JP6062790B2 - Diamond correction plan generation system, diamond correction plan generation method, and diamond correction plan generation program - Google Patents

Diamond correction plan generation system, diamond correction plan generation method, and diamond correction plan generation program Download PDF

Info

Publication number
JP6062790B2
JP6062790B2 JP2013088502A JP2013088502A JP6062790B2 JP 6062790 B2 JP6062790 B2 JP 6062790B2 JP 2013088502 A JP2013088502 A JP 2013088502A JP 2013088502 A JP2013088502 A JP 2013088502A JP 6062790 B2 JP6062790 B2 JP 6062790B2
Authority
JP
Japan
Prior art keywords
correction
diamond
score
information
plan
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2013088502A
Other languages
Japanese (ja)
Other versions
JP2014210530A (en
Inventor
智子 浦田
智子 浦田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Original Assignee
Hitachi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd filed Critical Hitachi Ltd
Priority to JP2013088502A priority Critical patent/JP6062790B2/en
Publication of JP2014210530A publication Critical patent/JP2014210530A/en
Application granted granted Critical
Publication of JP6062790B2 publication Critical patent/JP6062790B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Engineering & Computer Science (AREA)
  • Train Traffic Observation, Control, And Security (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Mechanical Engineering (AREA)
  • Business, Economics & Management (AREA)
  • Operations Research (AREA)
  • Tourism & Hospitality (AREA)

Description

本発明は、ダイヤ修正案生成システム、ダイヤ修正案生成方法、およびダイヤ修正案生成プログラムに関するものであり、具体的には、列車ダイヤの事前評価とそれに基づく修正作業に関する属人性を抑制し、品質良好なダイヤ修正案を効率的に生成可能とする技術に関する。   The present invention relates to a diamond correction plan generation system, a diamond correction plan generation method, and a diamond correction plan generation program. Specifically, the present invention suppresses personality related to train diamond prior evaluation and correction work based thereon, The present invention relates to a technology capable of efficiently generating a good diamond correction plan.

踏まえるべき要素が多岐に亘る列車ダイヤの作成作業には、従来から相応の経験値を備える高スキルの担当者が必要とされている。それ故に、ダイヤ作成作業の効率化や自動化を企図する様々な技術が提案されている。このような技術としては、例えば、列車ダイヤが日本全国にまたがっていて運用計画の範囲が非常に広い場合でも、仕業検査等の制約条件を満足して、実用的な時間内で適切な解(経路)を効率よく算出するための車両運用計画作成装置(特許文献1参照)などが提案されている。   In order to create train schedules with a wide range of elements to be taken into account, a highly skilled person with appropriate experience values has been required. For this reason, various techniques have been proposed that attempt to improve the efficiency and automation of the diamond creation work. As such a technology, for example, even when train schedules are spread across Japan and the scope of the operation plan is very wide, it is possible to satisfy the constraints such as work inspections and provide an appropriate solution within a practical time ( A vehicle operation plan creation device (see Patent Document 1) for efficiently calculating (route) is proposed.

特開2013−10388号公報JP 2013-10388 A

ところが、従来より運用されている列車ダイヤの作成システムにおいては、ユーザから指定された各種の条件値を満たすダイヤ案を作成、出力するのみで、ダイヤ案の良し悪しについて事前検討出来る機能は備わっていなかった。そのため、作成したダイヤ案に基づく実際の運用結果に対する事後評価を行うことでしか、ダイヤ案の評価はなされていない。一方、そうした評価に基づいてダイヤ案の修正を行う場合、多くの構成要素が複雑に関連しあう条件を踏まえた上での手作業が必要となり、作業者の知識や経験によって作業時間やコスト、成果物たる修正ダイヤ案の品質も大きく変動し、客観的なダイヤ案の生成や修正を行うことが困難であった。   However, train schedule creation systems that have been used in the past have a function that allows you to pre-examine the quality of a diamond plan by simply creating and outputting a diamond plan that satisfies various condition values specified by the user. There wasn't. Therefore, the diamond plan is evaluated only by performing an ex-post evaluation on the actual operation result based on the created diamond plan. On the other hand, when a plan is revised based on such an evaluation, manual work is required based on the condition that many components are related in a complicated manner. The quality of the revised diamond plan, which is a product, also fluctuated greatly, making it difficult to generate and modify an objective diamond plan.

そこで本発明の目的は、列車ダイヤの事前評価とそれに基づく修正作業に関する属人性を抑制し、品質良好なダイヤ修正案を効率的に生成可能とする技術を提供することにある。   SUMMARY OF THE INVENTION An object of the present invention is to provide a technique capable of efficiently generating a schedule correction plan with good quality by suppressing the personality related to the prior evaluation of train diagrams and the correction work based on the evaluation.

上記課題を解決する本発明のダイヤ修正案生成システムは、ダイヤ情報における、列車遅延確率、平均乗車率、運賃収入、車両保守費、および乗務員人件費の少なくとも2つ以上の項目に関して規定した修正方針毎に、前記各項目の値を上下させるための、ダイヤ情報に対する修正内容を複数定義した修正パターンテーブルを格納した記憶装置と、ダイヤ情報の修正方針に関する指示を入力装置で受け付ける処理と、ダイヤ情報を含む列車運行用情報の管理装置と通信を行い、現在の列車運行用情報を取得し、当該列車運行用情報に基づく列車運行シミュレーションを実行する処理と、前記シミュレーションの実行結果が含む、前記列車遅延確率、前記平均乗車率、前記運賃収入、前記車両保守費、および前記乗務員人件費の少なくとも2つ以上の項目に関するデータを所定基準と照合し、列車運行に関する該当項目に関する評価点数を特定する処理と、評価点数に関する達成条件である、前記評価点数の必要最低点と、該当各項目間での評価点数の点数差上限とに、前記特定した評価点数を照合し、前記各項目の評価点数のいずれかが前記必要最低点を下回っているか、或いは、各項目間の点数差が点数差上限を超えている場合、前記達成条件を達成していないと判定し、前記修正パターンテーブルより、前記受け付けている修正方針に対応付けられたいずれかの修正内容を選択し、該当修正内容で前記ダイヤ情報を修正してダイヤ修正案候補を生成する処理と、前記生成したダイヤ修正案候補で構成された列車運行用情報で前記列車運行シミュレーションを実行し、当該シミュレーションの実行結果に基づく前記評価点数の特定、および前記評価点数と前記達成条件との照合、の各処理を実行して、前記評価点数が前記達成条件を達成した場合に、前記ダイヤ修正案候補をダイヤ修正案として前記管理装置ないし所定端末に送信する処理を実行する演算装置と、を備えることを特徴とする。 The diagram correction plan generation system of the present invention that solves the above problem is a correction policy that is defined for at least two items of train delay probability, average boarding rate, fare revenue, vehicle maintenance cost, and crew personnel cost in the diagram information A storage device that stores a correction pattern table that defines a plurality of correction contents for the diamond information for increasing and decreasing the value of each item, a process for receiving an instruction regarding a correction policy for the diamond information, and a diamond information The train operation information management apparatus including the current train operation information is acquired, the train operation simulation based on the train operation information is executed, and the simulation execution result includes the train. At least two of a delay probability, the average boarding rate, the fare revenue, the vehicle maintenance cost, and the crew labor cost Data about item above against the predetermined criterion, the process of specifying the evaluation scores related to the corresponding items relating to train operation is achieved condition regarding evaluation scores, and the required minimum point of the evaluation scores, assessment of between the affected items The above-mentioned evaluation score is collated with the score difference upper limit of the score, and either of the evaluation scores of each item is below the required minimum score, or the score difference between each item exceeds the score difference upper limit. If it is determined that the achievement condition has not been achieved, from the correction pattern table, select any correction content associated with the accepted correction policy, the diamond information in the corresponding correction content The train operation simulation is executed with the processing for generating a schedule correction plan candidate by correction and the train operation information composed of the generated schedule correction plan candidates, and the simulation is performed. When the evaluation score reaches the achievement condition by executing the process of specifying the evaluation score based on the execution result of the application and collating the evaluation score with the achievement condition, the diamond correction proposal candidate And an arithmetic unit that executes a process for transmitting to the management device or a predetermined terminal as a diagram correction plan.

また、本発明のダイヤ修正案生成方法は、ダイヤ情報における、列車遅延確率、平均乗車率、運賃収入、車両保守費、および乗務員人件費の少なくとも2つ以上の項目に関して規定した修正方針毎に、前記各項目の値を上下させるための、ダイヤ情報に対する修正内容を複数定義した修正パターンテーブルを格納した記憶装置を備えた情報処理装置が、ダイヤ情報の修正方針に関する指示を入力装置で受け付ける処理と、ダイヤ情報を含む列車運行用情報の管理装置と通信を行い、現在の列車運行用情報を取得し、当該列車運行用情報に基づく列車運行シミュレーションを実行する処理と、前記シミュレーションの実行結果が含む、前記列車遅延確率、前記平均乗車率、前記運賃収入、前記車両保守費、および前記乗務員人件費の少なくとも2つ以上の項目に関するデータを所定基準と照合し、列車運行に関する該当項目に関する評価点数を特定する処理と、評価点数に関する達成条件である、前記評価点数の必要最低点と、該当各項目間での評価点数の点数差上限とに、前記特定した評価点数を照合し、前記各項目の評価点数のいずれかが前記必要最低点を下回っているか、或いは、各項目間の点数差が点数差上限を超えている場合、前記達成条件を達成していないと判定し、前記修正パターンテーブルより、前記受け付けている修正方針に対応付けられたいずれかの修正内容を選択し、該当修正内容で前記ダイヤ情報を修正してダイヤ修正案候補を生成する処理と、前記生成したダイヤ修正案候補で構成された列車運行用情報で前記列車運行シミュレーションを実行し、当該シミュレーションの実行結果に基づく前記評価点数の特定、および前記評価点数と前記達成条件との照合、の各処理を実行して、前記評価点数が前記達成条件を達成した場合に、前記ダイヤ修正案候補をダイヤ修正案として前記管理装置ないし所定端末に送信する処理と、を実行することを特徴とする。 In addition, the diagram correction plan generation method of the present invention is, for each correction policy defined for at least two items of train delay probability, average boarding rate, fare revenue, vehicle maintenance costs, and crew personnel costs in the diagram information , An information processing apparatus having a storage device storing a correction pattern table that defines a plurality of correction contents for diamond information for moving up and down the value of each item, and a process of receiving an instruction regarding a diamond information correction policy by an input device; Communicating with a train operation information management device including diamond information, acquiring current train operation information, and executing a train operation simulation based on the train operation information, and the execution result of the simulation includes , At least the train delay probability, the average boarding rate, the fare revenue, the vehicle maintenance cost, and the crew labor cost One or more data against the predetermined criterion of the items, a process of specifying the evaluation scores related to the corresponding items relating to train operation is achieved condition regarding evaluation scores, and the required minimum point of the evaluation scores, between the relevant items The above-mentioned evaluation score is collated with the score difference upper limit of the evaluation score, and either of the evaluation scores of each item is below the required minimum score, or the score difference between each item has the score difference upper limit. If it is exceeded, it is determined that the achievement condition has not been achieved, and any correction content associated with the accepted correction policy is selected from the correction pattern table, and the diagram information with the corresponding correction content The train operation simulation is executed with the processing for generating a schedule correction plan candidate by correcting the train operation information composed of the generated schedule correction plan candidates, and When the evaluation score reaches the achievement condition by specifying the evaluation score based on the execution result of the simulation and collating the evaluation score with the achievement condition, the diagram correction plan candidate Is transmitted to the management device or a predetermined terminal as a diamond correction plan.

また、本発明のダイヤ修正案生成プログラムは、ダイヤ情報における、列車遅延確率、平均乗車率、運賃収入、車両保守費、および乗務員人件費の少なくとも2つ以上の項目に関して規定した修正方針毎に、前記各項目の値を上下させるための、ダイヤ情報に対する修正内容を複数定義した修正パターンテーブルを格納した記憶装置を備えた情報処理装置に、ダイヤ情報の修正方針に関する指示を入力装置で受け付ける処理と、ダイヤ情報を含む列車運行用情報の管理装置と通信を行い、現在の列車運行用情報を取得し、当該列車運行用情報に基づく列車運行シミュレーションを実行する処理と、前記シミュレーションの実行結果が含む、前記列車遅延確率、前記平均乗車率、前記運賃収入、前記車両保守費、および前記乗務員人件費の少なくとも2つ以上の項目に関するデータを所定基準と照合し、列車運行に関する該当項目に関する評価点数を特定する処理と、評価点数に関する達成条件である、前記評価点数の必要最低点と、該当各項目間での評価点数の点数差上限とに、前記特定した評価点数を照合し、前記各項目の評価点数のいずれかが前記必要最低点を下回っているか、或いは、各項目間の点数差が点数差上限を超えている場合、前記達成条件を達成していないと判定し、前記修正パターンテーブルより、前記受け付けている修正方針に対応付けられたいずれかの修正内容を選択し、該当修正内容で前記ダイヤ情報を修正してダイヤ修正案候補を生成する処理と、前記生成したダイヤ修正案候補で構成された列車運行用情報で前記列車運行シミュレーションを実行し、当該シミュレーションの実行結果に基づく前記評価点数の特定、および前記評価点数と前記達成条件との照合、の各処理を実行して、前記評価点数が前記達成条件を達成した場合に、前記ダイヤ修正案候補をダイヤ修正案として前記管理装置ないし所定端末に送信する処理と、を実行させることを特徴とする。 In addition, the diagram correction plan generation program of the present invention is, for each correction policy defined for at least two items of train delay probability, average boarding rate, fare revenue, vehicle maintenance costs, and crew personnel costs in the diagram information , A process of receiving an instruction regarding a diamond information correction policy by an input device in an information processing apparatus having a storage device storing a correction pattern table in which a plurality of correction contents for the diamond information are defined to increase or decrease the value of each item ; Communicating with a train operation information management device including diamond information, acquiring current train operation information, and executing a train operation simulation based on the train operation information, and the execution result of the simulation includes The train delay probability, the average boarding rate, the fare revenue, the vehicle maintenance cost, and the crew labor cost Both data relating to two or more items against the predetermined criterion, the process of specifying the evaluation scores related to the corresponding items relating to train operation is achieved condition regarding evaluation scores, and the required minimum point of the evaluation scores, between the affected items The above-mentioned evaluation score is collated with the upper limit of the score difference of the evaluation score in the above, and either of the evaluation scores of each item is below the required minimum score, or the score difference between the items is a score difference If the upper limit is exceeded, it is determined that the achievement condition is not achieved, and any correction content associated with the accepted correction policy is selected from the correction pattern table, and the correction content is Executing the train operation simulation with the process for generating the diamond correction plan candidate by correcting the diamond information, and the train operation information configured by the generated diamond correction plan candidate, When each of the process of specifying the evaluation score based on the execution result of the simulation and comparing the evaluation score with the achievement condition is executed, and the evaluation score achieves the achievement condition, the diamond correction plan And a process of transmitting the candidate as a diamond correction plan to the management device or a predetermined terminal.

本発明によれば、列車ダイヤの事前評価とそれに基づく修正作業に関する属人性を抑制し、品質良好なダイヤ修正案を効率的に生成可能となる。   ADVANTAGE OF THE INVENTION According to this invention, the personality regarding the prior evaluation of a train schedule and the correction work based on it can be suppressed, and a schedule correction plan with good quality can be generated efficiently.

本実施形態のダイヤ修正案生成システムを含むネットワーク構成図である。It is a network block diagram containing the diamond correction plan production | generation system of this embodiment. 本実施形態におけるダイヤ修正案生成システムのハードウェア構成例を示す図である。It is a figure which shows the hardware structural example of the diamond correction plan production | generation system in this embodiment. 本実施形態の現行列車計画のデータ例を示す図である。It is a figure which shows the example of data of the current train plan of this embodiment. 本実施形態の現行車両運用計画のデータ例を示す図である。It is a figure which shows the example of data of the current vehicle operation plan of this embodiment. 本実施形態の現行乗務員運用計画のデータ例を示す図である。It is a figure which shows the example of data of the present crew member operation plan of this embodiment. 本実施形態の点数パターンテーブルの例を示す図である。It is a figure which shows the example of the score pattern table of this embodiment. 本実施形態の判定しきい値テーブルの例を示す図である。It is a figure which shows the example of the determination threshold value table of this embodiment. 本実施形態の修正パターンテーブルの例を示す図である。It is a figure which shows the example of the correction pattern table of this embodiment. 本実施形態におけるダイヤ修正案生成方法の処理例1を示すフロー図である。It is a flowchart which shows the process example 1 of the diamond correction proposal production | generation method in this embodiment. 本実施形態におけるダイヤ修正案生成方法の処理例2を示すフロー図である。It is a flowchart which shows the process example 2 of the diamond correction plan production | generation method in this embodiment. 本実施形態におけるダイヤ修正案生成方法の処理例3を示すフロー図である。It is a flowchart which shows the process example 3 of the diamond correction plan production | generation method in this embodiment. 本実施形態におけるダイヤ修正案生成方法の処理例4を示すフロー図である。It is a flowchart which shows the process example 4 of the diamond correction proposal production | generation method in this embodiment. 本実施形態の列車計画テーブルの例を示す図である。It is a figure which shows the example of the train plan table of this embodiment. 本実施形態の車両運用計画テーブルの例を示す図である。It is a figure which shows the example of the vehicle operation plan table of this embodiment. 本実施形態の乗務員運用計画テーブルの例を示す図である。It is a figure which shows the example of the crew member operation plan table of this embodiment. 本実施形態の点数テーブルの例を示す図である。It is a figure which shows the example of the score table of this embodiment. 本実施形態における表示画面例を示す図である。It is a figure which shows the example of a display screen in this embodiment.

−−−システム構成の例−−−
以下に本発明の実施形態について図面を用いて詳細に説明する。図1は、本実施形態のダイヤ修正案生成システム100を含むネットワーク構成図である。図1に示すダイヤ修正案生成システム100は、列車ダイヤの事前評価とそれに基づく修正作業に関する属人性を抑制し、品質良好なダイヤ修正案を効率的に生成可能とするコンピュータシステムである。また、ダイヤ修正案生成システム100は、ネットワーク120を介して、列車運行に関する現行計画管理装置(列車運行用情報の管理装置)として、列車計画管理装置200、車両運用計画管理装置300、および乗務員運用計画管理装置400と通信可能に結ばれている。
--- System configuration example ---
Embodiments of the present invention will be described below in detail with reference to the drawings. FIG. 1 is a network configuration diagram including a diagram correction plan generation system 100 of the present embodiment. A diagram correction plan generation system 100 shown in FIG. 1 is a computer system that can efficiently generate a schedule correction plan with good quality by suppressing the personality related to the prior evaluation of train schedules and the correction work based on it. In addition, the diagram correction plan generation system 100 is connected to the train plan management device 200, the vehicle operation plan management device 300, and the crew member operation as a current plan management device (train management information management device) related to train operation via the network 120. Communication with the plan management device 400 is possible.

このうち列車計画管理装置200は、実際の列車運行に現在使用されているダイヤ情報である現行列車計画210のデータを記憶装置201に保持した情報処理装置である。また、車両運用計画管理装置300は、列車計画管理装置200の保持する上述の現行列車計画210に沿った列車運行に必要となる車両の運用計画である現行車両運用計画310のデータを記憶装置301に保持した情報処理装置である。また、乗務員運用計画管理装置400は、上述の現行列車計画210および現行車両運用計画310に沿った列車運行に必要となる乗務員の運用計画である現行乗務員運用計画410のデータを記憶装置401に保持した情報処理装置である。本実施形態では、これら現行列車計画210、現行車両運用計画310、および現行乗務員運用計画410の各データを、ネットワーク120を介した他装置にて管理する形態を示しているが、ダイヤ修正案生成システム100がこれら各データを保持するとしてもよい。   Among these, the train plan management apparatus 200 is an information processing apparatus that holds in the storage device 201 data of the current train plan 210, which is diagram information currently used for actual train operation. Further, the vehicle operation plan management device 300 stores data of the current vehicle operation plan 310 that is a vehicle operation plan necessary for train operation along the above-described current train plan 210 held by the train plan management device 200. Information processing apparatus held in Further, the crew member operation plan management device 400 holds in the storage device 401 data of the current crew member operation plan 410 that is a crew member operation plan necessary for train operation along the above-described current train plan 210 and the current vehicle operation plan 310. Information processing apparatus. In the present embodiment, the data of the current train plan 210, the current vehicle operation plan 310, and the current crew member operation plan 410 are managed by other devices via the network 120. The system 100 may hold each of these data.

また、ダイヤ修正案生成システム100のハードウェア構成は以下の如くとなる。図2は本実施形態におけるダイヤ修正案生成システム100のハードウェア構成例を示す図である。すなわちダイヤ修正案生成システム100は、ハードディスクドライブなど適宜な不揮発性記憶装置で構成される記憶装置101、RAMなど揮発性記憶装置で構成されるメモリ103、記憶装置101に保持されるプログラム102をメモリ103に読み出すなどして実行し装置自体の統括制御を行なうとともに各種判定、演算及び制御処理を行なうCPUなどの演算装置104、ユーザからのキー入力や音声入力を受け付ける入力装置105、処理データの表示を行うディスプレイ等の出力装置106、ネットワーク120と接続し他装置との通信処理を担う通信装置107を備える。   The hardware configuration of the diagram correction plan generation system 100 is as follows. FIG. 2 is a diagram illustrating a hardware configuration example of the diagram correction plan generation system 100 according to the present embodiment. That is, the diagram correction plan generation system 100 stores a storage device 101 composed of a suitable non-volatile storage device such as a hard disk drive, a memory 103 composed of a volatile storage device such as RAM, and a program 102 held in the storage device 101 as a memory. 103, etc. to perform overall control of the apparatus itself and execute various determinations, calculations, and control processes, an arithmetic unit 104 such as a CPU, an input unit 105 that accepts key input and voice input from a user, and display of processing data An output device 106 such as a display, and a communication device 107 connected to the network 120 and responsible for communication processing with other devices.

なお、記憶装置101内には、本実施形態のダイヤ修正案生成システム100として必要な機能を実装する為のプログラム102の他、列車計画テーブル121、車両運用計画テーブル122、乗務員運用計画テーブル123、点数パターンテーブル124、点数テーブル125、判定しきい値テーブル126、および修正パターンテーブル127(いずれも詳細は後述)が記憶されている。また、プログラム102の実行により実装される機能部としては、ユーザが指定するダイヤ修正方針を取得する修正方針入力部110と、ダイヤ情報等に基づく列車運行シミュレーションや、ダイヤ修正案生成の各処理を実行するダイヤ情報計算部111がある。   In addition, in the storage device 101, in addition to the program 102 for implementing functions necessary as the diagram correction plan generation system 100 of the present embodiment, a train plan table 121, a vehicle operation plan table 122, a crew member operation plan table 123, A point pattern table 124, a point table 125, a determination threshold value table 126, and a correction pattern table 127 (all of which will be described later) are stored. In addition, as a functional unit implemented by executing the program 102, a correction policy input unit 110 that acquires a diamond correction policy designated by the user, a train operation simulation based on diamond information, and a schedule correction plan generation process There is a diagram information calculation unit 111 to be executed.

続いて、本実施形態のダイヤ修正案生成システム100における、修正方針入力部110およびダイヤ情報計算部111が備える機能について説明する。上述したように、以下に説明する機能は、例えばダイヤ修正案生成システム100が備えるプログラム102を実行することで実装されるものである。   Next, functions provided in the modification policy input unit 110 and the diagram information calculation unit 111 in the diagram modification plan generation system 100 of the present embodiment will be described. As described above, the functions described below are implemented by, for example, executing the program 102 included in the diagram correction plan generation system 100.

ダイヤ修正案生成システム100における修正方針入力部110は、ダイヤ情報の修正方針に関するユーザからの指示を入力装置105で受け付ける機能を具備している。この修正方針に関するユーザからの指示は、列車遅延確率、平均乗車率、運賃収入、車両保守費、および乗務員人件費といった項目について、どの項目を重視するかを指定した内容である。ユーザは、こうした項目のうち少なくとも1つ以上の項目に関して指定することになる。   The correction policy input unit 110 in the diamond correction plan generation system 100 has a function of accepting an instruction from the user regarding the correction policy of the diamond information by the input device 105. The instruction from the user regarding this correction policy is a content that specifies which items are to be emphasized among items such as a train delay probability, an average boarding rate, a fare revenue, a vehicle maintenance cost, and a crew personnel cost. The user will specify for at least one of these items.

また、ダイヤ修正案生成システム100におけるダイヤ情報計算部111は、上述の列車計画管理装置200、車両運用計画管理装置300、および乗務員運用計画管理装置400とそれぞれ通信を行い、現行列車計画210、現行車両運用計画310、および現行乗務員運用計画410(それぞれが現在の列車運行用情報)を取得し、これら各計画210、310、410に基づく列車運行シミュレーションを実行する機能を具備している。   In addition, the diagram information calculation unit 111 in the diagram correction plan generation system 100 communicates with the train plan management device 200, the vehicle operation plan management device 300, and the crew member operation plan management device 400, respectively, and the current train plan 210, A vehicle operation plan 310 and a current crew member operation plan 410 (each of which is current train operation information) are acquired, and a train operation simulation based on these plans 210, 310, and 410 is executed.

なお、上述の列車運行シミュレーションは、シミュレーションプログラム112が実行する。このシミュレーションプログラム112は、上述の各計画210、310、410のデータを入力として、列車遅延が発生する回数や時間の見込み、各列車に見込まれる乗客数、見込まれる乗客数に応じた運賃収入、列車運行のスケジュールに応じた車両メンテナンスの頻度や内容、列車運行のスケジュールや運用車両に応じて必要となる乗務員数といった各値を推定するアルゴリズムを有している。シミュレーションプログラム112としては既存のものを採用すればよい。   Note that the simulation program 112 executes the above-described train operation simulation. The simulation program 112 receives the data of each of the above-mentioned plans 210, 310, and 410 as an input, the number of times that the train delay occurs and the estimated time, the number of passengers expected for each train, the fare revenue according to the number of passengers expected, It has an algorithm for estimating each value such as the frequency and contents of vehicle maintenance according to the train operation schedule, the train operation schedule and the number of crew members required according to the operating vehicle. An existing program may be adopted as the simulation program 112.

また、ダイヤ情報計算部111は、上述のシミュレーションプログラム112によるシミュレーションの実行結果が含むデータを所定基準と照合し、列車運行に関する所定項目に関する評価点数を特定する機能を具備している。具体的には、ダイヤ情報計算部111は、例えば、上述のシミュレーションの実行結果に基づいて、列車遅延回数の値に基づく所定期間中の列車遅延確率、乗客数の値に基づく所定期間中の平均乗車率、各列車の運賃収入に基づく所定期間中の総運賃収入、車両メンテナンス頻度等に基づく所定期間中の車両保守費、乗務員数に基づく所定期間中の乗務員人件費、等を算定し、ここで算定した各値を、各値に対応した基準値(例:列車遅延確率が"0.1%"以下の場合の評価点数は"25")と照合することで、列車遅延確率、平均乗車率、運賃収入、車両保守費、および乗務員人件費といった項目に関して評価点数を特定する。   Further, the diagram information calculation unit 111 has a function of collating data included in a simulation execution result by the above-described simulation program 112 with a predetermined reference and specifying an evaluation score regarding a predetermined item related to train operation. Specifically, the diagram information calculation unit 111, for example, based on the execution result of the above-described simulation, the train delay probability during a predetermined period based on the value of the number of train delays, the average during the predetermined period based on the value of the number of passengers Calculate the occupancy rate, total fare revenue during the specified period based on the fare revenue of each train, vehicle maintenance costs during the specified period based on the vehicle maintenance frequency, etc., and crew personnel costs during the specified period based on the number of crew members, etc. By comparing each value calculated in step 1 with a reference value corresponding to each value (eg, the evaluation score is “25” when the train delay probability is “0.1%” or less), the train delay probability and the average ride Identify assessment scores for items such as rates, fare revenue, vehicle maintenance costs, and crew labor costs.

また、ダイヤ情報計算部111は、上述のように特定した評価点数と、評価点数に関する達成条件とを照合し、評価点数が達成条件を達成しているか判定する機能を具備している。この達成条件は、具体的には、評価点数の必要最低点と、列車遅延確率や運賃収入といった各項目間での評価点数の点数差上限とを規定したものとなる。よって、ダイヤ情報計算部111は、各項目(列車遅延確率、平均乗車率、総運賃収入、車両保守費、乗務員人件費)に関して特定してある各評価点数を達成条件に照合し、各項目の評価点数のいずれかが必要最低点を下回っているか、或いは、各項目間の点数差が点数差上限を超えていないか判定する。   The diagram information calculation unit 111 has a function of collating the evaluation score specified as described above with the achievement condition related to the evaluation score, and determining whether the evaluation score has achieved the achievement condition. Specifically, this achievement condition defines the necessary minimum score of the evaluation score and the upper limit of the difference in the evaluation score between the items such as the train delay probability and the fare revenue. Therefore, the diagram information calculation unit 111 compares each evaluation score specified for each item (train delay probability, average boarding rate, total fare revenue, vehicle maintenance cost, crew personnel cost) with the achievement condition, It is determined whether any of the evaluation scores is below the required minimum score, or whether the score difference between the items exceeds the score difference upper limit.

ダイヤ情報計算部111は、上述の達成条件が達成されていないと判定した場合、修正パターンテーブル127(詳細は後述)より、入力装置105で既に受け付けている修正方針に対応付けられたいずれかの修正内容を選択し、該当修正内容で、上述の現行列車計画210、現行車両運用計画310、および現行乗務員運用計画410を修正して、ダイヤ修正案候補としての、列車計画、車両運用計画、乗務員運用計画、をそれぞれ生成する機能を具備している。   When the diagram information calculation unit 111 determines that the above-described achievement condition is not achieved, the diagram information calculation unit 111 selects any one of the correction patterns already associated with the correction policy already accepted by the input device 105 from the correction pattern table 127 (details will be described later). The correction contents are selected, and the current train plan 210, the current vehicle operation plan 310, and the current crew operation plan 410 are corrected with the corresponding correction contents, and the train plan, the vehicle operation plan, the crew as the schedule correction plan candidates. It has a function to generate each operation plan.

また、ダイヤ情報計算部111は、上述のように生成したダイヤ修正案候補で構成された列車運行用情報で列車運行シミュレーションを再度実行し、当該シミュレーションの実行結果に基づく評価点数の特定、および評価点数と達成条件との照合、の各処理を実行して、評価点数が達成条件を達成した場合に、ダイヤ修正案候補をダイヤ修正案として列車計画管理装置200、車両運用計画管理装置300、および乗務員運用計画管理装置400ないし所定端末に送信する機能を具備している。   Further, the diagram information calculation unit 111 re-executes the train operation simulation with the train operation information configured by the schedule correction plan candidates generated as described above, and specifies the evaluation score based on the execution result of the simulation, and the evaluation When each process of collating the score and the achievement condition is executed and the evaluation score has achieved the achievement condition, the train plan management device 200, the vehicle operation plan management device 300, It has a function of transmitting to the crew member operation plan management device 400 or a predetermined terminal.

なお、上述のダイヤ情報計算部111は、評価点数が達成条件を達成するようになるまで、上述したダイヤ修正案候補の生成、当該ダイヤ修正案候補に基づく列車運行シミュレーションの実行、当該シミュレーションの実行結果に基づく評価点数の特定、および評価点数と達成条件との照合、の各処理を繰り返し実行する機能も具備している。更に、ダイヤ情報計算部111は、評価点数が達成条件を達成するようになるまで各処理を繰り返し実行することを、ダイヤ修正案が所定数得られるまで繰り返し、当該所定数のダイヤ修正案を、列車計画管理装置200、車両運用計画管理装置300、および乗務員運用計画管理装置400ないし所定端末に送信する機能も具備している。   The above-described diagram information calculation unit 111 generates the above-described schedule correction plan candidates, executes a train operation simulation based on the schedule correction plan candidates, and executes the simulation until the evaluation score reaches the achievement condition. It also has a function of repeatedly executing each process of specifying the evaluation score based on the result and collating the evaluation score with the achievement condition. Furthermore, the diagram information calculation unit 111 repeatedly executes each process until the evaluation score reaches the achievement condition until a predetermined number of diamond correction proposals are obtained, and the predetermined number of diamond correction proposals are obtained. The train plan management device 200, the vehicle operation plan management device 300, and the crew member operation plan management device 400 are also provided with a function of transmitting to a predetermined terminal.

−−−データ構造例−−−
次に、本実施形態のダイヤ修正案生成システム100が利用する各種データの構造例について説明する。図3は本実施形態の現行列車計画210のデータ例を示す図である。この現行列車計画210は、ダイヤ修正案生成システム100のダイヤ情報計算部111が、列車計画管理装置200から取得してメモリ103ないし記憶装置101に格納したデータであり、列車運行を行っている鉄道会社等が現在使用している現行の列車計画すなわちダイヤ情報である。この現行列車計画210は、図3に示すように、列車番号をキーとして、上り下り、停車駅、始発駅、始発時刻、および終着時刻といった各値を対応付けたレコードの集合体となっている。
--- Data structure example ---
Next, an example of the structure of various data used by the diagram correction plan generation system 100 of this embodiment will be described. FIG. 3 is a diagram illustrating an example of data of the current train plan 210 of the present embodiment. The current train plan 210 is data that the diagram information calculation unit 111 of the diagram correction plan generation system 100 acquires from the train plan management device 200 and stores in the memory 103 or the storage device 101, and is a train that is operating a train. It is the current train plan that is currently used by the company, that is, schedule information. As shown in FIG. 3, the current train plan 210 is a collection of records in which values such as up / down, stop station, start station, start time, and end time are associated with each other using a train number as a key. .

図4は本実施形態の現行車両運用計画310のデータ例を示す図である。この現行車両運用計画310は、ダイヤ修正案生成システム100のダイヤ情報計算部111が、車両運用計画管理装置300から取得してメモリ103ないし記憶装置101に格納したデータであり、列車運行を行っている鉄道会社等が、上述の現行列車計画210に沿って現在運用している現行の列車車両に関する情報である。この現行車両運用計画310は、図4に示すように、上述の現行列車計画210の各レコードと共通する列車番号をキーとして、車両の編成数、車両を回送する頻度である回送設定頻度、車両の検査頻度、および車両の入庫頻度といった各値を対応付けたレコードの集合体となっている。   FIG. 4 is a diagram showing an example of data of the current vehicle operation plan 310 of the present embodiment. The current vehicle operation plan 310 is data that the diagram information calculation unit 111 of the diagram correction plan generation system 100 acquires from the vehicle operation plan management device 300 and stores in the memory 103 or the storage device 101. This is information on the current train vehicle currently operated by the railway company or the like in accordance with the current train plan 210 described above. As shown in FIG. 4, the current vehicle operation plan 310 uses the train number common to each record of the above-described current train plan 210 as a key, the number of trains of the vehicle, the forwarding setting frequency which is the frequency of forwarding the vehicle, the vehicle This is a set of records in which values such as the inspection frequency and the vehicle warehousing frequency are associated with each other.

図5は本実施形態の現行乗務員運用計画410のデータ例を示す図である。この現行乗務員運用計画410は、ダイヤ修正案生成システム100のダイヤ情報計算部111が、乗務員運用計画管理装置400から取得してメモリ103ないし記憶装置101に格納したデータであり、列車運行を行っている鉄道会社等が、上述の現行列車計画210および現行車両運用計画310に沿って現在運用している現行の乗務員に関する情報である。この現行乗務員運用計画410は、図5に示すように、乗務員番号をキーとして、該当乗務員の所持する所持免許、割当、便乗、および勤務条件といった各値を対応付けたレコードの集合体となっている。   FIG. 5 is a diagram illustrating an example of data of the current crew member operation plan 410 of the present embodiment. The current crew member operation plan 410 is data that the diagram information calculation unit 111 of the diagram correction plan generation system 100 acquires from the crew member operation plan management device 400 and stores in the memory 103 or the storage device 101. This is information on current crew members currently operating in accordance with the above-described current train plan 210 and current vehicle operation plan 310 by a railway company or the like. As shown in FIG. 5, the current crew member operation plan 410 is a set of records in which values such as possession licenses, assignments, flight boarding, and working conditions possessed by the crew members are associated with each other using the crew number as a key. Yes.

また、ダイヤ情報の修正方針に関するユーザからの指示を入力装置105で受け付けるに当たり、上述の修正方針入力部110が利用する点数パターンテーブル124が記憶装置101に格納されている。この点数パターンテーブル124は、図6にて示すように、列車遅延確率、平均乗車率、運賃収入、車両保守費、および乗務員人件費といった各項目の重視度合いを、項目間の評価点数の占有割合で規定した修正方針を複数パターン格納したテーブルである。例えば、各項目の評価点数の合計点を100点とした場合、修正方針「01」であれば、各項目の重視度合いが、列車遅延確率:平均乗車率:運賃収入:車両保守費:乗務員人件費=20:20:20:20:20、と規定されており、各項目間で重視度が等しくなるような修正方針を示している。また同様に、修正方針「02」であれば、各項目の重視度合いが、列車遅延確率:平均乗車率:運賃収入:車両保守費:乗務員人件費=28:18:18:18:18、と規定されており、列車遅延確率を重視した修正方針を示している。修正方針入力部110は、この点数パターンテーブル124の各項目のうち、いずれを重視するかユーザから指示を受け付けることになる。   In addition, the point pattern table 124 used by the correction policy input unit 110 described above is stored in the storage device 101 when the input device 105 receives an instruction from the user regarding the diamond information correction policy. As shown in FIG. 6, this score pattern table 124 indicates the degree of importance of each item such as the train delay probability, average boarding rate, fare revenue, vehicle maintenance cost, and crew labor cost, It is a table that stores a plurality of patterns of revision policy specified in. For example, assuming that the total score of the evaluation scores for each item is 100, if the correction policy is “01”, the importance of each item is: train delay probability: average occupancy rate: fare revenue: vehicle maintenance costs: crew personnel Expenses = 20: 20: 20: 20: 20 are specified, and a correction policy is shown so that the importance is equal among the items. Similarly, if the revision policy is “02”, the importance of each item is: train delay probability: average boarding rate: fare revenue: vehicle maintenance costs: crew personnel costs = 28: 18: 18: 18: 18 It is defined and indicates a revision policy that emphasizes the probability of train delay. The correction policy input unit 110 receives an instruction from the user as to which of the items in the score pattern table 124 is to be emphasized.

また、ダイヤ情報計算部111は、図7に示す判定しきい値テーブル126を利用する。この判定しきい値テーブル126は、評価点数の達成条件となるテーブルであり、図7にて示すように、評価点数の必要最低点と、列車遅延確率や運賃収入といった各項目間での評価点数の点数差上限とを規定したものとなる。また、例えば雨季、乾季という時季に列車運行状況が左右される可能性の高い地域で本実施形態のダイヤ修正案生成システム100を適用する場合、図7で例示するように、各時季に関して達成条件を規定するとすれば好適である。   Further, the diagram information calculation unit 111 uses a determination threshold value table 126 shown in FIG. The determination threshold value table 126 is a table that is a condition for achieving the evaluation score, and as shown in FIG. 7, the required minimum score of the evaluation score and the evaluation score between each item such as the train delay probability and the fare revenue. The upper limit of the number difference is defined. Further, for example, when the diagram correction plan generating system 100 of the present embodiment is applied in an area where the train operation status is highly likely to be affected during the rainy season and the dry season, as shown in FIG. Is preferable.

また、ダイヤ情報計算部111が利用するテーブルとして、図8に示す修正パターンテーブル127が記憶装置101に格納されている。この修正パターンテーブル127は、ダイヤ情報の修正方針毎に、ダイヤ情報に対する修正内容を複数定義したテーブルである。具体的には、図6の点数パターンテーブル124と共通する修正方針の識別子をキーにして、列車本数の増減パターン、車両編成数の増減パターン、走行経路や停車駅等の列車の運転パターン、および車両へ割り当てる乗務員数の増減パターン、といったダイヤ情報の修正内容のパターンを対応付けたレコードの集合体となっている。なお、図8で示す修正パターンテーブル127の例では、列車本数を1本増加させる内容については、「U1」、同じく2本増加させる内容については、「U2」、列車本数を1本低減させる内容については、「D1」、同じく2本低減させる内容については、「D2」、としている。   A correction pattern table 127 shown in FIG. 8 is stored in the storage device 101 as a table used by the diagram information calculation unit 111. The correction pattern table 127 is a table that defines a plurality of correction contents for the diamond information for each diamond information correction policy. Specifically, using the identifier of the correction policy common to the point pattern table 124 of FIG. 6 as a key, an increase / decrease pattern of the number of trains, an increase / decrease pattern of the number of trains, an operation pattern of a train such as a travel route or a stop station, and the like It is a set of records in which patterns of correction contents of diagram information such as an increase / decrease pattern of the number of crew assigned to vehicles are associated. In the example of the correction pattern table 127 shown in FIG. 8, “U1” is used for the content that increases the number of trains by one, “U2” is the content that increases the number of trains by two, and the content for reducing the number of trains by one. Is “D1”, and the content to be reduced by two is “D2”.

こうした修正パターンテーブル127のうち、列車本数や車両編成数を増加させるパターンが採用され、ダイヤ修正案(候補含む)が生成された場合、乗客数は増大するはずであり、修正方針のうち「運賃収入」の項目に関して評価点数の上昇が見込まれることになる。一方で、密なダイヤで多くの車両を運行することになり、車両のメンテナンス頻度や乗務員数が上昇することにつながるため、修正方針のうち「車両保守費」や「乗務員人件費」の項目に関して評価点数の下落が見込まれることになる。   In such a correction pattern table 127, when a pattern that increases the number of trains or the number of trains is adopted and a diamond correction plan (including candidates) is generated, the number of passengers should increase. An increase in the evaluation score is expected for the item “income”. On the other hand, many vehicles will be operated with a dense schedule, which will lead to an increase in the frequency of vehicle maintenance and the number of crew, so the items related to “vehicle maintenance costs” and “crew personnel costs” in the revised policy A decline in the evaluation score is expected.

なお、この修正パターンテーブル127において、1つの修正方針について、複数のレコードが対応付けされており、各レコード間の優先順位が規定されている。図8の例では、修正方針「01」に関しては、「01」〜「05」の計5つのレコードが対応付けされている。   In the correction pattern table 127, a plurality of records are associated with one correction policy, and the priority order between the records is defined. In the example of FIG. 8, a total of five records “01” to “05” are associated with the correction policy “01”.

−−−処理手順例1−−−
以下、本実施形態におけるダイヤ修正案生成方法の実際手順について図に基づき説明する。以下で説明するダイヤ修正案生成方法に対応する各種動作は、ダイヤ修正案生成システム100がメモリ103等に読み出して実行するプログラム102によって実現される。そして、このプログラム102は、以下に説明される各種の動作を行うためのコードから構成されている。
--- Example of processing procedure 1 ---
Hereinafter, the actual procedure of the diamond correction plan generation method in the present embodiment will be described with reference to the drawings. Various operations corresponding to the diamond correction plan generation method described below are realized by a program 102 that the diamond correction plan generation system 100 reads into the memory 103 and executes it. And this program 102 is comprised from the code | cord | chord for performing the various operation | movement demonstrated below.

図9は、本実施形態におけるダイヤ修正案生成方法の処理例1を示すフロー図である。ここではまず、本実施形態のダイヤ修正案生成方法の全体フローについて概説する。ここで示すフローは、ダイヤ修正案を1件のみ生成する場合のフローとなる。   FIG. 9 is a flowchart showing a processing example 1 of the diagram correction plan generation method in the present embodiment. Here, first, an overall flow of the diamond correction plan generation method of the present embodiment will be outlined. The flow shown here is a flow when only one diamond correction plan is generated.

まず、ダイヤ修正案生成システム100の修正方針入力部110は、記憶装置101に予め保持している画面データを読み出し、これを出力装置106に表示させ、該当画面においてユーザによるダイヤ情報の修正方針の指示を受け付ける(S0001)。   First, the correction policy input unit 110 of the diagram correction plan generation system 100 reads screen data stored in the storage device 101 in advance, displays the screen data on the output device 106, and displays the diamond information correction policy of the user on the corresponding screen. An instruction is accepted (S0001).

ここでユーザによる修正方針を受け付ける画面としては、図17に示すものが想定できる。図17に示す画面1000は、列車遅延確率、平均乗車率、運賃収入、車両保守費、および乗務員人件費の各項目を列挙する表示欄1010と、各項目に対応したラジオボタン1020と、決定ボタン1030とを含んでいる。ユーザは、表示欄1010が示す各項目のうち、重視したい項目を修正方針として選択すべく、該当するラジオボタン1020へのクリック動作を行い、決定ボタン1030を押下することになる。修正方針入力部110は、この決定ボタン1030の押下に応じて、クリック済みのラジオボタン1020に対応する該当項目の情報を修正方針として取得する。   Here, the screen shown in FIG. 17 can be assumed as a screen for accepting the correction policy by the user. A screen 1000 shown in FIG. 17 includes a display column 1010 for enumerating items of train delay probability, average boarding rate, fare revenue, vehicle maintenance costs, and crew labor costs, radio buttons 1020 corresponding to the items, and a decision button. 1030. The user performs a click operation on the corresponding radio button 1020 and presses the decision button 1030 in order to select an item to be emphasized as a correction policy among the items indicated by the display column 1010. The correction policy input unit 110 acquires the information of the corresponding item corresponding to the clicked radio button 1020 as the correction policy in response to pressing of the determination button 1030.

次にダイヤ情報計算部111は、ダイヤシミュレーション、すなわち上述した列車運行シミュレーションを実行し(S0002)、これにより得たシミュレーション結果と、上述のステップS0001で得ている修正方針とに基づき、現行計画の評価点数を算出する(S0003)。   Next, the diagram information calculation unit 111 executes a diagram simulation, that is, the train operation simulation described above (S0002), and based on the simulation result obtained thereby and the correction policy obtained in step S0001 described above, An evaluation score is calculated (S0003).

また、ダイヤ情報計算部111は、ステップS0003で算出した評価点数を、判定しきい値テーブル126に照合して合否判定し(S0004)、不合格すなわち達成条件を満たしていない場合(S0004:NG)、ステップS0001で指定された修正方針に対応する修正パターンを修正パターンテーブル127から選択し(S0005)、この修正パターンを用いてダイヤ修正案を作成する(S0006)。   Further, the diagram information calculation unit 111 checks the evaluation score calculated in step S0003 against the determination threshold value table 126 to make a pass / fail determination (S0004), and fails or does not satisfy the achievement condition (S0004: NG). Then, a correction pattern corresponding to the correction policy specified in step S0001 is selected from the correction pattern table 127 (S0005), and a diamond correction plan is created using this correction pattern (S0006).

続いてダイヤ情報計算部111は、上述のステップS0006で作成したダイヤ修正案について、ステップS0002のダイヤシミュレーションを再び実施し、以降のステップS0002〜S0004を繰り返す。ダイヤ修正案に関するステップS0004の判定の結果、合格の場合(S0004:OK)、ダイヤ情報計算部111は各現行計画管理装置(列車計画管理装置200、車両運用計画管理装置300、乗務員運用計画管理装置400)に対し、ダイヤ修正案を送信し(S0007)、フローを終了する。   Subsequently, the diamond information calculation unit 111 performs the diamond simulation of step S0002 again on the diamond correction plan created in step S0006 described above, and repeats the subsequent steps S0002 to S0004. As a result of the determination in step S0004 regarding the schedule correction plan, if the result is a pass (S0004: OK), the diagram information calculation unit 111 displays each current plan management device (train plan management device 200, vehicle operation plan management device 300, crew member operation plan management device). 400), a diamond correction plan is transmitted (S0007), and the flow ends.

本実施形態におけるダイヤ修正案生成システム100のユーザは、初めにダイヤの修正方針を画面1000におけるリストから選択するだけでよく、ユーザの知識や技能の習熟度に関係なくダイヤ修正案生成が実行されることになる。この点から、一貫した手作業でのダイヤ情報の評価や修正を行う従来状況と比較して、担当ユーザの割当やダイヤ修正の実施が容易となり、ダイヤ修正案生成システム100におけるユーザビリティも高まることとなる。   The user of the diagram correction plan generation system 100 in the present embodiment only needs to first select a diamond correction policy from the list on the screen 1000, and the diamond correction plan generation is executed regardless of the user's knowledge and skill level. Will be. From this point, compared with the conventional situation in which the diamond information is evaluated and corrected manually, it is easier to assign the user in charge and execute the diamond correction, and the usability of the diamond correction plan generation system 100 is also improved. Become.

−−−処理手順例2−−−
次に、上述した図9のフローのうち、ダイヤシミュレーション(S0002)、及び計画点数算出(S0003)の各処理の詳細について図に基づき説明する。図10は、本実施形態におけるダイヤ修正案生成方法の処理例2を示すフロー図である。
--- Processing procedure example 2 ---
Next, details of each process of the diamond simulation (S0002) and the calculation of the planned score (S0003) in the flow of FIG. 9 described above will be described with reference to the drawings. FIG. 10 is a flowchart showing a processing example 2 of the diagram correction plan generation method in the present embodiment.

この場合、ダイヤ情報計算部111は、各現行計画管理装置(列車計画管理装置200、車両運用計画管理装置300、乗務員運用計画管理装置400)より、最新計画情報として、現行列車計画210、現行車両運用計画310、現行乗務員運用計画410の各データを取得する(S0101)。   In this case, the diagram information calculation unit 111 receives the current train plan 210, the current vehicle as the latest plan information from each current plan management device (the train plan management device 200, the vehicle operation plan management device 300, the crew member operation plan management device 400). Each data of the operation plan 310 and the current crew member operation plan 410 is acquired (S0101).

続いてダイヤ情報計算部111は、上述で取得した最新計画情報210、310、410をシミュレーションプログラム112に与え、所定期間に関するダイヤシミュレーションを実施し(S0102)、列車遅延が発生する回数や時間の見込み、各列車に見込まれる乗客数、見込まれる乗客数に応じた運賃収入、列車運行のスケジュールに応じた車両メンテナンスの頻度や内容、列車運行のスケジュールや運用車両に応じて必要となる乗務員数といった各値を推定する。   Subsequently, the diagram information calculation unit 111 gives the latest plan information 210, 310, 410 acquired above to the simulation program 112, performs a diagram simulation for a predetermined period (S0102), and estimates the number of times and time when train delay occurs. , The number of passengers expected for each train, the fare revenue according to the expected number of passengers, the frequency and content of vehicle maintenance according to the train operation schedule, the number of crew required according to the train operation schedule and operational vehicles, etc. Estimate the value.

次にダイヤ情報計算部111は、上述のシミュレーション結果に基づき、列車遅延確率の算出(S0103)、平均乗車率の算出(S0104)、運賃収入の算出(S0105)、車両保守費の算出(S0106)、乗務員人件費の算出(S0107)を実施する。このうち列車遅延確率は、例えば、シミュレーションの実行結果が示す列車遅延の発生回数を、列車本数や所定期間で除算することで算定できる。また、平均乗車率は、シミュレーションの実行結果が示す各列車に見込まれる乗客数を、列車毎の総定員で除算することで算出出来る。また、運賃収入は、シミュレーションの実行結果が示す各列車に見込まれる乗客数に所定の平均運賃額を乗算することで算出出来る。また、車両保守費は、シミュレーションの実行結果が示す車両メンテナンスの頻度に、メンテナンス1回毎の平均費用を乗算することで算出出来る。また、乗務員人件費は、シミュレーションの実行結果が示す必要な乗務員数に1人当たり平均人件費を乗算することで算出出来る。   Next, the diagram information calculation unit 111 calculates the train delay probability (S0103), the average boarding rate (S0104), the fare revenue calculation (S0105), and the vehicle maintenance cost calculation (S0106) based on the simulation results described above. The calculation of the crew labor cost (S0107) is carried out. Among these, the train delay probability can be calculated, for example, by dividing the number of occurrences of the train delay indicated by the simulation execution result by the number of trains or a predetermined period. The average boarding rate can be calculated by dividing the number of passengers expected in each train indicated by the simulation execution result by the total capacity of each train. The fare revenue can be calculated by multiplying the number of passengers expected for each train indicated by the simulation execution result by a predetermined average fare amount. Further, the vehicle maintenance cost can be calculated by multiplying the vehicle maintenance frequency indicated by the simulation execution result by the average cost for each maintenance. The crew labor cost can be calculated by multiplying the required number of crew shown by the simulation execution result by the average labor cost per person.

続いてダイヤ情報計算部111は、上述のステップS0103〜S0107で得た算出値を、各値に応じて予め記憶装置101に保持してある基準値(例:列車遅延確率が"0.1%"以下の場合の評価点数は"25")と照合することで、列車遅延確率、平均乗車率、運賃収入、車両保守費、および乗務員人件費といった項目に関して評価点数を特定する(S0108)。   Subsequently, the diagram information calculation unit 111 stores the calculated values obtained in the above-described steps S0103 to S0107 in advance in the storage device 101 according to each value (eg, the train delay probability is “0.1%”). The evaluation score is specified for items such as the train delay probability, the average boarding rate, the fare revenue, the vehicle maintenance cost, and the crew personnel cost (S0108).

また、ダイヤ情報計算部111は、ステップS0108で得た評価点数を合算して、総合点数を算出する(S0109)。また、ダイヤ情報計算部111は、各評価点数のうち最高点と最低点の差を点数差として算出する(S0110)。ダイヤ情報計算部111は、こうして算出した評価点数、総合点数、および点数差の各値を、点数テーブル125(図16)において算出回次を付して格納する。ダイヤ情報計算部111は、この算出回次を、ステップS0003の実行毎にカウントアップし、点数テーブル125に設定する。   Further, the diagram information calculation unit 111 calculates the total score by adding the evaluation scores obtained in step S0108 (S0109). Further, the diagram information calculation unit 111 calculates the difference between the highest score and the lowest score among the evaluation scores as a score difference (S0110). The diamond information calculation unit 111 stores the evaluation score, the total score, and the score difference calculated in this way with a calculation order in the score table 125 (FIG. 16). The diagram information calculation unit 111 counts up this calculation every time step S0003 is executed, and sets it in the score table 125.

上述のステップS0108で得た各項目の評価点数の値と、ステップS0110で得た点数差の値は、上述のステップS0004での判定に用いられることとなる。ステップS0004におけるダイヤ情報計算部111は、上述のように得た各項目(列車遅延確率、平均乗車率、総運賃収入、車両保守費、乗務員人件費)に関する評価点数と上述の点数差の各値を、判定しきい値テーブル126のうち上述の所定期間が属する時季に応じたレコードに照合し、各項目の評価点数のいずれかが必要最低点を下回っているか、或いは、各項目間の点数差が点数差上限を超えていないか判定することになる。以上で、ステップS0002、S0003に関する詳細説明を終える。   The evaluation score value of each item obtained in step S0108 and the score difference value obtained in step S0110 are used for the determination in step S0004. In step S0004, the diagram information calculation unit 111 calculates the evaluation score regarding each item (train delay probability, average boarding rate, total fare revenue, vehicle maintenance cost, crew personnel cost) obtained as described above and each value of the above-described score difference. Is compared with a record corresponding to the season to which the predetermined period belongs in the determination threshold value table 126, and either of the evaluation scores of each item is below the necessary minimum score, or the score difference between each item It is determined whether or not the upper limit of the score difference is exceeded. This completes the detailed description of steps S0002 and S0003.

−−−処理手順例3−−−
次に、上述した図9のフローのうち、修正パターン選択(S0005)、及びダイヤ修正案作成(S0006)の各処理の詳細について図に基づき説明する。図11は、本実施形態におけるダイヤ修正案生成方法の処理例3を示すフロー図である。
--- Processing procedure example 3 ---
Next, details of each process of the correction pattern selection (S0005) and the diamond correction plan creation (S0006) in the flow of FIG. 9 described above will be described with reference to the drawings. FIG. 11 is a flowchart showing a processing example 3 of the diagram correction plan generation method in the present embodiment.

この場合、ダイヤ情報計算部111は、ステップS0101(図10)で得ている現行列車計画210、現行車両運用計画310、現行乗務員運用計画410の各データの、各計画管理装置200、300、400からの再取込ないし記憶装置101からの再読み込みを実施する(S0201)。なお、ステップS0101で得た最新計画情報は、修正がなされておらず、1回目の修正対象として修正回次「01」の情報と定義する。この修正回次「01」と定義される各計画のデータについては、ダイヤ情報計算部111が図13の列車計画テーブル121、図14の車両運用計画テーブル122、図15の乗務員運用計画テーブル123に格納する。   In this case, the diagram information calculation unit 111 uses the plan management devices 200, 300, and 400 for the data of the current train plan 210, the current vehicle operation plan 310, and the current crew member operation plan 410 obtained in step S0101 (FIG. 10). From the storage device 101 or from the storage device 101 (S0201). Note that the latest plan information obtained in step S0101 has not been corrected, and is defined as information of the correction order “01” as the first correction target. For the data of each plan defined as the modified circulation “01”, the diagram information calculation unit 111 stores the train plan table 121 in FIG. 13, the vehicle operation plan table 122 in FIG. 14, and the crew member operation plan table 123 in FIG. 15. Store.

また、ダイヤ情報計算部111は、ステップS0001でユーザ指定を受けた修正方針に対応する修正内容として、修正パターンテーブル127の該当修正方針に対応付くレコード中より、最終修正回次から1を減算した値と同値の優先順位を持つものを修正パターンとして選択する(S0202)。例えば、ステップS0005、S0006の実行が1度目であれば、最終修正回次は「02」(初期状態は上述したように修正回次「01」である)とカウントアップし、ダイヤ情報計算部111は、この「02」から1を減算した値、すなわち優先順位「01」のレコードを修正パターンテーブル127から選択する。   In addition, the diagram information calculation unit 111 subtracts 1 from the last correction sequence from the records corresponding to the correction policy in the correction pattern table 127 as the correction content corresponding to the correction policy received in step S0001. A pattern having the same priority order as the value is selected as a correction pattern (S0202). For example, if the steps S0005 and S0006 are executed for the first time, the final correction number is incremented to “02” (the initial state is the correction number “01” as described above), and the diagram information calculation unit 111 Selects a record obtained by subtracting 1 from “02”, that is, a record of priority “01” from the correction pattern table 127.

修正パターンテーブル127の各レコードすなわち修正パターンは、既に述べたように、列車本数、編成パターン、運転パターン、および乗務員数について修正する内容となっている。そのためダイヤ情報計算部111は、上述のステップS0202で選択した修正パターンを用いて、列車本数の修正(S0203)、運転パターンの修正(S0204)、編成パターンの修正(S0205)、乗務員数の修正(S0206)を実施する。   Each record of the correction pattern table 127, that is, the correction pattern has contents for correcting the number of trains, the train pattern, the operation pattern, and the number of crew members as described above. Therefore, the diagram information calculation unit 111 uses the correction pattern selected in step S0202 described above to correct the number of trains (S0203), the operation pattern (S0204), the formation pattern (S0205), and the number of crew members ( S0206) is performed.

最後にダイヤ情報計算部111は、上述の各ステップ(S0202〜S0206)の修正結果を、ステップS0201で得ている修正回次「01」の各計画情報へ反映させて(S0207)、修正回次「02」であるダイヤ修正案候補を生成し、これを図13の列車計画テーブル121、図14の車両運用計画テーブル122、図15の乗務員運用計画テーブル123にそれぞれ格納する。   Finally, the diagram information calculation unit 111 reflects the correction result of each of the above steps (S0202 to S0206) on each plan information of the correction order “01” obtained in step S0201 (S0207), and the correction number A diamond correction plan candidate “02” is generated and stored in the train plan table 121 of FIG. 13, the vehicle operation plan table 122 of FIG. 14, and the crew member operation plan table 123 of FIG.

上述したステップS0201〜S0207の各処理は、ステップS0004(図9)で評価点数が不合格と判定する毎に繰り返し実行されものである。そのためダイヤ情報計算部111は、こうした繰り返しを行う毎に、修正回次をカウントアップし、優先順位も1つづつ下げて修正パターンを選択することとなる。   Each process of step S0201-S0207 mentioned above is repeatedly performed whenever it determines with evaluation score failing in step S0004 (FIG. 9). Therefore, each time such a repetition is performed, the diagram information calculation unit 111 counts up the correction times and lowers the priority order by one to select a correction pattern.

このように、ダイヤ修正案生成に際して修正パターンを用いることで、複雑な計算処理は不要となり、多数の構成要素が複雑に関連したダイヤ情報の修正においても短時間での見直し修正を実現することが可能となる。また、ユーザの知識や経験の多寡が及ぼすダイヤ修正結果の品質や精度のばらつき等の度合いも最小限に止めることが出来る。   In this way, the use of a correction pattern when generating a diamond correction proposal eliminates the need for complicated calculation processing, and it is possible to achieve a quick review and correction even in the correction of diamond information in which a large number of components are complicatedly related. It becomes possible. In addition, the degree of variation in the quality and accuracy of the diamond correction results caused by the user's knowledge and experience can be minimized.

−−−処理手順例4−−−
次に、ダイヤ修正案候補を複数生成する際の処理について図に基づき説明する。図12は、本実施形態におけるダイヤ修正案生成方法の処理例4を示すフロー図である。図9に示したフローと異なる点は、点数しきい値合否判定(S0004)にて合格判定が得られた場合において、再シミュレーション要否判定を実施し(S0008)、その判定結果に応じて処理を行う点である。よって、図9のフローと同一内容の処理については説明を省略する。
--- Processing procedure example 4 ---
Next, a process for generating a plurality of diamond correction plan candidates will be described with reference to the drawings. FIG. 12 is a flowchart showing a process example 4 of the diagram correction plan generation method in the present embodiment. A difference from the flow shown in FIG. 9 is that when a pass determination is obtained in the score threshold pass / fail determination (S0004), a re-simulation necessity determination is performed (S0008), and processing is performed according to the determination result. It is a point to do. Therefore, the description of the processing having the same contents as the flow of FIG. 9 is omitted.

この場合、ダイヤ情報計算部111は、ステップS0004において、上述のように得た各項目(列車遅延確率、平均乗車率、総運賃収入、車両保守費、乗務員人件費)に関する評価点数と上述の点数差の各値を、判定しきい値テーブル126のうち上述の所定期間が属する時季に応じたレコードに照合し、各項目の評価点数のいずれかが必要最低点を下回っているか、或いは、各項目間の点数差が点数差上限を超えていないか判定することになる。その結果、合格の場合(S0004:OK)、ダイヤ情報計算部111は、該当ダイヤ修正案候補をダイヤ修正案として記憶装置101に格納すると共に、メモリ103上に記憶しているダイヤ修正案格納数の値をインクリメントする。   In this case, in step S0004, the diagram information calculation unit 111 evaluates the items (the train delay probability, the average boarding rate, the total fare revenue, the vehicle maintenance costs, the crew personnel costs) obtained as described above and the above-mentioned scores. Each value of the difference is collated with the record corresponding to the season to which the predetermined period belongs in the determination threshold value table 126, and either of the evaluation scores of each item is below the necessary minimum score, or each item It is determined whether the score difference between them exceeds the score difference upper limit. As a result, if the result is acceptable (S0004: OK), the diagram information calculation unit 111 stores the corresponding diagram correction plan candidate in the storage device 101 as a diamond correction plan, and the number of stored diamond correction plans stored in the memory 103. Increments the value of.

ダイヤ情報計算部111は、こうしてダイヤ修正案の格納毎にインクリメントした値を、所定の、或いはユーザ所望の送信件数と比較して、上述の値が送信件数を満たしているか否かの判定、すなわち、再シミュレーション要否判定を実行する(S0008)。   The diagram information calculation unit 111 compares the value incremented each time the diagram correction plan is stored with a predetermined or user-desired number of transmissions to determine whether the above-described value satisfies the number of transmissions, that is, Then, the re-simulation necessity determination is executed (S0008).

この判定において、上述の値が送信件数を満たしていると判定した場合(S0008:n)、ダイヤ情報計算部111は、記憶装置101に格納してあるダイヤ修正案のデータを各現行計画管理装置(列車計画管理装置200、車両運用計画管理装置300、乗務員運用計画管理装置400)に送信し(S0007)、フローを終了する。他方、上述の値が送信件数を満たしていないと判定した場合(S0008:y)、ダイヤ情報計算部111は、上述のステップS0005へ処理を戻し、以降のステップS0006〜S0002〜S0004を繰り返す。   In this determination, when it is determined that the above-described value satisfies the number of transmissions (S0008: n), the diagram information calculation unit 111 stores the data of the diagram correction plan stored in the storage device 101 for each current plan management device. (Train plan management apparatus 200, vehicle operation plan management apparatus 300, crew member operation plan management apparatus 400) are transmitted (S0007), and the flow is terminated. On the other hand, when it determines with the above-mentioned value not satisfy | filling the number of transmissions (S0008: y), the diamond information calculation part 111 returns a process to the above-mentioned step S0005, and repeats subsequent steps S0006-S0002-S0004.

なお、上述の送信件数に関しては、例えば複数件のダイヤ修正案を検討し得る有識者の有無、検討期間確保の可否、検討するに十分な走行実績蓄積の有無等、地域や鉄道事業者の性質によって適切な値(1以上)が設定されている。こうした形態を採用することで、ダイヤ修正案生成システム100を運用あるいは適用する様々な国の特性に応じて、処理内容やシステムのカスタマイズを容易なものとし、ダイヤ修正案生成を効率的かつ確実なものとできる。   Note that the number of transmissions mentioned above depends on the nature of the region and the railway operator, such as whether or not there is an expert who can consider multiple schedule revision proposals, whether or not the examination period can be secured, and whether or not enough driving records have been accumulated. An appropriate value (1 or more) is set. By adopting such a form, it is possible to easily customize the processing contents and the system according to the characteristics of various countries that operate or apply the diagram correction plan generation system 100, and the schedule correction plan generation is efficient and reliable. I can do it.

以上、本発明を実施するための最良の形態などについて具体的に説明したが、本発明はこれに限定されるものではなく、その要旨を逸脱しない範囲で種々変更可能である。   Although the best mode for carrying out the present invention has been specifically described above, the present invention is not limited to this, and various modifications can be made without departing from the scope of the invention.

本実施形態によれば、多数の構成要素が複雑に関連した列車ダイヤ情報の見直しに際し、ユーザが簡便に修正方針を指定するだけで、知識や経験など属人的なユーザ個々のスキルに影響されない均一で客観的なダイヤ情報の評価と、ダイヤ修正案の生成が迅速かつ効率的に可能となる。従って、列車ダイヤの事前評価とそれに基づく修正作業に関する属人性を抑制し、品質良好なダイヤ修正案を効率的に生成可能となる。   According to this embodiment, when reviewing train schedule information in which a large number of components are related in a complex manner, the user simply specifies a correction policy, and is not affected by individual user skills such as knowledge and experience. Uniform and objective evaluation of diamond information and generation of diamond correction proposals can be made quickly and efficiently. Accordingly, it is possible to efficiently generate a schedule correction plan with good quality by suppressing the personality related to the prior evaluation of train diagrams and the correction work based thereon.

本明細書の記載により、少なくとも次のことが明らかにされる。すなわち、ダイヤ修正案生成システムにおいて、演算装置は、前記評価点数が前記達成条件を達成するようになるまで、前記ダイヤ修正案候補の生成、当該ダイヤ修正案候補に基づく前記列車運行シミュレーションの実行、当該シミュレーションの実行結果に基づく前記評価点数の特定、および前記評価点数と前記達成条件との照合、の各処理を繰り返し実行するものである、としてもよい。これによれば、過大な手間やコストをかけることなく、好適なダイヤ修正案の生成が効率的かつ確実に実行されることとなる。   At least the following will be clarified by the description of the present specification. That is, in the diamond correction plan generation system, the arithmetic unit generates the diamond correction plan candidate, executes the train operation simulation based on the diamond correction plan candidate, until the evaluation score reaches the achievement condition, Each process of specifying the evaluation score based on the execution result of the simulation and collating the evaluation score with the achievement condition may be repeatedly executed. According to this, generation of a suitable diamond correction plan is efficiently and reliably executed without excessive labor and cost.

また、ダイヤ修正案生成システムにおいて、演算装置は、前記評価点数が前記達成条件を達成するようになるまで前記各処理を繰り返し実行することを、前記ダイヤ修正案が所定数得られるまで繰り返し、当該所定数のダイヤ修正案を前記管理装置ないし所定端末に送信するものであるとしてもよい。これによれば、ダイヤ修正案の善し悪しを判断できる高スキルのユーザに対し、複数のダイヤ修正案を提示し、ユーザのニーズに的確に対応することが可能となる。   Further, in the diagram correction plan generation system, the arithmetic device repeatedly executes each of the processes until the evaluation score reaches the achievement condition until the predetermined number of the diamond correction plans is obtained, A predetermined number of schedule correction proposals may be transmitted to the management device or a predetermined terminal. According to this, it is possible to present a plurality of diamond correction proposals to a high-skilled user who can judge whether the diamond correction proposal is good or bad, and to accurately respond to the user's needs.

また、ダイヤ修正案生成システムにおいて、記憶装置における前記修正パターンテーブルは、ダイヤ情報の修正方針として、列車遅延確率、平均乗車率、運賃収入、車両保守費、および乗務員人件費の少なくとも2つ以上の項目に関して規定し、ダイヤ情報に対する修正内容として、前記各項目の値を上下させるためのダイヤ情報の修正内容を規定したテーブルであり、演算装置は、前記評価点数の特定する処理において、前記シミュレーションの実行結果が含むデータとして、前記修正パターンテーブルで規定された修正方針の項目に対応した、列車遅延確率、平均乗車率、運賃収入、車両保守費、および乗務員人件費の少なくとも2つ以上の項目に関するデータを、所定基準と照合し、該当項目に関する評価点数を特定し、前記ダイヤ修正案候補を生成する処理において、前記評価点数に関する達成条件である、前記評価点数の必要最低点と、該当各項目間での評価点数の点数差上限とに、前記特定した評価点数を照合し、前記各項目の評価点数のいずれかが前記必要最低点を下回っているか、或いは、各項目間の点数差が点数差上限を超えている場合、前記達成条件を達成していないと判定し、前記修正パターンテーブルより、前記受け付けている修正方針に対応付けられたいずれかの修正内容を選択し、該当修正内容で前記ダイヤ情報を修正してダイヤ修正案候補を生成するものであるとしてもよい。これによれば、列車遅延確率、平均乗車率、運賃収入、車両保守費、および乗務員人件費といった列車運行管理上、或いは鉄道運行企業における経営上、重要な項目に関してユーザニーズにマッチしたダイヤ修正案の生成を迅速かつ効率的に実行可能となる。   Further, in the diagram correction plan generation system, the correction pattern table in the storage device includes at least two or more of a train delay probability, an average boarding rate, a fare revenue, a vehicle maintenance cost, and a crew personnel cost as a schedule policy for schedule information. It is a table that prescribes the amendment contents of the diamond information for raising and lowering the value of each item as the amendment contents for the diamond information, and the arithmetic unit is configured to perform the simulation in the process of specifying the evaluation score. As data included in the execution results, it relates to at least two items of train delay probability, average boarding rate, fare revenue, vehicle maintenance costs, and crew personnel costs corresponding to the items of the correction policy defined in the correction pattern table. The data is checked against predetermined criteria, the score for the relevant item is specified, and In the process of generating a candidate for a candidate, the specified evaluation score is compared with the necessary minimum score of the evaluation score, which is an achievement condition regarding the evaluation score, and the upper limit of the score difference between the corresponding items, If any of the evaluation scores for each item is below the required minimum score, or if the score difference between the items exceeds the score difference upper limit, it is determined that the achievement condition has not been achieved, One of the correction contents associated with the received correction policy may be selected from the correction pattern table, and the diamond information may be corrected with the corresponding correction contents to generate a diamond correction proposal candidate. According to this, a schedule correction plan that matches the user's needs for important items in train operation management, such as train delay probability, average occupancy rate, fare revenue, vehicle maintenance costs, and crew labor costs, or management in railway operators. Can be generated quickly and efficiently.

100 ダイヤ修正案生成システム
101 記憶装置
102 プログラム
103 メモリ
104 演算装置
105 入力装置
106 出力装置
107 通信装置
110 修正方針入力部
111 ダイヤ情報計算部
120 ネットワーク
121 列車計画テーブル
122 車両運用計画テーブル
123 乗務員運用計画テーブル
124 点数パターンテーブル
125 点数テーブル
126 判定しきい値テーブル
127 修正パターンテーブル
200 列車計画管理装置
210 現行列車計画
300 車両運用計画管理装置
310 現行車両運用計画
400 乗務員運用計画管理装置
410 現行乗務員運用計画
DESCRIPTION OF SYMBOLS 100 Diamond correction plan production | generation system 101 Storage device 102 Program 103 Memory 104 Arithmetic device 105 Input device 106 Output device 107 Communication device 110 Correction policy input part 111 Diamond information calculation part 120 Network 121 Train plan table 122 Vehicle operation plan table 123 Crew crew operation plan Table 124 Point pattern table 125 Point table 126 Determination threshold table 127 Correction pattern table 200 Train plan management device 210 Current train plan 300 Vehicle operation plan management device 310 Current vehicle operation plan 400 Crew operation plan management device 410 Current crew operation plan

Claims (3)

ダイヤ情報における、列車遅延確率、平均乗車率、運賃収入、車両保守費、および乗務員人件費の少なくとも2つ以上の項目に関して規定した修正方針毎に、前記各項目の値を上下させるための、ダイヤ情報に対する修正内容を複数定義した修正パターンテーブルを格納した記憶装置と、
ダイヤ情報の修正方針に関する指示を入力装置で受け付ける処理と、
ダイヤ情報を含む列車運行用情報の管理装置と通信を行い、現在の列車運行用情報を取得し、当該列車運行用情報に基づく列車運行シミュレーションを実行する処理と、
前記シミュレーションの実行結果が含む、前記列車遅延確率、前記平均乗車率、前記運賃収入、前記車両保守費、および前記乗務員人件費の少なくとも2つ以上の項目に関するデータを所定基準と照合し、列車運行に関する該当項目に関する評価点数を特定する処理と、
評価点数に関する達成条件である、前記評価点数の必要最低点と、該当各項目間での評価点数の点数差上限とに、前記特定した評価点数を照合し、前記各項目の評価点数のいずれかが前記必要最低点を下回っているか、或いは、各項目間の点数差が点数差上限を超えている場合、前記達成条件を達成していないと判定し、前記修正パターンテーブルより、前記受け付けている修正方針に対応付けられたいずれかの修正内容を選択し、該当修正内容で前記ダイヤ情報を修正してダイヤ修正案候補を生成する処理と、
前記生成したダイヤ修正案候補で構成された列車運行用情報で前記列車運行シミュレーションを実行し、当該シミュレーションの実行結果に基づく前記評価点数の特定、および前記評価点数と前記達成条件との照合、の各処理を実行して、前記評価点数が前記達成条件を達成した場合に、前記ダイヤ修正案候補をダイヤ修正案として前記管理装置ないし所定端末に送信する処理を実行する演算装置と、
を備えることを特徴とするダイヤ修正案生成システム。
A diagram for increasing or decreasing the value of each item for each revision policy defined for at least two items of train delay probability, average occupancy rate, fare revenue, vehicle maintenance costs, and crew labor costs in the diagram information A storage device storing a correction pattern table that defines a plurality of correction contents for information;
A process of accepting an instruction regarding a correction policy of a diamond information by an input device;
A process for communicating with a train operation information management device including timetable information, obtaining current train operation information, and executing a train operation simulation based on the train operation information;
Train operation is performed by comparing data relating to at least two items of the train delay probability, the average boarding rate, the fare revenue, the vehicle maintenance cost, and the crew labor cost included in the simulation execution result with a predetermined standard. Processing to identify the evaluation score for the relevant item,
It is an achievement condition related to the evaluation score, the required minimum score of the evaluation score, and the upper limit of the difference in the evaluation score between the corresponding items, the above-mentioned evaluation score is collated, and any of the evaluation scores of the respective items Is below the necessary minimum score, or if the score difference between each item exceeds the score difference upper limit, it is determined that the achievement condition is not achieved, and the acceptance is made from the correction pattern table. A process of selecting any correction content associated with the correction policy, correcting the diagram information with the corresponding correction content, and generating a diamond correction plan candidate;
The train operation simulation is executed with the train operation information composed of the generated diamond correction plan candidates, the evaluation score is identified based on the execution result of the simulation, and the evaluation score is compared with the achievement condition. An arithmetic unit that executes each process and executes a process of transmitting the diamond correction plan candidate to the management device or a predetermined terminal as a diamond correction plan when the evaluation score has achieved the achievement condition;
A diamond correction plan generating system comprising:
ダイヤ情報における、列車遅延確率、平均乗車率、運賃収入、車両保守費、および乗務員人件費の少なくとも2つ以上の項目に関して規定した修正方針毎に、前記各項目の値を上下させるための、ダイヤ情報に対する修正内容を複数定義した修正パターンテーブルを格納した記憶装置を備えた情報処理装置が、
ダイヤ情報の修正方針に関する指示を入力装置で受け付ける処理と、
ダイヤ情報を含む列車運行用情報の管理装置と通信を行い、現在の列車運行用情報を取得し、当該列車運行用情報に基づく列車運行シミュレーションを実行する処理と、
前記シミュレーションの実行結果が含む、前記列車遅延確率、前記平均乗車率、前記運賃収入、前記車両保守費、および前記乗務員人件費の少なくとも2つ以上の項目に関するデータを所定基準と照合し、列車運行に関する該当項目に関する評価点数を特定する処理と、
評価点数に関する達成条件である、前記評価点数の必要最低点と、該当各項目間での評価点数の点数差上限とに、前記特定した評価点数を照合し、前記各項目の評価点数のいずれかが前記必要最低点を下回っているか、或いは、各項目間の点数差が点数差上限を超えている場合、前記達成条件を達成していないと判定し、前記修正パターンテーブルより、前記受け付けている修正方針に対応付けられたいずれかの修正内容を選択し、該当修正内容で前記ダイヤ情報を修正してダイヤ修正案候補を生成する処理と、
前記生成したダイヤ修正案候補で構成された列車運行用情報で前記列車運行シミュレーションを実行し、当該シミュレーションの実行結果に基づく前記評価点数の特定、および前記評価点数と前記達成条件との照合、の各処理を実行して、前記評価点数が前記達成条件を達成した場合に、前記ダイヤ修正案候補をダイヤ修正案として前記管理装置ないし所定端末に送信する処理と、
を実行することを特徴とするダイヤ修正案生成方法。
A diagram for increasing or decreasing the value of each item for each revision policy defined for at least two items of train delay probability, average occupancy rate, fare revenue, vehicle maintenance costs, and crew labor costs in the diagram information An information processing apparatus including a storage device that stores a correction pattern table that defines a plurality of correction contents for information,
A process of accepting an instruction regarding a correction policy of a diamond information by an input device;
A process for communicating with a train operation information management device including timetable information, obtaining current train operation information, and executing a train operation simulation based on the train operation information;
Train operation is performed by comparing data relating to at least two items of the train delay probability, the average boarding rate, the fare revenue, the vehicle maintenance cost, and the crew labor cost included in the simulation execution result with a predetermined standard. Processing to identify the evaluation score for the relevant item,
It is an achievement condition related to the evaluation score, the required minimum score of the evaluation score, and the upper limit of the difference in the evaluation score between the corresponding items, the above-mentioned evaluation score is collated, and any of the evaluation scores of the respective items Is below the necessary minimum score, or if the score difference between each item exceeds the score difference upper limit, it is determined that the achievement condition is not achieved, and the acceptance is made from the correction pattern table. A process of selecting any correction content associated with the correction policy, correcting the diagram information with the corresponding correction content, and generating a diamond correction plan candidate;
The train operation simulation is executed with the train operation information composed of the generated diamond correction plan candidates, the evaluation score is identified based on the execution result of the simulation, and the evaluation score is compared with the achievement condition. When each evaluation is performed and the evaluation score achieves the achievement condition, a process of transmitting the diamond correction proposal candidate as a diamond correction proposal to the management device or a predetermined terminal;
A method for generating a diagram correction plan, comprising:
ダイヤ情報における、列車遅延確率、平均乗車率、運賃収入、車両保守費、および乗務員人件費の少なくとも2つ以上の項目に関して規定した修正方針毎に、前記各項目の値を上下させるための、ダイヤ情報に対する修正内容を複数定義した修正パターンテーブルを格納した記憶装置を備えた情報処理装置に、
ダイヤ情報の修正方針に関する指示を入力装置で受け付ける処理と、
ダイヤ情報を含む列車運行用情報の管理装置と通信を行い、現在の列車運行用情報を取得し、当該列車運行用情報に基づく列車運行シミュレーションを実行する処理と、
前記シミュレーションの実行結果が含む、前記列車遅延確率、前記平均乗車率、前記運賃収入、前記車両保守費、および前記乗務員人件費の少なくとも2つ以上の項目に関するデータを所定基準と照合し、列車運行に関する該当項目に関する評価点数を特定する処理と、
評価点数に関する達成条件である、前記評価点数の必要最低点と、該当各項目間での評価点数の点数差上限とに、前記特定した評価点数を照合し、前記各項目の評価点数のいずれかが前記必要最低点を下回っているか、或いは、各項目間の点数差が点数差上限を超えている場合、前記達成条件を達成していないと判定し、前記修正パターンテーブルより、前記受け付けている修正方針に対応付けられたいずれかの修正内容を選択し、該当修正内容で前記ダイヤ情報を修正してダイヤ修正案候補を生成する処理と、
前記生成したダイヤ修正案候補で構成された列車運行用情報で前記列車運行シミュレーションを実行し、当該シミュレーションの実行結果に基づく前記評価点数の特定、および前記評価点数と前記達成条件との照合、の各処理を実行して、前記評価点数が前記達成条件を達成した場合に、前記ダイヤ修正案候補をダイヤ修正案として前記管理装置ないし所定端末に送信する処理と、
を実行させることを特徴とするダイヤ修正案生成プログラム。
A diagram for increasing or decreasing the value of each item for each revision policy defined for at least two items of train delay probability, average occupancy rate, fare revenue, vehicle maintenance costs, and crew labor costs in the diagram information In an information processing apparatus having a storage device storing a correction pattern table that defines a plurality of correction contents for information,
A process of accepting an instruction regarding a correction policy of a diamond information by an input device;
A process for communicating with a train operation information management device including timetable information, obtaining current train operation information, and executing a train operation simulation based on the train operation information;
Train operation is performed by comparing data relating to at least two items of the train delay probability, the average boarding rate, the fare revenue, the vehicle maintenance cost, and the crew labor cost included in the simulation execution result with a predetermined standard. Processing to identify the evaluation score for the relevant item,
It is an achievement condition related to the evaluation score, the required minimum score of the evaluation score, and the upper limit of the difference in the evaluation score between the corresponding items, the above-mentioned evaluation score is collated, and any of the evaluation scores of the respective items Is below the necessary minimum score, or if the score difference between each item exceeds the score difference upper limit, it is determined that the achievement condition is not achieved, and the acceptance is made from the correction pattern table. A process of selecting any correction content associated with the correction policy, correcting the diagram information with the corresponding correction content, and generating a diamond correction plan candidate;
The train operation simulation is executed with the train operation information composed of the generated diamond correction plan candidates, the evaluation score is identified based on the execution result of the simulation, and the evaluation score is compared with the achievement condition. When each evaluation is performed and the evaluation score achieves the achievement condition, a process of transmitting the diamond correction proposal candidate as a diamond correction proposal to the management device or a predetermined terminal;
A program for generating a diagram correction plan, characterized in that
JP2013088502A 2013-04-19 2013-04-19 Diamond correction plan generation system, diamond correction plan generation method, and diamond correction plan generation program Expired - Fee Related JP6062790B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2013088502A JP6062790B2 (en) 2013-04-19 2013-04-19 Diamond correction plan generation system, diamond correction plan generation method, and diamond correction plan generation program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2013088502A JP6062790B2 (en) 2013-04-19 2013-04-19 Diamond correction plan generation system, diamond correction plan generation method, and diamond correction plan generation program

Publications (2)

Publication Number Publication Date
JP2014210530A JP2014210530A (en) 2014-11-13
JP6062790B2 true JP6062790B2 (en) 2017-01-18

Family

ID=51930637

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2013088502A Expired - Fee Related JP6062790B2 (en) 2013-04-19 2013-04-19 Diamond correction plan generation system, diamond correction plan generation method, and diamond correction plan generation program

Country Status (1)

Country Link
JP (1) JP6062790B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11702120B2 (en) 2019-06-14 2023-07-18 Kabushiki Kaisha Toshiba Information processing apparatus, information processing method, and non-transitory computer readable medium

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6605929B2 (en) * 2015-11-20 2019-11-13 株式会社日立製作所 Resource operation plan support apparatus and resource operation plan support method
JP2017213962A (en) * 2016-05-31 2017-12-07 東日本旅客鉄道株式会社 Vehicle operation work assisting device and vehicle operation work assisting system
JP7066365B2 (en) 2017-10-16 2022-05-13 株式会社日立製作所 Timetable creation device and automatic train control system
FR3086431B1 (en) * 2018-09-26 2023-07-28 Cosmo Tech METHOD FOR REGULATING A MULTIMODAL TRANSPORT NETWORK
JP7243563B2 (en) * 2019-10-16 2023-03-22 トヨタ自動車株式会社 Information processing equipment
JP7200085B2 (en) * 2019-12-02 2023-01-06 株式会社日立製作所 Diagram creation system and diagram creation method
JP7227934B2 (en) 2020-02-20 2023-02-22 株式会社日立製作所 Vehicle operation support device and vehicle operation support method
JP7343437B2 (en) 2020-04-02 2023-09-12 トヨタ自動車株式会社 Vehicle operation control device, operation control method, and transportation system
JP7444805B2 (en) * 2021-02-19 2024-03-06 株式会社日立製作所 Data preparation system, data preparation method
JP7553417B2 (en) 2021-09-30 2024-09-18 日鉄ソリューションズ株式会社 Information processing device, information processing method, and program

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0692237A (en) * 1992-07-24 1994-04-05 Hitachi Ltd Method and system for solving problem
JPH0858592A (en) * 1994-08-23 1996-03-05 Mitsubishi Electric Corp Operation arrangement support device
JP2002293242A (en) * 2001-03-29 2002-10-09 Railway Technical Res Inst Label arrangement information, storage medium, and label paper arrangement
JP4727459B2 (en) * 2006-03-09 2011-07-20 公益財団法人鉄道総合技術研究所 Program and train diagram creation device
US7797088B2 (en) * 2006-05-02 2010-09-14 General Electric Company Method and apparatus for planning linked train movements

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11702120B2 (en) 2019-06-14 2023-07-18 Kabushiki Kaisha Toshiba Information processing apparatus, information processing method, and non-transitory computer readable medium

Also Published As

Publication number Publication date
JP2014210530A (en) 2014-11-13

Similar Documents

Publication Publication Date Title
JP6062790B2 (en) Diamond correction plan generation system, diamond correction plan generation method, and diamond correction plan generation program
JP6605929B2 (en) Resource operation plan support apparatus and resource operation plan support method
CN109476330B (en) Automation system and method for optimizing control of a train
CN111680893A (en) Digital twin system of multi-self-addressing robot picking system and scheduling method
US9349111B1 (en) System, method, and computer program for calculating risk associated with a software testing project
KR20170036068A (en) Train operation diagram correction device and train operation diagram correction program
JP2019093906A (en) Operation management support device and operation control system
CN105210089A (en) Production simulation
US20220358422A1 (en) Timetable Planning System and Timetable Generating Method
JP6038693B2 (en) Course control device, course control method, and course control program
JP2009230555A (en) Demand forecast method, inventory plan decision method, demand forecast system and inventory plan decision system
JP6975073B2 (en) Forecasting systems, forecasting methods, and programs
CN113312244A (en) Fault monitoring method, equipment, program product and storage medium
JP7273524B2 (en) Operation management system
JP2021088205A5 (en)
JP6925179B2 (en) Solution search processing device
JP5271139B2 (en) Diamond management method, program, and diamond management apparatus
JP5096698B2 (en) Schedule correction device
JP6045388B2 (en) Operation management device, operation management method, and program
US10897051B2 (en) Cell control system
JP2015077912A (en) Train travel actual record analyzer, train travel actual record analysis system, and control program
KR20210032725A (en) System and method for devising optimal action plan in panel building shop of shipyard and computer readable storage medium storing for the same
JP2017154536A (en) Crew operation management system and crew operation management method
US20230281532A1 (en) Service plan change assistance apparatus, decision model creation apparatus, decision model creation program, and train traffic management system
JP2023157746A (en) Reasoning device, generation method, and generate program

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20150716

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20160420

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20160426

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20160620

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20161206

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20161215

R150 Certificate of patent or registration of utility model

Ref document number: 6062790

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees