JP5611280B2 - Reservoir structure - Google Patents
Reservoir structure Download PDFInfo
- Publication number
- JP5611280B2 JP5611280B2 JP2012146361A JP2012146361A JP5611280B2 JP 5611280 B2 JP5611280 B2 JP 5611280B2 JP 2012146361 A JP2012146361 A JP 2012146361A JP 2012146361 A JP2012146361 A JP 2012146361A JP 5611280 B2 JP5611280 B2 JP 5611280B2
- Authority
- JP
- Japan
- Prior art keywords
- dowel
- horizontal
- retaining wall
- groove
- fixed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Wing Frames And Configurations (AREA)
Description
本発明は控え壁、より詳しくは引き戸の控え壁ユニット及び控え壁構造に関する。 The present invention relates to a retaining wall, and more particularly to a retaining wall unit and a retaining wall structure of a sliding door.
これまでより引き戸が納められる側には、縦枠、横枠、横桟などの芯材と表面材とから構成される控え壁が備えられており、この控え壁には、横桟を左右の縦枠の間に架け渡して仮固定した後に、表面材が横桟の位置にビス、ネジなどで固定される。
しかしながら、従来の控え壁においては、横桟はダボ係止溝を下にしてダボに仮固定されているため、片側から表面材を固定しようとしても、横桟の仮固定が不安定でダボを中心にクルリと回転して落ちることがあり、控え壁を製作するのに手間がかかっていた。 However, in the conventional retaining wall, the horizontal beam is temporarily fixed to the dowel with the dowel locking groove facing downward. Therefore, even if it is attempted to fix the surface material from one side, the temporary fixing of the horizontal beam is unstable and the dowel is There were times when it would rotate and fall at the center, and it took time and effort to make a buttress.
また、施工現場で縦枠、横枠、横桟などの芯材の切削加工、ダボ係止溝の切削加工や、これらの芯材の組み付けなど、施工時間を要していた。 In addition, construction time is required at the construction site, such as cutting of core materials such as vertical frames, horizontal frames, and horizontal rails, cutting of dowel locking grooves, and assembly of these core materials.
本発明はかかる状況に鑑み検討されたもので、「L字型金具7で固定可能な縦部材4と上下の横部材5,6と、ダボ孔が穿設されてダボ3が突出した縦部材4間に、ダボ係止溝1が形成され、前記ダボ係止溝1を水平方向にして横架可能な横桟2と、前記縦部材4と前記横部材5,6の外側には前記L字型金具7が埋設固定される溝8が形成されてなることを特徴とする控え壁ユニット15、また、縦部材4と、上下の横部材5,6と横桟2と、表面材9などから構成される控え壁構造であって、前記縦部材4と上下の横部材5,6とはL字型金具7で固定され、横桟2にはダボ係止溝1が形成され、前記横桟2は前記ダボ係止溝1を水平方向にして、ダボ孔が穿設されてダボ3が突出した縦部材4間に横架され、前記縦部材4と前記横部材5,6の外側には前記L字型金具7が埋設固定される程度の溝8が形成されてなることを特徴とする控え壁構造である。
The present invention has been studied in view of such a situation. “The vertical member 4 that can be fixed by the L-shaped bracket 7, the upper and lower horizontal members 5, 6, and the vertical member in which the dowel hole is formed and the dowel 3 protrudes. 4, a dowel locking groove 1 is formed, a
本発明では、ダボ係止溝が形成された横桟を、ダボ係止溝を水平方向にして縦部材間に、ダボ係止溝1を形成していない側から表面材を横桟に横架するため、表面材を横桟に固定する際に横桟が回転して落ちることがない。また、ユニット化されているので控え壁を製作するための時間を大幅に削減できる。以下、本発明を図面に基づいて詳細に説明する。 In the present invention, the horizontal beam formed with the dowel locking groove is horizontally mounted between the vertical members with the dowel locking groove in the horizontal direction, and the surface material is mounted on the horizontal beam from the side where the dowel locking groove 1 is not formed. Therefore, when fixing the surface material to the horizontal beam, the horizontal beam does not rotate and fall. Moreover, since it is unitized, the time for producing a retaining wall can be greatly reduced. Hereinafter, the present invention will be described in detail with reference to the drawings.
図1は控え壁の分解斜視図、図2は控え壁ユニット15の要部分解斜視図、図3は横桟2の斜視図である。
1 is an exploded perspective view of the retaining wall, FIG. 2 is an exploded perspective view of the main part of the
控え壁は上横部材5、下横部材6、縦部材4、横桟2、ダボ3、L字型金具7、表面材9から構成される。表面材9にはプラスターボードが用いられているが特に限定はない。
The retaining wall includes an upper horizontal member 5, a lower horizontal member 6, a vertical member 4, a
ダボ3は木製ダボ、金属性ダボを問わないが、木製ダボを使用することで、表面材を固定するときに初めて垂直が出るようにしている。これは控え壁の芯材が真直ぐはないことがあり、木製ダボは弾性がありこれを現場にあわせて強制できる。 The dowel 3 may be either a wooden dowel or a metal dowel, but the use of a wooden dowel allows the vertical to appear for the first time when fixing the surface material. This is because the core of the retaining wall may not be straight, and the wooden dowels are elastic and can be forced to match the site.
上横部材5の上側、下横部材6の下側、縦部材4の外側には、L字型金具7が埋設固定されやすく、L字型金具7の巾、厚みと同程度の巾、深さを有する溝8が設けられている。これにより各部材の組み付ける時間を短縮できるとともに。壁厚方向に生じる施工精度のブレを小さくとどめることができる。 An L-shaped metal fitting 7 is easily embedded and fixed on the upper side of the upper horizontal member 5, the lower side of the lower horizontal member 6, and the outer side of the vertical member 4. The width and depth of the L-shaped metal fitting 7 are approximately the same as the width and thickness. A groove 8 having a thickness is provided. As a result, the time for assembling each member can be shortened. It is possible to keep the fluctuation in construction accuracy that occurs in the wall thickness direction small.
L字型金具7を固定する位置を上横部材5、下横部材6、縦部材4の外側にすることにより、各部材より構成される四方組み芯材が太鼓状に膨らむ事を抑制することができる。 The L-shaped metal fitting 7 is fixed on the outer side of the upper horizontal member 5, the lower horizontal member 6, and the vertical member 4 so that the four-sided core material composed of each member is prevented from expanding in a drum shape. Can do.
縦部材4にはダボ孔が穿設されダボ3が突出しており、係止溝1が水平方向に設けられた横桟2が引っ掛かるようになっている。係止溝1を水平方向に設け、ダボ係止溝1を形成していない側から表面材を横桟2に固定することにより、横桟2が回転して落下することがない。また、横桟2は各部材より構成される四方組み芯材が鼓状になるのを突っ張って芯材が変形するのを防ぐことができる。
A dowel hole is formed in the vertical member 4 so that the dowel 3 protrudes, and a
上横部材5、下横部材6、縦部材4には溝8、横桟2には係止溝1が長さ方向に連続して設けられているため任意の位置で切断しても形状に変わりはなく、施工現場の状況に応じ所望の寸法にカットして用いることができる。
The upper horizontal member 5, the lower horizontal member 6, and the vertical member 4 are provided with a groove 8 and a locking groove 1 is provided continuously in the length direction on the
更に、上横部材5、下横部材6、縦部材4の溝8の巾を同一にすることにより、縦、横どちらでも使用できる。 Furthermore, by making the widths of the grooves 8 of the upper horizontal member 5, the lower horizontal member 6, and the vertical member 4 the same, it can be used either vertically or horizontally.
1 係止溝
2 横桟
3 ダボ
4 縦部材
5 上横部材
6 下横部材
7 L字型金具
8 溝
9 表面材
15 控え壁ユニット
DESCRIPTION OF SYMBOLS 1
Claims (3)
The retaining wall structure according to claim 1, wherein the dowel is a wooden dowel .
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2012146361A JP5611280B2 (en) | 2012-06-29 | 2012-06-29 | Reservoir structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2012146361A JP5611280B2 (en) | 2012-06-29 | 2012-06-29 | Reservoir structure |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2014009488A JP2014009488A (en) | 2014-01-20 |
JP5611280B2 true JP5611280B2 (en) | 2014-10-22 |
Family
ID=50106429
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2012146361A Expired - Fee Related JP5611280B2 (en) | 2012-06-29 | 2012-06-29 | Reservoir structure |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP5611280B2 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115075429A (en) * | 2022-08-23 | 2022-09-20 | 中航建筑工程有限公司 | Assembled light wall structure |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09368A (en) * | 1995-06-23 | 1997-01-07 | Matsushita Electric Works Ltd | Doorstop middle rail attaching structure of cabinet |
JP2002167893A (en) * | 2000-12-04 | 2002-06-11 | Itoki Crebio Corp | Connecting system for support |
JP2005226313A (en) * | 2004-02-12 | 2005-08-25 | Wood One:Kk | Construction method of small wall for sliding door |
JP3151022U (en) * | 2009-03-25 | 2009-06-04 | ジャパンレントオール株式会社 | Booth structure |
JP5571629B2 (en) * | 2011-07-20 | 2014-08-13 | パナソニック株式会社 | Underframe and sleeve wall structure using the same |
-
2012
- 2012-06-29 JP JP2012146361A patent/JP5611280B2/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
JP2014009488A (en) | 2014-01-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP5611280B2 (en) | Reservoir structure | |
JP4914161B2 (en) | Vertical beam mounting structure | |
EP2843179B1 (en) | Roller shutter box assembly, shutter box wall profile and supplementary profile | |
JP5684759B2 (en) | Reservoir structure | |
JP2006233604A5 (en) | ||
JP5929650B2 (en) | Earthquake-resistant partition panel | |
JP6474637B2 (en) | Door pocket structure | |
JP6317719B2 (en) | Reserving wall ground unit for sliding door, retaining wall structure for sliding door, and manufacturing method thereof | |
KR102183021B1 (en) | Bracket assembly for window frame | |
JP6317718B2 (en) | Reserving wall ground unit for sliding door, retaining wall structure for sliding door, and manufacturing method thereof | |
JP3123758U (en) | Stone panel mounting structure on the outer wall | |
US9611687B2 (en) | Door buck | |
JP6299161B2 (en) | Panel plate locking device in earthquake-resistant partitioning device | |
JP3145195U (en) | Building door frames and window frame materials | |
JP6425996B2 (en) | Underfloor ventilation member | |
JP3189263U (en) | Drainage board for floor drainage | |
JP6863616B2 (en) | Metal fittings for lattices and lattices | |
JP6838917B2 (en) | Inner wall structure | |
AT17475U1 (en) | Crate | |
EP3176357A1 (en) | Receiving element for a shading device and method for fixing same on the outside of a building | |
JP6853681B2 (en) | Sliding door bag structure and its construction method | |
EP3282080B1 (en) | Roller shutter formwork box from porous light weight construction material | |
JP6511967B2 (en) | Mounting device for adjuster support member on door frame | |
DE20308913U1 (en) | bottom track | |
JP2008223285A (en) | Reforming sash |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20140107 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20140110 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20140204 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20140324 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20140901 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20140902 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 5611280 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
LAPS | Cancellation because of no payment of annual fees |