JP5419587B2 - Replacement method and load measuring device for transmission tower members - Google Patents
Replacement method and load measuring device for transmission tower members Download PDFInfo
- Publication number
- JP5419587B2 JP5419587B2 JP2009184042A JP2009184042A JP5419587B2 JP 5419587 B2 JP5419587 B2 JP 5419587B2 JP 2009184042 A JP2009184042 A JP 2009184042A JP 2009184042 A JP2009184042 A JP 2009184042A JP 5419587 B2 JP5419587 B2 JP 5419587B2
- Authority
- JP
- Japan
- Prior art keywords
- load
- transmission tower
- replacement
- power transmission
- replacement tool
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 230000005540 biological transmission Effects 0.000 title claims description 69
- 238000000034 method Methods 0.000 title claims description 19
- 229910000831 Steel Inorganic materials 0.000 description 21
- 239000010959 steel Substances 0.000 description 21
- 239000000463 material Substances 0.000 description 12
- 230000006835 compression Effects 0.000 description 6
- 238000007906 compression Methods 0.000 description 6
- 238000005259 measurement Methods 0.000 description 6
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 230000003187 abdominal effect Effects 0.000 description 1
- 230000006866 deterioration Effects 0.000 description 1
- 238000004141 dimensional analysis Methods 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 229910052751 metal Inorganic materials 0.000 description 1
- 238000003825 pressing Methods 0.000 description 1
- 238000005096 rolling process Methods 0.000 description 1
Images
Landscapes
- Working Measures On Existing Buildindgs (AREA)
- Electric Cable Installation (AREA)
Description
本発明は、送電鉄塔の部材交換に用いる取替工具により発生した、送電鉄塔に加わる圧縮荷重、引張荷重を計測する送電鉄塔部材取替工法と、この取替工法に用いる荷重計測装置と、送電鉄塔の許容応力より過荷重を防止するリミット機能を有するリミット計に関するものである。 The present invention relates to a power transmission tower member replacement method for measuring a compression load and a tensile load applied to the power transmission tower generated by a replacement tool used for replacement of a power transmission tower member, a load measuring device used for this replacement method, and a power transmission The present invention relates to a limit meter having a limit function for preventing overload from allowable stress of a steel tower.
取替工具が送電線に及ぼす荷重は、油圧ポンプに取付けた油圧ゲージの値を油圧ポンプの軸力に換算することで求めていた。 The load exerted on the transmission line by the replacement tool was obtained by converting the value of the hydraulic gauge attached to the hydraulic pump into the axial force of the hydraulic pump.
しかし、この方法では、油圧ポンプに取付けた油圧ゲージの計測分解能の低さと誤差の大きさにより、換算軸力の精度が低いことから構造物におよぼす正確な荷重が計測できないという問題がある。 However, this method has a problem in that an accurate load on the structure cannot be measured due to the low accuracy of the converted axial force due to the low measurement resolution and the error of the hydraulic gauge attached to the hydraulic pump.
柱、梁などの構造物に加わる圧縮、引張等の荷重計測には、従来よりひずみゲージやひずみゲージを組み込んだ荷重センサー(ロードセル)が利用されており、荷重計測に関しては、ひずみゲージを構造物の表面に貼り付けたり、ロードセルを油圧ジャッキに取付けることにより荷重を計測している。 Conventionally, load gauges (load cells) incorporating strain gauges and strain gauges have been used to measure compression and tension loads applied to structures such as columns and beams. The load is measured by pasting it on the surface or attaching a load cell to a hydraulic jack.
しかし、この方法では、計測の都度ひずみゲージを構造物表面に正確に貼り付けたり、ロードセルをジャッキと構造物の間に正確に設置する必要があり、頻繁に使用する取替工具に対して適用するのは困難であるといった問題がある。 However, with this method, it is necessary to attach a strain gauge accurately to the surface of the structure every time it is measured, or to accurately place a load cell between the jack and the structure. This method is applicable to frequently used replacement tools. There is a problem that it is difficult to do.
取替工具を使って送電鉄塔の劣化部材を交換する際に、取替工具により送電鉄塔に加わる荷重を測定する方法として、取替工具の既存部品に荷重を計測するための荷重センサーを組み込んだ部品を組み合わせることにより、計測対象となる送電鉄塔への取付けが容易になり、また取替工具の送電鉄塔への取付け状態に関係なく高精度な測定が可能な荷重計測方法および荷重計測装置が求められている。 As a method of measuring the load applied to the transmission tower by the replacement tool when replacing the deteriorated member of the transmission tower using the replacement tool, a load sensor for measuring the load is incorporated into the existing parts of the replacement tool. By combining parts, it is easy to mount the power transmission tower to be measured, and there is a need for a load measuring method and load measuring device that can perform highly accurate measurement regardless of the mounting state of the replacement tool to the power transmission tower. It has been.
本発明による送電鉄塔の取替工法は、送電鉄塔の取り替え対象となる部材の近辺に取付ける取替工具に荷重計測装置を組み合わせて取付け、取替工具から送電鉄塔に加わる荷重を計測する。 In the power transmission tower replacement method according to the present invention, a load measuring device is attached in combination with a replacement tool attached in the vicinity of a member to be replaced of the power transmission tower, and a load applied to the power transmission tower from the replacement tool is measured.
本発明は、取替工具を使用して送電鉄塔の部材交換を行うのに際し、油圧ジャッキにより該送電鉄塔の主柱間に圧縮または引張荷重を加えて、該送電鉄塔の主柱にボルトで固定されている部材を取外または取付する送電鉄塔部材の取替工法において、ロードセルが組み込まれた荷重計測を行う荷重計測装置を取替工具に装着して、送電鉄塔の主柱に加わる圧縮および引張荷重を計測し、送電鉄塔に加わる荷重が過荷重になることを防止することができる送電鉄塔部材の取替工法である。
The present invention applies a compression or tensile load between the main pillars of the power transmission tower using a hydraulic jack when the members of the power transmission tower are replaced using a replacement tool, and is fixed to the main pillar of the power transmission tower with bolts. In the replacement method of the transmission tower member that removes or attaches the installed member, the load measuring device with the load cell incorporated is mounted on the replacement tool, and compression and tension applied to the main column of the transmission tower This is a replacement method of a power transmission tower member that can measure the load and prevent the load applied to the power transmission tower from being overloaded .
また、本発明の送電鉄塔部材の荷重計測装置は、 送電鉄塔の部材交換に用いる取替工具により発生する荷重が、送電鉄塔に加わる圧縮荷重、引張荷重を計測する送電鉄塔部材取替工法と、この取替工法に用いる荷重計測装置と、送電鉄塔の許容応力より過荷重を防止するリミット機能を有するリミット計に関するものである。 Moreover, the load measuring device of the power transmission tower member of the present invention includes a power transmission tower member replacement method for measuring a compressive load and a tensile load applied to the power transmission tower by a replacement tool used for replacement of the power transmission tower member, The present invention relates to a load measuring device used in this replacement method and a limit meter having a limit function for preventing overload from allowable stress of a transmission tower.
取替工具が送電鉄塔に及ぼす荷重は、油圧ポンプに取付けた油圧ゲージの値を油圧ポンプの軸力に換算することで求めていた。 The load exerted on the power transmission tower by the replacement tool was obtained by converting the value of the hydraulic gauge attached to the hydraulic pump into the axial force of the hydraulic pump.
しかし、この方法では、油圧ポンプに取付けた油圧ゲージの計測分解能の低さと誤差の大きさにより、換算軸力の精度が低いことから送電鉄塔におよぼす正確な荷重が計測できないという問題がある。 However, this method has a problem that due to the low measurement resolution of the hydraulic gauge attached to the hydraulic pump and the magnitude of the error, the accuracy of the converted axial force is low, so that an accurate load on the transmission tower cannot be measured.
柱、梁などの構造物に加わる圧縮、引張等の荷重計測には、従来よりひずみゲージやひずみゲージを組み込んだ荷重センサー(ロードセル)が利用されており、荷重計測に関しては、ひずみゲージを構造物の表面に貼り付けたり、ロードセルを油圧ジャッキに取付けることにより荷重を計測している。 Conventionally, load gauges (load cells) incorporating strain gauges and strain gauges have been used to measure compression and tension loads applied to structures such as columns and beams. The load is measured by pasting it on the surface or attaching a load cell to a hydraulic jack.
しかし、この方法では、計測の都度ひずみゲージを構造物表面に正確に貼り付けたり、ロードセルをジャッキと構造物の間に正確に設置する必要があり、頻繁に使用する取替工具に対して適用するのは困難であるといった問題がある。 However, with this method, it is necessary to attach a strain gauge accurately to the surface of the structure every time it is measured, or to accurately place a load cell between the jack and the structure. This method is applicable to frequently used replacement tools. There is a problem that it is difficult to do.
本発明は、送電鉄塔の主柱間に装着して主柱に加わる圧縮および引張荷重を計測する送電鉄塔部材の荷重計測装置において、内側円筒と外側円筒を摺動自在とした円筒体内にロードセルを収容し、ロードセルを収容した円筒体を取替工具の端部に取付け、円筒体の他端と主柱との間に端部材を介在させ、内筒体の両端間の圧縮荷重、引張荷重にロードセルを対応させ、ロードセルより対応した圧縮荷重、引張荷重を発信できるようにした送電鉄塔部材の荷重計測装置である。 The present invention provides a load measuring device of the transmission tower member for measuring the compressive and tensile load applied to the main post and mounted between the main pillars of transmission tower, a load cell in a cylindrical body which is slidable inside the cylinder and the outer cylinder The cylindrical body containing the load cell is attached to the end of the replacement tool, and an end member is interposed between the other end of the cylindrical body and the main column, so that the compressive load and tensile load between the both ends of the inner cylindrical body can be reduced. It is a load measuring device for a power transmission tower member that is made to correspond to a load cell and can transmit a corresponding compressive load and tensile load from the load cell.
さらに、本発明の荷重表示器はリミット機能を有しており、取替工具を使った送電鉄塔部材交換時の荷重検討プログラムにより検討された送電鉄塔の許容応力を事前に登録しておき、その許容応力より大きな荷重が掛った場合は、リミット機能が働き過荷重になったことを表示する。 Furthermore, the load indicator of the present invention has a limit function, and the allowable stress of the transmission tower studied by the load examination program at the time of replacement of the transmission tower member using the replacement tool is registered in advance. When a load greater than the allowable stress is applied, the limit function is activated and an overload is displayed.
リミット機能が働いた場合は、過荷重になる前に取替工具の油圧ジャッキによる荷重負荷を停止する。 When the limit function is activated, the load applied by the hydraulic jack of the replacement tool is stopped before it becomes overloaded.
本発明は、ロードセルで計測した荷重を表示するとともに、送電鉄塔の許容応力より過荷重を防止するためのリミット機能を有するリミット計を設けた請求項2記載の送電鉄塔部材の荷重計測装置である。 The present invention is the load measuring device for a power transmission tower member according to claim 2, wherein the load meter displays a load measured by a load cell and has a limit meter having a limit function for preventing an overload from an allowable stress of the power transmission tower. .
本発明は、取替工具を使用して送電鉄塔の部材交換を行うのに際し、取替工具に装着したロードセルにより送電鉄塔の主柱に加わる荷重を計測するようにした送電鉄塔部材の取替工法であるので、取替工具を使って送電鉄塔の劣化部材を交換する際に、取替工具により送電鉄塔に加わる荷重を測定できる。 The present invention relates to a method for replacing a power transmission tower member in which the load applied to the main column of the power transmission tower is measured by a load cell attached to the replacement tool when the replacement tool is used to replace the power transmission tower member. Therefore, when replacing the deterioration member of the power transmission tower using the replacement tool, the load applied to the power transmission tower by the replacement tool can be measured.
また、本発明は、主柱間に装着して主柱に加わる荷重を計測する送電鉄塔部材の荷重計測装置において、内側円筒と外側円筒を摺動自在とした円筒体内にロードセルを収容し、ロードセルを収容した円筒体を取替工具の端部に取付け、円筒体の他端と主柱との間に端部材を介在させ、円筒体両端間の圧縮荷重、引張荷重にロードセルを対応させ、ロードセルより対応した圧縮荷重、引張荷重を発信できるようにした送電鉄塔部材の荷重計測装置であるので、取替工具の既存部品に荷重を計測するための荷重センサーを組み込んだ部品を組み合わせることにより、計測対象となる送電鉄塔への取付けが容易になり、また取替工具の送電鉄塔への取付け状態に関係なく高精度な測定が可能である。 Further, the present invention provides a load measuring device for a power transmission tower member that is mounted between main columns and measures a load applied to the main column. The load cell is accommodated in a cylindrical body in which an inner cylinder and an outer cylinder are slidable, The cylindrical body containing the cylinder is attached to the end of the replacement tool, an end member is interposed between the other end of the cylindrical body and the main column, and the load cell is made to correspond to the compressive load and tensile load between both ends of the cylindrical body. Because it is a load measuring device for power transmission tower members that can transmit more compatible compressive load and tensile load, it can be measured by combining the existing part of the replacement tool with a part that incorporates a load sensor for measuring the load. Attachment to the target transmission tower becomes easy, and high-precision measurement is possible regardless of the state of attachment of the replacement tool to the transmission tower.
さらに、本発明は、ロードセルで計測した荷重を表示するとともに、送電鉄塔の許容応力より過荷重を防止するためのリミット機能を有するリミット計を設けた請求項2記載の送電鉄塔部材の荷重計測装置であるので、取替工具を使った送電鉄塔部材交換時の荷重検討プログラムにより検討された送電鉄塔の許容応力を事前に登録しておき、その許容応力より大きな荷重が掛った場合は、リミット機能が働き過荷重になったことを表示できる。 Furthermore, this invention displays the load measured with the load cell, and provided the limit meter which has a limit function for preventing an overload from the allowable stress of a power transmission tower, The load measuring device of the power transmission tower member of Claim 2 Therefore, if the allowable stress of the transmission tower studied by the load examination program at the time of replacement of the transmission tower member using the replacement tool is registered in advance and a load larger than the allowable stress is applied, the limit function It is possible to indicate that has become overloaded.
本発明の取替工具を、送電鉄塔の主柱間に装着した状態の正面図を図1に、送電鉄塔の主柱間に装着した状態の平面図を図2に示す。 FIG. 1 shows a front view of a state in which the replacement tool of the present invention is mounted between main columns of a power transmission tower, and FIG. 2 shows a plan view of a state in which the replacement tool is mounted between main columns of a power transmission tower.
取替工具1は、油圧ジャッキ2とロードセル3の間に中継材4を介在させ端部材5、取付バンド6よりなり、送電鉄塔の主柱7に装着される。
The
油圧ジャッキ2には油圧の流入・流出口8が設けられている。 The hydraulic jack 2 is provided with a hydraulic inlet / outlet 8.
ロードセル3は、内側円筒9と外側円筒10を摺動自在とした円筒体11内に収容されている。
The
油圧ジャッキ2、中継材4、ロードセル3を収容した円筒体11、端部材5、取付バンド6は、それぞれボルト12、ナット13で螺締されている。
The
図3は、取替工具1のロードセル3部と表示メータ14の正面図で、ロードセル3と表示メータ14とは接続コード15で接続されている。
FIG. 3 is a front view of the
図3に示す荷重表示器の表示メータ14には送電鉄塔に掛った荷重を制限するリミット機能を持たせている。取替工具1を使った送電鉄塔部材交換時の荷重検討プログラムにより検討された送電鉄塔の許容応力度を事前に登録しておき、その許容応力より大きな荷重が掛った場合は、リミット機能が働き過荷重になったことを表示する。
The display meter 14 of the load display shown in FIG. 3 has a limit function for limiting the load applied to the power transmission tower. Register the allowable stress level of the transmission tower studied by the load examination program at the time of exchanging the transmission tower member using the
図4は、ロードセル3部の正面図、図5は図4の右側面図、図6は図4の平面図である。
4 is a front view of the
図7は送電鉄塔へ取替工具を装着させた正面図、図8は図7の右側面図、図9は図7の背面図、図10は図9の右側面図である。 7 is a front view in which a replacement tool is mounted on the transmission tower, FIG. 8 is a right side view of FIG. 7, FIG. 9 is a rear view of FIG. 7, and FIG. 10 is a right side view of FIG.
図7〜図10において、送電鉄塔の主柱7間に8本の取替工具1が装着され、7本の取替え部材16が交換される。取替え部材16はB−A面2本、A−D面2本、D−C面2本、C−B面1本である。
7-10, the eight
取替工具1は、取替え部材16の上下に取付ける。
The
取付位置にマーキングを行い、水平になるように取付ける。 Mark the mounting position and mount it so that it is horizontal.
各接続箇所のボルトは確実に締め付ける。 Securely tighten the bolts at each connection point.
取替え部材16の取替えは1本ずつ行い、新材のボルト締付が完了するまで他の取替え部材16の取外しは行わない。
The
油圧ジャッキ2に圧力をかける前に、再度油圧ホースの接続、各部ボルトの締付確認を行う。 Before applying pressure to the hydraulic jack 2, check the connection of the hydraulic hose and tighten the bolts again.
取替え部材16の取外しは取替工具1に応力が掛ったことを確認後に行う。
The
1面の取替え部材16の取替えが終了したら、取替工具1を次の面に移動し、順次取替え部材16の取替えを行う。
When the replacement of the
図11は、取替工具の主柱材把持金具の新・旧形状を示す。 FIG. 11 shows the new and old shapes of the main pillar material gripping fitting of the replacement tool.
従来の取替工具の鉄塔主柱材把持部は、取付バンド6により主柱材7を両側から挟み込む構造であり、円形の主柱材7に対して直線で形作られた取付バンド6の接触点は4つの点接触になる。
The steel tower main pillar material gripping part of the conventional replacement tool has a structure in which the
新たな把持金具21は、主柱材7を前後から挟み込む形であり、円形の主柱材7との接触面は接触面積を多く取れるように円形構造になっている。
The new gripping
これにより、圧縮による荷重、引張による荷重のいずれの荷重に対しても広い面で鉄塔主柱材7と接することから鉄塔に損傷を及ぼす危険性は非常に少ないものである。
As a result, there is very little risk of damage to the steel tower because it contacts the tower
図12は取替工具の中間継部材として使用する伸縮式部材を示す。 FIG. 12 shows a telescopic member used as an intermediate member of a replacement tool.
鉄塔構造物の面開きは主柱材7の転びにより鉄塔上部では狭く、鉄塔下部では広くなっている。したがって、鉄塔構造物の種々な場所で使用する取替工具の長さも色々になる。
The opening of the steel tower structure is narrow at the top of the steel tower and wide at the bottom of the steel tower due to the rolling of the
そこで、様々な長さの取替工具が必要となることから、取替工具の中間継部材用に伸縮式の部材を製作した。これは鋼管を二重構造とし、外側の鋼管22と内側の鋼管23を凹凸の噛み合わせる構造にすることで、正確でスムーズにスライドする構造となり、容易に長さ調整を行うことが出来る伸縮式の中間継部材である。
Therefore, since replacement tools of various lengths are required, a telescopic member was produced for an intermediate member of the replacement tool. This is a telescopic structure in which the steel pipe has a double structure and the
鋼管部材は2重構造になっており、外側鋼管22と内側鋼管23とは凹凸の形状部を噛み合わせてスライドさせる構造になっている。外側鋼管22と内側鋼管23をスライドさせて伸縮させたのち、外側鋼管22と内側鋼管23に開けたピン接合穴を重ね合わせ、接合ボルト24を直交する2方向から挿入し固定する。
The steel pipe member has a double structure, and the
図13に、鉄塔腹材取替フローを示す。 FIG. 13 shows a tower bellows replacement flow.
取替工具を使って鉄塔構造物の一部材を取り替える前に、鉄塔構造物の許容応力度を立体解析で求め、部材の許容応力度と取替工具からの荷重を対比し、取替工具からの荷重が鉄塔部材の許容応力度を超えるようであれば、取替工具による過大な荷重で鉄塔構造物の損傷を与えることのないようにリミット機能で警報を発生させ部材交換を中止するフロー図になっている。 Before replacing one member of the tower structure using the replacement tool, obtain the allowable stress level of the tower structure by three-dimensional analysis, and compare the allowable stress level of the member with the load from the replacement tool. If the load of the steel tower exceeds the allowable stress level of the steel tower member, a flow chart will stop the member replacement by generating an alarm with the limit function so that the steel tower structure will not be damaged by the excessive load of the replacement tool It has become.
本発明が対象とした送電鉄塔の高さは,62000mm、油圧ジャッキは揚力200kN、引力100kN、ストローク250mm、シリンダ内径60mmである。 The height of the transmission tower targeted by the present invention is 62000 mm, the hydraulic jack has a lift of 200 kN, an attractive force of 100 kN, a stroke of 250 mm, and a cylinder inner diameter of 60 mm.
本発明は、送電鉄塔での荷重測定に用いたが、他の鉄塔構造物の荷重測定にも用いることができる。 Although this invention was used for the load measurement in a power transmission tower, it can be used also for the load measurement of another steel tower structure.
1…取替工具
3…ロードセル
7…主柱
9…内筒円筒
10…外筒円筒
11…円筒体
5…端部材
DESCRIPTION OF
Claims (3)
ロードセルが組み込まれた荷重計測を行う荷重計測装置を取替工具に装着して、該送電鉄塔の主柱に加わる圧縮および引張荷重を計測し、送電鉄塔に加わる荷重が過荷重になることを防止することができる送電鉄塔部材の取替工法。 When exchanging members of a power transmission tower using a replacement tool, a member that is compressed or tensioned between the main pillars of the power transmission tower by a hydraulic jack and fixed to the main pillars of the power transmission tower with bolts In the replacement method of the transmission tower member to be removed or installed,
A load measuring device that incorporates a load cell is installed in the replacement tool to measure the compressive and tensile loads applied to the main pillar of the transmission tower and prevent the load on the transmission tower from becoming overloaded. replacement method of transmission tower member that can be.
And displays the load measured by the load cell, the load measuring device of the transmission tower member according to claim 2, wherein provided a limit gauge with limit function for preventing excessive load from the allowable stress of the transmission tower.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2009184042A JP5419587B2 (en) | 2009-08-07 | 2009-08-07 | Replacement method and load measuring device for transmission tower members |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2009184042A JP5419587B2 (en) | 2009-08-07 | 2009-08-07 | Replacement method and load measuring device for transmission tower members |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2011038259A JP2011038259A (en) | 2011-02-24 |
JP5419587B2 true JP5419587B2 (en) | 2014-02-19 |
Family
ID=43766285
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2009184042A Active JP5419587B2 (en) | 2009-08-07 | 2009-08-07 | Replacement method and load measuring device for transmission tower members |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP5419587B2 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111122312B (en) * | 2018-10-30 | 2023-12-12 | 中国电力科学研究有限公司 | Measuring device for ultimate bearing capacity of lightning arrester hardware fitting |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS6221697A (en) * | 1985-07-23 | 1987-01-30 | オツクスジヤツキコンサルタント株式会社 | Hydraulic jack for monitoring load |
JP2001268758A (en) * | 2000-03-23 | 2001-09-28 | Chikahiro Morikama | Replacement method of damaged component of transmission steel tower, and replacement tool |
JP4588542B2 (en) * | 2005-06-03 | 2010-12-01 | 東京電力株式会社 | Member replacement method for truss structure |
-
2009
- 2009-08-07 JP JP2009184042A patent/JP5419587B2/en active Active
Also Published As
Publication number | Publication date |
---|---|
JP2011038259A (en) | 2011-02-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101655402B (en) | Method for testing preload of engine connecting rod bolt and special tool thereof | |
CN109723910B (en) | Tool for quantitatively installing, detecting and adjusting support and hanger and method for measuring load of support and hanger by using tool | |
CN105102950B (en) | Force measuring device | |
KR20090079192A (en) | Method and apparatus for indicating a load | |
CN103292969A (en) | Manual spring tension and compression testing machine | |
JP5419587B2 (en) | Replacement method and load measuring device for transmission tower members | |
CN206114179U (en) | Measure device that high strength bolt connects vice torque coefficient | |
JP5571114B2 (en) | Load calibration device | |
KR100626621B1 (en) | Parallel type load cell calibrator and hopper scale with the same | |
KR101519237B1 (en) | Axial-load-measuring-device of truck and operation-method thereof | |
CN110926940B (en) | Method for testing ultimate contact strength of material surface | |
CN111678807A (en) | Device and method for rock dynamic shear strength under pre-normal stress condition | |
CN116577013A (en) | Testing device for tightening torque and axial force of threaded structure | |
CN101131341B (en) | Overload safeguard for tensometer | |
KR20130105318A (en) | Lug test apparatus | |
KR200406974Y1 (en) | Strain Gage Attachment | |
CN101799033B (en) | Multistage push fastener with detection interface | |
JP6408397B2 (en) | PC steel bar unit tightening force measuring device | |
CN210198843U (en) | Monitor ware calibration rack | |
CN210487128U (en) | Stress test calibration experiment platform | |
CN203216656U (en) | Bridge automatic tensioning device adopting spoke-type sensor to measuring forces | |
CN205719819U (en) | Detection QS weld strength test-bed | |
CN111947874A (en) | Surface force effect based beam type member anti-explosion effect test device and method | |
CN111678806A (en) | SHPB rock shear test device and method under normal stress condition | |
JP6738674B2 (en) | Parts replacement jack |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20120619 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20120627 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20130705 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20130730 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20130930 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20131009 |
|
RD02 | Notification of acceptance of power of attorney |
Free format text: JAPANESE INTERMEDIATE CODE: A7422 Effective date: 20131009 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20131106 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20131119 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 5419587 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |