JP5600665B2 - Design man-hour estimation device and design man-hour estimation program - Google Patents

Design man-hour estimation device and design man-hour estimation program Download PDF

Info

Publication number
JP5600665B2
JP5600665B2 JP2011278671A JP2011278671A JP5600665B2 JP 5600665 B2 JP5600665 B2 JP 5600665B2 JP 2011278671 A JP2011278671 A JP 2011278671A JP 2011278671 A JP2011278671 A JP 2011278671A JP 5600665 B2 JP5600665 B2 JP 5600665B2
Authority
JP
Japan
Prior art keywords
design
creation
information
time
hour
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2011278671A
Other languages
Japanese (ja)
Other versions
JP2013130951A (en
Inventor
浩司 加茂田
彰 多田
義明 山田
勇志 吉田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Power Solutions Co Ltd
Original Assignee
Hitachi Power Solutions Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Power Solutions Co Ltd filed Critical Hitachi Power Solutions Co Ltd
Priority to JP2011278671A priority Critical patent/JP5600665B2/en
Publication of JP2013130951A publication Critical patent/JP2013130951A/en
Application granted granted Critical
Publication of JP5600665B2 publication Critical patent/JP5600665B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Description

本発明は、設計工数見積り技術に関し、特に、製品の設計図面を基に製品の施工図面を出図する際の設計工数を見積もる設計工数見積り装置および設計工数見積りプログラムに関する。より詳細には、複数の部品により組立てられる製品の設計図面を基に製品の組立に必要な情報を付加した施工図面の設計時間を予測して、施工図面を納期通りに出図(図面の発行)するために必要な設計人員の過不足を表示し、人員調整することができる装置およびプログラムに関するものである。   The present invention relates to a design man-hour estimation technique, and more particularly to a design man-hour estimation device and a design man-hour estimation program for estimating a design man-hour when drawing a product construction drawing based on a product design drawing. More specifically, based on the design drawing of the product assembled by multiple parts, the design time of the construction drawing to which information necessary for product assembly is added is predicted, and the construction drawing is released on time (issue of the drawing) The present invention relates to a device and a program that can display the excess or deficiency of design personnel necessary to adjust the personnel and adjust the personnel.

例えば、設計図を基にした施工図の設計日程では、施工図面の必要作成時間を見積り、完成要求納期である出図納期から期間中の必要作成時間の合計を求めて必要設計人員を計算し、出図納期が達成できるかを判断している。従来、図面の必要作成時間の見積りは、図面一枚当たりの必要作成時間を固定値として、図面枚数と作業時間の固定値とを掛け合わせることで必要作業時間を計算している。   For example, in the design schedule of a construction drawing based on a blueprint, the required creation time of the construction drawing is estimated, and the required design personnel is calculated by calculating the total required creation time during the period from the delivery date of the drawing, which is the required delivery date. Judging whether delivery date can be achieved. Conventionally, the required creation time of a drawing is calculated by multiplying the number of drawings by a fixed value of work time, with the required creation time per drawing as a fixed value.

本技術分野の背景技術として、例えば特開2006−3950号公報(特許文献1)に記載される技術がある。この特許文献1には、作図処理時間の計測誤差を小さくするために、休止状態検出部の処理により、作図処理が休止状態であるか否かが検出され、この検出結果が、作図処理時間算出部に供給されて、作図処理時間が精度良く計測される情報処理装置の技術が記載されている。   As a background art in this technical field, there is a technique described in, for example, Japanese Patent Laid-Open No. 2006-3950 (Patent Document 1). In Patent Document 1, in order to reduce the measurement error of the plotting processing time, it is detected whether or not the plotting processing is in the paused state by the processing of the pause state detection unit, and the detection result is calculated as the plotting processing time calculation. The technology of an information processing apparatus that is supplied to a section and measures the plotting processing time with high accuracy is described.

特開2006−3950号公報JP 2006-3950 A

しかしながら、前記特許文献1における情報処理装置では、設計図面の作成時間を設計機器数などの所定の属性情報を基に予測している。すなわち、図面中の一つの構成要素を説明変数にした線形近似で作成時間を予測しており、他要素の影響を考慮することができず、本来説明変数にするべき構成要素を見落とすことで予測精度が悪くなる恐れがあった。   However, the information processing apparatus in Patent Document 1 predicts the creation time of a design drawing based on predetermined attribute information such as the number of design devices. In other words, the creation time is predicted by linear approximation with one component in the drawing as an explanatory variable, the effect of other elements cannot be considered, and the prediction is made by overlooking the component that should originally be an explanatory variable. There was a risk that accuracy would deteriorate.

そこで、本発明の代表的な目的は、精度の高い設計時間推定を可能とする技術を提供することである。より詳細には、設計工数見積りにおいて、製品の仕様情報に基づき、図面内の部品別出現頻度と設計時間を対応付けたデータをグループ分けし、グループ分けしたデータ毎に設計時間の関係を多項式で定式化し、部品の出現頻度を用いて図面の作成時間を推定することで、設計納期に間に合うか判定し、間に合わない場合には設計人員をその設計期間内に追加するように促すことが目的である。   Therefore, a typical object of the present invention is to provide a technique that enables highly accurate design time estimation. More specifically, in design man-hour estimation, based on the product specification information, data that associates the appearance frequency and design time for each part in the drawing is grouped, and the design time relationship for each grouped data is expressed as a polynomial. The purpose is to formulate and estimate the creation time of the drawing using the appearance frequency of the parts to determine whether it is in time for the design delivery date, and if not, the purpose is to encourage the design personnel to be added within the design period. is there.

本発明の前記ならびにその他の目的と新規な特徴は、本明細書の記述および添付図面から明らかになるであろう。   The above and other objects and novel features of the present invention will be apparent from the description of this specification and the accompanying drawings.

本願において開示される発明のうち、代表的なものの概要を簡単に説明すれば、次のとおりである。   Of the inventions disclosed in the present application, the outline of typical ones will be briefly described as follows.

(1)コンピュータの情報処理によって製品の設計図面を基に前記製品の施工図面を出図する際の設計工数を見積もる設計工数見積り装置は、施工図面を作成した際の作成実績時間情報を出力する施工図面作成時間測定部と、設計図面情報から図面構成要素情報を集計する図面構成要素集計部と、前記作成実績時間情報から作成実績時間をグループ分けしたグループ別作成実績時間情報を作成する作成実績時間グループ分け部と、前記グループ別作成実績時間情報から施工図設計時間の推定近似式を作成し、前記図面構成要素情報と前記推定近似式とから図面作成時間推定情報を生成する施工図設計時間推定部と、前記図面作成時間推定情報から得た推定作成時間と設計人員情報と図面納期情報とから設計納期の達成状況を判定し、人員調整を行う画面を表示する人員調整部とを有することを特徴とする。   (1) A design man-hour estimation device for estimating a design man-hour when drawing out a construction drawing of the product based on a design drawing of the product by information processing of a computer outputs information on the creation actual time when the construction drawing is created. Construction drawing creation time measurement unit, drawing component totaling unit for summing up drawing component information from design drawing information, and creation results for creating group-by-group creation result time information by grouping the creation result time from the creation result time information Construction drawing design time for creating an estimated approximation formula for construction drawing design time from the time grouping unit and the group-by-group creation actual time information, and generating drawing creation time estimation information from the drawing component information and the estimated approximation formula Determine the achievement status of the design delivery date from the estimation unit, the estimated creation time obtained from the drawing creation time estimation information, the design personnel information, and the drawing delivery date information, and adjust the personnel And having a personnel adjustment unit for displaying a screen to.

(2)製品の設計図面を基に前記製品の施工図面を出図する際の設計工数を見積もる設計工数見積り装置としてコンピュータを動作させる設計工数見積りプログラムは、施工図面を作成した際の作成実績時間情報を出力する施工図面作成時間測定ステップと、設計図面情報から図面構成要素情報を集計する図面構成要素集計ステップと、前記作成実績時間情報から作成実績時間をグループ分けしたグループ別作成実績時間情報を作成する作成実績時間グループ分けステップと、前記グループ別作成実績時間情報から施工図設計時間の推定近似式を作成し、前記図面構成要素情報と前記推定近似式とから図面作成時間推定情報を生成する施工図設計時間推定ステップと、前記図面作成時間推定情報から得た推定作成時間と設計人員情報と図面納期情報とから設計納期の達成状況を判定し、人員調整を行う画面を表示する人員調整ステップとを実行することを特徴とする。   (2) A design man-hour estimation program for operating a computer as a design man-hour estimating device for estimating a man-hour for producing a construction drawing of the product based on the product's design drawing is the actual production time when the construction drawing is created. Construction drawing creation time measurement step for outputting information, drawing component summation step for summing up drawing component information from design drawing information, and creation actual time information by group in which the creation actual time is grouped from the creation actual time information. Create an estimated approximate expression for construction drawing design time from the created actual time grouping step to be created and the group-by-group created actual time information, and generate drawing creation time estimated information from the drawing component information and the estimated approximate expression Construction drawing design time estimation step, estimated creation time obtained from the drawing creation time estimation information, design personnel information, and drawing payment It determines achievement of design delivery from the information, and executes the personnel adjustment step of displaying a screen for personnel adjustments.

本願において開示される発明のうち、代表的なものによって得られる効果を簡単に説明すれば以下のとおりである。   Among the inventions disclosed in the present application, effects obtained by typical ones will be briefly described as follows.

すなわち、代表的なものによって得られる効果は、精度の高い設計時間推定を可能とする技術を提供することができる。より詳細には、設計工数見積りにおいて、製品の仕様情報に基づき、図面内の部品別出現頻度と設計時間を対応付けたデータをグループ分けし、グループ分けしたデータ毎に設計時間の関係を多項式で定式化することで、図面タイプ別に推定式を定義することができ、精度の高い設計時間推定が可能になる。その結果、設計納期に間に合わせるために効果的な人員調整の対策を打つことが可能になる。   That is, the effect obtained by a typical one can provide a technique that enables highly accurate design time estimation. More specifically, in design man-hour estimation, based on the product specification information, data that associates the appearance frequency and design time for each part in the drawing is grouped, and the design time relationship for each grouped data is expressed as a polynomial. By formulating, an estimation formula can be defined for each drawing type, and design time estimation with high accuracy becomes possible. As a result, effective personnel adjustment measures can be taken to meet the design delivery date.

本発明の一実施の形態に係る設計工数見積り装置の構成の一例を示す図である。It is a figure which shows an example of a structure of the design man-hour estimation apparatus which concerns on one embodiment of this invention. 本発明の一実施の形態に係る設計工数見積り装置において、演算部(施工図面作成時間測定部)の処理を説明するフローチャートの一例を示す図である。It is a figure which shows an example of the flowchart explaining the process of a calculating part (construction drawing creation time measurement part) in the design man-hour estimation apparatus which concerns on one embodiment of this invention. 本発明の一実施の形態に係る設計工数見積り装置において、演算部(作成実績時間グループ分け部と施工図設計時間推定部と人員調整部)の処理を説明するフローチャートの一例を示す図である。It is a figure which shows an example of the flowchart explaining the process of a calculating part (A production performance time grouping part, a construction drawing design time estimation part, and a staff adjustment part) in the design man-hour estimation apparatus which concerns on one embodiment of this invention. 本発明の一実施の形態に係る設計工数見積り装置において、図面構成要素情報のテーブルの一例を示す図である。It is a figure which shows an example of the table of drawing component information in the design effort estimation apparatus which concerns on one embodiment of this invention. 本発明の一実施の形態に係る設計工数見積り装置において、作成実績時間情報のテーブルの一例を示す図である。It is a figure which shows an example of the table of creation performance time information in the design man-hour estimation apparatus which concerns on one embodiment of this invention. 本発明の一実施の形態に係る設計工数見積り装置において、グループ別作成実績時間情報のテーブルの一例を示す図である。It is a figure which shows an example of the table of the production result time information classified by group in the design man-hour estimation apparatus which concerns on one embodiment of this invention. 本発明の一実施の形態に係る設計工数見積り装置において、図面作成時間推定情報のテーブルの一例を示す図である。It is a figure which shows an example of the table of drawing creation time estimation information in the design effort estimation apparatus which concerns on one embodiment of this invention. 本発明の一実施の形態に係る設計工数見積り装置において、グループ別有意差検定結果データの一例を示す図である。It is a figure which shows an example of the significant difference test result data according to group in the design effort estimation apparatus which concerns on one embodiment of this invention. 本発明の一実施の形態に係る設計工数見積り装置において、作成実績時間グループ分け画面の一例を示す図である。It is a figure which shows an example of a production performance time grouping screen in the design effort estimation apparatus which concerns on one embodiment of this invention. 本発明の一実施の形態に係る設計工数見積り装置において、図面作成工数推定式(溶接検査有り)の一例を示す図である。It is a figure which shows an example of drawing creation man-hour estimation formula (with welding inspection) in the design man-hour estimating device according to the embodiment of the present invention. 本発明の一実施の形態に係る設計工数見積り装置において、図面作成工数推定式(溶接検査無し)の一例を示す図である。It is a figure which shows an example of drawing preparation man-hour estimation formula (there is no welding inspection) in the design man-hour estimation apparatus which concerns on one embodiment of this invention. 本発明の一実施の形態に係る設計工数見積り装置において、図面作成工数見積もり近似式の修正画面の一例を示す図である。It is a figure which shows an example of the correction screen of a drawing preparation man-hour estimation approximate expression in the design man-hour estimation apparatus which concerns on one embodiment of this invention. 本発明の一実施の形態に係る設計工数見積り装置において、設計人員情報のテーブルの一例を示す図である。It is a figure which shows an example of the table of design personnel information in the design effort estimation apparatus which concerns on one embodiment of this invention. 本発明の一実施の形態に係る設計工数見積り装置において、図面納期情報のテーブルの一例を示す図である。It is a figure which shows an example of the table of drawing delivery date information in the design effort estimation apparatus which concerns on one embodiment of this invention. 本発明の一実施の形態に係る設計工数見積り装置において、設計納期判定の画面の一例を示す図である。It is a figure which shows an example of the screen of design delivery date determination in the design effort estimation apparatus which concerns on one embodiment of this invention. 本発明の一実施の形態に係る設計工数見積り装置において、人員調整画面の一例を示す図である。It is a figure which shows an example of a personnel adjustment screen in the design effort estimation apparatus which concerns on one embodiment of this invention.

以下の実施の形態においては、便宜上その必要があるときは、複数の実施の形態またはセクションに分割して説明するが、特に明示した場合を除き、それらは互いに無関係なものではなく、一方は他方の一部または全部の変形例、詳細、補足説明等の関係にある。また、以下の実施の形態において、要素の数等(個数、数値、量、範囲等を含む)に言及する場合、特に明示した場合および原理的に明らかに特定の数に限定される場合等を除き、その特定の数に限定されるものではなく、特定の数以上でも以下でも良い。   In the following embodiments, when it is necessary for the sake of convenience, the description will be divided into a plurality of embodiments or sections. However, unless otherwise specified, they are not irrelevant and one is the other. There are some or all of the modifications, details, supplementary explanations, and the like. Further, in the following embodiments, when referring to the number of elements (including the number, numerical value, quantity, range, etc.), especially when clearly indicated and when clearly limited to a specific number in principle, etc. Except, it is not limited to the specific number, and may be more or less than the specific number.

さらに、以下の実施の形態において、その構成要素(要素ステップ等も含む)は、特に明示した場合および原理的に明らかに必須であると考えられる場合等を除き、必ずしも必須のものではないことは言うまでもない。同様に、以下の実施の形態において、構成要素等の形状、位置関係等に言及するときは、特に明示した場合および原理的に明らかにそうでないと考えられる場合等を除き、実質的にその形状等に近似または類似するもの等を含むものとする。このことは、上記数値および範囲についても同様である。   Further, in the following embodiments, the constituent elements (including element steps and the like) are not necessarily indispensable unless otherwise specified and apparently essential in principle. Needless to say. Similarly, in the following embodiments, when referring to the shapes, positional relationships, etc. of the components, etc., the shapes are substantially the same unless otherwise specified, or otherwise apparent in principle. And the like are included. The same applies to the above numerical values and ranges.

[本発明の実施の形態の概要]
本発明の実施の形態に係る設計工数見積り装置(一例として、()内に対応する構成要素の符号などを付記)は、コンピュータの情報処理によって製品の設計図面を基に前記製品の施工図面を出図する際の設計工数を見積もる設計工数見積り装置であり、施工図面を作成した際の作成実績時間情報を出力する施工図面作成時間測定部(1004)と、設計図面情報から図面構成要素情報を集計する図面構成要素集計部(1002)と、前記作成実績時間情報から作成実績時間をグループ分けしたグループ別作成実績時間情報を作成する作成実績時間グループ分け部(1006)と、前記グループ別作成実績時間情報から施工図設計時間の推定近似式を作成し、前記図面構成要素情報と前記推定近似式とから図面作成時間推定情報を生成する施工図設計時間推定部(1008)と、前記図面作成時間推定情報から得た推定作成時間と設計人員情報と図面納期情報とから設計納期の達成状況を判定し、人員調整を行う画面を表示する人員調整部(1011)とを有することを特徴とする。
[Outline of Embodiment of the Present Invention]
The design man-hour estimation apparatus according to the embodiment of the present invention (for example, the reference numerals of the corresponding components in () are added as an example) is based on the product design drawing by computer information processing. It is a design man-hour estimation device that estimates the design man-hours when drawing out, the construction drawing creation time measuring unit (1004) that outputs the creation actual time information when creating the construction drawing, and the drawing component information from the design drawing information Drawing component totaling unit (1002) to be aggregated, creation result time grouping unit (1006) for creating creation result time information by group in which the creation result time is grouped from the creation result time information, and the creation result by group An estimated approximate expression for construction drawing design time is created from the time information, and drawing creation time estimated information is generated from the drawing component information and the estimated approximate expression. The figure design time estimation unit (1008), a person who displays the screen for judging the achievement status of the design delivery date from the estimated creation time obtained from the drawing creation time estimation information, the design personnel information, and the drawing delivery date information, and adjusting the personnel And an adjustment unit (1011).

本発明の実施の形態に係る設計工数見積りプログラム(一例として、()内に対応する構成要素の符号などを付記)は、製品の設計図面を基に前記製品の施工図面を出図する際の設計工数を見積もる設計工数見積り装置としてコンピュータを動作させる設計工数見積りプログラムであり、施工図面を作成した際の作成実績時間情報を出力する施工図面作成時間測定ステップ(201)と、設計図面情報から図面構成要素情報を集計する図面構成要素集計ステップ(301)と、前記作成実績時間情報から作成実績時間をグループ分けしたグループ別作成実績時間情報を作成する作成実績時間グループ分けステップ(302、303)と、前記グループ別作成実績時間情報から施工図設計時間の推定近似式を作成し、前記図面構成要素情報と前記推定近似式とから図面作成時間推定情報を生成する施工図設計時間推定ステップ(304、305)と、前記図面作成時間推定情報から得た推定作成時間と設計人員情報と図面納期情報とから設計納期の達成状況を判定し、人員調整を行う画面を表示する人員調整ステップ(306、307)とを実行することを特徴とする。   The design man-hour estimation program according to the embodiment of the present invention (for example, the reference numerals of the corresponding components in () are added) is used when drawing out the construction drawing of the product based on the design drawing of the product. A design man-hour estimation program that operates a computer as a design man-hour estimation device for estimating a design man-hour, a construction drawing creation time measuring step (201) for outputting creation actual time information when a construction drawing is created, and a drawing from the design drawing information A drawing component totaling step (301) for totalizing component information, and a creation actual time grouping step (302, 303) for creating group-specific creation actual time information obtained by grouping the creation actual time from the creation actual time information. , Create an estimated approximation formula of construction drawing design time from the group-by-group creation actual time information, and the drawing component information and previous Construction drawing design time estimation step (304, 305) for generating drawing creation time estimation information from the estimated approximation formula, design delivery date from the estimated creation time, design personnel information and drawing delivery date information obtained from the drawing creation time estimation information It is characterized by executing the personnel adjustment steps (306, 307) for determining the achievement status and displaying a screen for performing personnel adjustment.

上述した本発明の実施の形態の概要に基づいた本発明の一実施の形態を、以下において図面に基づいて詳細に説明する。なお、実施の形態を説明するための全図において、同一の部材には原則として同一の符号を付し、その繰り返しの説明は省略する。   An embodiment of the present invention based on the above-described outline of an embodiment of the present invention will be described in detail below with reference to the drawings. Note that components having the same function are denoted by the same reference symbols throughout the drawings for describing the embodiment, and the repetitive description thereof will be omitted.

[本発明の一実施の形態]
本発明の一実施の形態に係る設計工数見積り装置について、図1〜図16を用いて説明する。本実施の形態では、原子力や火力等の発電所に用いるプラント配管の施工図設計を例に、コンピュータの情報処理によって、設計図面情報から、施工図面の作成時間を予測して、図面の出図納期の達成可否を判定し、人員調整する画面を表示する設計工数見積り装置の例を説明する。また、本発明の一実施の形態は、前記のような設計工数見積り装置としてコンピュータを動作させる設計工数見積りプログラムにも適用する。
[One embodiment of the present invention]
A design man-hour estimation apparatus according to an embodiment of the present invention will be described with reference to FIGS. In this embodiment, the construction drawing design of the plant piping used for power plants such as nuclear power and thermal power is taken as an example, and the creation time of the construction drawing is predicted from the design drawing information by computer information processing, and the drawing of the drawing is performed. An example of a design man-hour estimation device that determines whether or not the delivery date can be achieved and displays a screen for adjusting personnel will be described. The embodiment of the present invention is also applied to a design man-hour estimation program for operating a computer as the design man-hour estimating device as described above.

<設計工数見積り装置の構成>
まず、図1を用いて、本実施の形態に係る設計工数見積り装置の構成について説明する。図1は、この設計工数見積り装置の構成の一例を示す図である。
<Configuration of design man-hour estimation device>
First, the configuration of the design man-hour estimating apparatus according to the present embodiment will be described with reference to FIG. FIG. 1 is a diagram showing an example of the configuration of the design man-hour estimating device.

本実施の形態の設計工数見積り装置100は、演算部110と、記憶部120と、入力部130と、出力部140と、通信部150とを有して構成される。この設計工数見積り装置100は、通信部150を通じてネットワーク160に接続されている。   The design man-hour estimation device 100 according to the present embodiment includes an arithmetic unit 110, a storage unit 120, an input unit 130, an output unit 140, and a communication unit 150. The design man-hour estimation apparatus 100 is connected to a network 160 through a communication unit 150.

演算部110は、図面構成要素集計部1002と、施工図面作成時間測定部1004と、作成実績時間グループ分け部1006と、施工図設計時間推定部1008と、人員調整部1011との各機能部を有して構成される。   The calculation unit 110 includes functional units such as a drawing component totaling unit 1002, a construction drawing creation time measurement unit 1004, a creation performance time grouping unit 1006, a construction drawing design time estimation unit 1008, and a personnel adjustment unit 1011. It is configured.

図面構成要素集計部1002は、設計図面情報から図面構成要素情報を集計する機能部である。   The drawing component totaling unit 1002 is a functional unit that totals drawing component information from design drawing information.

施工図面作成時間測定部1004は、施工図面を作成した際の作成実績時間情報を出力する機能部である。   The construction drawing creation time measuring unit 1004 is a functional unit that outputs the creation result time information when the construction drawing is created.

作成実績時間グループ分け部1006は、作成実績時間情報から作成実績時間をグループ分けしたグループ別作成実績時間情報を作成する機能部である。また、この作成実績時間グループ分け部1006は、作成実績時間情報から作成実績時間をグループ分けする画面において、グループ分け内容毎の有意差の確率を表示する機能を有する。   The creation result time grouping unit 1006 is a functional unit that creates group creation result time information obtained by grouping the creation result times from the creation result time information. Further, the creation result time grouping unit 1006 has a function of displaying the probability of significant difference for each grouping content on the screen for grouping the creation result time from the creation result time information.

施工図設計時間推定部1008は、グループ別作成実績時間情報から施工図設計時間の推定近似式を作成し、図面構成要素情報と推定近似式とから図面作成時間推定情報を生成する機能部である。また、この施工図設計時間推定部1008は、グループ別作成実績時間情報から施工図設計工数の推定近似式を作成する画面において、近似式の係数を調整可能な機能を有する。   The construction drawing design time estimation unit 1008 is a functional unit that creates an estimated approximate expression of construction drawing design time from the group-by-group creation actual time information and generates drawing creation time estimation information from the drawing component element information and the estimated approximation expression. . Further, the construction drawing design time estimation unit 1008 has a function capable of adjusting the coefficient of the approximate expression on a screen for creating an estimated approximate expression of the construction drawing design man-hour from the group-by-group creation result time information.

人員調整部1011は、図面作成時間推定情報から得た推定作成時間と設計人員情報と図面納期情報とから設計納期の達成状況を判定し、人員調整を行う画面を表示する機能部である。また、この人員調整部1011は、設計納期の達成状況を判定処理する画面において、図面毎の納期差を表示する機能、さらに、人員調整を行う画面において、設計工数に対する能力の過不足時間を表示する機能、設計人員の調整を受け付け、設計工数に対する能力の過不足を再計算する機能を有する。   The personnel adjustment unit 1011 is a functional unit that determines the achievement status of the design delivery date from the estimated creation time obtained from the drawing creation time estimation information, the design personnel information, and the drawing delivery date information, and displays a screen for performing personnel adjustment. In addition, the personnel adjustment unit 1011 displays a function for displaying the delivery date difference for each drawing on the screen for determining the achievement status of the design delivery date, and further displays the excess / shortage time of the capacity for the design man-hour on the screen for personnel adjustment. It has a function to accept adjustments of design personnel and design personnel, and to recalculate the excess and deficiency of the capacity for the design man-hours.

記憶部120は、設計図面情報1001と、図面構成要素情報1003と、作成実績時間情報1005と、グループ別作成実績時間情報1007と、図面作成時間推定情報1009と、設計人員情報1010と、図面納期情報1012との各情報を記憶している。   The storage unit 120 includes design drawing information 1001, drawing component information 1003, creation result time information 1005, group-by-group creation result time information 1007, drawing creation time estimation information 1009, design personnel information 1010, and drawing delivery date. Each information with the information 1012 is stored.

設計図面情報1001は、複数の部品により組立てられる製品の設計図面の情報である。この設計図面情報1001を基に、製品の組立に必要な情報を付加した施工図面が作成される。   The design drawing information 1001 is information on a design drawing of a product assembled by a plurality of parts. Based on the design drawing information 1001, a construction drawing to which information necessary for assembling the product is added is created.

図面構成要素情報1003は、後述する図4に示すような図面の構成要素情報と図面のタイプ情報とを含んでいる。   The drawing component information 1003 includes drawing component information and drawing type information as shown in FIG.

作成実績時間情報1005は、後述する図5に示すような図面の実績作成時間の情報を含んでいる。   The creation result time information 1005 includes information on the result creation time of the drawing as shown in FIG.

グループ別作成実績時間情報1007は、後述する図6に示すような図面のグループ別の実績作成時間の情報を含んでいる。   The group creation result time information 1007 includes information on the result creation time for each group in the drawing as shown in FIG.

図面作成時間推定情報1009は、後述する図7に示すような図面の推定作成時間の情報を含んでいる。   The drawing creation time estimation information 1009 includes information on the drawing creation time estimation as shown in FIG.

設計人員情報1010は、後述する図13に示すような週毎の人員の情報を含んでいる。   The design personnel information 1010 includes weekly personnel information as shown in FIG.

図面納期情報1012は、後述する図14に示すような図面毎の納期の情報を含んでいる。   The drawing delivery date information 1012 includes delivery date information for each drawing as shown in FIG.

本実施の形態の設計工数見積り装置100は、これに限定されるものではないが、例えばCADシステムに内装して構成される。また、演算部110の各機能部は、これに限定されるものではないが、例えばプログラムによるソフトウェアで構築される。また、記憶部120の各情報は、これに限定されるものではないが、例えばハードディスクドライブ上のデータベース上に記憶される。   The design man-hour estimating apparatus 100 of the present embodiment is not limited to this, but is configured to be incorporated in a CAD system, for example. Further, each functional unit of the calculation unit 110 is not limited to this, but is constructed by software by a program, for example. Further, each information of the storage unit 120 is stored in a database on a hard disk drive, for example, although not limited thereto.

以上のように構成される設計工数見積り装置100において、入力部130、またはネットワーク160、通信部150を介して入力する設計図面情報1001と設計人員情報1010と図面納期情報1012とを記憶部120に記憶する。   In the design man-hour estimation apparatus 100 configured as described above, design drawing information 1001, design personnel information 1010, and drawing delivery date information 1012 input via the input unit 130, the network 160, or the communication unit 150 are stored in the storage unit 120. Remember.

また、設計図面情報1001を入力として図面構成要素集計部1002にて出力する図面構成要素情報1003と、施工図面作成時間測定部1004にて測定する施工図面の作成実績時間情報1005と、作成実績時間情報1005を入力として作成実績時間グループ分け部1006にてグループ分けするグループ別作成実績時間情報1007と、グループ別作成実績時間情報1007を入力として施工図設計時間推定部1008にて施工図面の作成時間の推定式を作成して計算する図面作成時間推定情報1009と、を記憶部120に記憶する。   Further, drawing component information 1003 output by the drawing component totaling unit 1002 with the design drawing information 1001 as input, construction drawing creation time information 1005 measured by the construction drawing creation time measuring unit 1004, and creation time The creation actual time information 1007 grouped by the creation actual time grouping unit 1006 using the information 1005 as an input, and the construction drawing design time estimation unit 1008 using the group actual creation time information 1007 as input. The drawing creation time estimation information 1009 for creating and calculating the estimation formula is stored in the storage unit 120.

そして、図面作成時間推定情報1009と設計人員情報1010とを入力として図面の出図納期の達成可否を判定し人員調整を行う人員調整部1011により、設計人員情報1010を更新する。   Then, the design personnel information 1010 is updated by the personnel adjustment unit 1011 that receives the drawing creation time estimation information 1009 and the design personnel information 1010 as input and determines whether or not the drawing delivery date of the drawing can be achieved and performs personnel adjustment.

<設計工数見積り装置(演算部)の処理手順>
次に、図2と図3を用いて、本実施の形態に係る設計工数見積り装置100(演算部110)の処理手順について説明する。図2は、施工図面作成時間測定部1004の処理を説明するフローチャートの一例を示す図である。図3は、作成実績時間グループ分け部1006と施工図設計時間推定部1008と人員調整部1011の処理を説明するフローチャートの一例を示す図である。
<Processing procedure of design man-hour estimation device (arithmetic unit)>
Next, a processing procedure of the design man-hour estimation apparatus 100 (calculation unit 110) according to the present embodiment will be described with reference to FIGS. FIG. 2 is a diagram illustrating an example of a flowchart for explaining processing of the construction drawing creation time measurement unit 1004. FIG. 3 is a diagram illustrating an example of a flowchart for explaining processing of the creation result time grouping unit 1006, the construction drawing design time estimation unit 1008, and the personnel adjustment unit 1011.

図2に示す施工図面作成時間測定部1004による処理手順は、施工図面を作成する際に要した時間を測定し、設計図面の作成時間の推定式を作成するための基データとなる作成実績時間情報1005を蓄積するための処理であり、例えばCADシステムに内装し、操作履歴から図面の作成実績時間を測定する。   The processing procedure by the construction drawing creation time measuring unit 1004 shown in FIG. 2 measures the time required to create the construction drawing, and the creation actual time that becomes the basic data for creating the design drawing creation time estimation formula This is a process for accumulating information 1005. For example, it is built in a CAD system, and a drawing creation time is measured from an operation history.

また、図3に示す作成実績時間グループ分け部1006と施工図設計時間推定部1008と人員調整部1011による処理手順は、蓄積した作成実績時間情報1005から設計図面の作成時間の推定式を作成し、図面構成要素情報1003から図面の作成時間を推定し、設計納期に間に合わせるために必要な人員調整を行う処理であり、例えばCADシステムに内装し、図面構成要素情報1003から図面の作成時間を推定し、設計納期を達成できるか判定し、設計人員の調整を併せて行う。   Further, the processing procedure by the creation result time grouping unit 1006, the construction drawing design time estimation unit 1008, and the personnel adjustment unit 1011 shown in FIG. 3 creates a design drawing creation time estimation formula from the created creation time information 1005. This is a process for estimating the drawing creation time from the drawing component information 1003 and adjusting the personnel necessary to meet the design delivery date. For example, the drawing creation time is installed in the CAD system and the drawing creation time is calculated from the drawing component information 1003. Estimate, determine if the design delivery date can be achieved, and also adjust the design personnel.

図2に示す処理手順は、施工図面作成時間測定ステップ201からなり、図1の設計工数見積り装置100の構成のうち、施工図面作成時間測定部1004にて実行し、作成実績時間情報1005を生成する。   The processing procedure shown in FIG. 2 includes a construction drawing creation time measurement step 201, which is executed by the construction drawing creation time measurement unit 1004 in the configuration of the design man-hour estimation device 100 of FIG. To do.

図3に示す処理手順は、図面構成要素集計ステップ301と、設計図面のグループ分けステップ302と、グループ別の作成実績時間情報の有意差検定ステップ303と、グループ分け有効判定内容別の多項式作成ステップ304と、多項式の確認修正ステップ305と、設計納期の達成可否判定ステップ306と、設計人員の調整ステップ307とからなる。   The processing procedure shown in FIG. 3 includes a drawing component totaling step 301, a design drawing grouping step 302, a significant difference test step 303 for creation result time information for each group, and a polynomial creation step for each grouping valid determination content. 304, a polynomial confirmation and correction step 305, a design delivery date achievement determination step 306, and a design personnel adjustment step 307.

なお、図1の設計工数見積り装置100の構成のうち、図面構成要素集計部1002にて図面構成要素集計ステップ301を実行し、設計図面情報1001を入力として、図面構成要素情報1003を生成する。   In the configuration of the design man-hour estimation apparatus 100 in FIG. 1, the drawing component totaling unit 1002 executes the drawing component totaling step 301, and the design drawing information 1001 is input to generate the drawing component information 1003.

また、作成実績時間グループ分け部1006にて設計図面のグループ分けステップ302とグループ別の作成実績時間情報の有意差検定ステップ303とを実行し、グループ別作成実績時間情報1007を生成する。   Further, the creation result time grouping unit 1006 executes the grouping step 302 of the design drawing and the significant difference test step 303 of the creation result time information for each group to generate the creation result time information 1007 for each group.

また、施工図設計時間推定部1008にてグループ分け有効判定内容別の多項式作成ステップ304と多項式の確認修正ステップ305とを実行し、図面作成時間推定情報1009を作成する。   In addition, the construction drawing design time estimation unit 1008 executes a polynomial creation step 304 and a polynomial check / correction step 305 for each grouping validity determination content to create drawing creation time estimation information 1009.

また、人員調整部1011にて設計納期の達成可否判定ステップ306と設計人員の調整ステップ307とを実行する。   Further, the personnel adjustment unit 1011 executes a design delivery date achievement determination step 306 and a design personnel adjustment step 307.

<記憶部の各テーブルの説明>
次に、図4〜図7を用いて、本実施の形態に係る設計工数見積り装置100(記憶部120)にて扱う処理データについて説明する。図4は図面構成要素情報1003のテーブルの一例、図5は作成実績時間情報1005のテーブルの一例、図6はグループ別作成実績時間情報1007のテーブルの一例、図7は図面作成時間推定情報1009のテーブルの一例をそれぞれ示す図である。
<Description of each table in the storage unit>
Next, processing data handled by the design man-hour estimating apparatus 100 (storage unit 120) according to the present embodiment will be described with reference to FIGS. 4 is an example of a table of drawing component information 1003, FIG. 5 is an example of a table of creation result time information 1005, FIG. 6 is an example of a table of group creation result time information 1007, and FIG. 7 is drawing creation time estimation information 1009. It is a figure which shows an example of this table, respectively.

前述した図2で示したステップ201と図3で示した各ステップ301〜307で入力する、又は出力するデータの構成を示す。これら入出力データは、例えばハードディスクドライブ上のデータベースを用いることができる。   A configuration of data input or output in step 201 shown in FIG. 2 and steps 301 to 307 shown in FIG. 3 is shown. As these input / output data, for example, a database on a hard disk drive can be used.

まず、設計図面情報1001は、施工図設計の基となる、例えばCADデータフォーマットであるDXF(Drawing Exchange Format)等のデータであれば良い。設計図面情報1001は、入力部130から入力したり、ネットワーク160、通信部150を介して他のCADデータファイルサーバ等から入力する。   First, the design drawing information 1001 may be data such as DXF (Drawing Exchange Format), which is a CAD data format, which is a basis of construction drawing design. The design drawing information 1001 is input from the input unit 130 or from another CAD data file server or the like via the network 160 and the communication unit 150.

次に、図4に、図面構成要素情報1003の一例のデータを示す。この例では、図面構成要素情報1003は、図面の構成要素情報と図面のタイプ情報とを含む。図面の構成要素情報は、対象図面の図番401がA001、構成要素402がボルト、仕上げ箇所、保持具、穴あけ、余熱検査、数量403がボルト数は100、仕上げ箇所数は45、保持具数は35、穴あけ数は20、余熱検査数は45である。   Next, FIG. 4 shows an example of data of the drawing component information 1003. In this example, the drawing component information 1003 includes drawing component information and drawing type information. As for the component information of the drawing, the drawing number 401 of the target drawing is A001, the component 402 is the bolt, the finishing part, the holding tool, the drilling, the remaining heat inspection, the quantity 403 is 100 bolts, the number of finishing parts is 45, the number of holding tools Is 35, the number of drilling holes is 20, and the number of remaining heat inspections is 45.

また、図面のタイプ情報は、対象図面の図番404がA001、図面タイプ情報405が溶接検査、余熱検査、図示、有無情報406が溶接検査は「有り」、余熱検査は「有り」、図示は「無し」である。   The drawing type information includes the drawing number 404 of the target drawing as A001, the drawing type information 405 is welding inspection, residual heat inspection, illustration, and the presence / absence information 406 is “present” for welding inspection, “existing” for residual heat inspection, “None”.

この図面構成要素情報1003は、図面構成要素集計部1002に入力し、CADデータのオブジェクトの種類等と数を集計して図面の構成要素情報を作成し、CADデータのコメント情報から図面のタイプ情報を作成する。   This drawing component information 1003 is input to the drawing component totaling unit 1002, and the type and number of CAD data objects are totaled to create drawing component information. The drawing type information is obtained from the CAD data comment information. Create

次に、図5に、作成実績時間情報1005の一例のデータを示す。この例では、作成実績時間情報1005として、対象図面の図番501がA001、A002、実績作成時間502がA001は370、A002は740である。この作成実績時間情報1005は、施工図面作成時間測定部1004により、操作履歴等から図面の作成実績時間として測定して作成する。   Next, FIG. 5 shows an example of data of creation result time information 1005. In this example, as the creation result time information 1005, the drawing number 501 of the target drawing is A001, A002, the result creation time 502 is 370 for A001, and 740 for A002. This creation record time information 1005 is created by measuring the drawing creation record time from the operation history or the like by the construction drawing creation time measuring unit 1004.

次に、図6に、グループ別作成実績時間情報1007の一例のデータを示す。この例では、グループ別作成実績時間情報1007として、対象図面の図番601がA001、B001、図面タイプ情報602が溶接検査、余熱検査、有無情報603が「有り」、「無し」、実績作成時間604が370、270である。このグループ別作成実績時間情報1007は、作成実績時間グループ分け部1006により、図面構成要素情報1003のタイプ情報と作成実績時間情報1005とを図番401と図番501で突き合わせて作成する。   Next, FIG. 6 shows data of an example of the group-by-group creation result time information 1007. In this example, as the group-by-group creation result time information 1007, the drawing number 601 of the target drawing is A001, B001, the drawing type information 602 is the welding inspection, the residual heat inspection, and the presence / absence information 603 is “Yes”, “No”, the result creation time Reference numeral 604 denotes 370 and 270. The creation result time information 1007 for each group is created by the creation result time grouping unit 1006 by matching the type information of the drawing component information 1003 and the creation result time information 1005 with reference numbers 401 and 501.

次に、図7に、図面作成時間推定情報1009の一例のデータを示す。この例では、図面作成時間推定情報1009として、対象図面の図番701がB001、図面の推定作成時間702が450である。この図面作成時間推定情報1009は、施工図設計時間推定部1008により、図面構成要素情報1003とグループ別作成実績時間情報1007とから、図面タイプ別の実績作業時間の有意差検定を実施し、有意差があると判定した図面タイプで図面を分け、有意差がある図面タイプ別に図面構成要素情報1003の構成要素を説明変数とした多項式を生成し、図面作成時間推定情報1009の図番701毎の推定作成時間702を計算する。   Next, FIG. 7 shows data as an example of the drawing creation time estimation information 1009. In this example, as the drawing creation time estimation information 1009, the drawing number 701 of the target drawing is B001, and the drawing creation time 702 is 450. The drawing creation time estimation information 1009 is obtained by the construction drawing design time estimation unit 1008 performing a significant difference test of the actual work time for each drawing type from the drawing component information 1003 and the group-by-group creation actual time information 1007. Drawings are divided by drawing types determined to have a difference, a polynomial is generated for each drawing type having a significant difference, and the components of the drawing component information 1003 are used as explanatory variables, and each drawing number 701 in the drawing creation time estimation information 1009 Estimated creation time 702 is calculated.

<各処理ステップの詳細説明>
次に、図8〜図16を用いて、前述した図3に示したステップ301〜307を詳細に説明する。特に、施工図面を作成した際の作成実績時間情報1005と、図面構成要素情報1003と、グループ別作成実績時間情報1007とから、施工図設計時間の推定近似式を作成し、図面構成要素情報1003と推定近似式から図面作成時間推定情報1009を生成し、図面作成時間推定情報1009から得た推定作成時間と設計人員情報1010と図面納期情報1012とから、設計納期の達成状況を判定し、人員調整を行う画面を表示して人員調整する方法を詳しく説明する。
<Detailed description of each processing step>
Next, steps 301 to 307 shown in FIG. 3 will be described in detail with reference to FIGS. In particular, an estimated approximate expression of construction drawing design time is created from creation result time information 1005 when drawing a construction drawing, drawing component information 1003, and group creation result time information 1007, and drawing component information 1003 The drawing creation time estimation information 1009 is generated from the estimated approximate expression, and the achievement status of the design delivery date is determined from the estimated creation time obtained from the drawing creation time estimation information 1009, the design personnel information 1010, and the drawing delivery date information 1012. A method for adjusting the staff by displaying the screen for performing the adjustment will be described in detail.

図面構成要素集計ステップ301では、設計図面情報1001から図面の構成要素を集計する。例えば、配管、エルボ、フランジ、といった配管部品のオブジェクト個数を集計することにより、図面構成要素情報1003を作成する。   In the drawing component totaling step 301, the components of the drawing are totaled from the design drawing information 1001. For example, the drawing component information 1003 is created by counting the number of pipe parts such as pipes, elbows, and flanges.

次に、設計図面のグループ分けステップ302では、図面構成要素情報1003のタイプ情報から図番601毎の図面タイプ情報602、溶接検査の有無、余熱検査の有無により有無情報603を付加し、作成実績時間情報1005の図番501を参照して実績作成時間604を付加し、グループ別作成実績時間情報1007を作成する。   Next, in the design drawing grouping step 302, the drawing type information 602 for each drawing number 601 is added from the type information of the drawing component information 1003, the presence / absence information 603 is added depending on the presence / absence of the welding inspection and the presence / absence of the residual heat inspection. The record creation time 604 is added with reference to the figure number 501 of the time information 1005, and the group-by-group creation record time information 1007 is created.

次に、グループ別の作成実績時間情報の有意差検定ステップ303では、例えば、溶接検査の有無、余熱検査の有無といった離散尺度(二値データ)で作成実績時間情報1005をグループ分けし、夫々のグループでの作業時間を母集団とした時、母集団の有意差検定を行う。ここで母集団の有意差検定には、例えばt検定(正規分布する二つの母集団から抽出した標本の平均値の差が偶然誤差の範囲内に有るか無いかを判定する統計手法)を用いることができる。   Next, in the significant difference test step 303 of the creation result time information for each group, for example, the creation result time information 1005 is grouped on a discrete scale (binary data) such as the presence or absence of welding inspection and the presence or absence of residual heat inspection. When working time in a group is a population, a significant difference test of the population is performed. Here, for the significant difference test of the population, for example, a t-test (statistical method for determining whether or not the difference between the average values of the samples extracted from two populations with normal distribution is within the range of the chance error) is used. be able to.

図8に、グループ別の作成実績時間情報の有意差検定ステップ303により生成されるグループ別有意差検定結果データ800の一例を示す。このグループ別有意差検定結果データ800として、グループ分け内容801毎のp値802が対応付けて計算されている。このp値802は、有意差の確率を表す。   FIG. 8 shows an example of the significant difference test result data 800 for each group generated by the significant difference test step 303 of the creation result time information for each group. As the significant difference test result data 800 for each group, a p value 802 for each grouping content 801 is calculated in association with each other. The p value 802 represents the probability of significant difference.

図9に、グループ別の作成実績時間情報の有意差検定ステップ303で行ったグループ別の作業時間を母集団として有意差検定を行った結果を表示した作成実績時間グループ分け画面900の一例を示す。この作成実績時間グループ分け画面900には、グループ分け内容901、p値902、グループ分け有効判定結果903を表示する。なお、グループ分け有効判定結果903は入力部130がユーザからの入力を受け付けて表示する。なお、グループ分け有効判定結果903はp値902の閾値を予め設定して置くことにより、自動的に判定することもできる。   FIG. 9 shows an example of a creation result time grouping screen 900 that displays the results of performing a significant difference test using the work time by group performed in the significant difference test step 303 of the creation result time information by group as a population. . This creation result time grouping screen 900 displays grouping contents 901, a p value 902, and a grouping validity determination result 903. The grouping validity determination result 903 is displayed when the input unit 130 receives an input from the user. The grouping validity determination result 903 can be automatically determined by setting a threshold value of the p value 902 in advance.

次に、グループ分け有効判定内容別の多項式作成ステップ304では、前記グループ別の作成実績時間情報の有意差検定ステップ303でグループ分け有効判定結果903に有効と判定したグループ単位に図面作成時間を推定する多項式を作成する。この推定多項式の作成には、重回帰分析により図面作成時間を目的変数とし、図面の構成要素を説明変数とした重回帰式を作成する。ここで、重回帰分析の際の説明変数の選択には、様々な方法が一般的に知られており、例えば強制投入法、変数増加法、変数減少法、ステップワイズ法などがあり、いずれを用いても構わない。この重回帰分析により求めた、図面作成時間の推定式は、例えば数式1、数式2のように計算することができる。   Next, in the polynomial creation step 304 for each grouping validity judgment content, the drawing creation time is estimated for each group determined to be valid in the grouping validity judgment result 903 in the significant difference test step 303 of the group-by-group creation result time information. Create a polynomial that In order to create this estimation polynomial, a multiple regression equation is created by using multiple regression analysis with drawing creation time as an objective variable and drawing components as explanatory variables. Here, various methods are generally known for selection of explanatory variables in the multiple regression analysis, for example, forced injection method, variable increase method, variable decrease method, stepwise method, etc. You may use. The drawing creation time estimation formula obtained by this multiple regression analysis can be calculated as Formula 1 and Formula 2, for example.

(数式1) Y1=a1×x1+b1×x2+c1×x3+z1
但し、グループ分け内容901の有りの図面作成予測時間(Y1)、図面構成要素a1の偏回帰係数(a1)、図面構成要素a1のパラメータ値(x1)、図面構成要素b1の偏回帰係数(b1)、図面構成要素b1のパラメータ値(x2)、図面構成要素c1の偏回帰係数(c1)、図面構成要素c1のパラメータ値(x3)、切片(z1)とする。
(Formula 1) Y1 = a1 * x1 + b1 * x2 + c1 * x3 + z1
However, the drawing creation prediction time (Y1) with the grouping contents 901, the partial regression coefficient (a1) of the drawing component a1, the parameter value (x1) of the drawing component a1, and the partial regression coefficient (b1 of the drawing component b1) ), The parameter value (x2) of the drawing component b1, the partial regression coefficient (c1) of the drawing component c1, the parameter value (x3) of the drawing component c1, and the intercept (z1).

(数式2) Y2=a2×x4+b2×x5+c2×x6+z2
但し、グループ分け内容901の無しの図面作成予測時間(Y2)、図面構成要素a2の偏回帰係数(a2)、図面構成要素a2のパラメータ値(x4)、図面構成要素b2の偏回帰係数(b2)、図面構成要素b2のパラメータ値(x5)、図面構成要素c2の偏回帰係数(c2)、図面構成要素c2のパラメータ値(x6)、切片(z2)とする。
(Formula 2) Y2 = a2 * x4 + b2 * x5 + c2 * x6 + z2
However, the drawing creation prediction time (Y2) without the grouping content 901, the partial regression coefficient (a2) of the drawing component a2, the parameter value (x4) of the drawing component a2, and the partial regression coefficient (b2 of the drawing component b2) ), Parameter value (x5) of drawing component b2, partial regression coefficient (c2) of drawing component c2, parameter value (x6) of drawing component c2, and intercept (z2).

図10は、溶接検査有りの図面作成工数推定式の一例を示したものである。図面構成要素にボルト数として100、仕上げ箇所数として45、保持具数として30が与えられ、ボルト数の偏回帰係数として26.6、仕上げ箇所数の偏回帰係数として30.5、保持具数の偏回帰係数として88.2、切片が101.4になっている。   FIG. 10 shows an example of a drawing creation man-hour estimation formula with welding inspection. The number of bolts is 100, the number of finishing points is 45, the number of holding tools is 30, and the partial regression coefficient of bolts is 26.6, the number of finishing tools is 30.5, and the number of holding tools is 30.5. The partial regression coefficient is 88.2 and the intercept is 101.4.

また、図11は、溶接検査無しの図面作成工数推定式の一例を示したものである。図面構成要素にボルト数として33、穴あけ数として20、保持具数として35が与えられ、ボルト数の偏回帰係数として70.2、穴あけ数の偏回帰係数として36.7、保持具数の偏回帰係数として12.6、切片が123.4になっている。   FIG. 11 shows an example of a drawing creation man-hour estimation formula without welding inspection. The number of bolts is 33, the number of holes is 20, and the number of holders is 35, and the component number of the bolts is 70.2, the coefficient of regression of the bolts is 70.2, the coefficient of regression of the holes is 36.7, and the number of holders The regression coefficient is 12.6 and the intercept is 123.4.

次に、多項式の確認修正ステップ305では、グループ分け有効判定内容別の多項式作成ステップ304で作成した図面作成工数推定式の修正を入力部130がユーザからの要求を受け付けて修正する。図12に、図面作成工数推定式(見積もり近似式)の修正画面1200の一例を示す。この修正画面1200において、溶接検査有りの図面作成工数予測式:Y1の各偏回帰係数(26.6、30.5、88.2)、溶接検査無しの図面作成工数予測式:Y2の各偏回帰係数(70.2、36.7、12.6)をユーザが修正して調整することができる。また、図12の例において、溶接検査有りの図面作成工数予測式:Y1のR(R二乗値)は0.89となり、溶接検査無しの図面作成工数予測式:Y2のRは0.71となる。 Next, in the polynomial confirmation / correction step 305, the input unit 130 receives and corrects the request from the user for the correction of the drawing creation man-hour estimation formula created in the polynomial creation step 304 for each grouping validity determination content. FIG. 12 shows an example of a modification screen 1200 for drawing creation man-hour estimation formula (estimation approximation formula). In this correction screen 1200, each drawing regression man-hour prediction formula with welding inspection: Y1 partial regression coefficients (26.6, 30.5, 88.2), drawing creation man-hour prediction formula without welding inspection: each deviation of Y2 The regression coefficients (70.2, 36.7, 12.6) can be adjusted and adjusted by the user. Further, in the example of FIG. 12, the welding inspection There drafting effort prediction equation of: R 2 (R-squared value) was 0.89 next to the Y1, drafting effort prediction equation without welding inspection: R 2 of Y2 is 0. 71.

次に、設計納期の達成可否判定ステップ306では、設計人員情報1010と図面納期情報1012を用いて設計の納期の達成可否判定を行う。図13に、設計人員情報1010の一例を示す。この設計人員情報1010としては、週1301毎の人員1302を登録しており、2011年6月13日週は30人日、2011年6月20日週は28人日と週単位の設計人員情報になっている。なお、週別に係わらず、日別、月別の人員で設定しても良く、単位期間は特に定めるものではない。   Next, in the design delivery date feasibility determination step 306, it is determined whether or not the design delivery date can be achieved using the design personnel information 1010 and the drawing delivery date information 1012. FIG. 13 shows an example of design personnel information 1010. As the design personnel information 1010, the personnel 1302 is registered every 1301 per week, and the design personnel information on a weekly basis is such that the week of June 13, 2011 is 30 person days and the week of June 20, 2011 is 28 person days. It has become. Regardless of the week, it may be set by daily or monthly personnel, and the unit period is not particularly defined.

また、図14に、図面納期情報1012の一例を示す。この図面納期情報1012としては、図番1401毎の納期1402を登録しており、図番A001は2011年7月1日が納期、図番A002は2011年7月10日が納期になっている。   FIG. 14 shows an example of the drawing delivery date information 1012. As the drawing delivery date information 1012, a delivery date 1402 for each drawing number 1401 is registered. The drawing number A001 has a delivery date of July 1, 2011, and the drawing number A002 has a delivery date of July 10, 2011. .

図15に、設計納期の達成可否判定ステップ306で評価した設計納期判定の画面1500の一例を示す。この設計納期判定の画面1500には、図番1501、設計開始1502、出図予定1503、納期1504、納期差1505を表示する。この例において、図番A003は、2011年6月30日が設計開始で、2011年7月12日の納期に対して2011年7月15日の出図予定であるので、納期差は+3日(3日の遅れ)となり、調整が必要となる。同様に、図番A005も納期差は+2日となって調整が必要となる。   FIG. 15 shows an example of a design delivery date determination screen 1500 evaluated in the design delivery date achievement determination step 306. This design delivery date determination screen 1500 displays a drawing number 1501, a design start 1502, a drawing schedule 1503, a delivery date 1504, and a delivery date difference 1505. In this example, the drawing number A003 is designed on June 30, 2011, and is scheduled for sunrise on July 15, 2011 with respect to the delivery date on July 12, 2011. Therefore, the delivery date difference is +3 days (3 Adjustments are necessary. Similarly, the delivery number difference for drawing number A005 is +2 days and needs to be adjusted.

次に、設計人員の調整ステップ307では、ステップ306で納期差が+(遅れ)の判定について人員の調整を行う。図16に、設計人員の調整ステップ307で入力部130がユーザからの要求を受け付けて人員調整する人員調整画面1600の一例を示す。この人員調整画面1600には、週1601、設計工数1602、現状能力1603、過不足1604、人員1605を表示する。この例において、2011年6月20日の週は、28人日の人員で、1050Hrの設計工数に対して980Hrの現状能力であるので、過不足は−70Hr(70時間の不足)となり、人員調整が必要となる。同様に、2011年7月4日の週も過不足は−25Hrとなって人員調整が必要となる。   Next, in the design personnel adjustment step 307, the personnel is adjusted for the determination that the delivery date difference is + (delay) in step 306. FIG. 16 shows an example of a personnel adjustment screen 1600 in which the input unit 130 accepts a request from the user and adjusts the personnel in the design personnel adjustment step 307. On the personnel adjustment screen 1600, a week 1601, a design man-hour 1602, a current capacity 1603, an excess / deficiency 1604, and a personnel 1605 are displayed. In this example, the week of June 20, 2011 is 28 days of personnel, and the current capacity of 980 hours for the design man-hour of 1050 hours, so the excess or shortage becomes -70 hours (70 hours shortage) Adjustment is required. Similarly, the excess or deficiency is -25 hours in the week of July 4, 2011, and personnel adjustment is required.

図16において、人員調整が必要となる場合には、ユーザからの人員の調整を受け付け、設計工数に対する能力の過不足を再計算することができる。例えば、図16の人員調整画面1600の2011年6月20日の週の例において、28人日の人員では−70Hrの過不足となるので、人員を30人日に修正した後、確認を実行することで再計算させることができる。この再計算の結果、過不足が0Hrあるいは+Hrになれば、28人日を30人日に増やす人員調整対策を講ずる。   In FIG. 16, when personnel adjustment is required, the adjustment of personnel from the user can be accepted, and the excess or deficiency of the capacity with respect to the design man-hour can be recalculated. For example, in the example of the week of June 20, 2011 on the personnel adjustment screen 1600 in FIG. 16, since the personnel of 28 days is excessive or insufficient of −70 hours, the confirmation is executed after correcting the personnel to 30 days. It can be recalculated. As a result of this recalculation, if the excess or deficiency becomes 0Hr or + Hr, the personnel adjustment measures to increase 28 man-days to 30 man-days are taken.

<本実施の形態の効果>
以上説明したように、本実施の形態に係る設計工数見積り装置100によれば、施工図面作成時間測定部1004と、図面構成要素集計部1002と、作成実績時間グループ分け部1006と、施工図設計時間推定部1008と、人員調整部1011とを有することにより、施工図面の作成時間を推定することで、設計納期に間に合うか判定し、間に合わない場合には設計人員をその設計期間内に追加するように表示することができる。
<Effects of the present embodiment>
As described above, according to the design man-hour estimating apparatus 100 according to the present embodiment, the construction drawing creation time measuring unit 1004, the drawing component totaling unit 1002, the creation result time grouping unit 1006, and the construction drawing design. By having the time estimation unit 1008 and the personnel adjustment unit 1011, it is determined whether it is in time for the design delivery date by estimating the construction drawing creation time, and if it is not in time, the design personnel is added within the design period. Can be displayed.

さらに、以下のような効果を得ることができる。(1)設計納期判定の画面1500において、図面毎の納期差を表示することができる。(2)人員調整画面1600において、設計工数に対する能力の過不足時間を表示することができる。(3)人員調整画面1600において、設計人員の調整を受け付け、設計工数に対する能力の過不足を再計算することができる。(4)作成実績時間グループ分け画面900において、グループ分け内容毎の有意差の確率を表示することができる。(5)図面作成工数見積もり近似式の修正画面1200において、近似式の係数を調整することができる。   Furthermore, the following effects can be obtained. (1) The delivery date difference for each drawing can be displayed on the design delivery date judgment screen 1500. (2) On the personnel adjustment screen 1600, it is possible to display the excess / deficiency time of the capacity with respect to the design man-hour. (3) On the personnel adjustment screen 1600, the adjustment of the design personnel can be accepted, and the excess or deficiency of the capacity with respect to the design man-hour can be recalculated. (4) On the creation result time grouping screen 900, the probability of significant difference for each grouping content can be displayed. (5) In the drawing creation man-hour estimation approximate expression correction screen 1200, the coefficient of the approximate expression can be adjusted.

以上のように、設計工数見積りにおいて、製品の仕様情報に基づき、図面内の部品別出現頻度と設計時間を対応付けたデータをグループ分けし、グループ分けしたデータ毎に設計時間の関係を多項式で定式化することで、図面タイプ別に推定式を定義することができ、精度の高い設計時間推定が可能になる。その結果、設計納期に間に合わせるために効果的な人員調整の対策を打つことが可能になる。   As described above, in the design man-hour estimation, based on the product specification information, the data that associates the appearance frequency and design time for each part in the drawing is grouped, and the design time relationship for each grouped data is expressed by a polynomial. By formulating, an estimation formula can be defined for each drawing type, and design time estimation with high accuracy becomes possible. As a result, effective personnel adjustment measures can be taken to meet the design delivery date.

また、本実施の形態に係る設計工数見積りプログラムにおいても、ステップ201と、ステップ301〜307とを実行することで、設計工数見積り装置100と同様の効果を得ることができる。   Also in the design man-hour estimation program according to the present embodiment, the same effects as those of the design man-hour estimation device 100 can be obtained by executing step 201 and steps 301 to 307.

以上、本発明者によってなされた発明を実施の形態に基づき具体的に説明したが、本発明は前記実施の形態に限定されるものではなく、その要旨を逸脱しない範囲で種々変更可能であることはいうまでもない。   As mentioned above, the invention made by the present inventor has been specifically described based on the embodiment. However, the present invention is not limited to the embodiment, and various modifications can be made without departing from the scope of the invention. Needless to say.

本発明の設計工数見積り技術は、複数の部品により組立てられる製品の設計図面を基に製品の組立に必要な情報を付加した施工図面の設計時間を予測して、施工図面を納期通りに出図(図面の発行)するために必要な設計人員の過不足を表示し、人員調整することができる装置およびプログラムに利用可能である。   The design man-hour estimation technology of the present invention predicts the design time of a construction drawing to which information necessary for assembling the product is added based on the design drawing of the product assembled by a plurality of parts, and the construction drawing is delivered on time. The present invention is applicable to an apparatus and a program that can display the excess or deficiency of design personnel required for (issue of drawing) and adjust the personnel.

100…設計工数見積り装置、110…演算部、120…記憶部、130…入力部、140…出力部、150…通信部、160…ネットワーク、
1002…図面構成要素集計部、1004…施工図面作成時間測定部、1006…作成実績時間グループ分け部、1008…施工図設計時間推定部、1011…人員調整部、
1001…設計図面情報、1003…図面構成要素情報、1005…作成実績時間情報、1007…グループ別作成実績時間情報、1009…図面作成時間推定情報、1010…設計人員情報、1012…図面納期情報。
DESCRIPTION OF SYMBOLS 100 ... Design effort estimation apparatus, 110 ... Operation part, 120 ... Memory | storage part, 130 ... Input part, 140 ... Output part, 150 ... Communication part, 160 ... Network,
1002 ... Drawing component totaling unit, 1004 ... Construction drawing creation time measurement unit, 1006 ... Creation result time grouping unit, 1008 ... Construction drawing design time estimation unit, 1011 ... Personnel adjustment unit,
DESCRIPTION OF SYMBOLS 1001 ... Design drawing information, 1003 ... Drawing component information, 1005 ... Creation result time information, 1007 ... Creation result time information classified by group, 1009 ... Drawing creation time estimation information, 1010 ... Design personnel information, 1012 ... Drawing delivery date information.

Claims (12)

コンピュータの情報処理によって製品の設計図面を基に前記製品の施工図面を出図する際の設計工数を見積もる設計工数見積り装置であって、
施工図面を作成した際の作成実績時間情報を出力する施工図面作成時間測定部と、
設計図面情報から図面構成要素情報を集計する図面構成要素集計部と、
前記作成実績時間情報から作成実績時間をグループ分けしたグループ別作成実績時間情報を作成する作成実績時間グループ分け部と、
前記グループ別作成実績時間情報から施工図設計時間の推定近似式を作成し、前記図面構成要素情報と前記推定近似式とから図面作成時間推定情報を生成する施工図設計時間推定部と、
前記図面作成時間推定情報から得た推定作成時間と設計人員情報と図面納期情報とから設計納期の達成状況を判定し、人員調整を行う画面を表示する人員調整部とを有することを特徴とする設計工数見積り装置。
A design man-hour estimating device for estimating a man-hour for producing a construction drawing of the product based on a design drawing of the product by information processing of a computer,
The construction drawing creation time measurement unit that outputs the creation performance time information when creating the construction drawing,
A drawing component totaling unit that totals drawing component information from design drawing information;
Creation achievement time grouping unit for creating creation achievement time information for each group in which creation achievement times are grouped from the creation achievement time information,
A construction drawing design time estimation unit that creates an estimated approximation formula of construction drawing design time from the group-by-group creation actual time information, and generates drawing creation time estimation information from the drawing component information and the estimated approximation formula;
It has a personnel adjustment unit for determining the achievement status of the design delivery date from the estimated creation time obtained from the drawing creation time estimation information, design personnel information, and drawing delivery date information, and displaying a screen for performing personnel adjustment. Design man-hour estimation device.
請求項1に記載の設計工数見積り装置において、
前記人員調整部は、前記設計納期の達成状況を判定処理する画面において、図面毎の納期差を表示することを特徴とする設計工数見積り装置。
In the design man-hour estimation device according to claim 1,
The staff adjustment unit displays a delivery time difference for each drawing on a screen for determining the achievement status of the design delivery date.
請求項2に記載の設計工数見積り装置において、
前記人員調整部は、前記人員調整を行う画面において、設計工数に対する能力の過不足時間を表示することを特徴とする設計工数見積り装置。
In the design man-hour estimation device according to claim 2,
The manpower adjusting unit displays an excess / deficiency time of the capacity with respect to the design man-hour on the screen for performing the manpower adjustment.
請求項3に記載の設計工数見積り装置において、
前記人員調整部は、前記人員調整を行う画面において、設計人員の調整を受け付け、設計工数に対する能力の過不足を再計算することを特徴とする設計工数見積り装置。
In the design man-hour estimation device according to claim 3,
The manpower adjusting unit accepts the adjustment of the design manpower on the screen for performing the manpower adjustment, and recalculates the excess or deficiency of the capacity with respect to the design manpower.
請求項1に記載の設計工数見積り装置において、
前記作成実績時間グループ分け部は、前記作成実績時間情報から作成実績時間をグループ分けする画面において、グループ分け内容毎の有意差の確率を表示することを特徴とする設計工数見積り装置。
In the design man-hour estimation device according to claim 1,
The creation achievement time grouping unit displays a probability of significant difference for each grouping content on a screen for grouping creation achievement times from the creation achievement time information.
請求項1に記載の設計工数見積り装置において、
前記施工図設計時間推定部は、前記グループ別作成実績時間情報から施工図設計工数の推定近似式を作成する画面において、近似式の係数を調整可能とすることを特徴とする設計工数見積り装置。
In the design man-hour estimation device according to claim 1,
The construction drawing design time estimation unit is capable of adjusting a coefficient of an approximation formula on a screen for creating an estimated approximation formula of construction drawing design man-hour from the group-by-group creation result time information.
製品の設計図面を基に前記製品の施工図面を出図する際の設計工数を見積もる設計工数見積り装置としてコンピュータを動作させる設計工数見積りプログラムであって、
施工図面を作成した際の作成実績時間情報を出力する施工図面作成時間測定ステップと、
設計図面情報から図面構成要素情報を集計する図面構成要素集計ステップと、
前記作成実績時間情報から作成実績時間をグループ分けしたグループ別作成実績時間情報を作成する作成実績時間グループ分けステップと、
前記グループ別作成実績時間情報から施工図設計時間の推定近似式を作成し、前記図面構成要素情報と前記推定近似式とから図面作成時間推定情報を生成する施工図設計時間推定ステップと、
前記図面作成時間推定情報から得た推定作成時間と設計人員情報と図面納期情報とから設計納期の達成状況を判定し、人員調整を行う画面を表示する人員調整ステップとをコンピュータに実行させることを特徴とする設計工数見積りプログラム。
A design man-hour estimation program for operating a computer as a design man-hour estimating device for estimating a man-hour for design when drawing out a construction drawing of the product based on a product design drawing,
Construction drawing creation time measurement step for outputting creation actual time information when creating construction drawings,
A drawing component totaling step for totaling drawing component information from the design drawing information;
Creation achievement time grouping step for creating creation achievement time information by group in which creation achievement times are grouped from the creation achievement time information,
Construction drawing design time estimation step for creating an estimated approximation formula for construction drawing design time from the group-by-group creation actual time information, and generating drawing creation time estimation information from the drawing component information and the estimated approximation formula;
Determining the achievement status of the design delivery date from the estimated creation time obtained from the drawing creation time estimation information, the design personnel information, and the drawing delivery date information, and causing the computer to execute a personnel adjustment step for displaying a screen for performing personnel adjustment. A design man-hour estimation program.
請求項7に記載の設計工数見積りプログラムにおいて、
前記人員調整ステップでは、前記設計納期の達成状況を判定処理する画面において、図面毎の納期差を表示することを特徴とする設計工数見積りプログラム。
In the design man-hour estimation program according to claim 7,
In the personnel adjustment step, a design man-hour estimation program for displaying a delivery date difference for each drawing on a screen for determining the achievement status of the design delivery date.
請求項8に記載の設計工数見積りプログラムにおいて、
前記人員調整ステップでは、前記人員調整を行う画面において、設計工数に対する能力の過不足時間を表示することを特徴とする設計工数見積りプログラム。
In the design man-hour estimation program according to claim 8,
In the personnel adjustment step, a design man-hour estimation program characterized by displaying an excess or deficiency time of the capacity with respect to the design man-hour on a screen for performing the personnel adjustment.
請求項9に記載の設計工数見積りプログラムにおいて、
前記人員調整ステップでは、前記人員調整を行う画面において、設計人員の調整を受け付け、設計工数に対する能力の過不足を再計算することを特徴とする設計工数見積りプログラム。
In the design man-hour estimation program according to claim 9,
In the personnel adjustment step, a design man-hour estimation program characterized in that, on the screen for performing the manpower adjustment, accepts the adjustment of the design personnel and recalculates the excess or deficiency of the capacity with respect to the design man-hour.
請求項7に記載の設計工数見積りプログラムにおいて、
前記作成実績時間グループ分けステップでは、前記作成実績時間情報から作成実績時間をグループ分けする画面において、グループ分け内容毎の有意差の確率を表示することを特徴とする設計工数見積りプログラム。
In the design man-hour estimation program according to claim 7,
In the creation result time grouping step, a design man-hour estimation program for displaying a probability of significant difference for each grouping content on a screen for grouping creation result times from the creation result time information.
請求項7に記載の設計工数見積りプログラムにおいて、
前記施工図設計時間推定ステップでは、前記グループ別作成実績時間情報から施工図設計工数の推定近似式を作成する画面において、近似式の係数を調整可能とすることを特徴とする設計工数見積りプログラム。
In the design man-hour estimation program according to claim 7,
In the construction drawing design time estimation step, a design man-hour estimation program capable of adjusting a coefficient of an approximation formula on a screen for creating an estimated approximation formula of construction drawing design man-hours from the group-by-group creation result time information.
JP2011278671A 2011-12-20 2011-12-20 Design man-hour estimation device and design man-hour estimation program Expired - Fee Related JP5600665B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2011278671A JP5600665B2 (en) 2011-12-20 2011-12-20 Design man-hour estimation device and design man-hour estimation program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2011278671A JP5600665B2 (en) 2011-12-20 2011-12-20 Design man-hour estimation device and design man-hour estimation program

Publications (2)

Publication Number Publication Date
JP2013130951A JP2013130951A (en) 2013-07-04
JP5600665B2 true JP5600665B2 (en) 2014-10-01

Family

ID=48908477

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2011278671A Expired - Fee Related JP5600665B2 (en) 2011-12-20 2011-12-20 Design man-hour estimation device and design man-hour estimation program

Country Status (1)

Country Link
JP (1) JP5600665B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111080235B (en) * 2019-11-26 2023-10-13 泰康保险集团股份有限公司 Data processing method, device, electronic equipment and computer readable medium

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006003950A (en) * 2004-06-15 2006-01-05 Daikin Ind Ltd Information processor, information processing method, and program
JP5160773B2 (en) * 2006-11-28 2013-03-13 株式会社図研 Information processing apparatus and method

Also Published As

Publication number Publication date
JP2013130951A (en) 2013-07-04

Similar Documents

Publication Publication Date Title
US9524463B2 (en) Methods and systems for automating carbon footprinting
Leachman Closed-loop measurement of equipment efficiency and equipment capacity
JP2010122825A (en) Data estimating device, data estimating method, and data estimating program
CN113962468A (en) Energy consumption monitoring and statistics-based energy consumption carbon emission management method and system
JP2007199844A (en) Component demand prediction program, component demand prediction method, and system executing this method
JP7053152B2 (en) Systems and methods for optimizing recommended inspection intervals
JP2018063598A (en) Business supporting system and business supporting method
CN114511203A (en) Method and system for rapidly outputting project amount list based on BIM (building information modeling)
CN114529086A (en) Medicine data processing method, device and equipment
CN110084439A (en) A kind of software cost measure and cloud system based on the estimation of NESMA function point
JP2007213337A (en) Environmental load-evaluating method, environmental load-evaluating system, and environmental load-evaluating program
JP2017151980A5 (en)
JP2013045430A (en) Manufacturing cost management system and management method
CN114879619A (en) Digital workshop energy optimization method and system
Wang et al. Using value stream mapping to analyze an upholstery furniture engineering process
JP5600665B2 (en) Design man-hour estimation device and design man-hour estimation program
JP5725547B2 (en) Risk management device
US20090192843A1 (en) Method and system for time-standard development
JP2007026335A (en) Evaluation index forecast visualization method
JPH09101947A (en) Time series forcasting method
CN114418369A (en) Metering payment method and system based on BIM (building information modeling)
CN114036598A (en) Engineering quantity calculation method and system of engineering project and electronic equipment
CN108681838B (en) Scheduling plan determining method and device
RU2503015C2 (en) System to control power consumption of industrial enterprises and production facilities
JP5839662B2 (en) Delivery date achievement condition automatic verification system

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20130919

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20140408

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20140430

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20140627

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20140729

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20140818

R150 Certificate of patent or registration of utility model

Ref document number: 5600665

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313111

R360 Written notification for declining of transfer of rights

Free format text: JAPANESE INTERMEDIATE CODE: R360

R360 Written notification for declining of transfer of rights

Free format text: JAPANESE INTERMEDIATE CODE: R360

R371 Transfer withdrawn

Free format text: JAPANESE INTERMEDIATE CODE: R371

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313111

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

LAPS Cancellation because of no payment of annual fees