JP5911438B2 JP2013009784A JP2013009784A JP5911438B2 JP 5911438 B2 JP5911438 B2 JP 5911438B2 JP 2013009784 A JP2013009784 A JP 2013009784A JP 2013009784 A JP2013009784 A JP 2013009784A JP 5911438 B2 JP5911438 B2 JP 5911438B2
Authority
JP
Japan
Prior art keywords
bond
price
data
bonds
remaining period
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2013009784A
Other languages
Japanese (ja)
Other versions
JP2014142739A (en
Inventor
池田 弘
弘 池田
佐藤 裕一
裕一 佐藤
英俊 松岡
英俊 松岡
正信 佐々木
正信 佐々木
卓哉 阿部
卓哉 阿部
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujitsu Ltd
Original Assignee
Fujitsu Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujitsu Ltd filed Critical Fujitsu Ltd
Priority to JP2013009784A priority Critical patent/JP5911438B2/en
Publication of JP2014142739A publication Critical patent/JP2014142739A/en
Application granted granted Critical
Publication of JP5911438B2 publication Critical patent/JP5911438B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Description

本技術は、金利と残存期間との関係を表す曲線を推定するための技術に関する。   The present technology relates to a technology for estimating a curve representing a relationship between an interest rate and a remaining period.

イールドカーブとは、割引債の残存期間(満期日までの残り時間)と平均金利との関係を表す曲線である。日本の場合には、国債に割引債がないが、割引債の代わりに利付き国債の取引価格(すなわち市場価格)を用いてイールドカーブを推定する手法が存在している。また、割引債である国債が存在する国においては、当該国債の取引価格を使ってイールドカーブを推定する手法も多数存在している。   A yield curve is a curve representing the relationship between the remaining period of a discount bond (remaining time until maturity date) and the average interest rate. In the case of Japan, there is no discount bond for government bonds, but there is a method for estimating the yield curve using the transaction price of interest-bearing government bonds (ie market price) instead of discount bonds. In countries where government bonds, which are discount bonds, exist, there are many methods for estimating the yield curve using the transaction price of the government bonds.

市場の状況や債券の違いに応じて適切な手法を用いないと、適切なイールドカーブを得ることができないが、これまでは複数ある手法のうち適切な手法を選択することが難しかった。日本の国債は、おおよそ300銘柄存在しており、満期までの期間は最長40年である。しかしながら、満期までの期間が長い国債(例えば30年から40年)の銘柄数が少ないことが問題となる。これは、2007年10月までは満期までの最大の期間が30年だったが、2007年11月に満期40年の国債が発行され、残存期間30年から40年までの間に、銘柄数が少ない空白期間が生じてしまっている。この空白期間が存在するため、イールドカーブの推定が難しくなっている。   An appropriate yield curve cannot be obtained unless an appropriate method is used according to market conditions and bond differences, but until now it has been difficult to select an appropriate method from among several methods. There are approximately 300 Japanese government bonds, with a maximum maturity of 40 years. However, there is a problem that the number of issues of government bonds (for example, 30 to 40 years) with a long term to maturity is small. This is because the maximum period until maturity was 30 years until October 2007, but a government bond with a maturity of 40 years was issued in November 2007, and the number of issues was between 30 and 40 years. There are few blank periods. Since this blank period exists, it is difficult to estimate the yield curve.

川崎 能典、安道 知寛,正則化法非線形回帰モデルによるイールドカーブの推定,統計数理,第50巻第2号,149-164,2002Kawasaki Noritori, Yasuchi Tomohiro, Yield Curve Estimation by Regularized Nonlinear Regression Model, Statistical Mathematics, Vol. 50, No. 2, 149-164, 2002 みずほレポート「主成分分析による国債スポットレートカーブの構造把握とその予測可能性の検討 〜マクロ経済・金融変数に基づく共通ファクターモデルの利用〜」2010年9月21日発行,みずほ総合研究所Mizuho Report “Understanding the Structure of Government Bond Spot Rate Curves by Principal Component Analysis and Examining its Predictability: Using a Common Factor Model Based on Macroeconomic and Financial Variables” published on September 21, 2010, Mizuho Research Institute James M, Steeley, "Estimating the gilt-edged term structure basis splines and confidence intervals", Journal of Business Finance & Accounting, 18(4), June 1991James M, Steeley, "Estimating the gilt-edged term structure basis splines and confidence intervals", Journal of Business Finance & Accounting, 18 (4), June 1991 阿部卓哉、佐々木正信、松岡英俊、池田宏、”ノンパラメトリック手法と業者間市場データを用いたイールドカーブの推定”、日本金融・証券計量・工学学会(JAFEE)、2012年8月3日Takuya Abe, Masanobu Sasaki, Hidetoshi Matsuoka, Hiroshi Ikeda, “Estimation of yield curves using nonparametric methods and inter-market data”, Japan Finance, Securities Metrology and Engineering Society (JAFEE), August 3, 2012

従って、本技術の目的は、一側面によれば、債券の取引価格から適切なイールドカーブを推定できる手法を選択できるようにするための技術を提供することである。   Therefore, the objective of this technique is to provide the technique for enabling selection of the method which can estimate an appropriate yield curve from the transaction price of a bond according to one side.

本技術に係る方式選択方法は、(A)債券毎に当該債券の満期日と価格とを含む債券データを格納するデータ格納部において、残存期間についての所定期間に残存期間が入る債券のうち一部の債券を選択し、(B)選択された債券以外の債券のうち少なくとも一部の債券の債券データを用いて、複数の所定方式の各々に従って、金利と残存期間との関係を表す曲線を推定し、(C)複数の所定方式の各々について、推定された曲線と、選択された債券の債券データとから、選択された債券の価格を算出し、(D)複数の所定方式の各々について、選択された債券の債券データに含まれる価格と、算出された価格との差に基づく評価値を算出し、(E)複数の所定方式の各々の評価値に基づき、複数の所定方式のうちのいずれかの所定方式を選択する処理を含む。   The method selection method according to the present technology is as follows: (A) In a data storage unit that stores bond data including the maturity date and price of the bond for each bond, one of the bonds whose remaining period falls within a predetermined period of the remaining period. (B) A curve representing the relationship between the interest rate and the remaining period according to each of a plurality of predetermined methods using bond data of at least some bonds among bonds other than the selected bonds. And (C) calculating a price of the selected bond from the estimated curve and bond data of the selected bond for each of the plurality of predetermined methods, and (D) for each of the plurality of predetermined methods. Calculating an evaluation value based on the difference between the price included in the bond data of the selected bond and the calculated price, and (E) based on the evaluation value of each of the plurality of predetermined methods. Select one of the predetermined methods It includes a process for.

債券の取引価格から適切なイールドカーブを推定できる手法を選択できるようになる。   A method that can estimate an appropriate yield curve from the transaction price of a bond can be selected.

図1は、実施の形態に係る情報処理装置の構成例を示す図である。FIG. 1 is a diagram illustrating a configuration example of an information processing apparatus according to an embodiment. 図2は、債券DBに格納されるデータの一例を示す図である。FIG. 2 is a diagram illustrating an example of data stored in the bond DB. 図3は、実施の形態に係るメインの処理フローを示す図である。FIG. 3 is a diagram showing a main processing flow according to the embodiment. 図4は、データ選定処理を説明するための図である。FIG. 4 is a diagram for explaining the data selection process. 図5は、データ選定処理を説明するための図である。FIG. 5 is a diagram for explaining the data selection process. 図6は、データ選定処理を説明するための図である。FIG. 6 is a diagram for explaining the data selection process. 図7は、データ選定処理を説明するための図である。FIG. 7 is a diagram for explaining the data selection process. 図8は、データ選定処理を説明するための図である。FIG. 8 is a diagram for explaining the data selection process. 図9は、データ選定処理を説明するための図である。FIG. 9 is a diagram for explaining the data selection process. 図10は、データ選定処理を説明するための図である。FIG. 10 is a diagram for explaining the data selection process. 図11は、データ選定処理を説明するための図である。FIG. 11 is a diagram for explaining the data selection process. 図12は、データ選定処理を説明するための図である。FIG. 12 is a diagram for explaining the data selection process. 図13は、データ選定処理の処理フローを示す図である。FIG. 13 is a diagram showing a processing flow of data selection processing. 図14は、推定イールドカーブの一例を示す図である。FIG. 14 is a diagram illustrating an example of an estimated yield curve. 図15は、推定価格の一例を示す図である。FIG. 15 is a diagram illustrating an example of the estimated price. 図16は、価格差について説明するための図である。FIG. 16 is a diagram for explaining the price difference. 図17は、実施の形態に係るメインの処理フローを示す図である。FIG. 17 is a diagram illustrating a main processing flow according to the embodiment. 図18は、第3データ格納部に格納されるデータの一例を示す図である。FIG. 18 is a diagram illustrating an example of data stored in the third data storage unit. 図19は、コンピュータの機能ブロック図である。FIG. 19 is a functional block diagram of a computer.

図1に、本実施の形態に係る情報処理装置100の構成例を示す。情報処理装置100は、債券データベース(DB)101と、データ抽出部102と、第1データ格納部103と、制御部104と、第2データ格納部105と、評価指標算出部106と、第3データ格納部107と、選択部108と、設定データ格納部109と、入力部112と、第4データ格納部110と、出力部111と、第1イールドカーブ算出部120a、第2イールドカーブ算出部120b、...第nイールドカーブ算出部120nとを有する。   FIG. 1 shows a configuration example of an information processing apparatus 100 according to the present embodiment. The information processing apparatus 100 includes a bond database (DB) 101, a data extraction unit 102, a first data storage unit 103, a control unit 104, a second data storage unit 105, an evaluation index calculation unit 106, and a third Data storage unit 107, selection unit 108, setting data storage unit 109, input unit 112, fourth data storage unit 110, output unit 111, first yield curve calculation unit 120a, second yield curve calculation unit 120b,. . . An n-th yield curve calculation unit 120n.

債券DB101は、各債券の基本データ(満期日、額面、利払い額(又は利率)、利払日データなど)と、各債券の取引価格データを格納する。取引価格データは、各債券の取引履歴(ここでは取引日毎の取引価格。但し、時刻毎等の他の単位毎の取引価格の場合もある。)のデータを含む。取引価格データは、例えば取引日毎にデータが追加される。債券DB101に格納されるデータの一例を図2に示す。図2の例では、銘柄毎に、満期日、利払い率、額面、及び支払い間隔を含む基本データと、市場価格、取引日及び取引量などを含む取引価格データとが登録されるようになっている。   The bond DB 101 stores basic data of each bond (maturity date, face value, interest payment amount (or interest rate), interest payment date data, etc.) and transaction price data of each bond. The transaction price data includes data of the transaction history of each bond (here, the transaction price for each transaction day, but may be the transaction price for each other unit such as each time). For example, data is added to the transaction price data for each transaction date. An example of data stored in the bond DB 101 is shown in FIG. In the example of FIG. 2, basic data including maturity date, interest payment rate, face value, and payment interval, and transaction price data including market price, transaction date, and transaction volume are registered for each issue. Yes.

設定データ格納部109は、入力部112を介して入力される空白期間T([t1,t2])のデータ等を格納する。データ抽出部102は、設定データ格納部109に格納されているデータに従って、債券DB101から、イールドカーブ算出手法の選択に用いる債券データを抽出し、第1データ格納部103に格納する。   The setting data storage unit 109 stores data of a blank period T ([t1, t2]) input via the input unit 112. The data extraction unit 102 extracts bond data used for selecting the yield curve calculation method from the bond DB 101 according to the data stored in the setting data storage unit 109 and stores the bond data in the first data storage unit 103.

制御部104は、第1イールドカーブ算出部120a乃至第nイールドカーブ算出部120nを制御する。より具体的には、制御部104は、第1イールドカーブ算出部120a乃至第nイールドカーブ算出部120nに、第1データ格納部103に格納されている債券データから、例えば取引日毎のイールドカーブを算出させ、イールドカーブのデータを第2データ格納部105に格納する。また、適切なイールドカーブ算出手法が選択されると、制御部104は、債券DB101から債券データを読み出して、当該適切なイールドカーブ算出手法のためのイールドカーブ算出部120に、読み出した債券データからイールドカーブを算出させ、イールドカーブのデータを第4データ格納部110に格納する。   The control unit 104 controls the first yield curve calculation unit 120a to the nth yield curve calculation unit 120n. More specifically, the control unit 104 generates, for example, a yield curve for each trading day from the bond data stored in the first data storage unit 103 in the first yield curve calculation unit 120a to the nth yield curve calculation unit 120n. The yield curve data is stored in the second data storage unit 105. When an appropriate yield curve calculation method is selected, the control unit 104 reads bond data from the bond DB 101, and sends the bond data from the read bond data to the yield curve calculation unit 120 for the appropriate yield curve calculation method. The yield curve is calculated, and the yield curve data is stored in the fourth data storage unit 110.

評価指標算出部106は、第1データ格納部103に格納されている債券データと、第2データ格納部105に格納されているイールドカーブのデータとから、各イールドカーブについて、取引日毎の推定取引価格を算出する。そして、評価指標算出部106は、イールドカーブ算出手法毎に、取引日毎の推定取引価格と実際の取引価格との差に基づき評価指標値を算出し、第3データ格納部107に格納する。   The evaluation index calculation unit 106 uses the bond data stored in the first data storage unit 103 and the yield curve data stored in the second data storage unit 105 to estimate transactions for each transaction day for each yield curve. Calculate the price. Then, the evaluation index calculation unit 106 calculates an evaluation index value based on the difference between the estimated transaction price for each transaction day and the actual transaction price for each yield curve calculation method, and stores the evaluation index value in the third data storage unit 107.

選択部108は、第3データ格納部107に格納されている各イールドカーブ算出手法の評価値から、最も適切なイールドカーブ算出手法を選択する。   The selection unit 108 selects the most appropriate yield curve calculation method from the evaluation values of the respective yield curve calculation methods stored in the third data storage unit 107.

出力部111は、第4データ格納部110に格納されている適切なイールドカーブのデータを、出力装置(例えば表示装置、印刷装置、又はネットワークに接続された他のコンピュータ)に出力する。   The output unit 111 outputs appropriate yield curve data stored in the fourth data storage unit 110 to an output device (for example, a display device, a printing device, or another computer connected to a network).

第1イールドカーブ算出部120a乃至第nイールドカーブ算出部120nは、それぞれ異なるイールドカーブ算出手法でイールドカーブを算出する処理部である。例えば、非特許文献1乃至4に示すような手法を用いる。   The first yield curve calculation unit 120a to the nth yield curve calculation unit 120n are processing units that calculate yield curves using different yield curve calculation methods. For example, the methods shown in Non-Patent Documents 1 to 4 are used.

次に、図3乃至図18を用いて、情報処理装置100の処理内容について説明する。情報処理装置100のデータ抽出部102は、債券DB101のデータの内容又は入力部112などからの入力などから、イールドカーブ算出手法の決定タイミングを検出する(図3:ステップS1)。   Next, processing contents of the information processing apparatus 100 will be described with reference to FIGS. 3 to 18. The data extraction unit 102 of the information processing apparatus 100 detects the determination timing of the yield curve calculation method from the data content of the bond DB 101 or the input from the input unit 112 or the like (FIG. 3: step S1).

例えば、タイミングは、残存期間の空白期間T(=(t1,t2])に入るような残存期間を有する債券の銘柄が追加された場合、残存期間の空白期間Tに入るような残存期間を有する債券の銘柄が追加されてから所定期間経過した場合(例えば取引日(より具体的には取引価格)の数が十分に多くなった後)、ユーザにより指示された場合などである。   For example, the timing has a remaining period that falls into the blank period T of the remaining period when a bond stock having a remaining period that falls into the blank period T (= (t1, t2]) of the remaining period is added. This may be the case when a predetermined period has elapsed since the bond issue was added (for example, after the number of transaction days (more specifically, the transaction price) has increased sufficiently), or when instructed by the user.

このような決定タイミングを検出すると、データ抽出部102は、債券DB101から債券データを抽出するデータ選定処理を実行する(ステップS3)。このデータ選定処理については、図4乃至図13を用いて説明する。   When such determination timing is detected, the data extraction unit 102 executes a data selection process for extracting bond data from the bond DB 101 (step S3). This data selection process will be described with reference to FIGS.

例えば、図4に示すように、1つ目の40年債が発行されると(すなわち取引日X1)、空白期間Tに入るような残存期間を有する債券の銘柄が追加されたことになる。なお、以下、2つ目の40年債が発行された日が取引日X2であり、3つ目の40年債が発行された日が取引日X3であり、4つ目の40年債が発行された日が取引日X4であるものとする。また、以下の説明ではt1=30年であり、t2=40年であるものとする。図4では、時間は左から右に流れるものとする。すなわち、取引日X1では、残存期間40年の債券の銘柄に取引価格が決定されることになる。このような場合には、取引日X1よりも前の各取引日の債券データD1を抽出する。この場合、どこまで取引日を遡るかは、予め設定データ格納部109に規定しておく。   For example, as shown in FIG. 4, when a first 40-year bond is issued (that is, trading date X1), a bond brand having a remaining period that falls into the blank period T is added. In the following, the date on which the second 40-year bond was issued is trading day X2, the date on which the third 40-year bond was issued is trading date X3, and the fourth 40-year bond is It is assumed that the date of issue is the transaction date X4. In the following description, it is assumed that t1 = 30 years and t2 = 40 years. In FIG. 4, it is assumed that time flows from left to right. That is, on the transaction date X1, the transaction price is determined for the bond brand with a remaining period of 40 years. In such a case, bond data D1 is extracted for each transaction date prior to the transaction date X1. In this case, the setting data storage unit 109 defines in advance how far back the transaction date is.

さらに、本実施の形態では、取引日X1の前取引日において、空白期間Tに入るような残存期間を有する債券の銘柄の数nTを計数する。ここでは、nT=0となる。そして、取引日X1よりも前の各取引日の債券データD1(図5。図5中1つのグラフは1取引日分のデータを表し、×及び丸印は銘柄を表す。)の中で、残存期間についての期間T0(=(t0(=t1−(t2−t1)),t1])。この例では、(20,30]となる。)に入るような残存期間を有する債券の銘柄のうち、残存期間が長い方からnT+1個(ここでは1個)の債券の銘柄以外の銘柄(図5において丸印)については、イールドカーブ算出手法の決定に用いる債券の銘柄から除外する。除外された債券の銘柄は、算出価格と実際の取引価格との比較を行う対象となる。 Furthermore, in the present embodiment, the number nT of bonds having a remaining period that falls within the blank period T is counted on the previous trading day of the trading day X1. Here, n T = 0. And in the bond data D1 of each trading day prior to the trading date X1 (FIG. 5. One graph in FIG. 5 represents data for one trading day, and x and circles represent brands). Bonds having a remaining period that falls within the period T 0 (= (t0 (= t1- (t2-t1)), t1]). In this example, (20, 30]). Of these, stocks other than n T +1 (in this case, 1) stocks with the longer remaining period (circled in Fig. 5) are excluded from stocks used in determining the yield curve calculation method. Excluded bond issues are subject to comparison between the calculated price and the actual transaction price.

また、例えば図6に示すように、2つ目の40年債が発行されると、空白期間Tに入るような残存期間を有する債券の銘柄が追加されたことになる。図6でも、時間は左から右に流れるものとする。すなわち、取引日X2では、残存期間40年の債券の銘柄及び残存期間が40年よりも少し短い債券の銘柄に取引価格が決定されることになる。このような場合には、nT=1であり、取引日X2よりも前で取引日X1以降の各取引日の債券データD2を抽出する。すなわち、空白期間Tに入るような残存期間を有する債権の銘柄の数nTが変化しない各取引日についての債券データD2を抽出する。 For example, as shown in FIG. 6, when a second 40-year bond is issued, a bond brand having a remaining period that falls into the blank period T is added. Also in FIG. 6, time flows from left to right. That is, on the transaction date X2, the transaction price is determined for a bond brand having a remaining period of 40 years and a bond brand having a remaining period slightly shorter than 40 years. In such a case, n T = 1, and the bond data D2 of each transaction date after the transaction date X1 before the transaction date X2 is extracted. That is, extracts the bonds data D2 for each trading day the number n T of claims stocks with remaining period as fall blank period T is not changed.

そして、取引日X2よりも前で取引日X1以降の各取引日の債券データD2(図7。図7中1つのグラフは1取引日分のデータを表し、三角、×及び丸印は銘柄を表す。)の中で、残存期間についての期間T0に入るような残存期間を有する債券の銘柄のうち、残存期間が長い方からnT+1個(ここでは2個)の債券の銘柄以外の銘柄(図7において丸印)については、イールドカーブ算出手法の決定に用いる債券の銘柄から除外する。除外された債券の銘柄は、算出価格と実際の取引価格との比較を行う対象となる。また、空白期間Tに入るような残存期間を有する債券の銘柄(図7の三角印)については、完全に処理対象から除外する。 Then, bond data D2 for each trading day after trading date X1 before trading date X2 (FIG. 7. One graph in FIG. 7 represents data for one trading day, and triangles, x and circles indicate stocks. Among the issues of bonds that have a remaining period that falls within the period T 0 in terms of remaining period, other than issues of n T +1 (in this case, 2) bonds from the longer remaining period The issues (circles in FIG. 7) are excluded from the issues of bonds used to determine the yield curve calculation method. Excluded bond issues are subject to comparison between the calculated price and the actual transaction price. In addition, a bond brand (triangle mark in FIG. 7) having a remaining period that falls within the blank period T is completely excluded from the processing target.

このように、空白期間Tをそのまま用いるのに充分な数(例えば3つ)の債券の銘柄が処理時点においてない場合には、擬似的に空白期間を作成するため、空白期間Tの直前で且つ同じ長さを有する期間T0に空白期間を設定するようになっている。 As described above, when there are not enough bonds (for example, three) for the blank period T as they are at the time of processing, a blank period is created in a pseudo manner. A blank period is set in the period T 0 having the same length.

さらに、例えば図8に示すように、3つ目の40年債が発行されると、空白期間Tに入るような残存期間を有する債券の銘柄が追加されたことになる。図8でも、時間は左から右に流れるものとする。すなわち、取引日X3では、残存期間40年の債券の銘柄及び残存期間40年よりも少し短い債券の2銘柄に取引価格が決定されることになる。このような場合には、nT=2であり、取引日X3よりも前で取引日X2以降の各取引日の債券データD3を抽出する。すなわち、空白期間Tに入るような残存期間を有する債券の銘柄の数nTが変化しない各取引日についての債券データD3を抽出する。 Further, for example, as shown in FIG. 8, when a third 40-year bond is issued, a bond issue having a remaining period that falls into the blank period T is added. Also in FIG. 8, time flows from left to right. That is, on the transaction date X3, the transaction price is determined for two issues: a bond issue with a remaining period of 40 years and a bond with a slightly shorter remaining period of 40 years. In such a case, n T = 2 and the bond data D3 of each transaction date after the transaction date X2 before the transaction date X3 is extracted. That is, extracts the bonds data D3 for each trading day the number n T of bond issues with remaining period as fall blank period T is not changed.

そして、nTが2となると、取引日X3よりも前で取引日X2以降の各取引日の債券データD3(図9。図9中1つのグラフは1取引日分のデータを表し、×及び丸印は銘柄を表す。)の中で、残存期間についての期間Tに入るような残存期間を有する債券の銘柄のうち、残存期間が短い方から1銘柄(図9において丸印)については、イールドカーブ算出手法の決定に用いる債券の銘柄から除外する。除外された債券の銘柄は、算出価格と実際の取引価格との比較を行う対象となる。 When n T becomes 2, bond data D3 for each trading day before trading date X3 and after trading date X2 (FIG. 9; one graph in FIG. 9 represents data for one trading day, x and Among the issues of bonds that have a remaining period that falls within the period T for the remaining period, the one with the shorter remaining period (circled in FIG. 9) Excluded from bonds that are used to determine the yield curve calculation method. Excluded bond issues are subject to comparison between the calculated price and the actual transaction price.

さらに、例えば図10に示すように、4つ目の40年債が発行されると、空白期間Tに入るような残存期間を有する債券の銘柄が追加されたことになる。図10でも、時間は左から右に流れるものとする。すなわち、取引日X4では、残存期間40年の債券の銘柄及び残存期間40年よりも少し短い債券の3銘柄に取引価格が決定されることになる。このような場合には、nT=3となり、取引日X4よりも前で取引日X3以降の各取引日の債券データD4を抽出する。すなわち、空白期間Tに入るような残存期間を有する債券の銘柄の数nTが変化しない各取引日についての債券データD4を抽出する。 Furthermore, for example, as shown in FIG. 10, when a fourth 40-year bond is issued, a brand of a bond having a remaining period that falls into the blank period T is added. Also in FIG. 10, time flows from left to right. In other words, on the transaction date X4, the transaction price is determined for three issues: a bond issue with a remaining period of 40 years and a bond with a slightly shorter remaining period of 40 years. In such a case, n T = 3, and the bond data D4 for each transaction date after the transaction date X3 before the transaction date X4 is extracted. That is, extracts the bonds data D4 for each trading day the number n T of bond issues with remaining period as fall blank period T is not changed.

さらに、nTが2以上となっているので、取引日X4よりも前で取引日X3以降の各取引日の債券データD4(図11。図11中1つのグラフは1取引日分のデータを表し、×及び丸印は銘柄を表す。)の中で、残存期間についての期間Tに入るような残存期間を有する債券の銘柄のうち、残存期間が短い方から1銘柄(図11において丸印)については、イールドカーブ算出手法の決定に用いる債券の銘柄から除外する。除外された債券の銘柄は、算出価格と実際の取引価格との比較を行う対象となる。 Furthermore, since n T is 2 or more, bond data D4 for each trading day before trading date X4 and after trading date X3 (FIG. 11. One graph in FIG. 11 shows data for one trading day. Among the issues of bonds having a remaining period that falls within the period T of the remaining period, one symbol (indicated by a circle in FIG. 11) from the shorter remaining term. ) Is excluded from bond issues used to determine the yield curve calculation method. Excluded bond issues are subject to comparison between the calculated price and the actual transaction price.

上で述べたような40年債が発行されるタイミングだけではなく、例えば、債券データD3又はD4に、充分な数の取引日のデータが含まれているならば、債券発行のタイミングだけではなく、他のタイミングでも、同様のデータ抽出処理で対処するようにしてもよい。   Not only the timing of issuing 40-year bonds as described above, but also, for example, if bond data D3 or D4 contains a sufficient number of transaction date data, not only the timing of bond issuance. The same data extraction processing may be used at other timings.

例えば、図12に示すように、4つ目の40年債が発行される時点より前の処理時点において、3つ目の40年債が発行された取引日X3以降の取引日が充分な数(例えば設定データ格納部109において規定された数)以上であれば、取引日X3以降処理時点前の取引日の債券データD5を抽出すれば良い。この後の処理はD4についての処理と同様でよい。   For example, as shown in FIG. 12, there are a sufficient number of transaction days after transaction date X3 when the third 40-year bond was issued at the time of processing prior to the time when the fourth 40-year bond was issued. If it is equal to or greater than (for example, the number specified in the setting data storage unit 109), bond data D5 on the transaction date after the transaction date X3 and before the processing time may be extracted. The subsequent processing may be the same as the processing for D4.

このような処理の内容を図13を用いて具体的に説明する。データ抽出部102は、処理時点の前取引日のデータにおいて、設定データ格納部109に格納されている期間Tにおける銘柄数nTを計数し、銘柄数nTが変化しない範囲の取引日の債券データを、債券DB101から抽出して、第1データ格納部103に格納する(図13:ステップS51)。 The contents of such processing will be specifically described with reference to FIG. The data extraction unit 102 counts the number of issues n T in the period T stored in the setting data storage unit 109 in the data of the previous transaction date at the time of processing, and the bond on the transaction date in a range where the number of issues n T does not change. Data is extracted from the bond DB 101 and stored in the first data storage unit 103 (FIG. 13: step S51).

そして、データ抽出部102は、nTが1より大きいか判断する(ステップS55)。nTが1以下であれば、図4乃至図7に示したように、データ抽出部102は、期間T-1(t0以前の期間=[0,t0])に残存期間が含まれる銘柄と、T0に残存期間が含まれる銘柄のうち残存期間が長い方からnT+1個の銘柄を、イールドカーブ推定対象Vpに設定する(ステップS57)。 Then, the data extraction unit 102 determines whether n T is greater than 1 (step S55). If n T is 1 or less, as shown in FIG. 4 to FIG. 7, the data extraction unit 102 determines whether the period T −1 (period before t0 = [0, t0]) includes the remaining period. , N T +1 brands having the longer remaining period among the brands including the remaining period in T 0 are set as the yield curve estimation target Vp (step S57).

さらに、データ抽出部102は、期間T0に含まれる銘柄のうちイールドカーブ推定対象Vpに含まれない銘柄(但し、期間Tに含まれる銘柄を除く)を、価格算出対象Vcに設定する(ステップS59)。そして処理は呼出元の処理に戻る。 Further, the data extraction unit 102 sets, among the brands included in the period T 0 , brands that are not included in the yield curve estimation target Vp (excluding brands included in the period T) as the price calculation target Vc (step S1). S59). Then, the process returns to the caller process.

一方、nTが1を超える場合には、データ抽出部102は、図8乃至図12に示すように、期間T-1及びT0に残存期間が含まれる銘柄と、期間Tに残存期間が含まれる銘柄のうち残存期間最短の1銘柄以外の銘柄とを、イールドカーブ推定対象Vpに設定する(ステップS61)。 On the other hand, when n T exceeds 1, the data extraction unit 102, as shown in FIGS. 8 to 12, the brand including the remaining period in the periods T −1 and T 0 and the remaining period in the period T. Of the included brands, brands other than the one with the shortest remaining period are set as the yield curve estimation target Vp (step S61).

また、データ抽出部102は、期間Tに残存期間に含まれる銘柄のうちイールドカーブ推定対象Vpに含まれない銘柄を、価格算出対象Vcに設定する(ステップS63)。そして処理は呼出元の処理に戻る。   Further, the data extraction unit 102 sets a brand that is not included in the yield curve estimation target Vp among the brands included in the remaining period in the period T as the price calculation target Vc (step S63). Then, the process returns to the caller process.

このような処理を実行することによって、空白期間T又は擬似的に生成される空白期間に相当する期間T0において、債券の銘柄をイールドカーブ推定対象Vpと価格算出対象Vcとに分けることができるようになる。 By executing such processing, the bond brands can be divided into yield curve estimation targets Vp and price calculation targets Vc in the blank period T or a period T 0 corresponding to a pseudo blank period. It becomes like this.

なお、イールドカーブ推定対象Vpは、空白期間T又は期間T0において銘柄数を少ない状態にして、そのような状態でも適切なイールドカーブが推定できるか否かを判定できるようにする。 Note that the yield curve estimation target Vp has a small number of issues in the blank period T or the period T 0 so that it can be determined whether or not an appropriate yield curve can be estimated even in such a state.

図3の説明に戻って、制御部104は、n個のイールドカーブ算出手法のうち、未評価の手法を1つ特定する(ステップS5)。そして、制御部104は、第1データ格納部103から、データ選定処理においてイールドカーブ推定対象Vpとして選定された銘柄の債券データのうち、未処理の取引日の債券データを抽出する(ステップS7)。そして、制御部104は、抽出された債券データを含むイールドカーブ推定の要求を、ステップS5で特定された手法に係るイールドカーブ算出部120に出力して、当該イールドカーブ算出部120に、イールドカーブ算出処理を行わせる(ステップS9)。制御部104は、要求先のイールドカーブ算出部120から、処理結果であるイールドカーブのデータを受け取ると、第2データ格納部105に格納する。   Returning to the description of FIG. 3, the control unit 104 identifies one unevaluated method among the n yield curve calculation methods (step S <b> 5). And the control part 104 extracts the bond data of an unprocessed transaction day from the bond data of the brand selected as the yield curve estimation target Vp in the data selection process from the first data storage part 103 (step S7). . Then, the control unit 104 outputs a request for yield curve estimation including the extracted bond data to the yield curve calculation unit 120 according to the method specified in step S5, and the yield curve calculation unit 120 outputs the request to the yield curve calculation unit 120. Calculation processing is performed (step S9). Upon receiving the yield curve data as the processing result from the requested yield curve calculation unit 120, the control unit 104 stores the data in the second data storage unit 105.

その後、評価指標算出部106は、第2データ格納部105に格納されているイールドカーブのデータと、第1データ格納部103に格納されている債券データ(価格算出対象Vc)とを用いて、価格算出対象Vcの各銘柄の推定価格を算出する(ステップS11)。   Thereafter, the evaluation index calculation unit 106 uses the yield curve data stored in the second data storage unit 105 and the bond data (price calculation target Vc) stored in the first data storage unit 103, The estimated price of each brand of the price calculation target Vc is calculated (step S11).

債券データについては、主に基本データを用いることになる。r(t)を、イールドカーブ、t1乃至tLを、その銘柄のキャッシュフローが発生する時点、Lを将来のキャッシュフロー回数、Rをその銘柄の償還額、cを1回の利払い額、Pcを推定価格とすると、推定価格は以下のように表される。 For bond data, basic data is mainly used. r (t) is the yield curve, t 1 to t L is the time when the cash flow of the issue occurs, L is the number of future cash flows, R is the redemption amount of the issue, c is the amount of interest paid once, If Pc is an estimated price, the estimated price is expressed as follows.

Figure 0005911438
Figure 0005911438

図14に模式的に示すようなイールドカーブが得られると、図15に模式的に示すような推定価格(四角印)が算出される。   When a yield curve as schematically shown in FIG. 14 is obtained, an estimated price (square mark) as schematically shown in FIG. 15 is calculated.

そして、評価指標算出部106は、価格算出対象Vcの各銘柄の実際の価格と、各銘柄の対応する推定価格との差の二乗値を算出する(ステップS13)。図16に模式的に示すように、四角印の推定価格と、x印で表される実際の価格との差eijの二乗値が算出される。なお、eijは、i番目の取引日のj番目の銘柄の価格差を表している。そして処理は端子Aを介して図17の処理に移行する。 Then, the evaluation index calculation unit 106 calculates the square value of the difference between the actual price of each brand of the price calculation target Vc and the estimated price corresponding to each brand (step S13). As schematically shown in FIG. 16, the square value of the difference e ij between the estimated price of the square mark and the actual price represented by the x mark is calculated. Note that e ij represents the price difference of the j-th issue on the i-th transaction date. Then, the processing shifts to the processing in FIG.

図17の処理の説明に移行して、制御部104は、第1データ格納部103に格納されている債券データのうち未処理の取引日が存在するか判断する(ステップS15)。未処理の取引日が存在する場合には、処理は端子Bを介して図3のステップS7に戻る。   17, the control unit 104 determines whether there is an unprocessed transaction date among the bond data stored in the first data storage unit 103 (step S15). If there is an unprocessed transaction date, the process returns to step S7 in FIG.

一方、未処理の取引日が存在しない場合には、評価指標算出部106は、価格差の二乗値の平均により、ステップS5で特定されたイールドカーブ算定手法についての評価値を算出し、第3データ格納部107に格納する(ステップS17)。例えば、図18に示すようなデータが、第3データ格納部107に格納される。図18の例では、イールドカーブ算出手法毎に、評価値が登録されるようになっている。   On the other hand, if there is no unprocessed transaction date, the evaluation index calculation unit 106 calculates an evaluation value for the yield curve calculation method specified in step S5 based on the average of the square values of the price differences, and the third The data is stored in the data storage unit 107 (step S17). For example, data as illustrated in FIG. 18 is stored in the third data storage unit 107. In the example of FIG. 18, an evaluation value is registered for each yield curve calculation method.

なお、価格差の二乗値の平均値は評価値の一例であり、価格差の二乗値の総和であっても良いし、価格差の絶対値の平均値であっても良いし、価格差の絶対値の総和であっても良い。さらに、これらの値の逆数を評価値に採用して大きいほど良い値にする場合もある。   The average value of the squares of the price differences is an example of the evaluation value, and may be the sum of the squares of the price differences, the average value of the absolute values of the price differences, It may be the sum of absolute values. Furthermore, the reciprocal of these values may be adopted as the evaluation value to increase the value.

そして、制御部104は、未処理のイールドカーブ算出手法が存在するか判断する(ステップS19)。未処理のイールドカーブ算出手法が存在する場合には、処理は端子Cを介して図3のステップS5に戻る。   Then, the control unit 104 determines whether there is an unprocessed yield curve calculation method (step S19). If there is an unprocessed yield curve calculation method, the process returns to step S5 in FIG.

一方、未処理のイールドカーブ算出手法が存在しない場合には、選択部108は、評価値最小のイールドカーブ算出手法を、適切なイールドカーブ算出手法として選択し(ステップS21)、制御部104に、選択したイールドカーブ算出手法の識別子を通知する。図18の例では、手法1の評価値が最小となるので、手法1が選択される。   On the other hand, when there is no unprocessed yield curve calculation method, the selection unit 108 selects the yield curve calculation method with the smallest evaluation value as an appropriate yield curve calculation method (step S21), and the control unit 104 Notifies the identifier of the selected yield curve calculation method. In the example of FIG. 18, since the evaluation value of method 1 is the minimum, method 1 is selected.

そうすると、制御部104は、債券DB101から、処理時点の債券データを抽出して、選択されたイールドカーブ算出手法に係るイールドカーブ算出部120に出力して、イールドカーブの算出を行わせる(ステップS23)。制御部104は、イールドカーブ算出部120からイールドカーブのデータを受け取ると、第4データ格納部110に格納する。   Then, the control unit 104 extracts bond data at the time of processing from the bond DB 101, and outputs the bond data to the yield curve calculation unit 120 according to the selected yield curve calculation method so that the yield curve is calculated (step S23). ). Upon receiving the yield curve data from the yield curve calculation unit 120, the control unit 104 stores the data in the fourth data storage unit 110.

出力部111は、第4データ格納部110に格納されているイールドカーブのデータを、出力装置に出力する(ステップS25)。   The output unit 111 outputs the yield curve data stored in the fourth data storage unit 110 to the output device (step S25).

このような処理を行うことで、その時々において適切なイールドカーブ算出手法を選択できるようになる。   By performing such processing, an appropriate yield curve calculation method can be selected at any given time.

以上本技術の実施の形態を説明したが、本技術はこれに限定されるものではない。例えば、図1の機能ブロック図は一例であり、プログラムモジュール構成とは一致しない場合がある。また、処理フローについても、処理結果が変わらない限り、処理順番を入れ替えたり、複数の処理ステップを並列に実行しても良い。特に、第1イールドカーブ算出部120a乃至第nイールドカーブ算出部120nについては別々に処理可能であるから、イールドカーブの算出については並列に実行しても良い。さらに、処理時点の前取引日(但し、取引が日ごとに行われる場合。一般的には1単位時間前など追加で発行された債券の価格がない時期。)のnTを基準にTとT0のいずれかを用いる例を示したが、処理時点におけるnTを基準にする場合もある。上で述べたようにnTは、変化しない期間もある程度あるので、処理時点の数日前など、処理時点を基準に定められた取引日においてnTを計数する場合もある。なお、処理時点においてnTを計数する場合には、閾値を変更することで対応可能である。また、上で述べた閾値は一例であって他の閾値を採用しても良い。さらに、ユーザが指定したタイミングで手法を選択する処理を実行する場合には、nT=0であれば処理を行わないような設定を行うようにしても良い。 Although the embodiment of the present technology has been described above, the present technology is not limited to this. For example, the functional block diagram of FIG. 1 is an example, and may not match the program module configuration. As for the processing flow, as long as the processing result does not change, the processing order may be changed or a plurality of processing steps may be executed in parallel. In particular, since the first yield curve calculation unit 120a to the nth yield curve calculation unit 120n can be processed separately, the calculation of the yield curve may be performed in parallel. Furthermore, T is based on n T on the previous transaction date at the time of processing (however, when the transaction is performed every day. Generally, there is no price of additional issued bonds such as one unit time ago). Although an example using any of T 0 has been shown, there is a case where n T at the time of processing is used as a reference. As described above, since n T does not change to some extent, n T may be counted on a transaction date determined based on the processing time, such as several days before the processing time. It should be noted that the case where n T is counted at the time of processing can be handled by changing the threshold value. Moreover, the threshold value described above is an example, and another threshold value may be adopted. Further, when the process of selecting a method at the timing designated by the user is executed, a setting may be made such that the process is not performed if n T = 0.

なお、上で述べた情報処理装置100は、コンピュータ装置であって、図19に示すように、メモリ2501とCPU(Central Processing Unit)2503とハードディスク・ドライブ(HDD:Hard Disk Drive)2505と表示装置2509に接続される表示制御部2507とリムーバブル・ディスク2511用のドライブ装置2513と入力装置2515とネットワークに接続するための通信制御部2517とがバス2519で接続されている。オペレーティング・システム(OS:Operating System)及び本実施例における処理を実施するためのアプリケーション・プログラムは、HDD2505に格納されており、CPU2503により実行される際にはHDD2505からメモリ2501に読み出される。CPU2503は、アプリケーション・プログラムの処理内容に応じて表示制御部2507、通信制御部2517、ドライブ装置2513を制御して、所定の動作を行わせる。また、処理途中のデータについては、主としてメモリ2501に格納されるが、HDD2505に格納されるようにしてもよい。本技術の実施例では、上で述べた処理を実施するためのアプリケーション・プログラムはコンピュータ読み取り可能なリムーバブル・ディスク2511に格納されて頒布され、ドライブ装置2513からHDD2505にインストールされる。インターネットなどのネットワーク及び通信制御部2517を経由して、HDD2505にインストールされる場合もある。このようなコンピュータ装置は、上で述べたCPU2503、メモリ2501などのハードウエアとOS及びアプリケーション・プログラムなどのプログラムとが有機的に協働することにより、上で述べたような各種機能を実現する。   The information processing apparatus 100 described above is a computer apparatus, and as shown in FIG. 19, a memory 2501, a CPU (Central Processing Unit) 2503, a hard disk drive (HDD: Hard Disk Drive) 2505, and a display device. A display control unit 2507 connected to 2509, a drive device 2513 for the removable disk 2511, an input device 2515, and a communication control unit 2517 for connecting to a network are connected by a bus 2519. An operating system (OS) and an application program for executing the processing in this embodiment are stored in the HDD 2505, and are read from the HDD 2505 to the memory 2501 when executed by the CPU 2503. The CPU 2503 controls the display control unit 2507, the communication control unit 2517, and the drive device 2513 according to the processing content of the application program, and performs a predetermined operation. Further, data in the middle of processing is mainly stored in the memory 2501, but may be stored in the HDD 2505. In an embodiment of the present technology, an application program for performing the above-described processing is stored in a computer-readable removable disk 2511 and distributed, and installed from the drive device 2513 to the HDD 2505. In some cases, the HDD 2505 may be installed via a network such as the Internet and the communication control unit 2517. Such a computer apparatus realizes various functions as described above by organically cooperating hardware such as the CPU 2503 and the memory 2501 described above and programs such as the OS and application programs. .

以上述べた本実施の形態をまとめると、以下のようになる。   The above-described embodiment can be summarized as follows.

本技術に係る方式選択方法は、(A)債券毎に当該債券の満期日と価格とを含む債券データを格納するデータ格納部において、残存期間についての所定期間に残存期間が入る債券のうち一部の債券を選択し、(B)選択された債券以外の債券のうち少なくとも一部の債券の債券データを用いて、複数の所定方式の各々に従って、金利と残存期間との関係を表す曲線を推定し、(C)複数の所定方式の各々について、推定された曲線と、選択された債券の債券データとから、選択された債券の価格を算出し、(D)複数の所定方式の各々について、選択された債券の債券データに含まれる価格と、算出された価格との差に基づく評価値を算出し、(E)複数の所定方式の各々の評価値に基づき、複数の所定方式のうちのいずれかの所定方式を選択する処理を含む。   The method selection method according to the present technology is as follows: (A) In a data storage unit that stores bond data including the maturity date and price of the bond for each bond, one of the bonds whose remaining period falls within a predetermined period of the remaining period. (B) A curve representing the relationship between the interest rate and the remaining period according to each of a plurality of predetermined methods using bond data of at least some bonds among bonds other than the selected bonds. And (C) calculating a price of the selected bond from the estimated curve and bond data of the selected bond for each of the plurality of predetermined methods, and (D) for each of the plurality of predetermined methods. Calculating an evaluation value based on the difference between the price included in the bond data of the selected bond and the calculated price, and (E) based on the evaluation value of each of the plurality of predetermined methods. Select one of the predetermined methods It includes a process for.

このようにすれば、例えば該当する債券が少ない上記所定期間を考慮した上で、金利と残存期間との関係を表す曲線を推定するための適切な所定方式を選択できるようになる。   In this way, for example, an appropriate predetermined method for estimating a curve representing the relationship between the interest rate and the remaining period can be selected in consideration of the predetermined period with a small number of applicable bonds.

上で述べた債券を選択する処理が、(a1)データ格納部において、処理時点又は処理時点を基準に定まる取引時点において残存期間についての第1の所定期間に残存期間が入る債券の数に応じて、第1の所定期間に残存期間が入る債券のうち一部の債券と、第1の所定期間と同じ長さを有する第2の所定期間に残存期間が入る債券のうち一部の債券とのいずれかを選択する処理を含むようにしても良い。例えば、空白期間に対応する第1の所定期間に十分な数の債券が存在しない場合においても、第2の所定期間によって擬似的に空白期間が存在するような状態を生成できるようになる。   The processing for selecting a bond described above is (a1) depending on the number of bonds whose remaining period falls within the first predetermined period of the remaining period at the processing point or transaction point determined based on the processing point in the data storage unit. A portion of bonds that have a remaining period in the first predetermined period, and a part of bonds that have a remaining period in the second predetermined period that has the same length as the first period. A process for selecting one of the above may be included. For example, even when a sufficient number of bonds do not exist in the first predetermined period corresponding to the blank period, it is possible to generate a state in which a blank period exists in a pseudo manner by the second predetermined period.

また、上で述べた債券を選択する処理が、(a2)処理時点より前で第1の所定期間に残存期間が入る債券の数が変化しない期間内の取引についての債券データを抽出する処理を含むようにしても良い。これにより安定した曲線推定を行うためである。   In addition, the above-described processing for selecting a bond includes (a2) a process of extracting bond data for a transaction within a period in which the number of bonds whose remaining period falls within the first predetermined period before the processing time does not change. It may be included. This is for performing stable curve estimation.

さらに、上で述べた価格が、各取引日の価格である場合もある。この場合、上で述べた曲線を推定する処理が、取引日毎に、スポットレートと残存期間との関係を表す曲線を推定する処理を含むようにしても良い。また、上で述べた債券の価格を算出する処理が、取引日毎に、当該取引日の曲線と、選択された全件データとから、選択された債券の価格を算出する処理を含むようにしても良い。そして、上で述べた評価値を算出する処理が、複数の所定方式の各々について、取引日毎に、選択された価格と、選択された債券の債券データに含まれる価格との差に基づく第1の評価値を算出し、複数の所定方式の各々について、第1の評価値から第2の評価値を算出する処理を含むようにしても良い。このようにすれば、より多くのサンプルで評価を行うことができるようになる。   Furthermore, the price mentioned above may be the price of each trading day. In this case, the process for estimating the curve described above may include a process for estimating a curve representing the relationship between the spot rate and the remaining period for each transaction day. Further, the processing for calculating the price of the bond described above may include processing for calculating the price of the selected bond from the curve of the transaction date and all the selected case data for each transaction date. . Then, the process for calculating the evaluation value described above is performed based on the difference between the selected price and the price included in the bond data of the selected bond for each of the plurality of predetermined methods for each trading day. And a process of calculating a second evaluation value from the first evaluation value for each of a plurality of predetermined methods. In this way, evaluation can be performed with more samples.

さらに、上で述べた債券を選択する処理において、残存期間が短い債券を優先して選択するようにしても良い。価格比較を行う債券を適切に選択できる。   Furthermore, in the above-described processing for selecting a bond, a bond having a short remaining period may be preferentially selected. Bonds for price comparison can be selected appropriately.

なお、上で述べたような処理をコンピュータに実行させるためのプログラムを作成することができ、当該プログラムは、例えばフレキシブル・ディスク、CD−ROMなどの光ディスク、光磁気ディスク、半導体メモリ(例えばROM)、ハードディスク等のコンピュータ読み取り可能な記憶媒体又は記憶装置に格納される。なお、処理途中のデータについては、RAM等の記憶装置に一時保管される。   Note that a program for causing a computer to execute the processing described above can be created, and the program includes, for example, a flexible disk, an optical disk such as a CD-ROM, a magneto-optical disk, and a semiconductor memory (for example, ROM). Or a computer-readable storage medium such as a hard disk or a storage device. Note that data being processed is temporarily stored in a storage device such as a RAM.

以上の実施例を含む実施形態に関し、さらに以下の付記を開示する。   The following supplementary notes are further disclosed with respect to the embodiments including the above examples.

(付記1)
債券毎に当該債券の満期日と価格とを含む債券データを格納するデータ格納部において、残存期間についての所定期間に残存期間が入る債券のうち一部の債券を選択し、
選択された前記債券以外の債券のうち少なくとも一部の債券の債券データを用いて、複数の所定方式の各々に従って、金利と残存期間との関係を表す曲線を推定し、
前記複数の所定方式の各々について、推定された前記曲線と、選択された前記債券の債券データとから、選択された前記債券の価格を算出し、
前記複数の所定方式の各々について、選択された前記債券の債券データに含まれる価格と、算出された前記価格との差に基づく評価値を算出し、
前記複数の所定方式の各々の評価値に基づき、前記複数の所定方式のうちのいずれかの所定方式を選択する
処理を含み、コンピュータにより実行される方式選択方法。
(Appendix 1)
In the data storage unit that stores bond data including the maturity date and price of the bond for each bond, select a part of bonds that have a remaining period within a predetermined period of the remaining period,
Estimating a curve representing the relationship between the interest rate and the remaining period according to each of a plurality of predetermined methods using bond data of at least some of the bonds other than the selected bonds,
For each of the plurality of predetermined methods, a price of the selected bond is calculated from the estimated curve and bond data of the selected bond.
For each of the plurality of predetermined methods, calculate an evaluation value based on a difference between the price included in the bond data of the selected bond and the calculated price,
A method selection method executed by a computer, including a process of selecting any one of the plurality of predetermined methods based on an evaluation value of each of the plurality of predetermined methods.

(付記2)
前記債券を選択する処理が、
前記データ格納部において、処理時点又は処理時点を基準に定まる取引時点において残存期間についての第1の所定期間に残存期間が入る債券の数に応じて、前記第1の所定期間に残存期間が入る債券のうち一部の債券と、前記第1の所定期間と同じ長さを有する第2の所定期間に残存期間が入る債券のうち一部の債券とのいずれかを選択する処理
を含む付記1記載の方式選択方法。
(Appendix 2)
The process of selecting the bond is:
In the data storage unit, the remaining period enters the first predetermined period according to the number of bonds whose remaining period falls in the first predetermined period for the remaining period at the processing time or the transaction time determined based on the processing time. Supplementary note 1 including a process of selecting one of the bonds and one of the bonds having a remaining period in the second predetermined period having the same length as the first predetermined period The method selection method described.

(付記3)
前記債券を選択する処理が、
処理時点より前で前記第1の所定期間に残存期間が入る債券の数が変化しない期間内の取引についての債券データを抽出する処理
を含む付記2記載の方式選択方法。
(Appendix 3)
The process of selecting the bond is:
The method selection method according to supplementary note 2, including a process of extracting bond data for a transaction within a period in which the number of bonds whose remaining period falls within the first predetermined period before the processing time point does not change.

(付記4)
前記価格が、各取引日の価格であり、
前記曲線を推定する処理が、取引日毎に、スポットレートと残存期間との関係を表す曲線を推定する処理を含み、
前記債券の価格を算出する処理が、前記取引日毎に、当該取引日の曲線と、選択された全件データとから、選択された前記債券の価格を算出する処理を含み、
前記評価値を算出する処理が、
前記複数の所定方式の各々について、前記取引日毎に、選択された前記価格と、選択された前記債券の債券データに含まれる価格との差に基づく第1の評価値を算出し、
前記複数の所定方式の各々について、前記第1の評価値から第2の評価値を算出する
処理を含む付記1乃至3のいずれか1つ記載の方式選択方法。
(Appendix 4)
The price is the price of each trading day,
The process of estimating the curve includes a process of estimating a curve representing the relationship between the spot rate and the remaining period for each transaction day,
The process of calculating the price of the bond includes a process of calculating the price of the selected bond from the curve of the transaction date and all selected data for each transaction day,
The process of calculating the evaluation value includes
For each of the plurality of predetermined methods, for each trading day, a first evaluation value based on a difference between the selected price and a price included in bond data of the selected bond is calculated,
The method selection method according to any one of supplementary notes 1 to 3, further comprising: calculating a second evaluation value from the first evaluation value for each of the plurality of predetermined methods.

(付記5)
前記債券を選択する処理において、残存期間が短い債券を優先して選択する
付記2記載の方式選択方法。
(Appendix 5)
The method selection method according to claim 2, wherein, in the process of selecting the bond, the bond having a short remaining period is preferentially selected.

(付記6)
債券毎に当該債券の満期日と価格とを含む債券データを格納するデータ格納部において、残存期間についての所定期間に残存期間が入る債券のうち一部の債券を選択し、
選択された前記債券以外の債券のうち少なくとも一部の債券の債券データを用いて、複数の所定方式の各々に従って、金利と残存期間との関係を表す曲線を推定し、
前記複数の所定方式の各々について、推定された前記曲線と、選択された前記債券の債券データとから、選択された前記債券の価格を算出し、
前記複数の所定方式の各々について、選択された前記債券の債券データに含まれる価格と、算出された前記価格との差に基づく評価値を算出し、
前記複数の所定方式の各々の評価値に基づき、前記複数の所定方式のうちのいずれかの所定方式を選択する
処理を、コンピュータに実行させるための方式選択プログラム。
(Appendix 6)
In the data storage unit that stores bond data including the maturity date and price of the bond for each bond, select a part of bonds that have a remaining period within a predetermined period of the remaining period,
Estimating a curve representing the relationship between the interest rate and the remaining period according to each of a plurality of predetermined methods using bond data of at least some of the bonds other than the selected bonds,
For each of the plurality of predetermined methods, a price of the selected bond is calculated from the estimated curve and bond data of the selected bond.
For each of the plurality of predetermined methods, calculate an evaluation value based on a difference between the price included in the bond data of the selected bond and the calculated price,
A method selection program for causing a computer to execute a process of selecting any one of the plurality of predetermined methods based on an evaluation value of each of the plurality of predetermined methods.

(付記7)
債券毎に当該債券の満期日と価格とを含む債券データを格納するデータ格納部において、残存期間についての所定期間に残存期間が入る債券のうち一部の債券を選択する第1選択部と、
選択された前記債券以外の債券のうち少なくとも一部の債券の債券データを用いて、複数の所定方式の各々に従って、金利と残存期間との関係を表す曲線を推定する推定部と、
前記複数の所定方式の各々について、推定された前記曲線と、選択された前記債券の債券データとから、選択された前記債券の価格を算出し、前記複数の所定方式の各々について、選択された前記債券の債券データに含まれる価格と、算出された前記価格との差に基づく評価値を算出する算出部と、
前記複数の所定方式の各々の評価値に基づき、前記複数の所定方式のうちのいずれかの所定方式を選択する第2選択部と、
を含む情報処理装置。
(Appendix 7)
A first selection unit that selects a portion of bonds out of bonds whose remaining period falls within a predetermined period of the remaining period in a data storage unit that stores bond data including a maturity date and a price of the bond for each bond;
An estimation unit that estimates a curve representing a relationship between an interest rate and a remaining period according to each of a plurality of predetermined methods, using bond data of at least some bonds among bonds other than the selected bonds;
The price of the selected bond is calculated from the estimated curve and the bond data of the selected bond for each of the plurality of predetermined methods, and the selected for each of the plurality of predetermined methods. A calculation unit that calculates an evaluation value based on a difference between the price included in the bond data of the bond and the calculated price;
A second selection unit that selects any one of the plurality of predetermined methods based on an evaluation value of each of the plurality of predetermined methods;
An information processing apparatus including:

101 債券DB
102 データ抽出部
103 第1データ格納部
104 制御部
105 第2データ格納部
106 評価指標算出部
107 第3データ格納部
108 選択部
109 設定データ格納部
110 第4データ格納部
111 出力部
112 入力部
120 イールドカーブ算出部
101 Bond DB
102 data extraction unit 103 first data storage unit 104 control unit 105 second data storage unit 106 evaluation index calculation unit 107 third data storage unit 108 selection unit 109 setting data storage unit 110 fourth data storage unit 111 output unit 112 input unit 120 Yield curve calculator

Claims (7)

債券毎に当該債券の満期日と価格とを含む債券データを格納するデータ格納部において、残存期間についての所定期間に残存期間が入る債券のうち一部の債券を選択し、
選択された前記債券以外の債券のうち少なくとも一部の債券の債券データを用いて、複数の所定方式の各々に従って、金利と残存期間との関係を表す曲線を推定し、
前記複数の所定方式の各々について、推定された前記曲線と、選択された前記債券の債券データとから、選択された前記債券の価格を算出し、
前記複数の所定方式の各々について、選択された前記債券の債券データに含まれる価格と、算出された前記価格との差に基づく評価値を算出し、
前記複数の所定方式の各々の評価値に基づき、前記複数の所定方式のうちのいずれかの所定方式を選択する
処理を含み、コンピュータにより実行される方式選択方法。
In the data storage unit that stores bond data including the maturity date and price of the bond for each bond, select a part of bonds that have a remaining period within a predetermined period of the remaining period,
Estimating a curve representing the relationship between the interest rate and the remaining period according to each of a plurality of predetermined methods using bond data of at least some of the bonds other than the selected bonds,
For each of the plurality of predetermined methods, a price of the selected bond is calculated from the estimated curve and bond data of the selected bond.
For each of the plurality of predetermined methods, calculate an evaluation value based on a difference between the price included in the bond data of the selected bond and the calculated price,
A method selection method executed by a computer, including a process of selecting any one of the plurality of predetermined methods based on an evaluation value of each of the plurality of predetermined methods.
前記債券を選択する処理が、
前記データ格納部において、処理時点又は処理時点を基準に定まる取引時点において残存期間についての第1の所定期間に残存期間が入る債券の数に応じて、前記第1の所定期間に残存期間が入る債券のうち一部の債券と、前記第1の所定期間と同じ長さを有する第2の所定期間に残存期間が入る債券のうち一部の債券とのいずれかを選択する処理
を含む請求項1記載の方式選択方法。
The process of selecting the bond is:
In the data storage unit, the remaining period enters the first predetermined period according to the number of bonds whose remaining period falls in the first predetermined period for the remaining period at the processing time or the transaction time determined based on the processing time. A process of selecting either a part of bonds or a part of bonds having a remaining period in a second predetermined period having the same length as the first predetermined period. The method selection method according to 1.
前記債券を選択する処理が、
処理時点より前で前記第1の所定期間に残存期間が入る債券の数が変化しない期間内の取引についての債券データを抽出する処理
を含む請求項2記載の方式選択方法。
The process of selecting the bond is:
The method selection method according to claim 2, further comprising: extracting bond data for a transaction within a period in which the number of bonds whose remaining period falls within the first predetermined period before the processing time point does not change.
前記価格が、各取引日の価格であり、
前記曲線を推定する処理が、取引日毎に、スポットレートと残存期間との関係を表す曲線を推定する処理を含み、
前記債券の価格を算出する処理が、前記取引日毎に、当該取引日の曲線と、選択された全件データとから、選択された前記債券の価格を算出する処理を含み、
前記評価値を算出する処理が、
前記複数の所定方式の各々について、前記取引日毎に、選択された前記価格と、選択された前記債券の債券データに含まれる価格との差に基づく第1の評価値を算出し、
前記複数の所定方式の各々について、前記第1の評価値から第2の評価値を算出する
処理を含む請求項1乃至3のいずれか1つ記載の方式選択方法。
The price is the price of each trading day,
The process of estimating the curve includes a process of estimating a curve representing the relationship between the spot rate and the remaining period for each transaction day,
The process of calculating the price of the bond includes a process of calculating the price of the selected bond from the curve of the transaction date and all selected data for each transaction day,
The process of calculating the evaluation value includes
For each of the plurality of predetermined methods, for each trading day, a first evaluation value based on a difference between the selected price and a price included in bond data of the selected bond is calculated,
The method selection method according to any one of claims 1 to 3, further comprising: calculating a second evaluation value from the first evaluation value for each of the plurality of predetermined methods.
前記債券を選択する処理において、残存期間が短い債券を優先して選択する
請求項2記載の方式選択方法。
The method selection method according to claim 2, wherein in the process of selecting a bond, a bond having a short remaining period is selected with priority.
債券毎に当該債券の満期日と価格とを含む債券データを格納するデータ格納部において、残存期間についての所定期間に残存期間が入る債券のうち一部の債券を選択し、
選択された前記債券以外の債券のうち少なくとも一部の債券の債券データを用いて、複数の所定方式の各々に従って、金利と残存期間との関係を表す曲線を推定し、
前記複数の所定方式の各々について、推定された前記曲線と、選択された前記債券の債券データとから、選択された前記債券の価格を算出し、
前記複数の所定方式の各々について、選択された前記債券の債券データに含まれる価格と、算出された前記価格との差に基づく評価値を算出し、
前記複数の所定方式の各々の評価値に基づき、前記複数の所定方式のうちのいずれかの所定方式を選択する
処理を、コンピュータに実行させるための方式選択プログラム。
In the data storage unit that stores bond data including the maturity date and price of the bond for each bond, select a part of bonds that have a remaining period within a predetermined period of the remaining period,
Estimating a curve representing the relationship between the interest rate and the remaining period according to each of a plurality of predetermined methods using bond data of at least some of the bonds other than the selected bonds,
For each of the plurality of predetermined methods, a price of the selected bond is calculated from the estimated curve and bond data of the selected bond.
For each of the plurality of predetermined methods, calculate an evaluation value based on a difference between the price included in the bond data of the selected bond and the calculated price,
A method selection program for causing a computer to execute a process of selecting any one of the plurality of predetermined methods based on an evaluation value of each of the plurality of predetermined methods.
債券毎に当該債券の満期日と価格とを含む債券データを格納するデータ格納部において、残存期間についての所定期間に残存期間が入る債券のうち一部の債券を選択する第1選択部と、
選択された前記債券以外の債券のうち少なくとも一部の債券の債券データを用いて、複数の所定方式の各々に従って、金利と残存期間との関係を表す曲線を推定する推定部と、
前記複数の所定方式の各々について、推定された前記曲線と、選択された前記債券の債券データとから、選択された前記債券の価格を算出し、前記複数の所定方式の各々について、選択された前記債券の債券データに含まれる価格と、算出された前記価格との差に基づく評価値を算出する算出部と、
前記複数の所定方式の各々の評価値に基づき、前記複数の所定方式のうちのいずれかの所定方式を選択する第2選択部と、
を含む情報処理装置。
A first selection unit that selects a portion of bonds out of bonds whose remaining period falls within a predetermined period of the remaining period in a data storage unit that stores bond data including a maturity date and a price of the bond for each bond;
An estimation unit that estimates a curve representing a relationship between an interest rate and a remaining period according to each of a plurality of predetermined methods, using bond data of at least some bonds among bonds other than the selected bonds;
The price of the selected bond is calculated from the estimated curve and the bond data of the selected bond for each of the plurality of predetermined methods, and the selected for each of the plurality of predetermined methods. A calculation unit that calculates an evaluation value based on a difference between the price included in the bond data of the bond and the calculated price;
A second selection unit that selects any one of the plurality of predetermined methods based on an evaluation value of each of the plurality of predetermined methods;
An information processing apparatus including:
JP2013009784A 2013-01-23 2013-01-23 Method selection method and program, and information processing apparatus Active JP5911438B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2013009784A JP5911438B2 (en) 2013-01-23 2013-01-23 Method selection method and program, and information processing apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2013009784A JP5911438B2 (en) 2013-01-23 2013-01-23 Method selection method and program, and information processing apparatus

Publications (2)

Publication Number Publication Date
JP2014142739A JP2014142739A (en) 2014-08-07
JP5911438B2 true JP5911438B2 (en) 2016-04-27

Family

ID=51423979

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2013009784A Active JP5911438B2 (en) 2013-01-23 2013-01-23 Method selection method and program, and information processing apparatus

Country Status (1)

Country Link
JP (1) JP5911438B2 (en)

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002245238A (en) * 2001-02-21 2002-08-30 Hitachi Ltd Coefficient group estimating system for interest period structural model
JP2003067565A (en) * 2001-08-22 2003-03-07 Nli Research Institute Integrated evaluation system and method for market risk and credit risk
US8788306B2 (en) * 2007-03-05 2014-07-22 International Business Machines Corporation Updating a forecast model

Also Published As

Publication number Publication date
JP2014142739A (en) 2014-08-07

Similar Documents

Publication Publication Date Title
KR101879416B1 (en) Apparatus and method for detecting abnormal financial transaction
US20180253657A1 (en) Real-time credit risk management system
Hagspiel et al. How to escape a declining market: Capacity investment or exit?
WO2019105226A1 (en) Method and device used for predicting effect of marketing activity, and electronic device
US10489865B1 (en) Framework for cash-flow forecasting
JPWO2017221448A1 (en) INFORMATION PROCESSING APPARATUS, INFORMATION PROCESSING METHOD, AND PROGRAM
CN110688433B (en) Path-based feature generation method and device
JP2016522933A (en) Calculating the probability of a defaulting company
RU2015116731A (en) SYSTEMS AND METHODS OF PROVIDING AUTOMATED CORRECTIVE WIRES
DeNicco et al. Jobless recovery: A time series look at the United States
JP6797956B2 (en) Estimator, estimation method and program
CN110796379B (en) Risk assessment method, device and equipment of business channel and storage medium
JP5911438B2 (en) Method selection method and program, and information processing apparatus
WO2020173140A1 (en) Part-time job matching method and system, and storage medium
Kristóf et al. Lifetime Probability of Default Modeling for Hungarian Corporate Debt Instruments.
KR102244705B1 (en) Method for controlling worker inflow into project by reversal adjustment of work unit price between crowdsourcing based similar projects for training data generation
Wu et al. An econometric model of the term structure of interest rates under regime-switching risk
US11521274B2 (en) Cost allocation estimation using direct cost vectors and machine learning
CN115204923A (en) Entity detection method, entity detection device, computer equipment and storage medium
JP5017489B1 (en) Information processing apparatus, information processing method, and program
EP2838065A1 (en) Customer income estimator with confidence intervals
JP6002588B2 (en) Curve estimation method and apparatus
JP5911398B2 (en) Curve estimation method and apparatus
WO2020031199A1 (en) Method and system for valuation and forecasting for entities
Brunel et al. Expected Credit Loss vs. Credit Value Adjustment: A Comparative Analysis

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20150507

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20160226

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20160315

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20160329

R150 Certificate of patent or registration of utility model

Ref document number: 5911438

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250