Product development management program and product development management apparatus using the same Download PDFInfo
- Publication number
- JP6063764B2 JP6063764B2 JP2013027941A JP2013027941A JP6063764B2 JP 6063764 B2 JP6063764 B2 JP 6063764B2 JP 2013027941 A JP2013027941 A JP 2013027941A JP 2013027941 A JP2013027941 A JP 2013027941A JP 6063764 B2 JP6063764 B2 JP 6063764B2
- Authority
- JP
- Japan
- Prior art keywords
- information
- product
- development
- newly developed
- function
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000012356 Product development Methods 0.000 title claims description 35
- 238000011161 development Methods 0.000 claims description 90
- 238000000034 method Methods 0.000 claims description 50
- 230000008569 process Effects 0.000 claims description 47
- 238000012937 correction Methods 0.000 claims description 5
- 239000000463 material Substances 0.000 claims description 3
- 239000000047 product Substances 0.000 description 115
- 230000006870 function Effects 0.000 description 93
- 238000007726 management method Methods 0.000 description 64
- 230000008520 organization Effects 0.000 description 28
- 238000004519 manufacturing process Methods 0.000 description 10
- 238000012545 processing Methods 0.000 description 9
- 238000012384 transportation and delivery Methods 0.000 description 8
- 230000007423 decrease Effects 0.000 description 7
- 238000010586 diagram Methods 0.000 description 6
- 238000007639 printing Methods 0.000 description 6
- 230000004044 response Effects 0.000 description 6
- 238000004458 analytical method Methods 0.000 description 4
- 230000008859 change Effects 0.000 description 4
- 230000003247 decreasing effect Effects 0.000 description 4
- 239000011265 semifinished product Substances 0.000 description 4
- 230000000694 effects Effects 0.000 description 3
- 238000013468 resource allocation Methods 0.000 description 2
- 230000004397 blinking Effects 0.000 description 1
- 238000004364 calculation method Methods 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 239000000470 constituent Substances 0.000 description 1
- 238000013500 data storage Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000003287 optical effect Effects 0.000 description 1
- 230000008707 rearrangement Effects 0.000 description 1
- 239000004065 semiconductor Substances 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/30—Computing systems specially adapted for manufacturing
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Description
本発明は、製品開発を管理するための製品開発の管理プログラム及びそれを用いた製品開発の管理装置に関する。 The present invention relates to a product development management program for managing product development and a product development management apparatus using the program.
従来、特許文献1においてオブジェクト展開方式を利用して製品製造の工程を管理する管理システムが提案されている。この特許文献1において、モジュール展開手段は、生産しようとする製品を、それを構成する複数の半製品に分割し、また、それぞれの半製品を、それを構成する複数の部品に分割している。そして、特許文献1では、半製品毎及び部品毎に予算を算出し、また生産工程を計画するようにしている。このようにすることで、特許文献1は、それぞれの部品の制作に必要となる工数をもとにして製品の制作に必要となる工数を算出し、必要に応じて半製品や部品の生産工程の順序を変更して工数の削減を図れるようしている。 Conventionally, a management system for managing a product manufacturing process using an object expansion method has been proposed in Patent Document 1. In this patent document 1, the module expansion means divides a product to be produced into a plurality of semi-finished products constituting the product, and divides each semi-finished product into a plurality of components constituting the same. . In Patent Document 1, a budget is calculated for each semi-finished product and each part, and a production process is planned. By doing in this way, Patent Document 1 calculates the man-hours necessary for the production of products based on the man-hours necessary for the production of each part, and the production process of semi-finished products and parts as necessary The order can be changed to reduce man-hours.
ここで、特許文献1の管理システムを製品の開発の管理に適用することを考えた場合、製品の開発に際しては、複数の開発テーマが同時に進行することがあり得る。そして、製品開発の場合には、製品の生産の場合に比べて1つの開発テーマの中でも予算や人材の管理が複雑化し易い。特許文献1等の技術をそのまま製品の開発の管理に適用した場合、開発テーマの増加に伴って多くのタスクの統合管理が必要となり、管理に必要なモジュールの数やデータベースの規模が増加し易い。 Here, considering the application of the management system of Patent Literature 1 to the management of product development, a plurality of development themes may proceed simultaneously during product development. In the case of product development, compared to the case of product production, the management of budgets and human resources is likely to be complicated within one development theme. When the technology such as Patent Document 1 is applied to product development management as it is, integrated management of many tasks is required as the number of development themes increases, and the number of modules required for management and the scale of the database are likely to increase. .
本発明は、前記の事情に鑑みてなされたもので、複数の開発テーマ毎の予算及び人材の管理を簡易に行うことが可能な製品開発の管理プログラム及びそのような管理プログラムを用いた製品開発の管理装置を提供することを目的とする。 The present invention has been made in view of the above circumstances, a product development management program capable of easily managing a budget and human resources for each of a plurality of development themes, and product development using such a management program An object of the present invention is to provide a management apparatus.
前記の目的を達成するために、本発明の第1の態様の製品開発の管理プログラムは、複数の新規開発製品の情報を登録する機能と、前記登録した複数の新規開発製品の仕様に関する情報及び日程に関する情報を含む新規開発製品の情報のそれぞれと類似する、既存開発製品の仕様に関する情報と日程に関する実績情報と工数に関する実績情報とを含む既存開発製品の情報を取得する機能と、前記登録した複数の新規開発製品の情報と前記取得したそれぞれの既存開発製品の情報との差異と前記新規開発製品に関する情報又は前記新規開発製品の開発に係る効率情報に応じた補正情報に基づいて、前記登録した複数の新規開発製品のそれぞれの予算、人材、及び日程を算出して割り当てる機能と、をコンピュータに実現させる。 In order to achieve the above object, a product development management program according to the first aspect of the present invention includes a function for registering information on a plurality of newly developed products, information on specifications of the registered plurality of newly developed products, and A function for acquiring information on existing development products including information on specifications of existing development products, performance information on schedules, and performance information on man-hours, similar to each information on newly developed products including information on schedules, and the registered The registration based on the difference between the information on a plurality of newly developed products and the acquired information on each of the existing developed products and the correction information corresponding to the information on the newly developed products or the efficiency information on the development of the newly developed products The computer realizes the function of calculating and assigning the budget, human resources, and schedule of each of the newly developed products.
また、本発明の第2の態様の製品開発の管理装置は、複数の新規開発製品の情報を登録する製品情報登録部と、前記登録した複数の新規開発製品の仕様に関する情報及び日程に関する情報を含む新規開発製品の情報のそれぞれと類似する、既存開発製品の仕様に関する情報と日程に関する実績情報と工数に関する実績情報とを含む既存開発製品の情報を取得し、前記登録した複数の新規開発製品の情報と前記取得したそれぞれの既存開発製品の情報との差異と前記新規開発製品に関する情報又は前記新規開発製品の開発に係る効率情報に応じた補正情報に基づいて、前記登録した複数の新規開発製品のそれぞれの予算、人材、及び日程を算出して割り当てる割り当て部と、を具備する。 The product development management device according to the second aspect of the present invention includes a product information registration unit for registering information on a plurality of newly developed products, information on specifications of the plurality of newly developed products registered, and information on schedules. Information on the specifications of the existing development product, information on the schedule, and information on the schedule and performance information on the man-hours, which are similar to each of the information on the newly developed product including The plurality of registered newly developed products based on the difference between the information and the acquired information of each of the existing developed products and the correction information corresponding to the information on the newly developed product or the efficiency information on the development of the newly developed product An allocation unit that calculates and assigns each budget, human resource, and schedule.
本発明によれば、複数の開発テーマ毎の予算及び人材の管理を簡易に行うことが可能な製品開発の管理プログラム及びそのような管理プログラムを用いた製品開発の管理装置を提供することができる。 According to the present invention, it is possible to provide a product development management program capable of easily managing a budget and human resources for each of a plurality of development themes, and a product development management apparatus using such a management program. .
以下、図面を参照して本発明の実施形態を説明する。
図1は、本発明の一実施形態に係る製品開発の管理装置の構成を示す図である。また、図2は、プログラムモジュール間で利用される情報の関連図である。
Hereinafter, embodiments of the present invention will be described with reference to the drawings.
FIG. 1 is a diagram showing the configuration of a product development management apparatus according to an embodiment of the present invention. FIG. 2 is a related diagram of information used between program modules.
本実施形態に係る管理装置100は、例えば汎用のコンピュータ装置であって、図1に示すように、制御部102と、モジュール記録部104、106、108、110と、記憶部112と、情報記録部114と、入力部116と、表示部118と、印刷部120とを有している。これらのブロックは、バス122を介して相互に通信自在に接続されている。 The management apparatus 100 according to the present embodiment is, for example, a general-purpose computer apparatus. As illustrated in FIG. 1, the management apparatus 100, the module recording units 104, 106, 108, and 110, the storage unit 112, and the information recording unit A display unit 118, an input unit 116, a display unit 118, and a printing unit 120. These blocks are communicatively connected to each other via a bus 122.
制御部102は、例えばCPU(Central Processing Unit)により構成されている。制御部102は、モジュール記録部104、106、108、110に記録されたプログラムモジュールを相互に連携させて製品開発の管理を行う。これら4つのモジュール記録部104、106、108、110に記録されたプログラムモジュールにより、本実施形態に係る製品開発の管理プログラムが構成されている。 The control part 102 is comprised by CPU (Central Processing Unit), for example. The control unit 102 manages product development by linking the program modules recorded in the module recording units 104, 106, 108, and 110 with each other. The program modules recorded in these four module recording units 104, 106, 108, 110 constitute a product development management program according to the present embodiment.
モジュール記録部104は、ハードディスクやフラッシュROMといった周知の記録媒体で構成され、テーマ管理モジュールを記録しておくための記録媒体である。テーマ管理モジュールは、新規開発製品の開発工程の流れを、他のモジュールと連携して管理するモジュールである。テーマ管理モジュールは、次の4つの機能を有するように構成されたモジュールである。即ち、テーマ管理機能と、資源割り当て機能と、発注時期管理機能と、負荷分析機能である。 The module recording unit 104 is configured by a known recording medium such as a hard disk or a flash ROM, and is a recording medium for recording the theme management module. The theme management module is a module that manages the flow of the development process of a newly developed product in cooperation with other modules. The theme management module is a module configured to have the following four functions. That is, a theme management function, a resource allocation function, an order time management function, and a load analysis function.
テーマ管理機能は、テーマ情報を管理する機能である。ここでのテーマ情報の管理とは、テーマ情報の登録と更新とを含む。ここで、テーマ情報は、例えば「製品コード」、「日程」、「開発規模コード」、「組織コード」、「機能」、「概略仕様」、「新規要素」の7つの情報を含む。なお、テーマ情報は、情報記録部114に記録される情報である。 The theme management function is a function for managing theme information. The management of theme information here includes registration and update of theme information. Here, the theme information includes, for example, seven pieces of information of “product code”, “schedule”, “development scale code”, “organization code”, “function”, “rough specification”, and “new element”. The theme information is information recorded in the information recording unit 114.
「製品コード」は、新規開発製品の個々に与えられるコードである。「日程」は、当該新規開発製品の開発日程を示す情報である。ここで、通常、1つの新規開発製品の開発は、複数の開発工程に分けて行われる。したがって、開発日程の情報も、開発工程毎に分けられており、それぞれの開発工程の開始予定日及び終了予定日、並びに工数を示す情報を含む。「開発規模コード」は、当該新規開発製品の開発規模を示すコードである。開発規模コードは、例えば工数(人数と時間の積。単位は人月)で与えられる。「組織コード」は、当該新規開発製品の開発を担当した組織(担当部署)の名称を示すコードである。組織コードも、それぞれの開発工程毎に設定される。「機能」は、「組織コード」で示される組織の当該新規開発製品の開発における機能(役割)を示す情報である。例えば、その組織が、デジタルカメラの開発部門において鏡枠等のメカ系の開発に携わっている場合、「機能」の情報として「メカ」の情報が記録される。「概略仕様」は、当該新規開発製品に求められる概略の仕様を示す情報である。「新規要素」は、当該新規開発製品に新規に搭載する予定の要素を示す情報である。 The “product code” is a code given to each newly developed product. “Schedule” is information indicating the development schedule of the newly developed product. Here, normally, development of one newly developed product is performed in a plurality of development steps. Therefore, the information on the development schedule is also divided for each development process, and includes information indicating the scheduled start date and scheduled end date of each development process, and the man-hours. “Development scale code” is a code indicating the development scale of the newly developed product. The development scale code is given by, for example, the number of man-hours (the product of the number of people and time. The unit is man-month). “Organization code” is a code indicating the name of the organization (department in charge) in charge of development of the newly developed product. An organization code is also set for each development process. “Function” is information indicating a function (role) in development of the newly developed product of the organization indicated by “organization code”. For example, when the organization is engaged in the development of a mechanical system such as a lens frame in the development department of a digital camera, information on “mechanism” is recorded as information on “function”. “Outline specification” is information indicating an outline specification required for the newly developed product. “New element” is information indicating an element to be newly installed in the newly developed product.
資源割り当て機能は、開発テーマが類似する既存開発製品の工数実績情報から、新規開発製品の開発に要する資源(予算及び人材)を割り当てる機能である。 The resource allocation function is a function for allocating resources (budget and human resources) required for developing a newly developed product from the man-hour performance information of the existing developed product having a similar development theme.
発注時期管理機能は、製品開発に要する資材の発注時期、受注時期、納品時期、検収時期、請求時期をそれぞれ管理する機能である。 The order time management function is a function for managing the order time, the order time, the delivery time, the acceptance time, and the billing time for materials required for product development.
負荷分析機能は、新規開発製品の現在の工数の負荷を分析する機能である。ここでの負荷とは、実際に動員された人材の負荷だけでなく、これから動員され得る人材の負荷も含む。負荷は、テーマ情報と工数実績情報の差異から分析される。テーマ情報は、前述したものである。工数実績情報は、「製品コード」、「日程」、「組織コード」、「機能」、「費用」を含む。工数実績情報の「製品コード」は、テーマ情報の「製品コード」と対応している。また、工数実績情報の「日程」は、テーマ情報の「日程」と対応しているが、こちらはそれぞれの開発工程の実際の開始日、終了日、工数を示す情報である。工数実績情報の「組織コード」は、テーマ情報の「組織コード」と対応している。また、工数実績情報の「機能」は、テーマ情報の「組織」と対応している。また、テーマ実績情報の「費用」は、予算情報の「金額」と対応しているが、こちらは実際に使用された金額を示す情報である。 The load analysis function is a function for analyzing the load of the current man-hour of a newly developed product. The load here includes not only the load of human resources actually mobilized but also the load of human resources that can be mobilized from now on. The load is analyzed from the difference between the theme information and the man-hour performance information. The theme information is as described above. The man-hour record information includes “product code”, “schedule”, “organization code”, “function”, and “cost”. The “product code” in the man-hour record information corresponds to the “product code” in the theme information. The “schedule” in the man-hour record information corresponds to the “schedule” in the theme information. This is information indicating the actual start date, end date, and man-hour of each development process. The “organization code” of the man-hour record information corresponds to the “organization code” of the theme information. The “function” of the man-hour record information corresponds to the “organization” of the theme information. The “expense” in the theme performance information corresponds to the “amount” in the budget information, but this is information indicating the amount actually used.
モジュール記録部106は、ハードディスクやフラッシュROMといった周知の記録媒体で構成され、人材管理モジュールを記録しておくための記録媒体である。人材管理モジュールは、製品開発に関わる人材の情報を管理するためのモジュールである。人材管理モジュールは、次の2つの機能を有するように構成されたモジュールである。即ち、人材管理機能と、工数実績管理機能である。 The module recording unit 106 is configured by a known recording medium such as a hard disk or a flash ROM, and is a recording medium for recording a human resource management module. The human resource management module is a module for managing human resource information related to product development. The human resource management module is a module configured to have the following two functions. That is, a human resource management function and a man-hour performance management function.
人材管理機能は、要員情報及び時間単価情報を管理する機能である。要員情報は、例えば「要員コード」、「組織コード」、「機能」、「作業時間」の4つの情報を含む。なお、要員情報は、情報記録部114に記録されている情報である。 The human resource management function is a function for managing personnel information and hourly unit price information. The personnel information includes, for example, four pieces of information of “personnel code”, “organization code”, “function”, and “working time”. The personnel information is information recorded in the information recording unit 114.
「要員コード」は、組織内の要員毎に与えられるコード(例えばID番号である)。要員情報の「組織コード」は、要員コードと対応づけられており、その要員コードが示す要員がどの組織(担当部署)に属しているかを示すコードである。「機能」は、「組織コード」で示される組織の機能(役割)を示す情報である。「作業時間」は、その要員コードの要員の時期毎の作業予定時間を示す情報である。この「作業時間」は、「機能」毎の作業時間と各機能に対応した組織に属している要員毎の作業時間とを含む。ここで、「作業時間」は、固定値としても良い。この場合には、「作業時間」を記録しておく必要はない。 The “personnel code” is a code (for example, an ID number) given to each person in the organization. The “organization code” of the personnel information is associated with the personnel code, and is a code indicating to which organization (department in charge) the personnel indicated by the personnel code belongs. “Function” is information indicating the function (role) of the organization indicated by the “organization code”. “Working time” is information indicating the scheduled work time for each time of the personnel of the personnel code. This “work time” includes work time for each “function” and work time for each person belonging to the organization corresponding to each function. Here, the “working time” may be a fixed value. In this case, it is not necessary to record “working time”.
時間単価情報は、現在登録されている各要員の時間単価を示す情報である。なお、時価単価情報は、情報記録部114に記録されている情報である。 The hourly unit price information is information indicating the hourly unit price of each member currently registered. The market price unit information is information recorded in the information recording unit 114.
工数実績管理機能は、工数実績情報を管理する機能である。工数実績情報は、既存の製品開発に要した工数(人数と各人の作業時間の積)や費用等をテーマ毎にまとめたパッケージ情報である。工数実績情報については後で詳しく説明する。 The man-hour record management function is a function for managing the man-hour record information. The man-hour record information is package information in which man-hours (product of the number of people and the working time of each person), costs, etc. required for existing product development are summarized for each theme. The manhour performance information will be described in detail later.
モジュール記録部108は、ハードディスクやフラッシュROMといった周知の記録媒体で構成され、予算管理モジュールを記録しておくための記録媒体である。予算管理モジュールは、製品開発に関わる予算の情報を管理するためのモジュールである。予算管理モジュールは、次の3つの機能を有するように構成されたモジュールである。即ち、予算管理機能と、発注実績管理機能と、差異分析機能である。 The module recording unit 108 is configured by a known recording medium such as a hard disk or a flash ROM, and is a recording medium for recording a budget management module. The budget management module is a module for managing budget information related to product development. The budget management module is a module configured to have the following three functions. That is, a budget management function, an order performance management function, and a difference analysis function.
予算管理機能は、予算情報を管理する機能である。予算情報は、例えば「予算ID」、「製品コード」、「勘定科目」、「組織コード」、「予算年月日」、「金額」の6つの情報を含む。なお、予算情報は、情報記録部114に記録される情報である。 The budget management function is a function for managing budget information. The budget information includes, for example, six pieces of information of “budget ID”, “product code”, “account item”, “organization code”, “budget date”, and “amount”. The budget information is information recorded in the information recording unit 114.
「予算ID」は、開発中の新規開発製品毎に割り当てられた予算を特定するために与えられるID番号である。「製品コード」は、テーマ情報の製品コードと対応しており、その予算IDで示す予算がどの新規開発製品の開発に使用されるかを示す。「勘定科目」は、金額に示される予算が何に対して発生したものであるかを示す情報である。「組織コード」は、予算を発生させる組織名(担当部署名)を示すコードである。「予算年月日」は、予算が発生する予定の年月日又は発行された年月日を示す情報である。「金額」は、使用された又は使用される費用を示す情報である。 “Budget ID” is an ID number given to identify a budget allocated to each newly developed product under development. The “product code” corresponds to the product code of the theme information, and indicates which newly developed product is used for the budget indicated by the budget ID. The “account item” is information indicating what the budget indicated in the amount is generated. The “organization code” is a code indicating the name of the organization (department in charge) that generates the budget. “Budget date” is information indicating a date when the budget is scheduled to be generated or issued. “Amount” is information indicating a used or used cost.
発注実績管理機能は、発注実績情報を管理する機能である。発注実績情報は、予算情報と対応しており、例えば「予算ID」、「製品コード」、「勘定科目」、「組織コード」、「請求予定」、「金額」の6つの情報を含む。なお、発注実績情報は、情報記録部114に記録される情報である。 The order record management function is a function for managing order record information. The order record information corresponds to the budget information and includes, for example, six pieces of information of “budget ID”, “product code”, “account item”, “organization code”, “billing schedule”, and “amount”. Note that the order record information is information recorded in the information recording unit 114.
「予算ID」は、予算情報の予算IDと対応しており、予算情報によって示される予算が使用される又は使用された際に、その予算情報の予算IDと同じIDが与えられる。「製品コード」は、予算が使用される又は使用された場合に対象となる新規開発製品に対して割り当てられるコードである。「勘定科目」は、金額に示される予算が何に対してのものであるかを示す情報である。「組織コード」は、予算を発生させる又は発生させた組織名(担当部署名)を示すコードである。「請求予定」は、予算が発生する予定の年月日を示す情報である。「金額」は、発生した予算の金額を示す情報である。 “Budget ID” corresponds to the budget ID of the budget information, and when the budget indicated by the budget information is used or used, the same ID as the budget ID of the budget information is given. The “product code” is a code assigned to a newly developed product that is a target when a budget is used or used. The “account item” is information indicating what the budget indicated in the amount is for. “Organization code” is a code indicating the name of the organization that generated or generated the budget (signature in charge). “Billing schedule” is information indicating a date on which a budget is scheduled to be generated. “Amount” is information indicating the amount of the generated budget.
差異分析機能は、予算情報と発注実績情報との差異、即ち製品開発に際し、予算に対して実際にはどれだけの費用がかかっているかを分析する機能である。 The difference analysis function is a function for analyzing the difference between the budget information and the order record information, that is, how much money is actually spent on the budget in product development.
モジュール記録部110は、ハードディスクやフラッシュROMといった周知の記録媒体で構成され、発注管理モジュールを記録しておくための記録媒体である。発注管理モジュールは、実際の製品又は試作品の発注、受注、並びに製品又は試作品の納品といった製品の発注等に関わる各種の情報を管理するためのモジュールである。発注管理モジュールは、次の6つの機能を有するように構成されたモジュールである。即ち、見積機能と、発注機能と、受注機能と、納品機能と、検収機能と、請求機能である。発注管理モジュールは、発注側の管理と受注側の管理とを同時に行うことが可能なように構成されている。 The module recording unit 110 is configured by a known recording medium such as a hard disk or a flash ROM, and is a recording medium for recording an order management module. The order management module is a module for managing various information related to ordering of products such as ordering of actual products or prototypes, order receipt, and delivery of products or prototypes. The order management module is a module configured to have the following six functions. That is, an estimate function, an ordering function, an order receiving function, a delivery function, an acceptance function, and a billing function. The order management module is configured so that management on the ordering side and management on the order receiving side can be performed simultaneously.
見積機能は、実際に工場等において製品又は試作品を製造するのに先立って見積を作成する機能である。なお、見積機能として、見積書を印刷する等の機能も含めて良い。 The estimate function is a function for creating an estimate prior to actually manufacturing a product or prototype in a factory or the like. The estimation function may include a function such as printing an estimate.
発注機能は、製品又は試作品の製造の工場への発注状況を管理する機能である。なお、発注機能として、工場への発注依頼を例えば電子メールによって行う等の機能も含めて良い。 The ordering function is a function for managing the ordering status of a product or prototype production to a factory. The ordering function may include a function of making an order request to the factory by e-mail, for example.
受注機能は、工場毎の製品又は試作品の製造の受注状況を管理する機能である。なお、受注機能として、工場からの受注連絡を例えば電子メールによって行う等の機能も含めて良い。 The order receiving function is a function for managing the order receiving status of production of products or prototypes for each factory. Note that the order receiving function may include a function of making an order communication from the factory by e-mail, for example.
納品機能は、製品又は試作品の納品状況を管理する機能である。検収機能は、納品された製品又は試作品の検収状況を管理する機能である。 The delivery function is a function for managing the delivery status of a product or a prototype. The acceptance function is a function for managing the acceptance status of the delivered product or prototype.
請求機能は、製品又は試作品を製造した工場からの請求の管理をする機能である。なお、請求機能として、請求書を印刷する等の機能も含めて良い。 The billing function is a function that manages billing from the factory that manufactured the product or prototype. The billing function may include a function such as printing a bill.
以上の説明においては、モジュール記録部104、106、108、110を別個の記録部としている。しかしながら、モジュール記録部104、106、108、110の機能を、単一の記録部によって実現しても良い。 In the above description, the module recording units 104, 106, 108, and 110 are separate recording units. However, the functions of the module recording units 104, 106, 108, and 110 may be realized by a single recording unit.
記憶部112は、制御部102がモジュール記録部104、106、108、110に記録されたモジュールに従って管理を行う際のワークメモリとして使用される記憶部である。 The storage unit 112 is a storage unit used as a work memory when the control unit 102 performs management according to the modules recorded in the module recording units 104, 106, 108, and 110.
情報記録部114は、ハードディスク等の周知の記録媒体で構成され、前述の要員情報、工数実績情報、予算情報、発注実績情報といった各種の情報を記録している。ここで、情報記録部114をモジュール記録部104、106、108、110と同じ記録部としても良い。 The information recording unit 114 is composed of a known recording medium such as a hard disk, and records various types of information such as the aforementioned personnel information, man-hour record information, budget information, and order record information. Here, the information recording unit 114 may be the same recording unit as the module recording units 104, 106, 108, and 110.
入力部116は、マウスやキーボードといった、ユーザが管理装置100に関する各種の入力操作をするためのインターフェイスである。表示部118は、管理装置100における各種の管理画面を表示する。印刷部120は、管理装置100で作成された見積書等を印刷する。バス122は、管理装置100内でデータ転送をするための転送路である。 The input unit 116 is an interface such as a mouse or a keyboard for the user to perform various input operations related to the management apparatus 100. The display unit 118 displays various management screens in the management apparatus 100. The printing unit 120 prints an estimate sheet created by the management apparatus 100. The bus 122 is a transfer path for transferring data within the management apparatus 100.
以下、管理装置100の動作について説明する。図3は、管理装置100による新規開発製品の管理動作を示すフローチャートである。ここで、以下の管理装置100の動作は、例えばデジタルカメラの製品開発への適用例である。以下で示す処理は、制御部102が、各モジュールを連携させることによって制御する。 Hereinafter, the operation of the management apparatus 100 will be described. FIG. 3 is a flowchart showing the management operation of a newly developed product by the management apparatus 100. Here, the following operation of the management apparatus 100 is an example applied to product development of a digital camera, for example. The processing shown below is controlled by the control unit 102 in cooperation with each module.
開発管理システムが起動されると、制御部102は、メイン画面を表示部118に表示させる(ステップS101)。 When the development management system is activated, the control unit 102 displays the main screen on the display unit 118 (step S101).
図4は、メイン画面の一例を示す図である。図4に示すメイン画面には、現在進行中のテーマの開発日程を示すグラフ202を表示させる。このグラフ202は、開発の開始予定時期から開発の終了予定時期までの期間を示すグラフである。図4は、2つの新規開発製品の開発が同時に進行している状態を示している。グラフ202により、ユーザは、複数の新規開発製品の開発日程を同時に知ることが可能である。 FIG. 4 is a diagram illustrating an example of a main screen. The main screen shown in FIG. 4 displays a graph 202 indicating the development schedule of the theme that is currently in progress. This graph 202 is a graph showing a period from the scheduled start time of development to the scheduled end time of development. FIG. 4 shows a state where development of two newly developed products is proceeding simultaneously. The graph 202 allows the user to know the development schedules of a plurality of newly developed products at the same time.
ここで、多くの新規開発製品の情報が登録されることにより、画面内にグラフを表示しきれなくなった場合には、スクロールバーによって画面をスクロールさせることにより、未表示のグラフを表示させる。また、図4の例では、横軸を、第1四半期(1Q)、第2四半期(2Q)、第3四半期(3Q)、第4四半期(4Q)の4つの期間に分けているが、必ずしも4つの期間に分ける必要はない。例えば、12月で分けるようにしても良い。さらに、新規開発製品毎の開発工程を視認できるよう、1つのグラフを開発工程毎に色分けするようにしても良い。 Here, when the information of many newly developed products is registered and the graph cannot be displayed on the screen, the screen is scrolled by the scroll bar to display the undisplayed graph. In the example of FIG. 4, the horizontal axis is divided into four periods: 1st quarter (1Q), 2nd quarter (2Q), 3rd quarter (3Q), and 4th quarter (4Q). There is no need to divide into four periods. For example, you may make it divide by December. Furthermore, one graph may be color-coded for each development process so that the development process for each newly developed product can be visually recognized.
メイン画面200には、グラフ202を表示させる他、ユーザ操作用のソフトウェアボタンを表示させる。図4で示したメイン画面200は、登録ボタン204aと、調節ボタン204bとを表示させた例を示している。登録ボタン204aは、ユーザが新規開発製品の情報の登録を指示するためのボタンである。調節ボタン204bは、各機能の作業時間の割り当て、予算の割り当て、製品や試作品の発注時期等の調節をユーザが指示するためのボタンである。ユーザは、マウス等の入力部116を用いてポインタ206を操作し、登録ボタン204aや調節ボタン204bの選択を行う。ボタンの選択がなされた場合に、制御部102は、選択されたボタンの種類に応じた処理を実行する。 On the main screen 200, in addition to displaying the graph 202, software buttons for user operation are displayed. The main screen 200 shown in FIG. 4 shows an example in which a registration button 204a and an adjustment button 204b are displayed. The registration button 204a is a button for the user to instruct registration of information on a newly developed product. The adjustment button 204b is a button for the user to instruct the adjustment of work time allocation, budget allocation, product and prototype ordering time, etc. for each function. The user operates the pointer 206 using the input unit 116 such as a mouse, and selects the registration button 204a and the adjustment button 204b. When a button is selected, the control unit 102 executes processing according to the type of the selected button.
また、メイン画面200には、必要に応じてツールバー208やカレンダ210を表示させるようにしても良い。さらに、ツールバー208として表示されている各種のボタンを選択することにより、データの保存や印刷、編集等の作業を行うことが可能である。 In addition, a toolbar 208 and a calendar 210 may be displayed on the main screen 200 as necessary. Furthermore, by selecting various buttons displayed as the toolbar 208, it is possible to perform operations such as data storage, printing, and editing.
メイン画面の表示後、制御部102は、ユーザにより、登録ボタン204aが選択されたか否かを判定する(ステップS102)。ステップS102において、登録ボタン204aが選択されたと判定した場合に、制御部102は、テーマ登録処理を実行する(ステップS103)。テーマ登録処理の詳細については後述する。 After displaying the main screen, the control unit 102 determines whether or not the registration button 204a has been selected by the user (step S102). If it is determined in step S102 that the registration button 204a has been selected, the control unit 102 executes a theme registration process (step S103). Details of the theme registration process will be described later.
ステップS102において登録ボタン204aが選択されていないと判定した場合又はS103の後、制御部102は、ユーザにより、調節ボタン204bが選択されたか否かを判定する(ステップS104)。 When it is determined in step S102 that the registration button 204a has not been selected or after S103, the control unit 102 determines whether or not the adjustment button 204b has been selected by the user (step S104).
ステップS104において、調節ボタン204bが選択されたと判定した場合に、制御部102は、調節処理を実行する(ステップS105)。調節処理の詳細については後述する。 If it is determined in step S104 that the adjustment button 204b has been selected, the control unit 102 executes an adjustment process (step S105). Details of the adjustment process will be described later.
ステップS105において調節ボタン204bが選択されていないと判定した場合又はS105の後、制御部102は、発注・受注管理を実行する(ステップS106)。発注・受注管理は、テーマ登録処理によって登録される開発日程の情報に従い、見積、発注、受注、納品、検収、請求の時期を管理する。例えば、必要な時期に発注をしたり、請求書を発行したりする。 When it is determined in step S105 that the adjustment button 204b is not selected or after S105, the control unit 102 executes ordering / order management (step S106). Order / order management manages the timing of quotation, ordering, ordering, delivery, acceptance, and billing according to the development schedule information registered by the theme registration process. For example, place an order or issue an invoice when necessary.
発注・受注管理の後、ユーザにより、開発管理システムのプログラムを終了が指示されたか否かを判定する(ステップS107)。ステップS107において、プログラムの終了が指示されていないと判定した場合に、制御部102は、処理をステップS101に戻す。また、ステップS107において、プログラムの終了が指示されていないと判定した場合に、制御部102は、図3の処理を終了させる。 After the order / order management, it is determined whether or not the user has instructed to end the program of the development management system (step S107). If it is determined in step S107 that the termination of the program is not instructed, the control unit 102 returns the process to step S101. If it is determined in step S107 that the end of the program has not been instructed, the control unit 102 ends the process of FIG.
次に、テーマ登録処理について説明する。図5は、テーマ登録処理について示すフローチャートである。ここで、以下の例は、図4で示した2つの新規開発製品の情報が登録されている状態に対し、新たな新規開発製品Cの情報を登録する例を説明する。 Next, the theme registration process will be described. FIG. 5 is a flowchart showing the theme registration process. Here, the following example describes an example in which information on a new newly developed product C is registered with respect to a state where information on two newly developed products shown in FIG. 4 is registered.
テーマ登録処理の開始後、制御部102は、登録画面を表示部118に表示させる(ステップS201)。図6は、登録画面の一例を示す図である。図6に示す登録画面には、メイン画面と同様、現在進行中のテーマの開発日程を示すグラフ202を表示させている。さらに、登録画面には、新規開発製品の情報の登録フォーム212を表示させる。ユーザは、「製品名」、「テーマ」、「開発規模」、「仕様」、「新規要素」の5項目の入力を行う。ユーザは、入力欄212aに所望のテキストを入力したり、ドロップダウンリスト212bにより所望の項目を選択したりして、前述の5項目の入力をすることが可能である。入力の方式は、これらの方式に限るものではない。 After starting the theme registration process, the control unit 102 displays a registration screen on the display unit 118 (step S201). FIG. 6 is a diagram illustrating an example of a registration screen. On the registration screen shown in FIG. 6, a graph 202 indicating the development schedule of the currently ongoing theme is displayed as in the main screen. Further, a registration form 212 for information on newly developed products is displayed on the registration screen. The user inputs five items “product name”, “theme”, “development scale”, “specification”, and “new element”. The user can input the above-mentioned five items by inputting a desired text in the input field 212a or selecting a desired item from the drop-down list 212b. The input method is not limited to these methods.
登録画面の表示後、制御部102は、ユーザによる情報の入力を待つ(ステップS202)。図6で示した5項目の入力がなされると、制御部102は、ユーザによって入力されたテーマと類似するテーマを有する工数実績情報とその工数実績情報に関連した要員情報とを取得する(ステップS203)。 After displaying the registration screen, the control unit 102 waits for input of information by the user (step S202). When the five items shown in FIG. 6 are input, the control unit 102 acquires man-hour record information having a theme similar to the theme inputted by the user and personnel information related to the man-hour record information (step) S203).
図7は、工数実績情報の概要を示す図である。図7(a)〜図7(d)に示すように、各工数実績情報は、「要員」、「工数」、「費用」、「工数グラフタイプ」の情報が「テーマ」毎にパッケージ情報として記録されている。 FIG. 7 is a diagram showing an overview of the man-hour performance information. As shown in FIG. 7A to FIG. 7D, each man-hour performance information includes “personnel”, “man-hour”, “cost”, and “man-hour graph type” information as package information for each “theme”. It is recorded.
「テーマ」は、既存開発製品の開発のテーマを示す情報である。図8(a)は、デジタルカメラの開発の場合のテーマの情報の例である。図8(a)に示すように、「テーマ」の情報は、類似するテーマ毎にまとめられた階層構造の情報である。ここで、「テーマ」が類似しているとは、例えば仕様が類似している(開発規模等の数値化できる仕様であればその数値が所定範囲内である)、開発コンセプトが類似している(例えば同名製品やその後継機等)等が考えられる。 “Theme” is information indicating a development theme of an existing development product. FIG. 8A shows an example of theme information in the case of developing a digital camera. As shown in FIG. 8A, the “theme” information is information of a hierarchical structure organized for each similar theme. Here, “themes” are similar, for example, the specifications are similar (the numerical value is within a predetermined range if the specification can be quantified such as the development scale), and the development concept is similar (For example, a product with the same name or a successor machine, etc.) can be considered.
「要員」は、そのテーマの製品の開発に要した人数を示す情報である。図8(b)は、デジタルカメラの開発の場合の要員の情報の例である。図8(b)に示すように、「要員」の情報は、機能毎にまとめられた階層構造の情報であり、階層毎に人数を記録する。なお、図8(b)に示す「機能」は、前述の組織コードと関連付けされている。 “Staff” is information indicating the number of people required to develop the product of the theme. FIG. 8B is an example of personnel information when developing a digital camera. As shown in FIG. 8B, the “personnel” information is information of a hierarchical structure organized for each function, and the number of people is recorded for each hierarchy. Note that the “function” shown in FIG. 8B is associated with the aforementioned organization code.
「工数」は、そのテーマの製品の開発に要した工数の合計値である。この工数は、後述の工数グラフで示される工数の合計値である。 “Man-hour” is the total number of man-hours required to develop the product of the theme. This man-hour is the total man-hour shown in the man-hour graph described later.
「費用」は、そのテーマの製品の開発に要した費用である。図8(c)に示すように、「費用」の情報は、費用項目毎にまとめられた階層構造の情報であり、階層毎に費用を記録する。なお、図8(c)に示す「費用項目」の名称は、前述の勘定科目と関連付けされている。 “Cost” is the cost required to develop the product of the theme. As shown in FIG. 8C, the “cost” information is information of a hierarchical structure collected for each cost item, and the cost is recorded for each hierarchy. The name of “expense item” shown in FIG. 8C is associated with the account item described above.
「工数グラフタイプ」は、その開発テーマの時期毎の工数の負荷がどのような傾向かを示す工数グラフの種類を特定するための情報である。図9は、工数グラフの例である。通常、類似のテーマの開発をする場合、そのときの工数の負荷を示す工数グラフは類似のものとなる。したがって、既存開発製品とテーマが類似する新規開発製品の開発に際しては、この既存開発製品の工数グラフを用いて工数の負荷を予測できる。これにより、複数のテーマ間で工数負荷の大きくなる時期が重ならないように開発日程を調節したり、工数負荷の大きくなる時期に多くの要員を割り当てたりするといったことが可能である。 The “man-hour graph type” is information for specifying the type of the man-hour graph indicating the tendency of the man-hour load for each period of the development theme. FIG. 9 is an example of a man-hour graph. Usually, when developing a similar theme, the man-hour graph indicating the man-hour load at that time is similar. Therefore, when developing a newly developed product whose theme is similar to that of the existing developed product, the man-hour load can be predicted using the man-hour graph of the existing developed product. As a result, it is possible to adjust the development schedule so that the time when the man-hour load increases among a plurality of themes does not overlap, or to allocate a large number of personnel when the man-hour load increases.
ここで、図7では、「工数グラフタイプ」のみを記録する例を示しているが、「費用グラフタイプ」としてその開発テーマの時期毎の費用の負荷がどのような傾向かを示す費用グラフの種類を特定するための情報を記録しておいても良い。 Here, FIG. 7 shows an example in which only the “Effect graph type” is recorded. However, as the “cost graph type”, an expense graph indicating the tendency of the cost load for each period of the development theme is shown. Information for specifying the type may be recorded.
工数実績情報及び要員情報を取得した後、制御部102は、ユーザによって入力された情報とその入力された情報に対応して取得した工数実績情報との差異から、情報を登録した新規開発製品の工数負荷を予測する(ステップS204)。工数負荷とは、どの時期にどの程度の工数の負荷が発生しているかを示すものであり、例えば図9で示した工数グラフの形式で表される。 After acquiring the man-hour record information and the personnel information, the control unit 102 determines the newly developed product registered information from the difference between the information input by the user and the man-hour record information acquired corresponding to the input information. The man-hour load is predicted (step S204). The effort load, which indicates the load of the extent of the effort to which timing has occurred, represented in the form of man-hours graph shown for example in FIG.
テーマが類似している製品の開発は、類似の開発工程を経ることが多く、結果として工数の負荷、費用の負荷、人材の負荷も類似する。したがって、工数実績情報の工数グラフタイプによって示される工数グラフを用いて、類似の新規開発製品の工数負荷を予測することが可能である。実際には、開発規模等において工数実績情報と差異がある可能性がある。この差異から該当の新規開発製品の工数負荷を予測する。具体的には、工数実績情報との差異に基づいて既存の工数グラフ又は費用グラフを補正する。この他、既存の工数グラフ又は費用のグラフと実際の工数又は費用との平均値を予測結果としたり、工数実績情報を補正するための所定の関係式を予め求めておき、それを用いて補正したりしても良い。さらに、実際には、新規開発製品の仕様情報や新規開発製品の開発時点での開発効率の変化を示す情報に従って工数負荷を補正して良い。例えば、開発時点での開発効率が向上していれば、類似の開発製品であっても工数負荷が減ることとなる。逆に、人材の整理や入れ替え等により、各人の作業能力が落ちれば、類似の開発製品であっても工数負荷が増えることとなる。 Development of products with similar themes often goes through similar development processes, resulting in similar man-hours, costs, and human resources. Therefore, it is possible to predict the man-hour load of a similar newly developed product using the man-hour graph indicated by the man-hour graph type of the man-hour record information. Actually, there is a possibility that there is a difference from the man-hour record information in the development scale. The man-hour load of the newly developed product is predicted from this difference. Specifically, the existing man-hour graph or the cost graph is corrected based on the difference from the man-hour performance information. In addition, the average value of the existing man-hour graph or cost graph and the actual man-hour or cost is used as the prediction result, or a predetermined relational expression for correcting the man-hour performance information is obtained in advance, and the correction is made using it. You may do it. Further, in practice, the man-hour load may be corrected according to the specification information of the newly developed product and the information indicating the change in development efficiency at the time of development of the newly developed product. For example, if the development efficiency at the time of development is improved, the man-hour load is reduced even for similar developed products. On the other hand, if the work ability of each person decreases due to the rearrangement or replacement of human resources, the man-hour load increases even for similar developed products.
工数負荷を予測した後、制御部102は、新規開発製品の開発日程を割り当て可能な期間を検索する(ステップS205)。この期間は、現在進行中のテーマの工数の合計値が予め定めた所定値以下となる期間である。図4の例では、新規開発製品Aと新規開発製品Bの両方の開発日程と重ならない期間に新規開発製品Cの開発日程を割り当てれば、全体の工数負荷を少なくすることが可能である。 After predicting the man-hour load, the control unit 102 searches for a period in which a development schedule for a newly developed product can be assigned (step S205). This period is a period in which the total number of man-hours for the current ongoing theme is less than or equal to a predetermined value. In the example of FIG. 4, if the development schedule of the newly developed product C is assigned in a period that does not overlap with the development schedules of both the newly developed product A and the newly developed product B, the overall man-hour load can be reduced.
割り当て可能な期間の検索後、制御部102は、新規開発製品の情報を登録する(ステップS206)。この登録に際し、制御部102は、ステップS202で入力された「テーマ」における、「製品コード」、「開発規模コード」、「概略仕様」、「新規要素」の情報を情報記録部114に登録する。また、制御部102は、ステップS205で検索された開発日程における各開発工程の開始及び終了時期を「開発日程」として情報記録部114に登録する。さらに、制御部102は、開発工程毎に必要とされる要員の「組織コード」及びその「機能」を情報記録部114に登録する。ここで、新規開発製品の開発に必要な機能を有する組織の人材が不足している場合等においては、その旨をユーザに対して警告する。ユーザは、この警告を見て、不足している人材を募集する等の対策を採ることが可能である。 After searching for an allocatable period, the control unit 102 registers information on a newly developed product (step S206). At the time of registration, the control unit 102 registers information on “product code”, “development scale code”, “rough specification”, and “new element” in the information recording unit 114 in the “theme” input in step S202. . Further, the control unit 102 registers the start and end times of each development process in the development schedule searched in step S205 in the information recording unit 114 as “development schedule”. Further, the control unit 102 registers the “organization code” and “function” of personnel required for each development process in the information recording unit 114. Here, when there is a shortage of human resources in an organization having a function necessary for developing a newly developed product, the user is warned to that effect. The user can take measures such as recruiting missing human resources by seeing this warning.
情報の登録後、制御部102は、登録された情報を例えば図10に示すようにして表示部118に表示させる(ステップS207)。 After registering the information, the control unit 102 displays the registered information on the display unit 118 as shown in FIG. 10, for example (step S207).
次に、調節処理について説明する。図11は、調節処理について示すフローチャートである。 Next, the adjustment process will be described. FIG. 11 is a flowchart showing the adjustment process.
調節処理の開始後、制御部102は、調節画面を表示部118に表示させる(ステップS301)。図12は、調節画面の一例を示す図である。図12に示す調節画面には、自動調節ボタン204cを表示させる。この自動調節ボタン204cは、ユーザが、工数調節の自動処理を指示する場合に選択されるボタンである。また、調節画面には、例えば、開発日程ボタン214a、作業時間ボタン214b、発注時期ボタン214c、費用時期ボタン214d、予算ボタン214eを表示させる。これらのボタンは、ユーザが手動で工数調節をする場合に選択されるボタンである。 After starting the adjustment process, the control unit 102 displays an adjustment screen on the display unit 118 (step S301). FIG. 12 is a diagram illustrating an example of the adjustment screen. An automatic adjustment button 204c is displayed on the adjustment screen shown in FIG. The automatic adjustment button 204c is a button that is selected when the user instructs automatic processing for man-hour adjustment. Further, for example, a development schedule button 214a, a work time button 214b, an order time button 214c, a cost time button 214d, and a budget button 214e are displayed on the adjustment screen. These buttons are selected when the user manually adjusts man-hours.
調節画面の表示後、制御部102は、開発日程ボタン214aが選択されたか否かを判定する(ステップS302)。ステップS302において、開発日程ボタン214aが選択されていないと判定した場合に、制御部102は、処理をステップS303に移行させる。 After the adjustment screen is displayed, the control unit 102 determines whether or not the development schedule button 214a has been selected (step S302). When determining in step S302 that the development schedule button 214a has not been selected, the control unit 102 shifts the process to step S303.
また、ステップS302において、開発日程ボタン214aが選択されたと判定した場合に、制御部102は、日程調節処理を行う(ステップS303)。この日程調節処理において、制御部102は、図12に示すような日程調節画面216を表示させる。日程調節画面216には、グラフ202と同様の日程調節グラフ216aと、ユーザによって選択された日程調節グラフ216aに対応する工数グラフ216bを表示させる。 If it is determined in step S302 that the development schedule button 214a has been selected, the control unit 102 performs schedule adjustment processing (step S303). In the schedule adjustment process, the control unit 102 displays a schedule adjustment screen 216 as shown in FIG. On the schedule adjustment screen 216, a schedule adjustment graph 216a similar to the graph 202 and a man-hour graph 216b corresponding to the schedule adjustment graph 216a selected by the user are displayed.
図12に示す日程調節画面216が表示されたとき、ユーザは、マウス等の入力部116により、日程調節グラフ216a(グラフ202と対応している)を前又は後の時期にずらす操作を行う。例えば、図12は、新規開発製品Cに関する日程調節の操作が行われた例である。この操作を受けて制御部102は、ずらし操作後の日程調節グラフ216aの位置に従って、テーマ情報の「日程」の内容を書き換える。また、制御部102は、「日程」の内容の変更に伴って、工数グラフ216bを増減させる。例えば、図12に示すように、日程調節グラフ216aの位置が元の時期よりも前の時期側に移動された場合、工数グラフ216bもその全体を前の時期側に移動させるように工数グラフ216bを増減させる。逆に、日程調節グラフ216aの位置が元の時期よりも後の時期側に移動された場合、工数グラフ216bもその全体を後の時期側に移動させるように工数グラフ216bを増減させる。このようにして新規開発製品Cに関する開発日程の調節が行われる。なお、ここでは、新規開発製品Cの開発に要する全体日程の長さを変えずに開発の開始日程をずらす例を示したが、開始日程を調節することによって全体日程の長さも変わるようにしても良い。 When the schedule adjustment screen 216 shown in FIG. 12 is displayed, the user operates the input unit 116 such as a mouse to shift the schedule adjustment graph 216a (corresponding to the graph 202) to the previous or later time. For example, FIG. 12 is an example in which a schedule adjustment operation for a newly developed product C is performed. In response to this operation, the control unit 102 rewrites the contents of the “schedule” of the theme information according to the position of the schedule adjustment graph 216a after the shifting operation. Further, the control unit 102 increases or decreases the man-hour graph 216b in accordance with the change of the contents of the “schedule”. For example, as shown in FIG. 12, when the position of the schedule adjustment graph 216a is moved to a time earlier than the original time, the man-hour graph 216b also moves the man-hour graph 216b so as to move the whole to the previous time. Increase or decrease. On the other hand, when the position of the schedule adjustment graph 216a is moved to a time later than the original time, the man-hour graph 216b also increases or decreases the man-hour graph 216b so as to move the whole to the later time. In this way, the development schedule for the newly developed product C is adjusted. In this example, the start schedule of development is shifted without changing the length of the entire schedule required for the development of the newly developed product C. However, the length of the entire schedule is also changed by adjusting the start schedule. Also good.
また、日程調節グラフ216aの調節が行われた後で自動調節ボタン204cが選択された場合、制御部102は、日程調節グラフ216aの変更後の情報に基づいて前述のステップS204と同様の工数負荷の予測を行い、この予測結果に従って人材の割り当て等を行う。 When the automatic adjustment button 204c is selected after the adjustment of the schedule adjustment graph 216a is performed, the control unit 102 loads the man-hour load similar to that in step S204 described above based on the information after the change of the schedule adjustment graph 216a. And assigning human resources according to the prediction result.
続いて、制御部102は、作業時間ボタン214bが選択されたか否かを判定する(ステップS304)。ステップS304において、作業時間ボタン214bが選択されていないと判定した場合に、制御部102は、処理をステップS306に移行させる。 Subsequently, the control unit 102 determines whether or not the work time button 214b has been selected (step S304). If it is determined in step S304 that the work time button 214b has not been selected, the control unit 102 shifts the processing to step S306.
また、ステップS304において、作業時間ボタン214bが選択されたと判定した場合に、制御部102は、作業時間調節処理を行う(ステップS305)。この作業時間調節処理において、制御部102は、図13に示すような作業時間調節画面218を表示させる。作業時間調節画面218には、前述の開発日程を表すグラフ202と、ユーザによって選択されたグラフ202に対応する作業時間調節グラフ217aとを表示させる。図13に示すように、作業時間調節グラフ217aは、「機能」毎の作業時間を調節するためのグラフであって、当該新規開発製品の開発に携わる機能毎のグラフを表示させる。各機能に対応した作業時間調節の近傍には、詳細調節ボタン218a〜218cと、全体ボタン218dとを表示させる。 If it is determined in step S304 that the work time button 214b has been selected, the control unit 102 performs work time adjustment processing (step S305). In this work time adjustment process, the control unit 102 displays a work time adjustment screen 218 as shown in FIG. On the work time adjustment screen 218, a graph 202 representing the above-described development schedule and a work time adjustment graph 217a corresponding to the graph 202 selected by the user are displayed. As shown in FIG. 13, the work time adjustment graph 217a is a graph for adjusting the work time for each "function", and displays a graph for each function involved in the development of the newly developed product. Detailed adjustment buttons 218a to 218c and an overall button 218d are displayed in the vicinity of the work time adjustment corresponding to each function.
図13に示す作業時間調節画面218が表示されたとき、ユーザは、マウス等の入力部116により、作業時間調節グラフ217aを増減させる操作を行う。この操作を受けて制御部102は、増減操作後の作業時間調節グラフの位置に従って、要員情報の「作業時間」のうち、対応する機能の「作業時間」の内容を書き換える。このようにして作業時間の大まかな調節が行われる。 When the work time adjustment screen 218 shown in FIG. 13 is displayed, the user performs an operation of increasing / decreasing the work time adjustment graph 217a using the input unit 116 such as a mouse. In response to this operation, the control unit 102 rewrites the content of the “work time” of the corresponding function among the “work time” of the personnel information according to the position of the work time adjustment graph after the increase / decrease operation. In this way, rough adjustment of the working time is performed.
また、機能ボタン218a〜218cの何れかが選択された場合に、制御部102は、図14に示す作業時間の詳細調節画面220を表示させる。詳細調節画面220においては、ユーザによって選択された機能ボタンに対応した機能(組織)が行う予定の作業毎の作業時間調節グラフ220aを表示させる。さらに、追加ボタン222a、削除ボタン222b、戻るボタン222cも表示させる。 When any one of the function buttons 218a to 218c is selected, the control unit 102 displays a detailed adjustment screen 220 for work time shown in FIG. On the detailed adjustment screen 220, a work time adjustment graph 220a for each work scheduled to be performed by the function (organization) corresponding to the function button selected by the user is displayed. Further, an add button 222a, a delete button 222b, and a return button 222c are also displayed.
図14に示す詳細調節画面220が表示されたとき、ユーザは、マウス等の入力部116により、作業時間調節グラフ220aを増減させる操作を行う。この操作を受けて制御部102は、増減操作後の作業時間調節グラフ220aの位置に従って、要員情報の「作業時間」のうち、対応する機能の対応する作業の「作業時間」の内容を書き換える。このようにして作業時間の詳細な調節が行われる。 When the detailed adjustment screen 220 shown in FIG. 14 is displayed, the user performs an operation of increasing / decreasing the work time adjustment graph 220a using the input unit 116 such as a mouse. In response to this operation, the control unit 102 rewrites the content of the “work time” of the work corresponding to the corresponding function among the “work time” of the personnel information according to the position of the work time adjustment graph 220a after the increase / decrease operation. In this way, detailed adjustment of the working time is performed.
追加ボタン222aが選択された場合には、制御部102は、図示しない作業の追加画面を表示させる。この画面内でユーザは、該当する機能に対して新たな作業を追加することができる。作業の追加がされた場合には、対応する機能の「作業時間」の内容を書き換える。具体的には、追加した作業の分だけ対応する機能の「作業時間」を増加させる。また、削除ボタン222bが選択された場合には、制御部102は、ユーザによって選択された作業を削除する。作業の削除がされた場合には、対応する機能の「作業時間」の内容を書き換える。具体的には、追加した作業の分だけ対応する機能の「作業時間」を減少させる。さらに、戻るボタン222cが選択された場合には、図13に示す作業時間調節画面218を表示させる。 When the add button 222a is selected, the control unit 102 displays a work addition screen (not shown). Within this screen, the user can add a new work to the corresponding function. When a work is added, the content of “work time” of the corresponding function is rewritten. Specifically, the “work time” of the function corresponding to the added work is increased. When the delete button 222b is selected, the control unit 102 deletes the work selected by the user. When the work is deleted, the content of “work time” of the corresponding function is rewritten. Specifically, the “work time” of the function corresponding to the added work is reduced. Further, when the return button 222c is selected, a work time adjustment screen 218 shown in FIG. 13 is displayed.
また、全体ボタン218dが選択された場合に、制御部102は、全機能の作業時間を合計し、この合計作業時間の詳細調節画面を表示させる。 When the overall button 218d is selected, the control unit 102 adds up the work times of all functions and displays a detailed adjustment screen for the total work time.
また、作業時間調節グラフ217aの調節が行われた後で自動調節ボタン204cが選択された場合、制御部102は、作業時間調節グラフ217aの変更後の情報に基づいて前述のステップS204と同様の工数負荷の予測を行い、この予測結果に従って人材の割り当て等を行う。 Further, when the automatic adjustment button 204c is selected after the adjustment of the work time adjustment graph 217a, the control unit 102 is similar to step S204 described above based on the information after the change of the work time adjustment graph 217a. Man-hour load is predicted, and human resources are allocated according to the prediction result.
続いて、制御部102は、発注時期ボタン214cが選択されたか否かを判定する(ステップS306)。ステップS306において、発注時期ボタン214cが選択されていないと判定した場合に、制御部102は、処理をステップS308に移行させる。 Subsequently, the control unit 102 determines whether or not the order time button 214c is selected (step S306). If it is determined in step S306 that the order time button 214c has not been selected, the control unit 102 shifts the process to step S308.
また、ステップS306において、発注時期ボタン214cが選択されたと判定した場合に、制御部102は、発注時期調節処理を行う(ステップS306)。この発注時期調節処理において、制御部102は、図15に示すような発注時期調節画面224を表示させる。発注時期調節画面224には、各製品の開発に必要となる部品の試作品の発注時期及び受注時期を表す発注時期調節グラフ224aと、各製品の開発に必要となる部品の情報224bを表示させる。 If it is determined in step S306 that the order time button 214c has been selected, the control unit 102 performs an order time adjustment process (step S306). In this order time adjustment process, the control unit 102 displays an order time adjustment screen 224 as shown in FIG. On the order time adjustment screen 224, an order time adjustment graph 224a indicating the order time and order time of the prototype of the parts required for the development of each product and the information 224b of the parts required for the development of each product are displayed. .
図15に示す発注時期調節画面224が表示されたとき、ユーザは、マウス等の入力部116により、発注時期調節グラフ224aを前又は後の時期にずらす操作を行う。この操作を受けて制御部102は、ずらし操作後の発注時期調節グラフ224aの位置に従って、テーマ情報の「日程」の内容を書き換える。また、制御部102は、ずらし操作後の発注時期調節グラフ224aの位置に従って、予算情報の「予算年月日」及び発注実績情報を管理する機能である。発注実績情報の「請求予定」の内容を書き換える。このようにして発注時期及び受注時期等の調節が行われる。 When the order time adjustment screen 224 shown in FIG. 15 is displayed, the user performs an operation of shifting the order time adjustment graph 224a to the previous or later time by using the input unit 116 such as a mouse. In response to this operation, the control unit 102 rewrites the content of “schedule” in the theme information in accordance with the position of the order time adjustment graph 224a after the shifting operation. Further, the control unit 102 is a function for managing the “budget date” of the budget information and the order record information according to the position of the order timing adjustment graph 224a after the shifting operation. Rewrite the contents of “Billing schedule” in the order record information. In this way, adjustments such as ordering time and ordering time are performed.
さらに、例えば、情報224bの部分が選択されると、制御部102は、図16に示す発注時期の詳細調節画面226を表示させる。詳細調節画面226には、新規開発製品毎の開発に必要となる部品の発注時期、納品時期、請求予定時期等をグラフ表示させる。このグラフにおいて、まだ実際に発生していない処理のグラフ(図16の例では、「請求」)については例えば点滅表示させる。さらに、それぞれの時期に発生する又は発生した費用の金額をグラフ表示させる。ユーザは、発注時期、納品時期、請求予定時期等のグラフを費用のグラフにドラッグアンドドロップすることにより、当該ドラッグアンドドロップした処理がなされた際にどの程度の費用が発生するかを確認することが可能である。 Further, for example, when the portion of the information 224b is selected, the control unit 102 displays the order adjustment detail adjustment screen 226 shown in FIG. On the detailed adjustment screen 226, the ordering time, delivery time, billing time, etc. of parts necessary for development of each newly developed product are displayed in a graph. In this graph, a graph of a process that has not actually occurred yet (“billing” in the example of FIG. 16) is displayed, for example, by blinking. Further, the amount of expenses incurred or incurred at each time is displayed in a graph. The user can confirm how much cost is incurred when the drag-and-drop process is performed by dragging and dropping the graph of ordering time, delivery time, scheduled billing time, etc. to the cost graph. Is possible.
続いて、制御部102は、費用時期ボタン214dが選択されたか否かを判定する(ステップS308)。ステップS308において、費用時期ボタン214dが選択されていないと判定した場合に、制御部102は、処理をステップS310に移行させる。 Subsequently, the control unit 102 determines whether or not the expense time button 214d has been selected (step S308). When determining in step S308 that the expense time button 214d has not been selected, the control unit 102 shifts the processing to step S310.
また、ステップS308において、費用時期ボタン214dが選択されたと判定した場合に、制御部102は、費用時期調節処理を行う(ステップS309)。この費用時期調節処理において、制御部102は、図17に示すような費用時期調節画面228を表示させる。費用時期調節画面228には、各製品の開発に必要となる部品の試作品の発注時期及び受注時期を表す費用時期調節グラフ228aと、全製品の開発に必要となる費用がいつの時期に発生するかを表すグラフ228bを表示させる。ここで、図17においては、開発費と、生産費と、一般管理費とに分けてグラフを表示させている。この分類は一例である。 If it is determined in step S308 that the cost time button 214d has been selected, the control unit 102 performs a cost time adjustment process (step S309). In the cost time adjustment process, the control unit 102 displays a cost time adjustment screen 228 as shown in FIG. On the cost time adjustment screen 228, a cost time adjustment graph 228a indicating the ordering time and ordering time of the prototype of the parts required for the development of each product and the cost required for the development of all products are generated at any time. A graph 228b representing this is displayed. Here, in FIG. 17, a graph is displayed separately for development costs, production costs, and general management costs. This classification is an example.
図17に示す費用時期調節画面228が表示されたとき、ユーザは、マウス等の入力部116により、費用時期調節グラフ228aを増減させる操作を行う。この操作を受けて制御部102は、増減操作後の費用時期調節グラフ228aの位置に従って、予算情報の「予算年月日」及び発注実績情報を管理する機能である。発注実績情報の「請求予定」の内容を書き換える。 When the expense time adjustment screen 228 shown in FIG. 17 is displayed, the user performs an operation of increasing / decreasing the expense time adjustment graph 228a using the input unit 116 such as a mouse. In response to this operation, the control unit 102 has a function of managing the “budget date” of the budget information and the order record information according to the position of the cost timing adjustment graph 228a after the increase / decrease operation. Rewrite the contents of “Billing schedule” in the order record information.
続いて、制御部102は、予算ボタン214eが選択されたか否かを判定する(ステップS310)。ステップS310において、予算ボタン214eが選択されていないと判定した場合に、制御部102は、処理をステップS312に移行させる。 Subsequently, the control unit 102 determines whether or not the budget button 214e is selected (step S310). When determining in step S310 that the budget button 214e has not been selected, the control unit 102 shifts the processing to step S312.
また、ステップS310において、予算ボタン214eが選択されたと判定した場合に、制御部102は、予算調節処理を行う(ステップS311)。この予算調節処理において、制御部102は、図18に示すような予算調節画面230を表示させる。予算調節画面230には、新規開発製品毎の製品毎に、発生する予算を時系列で示した予算調節グラフを表示させる。また、製品ボタン230aも表示させる。図18は、新規開発製品Aに関する製品ボタン230aが選択された例を示している。この場合、新規開発製品Aに関する予算調節画面230を表示させる。 If it is determined in step S310 that the budget button 214e has been selected, the control unit 102 performs a budget adjustment process (step S311). In this budget adjustment process, the control unit 102 displays a budget adjustment screen 230 as shown in FIG. On the budget adjustment screen 230, a budget adjustment graph showing the generated budget in time series for each newly developed product is displayed. The product button 230a is also displayed. FIG. 18 shows an example in which the product button 230a related to the newly developed product A is selected. In this case, the budget adjustment screen 230 regarding the newly developed product A is displayed.
図18に示す予算調節画面230が表示されたとき、ユーザは、マウス等の入力部116により、予算調節グラフを増減させたり、他の予算調節グラフにドラッグアンドドロップさせたりする操作を行う。これらの操作を受けて、制御部102は、該当する時期における予算情報及び発注実績情報の「金額」の内容を書き換える。このようにして予算調節がなされる。 When the budget adjustment screen 230 shown in FIG. 18 is displayed, the user performs an operation of increasing / decreasing the budget adjustment graph or dragging and dropping it on another budget adjustment graph using the input unit 116 such as a mouse. In response to these operations, the control unit 102 rewrites the contents of the “money amount” of the budget information and the order record information at the corresponding time. In this way, the budget is adjusted.
また、別の新規開発製品についての製品ボタン230aが選択された場合、制御部102は、該当する新規開発製品の予算調節画面230を表示させる。 When the product button 230a for another newly developed product is selected, the control unit 102 displays the budget adjustment screen 230 for the corresponding newly developed product.
続いて、制御部102は、調節処理を終了させるか否かを判定する(ステップS312)。ステップS312において、例えば登録ボタン204aが選択された場合や本開発管理システムが終了された場合に、調節処理を終了させると判定される。ステップS312において、調節処理を終了させないと判定した場合に、制御部102は、処理をステップ302に戻す。また、ステップS312において、調節処理を終了させると判定した場合に、制御部102は、図11の処理を終了させる。 Subsequently, the control unit 102 determines whether or not to end the adjustment process (step S312). In step S312, for example, when the registration button 204a is selected or this development management system is terminated, it is determined that the adjustment process is terminated. If it is determined in step S <b> 312 that the adjustment process is not terminated, the control unit 102 returns the process to step 302. In step S312, when it is determined that the adjustment process is to be ended, the control unit 102 ends the process of FIG.
以上説明したように、本実施形態によれば、既存開発製品の情報をそのテーマ毎に登録している。テーマ毎に情報を登録しておくことにより、工数実績情報をテーマ毎に記録しておくことが可能である。このような工数実績情報に基づいて新規開発製品の工数負荷の予測を行うのに複雑な計算や大規模な装置を必要としない。これにより、例えば1台のPCで管理を行うようなことも可能である。 As described above, according to the present embodiment, information on existing developed products is registered for each theme. By registering information for each theme, it is possible to record man-hour performance information for each theme. Complex calculations and large-scale devices are not required for predicting the man-hour load of newly developed products based on such man-hour performance information. As a result, for example, management can be performed by one PC.
以上実施形態に基づいて本発明を説明したが、本発明は上述した実施形態に限定されるものではなく、本発明の要旨の範囲内で種々の変形や応用が可能なことは勿論である。また、前述の各動作フローチャートの説明において、便宜上「まず」、「次に」等を用いて動作を説明しているが、この順で動作を実施することが必須であることを意味するものではない。 Although the present invention has been described above based on the embodiments, the present invention is not limited to the above-described embodiments, and various modifications and applications are naturally possible within the scope of the gist of the present invention. Further, in the description of each operation flowchart described above, the operation is described using “first”, “next”, and the like for convenience, but this does not mean that it is essential to perform the operations in this order. Absent.
また、前述した各種画面の表示は一例であってその新規開発製品のテーマ等に応じて種々の変更をして良い。 The display of the various screens described above is merely an example, and various changes may be made according to the theme of the newly developed product.
また、上述した実施形態による各処理を実行させるプログラムは、メモリカード(ROMカード、RAMカード等)、磁気ディスク(フロッピディスク、ハードディスク等)、光ディスク(CD−ROM、DVD等)、半導体メモリ等の外部記憶装置の記憶媒体に格納して配布することができる。そして、制御部102は、この外部記憶装置の記憶媒体に記憶されたプログラムを読み込み、この読み込んだプログラムによって動作が制御されることにより、上述した処理を実行することができる。 A program for executing each process according to the above-described embodiment is a memory card (ROM card, RAM card, etc.), magnetic disk (floppy disk, hard disk, etc.), optical disk (CD-ROM, DVD, etc.), semiconductor memory, etc. It can be stored in a storage medium of an external storage device and distributed. Then, the control unit 102 reads the program stored in the storage medium of the external storage device, and the operation described above can be executed by controlling the operation by the read program.
さらに、上記した実施形態には種々の段階の発明が含まれており、開示される複数の構成要件の適当な組合せにより種々の発明が抽出され得る。例えば、実施形態に示される全構成要件からいくつかの構成要件が削除されても、上述したような課題を解決でき、上述したような効果が得られる場合には、この構成要件が削除された構成も発明として抽出され得る。 Further, the above-described embodiments include various stages of the invention, and various inventions can be extracted by appropriately combining a plurality of disclosed constituent elements. For example, even if some configuration requirements are deleted from all the configuration requirements shown in the embodiment, the above-described problem can be solved, and this configuration requirement is deleted when the above-described effects can be obtained. The configuration can also be extracted as an invention.
100…管理装置、102…制御部、104,106,108,110…プログラムモジュール記録部、112…記憶部、114…情報記録部、116…入力部、118…表示部、120…印刷部、122…バス DESCRIPTION OF SYMBOLS 100 ... Management apparatus, 102 ... Control part, 104, 106, 108, 110 ... Program module recording part, 112 ... Memory | storage part, 114 ... Information recording part, 116 ... Input part, 118 ... Display part, 120 ... Printing part, 122 …bus
Claims (9)
前記登録した複数の新規開発製品の仕様に関する情報及び日程に関する情報を含む新規開発製品の情報のそれぞれと類似する、既存開発製品の仕様に関する情報と日程に関する実績情報と工数に関する実績情報とを含む既存開発製品の情報を取得する機能と、
前記登録した複数の新規開発製品の情報と前記取得したそれぞれの既存開発製品の情報との差異と前記新規開発製品に関する情報又は前記新規開発製品の開発に係る効率情報に応じた補正情報に基づいて、前記登録した複数の新規開発製品のそれぞれの予算、人材、及び日程を算出して割り当てる機能と、
をコンピュータに実現させるための製品開発の管理プログラム。 A function to register information on multiple newly developed products,
Similar to each of the newly developed product information including the information on the specifications of the plurality of newly developed products registered and information on the schedule, the existing information including the information on the specifications of the existing developed product, the performance information on the schedule, and the performance information on the man-hours. A function to obtain information on the developed product,
Based on the difference between the information on the plurality of newly developed products registered and the information on each acquired existing development product and the correction information corresponding to the information on the newly developed product or the efficiency information on the development of the newly developed product , A function of calculating and assigning each budget, human resources, and schedule of each of the plurality of newly developed products registered,
Management program for product development to make computer realize
前記分析した人材の負荷に応じて前記新規開発製品の開始日程及び/又は全体日程を調節する機能と、
前記調節された日程に応じて新規開発製品の開発工程毎の作業時間を変更する機能と、
前記変更された作業時間に応じて前記人材毎の作業内容と作業時間とを変更する機能と、
をさらに前記コンピュータに実現させるための請求項1乃至5の何れか1項に記載の製品開発の管理プログラム。 A function of analyzing the current load of human resources related to the newly developed product;
A function of adjusting the start schedule and / or the overall schedule of the newly developed product according to the load of the analyzed human resources;
A function of changing the working time for each development process of a newly developed product according to the adjusted schedule;
A function of changing the work content and work time for each human resource according to the changed work time;
6. The product development management program according to claim 1, further comprising:
前記発注された資材又は人材に応じて前記新規開発製品の現在の人材の負荷を分析する機能と、
をさらに前記コンピュータに実現させるための請求項1乃至6の何れか1項に記載の製品開発の管理プログラム。 A function of ordering necessary materials or human resources according to the schedule or progress of development for each newly developed product;
A function of analyzing a current human resource load of the newly developed product according to the ordered material or human resource;
7. The product development management program according to claim 1, further comprising:
前記登録した複数の新規開発製品の仕様に関する情報及び日程に関する情報を含む新規開発製品の情報のそれぞれと類似する、既存開発製品の仕様に関する情報と日程に関する実績情報と工数に関する実績情報とを含む既存開発製品の情報を取得し、前記登録した複数の新規開発製品の情報と前記取得したそれぞれの既存開発製品の情報との差異と前記新規開発製品に関する情報又は前記新規開発製品の開発に係る効率情報に応じた補正情報に基づいて、前記登録した複数の新規開発製品のそれぞれの予算、人材、及び日程を算出して割り当てる割り当て部と、
を具備する製品開発の管理装置。 A product information registration section for registering information on multiple newly developed products;
Similar to each of the newly developed product information including the information on the specifications of the plurality of newly developed products registered and information on the schedule, the existing information including the information on the specifications of the existing developed product, the performance information on the schedule, and the performance information on the man-hours. Information on the developed product is acquired, the difference between the registered information on the plurality of newly developed products and the information on each of the acquired existing developed products, information on the newly developed products, or efficiency information on the development of the newly developed products An allocation unit that calculates and assigns the budget, human resources, and schedule of each of the plurality of newly developed products registered based on the correction information according to
A product development management device.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2013027941A JP6063764B2 (en) | 2013-02-15 | 2013-02-15 | Product development management program and product development management apparatus using the same |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2013027941A JP6063764B2 (en) | 2013-02-15 | 2013-02-15 | Product development management program and product development management apparatus using the same |
Publications (3)
Publication Number | Publication Date |
---|---|
JP2014157487A JP2014157487A (en) | 2014-08-28 |
JP2014157487A5 JP2014157487A5 (en) | 2016-03-17 |
JP6063764B2 true JP6063764B2 (en) | 2017-01-18 |
Family
ID=51578327
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2013027941A Active JP6063764B2 (en) | 2013-02-15 | 2013-02-15 | Product development management program and product development management apparatus using the same |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP6063764B2 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2021064163A (en) * | 2019-10-15 | 2021-04-22 | 明豊ファシリティワークス株式会社 | Manhour system |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001282341A (en) * | 2000-03-30 | 2001-10-12 | Nec Corp | System and method for production planning and system and method for material required calculation and recording medium |
JP2001318714A (en) * | 2000-05-10 | 2001-11-16 | Kenzu System:Kk | Object development type production management system |
JP2002109173A (en) * | 2000-09-29 | 2002-04-12 | Hitachi Ltd | System and method for managing project |
US20120197674A1 (en) * | 2011-01-27 | 2012-08-02 | Maher Rahmouni | Estimating a future project characteristic based on the similarity of past projects |
JP2012173828A (en) * | 2011-02-18 | 2012-09-10 | Hitachi Ltd | Estimation support system and program |
JP2013030036A (en) * | 2011-07-29 | 2013-02-07 | Hitachi Ltd | Process control system, process control method, program, and process control device |
-
2013
- 2013-02-15 JP JP2013027941A patent/JP6063764B2/en active Active
Also Published As
Publication number | Publication date |
---|---|
JP2014157487A (en) | 2014-08-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104732325B (en) | Computer method and apparatus for automatic scheduling | |
WO2017040249A1 (en) | Interactive charts with dynamic progress monitoring, notification and resource allocation | |
JP4675158B2 (en) | Cost element management system | |
JP2005275989A (en) | Planning business management support system, and planning business management support program | |
JP2009140350A (en) | Supply chain evaluation system, method, and program | |
CN103413201A (en) | Information processing system and information processing method | |
JP5885637B2 (en) | Scheduling method, scheduling program, and scheduling apparatus | |
JP5379261B2 (en) | Scheduling apparatus, scheduling method, and computer program | |
JP6869166B2 (en) | Production planning equipment and production planning method | |
JP2021144756A (en) | Project plan formulation system | |
JP2017091223A (en) | Information processing device, control method thereof, and production control system | |
JP2016181039A (en) | Schedule determination method, schedule determination program and schedule determination system | |
JP2002373013A (en) | Production scheduling method, program for computer to execute the same method and computer-readable recording medium with the program recorded thereon | |
CN118229034A (en) | Task list processing method and system | |
JP2019175032A (en) | Production planning device, production planning system, production planning method, and program | |
JP2019109699A (en) | Construction fee processing apparatus, construction fee processing method, and construction fee processing program | |
JP6695673B2 (en) | Plan generation device and plan generation method | |
JP6265871B2 (en) | Sales operation support system and sales operation support method | |
JP6063764B2 (en) | Product development management program and product development management apparatus using the same | |
JP2013122733A (en) | Production planning program and production planning device | |
JP5234818B2 (en) | Production plan creation method, production plan creation program, and production plan creation device | |
JP2006202082A (en) | Production line management system, production line management program, recording medium, and method for managing production line | |
JP7348051B2 (en) | Work instruction system and work instruction method | |
JP4069542B2 (en) | Budget management system and recording medium | |
JPH1125181A (en) | Material requirement development system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A711 | Notification of change in applicant |
Free format text: JAPANESE INTERMEDIATE CODE: A712 Effective date: 20150423 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20160128 |
|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20160128 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20161026 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20161122 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20161219 |
|
R151 | Written notification of patent or utility model registration |
Ref document number: 6063764 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R151 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
S111 | Request for change of ownership or part of ownership |
Free format text: JAPANESE INTERMEDIATE CODE: R313113 |
|
R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |