JP5107479B1 - Reinforced concrete opening method and reinforced concrete opening structure - Google Patents
Reinforced concrete opening method and reinforced concrete opening structure Download PDFInfo
- Publication number
- JP5107479B1 JP5107479B1 JP2012175319A JP2012175319A JP5107479B1 JP 5107479 B1 JP5107479 B1 JP 5107479B1 JP 2012175319 A JP2012175319 A JP 2012175319A JP 2012175319 A JP2012175319 A JP 2012175319A JP 5107479 B1 JP5107479 B1 JP 5107479B1
- Authority
- JP
- Japan
- Prior art keywords
- reinforced concrete
- hole
- annular frame
- opening
- split sleeve
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Reinforcement Elements For Buildings (AREA)
- Working Measures On Existing Buildindgs (AREA)
Abstract
【課題】 鉄筋コンクリート構造物の構造上の強度を弱体化させることなく、充分な強度を維持したまま建物の壁や床等に後施工で貫通孔を設けることのできる鉄筋コンクリート開口工法を提供すること。
【解決手段】 鉄筋コンクリート構造部Rに貫通孔Hを設ける第一のステップと;この第一のステップの後、鉄筋コンクリート構造部R両面の開口部周囲のコンクリートCを削って鉄筋Bを露出させると共に、この露出した鉄筋Bに対して環状フレーム1を固定する第二のステップと;この第二のステップの後、分割式スリーブ2を構成する一対のフランジ付き筒状片P・P’を、両側の開口部からそれぞれ挿入して連結し、更に両側のフランジを環状フレーム1・1に固定する第三のステップと;この第三のステップの後、分割式スリーブ2の小孔から充填材3を注入して、貫通孔Hの中空内壁と分割式スリーブ2との隙間を埋める第四のステップとを含む方法を採用した。
【選択図】 図1PROBLEM TO BE SOLVED: To provide a reinforced concrete opening method capable of providing a through-hole in a post-construction on a building wall or floor while maintaining a sufficient strength without weakening the structural strength of a reinforced concrete structure.
A first step of providing a through hole H in a reinforced concrete structure R; after this first step, the concrete C around the openings on both sides of the reinforced concrete structure R is shaved to expose the rebar B; A second step of fixing the annular frame 1 to the exposed reinforcing bar B; after this second step, a pair of flanged cylindrical pieces P · P ′ constituting the split sleeve 2 are attached to both sides. A third step of inserting and connecting each through the opening and fixing the flanges on both sides to the annular frame 1; 1; after this third step, the filler 3 is injected from the small hole of the split sleeve 2 Then, a method including a fourth step of filling a gap between the hollow inner wall of the through hole H and the split sleeve 2 was adopted.
[Selection] Figure 1
Description
本発明は、鉄筋コンクリート開口構造の改良、詳しくは、充分な強度を維持したまま建物の壁や床等に後施工で貫通孔を開設することができ、また、貫通孔周囲のコンクリートを広範囲にわたって削る必要もなく、しかも、スリーブの位置決めも容易に行える鉄筋コンクリート開口工法、及びこの工法を用いて施工された鉄筋コンクリート開口構造に関するものである。 The present invention improves the opening structure of the reinforced concrete, more specifically, it is possible to open a through-hole by post-construction on a building wall or floor while maintaining a sufficient strength, and to sharpen the concrete around the through-hole over a wide range The present invention relates to a reinforced concrete opening method in which positioning of a sleeve can be easily performed and a reinforced concrete opening structure constructed by using this method.
周知のとおり、新築の鉄筋コンクリート造(RC造)の建築物において、壁や床等に貫通孔を設ける場合には、事前に強度計算を行った上で、貫通孔の位置に所定大きさのスペースを空けて鉄筋を組み、更にそのスペースの周囲に補強用鉄筋を固定した後、型枠を設置してコンクリートを打設するのが一般的である。 As is well known, in newly constructed reinforced concrete (RC) buildings, when providing through holes in walls, floors, etc., after calculating the strength in advance, a space of a predetermined size at the position of the through holes It is common to lay a reinforcing bar around the space and fix a reinforcing bar around the space, and then place a formwork and cast concrete.
一方、鉄筋コンクリート造の壁や床等に後施工で貫通孔を設ける場合には、貫通孔周囲の補強を穿孔後に行う必要がある。そこで、従来においては、貫通孔周囲に鋼板をアンカーボルトで固定したり、メッシュ材や繊維強化プラスチック板等を接着したりして、開口部の補強を行う方法が提案されている(特許文献1〜3参照)。 On the other hand, when a through hole is provided in a reinforced concrete wall or floor after the work, it is necessary to reinforce the periphery of the through hole after drilling. Therefore, conventionally, a method has been proposed in which the opening is reinforced by fixing a steel plate around the through hole with an anchor bolt or by adhering a mesh material, a fiber reinforced plastic plate or the like (Patent Document 1). ~ 3).
しかし、上記板材やメッシュ材などの補強面材を用いる方法は、サイズが比較的小さい開口部においては特に問題を生じないものの、配筋間隔よりもサイズが大きい開口部を補強する場合には、鉄筋の切断によって失われる引張・剪断強度が大きくなるため、補強面材だけで充分な強度を維持することが難しい。 However, the method using the reinforcing surface material such as the plate material and the mesh material does not cause a problem in the opening portion having a relatively small size, but when reinforcing the opening portion having a size larger than the bar arrangement interval, Since the tensile / shear strength lost by cutting the reinforcing bars increases, it is difficult to maintain sufficient strength with only the reinforcing face material.
また、従来においては、貫通孔周囲のコンクリートを削って鉄筋を露出させた後、この露出させた鉄筋に直線状の棒材(鉄筋を含む)を固定して補強を行う方法も公知となっており(特許文献4参照)、この方法を用いれば、配筋間隔よりもサイズが大きい開口部を設けた場合でも充分な補強を行うことができる。 In addition, conventionally, a method of reinforcing a reinforcing bar by shaving concrete around a through hole to expose a reinforcing bar and then fixing a linear bar (including a reinforcing bar) to the exposed reinforcing bar is also known. If this method is used, sufficient reinforcement can be performed even when an opening having a size larger than the bar spacing is provided.
しかしながら、上記直線状の棒材を用いた補強方法では、既設鉄筋に棒材を固定するために、貫通孔周囲のコンクリートを広範囲にわたって切削する必要があるため、コンクリートの削り作業に多くの時間を割く必要がある。また、コンクリートを削った分だけ充填材も必要となるため、材料コストも高くなる。 However, in the reinforcing method using the above-mentioned linear bar, in order to fix the bar to the existing reinforcing bar, it is necessary to cut the concrete around the through hole over a wide range. It is necessary to break. In addition, since the filler is required for the amount of the concrete cut, the material cost increases.
また更に、上記貫通孔に配管スリーブを設置する場合、配管スリーブをコンクリートや充填材によって固定する方法が採られるが、その際、スリーブを支持する専用の器具(例えば、特許文献5参照)を貫通孔内に設置してスリーブを位置決めする必要があるため、スリーブの設置作業に手間がかかる。 Furthermore, when a piping sleeve is installed in the through hole, a method of fixing the piping sleeve with concrete or a filler is adopted, but at that time, a dedicated instrument for supporting the sleeve (for example, see Patent Document 5) is passed through. Since it is necessary to position the sleeve by installing it in the hole, it takes time to install the sleeve.
本発明は、上記の如き問題に鑑みて為されたものであり、その目的とするところは、鉄筋コンクリート構造物の構造上の強度を弱体化させることなく、充分な強度を維持したまま建物の壁や床等に後施工で貫通孔を設けることができ、また、貫通孔周囲のコンクリートを広範囲にわたって削る必要もなく、しかも、スリーブの位置決めも容易に行える鉄筋コンクリート開口工法、及びこの工法を用いて施工された鉄筋コンクリート開口構造を提供することにある。 The present invention has been made in view of the problems as described above, and the object of the present invention is to prevent the structural strength of a reinforced concrete structure from being weakened and maintain the sufficient strength of the building wall. Reinforced concrete opening method that can be provided in post-installation on floors, floors, etc., and it is not necessary to cut the concrete around the through hole over a wide area and the sleeve can be positioned easily, and construction using this method It is to provide a reinforced concrete opening structure.
本発明者が上記課題を解決するために採用した手段は次のとおりである。 Means employed by the present inventor to solve the above problems are as follows.
即ち、本発明は、既設のRC造建築物の壁や床等に後施工で貫通孔Hを設けるための鉄筋コンクリート開口工法において、
前記壁や床等を構成する鉄筋コンクリート構造部Rに、開口サイズが配筋間隔よりも大きい貫通孔Hを鉄筋Bを切断して設ける第一のステップと;この第一のステップの後、鉄筋コンクリート構造部R両面の開口部周囲のコンクリートCを削って鉄筋Bを露出させると共に、この露出した鉄筋Bに対して開口部よりも一回り大きい環状フレーム1を溶接または接着によって固定する第二のステップと;この第二のステップの後、分割式スリーブ2を構成する一対のフランジ付き筒状片P・P’を、両側の開口部からそれぞれ挿入して中空部内で両者を連結し、更に両側のフランジ21・21’を環状フレーム1・1に溶接または接着して固定する第三のステップと;この第三のステップの後、分割式スリーブ2の小孔23から充填材3を注入して、貫通孔Hの中空内壁と分割式スリーブ2との隙間を埋める第四のステップとを含む方法を採用して、
前記環状フレーム1と分割式スリーブ2の取付け、及び充填材3の注入によって鉄筋コンクリート構造部Rの貫通孔H周囲の補強を行えるようにした点に特徴がある。
That is, the present invention is a reinforced concrete opening method for providing a through hole H in the post-construction on the wall or floor of an existing RC building,
A first step in which a through hole H having an opening size larger than the bar arrangement interval is provided in the reinforced concrete structure portion R constituting the wall or floor by cutting the reinforcing bar B; after this first step, the reinforced concrete structure A second step of scraping the concrete C around the openings on both sides of the part R to expose the reinforcing bar B, and fixing the annular frame 1 larger than the opening to the exposed reinforcing bar B by welding or bonding; ; After this second step, a pair of flanged cylindrical pieces P and P 'constituting the split-type sleeve 2 are respectively inserted from the openings on both sides, and both are connected in the hollow portion, and the flanges on both sides are further connected. A third step of fixing 21 · 21 ′ to the annular frame 1 · 1 by welding or bonding; after this third step, the filler 3 is injected from the small hole 23 of the split sleeve 2 and penetrated. Adopts a method comprising a fourth step of filling the gap of the hollow inner wall of H and split sleeve 2,
It is characterized in that the periphery of the through hole H of the reinforced concrete structure R can be reinforced by attaching the annular frame 1 and the split sleeve 2 and injecting the filler 3.
また、上記第三のステップにおいて、分割式スリーブ2の一方の筒状片Pのフランジ21を環状フレーム1に固定した後、この筒状片Pのフランジ21の反対側に形成した嵌合部22に、もう一方の筒状片P’の嵌合部22’を嵌め合わせて、その状態で他方側のフランジ21’と環状フレーム1の固定を行えば、分割式スリーブ2の設置を容易に行うことができる。 Further, in the third step, after the flange 21 of one cylindrical piece P of the split sleeve 2 is fixed to the annular frame 1, the fitting portion 22 formed on the opposite side of the flange 21 of this cylindrical piece P. If the fitting part 22 'of the other cylindrical piece P' is fitted together and the other side flange 21 'and the annular frame 1 are fixed in this state, the split sleeve 2 can be easily installed. be able to.
また更に、上記第二のステップにおいて、鉄筋から成る環状フレーム1と、鉄筋コンクリート構造部Rの鉄筋Bとを溶接によって固定すると共に、第三のステップにおいて、前記環状フレーム1と、鋼管から成る分割式スリーブ2とを同じく溶接で固定すれば、部材同士が強固に連結されるため、貫通孔周囲の強度が更に高まる。 Furthermore, in the second step, the annular frame 1 made of a reinforcing bar and the reinforcing bar B of the reinforced concrete structure R are fixed by welding, and in the third step, the annular frame 1 and a split type made of a steel pipe are used. If the sleeve 2 is similarly fixed by welding, the members are firmly connected to each other, so that the strength around the through hole is further increased.
そしてまた、上記第四のステップにおいて、鉄筋コンクリート構造部Rにおける環状フレーム1の外側の溝部にも充填材3を注入して開口部周囲の壁面を面一にすることで、開口部の施工を効率良く完了することができる。 In the fourth step, the filling material 3 is also injected into the groove on the outer side of the annular frame 1 in the reinforced concrete structure portion R so that the wall surface around the opening is flush with the construction of the opening. Can be completed well.
また、上記開口工法を採用して、既設のRC造建築物の壁や床等に後施工で貫通孔Hを設けられた鉄筋コンクリート開口構造を、
前記壁や床等を構成し、かつ、開口サイズが配筋間隔よりも大きい貫通孔Hが設けられた鉄筋コンクリート構造部Rと;この鉄筋コンクリート構造部R両面の開口部よりもサイズが一回り大きく、かつ、開口部周囲の露出した鉄筋Bに溶接または接着して固定された環状フレーム1と;小孔23を有する一対のフランジ21付き筒状片P・P’から成り、かつ、これらの筒状片P・P’が前記貫通孔Hの両側からそれぞれ挿入されて中空部内で連結されると共に、両側のフランジ21・21’が環状フレーム1・1に溶接または接着によって固定された分割式スリーブ2と;この分割式スリーブ2の小孔23から注入され、分割式スリーブ2と貫通孔Hの中空内壁との隙間に充填された充填材3とから構成すれば、
前記鉄筋Bに固定された環状フレーム1、この環状フレーム1に固定された分割式スリーブ2、及びこの分割スリーブ2と貫通孔内壁の隙間を埋める充填材3によって貫通孔周囲を補強することが可能となる。
In addition, by adopting the above opening method, a reinforced concrete opening structure in which through holes H are provided in the post-construction on the walls and floors of existing RC buildings,
A reinforced concrete structure R that constitutes the walls, floors, and the like and that has through holes H whose opening size is larger than the spacing between the reinforcing bars; and a size that is slightly larger than the openings on both sides of the reinforced concrete structure R; And an annular frame 1 fixed by welding or bonding to the exposed reinforcing bar B around the opening; and a pair of cylindrical pieces P • P ′ with flanges 21 having small holes 23, and these cylindrical shapes Pieces P and P ′ are respectively inserted from both sides of the through hole H and connected in the hollow portion, and the flanges 21 and 21 ′ on both sides are fixed to the annular frames 1 and 1 by welding or adhesion, and the split sleeve 2 And a filling material 3 injected from the small hole 23 of the split sleeve 2 and filled in the gap between the split sleeve 2 and the hollow inner wall of the through hole H,
The periphery of the through hole can be reinforced by the annular frame 1 fixed to the reinforcing bar B, the split sleeve 2 fixed to the annular frame 1, and the filler 3 filling the gap between the split sleeve 2 and the inner wall of the through hole. It becomes.
また、上記分割スリーブ2を、両端にフランジ21・21’と嵌合部22・22’を備えた一対の筒状片P・P’から構成すると共に、少なくとも何れか一方の筒状片Pに嵌合部22に、筒状片P・P’同士を嵌め合わせた際に連結部分が密封されるシーリング材24を配設して構成すれば、分割式スリーブ2の取付け作業を容易化することができる。 The split sleeve 2 is composed of a pair of cylindrical pieces P and P ′ having flanges 21 and 21 ′ and fitting portions 22 and 22 ′ at both ends, and at least one of the cylindrical pieces P is provided. If the sealing member 24 that seals the connecting portion when the cylindrical pieces P and P ′ are fitted to each other is arranged in the fitting portion 22, installation work of the split sleeve 2 is facilitated. Can do.
一方、厚みの大きい鉄筋コンクリート構造部Rに開口部を設ける場合には、上記鉄筋コンクリート開口工法の第三のステップを、
分割式スリーブ2を構成する筒本体25と一対のフランジ部材26・26’の内、まず一方のフランジ部材26を環状フレーム1に溶接または接着により固定した後、反対側の開口部から挿入した筒本体25の一端部を、前記フランジ26の環状スロット26aに差し込んで止着部材Sで固定し、更にこの固定した筒本体25の他端部に、もう一方のフランジ部材26’を環状スロット26a’と止着部材Sで固定して、最後にこのフランジ部材26’と環状フレーム1を溶接または接着により固定する方法に替えることで、分割式スリーブ2の設置が容易に行えるようになる。
On the other hand, when providing an opening in the reinforced concrete structure R having a large thickness, the third step of the reinforced concrete opening method is
Of the cylinder body 25 and the pair of flange members 26 and 26 'constituting the split sleeve 2, first, one flange member 26 is fixed to the annular frame 1 by welding or adhesion, and then inserted from the opening on the opposite side. One end of the main body 25 is inserted into the annular slot 26a of the flange 26 and fixed with the fastening member S, and the other flange member 26 'is connected to the other end of the fixed cylinder main body 25 with the annular slot 26a'. By fixing the flange member 26 'and the annular frame 1 by welding or bonding, the split sleeve 2 can be easily installed.
また、上記開口工法を採用する場合には、鉄筋コンクリート開口構造を、鉄筋コンクリート構造部Rと;環状フレーム1と;筒本体25、及び小孔23を有する一対のフランジ部材26・26’から成り、かつ、前記筒本体25の両端部がフランジ部材26・26’の環状スロット26a・26a’に差し込まれて止着部材Sで固定され、更に両側の各フランジ部材26・26’が環状フレーム1・1に溶接または接着によって固定された分割式スリーブ2と;この分割式スリーブ2の小孔23から注入された充填材3とから構成することで、鉄筋コンクリート構造部Rの貫通孔周囲の補強が可能となる。 When the above opening method is adopted, the reinforced concrete opening structure is composed of a reinforced concrete structure portion R; an annular frame 1; a pair of flange members 26 and 26 'having a cylindrical body 25 and a small hole 23; The both ends of the cylinder body 25 are inserted into the annular slots 26a and 26a 'of the flange members 26 and 26' and fixed by the fastening members S, and the flange members 26 and 26 'on both sides are connected to the annular frames 1 and 1 respectively. It is possible to reinforce around the through-hole of the reinforced concrete structure R by comprising the split-type sleeve 2 fixed by welding or adhesion to the metal; and the filler 3 injected from the small hole 23 of the split-type sleeve 2 Become.
本発明では、鉄筋コンクリートの開口部を後施工で設ける際に、穿設した貫通孔周囲の鉄筋に環状フレームを固定すると共に、この環状フレームに分割式スリーブのフランジを固定し、更にスリーブと貫通孔内壁の隙間に充填材を注入する方法を採用しており、これによって、貫通孔周囲を各部材で補強することが可能となるため、充分な強度を有する開口部を形成することが可能となる。 In the present invention, when the opening of the reinforced concrete is provided in the post-construction, the annular frame is fixed to the reinforcing bar around the drilled through hole, the flange of the split-type sleeve is fixed to the annular frame, and the sleeve and the through hole are further fixed. Adopting a method of injecting a filler into the gap between the inner walls, which makes it possible to reinforce the periphery of the through hole with each member, so that an opening having a sufficient strength can be formed. .
しかも、本発明の開口工法は、鋼板等の面材では充分な補強が行えないようなサイズの大きい貫通孔を対象としているため、大型建築物を改築する際、複数の配管を通す大径の貫通孔が新たに必要となった場合でも、鉄筋の切断による強度低下を恐れずに壁や床に大型の開口部を新設することができる。 Moreover, since the opening method of the present invention is intended for large-sized through holes that cannot be sufficiently reinforced with a face material such as a steel plate, when remodeling a large building, a large-diameter through which a plurality of pipes are passed. Even when a new through-hole is required, a large opening can be provided in the wall or floor without fear of strength reduction due to the cutting of the reinforcing bar.
また、本発明の開口工法を採用すれば、補強用の直線状棒材を貫通孔周囲に配置する必要もなくなるため、貫通孔周囲のコンクリートを広範囲にわたって削る煩わしい作業も不要となり、施工作業の効率化も図れる。また、コンクリートを削る量を減らすことで、充填材のコストも抑えることができる。 In addition, if the opening method of the present invention is adopted, it is not necessary to arrange a reinforcing straight bar around the through hole, so that the troublesome work of cutting the concrete around the through hole over a wide area becomes unnecessary, and the efficiency of the construction work is reduced. Can also be achieved. Moreover, the cost of a filler can also be suppressed by reducing the amount which grinds concrete.
また更に、本発明の開口工法では、環状フレームに分割式スリーブのフランジを固定することで、貫通孔内でのスリーブの位置決めも同時に行えるため、スリーブを支持するための専用器具をわざわざ貫通孔内に配置しなくても、スリーブの設置を効率良く簡単に行うことができる。 Furthermore, in the opening method of the present invention, the flange of the split-type sleeve is fixed to the annular frame, so that the sleeve can be positioned in the through hole at the same time. Therefore, a dedicated instrument for supporting the sleeve is bothered in the through hole. Even if it does not arrange | position in, it can install a sleeve efficiently and easily.
したがって、本発明により、RC造建築物の強度基準を満たす大型の開口部を後施工で簡単に設けることができ、しかも、作業効率および施工コストの面でも優れた鉄筋コンクリート開口工法を提供できることから、本発明の実用的利用価値は頗る高い。 Therefore, according to the present invention, it is possible to easily provide a large opening satisfying the strength standard of the RC building by post-construction, and also provide an excellent reinforced concrete opening method in terms of work efficiency and construction cost. The practical utility value of the present invention is very high.
『実施例1』
本発明の実施例1について、図1〜図4に基いて説明する。なお同図において、符号1で指示するものは、環状フレームであり、また符号2で指示するものは、分割式スリーブである。符号3で指示するものは、充填材である。
“Example 1”
A first embodiment of the present invention will be described with reference to FIGS. In the figure, what is indicated by reference numeral 1 is an annular frame, and what is indicated by reference numeral 2 is a split sleeve. What is indicated by reference numeral 3 is a filler.
[鉄筋コンクリート開口構造]
この実施例1では、鉄筋コンクリート構造部R両面の鉄筋B・Bに固定した一対の環状フレーム1・1、貫通孔Hに挿入して両側のフランジ21・21’を環状フレーム1・1に固定した分割式スリーブ2、及び分割式スリーブ2と貫通孔Hの中空内壁の隙間に注入した充填材3から鉄筋コンクリート壁の開口部を形成している(図1、図2参照)。
[Reinforced concrete opening structure]
In the first embodiment, a pair of annular frames 1 and 1 fixed to the reinforcing bars B and B on both sides of the reinforced concrete structure R are inserted into the through holes H, and the flanges 21 and 21 'on both sides are fixed to the annular frames 1 and 1. An opening portion of the reinforced concrete wall is formed from the split sleeve 2 and the filler 3 injected into the gap between the split sleeve 2 and the hollow inner wall of the through hole H (see FIGS. 1 and 2).
また、上記鉄筋コンクリート構造部Rの貫通孔Hに関しては、中空断面の形状を円形状とすると共に、鉄筋Bを切断して穿設することで開口サイズを配筋間隔よりも大きくしている。そして、上記鉄筋コンクリート構造部R両面の開口部周囲は、所定幅だけコンクリートCを削って鉄筋Bを露出させている。 In addition, regarding the through hole H of the reinforced concrete structure portion R, the hollow cross section has a circular shape, and the rebar B is cut and drilled to make the opening size larger than the bar arrangement interval. Then, around the openings on both sides of the reinforced concrete structure portion R, the concrete C is cut by a predetermined width to expose the rebar B.
一方、上記環状フレーム1には、鉄筋コンクリート構造部R両面の開口部よりもサイズが一回り大きくなるように屈曲成形した環状の鉄筋を使用している。また、環状フレーム1の形状は貫通孔の中空断面に合わせて円環状としている。そして、この鉄筋から成る環状フレーム1は、開口部周囲の露出した鉄筋Bに溶接によって固定している。 On the other hand, the annular frame 1 uses an annular reinforcing bar that is bent so that the size is slightly larger than the openings on both sides of the reinforced concrete structure R. The shape of the annular frame 1 is an annular shape in accordance with the hollow cross section of the through hole. The annular frame 1 made of this reinforcing bar is fixed to the exposed reinforcing bar B around the opening by welding.
また、上記分割式スリーブ2に関しては、小孔23を有する一対のフランジ21付き筒状片P・P’から構成している。そして、これらの筒状片P・P’を貫通孔Hの両側からそれぞれ挿入した状態で中空部内で連結している。なお本実施例では、分割式スリーブ2に鋼管を使用して、両側のフランジ21・21’を環状フレーム1・1に溶接により固定している。 The split sleeve 2 is composed of a pair of cylindrical pieces P · P ′ with flanges 21 having small holes 23. And these cylindrical pieces P * P 'are connected in the hollow portion in a state of being inserted from both sides of the through hole H, respectively. In this embodiment, steel pipes are used for the split sleeve 2 and the flanges 21 and 21 'on both sides are fixed to the annular frame 1 and 1 by welding.
そしてまた、本実施例では、上記筒状片P・P’のフランジ21・21’と反対側に嵌合部22・22’を形成すると共に、一方の筒状片Pに嵌合部22に、筒状片P・P’同士を嵌め合わせた際に連結部分が密封されるリング状のシーリング材24を配設している。これによって、貫通孔H内での筒状片P・P’同士の連結を容易に行うことができる。 In this embodiment, the fitting portions 22 and 22 ′ are formed on the opposite side of the flanges 21 and 21 ′ of the cylindrical pieces P and P ′, and the fitting portions 22 are formed on one of the cylindrical pieces P. A ring-shaped sealing material 24 is provided in which the connecting portion is sealed when the cylindrical pieces P · P ′ are fitted together. Accordingly, the cylindrical pieces P and P ′ in the through hole H can be easily connected to each other.
他方、上記充填材3には、分割式スリーブ2の小孔23から流動性を有する状態で注入可能な無収縮グラウト材を使用している。そして、この充填材3によって分割式スリーブ2と貫通孔Hの中空内壁の間を隙間なく埋めている。なお本実施例では、充填材3の材料に圧縮強度に優れたセメント系の無収縮グラウト材を使用している。 On the other hand, a non-shrink grout material that can be injected from the small holes 23 of the split sleeve 2 in a fluid state is used for the filler 3. The filler 3 fills the space between the split sleeve 2 and the hollow inner wall of the through hole H without any gap. In this embodiment, a cement-based non-shrink grout material having excellent compressive strength is used as the material for the filler 3.
以上のように、本実施例では、環状フレーム1、分割式スリーブ2および充填材3を用いて開口部を形成しているため、鉄筋コンクリート壁に貫通孔Hを後施工で設ける場合でも、各部材を一体化させて貫通孔H周囲の補強を充分に行うことができる。そのため、貫通孔周囲のコンクリートにヒビが入ったり、耐震性が低下する等の心配がない。 As described above, in the present embodiment, the opening is formed using the annular frame 1, the split sleeve 2, and the filler 3. Therefore, even when the through hole H is provided in the reinforced concrete wall by post-construction, each member Can be integrated to sufficiently reinforce the periphery of the through hole H. Therefore, there is no worry that the concrete around the through hole cracks or the earthquake resistance is lowered.
[鉄筋コンクリート開口工法]
次に、上記鉄筋コンクリートの開口部を形成する方法について説明する。まず、第一のステップとして、図3(a)に示すように、建築物の壁を構成する鉄筋コンクリート構造部Rに、開口サイズが配筋間隔よりも大きい貫通孔Hを鉄筋を切断して穿設する。なお、鉄筋コンクリート構造部Rの孔開けには、ダイヤモンドコアドリル等が好適に使用される。
[Reinforced concrete opening method]
Next, a method for forming the opening of the reinforced concrete will be described. First, as a first step, as shown in FIG. 3 (a), a through hole H whose opening size is larger than the bar spacing is drilled in the reinforced concrete structure portion R constituting the wall of the building. Set up. A diamond core drill or the like is preferably used for drilling the reinforced concrete structure R.
そして、上記第一のステップで鉄筋コンクリート構造部Rに貫通孔Hを設けた後、第二のステップとして、図3(b)に示すように、鉄筋コンクリート構造部R両面の開口部周囲のコンクリートCを削って鉄筋を露出させる。その後、この露出させた鉄筋Bに対して開口部よりも一回り大きい環状フレーム1を溶接して固定する。 And after providing the through-hole H in the reinforced concrete structure part R in the said 1st step, as shown in FIG.3 (b), as shown in FIG.3 (b), the concrete C around the opening part of both surfaces of the reinforced concrete structure part R is carried out. Sharpen and expose the rebar. Then, the annular frame 1 that is slightly larger than the opening is welded and fixed to the exposed reinforcing bar B.
その後、第三のステップとして、図3(a)に示すように、分割式スリーブ2を構成する筒状片Pの一方を開口部に挿入して、そのフランジ21を環状フレーム1に溶接する。そして、もう一方の筒状片P’も、反対側の開口部から挿入して筒状片P・P’同士の嵌合部を嵌め合わせ、その状態で他方側のフランジ21’を環状フレーム1に溶接して固定する。 Thereafter, as a third step, as shown in FIG. 3A, one of the cylindrical pieces P constituting the split sleeve 2 is inserted into the opening, and the flange 21 is welded to the annular frame 1. The other cylindrical piece P ′ is also inserted from the opening on the opposite side, and the fitting portions of the cylindrical pieces P · P ′ are fitted together. In this state, the other flange 21 ′ is attached to the annular frame 1. Weld and fix to.
そして最後に、第四のステップとして、図3(b)に示す状態の分割式スリーブ2の小孔23から充填材3を注入して、貫通孔Hの中空内壁と分割式スリーブ2の隙間を埋める。またこの際、鉄筋コンクリート構造部Rにおける環状フレーム1の外側の溝部にも充填材3を注入して開口部周囲の壁面を面一にする。 Finally, as a fourth step, the filler 3 is injected from the small hole 23 of the split sleeve 2 in the state shown in FIG. 3 (b), and the gap between the hollow inner wall of the through hole H and the split sleeve 2 is formed. fill in. At this time, the filler 3 is also injected into the groove on the outer side of the annular frame 1 in the reinforced concrete structure R so that the wall surface around the opening is flush.
上記の方法で施工を行うことにより、鉄筋コンクリート構造部Rの開口部を効率良く低コストで形成することができる。また本実施例では、上記第二のステップにおいて、環状フレーム1と鉄筋Bを溶接すると共に、第三のステップにおいて、前記環状フレーム1と分割式スリーブ3を溶接しているため、部材同士を強固に連結することもできる。 By performing the construction by the above method, the opening of the reinforced concrete structure R can be efficiently formed at low cost. In the present embodiment, the annular frame 1 and the reinforcing bar B are welded in the second step, and the annular frame 1 and the split sleeve 3 are welded in the third step. It can also be connected to.
『実施例2』
次に、本発明の実施例2について図5及び図6に基いて以下に説明する。この実施例2では、分割式スリーブ3を、筒本体25、及び小孔23を有する一対のフランジ部材26・26’から構成し、筒本体25の両端部をフランジ部材26・26’の環状スロット26a・26a’に差し込んで止着部材Sで固定している(図5参照)。
“Example 2”
Next, Embodiment 2 of the present invention will be described below with reference to FIGS. In the second embodiment, the split sleeve 3 is composed of a cylinder body 25 and a pair of flange members 26 and 26 'having a small hole 23, and both ends of the cylinder body 25 are annular slots of the flange members 26 and 26'. It is inserted into 26a and 26a 'and fixed with a fastening member S (see FIG. 5).
なお、上記分割式スリーブ3を固定する際には、図6(a)に示すように、まず一方のフランジ部材26を環状フレーム1に溶接して固定した後、反対側の開口部から挿入した筒本体25の一端部を、固定したフランジ26の環状スロット26aに差し込んで止着部材Sで固定する。 When the split sleeve 3 is fixed, as shown in FIG. 6 (a), one flange member 26 is first welded and fixed to the annular frame 1 and then inserted through the opening on the opposite side. One end of the cylinder body 25 is inserted into the annular slot 26a of the fixed flange 26 and fixed by the fastening member S.
その後、上記フランジ部材26に固定した筒本体25の他端部に、もう一方のフランジ部材26’を環状スロット26a’と止着部材Sで固定して、最後にこのフランジ部材26’を環状フレーム1に溶接により固定する。これにより、厚みの大きい鉄筋コンクリート構造部Rの貫通孔Hに対しても、分割式スリーブ3を図6(b)に示す状態で設置することができる。 Thereafter, the other flange member 26 ′ is fixed to the other end portion of the cylinder body 25 fixed to the flange member 26 with the annular slot 26 a ′ and the fastening member S, and finally the flange member 26 ′ is attached to the annular frame. 1 is fixed by welding. Thereby, the split-type sleeve 3 can be installed in the state shown in FIG. 6 (b) even in the through hole H of the reinforced concrete structure portion R having a large thickness.
また本実施例では、上記分割スリーブ2の筒本体25とフランジ部材26を連結する止着部材Sにボルト材を使用し、このボルト材を環状スロット26a及び筒本体25の連通孔に挿通して、環状スロット26a内側の雌ネジ部に螺着している。もちろん、ボルト材の代わりにブラインドリベット等の他の止着部材Sを採用することも可能である。 In this embodiment, a bolt member is used for the fastening member S that connects the cylinder body 25 and the flange member 26 of the split sleeve 2, and the bolt member is inserted into the communication hole of the annular slot 26 a and the cylinder body 25. The inner threaded portion of the annular slot 26a is screwed. Of course, it is also possible to employ other fastening members S such as blind rivets instead of the bolt material.
本発明は、概ね上記のように構成されるが、実施例に限定されるものではなく、「特許請求の範囲」の記載内において種々の変更が可能であって、例えば、貫通孔Hを穿設する鉄筋コンクリート構造部Rは、RC造建築物の壁を構成するものだけでなく、床や柱などを構成する鉄筋コンクリート構造部Rを対象とすることもできる。 The present invention is generally configured as described above. However, the present invention is not limited to the embodiments, and various modifications can be made within the description of “Claims”. The reinforced concrete structure portion R to be installed can target not only the reinforced concrete structure portion R that constitutes the wall of the RC building but also the reinforced concrete structure portion R that constitutes a floor, a pillar, and the like.
また、鉄筋コンクリート構造部Rに設ける貫通孔Hの形状に関しても、必ずしも中空断面が円形状のものに限らず、例えば四角形などの多角形状の中空断面で形成することもできる。また、環状フレーム1や分割式スリーブ2の形状も、鉄筋コンクリート構造部Rの貫通孔Hの形状に合わせて変更することができる。 Further, regarding the shape of the through hole H provided in the reinforced concrete structure portion R, the hollow cross section is not necessarily limited to a circular shape, and may be formed with a polygonal hollow cross section such as a quadrangle. Further, the shapes of the annular frame 1 and the split sleeve 2 can be changed in accordance with the shape of the through hole H of the reinforced concrete structure portion R.
また更に、環状フレーム1や分割式スリーブ2の材質に関しても、炭素鋼やステンレス鋼などの金属材料だけでなく必要な強度を満たす材料であれば、炭素繊維強化プラスチックやC/Cコンポジット等を使用することもできる。またその場合には、部材同士の固定を溶接でなく接着で行うこともできる。 Furthermore, regarding the material of the annular frame 1 and the split sleeve 2, not only a metal material such as carbon steel and stainless steel but also a material satisfying a required strength, carbon fiber reinforced plastic or C / C composite is used. You can also In that case, the members can be fixed not by welding but by adhesion.
そしてまた、フランジ付き筒状片P・P’から成る分割式スリーブ2の取付け方法に関しても、まず貫通孔H両側の開口部から挿入した筒状片P・P’同士を連結した後、両側のフランジ21・21’を環状フレーム1・1に固定してもよく、上記何れのものも本発明の技術的範囲に属する。 As for the method of attaching the split sleeve 2 composed of the flanged cylindrical pieces P and P ′, first, the cylindrical pieces P and P ′ inserted from the openings on both sides of the through hole H are connected to each other, The flanges 21 and 21 'may be fixed to the annular frames 1 and 1, and any of the above belongs to the technical scope of the present invention.
近年、建築技術が進歩したことにより、改修(リフォーム)の需要が高まっている。しかし、RC造建築物の改修時における鉄筋コンクリートの孔開けは、鉄筋の切断によって強度低下を招く虞れがあるため、敬遠されることが多い。そのような中で、本発明の鉄筋コンクリート開口工法は、強度を維持しつつ効率的に貫通孔を設けることができる有用な技術であることから、その産業上の利用価値は非常に高い。 In recent years, the demand for renovation has increased due to advances in building technology. However, drilling of reinforced concrete at the time of renovation of RC structures is often avoided because there is a risk of strength reduction due to cutting of the reinforcing bars. Under such circumstances, the reinforced concrete opening method of the present invention is a useful technique capable of efficiently providing through-holes while maintaining strength, and thus has an industrial utility value.
1 環状フレーム
2 分割式スリーブ
21 フランジ
22 嵌合部
23 小孔
24 シーリング材
25 筒本体
26 フランジ部材
26a 環状スロット
3 充填材
R 鉄筋コンクリート構造部
H 貫通孔
C コンクリート
B 鉄筋
P 筒状片
S 止着部材
1 Annular frame 2 Split sleeve
21 Flange
22 Mating part
23 Small hole
24 Sealing material
25 Tube body
26 Flange member
26a Annular slot 3 Filler R Reinforced concrete structure H Through hole C Concrete B Reinforcement P Cylindrical piece S Fastening member
Claims (8)
前記壁や床等を構成する鉄筋コンクリート構造部(R)に、開口サイズが配筋間隔よりも大きい貫通孔(H)を鉄筋(B)を切断して開設する第一のステップと;この第一のステップの後、鉄筋コンクリート構造部(R)両面の開口部周囲のコンクリート(C)を削って鉄筋(B)を露出させると共に、この露出した鉄筋(B)に対して開口部よりも一回り大きい環状フレーム(1)を溶接又は接着により固定する第二のステップと;この第二のステップの後、分割式スリーブ(2)を構成する一対のフランジ付き筒状片(P)(P’)を、両側の開口部からそれぞれ挿入して中空部内で両者を連結し、更に両側のフランジ(21)(21’)を環状フレーム(1)(1)に溶接又は接着して固定する第三のステップと;この第三のステップの後、分割式スリーブ(2)の小孔(23)から充填材(3)を注入して、貫通孔(H)の中空内壁と分割式スリーブ(2)との隙間を埋める第四のステップとを含み、
前記環状フレーム(1)と分割式スリーブ(2)の取付け、及び充填材(3)の注入によって鉄筋コンクリート構造部(R)の貫通孔(H)周囲を補強することを特徴とする鉄筋コンクリート開口工法。 It is a reinforced concrete opening method for providing through holes (H) in the post-construction on the walls and floors of existing RC buildings,
A first step of opening a through hole (H) having an opening size larger than the bar spacing in the reinforced concrete structure (R) constituting the wall or floor by cutting the reinforcing bar (B); After this step, the concrete (C) around the openings on both sides of the reinforced concrete structure (R) is shaved to expose the reinforcing bars (B), and the exposed reinforcing bars (B) are slightly larger than the openings. A second step of fixing the annular frame (1) by welding or adhesion; after this second step, a pair of flanged cylindrical pieces (P) (P ') constituting the split sleeve (2) The third step is to insert through the openings on both sides, connect them in the hollow part, and further fix the flanges (21) (21 ') on both sides to the annular frame (1) (1) by welding or bonding. And after this third step, the filler (3) is removed from the small hole (23) of the split sleeve (2). By entering, and a fourth step of filling the gap between the hollow inner wall split sleeve of the through hole (H) (2),
A reinforced concrete opening method characterized by reinforcing the periphery of the through hole (H) of the reinforced concrete structure (R) by attaching the annular frame (1) and the split sleeve (2) and injecting a filler (3).
前記壁や床等を構成する鉄筋コンクリート構造部(R)に、開口サイズが配筋間隔よりも大きい貫通孔(H)を鉄筋(B)を切断して開設する第一のステップと;この第一のステップの後、鉄筋コンクリート構造部(R)両面の開口部周囲のコンクリート(C)を削って鉄筋(B)を露出させると共に、この露出した鉄筋(B)に対して開口部よりも一回り大きい環状フレーム(1)を溶接又は接着によって固定する第二のステップと;この第二のステップの後、分割式スリーブ(2)を構成する筒本体(25)と一対のフランジ部材(26)(26’)の内、まず一方のフランジ部材(26)を環状フレーム(1)に溶接または接着により固定した後、反対側の開口部から挿入した筒本体(25)の一端部を、前記フランジ(26)の環状スロット(26a)に差し込んで止着部材(S)で固定し、更にこの固定した筒本体(25)の他端部に、もう一方のフランジ部材(26’)を環状スロット(26a’)と止着部材(S)で固定して、最後にこのフランジ部材(26’)と環状フレーム(1)を溶接または接着により固定する第三のステップと;この第三のステップの後、分割式スリーブ(2)の小孔(23)から充填材(3)を注入して、貫通孔(H)の中空内壁と分割式スリーブ(2)との隙間を埋める第四のステップとを含み、
前記環状フレーム(1)と分割式スリーブ(2)の取付け、及び充填材(3)の注入によって鉄筋コンクリート構造部(R)の貫通孔(H)周囲を補強することを特徴とする鉄筋コンクリート開口工法。 It is a reinforced concrete opening method for providing through holes (H) in the post-construction on the walls and floors of existing RC buildings,
A first step of opening a through hole (H) having an opening size larger than the bar spacing in the reinforced concrete structure (R) constituting the wall or floor by cutting the reinforcing bar (B); After this step, the concrete (C) around the openings on both sides of the reinforced concrete structure (R) is shaved to expose the reinforcing bars (B), and the exposed reinforcing bars (B) are slightly larger than the openings. A second step of fixing the annular frame (1) by welding or adhesion; after this second step, a cylindrical body (25) constituting the split-type sleeve (2) and a pair of flange members (26) (26) ') First, one flange member (26) is fixed to the annular frame (1) by welding or adhesion, and then one end of the cylinder body (25) inserted from the opening on the opposite side is connected to the flange (26). ) Is inserted into the annular slot (26a) and fixed with the fastening member (S). The other flange member (26 ') is fixed to the other end of the cylinder body (25) with an annular slot (26a') and a fastening member (S), and finally the flange member (26 ') is annular A third step of fixing the frame (1) by welding or adhesion; after this third step, a filler (3) is injected from a small hole (23) of the split sleeve (2) A fourth step of filling a gap between the hollow inner wall of (H) and the split sleeve (2),
A reinforced concrete opening method characterized by reinforcing the periphery of the through hole (H) of the reinforced concrete structure (R) by attaching the annular frame (1) and the split sleeve (2) and injecting a filler (3).
前記壁や床等を構成し、かつ、開口サイズが配筋間隔よりも大きい貫通孔(H)が設けられた鉄筋コンクリート構造部(R)と;この鉄筋コンクリート構造部(R)両面の開口部よりもサイズが一回り大きく、かつ、開口部周囲の露出した鉄筋(B)に溶接又は接着して固定された環状フレーム(1)と;小孔(23)を有する一対のフランジ(21)付き筒状片(P)(P’)から成り、かつ、これらの筒状片(P)(P’)が前記貫通孔(H)の両側からそれぞれ挿入されて中空部内で連結されると共に、両側のフランジ(21)(21’)が環状フレーム(1)(1)に溶接または接着によって固定された分割式スリーブ(2)と;この分割式スリーブ(2)の小孔(23)から注入され、分割式スリーブ(2)と貫通孔(H)の中空内壁との隙間に充填された充填材(3)とを含んで成り、
前記鉄筋(B)に固定された環状フレーム(1)、環状フレーム(1)に固定された分割式スリーブ(2)、及び分割スリーブ(2)と貫通孔内壁の隙間を埋める充填材(3)によって鉄筋コンクリート構造部(R)の貫通孔周囲が補強されることを特徴とする鉄筋コンクリート開口構造。 It is a reinforced concrete opening structure in which a through hole (H) is provided in the post-construction on the wall or floor of an existing RC building,
Reinforced concrete structure (R) having the above-mentioned walls and floors and having through holes (H) whose opening size is larger than the bar arrangement interval; An annular frame (1) that is one size larger and fixed by welding or bonding to the exposed rebar (B) around the opening; and a cylindrical shape with a pair of flanges (21) having small holes (23) The cylindrical pieces (P) (P ') are inserted from both sides of the through hole (H) and connected in the hollow portion, and the flanges on both sides are formed. (21) (21 ′) is fixed to the annular frame (1) (1) by welding or bonding; and a split sleeve (2); injected from a small hole (23) of the split sleeve (2) and split Comprising a filler (3) filled in a gap between the type sleeve (2) and the hollow inner wall of the through hole (H),
An annular frame (1) fixed to the reinforcing bar (B), a split sleeve (2) fixed to the annular frame (1), and a filler (3) filling a gap between the split sleeve (2) and the inner wall of the through hole Reinforced concrete opening structure characterized in that the periphery of the through hole of the reinforced concrete structure (R) is reinforced by the above.
前記壁や床等を構成し、かつ、開口サイズが配筋間隔よりも大きい貫通孔(H)が設けられた鉄筋コンクリート構造部(R)と;この鉄筋コンクリート構造部(R)両面の開口部よりもサイズが一回り大きく、かつ、開口部周囲の露出した鉄筋(B)に溶接または接着して固定された環状フレーム(1)と;筒本体(25)、及び小孔(23)を有する一対のフランジ部材(26)(26’)から成り、かつ、前記筒本体(25)の両端部がフランジ部材(26)(26’)の環状スロット(26a)(26a’)に差し込まれて止着部材(S)で固定され、更に両側の各フランジ部材(26)(26’)が環状フレーム(1)(1)に溶接または接着によって固定された分割式スリーブ(2)と;この分割式スリーブ(2)の小孔(23)から注入され、分割式スリーブ(2)と貫通孔(H)の中空内壁との隙間に充填された充填材(3)とを含んで成り、
前記鉄筋(B)に固定された環状フレーム(1)、環状フレーム(1)に固定された分割式スリーブ(2)、及び分割スリーブ(2)と貫通孔内壁の隙間を埋める充填材(3)によって鉄筋コンクリート構造部(R)の貫通孔周囲が補強されることを特徴とする鉄筋コンクリート開口構造。 It is a reinforced concrete opening structure in which a through hole (H) is provided in the post-construction on the wall or floor of an existing RC building,
Reinforced concrete structure (R) having the above-mentioned walls and floors and having through holes (H) whose opening size is larger than the bar arrangement interval; An annular frame (1) that is one size larger and fixed by welding or bonding to the exposed reinforcing bar (B) around the opening; a pair of cylinder bodies (25), and a pair of small holes (23) A flange member (26) (26 '), and both ends of the cylindrical body (25) are inserted into the annular slots (26a) (26a') of the flange members (26) (26 ') to be fastening members A split sleeve (2) fixed by (S) and each flange member (26) (26 ') on both sides fixed to the annular frame (1) (1) by welding or bonding; and this split sleeve ( 2) injected from the small hole (23) of 2) and comprising a filler (3) filled in the gap between the split sleeve (2) and the hollow inner wall of the through hole (H),
An annular frame (1) fixed to the reinforcing bar (B), a split sleeve (2) fixed to the annular frame (1), and a filler (3) filling a gap between the split sleeve (2) and the inner wall of the through hole Reinforced concrete opening structure characterized in that the periphery of the through hole of the reinforced concrete structure (R) is reinforced by the above.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2012175319A JP5107479B1 (en) | 2012-08-07 | 2012-08-07 | Reinforced concrete opening method and reinforced concrete opening structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2012175319A JP5107479B1 (en) | 2012-08-07 | 2012-08-07 | Reinforced concrete opening method and reinforced concrete opening structure |
Publications (2)
Publication Number | Publication Date |
---|---|
JP5107479B1 true JP5107479B1 (en) | 2012-12-26 |
JP2014034773A JP2014034773A (en) | 2014-02-24 |
Family
ID=47528567
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2012175319A Expired - Fee Related JP5107479B1 (en) | 2012-08-07 | 2012-08-07 | Reinforced concrete opening method and reinforced concrete opening structure |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP5107479B1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107100324A (en) * | 2017-06-27 | 2017-08-29 | 厦门大学嘉庚学院 | It is a kind of to strengthen punch reinforced beam bearing capacity and the device of anti-seismic performance |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP7390280B2 (en) * | 2020-12-25 | 2023-12-01 | 大成建設株式会社 | Opening formation method and opening reinforcement structure |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5563078A (en) * | 1978-11-07 | 1980-05-12 | Obayashi Gumi Kk | Opening portion of reinforced concrete member for construction |
JPH05311891A (en) * | 1992-05-02 | 1993-11-22 | Takenaka Komuten Co Ltd | Reinforcing method for existing beam |
JPH06193196A (en) * | 1992-12-24 | 1994-07-12 | Takenaka Komuten Co Ltd | Structure of reinforcement for opening at connecting end with column of reinforced concrete beam |
JP2004332338A (en) * | 2003-05-06 | 2004-11-25 | Ohbayashi Corp | Reinforced structure of concrete member having opening and reinforcing method |
JP2008144415A (en) * | 2006-12-07 | 2008-06-26 | Shimizu Corp | Opening reinforcing structure of reinforced concrete structure wall |
-
2012
- 2012-08-07 JP JP2012175319A patent/JP5107479B1/en not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5563078A (en) * | 1978-11-07 | 1980-05-12 | Obayashi Gumi Kk | Opening portion of reinforced concrete member for construction |
JPH05311891A (en) * | 1992-05-02 | 1993-11-22 | Takenaka Komuten Co Ltd | Reinforcing method for existing beam |
JPH06193196A (en) * | 1992-12-24 | 1994-07-12 | Takenaka Komuten Co Ltd | Structure of reinforcement for opening at connecting end with column of reinforced concrete beam |
JP2004332338A (en) * | 2003-05-06 | 2004-11-25 | Ohbayashi Corp | Reinforced structure of concrete member having opening and reinforcing method |
JP2008144415A (en) * | 2006-12-07 | 2008-06-26 | Shimizu Corp | Opening reinforcing structure of reinforced concrete structure wall |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107100324A (en) * | 2017-06-27 | 2017-08-29 | 厦门大学嘉庚学院 | It is a kind of to strengthen punch reinforced beam bearing capacity and the device of anti-seismic performance |
Also Published As
Publication number | Publication date |
---|---|
JP2014034773A (en) | 2014-02-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP2009203764A (en) | Reinforcing method and reinforcing structure of existing building using pin device | |
JP5107479B1 (en) | Reinforced concrete opening method and reinforced concrete opening structure | |
CN204112525U (en) | Band perps precast shear wall structure in strong concrete precast frame | |
KR101673287B1 (en) | Methods of increasing the sectional resisting force for negative moment acting at the end part of beam in case of repair or remodeling | |
KR101521556B1 (en) | Underground wall construction method using wall members | |
JP2008144431A (en) | Method and structure for joining precast reinforced concrete beam members | |
JP2013087540A (en) | Out-frame reinforcing method and reinforcing structure therefor | |
JP2016008387A (en) | Hybrid beam | |
JP2009161976A (en) | Method of mounting seismically reinforcing precast concrete member | |
JP2010159565A (en) | Column-beam joint part and reinforcing hardware for column-beam joint part | |
KR20090065409A (en) | Permanent usage of temporary earth wall as the part of the basement exterior wall method = ptw ?? | |
CN110939138A (en) | Underground diaphragm wall subassembly | |
JP2012017575A (en) | Junction structure and junction method of precast concrete member | |
JP6365551B2 (en) | Replacement method and structure of concrete floor slab | |
JP5846863B2 (en) | Shield excavation wall | |
JP2009299267A (en) | Structure and method for joining precast concrete structural members together | |
KR101143553B1 (en) | Construction method for building remodeling by using pc panel for building remodeling, and connecting structure for remodeling pc panel | |
JP6673695B2 (en) | Construction method of mountain retaining wall and mountain retaining wall | |
JP6162772B2 (en) | Shield excavation wall | |
JP2008303673A (en) | Composite wall structure and its construction method | |
KR101685632B1 (en) | Shear connector to increase strength and ductility | |
JP2020105790A (en) | Reinforcement method of column made of brick | |
JP5994583B2 (en) | Tunnel support reinforcement structure and tunnel construction method using tunnel support reinforcement structure | |
JP6461457B2 (en) | Pile and pile construction method | |
JP2000129668A (en) | Soil-cement composite wall and execution method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20121003 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 5107479 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20181012 Year of fee payment: 6 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
LAPS | Cancellation because of no payment of annual fees |