JP2007026335A - Evaluation index forecast visualization method - Google Patents
Evaluation index forecast visualization method Download PDFInfo
- Publication number
- JP2007026335A JP2007026335A JP2005210734A JP2005210734A JP2007026335A JP 2007026335 A JP2007026335 A JP 2007026335A JP 2005210734 A JP2005210734 A JP 2005210734A JP 2005210734 A JP2005210734 A JP 2005210734A JP 2007026335 A JP2007026335 A JP 2007026335A
- Authority
- JP
- Japan
- Prior art keywords
- inventory
- evaluation index
- change rate
- target
- plan
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Abstract
Description
本発明は、受注から出荷に至るまでの企業活動であるSCM(サプライ・チェーン・マネジメント)に係わり、特にSCMを効果的に実施するよう支援するために、評価指標の見通値を可視化し、SCMに関する条件の変更によって評価指標の変化を可視化する技術に関する。 The present invention relates to SCM (Supply Chain Management), which is a corporate activity from order receipt to shipment, and in particular, in order to support effective implementation of SCM, the estimated value of an evaluation index is visualized. The present invention relates to a technique for visualizing a change in an evaluation index by changing a condition related to SCM.
企業活動において、ますます激しくなる外部環境の変化に対応して企業全体の最適化という観点でSCM(サプライチェーンマネジメント)の迅速な改革は重要である。改革の手順として、企業は企業特性に応じて経営目標数値を定める。そして、現状のSCMの把握・分析を実施するとともに、経営目標数値を達成するためにSCMの改革施策を立案する。この改革施策を迅速に決めるためには、条件の変化に対する評価指標の変化を効率的に可視化することが必要となる。 In corporate activities, rapid reform of SCM (Supply Chain Management) is important from the perspective of optimizing the entire company in response to increasingly severe changes in the external environment. As a procedure for reform, companies set management target figures according to their corporate characteristics. In addition to grasping and analyzing the current SCM, we will formulate SCM reform measures to achieve the management target figures. In order to quickly determine this reform measure, it is necessary to efficiently visualize changes in evaluation indices with respect to changes in conditions.
なおこの種の技術として関連するものには、例えば特許文献1に記載された技術などがある。
In addition, there exists a technique etc. which were described in
SCMの在庫管理などに関する評価指標の実績を集積することができる。しかし在庫管理などに関する評価指標の見通しが見えないため、SCMを効率化する施策が的確に判断できない、あるいはシミュレーションに時間がかかるのが実情であった。 It is possible to accumulate the performance of evaluation indexes related to SCM inventory management. However, since the prospects of the evaluation index regarding inventory management and the like are not visible, it is a fact that measures for improving the efficiency of SCM cannot be judged accurately or simulation takes time.
このように従来の技術では、在庫管理に関する評価指標の見通しが立てられない。そのため、SCMへの施策を実施した結果、在庫管理に関する評価指標は目標値と比較してどのようになっているかの迅速な検証ができず、的確なSCM対策ができないという問題点を有していた。 As described above, the conventional technique cannot provide a prospect of an evaluation index related to inventory management. Therefore, as a result of implementing measures for SCM, there is a problem that the evaluation index related to inventory management cannot be quickly verified as compared with the target value and accurate SCM measures cannot be taken. It was.
本発明の目的は、在庫管理に関する評価指標を可視化するとともに、SCM改善施策が必要な対象在庫品を選定することによってシミュレーションにかかる時間を短縮する技術を提供することにある。 An object of the present invention is to provide a technique for visualizing an evaluation index related to inventory management and shortening the time required for simulation by selecting a target inventory that requires SCM improvement measures.
本発明は、各対象在庫品の各期間についての発注案を格納する記憶手段と、在庫予測データを格納する記憶手段とを参照して各対象在庫品の特定の期間についての複数の評価指標の見通値を算出し、与えられた抽出条件を満足する対象在庫品を抽出してその発注案を表示し、その発注案をシミュレートする複数の発注案について評価指標の見通値を算出して表示し、目標とする複数の評価指標を満足する発注案によって元の発注案を修正可能とする評価指標見通し可視化技術を特徴とする。 The present invention refers to a storage means for storing an ordering proposal for each period of each target inventory and a storage means for storing inventory forecast data, and a plurality of evaluation indexes for a specific period of each target inventory. Calculate the expected value, extract the target inventory that satisfies the given extraction conditions, display the order proposal, and calculate the estimated value of the evaluation index for multiple order proposals that simulate the order proposal. It is characterized by an evaluation index prospect visualization technology that allows an original ordering plan to be modified by an ordering plan that satisfies a plurality of target evaluation indexes.
本発明によれば、対象在庫品の発注案を変動させたときの評価指標の変化をすぐに可視化することができる。また本発明によれば、抽出条件によって対象在庫品を絞ることができ、シミュレーションにかかる時間を短縮することができる。 According to the present invention, it is possible to immediately visualize the change in the evaluation index when the ordering plan for the target inventory item is changed. Further, according to the present invention, the target inventory can be narrowed down according to the extraction condition, and the time required for the simulation can be shortened.
以下、本発明の実施形態についてSCMを例にとり、図面を用いて詳細に説明する。 Hereinafter, an embodiment of the present invention will be described in detail using an SCM as an example with reference to the drawings.
図1は、本発明の一実施形態による評価指標見通し可視化システムの構成例を示すブロック図である。図1において、10は入力装置、20は表示装置、30は処理装置、40は記憶装置、50は出力装置である。 FIG. 1 is a block diagram illustrating a configuration example of an evaluation index line-of-sight visualization system according to an embodiment of the present invention. In FIG. 1, 10 is an input device, 20 is a display device, 30 is a processing device, 40 is a storage device, and 50 is an output device.
60は実績表示処理部、70は発注システム推奨案による評価見通算出処理部、80は発注案修正対象品の選定支援処理部、90は発注人手修正案による評価指標見通算出処理部である。処理装置30は、CPUおよびメモリを含む。処理部60〜90は、処理装置30のメモリに格納され、そのCPUによって実行されるプログラムである。
60 is a performance display processing unit, 70 is an evaluation forecast calculation processing unit based on an ordering system recommended plan, 80 is a selection support processing unit for an order plan correction target product, and 90 is an evaluation index forecast calculation processing unit based on an order manual correction plan. . The
100は需要実績システム、110は需要予測システム、120は発注システム、130は在庫システム、140は在庫予測システムである。システム100〜140は、本システムに接続される外部システムである。本可視化システムは、これら外部システムから受け取ったデータを記憶装置40のデータベース(DB)に格納する。
100 is a demand performance system, 110 is a demand prediction system, 120 is an ordering system, 130 is an inventory system, and 140 is an inventory prediction system. The
300は需要実績データベース(DB)、301は需要予測DB、302は発注案DB、303は在庫実績DB、304は在庫予測DB、305は商品属性マスター、306は評価指標実績値DB、307は発注修正案DB、308は発注システム推奨案評価指標見通値DB、309は必要在庫量DB、310は必要在庫量変化率DB、311は評価指標変化率DB、312は必要在庫量変化率に対する評価指標変化率DB、313は抽出範囲パラメータテーブル、314は抽出範囲設定テーブル、315は発注案修正対象品目DB、316は発注人手修正案評価指標見通値DBである。これらのDBやテーブルは、記憶装置40に格納される。
300 is a demand performance database (DB), 301 is a demand prediction DB, 302 is an order proposal DB, 303 is an inventory performance DB, 304 is an inventory prediction DB, 305 is a product attribute master, 306 is an evaluation index performance value DB, and 307 is an order. The revision plan DB, 308 is an order system recommended plan evaluation index expected value DB, 309 is a required inventory amount DB, 310 is a required inventory amount change rate DB, 311 is an evaluation index change rate DB, and 312 is an evaluation for the required inventory amount change rate. The index
図2は、処理装置30に含まれる実績表示処理部60、発注システム推奨案による評価見通算出処理部70、発注案修正対象品の選定支援処理部80、及び発注人手修正案による評価指標見通算出処理部90と、記憶装置40に収容される各テーブル、各DBとの関連を説明する図である。
FIG. 2 shows a performance
図2において、需要実績システム100は、需要実績DB300の登録及び更新を行うシステムである。需要予測システム110は、需要予測DB301の登録及び更新を行うシステムである。発注システム120は、発注案DB302の登録及び更新を行うシステムである。また発注システムは、発注修正案DB307に格納されたデータによって自身が保持するデータベースの登録及び更新を行う。在庫システム130は、在庫実績DB303の登録及び更新を行うシステムである。在庫予測システム140は、在庫予測DB304の登録及び更新を行うシステムである。
In FIG. 2, the
実績表示処理部60は、需要実績DB300、需要予測DB301および在庫実績DB303のデータを入力し、評価指標実績値と必要在庫量を算出し、それぞれ評価指標実績値DB306および必要在庫量DB309に格納する。
The performance
評価見通算出処理部70は、在庫予測DB304および発注案DB302のデータを入力し、発注システム推奨案と評価指標見通値を算出し、それぞれ発注修正案DB307および発注システム推奨案評価指標見通値DB308に格納する。
The evaluation forecast
発注案修正対象品の選定支援処理部80は、必要在庫量DB309および評価指標実績値DB306のデータを入力し、抽出範囲パラメータテーブル313および抽出範囲設定テーブル314を参照して必要在庫量変化率および評価指標変化率を算出し、それぞれ必要在庫量変化率DB310および評価指標変化率DB311に格納する。次に発注案修正対象品の選定支援処理部80は、必要在庫量変化率DB310と評価指標変化率DB311を入力し、必要在庫量変化率に対する評価指標変化率を算出し、必要在庫量変化率に対する評価指標変化率DB312に格納する。次に発注案修正対象品の選定支援処理部80は、必要在庫量変化率に対する評価指標変化率DB312を入力し、抽出範囲パラメータテーブル313および抽出範囲設定テーブル314を参照して抽出範囲の条件に合う対象商品と対象月を決定し、表示装置20に表示してユーザによる発注案の修正を促す。発注案が修正されると、発注案修正対象品の選定支援処理部80は、そのデータを発注案修正対象品目DB315に格納する。
The ordering plan correction target product selection
発注人手修正案による評価指標見通算出処理部90は、発注修正案DB307、発注システム推奨案評価指標見通値DB308、発注案修正対象品目DB315を入力し、発注人手修正案と発注人手修正案による評価指標見通値を算出し、それぞれ発注修正案DB307および発注人手修正案評価指標見通値DB316に格納する。
The evaluation index estimate
図3は、需要実績DB300のデータ構成例を示す図である。需要実績DB300には、商品ごとに、商品を一意に識別する商品コード欄501、商品コードに対応するメーカー名欄502、商品コードに対応する商品の需要数量を表す数量欄503、商品コードに対応する商品の需要金額を表す金額欄504が設けられている。数量欄503、金額欄504は、1ヶ月単位で設けられ、1年(12ヶ月)単位で区切られている。この数量欄503、金額欄504に格納されている値は、実績としての需要量を示すものであり、現在月の前月までの需要量が格納されている。需要実績DB300には、以下の処理に必要な少なくとも1年間のデータが格納されているものとする(他のDBについても同様)。なお商品の代わりに製品を構成する部品でもよい(以下すべての「商品」について同様)。
FIG. 3 is a diagram illustrating a data configuration example of the
図4は、需要予測DB301のデータ構成例を示す図である。需要予測DB301には、商品ごとに、商品コード欄511、商品コードに対応するメーカー名欄512、商品コードに対応する商品の需要予測数量を表す数量欄513、商品コードに対応する商品の需要予測金額を表す金額欄514が設けられている。数量欄513、金額欄514は、1ヶ月単位で設けられ、1年(12ヶ月)単位で区切られている。この数量欄513、金額欄514に格納されている値は、需要予測量を示すものである。この需要予測量は、実績としての需要量を示す需要実績DB300の需要量の変動傾向から推定されるものである。
FIG. 4 is a diagram illustrating a data configuration example of the
図5は、発注案DB302のデータ構成例を示す図である。発注案DB302には、商品ごとに、商品コード欄521、商品コードに対応するメーカー名欄522、商品コードに対応する商品の発注数量を表す数量欄523、商品コードに対応する商品の発注金額を表す金額欄524が設けられている。数量欄523、金額欄524は、1ヶ月単位で設けられ、1年(12ヶ月)単位で区切られている。この数量欄523、金額欄524に格納されている値は、発注案としての発注量を示すものである。この発注案DB302は、実績としての需要量を示す需要実績DB300の需要量の変動傾向から推定されるものである。
FIG. 5 is a diagram illustrating a data configuration example of the
図6は、在庫実績DB303のデータ構成例を示す図である。在庫実績DB303には、商品ごとに、商品コード欄531、商品コードに対応するメーカー名欄532、商品コードに対応する商品の在庫数量を表す数量欄533、商品コードに対応する商品の在庫金額を表す金額欄534が設けられている。数量欄533、金額欄534は、1ヶ月単位で設けられ、1年(12ヶ月)単位で区切られている。この数量欄533、金額欄534に格納されている値は、実績としての月末在庫量を示すものであり、現在月の前月までの在庫量が格納されている。
FIG. 6 is a diagram illustrating a data configuration example of the
図7は、在庫予測DB304のデータ構成例を示す図である。在庫予測DB304には、商品ごとに、商品コード欄541、商品コードに対応するメーカー名欄542、商品コードに対応する商品の在庫予測数量を表す数量欄543、商品コードに対応する商品の在庫予測金額を表す金額欄544が設けられている。数量欄543、金額欄544は、1ヶ月単位で設けられ、1年(12ヶ月)単位で区切られている。この数量欄543、金額欄544に格納されている値は、各月末の在庫予測量を示すものである。この在庫予測量は、実績としての在庫量を示す在庫実績DB303の在庫量の変動傾向から推定されるものである。
FIG. 7 is a diagram illustrating a data configuration example of the
図8は、商品属性マスター305のデータ構成例を示す図である。商品属性マスター305には、商品ごとに、商品コード欄551、商品コードに対応するメーカ名欄552、商品コードに対応する商品群欄553が設けられる。商品群は、その商品が属する商品グループの名称又は識別子である。
FIG. 8 is a diagram illustrating a data configuration example of the
図9は、評価指標実績値DB306のデータ構成例およびデータ例を示す図である。評価指標実績値DB306には、商品ごとに、商品コード欄561、商品コードに対応するメーカー名欄562、商品コードに対応する商品の即納率を表すパーセント欄563、商品コードに対応する商品の在庫金額を表す金額欄564、商品コードに対応する商品の在庫月数を表す月数欄565、商品コードに対応する商品の在庫月商を表す金額欄566が設けられている。パーセント欄563、金額欄564、月数欄565、金額欄566は、1ヶ月単位で設けられ、1年(12ヶ月)単位で区切られている。この評価指標実績値は、実績としての需要量を示す需要実績DB300、実績としての在庫量を示す在庫実績DB303から計算される数値である。
FIG. 9 is a diagram illustrating a data configuration example and a data example of the evaluation index
なお、ここで例示している「即納率」、「在庫金額」、「在庫月数」、「在庫月商」は以下のような意味づけで定義される。 The “immediate delivery rate”, “inventory amount”, “number of inventory months”, and “inventory monthly quotient” exemplified here are defined as follows.
即納率:商品ごとの数量ベースの引当率を対象商品について平均した値を示す。 Immediate delivery rate: Indicates the average value of the quantity-based provision rate for each product.
在庫金額:商品ごとの月平均在庫数に単価を掛けた値を対象商品について合算した値を示す。なお、1年間需要のない不動品を含む値である。 Inventory amount: A value obtained by multiplying the target product by a value obtained by multiplying the monthly average stock quantity for each product by the unit price. In addition, it is a value including non-moving goods that have no demand for one year.
在庫月数:商品ごとの月平均在庫数を6ヶ月需要平均数で割った数量ベースの在庫月数を対象商品について平均した値を示す。なお、1年間需要のない不動品を除いた値である。 Number of months of inventory: A value obtained by averaging the number of months of inventory on a quantity basis by dividing the number of monthly average inventory for each product by the average number of demands for 6 months. The value excludes non-moving goods that have no demand for one year.
在庫月商:在庫金額合算を、商品ごとの6ヶ月需要平均数に単価を掛けた値の合算で割っ
た値を示す。なお、1年間需要のない不動品を含む値である。
Monthly inventory: Indicates the value obtained by dividing the sum of the inventory amount by the sum of the average number of 6-month demand for each product multiplied by the unit price. In addition, it is a value including non-moving goods that have no demand for one year.
不動品:過去12ヶ月需要実績のない商品を示す。 Non-movable product: Indicates a product for which no demand has been recorded for the past 12 months.
図10は、発注修正案DB307のデータ構成例を示す図である。発注修正案DB307には、商品ごとに、商品コード欄571、商品コードに対応するメーカー名欄572、商品コードに対応する商品の発注システム推奨案数量を表す数量欄573、商品コードに対応する商品の発注システム推奨案金額を表す金額欄574、商品コードに対応する商品の発注人手修正案数量を表す数量欄575、商品コードに対応する商品の発注人手修正案金額を表す金額欄575が設けられている。数量欄573、金額欄574、数量欄575、金額欄576は、1ヶ月単位で設けられ、1年(12ヶ月)単位で区切られている。この発注修正案数値は、発注システム推奨案による評価指標見通処理部70の処理の結果として抽出された数値、及び発注人手修正案による評価指標見通算出処理部80の処理の結果として抽出された数値である。この発注修正案数値によって、発注システムが保持するデータベースが更新される。
FIG. 10 is a diagram illustrating a data configuration example of the order
図11は、発注システム推奨案評価指標見通値DB308のデータ構成例を示す図である。発注システム推奨案評価指標見通値DB308には、商品ごとに、商品コード欄581、商品コードに対応するメーカー名欄582、商品コードに対応する商品の即納率を表すパーセント欄583、商品コードに対応する商品の在庫金額を表す金額欄584、商品コードに対応する商品の在庫月数を表す月数欄585、商品コードに対応する商品の在庫月商を表す金額欄586が設けられている。パーセント欄583、金額欄584、月数欄585、金額欄586は、1ヶ月単位で設けられ、1年(12ヶ月)単位で区切られている。この発注システム推奨案評価指標見通値は、在庫予測量を示す在庫予測DB304と発注案としての発注量を示す発注案DB302から計算される数値である。
FIG. 11 is a diagram illustrating a data configuration example of the ordering system recommended plan evaluation index estimated
図12は、必要在庫量DB309のデータ構成例を示す図である。必要在庫量DB309には、商品ごとに、商品コード欄591、商品コードに対応するメーカー名欄592、商品コードに対応する商品の適正在庫量を表す数量欄593が設けられている。数量欄593は、1ヶ月単位で設けられ、1年(12ヶ月)単位で区切られている。この必要在庫量は、実績としての需要量を示す需要実績DB300から計算される数値である。
FIG. 12 is a diagram illustrating a data configuration example of the
図13は、必要在庫量変化率DB310のデータ構成例を示す図である。必要在庫量変化率DB310には、商品ごとに、商品コード欄601、商品コードに対応するメーカー名欄602、商品コードに対応する必要在庫量変化率を表すパーセント欄603が設けられる。このパーセント欄603に格納される値は、実績として必要在庫量変化率を示すものである。この必要在庫量変化率は、過去および発注案対象月の必要在庫量から計算されるものである。
FIG. 13 is a diagram illustrating a data configuration example of the necessary inventory amount
図14は、評価指標変化率DB311のデータ構成例を示す図である。評価指標変化率DB311には、商品ごとに、商品コード欄611、商品コードに対応するメーカー名欄612、商品コードに対応する商品の即納率変化率を表すパーセント欄613、商品コードに対応する商品の在庫金額変化率を表すパーセント欄614、商品コードに対応する商品の在庫月数変化率を表すパーセント欄615が設けられている。この評価指標変化率は、過去および発注案対象月の評価指標から計算される数値である。
FIG. 14 is a diagram illustrating a data configuration example of the evaluation index
図15は、必要在庫量変化率に対する評価指標変化率DB312のデータ構成例を示す図である。必要在庫量変化率に対する評価指標変化率DB312には、商品ごとに、商品コード欄621、商品コードに対応するメーカー名欄622、商品コードに対応する商品の即納率変化率を表すパーセント欄623、商品コードに対応する商品の在庫金額変化率を表すパーセント欄624、商品コードに対応する商品の在庫月数変化率を表すパーセント欄625が設けられている。この必要在庫量変化率に対する評価指標変化率は、必要在庫量変化率DB310および評価指標変化率DB311から計算される数値である。
FIG. 15 is a diagram illustrating a data configuration example of the evaluation index
図16は、抽出範囲パラメータテーブル313のデータ構成例を示す図である。抽出範囲パラメータテーブル313には、「a」、「b」、「c」と定義されたパラメータ定義欄631、パラメータ数値欄632が設けられている。パラメータ数値欄632に格納された値は、パラメータ定義に対応する任意の数値であり、システムを運用しながら変更される値である。そしてこの値は、後述する抽出範囲設定テーブル314において、商品ごとの抽出範囲に利用される。
FIG. 16 is a diagram illustrating a data configuration example of the extraction range parameter table 313. The extraction range parameter table 313 is provided with a
図17は、抽出範囲設定テーブル314のデータ構成例を示す図である。抽出範囲設定テーブル314は、必要在庫量変化率に対する即納率変化率をXとして、Xの値をパラメータaの任意の数値で範囲を設定したものと、必要在庫量変化率に対する在庫金額変化率をYとして、Yの値をパラメータbの任意の数値で範囲を設定したものと、必要在庫量変化率に対する在庫月数変化率をZとして、Zの値をパラメータcの任意の数値で範囲を設定したものであり、商品ごとに抽出範囲として「選択」か「選択しない=×」かを決定するテーブルである。 FIG. 17 is a diagram illustrating a data configuration example of the extraction range setting table 314. In the extraction range setting table 314, the immediate delivery rate change rate with respect to the required stock amount change rate is set to X, and the range of the X value is set by an arbitrary numerical value of the parameter a, and the stock amount change rate with respect to the required stock amount change rate Y is a range in which the value of Y is set with an arbitrary numerical value of parameter b, and Z is the rate of change in the number of months of inventory with respect to the rate of change in required inventory, and the range of Z is set with an arbitrary numerical value of parameter c This is a table for determining “selected” or “not selected = ×” as the extraction range for each product.
例示する抽出範囲設定テーブル314は、「X>a」の欄641、「X≦a」の欄642、「Y>b」の欄643、「Y≦b」の欄644、「Z>c」の欄645、「Z≦c」の欄646と分けられている。
The illustrated extraction range setting table 314 includes an “X> a”
図18は、発注案修正対象品目DB315のデータ構成例を示す図である。発注案修正対象品目DB315には、商品ごとに、商品コード欄651、商品コードに対応するメーカー名欄652、商品コードに対応する商品の発注見通数量を表す数量欄653、商品コードに対応する商品の発注見通金額を表す金額欄654が設けられている。数量欄653、金額欄654は、1ヶ月単位で設けられ、1年(12ヶ月)単位で区切られている。発注案修正対象品目DB315に格納される発注見通値は、発注修正案DB307より抽出される数値である。発注案修正対象品目DB315で修正の対象となる商品は、詳細を後述する発注案修正対象品の選定支援処理部80の処理の結果として抽出されたものである。また、発注案修正の対象発注月は、数量欄653、金額欄654に太枠で示している。
FIG. 18 is a diagram illustrating a data configuration example of the order plan correction
発注案修正の対象となる商品および対象月がピックアップされると、システムは、元の発注案の前後に発注案を変動させて評価指標の変化をみるシミュレーションを行い、その結果を表示装置20の画面に表示する。後述するように、ユーザは、目標評価指標を達成するように発注案を修正できる。
When the product and the target month subject to order plan modification are picked up, the system performs a simulation to change the order plan before and after the original order plan and see the change in the evaluation index, and the result is displayed on the
図19は、発注人手修正案評価指標見通値DB316のデータ構成例を示す図である。発注人手案評価指標見通値DB316には、商品ごとに、商品コード欄661、商品コードに対応するメーカー名欄662、商品コードに対応する商品の即納率を表すパーセント欄663、商品コードに対応する商品の在庫金額を表す金額欄664、商品コードに対応する商品の在庫月数を表す月数欄665、商品コードに対応する商品の在庫月商を表す金額欄666が設けられている。パーセント欄663、金額欄664、月数欄665、金額欄666は、1ヶ月単位で設けられ、1年(12ヶ月)単位で区切られている。この発注人手修正案評価指標見通値は、発注システム推奨案評価指標見通値DB308の見通値が人手によって修正された数値である。
FIG. 19 is a diagram illustrating a data configuration example of the orderer manual correction plan evaluation index estimated
図20は、本発明の実施形態による発注人手修正案による評価指標見通算出の処理手順を示すフローチャートであり、次にこれについて説明する。なお、図20の点線で囲んである部分が、それぞれ、実績表示処理部60による処理、システム推奨案による評価指標見通算出処理部70による処理、発注案修正対象品の選定支援処理部80による処理、および発注人手修正案による評価指標見通算出処理部90による処理を示している。また、発注案修正対象品の選定支援処理部80による処理の詳細手順を説明するフローチャートを図21で示す。
FIG. 20 is a flowchart showing a processing procedure of evaluation index forecast calculation based on an order manual correction plan according to an embodiment of the present invention, which will be described next. The portions surrounded by the dotted lines in FIG. 20 are the processing by the performance
(1)まず、実績表示処理部60は、需要実績DB300、需要予測DB301、および在庫実績DB303を読み込む(ステップ401)。
(1) First, the performance
需要実績DB300の商品コード欄501、メーカー名欄502、数量欄503、金額欄504の各情報は、需要情報システム100により情報の登録及び情報の変更が発生した場合に、情報の更新が行われている。また需要予測DB301の商品コード欄511、メーカー名欄512、数量欄513、金額欄514の各情報は、需要予測システム110により情報の登録及び情報の変更が発生した場合に、情報の更新が行われている。需要予測データは、ステップ404の計算で用いられる。また在庫実績DB303の商品コード欄531、メーカー名欄532、数量欄533、金額欄534の各情報は、在庫システム130により情報の登録及び情報の変更が発生した場合に、情報の更新が行われている。
Information in the
(2)次に、実績表示処理部60は、(1)で読み込んだデータを使い、評価指標実績値と必要在庫量を算出して表示する(ステップ402)。
(2) Next, the result
評価指標実績値は、数1〜数4により求められる。
The evaluation index actual value is obtained by
即納率実績=各月毎の平均(AVE)各商品毎
{(需要実績−B/O(バックオーダー)実績)÷需要実績} (数1)
在庫金額実績=各月毎のΣ各商品毎(各月末在庫量の月平均値×単価) (数2)
在庫月数実績=各月毎のAVE各商品毎
{Σ(各月末在庫量の月平均値)÷6ヶ月需要平均} (数3)
在庫月商実績=各月毎の{Σ各商品毎(各月末在庫量の月平均値×単価)}
÷Σ各商品毎(6ヶ月需要平均×単価) (数4)
必要在庫量は、数5により求められる。
Prompt delivery rate results = Average for each month (AVE) For each product
{(Demand Actual-B / O (Back Order) Actual) / Demand Actual} (Equation 1)
Inventory amount actual = Σ for each product for each product (monthly average of monthly inventory at the end of each month x unit price) (Equation 2)
Monthly inventory results = AVE each product for each month
{Σ (Monthly average value of each month's inventory) ÷ 6-month average demand} (Equation 3)
Monthly inventory sales results = Monthly {Σ Each product (Monthly average of the end-of-month inventory quantity x Unit price)}
÷ Σ for each product (6 month average demand × unit price) (Equation 4)
The necessary inventory amount is obtained by
必要在庫量=過去1年間の月平均需要量×(リードタイム+計画サイクル)
+安全在庫係数×√(リードタイム+計画サイクル)
×過去1年間の月単位需要標準偏差 (数5)
なお、即納率実績の式に記載してあるB/O(バックオーダー)とは、注文した商品の在庫切れが発生した場合を示す。B/O実績、単価などのデータは、図示しないデータベースに格納されている。
Necessary inventory = Monthly average demand for the past year x (Lead time + Planning cycle)
+ Safety stock factor x √ (Lead time + Planning cycle)
× Monthly demand standard deviation for the past year (Formula 5)
In addition, B / O (back order) described in the formula of the actual delivery rate results indicates a case where the ordered product is out of stock. Data such as B / O results and unit prices are stored in a database (not shown).
なお、安全在庫係数は「需要は正規分布に従うこと」を前提に次の表1により求められる。 The safety stock coefficient is obtained from the following Table 1 on the assumption that “demand follows a normal distribution”.
また、リードタイム、計画サイクルは、商品により異なる任意の数値である。 Further, the lead time and the planning cycle are arbitrary numerical values that differ depending on the product.
実績表示処理部60は、算出された評価指標実績値および必要在庫量値によって、それぞれ評価指標実績値DB306および必要在庫量DB309を更新する。
The actual result
なお図20の処理手順は、各商品を単位として計算および処理をしているが、商品属性マスター305を参照し、メーカごと又は商品群ごとに処理を行ってもよい。
In the processing procedure of FIG. 20, calculation and processing are performed for each product, but processing may be performed for each manufacturer or each product group with reference to the
(3)次に、発注システム推奨案による評価指標見通算出処理部70は、ステップ402で算出された評価指標実績値(即納率実績、在庫金額実績、在庫月数実績、在庫月商実績)、在庫予測DB304および発注案DB302を読み込み(ステップ403)、発注システム推奨案と評価指標(即納率、在庫金額、在庫月数、在庫月商)見通値を算出する(ステップ404)。発注システム推奨案、評価指標見通値は月別に算出される。
(3) Next, the evaluation index forecast
発注案DB302の商品コード欄521、メーカー名欄522、数量欄523、金額欄524の各情報は、発注システム120により情報の登録及び情報の変更が発生した場合に、情報の更新が行われている。在庫予測DB304の商品コード欄541、メーカー名欄542、数量欄543、金額欄544の各情報は、在庫予測システム140により情報の登録及び情報の変更が発生した場合に、情報の更新が行われている。
Information in the
発注システム推奨案は、数6〜数8により求められる。
The ordering system recommended plan is obtained by
月別需要予測値=各月毎のΣ各商品毎(需要予測値) (数6)
月別入荷数量=各月毎のΣ各商品毎(数量案) (数7)
月別入荷金額=各月毎のΣ各商品毎(数量案×単価) (数8)
評価指標見通値は、数9〜数12により求められる。
Monthly demand forecast value = Σ for each product (demand forecast value) (Equation 6)
Monthly arrival quantity = Σ for each product (proposed quantity) (Equation 7)
Monthly arrival amount = every month Σ each product (quantity plan x unit price) (Equation 8)
The estimated value of the evaluation index is obtained by
月別即納率見通
=各月毎のAVE各商品毎(発注時に算出した即納率見込値) (数9)
月別在庫金額見通
=各月毎の{Σ各商品毎(発注時に算出した在庫金額見込値)
+Σ(不動品最新月末在庫×単価)} (数10)
月別在庫月数見通
=各月毎のAVE各商品毎(発注時に算出した在庫月数見込値) (数11)
月別在庫月商見通
=各月毎の[{Σ各商品毎(発注時に算出した在庫金額見込値)}
+Σ(不動品最新月末在庫×単価)]÷Σ各商品毎(6ヶ月受注平均×単価) (数12)
発注システム推奨案による評価指標見通算出処理部70は、メモリ上に作成された発注システム推奨案を発注修正案DB307の数量欄573、金額欄574に格納し、評価指標見通値を発注システム推奨案評価指標見通値DB308に格納する(ステップ405)。
Monthly immediate delivery rate forecast = Each AVE product for each month (estimated immediate delivery rate calculated at the time of ordering) (Equation 9)
Monthly inventory value forecast = Monthly {Σ Each product (Estimated inventory value calculated at the time of ordering)
+ Σ (Fundamentals latest stock at end of month x Unit price)} (10)
Monthly inventory month forecast = AVE for each month (Estimated number of inventory months calculated at the time of ordering) (Equation 11)
Monthly inventory monthly forecast = [{Σ for each product (estimated stock value calculated at the time of order)} for each month}
+ Σ (Fundamental latest inventory at the end of the month x Unit price)] ÷ Σ Each product (6 months average order received x Unit price) (12)
The evaluation index estimate
(4)次に、発注案修正対象品の選定支援処理部80について説明する。ここでは、必要在庫量変化率と評価指標変化率を考慮して、発注案修正対象商品を選定する(ステップ406)。なお発注案修正対象品の選定支援処理部80の詳細のフローは、図21により説明する。
(4) Next, the selection
(5)次に、発注人手修正案による評価指標見通算出処理部90は、発注修正案DB307とステップ406で算出された発注人手修正案を発注案修正対象品目DB315から読み込み(ステップ407)、発注システム推奨案の評価指標見通値を発注システム推奨案評価指標見通値DB308から読み込み、発注人手修正案による評価指標見通値を算出する(ステップ408)。
(5) Next, the evaluation index forecast
発注人手修正案による評価指標見通値は、数13〜数16により求められる。 The estimated value of the evaluation index based on the manual order revision plan is obtained by Equations (13) to (16).
月別即納率修正値=各月毎のAVE各商品毎
{即納係数k(パラメタ値)登録時に設定したシミュレーション上の平均見込即納率}
×[1−(発注システム推奨案−発注人手修正案)
÷{発注月需要予測値×(手番+1)×(1+安全在庫係数)}] (数13)
月別在庫金額修正値=(月別在庫月数修正値×6ヶ月需要平均×単価)
+Σ(不動品最新月末在庫×単価)} (数14)
月別在庫月数修正値=各月毎のAVE各商品毎
{即納係数k(パラメタ値)登録時に設定したシミュレーション上の平均見込在庫月数}
×[{(発注システム推奨案−発注人手修正案)÷月実際納入回数}÷6ヶ月需要平均]
(数15)
月別在庫月商修正値=[(Σ各商品毎月別在庫金額修正値)
+Σ(不動品最新月末在庫×単価)]÷Σ各商品毎(6ヶ月需要平均×単価) (数16)
見通し値は月別に算出される。
Monthly immediate delivery rate correction value = AVE for each product for each month {Average expected immediate delivery rate on simulation set when registering immediate delivery coefficient k (parameter value)}
× [1- (Ordering system recommendation proposal-Ordering manual correction proposal)
÷ {Order Monthly Demand Forecast Value x (Stage + 1) x (1 + Safety Stock Coefficient)}] (Equation 13)
Monthly inventory value correction value = (Monthly inventory month correction value x 6-month average demand x unit price)
+ Σ (Fundamentals latest end of month inventory x unit price)} (14)
Monthly inventory month correction value = AVE each product for each month {average expected inventory months in simulation set when registering immediate delivery coefficient k (parameter value)}
× [{(Ordering system recommended plan-Ordered manual correction plan) ÷ Monthly actual delivery count} ÷ 6-month demand average]
(Equation 15)
Monthly inventory monthly quotient correction value = [(Σ each product monthly inventory value correction value)
+ Σ (Fundamentals latest stock at the end of the month x Unit price)] ÷ Σ Each product (6 months demand average x Unit price) (16)
Forecast values are calculated monthly.
発注人手修正案による評価指標見通算出処理部90は、メモリ上に作成された発注人手修正案による評価指標見通値を発注人手修正案評価指標見通値DB316に格納する(ステップ409)。また発注人手修正案による評価指標見通算出処理部90は、入力された発注システム推奨案を修正された発注案データにより更新し、発注修正案DB307の発注人手修正案を格納する。
The evaluation index estimate
(6)次に、システムは、需要実績DB300および在庫実績DB303に未処理のデータがあるか否か判定する(ステップ410)。すべてのデータが処理済であれば処理を終了する。未処理のデータがあれば、ステップ401に戻り、上記処理を繰り返す。
(6) Next, the system determines whether there is unprocessed data in the
図21は、発注案修正対象品の選定支援処理部80の処理手順を示すフローチャートであり、次にこれについて説明する。なお、図21の実線で囲んである部分が、発注案修正対象品の選定支援処理部80による処理を示している。
(1)発注案修正対象品の選定支援処理部80は、商品毎の月別発注金額(実績)による抽出条件を設定し、それに該当する商品を抽出する(ステップ501)。例を挙げると
「月発注金額>1,000,000円(この部分は任意の数値)の商品コードを抽出する」
などである。金額規模が大きい場合ほど、評価指標への影響が大きいため、最初に金額により範囲を設定する。
FIG. 21 is a flowchart showing the processing procedure of the ordering plan correction target product selection
(1) The ordering plan correction target product selection
Etc. The larger the monetary scale, the greater the impact on the evaluation index, so the range is first set according to the monetary amount.
(2)次に、発注案修正対象品の選定支援処理部80は、抽出された商品コードについてステップ402で算出された必要在庫量を格納してある必要在庫量DB309を読み込み、商品ごとに発注案対象月より過去1年間(=12ヶ月)を対象に必要在庫量変化率を計算する(ステップ502)。必要在庫量変化率の計算式は下記の通りである。
(2) Next, the ordering plan correction target product selection
必要在庫量変化率
=(発注案対象月より過去1年間の月平均必要在庫量/発注案対象月の必要在庫量)
×100 (数17)
発注案修正対象品の選定支援処理部80は、算出された必要在庫量変化率を必要在庫量変化率DB310に格納する。
Necessary inventory change rate = (Monthly average required inventory for the past year from the order proposal target month / Required inventory quantity for the order proposal target month)
× 100 (Equation 17)
The ordering plan correction target product selection
(3)次に、発注案修正対象品の選定支援処理部80は、抽出された商品コードについて評価指標実績値DB306のデータを読み込み、発注案対象月より過去1年間(=12ヶ月)を対象に在庫管理における評価指標(即納率、在庫金額、在庫月数)の変化率を計算する(ステップ503)。評価指標(即納率、在庫金額、在庫月数)の変化率の計算式は下記の通りである。
(3) Next, the ordering plan correction target product selection
即納率変化率
=(発注案対象月より過去1年間の月平均即納率/発注案対象月の即納率)×100 (数18)
在庫金額変化率
=(発注案対象月より過去1年間の月平均在庫金額/発注案対象月の在庫金額)
×100 (数19)
在庫月数変化率
=(発注案対象月より過去1年間の月平均在庫月数/発注案対象月の在庫月数)
×100 (数20)
発注案修正対象品の選定支援処理部80は、算出された評価指標変化率を評価指標変化率DB311に格納する。
Instant delivery rate change rate = (Monthly average instant delivery rate over the past year from the order proposal target month / Instant delivery ratio in the order proposal target month) x 100 (Equation 18)
Stock price change rate = (Monthly average stock price for the past one year from the order proposal target month / inventory amount for the order proposal month)
× 100 (Equation 19)
Rate of change in number of months in stock = (monthly average number of months in the past year from the order proposal target month / number of months in the order proposal target month)
× 100 (Equation 20)
The ordering plan correction target product selection
(4)次に、発注案修正対象品の選定支援処理部80は、必要在庫量変化率DB310と評価指標変化率DB311それぞれのデータを読み込み、抽出された商品ごとの必要在庫量変化率に対する在庫管理における評価指標(即納率、在庫金額、在庫月数)の変化率を計算する(ステップ504)。商品毎の必要在庫量変化率に対する評価指標の変化率は下記の通りである。
(4) Next, the ordering plan correction target product selection
必要在庫量変化率に対する即納率変化率=即納率変化率/必要在庫量変化率(数21)
必要在庫量変化率に対する在庫金額変化率=在庫金額変化率/必要在庫量変化率 (数22)
必要在庫量変化率に対する在庫月数変化率=在庫月数変化率/必要在庫量変化率 (数23)
発注案修正対象品の選定支援処理部80は、算出された前述の必要在庫量変化率に対する評価指標変化率を必要在庫量変化率に対する評価指標変化率DB312に格納する。
Instant delivery rate change rate relative to required inventory rate change rate = Instant delivery rate change rate / Necessary inventory amount change rate (Expression 21)
Inventory price change rate relative to required inventory quantity change rate = Inventory price change rate / Necessary inventory quantity change rate (Equation 22)
Monthly inventory change rate relative to required inventory change rate = Monthly inventory change rate / Necessary inventory rate change rate (Equation 23)
The ordering plan correction target product selection
(5)次に、発注案修正対象品の選定支援処理部80は、必要在庫量変化率に対する評価指標変化率DB312を読み込み、抽出範囲設定テーブル314を参照して必要在庫量の変化率に対して評価指標の変化率が高い商品を選定する。範囲設定の方法例は下記の通りである。
(5) Next, the ordering plan correction target product selection
i.必要在庫量変化率に対する即納率変化率>a
ii.必要在庫量変化率に対する在庫金額変化率>b
iii.必要在庫量変化率に対する在庫月数変化率>c
(a、b、cはいずれも任意の数値)
さらに、発注案修正対象品の選定支援処理部80は、この3つの範囲設定方法を表示装置20に表示し、下記の3つの条件の中から1つをユーザに選択させる(ステップ505)。
i. Immediate delivery rate change rate for required inventory change rate> a
ii. Inventory amount change rate relative to required inventory change rate> b
iii. Monthly inventory change rate relative to required inventory change rate> c
(A, b and c are all arbitrary numbers)
Further, the ordering plan correction target product selection
i.必要在庫量変化率に対する即納率変化率>a、
必要在庫量変化率に対する在庫金額変化率>b、
必要在庫量変化率に対する在庫月数変化率>c
以上3つの範囲設定を満たす条件
ii.必要在庫量変化率に対する即納率変化率>a、
必要在庫量変化率に対する在庫金額変化率>b、
必要在庫量変化率に対する在庫月数変化率>c
以上の中から2つの範囲設定を満たす条件
iii.必要在庫量変化率に対する即納率変化率>a、
必要在庫量変化率に対する在庫金額変化率>b、
必要在庫量変化率に対する在庫月数変化率>c
以上の中から1つの範囲設定を満たす条件
発注案修正対象品の選定支援処理部80は、選択された条件の下に対象商品と対象月を決定する(ステップ506)。発注案修正対象品の選定支援処理部80は、決定されたデータを発注案修正対象品目DB315に格納し、表示装置20に表示する。
i. Instant delivery rate change rate relative to required stock rate change rate> a,
Inventory amount change rate with respect to required inventory amount change rate> b,
Monthly inventory change rate relative to required inventory change rate> c
Conditions that satisfy the above three range settings
ii. Instant delivery rate change rate relative to required stock rate change rate> a,
Inventory amount change rate with respect to required inventory amount change rate> b,
Monthly inventory change rate relative to required inventory change rate> c
Conditions that satisfy two range settings from the above
iii. Instant delivery rate change rate relative to required stock rate change rate> a,
Inventory amount change rate with respect to required inventory amount change rate> b,
Monthly inventory change rate relative to required inventory change rate> c
Conditions satisfying one range setting from among the above The ordering plan correction target product selection
(6)次に、発注案修正対象品の選定支援処理部80は、入力装置10を介するユーザによる対象発注品の発注案のデータ入力を受け付ける(ステップ507)。発注案修正対象品の選定支援処理部80は、修正データによって発注案修正対象品目DB315を更新する。なおステップ507の詳細は、図22に基づいて後述する。
(6) Next, the ordering plan correction target product selection
図22は、抽出された発注案修正対象商品を対象に、ユーザによる発注案修正を支援するために、発注案修正対象品の選定支援処理部80が実行するシミュレーションの結果表示を示す図である。図で評価指標として与えられる目標即納率、目標在庫金額および目標在庫月数は、ユーザが入力装置10を介して入力した数値データである。発注案修正対象品の選定支援処理部80は、数9〜数11を用いて発注数量が100,200,…500個の場合の即納率見通、在庫金額見通および在庫月数見通を各々算出し、表示装置20上にシミュレーション結果を示すグラフとしてプロットする。この例では、発注システム推奨案の300個の前後に100個きざみで発注案を変動させている。なお、図22において、●を示す図は、発注案に対して目標評価指標を達成していることを示すポイントであり、×を示す図は、発注案に対して目標評価指標を達成していないことを示すポイントである。
FIG. 22 is a diagram illustrating a simulation result display executed by the ordering plan correction target product selection
図22は、修正対象商品の8月の発注数量案を示している。発注システム推奨案は300個を示している。しかし、発注システム推奨案が300個なら、目標即納率は達成しているが、目標在庫金額および目標在庫月数は達成してない。そこで、目標即納率、目標在庫金額、目標在庫月数をすべて達成するための発注案は、200個の時に達成することがわかる。この結果、目標評価指標をすべて超えている200個を人手修正発注案として採用するのがよい。この人手によりデータ修正された発注案は発注修正案DB307に格納される。
FIG. 22 shows the August order quantity proposal for the correction target product. The recommended ordering system shows 300 pieces. However, if there are 300 ordering system recommended proposals, the target immediate delivery rate is achieved, but the target stock amount and target stock months are not achieved. Therefore, it can be seen that the order proposal for achieving all of the target immediate delivery rate, the target inventory amount, and the target inventory months is achieved when the number is 200. As a result, it is preferable to employ 200 pieces that have exceeded all target evaluation indexes as manual correction order proposals. The order plan whose data has been manually corrected is stored in the order
処理部60〜90は、処理プログラムとして構成することができ、この処理プログラムは、HD、DAT、FD、USBメモリ、MO、DVD−RAM、CD−ROM等の記録媒体に格納して提供することができる。
The
本発明は、流通業、製造業等の広い範囲の業種で利用することが可能である。 The present invention can be used in a wide range of industries such as distribution industry and manufacturing industry.
70:発注システム推奨案による評価指標見通算出処理部、 80:発注案修正対象品の選定支援処理部、 90:発注人手修正案による評価指標見通算出処理部、 302:発注案DB、 304:在庫予測DB、 314:抽出範囲設定テーブル、 315:発注案修正対象品目DB、 316:発注人手修正案評価指標見通DB 70: Evaluation index foreseeable calculation processing unit based on ordering system recommended plan, 80: Selection support processing unit for product to be revised for ordering plan, 90: Evaluation index foreseeable calculation processing unit for manual order correction plan, 302: Order plan DB, 304 : Inventory forecast DB, 314: Extraction range setting table, 315: Order plan amendment target item DB, 316: Order manual revision plan evaluation index forecast DB
Claims (5)
各対象在庫品の前記期間についての前記見通値の過去の平均値に対する評価指標変化率を算出し、
前記評価指標変化率の抽出条件を満足する対象在庫品を抽出してその識別子と対応する発注案を表示し、
抽出された前記対象在庫品について前記発注案を前後に変動させたときの複数の発注案について前記評価指標の見通値を算出して表示し、
目標とする複数の評価指標を満足する発注案によって元の発注案を修正可能とすることを特徴とする評価指標見通し可視化方法。 Referring to the storage means for storing an order proposal for each period of each target inventory and the storage means for storing inventory forecast data, the estimated values of a plurality of evaluation indexes for the period of each target inventory are calculated. And
Calculate the rate of change of the evaluation index with respect to the past average value of the forecast value for the period of each target inventory item,
Extract the target inventory that satisfies the evaluation index change rate extraction condition, and display the order proposal corresponding to the identifier,
Calculate and display an estimated value of the evaluation index for a plurality of ordering proposals when the ordering proposals are fluctuated back and forth for the extracted target inventory items,
An evaluation index prospect visualization method characterized in that an original ordering plan can be modified by an ordering plan that satisfies a plurality of target evaluation indexes.
前記必要在庫量変化率に対する前記評価指標変化率を算出し、前記評価指標変化率の代わりに前記必要在庫量変化率に対する評価指標変化率を用いることを特徴とする請求項1記載の評価指標見通し可視化方法。 Further, the storage means for storing the necessary inventory quantity for each period of each target inventory item is referred to calculate the change rate of the necessary inventory quantity for the period with respect to the past average value of the required inventory quantity of each target inventory item. ,
The evaluation index prospect according to claim 1, wherein the evaluation index change rate with respect to the required inventory amount change rate is calculated, and the evaluation index change rate with respect to the required inventory amount change rate is used instead of the evaluation index change rate. Visualization method.
各対象在庫品の各期間についての発注案を格納する記憶手段と、在庫予測データを格納する記憶手段とを参照して各対象在庫品の前記期間についての複数の評価指標の見通値を算出する機能と、
各対象在庫品の前記期間についての前記見通値の過去の平均値に対する評価指標変化率を算出する機能と、
前記評価指標変化率の抽出条件を満足する対象在庫品を抽出してその識別子と対応する発注案を表示する機能と、
抽出された前記対象在庫品について前記発注案を前後に変動させたときの複数の発注案について前記評価指標の見通値を算出して表示する機能とを実現させるためのプログラムであって、
前記計算機に前記プログラムを実行させることによって、目標とする複数の評価指標を満足する発注案によって元の発注案を修正可能とすることを特徴とするプログラム。 In the calculator,
Referring to the storage means for storing an order proposal for each period of each target inventory and the storage means for storing inventory forecast data, the estimated values of a plurality of evaluation indexes for the period of each target inventory are calculated. Function to
A function of calculating an evaluation index change rate with respect to a past average value of the forecast value for the period of each target inventory item;
A function of extracting a target inventory that satisfies the extraction condition of the evaluation index change rate and displaying an order proposal corresponding to the identifier;
A program for realizing a function of calculating and displaying an estimated value of the evaluation index for a plurality of order proposals when the order proposal is changed back and forth with respect to the extracted target inventory,
A program characterized in that, by causing the computer to execute the program, the original order proposal can be modified by an order proposal that satisfies a plurality of target evaluation indexes.
各対象在庫品の各期間についての必要在庫量を格納する記憶手段を参照して各対象在庫品の前記必要在庫量の過去の平均値に対する前記期間についての必要在庫量の変化率を算出する機能と、
前記必要在庫量変化率に対する前記評価指標変化率を算出する機能とを実現させるためのプログラムであって、
前記評価指標変化率の代わりに前記必要在庫量変化率に対する評価指標変化率を用いることを特徴とする請求項4記載のプログラム。
In addition,
A function of calculating a rate of change of the required inventory quantity for the period with respect to a past average value of the required inventory quantity of each target inventory with reference to a storage unit that stores the required inventory quantity for each period of each target inventory When,
A program for realizing the function of calculating the evaluation index change rate with respect to the required inventory change rate,
5. The program according to claim 4, wherein an evaluation index change rate with respect to the required inventory amount change rate is used instead of the evaluation index change rate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2005210734A JP2007026335A (en) | 2005-07-21 | 2005-07-21 | Evaluation index forecast visualization method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2005210734A JP2007026335A (en) | 2005-07-21 | 2005-07-21 | Evaluation index forecast visualization method |
Publications (1)
Publication Number | Publication Date |
---|---|
JP2007026335A true JP2007026335A (en) | 2007-02-01 |
Family
ID=37786974
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2005210734A Pending JP2007026335A (en) | 2005-07-21 | 2005-07-21 | Evaluation index forecast visualization method |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2007026335A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2007284185A (en) * | 2006-04-14 | 2007-11-01 | Matsushita Electric Ind Co Ltd | Constant volume value management device |
JP2010039649A (en) * | 2008-08-01 | 2010-02-18 | Canon It Solutions Inc | Information processor and information processing method |
JP2017054446A (en) * | 2015-09-11 | 2017-03-16 | 新日鐵住金株式会社 | Safety stock determination device, method, and program |
CN110858378A (en) * | 2018-08-23 | 2020-03-03 | 阿里巴巴集团控股有限公司 | Evaluation information display method, order creation method, purchase adding method and purchase adding device |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002012308A (en) * | 2000-06-30 | 2002-01-15 | Hitachi Ltd | Inventory management method |
JP2002145421A (en) * | 2000-11-10 | 2002-05-22 | Hitachi Ltd | Supply chain simulation system |
JP2004292101A (en) * | 2003-03-26 | 2004-10-21 | Osaka Gas Co Ltd | System and method for supporting order processing |
-
2005
- 2005-07-21 JP JP2005210734A patent/JP2007026335A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002012308A (en) * | 2000-06-30 | 2002-01-15 | Hitachi Ltd | Inventory management method |
JP2002145421A (en) * | 2000-11-10 | 2002-05-22 | Hitachi Ltd | Supply chain simulation system |
JP2004292101A (en) * | 2003-03-26 | 2004-10-21 | Osaka Gas Co Ltd | System and method for supporting order processing |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2007284185A (en) * | 2006-04-14 | 2007-11-01 | Matsushita Electric Ind Co Ltd | Constant volume value management device |
JP2010039649A (en) * | 2008-08-01 | 2010-02-18 | Canon It Solutions Inc | Information processor and information processing method |
JP2017054446A (en) * | 2015-09-11 | 2017-03-16 | 新日鐵住金株式会社 | Safety stock determination device, method, and program |
CN110858378A (en) * | 2018-08-23 | 2020-03-03 | 阿里巴巴集团控股有限公司 | Evaluation information display method, order creation method, purchase adding method and purchase adding device |
CN110858378B (en) * | 2018-08-23 | 2023-07-28 | 浙江天猫技术有限公司 | Evaluation information display method, order creation method, purchasing method and device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CA2471294A1 (en) | Sales optimization | |
JP6370757B2 (en) | Profit / loss prediction apparatus and profit / loss prediction program | |
JP2007058760A (en) | Energy transaction support system and energy transaction support program | |
JP2018063598A (en) | Business supporting system and business supporting method | |
JP2012247964A (en) | Progress management apparatus and progress management program | |
JP2007026335A (en) | Evaluation index forecast visualization method | |
JP4921572B2 (en) | Bond characteristic calculation system and spread change rate calculation system | |
JP6067630B2 (en) | Profit / loss prediction apparatus and profit / loss prediction program | |
US20030088510A1 (en) | Operational risk measuring system | |
JP2011145960A (en) | Apparatus and program for managing proportional distribution of commodity | |
JP2008052413A (en) | Evaluation support system for sales plan | |
JP2010003112A (en) | Management support device and management support method | |
US20110213632A1 (en) | Environmental information documenting apparatus and environmental information documenting method | |
JP6242362B2 (en) | Profit / loss prediction apparatus and profit / loss prediction program | |
JP2002007671A (en) | Device and method for predicting demand, computer program and computer readable recording medium | |
CN114626660A (en) | Method and apparatus for surge regulation forecasting | |
JP5844293B2 (en) | Data editing apparatus and program | |
JP5781555B2 (en) | Data editing apparatus and program | |
JP5554674B2 (en) | Breakeven point simulation system, method, and program | |
JP2005242816A (en) | Order reception bargaining support method by computer | |
JP2004258717A (en) | Cost management system and method | |
JP2007310434A (en) | Evaluation system for procurement and production structure | |
JP2008165597A (en) | Business parameter determination system | |
JP2004102357A (en) | Production volume calculating method, device, system and program, and recording medium | |
JP5714037B2 (en) | Data editing apparatus and program |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20080317 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20100914 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20101104 |
|
A02 | Decision of refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A02 Effective date: 20110614 |