に調節可能であることを特徴とする請求項1または2に記載のエレベータ巻上機の設置治具。   The installation jig for an elevator hoist according to claim 1 or 2, wherein the height of each of the protrusions can be adjusted separately. 前記突出部は、互いに離間した複数の突出部分割体を有し、前記突出部分割体の各々の高さは、別々に調節可能であることを特徴とする請求項1または2に記載のエレベータ巻上機の設置治具。   3. The elevator according to claim 1, wherein the protrusion includes a plurality of protrusion divisions separated from each other, and the height of each of the protrusion divisions can be adjusted separately. Hoist installation jig. 前記巻上機吊下部は、前記治具本体に対して水平方向に移動可能であることを特徴とする請求項1乃至4のいずれか一項に記載のエレベータ巻上機の設置治具。   The elevator hoist installation jig according to any one of claims 1 to 4, wherein the hoisting unit suspension is movable in a horizontal direction with respect to the jig body. 前記治具本体は、前記被吊下部に対して水平方向に回転可能であることを特徴とする請求項1乃至5のいずれか一項に記載のエレベータ巻上機の設置治具。   The installation jig for an elevator hoisting machine according to any one of claims 1 to 5, wherein the jig body is rotatable in a horizontal direction with respect to the suspended lower part. エレベータの機械室よりも下方に設けられた昇降路の上部に、エレベータ巻上機を揚重して設置するエレベータ巻上機の設置方法であって、上方に突出する2つの突出部を有する設置治具を揚重機に吊り下げるとともに、前記設置治具に前記エレベータ巻上機を吊り下げる工程と、前記設置治具を前記揚重機によって上昇させて、前記設置治具の2つの前記突出部を前記昇降路の天井に当接させる工程と、2つの前記突出部が前記昇降路の天井に当接した状態で、前記エレベータ巻上機を前記昇降路内の設置位置に設置する工程と、設置された前記エレベータ巻上機から前記設置治具を取り外す工程と、を備えたことを特徴とするエレベータ巻上機の設置方法。   A method of installing an elevator hoisting machine in which an elevator hoisting machine is lifted and installed on an upper part of a hoistway provided below an elevator machine room, and having two projecting parts projecting upward The jig is suspended from the lifting machine, the elevator hoisting machine is suspended from the installation jig, the installation jig is raised by the lifting machine, and the two protrusions of the installation jig are A step of contacting the ceiling of the hoistway, a step of installing the elevator hoisting machine at an installation position in the hoistway in a state where the two protruding portions are in contact with the ceiling of the hoistway, and an installation And a step of removing the installation jig from the elevator hoisting machine. The method for installing an elevator hoisting machine is characterized by comprising: 前記機械室内に揚重機を設置する工程、を更に備え、前記揚重機を設置する工程の前に、前記機械室に設置されていた既設巻上機と、前記既設巻上機が巻き上げていた既設主ロープとが撤去されており、前記設置治具に前記エレベータ巻上機を吊り下げる工程において、前記設置治具は、前記揚重機に揚重機側吊下部材を介して連結され、前記揚重機側吊下部材は、前記昇降路の天井に設けられた、撤去された前記既設主ロープが通過していた主ロープ用孔を通過することを特徴とする請求項7に記載のエレベータ巻上機の設置方法。   A step of installing a lifting machine in the machine room, and before the step of installing the lifting machine, the existing hoisting machine installed in the machine room and the existing hoisting machine wound up by the existing hoisting machine A main rope is removed, and in the step of suspending the elevator hoisting machine from the installation jig, the installation jig is connected to the lifting machine via a lifting device side suspension member, and the lifting machine 8. The elevator hoisting machine according to claim 7, wherein the side suspension member passes through a main rope hole provided in a ceiling of the hoistway, through which the removed existing main rope has passed. Installation method. エレベータの機械室よりも下方に設けられた昇降路の上部に、エレベータ巻上機を揚重して設置するエレベータ巻上機の設置方法であって、上方に突出する2つの突出部を有する設置治具を揚重機に吊り下げて前記設置治具の一方の前記突出部を前記昇降路の天井に当接させ、その後、前記設置治具に前記エレベータ巻上機を吊り下げる工程と、前記エレベータ巻上機を前記揚重機によって上昇させて、前記設置治具の他方の前記突出部を前記昇降路の天井に当接させる工程と、2つの前記突出部が前記昇降路の天井に当接した状態で、前記エレベータ巻上機を前記昇降路内の設置位置に設置する工程と、設置された前記エレベータ巻上機から前記設置治具を取り外す工程と、を備えたことを特徴とするエレベータ巻上機の設置方法。 A method of installing an elevator hoisting machine in which an elevator hoisting machine is lifted and installed on an upper part of a hoistway provided below an elevator machine room, and having two projecting parts projecting upward A step of suspending a jig on a lifting machine so that one of the protruding portions of the installation jig abuts the ceiling of the hoistway , and then suspending the elevator hoisting machine on the installation jig; The hoisting machine is raised by the lifting machine, and the other projecting part of the installation jig is brought into contact with the ceiling of the hoistway, and the two projecting parts are brought into contact with the ceiling of the hoistway state, the step of installing the elevator machine in the installation position of the hoistway, a step of removing the installation tool from the installed the elevator hoisting machine, you comprising the Jer How to install a beta hoist.
JP2015238843A 2015-12-07 2015-12-07 Elevator hoist installation jig and elevator hoist installation method Active JP6089091B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2015238843A JP6089091B1 (en) 2015-12-07 2015-12-07 Elevator hoist installation jig and elevator hoist installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2015238843A JP6089091B1 (en) 2015-12-07 2015-12-07 Elevator hoist installation jig and elevator hoist installation method

Publications (2)

Publication Number Publication Date
JP6089091B1 true JP6089091B1 (en) 2017-03-01
JP2017105562A JP2017105562A (en) 2017-06-15

Family

ID=58186035

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2015238843A Active JP6089091B1 (en) 2015-12-07 2015-12-07 Elevator hoist installation jig and elevator hoist installation method

Country Status (1)

Country Link
JP (1) JP6089091B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111115412A (en) * 2020-01-20 2020-05-08 河南省川达建筑机械有限公司 Collapsible arch bridge formula bearing beam subassembly and spandrel girder for well construction elevator

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003276970A (en) * 2002-03-27 2003-10-02 Mitsubishi Electric Building Techno Service Co Ltd Elevator device
JP2003306282A (en) * 2002-04-16 2003-10-28 Mitsubishi Electric Building Techno Service Co Ltd Elevator equipment
WO2006022406A1 (en) * 2004-08-24 2006-03-02 Toshiba Elevator Kabushiki Kaisha Traction machine installing apparatus and installing method for traction machine
JP2011051742A (en) * 2009-09-02 2011-03-17 Toshiba Elevator Co Ltd Heavy load hoisting method on renewal work of elevator system
JP2011068429A (en) * 2009-09-24 2011-04-07 Toshiba Elevator Co Ltd Heavy load installing method and hoisting device
JP2012051668A (en) * 2010-08-31 2012-03-15 Toshiba Elevator Co Ltd Method of installing elevator hoisting machine
JP2012056678A (en) * 2010-09-08 2012-03-22 Toshiba Elevator Co Ltd Method and apparatus for installing elevator hoisting machine
JP2015124088A (en) * 2013-12-27 2015-07-06 東芝エレベータ株式会社 Hoisting machine lifting jig unit and hoisting machine lifting method

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003276970A (en) * 2002-03-27 2003-10-02 Mitsubishi Electric Building Techno Service Co Ltd Elevator device
JP2003306282A (en) * 2002-04-16 2003-10-28 Mitsubishi Electric Building Techno Service Co Ltd Elevator equipment
WO2006022406A1 (en) * 2004-08-24 2006-03-02 Toshiba Elevator Kabushiki Kaisha Traction machine installing apparatus and installing method for traction machine
JP2011051742A (en) * 2009-09-02 2011-03-17 Toshiba Elevator Co Ltd Heavy load hoisting method on renewal work of elevator system
JP2011068429A (en) * 2009-09-24 2011-04-07 Toshiba Elevator Co Ltd Heavy load installing method and hoisting device
JP2012051668A (en) * 2010-08-31 2012-03-15 Toshiba Elevator Co Ltd Method of installing elevator hoisting machine
JP2012056678A (en) * 2010-09-08 2012-03-22 Toshiba Elevator Co Ltd Method and apparatus for installing elevator hoisting machine
JP2015124088A (en) * 2013-12-27 2015-07-06 東芝エレベータ株式会社 Hoisting machine lifting jig unit and hoisting machine lifting method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111115412A (en) * 2020-01-20 2020-05-08 河南省川达建筑机械有限公司 Collapsible arch bridge formula bearing beam subassembly and spandrel girder for well construction elevator

Also Published As

Publication number Publication date
JP2017105562A (en) 2017-06-15

Similar Documents

Publication Publication Date Title
JP6537720B2 (en) Elevator hoist installation method
JP2015229570A (en) Method and device for installation of lifting equipment of elevator
JP3215594U (en) Suspended load attitude control device
JP6089091B1 (en) Elevator hoist installation jig and elevator hoist installation method
JP5791206B2 (en) Hoisting machine lifting jig unit and hoisting machine lifting method
JP5329031B2 (en) Elevator equipment
CN101837921A (en) The car of elevator
JP2017040069A (en) Traveling heavy load lifting device
JP6698900B1 (en) lift device
JP5040202B2 (en) Elevator installation jig
JP2007210703A (en) Device and method for installing hoist machine in machine-room-less elevator
JP6605411B2 (en) Lifting bracket and hoist
JP2018184257A (en) Double-deck elevator and maintenance method of double-deck elevator
JP2014159331A (en) Hanging device and hanging auxiliary tool
JP6336225B2 (en) Elevator equipment
JP2013107765A (en) Elevator device
JP2012046296A (en) Method of mounting elevator hoist
JP2012026257A (en) Guide device for lifting and lifting method using the same
JP2011068458A (en) Rail suspending device of elevator
JP5829179B2 (en) Double deck elevator inspection device
JP2008285260A (en) Guide rail installation engineering method of machine room-less elevator
JP2007210708A (en) Lifting device and lifting method for elevator hoist machine
JP2021008362A (en) Cargo handling method of heavy load
JP2015157676A (en) Elevator device
JP2015030559A (en) Main rope fixing device for elevator, and repair method for elevator

Legal Events

Date Code Title Description
A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20161201

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20170106

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20170206

R150 Certificate of patent or registration of utility model

Ref document number: 6089091

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150