JP5257470B2 - Combined steel wall - Google Patents

Combined steel wall Download PDF

Info

Publication number
JP5257470B2
JP5257470B2 JP2011026779A JP2011026779A JP5257470B2 JP 5257470 B2 JP5257470 B2 JP 5257470B2 JP 2011026779 A JP2011026779 A JP 2011026779A JP 2011026779 A JP2011026779 A JP 2011026779A JP 5257470 B2 JP5257470 B2 JP 5257470B2
Authority
JP
Japan
Prior art keywords
steel sheet
sheet pile
shaped steel
joint
claw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2011026779A
Other languages
Japanese (ja)
Other versions
JP2012167429A (en
Inventor
俊輔 宇佐美
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JFE Steel Corp
Original Assignee
JFE Steel Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JFE Steel Corp filed Critical JFE Steel Corp
Priority to JP2011026779A priority Critical patent/JP5257470B2/en
Publication of JP2012167429A publication Critical patent/JP2012167429A/en
Application granted granted Critical
Publication of JP5257470B2 publication Critical patent/JP5257470B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)
  • Revetment (AREA)

Description

本発明は、土木建築分野で港湾・河川護岸、山留め、締切り工事に使用される組合せ鋼製壁に関する。
なお、本明細書において、Z形鋼矢板とは、斜めに配置されたウェブの両端に該ウェブに連続してフランジが形成され、全体形状が略Z形になった鋼矢板をいう。
The present invention relates to a combined steel wall used for harbor / river revetment, mountain retaining and deadline construction in the field of civil engineering and construction.
In addition, in this specification, a Z-shaped steel sheet pile means the steel sheet pile in which the flange was continuously formed in the both ends of the web arrange | positioned diagonally, and this whole shape became a substantially Z shape.

土木建築分野で港湾・河川護岸、山留め、締切り工事に使用される鋼製壁として、U形鋼矢板とH形鋼を組み合わせた組合せ鋼製壁がある(特許文献1参照)。
特許文献1に記載の組合せ鋼矢板は、「ウェブ部とこのウェブ部の両端に設けられたフランジ部とこのフランジ部の一端に設けられた腕部とから断面ほぼU字状に形成されたU形鋼矢板と、このU形鋼矢板の一側面に一方のフランジを前記ウェブ部に固定して設置されたH形鋼とから形成され」ている(特許文献1の請求項1参照)。
As a steel wall used for harbor and river revetment, mountain retaining, and deadline construction in the civil engineering and construction field, there is a combined steel wall combining a U-shaped steel sheet pile and an H-shaped steel (see Patent Document 1).
The combined steel sheet pile described in Patent Document 1 is “U formed in a substantially U-shaped cross section from a web portion, a flange portion provided at both ends of the web portion, and an arm portion provided at one end of the flange portion. It is formed from a section steel sheet pile and an H-section steel that is installed with one flange fixed to the web portion on one side of the U-shaped steel sheet pile "(see claim 1 of Patent Document 1).

特開2002−212943号公報JP 2002-212943 A

特許文献1の組合せ鋼製壁は、U形鋼矢板のウェブ部とH形鋼のフランジを予め溶接等によって固定し、これを地盤に順次打設するというものである。
そのため、U形鋼矢板とH形鋼を予め固定しなければならないという手間がある。また、U形鋼矢板とH形鋼を予め固定した複雑な形状となっており、断面が大きいために地盤抵抗も大きく、打設が困難であるという問題もある。
また、U形鋼矢板のウェブ部にH形鋼のフランジを固定する形状であるため、単位長さあたりの鋼重が大きく、材料費が高くなるという問題もある。
The combined steel wall of Patent Document 1 is such that a web portion of a U-shaped steel sheet pile and a flange of an H-shaped steel are fixed in advance by welding or the like, and are sequentially placed on the ground.
Therefore, there is a trouble that the U-shaped steel sheet pile and the H-shaped steel must be fixed in advance. Moreover, it has a complicated shape in which a U-shaped steel sheet pile and an H-shaped steel are fixed in advance, and since the cross section is large, there is also a problem that ground resistance is large and placement is difficult.
Moreover, since it is a shape which fixes the flange of a H-section steel to the web part of a U-shaped steel sheet pile, there also exists a problem that the steel weight per unit length is large and material cost becomes high.

なお、U形鋼矢板、ハット形鋼矢板、あるいはZ形鋼矢板の継手部と継手部の間にH形鋼を並列させて連結することも考えられるが、現状の前記鋼矢板の継手部はラルゼン型と呼ばれるものであり、H形鋼のような他の鋼製部材と直接接続できるような形状ではない。
そのため、従来のZ形鋼矢板等とH形鋼を並列接続させて組合せ鋼製壁を構築するには、Z形鋼矢板等とH形鋼を接続するためにZ形鋼矢板等とH形鋼との間に両者を連結するためのコネクターが別途必要になる。
In addition, although it is also conceivable that H-shaped steel is connected in parallel between the joint portion and the joint portion of the U-shaped steel sheet pile, the hat-shaped steel sheet pile, or the Z-shaped steel sheet pile, It is called a Lalsen type and is not a shape that can be directly connected to other steel members such as H-shaped steel.
Therefore, to construct a combined steel wall by connecting a conventional Z-shaped steel sheet pile or the like and an H-shaped steel in parallel, in order to connect the Z-shaped steel sheet pile or the like and the H-shaped steel, the H-shaped Z-shaped steel sheet pile or the like A separate connector is required to connect the two to steel.

しかしながら、コネクターを別途設けるとすれば、コネクター分の材料コストが付加されることになり、経済性に劣る。また、コネクターを取付ける時間が余分に必要となり、組合せ鋼製壁を構築するための全体工期が長くなるという問題がある。
さらに、コネクターの形状にもよるが、ラルゼン型継手部とH形鋼とを連結するとすれば、コネクター部分がZ形鋼矢板のフランジ部の外側に出っ張ることになり、当該部位の平面が保たれなくなる。そのため、腹起し部材を設置する際に余分な裏込めコンクリートが必要となるなど、施工手間が増えることになる。
However, if a connector is provided separately, the material cost for the connector is added, resulting in poor economic efficiency. Further, there is a problem that extra time is required for attaching the connector, and the entire construction period for constructing the combined steel wall becomes long.
Furthermore, depending on the shape of the connector, if the Ralsen joint and H-section steel are connected, the connector will protrude outside the flange of the Z-shaped steel sheet pile, and the plane of the part will be maintained. Disappear. Therefore, construction labor increases, for example, an extra backfilling concrete is required when installing the angry member.

本発明はかかる課題を解決するためになされたものであり、コネクターという別部材を使用することなくZ形鋼矢板とH形鋼を接続してなる組合せ鋼製壁を提供することを目的とする。   The present invention has been made to solve such problems, and an object thereof is to provide a combined steel wall formed by connecting a Z-shaped steel sheet pile and an H-shaped steel without using a separate member called a connector. .

(1)本発明に係る組合せ鋼製壁は、ウェブ部の両端にフランジ部を有し、該フランジ部の各端部に継手部を有するZ形鋼矢板と、H形鋼とを連結して構成される組合せ鋼製壁であって、
前記Z形鋼矢板のフランジ部の軸線方向に沿うようにH形鋼のフランジ部が配置され、該H形鋼のフランジ部の軸線方向に沿うようにZ形鋼矢板が配置され、前記Z形鋼矢板の継手部と前記H形鋼のフランジ部の端部が直接連結されてなるZ形鋼矢板・H形鋼・Z形鋼矢板の順に配置された組合せ部位を有することを特徴とするものである。
(1) The combined steel wall according to the present invention has a flange portion at both ends of a web portion, and a Z-shaped steel sheet pile having a joint portion at each end of the flange portion and an H-shaped steel. A combined steel wall composed of:
A flange portion of H-shaped steel is disposed along the axial direction of the flange portion of the Z-shaped steel sheet pile, a Z-shaped steel sheet pile is disposed along the axial direction of the flange portion of the H-shaped steel, and the Z shape It has a combination part arranged in the order of Z-shaped steel sheet pile, H-shaped steel, Z-shaped steel sheet pile in which the joint part of the steel sheet pile and the end of the flange part of the H-shaped steel are directly connected It is.

(2)また、上記(1)に記載のものにおいて、前記Z形鋼矢板の継手部は、Z形鋼矢板を構成する一方のフランジ部の先端に形成された第1継手部と、他方のフランジ部の先端に形成された第2継手部とを有し、Z形鋼矢板が隣接配置されたときに、前記第1継手部と前記第2継手部が係合可能になっており、前記Z形鋼矢板・H形鋼・Z形鋼矢板の組合せ部位の端に位置するZ形鋼矢板同士が連結されてなることを特徴とするものである。 (2) Moreover, in the above-described (1), the joint portion of the Z-shaped steel sheet pile includes a first joint portion formed at the tip of one flange portion constituting the Z-shaped steel sheet pile, and the other joint portion. A second joint portion formed at the tip of the flange portion, and when the Z-shaped steel sheet pile is adjacently disposed, the first joint portion and the second joint portion are engageable, Z-shaped steel sheet piles located at the ends of the combined parts of the Z-shaped steel sheet pile, H-shaped steel, and Z-shaped steel sheet pile are connected to each other.

(3)また、上記(2)に記載のものにおいて、前記第1継手部は、先端に膨出部を有し鋼矢板内側に配置される主爪と、該主爪に対向するように形成された鋼矢板外側に配置される副爪とを有する二重爪型の継手部であり、
前記第2継手部は、先端に膨出部を有し鋼矢板外側に配置される主爪と、該主爪に対向するように形成された鋼矢板内側に配置される副爪とを有する二重爪型の継手部であり、
前記H形鋼のフランジ部は、その端部にフランジ部の厚み方向に突出する突起を備えてなることを特徴とするものである。
(3) Further, in the above-described (2), the first joint portion has a bulge at the tip and a main claw disposed on the inner side of the steel sheet pile, and is formed to face the main claw. A double-claw joint having a sub-claw arranged on the outer side of the steel sheet pile,
The second joint portion has a main claw having a bulging portion at the tip and disposed on the outer side of the steel sheet pile, and a secondary claw disposed on the inner side of the steel sheet pile formed to face the main claw. It is a heavy claw type joint,
The flange portion of the H-shaped steel is characterized in that a protrusion projecting in the thickness direction of the flange portion is provided at an end portion thereof.

(4)また、上記(2)に記載のものにおいて、前記第1継手部は、先端に膨出部を有し鋼矢板内側に配置される主爪と、該主爪に対向するように形成された鋼矢板外側に配置される副爪とを有する二重爪型の継手部であり、
前記第2継手部は、先端に膨出部を有し鋼矢板外側に配置される主爪と、該主爪に対向するように形成された鋼矢板内側に配置される副爪とを有する二重爪型の継手部であり、
前記H形鋼のフランジ部は、その端部に溝部を備えてなることを特徴とするものである。
(4) Moreover, in the above-described (2), the first joint portion has a bulge at the tip and a main claw disposed inside the steel sheet pile, and is formed so as to face the main claw. A double-claw joint having a sub-claw arranged on the outer side of the steel sheet pile,
The second joint portion has a main claw having a bulging portion at the tip and disposed on the outer side of the steel sheet pile, and a secondary claw disposed on the inner side of the steel sheet pile formed to face the main claw. It is a heavy claw type joint,
The flange portion of the H-shaped steel is provided with a groove portion at an end portion thereof.

(5)また、上記(3)又は(4)に記載のものにおいて、前記第1継手部は、鋼矢板内側に向けて曲がる第1曲り部を介して前記フランジ部の先端に設けられており、前記第1曲り部を設けることにより、前記副爪の外面がフランジ部の外面よりも鋼矢板外側に突出しないようになっており、
前記第2継手部は、鋼矢板内側に向けて曲がる第2曲り部を介して前記フランジ部の先端に設けられており、前記第2曲り部を設けることにより、前記主爪の外面が前記副爪の厚み分以上の距離だけ鋼矢板内側に配置されていることを特徴とするものである。
(5) Further, in the above (3) or (4), the first joint portion is provided at the tip of the flange portion via a first bent portion that bends toward the inside of the steel sheet pile. By providing the first bent portion, the outer surface of the sub-claw does not protrude outward from the steel sheet pile than the outer surface of the flange portion,
The second joint portion is provided at the tip of the flange portion via a second bent portion that is bent toward the inner side of the steel sheet pile, and by providing the second bent portion, the outer surface of the main claw is provided on the sub-plate. The steel sheet pile is arranged by a distance equal to or greater than the thickness of the nail.

本発明の組合せ鋼製壁においては、前記Z形鋼矢板のフランジ部の軸線方向に沿うようにH形鋼のフランジ部が配置され、該H形鋼のフランジ部の軸線方向に沿うようにZ形鋼矢板が配置され、前記Z形鋼矢板の継手部と前記H形鋼のフランジ部の端部が直接連結されてなるZ形鋼矢板・H形鋼・Z形鋼矢板の組合せ部位を有するので、Z形鋼矢板とH形鋼を予め固定する必要がなく、各部材ごとに地盤に打設できるので施工性に優れている。また、Z形鋼矢板の継手部にH形鋼のフランジ部の端部が直接連結されているので、Z形鋼矢板とH形鋼とを連結するために別途コネクター等を用いる必要がなく、施工性に優れると共に材料費の削減にもなっている。   In the combined steel wall of the present invention, the flange portion of the H-shaped steel is arranged along the axial direction of the flange portion of the Z-shaped steel sheet pile, and Z is aligned along the axial direction of the flange portion of the H-shaped steel. A shaped steel sheet pile is arranged, and has a combination part of a Z-shaped steel sheet pile, H-shaped steel, and Z-shaped steel sheet pile in which a joint portion of the Z-shaped steel sheet pile and an end portion of the flange portion of the H-shaped steel are directly connected. Therefore, it is not necessary to fix the Z-shaped steel sheet pile and the H-shaped steel in advance, and the workability is excellent because each member can be placed on the ground. Moreover, since the end of the flange part of the H-shaped steel is directly connected to the joint part of the Z-shaped steel sheet pile, it is not necessary to use a separate connector or the like to connect the Z-shaped steel sheet pile and the H-shaped steel. Excellent workability and reduced material costs.

本発明の一実施の形態に係る組合せ鋼製壁の説明図である。It is explanatory drawing of the combination steel wall which concerns on one embodiment of this invention. 図1の丸で囲んだA部の拡大図である。It is an enlarged view of the A section enclosed with the circle of FIG. 本発明の一実施の形態に係る組合せ鋼製壁を構成するZ形鋼矢板の説明図である。It is explanatory drawing of the Z-shaped steel sheet pile which comprises the combination steel wall which concerns on one embodiment of this invention. 図3の丸で囲んだC部の拡大図である。FIG. 4 is an enlarged view of a portion C surrounded by a circle in FIG. 3. 図3の丸で囲んだD部の拡大図である。FIG. 4 is an enlarged view of a portion D surrounded by a circle in FIG. 3. 本発明の一実施の形態に係る組合せ鋼製壁を構成するH形鋼の説明図である。It is explanatory drawing of the H-section steel which comprises the combination steel wall which concerns on one embodiment of this invention. 本発明の一実施の形態に係る組合せ鋼製壁を構成するH形鋼の他の態様の説明図である。It is explanatory drawing of the other aspect of the H-section steel which comprises the combination steel wall which concerns on one embodiment of this invention.

本実施の形態に係る組合せ鋼製壁1は、ウェブ部の両端にフランジ部を有し、該フランジ部の各端部に継手部を有するZ形鋼矢板2と、H形鋼4とを連結して構成される組合せ鋼製壁1であって、Z形鋼矢板2のフランジ部の軸線方向に沿うようにH形鋼4のフランジ部が配置され、H形鋼4のフランジ部の軸線方向に沿うようにZ形鋼矢板2が配置され、Z形鋼矢板2の継手部とH形鋼4のフランジ部の端部が直接連結されてなるZ形鋼矢板2・H形鋼4・Z形鋼矢板2の順に配置された組合せ部位を有しており、Z形鋼矢板2・H形鋼4・Z形鋼矢板2の組合せ部位の端に位置するZ形鋼矢板2同士が連結されてなるものである。
以下、組合せ鋼製壁1を構成するZ形鋼矢板2とH形鋼4を詳細に説明する。
The combined steel wall 1 according to this embodiment has a flange portion at both ends of a web portion, and a Z-shaped steel sheet pile 2 having a joint portion at each end of the flange portion and an H-shaped steel 4 are connected. The flange portion of the H-shaped steel 4 is arranged along the axial direction of the flange portion of the Z-shaped steel sheet pile 2, and the axial direction of the flange portion of the H-shaped steel 4. Z-shaped steel sheet pile 2 is arranged along the Z-shaped steel sheet pile 2 and the joint of the Z-shaped steel sheet pile 2 and the end of the flange portion of the H-shaped steel 4 are directly connected. The Z-shaped steel sheet piles 2 are connected to each other at the end of the combined position of the Z-shaped steel sheet pile 2, the H-shaped steel 4, and the Z-shaped steel sheet pile 2. It will be.
Hereinafter, the Z-shaped steel sheet pile 2 and the H-shaped steel 4 constituting the combined steel wall 1 will be described in detail.

<Z形鋼矢板>
本実施の形態に係るZ形鋼矢板2は、図3に示すように、Z形鋼矢板2を構成する第1フランジ部3の先端に形成された第1継手部5と、第2フランジ部7の先端に形成された第2継手部9とを有し、Z形鋼矢板2を隣接配置して、第1継手部5と第2継手部9を係合させて連結することができるZ形鋼矢板である。
そして、第1継手部5は、先端に膨出部11を有し鋼矢板内側に配置される主爪13と、主爪13に対向するように形成された鋼矢板外側に配置される副爪15とを有する二重爪型の継手部である(図4参照)。
また、第2継手部9は、先端に膨出部11を有し鋼矢板外側に配置される主爪13と、主爪13に対向するように形成された鋼矢板内側に配置される副爪15とを有する二重爪型の継手部である(図5参照)。
以下、Z形鋼矢板2の詳細を、全体形状、継手部に分けてさらに詳細に説明する。
<Z-shaped steel sheet pile>
As shown in FIG. 3, the Z-shaped steel sheet pile 2 according to the present embodiment includes a first joint portion 5 formed at the tip of the first flange portion 3 constituting the Z-shaped steel sheet pile 2, and a second flange portion. Z having a second joint portion 9 formed at the tip of 7, Z-shaped steel sheet piles 2 can be arranged adjacent to each other, and the first joint portion 5 and the second joint portion 9 can be engaged and connected. It is a shaped steel sheet pile.
And the 1st joint part 5 has the bulging part 11 in the front-end | tip, the main nail | claw 13 arrange | positioned inside a steel sheet pile, and the subnail | claw arrange | positioned outside the steel sheet pile formed so as to oppose the main claw 13 15 (see FIG. 4).
Moreover, the 2nd coupling part 9 has the bulging part 11 in the front-end | tip, the main nail | claw 13 arrange | positioned on the steel sheet pile outer side, and the subnail | claw arrange | positioned inside the steel sheet pile formed so as to oppose the main claw 13 15 (see FIG. 5).
Hereinafter, the details of the Z-shaped steel sheet pile 2 will be described in more detail by dividing them into an overall shape and a joint part.

〈全体形状〉
Z形鋼矢板2は、斜めに配置されたウェブ部16の一端側に第1フランジ部3を有し、第1フランジ部3の先端に第1継手部5が形成され、ウェブ部16の他端側に第2フランジ部7を有し、第2フランジ部7の先端に第2継手部9が形成され、全体として略Z形になっている。
<Overall shape>
The Z-shaped steel sheet pile 2 has a first flange portion 3 on one end side of a web portion 16 disposed obliquely, and a first joint portion 5 is formed at the tip of the first flange portion 3. It has the 2nd flange part 7 in the end side, the 2nd coupling part 9 is formed in the front-end | tip of the 2nd flange part 7, and it has a substantially Z shape as a whole.

〈継手部〉
第1継手部5と第2継手部9の基本形状は同じであるので、それを図4、図5に基づいて説明する。
第1継手部5と第2継手部9は、図4、図5に示すように、フランジ部の先端に連続するように形成された継手本体部17と、該継手本体部17から二股に分かれて互いに対向するように形成された主爪13と、副爪15を有している。
主爪13は、根元が細く先端に膨出部11が形成されている。本実施の形態における主爪13の膨出部11は略矩形をしており、主爪13全体の形状がT字状をしている。膨出部11は矩形状に限らず、円形、楕円形のようなものであってもよい。
<Fitting part>
Since the basic shape of the 1st joint part 5 and the 2nd joint part 9 is the same, it is demonstrated based on FIG. 4, FIG.
As shown in FIGS. 4 and 5, the first joint part 5 and the second joint part 9 are divided into a joint body part 17 formed so as to be continuous with the front end of the flange part, and the joint body part 17 into two branches. The main claw 13 and the sub claw 15 are formed so as to face each other.
As for the main nail | claw 13, the base is thin and the bulging part 11 is formed in the front-end | tip. The bulging portion 11 of the main claw 13 in the present embodiment has a substantially rectangular shape, and the shape of the entire main claw 13 is T-shaped. The bulging portion 11 is not limited to a rectangular shape, and may be a circle or an ellipse.

主爪13におけるT字の横片と縦片との連結部19は、外側の屈曲角度の方が内側の屈曲角度よりも鋭くなっている。内側の屈曲角度が滑らかになっていることから、継手部における主爪13と副爪15とで囲まれる継手内部21が滑らかな円弧状になっている。継手内部21が滑らかな円弧状になっていることから、継手部を連結したときに、回転の自由度を増している。   The connecting portion 19 between the T-shaped horizontal piece and the vertical piece in the main claw 13 has an outer bending angle that is sharper than an inner bending angle. Since the inner bending angle is smooth, the joint interior 21 surrounded by the main claws 13 and the sub claws 15 in the joint portion has a smooth arc shape. Since the joint interior 21 has a smooth arc shape, the degree of freedom of rotation is increased when the joint portions are connected.

副爪15は、根元の厚みが大きく、先端になるほど厚みが薄くなっており、全体として滑らかな湾曲した形状をしている。
主爪13と副爪15で囲まれる継手内部21に、これに連結される継手部の主爪13が挿入される。主爪13に膨出部11が形成されていることから、主爪13と副爪15との隙間から主爪13が抜け出さないようになっている。
The sub claw 15 has a thick root and a thickness that decreases toward the tip, and has a smooth curved shape as a whole.
The main claw 13 of the joint portion connected to the inside of the joint 21 surrounded by the main claw 13 and the sub claw 15 is inserted. Since the bulging portion 11 is formed on the main claw 13, the main claw 13 does not come out from the gap between the main claw 13 and the sub claw 15.

第1継手部5と第2継手部9は、上述した主爪13と副爪15を有している点において、共通しているが、異なる点もあるので、以下、図3中の左側に配置されている第1継手部5と、図3中の右側に配置されている第2継手部9を各別に説明する。   The first joint portion 5 and the second joint portion 9 are common in that they have the main claws 13 and the sub claws 15 described above, but there are also differences. The 1st joint part 5 arrange | positioned and the 2nd joint part 9 arrange | positioned at the right side in FIG. 3 are demonstrated separately.

(第1継手部)
第1継手部5は、第1継手部5と第2継手部9を連結して組合せ鋼製壁1(図1参照)を形成するときに、連結された継手部において副爪15が鋼矢板外側に配置されるものである。
なお、鋼矢板外側とは、第1フランジ部3の軸線に対してウェブ部16がある側と反対側をいい、鋼矢板内側とはその反対側、すなわち第1フランジ部3の中心軸に対してウェブ部16がある側をいう。
(First joint part)
When the 1st joint part 5 connects the 1st joint part 5 and the 2nd joint part 9, and forms the combination steel wall 1 (refer FIG. 1), the sub nail | claw 15 is a steel sheet pile in the connected joint part. It is arranged outside.
The outer side of the steel sheet pile refers to the side opposite to the side where the web portion 16 is present with respect to the axis of the first flange portion 3, and the opposite side to the inner side of the steel sheet pile, ie, the central axis of the first flange portion 3. The side where the web part 16 is located.

第1継手部5は、副爪15が鋼矢板外側に配置され、主爪13が副爪15に対向するように鋼矢板内側に配置されている。第1継手部5は、第1フランジ部3から鋼矢板内側に曲がる第1曲り部23を介して第1フランジ部3に連結されている。第1継手部5は、第1曲り部23を介して設けられていることにより、鋼矢板外側に配置されている副爪15の外面における最も鋼矢板外側の部位が、第1フランジ部3の外面と面一になるようになっている(図2、図4参照)。   The 1st coupling part 5 is arrange | positioned at the steel sheet pile inner side so that the sub nail | claw 15 may be arrange | positioned at the steel sheet pile outer side, and the main nail | claw 13 may oppose the sub nail | claw 15. The first joint portion 5 is connected to the first flange portion 3 through a first bent portion 23 that bends from the first flange portion 3 to the inside of the steel sheet pile. Since the first joint portion 5 is provided via the first bent portion 23, the outermost part of the steel sheet pile on the outer surface of the sub claw 15 disposed on the outer side of the steel sheet pile is the first flange portion 3. It is designed to be flush with the outer surface (see FIGS. 2 and 4).

(第2継手部)
第2継手部9は、第1継手部5と第2継手部9を連結して組合せ鋼製壁1を形成するときに、連結された継手部において主爪13が鋼矢板外側に配置されるものである。
第2継手部9は、主爪13が鋼矢板外側に配置され、副爪15が主爪13に対向するように鋼矢板内側に配置されている。
(Second joint part)
When the 2nd joint part 9 connects the 1st joint part 5 and the 2nd joint part 9 and forms the combination steel wall 1, the main nail | claw 13 is arrange | positioned in the connected joint part on the steel sheet pile outer side. Is.
The 2nd joint part 9 is arrange | positioned at the steel sheet pile inner side so that the main nail | claw 13 may be arrange | positioned at the steel sheet pile outer side, and the sub nail | claw 15 may oppose the main nail | claw 13.

第2継手部9は、第2フランジ部7から鋼矢板内側に曲がる第2曲り部25を介して第2フランジ部7に連結されている。第2曲り部25は、第1継手部5側に形成されている第1曲り部23よりも、鋼矢板内側への延出距離が大きくなるようになっている。
第2継手部9は、第2曲り部25を介して設けられていることにより、鋼矢板外側に配置されている主爪13の外面における最も鋼矢板外側の部位が、第2フランジ部7の外面よりも、距離Sだけ内側に配置されている(図5参照)。なお、距離Sは、副爪15の厚み以上の距離に設定されている。
The 2nd joint part 9 is connected with the 2nd flange part 7 via the 2nd bending part 25 bent from the 2nd flange part 7 to a steel sheet pile inner side. The second bent portion 25 has a longer extension distance to the inner side of the steel sheet pile than the first bent portion 23 formed on the first joint portion 5 side.
Since the second joint portion 9 is provided via the second bent portion 25, the outermost part of the steel sheet pile on the outer surface of the main claw 13 disposed on the outer side of the steel sheet pile is the second flange portion 7. It arrange | positions only the distance S rather than the outer surface (refer FIG. 5). The distance S is set to a distance that is equal to or greater than the thickness of the auxiliary nail 15.

<H形鋼>
H形鋼4は、図6に示すように、ウェブ部35とフランジ部37を有し、フランジ部37の先端に外側(フランジ部37の軸線に対してウェブ部35と反対側)に向けて突出する突起39を備えている。
突起39は、図1に示すように、Z形鋼矢板2の第1継手部5又は第2継手部9にH形鋼4のフランジ部37の先端を挿入した際に第1継手部5又は第2継手部9に係合する。このため、H形鋼4に対して、フランジ部37の軸線方向に引張り力が作用してもH形鋼4のフランジ部37が第1継手部5又は第2継手部9から抜け出さない。
なお、突起39は、本実施の形態のように、外側(フランジ部37の軸線に対してウェブ部35と反対側)に向けて突出するものの他、外側と内側(フランジ部37の軸線に対してウェブ部35と同じ側)の両方に突出するもの、あるいは内側にのみ突出するものであってもよい。
<H-section steel>
As shown in FIG. 6, the H-shaped steel 4 has a web portion 35 and a flange portion 37, and faces outward at the tip of the flange portion 37 (opposite to the web portion 35 with respect to the axis of the flange portion 37). A protruding projection 39 is provided.
As shown in FIG. 1, the protrusion 39 is formed when the tip of the flange portion 37 of the H-shaped steel 4 is inserted into the first joint portion 5 or the second joint portion 9 of the Z-shaped steel sheet pile 2. Engages with the second joint portion 9. For this reason, even if a tensile force acts on the H-section steel 4 in the axial direction of the flange portion 37, the flange portion 37 of the H-section steel 4 does not come out of the first joint portion 5 or the second joint portion 9.
In addition, the projection 39 projects outward (on the opposite side to the web portion 35 with respect to the axis of the flange portion 37) as in the present embodiment, and also on the outside and inside (with respect to the axis of the flange portion 37). And the same projecting side as the web portion 35) or projecting only inward.

次に、組合せ鋼製壁1の構築方法を説明する。
図1に示すように、例えば図中左側のZ形鋼矢板2を打設し、次にZ形鋼矢板2の第1継手部5の継手内部にH形鋼4のフランジ部37の先端(図中左側の先端)を挿入するようにして、H形鋼4を打設する。
次に、H形鋼4のフランジ部37の他方の先端(図中右側の先端)がZ形鋼矢板2の第1継手部5の継手内部に挿入されるようにしてZ形鋼矢板2を打設する。次に、打設されたZ形鋼矢板2の第2継手部9と別のZ形鋼矢板2の第1継手部5が係合するようにしてZ形鋼矢板2を打設する。次に、打設されたZ形鋼矢板2の第2継手部9の継手内部にH形鋼4のフランジ部37の先端(図中左側の先端)を挿入するようにして、H形鋼4を打設する。次に、H形鋼4のフランジ部37の他方の先端(図中右側の先端)がZ形鋼矢板2の第2継手部9の継手内部に挿入されるようにしてZ形鋼矢板2を打設する。
同様のことを繰り返すことにより、組合せ鋼製壁1が構築される。
Next, the construction method of the combined steel wall 1 will be described.
As shown in FIG. 1, for example, the Z-shaped steel sheet pile 2 on the left side in the figure is placed, and then the tip of the flange portion 37 of the H-shaped steel 4 (inside the first joint portion 5 of the Z-shaped steel sheet pile 2) The H-section steel 4 is driven in such a manner that the tip on the left side in the figure is inserted.
Next, the Z-shaped steel sheet pile 2 is made so that the other tip (the tip on the right side in the figure) of the flange portion 37 of the H-shaped steel 4 is inserted into the joint of the first joint portion 5 of the Z-shaped steel sheet pile 2. To cast. Next, the Z-shaped steel sheet pile 2 is driven so that the second joint portion 9 of the cast Z-shaped steel sheet pile 2 and the first joint portion 5 of another Z-shaped steel sheet pile 2 are engaged. Next, the tip of the flange portion 37 of the H-shaped steel 4 (the tip on the left side in the figure) is inserted into the joint of the second joint portion 9 of the cast Z-shaped steel sheet pile 2 so that the H-shaped steel 4 To cast. Next, the Z-shaped steel sheet pile 2 is made so that the other tip (the right tip in the drawing) of the flange portion 37 of the H-shaped steel 4 is inserted into the joint of the second joint portion 9 of the Z-shaped steel sheet pile 2. To cast.
By repeating the same, the combined steel wall 1 is constructed.

打設に際して、Z形鋼矢板2は地盤力を受けて回転しやすいが、その場合において、本実施の形態の二重爪型の継手部は、回転の自由度が高いので、継手部に過度の力が作用することがなく、打設時に継手部が変形等することがない。また、二重爪型の継手部は引張り力に対する抵抗力が強いので、変形も少ない。それ故に、高精度の組合せ鋼製壁1を形成することができる。   At the time of placing, the Z-shaped steel sheet pile 2 is easily rotated by receiving the ground force. However, in this case, the double-claw joint portion of the present embodiment has a high degree of freedom in rotation. Thus, the joint portion is not deformed at the time of placing. In addition, the double-claw joint has a high resistance to the tensile force, so that deformation is small. Therefore, the highly accurate combination steel wall 1 can be formed.

また、図2に示すように、2枚のZ形鋼矢板2の第1継手部5の間にH形鋼4を配置した場合において、第1フランジ部3よりも鋼矢板外側に出っ張るものがなく、この例では、H形鋼4を挟んで配置された2枚のZ形鋼矢板2の第1フランジ部3の外面が面一になっている。
2枚のZ形鋼矢板2の第1フランジ部3の外面が面一になることで、当該部位に直接腹越し材を設置することが可能になる。仮に、コネクターなどを使用した場合において、コネクターが鋼矢板外側に出っ張ると、当該部位に例えばコンクリート等を介在させて腹越し材を設置しなければならないが、本実施の形態のものではそのような手間がなく作業性に優れている。
In addition, as shown in FIG. 2, when the H-section steel 4 is arranged between the first joint portions 5 of the two Z-shaped steel sheet piles 2, the one that protrudes outside the steel sheet pile beyond the first flange portion 3. Instead, in this example, the outer surfaces of the first flange portions 3 of the two Z-shaped steel sheet piles 2 arranged with the H-shaped steel 4 interposed therebetween are flush with each other.
When the outer surfaces of the first flange portions 3 of the two Z-shaped steel sheet piles 2 are flush with each other, it becomes possible to directly install the waistline material on the part. If a connector or the like is used, if the connector protrudes outside the steel sheet pile, for example, concrete or the like must be interposed in the part, and an abdomen should be installed. There is no hassle and excellent workability.

また、連結状態においても、本実施の形態の継手部は回転の自由度が高いので、地震力などが作用した場合にも、継手部に過度の力が作用せず、継手部が変形等することがない。
また、本実施の形態の二重爪型の継手部は、引張り強度に優れているので、その意味でもZ形鋼矢板2が引張り力を受けたときに継手部が変形等しない。それ故に、継手部の止水性に優れている。
Even in the connected state, since the joint portion of the present embodiment has a high degree of freedom of rotation, even when an earthquake force or the like is applied, excessive force is not applied to the joint portion, and the joint portion is deformed or the like. There is nothing.
Further, since the double-claw joint portion of the present embodiment is excellent in tensile strength, the joint portion is not deformed or the like when the Z-shaped steel sheet pile 2 receives a tensile force. Therefore, it is excellent in the water stoppage of the joint part.

以上のようにように、本実施の形態の組合せ鋼製壁1は、コネクターという別部材を使用することなくZ形鋼矢板2とH形鋼4を直接接続して構築できる。   As described above, the combined steel wall 1 of the present embodiment can be constructed by directly connecting the Z-shaped steel sheet pile 2 and the H-shaped steel 4 without using another member called a connector.

なお、上記の実施の形態においては、Z形鋼矢板2とH形鋼4の配置に関し、図1に示すように、Z形鋼矢板2・H形鋼4・Z形鋼矢板2・Z形鋼矢板2・H形鋼4・Z形鋼矢板2・・という配置の例を示したが、本発明はこれに限られるものではなく、例えば以下のような配置であってもよい。
(a)Z形鋼矢板2・H形鋼4・Z形鋼矢板2・H形鋼4・Z形鋼矢板2・H形鋼4・・というようにZ形鋼矢板2とH形鋼4を交互に配置する。
(b) Z形鋼矢板2・H形鋼4・Z形鋼矢板2の順に配置された組合せ部位の隣に複数枚のZ形鋼矢板2を配置して、その次に再びZ形鋼矢板2・H形鋼4・Z形鋼矢板2の順に配置された組合せ部位があるように配置する。
In addition, in said embodiment, as shown in FIG. 1 regarding arrangement | positioning of the Z-shaped steel sheet pile 2 and the H-shaped steel 4, Z-shaped steel sheet pile 2, H-shaped steel 4, Z-shaped steel sheet pile 2, Z-shaped Although the example of arrangement | positioning called steel sheet pile 2, H-section steel 4, Z-shaped steel sheet pile 2 ... was shown, this invention is not restricted to this, For example, the following arrangements may be sufficient.
(a) Z-shaped steel sheet pile 2, H-shaped steel 4, Z-shaped steel sheet pile 2, H-shaped steel 4, Z-shaped steel sheet pile 2, H-shaped steel 4,. Are arranged alternately.
(b) A plurality of Z-shaped steel sheet piles 2 are arranged next to the combination parts arranged in the order of Z-shaped steel sheet pile 2, H-shaped steel 4, Z-shaped steel sheet pile 2, and then again Z-shaped steel sheet piles. It arrange | positions so that there may exist the combination site | part arrange | positioned in order of 2 * H-section steel 4 * Z-shaped steel sheet pile 2. FIG.

また、上記の実施の形態においては、H形鋼4のフランジ部37の先端に突起39を設ける例を示したが、図7に示すように、H形鋼4のフランジ部37の先端に第1継手部5又は第2継手部9に係合する溝部40を設けるようにしてもよい。
なお、溝部40は、図7に示すように、外側(フランジ部37の軸線に対してウェブ部35と反対側)に設けてもよいし、あるいは外側と内側(フランジ部37の軸線に対してウェブ部35と同じ側)の両方に設けてもよく、またあるいは内側にのみ設けるようにしてもよい。
Further, in the above embodiment, the example in which the protrusion 39 is provided at the tip of the flange portion 37 of the H-shaped steel 4 has been shown. However, as shown in FIG. You may make it provide the groove part 40 engaged with the 1 joint part 5 or the 2nd joint part 9. FIG.
In addition, as shown in FIG. 7, the groove part 40 may be provided on the outer side (the side opposite to the web part 35 with respect to the axis of the flange part 37), or the outer side and the inner side (with respect to the axis of the flange part 37). It may be provided both on the same side as the web portion 35, or may be provided only inside.

1 組合せ鋼製壁
2 Z形鋼矢板
3 第1フランジ部
4 H形鋼
5 第1継手部
7 第2フランジ部
9 第2継手部
11 膨出部
13 主爪
15 副爪
16 ウェブ部
17 継手本体部
19 連結部
21 継手内部
23 第1曲り部
25 第2曲り部
27 鋼矢板壁
35 ウェブ部
37 フランジ部
39 突起
40 溝部
DESCRIPTION OF SYMBOLS 1 Combination steel wall 2 Z-shaped steel sheet pile 3 1st flange part 4 H-section steel 5 1st joint part 7 2nd flange part 9 2nd joint part 11 bulging part 13 Main nail | claw 15 Sub claw 16 Web part 17 Joint body Part 19 Connection part 21 Inside of joint 23 First bent part 25 Second bent part 27 Steel sheet pile wall 35 Web part 37 Flange part 39 Projection 40 Groove part

Claims (5)

ウェブ部の両端にフランジ部を有し、該フランジ部の各端部に継手部を有するZ形鋼矢板と、H形鋼とを連結して構成される組合せ鋼製壁であって、
前記Z形鋼矢板のフランジ部の軸線方向に沿うようにH形鋼のフランジ部が配置され、該H形鋼のフランジ部の軸線方向に沿うようにZ形鋼矢板が配置され、前記Z形鋼矢板の継手部と前記H形鋼のフランジ部の端部が直接連結されてなるZ形鋼矢板・H形鋼・Z形鋼矢板の順に配置された組合せ部位を有することを特徴とする組合せ鋼製壁。
A combined steel wall configured by connecting a Z-shaped steel sheet pile having a flange portion at both ends of the web portion and a joint portion at each end of the flange portion, and an H-shaped steel,
A flange portion of H-shaped steel is disposed along the axial direction of the flange portion of the Z-shaped steel sheet pile, a Z-shaped steel sheet pile is disposed along the axial direction of the flange portion of the H-shaped steel, and the Z shape A combination characterized by having a combination portion arranged in the order of a Z-shaped steel sheet pile, an H-shaped steel, and a Z-shaped steel sheet pile, in which a joint portion of a steel sheet pile and an end of the flange portion of the H-shaped steel are directly connected. Steel wall.
前記Z形鋼矢板の継手部は、Z形鋼矢板を構成する一方のフランジ部の先端に形成された第1継手部と、他方のフランジ部の先端に形成された第2継手部とを有し、Z形鋼矢板が隣接配置されたときに、前記第1継手部と前記第2継手部が係合可能になっており、前記Z形鋼矢板・H形鋼・Z形鋼矢板の組合せ部位の端に位置するZ形鋼矢板同士が連結されてなることを特徴とする請求項1記載の組合せ鋼製壁。   The joint part of the Z-shaped steel sheet pile has a first joint part formed at the tip of one flange part constituting the Z-shaped steel sheet pile and a second joint part formed at the tip of the other flange part. When the Z-shaped steel sheet piles are arranged adjacent to each other, the first joint portion and the second joint portion can be engaged, and the combination of the Z-shaped steel sheet pile, the H-shaped steel, and the Z-shaped steel sheet pile. 2. The combined steel wall according to claim 1, wherein Z-shaped steel sheet piles positioned at the ends of the parts are connected to each other. 前記第1継手部は、先端に膨出部を有し鋼矢板内側に配置される主爪と、該主爪に対向するように形成された鋼矢板外側に配置される副爪とを有する二重爪型の継手部であり、
前記第2継手部は、先端に膨出部を有し鋼矢板外側に配置される主爪と、該主爪に対向するように形成された鋼矢板内側に配置される副爪とを有する二重爪型の継手部であり、
前記H形鋼のフランジ部は、その端部にフランジ部の厚み方向に突出する突起を備えてなることを特徴とする請求項2記載の組合せ鋼製壁。
The first joint portion has a main claw having a bulging portion at the tip and disposed inside the steel sheet pile, and a secondary claw disposed outside the steel sheet pile formed to face the main claw. It is a heavy claw type joint,
The second joint portion has a main claw having a bulging portion at the tip and disposed on the outer side of the steel sheet pile, and a secondary claw disposed on the inner side of the steel sheet pile formed to face the main claw. It is a heavy claw type joint,
The combined steel wall according to claim 2, wherein the flange portion of the H-shaped steel is provided with a protrusion protruding in the thickness direction of the flange portion at an end portion thereof.
前記第1継手部は、先端に膨出部を有し鋼矢板内側に配置される主爪と、該主爪に対向するように形成された鋼矢板外側に配置される副爪とを有する二重爪型の継手部であり、
前記第2継手部は、先端に膨出部を有し鋼矢板外側に配置される主爪と、該主爪に対向するように形成された鋼矢板内側に配置される副爪とを有する二重爪型の継手部であり、
前記H形鋼のフランジ部は、その端部に溝部を備えてなることを特徴とする請求項2記載の組合せ鋼製壁。
The first joint portion has a main claw having a bulging portion at the tip and disposed inside the steel sheet pile, and a secondary claw disposed outside the steel sheet pile formed to face the main claw. It is a heavy claw type joint,
The second joint portion has a main claw having a bulging portion at the tip and disposed on the outer side of the steel sheet pile, and a secondary claw disposed on the inner side of the steel sheet pile formed to face the main claw. It is a heavy claw type joint,
The combined steel wall according to claim 2, wherein the flange portion of the H-shaped steel has a groove portion at an end thereof.
前記第1継手部は、鋼矢板内側に向けて曲がる第1曲り部を介して前記フランジ部の先端に設けられており、前記第1曲り部を設けることにより、前記副爪の外面がフランジ部の外面よりも鋼矢板外側に突出しないようになっており、
前記第2継手部は、鋼矢板内側に向けて曲がる第2曲り部を介して前記フランジ部の先端に設けられており、前記第2曲り部を設けることにより、前記主爪の外面が前記副爪の厚み分以上の距離だけ鋼矢板内側に配置されていることを特徴とする請求項3又は4記載の組合せ鋼製壁。
The first joint portion is provided at the front end of the flange portion via a first bent portion that is bent toward the inner side of the steel sheet pile. By providing the first bent portion, the outer surface of the sub-jaw is a flange portion. It is designed not to protrude outward from the steel sheet pile than the outer surface of
The second joint portion is provided at the front end of the flange portion via a second bent portion that is bent toward the inside of the steel sheet pile, and by providing the second bent portion, the outer surface of the main claw is provided on the sub-joint. 5. The combined steel wall according to claim 3, wherein the combined steel wall is disposed on the inner side of the steel sheet pile by a distance equal to or greater than the thickness of the claw.
JP2011026779A 2011-02-10 2011-02-10 Combined steel wall Active JP5257470B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2011026779A JP5257470B2 (en) 2011-02-10 2011-02-10 Combined steel wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2011026779A JP5257470B2 (en) 2011-02-10 2011-02-10 Combined steel wall

Publications (2)

Publication Number Publication Date
JP2012167429A JP2012167429A (en) 2012-09-06
JP5257470B2 true JP5257470B2 (en) 2013-08-07

Family

ID=46971831

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2011026779A Active JP5257470B2 (en) 2011-02-10 2011-02-10 Combined steel wall

Country Status (1)

Country Link
JP (1) JP5257470B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SG10201909673XA (en) * 2018-10-19 2020-05-28 J D Fields & Company Inc Combined wall piling system
CN113699975A (en) * 2021-08-27 2021-11-26 华汇工程设计集团股份有限公司 HUI type combined steel sheet pile and construction method thereof

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102004019953B3 (en) * 2004-04-23 2005-12-08 Pilepro Llc Strand-shaped connection profile for connecting sheet piles to support elements
DE102006041049A1 (en) * 2006-09-01 2008-03-06 Pilepro Llc Barrier for e.g. military purpose, has bulkhead components e.g. Z-sheet pile and connection units, supported on surface of ground and connected with one another, such that barrier stands freely

Also Published As

Publication number Publication date
JP2012167429A (en) 2012-09-06

Similar Documents

Publication Publication Date Title
EP2672012B1 (en) A mono-pile type foundation structure for connecting steel pipe pile and steel sleeve pipe
EP2554751A1 (en) Connected wall structure consisting of steel pipe sheet piles and steel sheet pile, and method of constructing same
WO2013171909A1 (en) Combined steel wall
JP5257470B2 (en) Combined steel wall
JP5521277B2 (en) Hat-shaped steel sheet pile
JP2006241816A (en) Continuous underground wall
JP6714307B2 (en) Reinforcement method for existing steel sheet pile wall
JP6515293B2 (en) Steel sheet pile wall
JP2014020129A (en) Steel sheet pile and steel sheet pile wall body
JP2017066702A (en) Vertical connection structure of steel sheet pipe and steel sheet pile wall
JP5114731B2 (en) Design method of underground wall
JP5782729B2 (en) Z-shaped steel sheet pile, steel sheet pile wall formed by the Z-shaped steel sheet pile
JP2013199746A (en) Earth retaining wall
JP5637657B2 (en) Retaining wall and its reinforcement method
WO2013171910A1 (en) Z-shaped steel sheet pile, and steel sheet pile wall formed from said z-shaped steel sheet pile
JP5737058B2 (en) H-shaped sheet pile
JP2012092589A (en) Steel sheet pile and steel sheet pile wall formed of steel sheet pile
JP5079731B2 (en) Synthetic segment connecting surface plate and main girder, synthetic segment manufacturing method and tunnel
TWI480448B (en) Combination of steel wall
CN211171920U (en) Plastic steel sheet pile
JP5077954B2 (en) Underground continuous wall member, underground continuous wall body, and method of constructing underground continuous wall body
JP5633502B2 (en) Wall structure
JP2007040086A (en) Connection structure of steel pipe
JP2017198035A (en) Steel pile wall
TWI516659B (en) Z-shaped steel sheet pile, the Z-shaped steel sheet pile, formed by the steel sheet

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20130212

A871 Explanation of circumstances concerning accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A871

Effective date: 20130212

A975 Report on accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A971005

Effective date: 20130304

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20130326

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20130408

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20160502

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 5257470

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250