JP5479989B2 - Tunnel construction method and shield machine - Google Patents

Tunnel construction method and shield machine Download PDF

Info

Publication number
JP5479989B2
JP5479989B2 JP2010095312A JP2010095312A JP5479989B2 JP 5479989 B2 JP5479989 B2 JP 5479989B2 JP 2010095312 A JP2010095312 A JP 2010095312A JP 2010095312 A JP2010095312 A JP 2010095312A JP 5479989 B2 JP5479989 B2 JP 5479989B2
Authority
JP
Japan
Prior art keywords
segment
wife
jack
skin plate
shield machine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2010095312A
Other languages
Japanese (ja)
Other versions
JP2011226105A (en
Inventor
英之 坂根
邦博 永森
修一 瀬月内
佳則 福家
剛史 安部
公児 玉村
和生 吉迫
正義 奥山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP2010095312A priority Critical patent/JP5479989B2/en
Publication of JP2011226105A publication Critical patent/JP2011226105A/en
Application granted granted Critical
Publication of JP5479989B2 publication Critical patent/JP5479989B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)
  • Lining And Supports For Tunnels (AREA)

Description

本発明は、特に大断面のトンネルの施工中に、施工方式を変更可能なトンネルの施工方法およびこれに用いられるシールド機に関するものである。   The present invention relates to a tunnel construction method in which a construction method can be changed during construction of a tunnel having a large cross section, and a shield machine used therefor.

従来、トンネルを構築する際には、例えば、シールド機の後方で場所打ちコンクリートを施工しながら掘進するSENS(Shield machine Extruded concrete lining NATM System)工法のシールド機が用いられる場合がある。場所打ちコンクリート(ECL(Extruded Concrete Lining)用のシールド機を用いることで、シールド機後方に内型枠および妻型枠を用いてコンクリートを打設しながら掘進し、トンネルを施工することができる(以後、場所打ちコンクリート方式によるトンネルの施工方法と称する)。   Conventionally, when constructing a tunnel, for example, a shield machine of a SENS (Shield machine expanded NATM System) method of excavating while casting cast concrete behind a shield machine may be used. By using a shield machine for cast-in-place concrete (ECL (Extracted Concrete Lining), it is possible to dig up and cast a tunnel while placing concrete using the inner formwork and the end formwork behind the shield machine ( Hereinafter, it will be referred to as a tunnel construction method using the cast-in-place concrete method).

一方、シールド機の後方にセグメントを構築しながら掘進し、トンネルを施工する方法がある(以後、セグメント方式によるトンネルの施工方法と称する)。セグメント方式によりトンネルを施工するためには、セグメント方式用のシールド機を用いる必要がある。場所打ちコンクリート方式およびセグメント方式は、通常、施工するトンネルの場所や態様、コスト、工期等を勘案して使い分けられる。したがって、トンネルの施工に際しては、どのような施工方式を採用するかを事前に決定し、使用するシールド機を選定する必要がある。   On the other hand, there is a method of digging while constructing a segment behind the shield machine and constructing a tunnel (hereinafter referred to as a segment construction method). In order to construct a tunnel by the segment method, it is necessary to use a shield machine for the segment method. The cast-in-place concrete method and the segment method are normally used in consideration of the location and mode of the tunnel to be constructed, cost, construction period, and the like. Therefore, when constructing a tunnel, it is necessary to determine in advance what construction method should be adopted and to select a shield machine to be used.

しかし、トンネルによっては、掘進中の地山の強度や施工部位によって、これらの方式を使い分けたい場合がある。したがって、両方式に対応可能な施工方法が望まれる。   However, depending on the tunnel, you may want to use these methods depending on the strength of the ground and the construction site. Therefore, the construction method which can respond to both types is desired.

このような方法として、例えば、トンネル等を構築する際に、1台のシールド機を用い、場所打ちコンクリートおよびセグメントで覆工する方法がある(特許文献1、特許文献2)。   As such a method, for example, when constructing a tunnel or the like, there is a method of lining with cast-in-place concrete and a segment using one shield machine (Patent Document 1, Patent Document 2).

特公平7−863177-86317 特開2004−52467JP2004-52467

しかし、特許文献1、特許文献2いずれの方法においても、セグメント方式と場所打ちコンクリート方式との切り替えにおける具体的な部材の設置方法や止水等の方法については記載されていない。このため、方式の切り替え部における切り替え作業時のシールド機後方からの漏水の問題や、狭い位置におけるセグメントや内型枠の組み立て・設置作業が困難であるという問題がある。また、方式切り替え部における、シールド機の反力伝達部分の強度が十分でないと、施工したコンクリート部またはセグメント部の破損の恐れがある。   However, neither method of Patent Document 1 nor Patent Document 2 describes a specific method for installing members, water stopping, or the like in switching between the segment method and the cast-in-place concrete method. For this reason, there is a problem of water leakage from the rear of the shield machine at the time of switching work in the switching part of the system, and a problem that it is difficult to assemble and install segments and inner molds in a narrow position. Moreover, if the strength of the reaction force transmission portion of the shield machine in the method switching portion is not sufficient, the constructed concrete portion or segment portion may be damaged.

本発明は、このような問題に鑑みてなされたもので、トンネル施工時に、一台のシールド機で場所打ちコンクリート方式およびセグメント方式を切り替え可能であり、切り替え時に置ける漏水の問題がなく、切り替え作業が容易なトンネル施工方法およびこれに用いられるシールド機を提供することを目的とする。   The present invention has been made in view of such problems, and can be switched between a cast-in-place concrete method and a segment method with a single shield machine at the time of tunnel construction, there is no problem of water leakage that can be placed at the time of switching, and switching work An object of the present invention is to provide a tunnel construction method and a shield machine used therefor.

前述した目的を達成するため、第1の発明は、掘進途中において場所打ちコンクリートによる方式からセグメント方式に切り替えるトンネル施工方法であって、スキンプレート内に設けられる推進用ジャッキと、シールド機の後方での場所打ちコンクリートの型枠として用いられる妻型枠と、前記妻型枠を前後進可能な妻型枠用ジャッキと、前記妻型枠の内面に対し着脱可能な第1のシール部と、前記スキンプレートの内面に対し着脱可能な第2のシール部と、を具備するシールド機を用い、内型枠を設置しつつ、前記内型枠と前記妻型枠を型枠として場所打ちコンクリートによる方式でトンネルを施工する工程(a)と、前記スキンプレートの後端近傍の止水を行い、前記妻型枠用ジャッキにより前記妻型枠を前記シールド機の前方に引き戻す工程(b)と、前記第1のシール部を取り外し、前記妻型枠用ジャッキにより、前記第2のシール部を前記スキンプレート後方に移動させて前記スキンプレートの後端近傍に接合する工程(c)と、前記妻型枠用ジャッキにより、第1のセグメントを前記スキンプレートの後方に移動させ、前記第1のセグメントを前記内型枠の外周に接合する工程(d)と、前記第1のセグメントの前方に第2のセグメントを設置してシールド機を前進させ、セグメント方式によりトンネルを施工する工程(e)と、を具備することを特徴とするトンネル施工方法である。   In order to achieve the above-described object, the first invention is a tunnel construction method for switching from a cast-in-place concrete method to a segment method in the middle of excavation, and a propulsion jack provided in a skin plate and a shield machine behind Wife formwork used as a formwork of cast-in-place concrete, wife formwork jack capable of moving forward and backward with the wife formwork, a first seal part detachable with respect to the inner surface of the wife formwork, A method using cast-in-place concrete with the inner mold frame and the wife mold frame as a mold frame while using the shield machine having a second seal part detachable with respect to the inner surface of the skin plate. The step (a) of constructing a tunnel in step (b) and water stopping near the rear end of the skin plate are performed, and the wife formwork is pulled forward of the shield machine by the wife formwork jack. And (b) removing the first seal portion and moving the second seal portion rearward of the skin plate and joining the skin plate in the vicinity of the rear end thereof by the jack frame jack. (C) and a step (d) of moving the first segment to the rear of the skin plate and joining the first segment to the outer periphery of the inner mold frame by the wife mold jack, A step (e) of installing a second segment in front of one segment and moving the shield machine forward to construct a tunnel by a segment method.

前記工程(c)は、前記妻型枠の後方に前記第2のシール部を設置した後、前記妻型枠用ジャッキにより前記妻型枠および前記第2のシール部を後方に移動させる工程であり、前記工程(d)は、前記妻型枠を前記妻型枠用ジャッキにより前記シールド機前方に引き戻し、前記妻型枠用ジャッキの後方に第1のセグメントを設置した後、前記妻型枠用ジャッキにより、前記妻型枠および前記第1のセグメントを前記スキンプレート後方に移動させる工程であり、前記工程(e)は、前記妻型枠を前記妻型枠用ジャッキにより前記シールド機の前方に引き戻し、前記推進用ジャッキを前記第1のセグメントに押しつけて前記シールド機を前進させつつ、前記第1のセグメントの外方に第1の充填材を充填し、前記推進用ジャッキを前記第2のセグメントに押しつけて前記シールド機を前進させつつ、前記第2のセグメントの外方に第2の充填材を充填する工程であってもよい。   The step (c) is a step of moving the wife mold frame and the second seal part rearward by the wife mold jack after installing the second seal part behind the wife mold frame. Yes, the step (d) includes pulling back the wife formwork to the front of the shield machine by the wife formwork jack, and installing the first segment behind the wife formwork jack; A step of moving the wife formwork and the first segment to the rear of the skin plate by a jack for the use, wherein the step (e) is a step of moving the wife formwork to the front of the shield machine by the jack for the formwork frame. The propulsion jack is pushed against the first segment to advance the shield machine, and the first filler is filled outside the first segment, and the propulsion jack is moved to the second segment. No While against the instrument to advance the shield machine may be a step of filling the second sealing member outwardly of the second segment.

前記シールド機は、前記スキンプレートの内面に対し着脱可能かつ前記スキンプレートに沿ってスライド可能なリング部材を更に具備し、前記工程(c)は、前記妻型枠の後方に前記リング部材を設置し、前記リング部材の後方に前記第2のシール部を設置し、前記妻型枠用ジャッキにより、前記リング部材および前記第2のシール部を前記スキンプレート後方に移動させる工程であり、前記工程(d)は、前記妻型枠用ジャッキによって前記妻型枠および前記リング部材を前記シールド機前方に引き戻し、前記リング部材の後方に第1のセグメントを設置し、前記妻型枠用ジャッキにより、前記リング部材および前記第1のセグメントを前記スキンプレート後方に移動させる工程であってもよい。   The shield machine further includes a ring member that can be attached to and detached from the inner surface of the skin plate and that can slide along the skin plate, and in the step (c), the ring member is installed behind the end formwork. The second seal portion is installed behind the ring member, and the ring member and the second seal portion are moved rearward of the skin plate by the wife formwork jack. (D) pulls back the wife formwork and the ring member to the front of the shield machine by the wife formwork jack, installs a first segment behind the ring member, and uses the wife formwork jack, It may be a step of moving the ring member and the first segment to the rear of the skin plate.

前記シールド機は、前記スキンプレート後端部近傍に設けられる埋め込み凍結管を具備し、前記工程(b)は、前記埋め込み凍結管により、前記スキンプレート後端近傍の地山を凍結止水する工程であることが望ましい。   The shield machine includes an embedded freezing pipe provided in the vicinity of the rear end of the skin plate, and the step (b) includes a step of freezing and water-stopping a ground near the rear end of the skin plate by the embedded freezing pipe. It is desirable that

前記推進用ジャッキの先端にはスプレッダが取り付けられており、前記工程(e)は、前記推進用ジャッキの先端に設けられるスプレッダの軸芯を外周方向に偏心させて、前記推進用ジャッキを前記第1のセグメントに押しつけて前記シールド機を前進させる工程であることが望ましく、この場合、前記スプレッダの軸芯の偏心は、内型枠用スプレッダを前記内型枠用スプレッダよりも外方に偏心したセグメント用スプレッダに交換してもよく、前記スプレッダの軸芯の偏心は、前記推進用ジャッキを前記シールド機の外周方向にスライド移動させることにより行われてもよい。また、これらを組み合わせてもよい。   A spreader is attached to the tip of the propulsion jack, and in step (e), the shaft core of the spreader provided at the tip of the propulsion jack is eccentric in the outer peripheral direction, and the propulsion jack is moved to the first end. It is desirable that the shield machine is advanced by pressing against one segment. In this case, the center of the spreader shaft is offset outwardly from the inner mold spreader. The spreader may be replaced with a segment spreader, and the shaft center of the spreader may be decentered by sliding the propulsion jack in the outer peripheral direction of the shield machine. Moreover, you may combine these.

前記第1の充填材はモルタルであり、前記第2の充填材は、前記第1の充填材よりも強度の弱い裏込め材であることが望ましい。   The first filler is preferably mortar, and the second filler is preferably a backfill material having a lower strength than the first filler.

前記第1のセグメントは、テーパ形状を有するセグメントであり、前記工程(d)は、前記第1のセグメントの前方に仮セグメントが設けられる工程であり、前記工程(e)は、前記仮セグメントとともに前記第1のセグメントを後方に移動させ、前記仮セグメントと前記第1のセグメントを分離し、前記仮セグメントを前記シールド機の前方に引き戻す工程であってもよい。   The first segment is a segment having a tapered shape, and the step (d) is a step in which a temporary segment is provided in front of the first segment, and the step (e) is performed together with the temporary segment. The first segment may be moved rearward, the temporary segment and the first segment may be separated, and the temporary segment may be pulled back to the front of the shield machine.

本発明によれば、方式切り替え時において、スキンプレート後端部近傍の止水を行うため、地山からの漏水の恐れがない。特に、スキンプレートの後端近傍に埋め込まれた埋め込み凍結管を用いることで、他の部材等と干渉することもなく、容易かつ確実に止水を行うことができる。   According to the present invention, water is stopped near the rear end of the skin plate at the time of system switching, so there is no risk of water leakage from the natural ground. In particular, by using an embedded freezing tube embedded in the vicinity of the rear end of the skin plate, water can be stopped easily and reliably without interfering with other members.

また、内型枠とセグメントとの境界部には、第1のセグメントが内型枠の外周に設けられ、さらに第1のセグメントの前方に第2のセグメントが設けられるため、推進用ジャッキからの押圧力が確実に伝達されて、内型枠等の破損の恐れがない。   In addition, the first segment is provided on the outer periphery of the inner mold frame at the boundary between the inner mold frame and the segment, and the second segment is provided in front of the first segment. The pressing force is transmitted reliably and there is no risk of damage to the inner mold.

また、第2のシール部や第1のセグメントのスキンプレート後方への移動に対して妻型枠用ジャッキを用いることで、作業スペースの広い部位で組み立てを行い、設置位置まで容易に移動させることができるため、作業性に優れる。   Also, by using a wife form jack for moving the second seal part and the first segment to the rear of the skin plate, it is possible to assemble in a wide working space and easily move to the installation position. Therefore, workability is excellent.

特に、第2のシール部や第1のセグメントをスキンプレートの後方へ移動させる際に、妻型枠の後方にリング部材を設けることで、妻型枠用ジャッキのストローク以上にこれらの部材を後方に移動させることができ、妻型枠用ジャッキを必要以上に大型化する必要がない。   In particular, when moving the second seal part and the first segment to the rear of the skin plate, by providing a ring member behind the wife formwork, these members are moved rearward beyond the stroke of the wife formwork jack. It is not necessary to enlarge the wife form jack more than necessary.

また、第1のセグメントの外方には第1の充填材を充填し、第2のセグメントの外方には第2の充填材を充填することで、地山からの漏水を確実に防止することができる。この際、第1の充填材を、例えば、場所打ちコンクリートで使用されるコンクリートと略同強度のモルタル(場所打ち用のコンクリートから骨材を除いたものなど)とし、第2の充填材としては、例えば、従来から使用されるベントナイト等を含むモルタルのように第1の充填材よりも低強度の充填材とすることで、方式変更の境界部近傍には、より高強度の充填材を充填して、確実にひび割れや止水を行うとともに、その他の部位には、過剰な強度を有する充填材を使用する必要がない。   Also, the first segment is filled with the first filler, and the second segment is filled with the second filler, thereby reliably preventing water leakage from the ground. be able to. At this time, the first filler is, for example, a mortar having substantially the same strength as the concrete used in cast-in-place concrete (such as cast-in concrete removed), and the second filler is For example, by using a lower-strength filler than the first filler, such as mortar containing bentonite that has been used in the past, a higher-strength filler is filled near the boundary of the system change. Thus, it is possible to reliably crack and stop the water, and it is not necessary to use a filler having excessive strength in other portions.

また、施工方式の変更に伴い、推進用ジャッキにより後方に応力を伝達する部位に用いられるスプレッダの軸芯(押圧面の中心)を、内型枠押圧用からセグメント押圧用への変更時に外周方向に偏心させるため、内型枠に対してもセグメントに対しても同様に、確実に押圧力を伝達させることができる。この場合、内型枠用スプレッダを、内型枠用スプレッダよりも外方に偏心したセグメント用スプレッダに変更すれば、特殊な機構を有さず、スプレッダの位置を外周に偏心させることができ、また、これに代えて、またはこれと組み合わせて、推進用ジャッキ自体をシールド機の外周方向に移動させることで、同様の効果を得ることができる。   In addition, along with the change in construction method, when the shaft core (the center of the pressing surface) of the spreader used for the part where stress is transmitted backward by the propulsion jack is changed from the inner mold frame pressing to the segment pressing, the outer circumferential direction Therefore, the pressing force can be reliably transmitted to the inner mold frame and the segment as well. In this case, if the spreader for the inner mold is changed to the spreader for the segment that is eccentric outward than the spreader for the inner mold, the position of the spreader can be eccentric to the outer periphery without having a special mechanism. Further, instead of this, or in combination with this, the same effect can be obtained by moving the propulsion jack itself in the outer peripheral direction of the shield machine.

第2の発明は、掘進途中においてセグメント方式から場所打ちコンクリートによる方式に切り替るトンネル施工方法であって、スキンプレート内に設けられる推進用ジャッキと、シールド機の後方での場所打ちコンクリートの型枠として用いられる妻型枠と、前記妻型枠を前後進可能な妻型枠用ジャッキと、前記妻型枠の内面に対し着脱可能な第1のシール部と、前記スキンプレートの内面に対し着脱可能な第2のシール部と、を具備するシールド機を用い、第2のセグメントを設置しつつ、前記第2のセグメントの外方に第2の充填材を充填し、セグメント方式でトンネルを施工する工程(p)と、前記スキンプレートの後端近傍の止水を行う工程(q)と、前記第2のセグメントの内周に、内型枠反力リングを接合し、前記スキンプレートの後端近傍の止水を行い、前記第2のシール部を前記スキンプレートより撤去する工程(r)と、前記内型枠反力リングの前方に内型枠を設置するとともに、前記妻型枠の内面に第1のシール部を設置し、前記妻型枠を前記スキンプレートの後端近傍に移動させ、前記スキンプレートの後端部近傍の前記第2のセグメントの外方に第1の充填材を充填する工程(s)と、前記内型枠と前記妻型枠を型枠として場所打ちコンクリートによる方式でトンネルを施工する工程(t)と、を具備することを特徴とするトンネル施工方法である。   A second invention is a tunnel construction method for switching from a segment method to a cast-in-place concrete method during excavation, and a propulsion jack provided in a skin plate and a cast-in-place concrete formwork behind a shield machine Wife mold frame used as a wife, a wife mold jack capable of moving the wife mold frame back and forth, a first seal portion detachable from the inner surface of the wife mold frame, and a detachable attachment to the inner surface of the skin plate A second shield can be used, and a second segment can be installed and a second filler can be filled outside the second segment to construct a tunnel in a segmented manner. A step (p) of performing a step (q) of stopping water in the vicinity of the rear end of the skin plate, and joining an inner form reaction force ring to the inner periphery of the second segment, Water stop in the vicinity of the rear end, removing the second seal part from the skin plate (r), installing an inner mold in front of the inner mold reaction force ring, A first seal portion is installed on the inner surface of the frame, the wife frame is moved to the vicinity of the rear end of the skin plate, and the first segment is formed outside the second segment in the vicinity of the rear end of the skin plate. A tunnel construction comprising: a step (s) of filling a filler; and a step (t) of constructing a tunnel by a cast-in-place concrete method using the inner mold frame and the end mold frame as a mold frame. Is the method.

第2の発明によれば、第1の発明の逆の工程を行うことで、セグメント方式から場所打ちコンクリート方式に変更することもできる。この場合、方式変更境界部におけるセグメントの内周に、内型枠反力リングを設けることで、推進用ジャッキからの押圧力を境界部において確実に伝達させることができる。   According to the second invention, it is possible to change from the segment method to the cast-in-place concrete method by performing the reverse process of the first invention. In this case, by providing the inner form reaction force ring on the inner periphery of the segment at the system change boundary part, the pressing force from the propulsion jack can be reliably transmitted at the boundary part.

第3の発明は、掘進中に、セグメント方式および場所打ちコンクリートによる方式を任意に変更可能なシールド機であって、スキンプレート内に設けられる推進用ジャッキと、シールド機の後方での場所打ちコンクリートの型枠として用いられる妻型枠と、前記妻型枠を前後進可能な妻型枠用ジャッキと、前記スキンプレートの後端部近傍に設けられる埋め込み凍結管と、前記妻型枠の内面に着脱可能に設けられる第1のシール部と、前記スキンプレートの内面に着脱可能に設けられる第2のシール部と、前記スキンプレートの内面に対し着脱可能かつ前記スキンプレートに沿ってスライド可能なリング部材と、を具備することを特徴とするシールド機である。   A third invention is a shield machine capable of arbitrarily changing a segment system and a cast-in-place concrete system during excavation, and a propulsion jack provided in a skin plate, and a cast-in-place concrete behind the shield machine A wife formwork used as a formwork, a wife mold jack capable of moving the wife form back and forth, an embedded freezing tube provided near the rear end of the skin plate, and an inner surface of the wife formwork A first seal portion provided detachably, a second seal portion provided detachably on the inner surface of the skin plate, and a ring detachable with respect to the inner surface of the skin plate and slidable along the skin plate And a member.

第3の発明によれば、掘進中に任意の場所で、また、任意の回数でセグメント方式と場所打ちコンクリート方式を切り替えることができる。   According to the third invention, the segment method and the cast-in-place concrete method can be switched at an arbitrary place during excavation and at an arbitrary number of times.

本発明によれば、トンネル施工時に、一台のシールド機で場所打ちコンクリート方式およびセグメント方式を切り替え可能であり、切り替え時に置ける漏水の問題がなく、切り替え作業が容易なトンネル施工方法およびこれに用いられるシールド機を提供することができる。   According to the present invention, at the time of tunnel construction, it is possible to switch between the cast-in-place concrete method and the segment method with a single shield machine, there is no problem of water leakage that can be placed at the time of switching, and a tunnel construction method that can be easily switched and used for this Can be provided.

シールド機1を示す図で、(a)は概略側面断面図、(b)は(a)のA部拡大図。It is a figure which shows the shield machine 1, (a) is a schematic sectional side view, (b) is the A section enlarged view of (a). 場所打ちコンクリート方式からセグメント方式へ切り替える工程を示す図で、テールシール27の設置工程を示す図。The figure which shows the process of switching from a cast-in-place concrete system to a segment system, and is a figure which shows the installation process of the tail seal 27. 場所打ちコンクリート方式からセグメント方式へ切り替える工程を示す図で、テーパセグメント29の設置工程を示す図。The figure which shows the process of switching from a cast-in-place concrete system to a segment system, and is a figure which shows the installation process of the taper segment 29. FIG. 場所打ちコンクリート方式からセグメント方式へ切り替える工程を示す図で、セグメント35の組み立て工程を示す図。The figure which shows the process of switching from a cast-in-place concrete system to a segment system, and is a figure which shows the assembly process of the segment 35. FIG. セグメント方式から場所打ちコンクリート方式へ切り替える工程を示す図で、内型枠反力リング41の設置工程を示す図。The figure which shows the process of switching to a cast-in-place concrete system from a segment system, and is a figure which shows the installation process of the inner-frame form reaction force ring 41. FIG. セグメント方式から場所打ちコンクリート方式へ切り替える工程を示す図で、妻型枠内周シール18の設置工程を示す図。The figure which shows the process of switching to a cast-in-place concrete system from a segment system, and is a figure which shows the installation process of the end-frame inner periphery seal | sticker 18. FIG. セグメント方式から場所打ちコンクリート方式へ切り替える工程を示す図で、モルタル37の充填工程を示す図。The figure which shows the process switched from a segment system to a cast-in-place concrete system, and is a figure which shows the filling process of the mortar 37. FIG. セグメント方式から場所打ちコンクリート方式へ切り替える工程を示す図で、内型枠15の組み立て工程を示す図。The figure which shows the process of switching from a segment system to a cast-in-place concrete system, and is a figure which shows the assembly process of the inner formwork 15. 推進用ジャッキ7のスライド状態を示す図で、(a)は内周方向に位置した状態を示す図、(b)は外周方向に移動させた状態を示す図。It is a figure which shows the sliding state of the jack for propulsion 7, (a) is a figure which shows the state located in the inner peripheral direction, (b) is a figure which shows the state moved to the outer peripheral direction.

以下、本発明の実施の形態にかかるトンネルの施工方法について説明する。図1は、本発明に用いられるシールド機1を示す図であり、図1(a)はシールド機1の概略側方断面図、図1(b)は図1(a)のA部拡大図である。なお、図1(b)(および以後の図面)においては、簡単のため、妻型枠用ジャッキ11と合わせて推進用ジャッキ7を同一図面上に図示する。図1は、シールド機1が場所打ちコンクリート方式によりトンネルを構築する状態を示す図である。シールド機1は、主に、スキンプレート3、カッタヘッド5、推進用ジャッキ7、妻型枠9、妻型枠用ジャッキ11およびスクリューコンベア13等により構成される。   Hereinafter, a tunnel construction method according to an embodiment of the present invention will be described. FIG. 1 is a view showing a shield machine 1 used in the present invention, FIG. 1 (a) is a schematic side sectional view of the shield machine 1, and FIG. 1 (b) is an enlarged view of a portion A in FIG. 1 (a). It is. In FIG. 1B (and subsequent drawings), for the sake of simplicity, the propulsion jack 7 is shown together with the wife formwork jack 11 on the same drawing. FIG. 1 is a diagram showing a state in which the shield machine 1 constructs a tunnel by a cast-in-place concrete method. The shield machine 1 is mainly composed of a skin plate 3, a cutter head 5, a propulsion jack 7, a wife mold 9, a wife mold jack 11, a screw conveyor 13, and the like.

スキンプレート3は円筒状部材であり、前方にカッタヘッド5が設けられる。カッタヘッド5はシールド機1の前方の地山を掘削するものであり、図示を省略したモータ等により回転可能である。スキンプレート3の内面には、推進用ジャッキ7がスキンプレート3の周方向に所定間隔で複数設けられる。推進用ジャッキ7は、後方のセグメントや内型枠等を押圧し、その反力でシールド機1を推進させるものである。   The skin plate 3 is a cylindrical member, and a cutter head 5 is provided in front. The cutter head 5 excavates a natural ground in front of the shield machine 1 and can be rotated by a motor or the like (not shown). A plurality of jacks for propulsion 7 are provided on the inner surface of the skin plate 3 at predetermined intervals in the circumferential direction of the skin plate 3. The propulsion jack 7 presses the rear segment, the inner mold, and the like, and propels the shield machine 1 with the reaction force.

スキンプレート3の内周には、推進用ジャッキ7と同様に円周方向に複数の妻型枠用ジャッキ11が設けられる。妻型枠用ジャッキ11の先端にはリング状の妻型枠9が設けられる。すなわち、妻型枠9は妻型枠用ジャッキ11によってシールド機1の前後方向に移動可能である。なお、妻型枠用ジャッキ11と推進用ジャッキ7は干渉しないように周方向の位置をずらして配置され、推進用ジャッキ7同士の間であって、推進用ジャッキ7よりやや外方に妻型枠用ジャッキ7が配置される。   On the inner periphery of the skin plate 3, a plurality of wife form frame jacks 11 are provided in the circumferential direction in the same manner as the propulsion jack 7. A ring-shaped wife mold 9 is provided at the tip of the wife mold jack 11. That is, the wife mold 9 can be moved in the front-rear direction of the shield machine 1 by the wife mold jack 11. Note that the wife form jack 11 and the propulsion jack 7 are arranged with their circumferential positions shifted so as not to interfere with each other, and are located between the propulsion jacks 7 and slightly outward from the propulsion jack 7. A frame jack 7 is arranged.

図1(b)に示すように、推進用ジャッキ7の先端には内型枠用スプレッダ19が設けられる。内型枠用スプレッダ19は、推進用ジャッキ7により内型枠15に押し付けられて、内型枠15に対して押圧力を付与する部位である。すなわち、内型枠用スプレッダ19の押圧面の中心位置(シールド機1の径方向の位置)が、シールド機1における内型枠15の径方向の位置と一致するように配置される。なお、以下の説明において、リング状のスプレッダにおける押圧面の中心(シールド機1の径方向の位置)をスプレッダの軸芯と称する。   As shown in FIG. 1B, an inner mold spreader 19 is provided at the tip of the propulsion jack 7. The inner mold spreader 19 is a portion that is pressed against the inner mold 15 by the propulsion jack 7 and applies a pressing force to the inner mold 15. That is, the center position of the pressing surface of the inner mold spreader 19 (the radial position of the shield machine 1) is arranged so as to coincide with the radial position of the inner mold frame 15 in the shield machine 1. In the following description, the center of the pressing surface of the ring-shaped spreader (the radial position of the shield machine 1) is called the spreader axis.

妻型枠9の内周面には、妻型枠内周シール18が設けられる。第1のシール部である妻型枠内周シール18は、ブラシ状の部材であり、コンクリートを打設する際のシール部材として機能し、妻型枠9の内周面にボルト等で着脱可能に設置される。   On the inner peripheral surface of the wife mold 9, a wife mold inner peripheral seal 18 is provided. The first frame inner peripheral seal 18 is a brush-like member that functions as a seal member when placing concrete, and can be attached to and removed from the inner peripheral surface of the wife mold 9 with bolts or the like. Installed.

スキンプレート3の後端部近傍には、全周にわたって凍結管21が埋め込まれている。凍結管21には冷媒が流されて周囲の地山等を冷却することができる。すなわち、スキンプレート3の後端部近傍の地山やコンクリート等を凍結止水することができる。なお、スキンプレート3は、凍結管21が埋設可能な程度の厚みを有する。   A freezing tube 21 is embedded in the vicinity of the rear end portion of the skin plate 3 over the entire circumference. A refrigerant is flowed through the freezing tube 21 to cool surrounding natural ground. That is, it is possible to freeze and stop the ground and concrete near the rear end of the skin plate 3. The skin plate 3 has such a thickness that the freezing tube 21 can be embedded.

シールド機1は、シールド機1の前方の地山をカッタヘッド5で掘削して、掘削土砂をスクリューコンベア13でシールド機1後方に運搬しながら、推進用ジャッキ7(内型枠用スプレッダ19)を内型枠15に押し付け、反発力により前方に推進する。この際、妻型枠9はスキンプレート3の後端近傍に配置し、内型枠15および妻型枠9および周囲を地山とで囲まれた空間にコンクリート17を打設する。コンクリート17は、図示を省略したミキサおよびポンプ等により、妻型枠9後方に打設される。なお、内型枠15の設置及び撤去は、図示を省略した内型枠組み立て装置および内型枠撤去装置を用いて行われる。   The shield machine 1 excavates a natural ground in front of the shield machine 1 with a cutter head 5 and conveys excavated earth and sand to the rear of the shield machine 1 with a screw conveyor 13 while propelling jack 7 (inner formwork spreader 19). Is pressed against the inner mold 15 and is propelled forward by a repulsive force. At this time, the end form 9 is disposed in the vicinity of the rear end of the skin plate 3, and concrete 17 is placed in a space surrounded by the inner form 15, the end form 9, and the surrounding ground. The concrete 17 is placed behind the end form 9 by a mixer and a pump (not shown). In addition, installation and removal of the inner mold 15 are performed using an inner mold assembling apparatus and an inner mold removing apparatus that are not shown.

妻型枠用ジャッキ11は、コンクリート17の打設量や圧力等に応じて妻型枠9をシールド機1の前後方向に移動させる。所定量のコンクリート17が打設されると、推進用ジャッキ7を縮めて、図示を省略した内型枠組み立て装置によって、既設の内型枠15の前方にさらに内型枠15を組立、推進用ジャッキ11を押しつけてさらに前進する。以上を繰り返しながら、場所打ちコンクリート方式により、トンネルを施工することができる。   The wife formwork jack 11 moves the wife formwork 9 in the front-rear direction of the shield machine 1 in accordance with the placement amount, pressure, and the like of the concrete 17. When a predetermined amount of concrete 17 is placed, the propulsion jack 7 is shrunk, and the inner mold 15 is further assembled and propelled in front of the existing inner mold 15 by an inner mold assembling apparatus (not shown). Push the jack 11 and move forward. While repeating the above, a tunnel can be constructed by the cast-in-place concrete method.

次に、トンネル施工中において、場所打ちコンクリート方式からセグメント方式への切り替え方法について説明する。図2〜図4は、方式切り替えの工程を示す図である。   Next, a method for switching from the cast-in-place concrete method to the segment method during tunnel construction will be described. 2-4 is a figure which shows the process of a system switching.

まず、前述のように、場所打ちコンクリート方式によりトンネルを施工する。打設したコンクリート17が固結した後、図2(a)に示すように、凍結管21により、スキンプレート3後端部近傍の地山等を凍結止水し、止水部23を形成する。次に、妻型枠用ジャッキ11を駆動し、妻型枠9をシールド機1の前方へ引き戻す(図中矢印B方向)。この際、スキンプレート3後方近傍が凍結止水されるので、ここからの漏水の恐れがない。なお、非常に狭い部位においても、埋め込み凍結管21であれば、確実に漏水危険部位の止水を行うことができる。   First, as described above, a tunnel is constructed by a cast-in-place concrete method. After the cast concrete 17 is solidified, as shown in FIG. 2A, the freezing pipe 21 freezes and stops the ground in the vicinity of the rear end portion of the skin plate 3 to form a water stop portion 23. . Next, the wife mold jack 11 is driven, and the wife mold 9 is pulled back to the front of the shield machine 1 (in the direction of arrow B in the figure). At this time, since the vicinity of the back of the skin plate 3 is frozen and stopped, there is no fear of water leakage from here. In addition, even in a very narrow part, if it is the embedded freezing tube 21, water leakage can be reliably stopped at a leaking dangerous part.

次に、図2(b)に示すように、妻型枠内周シール18を妻型枠9より取り外す。また、妻型枠9の後方にリング部材25を設置し、妻型枠9と接合する。リング部材25は、スキンプレート3の内周に沿って軸方向にスライド移動可能なリング状の部材である。リング部材25は、妻型枠用ジャッキ11のストロークと、後述するテールシール27等の移動量に応じて設置される。リング部材25の後方には、テールシール27が設置される。第2のシール部であるテールシール27は、リング状の部材の内周にブラシ状部材が設けられた部材であり、スキンプレート3の内周に沿って軸方向にスライド移動可能である。なお、必要に応じて、テールシール27のリング状部材には、リング部材25との接合用のフランジ部が設けられ、リング部材25のフランジ部と接合される。   Next, as shown in FIG. 2 (b), the end form inner peripheral seal 18 is removed from the end form 9. In addition, a ring member 25 is installed behind the end form 9 and joined to the end form 9. The ring member 25 is a ring-shaped member that is slidable in the axial direction along the inner periphery of the skin plate 3. The ring member 25 is installed in accordance with the stroke of the end form jack 11 and the amount of movement of a tail seal 27 and the like which will be described later. A tail seal 27 is installed behind the ring member 25. The tail seal 27 that is the second seal portion is a member in which a brush-like member is provided on the inner periphery of the ring-shaped member, and is slidable in the axial direction along the inner periphery of the skin plate 3. If necessary, the ring-shaped member of the tail seal 27 is provided with a flange portion for joining to the ring member 25 and joined to the flange portion of the ring member 25.

次に、図2(c)に示すように、妻型枠用ジャッキ11を駆動し、妻型枠9を後方に移動させる(図中矢印C方向)。すなわち、妻型枠9によってリング部材25およびテールシール27が後方にスライド移動する。   Next, as shown in FIG. 2C, the wife formwork jack 11 is driven to move the wife formwork 9 backward (in the direction of arrow C in the figure). That is, the ring member 25 and the tail seal 27 are slid rearward by the wife mold 9.

次に、図2(d)に示すように、テールシール27をスキンプレート3の後端部近傍に配置して、テールシール27をスキンプレート3の内面に接合する。この状態で、テールシール27のフランジ部を取り外す。さらに、妻型枠用ジャッキ11を駆動し、妻型枠9および妻型枠9と接合されたリング部材25をシールド機1の前方に引き戻す(図中矢印D方向)。   Next, as shown in FIG. 2D, the tail seal 27 is disposed in the vicinity of the rear end portion of the skin plate 3, and the tail seal 27 is joined to the inner surface of the skin plate 3. In this state, the flange portion of the tail seal 27 is removed. Furthermore, the wife mold jack 11 is driven to pull the wife mold 9 and the ring member 25 joined to the wife mold 9 back to the front of the shield machine 1 (in the direction of arrow D in the figure).

次に、図3(a)に示すように、リング部材25の後方に仮セグメント31およびテーパセグメント29を接合する。第1のセグメントであるテーパセグメント29は、セグメント方式への切り替え境界部における推進用ジャッキからの押圧力を受ける部位である。仮セグメント31は、テーパセグメント29を内型枠15の所定位置に設置するための部材であり、テーパセグメント29の前面(押圧面)と略同じ大きさのセグメントである。   Next, as shown in FIG. 3A, the temporary segment 31 and the taper segment 29 are joined to the rear of the ring member 25. The taper segment 29, which is the first segment, is a part that receives a pressing force from the propulsion jack at the switching boundary to the segment system. The temporary segment 31 is a member for installing the taper segment 29 at a predetermined position of the inner mold 15, and is a segment that is substantially the same size as the front surface (pressing surface) of the taper segment 29.

図3(b)に示すように、妻型枠用ジャッキ11を駆動し、妻型枠9をシールド機1の後方に移動させる(図中矢印E方向)。すなわち、妻型枠9およびこれと接合される仮セグメント31およびテーパセグメント29を後方に移動させる。内型枠15の端面とテーパセグメント29の端面(仮セグメント31との接合面)とが略一致する位置で、テーパセグメント29を内型枠15の外面に接合する。テーパセグメント29は、前方が肉厚となるテーパ形状であるため、前方からの押圧力を確実に受けることができる。   As shown in FIG. 3B, the wife formwork jack 11 is driven to move the wife formwork 9 to the rear of the shield machine 1 (in the direction of arrow E in the figure). That is, the end form 9 and the temporary segment 31 and the taper segment 29 joined thereto are moved backward. The taper segment 29 is joined to the outer surface of the inner mold frame 15 at a position where the end surface of the inner mold frame 15 and the end surface of the taper segment 29 (joint surface with the temporary segment 31) substantially coincide with each other. Since the taper segment 29 has a tapered shape with a thick front portion, it can reliably receive a pressing force from the front.

次に、図3(c)に示すように、仮セグメント31とテーパセグメント29との仮止めを外す。さらに、妻型枠用ジャッキ11を駆動し、妻型枠9および妻型枠9と接合された仮セグメント31をシールド機1の前方に引き戻す(図中矢印F方向)。   Next, as shown in FIG.3 (c), the temporary fix | stop of the temporary segment 31 and the taper segment 29 is removed. Further, the wife formwork jack 11 is driven, and the wife formwork 9 and the temporary segment 31 joined to the wife formwork 9 are pulled back to the front of the shield machine 1 (in the direction of arrow F in the figure).

次に、図4(a)に示すように、リング部材25および仮セグメント31をばらして撤去する。さらに、内型枠用スプレッダ19をセグメント用スプレッダ33と交換する。セグメント用スプレッダ33は、内型枠用スプレッダ19よりも外周側に軸芯が位置する部材である。なお、セグメント用スプレッダ33の軸芯が、シールド機1における設置するセグメント35の径方向の位置と一致するように配置される。   Next, as shown in FIG. 4A, the ring member 25 and the temporary segment 31 are separated and removed. Further, the inner mold spreader 19 is replaced with the segment spreader 33. The segment spreader 33 is a member whose axis is located on the outer peripheral side of the inner formwork spreader 19. The segment spreader 33 is arranged so that the axial center of the segment spreader 33 coincides with the radial position of the segment 35 installed in the shield machine 1.

この状態で、内型枠15およびテーパセグメント29の前方に第2のセグメントであるセグメント35を設置する。セグメント35は例えば鋼製セグメントである。   In this state, a segment 35 as a second segment is installed in front of the inner mold 15 and the taper segment 29. The segment 35 is a steel segment, for example.

さらに、図4(b)に示すように、推進用ジャッキ7(セグメント用スプレッダ33)によってセグメント35を押圧し、セグメント35の設置を繰り返しながら推進する。なお、この際、テーパセグメント29の外方(およびテーパセグメント29と接触するセグメント35の外方)に、スキンプレート3の後方からモルタル37を充填する。第1の充填材であるモルタル37は、コンクリート17と略同強度であることが望ましい。たとえば、コンクリート17に対して骨材のみを省いた材料である。なお、モルタル37の充填を行った後は、凍結管21による止水を停止してもよい。   Further, as shown in FIG. 4B, the segment 35 is pressed by the propulsion jack 7 (segment spreader 33) and propelled while repeating the installation of the segment 35. At this time, the outer side of the taper segment 29 (and the outer side of the segment 35 in contact with the taper segment 29) is filled with mortar 37 from the rear side of the skin plate 3. It is desirable that the mortar 37 as the first filler has substantially the same strength as the concrete 17. For example, it is a material in which only the aggregate is omitted from the concrete 17. In addition, after filling with the mortar 37, you may stop the water stop by the freezing tube 21. FIG.

図4(c)に示すように、内型枠15およびセグメント35の境界近傍には、モルタル37を充填するが、それ以降(前方側)に対しては、セグメント35の外方には裏込め材39を充填しながら掘進する。裏込め材39は、モルタルにベントナイト等を混合したもので、特に強度は不要である。すなわち、モルタル37に対して、裏込め材39は強度が低い。以上、セグメント35の設置等を繰り返し、セグメント方式によりトンネルを施工することができる。すなわち、場所打ちコンクリート方式からセグメント方式への切り替えを行うことができる。   As shown in FIG. 4C, the vicinity of the boundary between the inner mold 15 and the segment 35 is filled with mortar 37, but after that (front side), the outside of the segment 35 is backed. It digs while filling the material 39. The backfill material 39 is a mixture of bentonite or the like with mortar, and does not require any particular strength. That is, the backing material 39 has a lower strength than the mortar 37. As described above, the installation of the segment 35 and the like can be repeated to construct the tunnel by the segment method. That is, it is possible to switch from the cast-in-place concrete method to the segment method.

次に、トンネル施工中において、セグメント方式から場所打ちコンクリート方式への切り替え方法について説明する。図5〜図8は、方式切り替えの工程を示す図である。なお、以下の説明においては、図2〜図4に示した構成と同様の構成については重複した説明は省略する。   Next, a method for switching from the segment method to the cast-in-place concrete method during tunnel construction will be described. FIG. 5 to FIG. 8 are diagrams showing the method switching process. In the following description, the same description as that shown in FIGS. 2 to 4 is omitted.

まず、図5(a)に示すようなセグメント方式によるトンネルの施工状態に対し、図5(b)に示すように、スキンプレート3の後端部近傍を凍結管21によって凍結止水する。これにより、裏込め材39および地山側からの漏水を防止できる。   First, as shown in FIG. 5B, the vicinity of the rear end portion of the skin plate 3 is frozen and stopped by the freezing pipe 21 with respect to the construction state of the tunnel by the segment method as shown in FIG. Thereby, the water leakage from the backfill material 39 and the natural ground side can be prevented.

また、切り替え前に最後に設置されたセグメント35(最も前方側に位置するセグメント35)の内周面に内型枠反力リング41が接合される。内型枠反力リング41は前方側の厚さが厚いテーパ断面形状の部材である。なお、内型枠反力リング41はリング状の部材であり、外周面がセグメント35の内周面と接合される。この際、内型枠反力リング41の端面とセグメント35の端面とが略一致するように設置される。なお、内型枠反力リング41は、複数のセグメント35にまたがるように接合されてもよい。   Further, the inner form reaction force ring 41 is joined to the inner peripheral surface of the segment 35 (the segment 35 located on the foremost side) installed last before switching. The inner form reaction force ring 41 is a member having a tapered cross-sectional shape with a thick front side. The inner mold reaction force ring 41 is a ring-shaped member, and the outer peripheral surface is joined to the inner peripheral surface of the segment 35. At this time, the end surface of the inner mold reaction force ring 41 and the end surface of the segment 35 are installed so as to substantially coincide with each other. The inner form reaction force ring 41 may be joined so as to straddle the plurality of segments 35.

次に、図5(c)に示すように、セグメント用スプレッダ33を内型枠用スプレッダ19に交換する。内型枠用スプレッダ19は、内型枠反力リング41およびセグメント35を押圧することができる。さらに、妻型枠9の後方にリング部材25を設置し接合する。   Next, as shown in FIG. 5C, the segment spreader 33 is replaced with the inner formwork spreader 19. The inner formwork spreader 19 can press the inner formwork reaction force ring 41 and the segment 35. Furthermore, the ring member 25 is installed and joined to the rear side of the wife formwork 9.

次に、図6(a)に示すように、妻型枠用ジャッキ11を駆動し、妻型枠9およびリング部材25を後方に移動させる(図中矢印G方向)。リング部材25がテールシール27の位置まで移動したら、フランジ等を接合して、リング部材25とテールシール27とを接合する。さらに、テールシール27とスキンプレート3との接合を取り外す。   Next, as shown in FIG. 6A, the wife formwork jack 11 is driven to move the wife formwork 9 and the ring member 25 backward (in the direction of arrow G in the figure). When the ring member 25 moves to the position of the tail seal 27, the flange or the like is joined and the ring member 25 and the tail seal 27 are joined. Further, the joint between the tail seal 27 and the skin plate 3 is removed.

次に、図6(b)に示すように、妻型枠用ジャッキ11を駆動し、妻型枠9およびこれと接合されたリング部材25、テールシール27をシールド機1の前方に引き戻す(図中矢印H方向)。   Next, as shown in FIG. 6B, the wife formwork jack 11 is driven, and the wife formwork 9, the ring member 25 and the tail seal 27 joined thereto are pulled back to the front of the shield machine 1 (see FIG. 6B). Middle arrow H direction).

次に、図6(c)に示すように、リング部材25およびテールシール27を撤去する。さらに、妻型枠9の内周面に妻型枠内周シール18を取り付ける。   Next, as shown in FIG. 6C, the ring member 25 and the tail seal 27 are removed. Further, a wife mold inner peripheral seal 18 is attached to the inner peripheral surface of the wife mold 9.

次に、図7(a)に示すように、内型枠15を内型枠反力リング41の前方に接合して、推進用ジャッキ7(内型枠用スプレッダ19)により押圧する。これと前後して、妻型枠用ジャッキ7を駆動し、妻型枠9を後方に移動させる(図中矢印I方向)。   Next, as shown in FIG. 7A, the inner mold 15 is joined to the front of the inner mold reaction force ring 41 and pressed by the propulsion jack 7 (inner mold spreader 19). Before and after this, the wife mold jack 7 is driven to move the wife mold 9 backward (in the direction of arrow I in the figure).

さらに、図7(b)に示すように、内型枠反力リング41が取り付けられたセグメント35の外周部にモルタル37を充填する。なお、モルタル37の充填を行う際には、凍結管21による止水を停止してもよい。   Further, as shown in FIG. 7B, the outer periphery of the segment 35 to which the inner form reaction force ring 41 is attached is filled with a mortar 37. In addition, when filling with the mortar 37, you may stop the water stop by the freezing pipe 21. FIG.

以上の状態から、図8(a)に示すように、妻型枠9と内型枠15とを型枠として、内型枠15の外方にコンクリート17を打設する。コンクリート17を打設しながら内型枠15を押圧してシールド機を推進させる。図8(b)に示すように、順次内型枠15を組み立てながら、トンネルを場所打ちコンクリート方式で施工する(図中矢印J方向)。   From the above state, as shown in FIG. 8A, concrete 17 is placed outside the inner mold 15 with the end mold 9 and the inner mold 15 as molds. While placing the concrete 17, the inner mold 15 is pressed to propel the shield machine. As shown in FIG. 8 (b), the tunnel is constructed by a cast-in-place concrete method while assembling the inner mold 15 sequentially (in the direction of arrow J in the figure).

本実施の形態にかかるトンネルの施工方法によれば、トンネルの施工途中において、セグメント方式および場所打ちコンクリート方式を任意の場所で、何回でも、容易に切り替えることができる。   According to the tunnel construction method according to the present embodiment, the segment method and the cast-in-place concrete method can be easily switched any number of times during the tunnel construction.

また、テールシール27や方式切り替え時に用いられるテーパセグメント29、内型枠用反力リング41等を必要に応じてシールド機1の後方に設置または撤去する際には、妻型枠用ジャッキ11およびリング部材25が用いられる。このため、組み立て、設置作業は比較的広い部位で行い、容易に部材を後方に移動させることができるため作業性に優れる。   Further, when installing or removing the tail seal 27, the taper segment 29 used at the time of system switching, the reaction force ring 41 for the inner mold, or the like behind the shield machine 1 as necessary, A ring member 25 is used. For this reason, the assembly and installation work is performed in a relatively wide region, and the member can be easily moved backward, so that the workability is excellent.

また、スキンプレート3の後端部には、凍結管21が埋め込まれているため、方式切り替え時における作業中に、方式変更境界部近傍の地山等からの漏水を確実に防止することができるとともに、凍結管21はスキンプレート3から露出しないため、トンネルの施工時等において、作業の妨げになったり他の部材と干渉したりすることもない。   In addition, since the freezing pipe 21 is embedded in the rear end portion of the skin plate 3, it is possible to reliably prevent water leakage from a natural ground or the like in the vicinity of the method change boundary during the operation at the time of method switching. At the same time, since the freezing tube 21 is not exposed from the skin plate 3, it does not hinder the work or interfere with other members at the time of tunnel construction or the like.

セグメント方式への切り替え時に用いられ、内型枠15に接合されるテーパセグメント29は、前方が肉厚のテーパ断面形状であるため、前方からの押圧力を確実に受け止め、内型枠15等へ押圧力を伝達することができる。また、仮セグメント31を用いるため、テーパセグメント29の固定位置を内型枠15の端面に合わせることが容易である。   The tapered segment 29 used when switching to the segment system and joined to the inner mold 15 has a thick tapered cross section at the front, so that it can reliably receive a pressing force from the front and move to the inner mold 15 and the like. A pressing force can be transmitted. Further, since the temporary segment 31 is used, it is easy to match the fixing position of the taper segment 29 with the end surface of the inner mold 15.

また、方式切り替え境界部近傍の外方には、強度の高いモルタル37が充填されるため、境界部のひび割れや漏水等を防止することができるとともに、通常のセグメントの外方には、必要最低限の裏込め材39を充填するため、過剰な強度となることがない。   Further, since the mortar 37 having high strength is filled outside the system switching boundary, it is possible to prevent the boundary from cracking, leaking water, etc., and to the outside of the normal segment, the minimum required Since the limited backfill material 39 is filled, there is no excessive strength.

また、方式切り替え境界部近傍には、テーパセグメント29や内型枠用反力リング41が用いられるため、内型枠15のみ、セグメント35のみの場合と比較して強度が高く、推進用ジャッキ7からの押圧力に対して、破損等の恐れがない。   Further, since the taper segment 29 and the reaction force ring 41 for the inner mold frame are used in the vicinity of the system switching boundary portion, the strength is higher than the case of only the inner mold frame 15 and only the segment 35, and the propulsion jack 7 There is no fear of breakage against the pressing force from.

また、内型枠15の押圧時とセグメント35の押圧時とで、推進用ジャッキ11に取り付けられるスプレッダを交換するため、内型枠15および内型枠15よりも外側に設置されるセグメント35のそれぞれの端面の中心を確実に押圧することができる。   Further, since the spreader attached to the propulsion jack 11 is exchanged between when the inner mold 15 is pressed and when the segment 35 is pressed, the inner mold 15 and the segment 35 installed outside the inner mold 15 are arranged. The center of each end face can be pressed reliably.

以上、添付図を参照しながら、本発明の実施の形態を説明したが、本発明の技術的範囲は、前述した実施の形態に左右されない。当業者であれば、特許請求の範囲に記載された技術的思想の範疇内において各種の変更例または修正例に想到し得ることは明らかであり、それらについても当然に本発明の技術的範囲に属するものと了解される。   As mentioned above, although embodiment of this invention was described referring an accompanying drawing, the technical scope of this invention is not influenced by embodiment mentioned above. It is obvious for those skilled in the art that various modifications or modifications can be conceived within the scope of the technical idea described in the claims, and these are naturally within the technical scope of the present invention. It is understood that it belongs.

例えば、内型枠15およびセグメント35それぞれの押圧時に用いられるスプレッダを交換したが、これに限られない。図9は、推進用ジャッキ7および妻型枠用ジャッキ11をシールド機1の後方から見た配置図である。図9(a)に示すように、推進用ジャッキ7および妻型枠用ジャッキ11は、スキンプレート3の内面にシールド機1の軸方向に略垂直に形成されるジャッキ保持フランジ45により保持される。   For example, although the spreader used at the time of pressing each of the inner mold 15 and the segment 35 is replaced, it is not limited to this. FIG. 9 is an arrangement view of the propulsion jack 7 and the end form jack 11 as seen from the rear of the shield machine 1. As shown in FIG. 9A, the propulsion jack 7 and the end frame jack 11 are held on the inner surface of the skin plate 3 by a jack holding flange 45 formed substantially perpendicular to the axial direction of the shield machine 1. .

ジャッキ保持フランジ45にはスライド孔43が形成される。スライド孔43は、略楕円形の長穴であり、シールド機1の中心方向側の端部(以下単に中心方向端部と称する)にやや張り出したような形状である。推進用ジャッキ7は、推進用ジャッキ7のロッドがスライド孔43を貫通するように設置される。推進用ジャッキ7により内型枠15を押圧する場合には(推進用ジャッキ7による押圧対象部が、スキンプレート3から離れた部位である場合には)推進用ジャッキ7をスライド孔43の中心方向端部側に移動させて、ジャッキ保持フランジ45に固定する。この際、推進用ジャッキ7のロッドは、スライド孔43の中心方向端部方向にずれた位置に配置される。なお、推進用ジャッキ7をスライド孔43の中心方向端部側に設置した状態でも、推進用ジャッキ7の端部には、スライド孔43の中心方向端部が露出している。すなわち、推進用ジャッキ7をシールド機1の中心方向に移動させても、スライド孔43の中心方向端部が塞がれないため、配管や配線等をスライド孔43に挿通することができる。   A slide hole 43 is formed in the jack holding flange 45. The slide hole 43 is a substantially elliptical long hole, and has a shape that slightly protrudes from an end portion on the center direction side of the shield machine 1 (hereinafter simply referred to as a center direction end portion). The propulsion jack 7 is installed such that the rod of the propulsion jack 7 passes through the slide hole 43. When the inner mold 15 is pressed by the propulsion jack 7 (when the portion to be pressed by the propulsion jack 7 is a part away from the skin plate 3), the propulsion jack 7 is moved in the center direction of the slide hole 43. It is moved to the end side and fixed to the jack holding flange 45. At this time, the rod of the jack for propulsion 7 is arranged at a position shifted in the direction of the end of the slide hole 43 in the center direction. Even when the jack for propulsion 7 is installed on the end side in the center direction of the slide hole 43, the end in the center direction of the slide hole 43 is exposed at the end of the jack for propulsion 7. That is, even if the propulsion jack 7 is moved in the center direction of the shield machine 1, the end portion in the center direction of the slide hole 43 is not blocked, so that piping, wiring, and the like can be inserted into the slide hole 43.

同様に、推進用ジャッキ7によりセグメント35を押圧する場合には(推進用ジャッキ7による押圧対象部が、スキンプレート3に近い部位である場合には)推進用ジャッキ7をシールド機1の外方側に移動させて(図中矢印K方向)、ジャッキ保持フランジ45に固定する。この際、推進用ジャッキ7のロッドは、スライド孔43の外方側端部(シールド機1の外方側の端部)方向にずれた位置に配置される。なお、この状態でも、スライド孔43の中心方向端部が塞がれないため、配管や配線等をジャッキ保持フランジ45に挿通することができる。   Similarly, when the segment 35 is pressed by the propulsion jack 7 (when the portion to be pressed by the propulsion jack 7 is a part close to the skin plate 3), the propulsion jack 7 is moved outward of the shield machine 1. To the jack holding flange 45 (in the direction of arrow K in the figure). At this time, the rod of the jack for propulsion 7 is arranged at a position shifted in the direction of the outer end of the slide hole 43 (end on the outer side of the shield machine 1). Even in this state, the end in the center direction of the slide hole 43 is not blocked, so that piping, wiring, and the like can be inserted into the jack holding flange 45.

以上により、推進用ジャッキ7をシールド機1の中心方向および外方にスライド移動させることができるため、推進用ジャッキ7の先端に設置されるスプレッダの軸芯をシールド機1の外周方向または中心方向に偏心(移動)させることができる。   As described above, the propulsion jack 7 can be slid in the center direction of the shield machine 1 and outward, so that the shaft core of the spreader installed at the tip of the propulsion jack 7 is in the outer peripheral direction or the center direction of the shield machine 1. Can be decentered (moved).

なお、推進用ジャッキ7のスライド移動によるスプレッダの軸芯の偏心移動と、スプレッダの交換によるスプレッダの軸芯の偏心量の変更とは、組み合わせて使用することもできる。たとえば、内型枠とセグメントの押圧部位が大きく異なる場合(偏心量が大きい場合)には、スプレッダの変更のみでは対応しきれず、また、推進用ジャッキ7の移動量にも制限があるため、このような場合には、これらを組み合わせることで、大きな偏心量に対しても対応することができる。   The eccentric movement of the spreader shaft core caused by the sliding movement of the propulsion jack 7 and the change of the eccentric amount of the spreader shaft core caused by the replacement of the spreader can also be used in combination. For example, if the inner mold frame and the pressed part of the segment are significantly different (when the eccentric amount is large), it cannot be handled by changing the spreader alone, and the amount of movement of the propulsion jack 7 is also limited. In such a case, it is possible to cope with a large amount of eccentricity by combining them.

1………シールド機
3………スキンプレート
5………カッタヘッド
7………推進用ジャッキ
9………妻型枠
11………妻型枠用ジャッキ
13………スクリューコンベア
15………内型枠
17………コンクリート
18………妻型枠内周シール
19………内型枠用スプレッダ
21………凍結管
23………止水部
25………リング部材
27………テールシール
29………テーパセグメント
31………仮セグメント
33………セグメント用スプレッダ
35………セグメント
37………モルタル
39………裏込め材
41………内型枠反力リング
43………スライド孔
45………ジャッキ保持フランジ
DESCRIPTION OF SYMBOLS 1 ......... Shielding machine 3 ......... Skin plate 5 ......... Cutter head 7 ......... Propulsion jack 9 ......... Wive formwork 11 ... …… Wife formwork jack 13 ......... Screw conveyor 15 ... ... Inner mold 17 ... Concrete 18 ... Tail mold inner periphery seal 19 ... Inner mold spreader 21 ... Frozen pipe 23 ... Water stop 25 ... Ring member 27 ... ... tail seal 29 ......... taper segment 31 ......... temporary segment 33 ......... segment spreader 35 ......... segment 37 ......... mortar 39 ......... backing material 41 ......... inner form reaction force ring 43 ……… Slide hole 45 ……… Jack holding flange

Claims (11)

掘進途中において場所打ちコンクリートによる方式からセグメント方式に切り替えるトンネル施工方法であって、
スキンプレート内に設けられる推進用ジャッキと、シールド機の後方での場所打ちコンクリートの型枠として用いられる妻型枠と、前記妻型枠を前後進可能な妻型枠用ジャッキと、前記妻型枠の内面に対し着脱可能な第1のシール部と、前記スキンプレートの内面に対し着脱可能な第2のシール部と、を具備するシールド機を用い、
内型枠を設置しつつ、前記内型枠と前記妻型枠を型枠として場所打ちコンクリートによる方式でトンネルを施工する工程(a)と、
前記スキンプレートの後端近傍の止水を行い、前記妻型枠用ジャッキにより前記妻型枠を前記シールド機の前方に引き戻す工程(b)と、
前記第1のシール部を取り外し、前記妻型枠用ジャッキにより、前記第2のシール部を前記スキンプレートの後方に移動させて前記スキンプレート後端近傍に接合する工程(c)と、
前記妻型枠用ジャッキにより、第1のセグメントを前記スキンプレートの後方に移動させ、前記第1のセグメントを前記内型枠の外周に接合する工程(d)と、
前記第1のセグメントの前方に第2のセグメントを設置してシールド機を前進させ、セグメント方式によりトンネルを施工する工程(e)と、
を具備することを特徴とするトンネル施工方法。
Tunnel construction method to switch from cast-in-place concrete method to segment method during excavation,
Propulsion jack provided in the skin plate, wife formwork used as a cast-in-place concrete formwork behind the shield machine, wife formwork jack capable of moving forward and backward in the formwork of the wife, and the wife mold Using a shield machine comprising a first seal part detachable from the inner surface of the frame and a second seal part detachable from the inner surface of the skin plate,
(A) constructing a tunnel by a cast-in-place concrete method using the inner mold and the wife mold as a mold while installing the inner mold;
(B) performing water stop near the rear end of the skin plate, and pulling the wife form frame back to the front of the shield machine by the wife form frame jack;
(C) removing the first seal part and moving the second seal part to the rear of the skin plate and joining the skin plate in the vicinity of the rear end by the wife formwork jack;
A step (d) of moving the first segment to the rear of the skin plate and joining the first segment to the outer periphery of the inner mold frame by the wife mold jack;
A step (e) of installing a second segment in front of the first segment to advance the shield machine and constructing a tunnel by a segment method;
The tunnel construction method characterized by comprising.
前記工程(c)は、前記妻型枠の後方に前記第2のシール部を設置した後、前記妻型枠用ジャッキにより前記妻型枠および前記第2のシール部を後方に移動させる工程であり、
前記工程(d)は、前記妻型枠を前記妻型枠用ジャッキにより前記シールド機の前方に引き戻し、前記妻型枠用ジャッキの後方に第1のセグメントを設置した後、前記妻型枠用ジャッキにより、前記妻型枠および前記第1のセグメントを前記スキンプレートの後方に移動させる工程であり、
前記工程(e)は、前記妻型枠を前記妻型枠用ジャッキにより前記シールド機の前方に引き戻し、前記推進用ジャッキを前記第1のセグメントに押しつけて前記シールド機を前進させつつ、前記第1のセグメントの外方に第1の充填材を充填し、前記推進用ジャッキを前記第2のセグメントに押しつけて前記シールド機を前進させつつ、前記第2のセグメントの外方に第2の充填材を充填する工程であることを特徴とする請求項1記載のトンネル施工方法。
The step (c) is a step of moving the wife mold frame and the second seal part rearward by the wife mold jack after installing the second seal part behind the wife mold frame. Yes,
In the step (d), the wife formwork is pulled back to the front of the shield machine by the wife formwork jack, and after the first segment is installed behind the wife formwork jack, A step of moving the wife formwork and the first segment to the rear of the skin plate by a jack;
In the step (e), the wife formwork is pulled back to the front of the shield machine by the wife formwork jack, and the propulsion jack is pressed against the first segment to advance the shield machine. Filling the outside of one segment with the first filler and pushing the propulsion jack against the second segment to advance the shield machine, while the second filling is carried out to the outside of the second segment The tunnel construction method according to claim 1, wherein the tunnel construction method is a step of filling a material.
前記シールド機は、前記スキンプレートの内面に対し着脱可能かつ前記スキンプレートに沿ってスライド可能なリング部材を更に具備し、
前記工程(c)は、前記妻型枠の後方に前記リング部材を設置し、前記リング部材の後方に前記第2のシール部を設置し、前記妻型枠用ジャッキにより、前記リング部材および前記第2のシール部を前記スキンプレートの後方に移動させる工程であり、
前記工程(d)は、前記妻型枠用ジャッキによって前記妻型枠および前記リング部材を前記シールド機の前方に引き戻し、前記リング部材の後方に第1のセグメントを設置し、前記妻型枠用ジャッキにより、前記リング部材および前記第1のセグメントを前記スキンプレートの後方に移動させる工程であることを特徴とする請求項2記載のトンネル施工方法。
The shield machine further includes a ring member that is detachable from the inner surface of the skin plate and is slidable along the skin plate;
In the step (c), the ring member is installed behind the wife formwork, the second seal portion is installed behind the ring member, and the ring member and the A step of moving the second seal portion rearward of the skin plate;
In the step (d), the wife mold and the ring member are pulled back to the front of the shield machine by the wife mold jack, a first segment is installed behind the ring member, and the wife mold is used. The tunnel construction method according to claim 2, wherein the ring member and the first segment are moved to the rear of the skin plate by a jack.
前記シールド機は、前記スキンプレートの後端部近傍に設けられる埋め込み凍結管を具備し、
前記工程(b)は、前記埋め込み凍結管により、前記スキンプレートの後端近傍の地山を凍結止水する工程であることを特徴とする請求項1から請求項3のいずれかに記載のトンネル施工方法。
The shield machine comprises an embedded freezing tube provided near the rear end of the skin plate,
4. The tunnel according to claim 1, wherein the step (b) is a step of freezing and water-stopping a ground near the rear end of the skin plate by the embedded freezing pipe. Construction method.
前記推進用ジャッキの先端にはスプレッダが取り付けられており、
前記工程(e)は、前記推進用ジャッキの先端に設けられるスプレッダの軸芯を外周方向に偏心させて、前記推進用ジャッキを前記第1のセグメントに押しつけて前記シールド機を前進させる工程であることを特徴とする請求項1から請求項4のいずれかに記載のトンネル施工方法。
A spreader is attached to the tip of the propulsion jack,
The step (e) is a step of advancing the shield machine by decentering the axis of a spreader provided at the tip of the propulsion jack in the outer peripheral direction and pressing the propulsion jack against the first segment. The tunnel construction method according to any one of claims 1 to 4, wherein the tunnel construction method is provided.
前記スプレッダの軸芯の偏心は、内型枠用スプレッダを前記内型枠用スプレッダよりも外方に偏心したセグメント用スプレッダに交換することにより行われることを特徴とする請求項5記載のトンネル施工方法。   6. The tunnel construction according to claim 5, wherein eccentricity of the shaft core of the spreader is performed by exchanging the spreader for the inner mold with a spreader for the segment eccentrically outward from the spreader for the inner mold. Method. 前記スプレッダの軸芯の偏心は、前記推進用ジャッキを前記シールド機の外周方向にスライド移動させることにより行われることを特徴とする請求項5または請求項6に記載のトンネル施工方法。   The tunnel construction method according to claim 5 or 6, wherein the eccentricity of the shaft core of the spreader is performed by sliding the jack for propulsion in the outer peripheral direction of the shield machine. 前記第1の充填材はモルタルであり、前記第2の充填材は、前記第1の充填材よりも強度の弱い裏込め材であることを特徴とする請求項1から請求項7のいずれかに記載のトンネル施工方法。   The said 1st filler is mortar, The said 2nd filler is a backfilling material whose intensity | strength is weaker than the said 1st filler, The any one of Claim 1-7 characterized by the above-mentioned. Tunnel construction method described in 2. 前記第1のセグメントは、テーパ形状を有するセグメントであり、
前記工程(d)は、前記第1のセグメントの前方に仮セグメントが設けられる工程であり、
前記工程(e)は、前記仮セグメントとともに前記第1のセグメントを後方に移動させ、前記仮セグメントと前記第1のセグメントを分離し、前記仮セグメントを前記シールド機の前方に引き戻す工程であることを特徴とする請求項1から請求項7のいずれかに記載のトンネル施工方法。
The first segment is a segment having a tapered shape,
The step (d) is a step in which a temporary segment is provided in front of the first segment,
The step (e) is a step of moving the first segment rearward together with the temporary segment, separating the temporary segment and the first segment, and pulling the temporary segment back to the front of the shield machine. The tunnel construction method according to claim 1, wherein:
掘進途中においてセグメント方式から場所打ちコンクリートによる方式に切り替るトンネル施工方法であって、
スキンプレート内に設けられる推進用ジャッキと、シールド機の後方での場所打ちコンクリートの型枠として用いられる妻型枠と、前記妻型枠を前後進可能な妻型枠用ジャッキと、前記妻型枠の内面に対し着脱可能な第1のシール部と、前記スキンプレートの内面に対し着脱可能な第2のシール部と、を具備するシールド機を用い、
第2のセグメントを設置しつつ、前記第2のセグメントの外方に第2の充填材を充填し、セグメント方式でトンネルを施工する工程(p)と、
前記スキンプレートの後端近傍の止水を行う工程(q)と、
前記第2のセグメントの内周に、内型枠反力リングを接合し、前記スキンプレートの後端近傍の止水を行い、前記第2のシール部を前記スキンプレートより撤去する工程(r)と、
前記内型枠反力リングの前方に内型枠を設置するとともに、前記妻型枠の内面に第1のシール部を設置し、前記妻型枠を前記スキンプレートの後端近傍に移動させ、前記スキンプレートの後端部近傍の前記第2のセグメントの外方に第1の充填材を充填する工程(s)と、
前記内型枠と前記妻型枠を型枠として場所打ちコンクリートによる方式でトンネルを施工する工程(t)と、
を具備することを特徴とするトンネル施工方法。
A tunnel construction method that switches from a segment method to a cast-in-place concrete method during excavation,
Propulsion jack provided in the skin plate, wife formwork used as a cast-in-place concrete formwork behind the shield machine, wife formwork jack capable of moving forward and backward in the formwork of the wife, and the wife mold Using a shield machine comprising a first seal part detachable from the inner surface of the frame and a second seal part detachable from the inner surface of the skin plate,
While installing the second segment, filling the second filler outside the second segment and constructing the tunnel in a segmented manner (p);
A step (q) of performing waterstop near the rear end of the skin plate;
A step (r) of joining an inner mold reaction force ring to the inner periphery of the second segment, stopping water in the vicinity of the rear end of the skin plate, and removing the second seal portion from the skin plate; When,
While installing an inner mold in front of the inner mold reaction force ring, installing a first seal part on the inner surface of the wife mold, moving the wife mold near the rear end of the skin plate, Filling the outside of the second segment in the vicinity of the rear end of the skin plate with a first filler (s);
(T) constructing a tunnel by a cast-in-place concrete method using the inner formwork and the end formwork as a formwork;
The tunnel construction method characterized by comprising.
掘進中に、セグメント方式および場所打ちコンクリートによる方式を任意に変更可能なシールド機であって、
スキンプレート内に設けられる推進用ジャッキと、
シールド機の後方での場所打ちコンクリートの型枠として用いられる妻型枠と、
前記妻型枠を前後進可能な妻型枠用ジャッキと、
前記スキンプレートの後端部近傍に設けられる埋め込み凍結管と、
前記妻型枠の内面に着脱可能に設けられる第1のシール部と、
前記スキンプレートの内面に着脱可能に設けられる第2のシール部と、
前記スキンプレートの内面に対し着脱可能かつ前記スキンプレートに沿ってスライド可能なリング部材と、
を具備することを特徴とするシールド機。
A shield machine that can arbitrarily change the segment method and the cast-in-place concrete method while digging,
A jack for propulsion provided in the skin plate;
Wife formwork used as cast-in-place concrete formwork behind the shield machine,
A wife mold jack capable of moving back and forth the wife mold frame;
An embedded cryotube provided near the rear end of the skin plate;
A first seal portion detachably provided on the inner surface of the wife formwork;
A second seal portion detachably provided on the inner surface of the skin plate;
A ring member detachably attached to the inner surface of the skin plate and slidable along the skin plate;
A shield machine comprising:
JP2010095312A 2010-04-16 2010-04-16 Tunnel construction method and shield machine Active JP5479989B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2010095312A JP5479989B2 (en) 2010-04-16 2010-04-16 Tunnel construction method and shield machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2010095312A JP5479989B2 (en) 2010-04-16 2010-04-16 Tunnel construction method and shield machine

Related Child Applications (1)

Application Number Title Priority Date Filing Date
JP2014025236A Division JP5688479B2 (en) 2014-02-13 2014-02-13 Tunnel construction method

Publications (2)

Publication Number Publication Date
JP2011226105A JP2011226105A (en) 2011-11-10
JP5479989B2 true JP5479989B2 (en) 2014-04-23

Family

ID=45041774

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2010095312A Active JP5479989B2 (en) 2010-04-16 2010-04-16 Tunnel construction method and shield machine

Country Status (1)

Country Link
JP (1) JP5479989B2 (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102913250B (en) * 2012-11-12 2014-07-16 中铁二局股份有限公司 Shield tunnel-entering construction method at stratum rich in water powder and soil powder sand
JP6480206B2 (en) * 2015-02-09 2019-03-06 株式会社奥村組 Shield machine
CN106321110B (en) * 2016-09-19 2019-08-20 南昌大学 A kind of multi-functional mud cake sluice gun for shield-tunneling construction
CN108868801B (en) * 2018-08-27 2024-04-12 郑州大学 Model shield machine capable of simulating grouting
CN116558696B (en) * 2023-07-11 2023-09-26 中铁十四局集团大盾构工程有限公司 Water and soil pressure monitoring system and method for shield construction process

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS53111628A (en) * 1977-03-10 1978-09-29 Obayashi Gumi Kk Method of filling backing material in shield tunnel
JPH02157397A (en) * 1988-12-07 1990-06-18 Mitsui Constr Co Ltd Exchanging method for tail seal of shield machine
JPH0643799B2 (en) * 1992-04-27 1994-06-08 株式会社大林組 Lining sealing method in cast-in-place lining shield method
JP3040677B2 (en) * 1994-12-15 2000-05-15 三菱重工業株式会社 Tunnel excavator
JP3272984B2 (en) * 1997-07-04 2002-04-08 株式会社奥村組 Tunnel excavator
JP3039921B2 (en) * 1997-09-23 2000-05-08 川崎重工業株式会社 Two-stage shield machine
JP3492924B2 (en) * 1998-09-25 2004-02-03 株式会社奥村組 Shield excavator
JP3890528B2 (en) * 2002-07-23 2007-03-07 清水建設株式会社 Tunnel construction method
JP2006274651A (en) * 2005-03-29 2006-10-12 Nishimatsu Constr Co Ltd Shielding jack

Also Published As

Publication number Publication date
JP2011226105A (en) 2011-11-10

Similar Documents

Publication Publication Date Title
JP5688479B2 (en) Tunnel construction method
JP5245486B2 (en) Tunnel construction method, inner formwork
JP5479989B2 (en) Tunnel construction method and shield machine
JP2006233752A (en) Construction method for tunnel
JP3863888B2 (en) Two-stage propulsion method and coupler
JP4752015B2 (en) Tunnel construction method and removal shield used in this method
JP2006037595A (en) Excavator for jacking method and jacking method
JP5292246B2 (en) Tunnel excavator with switching lining
JP4798381B2 (en) Shield tunnel and its construction method, backfilling method, building / backfilling method
JP4712529B2 (en) Tunnel excavator
JP4752017B2 (en) Removal shield and tunnel removal method using the same
JP4334954B2 (en) Method and apparatus for widening underground space
JP3890526B2 (en) Segment and tunnel construction method using the same
JP4081037B2 (en) Propulsion and shield combination method
JP4400377B2 (en) Existing buried pipe renewal device
JP2010019066A (en) Inner mold and tunnel excavator with inner mold
JP4752016B2 (en) Removal shield
JP4762641B2 (en) Tunnel excavator
JP2001115772A (en) Connection method for existing tunnel and new tunnel
JP3525130B1 (en) Removal method of excavator in propulsion method
JP2024120306A (en) How to freeze the ground
JP4172022B2 (en) Tunnel widening method and tunnel narrowing method
JP4970331B2 (en) Formwork piece installation method and formwork piece used in this method
JP2009167599A (en) Excavator
JP2007132039A (en) Shield machine and shield method using it

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20121114

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20130828

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20140114

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20140213

R150 Certificate of patent or registration of utility model

Ref document number: 5479989

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250