JP5209014B2 - Construction plan management apparatus and method - Google Patents

Construction plan management apparatus and method Download PDF

Info

Publication number
JP5209014B2
JP5209014B2 JP2010212742A JP2010212742A JP5209014B2 JP 5209014 B2 JP5209014 B2 JP 5209014B2 JP 2010212742 A JP2010212742 A JP 2010212742A JP 2010212742 A JP2010212742 A JP 2010212742A JP 5209014 B2 JP5209014 B2 JP 5209014B2
Authority
JP
Japan
Prior art keywords
construction plan
construction
plan
version
stored
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2010212742A
Other languages
Japanese (ja)
Other versions
JP2012068877A (en
Inventor
洋 濱田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chugoku Electric Power Co Inc
Original Assignee
Chugoku Electric Power Co Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chugoku Electric Power Co Inc filed Critical Chugoku Electric Power Co Inc
Priority to JP2010212742A priority Critical patent/JP5209014B2/en
Publication of JP2012068877A publication Critical patent/JP2012068877A/en
Application granted granted Critical
Publication of JP5209014B2 publication Critical patent/JP5209014B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

本発明は、工事計画管理装置及び方法に関する。   The present invention relates to a construction plan management apparatus and method.

従来より、各種の工事の計画は、計画の立案から計画の変更、工事の進捗等についてコンピュータを利用して管理されている。コンピュータへの入力に誤りがなければ、工事計画のコンピュータによる管理は、頻繁に発生する変更や変更に伴う再計算について、省力化を促進し、計算ミスを防止する。   Conventionally, various construction plans have been managed using a computer for planning, plan changes, construction progress, and the like. If there is no error in the input to the computer, the management of the construction plan by the computer promotes labor saving for frequent changes and recalculations accompanying the changes, and prevents calculation errors.

例えば、計画の予算書を作成する場合に、計算ミス、転記ミス、科目の指示ミス等を防ぐための予算書作成システムを開示する特許文献1が知られている。特許文献1に開示された予算書作成システムは、科目のコード、名称をファイル上に登録し、これを参照しながら見積内容をファイル上に登録する。次に、予算書作成システムは、登録した見積内容を集計することにより計算ミス、転記ミス、科目の指示ミスをチェックし、ミスがなければ予算書の出力を行う。   For example, Patent Document 1 that discloses a budget document creation system for preventing calculation errors, transcription errors, subject instruction errors, and the like when creating a budget document for a plan is known. The budget document creation system disclosed in Patent Document 1 registers a subject code and name on a file, and registers an estimate content on the file while referring to this. Next, the budget document creation system checks the calculation error, the transcription error, and the subject instruction error by summing up the registered estimate contents, and if there is no error, outputs the budget document.

特開平6−35921号公報JP-A-6-35921

しかしながら、特許文献1の予算書作成システムは、過去の集約データの再利用ができないため比較分析ができない。また、工事計画は、予算調整段階の都度、計画に変更が生じるが、その変更内容や経緯について保持する機能がないと、人間の作業が多くなる。例えば、工事計画が多量(約1700件)にある場合、工事計画の作成や変更について、工事計画の件名の並べ変えや分類をする人間の作業が多く発生し、多くの時間を要する。また、工事計画の変更が頻繁になると、どの工事計画が最新か、なぜ工事計画を変更したのかが不明になる場合がある。   However, the budget document creation system of Patent Document 1 cannot perform comparative analysis because past aggregated data cannot be reused. In addition, the construction plan is changed every time the budget is adjusted, but if there is no function to hold the contents and details of the change, human work increases. For example, when there are a large number of construction plans (about 1700), a lot of human work is required for rearranging and classifying the construction plan subject for creation and modification of the construction plan, which takes a lot of time. In addition, when the construction plan is frequently changed, it may be unclear which construction plan is the latest and why the construction plan has been changed.

そこで、工事計画のデータを再利用して比較したり、工事計画の変更や経緯を示すことができる装置が求められている。   Therefore, there is a need for a device that can reuse and compare construction plan data and indicate changes and details of construction plans.

本発明は、工事計画のデータを再利用して比較し、工事計画の変更や経緯を容易に示すことができる工事計画管理装置及び方法を提供することを目的とする。   SUMMARY OF THE INVENTION An object of the present invention is to provide a construction plan management apparatus and method capable of reusing and comparing construction plan data and easily showing changes and history of construction plans.

本発明では、以下のような解決手段を提供する。   The present invention provides the following solutions.

(1) 工事の計画を管理する工事計画管理装置であって、前記工事を識別する工事識別情報に対応付けた工事計画を複数の工事について設けた集約工事計画を記憶する工事計画記憶手段と、前記工事計画記憶手段に記憶される前記集約工事計画の任意の時点の複製にバージョンを対応付けてバージョン記憶手段に記憶するバージョン記憶制御手段と、前記工事計画記憶手段に記憶された前記集約工事計画に含まれる複数の工事計画から任意の工事計画を比較対象工事計画として抽出する工事計画抽出手段と、前記バージョン記憶手段に記憶された前記集約工事計画のうち任意のバージョンに対応付けられた集約工事計画を抽出するバージョン抽出手段と、前記工事計画抽出手段によって抽出された前記比較対象工事計画と、前記バージョン抽出手段によって抽出された前記集約工事計画のうち前記比較対象工事計画と同一の前記工事識別情報に対応付けられた工事計画と、を比較する工事計画比較手段と、を備える工事計画管理装置。   (1) A construction plan management device for managing a construction plan, a construction plan storage means for storing an aggregate construction plan in which a construction plan associated with construction identification information for identifying the construction is provided for a plurality of constructions; Version storage control means for storing a version in the version storage means in association with a copy at an arbitrary point in time of the aggregate construction plan stored in the construction plan storage means; and the aggregate construction plan stored in the construction plan storage means A construction plan extracting means for extracting an arbitrary construction plan from a plurality of construction plans included in the above as a comparison target construction plan, and an aggregated work associated with an arbitrary version among the aggregated construction plans stored in the version storage means Version extracting means for extracting a plan, the construction plan for comparison extracted by the construction plan extracting means, and the version Work plan management device and a construction plan comparing means for comparing a work plan associated with the comparison work plan and the same of the work identification information of the extracted by detecting means the aggregate construction plan.

(1)の構成によれば、本発明に係る工事計画管理装置は、複数の工事計画を工事識別情報と対応付けると共に集約して集約工事計画として記憶する工事計画記憶手段に加え、工事計画記憶手段に記憶される集約工事計画の任意の時点の複製にバージョンを対応付けて記憶するバージョン記憶手段を備える。そして、工事計画管理装置は、工事計画記憶手段に記憶された任意の工事計画(比較対象工事計画)と、バージョン記憶手段に記憶された任意のバージョンに対応付けられた集約工事計画のうち比較対象工事計画と同一の工事識別情報に対応付けられた工事計画と、を比較する。
このように工事計画のデータをバージョン管理し再利用することで、予算調整等により数度にわたって工事計画が変更されたとしても、当該変更内容を容易に管理することができる。また、個々の工事計画に工事識別情報を付しているため、多数の工事が存在していても過去の工事計画との比較を容易に行うことができる。
According to the configuration of (1), the construction plan management apparatus according to the present invention associates a plurality of construction plans with construction identification information and aggregates them and stores them as an aggregate construction plan. Version storage means for storing a version in association with a copy at an arbitrary point of time in the aggregated construction plan stored in Then, the construction plan management device can compare an arbitrary construction plan (comparison target construction plan) stored in the construction plan storage means and an aggregate construction plan associated with any version stored in the version storage means. The construction plan associated with the construction identification information identical to the construction plan is compared.
Thus, by managing and reusing the data of the construction plan, even if the construction plan is changed several times by budget adjustment or the like, the change contents can be easily managed. In addition, since the construction identification information is attached to each construction plan, it is possible to easily compare with a past construction plan even if a large number of constructions exist.

(2) 前記工事計画記憶手段に記憶された前記工事計画の変更指示を受け付けると、変更後の工事計画を前記工事計画記憶手段に記憶させると共に当該変更の理由を受け付ける工事計画変更手段をさらに備える(1)に記載の工事計画管理装置。   (2) When a change instruction for the work plan stored in the work plan storage means is received, the work plan change means further stores the changed work plan in the work plan storage means and receives the reason for the change. The construction plan management apparatus according to (1).

(2)の構成によれば、工事計画の変更指示を受け付けると、工事計画記憶手段に変更後の工事計画を記憶させ、当該変更の理由を受け付ける。これにより、本発明に係る工事計画管理装置では、変更された工事計画について、変更の理由を容易に示すことができる。   According to the configuration of (2), when an instruction to change the construction plan is received, the construction plan after the change is stored in the construction plan storage unit, and the reason for the change is received. Thereby, in the construction plan management apparatus which concerns on this invention, the reason for change can be shown easily about the changed construction plan.

(3) 前記バージョン記憶制御手段は、前記工事計画記憶手段に記憶された前記集約工事計画を前記バージョン記憶手段に複製するための複製指示を受け付けると、前記工事計画記憶手段に記憶された前記集約工事計画に新たなバージョンを対応付けて前記バージョン記憶手段に記憶する(1)又は(2)に記載の工事計画管理装置。   (3) When the version storage control unit receives a copy instruction for copying the consolidated construction plan stored in the construction plan storage unit to the version storage unit, the version storage control unit stores the aggregation stored in the construction plan storage unit The construction plan management apparatus according to (1) or (2), wherein a new version is associated with the construction plan and stored in the version storage unit.

(3)の構成によれば、管理者の指示に基づいて集約工事計画の複製を生成することができるため、工事計画をバージョンによって再利用して比較し、工事計画の変更や経緯をさらに容易に示すことができる。   According to the configuration of (3), since it is possible to generate a copy of the aggregated construction plan based on an instruction from the administrator, the construction plan can be reused and compared by version, making it easier to change the construction plan and history Can be shown.

(4) 前記バージョン記憶制御手段は、前記工事計画記憶手段に記憶された前記工事計画の変更指示を受け付けると、変更前の工事計画を含む前記集約工事計画に新たなバージョンを対応付けて前記バージョン記憶手段に記憶する(1)から(3)のいずれかに記載の工事計画管理装置。   (4) Upon receiving an instruction to change the construction plan stored in the construction plan storage unit, the version storage control unit associates a new version with the integrated construction plan including the construction plan before the change, and the version The construction plan management apparatus according to any one of (1) to (3), which is stored in a storage unit.

(4)の構成によれば、変更前の工事計画を自動的に複製しバージョンを対応付けて記憶させるので、バージョンによって再利用して比較し、工事計画の変更や経緯を容易に示すことができる。   According to the configuration of (4), since the construction plan before the change is automatically duplicated and stored in association with the version, it can be reused and compared according to the version to easily show the change and the history of the construction plan. it can.

(5) 工事を識別する工事識別情報に対応付けた工事計画を複数の工事について設けた集約工事計画を記憶する工事計画記憶手段を備える、前記工事の計画を管理する工事計画管理装置が実行する方法であって、前記工事計画記憶手段に記憶される前記集約工事計画の任意の時点の複製にバージョンを対応付けてバージョン記憶手段に記憶するバージョン記憶制御ステップと、前記工事計画記憶手段に記憶された前記集約工事計画に含まれる複数の工事計画から任意の工事計画を比較対象工事計画として抽出する工事計画抽出ステップと、前記バージョン記憶手段に記憶された前記集約工事計画のうち任意のバージョンに対応付けられた集約工事計画を抽出するバージョン抽出ステップと、前記工事計画抽出ステップによって抽出された前記比較対象工事計画と、前記バージョン抽出ステップによって抽出された前記集約工事計画のうち前記比較対象工事計画と同一の前記工事識別情報に対応付けられた工事計画と、を比較する工事計画比較ステップと、を備える方法。   (5) A construction plan management device for managing a construction plan, comprising construction plan storage means for storing an aggregate construction plan in which a construction plan associated with construction identification information for identifying a construction is provided for a plurality of constructions, is executed. A version storage control step of storing a version in a version storage unit in association with a version at a point in time of the aggregated construction plan stored in the construction plan storage unit, and a method stored in the construction plan storage unit A construction plan extracting step for extracting an arbitrary construction plan as a comparison target construction plan from a plurality of construction plans included in the aggregate construction plan, and corresponding to an arbitrary version of the aggregate construction plans stored in the version storage means A version extracting step for extracting the attached integrated construction plan, and a version extracted by the construction plan extracting step. A construction plan comparison step for comparing a construction plan to be compared with a construction plan associated with the construction identification information identical to the construction plan to be compared among the aggregate construction plans extracted by the version extraction step; A method comprising:

(5)の構成によれば、(1)と同様に、最新の工事計画を容易に抽出することができ、複製して記憶した工事計画を工事識別情報によって比較して、工事計画の変更や経緯を容易に示すことができる。   According to the configuration of (5), as in (1), the latest construction plan can be easily extracted, the construction plan copied and stored is compared by the construction identification information, History can be shown easily.

本発明によれば、本発明は、工事計画について過去の集約データを保持し、再利用できる機能を追加することで、今回と過去との予算集計の比較を容易にすることができる。また、本発明は、工事計画の変更理由(変更内容、経緯等)を保持し、確認できる機能を追加することで、変更管理を容易に行うことができる。したがって、本発明は、工事計画の集計業務及び変更管理について、迅速化及び省力化を可能とすることができる。   According to the present invention, the present invention can facilitate comparison of budget tabulation between the current time and the past by adding a function that can retain and reuse past consolidated data for a construction plan. Further, according to the present invention, change management can be easily performed by adding a function that holds and confirms the reason for changing the construction plan (change contents, history, etc.). Therefore, the present invention can speed up and save labor for the construction work totalization work and change management.

本発明の一実施形態に係る工事計画管理装置の機能を示す機能ブロック図である。It is a functional block diagram which shows the function of the construction plan management apparatus which concerns on one Embodiment of this invention. 本発明の一実施形態に係る工事計画管理装置のハードウェア構成の一例を示す図である。It is a figure which shows an example of the hardware constitutions of the construction plan management apparatus which concerns on one Embodiment of this invention. 本発明の一実施形態に係る工事計画DBの例を示す図である。It is a figure which shows the example of construction plan DB which concerns on one Embodiment of this invention. 本発明の一実施形態に係るバージョンDBの例を示す図である。It is a figure which shows the example of version DB which concerns on one Embodiment of this invention. 本発明の一実施形態に係る工事計画管理装置の処理内容を示すフローチャートである。It is a flowchart which shows the processing content of the construction plan management apparatus which concerns on one Embodiment of this invention. 本発明の一実施形態に係る工事計画管理装置の工事計画比較処理の内容を示すフローチャートである。It is a flowchart which shows the content of the construction plan comparison process of the construction plan management apparatus which concerns on one Embodiment of this invention. 本発明の一実施形態に係る工事計画管理装置の工事計画変更処理の内容を示すフローチャートである。It is a flowchart which shows the content of the construction plan change process of the construction plan management apparatus which concerns on one Embodiment of this invention. 本発明の一実施形態に係る工事計画管理装置の複製処理の内容を示すフローチャートである。It is a flowchart which shows the content of the duplication process of the construction plan management apparatus which concerns on one Embodiment of this invention. 本発明の一実施形態に係る工事計画管理装置が表示させるメニュー画面の例を示す図である。It is a figure which shows the example of the menu screen which the construction plan management apparatus which concerns on one Embodiment of this invention displays. 本発明の一実施形態に係る工事計画管理装置が表示させる工事計画比較画面の例を示す図である。It is a figure which shows the example of the construction plan comparison screen which the construction plan management apparatus concerning one Embodiment of this invention displays. 本発明の一実施形態に係る工事計画管理装置が表示させる工事計画変更画面の例を示す図である。It is a figure which shows the example of the construction plan change screen which the construction plan management apparatus concerning one Embodiment of this invention displays. 本発明の一実施形態に係る工事計画管理装置が表示させる工事計画変更画面の修正画面の例を示す図である。It is a figure which shows the example of the correction screen of the construction plan change screen which the construction plan management apparatus which concerns on one Embodiment of this invention displays. 本発明の一実施形態に係る工事計画管理装置が表示させる工事計画変更画面の変更理由入力画面の例を示す図である。It is a figure which shows the example of the change reason input screen of the construction plan change screen which the construction plan management apparatus which concerns on one Embodiment of this invention displays. 本発明の一実施形態に係る工事計画管理装置が表示させるバージョン管理画面の例を示す図である。It is a figure which shows the example of the version management screen which the construction plan management apparatus which concerns on one Embodiment of this invention displays. 本発明の一実施形態に係る工事計画管理装置が表示させるバージョン管理画面の確認画面の例を示す図である。It is a figure which shows the example of the confirmation screen of the version management screen which the construction plan management apparatus which concerns on one Embodiment of this invention displays. 本発明の実施形態2に係る工事計画DBの例を示す図である。It is a figure which shows the example of construction plan DB which concerns on Embodiment 2 of this invention. 本発明の実施形態2に係る工事計画管理装置の工事計画変更処理の内容を示すフローチャートである。It is a flowchart which shows the content of the construction plan change process of the construction plan management apparatus which concerns on Embodiment 2 of this invention.

[実施形態1]
以下、本発明の実施形態について図を参照しながら説明する。
[Embodiment 1]
Hereinafter, embodiments of the present invention will be described with reference to the drawings.

図1は、本発明の一実施形態に係る工事計画管理装置10の機能を示す機能ブロック図である。工事計画管理装置10は、工事計画記憶手段としての工事計画DB31と、バージョン記憶手段としてのバージョンDB32と、バージョン記憶制御手段11と、工事計画抽出手段12と、バージョン抽出手段13と、工事計画比較手段14と、工事計画変更手段15とを含んで構成される。以下各手段ごとに説明する。   FIG. 1 is a functional block diagram showing functions of a construction plan management apparatus 10 according to an embodiment of the present invention. The construction plan management apparatus 10 includes a construction plan DB 31 as a construction plan storage means, a version DB 32 as a version storage means, a version storage control means 11, a construction plan extraction means 12, a version extraction means 13, and a construction plan comparison. Means 14 and construction plan changing means 15 are included. Each means will be described below.

工事計画DB31は、工事を識別する工事識別情報に対応付けた工事計画を複数の工事について設けた集約工事計画を記憶する。すなわち、工事計画DB31は、工事IDに対応付けて個々の工事計画を記憶し、個々の工事計画を集めて集約工事計画として記憶する。例えば、工事計画は、工事名称や、工事額、工期等から構成される(後述する図3参照)。工事計画は変更されると工事計画DB31に記憶させるので、工事計画DB31から抽出した工事計画は、最新の工事計画である。   The construction plan DB 31 stores an aggregate construction plan in which construction plans associated with construction identification information for identifying construction are provided for a plurality of constructions. That is, the construction plan DB 31 stores individual construction plans in association with construction IDs, collects the individual construction plans, and stores them as an aggregate construction plan. For example, the construction plan includes a construction name, a construction amount, a construction period, and the like (see FIG. 3 described later). Since the construction plan is stored in the construction plan DB 31 when the construction plan is changed, the construction plan extracted from the construction plan DB 31 is the latest construction plan.

バージョン記憶制御手段11は、工事計画DB31に記憶される集約工事計画の任意の時点の複製にバージョンを対応付けてバージョンDB32に記憶する。任意の時点には、管理者による指示を受け付けて複製をする場合や、工事計画の変更の際に自動的に複製をする場合等がある。バージョンは、例えば、平成22年度中期計画の初期集計や、平成22年度中期計画の部長ヒアリングによる変更計画等のように工事計画の変更に対して設けられ、識別情報(バージョンID)を付して管理される。   The version storage control unit 11 stores a version in the version DB 32 by associating a version with a copy at an arbitrary point in the aggregated construction plan stored in the construction plan DB 31. At an arbitrary time, there is a case of copying by receiving an instruction from an administrator, or a case of copying automatically when a construction plan is changed. Versions are provided for changes to construction plans, such as initial aggregation of the 2010 mid-term plan and change plans based on interviews with managers of the 2010 mid-term plan, with identification information (version ID) attached. Managed.

工事計画抽出手段12は、工事計画DB31に記憶された集約工事計画に含まれる複数の工事計画から任意の工事計画を比較対象工事計画として抽出する。例えば、工事計画抽出手段12は、管理者によって選択された任意の工事計画を受け付けて、受け付けた工事計画を工事計画DB31から抽出する。抽出は、編集距離(レーベンシュタイン距離)アルゴリズムを用いた検索によって行われる。このような検索は、工事計画を受け付ける際に入力されたキーワードが工事名称にマッチしていなくても、キーワードと工事名称とについて文字列間の関連度が高い、類似する工事名称をも検索することができる。   The construction plan extraction means 12 extracts an arbitrary construction plan from the plurality of construction plans included in the aggregate construction plan stored in the construction plan DB 31 as a comparison target construction plan. For example, the construction plan extraction unit 12 accepts an arbitrary construction plan selected by the manager and extracts the accepted construction plan from the construction plan DB 31. The extraction is performed by a search using an edit distance (Levenstein distance) algorithm. Such a search also searches for similar construction names that have a high degree of relevance between character strings for the keyword and the construction name, even if the keyword entered when accepting the construction plan does not match the construction name. be able to.

バージョン抽出手段13は、バージョンDB32に記憶された集約工事計画のうち任意のバージョンに対応付けられた集約工事計画を抽出する。例えば、バージョン抽出手段13は、管理者によって入力される任意のバージョンを受け付けて、受け付けたバージョンに対応付けられた集約工事計画をバージョンDB32から抽出する。   The version extraction unit 13 extracts an aggregate work plan associated with an arbitrary version from the aggregate work plans stored in the version DB 32. For example, the version extraction unit 13 receives an arbitrary version input by the administrator, and extracts from the version DB 32 an aggregated construction plan associated with the received version.

工事計画比較手段14は、工事計画抽出手段12によって抽出された比較対象工事計画と、バージョン抽出手段13によって抽出された集約工事計画のうち比較対象工事計画と同一の工事識別情報に対応付けられた工事計画と、を比較する。
なお、工事計画管理装置10では、工事計画比較手段14による比較結果を表示することとしてもよい。この場合において、相違箇所を色表示したり、相違する工事計画のみを表示することで、工事額の相違や、工期の相違等を明示することが好ましい。また、相違箇所の色表示は、相違箇所に応じて異なる色彩で強調することとしてもよい。例えば、工事額が相違する場合には青色で強調し、工期が相違する場合には緑色で強調することとしてもよい。
The construction plan comparison means 14 is associated with the same construction identification information as the comparison target construction plan among the comparison construction plans extracted by the construction plan extraction means 12 and the aggregate construction plans extracted by the version extraction means 13. Compare the construction plan.
The construction plan management apparatus 10 may display the comparison result by the construction plan comparison unit 14. In this case, it is preferable to clearly indicate a difference in construction amount, a difference in construction period, or the like by displaying different parts in color or displaying only different construction plans. Moreover, the color display of a different location is good also as highlighting with a different color according to a different location. For example, when the construction amount is different, it may be emphasized in blue, and when the construction period is different, it may be emphasized in green.

バージョン記憶制御手段11は、工事計画DB31に記憶された集約工事計画をバージョンDB32に複製するための複製指示を受け付けると、工事計画DB31に記憶された集約工事計画に新たなバージョンを対応付けてバージョンDB32に記憶する。例えば、バージョン記憶制御手段11は、複製ボタン503(後述する図9参照)の押下を受け付けると、工事計画DB31に記憶された集約工事計画に新たなバージョンを対応付けてバージョンDB32に記憶する(任意複製)。   When the version storage control unit 11 receives a copy instruction for copying the aggregated construction plan stored in the construction plan DB 31 to the version DB 32, the version storage control unit 11 associates a new version with the aggregated construction plan stored in the construction plan DB 31 and performs versioning. Store in DB32. For example, when the version storage control unit 11 accepts pressing of the copy button 503 (see FIG. 9 described later), the version storage control unit 11 associates a new version with the aggregated construction plan stored in the construction plan DB 31 and stores the new version in the version DB 32 (optional). Duplication).

工事計画変更手段15は、工事計画DB31に記憶された工事計画の変更指示を受け付けると、変更後の工事計画を工事計画DB31に記憶させると共に当該変更の理由を受け付ける。例えば、工事計画変更手段15は、変更ボタン502(後述する図9参照)の押下を受け付けると、工事計画の変更を受け付け、変更後の工事計画を工事計画DB31に記憶させる。次に、工事計画変更手段15は、変更の理由の入力を受け付け、受け付けた変更の理由を、バージョン記憶制御手段11によって任意複製されたバージョンDB32に記憶する。   When the construction plan changing means 15 receives a change instruction for the construction plan stored in the construction plan DB 31, the construction plan changing means 15 stores the changed construction plan in the construction plan DB 31 and accepts the reason for the change. For example, when the construction plan changing unit 15 accepts pressing of the change button 502 (see FIG. 9 described later), the construction plan changing unit 15 accepts the change of the construction plan and stores the changed construction plan in the construction plan DB 31. Next, the construction plan changing unit 15 receives an input of the reason for the change, and stores the received reason for the change in the version DB 32 arbitrarily copied by the version storage control unit 11.

図2は、本発明の一実施形態に係る工事計画管理装置10のハードウェア構成の一例を示す図である。工事計画管理装置10は、CPU(Central Processing Unit)1000、通信I/F1040、メインメモリ1050、BIOS(Basic Input Output System)1060、I/Oコントローラ1070、ハードディスク1074、表示装置1080、入力装置1100及び入出力I/F装置2000を備え、バスライン1005により接続されている。   FIG. 2 is a diagram illustrating an example of a hardware configuration of the construction plan management apparatus 10 according to an embodiment of the present invention. The construction plan management apparatus 10 includes a CPU (Central Processing Unit) 1000, a communication I / F 1040, a main memory 1050, a BIOS (Basic Input Output System) 1060, an I / O controller 1070, a hard disk 1074, a display device 1080, an input device 1100, and the like. An input / output I / F device 2000 is provided and connected by a bus line 1005.

CPU1000は、工事計画管理装置10を統括的に制御する部分であり、ハードディスク1074に記憶された各種プログラムを適宜読み出して実行することにより、上述したハードウェアと協働し、本発明に係る各種機能を実現している。   The CPU 1000 is a part that controls the construction plan management apparatus 10 in an integrated manner, and by reading and executing various programs stored in the hard disk 1074 as appropriate, the CPU 1000 cooperates with the above-described hardware and performs various functions according to the present invention. Is realized.

通信I/F1040は、工事計画管理装置10を専用ネットワーク又は公共ネットワークを介してユーザ端末等と接続できるようにするためのネットワーク・アダプタである。   The communication I / F 1040 is a network adapter that enables the construction plan management apparatus 10 to be connected to a user terminal or the like via a dedicated network or a public network.

メインメモリ1050は、適宜読み出して実行されるプログラムを記憶し、プログラムの実行によって作成される種々の情報を記憶する。BIOS1060は、工事計画管理装置10の起動時にCPU1000が実行するブートプログラムや、工事計画管理装置10のハードウェアに依存するプログラム等を格納する。   The main memory 1050 stores a program that is read and executed as appropriate, and stores various types of information created by the execution of the program. The BIOS 1060 stores a boot program executed by the CPU 1000 when the construction plan management apparatus 10 is started up, a program depending on the hardware of the construction plan management apparatus 10, and the like.

I/Oコントローラ1070には、ハードディスク1074等の記憶手段を接続することができる。ハードディスク1074は、工事計画管理装置10が本発明の機能を実行するためのプログラムを記憶している。   Storage means such as a hard disk 1074 can be connected to the I / O controller 1070. The hard disk 1074 stores a program for the construction plan management apparatus 10 to execute the functions of the present invention.

工事計画管理装置10に提供されるプログラムは、ハードディスク1074、又はメモリカード等の記録媒体に格納されて提供される。このプログラムは、I/Oコントローラ1070を介して、記録媒体から読み出され、又は通信I/F1040を介してダウンロードされることによって、工事計画管理装置10にインストールされ実行されてもよい。   The program provided to the construction plan management apparatus 10 is provided by being stored in a recording medium such as a hard disk 1074 or a memory card. This program may be installed in the construction plan management apparatus 10 and executed by being read from a recording medium via the I / O controller 1070 or downloaded via the communication I / F 1040.

表示装置1080は、工事計画管理装置10による演算処理結果の画面、管理者の指示を受け付ける画面等を表示するものであり、ブラウン管表示装置、液晶表示装置等のディスプレイ装置を含む。入力装置1100は、工事計画管理装置10のオペレータによる入力を行う装置であり、キーボード及びマウス等で構成される。入出力I/F装置2000は、工事計画管理装置10と、他の機器、例えば補助記憶装置等とを接続する。   The display device 1080 displays a screen of a calculation processing result by the construction plan management device 10, a screen for receiving an instruction from the administrator, and the like, and includes a display device such as a cathode ray tube display device or a liquid crystal display device. The input device 1100 is a device that performs input by an operator of the construction plan management device 10 and includes a keyboard and a mouse. The input / output I / F device 2000 connects the construction plan management device 10 to another device such as an auxiliary storage device.

図3は、本発明の一実施形態に係る工事計画DB31の例を示す図である。工事計画DB31は、工事IDに対応付けて、工事計画を記憶している。工事計画は、例えば、担当(担当者名や担当部署等)、立案予定、工期(着工及び竣工)、総工事額(年度ごとの予算額の総計)、総工事額の内訳としての当年度工事額(当年度の詳細、例えば、4半期ごとの工事額を含む)や年度ごとの工事額等からなる。   FIG. 3 is a diagram illustrating an example of the construction plan DB 31 according to an embodiment of the present invention. The construction plan DB 31 stores a construction plan in association with the construction ID. The construction plan is, for example, responsible (name of person in charge, department in charge, etc.), planning schedule, construction period (starting and completion), total construction amount (total budget amount for each fiscal year), construction for the current fiscal year as a breakdown of the total construction amount It consists of the amount (including details of the current year, for example, the amount of work for each quarter) and the amount of work for each year.

図4は、本発明の一実施形態に係るバージョンDB32の例を示す図である。バージョンDB32は、集約工事計画のバージョンIDに対応付けて、工事計画DB31の複製と、工事計画の変更理由とを記憶している。バージョンIDは、例えば、V10_1(平成22年度中期計画の初期集計)や、V10_2(平成22年度中期計画の部長ヒアリングによる変更計画)等である。   FIG. 4 is a diagram showing an example of the version DB 32 according to an embodiment of the present invention. The version DB 32 stores a copy of the construction plan DB 31 and the reason for changing the construction plan in association with the version ID of the aggregate construction plan. The version ID is, for example, V10_1 (initial summation of the 2010 mid-term plan), V10_2 (change plan based on the hearing of the manager of the 2010 mid-term plan), or the like.

図5は、本発明の一実施形態に係る工事計画管理装置10の処理内容を示すフローチャートである。   FIG. 5 is a flowchart showing the processing contents of the construction plan management apparatus 10 according to one embodiment of the present invention.

ステップS101において、CPU1000は、工事計画の比較か否かを判断する。すなわち、CPU1000は、比較ボタン501(後述する図9参照)が押下されたか否かを判断する。この判断がYESの場合、CPU1000は、処理をステップS102に移し、NOの場合、CPU1000は、処理をステップS103に移す。   In step S101, the CPU 1000 determines whether or not the construction plans are compared. That is, the CPU 1000 determines whether or not a comparison button 501 (see FIG. 9 described later) has been pressed. If this determination is YES, the CPU 1000 moves the process to step S102, and if NO, the CPU 1000 moves the process to step S103.

ステップS102において、CPU1000は工事計画比較処理(後述する図6参照)を行う。その後、CPU1000は、処理をステップS103に移す。   In step S102, the CPU 1000 performs a construction plan comparison process (see FIG. 6 described later). Thereafter, the CPU 1000 shifts the processing to step S103.

ステップS103において、CPU1000は、工事計画の変更か否かを判断する。すなわち、CPU1000は、変更ボタン502(後述する図9参照)が押下されたか否かを判断する。この判断がYESの場合、CPU1000は、処理をステップS104に移し、NOの場合、CPU1000は、処理をステップS105に移す。   In step S103, the CPU 1000 determines whether or not the construction plan is changed. That is, the CPU 1000 determines whether or not a change button 502 (see FIG. 9 described later) has been pressed. If this determination is YES, the CPU 1000 moves the process to step S104, and if NO, the CPU 1000 moves the process to step S105.

ステップS104において、CPU1000は、工事計画変更処理(後述する図7参照)を行う。その後、CPU1000は、処理をステップS105に移す。   In step S104, the CPU 1000 performs a construction plan change process (see FIG. 7 described later). Thereafter, the CPU 1000 shifts the processing to step S105.

ステップS105において、CPU1000は、工事計画の複製か否かを判断する。すなわち、CPU1000は、複製ボタン503(後述する図9参照)が押下されたか否かを判断する。この判断がYESの場合、CPU1000は、処理をステップS106に移し、NOの場合、CPU1000は、処理をステップS107に移す。   In step S105, the CPU 1000 determines whether or not the work plan is duplicated. That is, the CPU 1000 determines whether or not the copy button 503 (see FIG. 9 described later) has been pressed. If this determination is YES, the CPU 1000 moves the process to step S106, and if NO, the CPU 1000 moves the process to step S107.

ステップS106において、CPU1000は、工事計画の複製処理(後述する図8参照)を行う。その後、CPU1000は、処理をステップS107に移す。   In step S106, the CPU 1000 performs a construction plan duplication process (see FIG. 8 described later). Thereafter, the CPU 1000 shifts the processing to step S107.

ステップS107において、CPU1000は、工事計画の作成か否かを判断する。すなわち、CPU1000は、作成ボタン504(後述する図9参照)が押下されたか否かを判断する。この判断がYESの場合、CPU1000は、処理をステップS108に移し、NOの場合、CPU1000は、処理をステップS109に移す。   In step S107, the CPU 1000 determines whether a construction plan is to be created. That is, the CPU 1000 determines whether a creation button 504 (see FIG. 9 described later) has been pressed. If this determination is YES, the CPU 1000 moves the process to step S108, and if NO, the CPU 1000 moves the process to step S109.

ステップS108において、CPU1000は、工事計画を作成する。より具体的には、CPU1000は、作成する工事計画について、工事計画変更画面のうち修正画面(後述する図12参照)と同様の画面により、工事計画の内容を受け付け、工事計画の変更理由を新規作成にし、工事IDを自動的に生成し(例えば、2010年度の1件目をK100001)、工事名称の入力を受け付け、工事計画に対応付けて工事計画DB31に記憶させる。その後、CPU1000は、処理をステップS109に移す。   In step S108, the CPU 1000 creates a construction plan. More specifically, the CPU 1000 accepts the contents of the construction plan for the construction plan to be created by using a screen similar to the modification screen (see FIG. 12 to be described later) among the construction plan change screens, and newly explains the reason for changing the construction plan. A construction ID is automatically generated (for example, K100001 in the first case in 2010), an input of a construction name is accepted, and stored in the construction plan DB 31 in association with the construction plan. After that, the CPU 1000 moves the process to step S109.

ステップS109において、CPU1000は、バージョン管理を行うか否かを判断する。すなわち、CPU1000は、管理ボタン505(後述する図9参照)が押下されたか否かを判断する。この判断がYESの場合、CPU1000は、処理をステップS110に移し、NOの場合、CPU1000は、処理をステップS101に移す。   In step S109, the CPU 1000 determines whether to perform version management. That is, the CPU 1000 determines whether or not a management button 505 (see FIG. 9 described later) has been pressed. If this determination is YES, the CPU 1000 moves the process to step S110, and if NO, the CPU 1000 moves the process to step S101.

ステップS110において、CPU1000は、バージョン管理を行う。より具体的には、CPU1000は、バージョン管理画面(後述する図14及び15参照)を表示装置1080に表示させ、受け付けたバージョンの検索を行い、検索したバージョンのうちの工事計画の変更理由の修正等を行う。その後、CPU1000は、処理をステップS101に移す。   In step S110, the CPU 1000 performs version management. More specifically, the CPU 1000 displays a version management screen (see FIGS. 14 and 15 described later) on the display device 1080, searches for the received version, and corrects the reason for changing the construction plan in the searched version. Etc. Thereafter, the CPU 1000 shifts the processing to step S101.

図6は、本発明の一実施形態に係る工事計画管理装置10の工事計画比較処理の内容を示すフローチャートである。   FIG. 6 is a flowchart showing the contents of the construction plan comparison process of the construction plan management apparatus 10 according to one embodiment of the present invention.

ステップS201において、CPU1000(工事計画抽出手段12)は、比較する工事計画を受け付ける。より具体的には、CPU1000は、比較する工事計画の工事名称の入力を受け付ける(後述する図10参照)。その後、CPU1000は、処理をステップS202に移す。   In step S201, the CPU 1000 (construction plan extraction means 12) accepts a construction plan to be compared. More specifically, the CPU 1000 receives an input of a construction name of a construction plan to be compared (see FIG. 10 described later). Thereafter, the CPU 1000 shifts the processing to step S202.

ステップS202において、CPU1000(工事計画抽出手段12)は、受け付けた工事計画を工事計画DB31から抽出する。より具体的には、CPU1000は、ステップS201で受け付けた工事名称によって、工事計画DB31を検索し、検索した工事計画を抽出する。その後、CPU1000は、処理をステップS203に移す。   In step S202, the CPU 1000 (construction plan extraction means 12) extracts the accepted construction plan from the construction plan DB 31. More specifically, the CPU 1000 searches the construction plan DB 31 based on the construction name received in step S201, and extracts the searched construction plan. Thereafter, the CPU 1000 moves the process to step S203.

ステップS203において、CPU1000(バージョン抽出手段13)は、バージョンを受け付ける。より具体的には、CPU1000は、比較するバージョンのバージョン名称やバージョンIDの入力を受け付ける(後述する図10参照)。その後、CPU1000は、処理をステップS204に移す。   In step S203, the CPU 1000 (version extraction unit 13) receives a version. More specifically, the CPU 1000 accepts input of the version name and version ID of the versions to be compared (see FIG. 10 described later). Thereafter, the CPU 1000 shifts the processing to step S204.

ステップS204において、CPU1000(バージョン抽出手段13)は、受け付けたバージョンをバージョンDB32から抽出する。より具体的には、CPU1000は、ステップS203で受け付けたバージョンIDによって、バージョンDB32を検索し、検索したバージョンを抽出する(後述する図10参照)。その後、CPU1000は、処理をステップS205に移す。   In step S204, the CPU 1000 (version extraction unit 13) extracts the received version from the version DB 32. More specifically, the CPU 1000 searches the version DB 32 using the version ID received in step S203 and extracts the searched version (see FIG. 10 described later). Thereafter, the CPU 1000 shifts the processing to step S205.

ステップS205において、CPU1000(工事計画比較手段14)は、工事IDが同一の工事計画同士を比較する。より具体的には、CPU1000は、ステップS202で抽出された比較対象工事計画と、ステップS204で抽出されたバージョンのうち比較対象工事計画と同一の工事IDに対応付けられた工事計画と、を比較する。その後、CPU1000は、処理をステップS206に移す。   In step S205, the CPU 1000 (construction plan comparison means 14) compares construction plans having the same construction ID. More specifically, the CPU 1000 compares the comparison target construction plan extracted in step S202 with the construction plan associated with the same construction ID as the comparison target construction plan among the versions extracted in step S204. To do. Thereafter, the CPU 1000 shifts the processing to step S206.

ステップS206において、CPU1000は、比較結果を色表示する。より具体的には、CPU1000は、工事計画に含まれる項目(担当、立案予定、工期、総工事額、総工事額の内訳等)を比較し、相違する項目について、色表示(例えば、工期が相違する場合に緑色、工事額が相違する場合に青色、新規作成され、同一の工事計画が存在しない場合に赤色)によって相違を明示して表示装置1080に表示したり、プリンタに比較表を出力したりする。その後、CPU1000は、処理を終了し、本処理に移るステップの次のステップに処理を戻す。   In step S206, the CPU 1000 displays the comparison result in color. More specifically, the CPU 1000 compares items included in the construction plan (in charge, planning schedule, construction period, total construction amount, breakdown of the total construction amount, etc.), and displays different items with color display (for example, construction period Green when there is a difference, blue when the construction amount is different, blue when newly created and red when there is no same construction plan) and display the difference on the display device 1080, or output a comparison table to the printer To do. Thereafter, the CPU 1000 ends the process, and returns the process to the next step after the step that moves to the present process.

図7は、本発明の一実施形態に係る工事計画管理装置10の工事計画変更処理の内容を示すフローチャートである。   FIG. 7 is a flowchart showing the contents of the construction plan change process of the construction plan management apparatus 10 according to one embodiment of the present invention.

ステップS301において、CPU1000(工事計画変更手段15)は、変更する工事計画を受け付け、受け付けた工事計画を工事計画DB31から抽出する。より具体的には、CPU1000は、変更する工事計画の工事名称の入力を受け付ける(後述する図11参照)。次に、CPU1000は、受け付けた工事名称によって工事計画DB31を検索し、検索した工事計画を表示する(後述する図11参照)。次に、CPU1000は、検索した工事計画のうちから選択された工事計画を表示する(後述する図11及び図12参照)。その後、CPU1000は、処理をステップS302に移す。   In step S301, the CPU 1000 (construction plan changing means 15) accepts a construction plan to be changed, and extracts the accepted construction plan from the construction plan DB 31. More specifically, the CPU 1000 receives an input of a construction name of a construction plan to be changed (see FIG. 11 described later). Next, the CPU 1000 searches the construction plan DB 31 by the accepted construction name and displays the searched construction plan (see FIG. 11 described later). Next, the CPU 1000 displays a construction plan selected from the searched construction plans (see FIGS. 11 and 12 described later). After that, the CPU 1000 moves the process to step S302.

ステップS302において、CPU1000(工事計画変更手段15)は、抽出した工事計画の内容を、受け付けた内容によって変更する。より具体的には、CPU1000は、工事計画に含まれる項目(担当、立案予定、工期、総工事額、総工事額の内訳等)の内容を表示し、内容の変更を受け付ける(後述する図12参照)。その後、CPU1000は、処理をステップS303に移す。   In step S302, the CPU 1000 (construction plan changing means 15) changes the contents of the extracted construction plan according to the accepted contents. More specifically, the CPU 1000 displays the contents of items included in the construction plan (in charge, planning schedule, construction period, total construction amount, breakdown of the total construction amount, etc.) and accepts changes in the contents (FIG. 12 described later). reference). Thereafter, the CPU 1000 shifts the processing to step S303.

ステップS303において、CPU1000(工事計画変更手段15)は、工事計画の変更理由を受け付け、変更後の工事計画を工事計画DB31に記憶させると共に、変更の理由をバージョンDB32に記憶させる。より具体的には、CPU1000は、工事計画を変更する理由を入力させるために、工事計画変更画面の理由入力画面を表示させ、入力を受け付ける(後述する図13参照)。そして、CPU1000は、ステップS302で変更された工事計画を工事計画DB31に記憶させると共に、入力された変更の理由をバージョンDB32に記憶させる。その後、CPU1000は、処理を終了し、本処理に移るステップの次のステップに処理を戻す。   In step S303, the CPU 1000 (construction plan changing unit 15) receives the reason for changing the construction plan, stores the changed construction plan in the construction plan DB 31, and stores the reason for the change in the version DB 32. More specifically, the CPU 1000 displays a reason input screen for the construction plan change screen and accepts input in order to input the reason for changing the construction plan (see FIG. 13 described later). And CPU1000 memorize | stores the construction plan changed by step S302 in construction plan DB31, and memorize | stores the reason for the inputted change in version DB32. Thereafter, the CPU 1000 ends the process, and returns the process to the next step after the step that moves to the present process.

図8は、本発明の一実施形態に係る工事計画管理装置10の複製処理の内容を示すフローチャートである。   FIG. 8 is a flowchart showing the contents of the duplication process of the construction plan management apparatus 10 according to the embodiment of the present invention.

ステップS401において、CPU1000(バージョン記憶制御手段11)は、バージョンを受け付ける。より具体的には、CPU1000は、複製する集約工事計画に対応付けるためのバージョンのバージョン名称の入力を受け付ける。その後、CPU1000は、処理をステップS402に移す。   In step S401, the CPU 1000 (version storage control unit 11) receives a version. More specifically, the CPU 1000 receives an input of the version name of the version for associating with the aggregated construction plan to be copied. After that, the CPU 1000 moves the process to step S402.

ステップS402において、CPU1000(バージョン記憶制御手段11)は、工事計画DB31に記憶された集約工事計画に、バージョンを対応付けてバージョンDB32に複製する。より具体的には、CPU1000は、工事計画DB31に記憶された集約工事計画に、ステップS401で受け付けたバージョンを対応付けてバージョンDB32に複製する。その後、CPU1000は、処理を終了し、本処理に移るステップの次のステップに処理を戻す。   In step S402, the CPU 1000 (version storage control means 11) copies the version to the version DB 32 by associating the version with the aggregated construction plan stored in the construction plan DB 31. More specifically, the CPU 1000 associates the version received in step S401 with the aggregated work plan stored in the work plan DB 31, and copies it to the version DB 32. Thereafter, the CPU 1000 ends the process, and returns the process to the next step after the step that moves to the present process.

図9は、本発明の一実施形態に係る工事計画管理装置10が表示させるメニュー画面の例を示す図である。図9に示すメニュー画面では、工事計画比較処理の選択を受け付けるための比較ボタン501と、工事計画変更処理の選択を受け付けるための変更ボタン502と、工事計画複製処理の選択を受け付けるための複製ボタン503と、工事計画作成処理の選択を受け付けるための作成ボタン504と、バージョン管理処理の選択を受け付けるための管理ボタン505と、が表示される。工事計画管理装置10は、比較ボタン501の押下を受け付けると図10に示す工事計画比較画面を表示装置1080に表示させ、変更ボタン502の押下を受け付けると図11から図13に示す工事計画変更画面を表示装置1080に表示させ、複製ボタン503の押下を受け付けると工事計画複製処理を行い、作成ボタン504の押下を受け付けると工事計画作成処理を行い、管理ボタン505の押下を受け付けると図14及び15に示すバージョン管理画面を表示装置1080に表示させる。   FIG. 9 is a diagram illustrating an example of a menu screen displayed by the construction plan management apparatus 10 according to an embodiment of the present invention. In the menu screen shown in FIG. 9, a comparison button 501 for accepting selection of construction plan comparison processing, a change button 502 for accepting selection of construction plan change processing, and a duplicate button for accepting selection of construction plan duplication processing 503, a creation button 504 for accepting selection of construction plan creation processing, and a management button 505 for accepting selection of version management processing are displayed. The construction plan management apparatus 10 displays the construction plan comparison screen shown in FIG. 10 on the display device 1080 when the pressing of the comparison button 501 is accepted, and the construction plan change screen shown in FIGS. 11 to 13 when the pressing of the change button 502 is accepted. Is displayed on the display device 1080, and when the depression of the copy button 503 is accepted, the construction plan duplication process is performed. When the depression of the creation button 504 is accepted, the construction plan creation process is performed, and when the depression of the management button 505 is accepted, FIGS. Is displayed on the display device 1080.

図10は、本発明の一実施形態に係る工事計画管理装置10が表示させる工事計画比較画面の例を示す図である。図10に示す工事計画比較画面では、工事計画DB31に記憶された工事計画と、バージョンDB32に記憶され工事IDが同一の工事計画とを比較して、表示装置1080に表示させる。
工事計画比較画面において、工事計画管理装置10は、入力欄611から工事名称の入力を受け付ける。工事計画管理装置10は、受け付けた工事名称によって工事計画DB31から工事計画(比較対象工事計画)を抽出する。なお、工事名称が入力されていない場合、工事計画管理装置10は、全ての工事計画を対象とする。
また、工事計画比較画面において、工事計画管理装置10は、入力欄612からバージョンの入力を受け付けて、受け付けたバージョンに対応付けられた集約工事計画をバージョンDB32から抽出する。
そして、工事計画管理装置10は、工事計画DB31から抽出した比較対象工事計画と、バージョンDB32から抽出した集約工事計画のうち比較対象工事計画と同一の工事IDである工事計画とを比較し、比較結果を表示装置1080の表示欄613に表示する。例えば、図10では、相違する箇所の表示方法を変えて(色によって相違を明示して)表示している。なお、管理者は、比較する項目、例えば、担当、立案予定、工期、総工事額、総工事額の内訳等を、適宜選択できることとしてもよい。また、比較表ボタン512の押下を受け付けると、比較結果をプリンタに比較表として印字する。比較表は、例えば、用紙の左半分に工事計画DB31から抽出した工事計画の内容が印字され、工事IDが同一であって、バージョンDB32から抽出した工事計画の内容が同一行の右半分に印字され、相違する箇所を色表示するように印字される。
FIG. 10 is a diagram illustrating an example of a construction plan comparison screen displayed by the construction plan management apparatus 10 according to an embodiment of the present invention. On the construction plan comparison screen shown in FIG. 10, the construction plan stored in the construction plan DB 31 is compared with the construction plan stored in the version DB 32 and having the same construction ID, and displayed on the display device 1080.
On the construction plan comparison screen, the construction plan management apparatus 10 receives an input of a construction name from the input field 611. The construction plan management apparatus 10 extracts a construction plan (comparison target construction plan) from the construction plan DB 31 based on the accepted construction name. If no construction name is input, the construction plan management apparatus 10 targets all construction plans.
In the construction plan comparison screen, the construction plan management apparatus 10 accepts version input from the input field 612 and extracts an aggregate construction plan associated with the accepted version from the version DB 32.
Then, the construction plan management apparatus 10 compares the comparison target construction plan extracted from the construction plan DB 31 with the construction plan having the same construction ID as the comparison target construction plan among the aggregated construction plans extracted from the version DB 32. The result is displayed in the display field 613 of the display device 1080. For example, in FIG. 10, the display method of different portions is changed (displays the difference by color). Note that the manager may be able to appropriately select items to be compared, for example, charge, planning schedule, construction period, total construction amount, breakdown of the total construction amount, and the like. When the pressing of the comparison table button 512 is accepted, the comparison result is printed on the printer as a comparison table. In the comparison table, for example, the content of the construction plan extracted from the construction plan DB 31 is printed on the left half of the sheet, the construction ID is the same, and the content of the construction plan extracted from the version DB 32 is printed on the right half of the same line. Then, different portions are printed so as to be displayed in color.

図11は、本発明の一実施形態に係る工事計画管理装置10が表示させる工事計画変更画面の例を示す図である。図11に示す工事計画変更画面では、内容を変更する工事計画の入力を受け付ける。
工事計画変更画面において、工事計画管理装置10は、検索するためのキーワードである工事名称の入力を入力欄621から受け付ける。工事計画管理装置10は、入力欄621への入力を受け付け、検索ボタン521の押下を検出すると、受け付けた工事名称によって工事計画DB31を検索し、検索した該当候補のリストを表示する。表示欄622に表示する内容は、例えば、工事名称と、工事IDとを含む。
検索した工事計画のうちから、修正する工事計画が選択され(破線枠629)、修正ボタン522の押下を検出すると、工事計画管理装置10は、工事計画の変更を受け付けるための修正画面(図12)に遷移する。
FIG. 11 is a diagram illustrating an example of a construction plan change screen displayed by the construction plan management apparatus 10 according to an embodiment of the present invention. The construction plan change screen shown in FIG. 11 accepts an input of a construction plan whose contents are to be changed.
On the construction plan change screen, the construction plan management apparatus 10 accepts an input of a construction name that is a keyword for searching from the input field 621. When the construction plan management apparatus 10 accepts an input to the input field 621 and detects that the search button 521 is pressed, the construction plan management apparatus 10 searches the construction plan DB 31 by the accepted construction name, and displays a list of retrieved candidates. The content displayed in the display field 622 includes, for example, a construction name and a construction ID.
From the searched construction plans, a construction plan to be corrected is selected (broken line 629), and when the pressing of the correction button 522 is detected, the construction plan management apparatus 10 receives a modification screen for accepting a change in the construction plan (FIG. 12). ).

図12は、本発明の一実施形態に係る工事計画管理装置10が表示させる工事計画変更画面の修正画面の例を示す図である。図12に示す工事計画変更画面の修正画面では、工事計画を構成する項目が表示され、各項目の変更内容の入力を受け付ける。
工事計画変更画面の修正画面において、入力欄623に変更内容が入力された後に、更新ボタン523の押下を検出すると、工事計画管理装置10は、変更理由入力画面(図13)に遷移する。また、削除ボタン524の押下を検出した場合も、変更理由入力画面(図13)に遷移する。
FIG. 12 is a diagram illustrating an example of a modification screen of the construction plan change screen displayed by the construction plan management apparatus 10 according to an embodiment of the present invention. In the modification screen of the construction plan change screen shown in FIG. 12, items constituting the construction plan are displayed, and input of change contents of each item is accepted.
When the pressing of the update button 523 is detected after the change content is input in the input field 623 on the correction screen of the work plan change screen, the work plan management apparatus 10 transitions to a change reason input screen (FIG. 13). Also, when the pressing of the delete button 524 is detected, the screen changes to the change reason input screen (FIG. 13).

図13は、本発明の一実施形態に係る工事計画管理装置10が表示させる工事計画変更画面の変更理由入力画面の例を示す図である。図13に示す工事計画変更画面の変更理由入力画面では、工事計画を変更する理由の入力を受け付ける。なお、工事計画の変更が行われる前に、図9の複製ボタン503の押下によって、工事計画DB31の集約工事計画は、バージョンを対応付けてバージョンDB32に複製されている。
工事計画変更画面の変更理由入力画面において、工事計画管理装置10は、変更理由の入力を入力欄624から受け付ける。次に、工事計画管理装置10は、登録ボタン525の押下を検出すると、変更対象の工事計画を変更又は削除し工事計画DB31に記憶させる。このとき、バージョンDB32には、入力欄624に入力された変更理由も併せて記憶される。
工事計画管理装置10は、キャンセルボタン526の押下を検出すると、工事計画の変更を中止する。
FIG. 13 is a diagram illustrating an example of a change reason input screen of a work plan change screen displayed by the work plan management apparatus 10 according to an embodiment of the present invention. In the change reason input screen of the construction plan change screen shown in FIG. 13, the input of the reason for changing the construction plan is accepted. Before the construction plan is changed, the consolidated construction plan in the construction plan DB 31 is copied to the version DB 32 in association with the version by pressing the copy button 503 in FIG.
On the change reason input screen of the work plan change screen, the work plan management apparatus 10 receives an input of the reason for change from the input field 624. Next, when detecting that the registration button 525 is pressed, the construction plan management apparatus 10 changes or deletes the construction plan to be changed and stores it in the construction plan DB 31. At this time, the reason for change input in the input field 624 is also stored in the version DB 32.
When the construction plan management apparatus 10 detects that the cancel button 526 has been pressed, the construction plan management apparatus 10 stops changing the construction plan.

図14は、本発明の一実施形態に係る工事計画管理装置10が表示させるバージョン管理画面の例を示す図である。図14に示すバージョン管理画面では、バージョンIDの入力を受け付けると共に、バージョンの選択を受け付ける。
バージョン管理画面において、工事計画管理装置10は、バージョンを検索するためのキーワードであるバージョンIDを入力欄651から受け付け、検索ボタン551の押下を検出すると、受け付けたバージョンIDによってバージョンDB32を検索し、検索したバージョンを表示欄652に表示する。表示欄652に表示する内容は、例えば、バージョンIDと、作成日と、バージョン名称とである。表示されたバージョンのうちからバージョンが選択され(破線枠659)、確認ボタン552の押下を検出すると、工事計画管理装置10は、修正画面(図15)に遷移する。
FIG. 14 is a diagram illustrating an example of a version management screen displayed by the construction plan management apparatus 10 according to an embodiment of the present invention. In the version management screen shown in FIG. 14, the input of the version ID is accepted and the selection of the version is accepted.
On the version management screen, the construction plan management apparatus 10 accepts a version ID, which is a keyword for searching for a version, from the input field 651, and when detecting that the search button 551 is pressed, searches the version DB 32 using the received version ID, The retrieved version is displayed in the display field 652. The contents displayed in the display field 652 are, for example, a version ID, a creation date, and a version name. When a version is selected from the displayed versions (broken frame 659) and the pressing of the confirmation button 552 is detected, the construction plan management apparatus 10 transitions to a correction screen (FIG. 15).

図15は、本発明の一実施形態に係る工事計画管理装置10が表示させるバージョン管理画面の確認画面の例を示す図である。図15に示すバージョン管理画面の確認画面では、図14で選択されたバージョンに含まれる工事計画の変更理由の一覧を表示する。
なお、バージョン管理画面の確認画面では、バージョンに含まれる工事計画の変更理由の一覧を表示するだけでなく、当該変更理由の修正を可能としてもよい。具体的には、図15において、修正ボタン553の押下を検出すると、工事計画管理装置10は、工事計画の変更理由の修正を受け付け、表示欄653において新たに入力された内容や、修正された内容を工事計画に対応付けてバージョンDB32に記憶する。
FIG. 15 is a diagram illustrating an example of a version management screen confirmation screen displayed by the construction plan management apparatus 10 according to an embodiment of the present invention. In the confirmation screen of the version management screen shown in FIG. 15, a list of reasons for changing the construction plan included in the version selected in FIG. 14 is displayed.
On the confirmation screen of the version management screen, not only a list of reasons for changing the construction plan included in the version but also the correction of the reason for change may be possible. Specifically, in FIG. 15, when the pressing of the correction button 553 is detected, the construction plan management apparatus 10 accepts the modification of the reason for changing the construction plan, and the contents newly input in the display field 653 and the modification are corrected. The contents are stored in the version DB 32 in association with the construction plan.

実施形態1によれば、工事計画管理装置10は、工事を識別する工事識別情報に対応付けた工事計画を複数の工事について設けた集約工事計画を記憶する工事計画DB31を備え、工事計画DB31に記憶される集約工事計画の任意の時点の複製にバージョンを対応付けてバージョン記憶手段に記憶する。そして、工事計画管理装置10は、工事計画DB31に記憶された集約工事計画に含まれる複数の工事計画から任意の工事計画を比較対象工事計画として抽出し、バージョンDB32に記憶された集約工事計画のうち任意のバージョンに対応付けられた集約工事計画を抽出し、抽出した比較対象工事計画と、抽出した集約工事計画のうち比較対象工事計画と同一の工事IDに対応付けられた工事計画と、を比較する。さらに、工事計画管理装置10は、工事計画DB31からバージョンDB32への複製を、複製指示を受け付けることによって行う。そして、工事計画管理装置10は、工事計画DB31に記憶された工事計画の変更指示を受け付けると、変更後の工事計画を工事計画DB31に記憶させると共に、変更と共に受け付けた変更の理由をバージョンDB32に記憶させる。したがって、工事計画管理装置10は、工事計画DB31から最新の工事計画を容易に抽出することができ、バージョンDB32に記憶した工事計画を工事IDによって比較して、工事計画の変更や経緯を容易に示すことができる。   According to the first embodiment, the construction plan management apparatus 10 includes a construction plan DB 31 for storing an aggregate construction plan in which a construction plan associated with construction identification information for identifying a construction is provided for a plurality of constructions. A version is associated with a copy at an arbitrary point of the stored aggregate construction plan and stored in the version storage means. Then, the construction plan management apparatus 10 extracts an arbitrary construction plan from the plurality of construction plans included in the aggregate construction plan stored in the construction plan DB 31 as a comparison target construction plan, and stores the aggregate construction plan stored in the version DB 32. An aggregated construction plan associated with an arbitrary version is extracted, and the extracted comparison target construction plan, and a construction plan associated with the same construction ID as the comparison target construction plan among the extracted aggregated construction plans, Compare. Furthermore, the construction plan management apparatus 10 performs duplication from the construction plan DB 31 to the version DB 32 by receiving a duplication instruction. When the construction plan management apparatus 10 receives a change instruction for the construction plan stored in the construction plan DB 31, the construction plan management apparatus 10 stores the changed construction plan in the construction plan DB 31, and the reason for the change received together with the change in the version DB 32. Remember. Therefore, the construction plan management apparatus 10 can easily extract the latest construction plan from the construction plan DB 31, compare the construction plan stored in the version DB 32 with the construction ID, and easily change or modify the construction plan. Can show.

[実施形態2]
実施形態2において、工事計画管理装置10は、実施形態1に加えて、工事計画DB31に変更理由を記憶させ、工事計画の変更に伴い自動複製を行う。
[Embodiment 2]
In the second embodiment, the construction plan management apparatus 10 stores the reason for change in the construction plan DB 31 in addition to the first embodiment, and performs automatic duplication along with the change of the construction plan.

工事計画変更手段15は、工事計画DB31に記憶された工事計画の変更指示を受け付けると、変更後の工事計画を工事計画DB31に記憶させると共に当該変更の理由を受け付け、変更後の工事計画を、受け付けた変更の理由と共に工事計画DB31に記憶させる。例えば、工事計画変更手段15は、変更ボタン502(図9参照)の押下を受け付けると、工事計画の変更を受け付けた後に、変更の理由の入力を受け付け、受け付けた変更の理由と共に、変更した工事計画を工事計画DB31に記憶させる。さらに、工事計画変更手段15は、工事計画の変更をした場合、変更した工事計画と、バージョンDB32に複製した工事計画との間を関係付ける(例えば、ポインタによってリンクさせる)こととしてもよい。工事計画管理装置10は、変更した工事計画について、変更する前の工事計画を容易に参照することができ、変更の経緯を容易に示すことができる。   When the construction plan changing means 15 receives the instruction to change the construction plan stored in the construction plan DB 31, the construction plan changing means 15 stores the changed construction plan in the construction plan DB 31 and accepts the reason for the change. The construction plan DB 31 is stored together with the reason for the accepted change. For example, when the construction plan changing means 15 accepts the pressing of the change button 502 (see FIG. 9), the construction plan changing means 15 accepts the input of the reason for the change after accepting the change of the construction plan, and the changed construction together with the reason for the accepted change. The plan is stored in the construction plan DB 31. Furthermore, when the construction plan is changed, the construction plan changing unit 15 may relate the changed construction plan and the construction plan copied to the version DB 32 (for example, link them with a pointer). The construction plan management apparatus 10 can easily refer to the construction plan before the change about the changed construction plan, and can easily show the history of the change.

さらに、バージョン記憶制御手段11は、工事計画DB31に記憶された工事計画の変更指示を受け付けると、変更前の工事計画を含む集約工事計画に新たなバージョンを対応付けてバージョンDB32に記憶する。例えば、バージョン記憶制御手段11は、変更ボタン502(図9参照)の押下が受け付けられ、工事計画変更手段15によって工事計画が変更されると、変更対象される前の工事計画を含む集約工事計画に新たなバージョンを対応付けてバージョンDB32に記憶する(自動複製)。   Further, when the version storage control unit 11 receives an instruction to change the construction plan stored in the construction plan DB 31, the version storage control unit 11 stores the new version in the version DB 32 in association with the aggregated construction plan including the construction plan before the change. For example, when the pressing of the change button 502 (see FIG. 9) is accepted and the construction plan is changed by the construction plan changing unit 15, the version storage control unit 11 includes an integrated construction plan including the construction plan before being changed. The new version is associated with and stored in the version DB 32 (automatic replication).

図16は、本発明の実施形態2に係る工事計画DB31の例を示す図である。工事計画DB31は、工事IDに対応付けて、工事計画と、変更理由とを記憶している。工事計画は、実施形態1と同様である。変更理由は、工事計画の変更の際に受け付けられて、記憶される。   FIG. 16 is a diagram illustrating an example of the construction plan DB 31 according to the second embodiment of the present invention. The construction plan DB 31 stores a construction plan and a reason for change in association with the construction ID. The construction plan is the same as in the first embodiment. The reason for the change is accepted and stored when the construction plan is changed.

図17は、本発明の実施形態2に係る工事計画管理装置10の工事計画変更処理の内容を示すフローチャートである。ステップS601及びステップS602は実施形態1のステップS301及びステップS302と同様である。   FIG. 17 is a flowchart showing the contents of the construction plan change process of the construction plan management apparatus 10 according to the second embodiment of the present invention. Steps S601 and S602 are the same as steps S301 and S302 of the first embodiment.

ステップS603において、CPU1000(工事計画変更手段15)は、実施形態1と同様に、工事計画の変更理由を受け付ける。そして、CPU1000、変更後の工事計画を変更の理由と共に工事計画DB31に記憶させる。その後、CPU1000は、処理をステップS604に移す。   In step S603, the CPU 1000 (construction plan changing unit 15) receives the reason for changing the construction plan, as in the first embodiment. Then, the CPU 1000 stores the changed construction plan in the construction plan DB 31 together with the reason for the change. After that, the CPU 1000 moves the process to step S604.

ステップS604において、CPU1000(工事計画変更手段15)は、変更前の集約工事計画にバージョンを対応付け、バージョンDB32に複製する。バージョンについて、CPU1000は、例えば、年度からなるバージョンIDを自動的に生成し(2010年度の1回目をV10_1とする)、バージョン名称の入力を受け付けてバージョンを作成する。その後、CPU1000は、処理を終了し、本処理に移るステップの次のステップに処理を戻す。   In step S604, the CPU 1000 (construction plan changing unit 15) associates the version with the aggregated construction plan before the change and copies it to the version DB 32. For the version, for example, the CPU 1000 automatically generates a version ID consisting of a year (V10_1 is the first time in 2010), and receives the input of the version name to create a version. Thereafter, the CPU 1000 ends the process, and returns the process to the next step after the step that moves to the present process.

実施形態2によれば、工事計画管理装置10は、工事計画DB31に記憶された工事計画の変更指示を受け付けると、変更後の工事計画を当該変更の理由と共に工事計画DB31に記憶させる。また、工事計画管理装置10は、工事計画DB31からバージョンDB32への複製を自動的に行う。したがって、工事計画管理装置10は、工事計画DB31から、変更理由と共に最新の工事計画を容易に抽出することができ、バージョンDB32に記憶した工事計画を工事IDによって比較して、工事計画の変更や経緯を容易に示すことができる。   According to the second embodiment, when the construction plan management apparatus 10 receives an instruction to change the construction plan stored in the construction plan DB 31, the construction plan management apparatus 10 stores the modified construction plan in the construction plan DB 31 together with the reason for the change. Further, the construction plan management apparatus 10 automatically duplicates the construction plan DB 31 to the version DB 32. Therefore, the construction plan management device 10 can easily extract the latest construction plan from the construction plan DB 31 together with the reason for the change, compare the construction plan stored in the version DB 32 by the construction ID, and change the construction plan. History can be shown easily.

本実施形態では、工事計画DB31とバージョンDB32とを工事計画管理装置10が備えるとしたが、バージョンDB32を工事計画管理装置10とは別のバージョン管理装置とし、専用回線を介して接続するとしてもよい。工事計画管理装置10の処理負担を軽減することができる。   In the present embodiment, the construction plan DB 31 and the version DB 32 are provided in the construction plan management apparatus 10, but the version DB 32 may be a version management apparatus different from the construction plan management apparatus 10 and connected via a dedicated line. Good. The processing burden on the construction plan management apparatus 10 can be reduced.

以上、本発明の実施形態について説明したが、本発明は上述した実施形態に限るものではない。また、本発明の実施形態に記載された効果は、本発明から生じる最も好適な効果を列挙したに過ぎず、本発明による効果は、本発明の実施形態に記載されたものに限定されるものではない。   As mentioned above, although embodiment of this invention was described, this invention is not restricted to embodiment mentioned above. The effects described in the embodiments of the present invention are only the most preferable effects resulting from the present invention, and the effects of the present invention are limited to those described in the embodiments of the present invention. is not.

10 工事計画管理装置
11 バージョン記憶制御手段
12 工事計画抽出手段
13 バージョン抽出手段
14 工事計画比較手段
15 工事計画変更手段
31 工事計画DB
32 バージョンDB
1080 表示装置
DESCRIPTION OF SYMBOLS 10 Construction plan management apparatus 11 Version storage control means 12 Construction plan extraction means 13 Version extraction means 14 Construction plan comparison means 15 Construction plan change means 31 Construction plan DB
32 Version DB
1080 Display device

Claims (5)

工事の計画を管理する工事計画管理装置であって、
前記工事を識別する工事識別情報に対応付けた工事計画を複数の工事について設けた集約工事計画を記憶する工事計画記憶手段と、
前記工事計画記憶手段に記憶される前記集約工事計画の任意の時点の複製にバージョンを対応付けてバージョン記憶手段に記憶するバージョン記憶制御手段と、
前記工事識別情報の入力を受け付ける工事計画受付手段と、
前記工事計画受付手段によって受け付けられた前記工事識別情報によって識別される工事計画を、前記工事計画記憶手段に記憶された前記集約工事計画に含まれる複数の工事計画から比較対象工事計画として抽出する工事計画抽出手段と、
集約工事計画を選択するために前記バージョンの入力を受け付ける集約工事選択手段と、
前記集約工事選択手段によって受け付けられた前記バージョンに対応付けられた集約工事計画を、前記バージョン記憶手段に記憶された前記集約工事計画から抽出するバージョン抽出手段と、
前記工事計画抽出手段によって抽出された前記比較対象工事計画に含まれる項目と、前記バージョン抽出手段によって抽出された前記集約工事計画のうち前記比較対象工事計画と同一の前記工事識別情報に対応付けられた工事計画に含まれる項目と、を比較し、比較結果を表示する工事計画比較手段と、
を備える工事計画管理装置。
A construction plan management device for managing construction plans,
Construction plan storage means for storing an aggregate construction plan in which a construction plan associated with construction identification information for identifying the construction is provided for a plurality of constructions;
Version storage control means for associating a version with a copy at an arbitrary point in time of the aggregate construction plan stored in the construction plan storage means and storing the version in the version storage means;
Construction plan accepting means for accepting input of the construction identification information;
The extracted work plan identified by the work identification information accepted by the construction plan reception unit, a plurality of construction plan or al comparisons target work plan contained in said stored aggregated work plan in the construction plan storage means Construction plan extraction means to perform,
An aggregate work selection means for accepting input of the version to select an aggregate work plan;
And version extracting means for extracting the aggregate work plan associated with the version received by the aggregate construction selection means, from said stored aggregated work plan in the version storage unit,
The items included in the comparison target construction plan extracted by the construction plan extraction unit are associated with the same construction identification information as the comparison target construction plan among the aggregated construction plans extracted by the version extraction unit. A construction plan comparison means for comparing items included in the construction plan and displaying a comparison result ;
Construction plan management device with
前記工事計画記憶手段に記憶された前記工事計画の変更指示を受け付けると、変更後の工事計画を前記工事計画記憶手段に記憶させると共に当該変更の理由を受け付ける工事計画変更手段をさらに備える請求項1に記載の工事計画管理装置。   The construction plan changing means further comprising: a construction plan changing means for storing the construction plan after the change in the construction plan storage means and receiving the reason for the change when the construction plan change instruction stored in the construction plan storage means is received. The construction plan management device described in 1. 前記バージョン記憶制御手段は、前記工事計画記憶手段に記憶された前記集約工事計画を前記バージョン記憶手段に複製するための複製指示を受け付けると、前記工事計画記憶手段に記憶された前記集約工事計画に新たなバージョンを対応付けて前記バージョン記憶手段に記憶する請求項1又は2に記載の工事計画管理装置。   When the version storage control unit receives a copy instruction for copying the consolidated construction plan stored in the construction plan storage unit to the version storage unit, the version storage control unit stores the integrated construction plan in the construction plan storage unit. The construction plan management apparatus according to claim 1, wherein a new version is associated and stored in the version storage unit. 前記バージョン記憶制御手段は、前記工事計画記憶手段に記憶された前記工事計画の変更指示を受け付けると、変更前の工事計画を含む前記集約工事計画に新たなバージョンを対応付けて前記バージョン記憶手段に記憶する請求項1から3のいずれかに記載の工事計画管理装置。   When the version storage control unit receives the instruction to change the construction plan stored in the construction plan storage unit, the version storage control unit associates a new version with the aggregated construction plan including the construction plan before the change in the version storage unit. The construction plan management apparatus according to claim 1, wherein the construction plan management apparatus is stored. 工事を識別する工事識別情報に対応付けた工事計画を複数の工事について設けた集約工事計画を記憶する工事計画記憶手段を備える、前記工事の計画を管理する工事計画管理装置が実行する方法であって、
前記工事計画記憶手段に記憶される前記集約工事計画の任意の時点の複製にバージョンを対応付けてバージョン記憶手段に記憶するバージョン記憶制御ステップと、
前記工事識別情報の入力を受け付ける工事計画受付ステップと、
前記工事計画受付ステップによって受け付けられた前記工事識別情報によって識別される工事計画を、前記工事計画記憶手段に記憶された前記集約工事計画に含まれる複数の工事計画から比較対象工事計画として抽出する工事計画抽出ステップと、
集約工事計画を選択するために前記バージョンの入力を受け付ける集約工事選択ステップと、
前記集約工事選択ステップによって受け付けられた前記バージョンに対応付けられた集約工事計画を、前記バージョン記憶手段に記憶された前記集約工事計画から抽出するバージョン抽出ステップと、
前記工事計画抽出ステップによって抽出された前記比較対象工事計画に含まれる項目と、前記バージョン抽出ステップによって抽出された前記集約工事計画のうち前記比較対象工事計画と同一の前記工事識別情報に対応付けられた工事計画に含まれる項目と、を比較し、比較結果を表示する工事計画比較ステップと、
を備える方法。
This is a method executed by a construction plan management device for managing a construction plan, comprising construction plan storage means for storing an aggregate construction plan in which a construction plan associated with construction identification information for identifying a construction is provided for a plurality of constructions. And
A version storage control step of associating a version with a copy at an arbitrary time of the aggregated construction plan stored in the construction plan storage means and storing the version in the version storage means;
A construction plan reception step for receiving the construction identification information;
The extracted work plan identified by the work identification information accepted by the construction plan accepting step, a plurality of construction plan or al comparisons target work plan contained in said stored aggregated work plan in the construction plan storage means A construction plan extraction step to perform,
An aggregate work selection step for accepting input of the version to select an aggregate work plan;
And version extracting said aggregate construction selected aggregation work plan associated with the version received by step, from said stored aggregated work plan in the version storage unit,
The items included in the comparison target construction plan extracted in the construction plan extraction step are associated with the same construction identification information as the comparison target construction plan among the aggregated construction plans extracted in the version extraction step. A construction plan comparison step for comparing the items included in the construction plan and displaying the comparison result ;
A method comprising:
JP2010212742A 2010-09-22 2010-09-22 Construction plan management apparatus and method Expired - Fee Related JP5209014B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2010212742A JP5209014B2 (en) 2010-09-22 2010-09-22 Construction plan management apparatus and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2010212742A JP5209014B2 (en) 2010-09-22 2010-09-22 Construction plan management apparatus and method

Publications (2)

Publication Number Publication Date
JP2012068877A JP2012068877A (en) 2012-04-05
JP5209014B2 true JP5209014B2 (en) 2013-06-12

Family

ID=46166088

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2010212742A Expired - Fee Related JP5209014B2 (en) 2010-09-22 2010-09-22 Construction plan management apparatus and method

Country Status (1)

Country Link
JP (1) JP5209014B2 (en)

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0830678A (en) * 1994-07-12 1996-02-02 Fujitsu Ltd Schedule control processor
JP2002073851A (en) * 2000-08-24 2002-03-12 Advantest Corp Unit for electronic equipment, and system and method of managing its version number
JP4351578B2 (en) * 2004-05-06 2009-10-28 株式会社 日立東日本ソリューションズ Production planning support system and computer program
JP5157069B2 (en) * 2006-01-18 2013-03-06 カシオ計算機株式会社 Image management device

Also Published As

Publication number Publication date
JP2012068877A (en) 2012-04-05

Similar Documents

Publication Publication Date Title
JP4100156B2 (en) Data conversion system
JP2008139971A (en) Document processing device and document processing program
JP2009187400A (en) Document management system, documentation management method, search apparatus, search program
JP2009245380A (en) Job processing system and job testing method
JP2010015458A (en) Program correction support system, program correction support method, and program correction support program
JP6003263B2 (en) Minutes creation support apparatus, minutes creation support system, minutes creation support method, and program
JP5245143B2 (en) Document management system and method
JPH1115646A (en) Technique information managing system
JP2003208501A (en) Business process definition display method and program
JP2009059293A (en) Job management system
JP5209014B2 (en) Construction plan management apparatus and method
JP2007334412A (en) Retrieval program and retrieving device
JP6695847B2 (en) Software parts management system, computer
JP2007249422A (en) Organization constitution management system, and program therefor
JP4991247B2 (en) Electronic file management method, electronic file management apparatus, and electronic file management program
CN104834661B (en) Management method, management equipment and management system
JP2021103592A (en) Document management device and method for managing document
US20160170717A1 (en) Association of program code and application features
CN112449072A (en) Information processing apparatus, information processing system, and information processing method
JP5039505B2 (en) Document search apparatus and document search support method
JP4330854B2 (en) Batch processing system
JP2002342137A (en) Device and method for managing document and recording medium
JP2005267540A (en) File search system, file searching method, and file searching program
JP2008077546A (en) Setting information collection support system and setting information collection support program
JP2004302522A (en) Menu screen control method by shortcut button and computer program

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20120730

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20120807

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20120919

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20130212

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20130220

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20160301

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 5209014

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees