JP5425857B2 - Power system supply and demand control method and information processing apparatus - Google Patents

Power system supply and demand control method and information processing apparatus Download PDF

Info

Publication number
JP5425857B2
JP5425857B2 JP2011228227A JP2011228227A JP5425857B2 JP 5425857 B2 JP5425857 B2 JP 5425857B2 JP 2011228227 A JP2011228227 A JP 2011228227A JP 2011228227 A JP2011228227 A JP 2011228227A JP 5425857 B2 JP5425857 B2 JP 5425857B2
Authority
JP
Japan
Prior art keywords
output
generator
information processing
control
attached
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2011228227A
Other languages
Japanese (ja)
Other versions
JP2013090419A (en
Inventor
明宏 小川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chugoku Electric Power Co Inc
Original Assignee
Chugoku Electric Power Co Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chugoku Electric Power Co Inc filed Critical Chugoku Electric Power Co Inc
Priority to JP2011228227A priority Critical patent/JP5425857B2/en
Publication of JP2013090419A publication Critical patent/JP2013090419A/en
Application granted granted Critical
Publication of JP5425857B2 publication Critical patent/JP5425857B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

この発明は、電力系統の需給制御方法、及び情報処理装置に関し、とくに電力系統における需給制御を適切かつ低コストで行えるようにするための技術に関する。   The present invention relates to a power supply and demand control method and an information processing apparatus, and more particularly to a technique for enabling supply and demand control in a power system to be performed appropriately and at low cost.

昨今、家庭用太陽光発電機等の自然エネルギーを利用した発電方法が注目されているが、自然エネルギーを利用した発電方法は、気象条件等により出力が変動しやすく、こうした発電方法に起因する電力系統への影響(電圧変動、周波数変動)が懸念されている。   Recently, power generation methods using natural energy such as solar power generators for household use have attracted attention, but the power generation method using natural energy tends to fluctuate depending on weather conditions and the like. There are concerns about the effects on the system (voltage fluctuation, frequency fluctuation).

電力系統への影響を防ぐ技術として、特許文献1には、電力系統の区分開閉器で分離された区間内で、区分開閉器に配置した開閉器エージェントをInitiatorとし、区間内の発電機や負荷および下流側開閉器に配置したエージェントをResponderとし、これらエージェント間で契約ネットプロトコルを用いて電力需給の契約をすることで、区間内の分散型電源と負荷および下流区間の需給制御を行う分散型電源の制御システムが記載されている。   As a technique for preventing the influence on the power system, Patent Document 1 discloses that a switch agent arranged in a section switch is an initiator in a section separated by a section switch of the power system, and a generator and a load in the section. The distributed agent that controls the distributed power supply and load in the section and the supply and demand in the downstream section by using the contract net protocol between the agents as the Responder and the agent placed in the downstream switch as the Responder A power supply control system is described.

特許文献2には、開閉器エージェントが、発電機エージェントの出力に応じた「不満足度」(各発電機の現状の出力コストと、その発電機で最も効率の良い出力の時のコストとの差)を台数制御のための評価値とし、その「不満足度」を集計し、単位マイクログリッド内の「発電機の稼働状況」を取得し、単位マイクログリッド内の発電機の現在の電力出力と最高効率点での電力出力との差を「過不足電力量」として集計し、「不満足度」と「発電機の稼働状況」および「過不足電力量」からマイクログリッド内の発電機の選択と起動・停止制御と出力制御を行うことが記載されている。   Patent Document 2 discloses that a switch agent has a “dissatisfaction level” according to the output of a generator agent (the difference between the current output cost of each generator and the cost of the most efficient output of the generator. ) As the evaluation value for unit control, and the “dissatisfaction level” is aggregated, the “generator operating status” in the unit microgrid is obtained, and the current power output of the generator in the unit microgrid and the maximum The difference from the power output at the efficiency point is counted as “over / under power”, and the generator is selected and started in the microgrid based on “unsatisfied”, “generator operating status” and “over / under power”. -It describes that stop control and output control are performed.

特開2008−301641号公報JP 2008-301641 A 特開2010−213454号公報JP 2010-213454 A

ところで、特許文献1や特許文献2に開示されている制御システムのように、分散型電源などの発電機が多数接続する電力系統においては、需給制御を適切かつ低コストで行うことが求められる。   Incidentally, in a power system in which a large number of generators such as a distributed power source are connected as in the control systems disclosed in Patent Document 1 and Patent Document 2, it is required to perform supply and demand control appropriately and at low cost.

本発明は電力系統における需給制御を適切かつ低コストで行うことが可能な電力系統の需給制御方法、及び情報処理装置を提供することを目的とする。   An object of the present invention is to provide a power supply and demand control method and an information processing apparatus capable of appropriately performing supply and demand control in a power system at low cost.

上記目的を達成するための本発明の一つは、複数の発電機を含んで構成されている電力系統の需給制御方法であって、前記複数の発電機のうち少なくとも2つ以上に第1情報処理装置を付設し、前記第1情報処理装置を介して当該第1情報処理装置が付設されている前記発電機の出力を制御する、前記第1情報処理装置の夫々と通信可能な第2情報処理装置を設け、前記第1情報処理装置の夫々は、自身が付設されている前記発電機の現在の出力を取得し、取得した前記出力を前記第2情報処理装置に送信し、前記第2情報処理装置は、前記第1情報処理装置に付設されている前記発電機の夫々について、夫々の出力と燃料費との関係を記憶し、前記第1情報処理装置から送信されてくる前記現在の出力を受信し、前記記憶した関係と前記受信した前記現在の出力とに基づき、前記電力系統における所定時間後の電力需要に対応する前記発電機の出力である予測出力を算出し、前記算出した前記予測出力を、前記電力系統における前記発電機の燃料費が最も安くなるように、前記第1情報処理装置に付設されている前記発電機のうち少なくとも1つ以上に配分し、配分した前記予測出力の出力制御である予測制御を、前記予測出力の配分を行った前記発電機に付設されている前記第1情報処理装置に行わせることを通知する情報である予測制御指令値を、当該第1情報処理装置に送信し、前記第1情報処理装置は、自身が付設されている前記発電機に対し、前記電力系統における地域要求量に基づく需給制御である地域要求量制御を行い、自身が付設されている前記発電機の発電能力を記憶し、前記第2情報処理装置から送信されてきた前記予測制御指令値を受信した際、受信した前記予測制御指令値と、前記記憶している前記発電能力との差に基づき、前記地域要求量制御を行うことが可能であるか否かを判断し、可能であると判断した場合に当該地域要求量制御を行うこととする。   One aspect of the present invention for achieving the above object is a power supply and demand control method including a plurality of generators, wherein at least two of the plurality of generators include first information. Second information communicable with each of the first information processing devices, which is provided with a processing device and controls the output of the generator to which the first information processing device is attached via the first information processing device. Each of the first information processing devices acquires a current output of the generator to which the processing device is attached, transmits the acquired output to the second information processing device, and the second information processing device The information processing device stores the relationship between the output and the fuel cost for each of the generators attached to the first information processing device, and the current information transmitted from the first information processing device Receive the output, and store the relationship and the received Based on the current output, a predicted output that is an output of the generator corresponding to power demand after a predetermined time in the power system is calculated, and the calculated predicted output is used as the generator in the power system. The prediction control that is the output control of the allocated predicted output is distributed to at least one of the generators attached to the first information processing apparatus so that the fuel cost of the first information processing apparatus is the lowest. The first information processing apparatus transmits a prediction control command value, which is information for notifying the first information processing apparatus attached to the generator that has performed output distribution, to the first information processing apparatus. The processing device performs local demand control, which is supply and demand control based on local demand in the power system, on the generator to which the processor is attached, and generates power of the generator to which the processor is attached. And when receiving the predicted control command value transmitted from the second information processing device, based on the difference between the received predicted control command value and the stored power generation capacity, the region It is determined whether or not the required amount control can be performed. When it is determined that the required amount control is possible, the regional required amount control is performed.

本発明によれば、第2情報処理装置は、電力系統における発電機の燃料費が最も安く、かつその電力系統における所定時間後の電力需要に対応する発電機の出力である予測出力を算出し、算出した予測出力を、第1情報処理装置に付設されている発電機に配分し、配分した予測出力の出力制御である予測制御をその配分を行った発電機に付設されている第1情報処理装置に行わせるための情報である予測制御指令値を、その第1情報処理装置に送信し、他方、第1情報処理装置は、予測制御指令値を受信した際、受信した予測制御指令値と、自身の発電能力との差に基づき、地域要求量制御を行うことが可能であるか否かを判断し、可能であると判断した場合に地域要求量制御を行うので、第1情報処理装置は、予測制御指令値と自身の発電能力に応じて、地域要求量制御を適切に行うことができる。これにより、電力系統における需給制御を適切かつ低コストで行うことができる。   According to the present invention, the second information processing device calculates a predicted output that is the output of the generator corresponding to the power demand after a predetermined time in the power system with the lowest fuel cost of the generator in the power system. The calculated predicted output is distributed to the generator attached to the first information processing apparatus, and the first information attached to the generator that has performed the prediction control that is the output control of the distributed predicted output. A prediction control command value that is information to be executed by the processing device is transmitted to the first information processing device. On the other hand, when the first information processing device receives the prediction control command value, the received prediction control command value is received. Since it is determined whether or not it is possible to perform the local requirement amount control based on the difference between the power generation capability and the own power generation capability, and the local requirement amount control is performed when it is determined that it is possible, the first information processing The device uses the predicted control command value and its power generation In response to a force, it is possible to suitably perform regional demand control. Thereby, the supply-and-demand control in an electric power system can be performed appropriately and at low cost.

本発明の他の一つは、上記電力系統の需給制御方法であって、前記第1情報処理装置は、前記地域要求量を記憶し、自身が付設されている前記発電機に前記地域要求量制御を行うことが可能であると判断した場合には、前記地域要求量制御を行うことが可能であることを表す情報である地域要求量制御可能情報を他の前記第1情報処理装置に送信し、他の前記第1情報処理装置から前記地域要求量制御可能情報を受信した場合には、前記記憶している前記地域要求量を減少させ、減少させた前記地域要求量に基づき前記地域要求量制御を行うこととする。   Another aspect of the present invention is a power supply / demand control method for the power system, wherein the first information processing apparatus stores the regional requirement amount, and the local requirement amount is stored in the generator to which the first information processing apparatus is attached. If it is determined that control is possible, the local request amount controllable information, which is information indicating that the regional request amount control can be performed, is transmitted to the other first information processing apparatus. When the area request amount controllable information is received from another first information processing apparatus, the stored area request amount is decreased, and the area request is based on the reduced area request amount. Quantity control is to be performed.

本発明によれば、第1情報処理装置は、自身が付設されている発電機に地域要求量制御を行うことが可能であると判断した場合、他の第1情報処理装置に、自身が地域要求量制御を行うことが可能であることを示す情報である地域要求量制御可能情報を送信し、他の第1情報処理装置から地域要求量制御可能情報を受信した場合、記憶している地域要求量を減少させ、減少させた地域要求量に基づき地域要求量制御を行うので、複数の第1情報処理装置が地域要求量制御を行うことができる場合、その複数の第1情報処理装置の夫々が協調して、適切に地域要求量制御を行うことができる。これにより、電力系統における需給制御をより適切に行うことができる。   According to the present invention, when the first information processing apparatus determines that it is possible to perform the regional requirement amount control on the generator to which the first information processing apparatus is attached, When the local request amount controllable information, which is information indicating that the request amount control can be performed, is transmitted and the local request amount controllable information is received from another first information processing apparatus, the stored region Since the request amount is decreased and the regional request amount control is performed based on the reduced regional request amount, when a plurality of first information processing devices can perform the regional request amount control, the plurality of first information processing devices Each of them can cooperate and appropriately control the regional demand. Thereby, the supply-and-demand control in an electric power system can be performed more appropriately.

その他、本願が開示する課題、及びその解決方法は、発明を実施するための形態の欄、及び図面により明らかにされる。   In addition, the subject which this application discloses, and its solution method are clarified by the column of the form for inventing, and drawing.

本発明によれば、電力系統における需給制御を適切かつ低コストで行うことができる。   According to the present invention, supply and demand control in an electric power system can be performed appropriately and at low cost.

電力系統1の概略的な構成を説明する図である。It is a figure explaining the schematic structure of electric power system. General Masterのハードウエア構成を説明する図である。It is a figure explaining the hardware constitutions of General Master. General Masterが備える主な機能を説明する図である。It is a figure explaining the main functions with which General Master is provided. 自局情報160(GM)の一例を説明する図である。It is a figure explaining an example of the local station information 160 (GM). 出力燃料費特性テーブル(GM)170の一例を説明する図である。It is a figure explaining an example of an output fuel cost characteristic table (GM) 170. Masterが備える主な機能を説明する図である。It is a figure explaining the main functions with which Master is provided. 自局情報260(M)の一例を説明する図である。It is a figure explaining an example of the local station information 260 (M). 出力燃料費特性テーブル(M)270の一例を説明する図である。It is a figure explaining an example of an output fuel cost characteristic table (M) 270. グループ出力燃料費特性テーブル(M)280の一例を説明する図である。It is a figure explaining an example of a group output fuel cost characteristic table (M) 280. subMasterが備える主な機能を説明する図である。It is a figure explaining the main functions with which subMaster is provided. 自局情報360(SM)の一例を説明する図である。It is a figure explaining an example of the local station information 360 (SM). 出力燃料費特性テーブル(SM)370の一例を説明する図である。It is a figure explaining an example of an output fuel cost characteristic table (SM) 370. グループ出力燃料費特性テーブル(SM)380の一例を説明する図である。It is a figure explaining an example of a group output fuel cost characteristic table (SM) 380. slaveが備える主な機能を説明する図である。It is a figure explaining the main functions with which a slave is provided. グループ出力燃料費特性(SL)460の一例を説明する図である。It is a figure explaining an example of group output fuel cost characteristic (SL) 460. 出力燃料費特性テーブル(SL)470の一例を説明する図である。It is a figure explaining an example of output fuel cost characteristic table (SL) 470. 出力燃料費特性(M)記憶処理S1700を説明するフローチャートである。It is a flowchart explaining output fuel cost characteristic (M) memory | storage process S1700. 発電機現在出力取得処理S1800を説明するフローチャートである。It is a flowchart explaining generator current output acquisition process S1800. 発電機現在出力受信処理S1900を説明するフローチャートである。It is a flowchart explaining a generator present output reception process S1900. 全発電機現在出力送信処理S2000を説明するフローチャートである。It is a flowchart explaining all generator present output transmission processing S2000. 予測制御通知処理S2100を説明するフローチャートである。It is a flowchart explaining prediction control notification processing S2100. General Masterが記憶する情報の一例を説明する図である。It is a figure explaining an example of the information which General Master memorizes. 需要電力変動予測処理S2111を説明するフローチャートである。It is a flowchart explaining demand power fluctuation prediction processing S2111. 関数y(t)、関数yi(t)、及びxiの関係の一例を示す図である。It is a figure which shows an example of the relationship between the function y (t), the function yi (t), and xi. 最小燃料費配分処理S2113を説明するフローチャートである。It is a flowchart explaining minimum fuel cost distribution process S2113. 「発電機1」,「発電機2」,・・・・「発電機n」の夫々における、各発電機5の燃料費と出力の範囲との関係の一例を示す図である。It is a figure which shows an example of the relationship between the fuel cost of each generator 5, and the output range in each of "generator 1", "generator 2", ... "generator n". 最小燃料費配分(Fr(Pr))の一例を示す図である。It is a figure which shows an example of minimum fuel cost distribution (Fr (Pr)). 需給制御処理S2800を説明するフローチャートである。It is a flowchart explaining supply and demand control processing S2800. 出力指令値(Pc)の算出方法の一例を説明する図である。It is a figure explaining an example of the calculation method of output command value (Pc). General Masterが行う需給制御の一例を説明する図である。It is a figure explaining an example of the supply-and-demand control which General Master performs. 出力燃料費特性(SM)記憶処理S3100を説明するフローチャートである。It is a flowchart explaining output fuel cost characteristic (SM) memory | storage process S3100. 発電機現在出力取得処理S3200を説明するフローチャートである。It is a flowchart explaining generator current output acquisition process S3200. 発電機現在出力受信処理S3300を説明するフローチャートである。It is a flowchart explaining the generator present output reception process S3300. 発電機現在出力送信処理S3400を説明するフローチャートである。It is a flowchart explaining the generator present output transmission process S3400. 全発電機現在出力受信処理S3500を説明するフローチャートである。It is a flowchart explaining all generator present output reception processing S3500. 予測制御指令値送信処理S3112を説明するフローチャートである。It is a flowchart explaining prediction control command value transmission processing S3112. 最小燃料費配分処理S3614の詳細を説明するフローチャートである。It is a flowchart explaining the detail of minimum fuel cost distribution process S3614. 需給制御処理S3800を説明するフローチャートである。It is a flowchart explaining supply-and-demand control processing S3800. Masterが生成するEDC指令値(Pe)の一例を説明する図である。It is a figure explaining an example of EDC command value (Pe) which Master generates. 出力燃料費特性(SL)記憶処理S4000を説明するフローチャートである。It is a flowchart explaining output fuel cost characteristic (SL) memory | storage process S4000. 発電機現在出力取得処理S4100を説明するフローチャートである。It is a flowchart explaining a generator present output acquisition process S4100. 発電機現在出力受信処理S4200を説明するフローチャートである。It is a flowchart explaining generator current output reception process S4200. 発電機現在出力送信処理S4300を説明するフローチャートである。It is a flowchart explaining the generator present output transmission process S4300. 全発電機現在出力受信処理S4400を説明するフローチャートである。It is a flowchart explaining all generator present output reception processing S4400. 予測制御指令値送信処理S4012を説明するフローチャートである。It is a flowchart explaining prediction control command value transmission processing S4012. 最小燃料費配分処理S4514を説明するフローチャートである。It is a flowchart explaining minimum fuel cost distribution processing S4514. 需給制御処理S4700を説明するフローチャートである。It is a flowchart explaining supply and demand control processing S4700. subMasterが生成するEDC指令値(Pe)の一例を説明する図である。It is a figure explaining an example of EDC command value (Pe) which subMaster generates. 発電機現在出力取得処理S4900を説明するフローチャートである。It is a flowchart explaining a generator present output acquisition process S4900. 発電機現在出力送信処理S5000を説明するフローチャートである。It is a flowchart explaining a generator present output transmission process S5000. 全発電機現在出力受信処理S5100を説明するフローチャートである。It is a flowchart explaining all generator present output reception processing S5100. 需給制御処理S5200を説明するフローチャートである。It is a flowchart explaining supply and demand control processing S5200. slaveが生成するEDC指令値(Pe)の一例を説明する図である。It is a figure explaining an example of EDC command value (Pe) which slave generates.

図1に本実施形態として説明する電力系統1の概略的な構成を示している。電力系統1は、例えば商用配電系統やマイクログリッド等であり、複数の発電機5を含んで構成されている。   FIG. 1 shows a schematic configuration of a power system 1 described as the present embodiment. The power system 1 is, for example, a commercial power distribution system or a microgrid, and includes a plurality of generators 5.

発電機5は、例えば、自然エネルギーを利用した発電機(太陽光発電機、水力発電、風力発電機等)、コージェネレーション発電機(ディーゼル発電機、ガスタービン発電機、ガスエンジン発電機等)などである。   The generator 5 is, for example, a generator (solar generator, hydroelectric generator, wind generator, etc.) using natural energy, a cogeneration generator (diesel generator, gas turbine generator, gas engine generator, etc.), etc. It is.

発電機5(1)の夫々には第1情報処理装置10(1)(以下、Masterとも称する。)が付設されている。発電機5(2)の夫々には第1報処理装置10(2)(以下、subMasterとも称する。)が付設されている。発電機5(3)の夫々には第1報処理装置10(3)(以下、slaveとも称する。)が付設されている。発電機5(4)には第2情報処理装置20(以下、General Masterとも称する。)が付設されている。   Each of the generators 5 (1) is provided with a first information processing apparatus 10 (1) (hereinafter also referred to as “Master”). Each of the generators 5 (2) is provided with a first information processing device 10 (2) (hereinafter also referred to as a subMaster). Each of the generators 5 (3) is provided with a first information processing apparatus 10 (3) (hereinafter also referred to as slave). A second information processing device 20 (hereinafter also referred to as a general master) is attached to the generator 5 (4).

同図に示すように、General Masterである「G0」は、Masterである「G1」「G2」の夫々と、有線又は無線の通信方式で通信可能に接続されている。   As shown in the figure, the general master “G0” is communicably connected to each of the masters “G1” and “G2” by a wired or wireless communication method.

Masterである「G1」は、subMasterである「G1−1」及び「G1−2」の夫々と、有線又は無線の通信方式で通信可能に接続されている。尚、以下では、「G1」、「G1−1」、及び「G1−2」で構成されるネットワークを「Group1」と称する。   The master “G1” is communicably connected to each of the submasters “G1-1” and “G1-2” by a wired or wireless communication method. Hereinafter, a network composed of “G1”, “G1-1”, and “G1-2” is referred to as “Group1”.

Masterである「G2」は、subMasterである「G2−1」と、有線又は無線の通信方式で通信可能に接続されている。尚、以下では、「G2」、及び「G2−1」で構成されるネットワークを「Group2」と称する。   “G2” that is a master is connected to “G2-1” that is a submaster so as to be communicable by a wired or wireless communication method. Hereinafter, a network composed of “G2” and “G2-1” is referred to as “Group2”.

subMasterである「G1−1」は、slaveである「G1−1a」及び「G1−1b」の夫々と、有線又は無線の通信方式で通信可能に接続されている。尚、以下では、「G1−1」、「G1−1a」、及び「G1−1b」で構成されるネットワークを「Group1−1」と称する。   The sub master “G1-1” is communicably connected to each of the slaves “G1-1a” and “G1-1b” by a wired or wireless communication method. Hereinafter, a network composed of “G1-1”, “G1-1a”, and “G1-1b” is referred to as “Group 1-1”.

subMasterである「G1−2」は、slaveである「G1−2a」及び「G1−2b」の夫々と、有線又は無線の通信方式で通信可能に接続されている。   The sub master “G1-2” is connected to each of the slaves “G1-2a” and “G1-2b” so that they can communicate with each other by a wired or wireless communication method.

subMasterである「G2−1」は、slaveである「G2−1a」と有線又は無線の通信方式で通信可能に接続されている。尚、以下では、「G2−1」、及び「G2−1a」で構成されるネットワークを「Group2−1」と称する。   “G2-1” that is a subMaster is connected to “G2-1a” that is a slave so as to be able to communicate with each other by a wired or wireless communication method. Hereinafter, a network composed of “G2-1” and “G2-1a” is referred to as “Group2-1”.

General Masterは、Masterを介して、当該Masterが付設されている発電機5の出力を、後述する予測制御により制御する。また、Masterは、自身と同じGroupに属するsubMasterを介して、当該subMasterが付設されている発電機5の出力を、後述する予測制御により制御する。また、subMasterは、自身と同じGroupに属するslaveを介して、当該slaveが付設されている発電機5の出力を、後述する予測制御により制御する。   The General Master controls the output of the generator 5 to which the Master is attached through the Master by predictive control described later. In addition, the Master controls the output of the generator 5 to which the subMaster is attached through the subMaster belonging to the same Group as itself by predictive control described later. Moreover, subMaster controls the output of the generator 5 to which the said slave is attached by the predictive control mentioned later via the slave which belongs to the same Group as self.

また、General Master、Master、subMaster、及びslaveの夫々は、自身が付設されている発電機5の出力を、後述する地域要求量制御により制御する。   Further, each of the general master, master, submaster, and slave controls the output of the generator 5 to which the master master is attached by regional requirement amount control described later.

このように、電力系統1では、各情報処理装置(第1情報処理装置10及び第2情報処理装置20)が、自身が属するネットワークグループ内の情報処理装置が付設されている発電機5に対して、出力制御(予測制御又は地域要求量制御)を行う。   As described above, in the power system 1, each information processing device (the first information processing device 10 and the second information processing device 20) is connected to the generator 5 to which the information processing device in the network group to which the information processing device belongs is attached. Then, output control (predictive control or local demand control) is performed.

図2に、General Masterのハードウエア構成を示している。同図に示すように、General Masterは、CPU111、RAM・ROM等のメモリ112、ハードディスクやSSD等の記憶装置113、タッチパネルやマウス等の入力装置114、液晶ディスプレイ等の表示装置115、通信回路116、RTC(Real Time Clock)等を用いて構成され現在日時等の日時情報(タイムスタンプ)を生成する計時回路117、自身が付設されている発電機の現在の出力を計測する出力計測回路118、自身が付設されている発電機5が接続している電力系統1の送配電線に接続し、電力系統1の系統周波数を計測する周波数計測回路119、及び自身が付設されている発電機の出力を制御する制御回路120を備える。   FIG. 2 shows the hardware configuration of the General Master. As shown in the figure, the general master includes a CPU 111, a memory 112 such as a RAM / ROM, a storage device 113 such as a hard disk or an SSD, an input device 114 such as a touch panel or a mouse, a display device 115 such as a liquid crystal display, and a communication circuit 116. A clock circuit 117 configured to use RTC (Real Time Clock) or the like to generate date and time information (time stamp) such as the current date and time, an output measuring circuit 118 to measure the current output of the generator to which it is attached, A frequency measuring circuit 119 for measuring the system frequency of the power system 1 connected to the transmission / distribution line of the power system 1 connected to the generator 5 to which the power generator 5 is attached, and the output of the power generator to which the power generator 1 is attached Is provided with a control circuit 120 for controlling.

Master、subMaster、及びslaveのハードウエア構成は、General Masterのハードウエア構成と同様である。   The hardware configuration of Master, subMaster, and slave is the same as that of General Master.

図3にGeneral Masterが備える主な機能を示している。同図に示すように、General Masterは、出力燃料費特性記憶部131、発電機現在出力受信部132、予測出力算出部133、予測出力配分部134、予測制御通知部135、発電機現在出力取得部137、発電能力記憶部138、地域要求量制御実行部139、及び予測制御実行部141の各機能を備える。これらの機能は、General Masterのハードウエアによって、もしくは、General MasterのCPU111が、メモリ112又は記憶装置113に格納されているプログラムを読み出して実行することにより実現される。   FIG. 3 shows the main functions of the General Master. As shown in the figure, the General Master includes an output fuel cost characteristic storage unit 131, a generator current output reception unit 132, a prediction output calculation unit 133, a prediction output distribution unit 134, a prediction control notification unit 135, and a generator current output acquisition. Unit 137, power generation capacity storage unit 138, regional requirement amount control execution unit 139, and prediction control execution unit 141. These functions are realized by the hardware of the general master, or by the CPU 111 of the general master reading and executing a program stored in the memory 112 or the storage device 113.

図3に示した機能のうち、出力燃料費特性記憶部131は、Masterに付設されている発電機5の夫々について、夫々の出力と燃料費との関係(以下、出力燃料費特性(M)と称する。)を記憶する。   Among the functions shown in FIG. 3, the output fuel cost characteristic storage unit 131 has a relationship between each output and fuel cost (hereinafter, output fuel cost characteristic (M)) for each of the generators 5 attached to the master. Is stored).

発電機現在出力受信部132は、Masterから送信されてくる、Masterが付設されている発電機5の現在の出力を受信する。   The generator current output receiving unit 132 receives the current output of the generator 5 to which the Master is attached, transmitted from the Master.

予測出力算出部133は、記憶している出力燃料費特性(M)と、発電機現在出力受信部132が受信した出力とに基づき、電力系統1における所定時間後の電力需要に対応する発電機5の出力(以下、予測出力と称する。)を算出する。   The predicted output calculation unit 133 generates a generator corresponding to the power demand after a predetermined time in the power system 1 based on the stored output fuel cost characteristic (M) and the output received by the generator current output reception unit 132. 5 (hereinafter referred to as a predicted output) is calculated.

予測出力配分部134は、予測出力算出部133が算出した予測出力を、Masterが付設されている発電機5のうち少なくとも1つ以上に配分する。尚、予測出力配分部134は、予測出力算出部133が算出した予測出力を、自身が付設されている発電機5に配分する。   The predicted output distribution unit 134 distributes the predicted output calculated by the predicted output calculation unit 133 to at least one of the generators 5 to which the Master is attached. The predicted output distribution unit 134 distributes the predicted output calculated by the predicted output calculation unit 133 to the generator 5 to which the predicted output distribution unit 134 is attached.

予測制御通知部135は、予測出力配分部134が配分した予測出力の出力制御(以下、予測制御と称する。)を、予測出力の配分を行った発電機5に付設されているMasterに行わせることを通知する情報(以下、予測制御指令値又はEDC指令値と称する。)を、そのMasterに送信する。尚、予測制御は、例えば、経済負荷予測制御(EDC: Economic load Dispatching Control)である。   The prediction control notification unit 135 causes the master attached to the generator 5 that has distributed the predicted output to perform the output control (hereinafter referred to as prediction control) of the predicted output distributed by the predicted output distribution unit 134. Information (hereinafter referred to as a predictive control command value or EDC command value) for notifying this is transmitted to the master. Note that the predictive control is, for example, economic load predictive control (EDC).

発電機現在出力取得部137は、自身が付設されている発電機5の現在の出力を取得する。   The generator current output acquisition unit 137 acquires the current output of the generator 5 to which it is attached.

発電能力記憶部138は、自身が付設されている発電機5の発電能力(例えば、最大出力や定格出力等)を記憶する。   The power generation capacity storage unit 138 stores the power generation capacity (for example, maximum output or rated output) of the generator 5 to which the power generation capacity storage unit 138 is attached.

地域要求量制御実行部139は、自身が付設されている発電機5に対して、電力系統1における地域要求量に基づく需給制御(以下、地域要求量制御と称する。)を実行する。地域要求量制御は、例えば、負荷周波数制御(LFC: Load Frequency Control)又は自動周波数制御(AFC: Automatic Frequency Control)等である。
である。
The regional requirement amount control execution unit 139 executes supply and demand control (hereinafter referred to as regional requirement amount control) based on the regional requirement amount in the power system 1 for the generator 5 to which the local requirement amount is attached. The regional requirement amount control is, for example, load frequency control (LFC) or automatic frequency control (AFC).
It is.

予測制御実行部141は、自身が付設されている発電機5に対して、予測制御を実行する。   The predictive control execution unit 141 executes predictive control on the generator 5 to which the predictive control execution unit 141 is attached.

図3に示すように、General Masterは、自局情報(GM)160、及び出力燃料費特性テーブル(GM)170を管理している。尚、以下では、出力燃料費特性テーブル(GM)170により管理される情報を「出力燃料費特性(GM)」と称する。   As shown in FIG. 3, the general master manages its own station information (GM) 160 and an output fuel cost characteristic table (GM) 170. Hereinafter, information managed by the output fuel cost characteristic table (GM) 170 is referred to as “output fuel cost characteristic (GM)”.

図4に自局情報(GM)160の一例を示している。同図に示すように、自局情報(GM)160は、識別子161、階層162、及び発電能力163を含む。   FIG. 4 shows an example of the local station information (GM) 160. As shown in the figure, the local station information (GM) 160 includes an identifier 161, a hierarchy 162, and a power generation capacity 163.

このうち識別子161には、General Masterのそれぞれに割り当てられた識別子が格納される。階層162には、自身がGeneral Masterである旨を表す情報が格納される。発電能力163には、自身が付設されている発電機5の発電能力(例えば、最大出力や定格出力等)が格納される。   Among these, the identifier 161 stores an identifier assigned to each General Master. The hierarchy 162 stores information indicating that it is a general master. The power generation capacity 163 stores the power generation capacity (for example, maximum output or rated output) of the generator 5 to which the power generation capacity 163 is attached.

図5に、出力燃料費特性テーブル(GM)170の一例を示している。同図に示すように、出力燃料費特性テーブル(GM)170は、出力値171、燃料費172、及び単位出力燃料費173の各項目を含む、少なくとも1つ以上のレコードから構成されている。   FIG. 5 shows an example of the output fuel cost characteristic table (GM) 170. As shown in the figure, the output fuel cost characteristic table (GM) 170 is composed of at least one record including items of an output value 171, a fuel cost 172, and a unit output fuel cost 173.

出力値171には、General Masterが付設されている発電機5の出力値が格納される。燃料費172には、出力値171が示す出力におけるその発電機5の燃料費が格納される。単位出力燃料費173には、出力値171が示す出力と燃料費172が示す燃料費から求められる、単位出力あたりの燃料費が格納される。   The output value 171 stores the output value of the generator 5 to which the General Master is attached. The fuel cost 172 stores the fuel cost of the generator 5 at the output indicated by the output value 171. In the unit output fuel cost 173, the fuel cost per unit output obtained from the output indicated by the output value 171 and the fuel cost indicated by the fuel cost 172 is stored.

図6にMasterが備える主な機能を示している。同図に示すように、Masterは、出力燃料費特性記憶部231、発電機現在出力受信部232、予測出力配分部234、予測制御通知部235、発電機現在出力取得部237、発電能力記憶部238、地域要求量制御実行部239、地域要求量制御判断部240、及び予測制御実行部241の各機能を備える。これらの機能は、Masterのハードウエアによって、もしくは、MasterのCPU111が、メモリ112又は記憶装置113に格納されているプログラムを読み出して実行することにより実現される。   FIG. 6 shows the main functions of the Master. As shown in the figure, the Master includes an output fuel cost characteristic storage unit 231, a generator current output reception unit 232, a prediction output distribution unit 234, a prediction control notification unit 235, a generator current output acquisition unit 237, and a power generation capacity storage unit. 238, an area requirement amount control execution unit 239, an area requirement amount control determination unit 240, and a prediction control execution unit 241. These functions are realized by the master hardware or by the master CPU 111 reading and executing a program stored in the memory 112 or the storage device 113.

図6に示した機能のうち、出力燃料費特性記憶部231は、subMasterに付設されている発電機5の夫々について、夫々の出力と燃料費との関係を記憶する。   Among the functions shown in FIG. 6, the output fuel cost characteristic storage unit 231 stores the relationship between the output and the fuel cost for each of the generators 5 attached to the subMaster.

発電機現在出力受信部232は、subMasterから送信されてくる、そのsubMasterが付設されている発電機5の現在の出力を受信する。   The generator current output reception unit 232 receives the current output of the generator 5 to which the subMaster is attached, which is transmitted from the subMaster.

予測出力配分部234は、予測出力算出部233が算出した予測出力を、subMasterが付設されている発電機5のうち少なくとも1つ以上に配分する。尚、予測出力配分部234は、予測出力算出部233が算出した予測出力を、自身が付設されている発電機5に配分する。   The predicted output distribution unit 234 distributes the predicted output calculated by the predicted output calculation unit 233 to at least one of the generators 5 to which the subMaster is attached. The predicted output distribution unit 234 distributes the predicted output calculated by the predicted output calculation unit 233 to the generator 5 to which the predicted output distribution unit 234 is attached.

予測制御通知部235は、予測出力配分部234が配分した予測出力の出力制御(予測制御)を、予測出力の配分を行った発電機5に付設されているsubMasterに行わせることを通知する情報(予測制御指令値(EDC指令値))を、そのsubMasterに送信する。   The prediction control notification unit 235 notifies the submaster attached to the generator 5 that has distributed the predicted output that the output control (prediction control) of the predicted output distributed by the predicted output distribution unit 234 is performed. (Predictive control command value (EDC command value)) is transmitted to the subMaster.

発電機現在出力取得部237は、自身が付設されている発電機5の現在の出力を取得する。   The generator current output acquisition unit 237 acquires the current output of the generator 5 to which it is attached.

発電能力記憶部238は、自身が付設されている発電機5の発電能力(例えば、最大出力や定格出力等)を取得する。   The power generation capacity storage unit 238 acquires the power generation capacity (for example, the maximum output or the rated output) of the generator 5 to which the power generation capacity storage unit 238 is attached.

地域要求量制御実行部239は、自身が付設されている発電機5に対して、地域要求量制御を実行する。   The regional requirement amount control execution unit 239 performs regional requirement amount control on the generator 5 to which the region requirement amount control unit 239 is attached.

地域要求量制御判断部240は、General Masterから送信されてきた予測制御指令値を受信した際、受信した予測制御指令値と、自身が記憶している発電能力との差に基づき、地域要求量制御を行うことが可能であるか否かを判断し、可能であると判断した場合にその地域要求量制御を行う。尚、本実施形態では、地域要求量制御を行うことが可能であるか否かは、自身が記憶している発電機5の発電能力から、受信した予測制御指令値を減じた値が、所定の閾値Aよりも大きいか否かで判断するものとする。   When the regional requirement amount control determination unit 240 receives the prediction control command value transmitted from the general master, the regional requirement amount control determination unit 240 determines the regional requirement amount based on the difference between the received prediction control command value and the power generation capacity stored by itself. It is determined whether or not it is possible to perform control, and when it is determined that control is possible, the regional requirement amount control is performed. In the present embodiment, whether or not it is possible to perform the regional requirement amount control is determined by a value obtained by subtracting the received predictive control command value from the power generation capability of the generator 5 stored therein. Judgment is made based on whether or not the threshold value A is larger.

また、地域要求量制御判断部240は、上記地域要求量制御を行うことが可能であるか否かの判断の結果を、地域要求量制御を行うことが可能であるか否かを示す情報である地域要求量制御可能情報として記憶する。尚、本実施形態では、地域要求量制御可能情報は、自身が地域要求量制御を行うことが可能である場合には「1」が設定され、自身が地域要求量制御を行うことが可能でない場合には「0」が設定されるものとする。   Further, the regional requirement amount control determination unit 240 uses the information indicating whether or not the regional requirement amount control can be performed as a result of the determination as to whether or not the regional requirement amount control can be performed. It is stored as a certain area request amount controllable information. In the present embodiment, the area request amount controllable information is set to “1” when the area request amount control can be performed by itself, and the area request amount control cannot be performed by itself. In this case, “0” is set.

また、地域要求量制御判断部240は、自身が付設されている発電機5に地域要求量制御を行うことが可能であると判断した場合、地域要求量制御可能情報を他の第1情報処理装置10(Master、subMaster、又はslave)に送信する。また、地域要求量制御判断部240は、他の第1情報処理装置10から地域要求量制御可能情報を受信した場合、自身が記憶している地域要求量を減少させ、減少させた地域要求量に基づき地域要求量制御を行う。   In addition, when the regional requirement amount control determination unit 240 determines that the regional requirement amount control can be performed on the generator 5 to which the local requirement amount control is attached, the regional requirement amount control determination unit 240 obtains the regional requirement amount controllable information as the other first information processing. Send to device 10 (Master, subMaster, or slave). In addition, when the area request amount control determination unit 240 receives the area request amount controllable information from the other first information processing apparatus 10, the area request amount control determination unit 240 decreases the area request amount stored by itself and decreases the area request amount. Based on this, the required amount of area is controlled.

予測制御実行部241は、自身が付設されている発電機5に対して、予測制御を実行する。   The predictive control execution unit 241 executes predictive control on the generator 5 to which the predictive control execution unit 241 is attached.

図6に示すように、Masterは、自局情報(M)260、出力燃料費特性テーブル(M)270、及びグループ出力燃料費特性テーブル(M)280を管理している。尚、以下では、出力燃料費特性テーブル(M)270により管理される情報を「出力燃料費特性(M)」と称する。また、グループ出力燃料費特性テーブル(M)280により管理される情報を「出力燃料費特性(MG)」と称する。   As shown in FIG. 6, the Master manages its own station information (M) 260, output fuel cost characteristic table (M) 270, and group output fuel cost characteristic table (M) 280. Hereinafter, the information managed by the output fuel cost characteristic table (M) 270 is referred to as “output fuel cost characteristic (M)”. Information managed by the group output fuel cost characteristic table (M) 280 is referred to as “output fuel cost characteristic (MG)”.

図7に自局情報(M)260の一例を示している。同図に示すように、自局情報(M)260は、識別子261、階層262、及び発電能力263を含む。   FIG. 7 shows an example of own station information (M) 260. As shown in the figure, the local station information (M) 260 includes an identifier 261, a hierarchy 262, and a power generation capacity 263.

このうち識別子261には、Masterのそれぞれに割り当てられた識別子が格納される。階層262には、自身がMasterである旨を表す情報が格納される。発電能力263には、自身が付設されている発電機5の発電能力(例えば、最大出力や定格出力等)が格納される。   Among these, the identifier 261 stores an identifier assigned to each Master. The hierarchy 262 stores information indicating that it is a Master. The power generation capacity 263 stores the power generation capacity (for example, maximum output or rated output) of the generator 5 to which the power generation capacity 263 is attached.

図8は、出力燃料費特性テーブル(M)270の一例を示している。同図に示すように、出力燃料費特性テーブル(M)270は、出力値271、燃料費272、及び単位出力燃料費273の各項目を含む、少なくとも1つ以上のレコードから構成されている。   FIG. 8 shows an example of the output fuel cost characteristic table (M) 270. As shown in the figure, the output fuel cost characteristic table (M) 270 includes at least one record including items of an output value 271, a fuel cost 272, and a unit output fuel cost 273.

出力値271には、Masterが付設されている発電機5の出力値が格納される。燃料費272には、出力値271が示す出力における発電機5の燃料費が格納される。単位出力燃料費273には、出力値271が示す出力と燃料費272が示す燃料費から求められる、単位出力あたりの燃料費が格納される。   The output value 271 stores the output value of the generator 5 to which the Master is attached. The fuel cost 272 stores the fuel cost of the generator 5 at the output indicated by the output value 271. In the unit output fuel cost 273, the fuel cost per unit output obtained from the output indicated by the output value 271 and the fuel cost indicated by the fuel cost 272 is stored.

図9に、グループ出力燃料費特性テーブル(M)280の一例を示している。同図に示すように、グループ出力燃料費特性テーブル(M)280は、出力値281、燃料費282、及び単位出力燃料費283の各項目を含む、少なくとも1つ以上のレコードから構成されている。   FIG. 9 shows an example of the group output fuel cost characteristic table (M) 280. As shown in the figure, the group output fuel cost characteristic table (M) 280 is composed of at least one record including items of output value 281, fuel cost 282, and unit output fuel cost 283. .

出力値281には、自身が付設されている発電機5、又はsubMasterが付設されている発電機5の出力値が格納される。燃料費282には、出力値281が示す出力におけるその発電機5の燃料費が格納される。単位出力燃料費283には、出力値281が示す出力と燃料費282が示す燃料費から求められる、単位出力あたりの燃料費が格納される。   The output value 281 stores the output value of the generator 5 to which it is attached or the generator 5 to which the subMaster is attached. The fuel cost 282 stores the fuel cost of the generator 5 at the output indicated by the output value 281. In the unit output fuel cost 283, the fuel cost per unit output, which is obtained from the output indicated by the output value 281 and the fuel cost indicated by the fuel cost 282, is stored.

図10にsubMasterが備える主な機能を示している。同図に示すように、subMasterは、出力燃料費特性記憶部331、発電機現在出力受信部332、予測出力配分部334、予測制御通知部335、発電機現在出力取得部337、発電能力記憶部338、地域要求量制御実行部339、地域要求量制御判断部340、及び予測制御実行部341の各機能を備える。これらの機能は、subMasterのハードウエアによって、もしくは、subMasterのCPU111が、メモリ112又は記憶装置113に格納されているプログラムを読み出して実行することにより実現される。   FIG. 10 shows the main functions provided in the subMaster. As shown in the figure, the subMaster includes an output fuel cost characteristic storage unit 331, a generator current output reception unit 332, a prediction output distribution unit 334, a prediction control notification unit 335, a generator current output acquisition unit 337, and a power generation capacity storage unit. 338, the regional requirement amount control execution unit 339, the regional requirement amount control determination unit 340, and the prediction control execution unit 341 are provided. These functions are realized by the subMaster hardware, or by the subMaster CPU 111 reading and executing a program stored in the memory 112 or the storage device 113.

図10に示した機能のうち、出力燃料費特性記憶部331は、slaveに付設されている発電機5の夫々について、夫々の出力と燃料費との関係を記憶する。   Of the functions shown in FIG. 10, the output fuel cost characteristic storage unit 331 stores the relationship between the output and the fuel cost for each of the generators 5 attached to the slave.

現在出力受信部332は、slaveから送信されてくる、そのslaveが付設されている発電機5の現在の出力を受信する。   The current output receiving unit 332 receives the current output of the generator 5 to which the slave is attached, which is transmitted from the slave.

予測出力配分部334は、予測出力算出部333が算出した予測出力を、slaveが付設されている発電機5のうち少なくとも1つ以上に配分する。   The predicted output distribution unit 334 distributes the predicted output calculated by the predicted output calculation unit 333 to at least one of the generators 5 to which the slave is attached.

予測制御通知部335は、予測出力配分部334が配分した予測出力の出力制御(予測制御)を、予測出力の配分を行った発電機5に付設されているslaveに行わせることを通知する情報(予測制御指令値(EDC指令値))を、そのslaveに送信する。   The prediction control notification unit 335 notifies that the output attached to the generator 5 that has allocated the predicted output is subjected to the output control (prediction control) of the predicted output distributed by the predicted output distribution unit 334. (Predictive control command value (EDC command value)) is transmitted to the slave.

発電機現在出力取得部337は、自身が付設されている発電機5の現在の出力を取得する。   The generator current output acquisition unit 337 acquires the current output of the generator 5 to which it is attached.

発電能力記憶部338は、自身が付設されている発電機5の発電能力(例えば、最大出力や定格出力等)を取得する。   The power generation capacity storage unit 338 acquires the power generation capacity (for example, maximum output, rated output, etc.) of the generator 5 to which the power generation capacity storage unit 338 is attached.

地域要求量制御実行部339は、自身が付設されている発電機5に対して、地域要求量制御を実行する。   The local requirement amount control execution unit 339 executes the regional requirement amount control for the generator 5 to which the local requirement amount control unit 339 is attached.

地域要求量制御判断部340は、Masterから送信されてきた予測制御指令値を受信した際、受信した予測制御指令値と、自身が記憶している発電能力との差に基づき、地域要求量制御を行うことが可能であるか否かを判断し、可能であると判断した場合にその地域要求量制御を行う。尚、尚、本実施形態では、地域要求量制御を行うことが可能であるか否かは、自身が記憶している発電機5の発電能力から、受信した予測制御指令値を減じた値が、所定の閾値Aよりも大きいか否かで判断するものとする。   When receiving the predicted control command value transmitted from the Master, the regional required amount control determination unit 340 controls the regional required amount control based on the difference between the received predicted control command value and the power generation capacity stored in itself. It is determined whether or not it is possible to perform, and if it is determined that it is possible, the regional requirement amount control is performed. In addition, in this embodiment, whether or not it is possible to perform the local requirement amount control is a value obtained by subtracting the received predictive control command value from the power generation capability of the generator 5 stored therein. Judgment is made based on whether or not the predetermined threshold value A is greater.

また、地域要求量制御判断部340は、上記地域要求量制御を行うことが可能であるか否かの判断の結果を、地域要求量制御可能情報として記憶する。   Further, the regional requirement amount control determination unit 340 stores the determination result as to whether or not the regional requirement amount control can be performed as regional requirement amount controllable information.

また、地域要求量制御判断部340は、自身が付設されている発電機5に地域要求量制御を行うことが可能であると判断した場合、地域要求量制御可能情報を他の第1情報処理装置10(Master、subMaster、又はslave)に送信する。また、地域要求量制御判断部340は、他の第1情報処理装置10から地域要求量制御可能情報を受信した場合、自身が記憶している地域要求量を減少させ、減少させた地域要求量に基づき地域要求量制御を行う。   In addition, when it is determined that the local requirement amount control determination unit 340 can perform the regional requirement amount control on the generator 5 to which the local requirement amount control is attached, the regional requirement amount control determination information is transmitted to the other first information processing. Send to device 10 (Master, subMaster, or slave). In addition, when the area request amount control determination unit 340 receives the area request amount controllable information from the other first information processing apparatus 10, the area request amount control determination unit 340 decreases the area request amount stored by itself and decreases the area request amount. Based on this, the required amount of area is controlled.

予測制御実行部341は、自身が付設されている発電機5に対して、予測制御を実行する。   The prediction control execution unit 341 executes prediction control for the generator 5 to which the prediction control execution unit 341 is attached.

図10に示すように、subMasterは、自局情報(SM)360、出力燃料費特性テーブル(SM)370、及びグループ出力燃料費特性テーブル(SM)380を管理している。尚、以下では、グループ出力燃料費特性テーブル(SM)370により管理される情報を「出力燃料費特性(SM)」と称する。また、グループ出力燃料費特性テーブル(SM)380により管理される情報を「出力燃料費特性(SMG)」と称する。   As shown in FIG. 10, the subMaster manages its own station information (SM) 360, output fuel cost characteristic table (SM) 370, and group output fuel cost characteristic table (SM) 380. Hereinafter, information managed by the group output fuel cost characteristic table (SM) 370 is referred to as “output fuel cost characteristic (SM)”. Information managed by the group output fuel cost characteristic table (SM) 380 is referred to as “output fuel cost characteristic (SMG)”.

図11に自局情報(SM)360の一例を示している。同図に示すように、自局情報(SM)360は、識別子361、階層362、及び発電能力363を含む。   FIG. 11 shows an example of the local station information (SM) 360. As shown in the figure, the local station information (SM) 360 includes an identifier 361, a hierarchy 362, and a power generation capacity 363.

このうち識別子361には、subMasterのそれぞれに割り当てられた識別子が格納される。階層362には、自身がsubMasterである旨を表す情報が格納される。発電能力363には、自身が付設されている発電機5の発電能力(例えば、最大出力や定格出力等)が格納される。   Among these, the identifier 361 stores an identifier assigned to each subMaster. The hierarchy 362 stores information indicating that it is a subMaster. The power generation capacity 363 stores the power generation capacity (for example, maximum output or rated output) of the generator 5 to which the power generation capacity 363 is attached.

図12に、出力燃料費特性テーブル(SM)370の一例を示している。同図に示すように、出力燃料費特性テーブル(M)370は、出力値371、燃料費372、及び単位出力燃料費373の各項目を含む、少なくとも1つ以上のレコードから構成されている。   FIG. 12 shows an example of the output fuel cost characteristic table (SM) 370. As shown in the figure, the output fuel cost characteristic table (M) 370 includes at least one record including items of an output value 371, a fuel cost 372, and a unit output fuel cost 373.

出力値371には、subMasterが付設されている発電機5の出力値が格納される。燃料費372には、出力値371が示す出力におけるその発電機5の燃料費が格納される。単位出力燃料費373には、出力値371が示す出力と燃料費372が示す燃料費から求められる、単位出力あたりの燃料費が格納される。   The output value 371 stores the output value of the generator 5 to which the subMaster is attached. The fuel cost 372 stores the fuel cost of the generator 5 at the output indicated by the output value 371. The unit output fuel cost 373 stores the fuel cost per unit output, which is obtained from the output indicated by the output value 371 and the fuel cost indicated by the fuel cost 372.

図13に、グループ出力燃料費特性テーブル(SM)380の一例を示している。同図に示すように、グループ出力燃料費特性テーブル(SM)380は、出力値381、燃料費382、及び単位出力燃料費383の各項目を含む、少なくとも1つ以上のレコードから構成されている。   FIG. 13 shows an example of the group output fuel cost characteristic table (SM) 380. As shown in the figure, the group output fuel cost characteristic table (SM) 380 includes at least one record including items of output value 381, fuel cost 382, and unit output fuel cost 383. .

出力値381には、自身が付設されている発電機5、又はslaveが付設されている発電機5の出力値が格納される。燃料費382には、出力値381が示す出力における発電機5の燃料費が格納される。単位出力燃料費383には、出力値381が示す出力と燃料費382が示す燃料費から求められる、単位出力あたりの燃料費が格納される。   The output value 381 stores the output value of the generator 5 to which the generator 5 is attached or the generator 5 to which the slave is attached. The fuel cost 382 stores the fuel cost of the generator 5 at the output indicated by the output value 381. In the unit output fuel cost 383, the fuel cost per unit output obtained from the output indicated by the output value 381 and the fuel cost indicated by the fuel cost 382 is stored.

図14にslaveが備える主な機能を示している。同図に示すように、slaveは、発電機現在出力取得部437、発電能力記憶部438、地域要求量制御実行部439、地域要求量制御判断部440、及び予測制御実行部441の各機能を備える。これらの機能は、slaveのハードウエアによって、もしくは、slaveのCPU111が、メモリ112又は記憶装置113に格納されているプログラムを読み出して実行することにより実現される。   FIG. 14 shows the main functions of the slave. As shown in the figure, the slave has the functions of the generator current output acquisition unit 437, the power generation capacity storage unit 438, the regional requirement amount control execution unit 439, the regional requirement amount control determination unit 440, and the prediction control execution unit 441. Prepare. These functions are realized by the slave hardware or by the slave CPU 111 reading and executing a program stored in the memory 112 or the storage device 113.

発電機現在出力取得部437は、自身が付設されている発電機5の現在の出力を取得する。   The generator current output acquisition unit 437 acquires the current output of the generator 5 to which it is attached.

発電能力記憶部438は、自身が付設されている発電機5の発電能力(例えば、最大出力や定格出力等)を取得する。   The power generation capacity storage unit 438 acquires the power generation capacity (for example, maximum output or rated output) of the generator 5 to which the power generation capacity storage unit 438 is attached.

地域要求量制御実行部439は、自身が付設されている発電機5に対して、地域要求量制御を実行する。   The regional requirement amount control execution unit 439 executes regional requirement amount control on the generator 5 to which the region requirement amount control unit 439 is attached.

地域要求量制御判断部440は、subMasterから送信されてきた予測制御指令値を受信した際、受信した予測制御指令値と、自身が記憶している発電能力との差に基づき、地域要求量制御を行うことが可能であるか否かを判断し、可能であると判断した場合にその地域要求量制御を行う。尚、本実施形態では、地域要求量制御を行うことが可能であるか否かの判断は、自身が記憶している発電機5の発電能力から、受信した予測制御指令値を減じた値が、所定の閾値Aよりも大きいか否かで判断するものとする。   When receiving the predicted control command value transmitted from the subMaster, the regional required amount control determination unit 440 controls the regional required amount control based on the difference between the received predicted control command value and the power generation capacity stored in itself. It is determined whether or not it is possible to perform, and if it is determined that it is possible, the regional requirement amount control is performed. In the present embodiment, the determination as to whether or not it is possible to perform the regional requirement amount control is based on the value obtained by subtracting the received predicted control command value from the power generation capability of the generator 5 stored therein. Judgment is made based on whether or not the predetermined threshold value A is greater.

また、地域要求量制御判断部440は、上記地域要求量制御を行うことが可能であるか否かの判断の結果を、地域要求量制御可能情報として記憶する。   Further, the regional requirement amount control determination unit 440 stores the result of the determination as to whether or not the regional requirement amount control is possible as regional requirement amount controllable information.

また、地域要求量制御判断部440は、自身が付設されている発電機5に地域要求量制御を行うことが可能であると判断した場合、地域要求量制御可能情報を他の第1情報処理装置10(Master、subMaster、又はslave)に送信する。また、地域要求量制御判断部440は、他の第1情報処理装置10から地域要求量制御可能情報を受信した場合、自身が記憶している地域要求量を減少させ、減少させた地域要求量に基づき地域要求量制御を行う。   In addition, when it is determined that the local requirement amount control determination unit 440 can perform the regional requirement amount control on the generator 5 to which the local requirement amount control is attached, the regional requirement amount control determination information is transmitted to the other first information processing. Send to device 10 (Master, subMaster, or slave). In addition, when the area request amount control determination unit 440 receives the area request amount controllable information from the other first information processing apparatus 10, the area request amount control determination unit 440 decreases the area request amount stored by itself and decreases the area request amount. Based on this, the required amount of area is controlled.

予測制御実行部441は、自身が付設されている発電機5に対して、予測制御を実行する。   The prediction control execution unit 441 executes prediction control on the generator 5 to which the prediction control execution unit 441 is attached.

図14に示すように、slaveは、自局情報(SL)460、及び出力燃料費特性テーブル(SL)470を管理している。尚、以下では、出力燃料費特性テーブル(SL)470により管理される情報を「出力燃料費特性(SL)」と称する。   As shown in FIG. 14, slave manages its own station information (SL) 460 and output fuel cost characteristic table (SL) 470. Hereinafter, information managed by the output fuel cost characteristic table (SL) 470 is referred to as “output fuel cost characteristic (SL)”.

図15に自局情報(SL)460の一例を示している。同図に示すように、自局情報(SL)460は、識別子461、階層462、及び発電能力463を含む。   FIG. 15 shows an example of the local station information (SL) 460. As shown in the figure, the local station information (SL) 460 includes an identifier 461, a hierarchy 462, and a power generation capacity 463.

このうち識別子461には、slaveのそれぞれに割り当てられた識別子が格納される。階層462には、自身がslaveである旨を表す情報が格納される。発電能力463には、自身が付設されている発電機5の発電能力(例えば、最大出力や定格出力等)が格納される。   Among these, the identifier 461 stores an identifier assigned to each slave. The hierarchy 462 stores information indicating that it is a slave. The power generation capacity 463 stores the power generation capacity (for example, maximum output or rated output) of the generator 5 to which the power generation capacity 463 is attached.

図16に、出力燃料費特性テーブル(SL)470の一例を示している。同図に示すように、出力燃料費特性テーブル(SL)470は、出力値471、燃料費472、及び単位出力燃料費473の各項目を含む、少なくとも1つ以上のレコードから構成されている。   FIG. 16 shows an example of the output fuel cost characteristic table (SL) 470. As shown in the figure, the output fuel cost characteristic table (SL) 470 is composed of at least one record including items of an output value 471, a fuel cost 472, and a unit output fuel cost 473.

出力値471には、slaveが付設されている発電機5の出力値が格納される。燃料費472には、出力値471が示す出力におけるその発電機5の燃料費が格納される。単位出力燃料費473には、出力値471が示す出力と燃料費472が示す燃料費から求められる、単位出力あたりの燃料費が格納される。   The output value 471 stores the output value of the generator 5 to which the slave is attached. The fuel cost 472 stores the fuel cost of the generator 5 at the output indicated by the output value 471. In the unit output fuel cost 473, the fuel cost per unit output obtained from the output indicated by the output value 471 and the fuel cost indicated by the fuel cost 472 is stored.

次に、電力系統1において行われる処理について説明する。   Next, processing performed in the power system 1 will be described.

<General Masterの処理>
General Masterは、Masterが付設されている発電機5の出力や燃料費を取得し、また、自身が付設されている発電機5の出力や燃料費を取得する。
<General Master processing>
The General Master acquires the output and fuel cost of the generator 5 to which the Master is attached, and acquires the output and fuel cost of the generator 5 to which the Master is attached.

図17は、General Masterが行う処理のうち、Masterから送信されてくる出力燃料費特性(M)を受信し記憶する処理(以下、出力燃料費特性(M)記憶処理S1700と称する。)を説明するフローチャートである。   FIG. 17 illustrates a process of receiving and storing the output fuel cost characteristic (M) transmitted from the master (hereinafter referred to as an output fuel cost characteristic (M) storage process S1700) among the processes performed by the general master. It is a flowchart to do.

同図に示すように、General Masterは、随時、Masterから送信されてくる出力燃料費特性(M)を受信し、記憶する(S1711)。   As shown in the figure, the General Master receives and stores the output fuel cost characteristic (M) transmitted from the Master at any time (S1711).

図18は、General Masterが、自身が付設されている発電機5の現在の出力を取得する処理(以下、発電機現在出力取得処理S1800と称する。)を説明するフローチャートである。   FIG. 18 is a flowchart illustrating a process in which the general master acquires the current output of the generator 5 to which the general master is attached (hereinafter referred to as a generator current output acquisition process S1800).

同図に示すように、General Masterは、随時、自身が付設されている発電機5の現在の出力(以下、発電機現在出力(P)と称する。)を取得し、取得した発電機現在出力(P)を記憶する(S1811)。また、General Masterは、随時、電力系統1の現在の系統周波数(f)を取得し、取得した系統周波数(f)を記憶する(S1812)。   As shown in the figure, the General Master acquires the current output of the generator 5 to which the General Master is attached (hereinafter referred to as the “generator current output (P)”), and acquires the acquired current generator output. (P) is stored (S1811). Moreover, General Master acquires the present system frequency (f) of the electric power grid | system 1, and memorize | stores the acquired system frequency (f) at any time (S1812).

General Masterは、自身が記憶している地域要求量制御可能情報(Flg)を随時取得し(S1813)、取得した地域要求量制御可能情報(Flg)が、地域要求量制御が可能であることを示している場合は、自身が付設されている発電機5の現在の出力を示す情報であるAFC装置現在出力(Pa)に、上記で取得した発電機現在出力(P)の値を設定する。   The General Master acquires the local request amount controllable information (Flg) stored in itself (S1813) as needed, and the acquired regional request amount controllable information (Flg) indicates that the local request amount control is possible. In the case where it is shown, the value of the current generator output (P) acquired above is set in the current AFC device output (Pa), which is information indicating the current output of the power generator 5 to which it is attached.

図19は、General Masterが、随時、Masterから、発電機5の現在の出力を受信する処理(以下、発電機現在出力受信処理S1900と称する。)を説明するフローチャートである。   FIG. 19 is a flowchart for explaining a process in which the General Master receives the current output of the generator 5 from the Master at any time (hereinafter referred to as a generator current output reception process S1900).

同図に示すように、General Masterは、Masterから送信されてくる、後述する、Masterグループ発電機現在出力(ΣP,MG)を受信する(S1911)。   As shown in the figure, the General Master receives a Master group generator current output (ΣP, MG), which will be described later, transmitted from the Master (S1911).

また、General Masterは、Masterから送信されてくる、後述する、Masterグループ地域要求量制御装置数(ΣFlg,MG)を受信する(S1912)。   Further, the General Master receives the number of master group regional requirement amount control devices (ΣFlg, MG), which will be described later, transmitted from the Master (S1912).

また、General Masterは、Masterから送信されてくる、後述する、MasterグループAFC装置現在出力(ΣPa,MG)を受信する(S1913)。   Further, the general master receives a master group AFC device current output (ΣPa, MG), which will be described later, transmitted from the master (S1913).

また、General Masterは、Masterから送信されてくる、後述する、MasterグループAFC装置EDC指令値(ΣPe,MG)を受信する(S1914)。   Further, the General Master receives a Master group AFC device EDC command value (ΣPe, MG), which will be described later, transmitted from the Master (S1914).

General Masterは、Masterが地域要求量制御を行うために必要な情報を、随時送信する。   The General Master transmits information necessary for the Master to perform regional request amount control as needed.

図20は、General Masterが、Masterグループ発電機現在出力(ΣP,MG)の合計値を送信する処理(以下、発電機現在出力送信処理S2000と称する。)を説明するフローチャートである。   FIG. 20 is a flowchart illustrating a process in which the general master transmits the total value of the current output of the master group generator (ΣP, MG) (hereinafter referred to as “generator current output transmission process S2000”).

同図に示すように、General Masterは、発電機現在出力受信処理S1900で受信したMasterグループ発電機現在出力(ΣP,MG)の合計値と、自身が記憶している発電機現在出力(P)との合計値(以下、全発電機現在出力(ΣP)と称する。)を算出して現在時刻と対応づけて記憶し、記憶した全発電機現在出力(ΣP)をMasterに送信する(S2011)。   As shown in the figure, the General Master indicates the total value of the current output of the master group generator (ΣP, MG) received in the current generator output output process S1900 and the current generator output (P) stored by itself. (Hereinafter, referred to as all generator current output (ΣP)) is calculated and stored in association with the current time, and the stored all generator current output (ΣP) is transmitted to the master (S2011). .

また、General Masterは、受信したMasterグループ地域要求量制御装置数(ΣFlg,MG)の合計値と、自身が記憶している地域要求量制御可能情報(Flg)との合計値(以下、全地域要求量制御装置数(ΣFlg)と称する。)を算出し、算出した全地域要求量制御装置数(ΣFlg)をMasterに送信する(S2012)。   In addition, the General Master is the sum of the total number of master group regional requirement amount control devices (ΣFlg, MG) received and the regional requirement amount controllable information (Flg) stored by itself (hereinafter, all regions). The request quantity control device number (ΣFlg) is calculated), and the calculated total area request quantity control device number (ΣFlg) is transmitted to the master (S2012).

また、General Masterは、受信したMasterグループAFC装置現在出力(ΣPa,MG)の合計値と、自身が記憶している、後述するAFC装置現在出力(Pa)との合計値(以下、全AFC装置現在出力(ΣPa)と称する。)を算出し、算出した全AFC装置現在出力(ΣPa)をMasterに送信する(S2013)。   The General Master is a total value of the received master group AFC device current output (ΣPa, MG) and an AFC device current output (Pa) (described later) stored in itself (hereinafter, all AFC devices). The current output (referred to as ΣPa) is calculated, and the calculated current output of all AFC devices (ΣPa) is transmitted to the master (S2013).

また、General Masterは、自身が記憶しているAFC装置EDC指令値(Pe,A)と、受信したMasterグループAFC装置EDC指令値(ΣPe,MG)の合計との合計値である全AFC装置EDC指令値(ΣPe)を算出し、算出した全AFC装置EDC指令値(ΣPe)をMasterに送信する(S2014)。   The General Master is a total value of the AFC device EDC command value (Pe, A) stored therein and the total of the received Master group AFC device EDC command value (ΣPe, MG). The command value (ΣPe) is calculated, and the calculated all AFC device EDC command values (ΣPe) are transmitted to the master (S2014).

また、General MasterはEDC指令値を生成し、生成したEDC指令値をMasterに送信することにより、そのMasterに予測制御を行わせる。   Further, the General Master generates an EDC command value and transmits the generated EDC command value to the Master, thereby causing the Master to perform prediction control.

図21は、General MasterがEDC指令値(Pe)を送信する処理(以下、予測制御通知処理S2100と称する。)を説明するフローチャートである。予測制御通知処理S2100は、例えば、随時、又は所定時間間隔(例えば10分間隔)で行われる。   FIG. 21 is a flowchart for explaining processing (hereinafter referred to as prediction control notification processing S2100) in which the General Master transmits an EDC command value (Pe). The prediction control notification process S2100 is performed, for example, at any time or at a predetermined time interval (for example, every 10 minutes).

同図に示すように、General Masterは、発電機現在出力受信処理S1900で記憶した出力燃料費特性(M)と、全発電機現在出力算出処理S2000で記憶した全発電機現在出力(ΣP)とに基づき、電力系統1における所定時間帯の電力需要の変動を予測する処理(以下、需要電力変動予測処理S2111と称する。)を行う。需要電力変動予測処理S2111の詳細は後述する。   As shown in the figure, the General Master includes the output fuel cost characteristic (M) stored in the generator current output reception process S1900, and the total generator current output (ΣP) stored in the all generator current output calculation process S2000. Based on the above, a process of predicting a fluctuation in power demand in a predetermined time zone in the power system 1 (hereinafter referred to as demand power fluctuation prediction process S2111) is performed. Details of the demand power fluctuation prediction process S2111 will be described later.

General Masterは、需要電力変動予測処理S2111で予測した電力需要の変動(以下、Pr(t)とも称する)に基づき、電力系統1における、現在から所定時間T0分後の時刻(以下、予測制御時刻と称する。)の電力需要に対応する、発電機5の出力(以下、予測出力(P0)と称する。)を算出する(S2112)。具体的には、所定時間T0分後におけるPr(t)の値を予測出力(P0)とする。尚、予測制御は、後述するように、予測制御時刻に行われる。   The General Master is based on the fluctuation of power demand predicted in the demand power fluctuation prediction process S2111 (hereinafter also referred to as Pr (t)), and the time after the predetermined time T0 minutes from the present in the power system 1 (hereinafter referred to as the prediction control time). The output of the power generator 5 (hereinafter referred to as a predicted output (P0)) corresponding to the power demand of (referred to as “predicted output (P0)”) is calculated (S2112). Specifically, the value of Pr (t) after a predetermined time T0 is assumed as the predicted output (P0). Note that the prediction control is performed at the prediction control time, as will be described later.

General Masterは、算出した予測出力(P0)を、電力系統1における発電機5の燃料費が最も安くなるように、Masterが付設されている発電機5のうち少なくとも1つ以上に配分する処理(以下、最小燃料費配分処理S2113と称する。)を行う(S2113)。最小燃料費配分処理S2113の詳細は後述する。   The general master distributes the calculated predicted output (P0) to at least one of the generators 5 to which the master is attached so that the fuel cost of the generator 5 in the power system 1 is the lowest ( Hereinafter, the minimum fuel cost distribution process S2113 is performed) (S2113). Details of the minimum fuel cost distribution process S2113 will be described later.

General Masterは、自身が付設されている発電機5、及び予測出力(P0)の配分を行ったMasterが付設されている発電機5のうち一つを選択する(S2114)。   The General Master selects one of the generator 5 to which the General Master is attached and the generator 5 to which the Master to which the predicted output (P0) is allocated is attached (S2114).

General Masterは、S2114で選択した発電機5のEDC指令値(Pe)を生成し、記憶する(S2115)。具体的には、後述する最小燃料費配分処理S2113で算出した各発電機5の出力Pi(D)(i=1,2,・・・)のうち、S2114で選択した発電機5の出力と予測制御時刻とを、EDC指令値(Pe)として記憶する。   The General Master generates and stores the EDC command value (Pe) for the generator 5 selected in S2114 (S2115). Specifically, out of the output Pi (D) (i = 1, 2,...) Of each generator 5 calculated in the minimum fuel cost distribution process S2113 described later, the output of the generator 5 selected in S2114 The predicted control time is stored as an EDC command value (Pe).

尚、図22は、General Masterが記憶する情報の一例を示している。同図に示すように、General Masterは、自身が付設されている発電機5のEDC指令値(Pe)を「100kW」に設定し、現在時刻「10:10」から10分後の予測制御時刻「10:20」と対応づけて記憶している。   FIG. 22 shows an example of information stored in the general master. As shown in the figure, the General Master sets the EDC command value (Pe) of the generator 5 to which the General Master is attached to “100 kW”, and the predicted control time 10 minutes after the current time “10:10”. It is stored in association with “10:20”.

図21に戻り、General Masterは、自身が付設されている発電機5、及び自身に発電機現在出力(P)を送信してきたMasterが付設されている発電機5のうち、EDC指令値(Pe)を生成していない発電機5があるか否かを判断する(S2116)。EDC指令値(Pe)を生成していない発電機5がある場合は(S2116:YES)S2114に戻り、EDC指令値(Pe)を生成していない発電機5が無い場合は(S2116:NO)S2117に進む。   Returning to FIG. 21, the general master includes the EDC command value (Pe) out of the generator 5 to which the master is attached and the generator 5 to which the master that has transmitted the generator current output (P) is attached. ) Is determined whether there is a generator 5 that has not generated (S2116). If there is a generator 5 that has not generated an EDC command value (Pe) (S2116: YES), the process returns to S2114, and if there is no generator 5 that has not generated an EDC command value (Pe) (S2116: NO) The process proceeds to S2117.

S2117では、General Masterは、S2115で生成した各発電機5のEDC指令値(Pe)のうち、自身に発電機現在出力(P)を送信してきたMasterが付設されている発電機5のEDC指令値(Pe)を、自身に発電機現在出力(P)を送信してきたそのMasterに送信する。   In S2117, the General Master, among the EDC command values (Pe) of each generator 5 generated in S2115, is the EDC command of the generator 5 to which the Master that has transmitted the generator current output (P) is attached. The value (Pe) is transmitted to the Master that has transmitted the generator current output (P) to itself.

General Masterは、S2115で生成した各発電機5のEDC指令値(Pe)のうち、自身が付設されている発電機5のEDC指令値(Pe)を取得する(S2118)。   The General Master acquires the EDC command value (Pe) of the generator 5 to which the General Master is attached from the EDC command value (Pe) of each generator 5 generated in S2115 (S2118).

General Masterは、自身が付設されている発電機5の発電能力(以下、Pcapと称する。)と、自身が付設されている発電機5に配分された予測出力(P0)との差に基づき、自身が付設されている発電機5に地域要求量制御を行うことが可能であるか否かを判断する(S2119)。具体的には、自身が付設されている発電機5の発電能力(Pcap)から、S2118で取得したEDC指令値(Pe)を減じた値(Pcap−Pe)が所定の閾値Aよりも大きいか否かで判断する。   The General Master is based on the difference between the power generation capacity of the generator 5 to which it is attached (hereinafter referred to as Pcap) and the predicted output (P0) allocated to the generator 5 to which it is attached. It is determined whether or not it is possible to perform local requirement amount control on the generator 5 to which it is attached (S2119). Specifically, is the value (Pcap-Pe) obtained by subtracting the EDC command value (Pe) acquired in S2118 from the power generation capacity (Pcap) of the generator 5 attached to itself larger than a predetermined threshold A? Judge by no.

地域要求量制御を行うことが可能である場合は(S2119:YES)S2120に進み、地域要求量制御を行うことが可能でない場合は(S2119:NO)予測制御通知処理S2100は終了する。   If the area request amount control can be performed (S2119: YES), the process proceeds to S2120. If the area request amount control cannot be performed (S2119: NO), the prediction control notification process S2100 ends.

S2120では、General Masterは、地域要求量制御が可能である旨を、地域要求量制御可能情報(Flg)に設定すると共に、自身が地域要求量制御が可能であることを示す情報であるAFC装置EDC指令値(Pe,A)に、自身が付設されている発電機5の現在のEDC指令値(Pe)を設定し、予測制御通知処理S2100は終了する。   In S2120, the General Master sets information indicating that the regional requirement amount control is possible in the regional requirement amount controllable information (Flg), and also indicates that the AFC device itself is capable of performing the regional requirement amount control. The current EDC command value (Pe) of the generator 5 to which it is attached is set in the EDC command value (Pe, A), and the prediction control notification process S2100 ends.

図23は、需要電力変動予測処理S2111の詳細を説明するフローチャートである。同図に示すように、General Masterは、発電機現在出力送信処理S2000で蓄積している全発電機現在出力(ΣP)のうち、現在より所定時間t1前(例えば24時間前)から現在時刻までの時間帯における全発電機現在出力(ΣP)の時間変動を取得し、時間変動の関数(以下、Y(t)と称する。)を生成する(S2311)。   FIG. 23 is a flowchart illustrating the details of the demand power fluctuation prediction process S2111. As shown in the figure, the General Master is the current generator output output (ΣP) accumulated in the generator current output transmission process S2000 from the current time t1 (for example, 24 hours before) to the current time. Is obtained, and a function of time fluctuation (hereinafter referred to as Y (t)) is generated (S2311).

General Masterは、生成した時間変動の関数Y(t)を平滑化した関数(以下、y(t)と称する。)を生成する(S2312)。具体的には、y(t)は、
y(t)=(1−α)・y(t−T)+α・Y(t)
として求める。ここで、αは平滑化の強さを表す定数(平滑定数)(0<α<1)、Tは平滑化を行う時間の単位を表す定数(サンプリング時間)である。
The General Master generates a function (hereinafter referred to as y (t)) obtained by smoothing the generated time variation function Y (t) (S2312). Specifically, y (t) is
y (t) = (1−α) · y (t−T) + α · Y (t)
Asking. Here, α is a constant representing the strength of smoothing (smoothing constant) (0 <α <1), and T is a constant representing the unit of time for performing smoothing (sampling time).

次に、General Masterは、過去の日Di(i=1,2,・・・)における電力需要(例えば、現在から過去3ヶ月までの各日、又は、前年当日の前後1ヶ月の各日のうち、当日と曜日が同じ日における電力需要)であって、Y(t)の時間帯と同じ時間帯の電力需要を取得し、取得した電力需要の時間変化(以下、Yr,i(t)と称する)を生成する(S2313)。尚、上記の過去のDi(i=1,2,・・・)における電力需要は、General Masterが記憶している全発電機現在出力(ΣP)でも良いし、予めGeneral Masterに入力された電力需要の情報であっても良い。   Next, the General Master displays the power demand on the past day Di (i = 1, 2,...) (For example, each day from the present to the past three months, or each day of the month before and after the previous year). Among them, the power demand on the same day and the day of the week), the power demand in the same time zone as the time zone of Y (t) is acquired, and the time change of the acquired power demand (hereinafter, Yr, i (t) Is generated (S2313). Note that the power demand in the past Di (i = 1, 2,...) May be the total generator current output (ΣP) stored in the General Master, or the power previously input to the General Master. It may be demand information.

General Masterは、S2313で生成したYr(t)の夫々(Yr,i(t)(i=1,2,・・・)について、その夫々を平滑化した関数(以下、yr,i(t)(i=1,2,・・・)と称する。)を生成する(S2314)。具体的には、y(t)は、
yr,i(t)=(1−α)・yr,i(t−T)+α・Yr,i(t)
として求める。ここで、αは平滑化の強さを表す定数(平滑定数)(0<α<1)、Tは平滑化を行う時間の単位を表す定数(サンプリング時間)である。
The General Master is a function (hereinafter referred to as yr, i (t)) obtained by smoothing each Yr (t) generated in S2313 (Yr, i (t) (i = 1, 2,...)). (Referred to as i = 1, 2,...)) (S2314) Specifically, y (t) is
yr, i (t) = (1−α) · yr, i (t−T) + α · Yr, i (t)
Asking. Here, α is a constant representing the strength of smoothing (smoothing constant) (0 <α <1), and T is a constant representing the unit of time for performing smoothing (sampling time).

General Masterは、S2312で算出したy(t)と、S2314で算出したyr,i(t)(i=1,2,・・・)の夫々との間のユークリッド距離(以下、「Ei^2」と称する。)を算出する。具体的には、「Ei^2」は、
Ei^2=x^2+x^2+・・・+xn−1^2+x^2
として求める。ここで、x=y(t)−yi(t)である。尚、図24は、y(t)、yi(t)、及びxの間の関係の一例を示している。
The General Master is a Euclidean distance (hereinafter referred to as “Ei ^ 2”) between y (t) calculated in S2312, and each of yr, i (t) (i = 1, 2,...) Calculated in S2314. "). Specifically, “Ei ^ 2”
Ei ^ 2 = x 1 ^ 2 + x 2 ^ 2 + ··· + x n-1 ^ 2 + x n ^ 2
Asking. Here, x i = y (t) −yi (t). Incidentally, FIG. 24 shows an example of the relationship between y (t), yi (t ), and x i.

General Masterは、上記の過去の日Di(i=1,2,・・・)のうち全ての日について「Ei^2」を算出したか否か判断し(S2316)、「Ei^2」を全ての日について算出した場合は(S2316:YES)S2317に進み、「Ei^2」を算出していない日がある場合は(S2316:NO)S2313に戻る。   The general master determines whether or not “Ei ^ 2” has been calculated for all the days of the above-mentioned past days Di (i = 1, 2,...) (S2316), and “Ei ^ 2” is determined. If all days have been calculated (S2316: YES), the process proceeds to S2317. If there is a day for which “Ei ^ 2” has not been calculated (S2316: NO), the process returns to S2313.

S2317では、General Masterは、「Ei^2」が最小値である日Diにおける関数yr,i(t)を、予測需要電力変動(Pr(t))として記憶する。   In S <b> 2317, the general master stores the function yr, i (t) on the day Di where “Ei ^ 2” is the minimum value as the predicted demand power fluctuation (Pr (t)).

図25は、最小燃料費配分処理S2113の詳細を説明するフローチャートである。同図に示すように、General Masterは、自身の出力燃料費特性(GM)、及び自身に発電機現在出力(P)を送信してきたMasterの夫々の出力燃料費特性(M)を、出力燃料費特性Fi(Pi)(i=1,2,・・・)として順次取得する(S2511)。   FIG. 25 is a flowchart for explaining the details of the minimum fuel cost distribution process S2113. As shown in the figure, the General Master shows its output fuel cost characteristic (GM) and each output fuel cost characteristic (M) of the Master that has transmitted the generator current output (P) to itself. It acquires sequentially as cost characteristic Fi (Pi) (i = 1, 2, ...) (S2511).

General Masterは、予測制御通知処理S2100で算出した予測出力(P0)の値を、「配分対象出力(Pr)」として記憶する(S2512)。   The general master stores the value of the prediction output (P0) calculated in the prediction control notification process S2100 as “distribution target output (Pr)” (S2512).

General Masterは、記憶した配分対象出力(Pr)を、S2511で取得した出力燃料費特性Fi(Pi)(i=1,2,・・・)に基づき、自身が付設されている発電機5、及び自身に発電機現在出力(P)を送信してきたMasterが付設されている発電機5の夫々に配分する(S2513)。   The General Master uses the generator 5 to which the self is attached based on the output fuel cost characteristic Fi (Pi) (i = 1, 2,...) Acquired in S2511 based on the stored distribution target output (Pr). And it distributes to each of the generator 5 with which the Master which has transmitted the generator present output (P) to itself is attached (S2513).

General Masterは、配分対象出力(Pr)を配分した発電機5と、その発電機5に配分した出力との組み合わせを上記各発電機5について生成し、生成した組み合わせ全体を、配分(D)として記憶する(S2514)。   The General Master generates a combination of the generator 5 to which the distribution target output (Pr) is allocated and the output allocated to the generator 5 for each of the generators 5 and sets the generated combination as distribution (D). Store (S2514).

General Masterは、出力燃料費特性Fi(Pi)(i=1,2,・・・)に基づき、S2514で記憶した配分(D)から、各発電機5の燃料費(Fi(D)(i=1,2,・・・))を取得し、取得した燃料費の合計値(以下、Fall(D)と称する。)を算出する(S2515)。   The general master calculates the fuel cost (Fi (D) (i) of each generator 5 from the distribution (D) stored in S2514 based on the output fuel cost characteristic Fi (Pi) (i = 1, 2,...). = 1, 2,...)) And the total value of the acquired fuel costs (hereinafter referred to as Fall (D)) is calculated (S2515).

General Masterは、S2413で生成した配分(D)とは異なる配分があるか否か判断し(S2516)、異なる配分がある場合には(S2516:YES)S2513に戻り、異なる配分がない場合には(S2517:NO)S2517に進む。   The General Master determines whether there is a distribution different from the distribution (D) generated in S2413 (S2516). If there is a different distribution (S2516: YES), the process returns to S2513. (S2517: NO) The process proceeds to S2517.

S2517では、General Masterは、S2513で算出した全ての配分(D)のうち、燃料費の合計値(Fall(D))が最小値となる配分(D)を、最小燃料費配分(Fr(Pr))として記憶する。また、General Masterは、最小燃料費配分(Fr(Pr))により配分された各発電機5の出力を、Pi(D)(i=1,2,・・・)として記憶する(S2518)。   In S2517, the General Master, among all the distributions (D) calculated in S2513, determines the distribution (D) at which the total value (Fall (D)) of the fuel cost is the minimum value as the minimum fuel cost distribution (Fr (Pr )). Moreover, General Master memorize | stores the output of each generator 5 allocated by minimum fuel cost allocation (Fr (Pr)) as Pi (D) (i = 1, 2, ...) (S2518).

尚、図26は、発電機5である「発電機1」,「発電機2」,・・・・「発電機n」の夫々の燃料費とその出力の範囲との関係の一例を示している。図27は、「発電機1」,「発電機2」,・・・・「発電機n」に対する最小燃料費配分(Fr(Pr))の一例を示している。   FIG. 26 shows an example of the relationship between the fuel cost of each of the “generator 1”, “generator 2”,... Yes. FIG. 27 shows an example of the minimum fuel cost distribution (Fr (Pr)) for “generator 1”, “generator 2”,... “Generator n”.

General Masterは、自身が付設されている発電機5に対する予測制御を、予測制御時刻に行う。また、General Masterは、随時、自身が付設されている発電機5に対して地域要求量制御を行う。   The General Master performs predictive control on the generator 5 to which the General Master is attached at the predictive control time. Moreover, General Master performs local requirement amount control with respect to the generator 5 with which it is attached at any time.

図28は、General Masterが、自身が付設されている発電機5に対して、予測制御及び地域要求量制御を行う処理(以下、需給制御処理S2800と称する。)を説明するフローチャートである。需給制御処理S2800は、随時、又は予測制御時刻に行われる。   FIG. 28 is a flowchart for explaining a process (hereinafter referred to as a supply and demand control process S2800) in which the General Master performs the predictive control and the regional demand amount control for the generator 5 to which the General Master is attached. The supply and demand control process S2800 is performed at any time or at the predicted control time.

同図に示すように、General Masterは、現在、自身が付設されている発電機5に対し、地域要求量制御を行うことが可能であるか否かを判断する(S2811)。   As shown in the figure, the General Master determines whether or not it is possible to perform the regional requirement amount control on the generator 5 to which the General Master is currently attached (S2811).

地域要求量制御を行うことが可能である場合は(S2811:YES)、AFC装置EDC指令値(Pe,A)を、予測制御通知処理S2100で生成した、自身が付設されている発電機5のEDC指令値に設定してS2812に進み、地域要求量制御を行うことができない場合は(S2811:NO)、S2821に進む。   When it is possible to perform the regional requirement amount control (S2811: YES), the AFC device EDC command value (Pe, A) is generated in the predictive control notification process S2100, and the generator 5 to which it is attached is attached. When the EDC command value is set and the process proceeds to S2812, the area request amount control cannot be performed (S2811: NO), the process proceeds to S2821.

S2812では、General Masterは、地域要求量(AR)を算出する。具体的には、地域要求量(AR)は、
AR=K・(f−f0)・(ΣP)+(ΣPe)−(ΣPa)
として算出する。ここで、Kは系統周波数特性定数、f0は基準周波数(例えば、50Hz又は60Hz)である。
In S2812, the General Master calculates a regional requirement amount (AR). Specifically, the regional demand (AR) is
AR = K · (f−f0) · (ΣP) + (ΣPe) − (ΣPa)
Calculate as Here, K is a system frequency characteristic constant, and f0 is a reference frequency (for example, 50 Hz or 60 Hz).

General Masterは、算出した地域要求量(AR)と、自身が付設されている発電機5に配分したEDC指令値(Pe)とに基づき、予測制御及び地域要求量制御を行うための指令値である出力指令値(Pc)を生成する(S2813)。具体的には、出力指令値(Pc)は、
Pc=Pe+(AR/(ΣFlg))
として生成する。
The General Master is a command value for performing predictive control and regional demand amount control based on the calculated regional demand amount (AR) and the EDC command value (Pe) distributed to the generator 5 to which it is attached. A certain output command value (Pc) is generated (S2813). Specifically, the output command value (Pc) is
Pc = Pe + (AR / (ΣFlg))
Generate as

尚、図29は、出力指令値(Pc)の算出方法の一例を説明する図である。同図に示すように、General Masterは、求めた地域要求量(AR)についてフィルタ処理、即ち、地域要求量(AR)に含まれる極短周期成分を除去する平滑化処理、及び微動成分を除去する不感帯処理を行う(S2911)。   FIG. 29 is a diagram illustrating an example of a method for calculating the output command value (Pc). As shown in the figure, the General Master performs a filtering process on the calculated regional requirement (AR), that is, a smoothing process that removes an extremely short period component included in the regional requirement (AR), and a fine movement component. A dead zone process is performed (S2911).

図28に戻り、General Masterは、S2813で生成した出力指令値(Pc)に基づき、自身が付設されている発電機5に対する出力制御を行う(S2814)。   Returning to FIG. 28, the General Master performs output control on the generator 5 to which the General Master is attached based on the output command value (Pc) generated in S2813 (S2814).

S2821では、General Masterは、予測制御通知処理S2100で生成したEDC指令値(Pe)に基づき、出力指令値(Pc)を生成する。具体的には、出力指令値(Pc)は、
Pc=Pe
として生成する。その後はS2814に進む。
In S2821, the General Master generates an output command value (Pc) based on the EDC command value (Pe) generated in the prediction control notification process S2100. Specifically, the output command value (Pc) is
Pc = Pe
Generate as Thereafter, the process proceeds to S2814.

尚、図30は、General Masterが行う出力制御(需給制御)の一例を説明する図である。同図に示すように、General Masterは、時刻t1からT0分後の時刻であるt2を予測制御時刻とするEDC指令値(Pe)を生成し、予測制御時刻において予測制御を行う。また、General Masterは、時刻t3において、全AFC装置EDC指令値(ΣPe)、全AFC装置現在出力(ΣPa)、及び地域要求量(AR)に基づき、時刻t3における需要電力である「目標出力Pt」(予測出力P0に相当)に出力を調整するための制御(地域要求量制御)を行う。   FIG. 30 is a diagram for explaining an example of output control (supply / demand control) performed by the general master. As shown in the figure, the General Master generates an EDC command value (Pe) having a prediction control time t2 which is a time T0 minutes after the time t1, and performs prediction control at the prediction control time. In addition, the general master is the “target output Pt that is the power demand at time t3 based on the all AFC device EDC command value (ΣPe), the current output of all AFC devices (ΣPa), and the local requirement (AR) at time t3. ”(Corresponding to the predicted output P0) is performed to adjust the output (regional requirement control).

<Masterの処理>
次に、Masterが行う処理について説明する。
Masterは、subMasterが付設されている発電機5の出力や燃料費の情報を取得し、また、自身が付設されている発電機5の出力や燃料費の情報を取得する。
<Master processing>
Next, processing performed by the Master will be described.
The Master acquires information on the output and fuel cost of the generator 5 to which the subMaster is attached, and acquires information on the output and fuel cost of the generator 5 to which the Master is attached.

図31は、Masterが行う処理のうち、subMasterから送信されてくる出力燃料費特性(SM)を記憶する処理(以下、出力燃料費特性(SM)記憶処理S3100と称する。)を説明するフローチャートである。   FIG. 31 is a flowchart for explaining a process of storing the output fuel cost characteristic (SM) transmitted from the subMaster (hereinafter referred to as an output fuel cost characteristic (SM) storage process S3100) among the processes performed by the Master. is there.

同図に示すように、Masterは、随時、subMasterから送信されてくる出力燃料費特性(SM)を受信し、記憶する(S3111)。   As shown in the figure, the Master receives and stores the output fuel cost characteristic (SM) transmitted from the subMaster as needed (S3111).

また、Masterは、随時、subMasterにEDC指令値を送信する処理である予測制御指令値送信処理を行う(S3112)。尚、予測制御指令値送信処理S3112の詳細は後述する。   Further, the Master performs a predictive control command value transmission process, which is a process of transmitting an EDC command value to the subMaster, as needed (S3112). Details of the predictive control command value transmission process S3112 will be described later.

図32は、Masterが、自身が付設されている発電機5の現在の出力を取得する処理(以下、現在出力取得処理S3200と称する。)を説明するフローチャートである。   FIG. 32 is a flowchart illustrating a process in which the Master acquires the current output of the generator 5 to which the Master is attached (hereinafter referred to as a current output acquisition process S3200).

同図に示すように、Masterは、随時、自身が付設されている発電機5の現在の出力(発電機現在出力(P))を取得し、取得した発電機現在出力(P)を記憶する(S3211)。また、Masterは、随時、電力系統1の現在の系統周波数(f)を取得し、取得した系統周波数(f)を記憶する(S3212)。   As shown in the figure, the Master acquires the current output (generator current output (P)) of the generator 5 to which the Master is attached as needed, and stores the acquired generator current output (P). (S3211). Further, the Master acquires the current system frequency (f) of the power system 1 as needed, and stores the acquired system frequency (f) (S3212).

また、Masterは、自身が記憶している地域要求量制御可能情報(Flg)を随時取得し(S3213)、取得した地域要求量制御可能情報(Flg)が、地域要求量制御が可能であることを示している場合は、AFC装置現在出力(Pa)に発電機現在出力(P)を設定する。   Further, the Master acquires the regional request amount controllable information (Flg) stored in itself (S3213) as needed, and the acquired regional request amount controllable information (Flg) is capable of controlling the regional request amount. , The generator current output (P) is set to the AFC device current output (Pa).

図33は、Masterが、随時、subMasterから、発電機5の現在の出力を受信する処理(以下、発電機現在出力受信処理S3300と称する。)を説明するフローチャートである。   FIG. 33 is a flowchart for explaining processing in which the Master receives the current output of the generator 5 from the subMaster as needed (hereinafter referred to as “generator current output reception processing S3300”).

同図に示すように、Masterは、subMasterから送信されてくる、後述する、subMasterグループ発電機現在出力(ΣP,SMG)を受信する(S3311)。   As shown in the figure, the Master receives a subMaster group generator current output (ΣP, SMG), which will be described later, transmitted from the subMaster (S3311).

また、Masterは、subMasterから送信されてくる、後述する、subMasterグループ地域要求量制御装置数(ΣFlg,SMG)を受信する(S3312)。   In addition, the Master receives the number of subMaster group regional request amount control devices (ΣFlg, SMG), which will be described later, transmitted from the subMaster (S3312).

また、Masterは、subMasterから送信されてくる、後述する、subMasterグループAFC装置現在出力(ΣPa,SMG)を受信する(S3313)。   In addition, the Master receives a submaster group AFC device current output (ΣPa, SMG), which will be described later, transmitted from the subMaster (S3313).

また、Masterは、subMasterから送信されてくる、後述する、subMasterグループAFC装置EDC指令値(ΣPe,SMG)を受信する(S3314)。   Further, the Master receives a subMaster group AFC device EDC command value (ΣPe, SMG), which will be described later, transmitted from the subMaster (S3314).

Masterは、発電機現在出力受信処理S3300で受信した情報をGeneral Masterに送信する。   The Master transmits the information received in the generator current output reception process S3300 to the General Master.

図34は、Masterが、subMasterグループ発電機現在出力(ΣP,SMG)の合計値をGeneral Masterに送信する処理(以下、発電機現在出力送信処理S3400と称する。)を説明するフローチャートである。   FIG. 34 is a flowchart for explaining a process in which the master transmits the total value of the submaster group generator current output (ΣP, SMG) to the general master (hereinafter referred to as a generator current output transmission process S3400).

同図に示すように、Masterは、受信したsubMasterグループ発電機現在出力(ΣP,SMG)の合計値と、自身が記憶している発電機現在出力(P)とを合計した値であるMasterグループ発電機現在出力(ΣP,MG)を算出し、算出したMasterグループ発電機現在出力(ΣP,MG)をGeneral Masterに送信する(S3411)。   As shown in the figure, the Master is a master group that is the sum of the received subMaster group generator current output (ΣP, SMG) and the generator current output (P) stored by itself. The generator current output (ΣP, MG) is calculated, and the calculated master group generator current output (ΣP, MG) is transmitted to the general master (S3411).

また、Masterは、受信したsubMasterグループ地域要求量制御装置数(ΣFlg,SMG)と、自身が記憶している地域要求量制御可能情報(Flg)とを合計した値であるMasterグループ地域要求量制御装置数(ΣFlg、MG)を算出し、算出したMasterグループ地域要求量制御装置数(ΣFlg、MG)をGeneral Masterに送信する(S3412)。   In addition, the Master is a master group area request amount control which is a sum of the received number of subMaster group area request amount control devices (ΣFlg, SMG) and the area request amount controllable information (Flg) stored in itself. The number of devices (ΣFlg, MG) is calculated, and the calculated number of master group regional requirement amount control devices (ΣFlg, MG) is transmitted to the General Master (S3412).

また、Masterは、受信したsubMasterグループAFC装置現在出力(ΣPa,SMG)の合計値と、自身が記憶しているAFC装置現在出力(Pa)との合計であるMasterグループAFC装置現在出力(ΣPa,MG)を算出し、算出したMasterグループAFC装置現在出力(ΣPa,MG)をGeneral Masterに送信する(S3413)。   Also, the Master is a master group AFC device current output (ΣPa, which is the sum of the total value of the received subMaster group AFC device current output (ΣPa, SMG) and the AFC device current output (Pa) stored in itself. MG) is calculated, and the calculated master group AFC device current output (ΣPa, MG) is transmitted to the general master (S3413).

また、Masterは、受信したsubMasterグループAFC装置EDC指令値(ΣPe,SMG)の合計値と、自身が記憶している、AFC装置EDC指令値(Pe,A)との合計であるMasterグループAFC装置EDC指令値(ΣPe,MG)を算出し、算出したMasterグループAFC装置EDC指令値(ΣPe,MG)をGeneral Masterに送信する(S3414)。   The Master is a master group AFC device that is the sum of the total value of the received subMaster group AFC device EDC command values (ΣPe, SMG) and the AFC device EDC command value (Pe, A) stored by itself. The EDC command value (ΣPe, MG) is calculated, and the calculated Master group AFC device EDC command value (ΣPe, MG) is transmitted to the General Master (S3414).

図35は、Masterが、General Masterから随時、全発電機現在出力(ΣP)を受信する処理(以下、全発電機現在出力受信処理S3500と称する。)を説明するフローチャートである。   FIG. 35 is a flowchart for explaining a process in which the Master receives the total generator current output (ΣP) from the General Master as needed (hereinafter referred to as the all generator current output reception process S3500).

同図に示すように、Masterは、General Masterから送信されてくる全発電機現在出力(ΣP)を受信する(S3511)。   As shown in the figure, the Master receives all generator current outputs (ΣP) transmitted from the General Master (S3511).

また、Masterは、General Masterから送信されてくる全地域要求量制御装置数(ΣFlg)を受信する(S3512)。   In addition, the Master receives the total number of regional requirement amount control devices (ΣFlg) transmitted from the General Master (S3512).

また、Masterは、General Masterから送信されてくる全AFC装置現在出力(ΣPa)を受信する(S3513)。   Further, the Master receives the current output (ΣPa) of all AFC devices transmitted from the General Master (S3513).

また、Masterは、General Masterから送信されてくる全AFC装置EDC指令値(ΣPe)を受信する(S3514)。   Further, the Master receives all AFC device EDC command values (ΣPe) transmitted from the General Master (S3514).

図36は、予測制御指令値送信処理S3112の詳細を説明するフローチャートである。   FIG. 36 is a flowchart for explaining the details of the prediction control command value transmission process S3112.

同図に示すように、Masterは、自身が付設されている発電機5の出力燃料費特性、及び自身に発電機現在出力(P)を送信してきたsubMasterが付設されている発電機5の出力燃料費特性(SM)の夫々を、Fi(Pi)(i=1,2,・・・)として順次取得する(S3611)。   As shown in the figure, the Master is the output fuel cost characteristic of the generator 5 to which the Master is attached, and the output of the generator 5 to which the subMaster that has transmitted the generator current output (P) is attached. Each of the fuel cost characteristics (SM) is sequentially acquired as Fi (Pi) (i = 1, 2,...) (S3611).

Masterは、取得したFi(Pi)(i=1,2,・・・)を参照し、各発電機5の出力の最小値を合計した値(Pmin)を算出する。また、Masterは、取得したFi(Pi)(i=1,2,・・・)を参照し、各発電機5の出力の最大値を合計した値(Pmax)を算出する(S3612)。   The Master refers to the acquired Fi (Pi) (i = 1, 2,...) And calculates a value (Pmin) obtained by summing the minimum values of the outputs of the generators 5. Further, the Master refers to the acquired Fi (Pi) (i = 1, 2,...), And calculates a value (Pmax) obtained by summing the maximum values of the outputs of the generators 5 (S3612).

Masterは、Pmin以上Pmax以下の値のうちの一つを選択し、選択した値を配分対象出力(Pr)として設定する(S3612)。   The Master selects one of the values between Pmin and Pmax, and sets the selected value as the distribution target output (Pr) (S3612).

Masterは、設定した配分対象出力(Pr)を、自身が付設されている発電機5、及び自身に発電機現在出力(P)を送信してきたsubMasterが付設されている各発電機5に配分する処理(以下、最小燃料費配分処理S3614と称する。)を行う。最小燃料費配分処理S3614の詳細は後述する。   The Master distributes the set distribution target output (Pr) to the generator 5 to which the master is attached and to each generator 5 to which the subMaster that has transmitted the generator current output (P) is attached. Processing (hereinafter referred to as minimum fuel cost distribution processing S3614) is performed. Details of the minimum fuel cost distribution process S3614 will be described later.

Masterは、S3612で設定した配分対象出力(Pr)とは異なる他の配分対象出力(Pr)があるか否かを判断し(S3615)、他の配分対象出力(Pr)がある場合は(S3615:YES)S3613に戻り、他の配分対象出力(Pr)がない場合は(S3615:NO)出力燃料費特性(MG)生成処理S3600は終了する。   The Master determines whether there is another distribution target output (Pr) different from the distribution target output (Pr) set in S3612 (S3615), and when there is another distribution target output (Pr) (S3615). : YES) Returning to S3613, if there is no other distribution target output (Pr) (S3615: NO), the output fuel cost characteristic (MG) generation process S3600 ends.

図37は、最小燃料費配分処理S3614の詳細を説明するフローチャートである。同図に示すように、Masterは、自身の出力燃料費特性(M)、及び自身に発電機現在出力(P)を送信してきたsubMasterの夫々の出力燃料費特性(SM)を、出力燃料費特性Fi(Pi)(i=1,2,・・・)として順次取得する(S3711)。   FIG. 37 is a flowchart for explaining the details of the minimum fuel cost distribution process S3614. As shown in the figure, the Master displays its output fuel cost characteristic (M) and each output fuel cost characteristic (SM) of the subMaster that has transmitted the generator current output (P) to itself. The characteristics Fi (Pi) (i = 1, 2,...) Are sequentially acquired (S3711).

Masterは、S3612で設定した配分対象出力(Pr)を、S3711で取得した出力燃料費特性Fi(Pi)(i=1,2,・・・)に基づき、自身が付設されている発電機5、及び自身に発電機現在出力(P)を送信してきたsubMasterが付設されている各発電機5に配分する(S3713)。   The master sets the distribution target output (Pr) set in S3612 based on the output fuel cost characteristic Fi (Pi) (i = 1, 2,...) Acquired in S3711 and the generator 5 to which the Master is attached. And the generator 5 attached with the subMaster that has transmitted the generator current output (P) to itself (S3713).

Masterは、配分対象出力(Pr)を配分した発電機5と、その発電機5に配分した出力との組み合わせを上記各発電機5について生成し、生成した組み合わせ全体を、配分(D)として記憶する(S3714)。   The Master generates a combination of the generator 5 to which the distribution target output (Pr) is allocated and the output allocated to the generator 5 for each of the generators 5, and stores the generated combination as distribution (D). (S3714).

Masterは、出力燃料費特性Fi(Pi)(i=1,2,・・・)に基づき、S3714で記憶した配分(D)から、各発電機5の燃料費(Fi(D)(i=1,2,・・・))を取得し、取得した燃料費の合計値(Fall(D))を算出する(S3715)。   Based on the output fuel cost characteristic Fi (Pi) (i = 1, 2,...), The master calculates the fuel cost (Fi (D) (i = 1, 2,...)) And the total value (Fall (D)) of the acquired fuel costs is calculated (S3715).

Masterは、S3713で算出した配分(D)とは異なる配分があるか否か判断し(S3716)、異なる配分がある場合には(S3716:YES)S3713に戻り、異なる配分はない場合には(S3717:NO)S3717に進む。   The Master determines whether there is a distribution different from the distribution (D) calculated in S3713 (S3716). If there is a different distribution (S3716: YES), the master returns to S3713, and if there is no different distribution (S3716: S3717: NO) The process proceeds to S3717.

S3717では、Masterは、S3713で算出した配分(D)のうち、燃料費の合計値(Fall(D))が最小値となる配分(D)を、最小燃料費配分(Fr(Pr))として記憶する。   In S3717, the master sets, as the minimum fuel cost distribution (Fr (Pr)), the distribution (D) in which the total value (Fall (D)) of the fuel cost becomes the minimum value among the distribution (D) calculated in S3713. Remember.

Masterは、自身に発電機現在出力(P)を送信してきたsubMasterに、EDC指令値Peを送信する(S3718)。具体的には、最小燃料費配分(Fr(Pr))により配分した出力(Pi(D)(i=1,2,・・・))と予測制御時刻とを、EDC指令値として送信する。尚、Masterは、自身が付設されている発電機5の出力(Pi(D))を、自身が付設されている発電機5に対するEDC指令値として記憶する。   The Master transmits the EDC command value Pe to the subMaster that has transmitted the generator current output (P) to itself (S3718). Specifically, the output (Pi (D) (i = 1, 2,...)) Distributed by the minimum fuel cost distribution (Fr (Pr)) and the predicted control time are transmitted as an EDC command value. The Master stores the output (Pi (D)) of the generator 5 to which the Master is attached as an EDC command value for the generator 5 to which the Master is attached.

Masterは、自身が付設されている発電機5に対する予測制御を、予測制御時刻に行う。また、Masterは、随時、自身が付設されている発電機5に対して地域要求量制御を行う。   The Master performs predictive control on the generator 5 to which the Master is attached at the predicted control time. In addition, the Master performs regional request amount control on the generator 5 to which the Master is attached at any time.

図38は、Masterが、自身が付設されている発電機5に対して、予測制御及び地域要求量制御を行う処理(以下、需給制御処理S3800と称する。)を説明するフローチャートである。需給制御処理S3800は、随時、又は予測制御時刻に行われる。   FIG. 38 is a flowchart for explaining a process (hereinafter referred to as supply / demand control process S3800) in which the master performs prediction control and regional requirement amount control for the generator 5 to which the master is attached. The supply and demand control process S3800 is performed at any time or at the predicted control time.

同図に示すように、Masterは、自身が付設されている発電機5に配分した出力(EDC指令値)と、自身が付設されている発電機5の発電能力(Pcap)との差に基づき、自身が付設されている発電機5に地域要求量制御を行うことが可能であるか否かを判断する(S3811)。   As shown in the figure, the Master is based on the difference between the output (EDC command value) distributed to the generator 5 to which the Master is attached and the power generation capacity (Pcap) of the generator 5 to which the Master is attached. Then, it is determined whether or not it is possible to perform local requirement amount control on the generator 5 to which it is attached (S3811).

地域要求量制御を行うことが可能である場合は(S3811:YES)、AFC装置EDC指令値(Pe,A)を、最小燃料費配分処理S3614で生成した、自身が付設されている発電機5に対するEDC指令値に設定してS3812に進み、地域要求量制御を行うことが可能でない場合は(S3819:NO)S3821に進む。   If it is possible to perform the regional demand control (S3811: YES), the generator 5 to which the AFC device EDC command value (Pe, A) is generated in the minimum fuel cost allocation process S3614 and attached to itself is generated. Is set to the EDC command value for step S3812, and the process proceeds to step S3812. If the regional request amount control cannot be performed (S3819: NO), the process proceeds to step S3821.

S3812では、Masterは、地域要求量(AR)を算出する。具体的には、地域要求量(AR)は、
AR=K・(f−f0)・(ΣP)+(ΣPe)−(ΣPa)
として算出する。ここで、Kは系統周波数特性定数、f0は基準周波数(例えば、50Hz又は60Hz)である。尚、Masterは、求めた地域要求量(AR)について、フィルタ処理、即ち、地域要求量(AR)に含まれる極短周期成分を除去する平滑化処理、及び微動成分を除去する不感帯処理を行う。
In S3812, the Master calculates the regional requirement amount (AR). Specifically, the regional demand (AR) is
AR = K · (f−f0) · (ΣP) + (ΣPe) − (ΣPa)
Calculate as Here, K is a system frequency characteristic constant, and f0 is a reference frequency (for example, 50 Hz or 60 Hz). Note that the master performs a filtering process, that is, a smoothing process for removing an extremely short period component included in the area request quantity (AR) and a dead band process for removing a fine movement component, for the obtained area request quantity (AR). .

Masterは、算出した地域要求量(AR)と、EDC指令値(Pe)とに基づき、出力指令値(Pc)を生成する(S3813)。具体的には、出力指令値(Pc)は、
Pc=Pe+(AR/(ΣFlg))
として生成する。
The Master generates an output command value (Pc) based on the calculated regional requirement amount (AR) and the EDC command value (Pe) (S3813). Specifically, the output command value (Pc) is
Pc = Pe + (AR / (ΣFlg))
Generate as

Masterは、S3813で生成した出力指令値(Pc)に基づき、自身が付設されている発電機5に対する出力制御を行う(S3814)。   The Master performs output control on the generator 5 to which the Master is attached based on the output command value (Pc) generated in S3813 (S3814).

S3821では、Masterは、EDC指令値(Pe)に基づき、出力指令値(Pc)を生成する。具体的には、出力指令値(Pc)は、
Pc=Pe
として生成する。その後はS3814に進む。
In S3821, the Master generates an output command value (Pc) based on the EDC command value (Pe). Specifically, the output command value (Pc) is
Pc = Pe
Generate as Thereafter, the process proceeds to S3814.

尚、図39には、Masterが生成するEDC指令値(Pe)の一例を示している。同図に示すように、Masterは、EDC指令値(Pe)を「70kW」に設定し、現在時刻「10:10」から10分後の時刻である予測制御時刻「10:20」と対応づけて記憶している。   FIG. 39 shows an example of an EDC command value (Pe) generated by the Master. As shown in the figure, the Master sets the EDC command value (Pe) to “70 kW” and associates it with the predicted control time “10:20” which is a time 10 minutes after the current time “10:10”. I remember.

<subMasterの処理>
次に、subMasterが行う処理について説明する。
subMasterは、slaveが付設されている発電機5の出力や燃料費の情報を取得し、また、自身が付設されている発電機5の出力や燃料費の情報を取得する。
<Processing of subMaster>
Next, processing performed by the subMaster will be described.
The subMaster acquires information on the output and fuel cost of the generator 5 to which the slave is attached, and acquires information on the output and fuel cost of the generator 5 to which the subMaster is attached.

図40は、subMasterが行う処理のうち、slaveから送信されてくる出力燃料費特性(SL)を受信し記憶する処理(以下、出力燃料費特性(SL)記憶処理S4000と称する。)を説明するフローチャートである。   FIG. 40 illustrates a process of receiving and storing the output fuel cost characteristic (SL) transmitted from the slave (hereinafter referred to as an output fuel cost characteristic (SL) storage process S4000) among the processes performed by the subMaster. It is a flowchart.

同図に示すように、subMasterは、随時、slaveから送信されてくる出力燃料費特性(SL)を受信し、記憶する(S4011)。また、subMasterは、slaveにEDC指令値を送信する処理である予測制御指令値送信処理を行う(S4012)。予測制御指令値送信処理S4012の詳細は後述する。   As shown in the figure, the subMaster receives and stores the output fuel cost characteristic (SL) transmitted from the slave at any time (S4011). Also, the subMaster performs a predictive control command value transmission process that is a process of transmitting an EDC command value to the slave (S4012). Details of the prediction control command value transmission processing S4012 will be described later.

図41は、subMasterが、自身が付設されている発電機5の現在の出力を取得する処理(以下、発電機現在出力取得処理S4100と称する。)を説明するフローチャートである。   FIG. 41 is a flowchart illustrating a process in which the subMaster acquires the current output of the generator 5 to which the subMaster is attached (hereinafter referred to as a generator current output acquisition process S4100).

同図に示すように、subMasterは、随時、自身が付設されている発電機5の現在の出力(発電機現在出力(P))を取得し、取得した発電機現在出力(P)を記憶する(S4111)。また、subMasterは、随時、電力系統1の現在の系統周波数(f)を取得し、取得した系統周波数(f)を記憶する(S4112)。   As shown in the figure, the subMaster acquires the current output (generator current output (P)) of the generator 5 to which the subMaster is attached, and stores the acquired generator current output (P) as needed. (S4111). Moreover, subMaster acquires the present system frequency (f) of the electric power grid | system 1 at any time, and memorize | stores the acquired system frequency (f) (S4112).

また、subMasterは、自身が記憶している地域要求量制御可能情報(Flg)を随時取得する(S4113)。subMasterは、取得した地域要求量制御可能情報(Flg)が、自身が地域要求量制御が可能であることを示している場合は、AFC装置現在出力(Pa)に、上記で取得した発電機現在出力(P)を設定する。   Moreover, subMaster acquires the area request | requirement amount controllable information (Flg) which self has memorize | stored at any time (S4113). If the acquired regional request quantity controllable information (Flg) indicates that the local master can control the local request quantity, the subMaster displays the current generator status acquired above in the AFC device current output (Pa). Set the output (P).

図42は、subMasterが、随時、slaveから、発電機5の現在の出力を受信する処理(以下、発電機現在出力受信処理S4200と称する。)を説明するフローチャートである。   FIG. 42 is a flowchart illustrating a process in which the subMaster receives the current output of the generator 5 from the slave at any time (hereinafter referred to as a generator current output reception process S4200).

同図に示すように、subMasterは、slaveから送信されてくる発電機現在出力(P)を受信する(S4211)。   As shown in the figure, the subMaster receives the current generator output (P) transmitted from the slave (S4211).

また、subMasterは、slaveから送信されてくる、地域要求量制御可能情報(Flg)を受信する(S4212)。   Further, the subMaster receives the regional request amount controllable information (Flg) transmitted from the slave (S4212).

また、subMasterは、slaveから送信されてくる、AFC装置現在出力(Pa)を受信する(S4213)。   Also, the subMaster receives the AFC device current output (Pa) transmitted from the slave (S4213).

また、subMasterは、slaveから送信されてくる、AFC装置EDC指令値(Pe,A)を受信する(S4214)。   Further, the subMaster receives the AFC device EDC command value (Pe, A) transmitted from the slave (S4214).

subMasterは、発電機現在出力受信処理S4200で受信した情報をMasterに送信する。   The subMaster transmits the information received in the generator current output reception process S4200 to the Master.

図43は、subMasterが、発電機現在出力受信処理S4200で受信したsubMasterグループ発電機現在出力(ΣP,SMG)の合計値をMasterに送信する処理(以下、発電機現在出力送信処理S4300と称する。)を説明するフローチャートである。   FIG. 43 is a process in which the subMaster transmits the total value of the subMaster group generator current output (ΣP, SMG) received in the generator current output reception process S4200 to the Master (hereinafter referred to as a generator current output transmission process S4300). Is a flow chart for explaining.

同図に示すように、subMasterは、受信した発電機現在出力(P)の合計値と、自身が記憶している発電機現在出力(P)とを合計した値であるsubMasterグループ発電機現在出力(ΣP,SMG)を算出し、算出したsubMasterグループ発電機現在出力(ΣP,SMG)をMasterに送信する(S4311)。   As shown in the figure, the subMaster is a submaster group generator current output which is a sum of the received generator current output (P) and the generator current output (P) stored in itself. (ΣP, SMG) is calculated, and the calculated subMaster group generator current output (ΣP, SMG) is transmitted to the Master (S4311).

また、subMasterは、slaveから受信した地域要求量制御可能情報(Flg)と、自身が記憶している地域要求量制御可能情報(Flg)とを合計した値であるsubMasterグループ地域要求量制御装置数(ΣFlg,SMG)を算出し、算出したsubMasterグループ地域要求量制御装置数(ΣFlg,SMG)をMasterに送信する(S4312)。   Also, the subMaster is the number of submaster group regional request quantity control devices, which is the sum of the local request quantity controllable information (Flg) received from slave and the local request quantity controllable information (Flg) stored by itself. (ΣFlg, SMG) is calculated, and the calculated number of subMaster group regional request quantity controllers (ΣFlg, SMG) is transmitted to the Master (S4312).

また、subMasterは、slaveから受信したAFC装置現在出力(Pa)の合計値と、自身が記憶しているAFC装置現在出力(Pa)との合計であるsubMasterグループAFC装置現在出力(ΣPa,SMG)を算出し、算出したsubMasterグループAFC装置現在出力(ΣPa,SMG)をMasterに送信する(S4313)。   The subMaster is a submaster group AFC device current output (ΣPa, SMG) that is the sum of the total value of the AFC device current output (Pa) received from slave and the AFC device current output (Pa) stored in itself. And the calculated subMaster group AFC device current output (ΣPa, SMG) is transmitted to the Master (S 4313).

また、subMasterは、slaveから受信したAFC装置EDC指令値(Pe,A)の合計値と、自身が記憶しているAFC装置EDC指令値(Pe,A)との合計であるsubMasterグループAFC装置EDC指令値(ΣPe,SMG)を算出し、算出したsubMasterグループAFC装置EDC指令値(ΣPe,SMG)をMasterに送信する(S4314)。   The subMaster is a submaster group AFC device EDC that is the sum of the total value of the AFC device EDC command values (Pe, A) received from the slave and the AFC device EDC command value (Pe, A) stored in itself. The command value (ΣPe, SMG) is calculated, and the calculated subMaster group AFC device EDC command value (ΣPe, SMG) is transmitted to the Master (S4314).

subMasterは、General Masterから、自身が地域要求量制御を行うための情報を受信する。   The subMaster receives information for performing local request amount control from the General Master.

図44は、subMasterが、General Masterから随時、全発電機現在出力(ΣP)を受信する処理(以下、全発電機現在出力受信処理S4400と称する。)を説明するフローチャートである。   FIG. 44 is a flowchart illustrating a process in which the subMaster receives all generator current output (ΣP) from the General Master as needed (hereinafter referred to as all generator current output reception process S4400).

同図に示すように、subMasterは、General Masterから送信されてくる全発電機現在出力(ΣP)を受信する(S4411)。   As shown in the figure, the subMaster receives all generator current outputs (ΣP) transmitted from the General Master (S4411).

また、subMasterは、General Masterから送信されてくる全地域要求量制御装置数(ΣFlg)を受信する(S4412)。   Also, the subMaster receives the number of all regional requirement amount control devices (ΣFlg) transmitted from the General Master (S4412).

また、subMasterは、General Masterから送信されてくる全AFC装置現在出力(ΣPa)を受信する(S4413)。   Also, the subMaster receives the current output (ΣPa) of all AFC devices transmitted from the General Master (S4413).

また、subMasterは、General Masterから送信されてくる全AFC装置EDC指令値(ΣPe)を受信する(S4414)。   Further, the subMaster receives all AFC device EDC command values (ΣPe) transmitted from the General Master (S4414).

図45は、予測制御指令値送信処理S4012の詳細を説明するフローチャートである。   FIG. 45 is a flowchart illustrating the details of the prediction control command value transmission process S4012.

同図に示すように、subMasterは、自身が付設されている発電機5の出力燃料費特性、及び自身に発電機現在出力(P)を送信してきたslaveが付設されている発電機5の出力燃料費特性(SL)の夫々を、Fi(Pi)(i=1,2,・・・)として順次取得する(S4511)。   As shown in the figure, the subMaster is the output fuel cost characteristic of the generator 5 to which the subMaster is attached, and the output of the generator 5 to which the slave that has transmitted the generator current output (P) is attached. Each of the fuel cost characteristics (SL) is sequentially acquired as Fi (Pi) (i = 1, 2,...) (S4511).

subMasterは、取得したFi(Pi)(i=1,2,・・・)を参照し、各発電機5の出力の最小値を合計した値(Pmin)を算出する。また、Masterは、取得したFi(Pi)(i=1,2,・・・)を参照し、各発電機5の出力の最大値を合計した値(Pmax)を算出する(S4512)。   The subMaster refers to the acquired Fi (Pi) (i = 1, 2,...) and calculates a value (Pmin) obtained by summing the minimum values of the outputs of the generators 5. Further, the Master refers to the acquired Fi (Pi) (i = 1, 2,...), And calculates a value (Pmax) obtained by summing the maximum values of the outputs of the generators 5 (S4512).

subMasterは、Pmin以上Pmax以下の値のうち一つを選択し、選択した値を配分対象出力(Pr)として設定する(S4513)。   The subMaster selects one of the values not less than Pmin and not more than Pmax, and sets the selected value as the distribution target output (Pr) (S4513).

subMasterは、設定した配分対象出力(Pr)を、自身が付設されている発電機5、及び発電機現在出力(P)を送信してきたslaveが付設されている各発電機5に配分する処理(以下、最小燃料費配分処理S4514と称する。)を行う。最小燃料費配分処理S4514の詳細は後述する。   The subMaster distributes the set distribution target output (Pr) to the generator 5 to which the subMaster is attached and each generator 5 to which the slave that has transmitted the generator current output (P) is attached ( Hereinafter, the minimum fuel cost distribution process S4514 is performed. Details of the minimum fuel cost distribution process S4514 will be described later.

subMasterは、S4512で設定した配分対象出力(Pr)とは異なる他の配分対象出力(Pr)があるか否かを判断し(S4515)、他の配分対象出力(Pr)がある場合は(S4515:YES)S4513に戻り、他の配分対象出力(Pr)がない場合は(S4515:NO)出力燃料費特性(SMG)生成処理S4500は終了する。   The subMaster determines whether there is another distribution target output (Pr) different from the distribution target output (Pr) set in S4512 (S4515), and when there is another distribution target output (Pr) (S4515). : YES) Returning to S4513, if there is no other distribution target output (Pr) (S4515: NO), the output fuel cost characteristic (SMG) generation process S4500 ends.

図46は、最小燃料費配分処理S4514の詳細を説明するフローチャートである。同図に示すように、subMasterは、自身の出力燃料費特性(SM)、及び自身に発電機現在出力(P)を送信してきたslaveの夫々の出力燃料費特性(SL)を、出力燃料費特性Fi(Pi)(i=1,2,・・・)として順次取得する(S4611)。   FIG. 46 is a flowchart for explaining the details of the minimum fuel cost distribution process S4514. As shown in the figure, the subMaster displays its output fuel cost characteristic (SM) and each output fuel cost characteristic (SL) of the slave that has transmitted the generator current output (P) to itself. The characteristics Fi (Pi) (i = 1, 2,...) Are sequentially acquired (S4611).

subMasterは、S4513で設定した配分対象出力(Pr)を、出力燃料費特性Fi(Pi)(i=1,2,・・・)に基づき、自身が付設されている発電機5、及び自身に発電機現在出力(P)を送信してきたslaveが付設されている各発電機5に配分する(S4613)。   The subMaster outputs the distribution target output (Pr) set in S4513 to the generator 5 to which it is attached based on the output fuel cost characteristic Fi (Pi) (i = 1, 2,...) and to itself. The generator current output (P) is distributed to each generator 5 to which the slave that has transmitted it is allocated (S4613).

subMasterは、配分対象出力(Pr)を配分した発電機5と、その発電機5に配分した出力との組み合わせを上記各発電機5について生成し、生成した組み合わせ全体を、配分(D)として記憶する(S4614)。   The subMaster generates a combination of the generator 5 to which the distribution target output (Pr) is allocated and the output allocated to the generator 5 for each of the generators 5 and stores the generated combination as distribution (D). (S4614).

subMasterは、出力燃料費特性Fi(Pi)(i=1,2,・・・)に基づき、S4614で記憶した配分(D)から、各発電機5の燃料費(Fi(D)(i=1,2,・・・))を取得し、取得した燃料費の合計値(Fall(D))を算出する(S4615)。   The subMaster is based on the output fuel cost characteristic Fi (Pi) (i = 1, 2,...), and from the distribution (D) stored in S4614, the fuel cost (Fi (D) (i = 1, 2,...)) And the total value (Fall (D)) of the acquired fuel costs is calculated (S4615).

subMasterは、S4613で生成した配分(D)とは異なる配分があるか否か判断し(S4616)、異なる配分がある場合には(S4616:YES)S4613に戻り、異なる配分がない場合には(S4617:NO)S4617に進む。   The subMaster determines whether there is a distribution different from the distribution (D) generated in S4613 (S4616). If there is a different distribution (S4616: YES), the process returns to S4613. S4617: NO) The process proceeds to S4617.

S4617では、subMasterは、S4613で生成した全ての配分(D)のうち、燃料費の合計値(Fall(D))が最小値となる配分(D)を最小燃料費配分(Fr(Pr))として記憶する。   In S4617, the subMaster determines the distribution (D) in which the total value (Fall (D)) of the fuel cost becomes the minimum value among all the distributions (D) generated in S4613 (Fr (Pr)). Remember as.

subMasterは、自身に発電機現在出力(P)を送信してきたslaveに、EDC指令値Peを送信する(S4618)。具体的には、最小燃料費配分(Fr(Pr))により配分した出力(Pi(D)(i=1,2,・・・))と予測制御時刻とを、EDC指令値として送信する。尚、subMasterは、自身が付設されている発電機5の出力(Pi(D))を、自身が付設されている発電機5に対するEDC指令値として記憶する。   The subMaster transmits the EDC command value Pe to the slave that has transmitted the generator current output (P) to itself (S4618). Specifically, the output (Pi (D) (i = 1, 2,...)) Distributed by the minimum fuel cost distribution (Fr (Pr)) and the predicted control time are transmitted as an EDC command value. In addition, subMaster memorize | stores the output (Pi (D)) of the generator 5 with which it is attached as an EDC command value with respect to the generator 5 with which it is attached.

図47は、subMasterが、自身が付設されている発電機5に対して、予測制御及び地域要求量制御を行う処理(以下、需給制御処理S4700と称する。)を説明するフローチャートである。需給制御処理S4700は、随時、又は予測制御時刻に行われる。   FIG. 47 is a flowchart for explaining processing (hereinafter referred to as supply and demand control processing S4700) in which the subMaster performs predictive control and regional requirement amount control on the generator 5 to which the subMaster is attached. The supply and demand control process S4700 is performed at any time or at the predicted control time.

同図に示すように、subMasterは、自身が付設されている発電機5に配分した出力(EDC指令値)と、自身が付設されている発電機5の発電能力(Pcap)との差に基づき、自身が付設されている発電機5に地域要求量制御を行うことが可能であるか否かを判断する(S4711)。   As shown in the figure, the subMaster is based on the difference between the output (EDC command value) distributed to the generator 5 to which it is attached and the power generation capacity (Pcap) of the generator 5 to which it is attached. Then, it is determined whether or not it is possible to perform local requirement amount control on the generator 5 to which it is attached (S4711).

地域要求量制御を行うことが可能である場合は(S4711:YES)、AFC装置EDC指令値(Pe,A)を、最小燃料費配分処理S4514で生成した、自身が付設されている発電機5に対するEDC指令値に設定してS4712に進み、地域要求量制御を行うことが可能でない場合は(S4719:NO)S4721に進む。   If it is possible to perform the regional demand control (S4711: YES), the generator 5 to which the AFC device EDC command value (Pe, A) is generated in the minimum fuel cost distribution process S4514 and attached to itself is generated. Is set to the EDC command value for step S4712, and the process proceeds to step S4712.

S4712では、subMasterは、地域要求量(AR)を算出する。具体的には、地域要求量(AR)は、
AR=K・(f−f0)・(ΣP)+(ΣPe)−(ΣPa)
として算出する。ここで、Kは系統周波数特性定数、f0は基準周波数(例えば、50Hz又は60Hz)である。尚、subMasterは、求めた地域要求量(AR)についてフィルタ処理、即ち、地域要求量(AR)に含まれる極短周期成分を除去する平滑化処理、及び微動成分を除去する不感帯処理を行う。
In S4712, the subMaster calculates a regional requirement amount (AR). Specifically, the regional demand (AR) is
AR = K · (f−f0) · (ΣP) + (ΣPe) − (ΣPa)
Calculate as Here, K is a system frequency characteristic constant, and f0 is a reference frequency (for example, 50 Hz or 60 Hz). The subMaster performs a filtering process on the obtained regional requirement quantity (AR), that is, a smoothing process that removes an extremely short period component included in the regional requirement quantity (AR) and a dead zone process that removes a fine movement component.

subMasterは、算出した地域要求量(AR)と、EDC指令値(Pe)とに基づき、出力指令値(Pc)を生成する(S4713)。具体的には、出力指令値(Pc)は、
Pc=Pe+(AR/(ΣFlg))
として生成する。
The subMaster generates an output command value (Pc) based on the calculated regional requirement amount (AR) and the EDC command value (Pe) (S4713). Specifically, the output command value (Pc) is
Pc = Pe + (AR / (ΣFlg))
Generate as

尚、図48は、subMasterが生成するEDC指令値(Pe)の一例を示している。同図に示すように、subMasterは、自身が付設されている発電機5のEDC指令値(Pe)を「70kW」に設定し、現在時刻「10:10」から10分後の予測制御時刻「10:20」と対応づけて記憶している。   FIG. 48 shows an example of the EDC command value (Pe) generated by the subMaster. As shown in the figure, the subMaster sets the EDC command value (Pe) of the generator 5 to which it is attached to “70 kW”, and the predicted control time “10:10” after the current time “10:10”. 10:20 "and stored.

図47に戻り、subMasterは、S4713で生成した出力指令値(Pc)に基づき、自身が付設されている発電機5に対する出力制御を行う(S4714)。   Returning to FIG. 47, the subMaster performs output control on the generator 5 to which the subMaster is attached based on the output command value (Pc) generated in S4713 (S4714).

S4721では、subMasterは、EDC指令値(Pe)に基づき、出力指令値(Pc)を生成する。具体的には、出力指令値(Pc)は、
Pc=Pe
として生成する。その後はS4714に進む。
In S4721, the subMaster generates an output command value (Pc) based on the EDC command value (Pe). Specifically, the output command value (Pc) is
Pc = Pe
Generate as Thereafter, the process proceeds to S4714.

<slaveの処理>
次に、slaveが行う処理について説明する。
slaveは、自身が付設されている発電機5の出力や燃料費の情報を取得する。
<Slave processing>
Next, processing performed by slave will be described.
The slave acquires information on the output and fuel cost of the generator 5 to which the slave is attached.

図49は、slaveが行う処理のうち、自身が付設されている発電機5の現在の出力を取得する処理(以下、現在出力取得処理S4900と称する。)を説明するフローチャートである。   FIG. 49 is a flowchart for explaining processing (hereinafter referred to as current output acquisition processing S4900) of acquiring the current output of the generator 5 to which the slave 5 is attached among the processing performed by the slave.

同図に示すように、slaveは、随時、自身が付設されている発電機5の現在の出力(発電機現在出力(P))を取得し、取得した発電機現在出力(P)を記憶する(S4911)。また、slaveは、随時、電力系統1の現在の系統周波数(f)を取得し、取得した系統周波数(f)を記憶する(S4912)。   As shown in the figure, the slave acquires the current output (generator current output (P)) of the generator 5 to which it is attached, and stores the acquired generator current output (P) as needed. (S4911). Further, the slave acquires the current system frequency (f) of the power system 1 as needed, and stores the acquired system frequency (f) (S4912).

また、slaveは、自身が記憶している地域要求量制御可能情報(Flg)を随時取得し(S4913)、取得した地域要求量制御可能情報(Flg)が、自身が地域要求量制御が可能であることを示している場合は、AFC装置現在出力(Pa)に発電機現在出力(P)を設定する。   Further, the slave acquires the local request amount controllable information (Flg) stored in itself (S4913) as needed, and the acquired local request amount controllable information (Flg) can be controlled by the local request amount. If it indicates that there is, the generator current output (P) is set to the AFC device current output (Pa).

slaveは、自身が付設されている発電機5の現在の出力を取得すると、取得した情報をsubMasterに送信する。   When the slave acquires the current output of the generator 5 to which the slave is attached, the slave transmits the acquired information to the subMaster.

図50は、slaveが、随時、取得した発電機現在出力(P)を送信する処理(以下、発電機現在出力送信処理S5000と称する。)を説明するフローチャートである。同図に示すように、slaveは、取得した発電機現在出力(P)をsubMasterに送信する(S5011)。   FIG. 50 is a flowchart for explaining processing in which slave transmits the acquired generator current output (P) as needed (hereinafter referred to as generator current output transmission processing S5000). As shown in the figure, slave transmits the acquired generator current output (P) to the subMaster (S5011).

また、slaveは、自身が記憶している地域要求量制御可能情報(Flg)を、subMasterに送信する(S5012)。   Further, the slave transmits the local request amount controllable information (Flg) stored in itself to the subMaster (S5012).

また、slaveは、自身が記憶しているAFC装置現在出力(Pa)をsubMasterに送信する(S5013)。   Further, the slave transmits the current output (Pa) of the AFC device stored in itself to the subMaster (S5013).

また、slaveは、自身が記憶しているAFC装置EDC指令値(Pe,A)をsubMasterに送信する(S5014)。   Further, slave transmits the AFC device EDC command value (Pe, A) stored in itself to the subMaster (S5014).

slaveは、General Masterから、地域要求量制御を行うための情報を受信する。   The slave receives information for performing regional request amount control from the General Master.

図51は、slaveが、General Masterから随時、全発電機現在出力(ΣP)を受信する処理(以下、全発電機現在出力受信処理S5100と称する。)を説明するフローチャートである。   FIG. 51 is a flowchart for explaining a process in which slave receives the all-generator current output (ΣP) as needed from the general master (hereinafter referred to as all-generator current output reception process S5100).

同図に示すように、slaveは、General Masterから送信されてくる全発電機現在出力(ΣP)を受信し、記憶する(S5111)。   As shown in the figure, the slave receives and stores all generator current outputs (ΣP) transmitted from the General Master (S5111).

また、slaveは、General Masterから送信されてくる全地域要求量制御装置数(ΣFlg)を受信し、記憶する(S5112)。   Further, the slave receives and stores the number of all regional requirement amount control devices (ΣFlg) transmitted from the general master (S5112).

また、slaveは、General Masterから送信されてくる全AFC装置現在出力(ΣPa)を受信し、記憶する(S5113)。   Further, the slave receives and stores the current output (ΣPa) of all AFC devices transmitted from the general master (S5113).

また、slaveは、General Masterから送信されてくる全AFC装置EDC指令値(ΣPe)を受信し、記憶する(S5114)。   Further, the slave receives and stores all AFC device EDC command values (ΣPe) transmitted from the general master (S5114).

slaveは、受信したEDC指令値に基づき、自身が付設されている発電機5に対する予測制御を、予測制御時刻に行う。また、slaveは、随時、自身が付設されている発電機5に対して地域要求量制御を行う。   The slave performs predictive control on the generator 5 to which it is attached based on the received EDC command value at the predicted control time. Moreover, slave performs area request | requirement amount control with respect to the generator 5 with which it is attached at any time.

図52は、slaveが、予測制御及び地域要求量制御を行う処理(以下、需給制御処理S5200と称する。)を説明するフローチャートである。需給制御処理S5200は、随時、又は予測制御時刻に行われる。   FIG. 52 is a flowchart for explaining processing in which slave performs prediction control and regional requirement amount control (hereinafter referred to as supply and demand control processing S5200). The supply and demand control process S5200 is performed at any time or at the predicted control time.

同図に示すように、slaveは、受信したEDC指令値(Pe)と、自身が付設されている発電機5の発電能力(Pcap)との差に基づき、自身が付設されている発電機5に地域要求量制御を行うことが可能であるか否かを判断する(S5211)。具体的には、受信したEDC指令値(Pe)から、自身が付設されている発電機5の発電能力(Pcap)を減じた値が、所定の閾値Aより大きいか否かによって判断する。   As shown in the figure, the slave is the generator 5 to which the slave is attached based on the difference between the received EDC command value (Pe) and the power generation capability (Pcap) of the generator 5 to which the slave is attached. It is then determined whether or not it is possible to perform the regional request amount control (S5211). Specifically, it is determined whether or not a value obtained by subtracting the power generation capability (Pcap) of the generator 5 to which the EDC command value (Pe) is attached is larger than a predetermined threshold A.

地域要求量制御を行うことが可能である場合は(S5211:YES)、AFC装置EDC指令値(Pe,A)を、受信したEDC指令値に設定してS5212に進み、地域要求量制御を行うことが可能でない場合は(S5219:NO)S5221に進む。   If it is possible to perform the regional requirement amount control (S5211: YES), the AFC device EDC command value (Pe, A) is set to the received EDC command value, and the process proceeds to S5212, where the regional requirement amount control is performed. If it is not possible (S5219: NO), the process proceeds to S5221.

S5212では、slaveは、地域要求量(AR)を算出する。具体的には、地域要求量(AR)は、
AR=K・(f−f0)・(ΣP)+(ΣPe)−(ΣPa)
として算出する。ここで、Kは系統周波数特性定数、f0は基準周波数(例えば、50Hz又は60Hz)である。尚、slaveは、求めた地域要求量(AR)についてフィルタ処理、即ち、地域要求量(AR)に含まれる極短周期成分を除去する平滑化処理、及び微動成分を除去する不感帯処理を行う。
In S5212, slave calculates an area request amount (AR). Specifically, the regional demand (AR) is
AR = K · (f−f0) · (ΣP) + (ΣPe) − (ΣPa)
Calculate as Here, K is a system frequency characteristic constant, and f0 is a reference frequency (for example, 50 Hz or 60 Hz). The slave performs a filtering process on the obtained regional requirement amount (AR), that is, a smoothing process that removes an extremely short period component included in the regional requirement amount (AR) and a dead zone process that removes a fine movement component.

slaveは、算出した地域要求量(AR)と、受信したEDC指令値(Pe)とに基づき、出力指令値(Pc)を生成する(S5213)。具体的には、出力指令値(Pc)は、
Pc=Pe+(AR/(ΣFlg))
として生成する。
The slave generates an output command value (Pc) based on the calculated regional request amount (AR) and the received EDC command value (Pe) (S5213). Specifically, the output command value (Pc) is
Pc = Pe + (AR / (ΣFlg))
Generate as

尚、図53は、slaveが生成するEDC指令値(Pe)の一例を示している。同図に示すように、slaveは、自身が付設されている発電機5のEDC指令値(Pe)を「60kW」に設定し、現在時刻「10:10」から10分後の予測制御時刻「10:20」と対応づけて記憶している。   FIG. 53 shows an example of an EDC command value (Pe) generated by slave. As shown in the figure, the slave sets the EDC command value (Pe) of the generator 5 to which the slave is attached to “60 kW”, and the predicted control time “10:10” after the current time “10:10”. 10:20 "and stored.

図52に戻り、slaveは、S5213で生成した出力指令値(Pc)に基づき、自身が付設されている発電機5に対する出力制御を行う(S5214)。   Returning to FIG. 52, the slave performs output control on the generator 5 to which it is attached based on the output command value (Pc) generated in S5213 (S5214).

S5221では、slaveは、EDC指令値(Pe)に基づき、出力指令値(Pc)を生成する。具体的には、出力指令値(Pc)は、
Pc=Pe
として生成する。その後はS5214に進む。
In S5221, slave generates an output command value (Pc) based on the EDC command value (Pe). Specifically, the output command value (Pc) is
Pc = Pe
Generate as Thereafter, the process proceeds to S5214.

以上のように、本実施形態の電力系統1によれば、第2情報処理装置20は、電力系統1における発電機5の燃料費が最も安く、かつその電力系統1における所定時間後の電力需要に対応する発電機5の出力である予測出力を算出し、算出した予測出力を、第1情報処理装置10に付設されている発電機5に配分し、配分した予測出力の出力制御である予測制御をその配分を行った発電機5に付設されている第1情報処理装置10に行わせるための情報である予測制御指令値を、その第1情報処理装置10に送信し、他方、第1情報処理装置10は、予測制御指令値を受信した際、受信した予測制御指令値と、自身の発電能力との差に基づき、地域要求量制御を行うことが可能であるか否かを判断し、可能であると判断した場合に地域要求量制御を行うので、第1情報処理装置10は、予測制御指令値と自身の発電能力に応じて、地域要求量制御を適切に行うことができる。これにより、1電力系統における需給制御を適切かつ低コストで行うことができる。   As described above, according to the power system 1 of the present embodiment, the second information processing apparatus 20 has the lowest fuel cost of the generator 5 in the power system 1 and the power demand after a predetermined time in the power system 1. Is a prediction output that is an output control of the allocated predicted output, and calculates the predicted output that is the output of the generator 5 corresponding to, and distributes the calculated predicted output to the generator 5 attached to the first information processing apparatus 10. A predictive control command value, which is information for causing the first information processing apparatus 10 attached to the generator 5 that has performed the control to perform control, is transmitted to the first information processing apparatus 10, while the first When the information processing apparatus 10 receives the predicted control command value, the information processing apparatus 10 determines whether or not it is possible to perform regional request amount control based on the difference between the received predicted control command value and its own power generation capacity. If it is determined that it is possible, Since the control, first information processing apparatus 10, in accordance with the predictive control command value and its power generation capacity, it is possible to suitably perform regional demand control. Thereby, supply and demand control in one electric power system can be performed appropriately and at low cost.

また、第1情報処理装置10は、自身が付設されている発電機5に地域要求量制御を行うことが可能であると判断した場合、他の第1情報処理装置10に、自身が地域要求量制御を行うことが可能であることを示す情報である地域要求量制御可能情報を送信し、他の第1情報処理装置10から地域要求量制御可能情報を受信した場合、記憶している地域要求量を減少させ、減少させた地域要求量に基づき地域要求量制御を行うので、複数の第1情報処理装置10が地域要求量制御を行うことができる場合、その複数の第1情報処理装置10の夫々が協調して、適切に地域要求量制御を行うことができる。これにより、電力系統における需給制御をより適切に行うことができる。   In addition, when the first information processing apparatus 10 determines that it is possible to perform the area request amount control on the generator 5 to which the first information processing apparatus 10 is attached, When the area request amount controllable information, which is information indicating that the amount control can be performed, is transmitted and the area request amount controllable information is received from another first information processing apparatus 10, the stored area Since the request amount is decreased and the regional request amount control is performed based on the reduced regional request amount, when the plurality of first information processing devices 10 can perform the regional request amount control, the plurality of first information processing devices. Each of the 10 can cooperate and appropriately perform regional requirement amount control. Thereby, the supply-and-demand control in an electric power system can be performed more appropriately.

また、第1情報処理装置10の夫々は、地域要求量(AR)を、電力系統1において現在地域要求量制御が可能である発電機5の数を示す全地域要求量制御装置数(ΣFlg)で除した値に基づき地域要求量制御を行うので、複数の第1情報処理装置10が地域要求量制御を行うことができる場合、その複数の第1情報処理装置10の夫々が協調して、適切な地域要求量制御を適切に行うことができる。これにより、電力系統1における需給バランスをより適切に維持することができる。   Further, each of the first information processing devices 10 indicates the number of local requirement amount control devices (ΣFlg) that indicates the number of generators 5 that can currently control the regional requirement amount in the power system 1. Since the area request amount control is performed based on the value divided by the above, when the plurality of first information processing apparatuses 10 can perform the area request amount control, each of the plurality of first information processing apparatuses 10 cooperates, Appropriate regional demand control can be performed appropriately. Thereby, the supply-and-demand balance in the electric power grid | system 1 can be maintained more appropriately.

以上に説明した実施の形態は、本発明の理解を容易にするためのものであり、本発明を限定するものではない。本発明は、その趣旨を逸脱することなく、変更、改良され得ると共に、本発明にはその等価物が含まれることは勿論である。   Embodiment described above is for making an understanding of this invention easy, and does not limit this invention. The present invention can be changed and improved without departing from the gist thereof, and the present invention includes the equivalents thereof.

また本実施形態では、4階層の情報処理装置が存在する場合の需給制御について説明したが、同様の方法により本発明はn階層(n=5,6,・・・)の情報処理装置が存在する場合に拡張することができる。   In the present embodiment, supply and demand control in the case where there are four layers of information processing apparatuses has been described. However, the present invention provides information processing apparatuses of n layers (n = 5, 6,...) By a similar method. Can be extended if you want.

1 電力系統
5 発電機
10 情報処理装置
S1700 出力燃料費特性(M)記憶処理
S1900 発電機現在出力受信処理
S2100 予測制御通知処理
S2111 需要電力変動予測処理
S2113 最小燃料費配分処理
S3800 需給制御処理
DESCRIPTION OF SYMBOLS 1 Electric power system 5 Generator 10 Information processing apparatus S1700 Output fuel cost characteristic (M) storage process S1900 Generator present output reception process S2100 Prediction control notification process S2111 Demand power fluctuation prediction process S2113 Minimum fuel cost distribution process S3800 Supply and demand control process

Claims (5)

複数の発電機を含んで構成されている電力系統の需給制御方法であって、
前記複数の発電機のうち少なくとも2つ以上に第1情報処理装置を付設し、
前記第1情報処理装置を介して当該第1情報処理装置が付設されている前記発電機の出力を制御する、前記第1情報処理装置の夫々と通信可能な第2情報処理装置を設け、
前記第1情報処理装置の夫々は、
自身が付設されている前記発電機の現在の出力を取得し、取得した前記出力を前記第2情報処理装置に送信し、
前記第2情報処理装置は、
前記第1情報処理装置に付設されている前記発電機の夫々について、夫々の出力と燃料費との関係を記憶し、
前記第1情報処理装置から送信されてくる前記現在の出力を受信し、
前記記憶した関係と前記受信した前記現在の出力とに基づき、前記電力系統における所定時間後の電力需要に対応する前記発電機の出力である予測出力を算出し、
前記算出した前記予測出力を、前記電力系統における前記発電機の燃料費が最も安くなるように、前記第1情報処理装置に付設されている前記発電機のうち少なくとも1つ以上に配分し、配分した前記予測出力の出力制御である予測制御を、前記予測出力の配分を行った前記発電機に付設されている前記第1情報処理装置に行わせることを通知する情報である予測制御指令値を、当該第1情報処理装置に送信し、
前記第1情報処理装置は、
自身が付設されている前記発電機に対し、前記電力系統における地域要求量に基づく需給制御である地域要求量制御を行い、
自身が付設されている前記発電機の発電能力を記憶し、
前記第2情報処理装置から送信されてきた前記予測制御指令値を受信した際、受信した前記予測制御指令値と、前記記憶している前記発電能力との差に基づき、前記地域要求量制御を行うことが可能であるか否かを判断し、可能であると判断した場合に当該地域要求量制御を行い、
前記地域要求量を記憶し、
自身が付設されている前記発電機に前記地域要求量制御を行うことが可能であると判断した場合には、前記地域要求量制御を行うことが可能であることを表す情報である地域要求量制御可能情報を他の前記第1情報処理装置に送信し、
他の前記第1情報処理装置から前記地域要求量制御可能情報を受信した場合には、前記記憶している前記地域要求量を減少させ、減少させた前記地域要求量に基づき前記地域要求量制御を行う
ことを特徴とする電力系統の需給制御方法。
A power supply and demand control method for a power system configured to include a plurality of generators,
A first information processing apparatus is attached to at least two of the plurality of generators;
Providing a second information processing device capable of communicating with each of the first information processing devices, controlling the output of the generator to which the first information processing device is attached via the first information processing device;
Each of the first information processing apparatuses is
Obtaining the current output of the generator to which it is attached, sending the obtained output to the second information processing apparatus,
The second information processing apparatus
For each of the generators attached to the first information processing device, store the relationship between each output and fuel cost,
Receiving the current output transmitted from the first information processing apparatus;
Based on the stored relationship and the received current output, calculate a predicted output that is an output of the generator corresponding to power demand after a predetermined time in the power system,
Distributing the calculated predicted output to at least one of the generators attached to the first information processing device so that the fuel cost of the generator in the power system is the lowest, A prediction control command value, which is information for notifying the first information processing apparatus attached to the generator that has performed the distribution of the prediction output to perform the prediction control that is the output control of the predicted output. , To the first information processing device,
The first information processing apparatus
For the generator to which it is attached, perform regional demand control that is supply and demand control based on local demand in the power system,
Memorize the power generation capacity of the generator attached to itself,
When the predicted control command value transmitted from the second information processing apparatus is received, the regional requirement amount control is performed based on the difference between the received predicted control command value and the stored power generation capacity. it is determined whether it is possible to perform, have rows the regional demand control when it is determined that it is possible,
Memorizing the regional demand,
If it is determined that the local requirement amount control can be performed on the generator attached to itself, the regional requirement amount is information indicating that the regional requirement amount control can be performed. Transmitting controllable information to the other first information processing apparatus,
When the regional requirement amount controllable information is received from another first information processing apparatus, the stored regional requirement amount is decreased, and the regional requirement amount control is performed based on the reduced regional requirement amount. supply and demand control method for a power system and performing.
請求項に記載の電力系統の需給制御方法に用いられる情報処理装置であって、
前記情報処理装置の夫々は、
自身が付設されている前記発電機の現在の出力を取得し、取得した前記出力を前記第2情報処理装置に送信し、
自身が付設されている前記発電機に対し、前記電力系統における地域要求量に基づく需給制御である地域要求量制御を行い、
自身が付設されている前記発電機の発電能力を記憶し、
前記第2情報処理装置から送信されてきた前記予測制御指令値を受信した際、受信した前記予測制御指令値と、前記記憶している前記発電能力との差に基づき、前記地域要求量制御を行うことが可能であるか否かを判断し、可能であると判断した場合に当該地域要求量制御を行う
ことを特徴とする情報処理装置。
An information processing apparatus used in the power supply and demand control method according to claim 1 ,
Each of the information processing devices
Obtaining the current output of the generator to which it is attached, sending the obtained output to the second information processing apparatus,
For the generator to which it is attached, perform regional demand control that is supply and demand control based on local demand in the power system,
Memorize the power generation capacity of the generator attached to itself,
When the predicted control command value transmitted from the second information processing apparatus is received, the regional requirement amount control is performed based on the difference between the received predicted control command value and the stored power generation capacity. An information processing apparatus that determines whether or not it is possible to perform, and performs the regional requirement amount control when it is determined that it is possible.
請求項に記載の情報処理装置であって、
前記情報処理装置の夫々は、
前記地域要求量を記憶し、
自身が付設されている前記発電機に前記地域要求量制御を行うことが可能であると判断した場合には、前記地域要求量制御を行うことが可能であることを表す情報である地域要求量制御可能情報を他の前記第1情報処理装置に送信し、
他の前記第1情報処理装置から前記地域要求量制御可能情報を受信した場合には、前記記憶している前記地域要求量を減少させ、減少させた前記地域要求量に基づき前記地域要求量制御を行う
ことを特徴とする情報処理装置。
An information processing apparatus according to claim 2 ,
Each of the information processing devices
Memorizing the regional demand,
If it is determined that the local requirement amount control can be performed on the generator attached to itself, the regional requirement amount is information indicating that the regional requirement amount control can be performed. Transmitting controllable information to the other first information processing apparatus,
When the regional requirement amount controllable information is received from another first information processing apparatus, the stored regional requirement amount is decreased, and the regional requirement amount control is performed based on the reduced regional requirement amount. An information processing apparatus characterized by performing
請求項に記載の電力系統の需給制御方法に用いられる情報処理装置であって、
前記情報処理装置は、
前記第1情報処理装置に付設されている前記発電機の夫々について、夫々の出力と燃料費との関係を記憶し、
前記第1情報処理装置から送信されてくる前記現在の出力を受信し、
前記算出した前記予測出力を、前記電力系統における前記発電機の燃料費が最も安くなるように、前記第1情報処理装置に付設されている前記発電機のうち少なくとも1つ以上に配分し、配分した前記予測出力の出力制御である予測制御を、前記予測出力の配分を行った前記発電機に付設されている前記第1情報処理装置に行わせることを通知する情報である予測制御指令値を、当該第1情報処理装置に送信する
ことを特徴とする情報処理装置。
An information processing apparatus used in the power supply and demand control method according to claim 1 ,
The information processing apparatus includes:
For each of the generators attached to the first information processing device, store the relationship between each output and fuel cost,
Receiving the current output transmitted from the first information processing apparatus;
Distributing the calculated predicted output to at least one of the generators attached to the first information processing device so that the fuel cost of the generator in the power system is the lowest, A prediction control command value, which is information for notifying the first information processing apparatus attached to the generator that has performed the distribution of the prediction output to perform the prediction control that is the output control of the predicted output. An information processing apparatus that transmits to the first information processing apparatus.
請求項に記載の情報処理装置であって、
前記情報処理装置は、
前記地域要求量を記憶し、
自身が付設されている前記発電機に前記地域要求量制御を行うことが可能であると判断した場合には、前記地域要求量制御を行うことが可能であることを表す情報である地域要求量制御可能情報を他の前記第1情報処理装置に送信し、
他の前記第1情報処理装置から前記地域要求量制御可能情報を受信した場合には、前記記憶している前記地域要求量を減少させ、減少させた前記地域要求量に基づき前記地域要求量制御を行う
ことを特徴とする情報処理装置。
The information processing apparatus according to claim 4 ,
The information processing apparatus includes:
Memorizing the regional demand,
If it is determined that the local requirement amount control can be performed on the generator attached to itself, the regional requirement amount is information indicating that the regional requirement amount control can be performed. Transmitting controllable information to the other first information processing apparatus,
When the regional requirement amount controllable information is received from another first information processing apparatus, the stored regional requirement amount is decreased, and the regional requirement amount control is performed based on the reduced regional requirement amount. An information processing apparatus characterized by performing
JP2011228227A 2011-10-17 2011-10-17 Power system supply and demand control method and information processing apparatus Expired - Fee Related JP5425857B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2011228227A JP5425857B2 (en) 2011-10-17 2011-10-17 Power system supply and demand control method and information processing apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2011228227A JP5425857B2 (en) 2011-10-17 2011-10-17 Power system supply and demand control method and information processing apparatus

Publications (2)

Publication Number Publication Date
JP2013090419A JP2013090419A (en) 2013-05-13
JP5425857B2 true JP5425857B2 (en) 2014-02-26

Family

ID=48533834

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2011228227A Expired - Fee Related JP5425857B2 (en) 2011-10-17 2011-10-17 Power system supply and demand control method and information processing apparatus

Country Status (1)

Country Link
JP (1) JP5425857B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6596858B2 (en) * 2015-03-18 2019-10-30 中国電力株式会社 Automatic voltage adjusting device and automatic voltage adjusting method
JP2023092890A (en) 2021-12-22 2023-07-04 ナブテスコ株式会社 Power generation control device, power generation control method, and power generation control program

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3930218B2 (en) * 2000-02-24 2007-06-13 株式会社東芝 Power system load frequency control system
JP4023101B2 (en) * 2001-04-13 2007-12-19 株式会社日立製作所 Electricity supply and demand control method and apparatus
JP4052959B2 (en) * 2003-02-24 2008-02-27 大阪瓦斯株式会社 Power supply adjustment system
JP5268961B2 (en) * 2010-02-05 2013-08-21 中国電力株式会社 Power supply system control method and power supply system

Also Published As

Publication number Publication date
JP2013090419A (en) 2013-05-13

Similar Documents

Publication Publication Date Title
Thien et al. Real-world operating strategy and sensitivity analysis of frequency containment reserve provision with battery energy storage systems in the german market
Zhong et al. Coordinated control for large-scale EV charging facilities and energy storage devices participating in frequency regulation
US9639904B2 (en) Systems and methods for minimizing energy costs for a power consumption system that has access to off-grid resources
JP6285631B2 (en) Power management apparatus, power management method and program
JP7249155B2 (en) Storage battery management device and storage battery management method
Zhao et al. Optimal siting and sizing of Energy Storage System for power systems with large-scale wind power integration
JP6192531B2 (en) Power management system, power management apparatus, power management method, and program
US20170017215A1 (en) Demand prediction system and program
US9638545B2 (en) Power management apparatus, power management system and power management method
JP2016019358A (en) Demand prediction apparatus, computer program, smart meter and power storage device
JP2017011804A (en) Power management device, device system, power management method, and program
JPWO2016139781A1 (en) Power generation control device, power generation device, control device, control system, control method, and program
CN104869241A (en) Intelligent terminal and electric quantity prompting method thereof
JP2015015865A (en) Server device and power supply-demand control method
JP5425857B2 (en) Power system supply and demand control method and information processing apparatus
CN110752598A (en) Method and device for evaluating flexibility of multipoint distributed energy storage system
CN103138294B (en) Operation and control method of large-scale wind turbine generator in micro grid system
JP2019004546A (en) Control device, power management system, control method, and program
JP6507666B2 (en) Power failure time period prediction device, power failure time period prediction method, program
JP6246091B2 (en) Power supply system
JP6598070B2 (en) Energy prediction system
JP2017195752A (en) Electric power control system and power control method
JP2017118715A (en) Power management device, power management system, and power management method
CN115693702A (en) Frequency modulation method and device for power system
JP2016126983A (en) Fuel cell controller, fuel cell control system, fuel cell control method and computer program

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20130828

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20130910

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20131106

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20131126

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20131127

R150 Certificate of patent or registration of utility model

Ref document number: 5425857

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees