JP5780827B2 - Energy management method, energy management program, energy management device, energy management system - Google Patents

Energy management method, energy management program, energy management device, energy management system Download PDF

Info

Publication number
JP5780827B2
JP5780827B2 JP2011108695A JP2011108695A JP5780827B2 JP 5780827 B2 JP5780827 B2 JP 5780827B2 JP 2011108695 A JP2011108695 A JP 2011108695A JP 2011108695 A JP2011108695 A JP 2011108695A JP 5780827 B2 JP5780827 B2 JP 5780827B2
Authority
JP
Japan
Prior art keywords
power
fuel cell
value
output
upper limit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2011108695A
Other languages
Japanese (ja)
Other versions
JP2012244636A (en
Inventor
雅彦 村井
雅彦 村井
谷本 智彦
智彦 谷本
高木 康夫
康夫 高木
祐之 山岸
祐之 山岸
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Original Assignee
Toshiba Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Corp filed Critical Toshiba Corp
Priority to JP2011108695A priority Critical patent/JP5780827B2/en
Publication of JP2012244636A publication Critical patent/JP2012244636A/en
Application granted granted Critical
Publication of JP5780827B2 publication Critical patent/JP5780827B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Description

本発明の実施形態は、エネルギー管理方法、エネルギー管理プログラム、制御装置、エネルギー管理システムに関する。   Embodiments described herein relate generally to an energy management method, an energy management program, a control device, and an energy management system.

太陽光発電と燃料電池を含むエネルギー管理システムにおいては、燃料電池は、給湯負荷(熱負荷)に追従するように運転されているため、電力負荷が小さい場合でも必ずしも電力負荷に追従した運転は行われておらず、不足する電力は、太陽光発電装置や商用系統から受電することで、家電機器による負荷に供給されている(例えば、非特許文献1参照)。   In an energy management system including solar power generation and a fuel cell, the fuel cell is operated so as to follow a hot water supply load (heat load). Therefore, even if the power load is small, the operation is not necessarily performed following the power load. Insufficient power is supplied to a load of home appliances by receiving power from a solar power generation device or a commercial system (for example, see Non-Patent Document 1).

特開2006―121853JP 2006-121853 A

オペレーションズ・リサーチ 第54巻 第6号「家庭用燃料電池コージェネレーションシステムの最適運転制御」325頁〜328頁Operations Research Vol. 54, No. 6, “Optimal Operation Control of Household Fuel Cell Cogeneration System”, pages 325-328

上述した太陽光発電を除く電力システムにおいて受電電力が正の場合には、太陽光発電による発電電力の一部が負荷に供給される。   When the received power is positive in the above-described power system excluding solar power generation, a part of the power generated by solar power generation is supplied to the load.

よって、太陽光発電装置で発電した電力を最大限商用系統に還元することができず、商用系統の電力供給の負担軽減量が最大限行われない。   Therefore, the electric power generated by the solar power generation device cannot be reduced to the commercial system as much as possible, and the burden reduction amount of the electric power supply of the commercial system is not maximized.

本実施形態のエネルギー管理方法、エネルギー管理プログラム、制御装置、エネルギー管理システムは、太陽光発電装置により発電した電力を最大限商用系統に逆潮流させ商用系統からの電力供給量を最大限減らすことを可能とする。   The energy management method, the energy management program, the control device, and the energy management system of the present embodiment are designed to reduce the power supply amount from the commercial system to the maximum by causing the power generated by the photovoltaic power generator to reversely flow to the commercial system. Make it possible.

実施形態によれば、商用系統と連系する太陽光発電装置が電力負荷に給電可能で、且つ、発電電力の余剰電力を前記商用系統に売電可能に接続する回路構成で、前記電力負荷への燃料電池からの出力を制御する制御装置に、前記太陽光発電装置の発電電力が閾値以上か未満かを判定する判定処理と、前記判定処理により閾値以上であると判定され場合には、前記燃料電池の出力上限値を上限として電力負荷の電力需要に基づき燃料電池出力設定値を算出し、前記判定処理により閾値未満であると判定される場合には、使用湯量予測値に基づき燃料電池出力設定値を算出する算出処理と、前記算出処理により算出され前記燃料電池出力設定値に基づき燃料電池を制御する制御処理とを実現させる。
According to the embodiment, the photovoltaic power generation apparatus linked to the commercial system can supply power to the power load, and the circuit configuration connects the surplus power of the generated power to the commercial system so that the power can be sold. of the control device for controlling the output from the fuel cell, a determination process generated power or less or more than the threshold of the photovoltaic device, when said by determination processing Ru is determined to be the threshold value or more, The fuel cell output set value is calculated based on the power demand of the power load with the output upper limit value of the fuel cell as the upper limit, and when it is determined by the determination process that it is less than the threshold value, the fuel cell is based on the predicted hot water usage value a calculating process for calculating the output set values, to realize a control process for controlling the fuel cell based on the fuel cell output setting value that will be calculated by the calculation processing.

第1の実施形態に係るエネルギー管理システムの構成の一例を示すブロック図。The block diagram which shows an example of a structure of the energy management system which concerns on 1st Embodiment. 第1の実施形態に係る太陽光発電の閾値を格納するテーブルの一例を示す図。The figure which shows an example of the table which stores the threshold value of the photovoltaic power generation concerning 1st Embodiment. 第1の実施形態に係る太陽光発電の発電量を格納するテーブルの一例を示す図。The figure which shows an example of the table which stores the electric power generation amount of the solar power generation concerning 1st Embodiment. 第1の実施形態に係る太陽光発電の発電量の一例を示すグラフ。The graph which shows an example of the electric power generation amount of the solar power generation concerning 1st Embodiment. 第1の実施形態に係る過去の使用湯量を格納するテーブルの一例を示す図。The figure which shows an example of the table which stores the past hot water usage which concerns on 1st Embodiment. 第1の実施形態に係る現在の貯湯率を格納するテーブルの一例を示す図。The figure which shows an example of the table which stores the present hot water storage rate which concerns on 1st Embodiment. 第1の実施形態に係る燃料電池出力上限値を格納するテーブルの一例を示す図。The figure which shows an example of the table which stores the fuel cell output upper limit which concerns on 1st Embodiment. 第1の実施形態に係る電力需要量を格納するテーブルの一例を示す図。The figure which shows an example of the table which stores the electric power demand amount which concerns on 1st Embodiment. 第1の実施形態に係る電力需要量の一例を示すグラフ。The graph which shows an example of the electric power demand amount which concerns on 1st Embodiment. 第1の実施形態に係る燃料電池出力設定値を格納するテーブルの一例を示す図。The figure which shows an example of the table which stores the fuel cell output setting value which concerns on 1st Embodiment. 第1の実施形態に係る燃料電池出力の一例を示すグラフ。The graph which shows an example of the fuel cell output which concerns on 1st Embodiment. 第1の実施形態に係る制御装置の動作の一例を示すフローチャート。The flowchart which shows an example of operation | movement of the control apparatus which concerns on 1st Embodiment. 第1の実施形態に係る太陽光発電と電力需要と燃料電池出力を併せて記載したグラフ。The graph which combined and described the photovoltaic power generation concerning 1st Embodiment, an electric power demand, and a fuel cell output. 第2の実施形態に係るエネルギー管理システムの構成の一例を示すブロック図。The block diagram which shows an example of a structure of the energy management system which concerns on 2nd Embodiment. 第2の実施形態に係る蓄電池出力上限値を格納するテーブルの一例を示す図。The figure which shows an example of the table which stores the storage battery output upper limit which concerns on 2nd Embodiment. 第2の実施形態に係る燃料電池・蓄電池出力設定値を格納するテーブルの一例を示す図。The figure which shows an example of the table which stores the fuel cell and storage battery output setting value which concerns on 2nd Embodiment. 第2の実施形態に係る太陽光発電と電力需要と燃料電池・蓄電池出力の一例を示すグラフ。The graph which shows an example of the photovoltaic power generation concerning 2nd Embodiment, an electric power demand, and a fuel cell and storage battery output. 第2の実施形態に係る燃料電池・蓄電池出力設定値を格納するテーブルの一例を示す図。The figure which shows an example of the table which stores the fuel cell and storage battery output setting value which concerns on 2nd Embodiment. 第2の実施形態に係る太陽光発電と電力需要と燃料電池・蓄電池出力の一例を示すグラフ。The graph which shows an example of the photovoltaic power generation concerning 2nd Embodiment, an electric power demand, and a fuel cell and storage battery output. 第2の実施形態に係るエネルギー管理システムの動作の一例を示すフローチャート。The flowchart which shows an example of operation | movement of the energy management system which concerns on 2nd Embodiment. 第2の実施形態に係る受電量を格納するテーブルの一例を示す図。The figure which shows an example of the table which stores the amount of received electric power which concerns on 2nd Embodiment. 第1、第2の実施形態の変形例1を示す図。The figure which shows the modification 1 of 1st, 2nd embodiment. 第1、第2の実施形態の変形例1を示す図。The figure which shows the modification 1 of 1st, 2nd embodiment. 第1、第2の実施形態の変形例2を示す図。The figure which shows the modification 2 of 1st, 2nd embodiment. 第1、第2の実施形態の変形例3を示す図。The figure which shows the modification 3 of 1st, 2nd embodiment.

以下、本エネルギー管理システムの実施形態について、図面を参照しながら説明する。   Hereinafter, embodiments of the energy management system will be described with reference to the drawings.

(第1の実施形態)
図1は、本実施形態に係るエネルギー管理システムの構成の一例を示すブロック図である。
(First embodiment)
FIG. 1 is a block diagram showing an example of the configuration of the energy management system according to the present embodiment.

図1に示す情報提供システムは、制御装置10、太陽光発電装置20、太陽光発電電力計測装置21、商用系統30、燃料電池40、燃料電池貯湯量計測装置41、負荷60、受電端電力計測装置71を含む構成のコンピュータシステムである。太陽光発電装置20、燃料電池40は、商用系統30と連系し、負荷60に給電可能に接続している。太陽光発電装置20、および燃料電池40の発電電力が電力負荷より大きいときは、その余剰電力を商用系統30へ売電し、また、発電電力が電力負荷より小さい場合は、不足分を商用系統30から受電する。
The information providing system shown in FIG. 1 includes a control device 10, a photovoltaic power generation device 20, a photovoltaic power generation power measurement device 21, a commercial system 30, a fuel cell 40, a fuel cell hot water storage amount measurement device 41, a load 60, and a receiving end power measurement. The computer system includes a device 71. The solar power generation device 20 and the fuel cell 40 are connected to the commercial system 30 and connected to the load 60 so that power can be supplied. When the generated power of the solar power generation device 20 and the fuel cell 40 is larger than the power load, the surplus power is sold to the commercial system 30, and when the generated power is smaller than the power load, the shortage is Receive power from 30.

本実施形態において、情報提供システムの構成要素の一つである制御装置10は、処理機能に応じて装置をLAN、イントラネット等を介して組み合わせたコンピュータ群で構成することができる。   In the present embodiment, the control device 10 that is one of the components of the information providing system can be configured by a computer group in which devices are combined via a LAN, an intranet, or the like according to a processing function.

通信ネットワーク1は、一方向または双方向通信可能なネットワーク網である。本実施形態ではネットワーク1はLAN、イントラネット等の有線通信網のごとく記載しているが、各種無線通信網に代替することができる。また有線の接続方法もこれに限られることはない。   The communication network 1 is a network network capable of one-way or two-way communication. In the present embodiment, the network 1 is described as a wired communication network such as a LAN or an intranet, but can be replaced with various wireless communication networks. Also, the wired connection method is not limited to this.

電力伝送ネットワーク2は、電力を伝送するケーブルである。必ずしも有線である必要はなく電磁誘導方式、磁界共鳴方式などの無線給電設備を介して負荷60への電力供給が無線給電によりなされていてもよい。   The power transmission network 2 is a cable for transmitting power. The power supply to the load 60 may be performed by wireless power feeding through a wireless power feeding facility such as an electromagnetic induction method or a magnetic field resonance method.

制御装置10は、CPU100と、RAM(RWM)110と、通信IF120と、入力IF130と、表示IF140と、ROM150と、記憶部160とを含む構成である。その他、USBメモリ等の外部記憶装置を装着するIF(インターフェース)など他のIFを備えていてもよい。   The control device 10 includes a CPU 100, a RAM (RWM) 110, a communication IF 120, an input IF 130, a display IF 140, a ROM 150, and a storage unit 160. In addition, another IF such as an IF (interface) to which an external storage device such as a USB memory is attached may be provided.

CPU100は、ROM150に予め書き込んだ各プログラムをRAM110に読み出し、演算処理を行う演算処理部(例えば、マイクロプロセッサ)である。   The CPU 100 is an arithmetic processing unit (for example, a microprocessor) that reads each program written in advance in the ROM 150 into the RAM 110 and performs arithmetic processing.

RAM(RWM)110は、CPU100がプログラムを実行する際にデータを一次記憶する記憶エリアなどのワーキングエリアとして用いられる。   The RAM (RWM) 110 is used as a working area such as a storage area for temporarily storing data when the CPU 100 executes a program.

通信IF120は、通信部121を接続するインターフェースである。本IFは必須の構成要素ではなくIFを介さず直接サーバ内の配線と接続されていてもよい。   The communication IF 120 is an interface that connects the communication unit 121. This IF is not an essential component and may be directly connected to the wiring in the server without the IF.

通信部121は、太陽光発電装置20、燃料電池装置40や太陽光発電計測装置21、受電端電力計測装置71と通信を行う通信装置、通信手段である。例えば、有線接続の場合はルーター、無線接続の場合はアンテナなどの通信装置である。その他、赤外線通信、可視光通信などを行う通信装置であってもよい。   The communication unit 121 is a communication device or a communication unit that communicates with the solar power generation device 20, the fuel cell device 40, the solar power generation measurement device 21, or the power receiving end power measurement device 71. For example, a communication device such as a router is used for wired connection and an antenna is used for wireless connection. In addition, a communication device that performs infrared communication, visible light communication, or the like may be used.

本実施形態では一つの通信IF、通信部として記載しているが、太陽光発電電力計測装置21、貯湯量計測装置41、受電端電力計測装置71と接続する通信IFを複数設けた形態であってもよい。   In this embodiment, the communication IF is described as one communication IF, but the communication power supply measuring device 21, the hot water storage amount measuring device 41, and the power receiving end power measuring device 71 are provided with a plurality of communication IFs. May be.

入力IF130は、入力部131と制御装置10とを接続するインターフェースである。入力部131からの信号を受けて、CPU100が認識可能な信号への返還などの入力制御がおこなわれてもよい。本IFは必須の構成要素ではなくIFを介さず直接サーバ内の配線と接続されていてもよい。   The input IF 130 is an interface that connects the input unit 131 and the control device 10. Upon receiving a signal from the input unit 131, input control such as returning to a signal that can be recognized by the CPU 100 may be performed. This IF is not an essential component and may be directly connected to the wiring in the server without the IF.

入力部131は、コンピュータ装置が一般に備えている各種キーボードやボタン等の入力制御を行う入力装置、入力手段である。その他、人の発する声を認識することにより、入力信号として認識する機能を備えていてもよい。   The input unit 131 is an input device or an input unit that performs input control of various keyboards and buttons that are generally provided in a computer device. In addition, a function of recognizing an input signal by recognizing a voice uttered by a person may be provided.

表示IF140は、表示部141と制御装置10とを接続するインターフェースである。CPU100から表示IF141を介して表示部141の表示制御がおこなわれてもよいし、本IF内にグラフィックボードなど描画処理を行うLSI(GPU)により表示制御機能を備えさせてもよい。IFを使用せず制御装置10内部に直接接続される形態であってもよい。   The display IF 140 is an interface that connects the display unit 141 and the control device 10. Display control of the display unit 141 may be performed from the CPU 100 via the display IF 141, or a display control function may be provided in this IF by an LSI (GPU) that performs drawing processing such as a graphic board. It may be configured to be directly connected to the inside of the control device 10 without using the IF.

表示部141は、液晶ディスプレイ、有機ELディスプレイ、プラズマディスプレイなどのモニターである。その他、音を発生させる出力機能を備えていてもよい。   The display unit 141 is a monitor such as a liquid crystal display, an organic EL display, or a plasma display. In addition, an output function for generating sound may be provided.

ROM150は、プログラムを記憶するプログラムメモリである。一般的には、データの書き込みはできない非一次記憶媒体が好適であるが、データの読み出し、書き込みが随時できる半導体メモリ等の記憶媒体であってもよい。その他、表示部141へ人が認識可能な文字や図柄を表示させる表示プログラムや各DB、ROMに情報を登録する情報登録プログラムや通信部121の通信を制御する通信制御プログラム等が格納されていてもよい。   The ROM 150 is a program memory that stores programs. In general, a non-primary storage medium that cannot write data is suitable, but a storage medium such as a semiconductor memory that can read and write data at any time may be used. In addition, a display program for displaying characters and symbols that can be recognized by a person on the display unit 141, an information registration program for registering information in each DB and ROM, a communication control program for controlling communication of the communication unit 121, and the like are stored. Also good.

ROM150には、太陽光発電判定プログラム151、使用湯量予測プログラム152、燃料電池出力算出プログラム153、燃料電池制御プログラム154、が格納されている。   The ROM 150 stores a photovoltaic power generation determination program 151, a hot water usage prediction program 152, a fuel cell output calculation program 153, and a fuel cell control program 154.

太陽光発電判定プログラム151は、太陽光発電電力計測装置21によって計測された電力値を発電電力DB161の閾値テーブルに格納されている発電電力下限値と比較する機能をCPU100に実現させる手段である。   The photovoltaic power generation determination program 151 is a means for causing the CPU 100 to realize a function of comparing the power value measured by the photovoltaic power generation power measuring device 21 with the generated power lower limit value stored in the threshold value table of the generated power DB 161.

また、太陽光発電判定プログラム151は、発電電力を比較した結果、太陽光発電電力が発電電力下限値以上である場合には太陽光発電装置による発電がおこなわれていると判定し、発電電力下限値未満である場合には、太陽光発電装置により発電がおこなわれていないと判定する機能をCPU100に実現させる。判定結果は一次RAM110に格納され、次の使用湯量予測に利用される。   Moreover, as a result of comparing the generated power, the photovoltaic power generation determination program 151 determines that power generation by the photovoltaic power generation apparatus is performed when the generated photovoltaic power is equal to or higher than the generated power lower limit value, and the generated power lower limit When it is less than the value, the CPU 100 is caused to realize a function of determining that power generation is not performed by the solar power generation device. The determination result is stored in the primary RAM 110 and is used for the next prediction of hot water usage.

使用湯量予測プログラム152は、1日の使用湯量を過去の使用湯量を用いて予測する機能をCPU100に実現させる手段である。使用湯量予測DB162に格納されている昨年の同じ季節の使用湯量や一週間前の同じ曜日の使用湯量を読み出し、1日の使用湯量の予測値を算出する。その他、外部の気温を併せて使用湯量予測DB162に記憶がなされてる場合はその値を用いて予測値を算出してもよいし、プログラムに組み込まれている数式を用いてもよい。算出した予測値をRAMに一次記憶させる他、次回の処理に利用するため使用湯量予測DB162に格納させてもよい。   The hot water usage prediction program 152 is a means for causing the CPU 100 to realize a function of predicting the daily hot water usage using the past hot water usage. The amount of hot water used in the same season last year stored in the hot water usage prediction DB 162 and the amount of hot water used on the same day of the week before are read out, and a predicted value of the daily hot water usage is calculated. In addition, when the external hot air temperature is stored in the hot water usage prediction DB 162, the predicted value may be calculated using the value, or a mathematical formula incorporated in the program may be used. In addition to temporarily storing the calculated predicted value in the RAM, it may be stored in the hot water usage prediction DB 162 for use in the next processing.

燃料電池出力算出プログラム153は、受電端電力計測装置71で計測された受電端電力がちょうど0(ゼロ)となるように、燃料電池出力設定値を算出する機能をCPU100に実現させる手段である。   The fuel cell output calculation program 153 is a means for causing the CPU 100 to realize a function of calculating the fuel cell output set value so that the power receiving end power measured by the power receiving end power measuring device 71 is exactly 0 (zero).

具体的には、太陽光発電量プログラム151が太陽光発電装置による発電がなされていると判定された場合には、燃料電池出力算出DB163に格納されている燃料電池出力および受電端電力の値を読み出して、
燃料電池出力設定値=燃料電池出力+受電端電力 (数式1)
から燃料電池出力設定値を算出する。この算出した燃料電池出力設定値と燃料電池出力上限値DB163に格納されている燃料電池出力上限値とを比較する。
Specifically, when the photovoltaic power generation amount program 151 determines that the photovoltaic power generation apparatus is generating power, the values of the fuel cell output and the receiving end power stored in the fuel cell output calculation DB 163 are set. Read
Fuel cell output set value = fuel cell output + receiving end power (Formula 1)
To calculate the fuel cell output set value. The calculated fuel cell output set value is compared with the fuel cell output upper limit value stored in the fuel cell output upper limit DB 163.

比較した結果、(数式1)を読み出して算出した燃料電池出力設定値が、燃料電池出力上限値を上回った場合には、燃料電池出力上限値テーブルから値を読み出し
燃料電池出力設定値=燃料電池出力上限値 (数式2)
から(数式1)で算出した燃料電池出力設定値を、燃料電池出力上限値としDB163に格納する。
As a result of the comparison, when the fuel cell output set value calculated by reading (Equation 1) exceeds the fuel cell output upper limit value, the value is read from the fuel cell output upper limit value table, and the fuel cell output set value = fuel cell Output upper limit (Formula 2)
The fuel cell output set value calculated by (Equation 1) is stored in the DB 163 as the fuel cell output upper limit value.

また、太陽光発電量プログラム151が太陽光発電装置による発電がなされていないと判定された場合は、一つ目のステップとして上記(数式1)、(数式2)を使用した算出を行う。さらに、(数式1)または(数式2)で算出された燃料電池出力設定値により燃料電池40が運転された場合の貯湯量の予測値が、使用湯量予測プログラム152を実行して予測された使用湯量を超える場合は、貯湯量計測装置41により計測された貯湯量を貯湯量テーブルから読み出し、燃料電池出力設定値を(数式3)により変更する。   Moreover, when it determines with the photovoltaic power generation amount program 151 not having produced electric power by a photovoltaic power generation apparatus, the calculation using said (Formula 1) and (Formula 2) is performed as a 1st step. Furthermore, the predicted value of the hot water storage amount when the fuel cell 40 is operated with the fuel cell output set value calculated by (Equation 1) or (Equation 2) is predicted by executing the hot water usage prediction program 152. When the amount of hot water is exceeded, the hot water storage amount measured by the hot water storage amount measuring device 41 is read from the hot water storage amount table, and the fuel cell output set value is changed by (Equation 3).

燃料電池出力設定値=(使用湯量予測値−貯湯量)/(運転時間×熱電比) (数式3)
燃料電池制御プログラム154は、燃料電池算出DB163から読み出しまたはRAM110に一次記憶されている燃料電池出力算出プログラム153によって算出された燃料電池出力設定値を燃料電池40へ送信し、燃料電池40の出力が燃料電池出力設定値と一致するように燃料電池40を制御する機能をCPU100に実現させる手段である。
Fuel cell output set value = (Predicted hot water usage-Hot water storage) / (Operating time x Thermoelectric ratio) (Formula 3)
The fuel cell control program 154 transmits the fuel cell output set value calculated by the fuel cell output calculation program 153 read from the fuel cell calculation DB 163 or temporarily stored in the RAM 110 to the fuel cell 40, and the output of the fuel cell 40 is This is a means for causing the CPU 100 to realize the function of controlling the fuel cell 40 so as to coincide with the fuel cell output set value.

記憶部160は、ハードディスクドライブ(HDD)などの不揮発性の記憶装置、記憶手段である。この他、不揮発性の記憶手段に限られることなく半導体メモリ(フラッシュメモリ、FeRAM、ReRAM、MRAM、PRAM、SSD)等の各種記憶媒体を利用してもよいし、これらの半導体メモリと、HDDとを組み合わせた方式を採用した記憶媒体であってもよい。本実施形態では、ROM150と記憶部160とは別の記憶媒体のごとく記載しているが、各種DBおよびプログラムを格納する同一の記憶部、記憶手段を用いてもよい。   The storage unit 160 is a non-volatile storage device such as a hard disk drive (HDD) or storage means. In addition, various kinds of storage media such as a semiconductor memory (flash memory, FeRAM, ReRAM, MRAM, PRAM, SSD) may be used without being limited to the non-volatile storage means. A storage medium that employs a combination of the above may be used. In the present embodiment, the ROM 150 and the storage unit 160 are described as different storage media, but the same storage unit and storage unit for storing various DBs and programs may be used.

記憶部160は、太陽光発電電力DB161、使用湯量予測DB162、燃料電池出力算出DB163、燃料電池制御DB164を格納している。その他、CPU100が演算処理に必要なデータが記憶されている。   The storage unit 160 stores a photovoltaic power generation DB 161, a hot water volume prediction DB 162, a fuel cell output calculation DB 163, and a fuel cell control DB 164. In addition, data necessary for the arithmetic processing by the CPU 100 is stored.

太陽光発電電力DB161は、太陽光発電判定プログラム151を実行するCPU100により太陽光発電電力計測装置21による発電量が一定値以上か否かの判定を行う際に利用する値である発電電力下限値(閾値)を格納する。例えば、図2に記載する閾値テーブルの形式で格納されている。また、太陽光発電電力計測装置21が計測した値を図3の太陽光発電量履歴テーブルに記載するようなテーブル形式で格納してもよい。なお、図3の太陽光発電量履歴テーブルをグラフ化すると図4のように示すことができる。   The photovoltaic power generation DB 161 is a power generation lower limit value that is a value used when the CPU 100 that executes the photovoltaic power generation determination program 151 determines whether the amount of power generated by the photovoltaic power generation measurement device 21 is equal to or greater than a certain value. (Threshold) is stored. For example, it is stored in the form of a threshold table described in FIG. Moreover, you may store the value which the photovoltaic power generation measuring device 21 measured in the table format which describes in the photovoltaic power generation amount history table of FIG. In addition, when the photovoltaic power generation amount history table of FIG. 3 is graphed, it can be shown as in FIG.

使用湯量予測DB162は、昨年の同じ季節の使用湯量や一週間前の同じ曜日の使用湯量を格納する。例えば、図5にしめすようなテーブル形式である。その他、外部の気温などの値を格納していてもよい。また貯湯量計測装置41の貯湯量を格納する。貯湯量を貯湯率として図6に示すようなテーブル形式で格納されている。   The hot water usage prediction DB 162 stores the hot water usage of the same season last year and the hot water usage of the same day of the week before. For example, the table format shown in FIG. In addition, values such as external temperature may be stored. Moreover, the hot water storage amount of the hot water storage measuring device 41 is stored. The hot water storage amount is stored as a hot water storage rate in a table format as shown in FIG.

燃料電池出力算出DB163は、燃料電池のパワーコンディショナなどから受信した燃料電池出力の値と受電端電力計測装置71が計測した受電端電力の値(電力需要)と、燃料電池出力上限値とを格納する。例示すると、燃料電池出力上限値を図7のようなテーブル形式で、電力需要の値を図8のようなテーブル形式で格納する。電力需要の値をグラフ化すると図9のように示すことができる。また、燃料電池出力算出プログラム153によって算出された燃料電池出力設定値を格納する。例えば図10に示すようなテーブル形式で格納する。図10に示す値をグラフ化すると図11にように表すことができる。   The fuel cell output calculation DB 163 includes the value of the fuel cell output received from the power conditioner of the fuel cell, the value of the receiving end power (power demand) measured by the receiving end power measuring device 71, and the upper limit value of the fuel cell output. Store. For example, the fuel cell output upper limit value is stored in a table format as shown in FIG. 7, and the power demand value is stored in a table format as shown in FIG. When the value of power demand is graphed, it can be shown as in FIG. Further, the fuel cell output setting value calculated by the fuel cell output calculation program 153 is stored. For example, it is stored in a table format as shown in FIG. When the values shown in FIG. 10 are graphed, they can be expressed as shown in FIG.

燃料電池制御DB164は、燃料電池制御プログラム154の実行に必要なデータを格納する。   The fuel cell control DB 164 stores data necessary for executing the fuel cell control program 154.

太陽光発電装置20は、太陽電池パネルとパワーコンディショナ(図示しない)を含む構成である。パワーコンディショナは、発電装置により発電された直流電力を交流電力に変換する変換装置と、電力の出力調整を行う制御装置を含む構成である。本実施形態では、太陽光発電電力計測装置21とパワーコンディショナを分けて記載しているが、パワーコンディショナに電力計測装置、電力計測機能が備えられていてもよい。   The solar power generation device 20 includes a solar battery panel and a power conditioner (not shown). The power conditioner includes a conversion device that converts DC power generated by the power generation device into AC power, and a control device that adjusts the output of the power. In this embodiment, although the photovoltaic power generation measuring device 21 and the power conditioner are described separately, the power conditioner may be provided with a power measuring device and a power measuring function.

太陽光発電電力計測装置21は、太陽光発電装置20からの出力電力(交流電力)を計測する。なお、直流電力を計測する形態であっても良い。   The photovoltaic power generation measuring device 21 measures output power (AC power) from the photovoltaic power generation device 20. Note that the DC power may be measured.

商用(電源)系統30は、負荷60に電力を供給する。また太陽光発電などで発電された電力を受電することができる。   The commercial (power supply) system 30 supplies power to the load 60. In addition, power generated by solar power generation or the like can be received.

燃料電池40は、燃料ガスを改質して水素ガスを発生させる改質器と、改質器から出た水素ガスを空気中の酸素と結合させて直流電力を発生する燃料電池セル、および、燃料電池セルで発電された直流電力を交流電力に変換するパワーコンディショナ(図示しない)を含む構成である。また、燃料電池40は、発電中に発生した熱を回収して湯を沸かし、この湯を貯湯する貯湯槽を備える。燃料電池40の発電電力は負荷60を超えることないように制御される。   The fuel cell 40 includes a reformer that reforms the fuel gas to generate hydrogen gas, a fuel battery cell that generates direct-current power by combining the hydrogen gas output from the reformer with oxygen in the air, and This is a configuration including a power conditioner (not shown) that converts DC power generated by the fuel cell into AC power. The fuel cell 40 includes a hot water storage tank that collects heat generated during power generation to boil hot water and store the hot water. The power generated by the fuel cell 40 is controlled so as not to exceed the load 60.

貯湯量計測装置41は、燃料電池40に貯湯槽に貯まった湯量は、貯湯量計測装置41により計測(検出)する。   The hot water storage amount measuring device 41 measures (detects) the hot water amount stored in the hot water storage tank in the fuel cell 40 by the hot water storage amount measuring device 41.

負荷60は、電力の被供給対象である。照明や洗濯機、冷蔵庫、エアコン、TVなどの家電機器である。   The load 60 is a power supply target. Home appliances such as lighting, washing machine, refrigerator, air conditioner, TV.

受電端電力計測装置71は、太陽光発電装置1を除く燃料電池40と負荷60とからなる配電回路が受電する電力を計測(検出)する。   The power receiving end power measuring device 71 measures (detects) the power received by the power distribution circuit including the fuel cell 40 and the load 60 excluding the solar power generation device 1.

次に、図12を用いて制御装置10の動作について説明する。   Next, operation | movement of the control apparatus 10 is demonstrated using FIG.

CPU100は、太陽光発電判定プログラム151を実行し、太陽光発電電力計測装置21によって計測された電力値を発電電力DB161に格納されている発電電力下限値と比較し、太陽光発電装置により発電がおこなわれているか否かの判定を行う(ステップS101)。   The CPU 100 executes the photovoltaic power generation determination program 151, compares the power value measured by the photovoltaic power generation power measuring device 21 with the generated power lower limit value stored in the generated power DB 161, and generates power by the solar power generation device. It is determined whether or not it has been performed (step S101).

太陽光発電装置により発電がおこなわれていると判定された場合には、燃料電池出力算出DB163に格納されている燃料電池出力および受電端電力の値を読み出して、(数式1)から燃料電池出力設定値を算出する。この算出した燃料電池出力設定値と燃料電池算出DB163に格納されている燃料電池出力上限値とを比較する。   If it is determined that power is being generated by the solar power generation device, the values of the fuel cell output and the receiving end power stored in the fuel cell output calculation DB 163 are read out, and the fuel cell output from (Equation 1) Calculate the set value. The calculated fuel cell output set value is compared with the fuel cell output upper limit value stored in the fuel cell calculation DB 163.

比較した結果、(数式1)を読み出して算出した燃料電池出力設定値が、燃料電池出力上限値を上回った場合には、次の(数式2)から(数式1)で算出した燃料電池出力設定値を、燃料電池出力上限値とする(ステップS102)。   As a result of the comparison, when the fuel cell output set value calculated by reading (Equation 1) exceeds the upper limit value of the fuel cell output, the fuel cell output setting calculated by (Equation 2) to (Equation 1) below The value is set as the fuel cell output upper limit value (step S102).

太陽光発電装置により発電がおこなわれていないと判定された場合には、まず(数式1)、(数式2)を使用した算出を行う。さらに、(数式1)または(数式2)で算出された燃料電池出力設定値により燃料電池40が運転された場合の貯湯量の予測値が使用湯量予測プログラム152を実行して予測された使用湯量を超える場合は、貯湯量計測装置41により計測された貯湯量を計測値DB165から読み出し、燃料電池出力設定値を(数式3)により変更する(ステップS103)。   When it is determined that power generation is not performed by the solar power generation device, first, calculation using (Formula 1) and (Formula 2) is performed. Furthermore, the predicted hot water storage amount when the fuel cell 40 is operated according to the fuel cell output set value calculated by (Equation 1) or (Equation 2) is predicted by executing the hot water usage prediction program 152. Is exceeded, the hot water storage amount measured by the hot water storage amount measuring device 41 is read from the measurement value DB 165, and the fuel cell output set value is changed by (Equation 3) (step S103).

ステップS102またはS103の次にCPU100は、燃料電池制御プログラム154は、燃料電池出力算出プログラム153によって算出された燃料電池出力設定値を燃料電池40へ送信し、燃料電池40の出力が燃料電池出力設定値と一致するように燃料電池40を制御する(ステップS104)。   After step S102 or S103, the CPU 100 causes the fuel cell control program 154 to transmit the fuel cell output setting value calculated by the fuel cell output calculation program 153 to the fuel cell 40, and the output of the fuel cell 40 is the fuel cell output setting. The fuel cell 40 is controlled to match the value (step S104).

図13に、図4、図9、図11を重ね合わせた図を記載する。図13からは、太陽光発電中の領域2においては、燃料電池出力は電力需要に最大限近づくような制御がなされている。領域1においては、電力需要に合うようには制御はなされていない。   FIG. 13 is a diagram in which FIGS. 4, 9, and 11 are overlapped. From FIG. 13, in the region 2 during solar power generation, the fuel cell output is controlled so as to be as close as possible to the power demand. In region 1, control is not performed to meet the power demand.

このように燃料電池出力を太陽光発電による発電がなされている期間は電力負荷に合わせた出力制御を行い、それ以外の期間は使用湯予測量に基づいた出力制御を行うことにより、太陽光発電装置により発電した電力を最大限商用系統に逆潮流させることを可能とし、商用系統の電力供給量を減らすことができ電力供給の安定化を図ることができる。   In this way, output control based on the power load is performed during the period when the fuel cell output is generated by solar power generation, and output control based on the predicted amount of hot water is performed during other periods. It is possible to reversely flow the power generated by the apparatus to the commercial system as much as possible, reduce the power supply amount of the commercial system, and stabilize the power supply.

(第2の実施形態)
第2の実施形態について図面を参照しながら説明する。なお第1の実施形態と同一の構成には同一の符号を付し、重複する説明は省略する。
(Second Embodiment)
A second embodiment will be described with reference to the drawings. In addition, the same code | symbol is attached | subjected to the structure same as 1st Embodiment, and the overlapping description is abbreviate | omitted.

本実施形態と第1の実施形態との主な違いは、図14に示すように蓄電池50を備えている点、ROM150内に燃料電池・蓄電池出力算出プログラム155、燃料電池・蓄電池出力制御プログラム156および燃料電池・蓄電池DB165、燃料電池・蓄電池制御DB166を備えている点である。   The main differences between the present embodiment and the first embodiment are that a storage battery 50 is provided as shown in FIG. 14, a fuel cell / storage battery output calculation program 155, a fuel cell / storage battery output control program 156 in the ROM 150. And a fuel cell / storage battery DB 165 and a fuel cell / storage battery control DB 166.

蓄電池50は、蓄電装置とその充放電を制御するパワーコンディショナから構成されるいわゆる二次電池である。このパワーコンディショナは、蓄電装置の充放電電力が、制御装置10から受け取った充放電電力の指令値に一致するように蓄電装置の制御を行う。   The storage battery 50 is a so-called secondary battery including a power storage device and a power conditioner that controls charging and discharging thereof. This power conditioner controls the power storage device so that the charge / discharge power of the power storage device matches the command value of the charge / discharge power received from the control device 10.

燃料電池・蓄電池出力算出プログラム155は、受電端電力計測装置71で計測された受電端電力がちょうど0(ゼロ)となるように、蓄電池出力設定値およびまたは燃料電池出力設定値を算出する機能をCPU100に実現させる手段である。   The fuel cell / storage battery output calculation program 155 has a function of calculating the storage battery output set value and / or the fuel cell output set value so that the power receiving end power measured by the power receiving end power measuring device 71 is exactly 0 (zero). This means is realized by the CPU 100.

具体的には、太陽光発電量プログラム151を実行し太陽光発電装置による発電がなされていると判定された場合には、燃料電池・蓄電池出力算出DB165に格納されている受電端電力の値を読み出して、
蓄電池出力設定値 = 受電端電力 (数式4)
によって蓄電池出力を算出する。受電端電力とは電力需要から燃料電池出力現在値を差し引いた値である。燃料電池出力現在値とは、熱負荷に追従するように運転する燃料電池の出力の値である。
Specifically, when the photovoltaic power generation amount program 151 is executed and it is determined that power is generated by the photovoltaic power generation device, the value of the receiving end power stored in the fuel cell / storage battery output calculation DB 165 is set to Read
Storage battery output set value = Receiving end power (Formula 4)
To calculate the storage battery output. The receiving end power is a value obtained by subtracting the current value of the fuel cell output from the power demand. The current value of the fuel cell output is the value of the output of the fuel cell that operates so as to follow the heat load.

もし、(数式4)で算出された蓄電池出力が蓄電池出力上限値を上回った場合には、蓄電池出力を(数式5)のように、蓄電池出力上限値とし、不足分を(数式6)のように燃料電池の出力を増加させることで対応する。   If the storage battery output calculated in (Expression 4) exceeds the storage battery output upper limit, the storage battery output is set to the storage battery output upper limit as shown in (Expression 5), and the shortage is expressed as in (Expression 6). This can be dealt with by increasing the output of the fuel cell.

蓄電池出力 =蓄電池出力上限値 (数式5)
燃料電池出力=燃料電池出力現在値+(受電端電力−蓄電池出力上限値) (数式6)
なお、受電端電力を一定とするように燃料電池出力およびまたは蓄電池出力を調整することにより、供給電力の変動が少なくなることから商用系統の負担を軽減することができる。蓄電池出力上限値は予めそのときどきの蓄電量に対応する値をテーブル形式で格納しそこから読み出した値を利用しても良いし、予め定めた一の値を格納するテーブルから読み出す形態であってもよい。
Storage battery output = Storage battery output upper limit (Formula 5)
Fuel cell output = Fuel cell output current value + (Receiving end power−Storage battery output upper limit value) (Formula 6)
Note that by adjusting the fuel cell output and / or the storage battery output so that the power at the receiving end is constant, the fluctuation of the supplied power is reduced, so that the burden on the commercial system can be reduced. The storage battery output upper limit value is a form in which a value corresponding to the amount of stored electricity in advance is stored in a table format and a value read from the value may be used, or read from a table storing a predetermined value. Also good.

蓄電池+燃料電池の出力を併せても電力需要に満たない場合は、商用系統からの電力または太陽光発電電力を使用する。   If the output of the storage battery + fuel cell is not enough to meet the power demand, the power from the commercial system or the photovoltaic power is used.

太陽光発電量プログラム151を実行し太陽光発電装置による発電がなされていないと判定された場合には、
燃料電池出力を(数式1)乃至(数式3)を用いて燃料電池出力を設定する。電力負荷と燃料電池出力との差がある場合は、蓄電池出力と商用系統からの受電量で補う
蓄電池出力設定値= 受電端電力−燃料電池出力現在値−商用系統からの受電量
(数式7)
この場合、商用系統からの受電がなくてもよい。
When it is determined that the photovoltaic power generation program 151 is executed and the photovoltaic power generation apparatus is not generating power,
The fuel cell output is set using (Equation 1) to (Equation 3). If there is a difference between the power load and the fuel cell output, the storage battery output set value to be supplemented by the storage battery output and the amount of power received from the commercial system = receiving end power-current value of fuel cell output-amount of power received from the commercial system
(Formula 7)
In this case, there is no need to receive power from a commercial system.

この他、太陽光発電がなされていないと判定された場合には燃料電池・蓄電池出力の出力については各種設定方法が利用することができる。   In addition, when it is determined that solar power generation is not performed, various setting methods can be used for the output of the fuel cell / storage battery output.

例えば、図17に示すように、
燃料電池出力上限値>電力需要 (数式8)
となった場合、または、図19に示すように
(燃料電池出力上限値+一定受電量)>電力需要 (数式9)
となった場合に蓄電池に商用系統からの電力で充電させるよう燃料電池出力および蓄電池の設定をする。このようにすることにより、電力需要量が少ない時間帯(本実施形態では夜間)の電力を利用して蓄電池に充電することができ、さらなる商用系統からの電力供給量の平準化や安定化に貢献することができる。
For example, as shown in FIG.
Fuel cell output upper limit> Electric power demand (Formula 8)
Or as shown in FIG. 19 (fuel cell output upper limit value + constant power reception amount)> power demand (Formula 9)
In this case, the fuel cell output and the storage battery are set so that the storage battery is charged with power from the commercial system. By doing in this way, it is possible to charge the storage battery by using the power in the time zone where the power demand is small (night in this embodiment), and for further leveling and stabilization of the power supply from the commercial system Can contribute.

燃料電池・蓄電池制御プログラム156は、燃料電池・蓄電池出力算出プログラム155を実行することによって算出された燃料電池出力および蓄電池出力に応じて、燃料電池40および蓄電池13の出力設定値を変更する機能をCPUに実現させる手段である。   The fuel cell / storage battery control program 156 has a function of changing the output set values of the fuel cell 40 and the storage battery 13 in accordance with the fuel cell output and storage battery output calculated by executing the fuel cell / storage battery output calculation program 155. This means is realized by the CPU.

また、燃料電池・蓄電池制御手段156は、(数式8)、(数式9)を用いて安価な夜間電力を用いて蓄電池13を満充電しておき、太陽光発電中に蓄電池の十分な放電運転が可能なように蓄電池13を制御する機能をCPU100に実現させる手段でもある。   Further, the fuel cell / storage battery control means 156 fully charges the storage battery 13 using cheap nighttime power using (Equation 8) and (Equation 9), and performs sufficient discharge operation of the storage battery during solar power generation. It is also a means for causing the CPU 100 to realize the function of controlling the storage battery 13 so as to be possible.

燃料電池・蓄電池DB165は、燃料電池のパワーコンディショナなどから受信した燃料電池出力の値と受電端電力計測装置71が計測した受電端電力の値(電力需要)と、蓄電池の出力上限値と、燃料電池出力上限値とを格納する。例示すると、蓄電池の出力上限値を図15のようなテーブル形式で格納する。燃料電池の出力上限値、電力需要の値については図7、図8等と同様であるので省略する。また、燃料電池出力算出プログラム153によって算出された燃料電池出力設定値を格納する。例えば図16、図18に示すようなテーブル形式で格納する。図16、図18に示す値をグラフ化すると図17、図19にように表すことができる。   The fuel cell / storage battery DB 165 includes the value of the fuel cell output received from the power conditioner of the fuel cell, the value of the receiving end power (power demand) measured by the receiving end power measuring device 71, the output upper limit value of the storage battery, The fuel cell output upper limit value is stored. For example, the output upper limit value of the storage battery is stored in a table format as shown in FIG. The output upper limit value and the power demand value of the fuel cell are the same as those shown in FIGS. Further, the fuel cell output setting value calculated by the fuel cell output calculation program 153 is stored. For example, it is stored in a table format as shown in FIGS. When the values shown in FIGS. 16 and 18 are graphed, they can be expressed as shown in FIGS.

燃料電池・蓄電池制御DB166は、燃料電池・蓄電池制御プログラム155の実行に必要なデータを格納する。   The fuel cell / storage battery control DB 166 stores data necessary for the execution of the fuel cell / storage battery control program 155.

図17および図19から読み取れるように太陽光発電が発電している時間帯においては、燃料電池と蓄電池の出力の合計が、電力負荷に追従するように運転される。また、その他の時間帯においては、燃料電池は熱負荷に追従するように運転される。また、蓄電池は、受電量が一定になるように制御する。一定とする受電量は図21に示すように予め定められた値であってもよいし、電力需要に従って異なる一定値となるよう記憶部160に格納されたテーブルから読み出す形態であってもよい。   As can be seen from FIG. 17 and FIG. 19, in the time zone in which photovoltaic power generation is occurring, the total output of the fuel cell and the storage battery is operated so as to follow the power load. In other time zones, the fuel cell is operated to follow the heat load. Further, the storage battery is controlled so that the amount of received power is constant. The power reception amount to be constant may be a predetermined value as shown in FIG. 21 or may be read from a table stored in the storage unit 160 so as to become a different constant value according to the power demand.

図17と図19の運転では、太陽光発電が発電中の燃料電池と蓄電池の出力の分担が異なっており、図17は、蓄電池の容量が比較的大きい場合であり、太陽光発電が発電している時間帯でも燃料電池出力は電力負荷より小さく、蓄電池からの出力と合わせて電力負荷に追従している。また図19は、蓄電池の容量が比較的小さい場合であり、太陽光発電が発電している時間帯では、燃料電池出力が可能な最大値をとり、残りを蓄電池で分担している。図17、図19、いずれの場合にも、蓄電池への充電は夜間に行われることが好適である。   In the operation of FIG. 17 and FIG. 19, the sharing of output between the fuel cell and the storage battery in the photovoltaic power generation is different, and FIG. 17 is a case where the capacity of the storage battery is relatively large. The fuel cell output is smaller than the power load even during a certain time period, and follows the power load together with the output from the storage battery. FIG. 19 shows a case where the capacity of the storage battery is relatively small. In the time zone where solar power generation is occurring, the maximum possible fuel cell output is taken and the remainder is shared by the storage battery. In either case of FIGS. 17 and 19, it is preferable that the storage battery is charged at night.

次に、図20を用いて制御装置10の動作について説明する。   Next, operation | movement of the control apparatus 10 is demonstrated using FIG.

CPU100は、太陽光発電判定プログラム151を実行し、太陽光発電電力計測装置21によって計測された電力値を発電電力DB161に格納されている発電電力下限値と比較し、太陽光発電装置により発電がおこなわれているか否かの判定を行う(ステップS201)。   The CPU 100 executes the photovoltaic power generation determination program 151, compares the power value measured by the photovoltaic power generation power measuring device 21 with the generated power lower limit value stored in the generated power DB 161, and generates power by the solar power generation device. It is determined whether or not it has been performed (step S201).

太陽光発電装置により発電がおこなわれていると判定された場合には、燃料電池出力算出DB163に格納されている燃料電池出力および受電端電力の値を読み出して、(数式4)から燃料電池出力設定値を算出する。この算出した燃料電池出力設定値と燃料電池算出DB163に格納されている燃料電池出力上限値とを比較する。   If it is determined that power is being generated by the solar power generation device, the values of the fuel cell output and the receiving end power stored in the fuel cell output calculation DB 163 are read out, and the fuel cell output from (Equation 4) Calculate the set value. The calculated fuel cell output set value is compared with the fuel cell output upper limit value stored in the fuel cell calculation DB 163.

比較した結果、(数式4)を読み出して算出した蓄電池出力設定値が、蓄電池出力上限値を上回った場合には、次の(数式5)から(数式4)で算出した蓄電池出力設定値を、蓄電池出力上限値とする。電力需要量に足りない場合は、さらに、燃料電池出力設定値を(数式6)により変更する(ステップS202)。   As a result of comparison, when the storage battery output set value calculated by reading (Formula 4) exceeds the storage battery output upper limit value, the storage battery output set value calculated by the following (Formula 5) to (Formula 4), Use the storage battery output upper limit. If the power demand is insufficient, the fuel cell output set value is further changed by (Equation 6) (step S202).

太陽光発電装置により発電がおこなわれていないと判定された場合には、燃料電池出力を(数式1)乃至(数式3)を用いて蓄電池およびまたは燃料電池出力を設定する。足りない場合は、電力負荷と燃料電池出力との差を、太陽光発電による発電電力と商用系統からの受電量で補う(数式7)
(ステップS203)。
When it is determined that power generation is not being performed by the solar power generation device, the storage battery and / or the fuel cell output is set using the fuel cell output (Formula 1) to (Formula 3). If not enough, the difference between the power load and the fuel cell output is compensated by the power generated by solar power generation and the amount of power received from the commercial system (Formula 7)
(Step S203).

ステップS202またはS203の次にCPU100は、燃料電池・蓄電池制御プログラム154は、燃料電池出力算出プログラム153によって算出された燃料電池出力設定値を燃料電池40へ送信し、燃料電池40の出力が燃料電池出力設定値と一致するように燃料電池40を制御する(ステップS204)。   After step S202 or S203, the CPU 100 causes the fuel cell / storage battery control program 154 to transmit the fuel cell output set value calculated by the fuel cell output calculation program 153 to the fuel cell 40, and the output of the fuel cell 40 is the fuel cell. The fuel cell 40 is controlled so as to coincide with the output set value (step S204).

<変形例1>
また、本実施形態の制御装置10は、一つのCPU100(演算処理部)、一つのROM150からプログラムを読み出し各機能を実現すると記載しているが、複数のCPU、ROMを備えていてもよい。例えば、図22に示すように、これらCPU、ROM一つのセットとして太陽光発電がなされているか否かの判定を行う太陽光発電判定部151、過去の使用湯量等をもとに使用湯量を予測する使用湯量予測部152、燃料電池出力の設定値を算出する燃料電池出力算出部153、前記設定値と実際の燃料電池出力が一致するよう制御する燃料電池制御部154、を備える構成の制御装置であってもよい。また図21の図1に示す各DBは同義である。
<Modification 1>
In addition, the control device 10 according to the present embodiment is described as realizing a function by reading a program from one CPU 100 (arithmetic processing unit) and one ROM 150, but may include a plurality of CPUs and ROMs. For example, as shown in FIG. 22, a solar power generation determination unit 151 that determines whether solar power generation is performed as a set of these CPUs and ROMs, and predicts the amount of hot water used based on the amount of hot water used in the past. A control device configured to include a hot water usage prediction unit 152 to perform, a fuel cell output calculation unit 153 that calculates a set value of the fuel cell output, and a fuel cell control unit 154 that controls the set value to match the actual fuel cell output It may be. Moreover, each DB shown in FIG. 1 of FIG. 21 is synonymous.

さらに演算処理を行う各部は、図23に記載するように利用するDBを含めた構成の太陽光発電判定手段151、過去の使用湯量等をもとに使用湯量を予測する使用湯量予測手段152、燃料電池出力の設定値を算出する燃料電池出力算出部15手段、前記設定値と実際の燃料電池出力が一致するよう制御する燃料電池制御手段154としてもよい。   Further, each unit that performs the arithmetic processing includes a photovoltaic power generation determination unit 151 configured to include a DB to be used as described in FIG. 23, a used hot water amount prediction unit 152 that predicts a used hot water amount based on the past used hot water amount, and the like. A fuel cell output calculating unit 15 for calculating a set value of the fuel cell output, and a fuel cell control unit 154 for controlling the set value so as to match the actual fuel cell output may be used.

<変形例2>
図24は、本変形例のエネルギー管理システムの構成図である。
<Modification 2>
FIG. 24 is a configuration diagram of the energy management system of the present modification.

本実施形態と第1、第2、の実施形態の情報提供システムとの違いは、記憶媒体171を含む点である。   The difference between the present embodiment and the information providing systems of the first and second embodiments is that a storage medium 171 is included.

記憶媒体171は、記憶部173と接続部172とを含む構成である。例えば、USBメモリなどのフラッシュメモリやメモリカードなどの外部記憶媒体をいう。また、ネットワークを介して接続されるサーバ―等の記憶媒体であってもよい。   The storage medium 171 includes a storage unit 173 and a connection unit 172. For example, it means an external storage medium such as a flash memory such as a USB memory or a memory card. Further, it may be a storage medium such as a server connected via a network.

記憶部172は、太陽光発電判定プログラム151と、使用湯量予測プログラム152と、燃料電池出力プログラムプログラム153と、燃料電池制御プログラム154と、発電電力DB161と、使用湯量予測DB162と、燃料電池出力上限値DB163と、燃料電池制御DB164と、を記憶するメモリである。データの書き込みはできない非一次記憶媒体を用いてもよいし、データの読み出し、書き込みが随時できる半導体メモリ等の記憶媒体であってもよい。その他、画像データを表示部140にて人が認識可能な文字や図柄を表示させる表示プログラムや、コンテンツを通信IFを介して移動端末に配信させるプログラム等が格納されていてもよい。   The storage unit 172 includes a photovoltaic power generation determination program 151, a hot water volume prediction program 152, a fuel cell output program program 153, a fuel cell control program 154, a generated power DB 161, a hot water volume prediction DB 162, and a fuel cell output upper limit. This is a memory for storing the value DB 163 and the fuel cell control DB 164. A non-primary storage medium that cannot write data may be used, or a storage medium such as a semiconductor memory that can read and write data at any time. In addition, a display program that displays characters and symbols that can be recognized by a person on the display unit 140, a program that distributes content to the mobile terminal via the communication IF, and the like may be stored.

本実施形態では、記憶媒体171に各プログラム、各テーブルが一括して格納されているが、ROM150、記憶部160、記憶媒体171に分割して格納されていてもよい。例えば、ROM150にプログラム151を格納し、記憶部171に、プログラム152乃至154を格納する。   In the present embodiment, each program and each table are collectively stored in the storage medium 171, but may be divided and stored in the ROM 150, the storage unit 160, and the storage medium 171. For example, the program 151 is stored in the ROM 150, and the programs 152 to 154 are stored in the storage unit 171.

接続部173は、サーバ等のコンピュータに設置されるUSB端子などの外部IF170と電気信号のやり取りが可能なように接続を行う。   The connection unit 173 performs connection so that an electric signal can be exchanged with an external IF 170 such as a USB terminal installed in a computer such as a server.

なお、USBメモリのように直接接続せずネットワークを介した接続であってもよい。   Note that a connection via a network may be used instead of a direct connection like a USB memory.

<変形例3>
図25は、本変形例のエネルギー管理システムの構成図である。いわゆるクラウドコンピューティングを用いたエネルギー管理システムである。
<Modification 3>
FIG. 25 is a configuration diagram of the energy management system of the present modification. This is an energy management system using so-called cloud computing.

本変形例では、情報提供システムがデータサーバ80を備えている点である。本実施形態で制御装置10は記憶部を備えていないかのごとく記載しているが、備えていてもよい。   In this modification, the information providing system includes a data server 80. In the present embodiment, the control device 10 is described as if it does not include a storage unit, but it may be provided.

データサーバ80は、CPU800と、RAM(RWM)810と、通信IF820と、入力IF830と、表示IF840と、ROM850と、記憶部860とを含む構成である。その他、USBメモリ等の外部記憶装置を装着するIF(インターフェース)を備えていてもよい。   The data server 80 includes a CPU 800, a RAM (RWM) 810, a communication IF 820, an input IF 830, a display IF 840, a ROM 850, and a storage unit 860. In addition, an IF (interface) for mounting an external storage device such as a USB memory may be provided.

ROM850には、各プログラム151乃至154が格納されている。その他、表示部への表示や通信に必要なプログラムを格納していてもよい。また、151乃至154の全てを備えている必要はなく、ROM150、850または他のコンピュータのROMに分割して格納されていてもよい。   The ROM 850 stores programs 151 to 154. In addition, a program necessary for display on the display unit and communication may be stored. Moreover, it is not necessary to provide all of 151 to 154, and the ROMs 150 and 850 or ROMs of other computers may be stored separately.

記憶部860は、各DB161乃至164が格納される。   The storage unit 860 stores the DBs 161 to 164.

動作としては、いずれかの制御装置10A、10BによりROMからネットワーク上で使用するプログラムを読み出し、実行する。例えば、制御装置10BのCPUが制御装置10A内のROM150(図示しない)からプログラムを読み出し、必要なデータを記憶部860から読み出して処理機能を発揮する。   As an operation, a program used on the network is read from the ROM by any one of the control devices 10A and 10B and executed. For example, the CPU of the control device 10B reads a program from a ROM 150 (not shown) in the control device 10A, reads necessary data from the storage unit 860, and exhibits a processing function.

通信ネットワーク3は、相互にデータを通信可能なインターネット等の通信回線である。有線のごとく記載しているが無線による接続であってもよい。   The communication network 3 is a communication line such as the Internet that can communicate data with each other. Although described as wired, a wireless connection may be used.

なお、各実施形態ともに太陽光発電の判断に用いる「一定以上、一定未満」の組み合わせと、「一定値より多く、一定値以下」の組み合わせとは、適宜相互に交換することができる。   In each embodiment, the combination of “greater than or equal to less than a certain value” and the combination of “greater than a certain value and less than or equal to a certain value” can be interchanged as appropriate.

また、説明した各実施形態では、太陽光発電装置20を使用しているがこれを太陽光発電装置、風力発電装置、地熱発電装置、水力発電装置、ガス発電装置、振動発電装置などの自家発電装置のうち一つ以上を組み合わせた発電装置に代替することができる。つまり、一または複数の太陽光発電装置を商用系統と切り離した単独系統を形成する発電装置群に置き換えることができる。   Moreover, in each described embodiment, although the solar power generation device 20 is used, this is used for private power generation such as a solar power generation device, a wind power generation device, a geothermal power generation device, a hydroelectric power generation device, a gas power generation device, and a vibration power generation device. It can replace with the electric power generating apparatus which combined one or more of the apparatuses. That is, it is possible to replace one or a plurality of photovoltaic power generation devices with a power generation device group that forms a single system separated from a commercial system.

また、各テーブルは一時間毎の電力量の値等を例示しているが、これに限らず例えば一分毎、二十秒毎、一秒毎などの一定間隔毎であってもよい。一定間隔ではなく、例えば夜間は1時間毎などの長い間隔毎、日中は10分間毎などの短い間隔で行ってもよい。   Each table exemplifies the value of the amount of power per hour, but is not limited to this, and may be at regular intervals such as every minute, every 20 seconds, or every second. For example, it may be performed at a long interval such as every hour at night, and at a short interval such as every 10 minutes during the day, for example.

以上、本発明のいくつかの実施形態を説明したが、これらの実施形態は、例として提示したものであり、発明の範囲を限定することは意図していない。これら新規な実施形態は、その他の様々な形態で実施されることが可能であり、発明の要旨を逸脱しない範囲で、種々の省略、置き換え、変更を行うことができる。これら実施形態やその変形は、発明の範囲や要旨に含まれるとともに、特許請求の範囲に記載された発明とその均等の範囲に含まれる。   As mentioned above, although some embodiment of this invention was described, these embodiment is shown as an example and is not intending limiting the range of invention. These novel embodiments can be implemented in various other forms, and various omissions, replacements, and changes can be made without departing from the scope of the invention. These embodiments and modifications thereof are included in the scope and gist of the invention, and are included in the invention described in the claims and the equivalents thereof.

1 … 通信ネットワーク
2 … 電力伝送ネットワーク
10 … 制御装置
20 … 太陽光発電装置
30 … 商用系統
40 … 燃料電池
50 … 蓄電池
60 … 負荷
71 … 受電端電力計測装置
80 … データセンター
100 … CPU(Central Processing Unit)(演算処理部)
101 … 太陽光発電判定部
102 … 使用湯量予測部
103 … 燃料電池出力算出部
104 … 燃料電池制御部
110 … RAM(RWM)(Random Access Memory)(Read Write Memory)
120 … 通信IF(inter face)
121 … 通信部
130 … 入力IF
131 … 入力部
140 … 表示IF
141 … 表示部
150 … ROM(Read Only Memory)
151 … 太陽光発電判定プログラム
152 … 使用湯量予測プログラム
153 … 燃料電池出力算出プログラム
154 … 燃料電池制御プログラム
160 … 記憶部
161 … 太陽光発電電力DB(data base)
162 … 受電端電力DB
163 … 燃料電池DB
164 … 燃料電池制御DB
165 … 燃料電池・蓄電池DB
166 … 燃料電池・蓄電池制御DB
170 … 外部IF
171 … 記憶装置
172 … 接続IF
173 … 記憶部
800 … CPU
810 … RAM(RWM)(Random Access Memory)(Read Write Memory)
820 … 通信IF(inter face)
821 … 通信部
830 … 入力IF
831 … 入力部
840 … 表示IF
841 … 表示部
850 … ROM(Read Only Memory)
860 … 記憶部
DESCRIPTION OF SYMBOLS 1 ... Communication network 2 ... Electric power transmission network 10 ... Control apparatus 20 ... Solar power generation device 30 ... Commercial system 40 ... Fuel cell 50 ... Storage battery 60 ... Load 71 ... Receiving end electric power measuring device 80 ... Data center 100 ... CPU (Central Processing) Unit) (arithmetic processing unit)
DESCRIPTION OF SYMBOLS 101 ... Solar power generation determination part 102 ... Hot water amount prediction part 103 ... Fuel cell output calculation part 104 ... Fuel cell control part 110 ... RAM (RWM) (Random Access Memory) (Read Write Memory)
120… Communication IF (inter face)
121 ... Communication unit 130 ... Input IF
131 ... Input unit 140 ... Display IF
141 ... Display unit 150 ... ROM (Read Only Memory)
151 ... Solar power generation determination program 152 ... Hot water amount prediction program 153 ... Fuel cell output calculation program 154 ... Fuel cell control program 160 ... Storage unit 161 ... Photovoltaic power generation DB (data base)
162 ... Receiving end power DB
163 ... Fuel cell DB
164 ... Fuel cell control DB
165 ... Fuel cell / storage battery DB
166 ... Fuel cell / storage battery control DB
170… External IF
171 ... Storage device 172 ... Connection IF
173 ... Storage unit 800 ... CPU
810 ... RAM (RWM) (Random Access Memory) (Read Write Memory)
820 ... Communication IF (inter face)
821 ... Communication unit 830 ... Input IF
831 ... Input unit 840 ... Display IF
841 ... Display unit 850 ... ROM (Read Only Memory)
860 ... storage unit

Claims (6)

商用系統と連系する太陽光発電装置が電力負荷に給電可能で、且つ、発電電力の余剰電力を前記商用系統に売電可能に接続する回路構成で、前記電力負荷への燃料電池からの出力を制御する制御装置に、
前記太陽光発電装置の発電電力が閾値以上か未満かを判定する判定処理と、
前記判定処理により閾値以上であると判定され場合には、前記燃料電池の出力上限値を上限として電力負荷の電力需要に基づき燃料電池出力設定値を算出し、前記判定処理により閾値未満であると判定される場合には、使用湯量予測値に基づき燃料電池出力設定値を算出する算出処理と、
前記算出処理により算出され前記燃料電池出力設定値に基づき燃料電池を制御する制御処理と
を実現させるエネルギー管理方法。
An output from the fuel cell to the electric power load in a circuit configuration in which a photovoltaic power generation device linked to the commercial power system can supply power to the power load and surplus power of the generated power is connected to the commercial power system so that the power can be sold. To the control device to control
A determination process for determining whether the generated power of the photovoltaic power generation apparatus is greater than or less than a threshold; and
When said by determination processing Ru is determined to be equal to or greater than the threshold, the output upper limit value of the fuel cell to calculate a fuel cell output setting value based on the power demand of the power load as the upper limit, is less than the threshold value by the judgment process If it is determined that, calculation processing to calculate the fuel cell output set value based on the predicted hot water usage value ,
Energy management method for implementing a control process for controlling the fuel cell based on the fuel cell output setting value that will be calculated by the calculation processing.
商用系統と連系する太陽光発電装置が電力負荷に給電可能で、且つ、発電電力の余剰電力を前記商用系統に売電可能に接続する回路構成で、ROMからデータを読み出しCPUを備えるコンピュータに前記電力負荷への燃料電池からの出力の制御処理を実行させるエネルギー管理プログラムにおいて、
前記太陽光発電装置の発電電力が閾値以上か未満かを判定する判定機能と、
前記判定機能により閾値以上であると判定され場合には、前記燃料電池の出力上限値を上限として電力負荷の電力需要に基づき燃料電池出力設定値を算出し、前記判定機能により閾値未満であると判定される場合には、使用湯量予測値に基づき燃料電池出力設定値を算出する算出機能と、
前記算出機能により算出され前記燃料電池出力設定値に基づき燃料電池を制御する制御機能と
を実現させるエネルギー管理プログラム。
A photovoltaic power generation device connected to a commercial system can supply power to a power load, and the surplus power of the generated power is connected to the commercial system so that the power can be sold. In an energy management program for executing control processing of output from the fuel cell to the power load,
A determination function for determining whether the generated power of the solar power generation apparatus is greater than or less than a threshold; and
The determination if that will be determined to be the threshold value or more by the function, the output upper limit value of the fuel cell to calculate a fuel cell output setting value based on the power demand of the power load as the upper limit, is less than the threshold value by the determination function A calculation function for calculating the fuel cell output set value based on the predicted hot water usage value ,
Energy management program for realizing a control function of controlling the fuel cell based on the fuel cell output setting value that will be calculated by the calculating function.
商用系統と連系する太陽光発電装置が電力負荷に給電可能で、且つ、発電電力の余剰電力を前記商用系統に売電可能に接続する回路構成で、前記電力負荷への燃料電池からの出力を制御する制御装置において、
前記太陽光発電装置の発電電力が閾値以上か未満かを判定する判定手段と、
前記判定手段により閾値以上であると判定され場合には、前記燃料電池の出力上限値を上限として電力負荷の電力需要に基づき燃料電池出力設定値を算出し、前記判定手段により閾値未満であると判定される場合には、使用湯量予測値に基づき燃料電池出力設定値を算出する算出手段と、
前記算出手段により算出され前記燃料電池出力設定値に基づき燃料電池を制御する制御手段と
を備える制御装置。
An output from the fuel cell to the electric power load in a circuit configuration in which a photovoltaic power generation device linked to the commercial power system can supply power to the power load and surplus power of the generated power is connected to the commercial power system so that the power can be sold. In a control device for controlling
Determining means for determining less than or generated power is equal to or larger than a threshold of the photovoltaic device,
If that will be determined to be equal to or greater than the threshold by the determination means, wherein the output upper limit value of the fuel cell to calculate a fuel cell output setting value based on the power demand of the power load as the upper limit, is less than the threshold value by the determination unit If it is determined, calculation means for calculating the fuel cell output set value based on the predicted hot water usage value ,
Controller and control means for controlling the fuel cell based on the fuel cell output setting value that will be calculated by the calculation means.
商用系統と連系する太陽光発電装置が電力負荷に給電可能で、且つ、発電電力の余剰電力を前記商用系統に売電可能に接続する回路構成で、前記電力負荷への燃料電池および蓄電池からの出力を制御する制御装置において、
前記太陽光発電装置の発電電力が閾値以上か未満かを判定する判定手段と、
前記判定手段により閾値以上であると判定され場合には、前記燃料電池の出力上限値を上限として電力負荷の電力需要に基づき燃料電池出力設定値および蓄電池出力設定値を算出し、前記判定手段により閾値未満であると判定される場合には、使用湯量予測値に基づき燃料電池出力設定値および蓄電池出力設定値を算出する算出手段と、
前記算出手段により算出され前記燃料電池出力設定値および蓄電池出力設定値に基づき燃料電池および蓄電池を制御する制御手段と
を備える制御装置。
A photovoltaic power generation apparatus linked to a commercial system is capable of supplying power to the power load, and the surplus power of the generated power is connected to the commercial system so that the power can be sold. From the fuel cell and the storage battery to the power load In the control device for controlling the output of
Determining means for determining less than or generated power is equal to or larger than a threshold of the photovoltaic device,
Wherein when that will be determined to be the threshold value or more by determining means calculates the fuel output preset value of fuel cell and battery output setting value based on the power demand of the electrical load as the upper limit output upper limit value of the battery, said determining means When it is determined that the value is less than the threshold value, the calculation means for calculating the fuel cell output set value and the storage battery output set value based on the hot water usage predicted value ,
Controller and control means for controlling the fuel cell and the storage battery on the basis of the output preset value of fuel cell and battery output setting value that will be calculated by the calculation means.
商用系統と連系する太陽光発電装置が電力負荷に給電可能で、且つ、発電電力の余剰電力を前記商用系統に売電可能に接続する回路構成で、前記電力負荷への燃料電池および蓄電池からの出力を制御する制御装置において、  A photovoltaic power generation apparatus linked to a commercial system is capable of supplying power to the power load, and the surplus power of the generated power is connected to the commercial system so that the power can be sold. From the fuel cell and the storage battery to the power load In the control device for controlling the output of
前記太陽光発電装置の発電電力が閾値以上か未満かを判定する判定手段と、  Determining means for determining whether the generated power of the solar power generation apparatus is greater than or less than a threshold; and
前記判定手段により閾値以上であると判定される場合には、前記燃料電池の出力上限値を上限として電力負荷の電力需要を満たし、且つ、商用系統からの受電量を一定とするように燃料電池出力設定値および蓄電池出力設定値を算出し、前記判定手段により閾値未満であると判定される場合には、使用湯量予測値に基づき燃料電池出力設定値および蓄電池出力設定値を算出する算出手段と、  When it is determined by the determination means that the value is equal to or greater than the threshold value, the fuel cell is configured to satisfy the power demand of the power load with the output upper limit value of the fuel cell as an upper limit and to keep the amount of power received from the commercial system constant. A calculating means for calculating an output set value and a storage battery output set value, and calculating a fuel cell output set value and a storage battery output set value based on a predicted amount of hot water used when the determining means determines that the output set value is less than a threshold value; ,
前記算出手段により算出される前記燃料電池出力設定値および蓄電池出力設定値に基づき燃料電池および蓄電池を制御する制御手段と  Control means for controlling the fuel cell and the storage battery based on the fuel cell output set value and the storage battery output set value calculated by the calculating means;
を備える制御装置。A control device comprising:
商用系統と連系する太陽光発電装置が電力負荷に給電可能で、且つ、発電電力の余剰電力を前記商用系統に売電可能に接続する回路構成で、前記電力負荷への燃料電池からの出力を制御するエネルギー管理システムにおいて、
前記太陽光発電装置の発電電力が閾値以上か未満かを判定する判定手段と、
前記判定手段により閾値以上であると判定され場合には、前記燃料電池の出力上限値を上限として電力負荷の電力需要に基づき燃料電池出力設定値を算出し、前記判定手段により閾値未満であると判定される場合には、使用湯量予測値に基づき燃料電池出力設定値を算出する算出手段と、
前記算出手段により算出され前記燃料電池出力設定値に基づき燃料電池を制御する制御手段と
を備えるエネルギー管理システム。
An output from the fuel cell to the electric power load in a circuit configuration in which a photovoltaic power generation device linked to the commercial power system can supply power to the power load and surplus power of the generated power is connected to the commercial power system so that the power can be sold. In the energy management system that controls
Determining means for determining less than or generated power is equal to or larger than a threshold of the photovoltaic device,
If that will be determined to be equal to or greater than the threshold by the determination means, wherein the output upper limit value of the fuel cell to calculate a fuel cell output setting value based on the power demand of the power load as the upper limit, is less than the threshold value by the determination unit If it is determined, calculation means for calculating the fuel cell output set value based on the predicted hot water usage value ,
Energy management system and control means for controlling the fuel cell based on the fuel cell output setting value that will be calculated by the calculation means.
JP2011108695A 2011-05-13 2011-05-13 Energy management method, energy management program, energy management device, energy management system Expired - Fee Related JP5780827B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2011108695A JP5780827B2 (en) 2011-05-13 2011-05-13 Energy management method, energy management program, energy management device, energy management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2011108695A JP5780827B2 (en) 2011-05-13 2011-05-13 Energy management method, energy management program, energy management device, energy management system

Publications (2)

Publication Number Publication Date
JP2012244636A JP2012244636A (en) 2012-12-10
JP5780827B2 true JP5780827B2 (en) 2015-09-16

Family

ID=47465796

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2011108695A Expired - Fee Related JP5780827B2 (en) 2011-05-13 2011-05-13 Energy management method, energy management program, energy management device, energy management system

Country Status (1)

Country Link
JP (1) JP5780827B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5953519B2 (en) * 2013-02-21 2016-07-20 大和ハウス工業株式会社 Power supply system
JP7165045B2 (en) * 2018-12-18 2022-11-02 トヨタホーム株式会社 building power supply system

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07257273A (en) * 1994-03-18 1995-10-09 Honda Motor Co Ltd Nighttime rear-end-collision warning device for vehicle
JP2003061251A (en) * 2001-08-08 2003-02-28 Hitachi Ltd Power supply system
JP2003235162A (en) * 2002-02-04 2003-08-22 Nippon Telegr & Teleph Corp <Ntt> Power supply system and control method therefor
JP4465168B2 (en) * 2003-03-06 2010-05-19 大阪瓦斯株式会社 Cogeneration system
JP4150974B2 (en) * 2004-03-12 2008-09-17 矢崎総業株式会社 Hybrid heat storage system
JP4775790B2 (en) * 2005-02-24 2011-09-21 サンエス電気通信株式会社 A power generation system that effectively uses natural energy,
JP5077958B2 (en) * 2008-06-16 2012-11-21 シャープ株式会社 Power generation system

Also Published As

Publication number Publication date
JP2012244636A (en) 2012-12-10

Similar Documents

Publication Publication Date Title
US11164111B2 (en) Electric power management system for reducing large and rapid change in power received from electricity delivery system
JP5079176B2 (en) Power supply system, control device for power supply system, operation method for power supply system, and control method for power supply system
US20180262003A1 (en) Power control device, operation plan planning method, and recording medium
US9543775B2 (en) Battery controller, management system, battery control method, battery control program, and storage medium
WO2015122196A1 (en) Occupancy state determination device, delivery system, occupancy state determination method, occupancy state determination program, and delivery terminal
JP2015122836A (en) Power management device, power management method and program
JPWO2019116960A1 (en) Power management system
JPWO2014042219A1 (en) Power management method, power management apparatus and program
JP6054373B2 (en) Power consumption mode guidance device and system
WO2015118744A1 (en) Energy management system
JP5917292B2 (en) Power management apparatus, power management system, and power management method
JP5780827B2 (en) Energy management method, energy management program, energy management device, energy management system
JP2014086367A (en) Operation control method and operation control system for fuel cell in apartment house
JP2016226141A (en) Controller, energy management system, control method, and program
EP3168951B1 (en) Power generation device, power generation system and power generation method
WO2013190603A1 (en) Electric device control system
JP2016126983A (en) Fuel cell controller, fuel cell control system, fuel cell control method and computer program
JP2016032379A (en) Power supply system
US20180233910A1 (en) Energy management device, energy management method, and energy management program
JP6075584B2 (en) Control device, energy management system, control method, and program
JP2015173517A (en) power supply system
JP6299514B2 (en) Power supply system
JP2014056429A (en) Energy management system, energy management device and method and program for energy management
JP7226730B2 (en) Electric power local production for local consumption system
JP2017070005A (en) Power supply system

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20140228

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20141125

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20141128

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20150127

RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20150216

RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20150218

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20150619

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20150714

R151 Written notification of patent or utility model registration

Ref document number: 5780827

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R151

LAPS Cancellation because of no payment of annual fees