JP5119347B2 - Accounting management system, accounting management method and accounting management program - Google Patents

Accounting management system, accounting management method and accounting management program Download PDF

Info

Publication number
JP5119347B2
JP5119347B2 JP2011076295A JP2011076295A JP5119347B2 JP 5119347 B2 JP5119347 B2 JP 5119347B2 JP 2011076295 A JP2011076295 A JP 2011076295A JP 2011076295 A JP2011076295 A JP 2011076295A JP 5119347 B2 JP5119347 B2 JP 5119347B2
Authority
JP
Japan
Prior art keywords
asset
evaluation
retirement
obligation
recorded
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2011076295A
Other languages
Japanese (ja)
Other versions
JP2012212214A (en
Inventor
美樹 光成
昌平 並河
智之 浦田
博子 橋本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mizuho Information and Research Institute Inc
Original Assignee
Mizuho Information and Research Institute Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mizuho Information and Research Institute Inc filed Critical Mizuho Information and Research Institute Inc
Priority to JP2011076295A priority Critical patent/JP5119347B2/en
Publication of JP2012212214A publication Critical patent/JP2012212214A/en
Application granted granted Critical
Publication of JP5119347B2 publication Critical patent/JP5119347B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Financial Or Insurance-Related Operations Such As Payment And Settlement (AREA)

Description

本発明は、資産除去債務について、将来キャッシュフローを算出するための会計管理システム、会計管理方法及び会計管理プログラムに関する。   The present invention relates to an accounting management system, accounting management method, and accounting management program for calculating future cash flows for asset retirement obligations.

販売目的でなく継続的に会社で使用することを目的とする固定資産については、その取得価額を、毎決算期に減価償却する。ここで、減価償却とは、それぞれの資産について耐用年数と残存価額とを決定し、原価から残存価額を控除した額を耐用年数に応じて各決算期に計画的・規則的に配分することである。   For fixed assets that are intended for continuous use by the company rather than for sale, the acquisition price is depreciated at the end of each fiscal year. Here, depreciation is to determine the useful life and residual value for each asset, and to distribute the amount obtained by deducting the residual value from the cost systematically and regularly according to the useful life. is there.

このような企業内にある資産管理における利用状況、経費情報(減価償却費、支払費用)、組織情報、日付情報などの要素を組み合わせて管理するための技術が検討されている(例えば、特許文献1参照)。この文献に記載されている技術においては、企業内の資産を入手した際には資産情報を資産情報管理部に登録するとともに、組織、場所情報を組織場所情報管理部に登録する。減価償却が発生する資産に関しては、データ登録時に償却可能限度額又は残存価額に達するまでの減価償却を計算する。   Technologies for managing combinations of elements such as usage status, expense information (depreciation expenses, payment expenses), organization information, date information, etc. in asset management in the company are being studied (for example, patent literature) 1). In the technique described in this document, when an asset in a company is acquired, asset information is registered in the asset information management unit, and organization and location information is registered in the organization location information management unit. For assets that are subject to depreciation, the depreciation until the depreciable limit or residual value is reached is calculated at the time of data registration.

一方、上場企業及び連結対象企業に対して、2010年度より資産除去債務に関する会計基準の適用が義務付けられている(例えば、非特許文献1参照)。この会計基準では、有形固定資産並びに賃借、その他の資産除去(用役提供から除外)時に必要な契約上の義務や環境法令等における負債情報の管理が必要になる。   On the other hand, the application of accounting standards related to asset retirement obligations has been required for listed companies and consolidated companies since 2010 (see Non-Patent Document 1, for example). Under this accounting standard, it is necessary to manage contractual obligations necessary for the removal of tangible fixed assets, leases, and other assets (excluded from service provision) and liability information in environmental laws and regulations.

ここで、資産除去債務となるものとしては、定期借地権契約における建物、建物賃借契約における内部造作や有形固定資産に使用されている有害物質がある。有害物質には、建物に使用されているアスベスト、電気機器に使用されている高濃度PCB、焼却施設に含まれるダイオキシン、有害物質使用特定施設に含まれる土壌汚染等がある。   Here, asset retirement obligations include buildings in fixed-term land lease agreements, internal construction in building lease agreements, and harmful substances used in tangible fixed assets. Hazardous substances include asbestos used in buildings, high-concentration PCBs used in electrical equipment, dioxins contained in incineration facilities, and soil contamination contained in specified facilities using hazardous substances.

特開2008−15845号公報(第1頁、図1)JP 2008-15845 A (first page, FIG. 1)

公益財団法人 財務会計基準機構、「企業会計基準第18号『資産除去債務に関する会計基準』及び企業会計基準適用指針第21号『資産除去債務に関する会計基準の適用指針」の公表』、[online]、[平成23年3月11日検索]、インターネット、<URL:https://www.asb.or.jp/asb/asb_j/documents/docs/aro/ >Financial Accounting Standards Organization, “Public Accounting Standards No. 18“ Accounting Standards for Asset Retirement Obligations ”and Corporate Accounting Standards Application Guidelines No. 21“ Guidelines for Applying Accounting Standards for Asset Retirement Obligations ”” [online] [Search on March 11, 2011], Internet, <URL: https://www.asb.or.jp/asb/asb_j/documents/docs/aro/>

上述の会計基準に従って資産除去債務を計上する際には、除去費用を債務として認識すべきかどうかを判断する必要がある。このためには、所有資産については法律で定められた有害物質を含んでいるかどうか、賃借資産については返却時に原状回復の義務があるかどうか等を調査しなければならない。   When recording asset retirement obligations in accordance with the above accounting standards, it is necessary to determine whether retirement costs should be recognized as debt. For this purpose, it is necessary to investigate whether owned assets contain harmful substances stipulated by law, and whether leased assets have an obligation to restore the original condition when returned.

従って、これまでの会計処理では必要がなかった環境関連の情報や契約内容と、それらから導き出された将来の除去費用の見積金額等を新たに管理する必要がある。具体的には、経理部門においては、情報収集や会計処理を行なうことになり、計上方針の策定、計上
作業の効率化、作業の全体マネジメントや効率化が必要である。また、統括的な環境・施設管理部門においては、情報の取りまとめ、債務性の調査を行なうことになり、評価情報登録指針の策定や各事業部門作業のマネジメントや効率化が必要である。また、資産を利用している事業部門においては、資産の利用情報の提供を行なうことになり、情報提供作業の効率化が必要である。
Therefore, it is necessary to newly manage environment-related information and contract contents that were not necessary in the conventional accounting process, estimated amounts of future removal costs derived from the information, and the like. Specifically, in the accounting department, information collection and accounting processing are performed, and it is necessary to formulate accounting policies, improve the efficiency of accounting work, and manage and improve the efficiency of overall work. In addition, the general environment / facility management department is responsible for collecting information and investigating debt, and it is necessary to formulate evaluation information registration guidelines and manage and improve the efficiency of each business department's work. In addition, in the business divisions that use assets, asset utilization information is provided, and it is necessary to improve the efficiency of information provision work.

しかしながら、従来の会計システムにおいては、国際的な会計基準に対応した資産除去債務の管理は考慮されておらず、管理作業の効率化という観点では十分でなかった。
本発明は、上記課題を解決するためになされたものであり、その目的は、資産除去債務について、将来キャッシュフローを算出するための会計管理システム、会計管理方法及び会計管理プログラムを提供することにある。
However, in the conventional accounting system, management of asset retirement obligations corresponding to international accounting standards is not considered, and it is not sufficient from the viewpoint of improving the efficiency of management work.
The present invention has been made to solve the above-described problems, and an object of the present invention is to provide an accounting management system, an accounting management method, and an accounting management program for calculating a future cash flow for asset retirement obligations. is there.

上記問題点を解決するために、請求項1に記載の発明は、管理対象資産の資産状況に関する資産管理情報を記憶している資産管理情報記憶手段と、資産除去債務が生じる資産を選別するための適用条件を記憶している適用条件情報記憶手段と、資産除去債務の対象毎に、資産除去債務を複数の債務評価手法により評価するための評価参照情報を記憶している評価参考情報記憶手段と、資産除去債務の将来キャッシュフローを算出する制御手段とを備えた会計管理システムであって、前記制御手段が、前記資産管理情報記憶手段に記録されている資産管理情報と、前記適用条件情報記憶手段に記録されている適用条件とを照合して、資産除去債務が発生する可能性がある候補資産を特定する手段と、前記候補資産の資産状況情報を取得する手段と、前記資産状況情報に基づいて、発生する資産除去債務の対象を特定し、前記資産除去債務の対象について、前記評価参考情報記憶手段に記憶されている評価参照情報を用いて、複数の債務評価手法により、複数の見積金額を算出する手段と、前記複数の見積金額に基づいて見積評価結果を算出し、この見積評価結果について、前記候補資産に関する耐用年数に対応した将来キャッシュフローを算出する手段とを備えたことを要旨とする。   In order to solve the above problems, the invention described in claim 1 is for selecting asset management information storage means for storing asset management information relating to the asset status of the asset to be managed, and assets for which asset retirement obligations are generated. Application condition information storage means that stores the application condition information, and evaluation reference information storage means that stores, for each asset retirement obligation target, evaluation reference information for evaluating the asset retirement obligation by a plurality of debt evaluation methods And a control means for calculating a future cash flow of the asset retirement obligation, wherein the control means includes asset management information recorded in the asset management information storage means, and the application condition information Means for collating application conditions recorded in the storage means to identify a candidate asset that may generate an asset retirement obligation; and means for acquiring asset status information of the candidate asset , Identifying a target of the asset retirement obligation to be generated based on the asset status information, and using the evaluation reference information stored in the evaluation reference information storage unit for the target of the asset retirement obligation, Means for calculating a plurality of estimated amounts by the method, and means for calculating an estimated evaluation result based on the plurality of estimated amounts, and calculating a future cash flow corresponding to a useful life of the candidate asset for the estimated evaluation result And the summary.

請求項2に記載の発明は、請求項1に記載の会計管理システムにおいて、前記制御手段が、前記候補資産についての耐用年数に対応したインフレ率及び割引率を取得し、前記見積評価結果に対して、前記インフレ率及び割引率を用いて、将来キャッシュフローを算出することを要旨とする。   According to a second aspect of the present invention, in the accounting management system according to the first aspect, the control means obtains an inflation rate and a discount rate corresponding to a useful life of the candidate asset, and for the estimated evaluation result The gist is to calculate the future cash flow using the inflation rate and the discount rate.

請求項3に記載の発明は、請求項1又は2に記載の会計管理システムにおいて、前記制御手段が、前記将来キャッシュフローに対して、前記候補資産についての耐用年数を用いて、減価償却費を算出することを要旨とする。   According to a third aspect of the present invention, in the accounting management system according to the first or second aspect, the control means calculates a depreciation cost for the future cash flow using a useful life of the candidate asset. The gist is to calculate.

請求項4に記載の発明は、請求項3に記載の会計管理システムにおいて、前記制御手段が、前記候補資産の耐用年数について、複数の耐用年数候補を用いて、複数の減価償却費を試算し、前記試算した減価償却費を、前記耐用年数候補に関連付けて出力することを要旨とする。   According to a fourth aspect of the present invention, in the accounting management system according to the third aspect, the control means calculates a plurality of depreciation expenses for a useful life of the candidate asset by using a plurality of useful life candidates. The summary is to output the estimated depreciation cost in association with the useful life candidate.

請求項5に記載の発明は、請求項1〜4のいずれか1つに記載の会計管理システムにおいて、前記評価参考情報記憶手段には、資産除去債務の対象毎に、評価参照情報として資産除去に必要な公表単価が記憶されており、前記債務評価手法においては、前記候補資産について、前記資産除去債務の対象の公表単価を取得し、この公表単価を用いて見積金額を算出する手法を含むことを要旨とする。   According to a fifth aspect of the present invention, in the accounting management system according to any one of the first to fourth aspects, the evaluation reference information storage means includes asset removal as evaluation reference information for each asset removal obligation target. The debt evaluation method includes a method of obtaining the published unit price of the asset retirement obligation for the candidate asset and calculating the estimated amount using the published unit price. This is the gist.

請求項6に記載の発明は、請求項1〜5のいずれか1つに記載の会計管理システムにおいて、前記評価参考情報記憶手段には、資産除去債務の対象について、評価参照情報とし
て資産除去の実績金額が記録されており、前記債務評価手法においては、前記候補資産について、資産除去債務の対象と共通する実績金額を取得し、この実績金額に基づいて算出された実績単価を用いて見積金額を算出する手法を含むことを要旨とする。
According to a sixth aspect of the present invention, in the accounting management system according to any one of the first to fifth aspects, the evaluation reference information storage means stores an asset removal obligation as evaluation reference information for an object of the asset removal obligation. The actual amount is recorded, and in the debt evaluation method, the actual amount common to the asset retirement obligation target is acquired for the candidate asset, and the estimated amount is calculated using the actual unit price calculated based on the actual amount The gist is to include a method for calculating

請求項7に記載の発明は、請求項1〜6のいずれか1つに記載の会計管理システムにおいて、前記評価参考情報記憶手段には、資産除去債務の対象毎に、評価参照情報として資産除去作業を行なう取引先の連絡先情報が記録されており、前記債務評価手法においては、前記連絡先情報を用いて、前記候補資産について、資産除去の見積依頼を送信し、前記取引先から、前記取引先における資産除去単価を用いた見積金額を取得する手法を含むことを要旨とする。   The invention according to claim 7 is the accounting management system according to any one of claims 1 to 6, wherein the evaluation reference information storage means stores asset removal as evaluation reference information for each asset removal obligation target. The contact information of the business partner who performs the work is recorded, and in the debt evaluation method, the contact information is used to transmit an estimate request for asset removal for the candidate asset, and the business partner The gist is to include a method for obtaining an estimated amount using an asset removal unit price at a business partner.

請求項8に記載の発明は、請求項1〜7のいずれか1つに記載の会計管理システムにおいて、前記制御手段が、前記候補資産について、資産除去のために必要な現在の単価を取得し、過去に減価償却費を算出した資産について、前記減価償却費の算出において用いた単価と現在の単価とを比較し、両者の差が基準範囲を超えている場合には、資産除去債務についての見積金額を再度、算出することを要旨とする。   According to an eighth aspect of the present invention, in the accounting management system according to any one of the first to seventh aspects, the control means acquires a current unit price necessary for asset removal for the candidate asset. Compare the unit price used in the calculation of depreciation expenses with the current unit price for assets for which depreciation expenses have been calculated in the past. The gist is to calculate the estimated amount again.

請求項9に記載の発明は、請求項1〜8のいずれか1つに記載の会計管理システムにおいて、前記資産管理情報記憶手段には、管理対象資産の関連部署が記録されており、前記制御手段が、前記資産管理情報記憶手段を用いて、管理対象資産の関連部署を特定し、前記関連部署の連絡先に対して、資産状況を確認するアンケートを送信する手段と、前記アンケートに基づいて取得した資産状況を前記資産管理情報記憶手段に記録する手段とを更に備えたことを要旨とする。   A ninth aspect of the present invention is the accounting management system according to any one of the first to eighth aspects, wherein the asset management information storage means stores a related department of the asset to be managed, and the control Means for identifying a related department of the asset to be managed using the asset management information storage means, and for transmitting a questionnaire for confirming the asset status to the contact of the related department; and based on the questionnaire The present invention is further characterized by further comprising means for recording the acquired asset status in the asset management information storage means.

請求項10に記載の発明は、管理対象資産の資産状況に関する資産管理情報を記憶している資産管理情報記憶手段と、資産除去債務が生じる資産を選別するための適用条件を記憶している適用条件情報記憶手段と、資産除去債務の対象毎に、資産除去債務を複数の債務評価手法により評価するための評価参照情報を記憶している評価参考情報記憶手段と、資産除去債務の将来キャッシュフローを算出する制御手段とを備えた会計管理システムを用いて会計管理を行なうための方法であって、前記制御手段が、前記資産管理情報記憶手段に記録されている資産管理情報と、前記適用条件情報記憶手段に記録されている適用条件とを照合して、資産除去債務が発生する可能性がある候補資産を特定する段階と、前記候補資産の資産状況情報を取得する段階と、前記資産状況情報に基づいて、発生する資産除去債務の対象を特定し、前記資産除去債務の対象について、前記評価参考情報記憶手段に記憶されている評価参照情報を用いて、複数の債務評価手法により、複数の見積金額を算出する段階と、前記複数の見積金額に基づいて見積評価結果を算出し、この見積評価結果について、前記候補資産に関する耐用年数に対応した将来キャッシュフローを算出する段階とを実行することを要旨とする。   The invention according to claim 10 is an application that stores asset management information storage means for storing asset management information relating to the asset status of the asset to be managed, and an application condition for selecting an asset for which an asset retirement obligation arises. Condition information storage means, evaluation reference information storage means for storing evaluation reference information for evaluating asset retirement obligations by multiple debt evaluation methods for each asset retirement obligation target, and future cash flow of asset retirement obligations A method for performing accounting management using an accounting management system including a control means for calculating the asset management information recorded in the asset management information storage means, and the application condition Identifying candidate assets that may generate asset retirement obligations by collating with the application conditions recorded in the information storage means, and obtaining asset status information of the candidate assets And identifying the target of the asset retirement obligation to be generated based on the asset status information, and using the evaluation reference information stored in the evaluation reference information storage means for the target of the asset retirement obligation, Calculating a plurality of estimated amounts using the debt evaluation method, and calculating an estimated evaluation result based on the plurality of estimated amounts, and regarding the estimated evaluation result, a future cash flow corresponding to a useful life of the candidate asset is calculated. The gist is to execute the step of calculating.

請求項11に記載の発明は、管理対象資産の資産状況に関する資産管理情報を記憶している資産管理情報記憶手段と、資産除去債務が生じる資産を選別するための適用条件を記憶している適用条件情報記憶手段と、資産除去債務の対象毎に、資産除去債務を複数の債務評価手法により評価するための評価参照情報を記憶している評価参考情報記憶手段と、資産除去債務の将来キャッシュフローを算出する制御手段とを備えた会計管理システムを用いて会計管理を行なうためのプログラムであって、前記制御手段を、前記資産管理情報記憶手段に記録されている資産管理情報と、前記適用条件情報記憶手段に記録されている適用条件とを照合して、資産除去債務が発生する可能性がある候補資産を特定する手段、前記候補資産の資産状況情報を取得する手段、前記資産状況情報に基づいて、発生する資産除去債務の対象を特定し、前記資産除去債務の対象について、前記評価参考情報記憶手段に記憶されている評価参照情報を用いて、複数の債務評価手法により、複数の見積金額
を算出する手段、前記複数の見積金額に基づいて見積評価結果を算出し、この見積評価結果について、前記候補資産に関する耐用年数に対応した将来キャッシュフローを算出する手段として機能させることを要旨とする。
The invention according to claim 11 is an application that stores asset management information storage means for storing asset management information relating to the asset status of the asset to be managed, and an application condition for selecting an asset for which an asset retirement obligation arises. Condition information storage means, evaluation reference information storage means for storing evaluation reference information for evaluating asset retirement obligations by multiple debt evaluation methods for each asset retirement obligation target, and future cash flow of asset retirement obligations A program for performing accounting management using an accounting management system comprising control means for calculating the asset management information recorded in the asset management information storage means, and the application condition Means for identifying candidate assets that may cause asset retirement obligations by collating with application conditions recorded in the information storage means, and asset status information of the candidate assets A means for obtaining, identifying a target of the asset retirement obligation to be generated based on the asset status information, and using the evaluation reference information stored in the evaluation reference information storage means for the target of the asset retirement obligation, A means for calculating a plurality of estimated amounts using a debt evaluation method, calculating an estimated evaluation result based on the plurality of estimated amounts, and calculating a future cash flow corresponding to the useful life of the candidate asset for the estimated evaluation result The gist is to make it function as a means.

(作用)
請求項1又は10、11に記載の発明によれば、資産管理情報記憶手段に記録されている資産管理情報と、適用条件情報記憶手段に記録されている適用条件とを照合して、資産除去債務が発生する可能性がある候補資産を特定する。次に、候補資産の資産状況情報を取得する。次に、資産状況情報に基づいて、発生する資産除去債務の対象を特定し、資産除去債務の対象について、評価参考情報記憶手段に記憶されている評価参照情報を用いて、複数の債務評価手法により、複数の見積金額を算出する。そして、複数の見積金額に基づいて見積評価結果を算出し、この見積評価結果について、候補資産に関する耐用年数による将来キャッシュフローを算出する。これにより、管理対象資産について、複数の見積金額を用いて、的確な資産除去債務を評価して、将来キャッシュフローを算出することができる。
(Function)
According to the invention described in claim 1, 10, or 11, the asset management information recorded in the asset management information storage unit and the application condition recorded in the application condition information storage unit are collated to remove the asset Identify candidate assets that may incur debt. Next, asset status information of candidate assets is acquired. Next, based on the asset status information, identify the target of the asset retirement obligations to be generated, and use the evaluation reference information stored in the evaluation reference information storage means for the asset retirement obligation targets, Thus, a plurality of estimated amounts are calculated. Then, an estimated evaluation result is calculated based on a plurality of estimated amounts, and a future cash flow based on the useful life of the candidate asset is calculated for the estimated evaluation result. As a result, it is possible to calculate the future cash flow by evaluating an accurate asset retirement obligation for a management target asset using a plurality of estimated amounts.

請求項2に記載の発明によれば、制御手段が、候補資産についての耐用年数に対応したインフレ率及び割引率を取得し、前記見積評価結果に対して、前記インフレ率及び割引率を用いて、将来キャッシュフローを算出する。これにより、資産の耐用年数を考慮して、将来キャッシュフローを算出することができる。   According to invention of Claim 2, a control means acquires the inflation rate and discount rate corresponding to the useful life about a candidate asset, and uses the said inflation rate and discount rate with respect to the said estimated evaluation result. Calculate future cash flow. As a result, the future cash flow can be calculated in consideration of the useful life of the asset.

請求項3に記載の発明によれば、制御手段が、将来キャッシュフローに対して、前記候補資産についての耐用年数を用いて、減価償却費を算出する。これにより、資産の耐用年数を考慮して、減価償却費を算出することができる。   According to invention of Claim 3, a control means calculates a depreciation expense using the useful life about the said candidate asset with respect to a future cash flow. Thereby, depreciation expenses can be calculated in consideration of the useful life of the asset.

請求項4に記載の発明によれば、制御手段が、候補資産の耐用年数について、複数の耐用年数候補を用いて、複数の減価償却費を試算し、試算した減価償却費を、耐用年数候補に関連付けて出力する。これにより、減価償却費に基づいて、企業経営に適した耐用年数を予測することができる。   According to the invention described in claim 4, the control means calculates a plurality of depreciation expenses using a plurality of useful life candidates for the useful lives of the candidate assets, and calculates the calculated depreciation expenses as the useful life candidates. Output in association with. Thereby, based on the depreciation expense, the useful life suitable for corporate management can be estimated.

請求項5に記載の発明によれば、債務評価手法においては、候補資産について、資産除去債務の対象の公表単価を取得し、この公表単価を用いて見積金額を算出する。これにより、公表された単価を用いて、将来キャッシュフロー、減価償却費を算出することができる。   According to the invention described in claim 5, in the debt evaluation method, an estimated unit price of the asset retirement obligation is acquired for the candidate asset, and an estimated amount is calculated using the announced unit price. As a result, future cash flows and depreciation expenses can be calculated using the published unit price.

請求項6に記載の発明によれば、債務評価手法においては、候補資産について、資産除去債務の対象と共通する実績金額を取得し、この実績金額に基づいて算出された実績単価を用いて見積金額を算出する。これにより、資産除去の実績を用いて、将来キャッシュフロー、減価償却費を算出することができる。   According to the invention described in claim 6, in the debt evaluation method, for the candidate asset, an actual amount common to the target of the asset retirement obligation is acquired and estimated using the actual unit price calculated based on the actual amount. Calculate the amount. As a result, the future cash flow and depreciation expenses can be calculated using the asset removal results.

請求項7に記載の発明によれば、債務評価手法においては、連絡先情報を用いて、候補資産について、資産除去の見積依頼を送信し、取引先から、取引先における資産除去単価を用いた見積金額を取得する。これにより、取引先において算出された見積金額に基づいて、将来キャッシュフロー、減価償却費を算出することができる。   According to the invention described in claim 7, in the debt evaluation method, the contact information is used to send an estimate request for asset removal for the candidate asset, and the asset removal unit price at the customer is used from the customer. Get an estimated amount. Thereby, the future cash flow and the depreciation expense can be calculated based on the estimated amount calculated by the business partner.

請求項8に記載の発明によれば、制御手段が、候補資産に関する現在の資産除去単価を取得する。そして、過去に減価償却費を算出した資産について、減価償却費の算出において用いた単価と現在の単価とを比較し、両者の差が基準範囲を超えている場合には、資産除去債務についての見積金額を再度、算出する。これにより、資産除去単価に大きな変動があった場合のみ、減価償却費の再計算を行なうため、計算負荷を軽減することができる
According to the invention described in claim 8, the control means acquires the current asset removal unit price related to the candidate asset. Compare the unit price used in the calculation of depreciation expenses with the current unit price for assets for which depreciation expenses have been calculated in the past. Calculate the estimated amount again. As a result, only when there is a large change in the asset removal unit price, the calculation load can be reduced because the depreciation expenses are recalculated.

請求項9に記載の発明によれば、制御手段が、資産管理情報記憶手段を用いて、管理対象資産の関連部署を特定する。そして、関連部署の連絡先に対して、資産状況を確認するアンケートを送信し、アンケートに基づいて取得した資産状況を資産管理情報記憶手段に記録する。これにより、効率的に資産状況を把握することができる。   According to the invention described in claim 9, the control means specifies the related department of the asset to be managed using the asset management information storage means. And the questionnaire which confirms an asset condition is transmitted with respect to the contact of a related department, and the asset condition acquired based on the questionnaire is recorded on an asset management information storage means. Thereby, an asset condition can be grasped efficiently.

本発明によれば、資産除去債務について、将来キャッシュフローを算出するための会計管理システム、会計管理方法及び会計管理プログラムを提供することができる。   According to the present invention, it is possible to provide an accounting management system, accounting management method, and accounting management program for calculating future cash flows for asset retirement obligations.

本発明の実施形態のシステム概略図。The system schematic of embodiment of this invention. 本発明の実施形態のデータベースの説明図であって、(a)は資産管理データベース、(b)は評価対象資産データベース、(c)は資産除去実績データベースに記録されたデータの説明図。It is explanatory drawing of the database of embodiment of this invention, Comprising: (a) is an asset management database, (b) is an evaluation object asset database, (c) is explanatory drawing of the data recorded on the asset removal performance database. 本実施形態の処理手順の説明図。Explanatory drawing of the process sequence of this embodiment. 本実施形態の処理手順の説明図。Explanatory drawing of the process sequence of this embodiment. 本実施形態の処理手順の説明図。Explanatory drawing of the process sequence of this embodiment. 本実施形態の処理手順の説明図。Explanatory drawing of the process sequence of this embodiment. 本実施形態の処理手順の説明図。Explanatory drawing of the process sequence of this embodiment. 他の実施形態の処理手順の説明図。Explanatory drawing of the process sequence of other embodiment.

以下、本発明を具体化した一実施形態を、図1〜図7に従って説明する。本実施形態では、資産について資産除去債務を評価し、減価償却費を算出するサービスを実現するための会計管理システム、会計管理方法及び会計管理プログラムとして説明する。本実施形態では、企業で保有している資産についての資産除去債務を評価する場合を想定する。   Hereinafter, an embodiment embodying the present invention will be described with reference to FIGS. In the present embodiment, description will be made as an accounting management system, accounting management method, and accounting management program for realizing a service for evaluating asset retirement obligations for assets and calculating depreciation expenses. In the present embodiment, it is assumed that an asset retirement obligation is evaluated for an asset held by a company.

本実施形態では、図1に示すように、資産管理サーバ10、資産除去債務評価サーバ20、クライアント端末30が、ネットワークを介して、相互に接続されている。
クライアント端末30は、この企業の担当者が利用するコンピュータ端末である。クライアント端末30は、表示部(ディスプレイ等)や入力部(キーボードやポインティングデバイス等)を備えている。
In the present embodiment, as shown in FIG. 1, an asset management server 10, an asset removal obligation evaluation server 20, and a client terminal 30 are connected to each other via a network.
The client terminal 30 is a computer terminal used by a person in charge of this company. The client terminal 30 includes a display unit (display, etc.) and an input unit (keyboard, pointing device, etc.).

資産管理サーバ10は、この企業が保有している資産を管理するコンピュータシステムである。そして、資産管理サーバ10は、資産除去債務評価サーバ20からの要求に応じて、評価対象の資産情報を提供する。資産管理サーバ10は、図1に示すように資産管理データベース12を備えている。   The asset management server 10 is a computer system that manages assets owned by this company. Then, the asset management server 10 provides asset information to be evaluated in response to a request from the asset removal obligation evaluation server 20. The asset management server 10 includes an asset management database 12 as shown in FIG.

資産管理データベース12には、図2(a)に示すように、各資産を管理するための資産管理レコード120が記録されている。この資産管理レコード120は、この企業において取得した資産が登録された場合に記録される。資産管理レコード120は、資産管理コード、関連部署、分類、取得日、取得価格、管理状況に関するデータを含んで構成される。   In the asset management database 12, an asset management record 120 for managing each asset is recorded as shown in FIG. This asset management record 120 is recorded when an asset acquired in this company is registered. The asset management record 120 includes data relating to an asset management code, a related department, a classification, an acquisition date, an acquisition price, and a management status.

資産管理コードデータ領域には、各資産を特定するための識別子に関するデータが記録される。
関連部署データ領域には、この資産の管理に関係する部署を特定するための識別子(部署コード)に関するデータが記録される。このデータ領域には、例えば、この資産の関連
部署や利用部署を特定する識別子が記録される。そして、このデータ領域には、資産を管理する上位部署(例えば、統括的な環境・施設管理部門に属する部署)から下位部署(例えば、有形固定資産を利用している事業部門に属する部署)のように、階層順番に部署コードが記録される。
In the asset management code data area, data relating to an identifier for identifying each asset is recorded.
In the related department data area, data relating to an identifier (department code) for identifying a department related to the management of the asset is recorded. In this data area, for example, an identifier for specifying a related department or a use department of the asset is recorded. In this data area, the upper departments (eg, departments that belong to the general environmental / facility management department) that manage assets are subordinate to the lower departments (eg, departments that belong to business departments that use tangible fixed assets). As such, department codes are recorded in hierarchical order.

分類データ領域には、この資産が属する分類を特定するための識別子に関するデータが記録される。例えば、このデータ領域には、建物、製造設備等の有形固定資産の分類を記録する。   In the classification data area, data relating to an identifier for specifying the classification to which the asset belongs is recorded. For example, in this data area, the classification of tangible fixed assets such as buildings and manufacturing facilities is recorded.

取得日データ領域には、この資産を取得した日付(年月日)に関するデータが記録される。
取得価格データ領域には、この資産を取得したときの価格に関するデータが記録される。
管理状況データ領域には、この資産の状態を特定するためのフラグが記録される。例えば、この資産が除却済みの場合には、このデータ領域に「除却済」フラグが記録される。
In the acquisition date data area, data relating to the date (year / month / day) when this asset was acquired is recorded.
In the acquisition price data area, data relating to the price when the asset is acquired is recorded.
In the management status data area, a flag for specifying the status of the asset is recorded. For example, if this asset has been retired, a “retired” flag is recorded in this data area.

資産除去債務評価サーバ20は、資産除去債務を評価し、減価償却費を算出するコンピュータシステムである。資産除去債務評価サーバ20は、図1に示すように制御部21、適用条件データベース22、会計指標データベース23、評価対象資産データベース24、資産除去実績データベース25、債務評価手法データベース26、組織管理データベース27を備えている。本実施形態では、適用条件データベース22は適用条件情報記憶手段として機能し、評価対象資産データベース24は資産管理情報記憶手段として機能する。更に、資産除去実績データベース25、債務評価手法データベース26は評価参考情報記憶手段として機能する。   The asset retirement obligation evaluation server 20 is a computer system that evaluates asset retirement obligations and calculates depreciation expenses. As shown in FIG. 1, the asset retirement obligation evaluation server 20 includes a control unit 21, an application condition database 22, an accounting index database 23, an evaluation target asset database 24, an asset retirement performance database 25, a debt evaluation method database 26, and an organization management database 27. It has. In the present embodiment, the application condition database 22 functions as application condition information storage means, and the evaluation target asset database 24 functions as asset management information storage means. Furthermore, the asset removal result database 25 and the debt evaluation technique database 26 function as evaluation reference information storage means.

制御部21は、クライアント端末30からの指示に基づいて、資産についての資産除去債務を評価するための各種処理等を行なう。制御部21は、制御手段としてのCPU、RAM及びROM等を有し、後述する処理(資産情報取得段階、スクリーニング段階、アンケート管理段階、見積管理段階、減価償却評価段階、再評価段階等の各処理)を行なう。このための会計管理プログラムを実行することにより、制御部21は、図1に示すように、資産情報取得手段211、スクリーニング手段212、アンケート管理手段213、見積管理手段214、減価償却評価手段215、再評価手段216等として機能する。   Based on an instruction from the client terminal 30, the control unit 21 performs various processes for evaluating the asset removal obligation for the asset. The control unit 21 includes a CPU, a RAM, a ROM, and the like as control means, and each of processes described later (an asset information acquisition stage, a screening stage, a questionnaire management stage, an estimate management stage, a depreciation evaluation stage, a re-evaluation stage, etc. Process). By executing the accounting management program for this purpose, the control unit 21, as shown in FIG. 1, the asset information acquisition means 211, screening means 212, questionnaire management means 213, estimate management means 214, depreciation evaluation means 215, It functions as reevaluation means 216 and the like.

資産情報取得手段211は、資産管理サーバ10から、評価対象資産の資産管理データを取得し、評価対象資産データベース24に登録する処理を実行する。
スクリーニング手段212は、資産除去債務が生じる資産を選別する処理を実行する。
The asset information acquisition unit 211 executes processing for acquiring asset management data of the evaluation target asset from the asset management server 10 and registering it in the evaluation target asset database 24.
The screening unit 212 executes a process of selecting an asset for which an asset removal obligation is generated.

アンケート管理手段213は、資産除去債務の発生の有無や債務費用を評価するための情報を収集し、評価対象資産データベース24に登録する処理を実行する。このアンケート管理手段213は、関連部署にアンケートを送信するとともに、関連部署から取得したアンケート回答を評価する。このため、アンケート管理手段213は、評価対象資産の分類に応じて、契約状況や資産状況についての情報を収集するための各種アンケートを保持している。このアンケートには、契約状況や資産状況を確認するための各種質問が含まれる。各アンケートの回答は「調査済みで見積あり」、「過去に調査あり」、「部分調査あり」、「未調査・不明」等から選択することができる。   The questionnaire management unit 213 collects information for evaluating the presence / absence of the asset removal obligation and the debt cost, and executes a process of registering in the evaluation target asset database 24. This questionnaire management means 213 transmits a questionnaire to the related department and evaluates the questionnaire response acquired from the related department. Therefore, the questionnaire management unit 213 holds various questionnaires for collecting information on the contract status and asset status according to the classification of the asset to be evaluated. This questionnaire includes various questions for confirming the contract status and asset status. The answer to each questionnaire can be selected from “Surveyed and estimated”, “Surveyed in the past”, “Partial surveyed”, “Unsurveyed / Unknown”, and the like.

見積管理手段214は、資産除去債務に必要な費用の見積額を取得し、評価対象資産データベース24に登録する処理を実行する。
減価償却評価手段215は、資産除去債務の減価償却費を評価する処理を実行する。
再評価手段216は、過去に算出した減価償却費を再評価する処理を実行する。
The estimate management unit 214 executes processing for acquiring an estimated amount of expenses necessary for the asset retirement obligation and registering it in the evaluation target asset database 24.
The depreciation evaluation means 215 executes processing for evaluating the depreciation cost of the asset retirement obligation.
The re-evaluation means 216 executes processing for re-evaluating the depreciation expenses calculated in the past.

適用条件データベース22には、法令等に基づいて資産除去債務が生じる資産を選別するための適用条件データが記録されている。この適用条件データは、「法令による義務」や「契約による義務」に基づいて資産除去債務の対象となる資産の分類、資産除去債務の対象や適用条件が登録された場合に記録される。この適用条件データには、分類、対象、適用条件、適用開始日(年月日)に関するデータが記録されている。
分類データ領域には、資産除去債務が発生する可能性がある資産の分類を特定するための識別子に関するデータが記録される。
対象データ領域には、資産除去債務の対象を特定するための識別子に関するデータが記録される。対象としては、例えばアスベスト、PCB、土壌汚染、特別管理廃棄物、フロン等がある。
The application condition database 22 records application condition data for selecting an asset that causes asset retirement obligations based on laws and regulations. This application condition data is recorded when the asset classification subject to asset retirement obligations, the target of asset retirement obligations and application conditions are registered based on “obligation by law” and “obligation by contract”. In this application condition data, data relating to classification, target, application condition, and application start date (year / month / day) is recorded.
In the classification data area, data relating to an identifier for specifying a classification of an asset that may cause an asset retirement obligation is recorded.
In the target data area, data relating to an identifier for specifying the target of the asset retirement obligation is recorded. Examples of the target include asbestos, PCB, soil contamination, special management waste, and Freon.

適用条件データ領域には、資産除去債務の対象とするための条件に関するデータが記録される。例えば、適用条件としては、適用法令に規定された有害物の使用量等が記録される。
適用開始日データ領域には、この対象や条件が適用される日付(年月日)に関するデータが記録される。
In the application condition data area, data relating to conditions for making an asset retirement obligation subject is recorded. For example, as the application condition, the usage amount of harmful substances specified in applicable laws and regulations is recorded.
In the application start date data area, data relating to the date (year / month / day) to which the target or condition is applied is recorded.

会計指標データベース23には、将来キャッシュフローや減価償却費を算出する場合に用いる会計指標テーブルが記録されている。この会計指標テーブルには、耐用年数毎に、適用されるインフレ率や割引率に関するデータが記録されている。   The accounting index database 23 records an accounting index table used for calculating future cash flows and depreciation expenses. In this accounting index table, data relating to the applied inflation rate and discount rate is recorded for each useful life.

評価対象資産データベース24には、図2(b)に示すように、資産除去債務が発生する可能性がある資産についての評価対象資産管理レコード240が記録される。この評価対象資産管理レコード240は、資産管理データを取得した場合に登録され、各種評価結果を算出した場合に追加記録される。評価対象資産管理レコード240は、資産管理コード、アンケート結果、契約状況、資産状況、適用法令、耐用年数、資産除去判定、見積結果、債務評価結果、減価償却評価結果を含んで構成される。   In the evaluation target asset database 24, as shown in FIG. 2 (b), an evaluation target asset management record 240 for an asset that may generate an asset retirement obligation is recorded. This evaluation target asset management record 240 is registered when asset management data is acquired, and is additionally recorded when various evaluation results are calculated. The asset management record 240 to be evaluated includes an asset management code, a questionnaire result, a contract status, an asset status, an applicable law, a useful life, an asset removal determination, an estimation result, a debt evaluation result, and a depreciation evaluation result.

資産管理コードデータ領域には、資産除去の評価対象の資産を特定するための識別子に関するデータが記録される。
アンケート結果データ領域には、関連部署から取得したアンケート結果に関するデータが記録される。このアンケート結果データ領域には、アンケート送信先、契約状況や資産状況、耐用年数に関する質問についての回答が記録される。複数の関連部署からアンケート結果を取得した場合には、すべてのアンケート結果が記録される。
In the asset management code data area, data relating to an identifier for identifying an asset to be evaluated for asset removal is recorded.
In the questionnaire result data area, data related to the questionnaire result acquired from the related department is recorded. In this questionnaire result data area, answers to questions concerning questionnaire destinations, contract statuses and asset statuses, and useful lives are recorded. When questionnaire results are acquired from a plurality of related departments, all questionnaire results are recorded.

契約状況データ領域には、アンケート結果に基づいて特定される、この資産の契約状況に関するデータが記録される。資産を取得したときの契約内容(賃貸借や購入等の契約形態や、原状回復義務の有無)を特定するためのフラグが記録される。   In the contract status data area, data relating to the contract status of the asset specified based on the questionnaire result is recorded. A flag for specifying the contract details when the asset is acquired (a contract form such as lease or purchase, and whether or not there is an obligation to restore the original state) is recorded.

資産状況データ領域には、アンケート結果に基づいて特定される、この資産の使用状況や対応状況に関するデータが記録される。例えば、対策費用を必要とする資産除去債務の対象(例えば有害物質)の種類や、建物の改築等を特定するための識別子に関するデータが記録される。更に、対象物質の使用状況等の総量情報(使用量や面積)や、改築等の総量情報(程度や面積)が記録される。また、自社内の対応で原状回復可能な場合には、「社内対応」フラグが記録される。更に、資産除去債務について既に対応済みの場合には、「対応済」フラグが記録される。   In the asset status data area, data relating to the usage status and response status of the asset specified based on the questionnaire result is recorded. For example, data relating to an identifier for identifying the type of asset retirement obligation (for example, a harmful substance) that requires countermeasure costs, reconstruction of a building, and the like is recorded. Furthermore, total amount information (usage amount and area) such as the usage status of the target substance, and total amount information (degree and area) such as reconstruction are recorded. In addition, when the original state can be recovered by in-house correspondence, an “in-house correspondence” flag is recorded. Further, when the asset retirement obligation has already been dealt with, the “corresponding” flag is recorded.

適用法令データ領域には、この資産について、資産除去債務の対象を既定した法令を特定するための識別子に関するデータが記録される。
耐用年数データ領域には、この資産についてアンケートに基づいて特定された耐用年数に関するデータが記録される。
In the applicable law data area, data relating to an identifier for identifying a law that defines a target of asset retirement obligations is recorded for this asset.
In the useful life data area, data relating to the useful life specified based on the questionnaire for this asset is recorded.

資産除去判定データ領域には、資産除去債務の評価の要否を判定するための識別子に関するデータが記録される。資産除去債務の評価が必要な場合には、このデータ領域に「対象」フラグが記録される。その他の対応を行なう場合には、「その他」フラグが記録される。   In the asset removal determination data area, data relating to an identifier for determining whether the asset removal obligation needs to be evaluated is recorded. When the asset retirement obligation needs to be evaluated, the “target” flag is recorded in this data area. When other measures are taken, an “other” flag is recorded.

見積結果データ領域には、資産除去債務の費用の見積に関するデータが記録される。本実施形態では、複数の債務評価手法により算出された複数の見積金額を取得し、すべての見積結果が見積結果データ領域に記録される。このデータ領域には、見積コード、見積日、見積方法、単価、見積金額に関するデータが記録される。見積コードデータデータ領域には、各見積を特定するための識別子が記録される。見積日データ領域には、この見積を取得した日付(年月日)が記録される。見積方法データ領域には、この見積を作成した根拠(公表値、実績値、取引先の見積)が記録される。単価データ領域には、資産除去債務費用を算出するための単価が記録される。見積金額データ領域には、単価を用いて算出された資産除去債務費用の見積金額が記録される。   In the estimation result data area, data relating to the estimation of the cost of asset retirement obligations is recorded. In this embodiment, a plurality of estimated amounts calculated by a plurality of debt evaluation methods are acquired, and all estimated results are recorded in the estimated result data area. In this data area, data relating to an estimation code, an estimation date, an estimation method, a unit price, and an estimated amount is recorded. In the estimate code data data area, an identifier for specifying each estimate is recorded. The date (year / month / day) when this estimate is acquired is recorded in the estimate date data area. In the estimation method data area, the basis for creating this estimate (public value, actual value, estimate of business partner) is recorded. In the unit price data area, a unit price for calculating the asset retirement obligation cost is recorded. In the estimated amount data area, an estimated amount of asset retirement obligation cost calculated using the unit price is recorded.

債務評価結果データ領域には、結果資産除去債務のための費用に関するデータが記録される。この費用は、後述するように、見積金額を総合評価して算出される。
減価償却評価結果データ領域には、資産除去債務のための費用を減価償却した場合の評価結果に関するデータが記録される。この減価償却評価結果データ領域には、算出日、インフレ率、割引率、減価償却費に関するデータが記録される。算出日データ領域には、この減価償却評価結果を算出した日付(年月日)が記録される。インフレ率、割引率の各データ領域には、この減価償却評価結果を算出したときのインフレ率、割引率が記録される。減価償却費データ領域には、資産除去債務について算出した減価償却費が記録される。
In the debt evaluation result data area, data relating to the cost for the result asset retirement obligation is recorded. This cost is calculated by comprehensively evaluating the estimated amount as will be described later.
In the depreciation evaluation result data area, data relating to the evaluation result when the cost for asset retirement obligations is depreciated is recorded. In this depreciation evaluation result data area, data relating to the calculation date, the inflation rate, the discount rate, and the depreciation expenses are recorded. In the calculation date data area, the date (year / month / day) when the depreciation evaluation result is calculated is recorded. Inflation rate and discount rate data areas store the inflation rate and discount rate when the depreciation evaluation result is calculated. In the depreciation expense data area, the depreciation expense calculated for the asset retirement obligation is recorded.

資産除去実績データベース25には、図2(c)に示すように、資産を除去した実績についての資産除去実績管理レコード250が記録されている。本実施形態では、資産除去実績管理レコード250は、資産除去債務を評価するための評価参照情報の一つとして用いられる。この資産除去実績管理レコード250は、資産を除去した場合に登録される。資産除去実績管理レコード250は、資産管理コード、除去日、実績額、除去内容に関するデータを含んで構成される。   In the asset removal record database 25, as shown in FIG. 2C, an asset removal record management record 250 for the record of asset removal is recorded. In this embodiment, the asset removal performance management record 250 is used as one piece of evaluation reference information for evaluating the asset removal obligation. This asset removal result management record 250 is registered when an asset is removed. The asset removal record management record 250 includes data relating to an asset management code, a removal date, an actual amount, and removal contents.

資産管理コードデータ領域には、除去された資産を特定するための識別子に関するデータが記録される。
除去日データ領域には、資産を除去した日付(年月日)に関するデータが記録される。
In the asset management code data area, data relating to an identifier for identifying the removed asset is recorded.
In the removal date data area, data related to the date (year / month / day) when the asset is removed is recorded.

実績額データ領域には、資産除去債務の対応に要した費用を特定するための識別子に関するデータが記録される。
除去内容データ領域には、資産除去債務の内容(資産除去債務の対象や総量情報)に関するデータが記録される。
In the actual amount data area, data relating to an identifier for specifying the cost required for handling the asset retirement obligation is recorded.
In the removal content data area, data relating to the content of the asset removal obligation (object of asset removal obligation and total amount information) is recorded.

債務評価手法データベース26には、資産除去債務を評価するための評価参照情報についての債務評価手法レコードが記録される。この債務評価手法レコードには、対象、公表単価、取引先に関するデータが記録されている。   The debt evaluation technique database 26 records a debt evaluation technique record for evaluation reference information for evaluating the asset removal obligation. In this debt evaluation method record, data on the target, the announced unit price, and the business partner are recorded.

対象データ領域には、資産除去債務において見積可能な対象(「法令による義務」、「契約における義務」の内容)を特定するための識別子に関するデータが記録される。
公表単価データ領域には、資産除去債務に必要な費用を算出するための公表単価に関す
るデータが記録される。このデータ領域には、資産除去債務に必要な費用を算出するための単価が公表されている場合のみ、その値が記録される。
In the target data area, data relating to an identifier for specifying a target that can be estimated in the asset retirement obligation (contents of “obligation by law” and “obligation in contract”) is recorded.
In the published unit price data area, data related to the published unit price for calculating the cost required for asset retirement obligations is recorded. In this data area, the value is recorded only when the unit price for calculating the cost required for the asset retirement obligation is announced.

取引先データ領域には、資産除去債務の対象について、見積依頼可能な取引先や、各取引先の連絡先に関するデータが記録される。この取引先は、資産除去債務に対応可能な取引先がある場合のみ記録される。   In the business partner data area, data relating to business partners that can request an estimate and contact information of each business partner are recorded for the asset retirement obligation target. This business partner is recorded only when there is a business partner that can handle the asset retirement obligation.

組織管理データベース27には、組織管理レコードが記録される。この組織管理レコードには、組織構成図、連絡先に関するデータが記録されている。
組織構成図データ領域には、この会社を構成する各部署を特定するための識別子(部署コード)に関するデータが記録される。
連絡先データ領域には、各部署の連絡先(電話番号や電子メールアドレス等)に関するデータが記録される。
Organization management records are recorded in the organization management database 27. In the organization management record, data relating to the organization configuration diagram and contact information is recorded.
Data relating to an identifier (department code) for specifying each department constituting the company is recorded in the organization configuration chart data area.
In the contact data area, data on contact information (phone number, e-mail address, etc.) of each department is recorded.

上記のように構成されたシステムを用いて、資産除去債務を評価する場合の処理手順について説明する。以下では、処理手順の概略(図3)、アンケートに基づくスクリーニング処理(図4)、見積情報の登録処理(図5)、減価償却費の試算処理(図6)、減価償却費の更新処理(図7)の順番に説明する。   A processing procedure in the case of evaluating the asset retirement obligation using the system configured as described above will be described. In the following, the outline of the processing procedure (FIG. 3), the screening process based on the questionnaire (FIG. 4), the estimation information registration process (FIG. 5), the depreciation expense calculation process (FIG. 6), the depreciation expense update process ( This will be described in the order of FIG.

(処理手順の概略)
まず、図3を用いて、処理の概略を説明する。
ここでは、資産除去債務評価サーバ20の制御部21は、資産情報の取得処理を実行する(ステップS1−1)。具体的には、制御部21の資産情報取得手段211は、資産管理サーバ10の資産管理データベース12から、資産情報を取得する。そして、資産情報取得手段211は、抽出した資産管理レコード120の資産管理コードが記録されている評価対象資産管理レコード240を、評価対象資産データベース24において検索する。資産管理コードが記録された評価対象資産管理レコード240が登録されていない場合には、資産情報取得手段211は、新たに評価対象資産管理レコード240を生成して、評価対象資産データベース24に記録する。
(Outline of processing procedure)
First, the outline of the process will be described with reference to FIG.
Here, the control unit 21 of the asset removal obligation evaluation server 20 executes asset information acquisition processing (step S1-1). Specifically, the asset information acquisition unit 211 of the control unit 21 acquires asset information from the asset management database 12 of the asset management server 10. Then, the asset information acquisition unit 211 searches the evaluation target asset database 24 for the evaluation target asset management record 240 in which the asset management code of the extracted asset management record 120 is recorded. If the evaluation target asset management record 240 in which the asset management code is recorded is not registered, the asset information acquisition unit 211 newly generates the evaluation target asset management record 240 and records it in the evaluation target asset database 24. .

次に、資産除去債務評価サーバ20の制御部21は、適用条件に基づいてスクリーニング処理を実行する(ステップS1−2)。具体的には、制御部21のスクリーニング手段212は、適用条件データベース22に記録されている資産除去債務対象の分類と、資産管理サーバ10から取得した資産管理レコード120の分類とを比較する。そして、スクリーニング手段212は、分類が一致する資産を評価対象資産として抽出する。   Next, the control unit 21 of the asset removal obligation evaluation server 20 executes a screening process based on the application condition (step S1-2). Specifically, the screening unit 212 of the control unit 21 compares the asset removal obligation target classification recorded in the application condition database 22 with the classification of the asset management record 120 acquired from the asset management server 10. Then, the screening unit 212 extracts assets having the same classification as the evaluation target assets.

次に、資産除去債務評価サーバ20の制御部21は、アンケート送信先の決定処理を実行する(ステップS1−3)。具体的には、制御部21のアンケート管理手段213は、抽出した資産管理レコード120の関連部署データ領域に記録されている部署コードを取得する。この場合、複数の関連部署が登録されている場合には、上位部署から順番にアンケート送信先として決定する。   Next, the control unit 21 of the asset removal obligation evaluation server 20 executes a questionnaire transmission destination determination process (step S1-3). Specifically, the questionnaire management unit 213 of the control unit 21 acquires the department code recorded in the related department data area of the extracted asset management record 120. In this case, if a plurality of related departments are registered, the questionnaire transmission destination is determined in order from the higher department.

次に、資産除去債務評価サーバ20の制御部21は、アンケート送信処理を実行する(ステップS1−4)。具体的には、制御部21のアンケート管理手段213は、アンケート送信先として決定した部署コードの連絡先情報を、組織管理データベース27から抽出する。そして、アンケート管理手段213は、処理対象資産の分類に対応した内容のアンケートを送信する。このアンケートには、資産管理コード、送信先の部署コードを設定しておく。   Next, the control part 21 of the asset removal obligation evaluation server 20 performs a questionnaire transmission process (step S1-4). Specifically, the questionnaire management means 213 of the control unit 21 extracts contact information of the department code determined as the questionnaire transmission destination from the organization management database 27. And the questionnaire management means 213 transmits the questionnaire of the content corresponding to the classification | category of a process target asset. In this questionnaire, an asset management code and a transmission destination department code are set.

次に、資産除去債務評価サーバ20の制御部21は、アンケート回答取得処理を実行す
る(ステップS1−5)。具体的には、アンケートを受信した部署の担当者は、評価対象資産の契約状況や資産状況を入力する。制御部21のアンケート管理手段213は、送信先の関連部署からアンケートについての回答を取得する。このアンケートにおいては、契約状況や資産状況について、送信先部署において把握をしている内容が記入されている。そして、アンケート管理手段213は、回収したアンケート回答に基づいて、資産状況、契約状況、耐用年数を評価対象資産管理レコード240に記録する。なお、送信先の関連部署において把握できていない内容についての質問に対しては、「未調査・不明」が記録される。
Next, the control unit 21 of the asset removal obligation evaluation server 20 executes a questionnaire response acquisition process (step S1-5). Specifically, the person in charge of the department receiving the questionnaire inputs the contract status and asset status of the asset to be evaluated. The questionnaire management means 213 of the control unit 21 acquires an answer about the questionnaire from the related department of the transmission destination. In this questionnaire, the contents which the transmission destination department knows about the contract status and asset status are entered. Then, the questionnaire management means 213 records the asset status, contract status, and useful life in the evaluation target asset management record 240 based on the collected questionnaire responses. In addition, “uninvestigated / unknown” is recorded for questions about contents that cannot be grasped by the related department of the transmission destination.

次に、資産除去債務評価サーバ20の制御部21は、評価のための情報が十分かどうかについての判定処理を実行する(ステップS1−6)。具体的には、制御部21のアンケート管理手段213は、回収したアンケート回答に基づいて判定する。ここで、一部に「部分調査あり」、「未調査・不明」の回答が含まれている場合には、評価のための情報が不十分と判定する。   Next, the control unit 21 of the asset removal obligation evaluation server 20 executes a determination process as to whether or not the information for evaluation is sufficient (step S1-6). Specifically, the questionnaire management means 213 of the control unit 21 makes a determination based on the collected questionnaire responses. Here, if some of the responses include “partial survey is present” and “not surveyed / unknown”, it is determined that the information for evaluation is insufficient.

評価のための情報が不十分と判定した場合(ステップS1−6において「NO」の場合)、資産除去債務評価サーバ20の制御部21は、アンケート送信先の決定処理(ステップS1−3)以降を繰り返す。この場合、アンケート管理手段213は、資産管理レコード120において、先にアンケートを送信した関連部署の次の下位部署として記録されている関連部署の部署コードを特定する。そして、アンケート管理手段213は、この関連部署の連絡先を組織管理データベース27から取得し、アンケート送信先として決定する。   When it is determined that the information for evaluation is insufficient (in the case of “NO” in step S1-6), the control unit 21 of the asset removal obligation evaluation server 20 performs the questionnaire transmission destination determination process (step S1-3) and the subsequent steps. repeat. In this case, the questionnaire management unit 213 identifies the department code of the related department recorded as the next lower department of the related department that has transmitted the questionnaire in the asset management record 120. Then, the questionnaire management unit 213 acquires the contact information of the related department from the organization management database 27 and determines it as a questionnaire transmission destination.

「部分調査あり」、「未調査・不明」の回答がなく、評価のための情報は十分と判定した場合(ステップS1−6において「YES」の場合)、資産除去債務評価サーバ20の制御部21は、アンケートに基づくスクリーニング処理を実行する(ステップS1−7)。具体的には、制御部21のスクリーニング手段212は、アンケート内容に基づいて更新された評価対象資産管理レコード240を用いて、スクリーニングを行なう。そして、スクリーニングの結果、債務計上対象と判定した資産の評価対象資産管理レコード240に、資産除去判定フラグを記録する。この処理については、図4を用いて後述する。   When there is no answer of “partial survey” or “not surveyed / unknown” and it is determined that the information for evaluation is sufficient (in the case of “YES” in step S1-6), the control unit of the asset removal obligation evaluation server 20 21 executes a screening process based on a questionnaire (step S1-7). Specifically, the screening unit 212 of the control unit 21 performs screening using the evaluation target asset management record 240 updated based on the contents of the questionnaire. Then, as a result of screening, an asset removal determination flag is recorded in the asset management record 240 for evaluation of an asset determined to be a debt recording target. This process will be described later with reference to FIG.

次に、資産除去債務評価サーバ20の制御部21は、見積情報の登録処理を実行する(ステップS1−8)。具体的には、制御部21の見積管理手段214は、複数の方法により、資産除去に必要な債務費用の見積金額を算出する。この処理については、図5を用いて後述する。   Next, the control unit 21 of the asset removal obligation evaluation server 20 executes a process for registering estimate information (step S1-8). Specifically, the estimate management unit 214 of the control unit 21 calculates an estimated amount of debt costs necessary for asset removal by a plurality of methods. This process will be described later with reference to FIG.

次に、資産除去債務評価サーバ20の制御部21は、減価償却費の試算処理を実行する(ステップS1−9)。具体的には、制御部21の減価償却評価手段215が、資産除去債務についての減価償却費を算出する。この処理については、図6を用いて後述する。   Next, the control unit 21 of the asset retirement obligation evaluation server 20 executes a depreciation expense calculation process (step S1-9). Specifically, the depreciation evaluation means 215 of the control unit 21 calculates the depreciation cost for the asset removal obligation. This process will be described later with reference to FIG.

次に、資産除去債務評価サーバ20の制御部21は、減価償却費の更新処理を実行する(ステップS1−10)。この処理については、図7を用いて後述する。
次に、資産除去債務評価サーバ20の制御部21は、報告書の出力処理を実行する(ステップS1−11)。具体的には、制御部21の減価償却評価手段215は、算出した費用についての報告書を出力する。この報告書には、資産除去債務が発生する資産毎に、資産除去についての減価償却評価結果を含める。
Next, the control unit 21 of the asset retirement obligation evaluation server 20 executes a depreciation expense update process (step S1-10). This process will be described later with reference to FIG.
Next, the control unit 21 of the asset retirement obligation evaluation server 20 executes a report output process (step S1-11). Specifically, the depreciation evaluation means 215 of the control unit 21 outputs a report on the calculated cost. This report includes the depreciation assessment results for asset retirement for each asset incurred.

(アンケートに基づくスクリーニング処理)
次に、図4を用いて、スクリーニング処理を説明する。ここでは、評価対象資産データベース24に記録された評価対象資産管理レコード240の資産を順次、処理対象資産と
して特定して、以下の処理を繰り返す。
(Screening process based on questionnaire)
Next, the screening process will be described with reference to FIG. Here, the assets in the evaluation target asset management record 240 recorded in the evaluation target asset database 24 are sequentially specified as processing target assets, and the following processing is repeated.

まず、資産除去債務評価サーバ20の制御部21は、資産の契約形態の特定処理を実行する(ステップS2−1)。具体的には、制御部21のスクリーニング手段212は、評価対象資産管理レコード240の契約状況データ領域に記録されたフラグを取得する。   First, the control unit 21 of the asset retirement obligation evaluation server 20 executes an asset contract form specifying process (step S2-1). Specifically, the screening unit 212 of the control unit 21 acquires the flag recorded in the contract status data area of the evaluation target asset management record 240.

次に、資産除去債務評価サーバ20の制御部21は、賃貸借契約かどうかについての判定処理を実行する(ステップS2−2)。具体的には、制御部21のスクリーニング手段212は、評価対象資産管理レコード240の契約形態データ領域に「賃貸借」フラグが記録されている場合には賃貸借契約と判定する。   Next, the control unit 21 of the asset retirement obligation evaluation server 20 executes determination processing as to whether or not the lease contract is satisfied (step S2-2). Specifically, the screening unit 212 of the control unit 21 determines that the lease is a lease contract when the “lease” flag is recorded in the contract form data area of the evaluation target asset management record 240.

賃貸借契約と判定した場合(ステップS2−2において「YES」の場合)、資産除去債務評価サーバ20の制御部21は、原状回復義務があるかどうかについての判定処理を実行する(ステップS2−3)。具体的には、制御部21のスクリーニング手段212は、評価対象資産管理レコード240の契約形態データ領域に「原状回復義務あり」フラグが記録されている場合には、原状回復義務があると判定する。   When it is determined as a lease contract (in the case of “YES” in Step S2-2), the control unit 21 of the asset retirement obligation evaluation server 20 executes a determination process as to whether or not there is an original restoration obligation (Step S2-3). ). Specifically, the screening unit 212 of the control unit 21 determines that there is an obligation to restore the original state if the “original restoration obligation” flag is recorded in the contract form data area of the evaluation target asset management record 240. .

原状回復義務があると判定した場合(ステップS2−3において「YES」の場合)、資産除去債務評価サーバ20の制御部21は、使用状況の取得処理を実行する(ステップS2−4)。具体的には、制御部21のスクリーニング手段212は、評価対象資産管理レコード240の資産状況データ領域に記録された使用状況を取得する。   When it is determined that there is an obligation to restore the original state (in the case of “YES” in step S2-3), the control unit 21 of the asset removal obligation evaluation server 20 executes usage status acquisition processing (step S2-4). Specifically, the screening unit 212 of the control unit 21 acquires the usage status recorded in the asset status data area of the evaluation target asset management record 240.

次に、資産除去債務評価サーバ20の制御部21は、原状回復が必要な使用状況かどうかについての判定処理を実行する(ステップS2−5)。具体的には、制御部21のスクリーニング手段212は、取得した使用状況に基づいて、原状回復の要否を判定する。例えば、資産状況データ領域に「社内対応」フラグや「対応済」フラグが記録されている場合には、原状回復が必要な使用状況ではないと判定する。一方、対策費用を必要とする資産除去債務の対象(例えば、除外が必要な有害物や、原状回復が必要な改築)が記録されている場合には、原状回復の対応が必要と判定する。   Next, the control unit 21 of the asset retirement obligation evaluation server 20 executes a determination process as to whether or not the usage state needs to be restored (step S2-5). Specifically, the screening unit 212 of the control unit 21 determines whether or not it is necessary to restore the original state based on the acquired usage status. For example, if an “in-house correspondence” flag or a “responded” flag is recorded in the asset status data area, it is determined that the usage status does not require restoration of the original state. On the other hand, when the target of asset retirement obligations requiring countermeasure costs (for example, harmful substances that need to be excluded or renovations that need to be restored) is recorded, it is determined that the restoration of the original condition is necessary.

原状回復が必要な使用状況と判定した場合(ステップS2−5において「YES」の場合)、資産除去債務評価サーバ20の制御部21は、資産除去債務の候補登録処理を実行する(ステップS2−6)。具体的には、制御部21のスクリーニング手段212は、評価対象資産管理レコード240の適用法令データ領域に、適用条件データにおいて特定された適用法令に関するデータを記録する。更に、スクリーニング手段212は、資産除去判定データ領域に「対象」フラグを記録する。   If it is determined that the usage state needs to be restored (in the case of “YES” in step S2-5), the control unit 21 of the asset retirement obligation evaluation server 20 executes asset retirement obligation candidate registration processing (step S2— 6). Specifically, the screening unit 212 of the control unit 21 records data on the applicable law specified in the application condition data in the applicable law data area of the evaluation target asset management record 240. Further, the screening unit 212 records a “target” flag in the asset removal determination data area.

一方、原状回復義務がないと判定した場合(ステップS2−3において「NO」の場合)や、原状回復が必要な使用状況でないと判定した場合(ステップS2−5において「NO」の場合)、資産除去債務評価サーバ20の制御部21は、その他の対応登録処理を実行する(ステップS2−7)。具体的には、制御部21のスクリーニング手段212は、評価対象資産管理レコード240の資産除去判定データ領域に「その他」フラグを記録する。   On the other hand, when it is determined that there is no obligation to restore the original state (in the case of “NO” in step S2-3), or when it is determined that the use state is not necessary to restore the original state (in the case of “NO” in step S2-5), The control unit 21 of the asset retirement obligation evaluation server 20 executes other correspondence registration processing (step S2-7). Specifically, the screening unit 212 of the control unit 21 records the “other” flag in the asset removal determination data area of the evaluation target asset management record 240.

一方、「購入」フラグが記録されており、賃貸借契約でないと判定した場合(ステップS2−2において「NO」の場合)、資産除去債務評価サーバ20の制御部21は、使用状況の取得処理を実行する(ステップS2−8)。具体的には、制御部21のスクリーニング手段212は、評価対象資産管理レコード240の資産状況データ領域に記録された使用状況を取得する。   On the other hand, when the “purchase” flag is recorded and it is determined that the contract is not a lease contract (in the case of “NO” in step S2-2), the control unit 21 of the asset retirement obligation evaluation server 20 performs usage status acquisition processing. Execute (step S2-8). Specifically, the screening unit 212 of the control unit 21 acquires the usage status recorded in the asset status data area of the evaluation target asset management record 240.

次に、資産除去債務評価サーバ20の制御部21は、法令対象かどうかについての判定処理を実行する(ステップS2−9)。具体的には、制御部21のスクリーニング手段212は、取得した使用状況が適用条件データベース22に記録された「法令による義務」(例えば、有害物質の使用)に該当するかどうかを確認する。適用条件データベース22に記録された「法令による義務」の対象に該当する場合には、法令対象と判定する。   Next, the control unit 21 of the asset retirement obligation evaluation server 20 executes a determination process as to whether or not it is a legal object (step S2-9). Specifically, the screening unit 212 of the control unit 21 confirms whether or not the acquired use state corresponds to “duty by law” (for example, use of harmful substances) recorded in the application condition database 22. If it falls under the category of “obligation by law” recorded in the application condition database 22, it is determined to be a law target.

法令対象と判定した場合(ステップS2−9において「YES」の場合)、資産除去債務評価サーバ20の制御部21は、未対応かどうかについての判定処理を実行する(ステップS2−10)。具体的には、制御部21のスクリーニング手段212は、評価対象資産管理レコード240の資産状況データ領域に「対応済」フラグが記録されていない場合には未対応と判定する。   If it is determined that it is a legal object (in the case of “YES” in step S2-9), the control unit 21 of the asset retirement obligation evaluation server 20 executes a determination process as to whether or not it is incompatible (step S2-10). Specifically, the screening unit 212 of the control unit 21 determines that it is not supported when the “corresponding” flag is not recorded in the asset status data area of the evaluation target asset management record 240.

未対応と判定した場合(ステップS2−10において「YES」の場合)、資産除去債務評価サーバ20の制御部21は、資産除去債務の候補登録処理を実行する(ステップS2−11)。具体的には、制御部21のスクリーニング手段212は、評価対象資産管理レコード240の適用法令データ領域に、適用条件データにおいて特定された適用法令に関するデータを記録する。更に、スクリーニング手段212は、評価対象資産管理レコード240の資産除去判定データ領域に「対象」フラグを記録する。   When it is determined that it is not supported (in the case of “YES” in Step S2-10), the control unit 21 of the asset removal obligation evaluation server 20 executes asset removal obligation candidate registration processing (Step S2-11). Specifically, the screening unit 212 of the control unit 21 records data on the applicable law specified in the application condition data in the applicable law data area of the evaluation target asset management record 240. Further, the screening unit 212 records a “target” flag in the asset removal determination data area of the evaluation target asset management record 240.

一方、法令対象でないと判定した場合(ステップS2−9において「NO」の場合)や、対応済みと判定した場合(ステップS2−10において「NO」の場合)、資産除去債務評価サーバ20の制御部21は、その他の対応登録処理を実行する(ステップS2−12)。具体的には、制御部21のスクリーニング手段212は、評価対象資産管理レコード240の資産除去判定データ領域に「その他」フラグを記録する。
以上の処理を、すべての資産除去債務対象についての処理を終了するまで繰り返す。
On the other hand, when it is determined that it is not subject to laws and regulations (in the case of “NO” in step S2-9) or in the case where it has been determined that it has been handled (in the case of “NO” in step S2-10), control of the asset removal obligation evaluation server 20 The unit 21 executes other correspondence registration processing (step S2-12). Specifically, the screening unit 212 of the control unit 21 records the “other” flag in the asset removal determination data area of the evaluation target asset management record 240.
The above processing is repeated until the processing for all asset retirement obligations is completed.

(見積情報の登録処理)
次に、図5を用いて、見積情報の登録処理を説明する。この処理は、評価対象資産データベース24において、資産除去判定データ領域に「対象」フラグが記録された評価対象資産管理レコード240の資産を順次、処理対象資産として特定して、以下の処理を繰り返す。
(Estimation information registration process)
Next, the estimate information registration process will be described with reference to FIG. In this processing, in the evaluation target asset database 24, the assets in the evaluation target asset management record 240 in which the “target” flag is recorded in the asset removal determination data area are sequentially specified as the processing target assets, and the following processing is repeated.

まず、資産除去債務評価サーバ20の制御部21は、見積もり可能かどうかについての判定処理を実行する(ステップS3−1)。具体的には、制御部21の見積管理手段214は、債務評価手法データベース26において、評価対象資産管理レコード240の資産状況データ領域に記録されている対象(「法令による義務」、「契約における義務」の内容)が記録された債務評価手法レコードを検索する。債務評価手法レコードを抽出できていない場合には、見積不可と判定する。   First, the control unit 21 of the asset removal obligation evaluation server 20 executes a determination process as to whether or not estimation is possible (step S3-1). Specifically, the estimate management unit 214 of the control unit 21 includes the objects (“obligation by law”, “obligation in contract” recorded in the asset status data area of the asset management record 240 to be evaluated in the debt evaluation method database 26. ”), The debt evaluation method record in which the information is recorded is searched. If the debt evaluation method record has not been extracted, it is determined that the estimation is impossible.

見積もり不可と判定した場合(ステップS3−1において「NO」の場合)、この資産除去債務対象についての処理を終了する。
一方、見積もり可能と判定した場合(ステップS3−1において「YES」の場合)、資産除去債務評価サーバ20の制御部21は、公表値の検索処理を実行する(ステップS3−2)。具体的には、制御部21の見積管理手段214は、債務評価手法データベース26の債務評価手法レコードにおいて、この対象についての公表単価を検索する。
When it is determined that estimation is impossible (in the case of “NO” in step S3-1), the processing for this asset removal obligation target is terminated.
On the other hand, when it is determined that estimation is possible (in the case of “YES” in step S3-1), the control unit 21 of the asset removal obligation evaluation server 20 executes a published value search process (step S3-2). Specifically, the estimate management unit 214 of the control unit 21 searches the debt evaluation method record of the debt evaluation method database 26 for the published unit price for this target.

次に、資産除去債務評価サーバ20の制御部21は、公表値を取得したかどうかについての判定処理を実行する(ステップS3−3)。具体的には、制御部21の見積管理手段214は、債務評価手法レコードに公表単価が記録されているかどうかにより判定する。   Next, the control unit 21 of the asset removal obligation evaluation server 20 executes a determination process as to whether or not a published value has been acquired (step S3-3). Specifically, the estimate management unit 214 of the control unit 21 determines based on whether or not the published unit price is recorded in the debt evaluation method record.

債務評価手法レコードに公表単価が記録されており、公表値を取得した場合(ステップS3−3において「YES」の場合)、資産除去債務評価サーバ20の制御部21は、公表値に基づいて見積もりの算出・登録処理を実行する(ステップS3−4)。具体的には、制御部21の見積管理手段214は、債務評価手法レコードに記録されている公表単価に、評価対象資産管理レコード240の資産状況データ領域に記録されている総量を乗算することにより、見積金額を算出する。そして、見積管理手段214は、評価対象資産管理レコード240の見積結果データ領域に、第1の見積結果として、見積コード、見積日、見積方法、公表単価、見積金額に関するデータを記録する。   When the published unit price is recorded in the debt evaluation method record and the published value is acquired (in the case of “YES” in step S3-3), the control unit 21 of the asset retirement obligation evaluation server 20 estimates based on the published value. The calculation / registration process is executed (step S3-4). Specifically, the estimate management unit 214 of the control unit 21 multiplies the announced unit price recorded in the debt evaluation method record by the total amount recorded in the asset status data area of the asset management record 240 to be evaluated. Calculate the estimated amount. Then, the estimate management unit 214 records, in the estimate result data area of the evaluation target asset management record 240, data relating to the estimate code, the estimate date, the estimate method, the published unit price, and the estimated amount as the first estimate result.

債務評価手法レコードに公表単価が記録されておらず、公表値を取得できない場合(ステップS3−3において「NO」の場合)、資産除去債務評価サーバ20の制御部21は、見積もりの算出・登録処理(ステップS3−4)をスキップする。   When the announced unit price is not recorded in the debt evaluation technique record and the published value cannot be acquired (in the case of “NO” in step S3-3), the control unit 21 of the asset removal obligation evaluation server 20 calculates and registers an estimate. The process (step S3-4) is skipped.

次に、資産除去債務評価サーバ20の制御部21は、類似資産の評価履歴の検索処理を実行する(ステップS3−5)。具体的には、制御部21の見積管理手段214は、資産除去実績データベース25において、今回の処理対象資産の資産状況と共通する資産状況が記録された資産除去実績管理レコード250を検索する。   Next, the control unit 21 of the asset retirement obligation evaluation server 20 executes a search process of a similar asset evaluation history (step S3-5). Specifically, the estimate management unit 214 of the control unit 21 searches the asset removal record database 25 for the asset removal record management record 250 in which the asset condition common to the asset condition of the current asset to be processed is recorded.

次に、資産除去債務評価サーバ20の制御部21は、評価履歴を取得かどうかについての判定処理を実行する(ステップS3−6)。具体的には、制御部21の見積管理手段214は、資産状況が共通する資産除去実績管理レコード250を抽出できたかどうかにより判定する。   Next, the control unit 21 of the asset removal obligation evaluation server 20 executes a determination process as to whether or not an evaluation history is acquired (step S3-6). Specifically, the estimate management unit 214 of the control unit 21 determines whether or not the asset removal record management record 250 having the same asset status can be extracted.

資産除去実績管理レコード250を抽出し、評価履歴を取得できた場合(ステップS3−6において「YES」の場合)、資産除去債務評価サーバ20の制御部21は、評価履歴に基づいて見積もりの算出・登録処理を実行する(ステップS3−7)。具体的には、制御部21の見積管理手段214は、資産除去実績管理レコード250に記録されている実績額を、除去内容データ領域に記録されている総量で除算することにより、実績単価を算出する。次に、見積管理手段214は、実績単価に、評価対象資産管理レコード240の資産状況データ領域に記録されている資産除去債務対象の総量を乗算することにより、見積金額を算出する。そして、見積管理手段214は、評価対象資産管理レコード240の見積結果データ領域に、第2の見積結果として、見積コード、見積日、見積方法、実績単価、見積金額に関するデータを記録する。   When the asset removal record management record 250 is extracted and the evaluation history can be acquired (in the case of “YES” in step S3-6), the control unit 21 of the asset removal obligation evaluation server 20 calculates an estimate based on the evaluation history. Registration processing is executed (step S3-7). Specifically, the estimate management unit 214 of the control unit 21 calculates the actual unit price by dividing the actual amount recorded in the asset removal result management record 250 by the total amount recorded in the removal content data area. To do. Next, the estimate management unit 214 calculates an estimated amount by multiplying the actual unit price by the total amount of asset removal obligations recorded in the asset status data area of the evaluation target asset management record 240. Then, the estimate management means 214 records data relating to the estimate code, the estimate date, the estimate method, the actual unit price, and the estimated amount as the second estimate result in the estimate result data area of the evaluation target asset management record 240.

資産除去実績管理レコード250を抽出できず、評価履歴を取得できない場合(ステップS3−6において「NO」の場合)、資産除去債務評価サーバ20の制御部21は、評価履歴に基づいて見積もりの算出・登録処理(ステップS3−7)をスキップする。   When the asset removal result management record 250 cannot be extracted and the evaluation history cannot be acquired (in the case of “NO” in step S3-6), the control unit 21 of the asset removal obligation evaluation server 20 calculates an estimate based on the evaluation history. -Skip the registration process (step S3-7).

次に、資産除去債務評価サーバ20の制御部21は、資産除去債務について見積もり依頼処理を実行する(ステップS3−8)。具体的には、制御部21の見積管理手段214は、債務評価手法データベース26の債務評価手法レコードに記録された取引先及び連絡先に関する情報を取得する。そして、見積管理手段214は、見積コードを付与して、この取引先に対して見積依頼を送信する。この見積依頼には、見積コード、評価対象資産に関する情報、資産除去債務の対象、総量情報に関するデータを含める。   Next, the control unit 21 of the asset removal obligation evaluation server 20 executes an estimate request process for the asset removal obligation (step S3-8). Specifically, the estimate management unit 214 of the control unit 21 acquires information on the business partner and the contact address recorded in the debt evaluation technique record of the debt evaluation technique database 26. Then, the estimate management unit 214 assigns an estimate code and transmits an estimate request to this business partner. This request for quotation includes an estimate code, information on the asset to be evaluated, data on asset retirement obligations, and data on total amount information.

そして、取引先から見積書を取得する。この見積書には、見積コード、見積日、見積方法、単価、見積金額が含まれる。この場合、資産除去債務評価サーバ20の制御部21は、資産除去債務について見積もりの取得・登録処理を実行する(ステップS3−9)。具体的には、制御部21の見積管理手段214は、評価対象資産管理レコード240の見積結果データ領域に、第3の見積結果として、取引先から取得した見積書に基づいて、見積
コード、見積日、見積方法、単価、見積金額に関するデータを記録する。
And an estimate is acquired from a business partner. This estimate includes an estimate code, an estimation date, an estimation method, a unit price, and an estimated amount. In this case, the control unit 21 of the asset retirement obligation evaluation server 20 executes an estimate acquisition / registration process for the asset retirement obligation (step S3-9). Specifically, the estimate management unit 214 of the control unit 21 stores the estimate code and the estimate in the estimate result data area of the evaluation target asset management record 240 based on the estimate obtained from the business partner as the third estimate result. Record data on the date, estimation method, unit price, and estimated amount.

次に、資産除去債務評価サーバ20の制御部21は、見積もりの総合評価処理を実行する(ステップS3−10)。具体的には、制御部21の見積管理手段214は、評価対象資産管理レコード240に記録された見積金額の統計値を算出する。この統計値としては、例えば、見積金額の中央値を特定し、他の見積金額に対して、予め定めた発生確率を乗算することにより、重み付けを行なった値を用いる。そして、見積管理手段214は、算出した統計値(資産除去債務費用)を債務評価結果データ領域に記録する。
以上の処理を、すべての処理対象資産についての処理を終了するまで繰り返す。
Next, the control unit 21 of the asset removal obligation evaluation server 20 executes a comprehensive evaluation process for estimation (step S3-10). Specifically, the estimate management unit 214 of the control unit 21 calculates a statistical value of the estimated amount recorded in the evaluation target asset management record 240. As this statistical value, for example, a median value of estimated amounts is specified, and a weighted value is used by multiplying another estimated amount by a predetermined occurrence probability. Then, the estimate management unit 214 records the calculated statistical value (asset removal obligation cost) in the obligation evaluation result data area.
The above processing is repeated until the processing is completed for all processing target assets.

(減価償却費の試算処理)
次に、図6を用いて、減価償却費の試算処理を説明する。この処理は、評価対象資産データベース24において、債務評価結果データ領域に見積金額が記録された評価対象資産管理レコード240の資産を順次、処理対象資産として特定して、以下の処理を繰り返す。
(Trial calculation of depreciation expenses)
Next, the calculation process of depreciation expenses will be described with reference to FIG. In this processing, in the evaluation target asset database 24, the assets of the evaluation target asset management record 240 whose estimated amount is recorded in the debt evaluation result data area are sequentially specified as the processing target assets, and the following processing is repeated.

まず、資産除去債務評価サーバ20の制御部21は、耐用年数の特定処理を実行する(ステップS4−1)。具体的には、制御部21の減価償却評価手段215は、処理対象資産の評価対象資産管理レコード240に記録されている耐用年数を取得する。   First, the control unit 21 of the asset retirement obligation evaluation server 20 executes a service life specifying process (step S4-1). Specifically, the depreciation evaluation means 215 of the control unit 21 acquires the useful life recorded in the evaluation target asset management record 240 of the processing target asset.

次に、資産除去債務評価サーバ20の制御部21は、耐用年数に応じて、インフレ率、割引率の特定処理を実行する(ステップS4−2)。具体的には、制御部21の減価償却評価手段215は、会計指標データベース23から、耐用年数に応じたインフレ率、割引率を取得する。   Next, the control unit 21 of the asset retirement obligation evaluation server 20 executes an inflation rate and discount rate specifying process according to the useful life (step S4-2). Specifically, the depreciation evaluation means 215 of the control unit 21 acquires an inflation rate and a discount rate according to the useful life from the accounting index database 23.

次に、資産除去債務評価サーバ20の制御部21は、将来キャッシュフロー作成処理を実行する(ステップS4−3)。具体的には、制御部21の減価償却評価手段215は、評価対象資産管理レコード240の債務評価結果データ領域に記録されている費用に対して、〔1+インフレ率〕を耐用年数回、乗算することにより、将来キャッシュフローを算出する。   Next, the control unit 21 of the asset removal obligation evaluation server 20 executes a future cash flow creation process (step S4-3). Specifically, the depreciation evaluation means 215 of the control unit 21 multiplies the cost recorded in the debt evaluation result data area of the asset management record 240 to be evaluated by [1 + inflation rate] the useful life times. As a result, the future cash flow is calculated.

次に、資産除去債務評価サーバ20の制御部21は、現在価値の算出処理を実行する(ステップS4−4)。具体的には、制御部21の減価償却評価手段215は、算出した将来キャッシュフローを、〔1+割引率〕により耐用年数回、除算することにより、現在価値を算出する。   Next, the control unit 21 of the asset removal obligation evaluation server 20 executes present value calculation processing (step S4-4). Specifically, the depreciation evaluation means 215 of the control unit 21 calculates the present value by dividing the calculated future cash flow by the useful life times by [1 + discount rate].

次に、資産除去債務評価サーバ20の制御部21は、耐用年数、現在価値に基づいて減価償却費の算出処理を実行する(ステップS4−5)。具体的には、制御部21の減価償却評価手段215は、定額法により、現在価値を耐用年数で除算して、各年における減価償却費を算出する。そして、減価償却評価手段215は、評価対象資産管理レコード240の減価償却評価結果データ領域に、算出日(現在日付)、減価償却費の算出に用いたインフレ率及び割引率とともに、算出した減価償却費に関するデータを記録する。
以上の処理を、すべての処理対象資産についての処理を終了するまで繰り返す。
Next, the control unit 21 of the asset retirement obligation evaluation server 20 executes a depreciation expense calculation process based on the useful life and the present value (step S4-5). Specifically, the depreciation evaluation means 215 of the control unit 21 calculates the depreciation expense for each year by dividing the present value by the useful life by the straight-line method. Then, the depreciation evaluation means 215 calculates the depreciation calculated in the depreciation evaluation result data area of the asset management record 240 to be evaluated together with the calculation date (current date), the inflation rate and the discount rate used to calculate the depreciation expenses. Record data about costs.
The above processing is repeated until the processing is completed for all processing target assets.

(減価償却費の更新処理)
次に、図7を用いて、減価償却費の更新処理を説明する。この処理は、評価対象資産データベース24において、債務評価結果データ領域に、過去の減価償却評価結果が記録された評価対象資産管理レコード240の資産を順次、処理対象資産として特定して、以下の処理を繰り返す。
(Update processing of depreciation expenses)
Next, the depreciation expense update process will be described with reference to FIG. In this process, in the evaluation target asset database 24, assets in the evaluation target asset management record 240 in which past depreciation evaluation results are recorded in the debt evaluation result data area are sequentially specified as processing target assets, and the following processing is performed. repeat.

まず、資産除去債務評価サーバ20の制御部21は、資産状況情報の取得処理を実行する(ステップS5−1)。具体的には、制御部21の再評価手段216は、処理対象資産の評価対象資産管理レコード240に記録された資産状況情報を抽出する。   First, the control unit 21 of the asset removal obligation evaluation server 20 executes an asset status information acquisition process (step S5-1). Specifically, the re-evaluation means 216 of the control unit 21 extracts the asset status information recorded in the evaluation target asset management record 240 of the processing target asset.

次に、資産除去債務評価サーバ20の制御部21は、対応済みかどうかについての判定処理を実行する(ステップS5−2)。具体的には、制御部21の再評価手段216は、この評価対象資産管理レコード240に記録されている資産管理コードを用いて、資産管理データベース12から資産管理レコード120を取得する。既に、資産管理レコード120の管理状況データ領域に「除却済」フラグが記録されている場合には、対応済みと判定する。   Next, the control unit 21 of the asset retirement obligation evaluation server 20 executes a determination process as to whether or not it has been handled (step S5-2). Specifically, the re-evaluation means 216 of the control unit 21 acquires the asset management record 120 from the asset management database 12 using the asset management code recorded in the evaluation target asset management record 240. If the “removed” flag has already been recorded in the management status data area of the asset management record 120, it is determined that it has been handled.

対応済みの場合(ステップS5−2において「YES」の場合)、資産除去債務評価サーバ20の制御部21は、評価対象資産管理情報の更新処理を実行する(ステップS5−3)。具体的には、制御部21の再評価手段216は、処理対象資産の評価対象資産管理レコード240の資産状況データ領域に「対応済」フラグを記録する。そして、この処理対象資産についての処理を終了する。   When the response has been made (in the case of “YES” in step S5-2), the control unit 21 of the asset removal obligation evaluation server 20 executes update processing of the evaluation target asset management information (step S5-3). Specifically, the re-evaluation means 216 of the control unit 21 records the “corresponding” flag in the asset status data area of the evaluation target asset management record 240 of the processing target asset. Then, the process for this processing target asset is terminated.

一方、対応済みでない場合(ステップS5−2において「NO」の場合)、資産除去債務評価サーバ20の制御部21は、法令基準の取得処理を実行する(ステップS5−4)。具体的には、制御部21の再評価手段216は、処理対象資産の評価対象資産管理レコード240の資産状況データ領域から、資産除去債務の対象を取得する。次に、再評価手段216は、この対象についての適用条件データを適用条件データベース22から取得する。   On the other hand, when it has not been dealt with (in the case of “NO” in step S5-2), the control unit 21 of the asset removal obligation evaluation server 20 executes a legal standard acquisition process (step S5-4). Specifically, the re-evaluation unit 216 of the control unit 21 acquires the asset removal obligation target from the asset status data area of the evaluation target asset management record 240 of the processing target asset. Next, the re-evaluation unit 216 obtains application condition data for this object from the application condition database 22.

次に、資産除去債務評価サーバ20の制御部21は、法令基準の変動があったかどうかについての判定処理を実行する(ステップS5−5)。具体的には、制御部21の再評価手段216は、処理対象資産の評価対象資産管理レコード240の減価償却評価結果データ領域に記録された算出日と適用開始日とを比較する。算出日以降の適用開始日が記録されている場合には、法令基準の変動があったと判定する。   Next, the control unit 21 of the asset retirement obligation evaluation server 20 executes a determination process as to whether or not there has been a change in legal standards (step S5-5). Specifically, the re-evaluation means 216 of the control unit 21 compares the calculation date recorded in the depreciation evaluation result data area of the evaluation target asset management record 240 of the processing target asset with the application start date. If the application start date after the calculation date is recorded, it is determined that there has been a change in legal standards.

適用基準の変動があったと判定した場合(ステップS5−5において「YES」の場合)、資産除去債務評価サーバ20の制御部21は、減価償却費の再試算処理を実行する(ステップS5−10)。具体的には、制御部21の再評価手段216は、この評価対象資産について、図6に示した減価償却費の試算処理を再実行する。   When it is determined that there is a change in the application standard (in the case of “YES” in step S5-5), the control unit 21 of the asset retirement obligation evaluation server 20 executes a re-estimation process of depreciation expenses (step S5-10). ). Specifically, the re-evaluation unit 216 of the control unit 21 re-executes the depreciation expense calculation process illustrated in FIG. 6 for the evaluation target asset.

一方、適用基準の変動がなかったと判定した場合(ステップS5−5において「NO」の場合)、資産除去債務評価サーバ20の制御部21は、インフレ率、割引率の特定処理を実行する(ステップS5−6)。具体的には、制御部21の再評価手段216は、処理対象資産の評価対象資産管理レコード240に記録されている耐用年数を取得する。そして、再評価手段216は、会計指標データベース23から、この処理対象資産の耐用年数に対応した現在のインフレ率、割引率を取得する。更に、再評価手段216は、処理対象資産の評価対象資産管理レコード240の減価償却評価結果データ領域に記録されたインフレ率、割引率を特定する。   On the other hand, when it is determined that there is no change in the application standard (in the case of “NO” in step S5-5), the control unit 21 of the asset removal obligation evaluation server 20 executes an inflation rate and discount rate specifying process (step S5-5). S5-6). Specifically, the re-evaluation means 216 of the control unit 21 acquires the useful life recorded in the evaluation target asset management record 240 of the processing target asset. Then, the re-evaluation means 216 acquires the current inflation rate and discount rate corresponding to the useful life of the processing target asset from the accounting index database 23. Further, the re-evaluation means 216 specifies the inflation rate and the discount rate recorded in the depreciation evaluation result data area of the evaluation target asset management record 240 of the processing target asset.

次に、資産除去債務評価サーバ20の制御部21は、インフレ率、割引率のいずれかに大幅な変動があったかどうかについての判定処理を実行する(ステップS5−7)。具体的には、制御部21の再評価手段216は、会計指標データベース23から取得したインフレ率や割引率について、評価対象資産管理レコード240に記録されているインフレ率や割引率に対する変化率を算出する。そして、変化率が、予め定められた許容範囲を超えている場合には、大幅な変動があったと判定する。   Next, the control unit 21 of the asset retirement obligation evaluation server 20 executes a determination process as to whether or not there has been a significant change in either the inflation rate or the discount rate (step S5-7). Specifically, the re-evaluation means 216 of the control unit 21 calculates the rate of change with respect to the inflation rate and the discount rate recorded in the evaluation target asset management record 240 for the inflation rate and the discount rate acquired from the accounting index database 23. To do. When the rate of change exceeds a predetermined allowable range, it is determined that there has been a significant change.

インフレ率、割引率のいずれかに大幅な変動があったと判定した場合(ステップS5−7において「YES」の場合)、資産除去債務評価サーバ20の制御部21は、減価償却費の再試算処理を実行する(ステップS5−10)。   When it is determined that there has been a significant change in either the inflation rate or the discount rate (in the case of “YES” in step S5-7), the control unit 21 of the asset retirement obligation evaluation server 20 recalculates the depreciation expenses. Is executed (step S5-10).

一方、インフレ率、割引率のいずれにも大幅な変動がなかったと判定した場合(ステップS5−7において「NO」の場合)には、資産除去債務評価サーバ20の制御部21は、公表値、実績値の取得処理を実行する(ステップS5−8)。具体的には、制御部21の再評価手段216は、評価対象資産管理レコード240の見積結果データ領域から、資産除去債務費用の算出時に用いた公表単価や実績単価を取得する。更に、再評価手段216は、債務評価手法データベース26から、資産除去債務の対象の公表単価を取得する。また、再評価手段216は、資産除去実績データベース25において、今回の処理対象資産の資産状況と共通する資産状況が記録された資産除去実績管理レコード250を検索する。次に、見積管理手段214は、資産除去実績管理レコード250に記録されている資産除去費用を総量で除算することにより、実績単価を算出する。   On the other hand, when it is determined that neither the inflation rate nor the discount rate has changed significantly (in the case of “NO” in step S5-7), the control unit 21 of the asset retirement obligation evaluation server 20 determines the announced value, An actual value acquisition process is executed (step S5-8). Specifically, the re-evaluation means 216 of the control unit 21 acquires the announced unit price and actual unit price used when calculating the asset removal obligation cost from the estimation result data area of the evaluation target asset management record 240. Further, the re-evaluation means 216 acquires the announced unit price of the asset removal obligation from the debt evaluation method database 26. Further, the re-evaluation means 216 searches the asset removal record database 25 in the asset removal record database 25 in which the asset condition common to the asset condition of the current asset to be processed is recorded. Next, the estimate management unit 214 calculates the actual unit price by dividing the asset removal cost recorded in the asset removal result management record 250 by the total amount.

次に、資産除去債務評価サーバ20の制御部21は、公表値、実績値のいずれかに大幅な変動があったかどうかについての判定処理を実行する(ステップS5−9)。具体的には、制御部21の再評価手段216は、新たに取得した公表単価や実績単価について、評価対象資産管理レコード240に記録されている公表単価や実績単価に対する変化率を算出する。そして、変化率が、予め定められた許容範囲を超えている場合には、大幅な変動があったと判定する。   Next, the control unit 21 of the asset retirement obligation evaluation server 20 executes a determination process as to whether or not there is a significant change in either the published value or the actual value (step S5-9). Specifically, the re-evaluation means 216 of the control unit 21 calculates the rate of change with respect to the announced unit price and the actual unit price recorded in the evaluation target asset management record 240 for the newly acquired published unit price and the actual unit price. When the rate of change exceeds a predetermined allowable range, it is determined that there has been a significant change.

公表値や実績値のいずれかに大幅な変動があったと判定した場合(ステップS5−9において「YES」の場合)、資産除去債務評価サーバ20の制御部21は、減価償却費の再試算処理を実行する(ステップS5−10)。   If it is determined that there is a significant change in either the published value or the actual value (in the case of “YES” in step S5-9), the control unit 21 of the asset retirement obligation evaluation server 20 recalculates the depreciation expenses. Is executed (step S5-10).

一方、公表値や実績値のいずれかにも大幅な変動がなかったと判定した場合(ステップS5−9において「NO」の場合)には、この評価対象資産についての処理を終了する。
そして、過去の減価償却評価結果が記録されたすべての評価対象資産についての処理を終了するまで繰り返す。
On the other hand, when it is determined that there is no significant change in either the published value or the actual value (in the case of “NO” in step S5-9), the processing for this evaluation target asset is ended.
And it repeats until the process about all the evaluation object assets in which the past depreciation evaluation result was recorded is complete | finished.

本実施形態によれば、以下のような効果を得ることができる。
(1)本実施形態においては、資産除去債務評価サーバ20の制御部21は、アンケート送信先の決定処理(ステップS1−3)、アンケート送信処理(ステップS1−4)を実行して、アンケート回答取得処理を実行する(ステップS1−5)。更に、制御部21は、評価のための情報が十分かどうかについての判定処理を実行する(ステップS1−6)。評価のための情報が不十分と判定した場合(ステップS1−6において「NO」の場合)、資産除去債務評価サーバ20の制御部21は、アンケート送信先の決定処理(ステップS1−3)以降を繰り返す。これにより、関係部署から、管理対象資産の契約状況や資産状況を把握し、資産除去債務を評価することができる。
According to this embodiment, the following effects can be obtained.
(1) In the present embodiment, the control unit 21 of the asset retirement obligation evaluation server 20 executes a questionnaire transmission destination determination process (step S1-3) and a questionnaire transmission process (step S1-4) to answer a questionnaire. An acquisition process is executed (step S1-5). Furthermore, the control part 21 performs the determination process about whether the information for evaluation is enough (step S1-6). When it is determined that the information for evaluation is insufficient (in the case of “NO” in step S1-6), the control unit 21 of the asset removal obligation evaluation server 20 performs the questionnaire transmission destination determination process (step S1-3) and the subsequent steps. repeat. As a result, it is possible to grasp the contract status and asset status of the managed asset from the related department and evaluate the asset retirement obligation.

(2)本実施形態のスクリーニング処理においては、賃貸借契約と判定した場合であって、原状回復義務があると判定した場合(ステップS2−2、S2−3において「YES」の場合)、資産除去債務評価サーバ20の制御部21は、使用状況の取得処理を実行する(ステップS2−4)。原状回復が必要な使用状況と判定した場合(ステップS2−5において「YES」の場合)、資産除去債務評価サーバ20の制御部21は、資産除去債務の候補登録処理を実行する(ステップS2−6)。これにより、賃貸借契約を行なっている資産について、原状回復義務を考慮して、資産除去債務を計上することができる。   (2) In the screening process of the present embodiment, when it is determined as a lease contract and it is determined that there is an obligation to restore the original state (when “YES” in steps S2-2 and S2-3), asset removal The control unit 21 of the debt evaluation server 20 executes usage status acquisition processing (step S2-4). If it is determined that the usage state needs to be restored (in the case of “YES” in step S2-5), the control unit 21 of the asset retirement obligation evaluation server 20 executes asset retirement obligation candidate registration processing (step S2— 6). As a result, asset retirement obligations can be recorded for assets with lease contracts in consideration of the obligation to restore the original condition.

一方、「購入」フラグが記録されており、賃貸借契約でないと判定した場合(ステップS2−2において「NO」の場合)、資産除去債務評価サーバ20の制御部21は、使用状況の取得処理を実行する(ステップS2−8)。法令対象と判定した場合(ステップS2−9において「YES」の場合)であって、未対応と判定した場合(ステップS2−10において「YES」の場合)、資産除去債務評価サーバ20の制御部21は、資産除去債務の候補登録処理を実行する(ステップS2−11)。これにより、取得資産においても、法令義務を考慮して、資産除去債務を計上することができる。   On the other hand, when the “purchase” flag is recorded and it is determined that the contract is not a lease contract (in the case of “NO” in step S2-2), the control unit 21 of the asset retirement obligation evaluation server 20 performs usage status acquisition processing. Execute (step S2-8). When it is determined to be a legal object (in the case of “YES” in step S2-9) and is determined to be incompatible (in the case of “YES” in step S2-10), the control unit of the asset removal obligation evaluation server 20 21 executes candidate registration processing for asset retirement obligations (step S2-11). As a result, asset retirement obligations can be recorded for acquired assets in consideration of legal obligations.

(3)本実施形態の見積情報の登録処理においては、資産除去債務評価サーバ20の制御部21は、公表値に基づいて見積もりの算出・登録処理を実行する(ステップS3−4)。更に、制御部21は、評価履歴に基づいて見積もりの算出・登録処理を実行する(ステップS3−7)。更に、制御部21は、取引先に対して資産除去債務について見積もり依頼処理(ステップS3−8)、資産除去債務について見積もりの取得・登録処理を実行する(ステップS3−9)。そして、資産除去債務評価サーバ20の制御部21は、見積もりの総合評価処理を実行する(ステップS3−10)。これにより、多様な方法により見積金額を取得し、的確な資産除去費用を予測することができる。   (3) In the estimate information registration process of the present embodiment, the control unit 21 of the asset retirement obligation evaluation server 20 executes an estimate calculation / registration process based on the published value (step S3-4). Further, the control unit 21 executes calculation / registration processing of an estimate based on the evaluation history (step S3-7). Furthermore, the control unit 21 executes an estimate request process for the asset removal obligation (step S3-8) and an estimate acquisition / registration process for the asset removal obligation (step S3-9). And the control part 21 of the asset removal obligation evaluation server 20 performs the comprehensive evaluation process of estimation (step S3-10). Thereby, an estimated amount can be acquired by various methods, and an accurate asset removal cost can be predicted.

(4)本実施形態の減価償却費の試算処理においては、資産除去債務評価サーバ20の制御部21は、耐用年数の特定処理(ステップS4−1)、耐用年数に応じて、インフレ率、割引率の特定処理(ステップS4−2)を実行する。そして、制御部21は、将来キャッシュフロー作成処理(ステップS4−3)、現在価値の算出処理(ステップS4−4)、耐用年数、現在価値に基づいて減価償却費の算出処理(ステップS4−5)を実行する。これにより、耐用年数に応じたインフレ率、割引率を考慮して、的確な将来キャッシュフローや減価償却費を算出することができる。   (4) In the trial calculation process of the depreciation expense of this embodiment, the control unit 21 of the asset retirement obligation evaluation server 20 determines the useful life (step S4-1), the inflation rate, the discount according to the useful life The rate specifying process (step S4-2) is executed. Then, the control unit 21 calculates a future cash flow (step S4-3), a present value calculation process (step S4-4), a depreciation expense calculation process based on the useful life and the present value (step S4-5). ). As a result, it is possible to calculate an accurate future cash flow and depreciation expenses in consideration of the inflation rate and the discount rate according to the useful life.

(5)本実施形態の減価償却費の更新処理においては、資産除去債務評価サーバ20の制御部21は、法令基準の変動についての判定処理(ステップS5−5)、インフレ率、割引率の変動についての判定処理(ステップS5−7)、公表値、実績値の変動についての判定処理(ステップS5−9)を実行する。変動があったと判定した場合(ステップS5−5、S5−7、S5−9において「YES」の場合)、資産除去債務評価サーバ20の制御部21は、減価償却費の再試算処理を実行する(ステップS5−10)。これにより、変動があった場合のみ、再度、資産除去費用を算出することができる。従って、変動がなかった場合には、既に算出した値を用いることができるので、評価負担を軽減することができる。   (5) In the depreciation expense update process of this embodiment, the control unit 21 of the asset retirement obligation evaluation server 20 determines the change in the legal standards (step S5-5), changes in the inflation rate, and the discount rate. A determination process (step S5-7), and a determination process (step S5-9) regarding the change of the published value and the actual value are executed. When it is determined that there has been a change (in the case of “YES” in steps S5-5, S5-7, and S5-9), the control unit 21 of the asset retirement obligation evaluation server 20 executes a recalculation process of depreciation expenses. (Step S5-10). Thereby, the asset removal cost can be calculated again only when there is a change. Therefore, when there is no change, the already calculated value can be used, so that the evaluation burden can be reduced.

なお、上記各実施形態は以下のように変更してもよい。
・ 上記実施形態の見積情報の登録処理では、資産除去債務評価サーバ20の制御部21は、公表値の検索処理(ステップS3−2)、類似資産の評価履歴の検索処理(ステップS3−5)、取引先に対して資産除去債務について見積もり依頼処理(ステップS3−8)を実行する。複数の方法により、見積情報を取得することができれば、上述の処理の順番に限定されるものではない。また、上記処理の一部実施や、他の見積方法を追加してもよい。例えば、公表値を取得できない場合や、類似資産の評価履歴を抽出できない場合には、見積を依頼する取引先の数を増加するようにしてもよい。具体的には、基準件数の見積情報を取得できるように債務評価方法を選択する。
In addition, you may change each said embodiment as follows.
In the estimation information registration process of the above embodiment, the control unit 21 of the asset removal obligation evaluation server 20 performs a published value search process (step S3-2) and a similar asset evaluation history search process (step S3-5). Then, an estimate request process (step S3-8) is executed for the asset removal obligation with respect to the business partner. As long as estimate information can be acquired by a plurality of methods, the order of the above-described processes is not limited. Moreover, you may add some implementation of the said process and another estimation method. For example, when the published value cannot be acquired or when the evaluation history of similar assets cannot be extracted, the number of business partners who request a quote may be increased. Specifically, the debt evaluation method is selected so that estimate information for the standard number can be obtained.

・ 上記実施形態の減価償却費の更新処理では、資産除去債務評価サーバ20の制御部21は、法令基準の変動についての判定処理(ステップS5−5)。インフレ率、割引率の変動についての判定処理(ステップS5−7)、公表値、実績値の変動についての判定処理(ステップS5−9)を実行する。ここで、減価償却費の見直しの要否判定の順番はこれに限定されるものではない。また、他の判定要素を追加することも可能である。更に
、減価償却費の更新のみならず、これらの変動を将来キャッシュフローの更新の要否判断に用いることも可能である。
-In the update process of the depreciation expense of the said embodiment, the control part 21 of the asset retirement obligation evaluation server 20 is the determination process about the fluctuation | variation of a legal standard (step S5-5). A determination process (step S5-7) for fluctuations in the inflation rate and discount rate and a determination process (step S5-9) for fluctuations in the published value and the actual value are executed. Here, the order of the necessity of review of depreciation expenses is not limited to this. Also, other determination elements can be added. Furthermore, not only depreciation expenses can be updated, but these changes can also be used to determine whether future cash flows need to be updated.

・ 上記実施形態では、評価対象資産データベース24には、図2(b)に示すように、資産除去債務が発生する可能性がある資産についての評価対象資産管理レコード240が記録されている。この評価対象資産管理レコード240には、耐用年数が記録される。そして、減価償却費の試算処理においては、この耐用年数を用いる。ここで、耐用年数を変更して、減価償却費のシミュレーションを行なうようにしてもよい。この処理を、図8を用いて説明する。この場合、制御部21に、減価償却費のシミュレーションを行なうシミュレーション手段を設ける。そして、シミュレーション手段に、資産の分類に応じて、耐用年数第1候補を記録した耐用年数テーブルを保持させておく。更に、シミュレーション手段に、耐用年数第1候補の長さに応じて、シミュレーションの変動幅を記録した調整テーブルを保持させておく。   In the above-described embodiment, as shown in FIG. 2B, the evaluation target asset database 24 records the evaluation target asset management record 240 for the asset that may generate the asset retirement obligation. In this asset management record for evaluation 240, the useful life is recorded. In the trial calculation of depreciation expenses, this useful life is used. Here, depreciation expenses may be simulated by changing the useful life. This process will be described with reference to FIG. In this case, the control unit 21 is provided with simulation means for simulating depreciation expenses. The simulation means stores a useful life table in which the first useful life candidate is recorded according to the asset classification. Further, the simulation means holds an adjustment table in which the fluctuation range of the simulation is recorded according to the length of the first useful life candidate.

そして、クライアント端末30において指定された評価対象資産管理レコード240の資産を処理対象資産として特定して以下の処理を実行する。
まず、資産除去債務評価サーバ20の制御部21は、耐用年数第1候補の特定処理を実行する(ステップS6−1)。具体的には、制御部21のシミュレーション手段は、処理対象資産の資産管理コードを用いて、資産管理データベース12から資産の分類を取得する。そして、シミュレーション手段は、耐用年数テーブルから、この資産の分類に応じた耐用年数第1候補を取得する。
And the asset of the evaluation object asset management record 240 designated in the client terminal 30 is specified as a process object asset, and the following processes are performed.
First, the control unit 21 of the asset retirement obligation evaluation server 20 executes a process for specifying a useful life first candidate (step S6-1). Specifically, the simulation unit of the control unit 21 acquires the asset classification from the asset management database 12 using the asset management code of the processing target asset. And a simulation means acquires the useful life 1st candidate according to this asset classification from the useful life table.

次に、資産除去債務評価サーバ20の制御部21は、耐用年数候補の算出処理を実行する(ステップS6−2)。具体的には、制御部21のシミュレーション手段は、調整テーブルから、この耐用年数第1候補の長さに応じた変動幅を取得する。そして、シミュレーション手段は、変動幅を加減算して、複数の耐用年数候補を算出する。   Next, the control unit 21 of the asset retirement obligation evaluation server 20 executes a service life candidate calculation process (step S6-2). Specifically, the simulation means of the control unit 21 obtains a fluctuation range corresponding to the length of the first useful life candidate from the adjustment table. Then, the simulation means calculates a plurality of useful life candidates by adding and subtracting the fluctuation range.

そして、以下の処理を、耐用年数候補毎に繰り返す。
ここでは、資産除去債務評価サーバ20の制御部21は、ステップS4−2〜S4−3と同様に、耐用年数に応じて、インフレ率、割引率の特定処理(ステップS6−3)、将来キャッシュフロー作成処理(ステップS6−4)を実行する。更に、ステップS4−4〜S4−5と同様に、現在価値の算出処理(ステップS6−5)、耐用年数、現在価値に基づいて減価償却費の算出処理(ステップS6−6)を実行する。
Then, the following processing is repeated for each useful life candidate.
Here, similarly to steps S4-2 to S4-3, the control unit 21 of the asset retirement obligation evaluation server 20 specifies the inflation rate and the discount rate (step S6-3) and future cash according to the useful life. A flow creation process (step S6-4) is executed. Further, similarly to steps S4-4 to S4-5, a present value calculation process (step S6-5), a depreciation expense calculation process (step S6-6) based on the useful life and the present value are executed.

そして、すべての耐用年数候補についての処理を終了するまで処理を繰り返す。
次に、資産除去債務評価サーバ20の制御部21は、シミュレーション結果の出力処理を実行する(ステップS6−7)。具体的には、制御部21のシミュレーション手段は、耐用年数候補に対応させて、算出した減価償却費をクライアント端末30に出力する。
これにより、減価償却費を考慮しながら、管理対象資産の耐用年数を決定することができる。更に、将来キャッシュフローを考慮しながら、管理対象資産の耐用年数を決定することも可能である。この場合には、ステップS6−4において作成した将来キャッシュフローをシミュレーション結果として出力する(ステップS6−7)。
Then, the processing is repeated until the processing for all the useful life candidates is completed.
Next, the control unit 21 of the asset removal obligation evaluation server 20 executes a simulation result output process (step S6-7). Specifically, the simulation unit of the control unit 21 outputs the calculated depreciation expense to the client terminal 30 in correspondence with the useful life candidate.
Thereby, it is possible to determine the useful life of the asset to be managed while taking into account depreciation expenses. Furthermore, it is also possible to determine the useful life of the managed asset while taking into account future cash flows. In this case, the future cash flow created in step S6-4 is output as a simulation result (step S6-7).

なお、耐用年数第1候補は、類似資産の使用実績期間に基づいて算出することも可能である。この場合には、資産管理データベース12を用いて、「除却済」フラグが記録された資産管理レコード120であって、処理対象資産の分類が共通する資産を検索する。そして、この資産管理レコード120の取得日を特定する。次に、この資産管理レコード120の資産管理コードが記録された資産除去実績管理レコード250を資産除去実績データベース25において検索する。そして、資産管理レコード120の取得日から資産除去実績データベース25の除去日に基づいて使用実績期間を算出する。これにより、使用実
績に応じた耐用年数候補を算出することができる。
The first useful life candidate can also be calculated based on the usage period of similar assets. In this case, the asset management database 12 is used to search for an asset management record 120 in which the “removed” flag is recorded and which has a common classification of assets to be processed. And the acquisition date of this asset management record 120 is specified. Next, the asset removal record management record 250 in which the asset management code of the asset management record 120 is recorded is searched in the asset removal record database 25. Then, the usage record period is calculated based on the removal date of the asset removal record database 25 from the acquisition date of the asset management record 120. Thereby, the service life candidate according to the usage record can be calculated.

・ 上記実施形態では、資産除去債務評価サーバ20の制御部21は、報告書の出力処理を実行する(ステップS1−11)。この報告書には、資産除去債務が発生する資産毎に、資産除去についての減価償却評価結果を含める。出力対象は減価償却評価結果に限定されるものではない。例えば、ステップS4−3において作成した将来キャッシュフローを出力対象としてもよい。   In the above embodiment, the control unit 21 of the asset removal obligation evaluation server 20 executes a report output process (step S1-11). This report includes the depreciation assessment results for asset retirement for each asset incurred. The output target is not limited to the depreciation evaluation result. For example, the future cash flow created in step S4-3 may be output.

10…資産管理サーバ、12…資産管理データベース、20…資産除去債務評価サーバ、21…制御部、211…資産情報取得手段、212…スクリーニング手段、213…アンケート管理手段、214…見積管理手段、215…減価償却評価手段、216…再評価手段、22…適用条件データベース、23…会計指標データベース、24…評価対象資産データベース、25…資産除去実績データベース、26…債務評価手法データベース、27…組織管理データベース、30…クライアント端末。   DESCRIPTION OF SYMBOLS 10 ... Asset management server, 12 ... Asset management database, 20 ... Asset removal obligation evaluation server, 21 ... Control part, 211 ... Asset information acquisition means, 212 ... Screening means, 213 ... Questionnaire management means, 214 ... Estimation management means, 215 ... depreciation evaluation means, 216 ... revaluation means, 22 ... application condition database, 23 ... accounting index database, 24 ... asset database to be evaluated, 25 ... asset removal performance database, 26 ... debt evaluation technique database, 27 ... organization management database , 30: Client terminal.

Claims (11)

管理対象資産の資産状況に関する資産管理情報を記憶している資産管理情報記憶手段と、
資産除去債務が生じる資産を選別するための適用条件を記憶している適用条件情報記憶手段と、
資産除去債務の対象毎に、資産除去債務を複数の債務評価手法により評価するための評価参照情報を記憶している評価参考情報記憶手段と、
資産除去債務の将来キャッシュフローを算出する制御手段とを備えた会計管理システムであって、
前記制御手段が、
前記資産管理情報記憶手段に記録されている資産管理情報と、前記適用条件情報記憶手段に記録されている適用条件とを照合して、資産除去債務が発生する可能性がある候補資産を特定する手段と、
前記候補資産の資産状況情報を取得する手段と、
前記資産状況情報に基づいて、発生する資産除去債務の対象を特定し、前記資産除去債務の対象について、前記評価参考情報記憶手段に記憶されている評価参照情報を用いて、複数の債務評価手法により、複数の見積金額を算出する手段と、
前記複数の見積金額に基づいて見積評価結果を算出し、この見積評価結果について、前記候補資産に関する耐用年数に対応した将来キャッシュフローを算出する手段と
を備えたことを特徴とする会計管理システム。
Asset management information storage means for storing asset management information related to the asset status of the managed asset;
Application condition information storage means for storing application conditions for selecting assets for which asset retirement obligations arise;
Evaluation reference information storage means for storing evaluation reference information for evaluating asset retirement obligations by a plurality of debt evaluation methods for each target of asset retirement obligations;
An accounting management system comprising a control means for calculating a future cash flow of asset retirement obligations,
The control means is
The asset management information recorded in the asset management information storage means and the application conditions recorded in the application condition information storage means are collated to identify candidate assets that may cause asset retirement obligations Means,
Means for obtaining asset status information of the candidate asset;
Based on the asset status information, a target of the asset retirement obligation to be generated is specified, and a plurality of debt evaluation methods are used for the asset retirement obligation target by using the evaluation reference information stored in the evaluation reference information storage means. To calculate a plurality of estimated amounts,
An accounting management system, comprising: means for calculating an estimated evaluation result based on the plurality of estimated amounts, and calculating a future cash flow corresponding to the useful life of the candidate asset for the estimated evaluation result.
前記制御手段が、
前記候補資産についての耐用年数に対応したインフレ率及び割引率を取得し、
前記見積評価結果に対して、前記インフレ率及び割引率を用いて、将来キャッシュフローを算出することを特徴とする請求項1に記載の会計管理システム。
The control means is
Obtaining an inflation rate and a discount rate corresponding to the useful life of the candidate asset;
2. The accounting management system according to claim 1, wherein a future cash flow is calculated for the estimated evaluation result by using the inflation rate and the discount rate.
前記制御手段が、前記将来キャッシュフローに対して、前記候補資産についての耐用年数を用いて、減価償却費を算出することを特徴とする請求項1又は2に記載の会計管理システム。   The accounting management system according to claim 1, wherein the control unit calculates a depreciation expense for the future cash flow by using a useful life of the candidate asset. 前記制御手段が、
前記候補資産の耐用年数について、複数の耐用年数候補を用いて、複数の減価償却費を試算し、
前記試算した減価償却費を、前記耐用年数候補に関連付けて出力することを特徴とする請求項3に記載の会計管理システム。
The control means is
With regard to the useful life of the candidate asset, a plurality of depreciation expenses are estimated using a plurality of useful life candidates,
The accounting management system according to claim 3, wherein the calculated depreciation expense is output in association with the useful life candidate.
前記評価参考情報記憶手段には、資産除去債務の対象毎に、評価参照情報として資産除去に必要な公表単価が記憶されており、
前記債務評価手法においては、前記候補資産について、前記資産除去債務の対象の公表単価を取得し、この公表単価を用いて見積金額を算出する手法を含むことを特徴とする請求項1〜4のいずれか1つに記載の会計管理システム。
In the evaluation reference information storage means, for each target of asset retirement obligations, the published unit price required for asset removal is stored as evaluation reference information,
The debt evaluation method includes a method of obtaining an estimated unit price of the asset retirement obligation target for the candidate asset and calculating an estimated amount using the announced unit price. The accounting management system as described in any one.
前記評価参考情報記憶手段には、資産除去債務の対象について、評価参照情報として資産除去の実績金額が記録されており、
前記債務評価手法においては、前記候補資産について、資産除去債務の対象と共通する実績金額を取得し、この実績金額に基づいて算出された実績単価を用いて見積金額を算出する手法を含むことを特徴とする請求項1〜5のいずれか1つに記載の会計管理システム。
In the evaluation reference information storage means, the actual amount of asset removal is recorded as evaluation reference information for the subject of the asset removal obligation,
The debt evaluation method includes a method of obtaining an actual amount common to the asset retirement obligation target for the candidate asset and calculating an estimated amount using an actual unit price calculated based on the actual amount. The accounting management system according to claim 1, wherein the accounting management system is characterized in that:
前記評価参考情報記憶手段には、資産除去債務の対象毎に、評価参照情報として資産除去作業を行なう取引先の連絡先情報が記録されており、
前記債務評価手法においては、前記連絡先情報を用いて、前記候補資産について、資産除去の見積依頼を送信し、前記取引先から、前記取引先における資産除去単価を用いた見積金額を取得する手法を含むことを特徴とする請求項1〜6のいずれか1つに記載の会計管理システム。
In the evaluation reference information storage means, for each asset retirement obligation target, contact information of a supplier who performs asset removal work is recorded as evaluation reference information.
In the debt evaluation method, a method for transmitting an estimate request for asset removal for the candidate asset using the contact information, and obtaining an estimated amount using an asset removal unit price at the supplier from the supplier The accounting management system according to any one of claims 1 to 6, further comprising:
前記制御手段が、
前記候補資産について、資産除去のために必要な現在の単価を取得し、
過去に減価償却費を算出した資産について、前記減価償却費の算出において用いた単価と現在の単価とを比較し、
両者の差が基準範囲を超えている場合には、資産除去債務についての見積金額を再度、算出することを特徴とする請求項1〜7のいずれか1つに記載の会計管理システム。
The control means is
For the candidate asset, obtain the current unit price necessary for asset removal,
For assets for which depreciation costs have been calculated in the past, compare the unit price used in calculating the depreciation expenses with the current unit price,
The accounting management system according to any one of claims 1 to 7, wherein when the difference between the two exceeds the reference range, the estimated amount of the asset retirement obligation is calculated again.
前記資産管理情報記憶手段には、管理対象資産の関連部署が記録されており、
前記制御手段が、
前記資産管理情報記憶手段を用いて、管理対象資産の関連部署を特定し、前記関連部署の連絡先に対して、資産状況を確認するアンケートを送信する手段と、
前記アンケートに基づいて取得した資産状況を前記資産管理情報記憶手段に記録する手段とを更に備えたことを特徴とする請求項1〜8のいずれか1つに記載の会計管理システム。
In the asset management information storage means, the related department of the asset to be managed is recorded,
The control means is
Means for identifying a related department of the asset to be managed using the asset management information storage means, and transmitting a questionnaire for checking the asset status to the contact information of the related department;
The accounting management system according to any one of claims 1 to 8, further comprising means for recording the asset status acquired based on the questionnaire in the asset management information storage means.
管理対象資産の資産状況に関する資産管理情報を記憶している資産管理情報記憶手段と、
資産除去債務が生じる資産を選別するための適用条件を記憶している適用条件情報記憶手段と、
資産除去債務の対象毎に、資産除去債務を複数の債務評価手法により評価するための評価参照情報を記憶している評価参考情報記憶手段と、
資産除去債務の将来キャッシュフローを算出する制御手段とを備えた会計管理システムを用いて会計管理を行なうための方法であって、
前記制御手段が、
前記資産管理情報記憶手段に記録されている資産管理情報と、前記適用条件情報記憶手段に記録されている適用条件とを照合して、資産除去債務が発生する可能性がある候補資産を特定する段階と、
前記候補資産の資産状況情報を取得する段階と、
前記資産状況情報に基づいて、発生する資産除去債務の対象を特定し、前記資産除去債務の対象について、前記評価参考情報記憶手段に記憶されている評価参照情報を用いて、複数の債務評価手法により、複数の見積金額を算出する段階と、
前記複数の見積金額に基づいて見積評価結果を算出し、この見積評価結果について、前記候補資産に関する耐用年数に対応した将来キャッシュフローを算出する段階と
を実行することを特徴とする会計管理方法。
Asset management information storage means for storing asset management information related to the asset status of the managed asset;
Application condition information storage means for storing application conditions for selecting assets for which asset retirement obligations arise;
Evaluation reference information storage means for storing evaluation reference information for evaluating asset retirement obligations by a plurality of debt evaluation methods for each target of asset retirement obligations;
A method for carrying out accounting management using an accounting management system comprising a control means for calculating future cash flows of asset retirement obligations,
The control means is
The asset management information recorded in the asset management information storage means and the application conditions recorded in the application condition information storage means are collated to identify candidate assets that may cause asset retirement obligations Stages,
Obtaining asset status information of the candidate asset;
Based on the asset status information, a target of the asset retirement obligation to be generated is specified, and a plurality of debt evaluation methods are used for the asset retirement obligation target by using the evaluation reference information stored in the evaluation reference information storage means. To calculate multiple estimated amounts,
An accounting management method comprising: calculating an estimated evaluation result based on the plurality of estimated amounts, and calculating a future cash flow corresponding to the useful life of the candidate asset for the estimated evaluation result.
管理対象資産の資産状況に関する資産管理情報を記憶している資産管理情報記憶手段と、
資産除去債務が生じる資産を選別するための適用条件を記憶している適用条件情報記憶手段と、
資産除去債務の対象毎に、資産除去債務を複数の債務評価手法により評価するための評価参照情報を記憶している評価参考情報記憶手段と、
資産除去債務の将来キャッシュフローを算出する制御手段とを備えた会計管理システムを用いて会計管理を行なうためのプログラムであって、
前記制御手段を、
前記資産管理情報記憶手段に記録されている資産管理情報と、前記適用条件情報記憶手段に記録されている適用条件とを照合して、資産除去債務が発生する可能性がある候補資産を特定する手段、
前記候補資産の資産状況情報を取得する手段、
前記資産状況情報に基づいて、発生する資産除去債務の対象を特定し、前記資産除去債務の対象について、前記評価参考情報記憶手段に記憶されている評価参照情報を用いて、複数の債務評価手法により、複数の見積金額を算出する手段、
前記複数の見積金額に基づいて見積評価結果を算出し、この見積評価結果について、前記候補資産に関する耐用年数に対応した将来キャッシュフローを算出する手段
として機能させることを特徴とする会計管理プログラム。
Asset management information storage means for storing asset management information related to the asset status of the managed asset;
Application condition information storage means for storing application conditions for selecting assets for which asset retirement obligations arise;
Evaluation reference information storage means for storing evaluation reference information for evaluating asset retirement obligations by a plurality of debt evaluation methods for each target of asset retirement obligations;
A program for performing accounting management using an accounting management system comprising a control means for calculating future cash flows of asset retirement obligations,
The control means;
The asset management information recorded in the asset management information storage means and the application conditions recorded in the application condition information storage means are collated to identify candidate assets that may cause asset retirement obligations means,
Means for obtaining asset status information of the candidate asset;
Based on the asset status information, a target of the asset retirement obligation to be generated is specified, and a plurality of debt evaluation methods are used for the asset retirement obligation target by using the evaluation reference information stored in the evaluation reference information storage means. To calculate a plurality of estimated amounts,
An accounting management program that calculates an estimated evaluation result based on the plurality of estimated amounts, and causes the estimated evaluation result to function as means for calculating a future cash flow corresponding to the useful life of the candidate asset.
JP2011076295A 2011-03-30 2011-03-30 Accounting management system, accounting management method and accounting management program Expired - Fee Related JP5119347B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2011076295A JP5119347B2 (en) 2011-03-30 2011-03-30 Accounting management system, accounting management method and accounting management program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2011076295A JP5119347B2 (en) 2011-03-30 2011-03-30 Accounting management system, accounting management method and accounting management program

Publications (2)

Publication Number Publication Date
JP2012212214A JP2012212214A (en) 2012-11-01
JP5119347B2 true JP5119347B2 (en) 2013-01-16

Family

ID=47266131

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2011076295A Expired - Fee Related JP5119347B2 (en) 2011-03-30 2011-03-30 Accounting management system, accounting management method and accounting management program

Country Status (1)

Country Link
JP (1) JP5119347B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7250984B1 (en) 2022-06-28 2023-04-03 株式会社オービック Depreciation simulation device, depreciation simulation method, and depreciation simulation program

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002049731A (en) * 2000-05-26 2002-02-15 Ns Solutions Corp Fixed property managing system
JP2004157822A (en) * 2002-11-07 2004-06-03 Renesas Technology Corp Integrated management system for asset
JP2004303104A (en) * 2003-03-31 2004-10-28 Daiwa House Ind Co Ltd System, method, device and program for taking measures in assets

Also Published As

Publication number Publication date
JP2012212214A (en) 2012-11-01

Similar Documents

Publication Publication Date Title
Al-Ashmori et al. BIM benefits and its influence on the BIM implementation in Malaysia
Schöggl et al. Toward supply chain-wide sustainability assessment: A conceptual framework and an aggregation method to assess supply chain performance
Cavka et al. Developing owner information requirements for BIM-enabled project delivery and asset management
Bhatia et al. Antecedents of implementation success in closed-loop supply chain: An empirical investigation
Boukherroub et al. Carbon footprinting in supply chains
do Carmo et al. Addressing uncertain scoring and weighting factors in social life cycle assessment
KR101549127B1 (en) System for engineering procurement construction business management and management method thereof
Buchert et al. Increasing resource efficiency with an engineering decision support system for comparison of product design variants
US20130325540A1 (en) Forecasting and Workforce Supply-Demand Projection System
JP4664776B2 (en) Environmental impact assessment system and environmental impact assessment method
Bapat et al. Application of multi-criteria decision making for evaluation of key performance indicators of integrated project delivery and BIM model for an infrastructure transportation project in Western India
Safa et al. Optimizing contractor selection for construction packages in capital projects
Badran et al. BIM based risk management for design bid build (DBB) design process in the United Arab Emirates: a conceptual framework
Yeung et al. BEAM Plus implementation in Hong Kong: assessment of challenges and policies
Obodo et al. Evaluating the factors affecting contractors tender for project construction: an empirical study of small scale indigenous contractors in awka, Nigeria
John et al. Assessing Materials Vendor Selection in Construction Project Supply Chain: The Relative Importance Index Approach
Savci et al. Knowledge elicitation for risk mapping in concurrent engineering projects
Sandanayake et al. Impediments affecting a comprehensive emission assessment at the construction stage of a building
Barqawi et al. Effects of critical success factors, BIM implementation strategies, and barriers on employer-initiated delays
JP5119347B2 (en) Accounting management system, accounting management method and accounting management program
Wuni et al. Ending the suitability quantification dilemma: intelligent decision support system for modular integrated construction in a high-density metropolis
Riesener et al. Implications of service-related business models on product development processes
JP2004355295A (en) Business risk countermeasure support system and method
Ghansah et al. A framework for smart building technologies implementation in the Ghanaian construction industry: a PLS-SEM approach
Ball et al. Requirements for modelling e-Business processes

Legal Events

Date Code Title Description
TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20121002

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20121022

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20151026

Year of fee payment: 3

LAPS Cancellation because of no payment of annual fees