JP5444020B2 - Cogeneration system - Google Patents

Cogeneration system Download PDF

Info

Publication number
JP5444020B2
JP5444020B2 JP2010014535A JP2010014535A JP5444020B2 JP 5444020 B2 JP5444020 B2 JP 5444020B2 JP 2010014535 A JP2010014535 A JP 2010014535A JP 2010014535 A JP2010014535 A JP 2010014535A JP 5444020 B2 JP5444020 B2 JP 5444020B2
Authority
JP
Japan
Prior art keywords
heat
predicted
power
operation control
state
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2010014535A
Other languages
Japanese (ja)
Other versions
JP2011153741A (en
Inventor
和茂 前田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Osaka Gas Co Ltd
Original Assignee
Osaka Gas Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Osaka Gas Co Ltd filed Critical Osaka Gas Co Ltd
Priority to JP2010014535A priority Critical patent/JP5444020B2/en
Publication of JP2011153741A publication Critical patent/JP2011153741A/en
Application granted granted Critical
Publication of JP5444020B2 publication Critical patent/JP5444020B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/10Energy storage using batteries
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/30Hydrogen technology
    • Y02E60/50Fuel cells
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P80/00Climate change mitigation technologies for sector-wide applications
    • Y02P80/10Efficient use of energy, e.g. using compressed air or pressurized fluid as energy carrier
    • Y02P80/15On-site combined power, heat or cool generation or distribution, e.g. combined heat and power [CHP] supply

Description

本発明は、電力と熱とを併せて発生させる熱電併給装置を備え、熱電併給装置で発生された電力を電力負荷へ供給可能に、かつ熱電併給装置で発生された熱を熱負荷へ供給可能に構成されたコージェネレーションシステムに関する。   The present invention includes a cogeneration device that generates both electric power and heat, can supply the electric power generated by the cogeneration device to the electric power load, and can supply the heat generated by the cogeneration device to the heat load. It is related with the cogeneration system comprised in.

上記のようなコージェネレーションシステムの一例として、電力と熱とを併せて発生させる熱電併給装置と、熱電併給装置で発生された熱を回収して蓄熱しかつ当該蓄えられた熱を熱負荷へ供給する熱回収手段と、熱電併給装置を所定の運転計画に従って運転制御する計画運転制御を実行する運転制御手段と、を備えたコージェネレーションシステムが既に知られている(下記の特許文献1を参照)。このコージェネレーションシステムは、電力と熱とを併せて発生させる熱電併給装置としての燃料電池と、燃料電池から発生する熱を回収して貯湯槽に湯水として蓄える熱回収手段としての貯湯ユニットと、電力負荷においてその時点で要求される電力需要に応じた電力を出力させるような運転計画に従って燃料電池を運転制御する運転制御手段と、燃料電池が発電した電力の余剰分を蓄電しかつ当該蓄えられた電力を電力負荷へ供給する蓄電手段としての蓄電池と、を備えている。   As an example of the cogeneration system as described above, a combined heat and power device that generates both electric power and heat, collects the heat generated by the combined heat and power device, stores it, and supplies the stored heat to the heat load. A cogeneration system is already known that includes a heat recovery unit that performs the operation control unit that performs a planned operation control that controls the operation of the combined heat and power supply device according to a predetermined operation plan (see Patent Document 1 below). . This cogeneration system includes a fuel cell as a combined heat and power device that generates both electric power and heat, a hot water storage unit as a heat recovery unit that recovers heat generated from the fuel cell and stores it as hot water in a hot water tank, Operation control means for controlling the operation of the fuel cell according to an operation plan for outputting electric power according to the power demand required at that time in the load, and storing and storing the surplus of the electric power generated by the fuel cell And a storage battery as power storage means for supplying power to the power load.

このコージェネレーションシステムでは、上記の運転計画に従って燃料電池を運転制御したときに熱回収手段により回収されると予測される予測回収熱量が、時系列的な予測熱需要に対して熱不足状態となる熱不足時間帯が求められると共に、燃料電池を最大出力で運転制御しても時系列的な予測電力需要を賄えなくなる電力不足時間帯が求められる。ここで、「最大出力」とは、燃料電池が発電を行うことができる発電出力の上限値を意味する。そして、運転制御手段は、熱不足時間帯及び電力不足時間帯の少なくとも一方が発生するよりも前に、燃料電池の発電出力を上昇側に変更調節する出力上昇処理を実行するように構成されている。これにより、燃料電池から発生する熱が回収されて湯水として貯湯槽に蓄えられると共に、燃料電池が発電した電力のうち電力負荷においてその時点で要求される電力需要を上回る余剰分が蓄電池に蓄えられる。よって、将来発生すると予測される熱不足時間帯及び電力不足時間帯の双方を解消することができ、商用電力の消費量や補助熱源の使用量を低減してエネルギ消費量を有効に低減することが可能となっている。   In this cogeneration system, the predicted amount of recovered heat that is predicted to be recovered by the heat recovery means when the fuel cell is operated and controlled according to the above operation plan is in a state of heat shortage with respect to the time-series predicted heat demand. A heat shortage time zone is required, and a power shortage time zone in which the time series predicted power demand cannot be covered even if the fuel cell is controlled to operate at the maximum output is required. Here, the “maximum output” means the upper limit value of the power generation output at which the fuel cell can generate power. The operation control means is configured to execute output increase processing for changing and adjusting the power generation output of the fuel cell to the increase side before at least one of the heat shortage time zone and the power shortage time zone occurs. Yes. As a result, the heat generated from the fuel cell is recovered and stored as hot water in the hot water storage tank, and the surplus of the electric power generated by the fuel cell exceeding the power demand required at that time in the power load is stored in the storage battery. . Therefore, both the heat shortage time zone and the power shortage time zone that are predicted to occur in the future can be resolved, and the energy consumption can be effectively reduced by reducing the consumption of commercial power and the usage of auxiliary heat sources. Is possible.

特許文献1に記載のコージェネレーションシステムにおける出力上昇処理について、更に詳細に説明する。まず、このコージェネレーションシステムでは、所定の運転周期としての管理周期(例えば、12時間)における単位時間(例えば、1時間)毎に過去の時系列的な電力消費量データ及び熱消費量データが管理されている。そして、当該電力消費量データ及び熱消費量データに基づいて時系列的な予測電力需要及び予測熱需要が求められる。出力上昇処理では、管理周期における単位時間毎に、燃料電池の発電出力を所定ステップで段階的に上昇させると仮定した場合の省エネルギ度がそれぞれ導出され、燃料電池を運転する時間帯及び段階的に上昇させる発電出力の全ての組み合わせのうち、熱不足時間帯及び電力不足時間帯の双方を解消するという条件の下で省エネルギ度が最大となる時間帯及び発電出力で、燃料電池が運転制御される。なお、この出力上昇処理においては、求められる時系列的な予測電力需要及び予測熱需要が正確であることを前提としている。   The output increase process in the cogeneration system described in Patent Document 1 will be described in more detail. First, in this cogeneration system, past time-series power consumption data and heat consumption data are managed every unit time (for example, 1 hour) in a management period (for example, 12 hours) as a predetermined operation cycle. Has been. Based on the power consumption data and the heat consumption data, time-series predicted power demand and predicted heat demand are obtained. In the output increase process, energy savings are derived for each unit time in the management cycle, assuming that the power generation output of the fuel cell is increased step by step in a predetermined step. Of all the combinations of power generation output to be increased, the fuel cell is operated and controlled in the time zone and power generation output where the energy saving degree is maximum under the condition that both the heat shortage time zone and the power shortage time zone are eliminated. Is done. In this output increase process, it is assumed that the required time-series predicted power demand and predicted heat demand are accurate.

特開2007−306661号公報JP 2007-306661 A

しかし、特許文献1に記載のコージェネレーションシステムでは、出力上昇処理において燃料電池を運転するための時間帯及び発電出力を決定するに際して、複数の時間帯及び複数の候補発電出力の全ての組み合わせについての省エネルギ度を導出して相互に比較する。このように、特許文献1の出力上昇処理では非常に緻密に省エネルギ度の検討がなされているため、実際の電力需要及び熱需要が予測電力需要及び予測熱需要に一致した場合には省エネルギに大きく寄与することができる一方で、出力上昇処理実行時の演算処理負荷は大きくなりがちだった。また、仮に実際の電力需要及び熱需要が予測電力需要及び予測熱需要から外れてしまった場合には、経時的にその差分が蓄積されていくので、その前提が崩れて熱不足時間帯及び電力不足時間帯の予測も大きく外れてしまう。そのため、出力上昇処理において決定された燃料電池を運転するための時間帯及び発電出力は、不正確な前提に基づいて決定されたことになり、非常に緻密に省エネルギ度の検討がなされる割には、本来求められる省エネルギ度を確保することができなかった。   However, in the cogeneration system described in Patent Document 1, when determining the time zone and the power generation output for operating the fuel cell in the output increase process, all combinations of a plurality of time zones and a plurality of candidate power generation outputs are determined. Deriving energy savings and comparing each other. As described above, in the output increase process of Patent Document 1, the energy saving degree is studied very precisely. Therefore, when the actual power demand and the heat demand coincide with the predicted power demand and the predicted heat demand, the energy saving is performed. On the other hand, the computation processing load when executing the output increase processing tends to be large. Also, if the actual power demand and heat demand deviate from the predicted power demand and predicted heat demand, the difference will accumulate over time, so the assumption will be lost and the heat shortage time and power The prediction of the shortage time is also greatly deviated. For this reason, the time zone for operating the fuel cell and the power generation output determined in the output increase process are determined based on inaccurate assumptions, and the energy saving degree is examined very closely. However, it was not possible to secure the originally required energy saving.

本発明は、上記の課題に鑑みてなされたものであり、比較的小さな演算処理負荷でかつ許容され得る高い精度で、熱不足状態の発生を抑制しつつエネルギ消費量を有効に低減することができるコージェネレーションシステムを提供することを目的とする。   The present invention has been made in view of the above problems, and is capable of effectively reducing energy consumption while suppressing the occurrence of a heat shortage state with a relatively small arithmetic processing load and high allowable accuracy. The purpose is to provide a cogeneration system.

本発明に係る、電力と熱とを併せて発生させる熱電併給装置と、前記熱電併給装置で発生された熱を回収して蓄熱しかつ当該蓄えられた熱を熱負荷へ供給する熱回収手段と、少なくとも前記熱電併給装置を所定の運転計画に従って運転制御する計画運転制御を実行する運転制御手段と、を備えたコージェネレーションシステムの特徴構成は、前記熱電併給装置で発生された電力を蓄電しかつ当該蓄えられた電力を電力負荷へ供給する蓄電手段と、将来の所定の運転周期内に前記熱負荷において需要があると予測される時系列的な予測熱需要を導出するエネルギ需要予測手段と、前記計画運転制御を継続して実行すると仮定した場合に、前記熱回収手段により回収されると予測される予測回収熱量が前記予測熱需要よりも小さい状態である熱不足状態となること予測する熱不足予測手段と、を備え、前記運転制御手段は、前記熱不足状態となることが予測された場合には前記熱不足状態となる時点以前の所定の直前期間だけ、前記計画運転制御に代えて、前記熱電併給装置を最大出力で運転制御する最大出力運転制御を実行し、当該直前期間に発生する余剰電力を前記蓄電手段に蓄電する点にある。   A combined heat and power device for generating electric power and heat according to the present invention, and heat recovery means for recovering and storing heat generated by the combined heat and power device and supplying the stored heat to a heat load. And an operation control means for performing planned operation control for controlling the operation of the combined heat and power unit according to a predetermined operation plan, the characteristic configuration of the cogeneration system stores electric power generated by the combined heat and power unit and Power storage means for supplying the stored power to the power load; energy demand prediction means for deriving time-series predicted heat demand that is predicted to be demanded in the thermal load within a predetermined future operation cycle; When it is assumed that the planned operation control is to be continuously executed, the heat recovery amount that is predicted to be recovered by the heat recovery means is smaller than the predicted heat demand. Heat shortage predicting means for predicting that the state will be in a state, and the operation control means, when it is predicted that the heat shortage state is predicted, only for a predetermined immediately preceding period before the time when the heat shortage state is reached, Instead of the planned operation control, the maximum output operation control for controlling the operation of the combined heat and power device with the maximum output is executed, and surplus power generated in the immediately preceding period is stored in the storage means.

なお、本願では、「最大出力」は、熱電併給装置が発電を行うことができる発電出力の上限値を意味する。このような「最大出力」は、エネルギ効率が最大となる状態で発電を行う場合における発電出力(定格出力)に等しくなることが一般的である。   In the present application, “maximum output” means an upper limit value of the power generation output at which the combined heat and power device can generate power. Such “maximum output” is generally equal to the power generation output (rated output) when power generation is performed in a state where the energy efficiency is maximum.

上記の特徴構成によれば、コージェネレーションシステムは、基本的には運転制御手段により計画運転制御されて、熱電併給装置は運転計画に従って運転制御される。この状態で、エネルギ需要予測手段により時系列的な予測熱需要が導出されると共に、熱不足予測手段により、計画運転制御を継続して実行すると仮定した場合に将来熱不足状態となるか否かが予測される。そして、熱不足状態となることが予測された場合には、当該熱不足状態となる以前の所定の直前期間だけ、計画運転制御に代えて最大出力運転制御が実行される。最大出力運転制御が実行されている間は、熱電併給装置は予測熱需要を上回る余剰熱を発生させるので、熱回収手段によりその余剰熱を回収して蓄熱することで、将来発生すると予測される熱不足状態の発生を抑制することができる。
その際、直前期間では、熱電併給装置は一般にエネルギ効率が最大に近い状態となる最大出力で発電を行うので、コージェネレーションシステム全体のエネルギ効率を向上させることができる。また、最大出力運転制御を実行する期間を、熱不足状態となる時点以前の所定の直前期間のみとすることで、熱電併給装置が発生した余剰熱が回収されてから実際に熱負荷に供給されるまでの間(蓄熱されている間)の放熱量を極力小さく抑えることができる。よって、蓄熱中における放熱によるエネルギ損失を低減することができるので、最大出力運転制御を実行する期間を短縮し或いは補助熱源を使用する場合にはその使用量を低減して、エネルギ消費量を有効に低減することができる。また、最大出力運転制御の実行により熱電併給装置が発電した電力のうちの余剰電力を蓄電手段に蓄電することで、将来電力負荷において熱電併給装置の最大出力を超える電力需要があった際に、当該蓄電した電力を電力負荷に供給することができる。なお、蓄電手段に蓄電し或いは蓄電手段から電力を持ち出す際の電力ロスによるエネルギ損失は、無視できる程度に小さい。
従って、熱不足状態の発生を抑制しつつエネルギ消費量を有効に低減することが可能なコージェネレーションシステムを提供することができる。
According to the above characteristic configuration, the cogeneration system is basically subjected to planned operation control by the operation control means, and the combined heat and power supply apparatus is controlled according to the operation plan. In this state, whether or not a future heat shortage state occurs when it is assumed that time-series predicted heat demand is derived by the energy demand prediction means and that the planned operation control is continuously executed by the heat shortage prediction means. Is predicted. Then, when it is predicted that the heat shortage state will occur, the maximum output operation control is executed instead of the planned operation control only for a predetermined immediately preceding period before the heat shortage state. While the maximum output operation control is being executed, the combined heat and power generation device generates surplus heat that exceeds the predicted heat demand, so it is predicted that it will occur in the future by collecting the surplus heat by the heat recovery means and storing it. Occurrence of a heat shortage state can be suppressed.
At that time, in the immediately preceding period, the combined heat and power apparatus generally generates power at the maximum output at which the energy efficiency is close to the maximum, so that the energy efficiency of the entire cogeneration system can be improved. In addition, by setting the period for executing the maximum output operation control only to a predetermined immediately preceding period before the time when the heat shortage state occurs, the excess heat generated by the combined heat and power supply device is recovered and actually supplied to the heat load. The amount of heat released during the period until it is stored (while heat is stored) can be minimized. Therefore, energy loss due to heat dissipation during heat storage can be reduced, so the period for executing the maximum output operation control can be shortened, or the amount of use can be reduced when using an auxiliary heat source, so that energy consumption is effective. Can be reduced. In addition, by storing the surplus power out of the power generated by the combined heat and power device by executing the maximum output operation control in the power storage means, when there is a power demand exceeding the maximum output of the combined heat and power device in the future power load, The stored electric power can be supplied to the electric power load. Note that the energy loss due to the power loss when the power is stored in the power storage means or taken out of the power storage means is small enough to be ignored.
Therefore, it is possible to provide a cogeneration system capable of effectively reducing energy consumption while suppressing the occurrence of a heat shortage state.

また、上記の特徴構成では、将来熱不足状態となることが予測された場合における熱電併給装置の運転制御は、当該熱不足状態となる時点以前の所定の直前期間だけ計画運転制御に代えて最大出力運転制御を実行するという、非常に簡素な運転制御である。よって、そのような運転制御を実行する際の演算処理負荷を大幅に低減することができる。更に、最大出力運転制御では、熱電併給装置の発電出力が一律に最大出力となるように制御されるので、仮に実際の熱需要が予測熱需要から外れてしまった場合であっても、当該予測外れによる実際の熱需要と予測熱需要との間の差分の蓄積が熱不足状態の解消や省エネルギ性に与える影響は比較的小さい。また、所定の運転計画が将来の運転周期内に電力負荷において需要があると予測される予測電力需要等に基づくものであって、かつ、仮に実際の電力需要や熱需要が予測電力需要や予測熱需要から外れてしまった場合についても同様である。   Further, in the above characteristic configuration, the operation control of the combined heat and power supply apparatus when the heat shortage state is predicted in the future is replaced with the planned operation control only for a predetermined immediately preceding period before the time point when the heat shortage state occurs. This is very simple operation control in which output operation control is executed. Therefore, it is possible to significantly reduce the arithmetic processing load when executing such operation control. Furthermore, in the maximum output operation control, since the power generation output of the combined heat and power supply device is controlled so as to be the maximum output uniformly, even if the actual heat demand deviates from the predicted heat demand, the prediction The accumulation of the difference between the actual heat demand and the predicted heat demand due to the deviation has a relatively small influence on the elimination of the heat shortage state and the energy saving performance. In addition, the predetermined operation plan is based on the predicted power demand that is predicted to be demanded at the power load within the future operation cycle, and the actual power demand or heat demand is assumed to be the predicted power demand or prediction. The same applies to the case where the heat demand is lost.

以上より、上記の特徴構成によれば、比較的小さな演算処理負荷でかつ許容され得る高い精度で、熱不足状態の発生を抑制しつつエネルギ消費量を有効に低減することが可能なコージェネレーションシステムを提供することができる。   As described above, according to the above-described characteristic configuration, a cogeneration system capable of effectively reducing energy consumption while suppressing the occurrence of a heat shortage state with a relatively small calculation processing load and high allowable accuracy. Can be provided.

ここで、前記熱不足予測手段は、更に、前記予測熱需要に対して前記予測回収熱量が不足する量である予測不足熱量を導出するように構成され、前記運転制御手段は、前記予測不足熱量に基づいて、前記予測不足熱量が大きいほど前記直前期間が長くなるように前記直前期間の長さを設定する構成とすると好適である。   Here, the heat shortage predicting unit is further configured to derive a predicted shortage heat amount that is a shortage of the predicted recovered heat amount with respect to the predicted heat demand, and the operation control unit includes the predicted shortage heat amount. On the basis of the above, it is preferable that the length of the immediately preceding period is set so that the immediately preceding period becomes longer as the predicted insufficient heat quantity is larger.

予測熱需要に対する予測回収熱量の不足量である予測不足熱量が大きいほど、熱不足状態となる時点までにより多くの熱を熱回収手段により回収して蓄熱しておく必要がある。そして、最大出力運転制御では熱電併給装置は一律に最大出力で運転制御されるので、熱回収手段により回収されて蓄熱される回収熱量は概ね直前期間の長さに応じたものとなる。
この構成によれば、予測不足熱量に応じて回収熱量を調節することが容易となり、最大出力運転制御により将来の予測熱需要を略過不足なく賄うことが容易となる。すなわち、必要最小限の最大出力運転制御で熱不足状態の発生を容易に抑制することができる。
The larger the predicted insufficient heat amount, which is the insufficient amount of the predicted recovered heat amount with respect to the predicted heat demand, the more heat needs to be recovered by the heat recovery means until the heat becomes insufficient. In the maximum output operation control, the combined heat and power supply device is uniformly controlled to operate at the maximum output. Therefore, the recovered heat amount recovered and stored by the heat recovery means generally corresponds to the length of the immediately preceding period.
According to this configuration, it becomes easy to adjust the recovered heat amount according to the predicted shortage heat amount, and it becomes easy to cover the future predicted heat demand by the maximum output operation control with almost no shortage. That is, it is possible to easily suppress the occurrence of a heat shortage state with the minimum necessary maximum output operation control.

また、前記運転計画を決定する運転計画決定手段を備え、前記運転計画決定手段は、所定の運転計画に従って前記熱電併給装置を運転制御すると仮定した場合において前記熱不足状態となることが予測される場合には、少なくとも前記熱不足状態となる時点以前の仮設直前期間に前記熱電併給装置を最大出力で運転制御させる特別運転計画を、前記運転計画として決定する構成とすると好適である。   The operation plan determination means is provided for determining the operation plan, and the operation plan determination means is predicted to be in the heat-insufficient state when it is assumed that the operation of the cogeneration device is controlled according to a predetermined operation plan. In this case, it is preferable that a special operation plan for controlling the operation of the combined heat and power device with the maximum output is determined as the operation plan at least immediately before the temporary installation period before the time when the heat is insufficient.

この構成によれば、所定の運転計画に従って熱電併給装置を運転制御すると仮定した場合に発生すると予測される熱不足状態に対して、当該熱不足状態となる時点以前の仮設直前期間だけ熱電併給装置が最大出力で運転制御されるような特別運転計画が決定される。運転制御手段が、このような特別運転計画に従って熱電併給装置を運転制御することで、熱電併給装置は仮設直前期間では余剰熱を発生させるので、熱回収手段によりその余剰熱を回収して蓄熱することで、将来発生すると予測される熱不足状態の発生を抑制することができる。よって、上記の構成によれば、運転計画を決定する段階で、熱不足状態の発生を抑制することが可能な運転計画を決定することができる。
なお、そのような特別運転計画が決定されたにも関わらず、実際に特別運転計画に従って熱電併給装置が運転制御された際に、実際に熱不足状態となると予測された場合には、実際に熱不足状態となると予測される時点以前の直前期間では、特別運転計画に対応する計画運転制御に代えて最大出力運転制御が実行される。これにより、特別運転計画における仮設直前期間の開始時点よりも前の期間を、必要に応じて適宜直前期間として熱電併給装置を最大出力で運転制御して、熱不足状態の発生を略確実に防止することができる。
According to this configuration, for a heat shortage state that is predicted to occur when it is assumed that the operation of the cogeneration device is controlled according to a predetermined operation plan, the heat and power combined device is provided only for a period immediately before the temporary setting before the time when the heat shortage state occurs. A special operation plan is determined such that the operation is controlled at the maximum output. The operation control means controls the operation of the combined heat and power unit according to such a special operation plan, so that the combined heat and power generation apparatus generates surplus heat in the period immediately before temporary installation, so that the excess heat is recovered and stored by the heat recovery means. Thus, it is possible to suppress the occurrence of a heat shortage state that is predicted to occur in the future. Therefore, according to said structure, the operation plan which can suppress generation | occurrence | production of a heat shortage state can be determined in the step which determines an operation plan.
In addition, even if such a special operation plan is determined, when it is predicted that the heat and power supply device is actually operated and controlled according to the special operation plan, the actual heat shortage state is actually In the immediately preceding period before the time when it is predicted that the heat shortage state is expected, the maximum output operation control is executed instead of the planned operation control corresponding to the special operation plan. This makes it possible to prevent the occurrence of an insufficient heat condition by controlling the operation of the combined heat and power system at the maximum output as necessary, with the period prior to the start of the period immediately before the temporary period in the special operation plan as appropriate. can do.

また、前記運転計画決定手段は、前記仮設直前期間の長さを仮設定すると共に、当該仮設定された長さの前記仮設直前期間に応じた前記特別運転計画に従って前記熱電併給装置を継続して運転制御すると仮定した場合における前記蓄電手段の状態の将来予測及び前記熱回収手段の状態の将来予測の一方又は双方に基づいて、前記仮設直前期間の長さを調節する構成とすると好適である。   Further, the operation plan determining means temporarily sets the length of the period immediately before the temporary installation, and continues the cogeneration device according to the special operation plan according to the period immediately before the temporary setting of the temporarily set length. It is preferable that the length of the period immediately before the temporary setting is adjusted based on one or both of the future prediction of the state of the power storage unit and the future prediction of the state of the heat recovery unit when it is assumed that operation control is performed.

この構成によれば、仮設定された特別運転計画に従って熱電併給装置を継続して運転制御すると仮定した場合における、蓄電手段の状態の将来予測及び熱回収手段の状態の将来予測の一方又は双方に基づいて、特別運転計画における仮設直前期間の長さを適正化することができる。   According to this configuration, when it is assumed that the combined operation of the heat and power supply device is continuously controlled according to the temporarily set special operation plan, either or both of the future prediction of the state of the power storage means and the future prediction of the state of the heat recovery means. Based on this, it is possible to optimize the length of the period immediately before the temporary operation in the special operation plan.

より具体的には、前記蓄電手段の状態の将来予測として、前記仮設直前期間内に前記蓄電手段が所定の満充電状態となると予測されるか否かが判定され、前記運転計画決定手段は、前記満充電状態となると予測される場合には、前記仮設直前期間の長さを短くする構成とすると好適である。   More specifically, as the future prediction of the state of the power storage means, it is determined whether or not the power storage means is predicted to be in a predetermined full charge state within the period immediately before the temporary installation. In the case where it is predicted that the battery will be in the fully charged state, it is preferable to shorten the length of the period immediately before the temporary installation.

なお、本願では、蓄電手段の「満充電状態」とは、蓄電手段がそれ以上は有効に蓄電(充電)を行うことができない状態を言う。より具体的には、蓄電手段の充電残量が所定の満充電判定閾値以上である状態を言う。ここで、所定の満充電判定閾値は、蓄電手段の充電容量の上限値付近の、当該上限値よりも小さな値に設定されていると好適である。   In the present application, the “fully charged state” of the power storage means refers to a state in which the power storage means cannot effectively store (charge) any more. More specifically, it refers to a state in which the remaining charge of the power storage means is greater than or equal to a predetermined full charge determination threshold. Here, the predetermined full charge determination threshold value is preferably set to a value smaller than the upper limit value in the vicinity of the upper limit value of the charge capacity of the power storage means.

仮設定された特別運転計画に従って熱電併給装置を継続して運転制御すると仮定した場合に、蓄電手段の状態が満充電状態となると予測される場合には、一旦仮設定された仮設直前期間の長さが長過ぎると判定することができる。よって、そのような場合には仮設直前期間の長さを短くする構成を採用することで、特別運転計画に従って熱電併給装置を最大出力で運転制御する期間を短縮して、必要最小限の最大出力での運転制御で熱不足状態の発生を抑制することができる。   If it is assumed that the combined operation of the thermoelectric power supply device will be continued according to the special operation plan that is temporarily set, and the state of the power storage means is predicted to be fully charged, the length of the period immediately before the temporary setting once temporarily set Can be determined to be too long. Therefore, in such a case, by adopting a configuration that shortens the length of the period immediately before the temporary installation, the period for controlling the operation of the combined heat and power unit at the maximum output in accordance with the special operation plan is shortened, and the minimum required maximum output Occurrence of a heat shortage state can be suppressed by the operation control at.

また、前記熱回収手段の状態の将来予測として、前記仮設直前期間内に前記予測回収熱量が前記予測熱需要よりも大きい状態である熱余剰状態となると予測されるか否か、又は、前記熱回収手段が所定の満蓄熱状態となると予測されるか否かが判定され、前記運転計画決定手段は、前記熱余剰状態又は前記満蓄熱状態となると予測される場合には、前記仮設直前期間の長さを短くする構成とすると好適である。   Further, as a future prediction of the state of the heat recovery means, whether or not it is predicted that the predicted recovered heat amount is larger than the predicted heat demand within the period immediately before the temporary setting, or whether the heat It is determined whether or not the recovery unit is predicted to be in a predetermined full heat storage state, and when the operation plan determination unit is predicted to be in the heat surplus state or the full heat storage state, It is preferable that the length is shortened.

なお、本願では、熱回収手段の「満蓄熱状態」とは、熱回収手段が熱を回収したとしてもそれ以上は有効に蓄熱を行うことができない状態を言う。より具体的には、熱回収手段が蓄熱を行うために保有する熱媒の略全量の温度が所定の高温判定温度以上である状態を言う。ここで、所定の高温判定温度は、熱回収手段が余剰熱を回収する際に熱媒が達し得る温度の上限値付近の値に設定されていると好適である。   In the present application, the “full heat storage state” of the heat recovery means refers to a state in which heat cannot be effectively stored any more even if the heat recovery means recovers heat. More specifically, it refers to a state where the temperature of substantially the entire amount of the heat medium held by the heat recovery means for storing heat is equal to or higher than a predetermined high temperature determination temperature. Here, the predetermined high temperature determination temperature is preferably set to a value near the upper limit value of the temperature that can be reached by the heat medium when the heat recovery means recovers excess heat.

仮設定された特別運転計画に従って熱電併給装置を継続して運転制御すると仮定した場合に、熱余剰状態となると予測され、又は、熱回収手段の状態が満蓄熱状態となると予測される場合には、一旦仮設定された仮設直前期間の長さが長過ぎると判定することができる。よって、そのような場合には仮設直前期間の長さを短くする構成を採用することで、特別運転計画に従って熱電併給装置を最大出力で運転制御する期間を短縮して、必要最小限の最大出力での運転制御で熱不足状態の発生を抑制することができる。   When it is assumed that the combined heat and power supply device will be operated continuously according to the temporarily set special operation plan, it is predicted that the heat surplus state will occur, or if the state of the heat recovery means is predicted to become the full heat storage state It can be determined that the temporarily set temporary period is temporarily too long. Therefore, in such a case, by adopting a configuration that shortens the length of the period immediately before the temporary installation, the period for controlling the operation of the combined heat and power unit at the maximum output in accordance with the special operation plan is shortened, and the minimum required maximum output Occurrence of a heat shortage state can be suppressed by the operation control at.

ここで、前記エネルギ需要予測手段は、将来の前記運転周期内に前記電力負荷において需要があると予測される時系列的な予測電力需要を更に導出し、前記運転制御手段は、前記計画運転制御として、発生される電力が前記予測電力需要に追従するように前記熱電併給装置を運転制御する電主運転制御を実行する構成とすると好適である。   Here, the energy demand prediction unit further derives a time-series predicted power demand that is predicted to be demanded in the power load within the future operation cycle, and the operation control unit is configured to perform the planned operation control. It is preferable that the main operation control for controlling the operation of the thermoelectric power supply device is executed so that the generated power follows the predicted power demand.

この構成によれば、運転制御手段が計画運転制御として電主運転制御を実行することにより、熱電併給装置が発生する電力により予測電力需要を略過不足なく賄うことができる。よって、運転制御手段、エネルギ需要予測手段、及び熱不足予測手段の協働により、熱不足状態及び電力不足状態の双方の発生を適切に抑制しつつ、エネルギ消費量を有効に低減することができる。   According to this configuration, when the operation control unit executes the main operation control as the planned operation control, the predicted electric power demand can be covered with the power generated by the combined heat and power supply apparatus with almost no excess or shortage. Therefore, the energy consumption can be effectively reduced while appropriately suppressing the occurrence of both the heat shortage state and the power shortage state by the cooperation of the operation control means, the energy demand prediction means, and the heat shortage prediction means. .

或いは、前記エネルギ需要予測手段は、将来の前記運転周期内に前記電力負荷において需要があると予測される時系列的な予測電力需要を更に導出し、前記運転制御手段は、前記計画運転制御として、前記仮設直前期間以外では発生される電力が前記予測電力需要に追従するように前記熱電併給装置を運転制御させると共に、前記仮設直前期間だけ前記熱電併給装置を最大出力で運転制御させる特別運転制御を実行する構成とすると好適である。   Alternatively, the energy demand prediction unit further derives a time-series predicted power demand that is predicted to be demanded in the power load within the future operation cycle, and the operation control unit is configured as the planned operation control. Special operation control for controlling the combined operation of the thermoelectric generator so that the generated electric power follows the predicted power demand except for the period immediately before the temporary installation, and controlling the combined operation of the thermoelectric generator at the maximum output only during the period immediately before the temporary installation. It is preferable to adopt a configuration that executes

この構成によれば、運転制御手段が計画運転制御として特別運転制御を実行することにより、仮設直前期間以外では熱電併給装置が発生する電力により予測電力需要を略過不足なく賄うことができ、仮設直前期間では将来発生すると予測される熱不足状態に備えるための余剰熱を発生させてこれを蓄熱することができる。よって、計画運転決定手段、運転制御手段、エネルギ需要予測手段、及び熱不足予測手段の協働により、熱不足状態及び電力不足状態の双方の発生を適切に抑制しつつ、エネルギ消費量を有効に低減することができる。   According to this configuration, when the operation control means executes the special operation control as the planned operation control, it is possible to cover the predicted electric power demand with the electric power generated by the cogeneration device except for the period immediately before the temporary installation. In the immediately preceding period, it is possible to generate surplus heat to prepare for a heat shortage state that is predicted to occur in the future, and to store this. Therefore, the energy consumption can be effectively reduced by appropriately suppressing the occurrence of both the heat shortage state and the power shortage state by the cooperation of the planned operation determination means, the operation control means, the energy demand prediction means, and the heat shortage prediction means. Can be reduced.

また、前記運転制御手段は、前記直前期間内に前記蓄電手段が所定の満充電状態となった場合には、前記直前期間のうち前記満充電状態にある期間では前記最大出力運転制御を実行することなく前記計画運転制御を実行する構成とすると好適である。   The operation control means executes the maximum output operation control in the full charge state of the immediately preceding period when the power storage means is in a predetermined full charge state within the immediately preceding period. It is preferable that the planned operation control is executed without any problem.

直前期間内に蓄電手段が満充電状態となった場合には、その後も熱電併給装置が最大出力運転制御されて実際の電力需要を上回る余剰電力を発生させたとしても、当該余剰電力を蓄電手段に蓄電することができない。
この構成によれば、熱不足状態となると予測される時点より前の直前期間内に蓄電手段が満充電状態となった場合には、直前期間のうち当該満充電状態にある期間では計画運転制御を実行するので、蓄電手段が満充電状態となった後は予測電力需要のみを略過不足なく賄って、無駄な余剰電力の発生を抑制することができる。
If the power storage means becomes fully charged within the immediately preceding period, even if the combined heat and power unit is controlled to operate at maximum output and generates surplus power exceeding the actual power demand, the surplus power is stored in the power storage means. Can not be stored.
According to this configuration, when the power storage unit becomes fully charged within the immediately preceding period before the time when the heat shortage state is predicted, the planned operation control is performed during the fully charged state in the immediately preceding period. Thus, after the power storage means is fully charged, it is possible to cover only the predicted power demand without much excess and deficiency and suppress the generation of useless surplus power.

また、前記運転制御手段は、前記直前期間内に前記予測回収熱量が前記予測熱需要よりも大きい状態である熱余剰状態となった場合、又は、前記熱回収手段が所定の満蓄熱状態となった場合には、前記直前期間のうち前記熱余剰状態又は前記満蓄熱状態にある期間では前記最大出力運転制御を実行することなく前記計画運転制御を実行する構成とすると好適である。   In addition, the operation control means is in a state of surplus heat in which the predicted heat recovery amount is larger than the predicted heat demand within the immediately preceding period, or the heat recovery means is in a predetermined full heat storage state. In this case, it is preferable that the planned operation control is executed without executing the maximum output operation control in the period of the heat surplus state or the full heat storage state in the immediately preceding period.

運転制御手段が最大出力運転制御を実行した結果、直前期間内に熱余剰状態となった場合には、既に将来の熱不足状態の発生を回避することが可能であると予測されるので、熱電併給装置が最大出力運転制御され、それ以上の余剰熱を発生させて当該余剰熱を熱回収手段により回収したとしても、その余剰熱は熱不足状態の解消のために使用されない可能性が高い。また、直前期間内に満蓄熱状態となった場合には、その後も熱電併給装置が最大出力運転制御されて余剰熱を発生させたとしても、熱回収手段が当該余剰熱を回収して蓄熱することができない。
この構成によれば、熱不足状態となると予測される時点より前の直前期間内に熱余剰状態又は満蓄熱状態となった場合には、直前期間のうち熱余剰状態又は満蓄熱状態にある期間では計画運転制御を実行するので、無駄な余剰熱の発生を抑制することができる。
As a result of the operation control means performing the maximum output operation control, if it becomes a heat surplus state within the immediately preceding period, it is predicted that it is possible to avoid the occurrence of a future heat shortage state. Even if the cogeneration device is controlled to operate at maximum output and generates more excess heat, and the excess heat is recovered by the heat recovery means, it is highly possible that the excess heat is not used for eliminating the heat shortage state. In addition, when the full heat storage state is reached within the immediately preceding period, the heat recovery means recovers and stores the excess heat even if the combined heat and power supply device is controlled for maximum output operation and generates excess heat. I can't.
According to this structure, when it becomes a heat surplus state or a full heat storage state within the immediately preceding period before the time point at which it is predicted that the heat shortage state is expected, the period in the heat surplus state or the full heat storage state in the immediately preceding period. Then, since planned operation control is performed, generation | occurrence | production of useless surplus heat can be suppressed.

これまで説明してきたような構成を備えるコージェネレーションシステムは、例えば計画運転制御として、発生される電力が予測電力需要に追従するように熱電併給装置を運転制御する電主運転制御を実行する場合に、ある程度の頻度で熱不足状態が発生し得るような状況で使用される場合に特に有効である。従って、本発明に係るコージェネレーションシステムの設置対象としては、前記電力負荷における電力需要レベルに対して前記熱負荷における熱需要レベルが大きいエネルギ需要家が特に適している。   A cogeneration system having a configuration as described so far, for example, as planned operation control, when executing main operation control that controls operation of the combined heat and power supply so that the generated power follows the predicted power demand It is particularly effective when used in a situation where an insufficient heat state may occur at a certain frequency. Therefore, as an installation target of the cogeneration system according to the present invention, an energy consumer having a large heat demand level in the heat load with respect to the power demand level in the power load is particularly suitable.

本発明に係る、電力と熱とを併せて発生させる熱電併給装置と、前記熱電併給装置で発生された熱を回収して蓄熱しかつ当該蓄えられた熱を熱負荷へ供給する熱回収手段と、前記熱電併給装置を運転制御する運転制御手段と、を備えたコージェネレーションシステムの特徴構成は、前記熱電併給装置で発生された電力を蓄電しかつ当該蓄えられた電力を電力負荷へ供給する蓄電手段と、将来の所定の運転周期内に前記熱負荷において需要があると予測される時系列的な予測熱需要を導出するエネルギ需要予測手段と、前記熱電併給装置を計画運転制御するための所定の運転計画を決定する運転計画決定手段と、前記計画運転制御を継続して実行すると仮定した場合に、前記熱回収手段により回収されると予測される予測回収熱量が前記予測熱需要よりも小さい状態である熱不足状態となるか否かを予測する熱不足予測手段と、を備え、前記運転計画決定手段は、前記熱不足状態となることが予測された場合には、少なくとも前記熱不足状態となる時点以前の直前期間に前記熱電併給装置を最大出力で運転制御させる特別運転計画を決定し、運転制御手段は、前記特別運転計画に従って前記熱電併給装置を運転制御する特別運転制御を実行し、前記直前期間に発生する余剰電力を前記蓄電手段に蓄電する点にある。   A combined heat and power device for generating electric power and heat according to the present invention, and heat recovery means for recovering and storing heat generated by the combined heat and power device and supplying the stored heat to a heat load. And an operation control means for controlling the operation of the combined heat and power unit. The characteristic configuration of the cogeneration system includes a storage unit that stores electric power generated by the combined heat and power supply unit and supplies the stored electric power to a power load. Means, energy demand predicting means for deriving time-series predicted heat demand that is predicted to be demanded in the thermal load within a predetermined operation cycle in the future, and predetermined for controlling planned operation of the combined heat and power supply device When the operation plan determining means for determining the operation plan and the planned operation control are assumed to be continuously executed, the predicted recovered heat amount predicted to be recovered by the heat recovery means is the predicted heat. A heat shortage predicting means for predicting whether or not the heat shortage state is smaller than necessary, and when the operation plan determining means is predicted to become the heat shortage state, at least A special operation plan for controlling the operation of the combined heat and power device at the maximum output immediately before the time when the heat shortage state is reached is determined, and the operation control means performs a special operation for controlling the operation of the combined heat and power device according to the special operation plan. Control is executed, and surplus power generated in the immediately preceding period is stored in the power storage means.

上記の特徴構成によれば、コージェネレーションシステムは、計画運転決定手段により決定される運転計画に従って熱電併給装置が運転制御される。計画運転決定手段が運転計画を決定するに際しては、エネルギ需要予測手段により時系列的な予測熱需要が導出されると共に、熱不足予測手段により、計画運転制御を継続して実行すると仮定した場合に将来熱不足状態となるか否かが予測される。そして、熱不足状態となることが予測された場合には、少なくとも熱不足状態となると予測される時点以前の直前期間に熱電併給装置を最大出力で運転制御させる特別運転計画が決定され、熱電併給装置は決定された特別運転計画に従って運転制御される。このような特別運転計画に従い、熱電併給装置が最大出力で運転制御される直前期間では、熱電併給装置は予測熱需要を上回る余剰熱を発生させるので、熱回収手段によりその余剰熱を回収して蓄熱することで、将来発生すると予測される熱不足状態の発生を抑制することができる。
その際、直前期間では、熱電併給装置は一般にエネルギ効率が最大に近い状態となる最大出力で発電を行うので、コージェネレーションシステム全体のエネルギ効率を向上させることができる。また、熱電併給装置を最大出力で運転制御する期間を、熱不足状態となると予測される時点以前の直前期間のみとすることで、熱電併給装置が発生した余剰熱が回収されてから実際に熱負荷に供給されるまでの間(蓄熱されている間)の放熱量を極力小さく抑えることができる。よって、蓄熱中における放熱によるエネルギ損失を低減することができるので、熱電併給装置を最大出力で運転制御する期間を短縮し或いは補助熱源を使用する場合にはその使用量を低減して、エネルギ消費量を有効に低減することができる。また、熱電併給装置を最大出力で運転制御することにより熱電併給装置が発電した電力のうちの余剰電力を蓄電手段に蓄電することで、将来電力負荷において熱電併給装置の最大出力を超える電力需要があった際に、当該蓄電した電力を電力負荷に供給することができる。なお、蓄電手段に蓄電し或いは蓄電手段から電力を持ち出す際の電力ロスによるエネルギ損失は、無視できる程度に小さい。
従って、熱不足状態の発生を抑制しつつエネルギ消費量を有効に低減することが可能なコージェネレーションシステムを提供することができる。
According to the above characteristic configuration, in the cogeneration system, the operation of the cogeneration system is controlled according to the operation plan determined by the planned operation determination unit. When the planned operation determining means determines the operation plan, it is assumed that the time-series predicted heat demand is derived by the energy demand predicting means and that the planned operation control is continuously executed by the heat shortage predicting means. It is predicted whether a heat shortage will occur in the future. If it is predicted that a heat shortage state will occur, at least a special operation plan for controlling the operation of the combined heat and power unit at the maximum output will be determined immediately before the time point at which the heat shortage state is predicted. The device is controlled according to the determined special operation plan. According to such a special operation plan, in the period immediately before the combined operation of the combined heat and power device at the maximum output, the combined heat and power device generates surplus heat that exceeds the predicted heat demand, so the heat recovery means recovers the excess heat. By storing heat, it is possible to suppress the occurrence of a heat shortage state that is predicted to occur in the future.
At that time, in the immediately preceding period, the combined heat and power apparatus generally generates power at the maximum output at which the energy efficiency is close to the maximum, so that the energy efficiency of the entire cogeneration system can be improved. In addition, by setting the period for controlling the operation of the combined heat and power unit at the maximum output only to the period immediately before the time when it is predicted that the heat and heat shortage state is predicted, the excess heat generated by the combined heat and power unit is recovered and the actual heat is recovered. The amount of heat released until the load is supplied (while the heat is stored) can be minimized. Therefore, energy loss due to heat dissipation during heat storage can be reduced. Therefore, the period for controlling the operation of the combined heat and power unit with the maximum output can be shortened, or when using an auxiliary heat source, the amount used can be reduced to reduce energy consumption. The amount can be effectively reduced. In addition, by controlling the operation of the combined heat and power unit at the maximum output, the surplus power out of the power generated by the combined heat and power unit is stored in the power storage means, so that there is a demand for power exceeding the maximum output of the combined heat and power unit in the future power load. When this occurs, the stored power can be supplied to the power load. Note that the energy loss due to the power loss when the power is stored in the power storage means or taken out of the power storage means is small enough to be ignored.
Therefore, it is possible to provide a cogeneration system capable of effectively reducing energy consumption while suppressing the occurrence of a heat shortage state.

また、上記の特徴構成では、直前期間では熱電併給装置の発電出力が一律に最大出力となるように制御されるので、仮に実際の熱需要が予測熱需要から外れてしまった場合であっても、当該予測外れによる実際の熱需要と予測熱需要との間の差分の蓄積が熱不足状態の解消や省エネルギ性に与える影響は比較的小さい。   Further, in the above-described characteristic configuration, since the power generation output of the combined heat and power supply device is controlled to be the maximum output uniformly in the immediately preceding period, even if the actual heat demand deviates from the predicted heat demand. The accumulation of the difference between the actual heat demand and the predicted heat demand due to the prediction error has a relatively small influence on the elimination of the heat shortage state and the energy saving performance.

以上より、上記の特徴構成によれば、許容され得る高い精度で、熱不足状態の発生を抑制しつつエネルギ消費量を有効に低減することが可能なコージェネレーションシステムを提供することができる。   As described above, according to the above-described characteristic configuration, it is possible to provide a cogeneration system capable of effectively reducing energy consumption while suppressing the occurrence of a heat shortage state with high allowable accuracy.

第一の実施形態に係るコージェネレーションシステムの全体構成を示すブロック図である。It is a block diagram which shows the whole structure of the cogeneration system which concerns on 1st embodiment. 第一の実施形態に係るコージェネレーションシステムの制御系の構成を示すブロック図である。It is a block diagram which shows the structure of the control system of the cogeneration system which concerns on 1st embodiment. 第一の実施形態に係る過去エネルギ消費量データのデータ構造の一例を示す模式図である。It is a schematic diagram which shows an example of the data structure of the past energy consumption data which concern on 1st embodiment. 第一の実施形態に係る運転制御処理の処理手順を示すフローチャートである。It is a flowchart which shows the process sequence of the operation control process which concerns on 1st embodiment. 第一の実施形態に係る運転制御処理を実行した場合のタイムチャートの一例である。It is an example of the time chart at the time of performing the operation control process which concerns on 1st embodiment. 第一の実施形態に係る運転制御処理を実行した場合のタイムチャートの一例である。It is an example of the time chart at the time of performing the operation control process which concerns on 1st embodiment. 第一の実施形態に係る運転制御処理を実行した場合のタイムチャートの一例である。It is an example of the time chart at the time of performing the operation control process which concerns on 1st embodiment. 第二の実施形態に係る運転制御処理の処理手順を示すフローチャートである。It is a flowchart which shows the process sequence of the operation control process which concerns on 2nd embodiment.

1.第一の実施形態
本発明に係るコージェネレーションシステムの第一の実施形態について、図面を参照して説明する。図1は、本実施形態に係るコージェネレーションシステム1の全体構成を示すブロック図である。また、図2は、本実施形態に係るコージェネレーションシステム1の制御系の構成を示すブロック図である。これらの図に示すように、本実施形態に係るコージェネレーションシステム1は、電力と熱とを併せて発生させる燃料電池3と、燃料電池3で発生された熱を回収して蓄熱しかつ当該蓄えられた熱を熱負荷9へ供給する貯湯ユニット4と、燃料電池3の運転制御を行う制御ユニット30と、を備えている。また、コージェネレーションシステム1は、燃料電池3で発生された電力を蓄電しかつ当該蓄えられた電力を電力負荷8へ供給するバッテリ5を備えている。このような構成において、本実施形態に係るコージェネレーションシステム1は、基本的には発生される電力が将来の予測電力需要に追従するように燃料電池3を運転制御しつつ、そのままでは熱不足状態となることが予測された場合には、特別に、熱不足状態となる時点以前の所定の直前期間Ta(図6及び図7を参照)だけ燃料電池3を最大出力で運転制御するように構成されている点に特徴を有する。これにより、比較的小さな演算処理負荷でかつ許容され得る高い精度で、熱不足状態の発生を抑制しつつエネルギ消費量を有効に低減することが可能となっている。以下、本実施形態に係るコージェネレーションシステム1について、詳細に説明する。
1. First Embodiment A first embodiment of a cogeneration system according to the present invention will be described with reference to the drawings. FIG. 1 is a block diagram showing an overall configuration of a cogeneration system 1 according to the present embodiment. FIG. 2 is a block diagram showing the configuration of the control system of the cogeneration system 1 according to this embodiment. As shown in these drawings, the cogeneration system 1 according to the present embodiment recovers and stores the fuel cell 3 that generates electric power and heat together, the heat generated by the fuel cell 3, and stores the heat. A hot water storage unit 4 that supplies the generated heat to the heat load 9 and a control unit 30 that controls the operation of the fuel cell 3 are provided. The cogeneration system 1 also includes a battery 5 that stores electric power generated in the fuel cell 3 and supplies the stored electric power to the electric power load 8. In such a configuration, the cogeneration system 1 according to the present embodiment basically controls the fuel cell 3 so that the generated electric power follows the predicted power demand in the future, and remains in a heat-deficient state as it is. When it is predicted that the fuel cell 3 will be operated, the fuel cell 3 is controlled to operate at the maximum output only during a predetermined immediately preceding period Ta (see FIGS. 6 and 7) before the time when the heat becomes insufficient. It is characterized in that As a result, it is possible to effectively reduce the energy consumption while suppressing the occurrence of a heat shortage state with a relatively small arithmetic processing load and with high accuracy that can be tolerated. Hereinafter, the cogeneration system 1 according to the present embodiment will be described in detail.

1−1.コージェネレーションシステムの全体構成
まず、本実施形態に係るコージェネレーションシステム1の全体構成について説明する。コージェネレーションシステム1は、図1に示すように、燃料電池3と、貯湯ユニット4と、バッテリ5と、を主要な構成要素として備えている。また、コージェネレーションシステム1は、図2に示すように、当該コージェネレーションシステム1に備えられる各構成要素の動作制御を行うための制御ユニット30を備えている。制御ユニット30による動作制御に従い、コージェネレーションシステム1は、電力負荷8に対して電力を供給すると共に熱負荷9に対して熱を供給することができるように構成されている。
1-1. First, the overall configuration of the cogeneration system 1 according to the present embodiment will be described. As shown in FIG. 1, the cogeneration system 1 includes a fuel cell 3, a hot water storage unit 4, and a battery 5 as main components. Moreover, the cogeneration system 1 is provided with the control unit 30 for performing operation control of each component with which the said cogeneration system 1 is provided, as shown in FIG. According to the operation control by the control unit 30, the cogeneration system 1 is configured to supply power to the power load 8 and to supply heat to the heat load 9.

燃料電池3は、原燃料ガスから生成される水素ガスを燃料として発電を行う装置である。ここで、原燃料ガスは、メタンやプロパン等の炭化水素を主成分とするガスであり、本実施形態では都市ガスやLPG等の形態で供給される。原燃料ガスは、付臭剤として添加されたDMS等の硫黄化合物が除去された後、改質反応により水素を主成分とするガスに改質される。その後、改質ガスは、一酸化炭素等の副生ガスが除去されて水素リッチとなった状態でセルスタックに供給される。また、セルスタックには酸素含有ガスとしての空気も供給され、水素と酸素との化学反応により発電が行われて直流電力が取り出される。なお、ガス流量調節弁等により原燃料ガスの供給量を調節することで、燃料電池3による発電出力を調節することができるようになっている。このような燃料電池3としては、固体高分子形燃料電池(PEFC)、固体酸化物形燃料電池(SOFC)、リン酸形燃料電池(PAFC)、溶融炭酸塩形燃料電池(MCFC)等、各種方式のものを採用することができる。   The fuel cell 3 is a device that generates power using hydrogen gas generated from raw fuel gas as fuel. Here, the raw fuel gas is a gas mainly composed of hydrocarbons such as methane and propane, and is supplied in the form of city gas, LPG, or the like in this embodiment. The raw fuel gas is reformed into a gas containing hydrogen as a main component by a reforming reaction after a sulfur compound such as DMS added as an odorant is removed. Thereafter, the reformed gas is supplied to the cell stack in a state in which a by-product gas such as carbon monoxide is removed and becomes hydrogen rich. In addition, air as an oxygen-containing gas is also supplied to the cell stack, and electric power is generated by a chemical reaction between hydrogen and oxygen to extract DC power. It should be noted that the power generation output by the fuel cell 3 can be adjusted by adjusting the supply amount of the raw fuel gas with a gas flow rate adjusting valve or the like. Such a fuel cell 3 includes various types such as a polymer electrolyte fuel cell (PEFC), a solid oxide fuel cell (SOFC), a phosphoric acid fuel cell (PAFC), a molten carbonate fuel cell (MCFC), etc. The system can be adopted.

燃料電池3のセルスタックにおける水素と酸素との化学反応は発熱反応であり、反応の進行とともに熱が発生する。更に、セルスタック内部における各種の抵抗成分による発熱によっても熱が発生する。従って、燃料電池3は、電力を発生させると共に熱も併せて発生させる。本実施形態においては、燃料電池3が本発明における「熱電併給装置」に相当する。   The chemical reaction between hydrogen and oxygen in the cell stack of the fuel cell 3 is an exothermic reaction, and heat is generated as the reaction proceeds. Furthermore, heat is also generated by heat generated by various resistance components inside the cell stack. Therefore, the fuel cell 3 generates electric power as well as heat. In the present embodiment, the fuel cell 3 corresponds to the “cogeneration apparatus” in the present invention.

燃料電池3は、第一コンバータ12に電気的に接続されている。第一コンバータ12は、燃料電池3により発電されて出力された直流電力を所定の電圧に電圧変換する。第一コンバータ12は、インバータ11に電気的に接続されている。インバータ11は、第一コンバータ12により所定電圧に電圧変換された直流電力を、所定周波数の交流電力に変換する。インバータ11により出力される交流電力は、商用電力系統7と連系して電気機器等の電力負荷8に供給されるように構成されている。そのため、第一コンバータ12とインバータ11とが協働して、燃料電池3から出力される直流電力を、商用電力系統7から供給される交流電力の電圧及び周波数に等しい電圧及び周波数の交流電力に変換するように構成されている。   The fuel cell 3 is electrically connected to the first converter 12. The first converter 12 converts the DC power generated and output by the fuel cell 3 into a predetermined voltage. The first converter 12 is electrically connected to the inverter 11. The inverter 11 converts the DC power that has been converted into a predetermined voltage by the first converter 12 into AC power having a predetermined frequency. The AC power output from the inverter 11 is connected to the commercial power system 7 and supplied to the power load 8 such as an electric device. Therefore, the first converter 12 and the inverter 11 cooperate to convert the DC power output from the fuel cell 3 into AC power having a voltage and frequency equal to the voltage and frequency of the AC power supplied from the commercial power system 7. Configured to convert.

第一コンバータ12とインバータ11との間に、バッテリ5が電気的に接続されている。バッテリ5は、燃料電池3により発電されて第一コンバータ12により所定電圧に電圧変換された直流電力を蓄電(充電)することができるように構成されている。また、バッテリ5は、当該バッテリ5に蓄電された電力を電力負荷8へ供給することができるように構成されている。すなわち、バッテリ5は、燃料電池3により発電される電力のうち電力負荷8へ供給される電力を上回る分となる余剰電力を一旦蓄電し、当該蓄電した電力を、その余剰電力が発生した時間帯とは異なる時間帯に電力負荷8へ供給することができるように構成されている。なお、バッテリ5に蓄電された直流電力は、インバータ11により所定周波数の交流電力に変換された後、電力負荷8へ供給される。本実施形態においては、バッテリ5が本発明における「蓄電手段」に相当する。バッテリ5としては、例えばニッケル水素二次電池やリチウムイオン二次電池等の各種二次電池を用いることができる。なお、バッテリ5は蓄電手段の一例であり、これ以外にもキャパシタ等の他の蓄電手段を用い、或いはこれらを組み合わせて用いることもできる。   A battery 5 is electrically connected between the first converter 12 and the inverter 11. The battery 5 is configured to store (charge) DC power generated by the fuel cell 3 and converted into a predetermined voltage by the first converter 12. The battery 5 is configured to be able to supply the electric power stored in the battery 5 to the electric power load 8. That is, the battery 5 temporarily stores surplus power that exceeds the power supplied to the power load 8 out of the power generated by the fuel cell 3, and the stored power is stored in the time zone when the surplus power is generated. It is comprised so that it can supply to the electric power load 8 in a different time slot | zone. The DC power stored in the battery 5 is converted into AC power having a predetermined frequency by the inverter 11 and then supplied to the power load 8. In the present embodiment, the battery 5 corresponds to the “power storage means” in the present invention. As the battery 5, for example, various secondary batteries such as a nickel hydride secondary battery and a lithium ion secondary battery can be used. Note that the battery 5 is an example of a power storage unit, and other power storage units such as a capacitor may be used in combination, or a combination thereof may be used.

バッテリ5に隣接して、当該バッテリ5の状態を検出するバッテリ状態検出センサS1が設けられている。バッテリ状態検出センサS1は、バッテリ5の状態として、本実施形態では特にバッテリ5の蓄電量(充電量)を検出するように構成されている。具体的には、バッテリ5の正極と負極との間の電圧値を検出するための電圧センサやバッテリ5から持ち出される電流値を検出するための電流センサ等により構成され、これらの検出値に基づいてバッテリ5の充電量が検出される。バッテリ状態検出センサS1により検出されるバッテリ5の充電量の情報は、制御ユニット30に出力される。   A battery state detection sensor S <b> 1 that detects the state of the battery 5 is provided adjacent to the battery 5. In the present embodiment, the battery state detection sensor S1 is configured to detect the amount of charge (charge amount) of the battery 5 in particular in the present embodiment. Specifically, it is configured by a voltage sensor for detecting a voltage value between the positive electrode and the negative electrode of the battery 5, a current sensor for detecting a current value taken out from the battery 5, and the like based on these detected values. Thus, the charge amount of the battery 5 is detected. Information on the charge amount of the battery 5 detected by the battery state detection sensor S <b> 1 is output to the control unit 30.

燃料電池3と第一コンバータ12との間に、第二コンバータ13が電気的に接続されている。第二コンバータ13は、燃料電池3により発電されて出力された直流電力を所定の電圧に電圧変換する。第二コンバータ13は、電気ヒータ14に電気的に接続されている。電気ヒータ14は、燃料電池3からの発電出力を熱に変換して回収するための装置であり、例えば余剰電力が発生しているにもかかわらず、バッテリ5にそれ以上電力を蓄電することができない満充電状態のような状況で作動する。電気ヒータ14は、例えば複数の電熱線等により構成されており、これら複数の電熱線を各別にオン・オフするための複数の作動スイッチ15が設けられている。オン状態とする作動スイッチ15の数を調節することにより、電気ヒータ14による消費電力(電力から熱への変換量)が調節される。   A second converter 13 is electrically connected between the fuel cell 3 and the first converter 12. The second converter 13 converts the DC power generated and output by the fuel cell 3 into a predetermined voltage. The second converter 13 is electrically connected to the electric heater 14. The electric heater 14 is a device for converting the power generation output from the fuel cell 3 into heat and recovering the heat. For example, even though surplus power is generated, the battery 5 can store more power. Operates in situations where it cannot be fully charged. The electric heater 14 is composed of, for example, a plurality of heating wires and the like, and a plurality of operation switches 15 for turning on and off the plurality of heating wires are provided. By adjusting the number of the operation switches 15 to be turned on, the power consumption (amount of conversion from electric power to heat) by the electric heater 14 is adjusted.

上記のとおり燃料電池3は熱を発生させることから、当該燃料電池3を冷却するための冷却水を循環させる冷却水循環路21が設けられている。冷却水循環路21には、冷却水循環ポンプ18と燃料電池3と電気ヒータ14と貯湯槽24とラジエータ19とが介挿されている。冷却水循環ポンプ18が作動することにより、冷却水循環路21中を通って、冷却水は燃料電池3、電気ヒータ14、貯湯槽24、及びラジエータ19の順に循環する。すなわち、冷却水循環ポンプ18により吐出された冷却水は、燃料電池3を冷却すると共に、燃料電池3からの排熱を回収して自身は加熱される。加熱された冷却水は、必要に応じて電気ヒータ14により更に加熱されて湯水となり、貯湯槽24に流入して貯湯槽24に貯えられる。すなわち、貯湯槽24に貯えられる熱媒としての湯水が有する熱量の形態で、回収された熱が蓄熱される。   Since the fuel cell 3 generates heat as described above, the cooling water circulation path 21 for circulating the cooling water for cooling the fuel cell 3 is provided. A coolant circulation pump 18, a fuel cell 3, an electric heater 14, a hot water tank 24, and a radiator 19 are interposed in the coolant circulation path 21. By operating the cooling water circulation pump 18, the cooling water circulates in the order of the fuel cell 3, the electric heater 14, the hot water storage tank 24, and the radiator 19 through the cooling water circulation path 21. That is, the cooling water discharged by the cooling water circulation pump 18 cools the fuel cell 3 and collects exhaust heat from the fuel cell 3 to heat itself. The heated cooling water is further heated by the electric heater 14 as necessary to become hot water, flows into the hot water storage tank 24 and is stored in the hot water storage tank 24. That is, the recovered heat is stored in the form of the amount of heat that hot water as a heat medium stored in the hot water storage tank 24 has.

貯湯槽24は、湯水の温度に応じて複数の温度層を形成して湯水を貯留する、所謂温度成層型に構成されている。すなわち、貯湯槽24は、その上部ほど高温の湯水が滞留する高温層を形成すると共に、下部ほど低温の湯水が滞留する低温層を形成する形態で湯水を貯留するように構成されている。本実施形態では、燃料電池3(及び、必要に応じて電気ヒータ14)で加熱された高温の湯水は、貯湯槽24の上端部の高温層に供給される。冷却水循環ポンプ18が作動することにより、貯湯槽24の下端部の低温層に滞留する比較的低温の湯水はラジエータ19に供給される。この比較的低温の湯水はラジエータ19にて外気に対して放熱されて冷却され、冷却水循環ポンプ18により吐出されて再度上記のサイクルを繰り返す。   The hot water storage tank 24 is configured as a so-called temperature stratification type in which a plurality of temperature layers are formed according to the temperature of hot water to store hot water. That is, the hot water storage tank 24 is configured to store hot water in a form that forms a high temperature layer in which hot hot water stays in the upper part and forms a low temperature layer in which low temperature hot water stays in the lower part. In the present embodiment, high-temperature hot water heated by the fuel cell 3 (and the electric heater 14 as necessary) is supplied to the high-temperature layer at the upper end of the hot water storage tank 24. By operating the cooling water circulation pump 18, relatively low temperature hot water staying in the low temperature layer at the lower end of the hot water storage tank 24 is supplied to the radiator 19. This relatively low temperature hot water is radiated to the outside air by the radiator 19 to be cooled, discharged by the cooling water circulation pump 18, and the above cycle is repeated again.

貯湯槽24に貯留する湯水の形態で蓄熱された熱は、更に熱負荷9へも供給されるように構成されている。すなわち、貯湯槽24の上端部の高温層に滞留する比較的高温の湯水は、更に熱負荷9へも供給されるように構成されている。本実施形態では、貯湯槽24と熱負荷9との間に、貯湯槽24から供給される湯水を加熱するための補助加熱器26が配設されている。このような補助加熱器26は、例えば加熱対象の湯水を通流させる熱交換器と、火炎によりその熱交換器内を流通する湯水を加熱するバーナと、を備えて構成することができる。このように、本実施形態では、冷却水循環路21中に備えられる各構成が協働することにより、燃料電池3で発生された熱を湯水の形態で回収して熱負荷9へ供給される量を上回る分の余剰熱を貯湯槽24に蓄熱し、かつ当該貯湯槽24に貯留された高温の湯水を、その余剰熱が発生した時間帯とは異なる時間帯に熱負荷9へ供給することができるように構成されている。本実施形態においては、冷却水循環路21中に備えられる各構成が協働して貯湯ユニット4を構成しており、この貯湯ユニット4が本発明における「熱回収手段」に相当する。なお、貯湯ユニット4の具体的構成は上記の構成に限定されない。例えば、貯湯ユニット4を、燃料電池3を冷却するための冷却水を循環させる冷却水循環路と、貯湯槽24に貯留された湯水を循環させる湯水循環路と、冷却水循環路内を流通する冷却水と湯水循環路内を流通する湯水との間で熱交換を行わせる熱交換器と、を備えた構成等としても良い。   The heat stored in the form of hot water stored in the hot water storage tank 24 is further supplied to the heat load 9. That is, the relatively high temperature hot water staying in the high temperature layer at the upper end of the hot water tank 24 is further supplied to the heat load 9. In the present embodiment, an auxiliary heater 26 for heating hot water supplied from the hot water tank 24 is disposed between the hot water tank 24 and the thermal load 9. Such an auxiliary heater 26 can be configured to include, for example, a heat exchanger that allows hot water to be heated to flow and a burner that heats hot water flowing through the heat exchanger using a flame. As described above, in the present embodiment, the components provided in the cooling water circulation path 21 cooperate to collect the heat generated in the fuel cell 3 in the form of hot water and supply it to the heat load 9. Is stored in the hot water storage tank 24, and the hot water stored in the hot water storage tank 24 is supplied to the thermal load 9 in a time zone different from the time zone in which the excess heat is generated. It is configured to be able to. In the present embodiment, the components provided in the cooling water circulation path 21 cooperate to constitute the hot water storage unit 4, and the hot water storage unit 4 corresponds to the “heat recovery means” in the present invention. The specific configuration of the hot water storage unit 4 is not limited to the above configuration. For example, in the hot water storage unit 4, a cooling water circulation path for circulating cooling water for cooling the fuel cell 3, a hot water circulation path for circulating hot water stored in the hot water storage tank 24, and cooling water flowing in the cooling water circulation path It is good also as a structure provided with the heat exchanger which performs heat exchange between the hot water which circulates in the hot water circulation path.

また、貯湯槽24に隣接して、当該貯湯槽24に貯留された湯水の温度を検出する湯温センサS2が設けられている。本実施形態では、複数(図示の例では、4個)の湯温センサS2が、貯湯槽24の上下方向に所定間隔を隔てて設置されている。それぞれの湯温センサS2により検出される湯水の温度に関する情報は、それぞれ制御ユニット30に出力される。   In addition, a hot water temperature sensor S <b> 2 that detects the temperature of the hot water stored in the hot water storage tank 24 is provided adjacent to the hot water storage tank 24. In the present embodiment, a plurality (four in the illustrated example) of hot water temperature sensors S <b> 2 are installed at predetermined intervals in the vertical direction of the hot water storage tank 24. Information on the temperature of the hot water detected by each hot water temperature sensor S2 is output to the control unit 30.

1−2.制御ユニットの構成
次に、制御ユニット30の構成について説明する。コージェネレーションシステム1が備える制御ユニット30は、図2に示すように、コージェネレーションシステム1の各部の動作制御を行う中核部材としての機能を果たしている。本実施形態においては、制御ユニット30は、学習記憶部31と、エネルギ需要予測部32と、運転計画決定部33と、熱不足予測部34と、運転制御部35と、を備えている。これらの各機能部は、ソフトウェア(プログラム)又はハードウェア、或いはそれらの両方により構成されており、互いに情報の受け渡しを行うことができるように構成されている。また、制御ユニット30との間で互いに情報の受け渡しを行うことが可能な状態で、メモリ40が設けられている。このメモリ40は、例えばフラッシュメモリ等のように、情報を記憶及び書き換え可能な記録媒体をハードウェア構成として備えている。本実施形態では、メモリ40には過去電力消費量データ41と過去熱消費量データ42とが格納されている。なお、制御ユニット30の各機能部がソフトウェアにより構成される場合には、当該各機能部を構成するソフトウェアを記憶する記憶装置とメモリ40とを一体化させても良い。
1-2. Configuration of Control Unit Next, the configuration of the control unit 30 will be described. As shown in FIG. 2, the control unit 30 included in the cogeneration system 1 functions as a core member that controls the operation of each part of the cogeneration system 1. In the present embodiment, the control unit 30 includes a learning storage unit 31, an energy demand prediction unit 32, an operation plan determination unit 33, a heat shortage prediction unit 34, and an operation control unit 35. Each of these functional units is configured by software (program) and / or hardware, and is configured to be able to exchange information with each other. The memory 40 is provided in a state where information can be exchanged with the control unit 30. The memory 40 includes a recording medium capable of storing and rewriting information, such as a flash memory, as a hardware configuration. In the present embodiment, the memory 40 stores past power consumption data 41 and past heat consumption data 42. In addition, when each function part of the control unit 30 is comprised by software, you may integrate the memory | storage device and the memory 40 which memorize | store the software which comprises the said each function part.

また、制御ユニット30には、上述したバッテリ状態検出センサS1により検出されるバッテリ5の充電量の情報や、湯温センサS2により検出される湯水の温度に関する情報が入力される。また、本実施形態においては、コージェネレーションシステム1による電力の供給先である電力負荷8に隣接して電力消費量計測装置28が設けられており、熱の供給先である熱負荷9への出力部に熱消費量計測装置29が設けられている(図1を参照)。ここで、電力消費量計測装置28は、電力負荷8における実際の電力消費量を計測する装置であり、具体的には電流センサや電圧センサ等により構成される。熱消費量計測装置29は、熱負荷9における実際の熱消費量を計測する装置であり、具体的には貯湯槽24から熱負荷9に供給される湯水の流量を検出する流量センサやその温度を検出する温度センサ等により構成される。そして、制御ユニット30には、電力消費量計測装置28により計測される電力負荷8における電力消費量の情報、及び熱消費量計測装置29により計測される熱負荷9における熱消費量の情報も入力される。以下では、制御ユニット30の各機能部の詳細について説明する。   Further, the control unit 30 receives information on the amount of charge of the battery 5 detected by the battery state detection sensor S1 and information on the temperature of hot water detected by the hot water temperature sensor S2. Moreover, in this embodiment, the power consumption measuring device 28 is provided adjacent to the power load 8 that is the power supply destination of the cogeneration system 1 and is output to the heat load 9 that is the heat supply destination. A heat consumption measuring device 29 is provided in the section (see FIG. 1). Here, the power consumption measuring device 28 is a device that measures the actual power consumption in the power load 8, and specifically includes a current sensor, a voltage sensor, and the like. The heat consumption measuring device 29 is a device that measures the actual heat consumption in the heat load 9, specifically, a flow rate sensor that detects the flow rate of hot water supplied from the hot water tank 24 to the heat load 9 and its temperature. It is comprised by the temperature sensor etc. which detect this. The control unit 30 also receives information on the power consumption at the power load 8 measured by the power consumption measuring device 28 and information on the heat consumption at the heat load 9 measured by the heat consumption measuring device 29. Is done. Below, the detail of each function part of the control unit 30 is demonstrated.

学習記憶部31は、電力負荷8及び熱負荷9における過去の単位時間(本例では、1時間)毎のエネルギ消費量(電力消費量及び熱消費量)に関するエネルギ消費量を学習して記憶する機能部である。学習記憶部31は学習記憶手段として機能する。本実施形態では、学習記憶部31は、電力負荷8及び熱負荷9におけるエネルギ消費量を、1週間の設定周期内において曜日毎・時間毎に分類して学習及び記憶する構成とされている。図3は、過去エネルギ消費量データ(過去電力消費量データ41及び過去熱消費量データ42)のデータ構造の一例を示す模式図である。この図に示すように、電力消費量E及び熱消費量Hが、月曜日、火曜日、・・・、日曜日の7つの曜日毎に、かつ、0時〜1時、1時〜2時、・・・、23時〜24時の24の時間毎に分類されてそれぞれ記憶されている。なお、本例では電力消費量E及び熱消費量Hを1時間毎に分類しているが、例えば30分毎、15分毎等、更に短い時間毎に分類する構成としても良い。また、本例では過去電力消費量データ41と過去熱消費量データ42とを1つのテーブルによりまとめて管理しているが、これらを個別に管理する構成としても良い。   The learning storage unit 31 learns and stores energy consumption related to energy consumption (power consumption and heat consumption) for each past unit time (1 hour in this example) in the power load 8 and the heat load 9. It is a functional part. The learning storage unit 31 functions as learning storage means. In the present embodiment, the learning storage unit 31 is configured to learn and store the energy consumption amounts in the power load 8 and the heat load 9 by classifying the energy consumption amount for each day of the week and every hour within a set period of one week. FIG. 3 is a schematic diagram showing an example of the data structure of past energy consumption data (past power consumption data 41 and past heat consumption data 42). As shown in this figure, the power consumption E and the heat consumption H are calculated every Monday, Tuesday,..., Every seven days of the week, from 0:00 to 1:00, from 1:00 to 2:00,.・ It is classified and stored every 24 hours from 23:00 to 24:00. In this example, the power consumption E and the heat consumption H are classified every hour. However, the power consumption E and the heat consumption H may be classified every shorter time such as every 30 minutes or every 15 minutes. Further, in this example, the past power consumption data 41 and the past heat consumption data 42 are collectively managed by one table, but these may be managed individually.

ここで、図3のテーブルに表示された「E(d、h)」は、d曜日のh時の時間帯における電力消費量を表す。また、「H(d、h)」は、d曜日のh時の時間帯における熱消費量を表す。但し、d=0〜6がそれぞれ月曜日、火曜日、・・・、日曜日の各曜日を表すものとし、h=0〜23がそれぞれ0時〜1時、1時〜2時、・・・、23時〜24時の各時間帯を表すものとする。従って、例えば図3の「E(1、0)」は火曜日の0時〜1時の時間帯における電力消費量を表し、「H(5、22)」は土曜日の22時〜23時の時間帯における熱消費量を表すものとなる。   Here, “E (d, h)” displayed in the table of FIG. 3 represents the power consumption amount in the time zone at h on d day of the week. Further, “H (d, h)” represents the heat consumption amount in the time zone of h on d day. However, d = 0 to 6 represent Monday, Tuesday,..., Sunday, respectively, and h = 0 to 23 are 0 to 1 o'clock, 1 o'clock to 2 o'clock,. Each time zone from Hours to 24:00 shall be represented. Therefore, for example, “E (1, 0)” in FIG. 3 represents the power consumption in the time zone from 0:00 to 1 o'clock on Tuesday, and “H (5, 22)” is the time from 22:00 to 23:00 on Saturday. It represents the heat consumption in the belt.

このようにして記憶管理された過去電力消費量データ41及び過去熱消費量データ42に対して、学習記憶部31は、これらの情報を逐次更新して記憶するように構成されている。学習記憶部31は、電力消費量計測装置28により計測される電力負荷8における電力消費量の情報、及び熱消費量計測装置29により計測される熱負荷9における熱消費量の情報に基づいて、過去電力消費量データ41及び過去熱消費量データ42を更新する。本実施形態では、学習記憶部31は、計測された曜日及び時間帯毎の電力消費量及び熱消費量をそのまま記憶することにより過去電力消費量データ41及び過去熱消費量データ42を更新する。なお、既存の過去電力消費量データ41に記憶された、ある曜日及び時間帯に関しての過去の電力消費量と、新たに計測された電力消費量と、を所定の割合(例えば、過去:新規=3:1)で重み付けして加算することにより過去電力消費量データ41を更新し、既存の過去熱消費量データ42に記憶された、ある曜日及び時間帯に関しての過去の熱消費量と、新たに計測された熱消費量と、を所定の割合(例えば、過去:新規=3:1)で重み付けして加算することにより過去熱消費量データ42を更新する構成等としても良い。   With respect to the past power consumption data 41 and the past heat consumption data 42 thus stored and managed, the learning storage unit 31 is configured to sequentially update and store these pieces of information. The learning storage unit 31 is based on the information on the power consumption in the power load 8 measured by the power consumption measuring device 28 and the information on the heat consumption in the heat load 9 measured by the heat consumption measuring device 29. The past power consumption data 41 and the past heat consumption data 42 are updated. In the present embodiment, the learning storage unit 31 updates the past power consumption data 41 and the past heat consumption data 42 by storing the measured power consumption and heat consumption for each day and time period as they are. It should be noted that the past power consumption for a certain day of the week and the time period stored in the existing past power consumption data 41 and the newly measured power consumption are set to a predetermined ratio (for example, past: new = The past power consumption data 41 is updated by weighting and adding in 3: 1), and the past heat consumption related to a certain day of the week and time period stored in the existing past heat consumption data 42 is newly updated. The past heat consumption data 42 may be updated by weighting and adding the measured heat consumption to a predetermined ratio (for example, past: new = 3: 1).

エネルギ需要予測部32は、将来の所定の運転周期Tc(図5〜図7を参照)内に熱負荷9において需要があると予測される時系列的な予測熱需要を導出する機能部である。エネルギ需要予測部32はエネルギ需要予測手段として機能する。本実施形態においては、エネルギ需要予測部32は、将来の運転周期Tc内に電力負荷8において需要があると予測される時系列的な予測電力需要を更に導出するように構成されている。ここで、将来の所定の運転周期Tcとしては、例えば24時間、36時間、48時間等が適宜設定される。本例では、所定の運転周期Tcとして24時間が設定されており、エネルギ需要予測部32は、24時間先までの時系列的な予測電力需要及び予測熱需要を導出する。このような予測電力需要及び予測熱需要の導出処理は運転周期Tc毎に所定のタイミングで実行される。例えば、曜日が切り替わる際(0時の時点)に実行される構成とすることができる。   The energy demand prediction unit 32 is a functional unit that derives a time-series predicted heat demand that is predicted to be demanded at the thermal load 9 within a predetermined future operation cycle Tc (see FIGS. 5 to 7). . The energy demand prediction unit 32 functions as an energy demand prediction unit. In the present embodiment, the energy demand prediction unit 32 is configured to further derive a time-series predicted power demand that is predicted to be demanded at the power load 8 within the future operation cycle Tc. Here, as the predetermined future operation cycle Tc, for example, 24 hours, 36 hours, 48 hours, and the like are appropriately set. In this example, 24 hours is set as the predetermined operation cycle Tc, and the energy demand prediction unit 32 derives time-series predicted power demand and predicted heat demand up to 24 hours ahead. Such prediction power demand and prediction heat demand derivation processing is executed at a predetermined timing for each operation cycle Tc. For example, it can be configured to be executed when the day of the week is switched (at 0:00).

本実施形態においては、エネルギ需要予測部32は、メモリ40に記憶された過去電力消費量データ41及び過去熱消費量データ42に基づいて、予測電力需要及び予測熱需要を導出する。すなわち、エネルギ需要予測部32は、過去電力消費量データ41に記憶された、予測対象となる曜日の各時間帯に関しての過去の電力消費量と、予測対象となる日の前日の各時間帯に関しての実際の電力消費量と、を所定の割合(例えば、過去:前日=1:3)で重み付けして加算することにより24時間先までの時系列的な予測電力需要を導出する。同様に、エネルギ需要予測部32は、過去熱消費量データ42に記憶された、予測対象となる曜日の各時間帯に関しての過去の熱消費量と、予測対象となる日の前日の各時間帯に関しての実際の熱消費量と、を所定の割合(例えば、過去:前日=1:3)で重み付けして加算することにより24時間先までの時系列的な予測熱需要を導出する。なお、予測対象となる日とその前日との間で平日と休日とが切り替わる場合には、予測対象となる日と同じ属性(平日又は休日)の中で直近の日のデータを、予測対象となる日の前日のデータに代えて用いる構成としても好適である。   In the present embodiment, the energy demand prediction unit 32 derives a predicted power demand and a predicted heat demand based on the past power consumption data 41 and the past heat consumption data 42 stored in the memory 40. That is, the energy demand prediction unit 32 relates to the past power consumption stored in the past power consumption data 41 for each time zone of the day of the week to be predicted and each time zone the day before the day to be predicted. Is calculated by weighting the actual power consumption at a predetermined ratio (for example, past: previous day = 1: 3) to derive a time-series predicted power demand up to 24 hours ahead. Similarly, the energy demand prediction unit 32 stores the past heat consumption for each time zone of the day of the week to be predicted stored in the past heat consumption data 42 and each time zone on the day before the day to be predicted. Is calculated by weighting the actual amount of heat consumption with a predetermined ratio (for example, the past: the previous day = 1: 3) to derive a time-series predicted heat demand up to 24 hours ahead. In addition, when a weekday and a holiday are switched between the day to be predicted and the previous day, the data of the most recent day within the same attribute (weekday or holiday) as the day to be predicted is used as the prediction target. It is also suitable as a configuration used instead of the data of the previous day.

運転計画決定部33は、燃料電池3を運転制御するための所定の運転計画を決定する機能部である。運転計画決定部33は運転計画決定手段として機能する。本実施形態では、運転計画決定部33は、燃料電池3が所謂電主運転となるような運転計画を決定する。ここで、電主運転とは、燃料電池3により発生される電力を、エネルギ需要予測部32により導出される予測電力需要に過不足なく追従させる当該燃料電池3の運転を言う。従って、本実施形態では、運転計画決定部33は、エネルギ需要予測部32により導出される時間帯毎の時系列的な予測電力需要に基づき、基本的にはこれと同一となる、時間帯毎の時系列的な運転計画を決定する。本実施形態では後述するように、この運転計画に基づき、運転制御部35は、基本的には燃料電池3を上記の運転計画に従って運転制御する計画運転制御(本例では、燃料電池3が所謂電主運転となるように運転制御する電主運転制御)を実行することになる。   The operation plan determination unit 33 is a functional unit that determines a predetermined operation plan for controlling the operation of the fuel cell 3. The operation plan determination unit 33 functions as an operation plan determination unit. In the present embodiment, the operation plan determination unit 33 determines an operation plan in which the fuel cell 3 is in a so-called electric main operation. Here, the electric main operation refers to an operation of the fuel cell 3 that causes the electric power generated by the fuel cell 3 to follow the predicted electric power demand derived by the energy demand prediction unit 32 without excess or deficiency. Therefore, in the present embodiment, the operation plan determination unit 33 is basically the same for each time zone based on the time-series predicted power demand for each time zone derived by the energy demand prediction unit 32. Determine the time series operation plan. In this embodiment, as will be described later, based on this operation plan, the operation control unit 35 basically operates the fuel cell 3 in accordance with the above operation plan (in this example, the fuel cell 3 is so-called). The main operation control for controlling the operation so as to be the main operation is executed.

熱不足予測部34は、計画運転制御(本例では、電主運転制御)を継続して実行すると仮定した場合に、熱不足状態となるか否かを予測する機能部である。熱不足予測部34は熱不足予測手段として機能する。ここで、熱不足状態は、貯湯ユニット4により回収されると予測される予測回収熱量が、エネルギ需要予測部32により導出される予測熱需要よりも小さい状態である。熱不足予測部34により熱不足状態となることが予測された場合には、燃料電池3に対してそのまま電主運転制御を継続して実行すると、その後24時間以内のいずれかの時点で、貯湯ユニット4の貯湯槽24に貯留された湯水によっては予測熱需要を賄いきれないことになる。そこで、熱不足予測部34は、例えば現時点から所定時間先までを見越して、電主運転制御を継続して実行すると仮定した場合に当該電主運転制御の実行により発生することが予測される余剰熱量と、現時点における蓄熱量と、に基づいて、熱不足状態となるか否かを予測する。そして、熱不足状態となることが予測された場合には、本願特有の特別運転制御により燃料電池3を運転制御させるべく、熱不足予測部34はその旨の情報を運転制御部35へ出力する。   The heat shortage prediction unit 34 is a functional unit that predicts whether or not a heat shortage state occurs when it is assumed that planned operation control (electric main operation control in this example) is continuously executed. The heat shortage prediction unit 34 functions as a heat shortage prediction unit. Here, the heat shortage state is a state in which the predicted heat recovery amount predicted to be recovered by the hot water storage unit 4 is smaller than the predicted heat demand derived by the energy demand prediction unit 32. If it is predicted by the heat shortage predicting unit 34 that the heat shortage state will occur, if the main operation control is continuously performed on the fuel cell 3 as it is, hot water storage will be performed at any point within 24 hours thereafter. The hot water stored in the hot water storage tank 24 of the unit 4 cannot cover the predicted heat demand. Thus, the heat shortage predicting unit 34, for example, surplus predicted to occur due to the execution of the main operation control when it is assumed that the main operation control is continuously executed in anticipation of a predetermined time from the present time. Based on the amount of heat and the amount of heat stored at the present time, it is predicted whether or not a heat shortage state will occur. When it is predicted that the heat shortage state will occur, the heat shortage prediction unit 34 outputs information to that effect to the operation control unit 35 in order to control the operation of the fuel cell 3 by special operation control unique to the present application. .

本実施形態においては、熱不足予測部34は、更に、エネルギ需要予測部32により導出される予測熱需要に対して貯湯ユニット4により回収されると予測される予測回収熱量が不足する量である予測不足熱量を導出するように構成されている。すなわち、熱不足予測部34は、予測熱需要をHd、予測回収熱量をHc、予測不足熱量をΔHとして、
ΔH=Hd−Hc
に基づいて予測不足熱量を導出する。ここで、予測回収熱量Hcは、電主運転制御の実行により発生することが予測される予測余剰熱量Hsと、現時点における蓄熱量Hrと、の和である。よって、熱不足予測部34は、
ΔH=Hd−Hs−Hr
に基づいて予測不足熱量を導出することになる。熱不足予測部34は、熱不足状態となることが予測された場合には、導出された予測不足熱量ΔHの情報も運転制御部35に出力する。
In the present embodiment, the heat shortage predicting unit 34 is an amount in which the predicted recovered heat amount predicted to be recovered by the hot water storage unit 4 with respect to the predicted heat demand derived by the energy demand predicting unit 32 is insufficient. It is configured to derive the predicted underheat. That is, the heat shortage predicting unit 34 sets the predicted heat demand as Hd, the predicted recovered heat amount as Hc, and the predicted insufficient heat amount as ΔH.
ΔH = Hd−Hc
Based on the above, the predicted insufficient heat quantity is derived. Here, the predicted recovered heat amount Hc is the sum of the predicted surplus heat amount Hs predicted to be generated by the execution of the main operation control and the current heat storage amount Hr. Therefore, the heat shortage prediction unit 34
ΔH = Hd−Hs−Hr
Based on this, the predicted insufficient heat quantity is derived. When it is predicted that the heat shortage prediction unit 34 is in a heat shortage state, the heat shortage prediction unit 34 also outputs information on the derived prediction insufficient heat amount ΔH to the operation control unit 35.

運転制御部35は、燃料電池3の運転制御を行う機能部である。運転制御部35は運転制御手段として機能する。運転制御部35は、運転計画決定部33により決定された運転計画に従って燃料電池3を運転制御する計画運転制御を少なくとも実行する。本実施形態では、上記のとおり運転計画決定部33は燃料電池3が電主運転となるような運転計画を決定するように構成されているので、運転制御部35は、燃料電池3を電主運転させる電主運転制御を少なくとも実行する。燃料電池3を電主運転制御することにより、当該燃料電池3で発生される電力はエネルギ需要予測部32により導出される時系列的な予測電力需要に追従するものとなる。すなわち、電力負荷8で実際に消費される電力が、エネルギ需要予測部32により導出される予測電力需要に略等しい場合には、燃料電池3により発電された電力は略過不足なく電力負荷8で消費される。このような電主運転制御は、熱不足予測部34により熱不足状態となることが予測されない場合、すなわち、貯湯ユニット4により回収されると予測される予測回収熱量が、エネルギ需要予測部32により導出される予測熱需要よりも常に大きい場合には常時継続して実行される。   The operation control unit 35 is a functional unit that performs operation control of the fuel cell 3. The operation control unit 35 functions as an operation control unit. The operation control unit 35 executes at least planned operation control for controlling the operation of the fuel cell 3 according to the operation plan determined by the operation plan determination unit 33. In the present embodiment, as described above, the operation plan determination unit 33 is configured to determine an operation plan in which the fuel cell 3 is in the main operation, so that the operation control unit 35 controls the fuel cell 3 as the main operation. At least electric main operation control to be operated is executed. By controlling the main operation of the fuel cell 3, the power generated by the fuel cell 3 follows the time-series predicted power demand derived by the energy demand prediction unit 32. That is, when the power actually consumed by the power load 8 is substantially equal to the predicted power demand derived by the energy demand prediction unit 32, the power generated by the fuel cell 3 is not excessively insufficient. Is consumed. In such electric main operation control, when the heat shortage prediction unit 34 does not predict that the heat shortage state is predicted, that is, the predicted recovery heat amount predicted to be recovered by the hot water storage unit 4 is calculated by the energy demand prediction unit 32. When it is always larger than the derived predicted heat demand, it is continuously executed.

一方、熱不足予測部34により熱不足状態となることが予測された場合には、運転制御部35は、熱不足状態となる時点以前の所定の直前期間Ta(図6及び図7を参照)だけ、電主運転制御に代えて最大出力運転制御を実行する。最大出力運転制御は、燃料電池3を最大出力で発電させる運転制御である。ここで、最大出力とは燃料電池3が発電を行うことができる発電出力の上限値である。本実施形態のように熱電併給装置が燃料電池3により構成される場合には、最大出力はエネルギ効率が最大となる状態で発電を行う場合における発電出力(定格出力)に等しくなることが一般的である。   On the other hand, when it is predicted by the heat shortage prediction unit 34 that the heat shortage state is predicted, the operation control unit 35 performs a predetermined immediately preceding period Ta before the time when the heat shortage state occurs (see FIGS. 6 and 7). Only the maximum output operation control is executed instead of the electric main operation control. The maximum output operation control is operation control that causes the fuel cell 3 to generate power at the maximum output. Here, the maximum output is an upper limit value of the power generation output at which the fuel cell 3 can generate power. When the combined heat and power supply apparatus is configured by the fuel cell 3 as in the present embodiment, the maximum output is generally equal to the power generation output (rated output) when power generation is performed in a state where the energy efficiency is maximized. It is.

ところで、燃料電池3が最大出力に近い状態で運転制御されるほど、発電出力が大きくなると共にそれに合わせて熱出力も大きくなる。一方、燃料電池3が最小出力に近い状態で運転制御されるほど、発電出力が小さくなると共にそれに合わせて熱出力も小さくなる。そのため、エネルギ需要予測部32により導出される予測電力需要が比較的低いレベルで推移する場合には、電主運転制御が実行され続ける限り、燃料電池3は比較的小さな発電出力で運転制御される状態が長く継続して熱出力も小さくなりがちとなる。よって、熱不足状態に陥り易い。そこで、そのような場合には、燃料電池3を、熱不足状態となる時点以前の所定の直前期間Taだけ電主運転制御に代えて最大出力運転制御を実行する構成とすることで、燃料電池3の熱出力を増大させることができる。燃料電池3の熱出力を増大させることにより発生する余剰熱は、熱回収手段としての貯湯ユニット4により回収され、その後発生すると予測される熱不足状態に備えられる。これにより、将来の熱不足状態の発生を抑制することができる。   By the way, as the fuel cell 3 is operated and controlled in a state close to the maximum output, the power generation output increases and the heat output increases accordingly. On the other hand, the more the fuel cell 3 is operated and controlled in a state near the minimum output, the smaller the power generation output and the smaller the heat output. Therefore, when the predicted power demand derived by the energy demand prediction unit 32 changes at a relatively low level, the fuel cell 3 is controlled to operate with a relatively small power output as long as the main operation control is continued. The state continues for a long time and the heat output tends to be small. Therefore, it is easy to fall into a heat shortage state. Therefore, in such a case, the fuel cell 3 is configured to execute the maximum output operation control instead of the main operation control only for a predetermined immediately preceding period Ta before the time when the heat is insufficient. 3 heat output can be increased. Surplus heat generated by increasing the heat output of the fuel cell 3 is recovered by the hot water storage unit 4 as heat recovery means, and is prepared for a heat shortage state that is predicted to occur thereafter. Thereby, generation | occurrence | production of the future heat shortage state can be suppressed.

