JP5792599B2 - Building floor construction method - Google Patents

Building floor construction method Download PDF

Info

Publication number
JP5792599B2
JP5792599B2 JP2011252204A JP2011252204A JP5792599B2 JP 5792599 B2 JP5792599 B2 JP 5792599B2 JP 2011252204 A JP2011252204 A JP 2011252204A JP 2011252204 A JP2011252204 A JP 2011252204A JP 5792599 B2 JP5792599 B2 JP 5792599B2
Authority
JP
Japan
Prior art keywords
tatami
temporary frame
floor
gap
corner portion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2011252204A
Other languages
Japanese (ja)
Other versions
JP2013108241A (en
Inventor
智弘 小峯
智弘 小峯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sekisui Chemical Co Ltd
Original Assignee
Sekisui Chemical Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sekisui Chemical Co Ltd filed Critical Sekisui Chemical Co Ltd
Priority to JP2011252204A priority Critical patent/JP5792599B2/en
Publication of JP2013108241A publication Critical patent/JP2013108241A/en
Application granted granted Critical
Publication of JP5792599B2 publication Critical patent/JP5792599B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Floor Finish (AREA)

Description

本発明は、建物の床施工方法に関し、特に、床下地の上に畳を敷設すると共に、畳敷設箇所の外周に沿ってフローリングや見切材といった畳周辺部材を敷設する床施工方法に関する。   The present invention relates to a floor construction method for a building, and more particularly, to a floor construction method for laying a tatami mat on a floor foundation and laying tatami peripheral members such as flooring and parting material along the outer periphery of the tatami laying location.

従来、床下地の上に畳を敷設すると共に、畳敷設箇所の外周に沿ってフローリングや見切材などの畳周辺部材を敷設した床構造が知られている(例えば、特許文献1参照)。
また、この特許文献1には、床下地の上に畳を敷設し、次に、その外周に第1の畳周辺部材としての見切材を固定し、その後、見切材の外周に第2の畳周辺部材としての遮音フローリング材を設置する施工方法が記載されている。
Conventionally, a floor structure is known in which a tatami mat is laid on a floor foundation and tatami peripheral members such as flooring and parting materials are laid along the outer periphery of the tatami laying site (see, for example, Patent Document 1).
Further, in Patent Document 1, a tatami mat is laid on a floor base, and then a parting material as a first tatami peripheral member is fixed to the outer periphery of the tatami mat, and then a second mat is arranged on the outer periphery of the parting material. A construction method for installing a sound insulation flooring material as a peripheral member is described.

特開2006−241704号公報JP 2006-241704 A

しかしながら、上述のように畳の敷設後にその外周に見切材などの畳周辺部材を固定する施工方法では、畳どうし、畳と畳周辺部材の密着度を十分得ることが難しく、畳どうしの間、並びに畳と見切材との間の隙間が大きくなって仕上がり品質の低下を招くおそれがあった。さらに、このように上記隙間が大きくなった場合、再度、隙間を調整する作業が必要になり、施工手間が増す。特に、畳として工場などで大量に生産される規格畳を用いた場合、畳個々が仕上がり寸法誤差を有しており、かつ、施工現場による寸法調整が難しいため、上記問題が生じ易い。
また、上記施工方法とは逆に、先に、床下地に見切材を枠状に設置し、その後、畳を敷設する方法では、上記問題に加え、畳が見切材で形成した枠内に納まりきれない不具合が生じるおそれもあった。この場合も、見切材の位置の調整など施工手間がさらに増す。
However, in the construction method of fixing tatami peripheral members such as parting materials on the outer periphery after laying the tatami mat as described above, it is difficult to obtain sufficient contact between the tatami mats and the tatami peripheral member. In addition, the gap between the tatami mat and the parting material becomes large, and there is a possibility that the quality of the finished product is deteriorated. Further, when the gap becomes large in this way, an operation for adjusting the gap again becomes necessary, and the labor for construction increases. In particular, when standard tatami mats produced in large quantities at factories or the like are used as tatami mats, the tatami mats have finished dimensional errors, and it is difficult to adjust the dimensions at the construction site.
In contrast to the above construction method, in the method in which the parting material is first installed in a frame shape on the floor base, and then the tatami is laid, in addition to the above problem, the tatami fits in the frame formed by the parting material. There was also a risk of problems that could not be solved. In this case as well, construction labor such as adjustment of the position of the parting material is further increased.

本発明は、上述の問題を解決することを目的とするものであり、畳の敷設箇所の外周に畳周辺部材を設置する床構造において、畳相互間並びに畳と畳周辺部材との隙間の管理性を高め仕上がり品質の向上を図ることが可能であり、かつ、施工性に優れる建物の床施工方法を提供することを目的としている。   The present invention aims to solve the above-mentioned problems, and in a floor structure in which tatami peripheral members are installed on the outer periphery of a tatami laying place, management of gaps between tatami mats and between tatami mats and tatami peripheral members. The purpose is to provide a floor construction method for a building that can improve the quality and improve the finished quality, and has excellent workability.

上記目的を達成するために、本発明は、
建物の床下地の上に複数の畳を敷設すると共に、これら複数の畳を敷設する畳敷設箇所の外周を囲んで畳周辺部材を設置する建物の床施工方法であって、
前記畳敷設箇所の外周を囲んで、前記床下地に仮枠を設置する仮枠設置工程と、
前記仮枠内に前記畳を仮置きする畳仮置き工程と、
仮置きした前記畳どうしの間の隙間及び前記畳と前記仮枠との間の隙間の寸法を測定し、前記隙間の寸法から、前記仮枠の設置位置に対する前記畳敷設箇所の外周縁の正規位置を示す矯正値を求める隙間測定工程と、
仮置きした前記畳及び前記仮枠を、前記床下地から取り外す取外工程と、
前記仮枠の設置位置と前記矯正値とに基づいて、前記畳敷設箇所の外周縁の正規位置に畳周辺部材を設置する畳周辺部材設置工程と、
前記畳周辺部材で囲まれた前記畳敷設箇所に前記畳を本設置する畳本設置工程と、
を備えていることを特徴とする建物の床施工方法とした。
In order to achieve the above object, the present invention provides:
A floor construction method for a building in which a plurality of tatami mats are laid on the floor floor of the building, and surrounding members of the tatami laying place for laying the plurality of tatami mats are installed, and tatami peripheral members are installed.
Surrounding the outer periphery of the tatami laying location, a temporary frame installation step of installing a temporary frame on the floor foundation,
Tatami temporary placing step of temporarily placing the tatami in the temporary frame;
Measure the size of the gap between the tatami mats temporarily placed and the gap between the tatami mat and the temporary frame, and from the size of the gap, the outer peripheral edge of the tatami laying position relative to the installation position of the temporary frame A gap measuring step for obtaining a correction value indicating the position;
The removal step of removing the temporarily placed tatami mat and the temporary frame from the floor base,
Based on the installation position of the temporary frame and the correction value, a tatami peripheral member installation step of installing a tatami peripheral member at a normal position of the outer periphery of the tatami laying location;
Tatami book installation step of permanently installing the tatami in the tatami laying location surrounded by the tatami peripheral members,
It was set as the floor construction method of the building characterized by having.

なお、本発明の建物の床施工方法において、
前記隙間測定工程では、前記畳の縦横に沿う方向の間隔である縦方向隙間及び横方向隙間の寸法と各隙間の基準値との差を、それぞれ縦方向と横方向とで合計した値を、それぞれ縦方向と横方向の矯正値とすることが好ましい。
また、前記畳仮置き工程では、前記仮枠においてあらかじめ設定されたコーナー部である基準コーナー部に近い位置から前記畳を仮置きし、
前記畳周辺部材設置工程では、前記基準コーナー部を囲む2辺に配置する前記畳周辺部材は、前記仮枠と同一位置に配置し、前記基準コーナー部の対角である対角コーナー部を囲む残りの2辺に配置する前記畳周辺部材を、前記仮枠の設置位置に対して前記矯正値の分だけずらして配置することが好ましい。
また、前記仮枠設置工程には、前記畳敷設箇所において、前記床下地に対する前記畳上面高さを調整するための捨貼合板を前記床下地上に設置する工程が含まれ、
前記仮枠設置工程では、
まず、前記仮枠を、前記基準コーナー部を囲む2辺に配置し、
次に、前記捨貼合板を、前記2辺の前記仮枠に突き当てて配置し、
さらに、前記捨貼合板の前記対角コーナー部を囲む残りの2辺側では、その外周端縁が前記畳敷設箇所の外周縁に配置されるよう寸法調節を行い、
その後、前記残りの2辺の位置に配置する前記仮枠を、前記捨貼合板の前記残りの2辺の外周端縁に当接させて設置し、
前記畳周辺部材設置工程では、
まず、前記捨貼合板の前記残りの2辺の外周端縁位置が、前記矯正値の分だけずらした位置となるように寸法調整あるいは位置調整した後に、前記捨貼合板を前記床下地に固定し、
次に、前記畳周辺部材を、前記捨貼合板の外周端縁に当接させて、前記畳敷設箇所を囲む四周に設置することが好ましい。
In the building floor construction method of the present invention,
In the gap measurement step, the difference between the vertical gap and the horizontal gap in the direction along the vertical and horizontal directions of the tatami mat and the reference value of each gap, the total value in the vertical and horizontal directions, respectively, It is preferable to set the correction values in the vertical direction and the horizontal direction, respectively.
Moreover, in the tatami mat temporary placing step, the tatami mat is temporarily placed from a position close to a reference corner portion which is a preset corner portion in the temporary frame,
In the tatami peripheral member installation step, the tatami peripheral members arranged on two sides surrounding the reference corner portion are arranged at the same position as the temporary frame and surround a diagonal corner portion which is a diagonal of the reference corner portion. It is preferable that the tatami peripheral members arranged on the remaining two sides are arranged so as to be shifted from the installation position of the temporary frame by the correction value.
In addition, the temporary frame installation step includes a step of installing on the floor foundation a scraping plate for adjusting the tatami upper surface height with respect to the floor foundation in the tatami laying location,
In the temporary frame installation step,
First, the temporary frame is arranged on two sides surrounding the reference corner portion,
Next, the scraping and pasting plate is placed against the temporary frame on the two sides,
Furthermore, on the remaining two sides surrounding the diagonal corner portion of the scraped plywood, the dimensions are adjusted so that the outer peripheral edge is arranged on the outer peripheral edge of the tatami laying place,
Then, the temporary frame to be arranged at the position of the remaining two sides is placed in contact with the outer peripheral edge of the remaining two sides of the scraping and bonding board,
In the tatami peripheral member installation process,
First, after adjusting the size or position so that the outer peripheral edge position of the remaining two sides of the scraping board is shifted by the correction value, the scraping board is fixed to the floor base,
Next, it is preferable that the tatami peripheral member is placed on the four circumferences surrounding the tatami laying place by bringing the tatami peripheral member into contact with the outer peripheral edge of the scraping and laminating board.

本発明の建物の床施工方法では、畳敷設箇所の外周を囲んで設置した仮枠内に、畳を仮置きし、このときの畳どうし間及び畳と畳周辺部材との隙間の寸法を測定して矯正値を求め、この矯正値に基づいて畳周辺部材を正規位置に設置し、その後、正規位置に配置した畳周辺部材の内側に畳を本設置するようにした。
したがって、畳の敷設の後に見切材を設置する場合と比較して、畳どうし及び畳と畳周辺部材との間の隙間が、設定値よりも大きくならないようにできる。また、畳周辺部材を正規位置に配置できるため、先に畳周辺部材を固定しても、畳周辺部材どうしの間隔が狭くなって畳を入れることができない不具合も生じることがない。
よって、畳相互間並びに畳と畳周辺部材との隙間の管理性を高め仕上がり品質の向上を図ることができ、かつ、施工性にも優れる。
In the building floor construction method of the present invention, tatami mats are temporarily placed in a temporary frame that surrounds the outer periphery of the tatami laying location, and the dimensions of the gaps between the tatami mats and the tatami mat and surrounding tatami mat members are measured. Then, the correction value is obtained, and the tatami peripheral member is installed at the normal position based on the correction value, and then the tatami mat is installed inside the tatami peripheral member arranged at the normal position.
Therefore, the gap between the tatami mats and the tatami mat and the tatami peripheral member can be prevented from becoming larger than the set value as compared with the case where the parting material is installed after laying the tatami mats. In addition, since the tatami peripheral member can be arranged at the normal position, even if the tatami peripheral member is fixed first, the interval between the tatami peripheral members is narrowed so that the tatami cannot be inserted.
Therefore, the manageability of the gap between the tatami mats and between the tatami mats and the tatami peripheral members can be improved to improve the finished quality, and the workability is also excellent.

また、隙間測定工程において、畳の縦横に沿う方向の間隔である縦方向隙間及び横方向隙間の寸法と各隙間の基準値との差を、それぞれ縦方向と横方向とで合計した値を、それぞれ縦方向と横方向の矯正値とするものでは、下記の効果を得ることができる。
すなわち、仮枠の設置時の位置精度は低くて済みながら、これを基準として畳周辺部材の適正な設置位置を簡単に正確に求めることができる。そして、これら矯正値により、対向して配置される畳周辺部材の正規の間隔を仮枠の設置位置を基準として求めることができる。
Further, in the gap measurement step, the difference between the vertical gap and the horizontal gap in the direction along the vertical and horizontal directions of the tatami mat and the reference value of each gap, the total value in the vertical and horizontal directions, respectively, With the correction values in the vertical and horizontal directions, the following effects can be obtained.
That is, although the position accuracy at the time of installation of the temporary frame may be low, an appropriate installation position of the tatami peripheral member can be easily and accurately obtained based on this. And with these correction values, it is possible to determine the normal interval between the tatami peripheral members arranged facing each other with the installation position of the temporary frame as a reference.

また、畳仮置き工程において、前記仮枠においてあらかじめ設定されたコーナー部である基準コーナー部に近い位置から前記畳を仮置きし、畳周辺部材設置工程において、前記基準コーナー部を囲む2辺に配置する前記畳周辺部材は、前記仮枠と同一位置に配置し、前記基準コーナー部の対角である対角コーナー部を囲む残りの2辺に配置する前記畳周辺部材を、前記仮枠の設置位置に対して前記矯正値の分だけずらして配置するものでは、下記の効果を得ることができる。
すなわち、畳敷設箇所の四周を囲む畳周辺部材のうち、位置を調整するのが2辺に配置するものだけで済むので、四周の全ての畳周辺部材の位置を調整するのと比較して、作業性に優れる。
Further, in the tatami mat temporary placing step, the tatami mat is temporarily placed from a position close to a reference corner portion that is a preset corner portion in the temporary frame, and in the tatami peripheral member installing step, two sides surrounding the reference corner portion are placed. The tatami peripheral member to be arranged is arranged at the same position as the temporary frame, and the tatami peripheral member to be arranged on the remaining two sides surrounding the diagonal corner portion that is a diagonal of the reference corner portion is disposed on the temporary frame. The following effects can be obtained with the arrangement shifted from the installation position by the correction value.
In other words, among the tatami peripheral members surrounding the four laps of the tatami laying location, only the ones arranged on the two sides need to be adjusted in position, so compared to adjusting the positions of all the tatami peripheral members on the four laps, Excellent workability.

また、前記仮枠設置工程には、前記畳敷設箇所において、前記床下地に対する前記畳上面高さを調整するための捨貼合板を前記床下地上に設置する工程が含まれ、前記仮枠設置工程では、まず、前記仮枠を、前記基準コーナー部を囲む2辺に配置し、次に、前記捨貼合板を、前記2辺の前記仮枠に突き当てて配置し、さらに、前記捨貼合板の前記対角コーナー部を囲む残りの2辺側では、その外周端縁が前記畳敷設箇所の外周縁に配置されるよう寸法調節を行い、その後、前記残りの2辺の位置に配置する前記仮枠を、前記捨貼合板の前記残りの2辺の外周端縁に当接させて設置し、前記畳周辺部材設置工程では、まず、前記捨貼合板の前記残りの2辺の外周端縁位置が、前記矯正値の分だけずらした位置となるように寸法調整あるいは位置調整した後に、前記捨貼合板を前記床下地に固定し、次に、前記畳周辺部材を、前記捨貼合板の外周端縁に当接させて、前記畳敷設箇所を囲む四周に設置した場合、下記の効果を得ることができる。
すなわち、畳周辺部材の設置の際には、畳周辺部材を、捨貼合板の外周端縁に当接させて設置するだけで正規位置に設置することができ、床下地に対する位置を計測や調整しながら設置する作業が不要であり作業性に優れる。
しかも、このような良好な作業性を得るのに、床下地に対する畳の表面高さを調節する捨貼合板を利用しているため、畳周辺部材の位置を調整するための部材を別途設定するのと比較して、コスト的に有利である。
In addition, the temporary frame installation step includes a step of installing on the floor foundation a scraping plate for adjusting the tatami mat upper surface height with respect to the floor foundation at the tatami laying location. In the temporary frame installation step, First, the temporary frame is disposed on two sides surrounding the reference corner portion, and then the scraping plate is disposed so as to abut against the temporary frame on the two sides, and further, the pair of the scraping plates On the remaining two sides surrounding the corner portion, the size adjustment is performed so that the outer peripheral edge is arranged on the outer peripheral edge of the tatami laying place, and then the temporary frame arranged at the position of the remaining two sides In the tatami peripheral member installation step, first, the outer peripheral edge positions of the remaining two sides of the scraping plate are the corrections. Dimension adjustment or position to be shifted by the value After adjusting, when the flooring board is fixed to the floor base, and then the tatami peripheral member is brought into contact with the outer peripheral edge of the flooring board, and installed around the tatami laying place, the following, The effect of can be obtained.
In other words, when installing the tatami peripheral member, the tatami peripheral member can be installed at the normal position simply by contacting the outer peripheral edge of the littering board, and the position relative to the floor base is measured and adjusted. However, the installation work is unnecessary and the workability is excellent.
In addition, in order to obtain such good workability, a scraping board that adjusts the surface height of the tatami mat with respect to the floor base is used, so a member for adjusting the position of the tatami peripheral member is set separately. This is advantageous in terms of cost.

図1は、本発明の実施の形態の建物の床施工方法における畳本設置工程の終了直前の床構造を示す斜視図である。FIG. 1 is a perspective view showing the floor structure immediately before the end of the tatami mat installation process in the building floor construction method according to the embodiment of the present invention. 図2は、実施の形態の建物の床施工方法における仮枠設置工程の実施前の時点の状態を示す平面図である。FIG. 2 is a plan view illustrating a state before the temporary frame installation step in the building floor construction method according to the embodiment. 図3は、実施の形態の建物の床施工方法における仮枠設置工程において、基準コーナー部に2本の木桟を仮固定する作業を説明するための斜視図である。FIG. 3 is a perspective view for explaining an operation of temporarily fixing two wooden crosspieces to a reference corner portion in the temporary frame installation step in the building floor construction method according to the embodiment. 図4は、実施の形態の建物の床施工方法における仮枠設置工程において、捨貼合板の設置途中の状態を示す斜視図である。Drawing 4 is a perspective view showing the state in the middle of installation of a lump board in the temporary frame installation process in the floor construction method of the building of an embodiment. 図5は、実施の形態の建物の床施工方法における仮枠設置工程において、捨貼合板の設置後に、残りの2本の木桟を設置する過程を示す平面図である。FIG. 5 is a plan view showing a process of installing the remaining two wooden crosspieces after the installation of the litter laminate in the temporary frame installation process in the building floor construction method of the embodiment. 図6は、実施の形態の建物の床施工方法における畳仮置き工程及び隙間測定工程を示す斜視図である。FIG. 6 is a perspective view showing a tatami mat temporary placing step and a gap measuring step in the building floor construction method of the embodiment. 図7は実施の形態の建物の床施工方法における隙間測定工程を説明するための要部を拡大した平面図である。FIG. 7 is an enlarged plan view of a main part for explaining a gap measuring step in the building floor construction method of the embodiment. 図8は、実施の形態の建物の床施工方法における畳周辺部材設置工程の途中過程を説明するための平面図である。Drawing 8 is a top view for explaining the middle process of the tatami peripheral member installation process in the floor construction method of the building of an embodiment. 図9は、実施の形態の建物の床施工方法における畳周辺部材設置工程の途中過程を説明するための斜視図である。FIG. 9 is a perspective view for explaining an intermediate process of a tatami peripheral member installation process in the building floor construction method of the embodiment. 図10は、実施の形態の建物の床施工方法の畳周辺部材設置工程を説明するための一部を切断した状態の斜視図である。FIG. 10 is a perspective view of a state where a part of the tatami peripheral member installation process of the building floor construction method according to the embodiment is cut. 図11は、実施の形態の建物の床施工方法における畳周辺部材設置工程の途中過程を示す斜視図である。FIG. 11 is a perspective view illustrating an intermediate process of a tatami peripheral member installation process in the building floor construction method of the embodiment. 図12は、実施の形態の建物の床施工方法に用いる畳を示す図であり(a)は畳の端縁部の断面図であり、(b)は畳の平面図である。Drawing 12 is a figure showing the tatami used for the floor construction method of the building of an embodiment, (a) is a sectional view of the edge part of tatami, (b) is a top view of a tatami.

以下、本発明の実施の形態の建物の床施工方法について、添付図面を参照しながら説明する。
この実施の形態の建物の床施工方法を説明するのにあたり、まず、この施工方法を適用する床の構造について図1に基づいて簡単に説明する。
Hereinafter, a building floor construction method according to an embodiment of the present invention will be described with reference to the accompanying drawings.
In describing the floor construction method for a building according to this embodiment, first, the structure of a floor to which this construction method is applied will be briefly described with reference to FIG.

図1は、実施の形態の建物の床施工方法により施工された床構造を示す斜視図である。この床構造は、部屋RMの床FLの外周にフローリング材(畳周辺部材)10と見切材(畳周辺部材)30とが枠状に設置され、その内側に複数の畳20が敷設された構造となっている。なお、見切材30は、枠全体を指す場合の符号は30と標記するが、特に、設置位置に応じて特定のものを指す場合には符号30の後に(a)(b)(c)(d)を付して区別する。   FIG. 1 is a perspective view showing a floor structure constructed by the building floor construction method of the embodiment. In this floor structure, a flooring material (tatami peripheral member) 10 and a parting material (tatami peripheral member) 30 are installed in a frame shape on the outer periphery of the floor FL of the room RM, and a plurality of tatami mats 20 are laid on the inside. It has become. The parting material 30 is denoted by 30 when referring to the entire frame, but in particular, when pointing to a specific object depending on the installation position, the sign 30 is followed by (a) (b) (c) ( d) to distinguish.

畳20は、工場においてあらかじめ決められた寸法に形成された規格品である規格畳を用いており、本実施の形態では、畳20として、図12(b)に示すように、L1=L2の半畳タイプのものを用いている。
また、畳20は、図12(a)に示すように、芯材21の表面に上側クッション材22と畳表23とを順次積層し、芯材21の裏面に段差調整材24a及び下側クッション材24を積層して形成されている。なお、下側クッション材24の外周縁部は、畳表23の折返し部分に対し、端縁が露出しないように接着テープ25で覆われた状態で接着されている。
芯材21としては、例えば、ミディアムデンシティファイバーボードと呼ばれる、木材などの植物繊維を原料として合成樹脂接着剤を加え成型熱圧した板や、発泡樹脂板などを用いることができる。
上側クッション材22及び下側クッション材24としては、例えば、無架橋ポリオレフィンや架橋ポリオレフィンやポリウレタン、ポリスチレン、エラストマー等の合成樹脂発泡体を用いることができる。また、段差調整材24aは、畳表23と同様の厚みの繊維を含む合成樹脂製のシートである。
畳表23としては、従来から畳の畳表として使用されている任意の畳表(例えば、イ草、ポリオレフィン系樹脂、和紙などから製造された畳表)を用いることができる。
The tatami mat 20 uses a standard tatami mat that is a standard product formed in a predetermined size at the factory. In the present embodiment, as the tatami mat 20, as shown in FIG. Semi-tatami mat type is used.
In addition, as shown in FIG. 12A, the tatami 20 is formed by sequentially laminating an upper cushion material 22 and a tatami surface 23 on the surface of the core material 21, and a step adjusting material 24 a and a lower cushion material on the back surface of the core material 21. 24 is laminated. The outer peripheral edge of the lower cushion member 24 is bonded to the folded portion of the tatami surface 23 in a state of being covered with the adhesive tape 25 so that the edge is not exposed.
As the core material 21, for example, a plate called a medium density fiber board, which is obtained by using a plant fiber such as wood as a raw material to which a synthetic resin adhesive is added and heat-molded, a foamed resin plate, or the like can be used.
As the upper cushion material 22 and the lower cushion material 24, for example, synthetic resin foams such as non-crosslinked polyolefin, crosslinked polyolefin, polyurethane, polystyrene, and elastomer can be used. Further, the level difference adjusting member 24 a is a synthetic resin sheet including fibers having the same thickness as the tatami mat 23.
As the tatami table 23, any tatami table conventionally used as a tatami mat table (for example, a tatami table manufactured from grass, polyolefin resin, Japanese paper, etc.) can be used.

(床施工方法)
次に、実施の形態による床施工方法を、図面に基づいて順を追って説明する。
<墨出し工程>
墨出し工程は、部屋RMの畳20を敷設する箇所である畳敷設箇所200の四周を囲む位置に、後述する仮枠40を設置するための墨出しを行なう工程である。
すなわち、図2に示すように、この時点で部屋RMに露出している床下地50の表面に対し、部屋RMの内周縁から、フローリング材10及び見切材30を設置する寸法a,b,c,dだけ離した位置に、墨出し線LX1,LX2,LY1,LY2を引く。
(Floor construction method)
Next, the floor construction method according to the embodiment will be described in order based on the drawings.
<Inking process>
The ink marking process is a process of performing ink marking for installing a temporary frame 40 to be described later at a position surrounding the four circumferences of the tatami laying place 200 that is a place where the tatami 20 of the room RM is laid.
That is, as shown in FIG. 2, the dimensions a, b, c for installing the flooring material 10 and the parting material 30 from the inner periphery of the room RM to the surface of the floor base 50 exposed to the room RM at this time. , D are drawn at positions separated by d, LX1, LX2, LY1, LY2.

<仮枠設置工程>
仮枠設置工程は、床下地50の表面に仮枠40を設置する工程である。
仮枠40は、図5に示す4本の細長い木桟41,42,43,44を、墨出し線LX1,LX2,LY1,LY2の外側に沿って四角枠状に設置するもので、まず、図3に示すように、仮枠40により形成する四角枠のうちの1つのコーナー部である基準コーナー部40cを囲む2辺の位置に2本の木桟41,42を仮固定する。
なお、この仮固定には、本実施の形態では、ビス45を用いるが、その手段はこれに限定されるものではなく、釘などの他の固定具や接着材などを用いることができる。
<Temporary frame installation process>
The temporary frame installation step is a step of installing the temporary frame 40 on the surface of the floor foundation 50.
The temporary frame 40 is a frame in which the four elongated wooden crosspieces 41, 42, 43, and 44 shown in FIG. 5 are installed in a square frame shape along the outside of the inking lines LX1, LX2, LY1, and LY2. As shown in FIG. 3, two wooden crosspieces 41 and 42 are temporarily fixed at positions on two sides surrounding a reference corner portion 40 c that is one corner portion of a square frame formed by the temporary frame 40.
In this embodiment, the screw 45 is used for the temporary fixing, but the means is not limited to this, and other fixing tools such as a nail or an adhesive can be used.

次に、この仮枠設置工程の途中において捨貼合板60を設置する。
この捨貼合板60は、畳敷設箇所200において、図10に示すように床下地50の上に設置する。この捨貼合板60として、本実施の形態では、5枚の合板61〜65を設置する。
この捨貼合板60の設置にあたって、まず、図4に示すように、木桟41と木桟42とにより形成される基準コーナー部40cに近い側に配置され、畳敷設箇所200の範囲内に全体が収まる2枚の合板61,62は、その端縁部を木桟41,42に当接させた状態で、床下地50にフィニッシュネイルなどの固定具66を用いて固定する。
また、全体が畳敷設箇所200の範囲内に納まりきれない3枚の合板63,64,65については、墨出し線LX2,LY2に重なる位置で切断した上で、その外周端縁を先に固定した合板61,62に当接させて床下地50の上に仮置きする。なお、図4において、各合板63〜65の斜線で表示している部分が、切断して切り落とす部分を示しており、非斜線部分を床下地50の上に仮置きする。
Next, the littering board 60 is installed in the middle of this temporary frame installation process.
This discarding and bonding board 60 is installed on the floor foundation 50 as shown in FIG. In the present embodiment, five sheets of plywood 61 to 65 are installed as the discarded plywood 60.
In the installation of the littering board 60, first, as shown in FIG. 4, it is disposed on the side close to the reference corner portion 40c formed by the wooden crosspiece 41 and the wooden crosspiece 42, and the whole is within the range of the tatami laying place 200. The two plywoods 61 and 62 to be accommodated are fixed to the floor base 50 by using a fixture 66 such as a finish nail in a state where the edge portions thereof are in contact with the wooden crosspieces 41 and 42.
Further, the three plywoods 63, 64, 65 that cannot be entirely accommodated within the tatami laying place 200 are cut at positions that overlap the inking lines LX2, LY2, and the outer peripheral edges thereof are fixed first. Temporarily placed on the floor substrate 50 in contact with the plywood 61 and 62. In FIG. 4, the hatched portions of the plywoods 63 to 65 indicate the portions to be cut and cut off, and the non-hatched portions are temporarily placed on the floor base 50.

その後、図5に示すように、木桟43,44を、墨出し線LX2,LY2に沿わせるとともに、合板63〜64の外側端縁に当接させて床下地50に仮固定する。
以上により、仮枠設置工程を終える。
After that, as shown in FIG. 5, the wooden bars 43 and 44 are placed along the inking lines LX <b> 2 and LY <b> 2 and are brought into contact with the outer edges of the plywoods 63 to 64 to be temporarily fixed to the floor base 50.
Thus, the temporary frame installation process is completed.

<畳仮置き工程>
畳仮置き工程は、仮枠40の内側に設定された畳敷設箇所200に畳20を仮置きする工程である。
この畳仮置き工程では、9枚の畳20を、図6に示すように、基準コーナー部40cに近い位置から、それぞれ矢印で示すように図において右上方向に向かって押し当てながら順に捨貼合板60の上に仮置きする。
また、この際、畳20と畳20との間に形成される隙間201(図7参照)は、畳敷設箇所200の外周縁に沿う方向である縦横両方向に直線状に並ぶように、各畳20の配置を入れ替えて調節するのが好ましい。
<Tatami temporary storage process>
The tatami mat temporary placing process is a process of temporarily placing the tatami mat 20 on the tatami laying place 200 set inside the temporary frame 40.
In this tatami mat temporary placing step, the nine tatami mats 20 are disposed in order, while being pressed from the position close to the reference corner portion 40c toward the upper right direction in the drawing as shown by arrows, as shown in FIG. Temporarily place on top.
At this time, the gaps 201 (see FIG. 7) formed between the tatami 20 and the tatami 20 are arranged in a straight line in both the vertical and horizontal directions along the outer peripheral edge of the tatami laying place 200. It is preferable to adjust by changing the arrangement of the twenty.

<隙間測定工程>
隙間測定工程は、仮置きを終えた畳20どうしの間、並びに畳20と仮枠40との間に形成される隙間201の寸法を測定する工程である。
<Gap measurement process>
The gap measuring step is a step of measuring the dimension of the gap 201 formed between the tatami mats 20 that have been temporarily placed and between the tatami mat 20 and the temporary frame 40.

これらの隙間201は、図7に示すように、金尺100などの測定具を用いて測定する。ここで、図6及び図7に示すように、両図において左右方向をx(この方向を、以下、横方向とする)とし、各隙間201の寸法をそれぞれ、Sx1〜Sx4とする。また、両図において前後方向をy(この方向を、以下、縦方向とする)とし、各隙間201の寸法をSy1〜Sy4とする。   These gaps 201 are measured using a measuring tool such as a metal scale 100 as shown in FIG. Here, as shown in FIGS. 6 and 7, the left-right direction is x (this direction is hereinafter referred to as a horizontal direction) and the dimensions of the gaps 201 are Sx1 to Sx4, respectively. In both figures, the front-rear direction is y (this direction is hereinafter referred to as the vertical direction), and the dimensions of the gaps 201 are Sy1 to Sy4.

そして、各隙間201の寸法Sx1,Sx2,Sx3,Sx4,Sy1,Sy2,Sy3,Sy4の測定を終えると、次に、矯正値Kx,Kyを求める。
これらの矯正値Kx,Kyは、それぞれ、横方向の矯正値Kxと、縦方向の矯正値Kyとが存在し、これらは、各隙間201の寸法からそれぞれ基準値Saを差し引いた数値を合計して矯正値Kx,Kyを求める。なお、基準値Saは、目標とする隙間寸法である。
Kx=(Sx1−Sa)+(Sx2−Sa)+(Sx3−Sa)+(Sx4−Sa)
Ky=(Sy1−Sa)+(Sy2−Sa)+(Sy3−Sa)+(Sy4−Sa)
なお、畳20は、相互に密着するように敷設するのが一般的であって、基準値Saは、1mm未満の僅かな寸法に設定する。
Then, when the measurement of the dimensions Sx1, Sx2, Sx3, Sx4, Sy1, Sy2, Sy3, Sy4 of each gap 201 is completed, next, correction values Kx, Ky are obtained.
These correction values Kx and Ky each have a horizontal correction value Kx and a vertical correction value Ky. These values are obtained by adding the numerical values obtained by subtracting the reference value Sa from the dimensions of the gaps 201, respectively. The correction values Kx and Ky are obtained. The reference value Sa is a target gap size.
Kx = (Sx1-Sa) + (Sx2-Sa) + (Sx3-Sa) + (Sx4-Sa)
Ky = (Sy1-Sa) + (Sy2-Sa) + (Sy3-Sa) + (Sy4-Sa)
The tatami mat 20 is generally laid so as to be in close contact with each other, and the reference value Sa is set to a small dimension of less than 1 mm.

したがって、矯正値Kx,Kyがプラスの場合、現在の仮枠40の位置では、現在の隙間の合計が矯正値Kx,Kyの分だけ大き過ぎることを意味する。すなわち、仮枠40間の間隔が矯正値Kx,Kyの分だけ大き過ぎることを意味する。一方、矯正値Kx,Kyがマイナスの場合は、現在の仮枠40の位置では、現在の隙間の合計が矯正値Kx,Kyの分だけ不足することを意味する。すなわち、仮枠40間の間隔が矯正値Kx,Kyの分だけ不足することを意味する。   Therefore, when the correction values Kx and Ky are positive, it means that the current total gap is too large by the correction values Kx and Ky at the current temporary frame 40 position. That is, it means that the interval between the temporary frames 40 is too large by the correction values Kx and Ky. On the other hand, when the correction values Kx and Ky are negative, it means that the current gap is insufficient at the current temporary frame 40 by the correction values Kx and Ky. That is, the interval between the temporary frames 40 is insufficient by the correction values Kx and Ky.

<畳取外工程(取外工程)>
畳取外工程は、畳敷設箇所200に仮置きした畳20を、全て捨貼合板60上から取り外す工程である。
<Tatami removal process (removal process)>
The tatami removal process is a process of removing all the tatami mats 20 temporarily placed on the tatami laying place 200 from the lump-bonding board 60.

<仮枠取外工程(取外工程)>
仮枠取外工程は、床下地50に設置していた仮枠40を、全て床下地50から取り外す工程である。
<Temporary frame removal process (removal process)>
The temporary frame removing step is a step of removing all the temporary frames 40 installed on the floor base 50 from the floor base 50.

<捨貼合板再調整工程>
本実施の形態では、仮枠取外工程の後に、捨貼合板再調整工程を実施するもので、この捨貼合板再調整工程は、捨貼合板60のうちで、床下地50に仮置き状態の合板63〜65を、矯正値Kx,Kyに応じて、寸法あるいは設置位置を再調整する工程である。
<Discarded plywood readjustment process>
In the present embodiment, after the temporary frame removing step, the scraping and pasting board readjustment step is carried out. ˜65 is a step of readjusting the size or the installation position according to the correction values Kx, Ky.

この工程では、横方向の矯正値Kxがプラスの場合、合板63及び合板65の横方向の寸法を矯正値Kxの分(図8において斜線で示す部分)だけカットした後、再び、元の位置に配置して床下地50に固定具66(図4参照)を用いて固定する。
一方、横方向の矯正値Kxがマイナスの場合は、合板63及び合板65を、仮置きしていた位置から、矯正値Kxの分だけ、合板62から図8において左方向に離して配置した後、固定具66(図4参照)を用いて固定する。
In this step, when the lateral correction value Kx is positive, the lateral dimensions of the plywood 63 and the plywood 65 are cut by the correction value Kx (the portion indicated by the slanted line in FIG. 8), and then the original position again. And fixed to the floor base 50 using a fixture 66 (see FIG. 4).
On the other hand, when the lateral correction value Kx is negative, after the plywood 63 and the plywood 65 are arranged away from the plywood 62 in the left direction in FIG. 8 by the correction value Kx from the temporarily placed position. The fixing tool 66 (see FIG. 4) is used for fixing.

また、縦方向の矯正値Kyがプラスの場合、合板64及び合板65の縦方向の寸法を矯正値Kyの分(図8において斜線で示す部分)だけカットした後、再び、元の位置に配置して床下地50に固定具66(図4参照)を用いて固定する。
一方、矯正値Kyがマイナスの場合は、合板64及び合板65を、仮置きしていた位置から、矯正値Kyの分だけ、合板61〜63に対して図において縦方向に離して配置した後、固定具66(図4参照)を用いて固定する。
If the correction value Ky in the vertical direction is positive, the vertical dimension of the plywood 64 and the plywood 65 is cut by the correction value Ky (the portion indicated by the slanted line in FIG. 8) and then placed again at the original position. And it fixes to the floor base 50 using the fixing tool 66 (refer FIG. 4).
On the other hand, when the correction value Ky is negative, after the plywood 64 and the plywood 65 are arranged apart from the plywood 61 to 63 in the vertical direction in the drawing by the correction value Ky from the temporarily placed position. The fixing tool 66 (see FIG. 4) is used for fixing.

<見切材設置工程(畳周辺部材設置工程)>
見切材設置工程は、畳周辺部材としての見切材30を、仮枠40の設置位置に対して矯正値Kx,Kyに応じた分だけずらして設置する工程である。
<Parting material installation process (Tatami peripheral member installation process)>
The parting material installation process is a process of installing the parting material 30 as a tatami peripheral member by shifting the parting material 30 by an amount corresponding to the correction values Kx and Ky with respect to the installation position of the temporary frame 40.

この場合、本実施の形態では、基準コーナー部40cを囲む2辺に配置する見切材30(a),30(b)は、仮枠40の木桟41,42と同一位置に設置する。一方、基準コーナー部40cと対角の対角コーナー部40dを囲む2辺の見切材30(c),30(d)は、仮枠40を構成する木桟43,44の設置位置に対して矯正値Kx,Kyに応じた位置にずらして配置する。   In this case, in the present embodiment, the parting materials 30 (a) and 30 (b) arranged on the two sides surrounding the reference corner portion 40c are installed at the same position as the wooden rails 41 and 42 of the temporary frame 40. On the other hand, the parting materials 30 (c), 30 (d) on the two sides surrounding the reference corner portion 40c and the diagonal corner portion 40d diagonal to the reference corner portion 40c are located with respect to the installation positions of the wooden crosspieces 43, 44 constituting the temporary frame 40. The positions are shifted to positions corresponding to the correction values Kx and Ky.

本実施の形態では、この時点で、既に捨貼合板60の合板63〜65の外側縁の位置が仮枠40の設置位置に対して矯正値Kx,Kyに応じた分だけずらして配置している。このため、見切材30を、上記の位置に配置するのにあたり、本実施の形態では、各見切材30(a)(b)(c)(d)を、図9に示すように、捨貼合板60の外周縁に沿って4周に設置するだけでよい。そして、この状態で、見切材30の側方から固定具を打って捨貼合板60の側面に固定するか、あるいは見切材30の上方から固定具を打って床下地50に固定する。
なお、図10に示すように、見切材30は、直方体の木桟状の部材であって、床下地50の上に設置した場合に、その上面が、捨貼合板60の上に設置状態の畳20の上面と、略同一高さに配置される寸法に形成されている。
In the present embodiment, at this time, the positions of the outer edges of the plywoods 63 to 65 of the scraped plywood 60 are already shifted from the installation position of the temporary frame 40 by the amount corresponding to the correction values Kx and Ky. . For this reason, when arranging the parting material 30 in said position, in this Embodiment, each parting material 30 (a) (b) (c) (d) is a rounding board as shown in FIG. It only needs to be installed around the outer periphery of 60 in four rounds. Then, in this state, the fixing tool is hit from the side of the parting material 30 and fixed to the side surface of the discarding laminate 60, or the fixing tool is hit from above the parting material 30 and fixed to the floor base 50.
As shown in FIG. 10, the parting material 30 is a rectangular parallelepiped-like member, and when installed on the floor base 50, the upper surface of the parting material 30 is installed on the littering board 60. It is formed in the dimension arrange | positioned in the upper surface of 20 and substantially the same height.

<フローリング材設置工程(畳周辺部材設置工程)>
フローリング材設置工程は、図10及び図11に示すように、見切材30の外側に沿って、畳周辺部材としてのフローリング材10を設置する工程である。
<Flooring material installation process (Tatami peripheral member installation process)>
As shown in FIGS. 10 and 11, the flooring material installation step is a step of installing the flooring material 10 as a tatami peripheral member along the outside of the parting material 30.

フローリング材10は、図10に示すように、第2の捨貼合板70と重ねて床下地50の上に設置する。なお、第2の捨貼合板70は、フローリング材10の設置時に、フローリング材10の上面が畳20の上面と略同一高さとなるように、その厚さが設定されている。
また、フローリング材10と第2の捨貼合板70との積層は、あらかじめ工場などで行なっていてもよいし、施工現場で行なってもよい。
As shown in FIG. 10, the flooring material 10 is placed on the floor substrate 50 so as to overlap the second scraping and bonding board 70. In addition, the thickness of the 2nd discarding board 70 is set so that the upper surface of the flooring material 10 may become substantially the same height as the upper surface of the tatami 20 at the time of installation of the flooring material 10.
Moreover, lamination | stacking with the flooring material 10 and the 2nd discarding board 70 may be previously performed at the factory etc., and may be performed at a construction site.

<畳本設置工程>
畳本設置工程は、畳20を、見切材30で囲まれた畳敷設箇所200において捨貼合板60の上に設置する工程である。
この場合、畳20は、それぞれ、畳仮置き工程及び隙間測定工程において、畳敷設箇所200に仮置きした場合と同じ位置に配置する。
<Tatami book installation process>
The tatami mat installation process is a process of installing the tatami 20 on the littering board 60 in the tatami laying place 200 surrounded by the parting material 30.
In this case, the tatami 20 is disposed at the same position as when the tatami 20 is temporarily placed on the tatami laying place 200 in the tatami temporary placing process and the gap measuring process.

また、見切材30は、畳20を敷設した際に、畳20どうしの間及び畳20と見切材30との間の隙間201の寸法が基準値Saとなるよう配置されている。このため、畳20の相互間並びに畳20と見切材30との隙間201を一定寸法とすることができ、畳20として規格畳を用いながらも高い仕上がり品質を得ることができる。また、畳敷設箇所200の寸法が不足して畳20が納まらないという不具合が生じることもない。
したがって、この畳本設置工程の際には、畳20の置き直し作業や見切材30の付け替え作業や寸法調節作業などを行う必要が無く、施工性に優れる。
Moreover, the parting material 30 is arrange | positioned so that the dimension of the clearance gap 201 between the tatami 20 and between the tatami 20 and the parting material 30 may become the reference value Sa when the tatami 20 is laid. For this reason, the gaps 201 between the tatami mats 20 and between the tatami mat 20 and the parting material 30 can be set to a constant size, and high finished quality can be obtained while using standard tatami mats as the tatami mats 20. Moreover, the problem that the size of the tatami laying place 200 is insufficient and the tatami 20 cannot be accommodated does not occur.
Therefore, in this tatami mat installation process, it is not necessary to perform the work of replacing the tatami 20, the work of replacing the parting material 30, the size adjusting work, etc., and the workability is excellent.

以上説明したように、本実施の形態の建物の床施工方法では、以下に列挙する効果を得ることができる。
1)本実施の形態では、
畳敷設箇所200の外周を囲んで仮枠40を設置する仮枠設置工程と、
仮枠40内に畳20を仮置きする畳仮置き工程と、
仮置きした畳20どうしの間の隙間及び畳20と仮枠40との間の隙間の寸法を測定し、これらの隙間の寸法から、仮枠40の設置位置に対する畳敷設箇所200の外周縁の正規位置を示す矯正値Kx,Kyを求める隙間測定工程と、
仮置きした畳20及び仮枠40を、床下地50から取り外す畳取外工程及び仮枠取外工程と、
仮枠40の設置位置と矯正値Kx,Kyとに基づいて、畳敷設箇所200の周囲を囲む位置に、畳周辺部材としての見切材30を設置する見切材設置工程(畳周辺部材設置工程)と、
見切材30で囲まれた畳敷設箇所200に畳20を本設置する畳本設置工程と、
を備えた建物の床施工方法とした。
この床施工方法では、一旦、畳20を仮置きし、その隙間201の寸法Sx1〜4,Sy1〜4に基づいて、矯正値Kx,Kyを求め、この矯正値Kx,Kyに基づいて見切材30の設置位置を決定する。
したがって、畳20の敷設の後に見切材30を設置する場合と比較して、畳20どうし及び畳20と見切材30との間の隙間201が、基準値Saよりも大きくならないようにできる。また、見切材30を正規位置に配置できるため、畳20の本敷設の前に見切材30を固定しても、見切材30どうしの間隔が狭くなって畳20を敷設できない不具合も生じることがない。
よって、畳20として規格畳を用いても、畳20相互間及び畳20と見切材30との隙間が適正値となり、高い仕上がり品質を得ることができる。そして、この際には、畳20の置き直し作業や見切材30の付け替え作業や寸法調節作業などを行う必要が無く、施工性に優れる。
As described above, in the building floor construction method of the present embodiment, the effects listed below can be obtained.
1) In this embodiment,
A temporary frame installation step of installing the temporary frame 40 so as to surround the outer periphery of the tatami laying place 200;
A tatami mat temporary placing step of temporarily placing the tatami mat 20 in the temporary frame 40;
The dimensions of the gap between the temporarily placed tatami mats 20 and the gap between the tatami mat 20 and the temporary frame 40 are measured, and from the dimensions of these gaps, the outer peripheral edge of the tatami laying place 200 with respect to the installation position of the temporary frame 40 is measured. A gap measuring step for obtaining correction values Kx and Ky indicating normal positions;
The tatami mat 20 and the temporary frame 40 that have been temporarily placed, the tatami mat removing step and the temporary frame removing step for removing from the floor base 50, and
A parting material installation process for installing a parting material 30 as a tatami peripheral member at a position surrounding the tatami laying place 200 based on the installation position of the temporary frame 40 and the correction values Kx, Ky (tatami peripheral member installation process). When,
A tatami book installation process in which a tatami 20 is installed in a tatami laying location 200 surrounded by the parting material 30;
The floor construction method of the building equipped with.
In this floor construction method, the tatami 20 is temporarily placed, and the correction values Kx and Ky are obtained based on the dimensions Sx1 to 4 and Sy1 to 4 of the gap 201, and the parting material is obtained based on the correction values Kx and Ky. 30 installation positions are determined.
Therefore, compared with the case where the parting material 30 is installed after laying the tatami 20, the gaps 201 between the tatami 20 and the tatami 20 and the parting material 30 can be prevented from becoming larger than the reference value Sa. Moreover, since the parting material 30 can be arrange | positioned in a regular position, even if it fixes the parting material 30 before the main laying of the tatami mat 20, the space | interval of the parting material 30 becomes narrow and the malfunction which cannot lay the tatami 20 may arise. Absent.
Therefore, even if standard tatami mats are used as the tatami mats 20, the gaps between the tatami mats 20 and between the tatami mats 20 and the parting material 30 are appropriate values, and high finished quality can be obtained. In this case, it is not necessary to perform the replacement work of the tatami 20, the replacement work of the parting material 30, the dimension adjustment work, and the like, and the workability is excellent.

2)実施の形態では、隙間測定工程では、畳20の縦横に沿う方向の間隔である縦方向隙間及び横方向隙間の寸法Sy,Sxと各隙間201の基準値Saとの差を、それぞれ縦方向と横方向とで合計した値を、それぞれ縦方向と横方向の矯正値Ky,Kxとするようにした。
このように、縦方向及び横方向でそれぞれ隙間201の合計値と基準値Saとの差から矯正値Kx,Kyを決定するようにしたため、畳周辺部材としての見切材30の正規の設置位置を簡単に求めることができる。そして、これら矯正値Kx,Kyにより、対向する一対の見切材30(a),30(d)及び見切材30(b),30(c)の正規の間隔を仮枠40の設置位置を基準に求めることができる。
また、仮枠40の設置時の位置精度は低くて済みながら、これを基準として、寸法誤差を有した規格品の畳20に応じた、見切材30の正規の設置位置を正確に把握することができる。
2) In the embodiment, in the gap measuring step, the difference between the vertical gap and the horizontal gap dimensions Sy and Sx, which are intervals in the vertical and horizontal directions of the tatami mat 20, and the reference value Sa of each gap 201, respectively. The total value in the direction and the horizontal direction is set as the correction values Ky and Kx in the vertical direction and the horizontal direction, respectively.
Thus, since the correction values Kx and Ky are determined from the difference between the total value of the gap 201 and the reference value Sa in the vertical direction and the horizontal direction, respectively, the normal installation position of the parting material 30 as the tatami peripheral member is determined. It can be easily obtained. Based on these correction values Kx and Ky, the regular interval between the pair of facing parting materials 30 (a) and 30 (d) and the parting material 30 (b) and 30 (c) is used as a reference for the installation position of the temporary frame 40. Can be requested.
Moreover, although the position accuracy at the time of installation of the temporary frame 40 may be low, the proper installation position of the parting material 30 corresponding to the standard tatami 20 having a dimensional error is accurately grasped based on this. Can do.

3)畳仮置き工程では、仮枠40においてあらかじめ設定されたコーナー部である基準コーナー部40cに近い位置から畳20を仮置きし、
畳周辺部材設置工程では、基準コーナー部40cを囲む2辺に配置する見切材30(a),30(b)は、仮枠40の木桟41,42と同一位置に配置し、対角コーナー部40dを囲む残りの2辺に配置する見切材30(c),30(d)を、仮枠40の木桟43,44の設置位置に対して矯正値Kx,Kyの分だけずらして配置するようにした。
このため、位置を調整するのが4本の見切材30(a)〜(d)のうちの2本の見切材30(c)(d)のみで済むため、4本の見切材30(a)〜(d)の全ての位置を調整するのと比較して、作業性に優れる。
3) In the tatami mat temporary placing step, the tatami mat 20 is temporarily placed from a position close to the reference corner portion 40c which is a preset corner portion in the temporary frame 40,
In the tatami peripheral member installation process, the parting materials 30 (a) and 30 (b) arranged on the two sides surrounding the reference corner portion 40c are arranged at the same position as the wooden crosspieces 41 and 42 of the temporary frame 40, and the diagonal corner. The parting materials 30 (c) and 30 (d) arranged on the remaining two sides surrounding the portion 40 d are arranged so as to be shifted by correction values Kx and Ky with respect to the installation positions of the wooden frames 43 and 44 of the temporary frame 40. I tried to do it.
For this reason, only the two parting materials 30 (c) (d) out of the four parting materials 30 (a) to (d) need to be adjusted, so that the four parting materials 30 (a ) To (d) are excellent in workability as compared with adjusting all positions.

4)仮枠設置工程には、畳敷設箇所200において床下地50上に捨貼合板60を設置する工程が含まれ、
仮枠設置工程では、
まず、仮枠40の木桟41,42を、基準コーナー部40cを囲む2辺に配置し、
次に、捨貼合板60のうちの合板61,62を、2辺の仮枠40の木桟41,42に突き当てて配置し、
さらに、捨貼合板60の対角コーナー部40dを囲む残りの2辺側では、その外周端縁が畳敷設箇所200の外周縁に配置されるよう寸法調節を行い、
その後、残りの2辺の位置に配置する仮枠40(木桟43,44)を、捨貼合板60の前記残りの2辺の外周端縁に当接させて設置し、
畳周辺部材設置工程では、
まず、捨貼合板60の対角コーナー部40dを囲む2辺の外周端縁位置が、矯正値Kx,Kyの分だけずらした位置となるように寸法調整あるいは位置調整した後に、捨貼合板60を床下地50に固定し、
次に、見切材30を、捨貼合板60の外周端縁に当接させて、畳敷設箇所200を囲む四周に設置するようにした。
このように、見切材30は、捨貼合板60の外周端縁に当接させて設置するだけで、矯正値Kx,Kyに基づいて正規の位置に設置することができ、床下地50に対する位置を計測や調整しながら設置する作業が不要であり作業性に優れる。
しかも、このような良好な作業性を得るのに、床下地50に対する畳20の表面高さを調節する捨貼合板60を利用しているため、見切材30の位置を調整するための部材を別途設定するのと比較して、コスト的に有利である。
4) The temporary frame installation process includes a process of installing the lump-bonding board 60 on the floor foundation 50 in the tatami laying place 200,
In the temporary frame installation process,
First, the wooden frames 41 and 42 of the temporary frame 40 are arranged on two sides surrounding the reference corner portion 40c,
Next, the plywoods 61 and 62 of the littering plywood 60 are placed against the wooden crosspieces 41 and 42 of the temporary frames 40 on the two sides,
Furthermore, on the remaining two sides surrounding the diagonal corner portion 40d of the scraping and pasting board 60, dimensional adjustment is performed so that the outer peripheral edge is arranged on the outer peripheral edge of the tatami laying place 200,
After that, the temporary frame 40 (wood bars 43, 44) to be arranged at the remaining two sides is placed in contact with the outer peripheral edges of the remaining two sides of the scraping plate 60,
In the tatami peripheral member installation process,
First, after adjusting the size or adjusting the position so that the outer peripheral edge positions of the two corners surrounding the diagonal corner portion 40d of the scraping plate 60 are shifted by the correction values Kx and Ky, the scraping plate 60 is moved under the floor. Fixed to the ground 50,
Next, the parting material 30 was put in contact with the outer peripheral edge of the scraping and pasting board 60 and installed around the tatami laying place 200.
In this way, the parting material 30 can be installed at a normal position based on the correction values Kx and Ky only by being brought into contact with the outer peripheral edge of the scraping board 60, and the position relative to the floor substrate 50 can be determined. The installation work while measuring and adjusting is unnecessary and the workability is excellent.
In addition, in order to obtain such good workability, a scraping board 60 that adjusts the surface height of the tatami 20 with respect to the floor base 50 is used, so a member for adjusting the position of the parting material 30 is separately provided. Compared with setting, it is advantageous in terms of cost.

以上、本発明の実施の形態について説明したが、本発明はこうした実施の形態に限定されるものではなく、本発明の要旨を逸脱しない範囲内において種々の変形及び置換を加えることができる。   As mentioned above, although embodiment of this invention was described, this invention is not limited to such embodiment, In the range which does not deviate from the summary of this invention, a various deformation | transformation and substitution can be added.

例えば、畳を敷設する部屋としては、実施の形態で示した形状、大きさの部屋に限定されるものではない。要は、床下地の上において畳周辺部材により囲まれた枠状の畳敷設箇所に畳を設置するのであれば、本発明の床施工方法を適用できる。
また、実施の形態では、畳として半畳タイプのものを示したが、これに限定されず、一畳タイプのものを用いてもよい。
For example, a room for laying a tatami is not limited to a room having the shape and size shown in the embodiment. In short, the floor construction method of the present invention can be applied if a tatami is installed on a frame-like tatami laying site surrounded by tatami peripheral members on the floor foundation.
In the embodiment, the semi-tatami mat type is shown as the tatami mat, but the tatami mat is not limited to this, and a tatami mat type may be used.

また、畳周辺部材としては、実施の形態で示した見切材及びフローリング材に限定されるものではなく、例えば、実施の形態で示したフローリング材及び捨貼合板を畳周辺部材とし、実施の形態で示した見切材を介在させることなくこれらフローリング材及び捨貼合板の内周に畳を敷設するようにしてもよい。あるいは、フローリング材を設置することなく見切材のみを設置するようにしてよい。あるいは、実施の形態で示した見切材及びフローリング材以外の部材を畳周辺部材として畳敷設箇所を囲んで設置するようにしてもよい。   Moreover, as a tatami peripheral member, it is not limited to the parting material and flooring material which were shown in embodiment, for example, the flooring material and scraping board shown by embodiment were used as a tatami peripheral member, and in embodiment You may make it lay a tatami | tatami on the inner periphery of these flooring materials and a littering board, without interposing the shown parting material. Or you may make it install only a parting material, without installing a flooring material. Alternatively, members other than the parting material and flooring material shown in the embodiment may be installed surrounding the tatami laying place as tatami peripheral members.

また、実施の形態では、畳と床下地との間に捨貼合板を設置する例を示したが、これに限定されず、畳を床下地の上に直接敷設するようにしてもよい。あるいは、畳と床下地との間に、捨貼合板以外の部材(例えば、断熱材やクッション材など)を介在させるようにしてもよい。   Moreover, in embodiment, although the example which installs a lump board between a tatami and a floor base was shown, it is not limited to this, You may make it lay a tatami directly on a floor base. Or you may make it interpose members (for example, a heat insulating material, a cushioning material, etc.) other than the littering board between the tatami and the floor base.

10 フローリング材(畳周辺部材)
20 畳
30 見切材(畳周辺部材)
40 仮枠
40c 基準コーナー部
40d 対角コーナー部
50 床下地
60 捨貼合板
200 畳敷設箇所
201 隙間
FL 床
Kx,Ky 矯正値
10 Flooring material (Tatami peripheral members)
20 tatami mats 30 parting materials
40 Temporary frame 40c Reference corner portion 40d Diagonal corner portion 50 Floor base 60 Discarding plywood 200 Tatami laying location 201 Clearance FL Floor Kx, Ky Correction value

Claims (4)

建物の床下地の上に複数の畳を敷設すると共に、これら複数の畳を敷設する畳敷設箇所の外周を囲んで畳周辺部材を設置する建物の床施工方法であって、
前記畳敷設箇所の外周を囲んで、前記床下地に仮枠を設置する仮枠設置工程と、
前記仮枠内に前記畳を仮置きする畳仮置き工程と、
仮置きした前記畳どうしの間の隙間及び前記畳と前記仮枠との間の隙間の寸法を測定し、前記隙間の寸法から、前記仮枠の設置位置に対する前記畳敷設箇所の外周縁の正規位置を示す矯正値を求める隙間測定工程と、
仮置きした前記畳及び前記仮枠を、前記床下地から取り外す取外工程と、
前記仮枠の設置位置と前記矯正値とに基づいて、前記畳敷設箇所の外周縁の正規位置に畳周辺部材を設置する畳周辺部材設置工程と、
前記畳周辺部材で囲まれた前記畳敷設箇所に前記畳を本設置する畳本設置工程と、
を備えていることを特徴とする建物の床施工方法。
A floor construction method for a building in which a plurality of tatami mats are laid on the floor floor of the building, and surrounding members of the tatami laying place for laying the plurality of tatami mats are installed, and tatami peripheral members are installed.
Surrounding the outer periphery of the tatami laying location, a temporary frame installation step of installing a temporary frame on the floor foundation,
Tatami temporary placing step of temporarily placing the tatami in the temporary frame;
Measure the size of the gap between the tatami mats temporarily placed and the gap between the tatami mat and the temporary frame, and from the size of the gap, the outer peripheral edge of the tatami laying position relative to the installation position of the temporary frame A gap measuring step for obtaining a correction value indicating the position;
The removal step of removing the temporarily placed tatami mat and the temporary frame from the floor base,
Based on the installation position of the temporary frame and the correction value, a tatami peripheral member installation step of installing a tatami peripheral member at a normal position of the outer periphery of the tatami laying location;
Tatami book installation step of permanently installing the tatami in the tatami laying location surrounded by the tatami peripheral members,
A floor construction method for a building, characterized by comprising:
前記隙間測定工程では、前記畳の縦横に沿う方向の間隔である縦方向隙間及び横方向隙間の寸法と各隙間の基準値との差を、それぞれ縦方向と横方向とで合計した値を、それぞれ縦方向と横方向の矯正値とすることを特徴とする請求項1に記載の建物の床施工方法。   In the gap measurement step, the difference between the vertical gap and the horizontal gap in the direction along the vertical and horizontal directions of the tatami mat and the reference value of each gap, the total value in the vertical and horizontal directions, respectively, The building floor construction method according to claim 1, wherein the correction values are in the vertical direction and the horizontal direction, respectively. 前記畳仮置き工程では、前記仮枠においてあらかじめ設定されたコーナー部である基準コーナー部に近い位置から前記畳を仮置きし、
前記畳周辺部材設置工程では、前記基準コーナー部を囲む2辺に配置する前記畳周辺部材は、前記仮枠と同一位置に配置し、前記基準コーナー部の対角である対角コーナー部を囲む残りの2辺に配置する前記畳周辺部材を、前記仮枠の設置位置に対して前記矯正値の分だけずらして配置することを特徴とする請求項1または請求項2に記載の建物の床施工方法。
In the tatami mat temporary placing step, the tatami mat is temporarily placed from a position close to a reference corner portion which is a preset corner portion in the temporary frame,
In the tatami peripheral member installation step, the tatami peripheral members arranged on two sides surrounding the reference corner portion are arranged at the same position as the temporary frame and surround a diagonal corner portion which is a diagonal of the reference corner portion. The floor of the building according to claim 1 or 2, wherein the tatami peripheral members arranged on the remaining two sides are arranged by being shifted from the installation position of the temporary frame by the correction value. Construction method.
前記仮枠設置工程には、前記畳敷設箇所において、前記床下地に対する前記畳上面高さを調整するための捨貼合板を前記床下地上に設置する工程が含まれ、
前記仮枠設置工程では、
まず、前記仮枠を、前記基準コーナー部を囲む2辺に配置し、
次に、前記捨貼合板を、前記2辺の前記仮枠に突き当てて配置し、
さらに、前記捨貼合板の前記対角コーナー部を囲む残りの2辺側では、その外周端縁が前記畳敷設箇所の外周縁に配置されるよう寸法調節を行い、
その後、前記残りの2辺の位置に配置する前記仮枠を、前記捨貼合板の前記残りの2辺の外周端縁に当接させて設置し、
前記畳周辺部材設置工程では、
まず、前記捨貼合板の前記残りの2辺の外周端縁位置が、前記矯正値の分だけずらした位置となるように寸法調整あるいは位置調整した後に、前記捨貼合板を前記床下地に固定し、
次に、前記畳周辺部材を、前記捨貼合板の外周端縁に当接させて、前記畳敷設箇所を囲む四周に設置することを特徴とする請求項3に記載の建物の床施工方法。
In the temporary frame installation step, in the tatami laying place, a step of installing a scraping and pasting plate on the floor base for adjusting the height of the tatami upper surface with respect to the floor base is included.
In the temporary frame installation step,
First, the temporary frame is arranged on two sides surrounding the reference corner portion,
Next, the scraping and pasting plate is placed against the temporary frame on the two sides,
Furthermore, on the remaining two sides surrounding the diagonal corner portion of the scraped plywood, the dimensions are adjusted so that the outer peripheral edge is arranged on the outer peripheral edge of the tatami laying place,
Then, the temporary frame to be arranged at the position of the remaining two sides is placed in contact with the outer peripheral edge of the remaining two sides of the scraping and bonding board,
In the tatami peripheral member installation process,
First, after adjusting the size or position so that the outer peripheral edge position of the remaining two sides of the scraping board is shifted by the correction value, the scraping board is fixed to the floor base,
4. The building floor construction method according to claim 3, wherein the tatami peripheral member is placed on four sides surrounding the tatami laying place by bringing the tatami peripheral member into contact with an outer peripheral edge of the littering board.
JP2011252204A 2011-11-18 2011-11-18 Building floor construction method Active JP5792599B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2011252204A JP5792599B2 (en) 2011-11-18 2011-11-18 Building floor construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2011252204A JP5792599B2 (en) 2011-11-18 2011-11-18 Building floor construction method

Publications (2)

Publication Number Publication Date
JP2013108241A JP2013108241A (en) 2013-06-06
JP5792599B2 true JP5792599B2 (en) 2015-10-14

Family

ID=48705273

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2011252204A Active JP5792599B2 (en) 2011-11-18 2011-11-18 Building floor construction method

Country Status (1)

Country Link
JP (1) JP5792599B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7009152B2 (en) * 2017-10-06 2022-01-25 積水成型工業株式会社 How to lay system tatami mats

Also Published As

Publication number Publication date
JP2013108241A (en) 2013-06-06

Similar Documents

Publication Publication Date Title
JP5792599B2 (en) Building floor construction method
JP5684753B2 (en) Sound insulation floor structure and construction method of sound insulation floor structure
CN208309942U (en) A kind of floating platform
JP5431089B2 (en) Laying rimless tatami mats
JP2021014730A (en) Floor material set
JP4863938B2 (en) Mounting structure and mounting method of plate material in wall structure using corrugated steel plate
JP2019070253A (en) Installation method for systematic japanese mat
WO2006059058A1 (en) Levelling cradles for supporting a batten and method of supporting a batten
DK2641714T3 (en) A mold system, mold and method for making an element
KR200452954Y1 (en) Soundproofing Frames
JP6559564B2 (en) Bathroom pattern, bathroom construction kit and bathroom construction method
JP6482139B2 (en) Reform method
CN103031935B (en) Blade inserting installed part
JP2007314969A (en) Sound-insulating building material for building, and sound-insulating floor structure of building
CN211396432U (en) Floor base plate and floor base
CN200999403Y (en) Plate type baffle wall
JP4865595B2 (en) Laminated rubber bearing
JP2008050897A (en) Plywood deck panel
JP2018017077A (en) Double floor support leg, double floor structure of using the same and construction method thereof
CN205968897U (en) Table is cut out to lead frame frame plate
WO2007060383A1 (en) Improvements in and relating to tiling
KR101536345B1 (en) Korean room floor paper
JP2008127905A (en) Reversible floor surface structure and set for execution of floor plate
TWM453698U (en) Thermal insulation board for building
JP2018162603A (en) Installation structure of floor material

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20140702

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20150629

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20150714

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20150806

R151 Written notification of patent or utility model registration

Ref document number: 5792599

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R151