JP6064023B1 - Renewal method of elevator hoisting machine - Google Patents

Renewal method of elevator hoisting machine Download PDF

Info

Publication number
JP6064023B1
JP6064023B1 JP2015235042A JP2015235042A JP6064023B1 JP 6064023 B1 JP6064023 B1 JP 6064023B1 JP 2015235042 A JP2015235042 A JP 2015235042A JP 2015235042 A JP2015235042 A JP 2015235042A JP 6064023 B1 JP6064023 B1 JP 6064023B1
Authority
JP
Japan
Prior art keywords
existing
hoisting machine
new
sheave
traction sheave
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2015235042A
Other languages
Japanese (ja)
Other versions
JP2017100842A (en
Inventor
高田 英樹
英樹 高田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Elevator and Building Systems Corp
Original Assignee
Toshiba Elevator Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=57800050&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=JP6064023(B1) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Toshiba Elevator Co Ltd filed Critical Toshiba Elevator Co Ltd
Priority to JP2015235042A priority Critical patent/JP6064023B1/en
Application granted granted Critical
Publication of JP6064023B1 publication Critical patent/JP6064023B1/en
Publication of JP2017100842A publication Critical patent/JP2017100842A/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

【課題】リニューアル作業の工期を短縮し、リニューアル費用を削減することができるエレベータ巻上機のリニューアル方法を提供する。【解決手段】実施の形態のよるエレベータ巻上機のリニューアル方法は、既設主ロープ4を取り外す工程と、既設トラクションシーブ22を有する既設巻上機20を撤去することなく、既設巻上機20のロープ巻上機能を取り除く工程と、を備えている。また、エレベータ巻上機のリニューアル方法は、新設トラクションシーブ42を有する新設巻上機40を設置する工程と、新設主ロープ7を、既設トラクションシーブ22および新設トラクションシーブ42に巻き掛ける工程と、を備えている。新設主ロープ7を巻き掛ける工程の後において、既設トラクションシーブ22は、そらせシーブとして利用されている。【選択図】図2An elevator hoisting machine renewal method capable of shortening the renewal work period and reducing the renewal cost. A method for renewing an elevator hoisting machine according to an embodiment includes a step of removing an existing main rope 4 and an existing hoisting machine 20 having an existing traction sheave 22 without removing the existing hoisting machine 20. And a step of removing the rope hoisting function. Moreover, the renewal method of an elevator hoisting machine includes a step of installing a new hoisting machine 40 having a new traction sheave 42 and a step of winding the new main rope 7 around the existing traction sheave 22 and the new traction sheave 42. I have. After the step of winding the new main rope 7, the existing traction sheave 22 is used as a deflecting sheave. [Selection] Figure 2

Description

本発明の実施の形態は、エレベータ巻上機のリニューアル方法に関する。   Embodiments of the present invention relate to an elevator hoist renewal method.

近年、巻上機を機械室に設置することなく、昇降路内に設置するマシンルームレスエレベータ装置が主流となっている。マシンルームレスエレベータ装置は、市場に登場してから20年余りが経過している。このため、初期に登場したマシンルームレスエレベータ装置は、寿命に近づいた機器の交換や、新型の機器に交換することを目的としたリニューアルのタイミングに近づいている。   In recent years, a machine room-less elevator apparatus installed in a hoistway without installing a hoisting machine in a machine room has become mainstream. More than 20 years have passed since the machine room-less elevator device appeared on the market. For this reason, the machine room-less elevator apparatus that appeared at an early stage is approaching the timing of renewal for the purpose of exchanging equipment that has reached the end of its life or replacing it with a new equipment.

特開2009−167957号公報JP 2009-167957 A 特許第4339578号公報Japanese Patent No. 4339578

しかしながら、マシンルームレスエレベータ装置におけるリニューアルでは、既設の巻上機、既設のそらせシーブ、および既設の釣合錘の昇降路内の用品を撤去して搬出し、新設の巻上機、新設のそらせシーブ、および新設の釣合錘を昇降路内に設置している。この場合、既設の用品、特に重量物である巻上機や、巻上機が設置される巻上機ベースの撤去作業および搬出作業に、多大な労力と時間が費やされる。リニューアル作業の工期を短縮するためには、作業者の増員が効果的であるが、人件費が増大してリニューアル費用に反映されるという問題があった。   However, in the renewal of the machine roomless elevator system, the existing hoisting machine, the existing deflecting sheave, and the equipment in the hoistway of the existing counterweight are removed and carried out, and the new hoisting machine and the new deflecting machine are removed. A sheave and a new counterweight are installed in the hoistway. In this case, a great amount of labor and time are spent on the removal work and the carrying-out work of the existing equipment, in particular, the hoisting machine that is heavy and the hoisting machine base on which the hoisting machine is installed. In order to shorten the renovation work period, it is effective to increase the number of workers, but there is a problem that the labor cost increases and is reflected in the renewal cost.

本発明は、このような点を考慮してなされたものであり、リニューアル作業の工期を短縮し、リニューアル費用を削減することができるエレベータ巻上機のリニューアル方法を提供することを目的とする。   The present invention has been made in consideration of such points, and an object thereof is to provide a renewal method for an elevator hoisting machine that can shorten the renewal work period and reduce the renewal cost.

実施の形態によるエレベータ巻上機のリニューアル方法は、マシンルームレスエレベータ装置におけるエレベータ巻上機をリニューアルする。このリニューアル方法は、既設主ロープを取り外す工程と、既設トラクションシーブを有する既設巻上機を撤去することなく、既設巻上機のロープ巻上機能を取り除く工程と、を備えている。また、このリニューアル方法は、新設トラクションシーブを有する新設巻上機を設置する工程と、新設主ロープを、既設トラクションシーブおよび新設トラクションシーブに巻き掛ける工程と、を備えている。新設主ロープを巻き掛ける工程の後において、既設トラクションシーブは、そらせシーブとして利用されている。   The elevator hoisting machine renewal method according to the embodiment renews the elevator hoisting machine in the machine roomless elevator apparatus. This renewal method includes a step of removing the existing main rope and a step of removing the rope hoisting function of the existing hoisting machine without removing the existing hoisting machine having the existing traction sheave. The renewal method includes a step of installing a new hoisting machine having a new traction sheave and a step of winding a new main rope around the existing traction sheave and the new traction sheave. After the process of winding the new main rope, the existing traction sheave is used as a deflecting sheave.

また、実施の形態によるエレベータ巻上機のリニューアル方法は、マシンルームレスエレベータ装置におけるエレベータ巻上機をリニューアルする。このリニューアル方法は、既設主ロープを取り外す工程と、既設巻上機を撤去することなく、既設巻上機のロープ巻上機能を取り除くとともに、既設巻上機から既設トラクションシーブを撤去する工程と、を備えている。また、このリニューアル方法は、既設トラクションシーブが撤去された既設巻上機に、新設そらせシーブを設置する工程と、新設トラクションシーブを有する新設巻上機を設置する工程と、を備えている。さらに、このリニューアル方法は、新設主ロープを、新設そらせシーブおよび新設トラクションシーブに巻き掛ける工程を備えている。   Moreover, the elevator hoisting machine renewal method by embodiment renews the elevator hoisting machine in a machine room-less elevator apparatus. This renewal method includes a step of removing the existing main rope, a step of removing the rope hoisting function of the existing hoisting machine without removing the existing hoisting machine, and a step of removing the existing traction sheave from the existing hoisting machine, It has. In addition, this renewal method includes a step of installing a new deflecting sheave on an existing hoisting machine from which an existing traction sheave has been removed, and a step of installing a new hoisting machine having a new traction sheave. The renewal method further includes a step of winding the new main rope around the new shave sheave and the new traction sheave.

また、実施の形態によるエレベータ巻上機のリニューアル方法は、マシンルームレスエレベータ装置におけるエレベータ巻上機をリニューアルする。このリニューアル方法は、既設主ロープを取り外す工程と、既設トラクションシーブを有する既設巻上機を撤去する工程と、新設トラクションシーブを有する新設巻上機を設置する工程と、釣合錘の錘枠から既設錘シーブを撤去する工程と、を備えている。また、このリニューアル方法は、撤去された既設巻上機を、既設錘シーブが撤去された錘枠に設置する工程と、新設主ロープを、新設トラクションシーブ、および錘枠に設置された既設巻上機の既設トラクションシーブに巻き掛ける工程と、を備えている。新設主ロープを巻き掛ける工程の後において、既設トラクションシーブは、錘シーブとして利用されている。   Moreover, the elevator hoisting machine renewal method by embodiment renews the elevator hoisting machine in a machine room-less elevator apparatus. This renewal method consists of a step of removing the existing main rope, a step of removing the existing hoisting machine having the existing traction sheave, a step of installing a new hoisting machine having the new traction sheave, and a weight frame of the counterweight. And a step of removing the existing weight sheave. In addition, this renewal method includes the step of installing the removed existing hoisting machine on the weight frame from which the existing weight sheave has been removed, the new main rope, the new traction sheave, and the existing hoisting machine installed on the weight frame. And winding around the existing traction sheave of the machine. After the step of winding the new main rope, the existing traction sheave is used as a weight sheave.

また、実施の形態によるエレベータ巻上機のリニューアル方法は、マシンルームレスエレベータ装置におけるエレベータ巻上機をリニューアルする。このリニューアル方法は、既設主ロープを取り外す工程と、既設巻上機ベースから、既設巻上機を撤去する工程と、既設巻上機が撤去された既設巻上機ベースに、新設そらせシーブを設置する工程と、を備えている。また、このリニューアル方法は、新設トラクションシーブを有する新設巻上機を設置する工程と、新設主ロープを、新設そらせシーブおよび新設トラクションシーブに巻き掛ける工程と、を備えている。   Moreover, the elevator hoisting machine renewal method by embodiment renews the elevator hoisting machine in a machine room-less elevator apparatus. In this renewal method, a process of removing the existing main rope, a process of removing the existing hoisting machine from the existing hoisting machine base, and a new deflecting sheave are installed on the existing hoisting machine base from which the existing hoisting machine has been removed. And a step of performing. The renewal method includes a step of installing a new hoisting machine having a new traction sheave, and a step of winding a new main rope around the new shave sheave and the new traction sheave.

図1は、本発明の第1の実施の形態におけるリニューアル前のエレベータ装置の全体概略構成を示す図である。FIG. 1 is a diagram showing an overall schematic configuration of an elevator apparatus before renewal according to a first embodiment of the present invention. 図2は、本発明の第1の実施の形態におけるリニューアル後のエレベータ装置の全体概略構成を示す図である。FIG. 2 is a diagram showing an overall schematic configuration of the elevator apparatus after renewal according to the first embodiment of the present invention. 図3は、本発明の第2の実施の形態におけるリニューアル前のエレベータ装置の全体概略構成を示す図である。FIG. 3 is a diagram showing an overall schematic configuration of the elevator apparatus before renewal according to the second embodiment of the present invention. 図4は、本発明の第2の実施の形態におけるリニューアル後のエレベータ装置の全体概略構成を示す図である。FIG. 4 is a diagram showing an overall schematic configuration of the elevator apparatus after the renewal according to the second embodiment of the present invention. 図5は、本発明の第3の実施の形態におけるリニューアル後の新設巻上機およびそらせシーブの概略構成を示す図である。FIG. 5 is a diagram showing a schematic configuration of the newly installed hoist and the deflector sheave after the renewal in the third embodiment of the present invention. 図6は、本発明の第4の実施の形態におけるリニューアル後のエレベータ装置の全体概略構成を示す図である。FIG. 6 is a diagram showing an overall schematic configuration of the elevator apparatus after the renewal according to the fourth embodiment of the present invention. 図7は、図6の変形例を示す図である。FIG. 7 is a diagram showing a modification of FIG. 図8は、本発明の第5の実施の形態におけるリニューアル後のエレベータ装置の全体概略構成を示す図である。FIG. 8 is a diagram showing an overall schematic configuration of the elevator apparatus after the renewal according to the fifth embodiment of the present invention. 図9は、図8の変形例を示す図である。FIG. 9 is a diagram showing a modification of FIG.

以下、図面を参照して本発明の実施の形態について説明する。   Embodiments of the present invention will be described below with reference to the drawings.

(第1の実施の形態)
図1および図2を用いて、第1の実施の形態におけるエレベータ巻上機のリニューアル方法(以下、単にリニューアル方法と記す)について説明する。
(First embodiment)
A renewal method (hereinafter simply referred to as a renewal method) for the elevator hoisting machine according to the first embodiment will be described with reference to FIGS. 1 and 2.

ここでは、まず、本実施の形態によるリニューアル方法が適用されるリニューアル前のマシンルームレスエレベータ装置(以下、単にエレベータ装置と記す)について図1を用いて説明する。   Here, a machine roomless elevator apparatus (hereinafter simply referred to as an elevator apparatus) before renewal to which the renewal method according to the present embodiment is applied will be described with reference to FIG.

図1に示すように、エレベータ装置1は、昇降路2内を昇降自在な乗りかご3と、乗りかご3に既設主ロープ4を介して連結された釣合錘10と、既設主ロープ4を介して乗りかご3及び釣合錘10を昇降させる既設巻上機20と、を備えている。   As shown in FIG. 1, an elevator apparatus 1 includes a car 3 that can be raised and lowered in a hoistway 2, a counterweight 10 that is connected to the car 3 via an existing main rope 4, and an existing main rope 4. And an existing hoisting machine 20 that raises and lowers the car 3 and the counterweight 10.

乗りかご3には、既設主ロープ4が巻き掛けられる一対のかごシーブ5が設けられている。   The car 3 is provided with a pair of car sheaves 5 around which the existing main rope 4 is wound.

釣合錘10は、錘枠11を有しており、錘枠11には、既設主ロープ4が巻き掛けられる一対の既設錘シーブ(錘シーブ)12a、12bが設置されている。また、錘枠11には、複数の錘体13が設置されており、乗りかご3の質量との釣合を図っている。   The counterweight 10 has a weight frame 11, and a pair of existing weight sheaves (weight sheaves) 12 a and 12 b around which the existing main rope 4 is wound are installed on the weight frame 11. The weight frame 11 is provided with a plurality of weight bodies 13 to balance the weight of the car 3.

本実施の形態においては、既設巻上機20は、機械室ではなく昇降路2の上部に設けられている。より具体的には、昇降路2の上部に既設巻上機ベース21が設けられており、既設巻上機20はこの既設巻上機ベース21上に設置されている。   In the present embodiment, the existing hoisting machine 20 is provided in the upper part of the hoistway 2 instead of the machine room. More specifically, an existing hoisting machine base 21 is provided in the upper part of the hoistway 2, and the existing hoisting machine 20 is installed on the existing hoisting machine base 21.

既設巻上機20は、既設主ロープ4が巻き掛けられる既設トラクションシーブ22を有している。既設巻上機20は、既設トラクションシーブ22に巻き掛けられた既設主ロープ4を巻き上げる。また、既設巻上機20は、既設巻上機ブレーキ部23を有している。   The existing hoisting machine 20 has an existing traction sheave 22 around which the existing main rope 4 is wound. The existing hoisting machine 20 winds up the existing main rope 4 wound around the existing traction sheave 22. The existing hoisting machine 20 has an existing hoisting machine brake unit 23.

既設主ロープ4の両端は、昇降路2の上部に設けられたヒッチ部(図示せず)に取り付けられている。既設主ロープ4は、一方(図1の左側)のヒッチ部から他方(図1の右側)のヒッチ部に向かって、一対のかごシーブ5、既設巻上機20の既設トラクションシーブ22、一対の既設錘シーブ12a、12bに、この配列順で巻き掛けられている。   Both ends of the existing main rope 4 are attached to hitch portions (not shown) provided in the upper part of the hoistway 2. The existing main rope 4 includes a pair of car sheaves 5, an existing traction sheave 22 of the existing hoisting machine 20, a pair of pairs from one (left side in FIG. 1) to the other (right side in FIG. 1). It is wound around the existing weight sheaves 12a and 12b in this arrangement order.

このような構成において、既設巻上機20が既設トラクションシーブ22を回転駆動することにより、既設主ロープ4が巻き上げられ、既設主ロープ4を介して乗りかご3および釣合錘10がそれぞれ昇降する。これにより、乗りかご3は、エレベータ装置1が設置された建物の複数の階床にそれぞれ設けられた乗場間を昇降する。   In such a configuration, when the existing hoist 20 rotates the existing traction sheave 22, the existing main rope 4 is wound up, and the car 3 and the counterweight 10 are raised and lowered via the existing main rope 4. . Thereby, the car 3 moves up and down between the halls respectively provided on the plurality of floors of the building where the elevator apparatus 1 is installed.

ところで、昇降路2内には、上下方向に延びるかごガイドレール6が設けられている。このかごガイドレール6に沿って乗りかご3が昇降するようになっている。図1に示すように、本実施の形態においては、かごガイドレール6の上部に既設巻上機ベース21が取り付けられている。なお、図1に示す例では、かごガイドレール6を模式的に示している。また、図示はしないが、昇降路2内には、上下方向に延びる錘ガイドレールが設けられており、この錘ガイドレールに沿って釣合錘10が昇降するようになっている。上述した既設巻上機ベース21は、この錘ガイドレールの上部に取り付けられていてもよい。   Incidentally, a car guide rail 6 extending in the vertical direction is provided in the hoistway 2. The car 3 is moved up and down along the car guide rail 6. As shown in FIG. 1, in the present embodiment, an existing hoisting machine base 21 is attached to the upper part of the car guide rail 6. In the example shown in FIG. 1, the car guide rail 6 is schematically shown. Although not shown, a weight guide rail extending in the vertical direction is provided in the hoistway 2, and the counterweight 10 is raised and lowered along the weight guide rail. The existing hoisting machine base 21 described above may be attached to the upper part of the weight guide rail.

次に、図1に示すエレベータ装置1をリニューアルした後のエレベータ装置1ついて図2を用いて説明する。   Next, the elevator apparatus 1 after the renewal of the elevator apparatus 1 shown in FIG. 1 will be described with reference to FIG.

図2に示すエレベータ装置1は、ロープ巻上機能が取り除かれた既設巻上機20と、新設主ロープ7を介して乗りかご3および釣合錘10を昇降させる新設巻上機40と、を備えている。   The elevator apparatus 1 shown in FIG. 2 includes an existing hoisting machine 20 from which the rope hoisting function is removed, and a new hoisting machine 40 that raises and lowers the car 3 and the counterweight 10 via the new main rope 7. I have.

既設巻上機20は、昇降路2内から撤去されることなく、昇降路2内に残存している。しかしながら、既設巻上機20は主ロープを巻き上げるロープ巻上機能が取り除かれている。そして、既設巻上機20の既設トラクションシーブ22には、新設主ロープ7が巻き掛けられており、既設トラクションシーブ22は、リニューアル後のエレベータ装置1においては、そらせシーブとして利用されている。また、リニューアル後の既設巻上機20は、ブレーキ機能を有している。より具体的には、新設主ロープ7を巻き掛ける工程の後において、既設巻上機20は、ブレーキ機能を有している。すなわち、既設巻上機20には、既設巻上機ブレーキ部23が残されている。既設巻上機20のブレーキ機能は、後述する新設巻上機40の新設巻上機ブレーキ部43に連動するようになっている。   The existing hoisting machine 20 remains in the hoistway 2 without being removed from the hoistway 2. However, the existing hoisting machine 20 has the rope hoisting function of hoisting the main rope removed. The new main rope 7 is wound around the existing traction sheave 22 of the existing hoisting machine 20, and the existing traction sheave 22 is used as a deflecting sheave in the elevator apparatus 1 after the renewal. Moreover, the existing hoisting machine 20 after renewal has a brake function. More specifically, the existing hoisting machine 20 has a brake function after the step of winding the new main rope 7. That is, the existing hoisting machine brake unit 23 is left in the existing hoisting machine 20. The brake function of the existing hoisting machine 20 is interlocked with a new hoisting machine brake unit 43 of the new hoisting machine 40 described later.

新設巻上機40は、機械室ではなく昇降路2の上部に設けられている。より具体的には、昇降路2の上部に新設巻上機ベース41が設けられており、新設巻上機40はこの新設巻上機ベース41上に設置されている。本実施の形態では、新設巻上機40は、既設巻上機20と同等の高さ位置に設置されている。   The new hoisting machine 40 is provided not in the machine room but in the upper part of the hoistway 2. More specifically, a new hoisting machine base 41 is provided in the upper part of the hoistway 2, and the new hoisting machine 40 is installed on the new hoisting machine base 41. In the present embodiment, the new hoisting machine 40 is installed at the same height as the existing hoisting machine 20.

新設巻上機40は、新設主ロープ7が巻き掛けられる新設トラクションシーブ42を有している。新設巻上機40は、新設トラクションシーブ42に巻き掛けられた新設主ロープ7を巻き上げる。また、新設巻上機40は、新設巻上機ブレーキ部43を有している。   The new hoisting machine 40 has a new traction sheave 42 around which the new main rope 7 is wound. The new hoisting machine 40 winds up the new main rope 7 wound around the new traction sheave 42. The new hoisting machine 40 has a new hoisting machine brake unit 43.

新設主ロープ7の両端は、昇降路2の上部に設けられたヒッチ部(図示せず)に取り付けられている。新設主ロープ7は、一方(図2の左側)のヒッチ部から他方(図2の右側)のヒッチ部に向かって、一対のかごシーブ5、そらせシーブ(既設巻上機20の既設トラクションシーブ22)、一方(図2の左側)の既設錘シーブ12a、新設巻上機40の新設トラクションシーブ42、他方(図2の右側)の既設錘シーブ12bに、この配列順で巻き掛けられている。   Both ends of the new main rope 7 are attached to hitch portions (not shown) provided in the upper part of the hoistway 2. The new main rope 7 has a pair of car sheaves 5 and deflecting sheaves (existing traction sheaves 22 of the existing hoisting machine 20) from one (left side in FIG. 2) to the other (right side in FIG. 2). ), The existing weight sheave 12a on one side (left side in FIG. 2), the new traction sheave 42 of the new hoisting machine 40, and the existing weight sheave 12b on the other side (right side in FIG. 2) are wound in this arrangement order.

このような構成において、新設巻上機40が新設トラクションシーブ42を回転駆動することにより、新設主ロープ7が巻き上げられ、新設主ロープ7を介して乗りかご3および釣合錘10がそれぞれ昇降する。これにより、乗りかご3は、エレベータ装置1が設置された建物の複数の階床にそれぞれ設けられた乗場間を昇降する。このように、ロープ巻上機能が、既設巻上機20から新設巻上機40に移されている。   In such a configuration, the new hoisting machine 40 rotationally drives the new traction sheave 42, whereby the new main rope 7 is wound up, and the car 3 and the counterweight 10 are moved up and down via the new main rope 7, respectively. . Thereby, the car 3 moves up and down between the halls respectively provided on the plurality of floors of the building where the elevator apparatus 1 is installed. In this way, the rope hoisting function is transferred from the existing hoisting machine 20 to the new hoisting machine 40.

ところで、図2に示すように、本実施の形態においては、かごガイドレール6に新設巻上機ベース41が取り付けられている。なお、新設巻上機ベース41は、錘ガイドレールに取り付けられていてもよい。   By the way, as shown in FIG. 2, in the present embodiment, a new hoisting machine base 41 is attached to the car guide rail 6. The newly installed hoist base 41 may be attached to the weight guide rail.

次に、このような構成からなる本実施の形態における作用について説明する。ここでは、図1に示すリニューアル前のエレベータ装置1から図2に示すリニューアル後のエレベータ装置1にリニューアルするための、エレベータ巻上機のリニューアル方法について説明する。   Next, the operation in the present embodiment having such a configuration will be described. Here, a renewal method of the elevator hoisting machine for renewal from the elevator apparatus 1 before renewal shown in FIG. 1 to the elevator apparatus 1 after renewal shown in FIG. 2 will be described.

まず、既設主ロープ4が、一対のかごシーブ5、既設巻上機20の既設トラクションシーブ22、一対の既設錘シーブ12a、12b、およびヒッチ部から取り外される。   First, the existing main rope 4 is removed from the pair of car sheaves 5, the existing traction sheave 22 of the existing hoisting machine 20, the pair of existing weight sheaves 12a and 12b, and the hitch portion.

続いて、既設巻上機20の主ロープを巻き上げるロープ巻上機能が取り除かれる。このとき、例えば、図示しない制御装置に接続されていた制御配線を取り除いてもよく、または当該制御装置の制御回路を改造してもよい。なお、既設巻上機20のブレーキ機能は取り除かれない。また、既設巻上機20および既設巻上機ベース21は昇降路2内から撤去されることなく、昇降路2内に残存する。既設巻上機20の既設トラクションシーブ22は、そらせシーブとして利用される。   Subsequently, the rope hoisting function for hoisting the main rope of the existing hoisting machine 20 is removed. At this time, for example, the control wiring connected to the control device (not shown) may be removed, or the control circuit of the control device may be modified. Note that the brake function of the existing hoisting machine 20 is not removed. Further, the existing hoisting machine 20 and the existing hoisting machine base 21 remain in the hoistway 2 without being removed from the hoistway 2. The existing traction sheave 22 of the existing hoisting machine 20 is used as a deflecting sheave.

次に、新設巻上機ベース41上に、新設トラクションシーブ42を有する新設巻上機40が設置される。この場合、まず、昇降路2の上部に、新設巻上機40の新設巻上機ベース41が取り付けられる。続いて、新設巻上機ベース41上に新設巻上機40が取り付けられる。   Next, the new hoisting machine 40 having the new traction sheave 42 is installed on the new hoisting machine base 41. In this case, first, the new hoisting machine base 41 of the new hoisting machine 40 is attached to the upper part of the hoistway 2. Subsequently, the new hoisting machine 40 is mounted on the new hoisting machine base 41.

その後、新設主ロープ7が、既設巻上機20の既設トラクションシーブ22、および新設巻上機40の新設トラクションシーブ42に巻き掛けられる。このとき、例えば、新設主ロープ7の一端が、一方(図2の左側)のヒッチ部に取り付けられる。続いて、新設主ロープ7が、一対のかごシーブ5、既設巻上機20の既設トラクションシーブ22、一方の既設錘シーブ12a、新設巻上機40の新設トラクションシーブ42、他方の既設錘シーブ12bに、この配列順となるように巻き掛けられる。なお、新設主ロープ7が、一対のかごシーブ5、既設巻上機20の既設トラクションシーブ22、一方の既設錘シーブ12a、新設巻上機40の新設トラクションシーブ42、他方の既設錘シーブ12bに、この配列順となるように巻き掛けられれば、新設主ロープ7を各機器に巻き掛ける順番は任意である。その後、新設主ロープ7の他端が、他方(図2の右側)のヒッチ部に取り付けられる。   Thereafter, the new main rope 7 is wound around the existing traction sheave 22 of the existing hoisting machine 20 and the new traction sheave 42 of the new hoisting machine 40. At this time, for example, one end of the new main rope 7 is attached to one (left side in FIG. 2) hitch portion. Subsequently, the new main rope 7 includes a pair of car sheaves 5, an existing traction sheave 22 of the existing hoisting machine 20, one existing weight sheave 12a, a new traction sheave 42 of the new hoisting machine 40, and the other existing weight sheave 12b. Are wound in this order of arrangement. The new main rope 7 is connected to the pair of car sheaves 5, the existing traction sheave 22 of the existing hoisting machine 20, one existing weight sheave 12a, the new traction sheave 42 of the new hoisting machine 40, and the other existing weight sheave 12b. As long as it is wound in this arrangement order, the order in which the new main rope 7 is wound around each device is arbitrary. Thereafter, the other end of the new main rope 7 is attached to the other (right side in FIG. 2) hitch portion.

このようにして、リニューアル作業が完了し、図2に示すエレベータ装置1が得られる。エレベータ装置1の新設主ロープ7は、既設巻上機20ではなく新設巻上機40によって巻き上げられるようになり、ロープ巻上機能を有する巻上機が既設巻上機20から新設巻上機40に交換される。この場合、昇降している乗りかご3および釣合錘10を停止させる場合には、新設巻上機40の新設巻上機ブレーキ部53だけでなく、既設巻上機20の既設巻上機ブレーキ部23を作動させて、乗りかご3および釣合錘10を制動することができる。   In this way, the renewal work is completed, and the elevator apparatus 1 shown in FIG. 2 is obtained. The new main rope 7 of the elevator apparatus 1 is wound up by the new hoisting machine 40 instead of the existing hoisting machine 20, and the hoisting machine having the rope hoisting function is changed from the existing hoisting machine 20 to the new hoisting machine 40. Will be replaced. In this case, when the elevator car 3 and the counterweight 10 that are moving up and down are stopped, not only the new hoisting machine brake unit 53 of the new hoisting machine 40 but also the existing hoisting machine brake of the existing hoisting machine 20. The car 23 and the counterweight 10 can be braked by operating the portion 23.

このように本実施の形態によれば、既設巻上機20を撤去することなく、既設巻上機20の既設トラクションシーブ22が、昇降路2内でそらせシーブとして利用されている。このことにより、既設巻上機20および既設巻上機ベース21を有効利用することができ、既設巻上機20および既設巻上機ベース21の撤去および搬出を省略することができる。このため、リニューアル時の作業量を軽減することができ、リニューアル作業の効率を向上させることができる。この結果、リニューアル作業の工期を短縮することができるとともに、リニューアル費用を削減することができる。   Thus, according to the present embodiment, the existing traction sheave 22 of the existing hoisting machine 20 is used as the deflecting sheave in the hoistway 2 without removing the existing hoisting machine 20. Thus, the existing hoisting machine 20 and the existing hoisting machine base 21 can be effectively used, and the removal and removal of the existing hoisting machine 20 and the existing hoisting machine base 21 can be omitted. For this reason, the work amount at the time of renewal can be reduced, and the efficiency of the renewal work can be improved. As a result, the renovation work period can be shortened and the renewal cost can be reduced.

また、本実施の形態によれば、新設主ロープ7が、既設トラクションシーブ22、一方の既設錘シーブ12a、新設トラクションシーブ42、他方の既設錘シーブ12bに、この配列順で巻き掛けられている。このことにより、新設主ロープ7が、既設トラクションシーブ22、新設トラクションシーブ42に、この配列順で巻き掛けられる場合よりも、新設トラクションシーブ42に巻き掛けられる新設主ロープ7の巻き掛け角度を大きくすることができる。このため、新設主ロープ7と新設トラクションシーブ42との間の摩擦(トラクション)を、効果的に発生させることができる。このため、新設主ロープ7の巻き上げに要求される所定のトラクションをより効率的に得ることができる。   Further, according to the present embodiment, the new main rope 7 is wound around the existing traction sheave 22, one existing weight sheave 12a, the new traction sheave 42, and the other existing weight sheave 12b in this arrangement order. . As a result, the winding angle of the new main rope 7 wound around the new traction sheave 42 is larger than when the new main rope 7 is wound around the existing traction sheave 22 and the new traction sheave 42 in this arrangement order. can do. For this reason, the friction (traction) between the new main rope 7 and the new traction sheave 42 can be effectively generated. For this reason, the predetermined traction required for winding up the new main rope 7 can be obtained more efficiently.

また、本実施の形態によれば、既設巻上機20が、ブレーキ機能を有している。このことにより、新設巻上機40の新設巻上機ブレーキ部53と、既設巻上機20の既設巻上機ブレーキ部23とによってブレーキの2重化を図ることができる。このため、制動力を増大させてエレベータ装置1の安全性を高めることができる。   Moreover, according to this Embodiment, the existing winding machine 20 has a brake function. This makes it possible to duplicate the brake by the newly installed hoisting machine brake unit 53 of the newly installed hoisting machine 40 and the existing hoisting machine brake unit 23 of the existing hoisting machine 20. For this reason, the braking force can be increased and the safety of the elevator apparatus 1 can be improved.

また、本実施の形態によれば、新設巻上機40が、昇降路2の上部に設けられている。このため、降雨等により昇降路2内が冠水した場合であっても、新設巻上機40が冠水する事態を回避し得る。   Further, according to the present embodiment, the new hoisting machine 40 is provided in the upper part of the hoistway 2. For this reason, even if it is a case where the inside of the hoistway 2 is flooded by rain etc., the situation where the new hoist 40 is flooded can be avoided.

なお、上述した本実施の形態においては、既設主ロープ4を取り外す工程と、既設巻上機20のロープ巻上機能を取り除く工程と、新設巻上機40を設置する工程と、新設主ロープ7を巻き掛ける工程と、がこの順番で行われる例について説明した。しかしながら、このことに限られることはなく、リニューアル作業が完了した後に、図2に示すエレベータ装置1が得られていれば、各工程の順番はこれに限られることはない。   In the above-described embodiment, the step of removing the existing main rope 4, the step of removing the rope hoisting function of the existing hoisting machine 20, the step of installing the new hoisting machine 40, and the new main rope 7 In the above description, the example in which the step of winding the steps is performed in this order is described. However, the present invention is not limited to this, and the order of the steps is not limited to this as long as the elevator apparatus 1 shown in FIG. 2 is obtained after the renewal work is completed.

また、上述した本実施の形態においては、既設巻上機20および新設巻上機40が昇降路2の上部に設けられている例について説明した。しかしながら、このことに限られることはなく、既設巻上機20が昇降路2の上部に設けられていた場合であっても、新設巻上機40を昇降路2の下部に設けるようにしてもよい。この場合、追加のそらせシーブを使用することにより、新設主ロープ7をかごシーブ5、新設トラクションシーブ42および既設錘シーブ12a、12bに巻き掛けることができる。この場合、例えば、図3に示すような態様で、新設主ロープ7を巻き掛けることができる。このため、既設巻上機20および既設巻上機ベース21を有効利用することができ、既設巻上機20および既設巻上機ベース21の撤去および搬出を省略することができる。   Moreover, in this Embodiment mentioned above, the example in which the existing winding machine 20 and the new winding machine 40 were provided in the upper part of the hoistway 2 was demonstrated. However, the present invention is not limited to this, and even if the existing hoisting machine 20 is provided in the upper part of the hoistway 2, the new hoisting machine 40 may be provided in the lower part of the hoistway 2. Good. In this case, the new main rope 7 can be wound around the car sheave 5, the new traction sheave 42, and the existing weight sheaves 12a and 12b by using an additional deflecting sheave. In this case, for example, the new main rope 7 can be wound around in the manner shown in FIG. For this reason, the existing hoisting machine 20 and the existing hoisting machine base 21 can be used effectively, and removal and removal of the existing hoisting machine 20 and the existing hoisting machine base 21 can be omitted.

また、上述した本実施の形態においては、釣合錘10に、2つの既設錘シーブ12a、12bが設置されている例について説明した。しかしながら、このことに限られることはなく、釣合錘10に設置される既設錘シーブは1つであってもよい。この場合、既設錘シーブは、新設主ロープ7が並列状に巻き掛けられる2つのシーブ溝群(図示せず)を含むように構成され得る。   Moreover, in this Embodiment mentioned above, the example in which the two existing weight sheaves 12a and 12b were installed in the counterweight 10 was demonstrated. However, the present invention is not limited to this, and the number of existing weight sheaves installed on the counterweight 10 may be one. In this case, the existing weight sheave can be configured to include two sheave groove groups (not shown) around which the new main rope 7 is wound in parallel.

(第2の実施の形態)
次に、図3および図4を用いて、本発明の第2の実施の形態におけるエレベータ巻上機のリニューアル方法について説明する。
(Second Embodiment)
Next, an elevator hoist renewal method according to the second embodiment of the present invention will be described with reference to FIGS. 3 and 4.

図3および図4に示す第2の実施の形態においては、既設巻上機が昇降路の下部に設けられている点が主に異なり、他の構成は、図1および図2に示す第1の実施の形態と略同一である。なお、図3および図4において、図1および図2に示す第1の実施の形態と同一部分には同一符号を付して詳細な説明は省略する。   The second embodiment shown in FIGS. 3 and 4 is mainly different in that the existing hoisting machine is provided in the lower part of the hoistway, and other configurations are the same as those in the first embodiment shown in FIGS. This is substantially the same as the embodiment. 3 and 4, the same parts as those of the first embodiment shown in FIGS. 1 and 2 are denoted by the same reference numerals, and detailed description thereof is omitted.

図3に示すように、本実施の形態のリニューアル前のエレベータ装置1においては、既設巻上機20は、機械室ではなく昇降路2の下部に設けられている。より具体的には、昇降路2の下部に既設巻上機ベース21が設けられており、既設巻上機20はこの既設巻上機ベース21上に設置されている。   As shown in FIG. 3, in the elevator apparatus 1 before renewal according to the present embodiment, the existing hoisting machine 20 is provided in the lower part of the hoistway 2 instead of the machine room. More specifically, an existing hoisting machine base 21 is provided at the lower part of the hoistway 2, and the existing hoisting machine 20 is installed on the existing hoisting machine base 21.

昇降路2の上部には、2つの既設そらせシーブ50a、50bが設けられている。この場合、例えば、既設そらせシーブベースが設けられており、2つの既設そらせシーブ50a、50bは、昇降路2の上部に設けられた既設そらせシーブベースに設置されている。   Two existing deflecting sheaves 50 a and 50 b are provided at the upper part of the hoistway 2. In this case, for example, an existing deflecting sheave base is provided, and the two existing deflecting sheaves 50 a and 50 b are installed on an existing deflecting sheave base provided in the upper part of the hoistway 2.

既設主ロープ4は、一方(図3の左側)のヒッチ部から他方(図3の右側)のヒッチ部に向かって、一対のかごシーブ5、一方の既設そらせシーブ50a、既設トラクションシーブ22、他方の既設そらせシーブ50b、一対の既設錘シーブ12a、12bに、この配列順で巻き掛けられている。   The existing main rope 4 has a pair of car sheaves 5, one existing deflecting sheave 50 a, an existing traction sheave 22, and the other from the one (left side in FIG. 3) to the other (right side in FIG. 3). The existing deflecting sheave 50b and the pair of existing weight sheaves 12a and 12b are wound around in this arrangement order.

次に、図3に示すエレベータ装置1をリニューアルした後のエレベータ装置1ついて図4を用いて説明する。   Next, the elevator apparatus 1 after the renewal of the elevator apparatus 1 shown in FIG. 3 will be described with reference to FIG.

図4に示すエレベータ装置1では、2つの既設そらせシーブ50a、50bのうち一方(図3の右側)の既設そらせシーブ50bが撤去され、新設トラクションシーブ42を有する新設巻上機40が設置されている。   In the elevator apparatus 1 shown in FIG. 4, one of the two existing deflecting sheaves 50a and 50b (right side in FIG. 3) is removed, and a new hoisting machine 40 having a new traction sheave 42 is installed. Yes.

新設巻上機40は、機械室ではなく昇降路2の上部に設置されている。新設巻上機40の新設トラクションシーブ42は、撤去された既設そらせシーブ50bが設置されていた位置に配置されることが好適である。より具体的には、昇降路2の上部に新設巻上機ベース41が設けられており、新設巻上機40は、この新設巻上機ベース41上に設置されている。   The new hoisting machine 40 is installed not in the machine room but in the upper part of the hoistway 2. The newly installed traction sheave 42 of the newly installed hoisting machine 40 is preferably arranged at the position where the removed existing deflecting sheave 50b has been installed. More specifically, a new hoisting machine base 41 is provided in the upper part of the hoistway 2, and the new hoisting machine 40 is installed on the new hoisting machine base 41.

新設主ロープ7は、一方(図4の左側)のヒッチ部から他方(図4の右側)のヒッチ部に向かって、一対のかごシーブ5、既設そらせシーブ50a、既設トラクションシーブ22、新設トラクションシーブ42、既設錘シーブ12a、12bに、この配列順で巻き掛けられている。   The new main rope 7 has a pair of car sheaves 5, an existing deflecting sheave 50a, an existing traction sheave 22, and a new traction sheave from one (left side in FIG. 4) to the other (right side in FIG. 4). 42, wound around the existing weight sheaves 12a and 12b in this arrangement order.

次に、図3に示すリニューアル前のエレベータ装置1から図4に示すリニューアル後のエレベータ装置1にリニューアルするための、エレベータ巻上機のリニューアル方法について説明する。   Next, a renewal method of the elevator hoisting machine for renewal from the elevator apparatus 1 before renewal shown in FIG. 3 to the elevator apparatus 1 after renewal shown in FIG. 4 will be described.

まず、既設主ロープ4が、一対のかごシーブ5、一方の既設そらせシーブ50a、既設トラクションシーブ22、他方の既設そらせシーブ50b、一対の既設錘シーブ12a、12bおよびヒッチ部から取り外される。   First, the existing main rope 4 is removed from the pair of car sheaves 5, one existing deflecting sheave 50a, the existing traction sheave 22, the other existing deflecting sheave 50b, the pair of existing weight sheaves 12a, 12b, and the hitch portion.

続いて、新設巻上機40を設置する前に、昇降路2の上部に設けられていた既設そらせシーブ50bが撤去される。この場合、例えば、昇降路2の上部に設けられた既設そらせシーブベースから既設そらせシーブ50bが撤去される。   Subsequently, before installing the new hoisting machine 40, the existing deflecting sheave 50b provided in the upper part of the hoistway 2 is removed. In this case, for example, the existing deflecting sheave 50b is removed from the existing deflecting sheave base provided in the upper part of the hoistway 2.

次に、新設巻上機40が、昇降路2の上部に設置される。この場合、新設巻上機40の新設トラクションシーブ42は、撤去された既設そらせシーブ50bが設置されていた位置に配置されることが好適である。   Next, a new hoisting machine 40 is installed at the upper part of the hoistway 2. In this case, it is preferable that the newly installed traction sheave 42 of the newly installed hoisting machine 40 is disposed at a position where the removed existing deflecting sheave 50b is installed.

その後、新設主ロープ7が、既設トラクションシーブ22、および新設トラクションシーブ42に巻き掛けられる。このとき、例えば、新設主ロープ7の一端が、一方(図4の左側)のヒッチ部に取り付けられる。続いて、新設主ロープ7が、一対のかごシーブ5、一方の既設そらせシーブ50a、既設トラクションシーブ22、他方の既設そらせシーブ50b、一対の既設錘シーブ12a、12bに、この配列順となるように巻き掛けられる。その後、新設主ロープ7の他端が、他方(図4の右側)のヒッチ部に取り付けられる。   Thereafter, the new main rope 7 is wound around the existing traction sheave 22 and the new traction sheave 42. At this time, for example, one end of the new main rope 7 is attached to one (left side in FIG. 4) hitch portion. Subsequently, the new main rope 7 is arranged in this order in the pair of car sheaves 5, one existing deflecting sheave 50a, the existing traction sheave 22, the other existing deflecting sheave 50b, and the pair of existing weight sheaves 12a, 12b. Wrapped around. Thereafter, the other end of the new main rope 7 is attached to the other (right side in FIG. 4) hitch portion.

このようにして、リニューアル作業が完了し、図4に示すエレベータ装置1が得られる。   In this way, the renewal work is completed, and the elevator apparatus 1 shown in FIG. 4 is obtained.

このように本実施の形態によれば、既設巻上機20が昇降路2の下部に設けられている場合であっても、既設巻上機20を撤去することなく、既設巻上機20の既設トラクションシーブ22が、昇降路2内でそらせシーブとして利用されている。このことにより、既設巻上機20および既設巻上機ベース21を有効利用することができ、既設巻上機20および既設巻上機ベース21の撤去および搬出を省略することができる。このため、リニューアル時の作業量を軽減することができ、リニューアル作業の効率を向上させることができる。この結果、リニューアル作業の工期を短縮することができるとともに、リニューアル費用を削減することができる。   As described above, according to the present embodiment, even if the existing hoisting machine 20 is provided in the lower part of the hoistway 2, the existing hoisting machine 20 is removed without removing the existing hoisting machine 20. The existing traction sheave 22 is used as a deflecting sheave in the hoistway 2. Thus, the existing hoisting machine 20 and the existing hoisting machine base 21 can be effectively used, and the removal and removal of the existing hoisting machine 20 and the existing hoisting machine base 21 can be omitted. For this reason, the work amount at the time of renewal can be reduced, and the efficiency of the renewal work can be improved. As a result, the renovation work period can be shortened and the renewal cost can be reduced.

なお、上述した本実施の形態においては、既設主ロープ4を取り外す工程と、既設そらせシーブ50bが撤去される工程と、新設巻上機40が設置される工程と、新設主ロープ7を巻き掛ける工程と、がこの順番で行われる例について説明した。しかしながら、このことに限られることはなく、既設そらせシーブ50bが撤去された後に、新設巻上機40が設置されるとともに、リニューアル作業が完了した後に、図4に示すエレベータ装置1が得られていれば、各工程の順番はこれに限られることはない。   In the present embodiment described above, the step of removing the existing main rope 4, the step of removing the existing deflecting sheave 50b, the step of installing the new hoisting machine 40, and the new main rope 7 are wound. An example in which the steps are performed in this order has been described. However, the present invention is not limited to this. After the existing deflecting sheave 50b is removed, the new hoisting machine 40 is installed, and after the renewal work is completed, the elevator apparatus 1 shown in FIG. 4 is obtained. If so, the order of each step is not limited to this.

また、上述した本実施の形態においては、釣合錘10に、2つの既設錘シーブ12a、12bが設置されている例について説明した。しかしながら、このことに限られることはなく、釣合錘10に設置される既設錘シーブは1つであってもよい。この場合、既設錘シーブは、新設主ロープ7が並列状に巻き掛けられる2つのシーブ溝群(図示せず)を含むように構成され得る。   Moreover, in this Embodiment mentioned above, the example in which the two existing weight sheaves 12a and 12b were installed in the counterweight 10 was demonstrated. However, the present invention is not limited to this, and the number of existing weight sheaves installed on the counterweight 10 may be one. In this case, the existing weight sheave can be configured to include two sheave groove groups (not shown) around which the new main rope 7 is wound in parallel.

(第3の実施の形態)
次に、図5を用いて、本発明の第3の実施の形態におけるエレベータ巻上機のリニューアル方法について説明する。
(Third embodiment)
Next, an elevator hoist renewal method according to a third embodiment of the present invention will be described with reference to FIG.

図5に示す第3の実施の形態においては、既設トラクションシーブを撤去して、既設巻上機に新設そらせシーブを設置する点が主に異なり、他の構成は、図1および図2に示す第1の実施の形態と略同一である。なお、図5において、図1および図2に示す第1の実施の形態と同一部分には同一符号を付して詳細な説明は省略する。   The third embodiment shown in FIG. 5 is mainly different in that the existing traction sheave is removed and a new deflecting sheave is installed in the existing hoisting machine, and other configurations are shown in FIGS. 1 and 2. This is substantially the same as the first embodiment. In FIG. 5, the same parts as those of the first embodiment shown in FIGS. 1 and 2 are denoted by the same reference numerals, and detailed description thereof is omitted.

図5に示すように、本実施の形態のリニューアルした後のエレベータ装置1においては、既設巻上機20に新設そらせシーブ60が設置されている。   As shown in FIG. 5, in the elevator apparatus 1 after the renewal of the present embodiment, a new deflecting sheave 60 is installed in the existing hoisting machine 20.

既設巻上機20は、既設トラクションシーブ22が撤去され、この既設トラクションシーブ22の代替えとして、既設巻上機20に新設そらせシーブ60が設置されている。このようにして、本実施の形態では、既設トラクションシーブ22が新設そらせシーブ60に交換されている。この交換は、例えば、主ロープの変更に対応させることを目的とすることができる。より具体的には、ロープ径の変更によりシーブ径を変更する場合や、シーブ溝の個数を変更する場合等に既設トラクションシーブ22を新設そらせシーブ60に交換することが好適である。このため、新設そらせシーブ60のシーブ径は、既設トラクションシーブ22のシーブ径よりも大きくてもよく、または小さくてもよい。また、新設そらせシーブ60のシーブ溝の個数は、既設トラクションシーブ22のシーブ溝の個数よりも多くてもよく、または少なくてもよい。   The existing hoisting machine 20 has the existing traction sheave 22 removed, and a new deflecting sheave 60 is installed in the existing hoisting machine 20 as an alternative to the existing traction sheave 22. In this way, in the present embodiment, the existing traction sheave 22 is replaced with the new deflecting sheave 60. This exchange can be aimed, for example, to accommodate changes in the main rope. More specifically, it is preferable to replace the existing traction sheave 22 with the new deflected sheave 60 when changing the sheave diameter by changing the rope diameter or when changing the number of sheave grooves. For this reason, the sheave diameter of the newly installed deflecting sheave 60 may be larger or smaller than the sheave diameter of the existing traction sheave 22. Further, the number of sheave grooves of the newly installed deflecting sheave 60 may be larger or smaller than the number of sheave grooves of the existing traction sheave 22.

新設主ロープ7は、一方(図5の左側)のヒッチ部から他方(図5の右側)のヒッチ部に向かって、一対のかごシーブ5、新設そらせシーブ60、一方の既設錘シーブ12a、新設トラクションシーブ42、他方の既設錘シーブ12bに、この配列順で巻き掛けられている。   The new main rope 7 has a pair of car sheaves 5, a new deflecting sheave 60, one existing weight sheave 12 a, and a new installation from one (left side in FIG. 5) to the other (right side in FIG. 5). The traction sheave 42 and the other existing weight sheave 12b are wound in this arrangement order.

次に、図1に示すリニューアル前のエレベータ装置1から図6に示すリニューアル後のエレベータ装置1にリニューアルするための、エレベータ巻上機のリニューアル方法について説明する。   Next, a renewal method of the elevator hoisting machine for renewal from the elevator apparatus 1 before renewal shown in FIG. 1 to the elevator apparatus 1 after renewal shown in FIG. 6 will be described.

まず、既設主ロープ4が、一対のかごシーブ5、既設トラクションシーブ22、一対の既設錘シーブ12a、12b、およびヒッチ部から取り外される。   First, the existing main rope 4 is removed from the pair of car sheaves 5, the existing traction sheave 22, the pair of existing weight sheaves 12a and 12b, and the hitch portion.

続いて、既設巻上機20の主ロープを巻き上げるロープ巻上機能が取り除かれるとともに、既設巻上機20から既設トラクションシーブ22が撤去される。なお、既設巻上機20のブレーキ機能は取り除かれない。また、既設巻上機20および既設巻上機ベース21は昇降路2内から撤去されることなく、昇降路2内に残存する。   Subsequently, the rope hoisting function for winding the main rope of the existing hoisting machine 20 is removed, and the existing traction sheave 22 is removed from the existing hoisting machine 20. Note that the brake function of the existing hoisting machine 20 is not removed. Further, the existing hoisting machine 20 and the existing hoisting machine base 21 remain in the hoistway 2 without being removed from the hoistway 2.

次に、既設トラクションシーブ22が撤去された既設巻上機20に、新設そらせシーブ60が設置される。   Next, a new deflecting sheave 60 is installed on the existing hoisting machine 20 from which the existing traction sheave 22 has been removed.

次に、新設トラクションシーブ42を有する新設巻上機40が、設置される。   Next, a new hoisting machine 40 having a new traction sheave 42 is installed.

その後、新設主ロープ7が、新設そらせシーブ60および新設トラクションシーブ42に巻き掛けられる。このとき、例えば、新設主ロープ7の一端が、一方(図5の左側)のヒッチ部に取り付けられる。続いて、新設主ロープ7が、一対のかごシーブ5(図示せず)、新設そらせシーブ60、一方の既設錘シーブ12a(図示せず)、新設トラクションシーブ42、他方の既設錘シーブ12b(図示せず)に、この配列順となるように巻き掛けられる。その後、新設主ロープ7の他端が、他方(図5の右側)のヒッチ部に取り付けられる。   Thereafter, the new main rope 7 is wound around the new deflecting sheave 60 and the new traction sheave 42. At this time, for example, one end of the new main rope 7 is attached to one (left side in FIG. 5) hitch portion. Subsequently, the new main rope 7 includes a pair of car sheaves 5 (not shown), a new deflecting sheave 60, one existing weight sheave 12a (not shown), a new traction sheave 42, and the other existing weight sheave 12b (see FIG. (Not shown). Thereafter, the other end of the new main rope 7 is attached to the other (right side in FIG. 5) hitch portion.

このようにして、リニューアル作業が完了し、図5に示すエレベータ装置1が得られる。   In this way, the renewal work is completed, and the elevator apparatus 1 shown in FIG. 5 is obtained.

このように本実施の形態によれば、既設トラクションシーブ22が取り外された既設巻上機20に、新設そらせシーブ60が設置されている。このことにより、既設トラクションシーブ22を新設そらせシーブ60に交換して、主ロープの変更に対応させることができる。このため、既設巻上機20および既設巻上機ベース21を有効利用することができる。この結果、既設巻上機20および既設巻上機ベース21の撤去および搬出を省略することができる。このため、リニューアル時の作業量を軽減することができ、リニューアル作業の効率を向上させることができる。この結果、リニューアル作業の工期を短縮することができるとともに、リニューアル費用を削減することができる。   As described above, according to the present embodiment, the new deflecting sheave 60 is installed on the existing hoisting machine 20 from which the existing traction sheave 22 has been removed. As a result, the existing traction sheave 22 can be replaced with the newly installed sheave 60 so that the main rope can be changed. For this reason, the existing hoisting machine 20 and the existing hoisting machine base 21 can be used effectively. As a result, removal and removal of the existing hoisting machine 20 and the existing hoisting machine base 21 can be omitted. For this reason, the work amount at the time of renewal can be reduced, and the efficiency of the renewal work can be improved. As a result, the renovation work period can be shortened and the renewal cost can be reduced.

なお、上述した本実施の形態においては、既設主ロープ4を取り外す工程と、既設巻上機20のロープ巻上機能が取り除かれるとともに、既設トラクションシーブ22が撤去される工程と、新設そらせシーブ60が設置される工程と、新設巻上機40が設置される工程と、新設主ロープ7を巻き掛ける工程と、がこの順番で行われる例について説明した。しかしながら、このことに限られることはなく、リニューアル作業が完了した後に、図5に示すエレベータ装置1が得られていれば、各工程の順番はこれに限られることはない。   In the above-described embodiment, the step of removing the existing main rope 4, the step of removing the rope hoisting function of the existing hoisting machine 20, the step of removing the existing traction sheave 22, and the new deflecting sheave 60 The example in which the process of installing the new hoisting machine 40 and the process of winding the new main rope 7 are performed in this order have been described. However, the present invention is not limited to this, and the order of each process is not limited to this as long as the elevator apparatus 1 shown in FIG. 5 is obtained after the renewal work is completed.

(第4の実施の形態)
次に、図6を用いて、本発明の第4の実施の形態におけるエレベータ巻上機のリニューアル方法について説明する。
(Fourth embodiment)
Next, a method for renewing an elevator hoisting machine according to a fourth embodiment of the present invention will be described with reference to FIG.

図6に示す第4の実施の形態においては、撤去された既設巻上機が、既設錘シーブが撤去された錘枠に設置される点が主に異なり、他の構成は、図1および図2に示す第1の実施の形態と略同一である。なお、図6において、図1および図2に示す第1の実施の形態と同一部分には同一符号を付して詳細な説明は省略する。   The fourth embodiment shown in FIG. 6 is mainly different in that the removed existing hoisting machine is installed on the weight frame from which the existing weight sheave has been removed. This is substantially the same as the first embodiment shown in FIG. In FIG. 6, the same parts as those of the first embodiment shown in FIGS. 1 and 2 are denoted by the same reference numerals, and detailed description thereof is omitted.

図6に示すように、本実施の形態のリニューアルした後のエレベータ装置1においては、釣合錘10の錘枠11から、一対の既設錘シーブ12a、12bが撤去されている。また、既設巻上機20が設置されていた既設巻上機ベース21から、既設トラクションシーブ22を有する既設巻上機20が撤去されている。そして、既設巻上機ベース21から撤去された既設巻上機20が、既設錘シーブ12a、12bが撤去された錘枠11に設置されている。   As shown in FIG. 6, in the elevator apparatus 1 after the renewal of the present embodiment, a pair of existing weight sheaves 12 a and 12 b are removed from the weight frame 11 of the counterweight 10. Further, the existing hoisting machine 20 having the existing traction sheave 22 has been removed from the existing hoisting machine base 21 where the existing hoisting machine 20 has been installed. And the existing hoisting machine 20 removed from the existing hoisting machine base 21 is installed in the weight frame 11 from which the existing weight sheaves 12a and 12b are removed.

錘枠11に設置されている既設巻上機20は、釣合錘10の錘として機能している。そして、既設巻上機20の既設トラクションシーブ22には、新設主ロープ7が巻き掛けられており、既設トラクションシーブ22は、リニューアル後のエレベータ装置1においては、錘シーブとして利用されている。すなわち、既設トラクションシーブ22は、撤去された錘シーブ12の代替えとして機能している。   The existing hoisting machine 20 installed in the weight frame 11 functions as a weight of the counterweight 10. Then, the new main rope 7 is wound around the existing traction sheave 22 of the existing hoisting machine 20, and the existing traction sheave 22 is used as a weight sheave in the elevator apparatus 1 after the renewal. That is, the existing traction sheave 22 functions as a substitute for the removed weight sheave 12.

新設巻上機40は、昇降路2の上部に設置されているとともに新設トラクションシーブ42を有している。新設巻上機40は、既設巻上機20が設置されていた位置に配置されることが好適である。より具体的には、昇降路2の上部に既設巻上機ベース21が残存しており、新設巻上機40はこの既設巻上機ベース21上に設置されている。   The new hoisting machine 40 is installed in the upper part of the hoistway 2 and has a new traction sheave 42. The new hoisting machine 40 is preferably arranged at the position where the existing hoisting machine 20 has been installed. More specifically, the existing hoisting machine base 21 remains above the hoistway 2, and the new hoisting machine 40 is installed on the existing hoisting machine base 21.

新設主ロープ7は、一方(図6の左側)のヒッチ部から他方(図6の右側)のヒッチ部に向かって、一対のかごシーブ5、新設トラクションシーブ42、錘枠11に設置された既設巻上機20の既設トラクションシーブ22に、この配列順で巻き掛けられている。   The new main rope 7 is installed on the pair of car sheaves 5, the new traction sheave 42, and the weight frame 11 from one (left side in FIG. 6) to the other (right side in FIG. 6). It is wound around the existing traction sheave 22 of the hoisting machine 20 in this arrangement order.

次に、図1に示すリニューアル前のエレベータ装置1から図6に示すリニューアル後のエレベータ装置1にリニューアルするための、エレベータ巻上機のリニューアル方法について説明する。   Next, a renewal method of the elevator hoisting machine for renewal from the elevator apparatus 1 before renewal shown in FIG. 1 to the elevator apparatus 1 after renewal shown in FIG. 6 will be described.

まず、既設主ロープ4が、一対のかごシーブ5、既設巻上機20の既設トラクションシーブ22、一対の既設錘シーブ12a、12b、およびヒッチ部から取り外される。   First, the existing main rope 4 is removed from the pair of car sheaves 5, the existing traction sheave 22 of the existing hoisting machine 20, the pair of existing weight sheaves 12a and 12b, and the hitch portion.

続いて、既設巻上機20が設置されている既設巻上機ベース21から、既設トラクションシーブ22を有する既設巻上機20が撤去される。撤去された既設巻上機20のロープ巻上機能およびブレーキ機能は、取り除かれる。なお、既設巻上機ベース21は、昇降路2内から撤去されることなく、昇降路2内に残存する。   Subsequently, the existing hoisting machine 20 having the existing traction sheave 22 is removed from the existing hoisting machine base 21 where the existing hoisting machine 20 is installed. The rope hoisting function and the brake function of the removed existing hoisting machine 20 are removed. The existing hoisting machine base 21 remains in the hoistway 2 without being removed from the hoistway 2.

次に、新設トラクションシーブ42を有する新設巻上機40が設置される。この場合、既設巻上機ベース21上に新設巻上機40が取り付けられる。   Next, a new hoisting machine 40 having a new traction sheave 42 is installed. In this case, the new hoisting machine 40 is mounted on the existing hoisting machine base 21.

次に、新設巻上機40によって新設主ロープ7を介して昇降される釣合錘10から、釣合錘10の錘枠11に設置されていた既設錘シーブ12a、12bが撤去される。   Next, the existing weight sheaves 12 a and 12 b installed in the weight frame 11 of the counterweight 10 are removed from the counterweight 10 that is lifted and lowered by the new hoisting machine 40 via the new main rope 7.

次に、撤去された既設巻上機20が、既設錘シーブ12a、12bが撤去された錘枠11に設置される。このようにして、既設巻上機20の既設トラクションシーブ22は、錘シーブとして利用される。   Next, the removed existing hoisting machine 20 is installed on the weight frame 11 from which the existing weight sheaves 12a and 12b are removed. In this manner, the existing traction sheave 22 of the existing hoisting machine 20 is used as a weight sheave.

その後、新設主ロープ7が、新設トラクションシーブ42、および錘枠11に設置された既設巻上機20の既設トラクションシーブ22に巻き掛けられる。このとき、例えば新設主ロープ7の一端が、一方(図6の左側)のヒッチ部に取り付けられる。続いて、新設主ロープ7が、一対のかごシーブ5、新設トラクションシーブ42、既設巻上機20の既設トラクションシーブ22に、この配列順となるように巻き掛けられる。その後、新設主ロープ7の他端が、他方(図6の右側)のヒッチ部に取り付けられる。   Thereafter, the new main rope 7 is wound around the new traction sheave 42 and the existing traction sheave 22 of the existing hoisting machine 20 installed on the weight frame 11. At this time, for example, one end of the new main rope 7 is attached to one (left side in FIG. 6) hitch portion. Subsequently, the new main rope 7 is wound around the pair of car sheaves 5, the new traction sheave 42, and the existing traction sheave 22 of the existing hoisting machine 20 in this arrangement order. Thereafter, the other end of the new main rope 7 is attached to the other (right side in FIG. 6) hitch portion.

このようにして、リニューアル作業が完了し、図6に示すエレベータ装置1が得られる。   In this way, the renewal work is completed, and the elevator apparatus 1 shown in FIG. 6 is obtained.

このように本実施の形態によれば、既設巻上機20を昇降路2から搬出することなく、既設巻上機20の既設トラクションシーブ22が、錘シーブとして利用されている。また、既設巻上機ベース21を撤去することなく、新設巻上機40が既設巻上機ベース21上に設置されている。このことにより、既設巻上機20および既設巻上機ベース21を有効利用することができ、既設巻上機20の搬出を省略するとともに、既設巻上機ベース21の撤去および搬出を省略することができる。このため、リニューアル時の作業量を軽減することができ、リニューアル作業の効率を向上させることができる。この結果、リニューアル作業の工期を短縮することができるとともに、リニューアル費用を削減することができる。   Thus, according to the present embodiment, the existing traction sheave 22 of the existing hoisting machine 20 is used as a weight sheave without carrying out the existing hoisting machine 20 from the hoistway 2. Further, the new hoisting machine 40 is installed on the existing hoisting machine base 21 without removing the existing hoisting machine base 21. Accordingly, the existing hoisting machine 20 and the existing hoisting machine base 21 can be used effectively, and the removal of the existing hoisting machine base 21 is omitted while the carrying out of the existing hoisting machine 20 is omitted. Can do. For this reason, the work amount at the time of renewal can be reduced, and the efficiency of the renewal work can be improved. As a result, the renovation work period can be shortened and the renewal cost can be reduced.

また、本実施に形態によれば、既設巻上機20が、釣合錘10の錘として利用されている。このことにより、既設巻上機20を有効利用することができ、既設巻上機20の搬出を省略することができる。   Further, according to the present embodiment, the existing hoisting machine 20 is used as the weight of the counterweight 10. Thereby, the existing hoisting machine 20 can be used effectively, and the carrying-out of the existing hoisting machine 20 can be omitted.

なお、上述した本実施の形態においては、既設主ロープ4を取り外す工程と、既設巻上機20を撤去する工程と、新設巻上機40を設置する工程と、既設錘シーブ12a、12bを撤去する工程と、既設巻上機20を設置する工程と、新設主ロープ7を巻き掛ける工程と、がこの順番で行われる例について説明した。しかしながら、このことに限られることはなく、リニューアル作業が完了した後に、図6に示すエレベータ装置1が得られていれば、各工程の順番はこれに限られることはない。   In the above-described embodiment, the step of removing the existing main rope 4, the step of removing the existing hoisting machine 20, the step of installing the new hoisting machine 40, and the existing weight sheaves 12a and 12b are removed. An example in which the step of performing, the step of installing the existing hoisting machine 20, and the step of winding the new main rope 7 are performed in this order has been described. However, the present invention is not limited to this, and the order of each process is not limited to this as long as the elevator apparatus 1 shown in FIG. 6 is obtained after the renewal work is completed.

また、上述した本実施の形態においては、既設巻上機20が昇降路2の上部に設けられていた例(図1参照)について説明した。しかしながら、このことに限られることはなく、既設巻上機20が昇降路2の下部に設けられていてもよい(図3参照)。この場合においても、図7に示すように、既設巻上機20を既設巻上機ベース21から撤去し、撤去した既設巻上機20を錘枠11に設置し、既設巻上機ベース21上に新設巻上機40を設置すればよい。このことにより、新設主ロープ7をかごシーブ5、新設トラクションシーブ42および既設トラクションシーブ22に巻き掛けることができる。このため、既設巻上機20および既設巻上機ベース21を有効利用することができ、既設巻上機20の搬出を省略するとともに、既設巻上機ベース21の撤去および搬出を省略することができる。   Moreover, in this Embodiment mentioned above, the example (refer FIG. 1) in which the existing winding machine 20 was provided in the upper part of the hoistway 2 was demonstrated. However, it is not restricted to this, The existing hoisting machine 20 may be provided in the lower part of the hoistway 2 (refer FIG. 3). Also in this case, as shown in FIG. 7, the existing hoisting machine 20 is removed from the existing hoisting machine base 21, the removed existing hoisting machine 20 is installed on the weight frame 11, and the existing hoisting machine base 21 is A new hoisting machine 40 may be installed in Thus, the new main rope 7 can be wound around the car sheave 5, the new traction sheave 42, and the existing traction sheave 22. For this reason, the existing hoisting machine 20 and the existing hoisting machine base 21 can be used effectively, and the removal of the existing hoisting machine base 21 and the removal of the existing hoisting machine base 21 can be omitted while being omitted. it can.

また、上述した本実施の形態においては、錘枠11に設置されていた錘体13が、例えば、既設錘シーブ12a、12bを撤去する際に撤去されてもよい。   Moreover, in this Embodiment mentioned above, the weight body 13 installed in the weight frame 11 may be removed when removing existing weight sheaves 12a and 12b, for example.

(第5の実施の形態)
次に、図8を用いて、本発明の第5の実施の形態におけるエレベータ巻上機のリニューアル方法について説明する。
(Fifth embodiment)
Next, an elevator hoist renewal method according to the fifth embodiment of the present invention will be described with reference to FIG.

図8に示す第5の実施の形態においては、既設巻上機が撤去された既設巻上機ベースに、新設そらせシーブが設置される点が主に異なり、他の構成は、図1および図2に示す第1の実施の形態と略同一である。なお、図8において、図1および図2に示す第1の実施の形態と同一部分には同一符号を付して詳細な説明は省略する。   The fifth embodiment shown in FIG. 8 is mainly different in that the newly installed deflector sheave is installed on the existing hoisting machine base from which the existing hoisting machine has been removed. This is substantially the same as the first embodiment shown in FIG. In FIG. 8, the same parts as those of the first embodiment shown in FIGS. 1 and 2 are denoted by the same reference numerals, and detailed description thereof is omitted.

図8に示すように、本実施の形態のリニューアルした後のエレベータ装置1においては、既設巻上機ベース21から既設巻上機20が撤去されている。しかしながら、既設巻上機ベース21は、昇降路2内から撤去されることなく、昇降路2内に残存している。そして、既設巻上機20が撤去された既設巻上機ベース21上に、新設そらせシーブ70が設置されている。   As shown in FIG. 8, in the elevator apparatus 1 after the renewal of the present embodiment, the existing hoisting machine 20 is removed from the existing hoisting machine base 21. However, the existing hoisting machine base 21 remains in the hoistway 2 without being removed from the hoistway 2. Then, a new deflecting sheave 70 is installed on the existing hoisting machine base 21 from which the existing hoisting machine 20 has been removed.

新設主ロープ7は、一方(図8の左側)のヒッチ部から他方(図8の右側)のヒッチ部に向かって、一対のかごシーブ5、新設そらせシーブ70、一方の既設錘シーブ12a、新設トラクションシーブ42、他方の既設錘シーブ12bに、この配列順で巻き掛けられている。   The new main rope 7 has a pair of car sheaves 5, a new deflecting sheave 70, one existing weight sheave 12 a, and a new installation from one (left side in FIG. 8) to the other (right side in FIG. 8). The traction sheave 42 and the other existing weight sheave 12b are wound in this arrangement order.

次に、図1に示すリニューアル前のエレベータ装置1から図8に示すリニューアル後のエレベータ装置1にリニューアルするための、エレベータ巻上機のリニューアル方法について説明する。   Next, a renewal method of the elevator hoisting machine for renewing the elevator apparatus 1 before renewal shown in FIG. 1 to the elevator apparatus 1 after renewal shown in FIG. 8 will be described.

まず、既設主ロープ4が、一対のかごシーブ5、既設巻上機20の既設トラクションシーブ22、一対の既設錘シーブ12a、12b、およびヒッチ部から取り外される。   First, the existing main rope 4 is removed from the pair of car sheaves 5, the existing traction sheave 22 of the existing hoisting machine 20, the pair of existing weight sheaves 12a and 12b, and the hitch portion.

続いて、既設巻上機ベース21から、既設巻上機20が撤去される。このとき、既設巻上機ベース21は昇降路2内から撤去されることなく、昇降路2内に残存し、新設そらせシーブ70のベースとして利用される。撤去された既設巻上機20のロープ巻上機能およびブレーキ機能は、取り除かれる。   Subsequently, the existing hoisting machine 20 is removed from the existing hoisting machine base 21. At this time, the existing hoisting machine base 21 remains in the hoistway 2 without being removed from the hoistway 2, and is used as a base for the new deflecting sheave 70. The rope hoisting function and the brake function of the removed existing hoisting machine 20 are removed.

次に、既設巻上機20が撤去された既設巻上機ベース21上に、新設そらせシーブ70が設置される。   Next, a new deflecting sheave 70 is installed on the existing hoisting machine base 21 from which the existing hoisting machine 20 has been removed.

次に、新設トラクションシーブ42を有する新設巻上機40が設置される。   Next, a new hoisting machine 40 having a new traction sheave 42 is installed.

その後、新設主ロープ7を、新設そらせシーブ70および新設トラクションシーブ42に巻き掛ける。このとき、例えば新設主ロープ7の一端が、一方(図8の左側)のヒッチ部に取り付けられる。続いて、新設主ロープ7が、一対のかごシーブ5、新設そらせシーブ70、一方の既設錘シーブ12a、新設トラクションシーブ42、他方の既設錘シーブ12bに、この配列順となるように巻き掛けられる。その後、新設主ロープ7の他端が、他方(図8の右側)のヒッチ部に取り付けられる。   Thereafter, the new main rope 7 is wound around the new deflected sheave 70 and the new traction sheave 42. At this time, for example, one end of the new main rope 7 is attached to one (left side in FIG. 8) hitch portion. Subsequently, the new main rope 7 is wound around the pair of car sheaves 5, the new deflecting sheave 70, one existing weight sheave 12a, the new traction sheave 42, and the other existing weight sheave 12b in this arrangement order. . Thereafter, the other end of the new main rope 7 is attached to the other (right side in FIG. 8) hitch portion.

このようにして、リニューアル作業が完了し、図8に示すエレベータ装置1が得られる。   In this way, the renewal work is completed, and the elevator apparatus 1 shown in FIG. 8 is obtained.

このように本実施の形態によれば、既設巻上機ベース21を撤去することなく、新設そらせシーブ70が、既設巻上機ベース21上に設置されている。このことにより、既設巻上機ベース21を有効利用することができ、既設巻上機ベース21の撤去および搬出を省略することができる。このため、リニューアル時の作業量を軽減することができ、リニューアル作業の効率を向上させることができる。この結果、リニューアル作業の工期を短縮することができるとともに、リニューアル費用を削減することができる。   Thus, according to the present embodiment, the new deflecting sheave 70 is installed on the existing hoisting machine base 21 without removing the existing hoisting machine base 21. Thus, the existing hoisting machine base 21 can be used effectively, and removal and unloading of the existing hoisting machine base 21 can be omitted. For this reason, the work amount at the time of renewal can be reduced, and the efficiency of the renewal work can be improved. As a result, the renovation work period can be shortened and the renewal cost can be reduced.

なお、上述した本実施の形態においては、既設主ロープ4を取り外す工程と、既設巻上機20を撤去する工程と、新設そらせシーブ70を設置する工程と、新設巻上機40を設置する工程と、新設主ロープ7を巻き掛ける工程と、がこの順番で行われる例について説明した。しかしながら、このことに限られることはなく、リニューアル作業が完了した後に、図8に示すエレベータ装置1が得られていれば、各工程の順番はこれに限られることはない。   In the present embodiment described above, the step of removing the existing main rope 4, the step of removing the existing hoisting machine 20, the step of installing the new deflecting sheave 70, and the step of installing the new hoisting machine 40. The example in which the step of winding the new main rope 7 is performed in this order has been described. However, the present invention is not limited to this, and the order of the steps is not limited to this as long as the elevator apparatus 1 shown in FIG. 8 is obtained after the renewal work is completed.

また、上述した本実施の形態においては、既設巻上機20が昇降路2の上部に設けられていた例(図1参照)について説明した。しかしながら、このことに限られることはなく、既設巻上機20が昇降路2の下部に設けられていてもよい(図3参照)。この場合においても、図9に示すように、既設巻上機20を既設巻上機ベース21から撤去し、既設巻上機ベース21上に新設そらせシーブ70を設置し、新設巻上機ベース41上に新設巻上機40を設置すればよい。このことにより、新設主ロープ7をかごシーブ5、新設そらせシーブ70および新設トラクションシーブ42に巻き掛けることができる。このため、既設巻上機ベース21を有効利用することができ、既設巻上機ベース21の撤去および搬出を省略することができる。   Moreover, in this Embodiment mentioned above, the example (refer FIG. 1) in which the existing winding machine 20 was provided in the upper part of the hoistway 2 was demonstrated. However, it is not restricted to this, The existing hoisting machine 20 may be provided in the lower part of the hoistway 2 (refer FIG. 3). Also in this case, as shown in FIG. 9, the existing hoisting machine 20 is removed from the existing hoisting machine base 21, the new deflecting sheave 70 is installed on the existing hoisting machine base 21, and the new hoisting machine base 41 is installed. What is necessary is just to install the new winding machine 40 on top. Thus, the new main rope 7 can be wound around the car sheave 5, the new deflecting sheave 70 and the new traction sheave 42. For this reason, the existing hoisting machine base 21 can be used effectively, and removal and removal of the existing hoisting machine base 21 can be omitted.

以上述べた実施の形態によれば、リニューアル作業の工期を短縮し、リニューアル費用を削減することができる。   According to the embodiment described above, the renewal work period can be shortened and the renewal cost can be reduced.

本発明のいくつかの実施の形態を説明したが、これらの実施の形態は、例として提示したものであり、発明の範囲を限定することは意図していない。これら新規な実施形態は、その他の様々な形態で実施されることが可能であり、発明の要旨を逸脱しない範囲で、種々の省略、置き換え、変更を行うことができる。これら実施の形態やその変形は、発明の範囲や要旨に含まれるとともに、特許請求の範囲に記載された発明とその均等の範囲に含まれる。また、当然のことながら、本発明の要旨の範囲内で、これらの実施の形態を、部分的に適宜組み合わせることも可能である。   Although several embodiments of the present invention have been described, these embodiments are presented as examples and are not intended to limit the scope of the invention. These novel embodiments can be implemented in various other forms, and various omissions, replacements, and changes can be made without departing from the scope of the invention. These embodiments and modifications thereof are included in the scope and gist of the invention, and are included in the invention described in the claims and the equivalents thereof. Moreover, as a matter of course, these embodiments can be partially combined as appropriate within the scope of the present invention.

1・・・エレベータ装置、2・・・昇降路、4・・・既設主ロープ、7・・・新設主ロープ、10・・・釣合錘、11・・・錘枠、12a、12b・・・既設錘シーブ、13・・・錘体、20・・・既設巻上機、21・・・既設巻上機ベース、22・・・既設トラクションシーブ、23・・・既設巻上機ブレーキ部、40・・・新設巻上機、42・・・新設トラクションシーブ、50a、50b・・・既設そらせシーブ、60・・・新設そらせシーブ、70・・・新設そらせシーブ   DESCRIPTION OF SYMBOLS 1 ... Elevator apparatus, 2 ... Hoistway, 4 ... Existing main rope, 7 ... New main rope, 10 ... Counterweight, 11 ... Weight frame, 12a, 12b ... -Existing weight sheave, 13 ... Weight body, 20 ... Existing hoisting machine, 21 ... Existing hoisting machine base, 22 ... Existing traction sheave, 23 ... Existing hoisting machine brake section, 40 ... New winding machine, 42 ... New traction sheave, 50a, 50b ... Existing deflecting sheave, 60 ... New deflecting sheave, 70 ... New deflecting sheave

Claims (7)

マシンルームレスエレベータ装置におけるエレベータ巻上機のリニューアル方法であって、既設主ロープを取り外す工程と、既設トラクションシーブを有する既設巻上機を撤去することなく、前記既設巻上機のロープ巻上機能を取り除く工程と、新設トラクションシーブを有する新設巻上機を設置する工程と、新設主ロープを、前記既設トラクションシーブおよび前記新設トラクションシーブに巻き掛ける工程と、を備え、前記新設主ロープを巻き掛ける工程の後において、前記既設トラクションシーブは、そらせシーブとして利用されることを特徴とするエレベータ巻上機のリニューアル方法。   A method for renewing an elevator hoisting machine in a machine roomless elevator apparatus, the step of removing an existing main rope, and the rope hoisting function of the existing hoisting machine without removing the existing hoisting machine having an existing traction sheave And a step of installing a new hoisting machine having a new traction sheave, and a step of winding a new main rope around the existing traction sheave and the new traction sheave, and winding the new main rope After the process, the existing traction sheave is used as a deflecting sheave. 前記既設巻上機は、昇降路の上部に設置されており、釣合錘に、一対の錘シーブが設けられており、前記新設巻上機を設置する工程において、前記新設巻上機は、前記昇降路の上部に設置され、前記新設主ロープを巻き掛ける工程において、前記新設主ロープは、一方の前記錘シーブ、前記新設トラクションシーブ、他方の前記錘シーブに、この配列順で巻き掛けられることを特徴とする請求項1に記載のエレベータ巻上機のリニューアル方法。   The existing hoisting machine is installed at the upper part of the hoistway, and a pair of weight sheaves are provided on the counterweight.In the step of installing the new hoisting machine, the new hoisting machine is In the step of winding the new main rope installed on the hoistway, the new main rope is wound around one of the weight sheaves, the new traction sheave, and the other weight sheaves in this arrangement order. The renewal method of the elevator hoisting machine according to claim 1. 前記既設巻上機は、昇降路の下部に設けられており、前記新設巻上機を設置する工程の前に、前記昇降路の上部に設けられていた既設そらせシーブが撤去され、前記新設巻上機を設置する工程において、前記新設巻上機は、前記昇降路の上部に設置されることを特徴とする請求項1に記載のエレベータ巻上機のリニューアル方法。   The existing hoisting machine is provided at the lower part of the hoistway, and before the step of installing the new hoisting machine, the existing deflecting sheave provided at the upper part of the hoistway is removed, and the new hoisting machine is removed. The method for renewing an elevator hoisting machine according to claim 1, wherein, in the step of installing the upper machine, the newly installed hoisting machine is installed at an upper part of the hoistway. 前記新設主ロープを巻き掛ける工程の後において、前記既設巻上機は、ブレーキ機能を有していることを特徴とする請求項1乃至3のいずれか一項に記載のエレベータ巻上機のリニューアル方法。   The renewal of the elevator hoisting machine according to any one of claims 1 to 3, wherein the existing hoisting machine has a brake function after the step of winding the new main rope. Method. マシンルームレスエレベータ装置におけるエレベータ巻上機のリニューアル方法であって、既設主ロープを取り外す工程と、既設巻上機を撤去することなく、前記既設巻上機のロープ巻上機能を取り除くとともに、前記既設巻上機から既設トラクションシーブを撤去する工程と、前記既設トラクションシーブが撤去された前記既設巻上機に、新設そらせシーブを設置する工程と、新設トラクションシーブを有する新設巻上機を設置する工程と、新設主ロープを、前記新設そらせシーブおよび前記新設トラクションシーブに巻き掛ける工程と、を備えたことを特徴とするエレベータ巻上機のリニューアル方法。   A method for renewing an elevator hoisting machine in a machine roomless elevator device, the step of removing an existing main rope, and removing the rope hoisting function of the existing hoisting machine without removing the existing hoisting machine, The process of removing the existing traction sheave from the existing hoisting machine, the process of installing a new deflecting sheave on the existing hoisting machine from which the existing traction sheave has been removed, and the installation of a new hoisting machine having the new traction sheave A method for renewing an elevator hoisting machine, comprising: a step; and a step of winding a new main rope around the new shave sheave and the new traction sheave. マシンルームレスエレベータ装置におけるエレベータ巻上機のリニューアル方法であって、既設主ロープを取り外す工程と、既設トラクションシーブを有する既設巻上機を撤去する工程と、新設トラクションシーブを有する新設巻上機を設置する工程と、釣合錘の錘枠から既設錘シーブを撤去する工程と、撤去された前記既設巻上機を、前記既設錘シーブが撤去された前記錘枠に設置する工程と、新設主ロープを、前記新設トラクションシーブ、および前記錘枠に設置された前記既設巻上機の前記既設トラクションシーブに巻き掛ける工程と、を備え、前記新設主ロープを巻き掛ける工程の後において、前記既設トラクションシーブは、錘シーブとして利用されることを特徴とするエレベータ巻上機のリニューアル方法。   A method for renewing an elevator hoisting machine in a machine roomless elevator apparatus, comprising a step of removing an existing main rope, a step of removing an existing hoisting machine having an existing traction sheave, and a new hoisting machine having a new traction sheave. A step of installing, a step of removing the existing weight sheave from the weight frame of the counterweight, a step of installing the removed existing hoist on the weight frame from which the existing weight sheave has been removed, and a new owner Winding the rope around the new traction sheave and the existing traction sheave of the existing hoist installed in the weight frame, and after the step of winding the new main rope, the existing traction A method of renewing an elevator hoisting machine, wherein the sheave is used as a weight sheave. マシンルームレスエレベータ装置におけるエレベータ巻上機のリニューアル方法であって、既設主ロープを取り外す工程と、既設巻上機ベースから、既設巻上機を撤去する工程と、前記既設巻上機が撤去された前記既設巻上機ベース上に、新設そらせシーブを設置する工程と、新設トラクションシーブを有する新設巻上機を設置する工程と、新設主ロープを、前記新設そらせシーブおよび前記新設トラクションシーブに巻き掛ける工程と、を備えたことを特徴とするエレベータ巻上機のリニューアル方法。   A method for renewing an elevator hoisting machine in a machine roomless elevator apparatus, a step of removing an existing main rope, a step of removing an existing hoisting machine from an existing hoisting machine base, and the existing hoisting machine is removed. In addition, a step of installing a new deflecting sheave on the existing hoisting machine base, a step of installing a new hoisting machine having a new traction sheave, and a new main rope are wound around the new deflecting sheave and the new traction sheave. A method of renewing an elevator hoisting machine, comprising:
JP2015235042A 2015-12-01 2015-12-01 Renewal method of elevator hoisting machine Active JP6064023B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2015235042A JP6064023B1 (en) 2015-12-01 2015-12-01 Renewal method of elevator hoisting machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2015235042A JP6064023B1 (en) 2015-12-01 2015-12-01 Renewal method of elevator hoisting machine

Publications (2)

Publication Number Publication Date
JP6064023B1 true JP6064023B1 (en) 2017-01-18
JP2017100842A JP2017100842A (en) 2017-06-08

Family

ID=57800050

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2015235042A Active JP6064023B1 (en) 2015-12-01 2015-12-01 Renewal method of elevator hoisting machine

Country Status (1)

Country Link
JP (1) JP6064023B1 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04213581A (en) * 1990-12-12 1992-08-04 Mitsubishi Electric Corp Installation method for linear motor type elevator
JP2005126166A (en) * 2003-10-21 2005-05-19 Nabtesco Corp Elevator remodeling method and elevator
JP2008030885A (en) * 2006-07-27 2008-02-14 Toshiba Elevator Co Ltd Renewal method of elevator
JP2010275089A (en) * 2009-05-29 2010-12-09 Hitachi Building Systems Co Ltd Elevator renewal method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04213581A (en) * 1990-12-12 1992-08-04 Mitsubishi Electric Corp Installation method for linear motor type elevator
JP2005126166A (en) * 2003-10-21 2005-05-19 Nabtesco Corp Elevator remodeling method and elevator
JP2008030885A (en) * 2006-07-27 2008-02-14 Toshiba Elevator Co Ltd Renewal method of elevator
JP2010275089A (en) * 2009-05-29 2010-12-09 Hitachi Building Systems Co Ltd Elevator renewal method

Also Published As

Publication number Publication date
JP2017100842A (en) 2017-06-08

Similar Documents

Publication Publication Date Title
JP5951104B2 (en) Elevator repair method
CN201400508Y (en) Evaluator without machine room
JP4595011B2 (en) Repair method and elevator apparatus for existing elevator
JP2016079010A (en) Method for repairing elevator without machinery room
JP6579736B2 (en) Renovation method of machine room-less elevator and machine room-less elevator
WO2015025396A1 (en) Elevator device
WO2020035933A1 (en) Method for applying construction elevator lifting height extension technology
JP6270635B2 (en) Renovation method of machine room less elevator
JP6064023B1 (en) Renewal method of elevator hoisting machine
JP2013245033A (en) Method of installing hoisting machine
JPWO2020065774A1 (en) Elevator Balance Weight Lifting Device and Lifting Method
WO2015025397A1 (en) Elevator device
JP6218158B2 (en) Machine room-less elevator
JP2016008131A (en) Elevator and remodeling method of existing elevator
JP5595292B2 (en) Replacing the main rope of the machine room-less elevator
JP2011020804A (en) Renewal method of elevator
JP2010275089A (en) Elevator renewal method
JP5535055B2 (en) Elevator apparatus repair method and elevator apparatus
JP5823450B2 (en) Elevator renewal method and elevator
JP6806660B2 (en) How to repair a machine roomless elevator
JP5806166B2 (en) Elevator repair equipment installation method
JP6758461B2 (en) How to repair a machine roomless elevator
JP2012224414A (en) Method of repairing elevator, and the elevator
JP2015071482A (en) Elevator device modification method and elevator device
JP6072146B2 (en) Elevator hoist support structure and elevator hoist renewal method

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20161107

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20161118

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20161219

R150 Certificate of patent or registration of utility model

Ref document number: 6064023

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R157 Certificate of patent or utility model (correction)

Free format text: JAPANESE INTERMEDIATE CODE: R157

R157 Certificate of patent or utility model (correction)

Free format text: JAPANESE INTERMEDIATE CODE: R157