本実施形態では、運転制御部35が最大出力運転制御を実行する直前期間Taは、熱不足状態となる時点を含みかつそれ以前の期間となるように設定される。また、運転制御部35は、熱不足予測部34により導出される予測不足熱量ΔHに基づいて、当該予測不足熱量ΔHが大きいほど直前期間Taが長くなるように、直前期間Taの長さを設定する。例えば、予測不足熱量ΔHの大きさを複数領域に区分すると共に、より大きな不足熱量ΔHに対応する領域ほど段階的に長くなるように予め割り当てられた期間に基づいて、直前期間Taの長さを設定する構成とすることができる。この場合、複数の異なる長さの中から択一的に直前期間Taの長さを決定することになる。最大出力運転制御では燃料電池3は一律に最大出力で運転制御されてその熱出力は略一定となるので、このような構成を採用することにより、熱不足状態となる時点の直近の期間において熱不足状態となる時点までに、予測不足熱量ΔHが大きいほどより多くの熱を貯湯ユニット4により回収して蓄熱しておくことが可能となる。よって、最大出力運転制御により将来の予測熱需要Hdを略過不足なく賄うことが容易となり、必要最小限の最大出力運転制御で熱不足状態の発生を容易に抑制することができる。   In the present embodiment, the period Ta immediately before the operation control unit 35 executes the maximum output operation control is set so as to include a period before and before the heat shortage state. Further, the operation control unit 35 sets the length of the immediately preceding period Ta based on the predicted insufficient heat amount ΔH derived by the heat shortage predicting unit 34 so that the previous period Ta becomes longer as the predicted insufficient heat amount ΔH increases. To do. For example, the magnitude of the predicted insufficient heat amount ΔH is divided into a plurality of regions, and the length of the immediately preceding period Ta is set based on a period allocated in advance so that the region corresponding to the larger insufficient heat amount ΔH becomes stepwise longer. It can be set as the structure to set. In this case, the length of the immediately preceding period Ta is determined alternatively from a plurality of different lengths. In the maximum output operation control, the fuel cell 3 is uniformly controlled to operate at the maximum output, and its heat output becomes substantially constant. By adopting such a configuration, the heat cell 3 is heated in the immediate period when the heat becomes insufficient. By the time when the shortage state occurs, the larger the predicted insufficient heat amount ΔH, the more heat can be recovered by the hot water storage unit 4 and stored. Therefore, it becomes easy to cover the predicted heat demand Hd in the future without any excess or deficiency by the maximum output operation control, and it is possible to easily suppress the occurrence of the heat deficiency state with the minimum required maximum output operation control.

その際、直前期間Taでは、燃料電池3はエネルギ効率が最大に近い状態となる最大出力で発電を行うので、コージェネレーションシステム1全体のエネルギ効率を向上させることができる。また、最大出力運転制御を実行する期間を、熱不足状態となる時点以前の直近の直前期間Taのみとすることで、燃料電池3が発生した熱が貯湯ユニット4により回収されてから実際に熱負荷9に供給されるまでの間(湯水が貯湯槽24に貯留されている間)の放熱量を極力小さく抑えることができる。また、湯水が貯湯槽24に貯留されている間の放熱量が小さくなるので、熱負荷9へ供給される湯水を補助加熱器26により加熱する必要がある場合にも、その加熱量を低減することができる。従って、本実施形態に係るコージェネレーションシステム1によれば、熱不足状態の発生を抑制しつつエネルギ消費量を有効に低減することができる。   At that time, in the immediately preceding period Ta, the fuel cell 3 generates power at the maximum output at which the energy efficiency is close to the maximum, so that the energy efficiency of the entire cogeneration system 1 can be improved. Further, the period for executing the maximum output operation control is set to only the immediately preceding period Ta immediately before the time when the heat is insufficient, so that the heat generated by the fuel cell 3 is actually recovered after being collected by the hot water storage unit 4. The amount of heat released until hot water is supplied to the load 9 (while hot water is stored in the hot water storage tank 24) can be minimized. Further, since the amount of heat released while hot water is stored in the hot water storage tank 24 is reduced, the amount of heating is reduced even when the hot water supplied to the heat load 9 needs to be heated by the auxiliary heater 26. be able to. Therefore, according to the cogeneration system 1 which concerns on this embodiment, energy consumption can be reduced effectively, suppressing generation | occurrence | production of a heat shortage state.

ところで、燃料電池3を、熱不足状態となる時点以前の直前期間Taだけ電主運転制御に代えて最大出力運転制御を実行する構成とすると、熱出力に加えて、燃料電池3の電力出力も増大することになる。本実施形態では、電主運転制御により燃料電池3は基本的には略過不足なく電力負荷8で消費されるだけの電力を発電する。そのため、直前期間Taにおいて最大出力運転制御が実行されると、その結果として余剰電力が発生する。この直前期間Taに発生する余剰電力は、バッテリ5に蓄電される。これにより、将来電力負荷8において燃料電池3の最大出力を超える電力需要があった際に、バッテリ5に蓄電した電力を電力負荷8に供給することができる。なお、燃料電池3により発電された余剰電力をバッテリ5に蓄電し、或いはバッテリ5から電力を持ち出す際の電力ロスによるエネルギ損失は、湯水が貯湯槽24に貯留されている間の放熱によるエネルギ損失と比較して、無視できる程度に小さい。   By the way, when the fuel cell 3 is configured to execute the maximum output operation control instead of the main operation control only for the immediately preceding period Ta before the time when the heat is insufficient, in addition to the heat output, the power output of the fuel cell 3 is also increased. Will increase. In the present embodiment, the fuel cell 3 basically generates electric power that is consumed by the power load 8 without substantial excess or deficiency by the main operation control. Therefore, when the maximum output operation control is executed in the immediately preceding period Ta, surplus power is generated as a result. Surplus power generated in the immediately preceding period Ta is stored in the battery 5. Thereby, when there is a power demand exceeding the maximum output of the fuel cell 3 in the future power load 8, the power stored in the battery 5 can be supplied to the power load 8. Note that the energy loss due to the power loss when the surplus power generated by the fuel cell 3 is stored in the battery 5 or taken out from the battery 5 is the energy loss due to heat dissipation while hot water is stored in the hot water storage tank 24. Compared to, it is small enough to be ignored.

また、本実施形態では、将来熱不足状態となることが予測された場合における燃料電池3の運転制御は、当該熱不足状態となる以前の直近の直前期間Taだけ計画運転制御に代えて最大出力運転制御を実行するという、非常に簡素な運転制御である。よって、そのような運転制御を実行する際の制御ユニット30による演算処理負荷を大幅に低減することができる。更に、最大出力運転制御では、燃料電池3の発電出力が一律に最大出力となるように制御されるので、仮に電力負荷8による実際の電力需要がエネルギ需要予測部32により導出される予測電力需要から外れてしまった場合であっても、当該予測外れによる実際の熱需要と予測熱需要との間の差分の蓄積が熱不足状態の解消や省エネルギ性に与える影響は比較的小さい。つまり、本実施形態に係る運転制御方法では、予測電力需要及び予測熱需要の精度はそれ程重要ではなく、予測電力需要は運転計画を決定するための基準となり得る程度に、また、予測熱需要は将来の熱不足状態を予測するための基準となり得る程度に正確であれば良い。そのような比較的緩い精度の情報に基づいても、比較的高い精度で熱不足状態の発生を抑制することができる。従って、本実施形態に係るコージェネレーションシステム1によれば、比較的小さな演算処理負荷でかつ許容され得る高い精度で、熱不足状態の発生を抑制することができる。   Further, in the present embodiment, the operation control of the fuel cell 3 in the case where it is predicted that a heat shortage will occur in the future is performed by replacing the planned operation control with a maximum output only for the immediately preceding period Ta before the heat shortage. This is very simple operation control in which operation control is executed. Therefore, the arithmetic processing load by the control unit 30 at the time of performing such operation control can be reduced significantly. Furthermore, in the maximum output operation control, since the power generation output of the fuel cell 3 is controlled so as to be uniformly the maximum output, the predicted power demand that the actual power demand by the power load 8 is derived by the energy demand prediction unit 32 is assumed. Even if it is deviated from the above, the accumulation of the difference between the actual heat demand and the predicted heat demand due to the predicted deviation has a relatively small effect on the elimination of the heat shortage state and the energy saving. That is, in the operation control method according to the present embodiment, the accuracy of the predicted power demand and the predicted heat demand is not so important, the predicted power demand can be a reference for determining the operation plan, and the predicted heat demand is It may be accurate enough to be a standard for predicting a future heat shortage state. Even on the basis of such relatively loose information, the occurrence of a heat shortage state can be suppressed with relatively high accuracy. Therefore, according to the cogeneration system 1 according to the present embodiment, it is possible to suppress the occurrence of a heat shortage state with a relatively small calculation processing load and with high accuracy that can be tolerated.

本実施形態においては、運転制御部35は、直前期間Ta内にバッテリ5の状態が所定の満充電状態となった場合には、直前期間Taのうちバッテリ5が満充電状態にある期間では最大出力運転制御を実行することなく計画運転制御(本例では、電主運転制御)を実行する。すなわち、運転制御部35は、直前期間Taのうちバッテリ5が満充電状態となる前の期間は最大出力運転制御を実行し、バッテリ5が満充電状態となった後の期間は電主運転制御を実行する。なお、バッテリ5が満充電状態となった後は、運転制御部35は、既に将来の熱不足状態が解消された状態となっているか否かに関わらず電主運転制御を実行する。ここで、バッテリ5の充電状態は、バッテリ5の充電容量に対する充電残量の比率に基づいて定められるものとする。なお、バッテリ5の充電残量は、現在値はバッテリ状態検出センサS1により検出されるバッテリ電圧や充放電電流等に基づいて求められ、予測値は充電量と放電量とに基づいて求められる。そして、バッテリ5の仕様で定められた充電残量(蓄電量)の上限に達した状態、すなわち、バッテリ5の充電残量が当該バッテリ5の充電容量の上限値付近の、上限値よりも小さな値に設定された満充電判定閾値以上となっている状態を、満充電状態とする。例えば、バッテリ5の充電容量の上限値を「100」とした場合における、「95〜100」の状態を満充電状態とすることができる。   In the present embodiment, when the state of the battery 5 becomes a predetermined full charge state within the immediately preceding period Ta, the operation control unit 35 maximizes the period during which the battery 5 is fully charged in the immediately preceding period Ta. Planned operation control (in this example, main operation control) is executed without executing output operation control. That is, the operation control unit 35 executes the maximum output operation control during the period before the battery 5 is fully charged in the immediately preceding period Ta, and the main operation control is performed during the period after the battery 5 is fully charged. Execute. Note that after the battery 5 is fully charged, the operation control unit 35 executes the main operation control regardless of whether or not the future heat shortage state has already been resolved. Here, it is assumed that the state of charge of the battery 5 is determined based on the ratio of the remaining charge to the charge capacity of the battery 5. In addition, as for the charge remaining amount of the battery 5, a present value is calculated | required based on the battery voltage, charging / discharging current, etc. which are detected by battery state detection sensor S1, and a predicted value is calculated | required based on charge amount and discharge amount. Then, a state in which the upper limit of the remaining charge amount (accumulated amount) determined by the specification of the battery 5 is reached, that is, the remaining charge amount of the battery 5 is smaller than the upper limit value near the upper limit value of the charge capacity of the battery 5. A state that is equal to or greater than the full charge determination threshold set in the value is defined as a full charge state. For example, when the upper limit value of the charge capacity of the battery 5 is “100”, the state “95 to 100” can be set to the fully charged state.

直前期間Ta内にバッテリ5の状態が満充電状態となった場合には、その後も燃料電池3を最大出力運転制御して電力負荷8における実際の電力需要を上回る余剰電力を発生させたとしても、当該余剰電力をバッテリ5に充電することができない。そこで、上記のように、直前期間Taのうちバッテリ5が満充電状態にある期間では電主運転制御を実行する構成とすることで、バッテリ5が満充電状態となった後は予測電力需要のみを略過不足なく賄って、無駄な余剰電力の発生を抑制することができる。   Even if the state of the battery 5 becomes fully charged within the immediately preceding period Ta, the surplus power exceeding the actual power demand in the power load 8 is generated by controlling the fuel cell 3 to the maximum output after that. The battery 5 cannot be charged with the surplus power. Therefore, as described above, the main operation control is performed in the period when the battery 5 is in the fully charged state in the immediately preceding period Ta, so that only the predicted power demand is obtained after the battery 5 is in the fully charged state. The generation of useless surplus power can be suppressed.

なお、運転制御部35は、直前期間Taの開始時点におけるバッテリ5の状態が既に満充電状態である場合には、当該直前期間Taでは最大出力運転制御を実行することなく計画運転制御(本例では、電主運転制御)を実行する。直前期間Taの開始時点において既にバッテリ5が満充電状態となっている場合にも、燃料電池3を最大出力運転制御して余剰電力を発生させたとしても、当該余剰電力をバッテリ5に充電することができない。よって、上記の構成を採用することで、直前期間Taの全体で予測電力需要のみを略過不足なく賄って、無駄な余剰電力の発生を抑制することができる。   Note that, when the state of the battery 5 at the start of the immediately preceding period Ta is already in a fully charged state, the operation control unit 35 performs planned operation control (this example) without executing the maximum output operation control in the immediately preceding period Ta. Then, electric main operation control) is executed. Even when the battery 5 is already fully charged at the start of the immediately preceding period Ta, the surplus power is charged into the battery 5 even when the surplus power is generated by controlling the maximum output operation of the fuel cell 3. I can't. Therefore, by adopting the above-described configuration, it is possible to cover only the predicted power demand for the entire immediately preceding period Ta without much excess and deficiency, and to suppress the generation of useless surplus power.

また、本実施形態においては、運転制御部35は、直前期間Ta内に、貯湯ユニット4により回収されると予測される予測回収熱量が予測熱需要Hdよりも大きい状態である熱余剰状態となった場合には、直前期間Taのうち熱余剰状態にある期間では最大出力運転制御を実行することなく計画運転制御(本例では、電主運転制御)を実行する。すなわち、運転制御部35は、直前期間Taのうち熱余剰状態となる前の期間は最大出力運転制御を実行し、熱余剰状態となった後の期間は電主運転制御を実行する。このような運転制御条件の設定は、実際の熱需要が予測熱需要を下回って推移して、最大出力運転制御の実行により予測された以上の余剰熱が発生する場合に実益がある。すなわち、最大出力運転制御が実行された結果、直前期間Ta内に熱余剰状態となった場合には、既に将来の熱不足状態の発生を回避することが可能であると予測されるので、燃料電池3が最大出力運転制御され、それ以上の余剰熱を発生させて当該余剰熱を貯湯ユニット4により回収したとしても、その余剰熱は熱不足状態の解消のために使用されない可能性が高い。そこで、上記のように、直前期間Taのうち熱余剰状態にある期間では電主運転制御を実行する構成とすることで、無駄な余剰熱の発生を抑制することができる。   Moreover, in this embodiment, the operation control part 35 will be in the heat surplus state which is a state in which the estimated recovery heat amount estimated to be collect | recovered by the hot water storage unit 4 is larger than the prediction heat demand Hd in the last period Ta. In this case, the planned operation control (in this example, the main operation control) is executed without executing the maximum output operation control in the period in the heat surplus state in the immediately preceding period Ta. That is, the operation control unit 35 executes the maximum output operation control during the period before the heat surplus state in the immediately preceding period Ta, and performs the main operation control during the period after the heat surplus state. Such setting of the operation control condition is beneficial when the actual heat demand changes below the predicted heat demand and surplus heat more than predicted by the execution of the maximum output operation control is generated. That is, as a result of the execution of the maximum output operation control, when the heat surplus state is reached within the immediately preceding period Ta, it is predicted that it is possible to avoid the occurrence of a future heat shortage state. Even if the battery 3 is subjected to the maximum output operation control, more excess heat is generated, and the excess heat is recovered by the hot water storage unit 4, it is highly possible that the excess heat is not used for eliminating the heat shortage state. Therefore, as described above, the generation of useless surplus heat can be suppressed by performing the main operation control in the period in the heat surplus state in the immediately preceding period Ta.

なお、運転制御部35は、直前期間Ta内に、貯湯ユニット4による蓄熱量が所定の満蓄熱状態となった場合には、直前期間Taのうち満蓄熱状態にある期間では最大出力運転制御を実行することなく計画運転制御(本例では、電主運転制御)を実行する。すなわち、運転制御部35は、直前期間Taのうち満蓄熱状態となる前の期間は最大出力運転制御を実行し、満蓄熱状態となった後の期間は電主運転制御を実行する。ここで、本実施形態では、貯湯ユニット4の蓄熱量は、貯湯槽24に貯留された湯水の温度及び量に基づいて判定される。すなわち、貯湯槽24に隣接して配設された複数の湯温センサS2により上下方向の複数位置における湯水の温度が検出され、予め設定された所定の高温判定温度(例えば、60°C)以上の温度状態にある湯水量が多いほど蓄熱量が大きいと判定される。そして、本例では、貯湯槽24に貯留された湯水全体の温度が上記高温判定温度以上である状態を満蓄熱状態としている。具体的には、複数の湯温センサS2のうち上下方向で最下部に設置された湯温センサS2b(図1を参照)により検出される湯水の温度が上記高温判定温度以上である場合に、満蓄熱状態と判定される。   In addition, when the amount of heat stored by the hot water storage unit 4 becomes a predetermined full heat storage state within the immediately preceding period Ta, the operation control unit 35 performs the maximum output operation control in the full heat storage state of the immediately preceding period Ta. Planned operation control (in this example, main operation control) is executed without executing it. That is, the operation control unit 35 executes the maximum output operation control during the period before the full heat storage state in the immediately preceding period Ta, and executes the main operation control during the period after the full heat storage state. Here, in the present embodiment, the amount of heat stored in the hot water storage unit 4 is determined based on the temperature and amount of hot water stored in the hot water storage tank 24. That is, the temperature of hot water at a plurality of positions in the vertical direction is detected by a plurality of hot water temperature sensors S2 disposed adjacent to the hot water tank 24, and is equal to or higher than a predetermined high temperature determination temperature (for example, 60 ° C.). It is determined that the amount of stored heat increases as the amount of hot water in the temperature state increases. In this example, a state where the temperature of the whole hot water stored in the hot water storage tank 24 is equal to or higher than the high temperature determination temperature is set as a fully stored heat state. Specifically, when the temperature of the hot water detected by the hot water temperature sensor S2b (see FIG. 1) installed at the bottom in the vertical direction among the plurality of hot water temperature sensors S2 is equal to or higher than the high temperature determination temperature, It is determined that the heat storage state is full.

直前期間Ta内に満蓄熱状態となった場合には、その後も燃料電池3を最大出力運転制御して余剰熱を発生させたとしても、それ以上は当該余剰熱を湯水の形態で回収して貯湯槽24に貯留することができない。そこで、上記のように、直前期間Taのうち満蓄熱状態にある期間では電主運転制御を実行する構成とすることで、無駄な余剰熱の発生を抑制することができる。   Even when the fuel cell 3 is fully output and controlled to generate excess heat after the full-time heat storage within the immediately preceding period Ta, the excess heat is recovered in the form of hot water. It cannot be stored in the hot water tank 24. Therefore, as described above, the generation of useless surplus heat can be suppressed by performing the main operation control during the full heat storage period in the immediately preceding period Ta.

1−3.運転制御処理の手順
次に、本実施形態に係る制御ユニット30によるコージェネレーションシステム1の運転制御処理の内容について説明する。図4は、本実施形態に係る運転制御処理の処理手順を示すフローチャートである。以下に説明する運転制御処理の手順は、制御ユニット30に備えられる各機能部により実行される。
1-3. Procedure of Operation Control Process Next, the content of the operation control process of the cogeneration system 1 by the control unit 30 according to the present embodiment will be described. FIG. 4 is a flowchart showing a processing procedure of the operation control process according to the present embodiment. The procedure of the operation control process described below is executed by each functional unit provided in the control unit 30.

図4に示すように、運転制御処理では、まずエネルギ需要予測部32は、メモリ40から、予測対象となる曜日についての過去電力消費量データ41及び過去熱消費量データ42を読み出して取得する。また、エネルギ需要予測部32は、予測対象となる日の前日の実際の電力消費量データ及び実際の熱消費量データを取得する(ステップ#01)。エネルギ需要予測部32は、これらのデータに基づいて、将来の所定の運転周期Tc(本例では、24時間)先までの時系列的な予測電力需要及び予測熱需要を導出する(ステップ#02)。運転計画決定部33は、導出された時系列的な予測電力需要に基づいて、運転計画を決定する(ステップ#03)。本例では、運転計画決定部33は、燃料電池3が所謂電主運転となるような運転計画を決定する。運転制御部35は、決定された運転計画に基づいて、計画運転制御(本例では、電主運転制御)を実行する(ステップ#04)。これにより、燃料電池3は、当該燃料電池3により発生される電力がエネルギ需要予測部32により導出される予測電力需要に追従するように運転制御される。   As shown in FIG. 4, in the operation control process, the energy demand prediction unit 32 first reads and acquires the past power consumption data 41 and the past heat consumption data 42 for the day of the week to be predicted from the memory 40. Further, the energy demand prediction unit 32 acquires actual power consumption data and actual heat consumption data on the day before the prediction target day (step # 01). Based on these data, the energy demand prediction unit 32 derives a time-series predicted power demand and predicted heat demand up to a predetermined future operation cycle Tc (24 hours in this example) ahead (step # 02). ). The operation plan determination unit 33 determines an operation plan based on the derived time-series predicted power demand (step # 03). In this example, the operation plan determination unit 33 determines an operation plan in which the fuel cell 3 is in a so-called electric main operation. The operation control unit 35 executes planned operation control (in this example, main operation control) based on the determined operation plan (step # 04). As a result, the fuel cell 3 is controlled so that the power generated by the fuel cell 3 follows the predicted power demand derived by the energy demand prediction unit 32.

次に、熱不足予測部34は、電主運転制御を継続して実行すると仮定した場合に、熱不足状態となるか否かを予測する(ステップ#05)。熱不足状態となることが予測されない場合には(ステップ#05:No)、そのまま電主運転制御を継続して実行し、運転制御処理を終了する。一方、熱不足状態となることが予測される場合には(ステップ#05:Yes)、運転制御部35は、バッテリ5が満充電状態であるか否かを判定する(ステップ#06)。バッテリ5が満充電状態であると判定された場合には(ステップ#06:Yes)、そのまま電主運転制御を継続して実行し、運転制御処理を終了する。一方、バッテリ5が満充電状態ではないと判定された場合には(ステップ#06:No)、熱不足予測部34は予測不足熱量ΔHを導出する(ステップ#07)。また、運転制御部35は、予測不足熱量ΔHに基づいて直前期間Taの長さを設定する(ステップ#08)。なお、この間、運転制御部35は電主運転制御を実行しており、この電主運転制御は直前期間Taの開始時まで(ステップ#09:No)継続して実行される。   Next, the heat shortage predicting unit 34 predicts whether or not the heat shortage state is caused when it is assumed that the electric main operation control is continuously executed (step # 05). When it is not predicted that the heat shortage state is expected (step # 05: No), the main operation control is continued and executed, and the operation control process is terminated. On the other hand, when it is predicted that a heat shortage state is expected (step # 05: Yes), the operation control unit 35 determines whether or not the battery 5 is in a fully charged state (step # 06). If it is determined that the battery 5 is in a fully charged state (step # 06: Yes), the main operation control is continued as it is, and the operation control process is terminated. On the other hand, when it is determined that the battery 5 is not fully charged (step # 06: No), the heat shortage predicting unit 34 derives a prediction shortage heat amount ΔH (step # 07). Further, the operation control unit 35 sets the length of the immediately preceding period Ta based on the predicted insufficient heat amount ΔH (step # 08). During this time, the operation control unit 35 is executing the main operation control, and this main operation control is continuously executed until the start of the immediately preceding period Ta (step # 09: No).

この状態で、やがて直前期間Taが開始されると(ステップ#09:Yes)、運転制御部35は、電主運転制御に代えて最大出力運転制御を実行する(ステップ#10)。これにより、燃料電池3は、エネルギ効率が最大となる状態で発電を行うように運転制御される。また、最大出力運転制御では、燃料電池3の熱出力が増大して余剰熱が発生するので、当該余剰熱は貯湯ユニット4により回収されて、その後発生すると予測される熱不足状態に備えられる。また、最大出力運転制御では、燃料電池3の発電出力も増大して余剰電力が発生する場合が多いので、当該余剰電力はバッテリ5に蓄電されて、その後電力負荷8において燃料電池3の最大出力を超える電力需要があった場合に備えられる。このような運転制御処理により、比較的小さな演算処理負荷でかつ許容され得る高い精度で、熱不足状態の発生を抑制しつつエネルギ消費量を有効に低減することができる。   In this state, when the immediately preceding period Ta is finally started (step # 09: Yes), the operation control unit 35 executes maximum output operation control instead of the main operation control (step # 10). As a result, the fuel cell 3 is controlled to perform power generation in a state where the energy efficiency is maximized. Further, in the maximum output operation control, the heat output of the fuel cell 3 is increased and surplus heat is generated. Therefore, the surplus heat is recovered by the hot water storage unit 4 and is prepared for a heat shortage state that is predicted to occur thereafter. Further, in the maximum output operation control, the power generation output of the fuel cell 3 also increases and surplus power is often generated. Therefore, the surplus power is stored in the battery 5 and then the maximum output of the fuel cell 3 at the power load 8. It is prepared when there is a demand for electricity exceeding. By such operation control processing, it is possible to effectively reduce the energy consumption while suppressing the occurrence of a heat shortage state with a relatively small arithmetic processing load and with high accuracy that can be tolerated.

直前期間Ta中は、運転制御部35は、バッテリ5の状態が満充電状態となったか否かを監視している(ステップ#11)。また、運転制御部35は、熱余剰状態又は満蓄熱状態となったか否かを監視している(ステップ#12)。バッテリ5の状態が満充電状態とはならず(ステップ#11:No)、かつ、熱余剰状態とも満蓄熱状態ともならない場合には(ステップ#12:No)、直前期間Ta中は最大出力運転制御を継続して実行し、運転制御処理を終了する。一方、直前期間Ta中にバッテリ5の状態が満充電状態となったと判定された場合(ステップ#11:Yes)、又は、熱余剰状態若しくは満蓄熱状態となったと判定された場合には(ステップ#12:Yes)、直前期間Taのうちそのように判定された後の期間では、最大出力運転制御に代えて、再度電主運転制御を実行する(ステップ#13)。以上で、一連の運転制御処理を終了する。   During the immediately preceding period Ta, the operation control unit 35 monitors whether or not the battery 5 is in a fully charged state (step # 11). Moreover, the operation control part 35 is monitoring whether it became the heat surplus state or the full heat storage state (step # 12). When the state of the battery 5 does not become a fully charged state (step # 11: No), and when neither a heat surplus state nor a full heat storage state occurs (step # 12: No), the maximum output operation is performed during the immediately preceding period Ta. The control is continuously executed, and the operation control process is terminated. On the other hand, when it is determined that the state of the battery 5 is fully charged during the immediately preceding period Ta (step # 11: Yes), or when it is determined that the battery is in a heat surplus state or a full heat storage state (step # 11). (# 12: Yes), in the period after such determination in the immediately preceding period Ta, the main operation control is executed again instead of the maximum output operation control (step # 13). Thus, a series of operation control processing is completed.

1−4.運転制御処理の具体例
次に、本実施形態に係る運転制御処理によりコージェネレーションシステム1の運転制御を行った場合の具体例について図5〜図7を参照して説明する。これらの図においては、上から順に(a)予測エネルギ需要(予測電力需要及び予測熱需要)、(b)電主運転制御の実行による蓄熱量、(c)燃料電池3の発電出力及びバッテリ5の充電量、(d)最大出力運転制御の実行による蓄熱量、が示されている。なお、図5〜図7の各図において、(a)の予測エネルギ需要においては、破線で示されるチャートが予測電力需要を示し、太実線で示されるチャートが予測熱需要を示している。(b)の電主運転制御の実行による蓄熱量、及び(d)の最大出力運転制御の実行による蓄熱量においては、破線で示される蓄熱量のチャートと共に、予測不足熱量が太実線のチャートで示されている。(c)の燃料電池3の発電出力及びバッテリ5の充電量においては、破線で示されるチャートが発電出力を示し、太実線で示されるチャートが充電量を示している。
1-4. Specific Example of Operation Control Process Next, a specific example when the operation control of the cogeneration system 1 is performed by the operation control process according to the present embodiment will be described with reference to FIGS. In these drawings, in order from the top, (a) predicted energy demand (predicted power demand and predicted heat demand), (b) heat storage amount due to execution of main operation control, (c) power generation output of the fuel cell 3 and the battery 5 (D) heat storage amount by execution of the maximum output operation control is shown. In each figure of Drawing 5-Drawing 7, in the prediction energy demand of (a), the chart shown with a dashed line shows prediction power demand, and the chart shown with a thick solid line shows prediction heat demand. In the heat storage amount by execution of the main operation control in (b) and the heat storage amount by execution of the maximum output operation control in (d), the prediction insufficient heat amount is a thick solid chart along with the heat storage amount chart indicated by a broken line. It is shown. In the power generation output of the fuel cell 3 and the charge amount of the battery 5 in (c), the chart indicated by the broken line indicates the power generation output, and the chart indicated by the thick solid line indicates the charge amount.

また、図5は、コージェネレーションシステム1を、電力負荷8における電力需要レベルに対して熱負荷9における熱需要レベルが小さいエネルギ需要家(以下では、電主需要家と称する。)に導入した場合の一例を示している。図6は、コージェネレーションシステム1を、電力負荷8における電力需要レベルに対して熱負荷9における熱需要レベルが大きいエネルギ需要家(以下では、熱主需要家と称する。)に導入した場合の一例を示している。図7は、コージェネレーションシステム1を、電力負荷8における電力需要レベルと熱負荷9における熱需要レベルとが略均衡しているエネルギ需要家(以下では、熱電均衡需要家と称する。)に導入した場合の一例を示している。   FIG. 5 shows a case where the cogeneration system 1 is introduced to an energy consumer (hereinafter referred to as an electric power consumer) whose heat demand level in the heat load 9 is smaller than the power demand level in the power load 8. An example is shown. FIG. 6 shows an example in which the cogeneration system 1 is introduced to an energy consumer (hereinafter referred to as a heat main consumer) having a large heat demand level in the heat load 9 with respect to the power demand level in the power load 8. Is shown. In FIG. 7, the cogeneration system 1 is introduced to an energy consumer (hereinafter referred to as a thermoelectric equilibrium consumer) in which the power demand level in the power load 8 and the heat demand level in the heat load 9 are substantially balanced. An example of the case is shown.

図5に示すように、電主需要家では、(b)において太実線で示される予測不足熱量が常にゼロに維持されている。つまり、電主需要家では、電主運転制御を継続して実行したとしても、燃料電池3が発生する熱だけで熱負荷9における熱需要を十分に賄うことができ、一の運転周期Tc内で熱不足状態は発生していないことが分かる。よって、この例におけるコージェネレーションシステム1では、常時電主運転制御が実行され、最大出力運転制御は実行されていない。なお、図5において燃料電池3が最大出力で運転制御される期間が見られるが、これはあくまで電主運転制御による結果であり、本願で言う最大出力運転制御が実行されたことによる結果ではない。   As shown in FIG. 5, in the electric power customer, the predicted insufficient heat quantity indicated by the thick solid line in (b) is always maintained at zero. That is, even if the main electric consumer continues to execute the main electric operation control, the heat demand in the heat load 9 can be sufficiently covered only by the heat generated by the fuel cell 3, and within one operation cycle Tc. It can be seen that no heat shortage occurred. Therefore, in the cogeneration system 1 in this example, the electric main operation control is always performed, and the maximum output operation control is not performed. In FIG. 5, there is a period during which the fuel cell 3 is operated and controlled at the maximum output, but this is only a result of the main operation control and not a result of executing the maximum output operation control referred to in the present application. .

一方、図6に示すように、熱主需要家では、電主運転制御の実行によってでは燃料電池3が発生する熱だけで熱負荷9における熱需要を十分に賄うことができず、一の運転周期Tc内の所定時点で、熱不足状態が発生していることが分かる((b)の白抜き矢印を参照)。よって、この例におけるコージェネレーションシステム1では、熱不足状態が発生する時点を含みかつそれ以前の直前期間Taだけ、電主運転制御に代えて最大出力運転制御が実行されている。これにより、最大出力運転制御の実行による蓄熱量は、電主運転制御の実行による蓄熱量と比較して大きく増大され((d)の太矢印を参照)、熱不足状態の発生が有効に回避されていることが分かる((d)の破線矢印を参照)。なお、(c)の太実線のチャートを参照して、最大出力運転制御の実行によりバッテリ5の充電量も増加し、充電された電力は、その後電力負荷8に供給されて消費されていることが分かる。   On the other hand, as shown in FIG. 6, in the heat main consumer, the heat demand in the heat load 9 cannot be sufficiently covered only by the heat generated by the fuel cell 3 by the execution of the main operation control. It can be seen that an insufficient heat state has occurred at a predetermined time in the cycle Tc (see the white arrow in (b)). Therefore, in the cogeneration system 1 in this example, the maximum output operation control is executed instead of the electric main operation control only for the immediately preceding period Ta including the time point when the heat shortage state occurs. As a result, the amount of heat stored by executing the maximum output operation control is greatly increased compared to the amount of heat stored by executing the main operation control (see the thick arrow in (d)), and the occurrence of a heat shortage state is effectively avoided. (See the broken line arrow in (d)). In addition, with reference to the thick solid line chart of (c), the amount of charge of the battery 5 also increases due to the execution of the maximum output operation control, and the charged power is then supplied to the power load 8 and consumed. I understand.

図7に示すように、熱電均衡需要家でも、電主運転制御の実行によってでは燃料電池3が発生する熱だけで熱負荷9における熱需要を十分に賄うことができず、一の運転周期Tc内の所定時点で、熱不足状態が発生していることが分かる((b)の白抜き矢印を参照)。よって、この例におけるコージェネレーションシステム1では、熱不足状態が発生する時点を含みかつそれ以前の直前期間Taだけ、電主運転制御に代えて最大出力運転制御が実行されている。これにより、最大出力運転制御の実行による蓄熱量は、電主運転制御の実行による蓄熱量と比較して少なくとも増大され((d)の太矢印を参照)、熱不足状態の発生が回避され((d)の破線矢印を参照)或いは熱不足状態の発生が完全には回避できないにしてもその程度が抑制されていることが分かる((d)の斜線付矢印を参照)。なお、(c)の太実線のチャートを参照して、最大出力運転制御の実行によりバッテリ5の充電量も僅かに増加し、充電された電力は、その後電力負荷8に供給されて消費されていることが分かる。   As shown in FIG. 7, even a thermoelectric equilibrium consumer cannot sufficiently cover the heat demand in the heat load 9 only by the heat generated by the fuel cell 3 by executing the main operation control, and one operation cycle Tc. It can be seen that an insufficient heat condition has occurred at a predetermined time (see the white arrow in (b)). Therefore, in the cogeneration system 1 in this example, the maximum output operation control is executed instead of the electric main operation control only for the immediately preceding period Ta including the time point when the heat shortage state occurs. Thereby, the heat storage amount by execution of the maximum output operation control is at least increased as compared with the heat storage amount by execution of the electric main operation control (see the thick arrow in (d)), and the occurrence of a heat shortage state is avoided ( It can be seen that even if the occurrence of a heat shortage state cannot be completely avoided (see the dashed arrow in (d)), the degree is suppressed (see the hatched arrow in (d)). Note that, referring to the thick solid line chart of (c), the amount of charge of the battery 5 slightly increases due to the execution of the maximum output operation control, and the charged power is then supplied to the power load 8 and consumed. I understand that.

これらの図5〜図7を参照して良く理解できるように、本実施形態に係るコージェネレーションシステム1の設置対象としては、電力負荷8における電力需要レベルに対して熱負荷9における熱需要レベルが大きいエネルギ需要家(熱主需要家)が特に適している。このような熱主需要家では、電主運転制御を実行して、燃料電池3により発生される電力を予測電力需要に追従させた場合に、比較的高い頻度で熱不足状態が発生し得る。本実施形態に係るコージェネレーションシステム1及びその運転制御方法によれば、そのような熱不足状態の発生を有効に抑制することができる。なお、熱電均衡需要家でも、電主運転制御を実行した場合に、ある程度の頻度で熱不足状態が発生し得る。また、電主需要家でも、電力負荷8や熱負荷9の使用状況次第では熱不足状態が発生する可能性がある。従って、熱電均衡需要家や電主需要家を本実施形態に係るコージェネレーションシステム1の設置対象とすることも、当然に可能である。   As can be easily understood with reference to FIGS. 5 to 7, the cogeneration system 1 according to the present embodiment is installed on the heat demand level in the heat load 9 relative to the power demand level in the power load 8. Large energy consumers (heat main consumers) are particularly suitable. In such a heat main consumer, when the main operation control is executed and the power generated by the fuel cell 3 is made to follow the predicted power demand, a heat shortage state can occur at a relatively high frequency. According to the cogeneration system 1 and the operation control method thereof according to the present embodiment, occurrence of such a heat shortage state can be effectively suppressed. Even in thermoelectric balanced customers, when the main operation control is executed, a heat shortage state may occur with a certain frequency. Moreover, even in the case of an electric power customer, there is a possibility that a heat shortage state may occur depending on the usage state of the electric load 8 and the heat load 9. Therefore, it is naturally possible to set the cogeneration system 1 according to the present embodiment as the installation target of the thermoelectric balanced consumer and the electric power consumer.

2.第二の実施形態
本発明に係るコージェネレーションシステムの第二の実施形態について、図面を参照して説明する。本実施形態に係るコージェネレーションシステム1は、発生される電力が将来の予測電力需要に追従するように燃料電池3を継続して運転制御すると仮定した場合においてそのままでは熱不足状態となると予測された場合には、少なくとも熱不足状態となる時点以前の仮設直前期間Tbは燃料電池3を最大出力で運転制御させる特別運転計画を、所定の運転計画として決定するように構成されている。この点において、燃料電池3が全ての期間で所謂電主運転となるような運転計画を決定するように構成された上記第一の実施形態と相違している。そして、本実施形態に係るコージェネレーションシステム1は、基本的にはそのように決定された特別運転計画に従って実際に燃料電池3を運転制御する特別運転制御を実行し、そのままでは熱不足状態となることが予測された場合には、特別に、熱不足状態となる時点以前の所定の直前期間Taだけ燃料電池3を最大出力で運転制御するように構成されている。以下では、本実施形態に係るコージェネレーションシステム1について、上記第一の実施形態との相違点を中心に詳細に説明する。なお、特に明記しない点については、上記第一の実施形態と同様とする。
2. Second Embodiment A second embodiment of the cogeneration system according to the present invention will be described with reference to the drawings. The cogeneration system 1 according to the present embodiment is predicted to be in a heat-insufficient state as it is when it is assumed that the fuel cell 3 is continuously operated and controlled so that the generated power follows the predicted power demand in the future. In this case, at least the temporary operation period Tb before the time when the heat is insufficient, the special operation plan for controlling the operation of the fuel cell 3 with the maximum output is determined as the predetermined operation plan. In this respect, the fuel cell 3 is different from the first embodiment configured so as to determine an operation plan in which a so-called electric main operation is performed in all periods. And the cogeneration system 1 which concerns on this embodiment performs special operation control which actually carries out operation control of the fuel cell 3 according to the special operation plan determined in that way, and will be in a heat shortage state as it is. In the case where it is predicted, the fuel cell 3 is specially configured to control the operation at the maximum output for a predetermined immediately preceding period Ta before the time when the heat is insufficient. Below, the cogeneration system 1 which concerns on this embodiment is demonstrated in detail centering on difference with said 1st embodiment. Note that points not particularly specified are the same as those in the first embodiment.

2−1.制御ユニットの構成
本実施形態においては、運転計画決定部33は、燃料電池3が全ての期間で所謂電主運転となるような運転計画を仮決定する。そして、仮決定された運転計画に従って燃料電池3が電主運転されたと仮定した場合において、熱不足予測部34により熱不足状態となることが予測された場合には、運転計画決定部33は、全ての期間で電主運転となるような運転計画に代えて、少なくとも仮設直前期間Tbは燃料電池3を最大出力で運転制御させる特別運転計画を仮決定する。すなわち、特別運転計画は、基本的には電主運転制御を実行させつつ、熱不足状態となることが予測される時点以前の仮設直前期間Tbだけ最大出力運転制御を実行させるような運転計画である。なお、この「仮設直前期間Tb」は、上記第一の実施形態で説明した「直前期間Ta」と同種ではあるが異なる概念である。すなわち、「直前期間Ta」は、実際の計画運転制御中に熱不足状態となると予測された場合に設定される期間を表す概念であり、これに対して「仮設直前期間Tb」は、運転計画の実行時(計画時)にシミュレーション上仮想的に設定される期間を表す概念である。本実施形態では、運転計画決定部33は、熱不足予測部34により導出される予測不足熱量ΔHに基づいて、当該予測不足熱量ΔHが大きいほど仮設直前期間Tbが長くなるように、仮設直前期間Tbの長さを仮設定する。また、本実施形態では、仮設直前期間Tbは、熱不足状態となる時点を含みかつそれ以前の期間となるように設定される。
2-1. Configuration of Control Unit In the present embodiment, the operation plan determination unit 33 temporarily determines an operation plan in which the fuel cell 3 is in a so-called electric main operation in all periods. When it is assumed that the fuel cell 3 has been operated mainly in accordance with the provisionally determined operation plan, when the heat shortage prediction unit 34 predicts that the fuel cell 3 will be in a heat shortage state, the operation plan determination unit 33 Instead of an operation plan in which the main operation is performed in all periods, at least a temporary operation period Tb is temporarily determined as a special operation plan for controlling the operation of the fuel cell 3 at the maximum output. In other words, the special operation plan is basically an operation plan in which the main output operation control is executed and the maximum output operation control is executed only during the period Tb immediately before the temporary installation before the time when the heat shortage is predicted. is there. The “temporary immediately preceding period Tb” is the same type of concept as the “immediately preceding period Ta” described in the first embodiment, but is different. That is, the “immediately preceding period Ta” is a concept representing a period set when it is predicted that a heat shortage state is predicted during actual planned operation control, whereas the “temporary immediately preceding period Tb” is an operation plan. This is a concept representing a period that is virtually set in the simulation at the time of execution (planning time). In the present embodiment, the operation plan determination unit 33 is based on the predicted shortage heat ΔH derived by the heat shortage prediction unit 34, so that the temporary shortage period Tb becomes longer as the predicted shortage heat ΔH is larger. Temporarily set the length of Tb. In the present embodiment, the temporary provisional period Tb is set so as to include a period before and before the time when the heat is insufficient.

本実施形態では、運転計画決定部33は、バッテリ5の状態の将来予測及び貯湯ユニット4による蓄熱量の将来予測の一方又は双方に基づいて、仮設定された仮設直前期間Tbの長さを調節するように構成されている。より具体的には、運転計画決定部33は、仮設直前期間Tbの間、電主運転制御に代えて最大出力運転制御を継続して実行すると仮定した場合に、当該仮設直前期間Tb内にバッテリ5の状態が満充電状態となると予測される場合には、仮設直前期間Tbの長さを所定時間(例えば、1分、10分等;適宜変更可能)だけ短くするように仮設直前期間Tbの長さを調節する。また、運転計画決定部33は、仮設直前期間Tbの間、電主運転制御に代えて最大出力運転制御を継続して実行すると仮定した場合に、当該仮設直前期間Tb内に貯湯ユニット4により回収されると予測される予測回収熱量が予測熱需要Hdよりも大きい状態である熱余剰状態となると予測され、又は、貯湯ユニット4による蓄熱量が満蓄熱状態となると予測される場合には、同様に仮設直前期間Tbの長さを所定時間だけ短くするように仮設直前期間Tbの長さを調節する。   In the present embodiment, the operation plan determination unit 33 adjusts the length of the temporarily set temporary immediately preceding period Tb based on one or both of the future prediction of the state of the battery 5 and the future prediction of the heat storage amount by the hot water storage unit 4. Is configured to do. More specifically, the operation plan determination unit 33 assumes that the maximum output operation control is continuously executed instead of the main operation control during the temporary immediately preceding period Tb, and the battery is included in the temporary immediately preceding period Tb. When the state 5 is predicted to be fully charged, the length of the period Tb immediately before temporary setting is shortened by a predetermined time (for example, 1 minute, 10 minutes, etc .; can be changed as appropriate). Adjust the length. In addition, when it is assumed that the maximum output operation control is continuously executed instead of the main operation control during the immediately preceding temporary period Tb, the operation plan determination unit 33 collects the hot water storage unit 4 within the immediately preceding temporary period Tb. In the case where the predicted recovered heat amount that is predicted to be generated is predicted to be in a heat surplus state that is larger than the predicted heat demand Hd, or the heat storage amount by the hot water storage unit 4 is predicted to be in the fully stored state, the same applies. In addition, the length of the period Tb immediately before the temporary setting is adjusted so that the length of the period Tb immediately before the temporary setting is shortened by a predetermined time.

そして、運転計画決定部33は、バッテリ5の状態の将来予測及び貯湯ユニット4による蓄熱量の将来予測の一方又は双方に基づいて、調節されて再設定された仮設直前期間Tbの長さを、再度調節するように構成されている。すなわち、運転計画決定部33は、上記のようにして再設定された仮設直前期間Tbの間、電主運転制御に代えて最大出力運転制御を継続して実行すると仮定した場合に、満充電状態、熱余剰状態、及び満蓄熱状態のいずれかとなると予測される場合には、再設定された仮設直前期間Tbの長さを、更に所定時間だけ短くするように仮設直前期間Tbの長さを再度調節する。本実施形態では、運転計画決定部33は、このような仮設直前期間Tbの長さの調節処理を、満充電状態、熱余剰状態、及び満蓄熱状態のいずれにもならないと予測されるまで繰り返し行う。これにより、仮設直前期間Tbの長さを適正化する。このようにして、基本的には電主運転制御を実行させつつ、熱不足状態となることが予測される時点以前の適正な長さの仮設直前期間Tbだけ最大出力運転制御を実行させる特別運転計画が正式に決定される。   Then, the operation plan determination unit 33 adjusts the length of the immediately preceding temporary period Tb that is adjusted and reset based on one or both of the future prediction of the state of the battery 5 and the future prediction of the heat storage amount by the hot water storage unit 4. It is configured to adjust again. That is, when it is assumed that the operation plan determination unit 33 continuously executes the maximum output operation control instead of the main operation control during the immediately preceding temporary period Tb reset as described above, the fully charged state When the heat surplus state and the full heat storage state are predicted, the length of the reset pre-temporary period Tb is set again so that the length of the reset pre-temporary period Tb is further shortened by a predetermined time. Adjust. In the present embodiment, the operation plan determination unit 33 repeats such adjustment processing of the length of the temporary immediately preceding period Tb until it is predicted that none of the full charge state, the heat surplus state, and the full heat storage state will occur. Do. Thereby, the length of the period Tb immediately before temporary setting is optimized. In this way, the special operation for executing the maximum output operation control for the period Tb of an appropriate length before the time when the heat shortage is predicted is basically executed while the main operation control is basically executed. The plan is formally determined.

本実施形態では、運転制御部35は、運転計画決定部33により決定された特別運転計画に従って燃料電池3を運転制御する特別運転制御を少なくとも実行する。燃料電池3を特別運転制御することにより、当該燃料電池3で発生される電力は、エネルギ需要予測部32により導出される時系列的な予測電力需要に追従しつつ、運転計画の決定時に設定された仮設直前期間Tbでは最大出力となる。そして、実際に特別運転制御が実行された状態で、熱不足予測部34は、例えば現時点から所定時間先までを見越して、当該特別運転制御をそのまま継続して実行すると仮定した場合に、熱不足状態となるか否かを予測する。そして、熱不足状態となると予測された場合には、運転制御部35は、上記第一の実施形態と同様に、直前期間Taだけ特別運転制御に代えて最大出力運転制御を実行する。   In the present embodiment, the operation control unit 35 executes at least the special operation control that controls the operation of the fuel cell 3 in accordance with the special operation plan determined by the operation plan determination unit 33. By performing special operation control of the fuel cell 3, the electric power generated in the fuel cell 3 is set when the operation plan is determined while following the time-series predicted power demand derived by the energy demand prediction unit 32. In the period Tb immediately before the temporary setting, the maximum output is obtained. Then, in a state where the special operation control is actually executed, the heat shortage prediction unit 34 assumes that the special operation control is continuously executed as it is, for example, in anticipation of a predetermined time ahead from the present time. Predict whether or not it will be in a state. Then, when it is predicted that a heat shortage state will occur, the operation control unit 35 executes the maximum output operation control instead of the special operation control for the immediately preceding period Ta as in the first embodiment.

運転制御部35が、直前期間Taだけ特別運転制御に代えて最大出力運転制御を実行した結果、実際に満充電状態、熱余剰状態、及び満蓄熱状態のいずれかとなった場合には、運転制御部35は、直前期間Taのうち上記いずれかの状態となった後の期間では最大出力運転制御を実行することなく計画運転制御を実行する。この点に関しては、上記第一の実施形態における場合と同様である。なお、この場合における計画運転制御は、特別運転制御ではなく一律に電主運転制御とすると好適である。満充電状態、熱余剰状態、及び満蓄熱状態のいずれかの状態では、予測電力需要のみを略過不足なく賄うことができれば十分だからである。   When the operation control unit 35 executes the maximum output operation control instead of the special operation control only for the immediately preceding period Ta, when the actual control state becomes one of the fully charged state, the heat surplus state, and the full heat storage state, the operation control is performed. The unit 35 executes the planned operation control without executing the maximum output operation control in the period after any of the above states in the immediately preceding period Ta. This is the same as in the first embodiment. Note that the planned operation control in this case is preferably not the special operation control but the electric main operation control. This is because it is sufficient that only the predicted power demand can be covered without substantial excess or deficiency in any of the fully charged state, the surplus heat state, and the fully stored state.

2−2.運転制御処理の手順
本実施形態に係る制御ユニット30によるコージェネレーションシステム1の運転制御処理の内容について説明する。図8は、本実施形態に係る運転制御処理の処理手順を示すフローチャートである。本実施形態に係る運転制御処理のステップ#21〜ステップ#23の処理は、上記第一実施形態におけるステップ#01〜ステップ#03の処理(図4を参照)に相当する。但し、本実施形態のステップ#23の処理においては、運転計画決定部33は、燃料電池3が所謂電主運転となるような仮の運転計画(ここでは、電主運転となるような運転計画)を決定するにとどまる。次に、運転計画決定部33は、仮決定された運転計画に基づいて計画運転制御(ここでは、電主運転制御)を継続して実行すると仮定した場合に(ステップ#24)、熱不足予測部34により熱不足状態となることが予測されるか否かを判定すると共に(ステップ#25)、バッテリ5が満充電状態となると予測されるか否かを判定する(ステップ#26)。熱不足状態となるとは予測されなかった場合(ステップ#25:No)、又は、バッテリ5が満充電状態となると予測された場合には(ステップ#26:Yes)、運転計画決定部33は電主運転となるような運転計画を決定し、運転制御部35はこれに基づいて計画運転制御を実行する(ステップ#33)。
2-2. Procedure of Operation Control Process The content of the operation control process of the cogeneration system 1 by the control unit 30 according to the present embodiment will be described. FIG. 8 is a flowchart showing the procedure of the operation control process according to the present embodiment. The process of step # 21 to step # 23 of the operation control process according to the present embodiment corresponds to the process of step # 01 to step # 03 in the first embodiment (see FIG. 4). However, in the process of step # 23 of the present embodiment, the operation plan determination unit 33 performs a temporary operation plan in which the fuel cell 3 is in a so-called main operation (in this case, an operation plan in which the main operation is performed). ) Stay in the decision. Next, when it is assumed that the operation plan determination unit 33 continuously executes the planned operation control (here, the main operation control) based on the temporarily determined operation plan (step # 24), the heat shortage prediction is performed. Whether or not it is predicted by the unit 34 that the heat shortage state is predicted (step # 25) and whether or not the battery 5 is predicted to be fully charged is determined (step # 26). When it is not predicted that the heat shortage state will occur (step # 25: No), or when it is predicted that the battery 5 will be fully charged (step # 26: Yes), the operation plan determining unit 33 An operation plan that determines the main operation is determined, and the operation control unit 35 executes planned operation control based on the operation plan (step # 33).

一方、熱不足状態となると予測され(ステップ#25:Yes)、かつ、バッテリ5が満充電状態とはならないと予測された場合には(ステップ#26:No)、熱不足予測部34は予測不足熱量ΔHを導出し(ステップ#27)、運転計画決定部33は、予測不足熱量ΔHに基づいて、仮設直前期間Tbの長さを仮設定する(ステップ#28)。次に、運転計画決定部33は、仮設直前期間Tbの間、最大出力運転制御を継続して実行すると仮定した場合に(ステップ#29)、バッテリ5の状態が満充電状態となると予測されるか否かを判定すると共に(ステップ#30)、熱余剰状態又は満蓄熱状態となると予測されるか否かを判定する(ステップ#31)。バッテリ5が満充電状態となると予測された場合(ステップ#30:Yes)、又は、熱余剰状態若しくは満蓄熱状態となると予測された場合には(ステップ#31:Yes)、運転計画決定部33は、ステップ#28で仮設定された仮設直前期間Tbの長さを所定時間だけ短くするように調節する(ステップ#32)。そして、調節されて再設定された長さの仮設直前期間Tbに対して、ステップ#29〜ステップ#32の処理が再度繰り返して実行される。   On the other hand, when it is predicted that the heat shortage state will occur (step # 25: Yes) and the battery 5 is predicted not to be fully charged (step # 26: No), the heat shortage prediction unit 34 predicts. The insufficient heat amount ΔH is derived (step # 27), and the operation plan determination unit 33 temporarily sets the length of the immediately preceding temporary period Tb based on the predicted insufficient heat amount ΔH (step # 28). Next, when it is assumed that the maximum output operation control is to be continuously executed during the period Tb immediately before the temporary setting (step # 29), the operation plan determination unit 33 is predicted that the state of the battery 5 is in a fully charged state. Is determined (step # 30), and it is determined whether or not it is predicted that the heat surplus state or the full heat storage state is reached (step # 31). When the battery 5 is predicted to be in a fully charged state (step # 30: Yes), or when it is predicted that the battery 5 is in a heat surplus state or a full heat storage state (step # 31: Yes), the operation plan determination unit 33 Adjusts the length of the period Tb immediately set temporarily in step # 28 to be shortened by a predetermined time (step # 32). And the process of step # 29-step # 32 is repeatedly performed again with respect to the temporary temporary period Tb of the length adjusted and reset.

やがて仮設直前期間Tbの長さが適正化されて、最大出力運転制御を継続して実行すると仮定した場合に、満充電状態、熱余剰状態、及び満蓄熱状態のいずれにもならないと予測されるに至ると(ステップ#30:No、かつ、ステップ#31:No)、運転計画決定部33は、基本的には電主運転制御を実行させつつ、熱不足状態となることが予測される時点以前の適正な長さの仮設直前期間Tbだけ最大出力運転制御を実行させる特別運転計画を正式に決定することになる。運転制御部35は、決定された特別運転計画に基づいて、特別運転制御を実行する(ステップ#33)。なお、このステップ#33の処理は、上記第一実施形態におけるステップ#04の処理に相当する。その後、上記第一実施形態におけるステップ#05〜ステップ#13の処理と同様の処理が行われて、本実施形態に係る運転制御処理を終了する。なお、図8のフローチャートにおいては、ステップ#33以降の処理を省略して示している。   When it is assumed that the length of the period Tb immediately before the temporary setting will eventually be optimized and the maximum output operation control is to be continuously executed, it is predicted that none of the fully charged state, the heat surplus state, and the fully stored heat state will occur. (Step # 30: No, and step # 31: No), the operation plan determination unit 33 is basically predicted to be in a heat-deficient state while executing the main operation control. The special operation plan for executing the maximum output operation control only for the temporary period Tb of the previous appropriate length is formally determined. The operation control unit 35 executes special operation control based on the determined special operation plan (step # 33). The process of step # 33 corresponds to the process of step # 04 in the first embodiment. Thereafter, processing similar to the processing of Step # 05 to Step # 13 in the first embodiment is performed, and the operation control processing according to the present embodiment is terminated. In the flowchart of FIG. 8, the processing after step # 33 is omitted.

本実施形態に係るコージェネレーションシステム1によれば、運転計画の決定時に、電主運転制御を継続して実行すると仮定した場合にそのままでは熱不足状態となることが予測される場合には、仮設直前期間Tb以外の期間は電主運転制御を実行させつつ、熱不足状態となることが予測される時点以前の仮設直前期間Tbだけは最大出力運転制御を実行させる特別運転計画が決定される。そして、決定される特別運転計画に基づいて特別運転制御が実行されることにより、実際の電力需要及び熱需要が予測電力需要及び予測熱需要に略等しい状態で推移する場合には、仮設直前期間Tbでは余剰電力及び余剰熱が発生する。発生した余剰熱は貯湯ユニット4により回収されて熱媒としての湯水が蓄える熱量の形態で蓄熱される。これにより、本実施形態では、計画運転制御の一種である特別運転制御を実行することのみによっても、熱不足状態の発生を抑制しつつエネルギ消費量を有効に低減することが可能となっている。なお、余剰電力はバッテリ5に蓄電される。   According to the cogeneration system 1 according to the present embodiment, when it is assumed that the main operation control is to be continuously executed when the operation plan is determined, if it is predicted that a heat shortage state is expected as it is, A special operation plan for executing the maximum output operation control is determined only during the temporary immediately preceding period Tb before the time when it is predicted that the heat shortage state is caused while executing the electric main operation control during the period other than the immediately preceding period Tb. And when special operation control is executed based on the determined special operation plan, when the actual power demand and heat demand change in a state substantially equal to the predicted power demand and the predicted heat demand, At Tb, surplus power and surplus heat are generated. The generated surplus heat is recovered by the hot water storage unit 4 and stored in the form of a heat quantity that hot water as a heat medium is stored. Thereby, in this embodiment, it is possible to effectively reduce the energy consumption while suppressing the occurrence of the heat shortage state only by executing the special operation control which is a kind of the planned operation control. . The surplus power is stored in the battery 5.

更に、本実施形態では、運転計画の決定時において仮設定される仮設直前期間Tbの長さが、バッテリ5の状態の将来予測及び貯湯ユニット4による蓄熱量の将来予測に基づいて、適正な長さとなるように調節される。すなわち、将来の熱不足状態の発生を解消することができると予測され、かつ、満充電状態、熱余剰状態、及び満蓄熱状態のいずれにもならないと予測されるだけの長さとなるように、仮設直前期間Tbの長さが調節される。これにより、仮設直前期間Tbにおける燃料電池3の最大出力運転制御により将来の予測熱需要を略過不足なく賄うことが可能となり、必要最小限の最大出力運転制御で熱不足状態の発生を抑制することが可能となっている。   Further, in the present embodiment, the length of the temporary immediately preceding period Tb that is temporarily set when the operation plan is determined is an appropriate length based on the future prediction of the state of the battery 5 and the future prediction of the heat storage amount by the hot water storage unit 4. It is adjusted to become. That is, it is predicted that it will be possible to eliminate the occurrence of a future heat shortage state, and it will be long enough to be predicted not to be in a fully charged state, a heat surplus state, or a full heat storage state, The length of the temporary provisional period Tb is adjusted. As a result, it becomes possible to cover the future predicted heat demand almost without deficiency by the maximum output operation control of the fuel cell 3 in the period Tb immediately before the temporary installation, and the occurrence of the heat deficiency state is suppressed by the minimum output operation control as necessary. It is possible.

更に、本実施形態では、実際に特別運転制御を実行しながら、その特別運転制御を継続して実行すると仮定した場合に熱不足状態となると予測された場合には、仮設直前期間Tbの開始時点よりも早い時点を始点とする直前期間Taの間、特別運転制御に代えて最大出力運転制御が実行される。これにより、例えば実際の熱需要が予測熱需要を上回って推移して、特別運転計画で予定された仮設直前期間Tbの終了時点よりも前に実際に熱不足状態に陥ると予測された場合にも、熱不足状態の発生を抑制しつつエネルギ消費量を有効に低減することが可能となっている。   Further, in the present embodiment, when it is predicted that a heat shortage state will occur when it is assumed that the special operation control is continuously executed while actually performing the special operation control, the start time of the temporary immediately preceding period Tb is assumed. During the immediately preceding period Ta starting from an earlier time point, the maximum output operation control is executed instead of the special operation control. Thereby, for example, when the actual heat demand changes above the predicted heat demand, and it is predicted that the actual heat shortage will actually occur before the end point of the temporary temporary period Tb scheduled in the special operation plan. However, it is possible to effectively reduce the energy consumption while suppressing the occurrence of the heat shortage state.

〔その他の実施形態〕
(1)上記第一の実施形態においては、運転制御部35が予測不足熱量ΔHに基づいて直前期間Taの長さを設定する場合を例として説明した。また、上記第二の実施形態においては、運転計画決定部33が予測不足熱量ΔHに基づいて仮設直前期間Tbの長さを仮設定する場合を例として説明した。しかし、本発明の実施形態はこれに限定されない。すなわち、例えば運転制御部35が、予測不足熱量ΔHとは無関係に直前期間Taの長さを一律に設定したり、運転計画決定部33が、予測不足熱量ΔHとは無関係に仮設直前期間Tbの長さを一律に仮設定したりする構成とすることも、本発明の好適な実施形態の一つである。このような構成は、その後仮設直前期間Tbの長さを適正化させる処理(図8におけるステップ#29〜ステップ#32の処理)を行うことになる、上記第二の実施形態に採用する構成として適している。
[Other Embodiments]
(1) In the first embodiment, the case where the operation control unit 35 sets the length of the immediately preceding period Ta based on the predicted insufficient heat amount ΔH has been described as an example. Moreover, in said 2nd embodiment, the operation plan determination part 33 demonstrated as an example the case where the length of temporary provisional period Tb was temporarily set based on prediction insufficient heat quantity (DELTA) H. However, the embodiment of the present invention is not limited to this. That is, for example, the operation control unit 35 uniformly sets the length of the immediately preceding period Ta regardless of the predicted insufficient heat quantity ΔH, or the operation plan determining unit 33 sets the temporary shortly preceding period Tb regardless of the predicted insufficient heat quantity ΔH. A configuration in which the length is temporarily set uniformly is also one of the preferred embodiments of the present invention. Such a configuration is adopted as the configuration adopted in the second embodiment, in which processing (steps # 29 to # 32 in FIG. 8) for optimizing the length of the immediately preceding temporary period Tb is performed thereafter. Is suitable.

(2)上記第一の実施形態においては、運転制御部35が、予測不足熱量ΔHに基づいて、当該予測不足熱量ΔHが大きいほど直前期間Taが長くなるように、複数の異なる長さの中から択一的に直前期間Taの長さを設定する場合を例として説明した。しかし、本発明の実施形態はこれに限定されない。すなわち、例えば運転制御部35が、最大出力運転制御時の各時点における燃料電池3が発生する発生熱量と予測熱需要Hdとの差分の時間積分が予測不足熱量ΔHに等しくなるように、直前期間Taの長さを設定する構成とすることも、本発明の好適な実施形態の一つである。直前期間Taにおいて貯湯ユニット4により回収されて蓄熱される熱量のうち、将来の予測熱需要Hdを超える分である予測不足熱量ΔHは、当該直前期間Taの各時点における、燃料電池3が発生する発生熱量と予測熱需要Hdとの差分の時間積分に略等しくなる。よって、この構成によれば、より確実に、最大出力運転制御により将来の予測熱需要Hdを略過不足なく賄うことが可能となり、必要最小限の最大出力運転制御で熱不足状態の発生を抑制することが可能となる。このような構成では、当初から適正な長さの直前期間が設定されることになるので、その後直前期間の長さを適正化させる処理(図8におけるステップ#29〜ステップ#32)を行うことのない、上記第一の実施形態に採用する構成として適している。 (2) In the first embodiment, the operation control unit 35 has a plurality of different lengths based on the predicted insufficient heat amount ΔH so that the immediately preceding period Ta becomes longer as the predicted insufficient heat amount ΔH increases. As an example, the case where the length of the immediately preceding period Ta is set has been described. However, the embodiment of the present invention is not limited to this. That is, for example, the operation control unit 35 is configured so that the time integral of the difference between the generated heat amount generated by the fuel cell 3 at each time point during the maximum output operation control and the predicted heat demand Hd becomes equal to the predicted insufficient heat amount ΔH. A configuration in which the length of Ta is set is also one preferred embodiment of the present invention. Of the amount of heat collected and stored by the hot water storage unit 4 in the immediately preceding period Ta, the predicted insufficient heat amount ΔH that exceeds the predicted heat demand Hd in the future is generated by the fuel cell 3 at each time point in the immediately preceding period Ta. This is approximately equal to the time integral of the difference between the amount of generated heat and the predicted heat demand Hd. Therefore, according to this configuration, it is possible to more reliably cover the predicted heat demand Hd in the future without any excess or deficiency by the maximum output operation control, and the occurrence of a heat deficiency state is suppressed by the minimum required maximum output operation control. It becomes possible to do. In such a configuration, an immediately preceding period having an appropriate length is set from the beginning, and thereafter processing for optimizing the length of the immediately preceding period (steps # 29 to # 32 in FIG. 8) is performed. This is suitable as a configuration employed in the first embodiment.

(3)上記第一の実施形態においては、計画運転制御として、燃料電池3を電主運転させる電主運転制御が実行される場合を例として説明した。また、上記第二の実施形態においては、計画運転制御として、仮設直前期間Tb以外の期間は燃料電池3を電主運転させると共に、仮設直前期間Tbでは燃料電池3を最大出力で運転させる特別運転制御が実行される場合を例として説明した。しかし、本発明の実施形態はこれに限定されない。すなわち、運転制御部35は、計画運転制御として、少なくとも運転計画決定部33により決定された所定の運転計画に従った計画運転制御を実行するように構成されていれば良い。この場合において、運転計画決定部33は、例えばエネルギ需要家のエネルギ消費性向やコージェネレーションシステム1の各部の特性等に応じて最適となる各種の運転計画を決定する構成とすることができる。 (3) In said 1st embodiment, the case where the main operation control which makes main operation of the fuel cell 3 was performed as planned operation control was demonstrated as an example. In the second embodiment, as the planned operation control, the fuel cell 3 is operated as a main operation during a period other than the temporary provisional period Tb, and the fuel cell 3 is operated at the maximum output during the temporary provisional period Tb. The case where the control is executed has been described as an example. However, the embodiment of the present invention is not limited to this. In other words, the operation control unit 35 may be configured to execute at least the planned operation control according to the predetermined operation plan determined by the operation plan determination unit 33 as the planned operation control. In this case, the operation plan determination unit 33 can be configured to determine various types of operation plans that are optimal according to, for example, the energy consumption tendency of the energy consumer, the characteristics of each unit of the cogeneration system 1, and the like.

(4)上記第二の実施形態においては、仮設直前期間Tb以外の期間は燃料電池3を電主運転させると共に仮設直前期間Tbでは燃料電池3を最大出力で運転させる特別運転制御が実行されるように構成されており、実際に特別運転制御が実行された結果、そのままでは熱不足状態となることが予測された場合に、直前期間Taだけ最大出力運転制御が実行される場合を例として説明した。しかし、本発明の実施形態はこれに限定されない。すなわち、実際に特別運転制御が実行された場合に、そのままでは熱不足状態となることが予測されるか否かに関わらず、特別運転計画に従った特別運転制御が常時継続して実行される構成とすることも、本発明の好適な実施形態の一つである。この場合であっても、仮設直前期間Tbで発生する余剰熱を蓄熱しておくことで熱不足状態の発生を抑制することができる。 (4) In the second embodiment, special operation control is performed in which the fuel cell 3 is operated in the main mode during the period other than the temporary provisional period Tb and the fuel cell 3 is operated at the maximum output during the temporary provisional period Tb. The case where the maximum output operation control is executed only for the immediately preceding period Ta when the special operation control is actually executed and it is predicted that the heat shortage state is expected as it is as an example will be described. did. However, the embodiment of the present invention is not limited to this. That is, when the special operation control is actually executed, the special operation control according to the special operation plan is continuously executed regardless of whether or not it is predicted that the heat shortage state is expected as it is. The configuration is also one of the preferred embodiments of the present invention. Even in this case, it is possible to suppress the occurrence of the heat shortage state by storing the excess heat generated in the period Tb immediately before the temporary installation.

(5)上記の各実施形態においては、運転制御部35が、直前期間Ta内にバッテリ5が満充電状態となった場合には、直前期間Taのうちバッテリ5が満充電状態にある期間では最大出力運転制御を実行することなく計画運転制御を実行する場合を例として説明した。しかし、本発明の実施形態はこれに限定されない。すなわち、例えば直前期間Ta内にバッテリ5が満充電状態となった場合であっても、その時点では未だ熱余剰状態でも満蓄熱状態でもない場合には、最大出力運転制御を継続して実行する構成とすることも、本発明の好適な実施形態の一つである。この場合、バッテリ5が満充電状態となった後は、最大出力運転制御実行することにより燃料電池3が発生する余剰電力の全てを、電気ヒータ14で熱に変換すると共に貯湯ユニット4で当該変換された熱を回収して蓄熱する構成とすることができる。なお、その後、熱余剰状態又は満蓄熱状態となった場合には、最大出力運転制御に代えて計画運転制御を実行する構成とすると好適である。 (5) In each of the above-described embodiments, when the battery 5 is fully charged within the immediately preceding period Ta, the operation control unit 35 is in a period in which the battery 5 is fully charged in the immediately preceding period Ta. The case where the planned operation control is executed without executing the maximum output operation control has been described as an example. However, the embodiment of the present invention is not limited to this. That is, for example, even when the battery 5 is in a fully charged state within the immediately preceding period Ta, the maximum output operation control is continuously executed when the battery 5 is not in a surplus heat state or a full heat storage state at that time. The configuration is also one of the preferred embodiments of the present invention. In this case, after the battery 5 is fully charged, all the surplus power generated by the fuel cell 3 by performing the maximum output operation control is converted into heat by the electric heater 14 and converted by the hot water storage unit 4. It can be set as the structure which collect | recovers the heat | fever which was performed and stores heat. In addition, when it becomes a heat surplus state or a full heat storage state after that, it is suitable if it is set as the structure which replaces with maximum output operation control and performs planned operation control.

(6)上記の各実施形態においては、運転制御部35が、直前期間Ta内に熱余剰状態又は満蓄熱状態となった場合には、直前期間Taのうちそれら以降の期間では最大出力運転制御を実行することなく計画運転制御を実行する場合を例として説明した。しかし、本発明の実施形態はこれに限定されない。すなわち、例えば直前期間Ta内に熱余剰状態となった場合であっても、その時点では未だ満蓄熱状態ではない場合には、最大出力運転制御を継続して実行する構成とすることも、本発明の好適な実施形態の一つである。この場合、その後、満蓄熱状態となった場合には、最大出力運転制御に代えて計画運転制御を実行する構成とすると好適である。 (6) In each of the above embodiments, when the operation control unit 35 is in a heat surplus state or a full heat storage state in the immediately preceding period Ta, the maximum output operation control is performed in the subsequent period of the immediately preceding period Ta. The case where planned operation control is executed without executing is described as an example. However, the embodiment of the present invention is not limited to this. That is, for example, even when the heat surplus state is reached within the immediately preceding period Ta, if the heat storage state is not yet at that time, the maximum output operation control may be continuously executed. It is one of the preferred embodiments of the invention. In this case, it is preferable that the planned operation control is executed instead of the maximum output operation control when the full heat storage state is reached.

(7)上記の各実施形態においては、直前期間Ta及び仮設直前期間Tbが、熱不足状態となる時点を含みかつそれ以前の期間となるように設定されている場合を例として説明した。しかし、本発明の実施形態はこれに限定されない。すなわち、直前期間Ta又は仮設直前期間Tbの終期と熱不足状態となる時点との間に多少の空白期間が生じるように、熱不足状態となる時点を含まないそれ以前の期間として直前期間Ta又は仮設直前期間Tbを設定する構成とすることも、本発明の好適な実施形態の一つである。但し、そのような空白期間の長さは、燃料電池3が発生した熱が貯湯ユニット4により回収されてから実際に熱負荷9に供給されるまでの間(湯水が貯湯槽24に貯留されている間)の放熱量がほとんど無視できる程度の長さにとどめておくことが好ましい。 (7) In each of the above embodiments, the case where the immediately preceding period Ta and the temporary immediately preceding period Tb are set so as to include a period before and including the time when the heat is insufficient is described. However, the embodiment of the present invention is not limited to this. That is, the previous period Ta or the previous period not including the time when the heat shortage state is included so that a slight blank period occurs between the end of the immediately preceding period Ta or the temporary immediately preceding period Tb and the time when the heat shortage state occurs. It is one of the preferred embodiments of the present invention to set the period immediately before the temporary setting Tb. However, the length of such a blank period is from when the heat generated by the fuel cell 3 is recovered by the hot water storage unit 4 until it is actually supplied to the heat load 9 (hot water is stored in the hot water storage tank 24). It is preferable to keep the heat dissipation amount so long as to be negligible.

(8)上記の各実施形態においては、コージェネレーションシステム1が熱電併給装置としての燃料電池3を備えて構成された場合を例として説明した。しかし、本発明の実施形態はこれに限定されない。すなわち、コージェネレーションシステム1を、例えばガスエンジンと当該ガスエンジンの軸出力により発電を行う発電機とを有する熱電併給装置を備えて構成することも、本発明の好適な実施形態の一つである。この場合、熱電併給装置の最大出力運転制御時におけるエネルギ効率は、最適燃費特性に沿った状態(効率が高く排ガスの少ない状態)におけるエネルギ効率よりも低くなる可能性がある。しかし、この場合であっても、少なくとも比較的小さな演算処理負荷でかつ許容され得る高い精度で、熱不足状態の発生を抑制することができる。 (8) In each of the above embodiments, the case where the cogeneration system 1 is configured to include the fuel cell 3 as a combined heat and power supply device has been described as an example. However, the embodiment of the present invention is not limited to this. That is, it is also one of the preferred embodiments of the present invention that the cogeneration system 1 includes a cogeneration device having, for example, a gas engine and a generator that generates electric power based on the shaft output of the gas engine. . In this case, the energy efficiency at the time of the maximum output operation control of the combined heat and power supply apparatus may be lower than the energy efficiency in a state (a state where the efficiency is high and the exhaust gas is low) in accordance with the optimum fuel efficiency characteristics. However, even in this case, it is possible to suppress the occurrence of a heat shortage state with at least a relatively small calculation processing load and with high accuracy that can be tolerated.

本発明は、電力と熱とを併せて発生させる熱電併給装置を備え、熱電併給装置で発生された電力を電力負荷へ供給可能に、かつ熱電併給装置で発生された熱を熱負荷へ供給可能に構成されたコージェネレーションシステムに好適に利用することができる。   The present invention includes a cogeneration device that generates both electric power and heat, can supply the electric power generated by the cogeneration device to the electric power load, and can supply the heat generated by the cogeneration device to the heat load. It can utilize suitably for the cogeneration system comprised by.

1 コージェネレーションシステム
3 燃料電池(熱電併給装置)
4 貯湯ユニット(熱回収手段)
5 バッテリ(蓄電手段)
8 電力負荷
9 熱負荷
32 エネルギ需要予測部(エネルギ需要予測手段)
33 運転計画決定部(運転計画決定手段)
34 熱不足予測部(熱不足予測手段)
35 運転制御部(運転制御手段)
Ta 直前期間
Tb 仮設直前期間
Tc 運転周期
1 Cogeneration system 3 Fuel cell (Cogeneration system)
4 Hot water storage unit (heat recovery means)
5 Battery (electric storage means)
8 Electric power load 9 Thermal load 32 Energy demand prediction section (energy demand prediction means)
33 Operation plan decision unit (operation plan decision means)
34 Heat shortage prediction section (heat shortage prediction means)
35 Operation control unit (operation control means)
Ta immediately preceding period Tb temporary immediately preceding period Tc operation cycle

Claims (12)

電力と熱とを併せて発生させる熱電併給装置と、前記熱電併給装置で発生された熱を回収して蓄熱しかつ当該蓄えられた熱を熱負荷へ供給する熱回収手段と、前記熱電併給装置を所定の運転計画に従って運転制御する計画運転制御を少なくとも実行する運転制御手段と、を備えたコージェネレーションシステムであって、
前記熱電併給装置で発生された電力を蓄電しかつ当該蓄えられた電力を電力負荷へ供給する蓄電手段と、
将来の所定の運転周期内に前記熱負荷において需要があると予測される時系列的な予測熱需要を導出するエネルギ需要予測手段と、
前記計画運転制御を継続して実行すると仮定した場合に、前記熱回収手段により回収されると予測される予測回収熱量が前記予測熱需要よりも小さい状態である熱不足状態となるか否かを予測する熱不足予測手段と、を備え、
前記運転制御手段は、前記熱不足状態となることが予測された場合には、前記熱不足状態となる時点以前の所定の直前期間だけ、前記計画運転制御に代えて前記熱電併給装置を最大出力で運転制御する最大出力運転制御を実行し、当該直前期間に発生する余剰電力を前記蓄電手段に蓄電するコージェネレーションシステム。
A combined heat and power device that generates both electric power and heat, heat recovery means that recovers and stores heat generated by the combined heat and power device and supplies the stored heat to a heat load, and the combined heat and power device An operation control means for executing at least planned operation control for performing operation control according to a predetermined operation plan, and a cogeneration system comprising:
Power storage means for storing electric power generated by the combined heat and power supply apparatus and supplying the stored electric power to an electric power load;
Energy demand prediction means for deriving a time-series predicted heat demand that is predicted to be demanded at the thermal load within a predetermined operating cycle in the future;
If it is assumed that the planned operation control is to be continuously executed, whether or not the predicted heat recovery amount predicted to be recovered by the heat recovery means is in a heat shortage state that is smaller than the predicted heat demand. A heat shortage predicting means for predicting,
When the operation control means is predicted to be in the heat-insufficient state, the maximum output of the cogeneration device is output instead of the planned operation control only during a predetermined immediately preceding period before the time when the heat-insufficient state is reached. A cogeneration system that performs maximum output operation control that performs operation control at the power storage, and stores surplus power generated in the immediately preceding period in the power storage means.
前記熱不足予測手段は、更に、前記予測熱需要に対して前記予測回収熱量が不足する量である予測不足熱量を導出するように構成され、
前記運転制御手段は、前記予測不足熱量に基づいて、前記予測不足熱量が大きいほど前記直前期間が長くなるように前記直前期間の長さを設定する請求項1に記載のコージェネレーションシステム。
The heat shortage predicting means is further configured to derive a predicted shortage heat amount that is an amount that the predicted recovered heat amount is insufficient with respect to the predicted heat demand,
2. The cogeneration system according to claim 1, wherein the operation control unit sets the length of the immediately preceding period based on the predicted insufficient heat quantity so that the immediately preceding period becomes longer as the predicted insufficient heat quantity increases.
前記運転計画を決定する運転計画決定手段を備え、
前記運転計画決定手段は、所定の運転計画に従って前記熱電併給装置を運転制御すると仮定した場合において前記熱不足状態となることが予測される場合には、少なくとも前記熱不足状態となる時点以前の仮設直前期間に前記熱電併給装置を最大出力で運転制御させる特別運転計画を、前記運転計画として決定する請求項1又は2に記載のコージェネレーションシステム。
An operation plan determining means for determining the operation plan;
When it is predicted that the operation plan determination means is in the heat shortage state when it is assumed that the operation of the cogeneration device is controlled according to a predetermined operation plan, at least a temporary configuration before the time when the heat shortage state is reached. The cogeneration system according to claim 1, wherein a special operation plan for controlling the operation of the combined heat and power unit at a maximum output in the immediately preceding period is determined as the operation plan.
前記運転計画決定手段は、前記仮設直前期間の長さを仮設定すると共に、当該仮設定された長さの前記仮設直前期間に応じた前記特別運転計画に従って前記熱電併給装置を継続して運転制御すると仮定した場合における前記蓄電手段の状態の将来予測及び前記熱回収手段の状態の将来予測の一方又は双方に基づいて、前記仮設直前期間の長さを調節する請求項3に記載のコージェネレーションシステム。   The operation plan determination means temporarily sets the length of the period immediately before temporary installation, and continuously controls the thermoelectric generator according to the special operation plan according to the period immediately before temporary installation of the temporarily set length. 4. The cogeneration system according to claim 3, wherein the length of the period immediately before the temporary setting is adjusted based on one or both of a future prediction of the state of the power storage unit and a future prediction of the state of the heat recovery unit when it is assumed. . 前記蓄電手段の状態の将来予測として、前記仮設直前期間内に前記蓄電手段が所定の満充電状態となると予測されるか否かが判定され、
前記運転計画決定手段は、前記満充電状態となると予測される場合には、前記仮設直前期間の長さを短くする請求項4に記載のコージェネレーションシステム。
As a future prediction of the state of the power storage means, it is determined whether or not the power storage means is predicted to be in a predetermined fully charged state within the period immediately before the temporary installation,
5. The cogeneration system according to claim 4, wherein the operation plan determination unit shortens the length of the period immediately before the temporary installation when it is predicted that the fully charged state is reached.
前記熱回収手段の状態の将来予測として、前記仮設直前期間内に前記予測回収熱量が前記予測熱需要よりも大きい状態である熱余剰状態となると予測されるか否か、又は、前記熱回収手段が所定の満蓄熱状態となると予測されるか否かが判定され、
前記運転計画決定手段は、前記熱余剰状態又は前記満蓄熱状態となると予測される場合には、前記仮設直前期間の長さを短くする請求項4又は5に記載のコージェネレーションシステム。
As a future prediction of the state of the heat recovery means, whether or not it is predicted that the predicted recovered heat amount is in a state larger than the predicted heat demand within the period immediately before temporary installation, or the heat recovery means Is determined to be expected to become a predetermined full heat storage state,
6. The cogeneration system according to claim 4, wherein the operation plan determination unit shortens the length of the period immediately before the temporary installation when the surplus heat state or the full heat storage state is predicted.
前記エネルギ需要予測手段は、将来の前記運転周期内に前記電力負荷において需要があると予測される時系列的な予測電力需要を更に導出し、
前記運転制御手段は、前記計画運転制御として、発生される電力が前記予測電力需要に追従するように前記熱電併給装置を運転制御する電主運転制御を実行する請求項1又は2に記載のコージェネレーションシステム。
The energy demand prediction means further derives a time-series predicted power demand that is predicted to be demanded in the power load within the future operation cycle,
3. The code according to claim 1, wherein the operation control unit executes, as the planned operation control, an electric main operation control that controls the operation of the cogeneration device so that generated electric power follows the predicted power demand. Generation system.
前記エネルギ需要予測手段は、将来の前記運転周期内に前記電力負荷において需要があると予測される時系列的な予測電力需要を更に導出し、
前記運転制御手段は、前記計画運転制御として、前記仮設直前期間以外では発生される電力が前記予測電力需要に追従するように前記熱電併給装置を運転制御させると共に、前記仮設直前期間だけ前記熱電併給装置を最大出力で運転制御させる特別運転制御を実行する請求項3から6のいずれか一項に記載のコージェネレーションシステム。
The energy demand prediction means further derives a time-series predicted power demand that is predicted to be demanded in the power load within the future operation cycle,
The operation control means, as the planned operation control, controls the operation of the combined heat and power supply so that the generated electric power follows the predicted power demand except in the period immediately before the temporary installation, and the combined heat and power supply only in the period immediately before the temporary installation. The cogeneration system according to any one of claims 3 to 6, wherein special operation control for controlling the operation of the apparatus at a maximum output is executed.
前記運転制御手段は、前記直前期間内に前記蓄電手段が所定の満充電状態となった場合には、前記直前期間のうち前記満充電状態にある期間では前記最大出力運転制御を実行することなく前記計画運転制御を実行する請求項1から8のいずれか一項に記載のコージェネレーションシステム。   The operation control means does not execute the maximum output operation control in the full charge state of the immediately preceding period when the power storage means is in a predetermined full charge state within the immediately preceding period. The cogeneration system according to any one of claims 1 to 8, wherein the planned operation control is executed. 前記運転制御手段は、前記直前期間内に前記予測回収熱量が前記予測熱需要よりも大きい状態である熱余剰状態となった場合、又は、前記熱回収手段が所定の満蓄熱状態となった場合には、前記直前期間のうち前記熱余剰状態又は前記満蓄熱状態にある期間では前記最大出力運転制御を実行することなく前記計画運転制御を実行する請求項1から9のいずれか一項に記載のコージェネレーションシステム。   When the operation control means is in a heat surplus state in which the predicted heat recovery amount is greater than the predicted heat demand within the immediately preceding period, or when the heat recovery means is in a predetermined full heat storage state The said scheduled operation control is performed without performing the said maximum output operation control in the period in the said heat surplus state or the said full heat storage state among the said immediately preceding periods. Cogeneration system. 前記電力負荷における電力需要レベルに対して前記熱負荷における熱需要レベルが大きいエネルギ需要家を設置対象とする請求項1から10のいずれか一項に記載のコージェネレーションシステム。   The cogeneration system according to any one of claims 1 to 10, wherein an energy consumer having a large heat demand level in the heat load with respect to a power demand level in the power load is set as an installation target. 電力と熱とを併せて発生させる熱電併給装置と、前記熱電併給装置で発生された熱を回収して蓄熱しかつ当該蓄えられた熱を熱負荷へ供給する熱回収手段と、前記熱電併給装置を運転制御する運転制御手段と、を備えたコージェネレーションシステムであって、
前記熱電併給装置で発生された電力を蓄電しかつ当該蓄えられた電力を電力負荷へ供給する蓄電手段と、
将来の所定の運転周期内に前記熱負荷において需要があると予測される時系列的な予測熱需要を導出するエネルギ需要予測手段と、
前記熱電併給装置を計画運転制御するための所定の運転計画を決定する運転計画決定手段と、
前記計画運転制御を継続して実行すると仮定した場合に、前記熱回収手段により回収されると予測される予測回収熱量が前記予測熱需要よりも小さい状態である熱不足状態となるか否かを予測する熱不足予測手段と、を備え、
前記運転計画決定手段は、前記熱不足状態となることが予測された場合には、少なくとも前記熱不足状態となる時点以前の直前期間に前記熱電併給装置を最大出力で運転制御させる特別運転計画を決定し、
運転制御手段は、前記特別運転計画に従って前記熱電併給装置を運転制御する特別運転制御を実行し、前記直前期間に発生する余剰電力を前記蓄電手段に蓄電するコージェネレーションシステム。
A combined heat and power device that generates both electric power and heat, heat recovery means that recovers and stores heat generated by the combined heat and power device and supplies the stored heat to a heat load, and the combined heat and power device An operation control means for controlling the operation of the cogeneration system,
Power storage means for storing electric power generated by the combined heat and power supply apparatus and supplying the stored electric power to an electric power load;
Energy demand prediction means for deriving a time-series predicted heat demand that is predicted to be demanded at the thermal load within a predetermined operating cycle in the future;
An operation plan determining means for determining a predetermined operation plan for controlling the operation of the combined heat and power unit;
If it is assumed that the planned operation control is to be continuously executed, whether or not the predicted heat recovery amount predicted to be recovered by the heat recovery means is in a heat shortage state that is smaller than the predicted heat demand. A heat shortage predicting means for predicting,
When it is predicted that the heat shortage state is expected, the operation plan determination means sets a special operation plan for controlling the operation of the combined heat and power unit with the maximum output at least immediately before the time when the heat shortage state is reached. Decide
The operation control means executes a special operation control for controlling the operation of the cogeneration apparatus according to the special operation plan, and stores the surplus power generated in the immediately preceding period in the power storage means.
JP2010014535A 2010-01-26 2010-01-26 Cogeneration system Expired - Fee Related JP5444020B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2010014535A JP5444020B2 (en) 2010-01-26 2010-01-26 Cogeneration system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2010014535A JP5444020B2 (en) 2010-01-26 2010-01-26 Cogeneration system

Publications (2)

Publication Number Publication Date
JP2011153741A JP2011153741A (en) 2011-08-11
JP5444020B2 true JP5444020B2 (en) 2014-03-19

Family

ID=44539846

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2010014535A Expired - Fee Related JP5444020B2 (en) 2010-01-26 2010-01-26 Cogeneration system

Country Status (1)

Country Link
JP (1) JP5444020B2 (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9879879B2 (en) 2011-11-09 2018-01-30 Panasonic Intellectual Property Management Co., Ltd. Cogeneration system and method for controlling same
JP6086014B2 (en) * 2013-04-04 2017-03-01 株式会社ノーリツ Heat pump water heater
JP6161483B2 (en) * 2013-09-19 2017-07-12 大阪瓦斯株式会社 Power generation planning system for collective housing
JP6188523B2 (en) * 2013-10-02 2017-08-30 大阪瓦斯株式会社 Distributed power system
JP2015130768A (en) * 2014-01-08 2015-07-16 パナソニックIpマネジメント株式会社 Energy management apparatus and energy management system
JP6467216B2 (en) * 2014-12-18 2019-02-06 株式会社日立製作所 Heat source system management apparatus, heat source system management method, and program
JP6649162B2 (en) * 2016-04-08 2020-02-19 大阪瓦斯株式会社 Fuel cell system

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4660422B2 (en) * 2006-05-09 2011-03-30 大阪瓦斯株式会社 Energy supply system
JP5069455B2 (en) * 2006-12-12 2012-11-07 大阪瓦斯株式会社 Collective cogeneration system

Also Published As

Publication number Publication date
JP2011153741A (en) 2011-08-11

Similar Documents

Publication Publication Date Title
JP5444020B2 (en) Cogeneration system
JP4660422B2 (en) Energy supply system
EP1398842A1 (en) Cogeneration apparatus, cogeneration method, program, and medium
JP5191636B2 (en) Cogeneration system
JP2020118335A (en) Cogeneration system
JPWO2013088611A1 (en) Distributed power generation system and control method of distributed power generation system
JP3810307B2 (en) Power supply
US20050255353A1 (en) Fuel-cell power system
JP4397183B2 (en) Cogeneration system
JP4030446B2 (en) Cogeneration system
JP4966066B2 (en) Cogeneration system
CN102792507A (en) Fuel cell system and method for controlling electric current of same
JP5295694B2 (en) Fuel cell system and operation method thereof
JP5069455B2 (en) Collective cogeneration system
JP2005009781A (en) Output control device and output control method for cogeneration system
JP2013164955A (en) Solid oxide fuel cell system, and system stopping method upon failure of reforming catalyst temperature sensor
JP2012084380A (en) Fuel cell system
JP2009216382A (en) Cogeneration system
JP7366275B2 (en) Fuel cell system and fuel cell system control method
JP2017175859A (en) Cogeneration system
JP4994108B2 (en) Thermal storage control device
JP4359248B2 (en) Cogeneration system
JP2000285941A (en) Operation control device for fuel cell
JP2005287211A (en) Energy supply system
JP2005009780A (en) Output control device and output control method for cogeneration system

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20121213

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20131121

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20131220

R150 Certificate of patent or registration of utility model

Ref document number: 5444020

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees