JP5035048B2 - Construction reservation device, construction reservation processing method and program - Google Patents

Construction reservation device, construction reservation processing method and program Download PDF

Info

Publication number
JP5035048B2
JP5035048B2 JP2008067378A JP2008067378A JP5035048B2 JP 5035048 B2 JP5035048 B2 JP 5035048B2 JP 2008067378 A JP2008067378 A JP 2008067378A JP 2008067378 A JP2008067378 A JP 2008067378A JP 5035048 B2 JP5035048 B2 JP 5035048B2
Authority
JP
Japan
Prior art keywords
construction
resource
resource amount
reservation
priority
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2008067378A
Other languages
Japanese (ja)
Other versions
JP2009223618A (en
Inventor
達也 幅田
芳和 村田
佳太 水戸部
博文 吉川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujitsu Ltd
Original Assignee
Fujitsu Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujitsu Ltd filed Critical Fujitsu Ltd
Priority to JP2008067378A priority Critical patent/JP5035048B2/en
Publication of JP2009223618A publication Critical patent/JP2009223618A/en
Application granted granted Critical
Publication of JP5035048B2 publication Critical patent/JP5035048B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Description

本発明は、工事の予約処理についての技術に関する。   The present invention relates to a technique for construction reservation processing.

顧客からのサービス提供依頼に対して工事が必要な場合には、その工事の前にいくつかのステップを踏まなければならない場合がある。例えば、現地調査をして工事内容を決定したり、設計したり、法律上必要な申請を行ったり、契約書を取り交わしたりといったことである。   When construction is required for a service provision request from a customer, it may be necessary to take several steps before the construction. For example, it is necessary to conduct field surveys to determine the contents of construction, design, make legally required applications, and exchange contracts.

現状では、これらの手続きを踏んで、工事が確実にできる段階で、スケジュールを決めている。例えば、まず現地調査を行い、工事内容を決定して、その工事に必要な期間を算出し、工事予定日を顧客に通知している。工事可能であれば、顧客に契約書を送付し、顧客から記入・押印済みの契約書を受けた時点で、顧客と工事日程の確定を行い、工事を実施している。   Currently, following these procedures, the schedule is decided at the stage where the construction can be performed reliably. For example, a field survey is first performed to determine the contents of the construction, a period required for the construction is calculated, and the planned construction date is notified to the customer. If construction is possible, the contract is sent to the customer, and when the contract that has been filled in and stamped is received from the customer, the construction schedule is confirmed with the customer and the construction is carried out.

このような手続きを実施すると、サービス提供依頼を行った時点で顧客はいつ頃工事が完了するのか不明であり、サービス提供依頼から工事完了までの期間も長くなる。また、工事管理会社が顧客と工事担当会社との間に入っている場合には、工事担当会社のリソースを把握するのが難しく、工事日の調整に手間が掛かる場合もある。両者の都合が合わない場合には、特開2004−78442号公報にも開示されているように、日程が合うまで再調整を繰り返さなければならない。
特開2004−78442号公報
When such a procedure is carried out, when the service provision request is made, the customer is not sure when the construction is completed, and the period from the service provision request to the completion of the construction becomes long. Further, when the construction management company is between the customer and the construction company, it is difficult to grasp the resources of the construction company, and it may take time to adjust the construction date. If the conveniences of the two do not suit, readjustment must be repeated until the schedule is met, as disclosed in Japanese Patent Application Laid-Open No. 2004-78442.
JP 2004-78442 A

このような状況で顧客満足度向上のため、サービス提供依頼から工事完了までの期間短縮は急務である。このため、日程調整のために必要となる期間を短縮するために複数の候補日を顧客から受け付ける場合もあるが、この複数の候補日について工事担当会社のリソース(人や工具など)を工事に必要な分そのまま確保すれば、実際の工事日以外は無駄になってしまい、工事担当会社の業務効率上問題となる。   In such a situation, in order to improve customer satisfaction, it is urgent to shorten the period from service provision request to completion of construction. For this reason, in order to shorten the time required for schedule adjustment, multiple candidate dates may be received from the customer. However, the resources of the construction company (people, tools, etc.) are used for construction for these multiple candidate dates. If the necessary amount is secured as it is, it will be wasted except on the actual construction day, which will be a problem in the work efficiency of the construction company.

従って、本発明の目的は、工事予約を行う際に工事担当会社の無駄なリソース確保を抑制するための技術を提供することである。   Accordingly, an object of the present invention is to provide a technique for suppressing useless resource securing of a construction company when making a construction reservation.

本発明の第1の態様に係る工事予約装置は、各単位時間において利用可能な最大リソース量と予約中リソース量と確保済リソース量とを管理し、優先度(優先順位とも呼ぶ)に応じたリソース予約割合のデータとを格納するリソース管理データ格納部と、複数の工事実行候補単位時間と各工事実行候補単位時間についての優先度とを含む工事予約データを受信する予約受信手段と、各工事実行候補単位時間において、リソース管理データ格納部で管理されている最大リソース量と予約中リソース量及び確保済リソース量との差で特定される余裕リソース量が、リソース管理データ格納部に格納されている、各工事実行候補単位時間についての優先度に応じたリソース予約割合と工事に必要なリソース量との積によって特定される必要リソース量以上存在する場合には、リソース管理データ格納部において各工事実行候補単位時間について必要リソース量だけ予約中リソース量を増加させる予約手段とを有する。   The construction reservation apparatus according to the first aspect of the present invention manages a maximum resource amount, a reserved resource amount, and a reserved resource amount that can be used in each unit time, and according to priority (also referred to as priority). A resource management data storage unit for storing resource reservation ratio data, reservation receiving means for receiving construction reservation data including a plurality of construction execution candidate unit times and priorities for each construction execution candidate unit time, and each construction In the execution candidate unit time, the marginal resource amount specified by the difference between the maximum resource amount managed in the resource management data storage unit, the reserved resource amount, and the reserved resource amount is stored in the resource management data storage unit. Required resources specified by the product of the resource reservation ratio according to the priority for each construction execution candidate unit time and the amount of resources required for construction When present above, and a reservation means for increasing the reservation in the resource amount only resource required for each work execution candidate unit time in the resource management data storage unit.

このように、高い優先度には高いリソース予約割合でリソース予約を行うことによって、確率の高い単位時間については多くのリソースを確保しておき、確率の低い単位時間については少なくリソースを確保するので、無駄にリソースを確保することが抑制される。   In this way, by making resource reservations at a high priority at a high resource reservation ratio, a large number of resources are secured for unit time with a high probability, and a small number of resources are secured for unit time with a low probability. Securing resources in vain is suppressed.

また、上で述べた予約受信手段が、予約手段が前記必要リソース量だけ予約中リソース量を増加させた場合、工事予約データをリソース管理データ格納部に格納するようにしてもよい。そして、本発明の第1の態様において、特定の工事予約データについて工事決定単位時間又は工事決定優先度を指定する通知を受信する工事日程受信手段と、リソース管理データ格納部において、工事決定優先度により特定の工事予約データから特定される工事決定単位時間又は指定の工事決定単位時間に対応して登録されている予約中リソース量を、工事決定単位時間についての優先度に応じたリソース予約割合と特定の工事予約データについての工事に必要なリソース量との積によって特定される必要リソース量だけ減じて、確保済リソース量を特定の工事予約データについての工事に必要なリソース量だけ増加させるリソース確保手段と、リソース管理データ格納部において、特定の工事予約データに含まれる、工事決定単位時間以外の工事実行候補単位時間に対応して登録されている予約中リソース量を、当該工事決定単位時間以外の工事実行候補単位時間の優先度に応じたリソース予約割合と特定の工事予約データについての工事に必要なリソース量との積によって特定される必要リソース量だけ減ずるリソース開放手段とをさらに有するようにしてもよい。このようにすれば、工事を行う単位時間には適切な分だけリソースが確保され、不要となった工事実行候補単位時間について予約されていたリソース量がキャンセルされるようになる。   In addition, the reservation receiving unit described above may store the construction reservation data in the resource management data storage unit when the reservation unit increases the resource amount being reserved by the required resource amount. In the first aspect of the present invention, the construction schedule receiving means for receiving a notification designating the construction decision unit time or construction decision priority for the specific construction reservation data, and the construction decision priority in the resource management data storage unit The resource reservation ratio corresponding to the priority for the construction determination unit time is set as the reserved resource amount registered corresponding to the construction determination unit time specified from the specific construction reservation data or the designated construction determination unit time. Reserving resources that reduce the necessary resource amount specified by the product of the resource amount required for construction for specific construction reservation data and increase the secured resource amount by the amount necessary for construction for specific construction reservation data Means and resource management data storage unit, other than the construction decision unit time included in the specific construction reservation data The amount of reserved resources registered corresponding to the construction execution candidate unit time is used for the construction of the resource reservation ratio and the specific construction reservation data according to the priority of the construction execution candidate unit time other than the construction decision unit time. You may make it further have a resource release means to reduce only the required resource amount specified by the product with the required resource amount. In this way, an appropriate amount of resources are secured in the unit time for performing the construction, and the amount of resources reserved for the construction execution candidate unit time that is no longer necessary is cancelled.

さらに、リソース確保手段及びリソース開放手段が、リソース管理データ格納部において格納されている特定の工事予約データから工事決定単位時間により特定される工事決定優先度又は指定の工事決定優先度が最も高い優先度より低い優先度である場合には、工事決定単位時間に対応して登録されている予約中リソース量を、工事決定単位時間についての優先度に応じたリソース予約割合と特定の工事予約データについての工事に必要なリソース量との積によって特定される必要リソース量だけ減じて、確保済リソース量を特定の工事予約データについての工事に必要なリソース量だけ増加させた場合に、予約中リソース量と確保済リソース量との和が工事決定単位時間に対応する最大リソース量以下であれば動作するようにしてもよい。優先度が低い場合には、工事に必要なリソース量を確保できない場合が生ずるので、その確認の上動作するものである。   Further, the resource securing means and the resource releasing means have the highest construction decision priority specified by the construction decision unit time or the designated construction decision priority from the specific construction reservation data stored in the resource management data storage unit. If the priority is lower than the default, the amount of reserved resources registered corresponding to the construction decision unit time is determined for the resource reservation ratio and the specific construction reservation data according to the priority for the construction decision unit time. When the required resource amount specified by the product with the resource amount required for the current work is reduced and the reserved resource amount is increased by the resource amount required for the work for the specific work reservation data, the reserved resource amount And the reserved resource amount may be operated if the sum is equal to or less than the maximum resource amount corresponding to the construction determination unit time. When the priority is low, there may be a case where the amount of resources necessary for the construction cannot be secured.

さらに、工事日程受信手段が、リソース確保手段及びリソース開放手段とが動作した場合、リソース管理データ格納部において特定の工事予約データに対応して工事決定単位時間又は工事決定優先度を登録するようにしてもよい。その場合、本発明の第1の態様において、リソース管理データ格納部において工事予約データに対応して登録されている工事決定単位時間から特定される工事決定優先度又は指定の工事決定優先度の発生割合に応じて、リソース予約割合を算出する手段をさらに有するようにしてもよい。リソース予約割合を実態に合わせて変化させるためである。   Further, when the work schedule receiving means operates as the resource securing means and the resource releasing means, the construction management unit time or construction decision priority is registered in the resource management data storage unit corresponding to the specific construction reservation data. May be. In that case, in the first aspect of the present invention, the occurrence of the construction decision priority specified or the designated construction decision priority specified from the construction decision unit time registered corresponding to the construction reservation data in the resource management data storage unit You may make it further have a means to calculate a resource reservation ratio according to a ratio. This is to change the resource reservation ratio according to the actual situation.

また、予約中リソース量と確保済リソース量との和が工事決定単位時間に対応する最大リソース量を超えてしまう場合、リソース確保手段又はリソース開放手段が、リソース管理データ格納部において格納されている特定の工事予約データから工事決定単位時間により特定される工事決定優先度又は指定の工事決定優先度より低い優先度の工事実行候補単位時間を特定するようにしてもよい。そして、リソース管理データ格納部において、当該工事実行候補単位時間に対応して登録されている予約中リソース量を、工事実行候補単位時間についての優先度に応じたリソース予約割合と特定の工事予約データについての工事に必要なリソース量との積によって特定される必要リソース量だけ減じて、確保済リソース量を特定の工事予約データについての工事に必要なリソース量だけ増加させた場合に、予約中リソース量と確保済リソース量との和が、特定された工事実行候補単位時間に対応する最大リソース量以下であるか確認するようにしてもよい。そして、予約中リソース量と確保済リソース量との和が、特定された工事実行候補単位時間に対応する最大リソース量以下である場合に、リソース管理データ格納部において、特定された工事実行候補単位時間に対応して登録されている予約中リソース量を、工事実行候補単位時間についての優先度に応じたリソース予約割合と特定の工事予約データについての工事に必要なリソース量との積によって特定される必要リソース量だけ減じて、確保済リソース量を特定の工事予約データについての工事に必要なリソース量だけ増加させるようにしてもよい。このように、優先度を下げていって、リソースを確保することによって、日程調整の手間を省くことができるようになる。   Further, when the sum of the reserved resource amount and the reserved resource amount exceeds the maximum resource amount corresponding to the construction determination unit time, the resource securing unit or the resource releasing unit is stored in the resource management data storage unit. You may make it identify the construction execution candidate unit time of the priority lower than the construction decision priority specified by the construction decision unit time from the specific construction reservation data or the designated construction decision priority. Then, in the resource management data storage unit, the reserved resource amount registered in correspondence with the construction execution candidate unit time is determined based on the resource reservation ratio according to the priority for the construction execution candidate unit time and the specific construction reservation data. When the required resource amount specified by the product with the resource amount required for the construction is reduced and the secured resource amount is increased by the resource amount necessary for the construction for the specific construction reservation data, the reserved resource It may be confirmed whether the sum of the amount and the secured resource amount is equal to or less than the maximum resource amount corresponding to the specified construction execution candidate unit time. When the sum of the reserved resource amount and the reserved resource amount is equal to or less than the maximum resource amount corresponding to the specified construction execution candidate unit time, the resource management data storage unit specifies the specified construction execution candidate unit. The amount of reserved resources registered corresponding to the time is specified by the product of the resource reservation ratio according to the priority for the construction execution candidate unit time and the amount of resources required for the construction for specific construction reservation data. The reserved resource amount may be reduced, and the secured resource amount may be increased by the resource amount necessary for the construction for the specific construction reservation data. In this way, it is possible to save time and effort by adjusting the priority and securing resources.

本発明の第2の実施の形態に係る工事予約方法は、複数の工事実行候補単位時間と各工事実行候補単位時間についての優先度とを含む工事予約データを受信する予約受信ステップと、各工事実行候補単位時間において、リソース管理データ格納部で管理されている最大リソース量と予約中リソース量及び確保済リソース量との差で特定される余裕リソース量が、リソース管理データ格納部に格納されている、各工事実行候補単位時間についての優先度に応じたリソース予約割合と工事に必要なリソース量との積によって特定される必要リソース量以上存在する場合には、リソース管理データ格納部において各工事実行候補単位時間について必要リソース量だけ予約中リソース量を増加させる予約ステップとを含む。   The construction reservation method according to the second embodiment of the present invention includes a reservation receiving step for receiving construction reservation data including a plurality of construction execution candidate unit times and priorities for each construction execution candidate unit time, and each construction In the execution candidate unit time, the marginal resource amount specified by the difference between the maximum resource amount managed in the resource management data storage unit, the reserved resource amount, and the reserved resource amount is stored in the resource management data storage unit. If there is more than the required resource amount specified by the product of the resource reservation ratio corresponding to the priority for each construction execution candidate unit time and the resource amount required for the construction, each construction work is stored in the resource management data storage unit. A reservation step of increasing the reserved resource amount by the required resource amount for the execution candidate unit time.

なお、本方法は、コンピュータと当該コンピュータによって実行されるプログラムとの組み合わせにて実行される場合があり、当該プログラムは、例えばフレキシブルディスク、CD−ROM、光磁気ディスク、半導体メモリ、ハードディスク等の記憶媒体又は記憶装置に格納される。また、ネットワークなどを介してデジタル信号として配信される場合もある。尚、中間的な処理結果はメインメモリ等の記憶装置に一時保管される。   The method may be executed by a combination of a computer and a program executed by the computer, and the program is stored in, for example, a flexible disk, a CD-ROM, a magneto-optical disk, a semiconductor memory, a hard disk, or the like. Stored in a medium or storage device. Moreover, it may be distributed as a digital signal via a network or the like. The intermediate processing result is temporarily stored in a storage device such as a main memory.

本発明によれば、工事予約を行う際に工事担当会社の無駄なリソース確保を抑制することができるようになる。   According to the present invention, it is possible to suppress useless resource securing of a construction company when making a construction reservation.

本発明の一実施の形態に係るシステム概要を図1を用いて説明する。例えばインターネット等のネットワーク1には、複数の顧客端末7(携帯電話機だけではなくパーソナルコンピュータやPDA(Personal Digital Assistance)などを含む)と、複数の工事担当者(管理者)端末9(顧客端末7と同じ)と、顧客端末7及び工事担当者端末9と工事会社装置5とを仲介する仲介装置3とが接続されている。工事会社装置5は、工事会社毎に設けられ、仲介装置3に接続される。但し、図1では仲介装置3にネットワーク1を介さずに接続する例を示しているが、ネットワーク1を介して接続するようにしても良い。また、仲介装置3も工事会社装置5も、1台のコンピュータではなく、複数台のコンピュータによって構成するようにしても良い。   An outline of a system according to an embodiment of the present invention will be described with reference to FIG. For example, the network 1 such as the Internet includes a plurality of customer terminals 7 (including not only mobile phones but also personal computers and PDAs (Personal Digital Assistance)) and a plurality of construction staff (administrator) terminals 9 (customer terminals 7 Is connected to the customer terminal 7, the construction worker terminal 9, and the intermediary device 3 that mediates the construction company device 5. The construction company device 5 is provided for each construction company and is connected to the mediation device 3. However, although FIG. 1 shows an example in which the mediation device 3 is connected without the network 1, the mediation device 3 may be connected via the network 1. Further, the mediation device 3 and the construction company device 5 may be configured by a plurality of computers instead of a single computer.

次に、仲介装置3の機能ブロック図を図2Aに示す。仲介装置3は、顧客端末7からの工事可能日問い合わせを含む工事の申し込みを受信する申込受付部31と、申込受付部31からの工事可能日問い合わせ要求を工事会社装置5に送信する工事可能日問い合わせ部32と、工事会社装置5から工事可能日のデータを受信する工事可能日受信部34と、工事可能日受信部34から受信した工事可能日のデータを選択可能な態様で顧客端末7に送信すると共に、顧客端末7から複数の工事希望日(工事候補日とも呼ぶ)の通知を受信する工事日選択部33と、工事日選択部33から複数の工事希望日のデータを受信して工事会社装置5に送信すると共に顧客の希望が受け入れられたか否かの通知を工事会社装置5から受信して工事日選択部33に出力する工事希望日通知部35と、工事希望日通知部35等によって更新され、申し込みを受け付けた工事ごとに工事会社、工事予定、工事日を確定した情報などを管理する工事管理DB36と、例えば工事管理DB36のデータに基づき工事担当者(管理者)に対して調査依頼を行い、工事担当者端末9から調査結果のデータ(工事日を含む)を受信する現地調査依頼部37と、現地調査依頼部37から工事日のデータを受信し、工事会社装置5に工事日のデータを送信すると共に、工事会社装置5から工事日のデータの処理結果を受信し、工事日が確定した場合に工事管理DB36を更新する工事日決定部38と、工事日決定部38から工事会社装置5から受信した工事日のデータの処理結果を顧客及び工事担当者に対して送信する工事日決定通知部39とを有する。   Next, a functional block diagram of the intermediary device 3 is shown in FIG. 2A. The intermediary device 3 receives an application for construction including a construction date inquiry from the customer terminal 7 and a construction possible date for transmitting a construction date inquiry request from the application reception unit 31 to the construction company device 5. The inquiry terminal 32, the construction possible date receiving unit 34 that receives the construction possible date data from the construction company device 5, and the construction possible date data received from the construction possible date receiving unit 34 can be selected to the customer terminal 7. A construction date selection unit 33 that receives notification of a plurality of desired construction dates (also referred to as construction candidate dates) from the customer terminal 7, and receives a plurality of desired construction date data from the construction date selection unit 33 and performs construction. A desired construction date notifying unit 35 that receives the notification from the construction company device 5 and outputs it to the construction date selecting unit 33, and transmits the notification to the company device 5 and whether or not the customer's request has been accepted. A construction management DB 36 that manages information such as a construction company, a construction schedule, and a confirmed construction date for each construction that has been renewed by 35 etc. and has received an application. For example, based on the data in the construction management DB 36, the construction manager (manager) A site survey requesting unit 37 that makes a survey request to the site and receives survey result data (including the date of construction) from the construction person in charge terminal 9; 5, the construction date data is transmitted to the construction company device 5, the construction date data processing result is received from the construction company device 5, and the construction management DB 36 is updated when the construction date is confirmed. A construction date determination notification unit 39 for transmitting the processing result of the construction date data received from the construction company device 5 from the unit 38 to the customer and the person in charge of the construction.

工事管理DB36は、図2Bに示すように、管理番号(No.)と、工事会社と、工事種別及び工事場所を含む工事情報と、優先順位1の希望工事日と、優先順位2の希望工事日と、確定優先順位と、工事担当管理者と、工事担当管理者E−mailアドレスと、顧客名と、顧客E−mailアドレス等が登録されるようになっている。なお、工事管理DB36は、後に述べるリソース管理DB55と同様の内容であってもよい。   As shown in FIG. 2B, the construction management DB 36 has a management number (No.), construction company, construction information including construction type and construction location, desired construction date with priority 1, and desired construction with priority 2. Date, confirmation priority, construction manager, construction manager E-mail address, customer name, customer E-mail address, etc. are registered. The construction management DB 36 may have the same contents as the resource management DB 55 described later.

なお、工事日選択部33は、顧客端末7から複数の工事希望日のデータを受信して、工事希望日通知部35に出力し、工事希望日通知部35から顧客の希望が受け入れられたか否かの通知を受信し、顧客端末7に送信する。工事管理DB36には、工事希望日通知部35によって顧客の希望が受け入れられた場合に当該顧客の工事希望日についてのデータが登録され、工事日決定部38によって工事日が確定した場合に当該工事日についてのデータが登録される。   The construction date selection unit 33 receives a plurality of desired construction date data from the customer terminal 7 and outputs the data to the desired construction date notification unit 35, and whether or not the customer's request is accepted from the desired construction date notification unit 35. Is sent to the customer terminal 7. In the construction management DB 36, data on the customer's desired construction date is registered when the customer's wish is accepted by the construction desired date notifying unit 35, and when the construction date is confirmed by the construction date determining unit 38, the construction work is performed. Data about the day is registered.

次に、工事会社装置5の機能ブロック図を図3に示す。工事会社装置5は、仲介装置3から工事可能日問い合わせ要求を受信し、工事可能日のデータを仲介装置3に返信する工事可能日問い合わせ受信・返信部51と、工事会社の各日のリソースを管理するリソース管理DB55と、工事可能日問い合わせ受信・返信部51から工事可能日問い合わせ要求を受信すると、リソース管理DB55から工事可能日を検索して、工事可能日のデータを生成して工事可能日問い合わせ受信・返信部51に出力する工事可能日検索・回答部52と、仲介装置3から複数の工事希望日のデータを受信し、仲介装置3に工事希望日についての顧客の希望が受け入れられたか否かの通知を送信する工事希望日受信・確認返信部53と、工事希望日受信・確認返信部53から複数の工事希望日のデータを受信し、リソース管理DB55に対して更新処理を実施し、更新処理の結果を工事希望日受信・確認返信部53に返信する工事リソース予約部54と、仲介装置3から工事日のデータを受信し、当該工事日のデータの処理結果を仲介装置3に送信する工事日決定受信部56と、工事日決定受信部56から工事日のデータを受信して、リソース管理DB55の更新処理を実施し、更新処理の結果を工事日のデータの処理結果として工事日決定受信部56に出力する工事リソース確定・不要リソース開放部57と、リソース管理DB55に格納されている下位優先度候補日用のリソース予約率を自動的に更新する処理を実施する下位優先度候補日用リソース予約率算出部58とを有する。   Next, a functional block diagram of the construction company apparatus 5 is shown in FIG. The construction company device 5 receives a construction date inquiry request from the mediation device 3, and returns a construction date inquiry reception / reply unit 51 for returning the construction date data to the mediation device 3, and a resource for each day of the construction company. When receiving the construction date inquiry request from the resource management DB 55 to be managed and the construction date inquiry reception / reply unit 51, the construction date is searched from the resource management DB 55, and data on the construction date is generated to obtain the construction date. The construction possible date search / reply unit 52 to be output to the inquiry reception / reply unit 51 and data of a plurality of desired construction dates from the mediation device 3 have been received, and the mediator device 3 has received the customer's request for the desired construction date. The desired construction date reception / confirmation reply unit 53 for transmitting a notification of whether or not, and a plurality of desired construction date data are received from the desired construction date reception / confirmation reply unit 53, Update processing is performed on the work management DB 55, the construction resource reservation unit 54 that sends back the result of the update processing to the desired construction date reception / confirmation reply unit 53, and the construction date data is received from the intermediary device 3, and the construction The construction date determination receiving unit 56 that transmits the processing result of the date data to the intermediary device 3, the construction date data is received from the construction date determination receiving unit 56, the update processing of the resource management DB 55 is performed, and the update processing The construction resource confirmation / unnecessary resource release unit 57 that outputs the result to the construction date determination reception unit 56 as the processing result of the construction date data, and the resource reservation rate for the lower priority candidate date stored in the resource management DB 55 are automatically set. A lower priority candidate daily resource reservation rate calculation unit 58 that performs a process of updating the data automatically.

次に、図4乃至図24を用いて図1乃至図3に示したシステムの動作について説明する。まず、顧客端末7からの工事可能日問い合わせに応じて工事可能日問い合わせ処理を実施する(ステップS1)。具体的には、顧客は、顧客端末7を操作して、顧客端末7に、工事種別、工事場所、工事可能日問い合わせを含む工事の申し込みを仲介装置3に送信させる。仲介装置3の申込受付部31は、工事可能日問い合わせを含む工事の申し込みを受信し、工事可能日問い合わせを工事可能日問い合わせ部32に出力する。工事可能日問い合わせ部32は、図5に示すように依頼番号と工事種別と工事開始最早日(例えば現在日+工事種別に応じた所定日数で特定)とを含む工事可能日問い合わせを、申し込みに係る工事種別、工事場所等に応じて工事会社を特定し、当該工事会社の工事会社装置5に送信する。工事会社装置5の工事可能日問い合わせ受信・返信部51は、仲介装置3から工事可能日問い合わせを受信し、工事可能日検索・回答部52に転送する。工事可能日検索・回答部52は、図6に示すような処理を実施する。工事可能日検索・回答部52は、工事可能日問い合わせに含まれる工事種別と工事開始最早日とを検索条件として受信し(図6:ステップS11)、リソース管理DB55から、工事開始最早日以降であって、工事種別に対応して必要なリソース量以上余裕がある日を抽出するリソース情報検索処理を実施する(ステップS13)。なお、リソース管理DB55に格納されるデータについては以下で詳述する。そして、工事可能日検索・回答部52は、図7に示すように、依頼番号と、検索結果である工事可能日のリスト(図7では工事可能日1乃至4)とを含む回答データを生成して、工事可能日問い合わせ受信・返信部51に出力する(ステップS15)。   Next, the operation of the system shown in FIGS. 1 to 3 will be described with reference to FIGS. First, the construction date inquiry process is executed in response to the construction date inquiry from the customer terminal 7 (step S1). Specifically, the customer operates the customer terminal 7 to cause the customer terminal 7 to transmit an application for a construction including a construction type, a construction place, and a construction date inquiry to the intermediary device 3. The application reception unit 31 of the intermediary device 3 receives an application for construction including an inquiry about possible construction dates, and outputs an inquiry about possible construction dates to the possible construction date inquiry unit 32. As shown in FIG. 5, the construction possible date inquiry unit 32 applies for a construction possible date inquiry including a request number, construction type, and the earliest date of construction start (for example, specified by a predetermined number of days according to the current date and construction type). The construction company is identified according to the construction type, construction location, etc., and transmitted to the construction company apparatus 5 of the construction company. The construction possible date inquiry reception / reply unit 51 of the construction company device 5 receives the construction possible date inquiry from the intermediary device 3 and transfers it to the construction possible date search / reply unit 52. The workable day search / reply section 52 performs processing as shown in FIG. The construction possible date search / reply section 52 receives the construction type and the earliest construction start date included in the construction feasible date inquiry as search conditions (FIG. 6: step S11), and from the resource management DB 55 after the earliest construction start date. Then, a resource information search process is performed for extracting a day that has a margin beyond the required resource amount corresponding to the construction type (step S13). The data stored in the resource management DB 55 will be described in detail below. Then, as shown in FIG. 7, the construction possible date search / reply unit 52 generates response data including a request number and a list of construction possible dates (in FIG. 7, construction possible dates 1 to 4). Then, it is output to the construction date inquiry reception / reply section 51 (step S15).

工事可能日問い合わせ受信・返信部51は、工事可能日検索・回答部52から依頼番号と工事可能日のリストとを含む工事可能日の回答データを受信し、仲介装置3に送信する。仲介装置3の工事可能日受信部34は、工事可能日の回答データを受信し、受信した工事可能日の回答データを工事日選択部33に出力する。工事日選択部33は、工事可能日のリストから、それらの工事可能日のうち複数の工事可能日を優先順位付きで選択可能な態様のページ・データを生成し、顧客端末7に送信する。この際、ページ・データには、例えば工事種別や工事場所のデータをも含まれる。顧客端末7は、工事可能日のリストを含み、複数の工事可能日を優先順位付きで選択可能な態様のページ・データを受信し、表示装置に表示する。   The workable day inquiry reception / reply unit 51 receives the reply data for the workable date including the request number and the list of workable days from the workable day search / reply unit 52 and transmits it to the intermediary device 3. The construction possible date receiving unit 34 of the intermediary device 3 receives the construction date reply data and outputs the received construction date reply data to the construction date selection unit 33. The construction date selection unit 33 generates page data in a mode in which a plurality of construction possible dates among those possible construction dates can be selected with priority from the construction possible date list, and transmits the page data to the customer terminal 7. At this time, the page data includes, for example, construction type and construction place data. The customer terminal 7 receives a page data in a form including a list of construction possible dates, in which a plurality of construction possible dates can be selected with priority, and displays the page data on the display device.

図4の説明に戻って、工事希望日リソース予約処理を実施する(ステップS3)。この処理については、図8乃至図16を用いて説明する。顧客は、複数の工事可能日を優先順位付きで選択可能な態様の表示画面を見て、工事希望日を複数指定すると共に、工事希望日毎に優先順位を指定し、顧客端末7に送信を指示する。顧客端末7は、顧客からの入力を受け付け、工事種別及び工事場所のデータと共に工事希望日と優先順位の対のデータを複数セット含む工事希望日データを仲介装置3に送信する(図8:ステップ(1))。そして、仲介装置3の工事日選択部33は、工事希望日データを顧客端末7から受信し、工事希望日通知部35に、図9に示すようなデータを出力する。図9の例では、管理番号が付されて、工事種別及び工事場所を含む工事情報と、優先順位1の工事希望日及び優先順位2の工事希望日とが含まれる。   Returning to the description of FIG. 4, the resource reservation process for the desired construction date is performed (step S3). This process will be described with reference to FIGS. The customer looks at the display screen in which a plurality of possible construction dates can be selected with priority, and designates a plurality of desired construction dates, designates the priority for each desired construction date, and instructs the customer terminal 7 to transmit. To do. The customer terminal 7 receives input from the customer, and transmits desired construction date data including a plurality of pairs of desired construction date and priority order data to the intermediary device 3 together with construction type and construction location data (FIG. 8: step). (1)). Then, the construction date selection unit 33 of the intermediary device 3 receives the desired construction date data from the customer terminal 7 and outputs data as shown in FIG. 9 to the desired construction date notification unit 35. In the example of FIG. 9, a management number is assigned, and construction information including a construction type and a construction place, a construction priority date with priority 1 and a construction preference date with priority 2 are included.

工事希望日通知部35は、図9に示すような工事希望日データを、工事種別及び工事場所等から特定される工事会社の工事会社装置5に送信する(ステップ(2))。工事会社装置5の工事希望日受信・確認返信部53は、仲介装置3から図9のような工事希望日データを受信し、当該工事希望日データを含む工事リソース予約依頼を工事リソース予約部54に出力する(ステップ(3))。工事リソース予約部54は、図10に示すような処理を実施する。   The desired construction date notifying unit 35 transmits the desired construction date data as shown in FIG. 9 to the construction company device 5 of the construction company specified from the construction type and the construction location (step (2)). The desired construction date reception / confirmation reply unit 53 of the construction company device 5 receives the desired construction date data as shown in FIG. 9 from the intermediary device 3, and sends a construction resource reservation request including the desired construction date data to the construction resource reservation unit 54. (Step (3)). The construction resource reservation unit 54 performs processing as shown in FIG.

工事リソース予約部54は、工事希望日データを含む工事リソース予約依頼を受信し、例えばメインメモリなどの記憶装置に格納する(図10:ステップS21)。そして、リソース管理DB55から、工事希望日別にリソース予約率を読み出す(ステップS23)。リソース管理DB55には、例えば図11に示すようなリソース予約率テーブルが格納されている。図11の例では、工事種別と、計算期間(開始日付と終了日付を含む)と、件数(全体及び第1優先順位で工事日が決定した件数を含む)と、第1優先順位の候補日についてのリソース予約率と、下位優先順位(ここでは第2位)の候補日についてのリソース予約率とが登録されている。計算期間と件数については、下位優先順位の候補日についてのリソース予約率を算出するために用いられる。また、このテーブルで分かるように、優先順位に応じてリソース予約率が決定されている。図11の例では、第1優先順位の場合には「1」であり、第2優先順位の場合には「0.3」である。なお、以下で詳しく述べるが、「0.3」は、第2優先順位で工事日が決定した件数の割合((207−144)/207)である。本実施の形態では、優先順位は2位までしか定義されていないが、それ以降の順位を定義するようにしてもよい。   The construction resource reservation unit 54 receives the construction resource reservation request including the desired construction date data, and stores it in a storage device such as a main memory (FIG. 10: Step S21). Then, the resource reservation rate is read from the resource management DB 55 for each desired construction date (step S23). In the resource management DB 55, for example, a resource reservation rate table as shown in FIG. 11 is stored. In the example of FIG. 11, the construction type, the calculation period (including the start date and the end date), the number of cases (including the whole and the number of cases for which the construction date is determined according to the first priority), and the first priority candidate date And the resource reservation rate for the candidate date of the lower priority (second place here) are registered. The calculation period and the number of cases are used to calculate the resource reservation rate for the lower priority candidate date. Further, as can be seen from this table, the resource reservation rate is determined according to the priority order. In the example of FIG. 11, the first priority is “1”, and the second priority is “0.3”. As will be described in detail below, “0.3” is the ratio ((207-144) / 207) of the number of work dates determined in the second priority order. In this embodiment, the priority order is defined only up to the second place, but the order after that may be defined.

また、工事リソース予約部54は、リソース管理DB55から工事リソース予約依頼に係る工事種別に応じた標準リソース量のデータを読み出して、当該標準リソース量と工事希望日別のリソース予約率とから、工事希望日別に必要リソース量を算出し、例えばメインメモリなどの記憶装置に格納する(ステップS25)。リソース管理DB55には、例えば図12に示すような標準リソース量についてのテーブルが登録されている。図12の例では、工事種別毎に、必要UNIT数、1UNIT量、及び時間が登録されている。UNITは、工事を行うのに必要な最小単位を表しており、リソース量は必要UNIT数×時間で特定される。ここで「宅内ルータ設置」であれば、1×6=6が標準リソース量となる。そして、第1順位の工事希望日については6×1(第1優先順位のリソース予約率)=6が必要リソース量であり、第2順位の工事希望日については6×0.3(第2優先順位のリソース予約率)=1.8が必要リソース量となる。   In addition, the construction resource reservation unit 54 reads out the data of the standard resource amount corresponding to the construction type related to the construction resource reservation request from the resource management DB 55, and based on the standard resource amount and the resource reservation rate according to the desired construction date, The required resource amount is calculated for each desired date and stored in a storage device such as a main memory (step S25). In the resource management DB 55, for example, a table for standard resource amounts as shown in FIG. 12 is registered. In the example of FIG. 12, the number of necessary UNITs, the amount of UNITs, and the time are registered for each construction type. The UNIT represents the minimum unit necessary for construction work, and the resource amount is specified by the number of required UNITs × time. Here, if “in-home router installation”, 1 × 6 = 6 is the standard resource amount. Then, 6 × 1 (first-priority resource reservation rate) = 6 is the required resource amount for the first-order construction desired date, and 6 × 0.3 (second-order construction desired date). (Priority resource reservation rate) = 1.8 is the required resource amount.

このように必要リソース量は、第2順位以下の優先順位についてはリソース予約率で減じられているので、優先順位が低い場合には、無駄にリソースを確保してしまうことを抑制している。   As described above, since the required resource amount is reduced by the resource reservation rate for the priorities lower than the second order, it is possible to prevent unnecessary resources from being reserved when the priorities are low.

その後、工事リソース予約部54は、リソース管理DB55におけるリソース管理テーブルを参照して、工事希望日別にリソース予約の可否を判断する(ステップS27)。図13にリソース管理テーブルの一例を示す。図14の例では、工事種別毎に、年月日(ここでは1日が工事管理の単位時間)、総リソース量、予約済リソース量、及び確保済リソース量が登録されるようになっている。なお、総リソース量−予約済リソース量−確保済リソース量である余裕リソース量については、リソース管理テーブルに登録するようにしても良いし、その都度計算するようにしても良い。ステップS27では、ステップS25で算出された工事希望日別の必要リソース量が、工事希望日別の余裕リソース量以下であるか判断する。   Thereafter, the construction resource reservation unit 54 refers to the resource management table in the resource management DB 55 and determines whether or not the resource reservation is possible according to the desired construction date (step S27). FIG. 13 shows an example of the resource management table. In the example of FIG. 14, the date (here, 1 day is the unit time for construction management), the total resource amount, the reserved resource amount, and the reserved resource amount are registered for each construction type. . Note that the surplus resource amount that is the total resource amount−the reserved resource amount−the reserved resource amount may be registered in the resource management table or may be calculated each time. In step S27, it is determined whether the required resource amount for each desired construction date calculated in step S25 is equal to or less than the surplus resource amount for each desired construction date.

工事リソース予約部54は、例えばいずれかの工事希望日について余裕リソース量を超えた必要リソース量が要求されており、リソース確保が不可能であると判断した場合には(ステップS29:Noルート)、リソース確保不可を表すデータを含む工事リソース予約結果を、工事希望日受信・確認返信部53に返信する(ステップS33)。   For example, when it is determined that the required resource amount exceeding the surplus resource amount is requested for any desired construction date and the resource cannot be secured (step S29: No route), the construction resource reservation unit 54 Then, the construction resource reservation result including the data indicating that the resource cannot be secured is returned to the construction desired date reception / confirmation reply unit 53 (step S33).

一方、工事リソース予約部54は、全ての工事希望日について余裕リソース量以下の必要リソース量が要求されており、リソースの確保が可能であると判断した場合には(ステップS29:Yesルート)、工事希望日別に、リソース管理DB55のリソース管理テーブルにおいて、必要リソース量を「予約済リソース量」に加算することによってリソース予約を実施する(ステップS31)。例えば、第1優先順位の工事希望日が2008年2月12日である場合には、「6」だけ2008年2月12日の予約済リソース量を増加させ、第2優先順位の工事希望日が2008年2月14日である場合には、「1.8」だけ2008年2月14日の予約済リソース量を増加させる。具体的には、図13に示したリソース管理テーブルは、図14に示すようなリソース管理テーブルのように変化する。なお、余裕リソース量については、予約済リソース量が増加した分減少する。   On the other hand, when the construction resource reservation unit 54 determines that the required resource amount below the surplus resource amount is requested for all the desired construction dates and the resource can be secured (step S29: Yes route), Depending on the desired construction date, resource reservation is performed by adding the required resource amount to the “reserved resource amount” in the resource management table of the resource management DB 55 (step S31). For example, when the construction priority date with the first priority is February 12, 2008, the reserved resource amount on February 12, 2008 is increased by “6” and the construction priority date with the second priority. Is February 14, 2008, the reserved resource amount on February 14, 2008 is increased by “1.8”. Specifically, the resource management table shown in FIG. 13 changes like a resource management table as shown in FIG. Note that the margin resource amount decreases as the reserved resource amount increases.

さらに、工事リソース予約部54は、ステップS21で受信した工事リソース予約依頼のデータ(予約情報)をリソース管理DB55に登録する(ステップS32)。例えばリソース管理DB55には、図15に示すような工事予約管理テーブルが格納されており、このテーブルに工事リソース予約依頼のデータを登録する。図15の例では、管理番号と、工事情報(工事種別と工事場所)と、第1優先順位の工事希望日と、第2優先順位の工事希望日と、工事日として確定した日の優先順位を表す確定優先順位とが登録されている。例えば、管理番号「080031」の行のデータが登録される。なお、この行のデータには、まだ確定優先順位は登録されていない。   Further, the construction resource reservation unit 54 registers the construction resource reservation request data (reservation information) received in step S21 in the resource management DB 55 (step S32). For example, the resource management DB 55 stores a construction reservation management table as shown in FIG. 15, and the construction resource reservation request data is registered in this table. In the example of FIG. 15, the management number, the construction information (construction type and construction location), the construction priority date of the first priority, the construction preference date of the second priority, and the priority order determined as the construction date. Is registered. For example, the data of the row with the management number “080031” is registered. Note that the fixed priority order is not yet registered in the data of this row.

そして、工事リソース予約部54は、リソース確保が可能であることを表す工事リソース予約結果を、工事希望日受信・確認返信部53に返信する(ステップS33)。例えば、図16に示すようなデータを返信する。図16の例では、管理番号と、工事情報(工事種別及び工事場所)と、第1優先順位の工事希望日と、そのリソース確保の可否を表す結果1と、第2優先順位の工事希望日と、そのリソース確保の可否を表す結果2とを含む。なお、本実施の形態では、全ての工事希望日についてリソース確保が可能と判断されない限りにおいて、予約を実施しないものとする。   Then, the construction resource reservation unit 54 returns a construction resource reservation result indicating that resources can be secured to the desired construction date reception / confirmation reply unit 53 (step S33). For example, data as shown in FIG. 16 is returned. In the example of FIG. 16, the management number, the construction information (construction type and construction location), the construction priority date of the first priority, the result 1 indicating whether or not the resource can be secured, and the construction priority date of the second priority. And a result 2 indicating whether or not the resource can be secured. In the present embodiment, it is assumed that no reservation is made unless it is determined that resources can be secured for all desired construction dates.

図8の説明に戻って、ステップS33は、ステップ(4)における工事リソース予約結果の返信に相当する。工事希望日受信・確認返信部53は、工事リソース予約結果の返信を受信すると、仲介装置3に転送する(ステップ(5))。仲介装置3の工事希望日通知部35は、工事会社装置5から、工事リソース予約結果を受信し、工事リソース予約結果が全ての工事希望日についてリソース確保が可能であることを表している場合には、工事管理DB36に、工事リソース予約結果のデータを登録する。また、工事希望日通知部35は、工事リソース予約結果を工事日選択部33に出力する。工事日選択部33は、工事希望日通知部35から工事リソース予約結果を受信すると、全ての工事希望日についてリソース確保可能である場合には工事予約確認通知を顧客端末7に送信し、いずれかの工事希望日についてリソース確保が不可能である場合には予約拒否通知を顧客端末7に送信する(ステップ(6))。   Returning to the description of FIG. 8, step S33 corresponds to a reply of the construction resource reservation result in step (4). Upon receiving a reply to the construction resource reservation result, the construction desired date reception / confirmation reply unit 53 transfers the reply to the mediation apparatus 3 (step (5)). When the desired construction date notifying unit 35 of the intermediary device 3 receives the construction resource reservation result from the construction company device 5 and the construction resource reservation result indicates that resources can be secured for all desired construction dates. Registers the data of the construction resource reservation result in the construction management DB 36. In addition, the desired construction date notification unit 35 outputs the construction resource reservation result to the construction date selection unit 33. Upon receiving the construction resource reservation result from the construction desired date notifying unit 35, the construction date selecting unit 33 transmits a construction reservation confirmation notification to the customer terminal 7 when resources can be secured for all construction desired dates. If it is impossible to secure resources for the desired construction date, a reservation rejection notice is transmitted to the customer terminal 7 (step (6)).

顧客端末7は、工事予約確認通知を受信した場合には、表示装置に表示し、顧客に工事予約が完了したことを知らせる。一方、予約拒否通知を受信した場合には、表示装置に表示し、顧客に再度工事希望日を変更して工事希望日データを再度送信するように促す。   When the customer terminal 7 receives the construction reservation confirmation notification, the customer terminal 7 displays it on the display device to notify the customer that the construction reservation has been completed. On the other hand, when the reservation rejection notification is received, it is displayed on the display device, and the customer is prompted to change the desired construction date again and transmit the desired construction date data again.

さらに、現地調査依頼部37は、工事管理DB36に新たに工事リソース予約結果のデータが登録されると、工事管理DB36に登録されている工事会社の管理者のメールアドレスを読み出し、当該メールアドレス宛に工事リソース予約結果のデータを含む現地調査依頼をメールで送信する(ステップ(7))。   Further, when the construction resource reservation result data is newly registered in the construction management DB 36, the field survey requesting unit 37 reads the email address of the manager of the construction company registered in the construction management DB 36, and sends it to the email address. The site survey request including the construction resource reservation result data is transmitted to E-mail by mail (step (7)).

ここまでで工事希望日リソース予約処理が完了する。   This completes the resource reservation process on the desired construction date.

図4の説明に戻って、次に、工事リソース確保処理を実施する(ステップS5)。この処理については、現地調査依頼に応じて工事担当者が現地に出向いて各種調査を実施した結果、工事する日が決定した場合に実行される。この処理を、図17乃至図23を用いて説明する。   Returning to the description of FIG. 4, next, construction resource securing processing is performed (step S <b> 5). This processing is executed when a construction day is determined as a result of various surveys conducted by the construction staff in response to a site survey request. This process will be described with reference to FIGS.

工事担当者は、工事担当者端末9を操作して管理番号に対応して工事決定日又は工事決定日の優先順位を含む現地調査結果通知を仲介装置3に送信する(図17:ステップ(11))。仲介装置3の現地調査依頼部37は、工事担当者端末9から現地調査結果通知を受信すると、工事日決定部38に出力する。工事日決定部38は、例えば図18のような工事日決定通知を、工事会社装置5に送信する(ステップ(12))。図18のように、工事日決定通知は、管理番号及び工事決定日又は優先順位(決定優先順位)を含む。工事会社装置5の工事日決定受信部56は、仲介装置3から工事日決定通知を受信し、工事日日程通知のデータを含む工事リソース確保・不要リソース開放依頼を、工事リソース確定・不要リソース開放部57に出力する(ステップ(13))。そして、工事リソース確定・不要リソース開放部57は、図19に示すような処理を実施する。   The person in charge of construction operates the person in charge of construction terminal 9 to transmit a field survey result notification including the construction decision date or the priority order of the construction decision date to the intermediary device 3 corresponding to the management number (FIG. 17: step (11) )). Upon receiving the field survey result notification from the construction worker terminal 9, the field survey requesting unit 37 of the intermediary device 3 outputs it to the construction date determining unit 38. The construction date determination unit 38 transmits, for example, a construction date determination notification as shown in FIG. 18 to the construction company apparatus 5 (step (12)). As shown in FIG. 18, the construction date determination notification includes a management number and a construction determination date or priority (determination priority). The construction date determination receiving unit 56 of the construction company device 5 receives the construction date determination notification from the intermediary device 3, and confirms the construction resource securing / unnecessary resource release request including the construction date schedule notification data. It outputs to the part 57 (step (13)). Then, the construction resource confirmation / unnecessary resource release unit 57 performs a process as shown in FIG.

工事リソース確定・不要リソース開放部57は、工事日決定受信部56から工事リソース確保・不要リソース開放依頼を受信し(図19:ステップS41)、例えばメインメモリなどの記憶装置に格納する。そして、工事リソース確保・不要リソース開放依頼に含まれる管理番号でリソース管理DB55の工事予約管理テーブルを検索し、該当する予約情報を読み出す(ステップS43)。ここで、工事リソース確保・不要リソース開放依頼に含まれる決定優先順位又は工事決定日から特定される決定優先順位が、第1優先順位であるか判断する(ステップS45)。このような場合には、第1優先順位の日でリソース確保処理を実施する(ステップS47)。図20のリソース管理テーブルを用いて説明すると、ステップS47では、確保済リソース量を今回の工事の標準リソース量「6」(工事種別から特定)だけ増加させる。さらに、第1優先順位の日の予約リソースを開放する処理を実施する(ステップS49)。ステップS49では、第1優先順位の日である2008年2月12日における予約済リソース量を、今回の工事の標準リソース量「6」だけ減ずる。この処理では余裕リソース量については変化はない。また、下位優先順位の工事希望日の予約リソース開放処理を実施する(ステップS51)。下位優先順位の工事希望日を、ステップS43で読み出した予約情報から特定し、その日における必要リソース量を、工事種別で特定される標準リソース量×優先順位から特定されるリソース予約率で算出して、リソース管理テーブル(図20)において、下位優先順位の工事希望日における予約済リソース量を必要リソース量だけ減ずる。図20では、必要リソース量「1.8」だけ予約済リソース量は削減される。この場合には、必要リソース量「1.8」だけ余裕リソース量を増加させる。   The construction resource confirmation / unnecessary resource release unit 57 receives a construction resource securing / unnecessary resource release request from the construction date determination reception unit 56 (FIG. 19: step S41) and stores it in a storage device such as a main memory. Then, the construction reservation management table of the resource management DB 55 is searched with the management number included in the construction resource securing / unnecessary resource release request, and the corresponding reservation information is read (step S43). Here, it is determined whether the determination priority order included in the construction resource securing / unnecessary resource release request or the determination priority order specified from the construction determination date is the first priority order (step S45). In such a case, the resource securing process is performed on the day of the first priority (step S47). Referring to the resource management table of FIG. 20, in step S47, the secured resource amount is increased by the standard resource amount “6” (specified from the construction type) of the current construction. Further, a process for releasing the reserved resources on the day of the first priority is performed (step S49). In step S49, the reserved resource amount on February 12, 2008, which is the first priority day, is reduced by the standard resource amount “6” for the current construction. In this process, there is no change in the margin resource amount. In addition, a reservation resource release process for the desired construction date of lower priority is performed (step S51). The desired construction date of lower priority is specified from the reservation information read in step S43, and the required resource amount on that day is calculated by the standard resource amount specified by the construction type × the resource reservation rate specified from the priority order. In the resource management table (FIG. 20), the reserved resource amount on the desired construction date of lower priority is reduced by the necessary resource amount. In FIG. 20, the reserved resource amount is reduced by the necessary resource amount “1.8”. In this case, the surplus resource amount is increased by the necessary resource amount “1.8”.

また、工事リソース確定・不要リソース開放部57は、リソース管理DB55における工事予約管理テーブルにおいて、該当する管理番号に対応して確定優先順位を登録する(ステップS60)。上で述べた例のように、第1優先順位の日でリソース確保できれば、図21に示すように、工事予約管理テーブルにおいて、管理番号「080031」に対応して、確定優先順位の欄に「1」を登録する。   Further, the construction resource confirmation / unnecessary resource release unit 57 registers the confirmation priority in correspondence with the corresponding management number in the construction reservation management table in the resource management DB 55 (step S60). As shown in the example described above, if resources can be secured on the day of the first priority, as shown in FIG. 21, in the construction reservation management table, “0” is assigned to the confirmation priority column corresponding to the management number “080031”. 1 ”is registered.

そして、工事リソース確定・不要リソース開放部57は、工事決定日を含み、成功を表す工事リソース確保・不要リソース開放結果通知を、工事日決定受信部56に出力する(ステップS61)。   Then, the construction resource confirmation / unnecessary resource release unit 57 outputs a construction resource securing / unnecessary resource release result notification indicating the success including the construction determination date to the construction date determination reception unit 56 (step S61).

一方、工事リソース確保・不要リソース開放依頼に含まれる決定優先順位又は工事決定日から特定される決定優先順位が、第1優先順位でない場合、工事リソース確定・不要リソース開放部57は、工事決定日のリソース確保が可能であるか判断する(ステップS53)。リソース管理テーブルにおいて、工事リソース確保・不要リソース開放依頼に含まれる工事決定日又は決定優先順位で特定される工事決定日について登録されている予約済リソース量から必要リソース量(=工事種別で特定される標準リソース量×優先順位から特定されるリソース予約率)を減じ、工事決定日について登録されている確定済リソース量を工事種別で特定される標準リソース量だけ増加させた場合に、予約済リソース量+確定済リソース量が、総リソース量以下であるか判断する。第1優先順位より下位の工事希望日については、標準リソース量より少ないリソース量だけ予約時に確保しているので、この段階でリソース量が不足する可能性がある。それを確認するものである。上で述べた処理は、余裕リソース量が、(標準リソース量−標準リソース量×リソース予約率)以上あるかという判断で代替され得る。   On the other hand, when the determination priority order included in the construction resource securing / unnecessary resource release request or the determination priority order specified from the construction determination date is not the first priority order, the construction resource determination / unnecessary resource release unit 57 It is determined whether the resource can be secured (step S53). In the resource management table, the required resource amount (= specified by the construction type) from the reserved resource amount registered for the construction decision date included in the request for securing construction resources / unnecessary resources release or the construction decision date specified by the decision priority. (Reserved standard resource amount x resource reservation rate specified from the priority)) and the confirmed resource amount registered for the construction decision date is increased by the standard resource amount specified by the construction type. It is determined whether the amount + the determined resource amount is equal to or less than the total resource amount. Since the desired construction date lower than the first priority is reserved at the time of reservation, only the resource amount smaller than the standard resource amount may be insufficient at this stage. It is what confirms it. The processing described above can be replaced by determining whether the surplus resource amount is equal to or greater than (standard resource amount−standard resource amount × resource reservation rate).

ステップS53で、工事決定日のリソース確保が可能である場合には、工事リソース確定・不要リソース開放部57は、工事決定日の必要リソース確保処理を実施する(ステップS55)。リソース管理テーブルにおいて、工事リソース確保・不要リソース開放依頼に含まれる工事決定日又は決定優先順位で特定される工事決定日について登録されている確定済リソース量を工事種別で特定される標準リソース量だけ増加させる。また、工事決定日の予約リソース開放処理を実施する(ステップS57)。リソース管理テーブルにおいて、工事リソース確保・不要リソース開放依頼に含まれる工事決定日又は決定優先順位で特定される工事決定日について登録されている予約済リソース量から必要リソース量(=工事種別で特定される標準リソース量×優先順位から特定されるリソース予約率)を減ずる。さらに、工事決定日以外の日の予約リソース開放処理を実施する(ステップS59)。工事決定日以外の工事希望日を、ステップS43で読み出した予約情報から特定し、その日における必要リソース量を、工事種別で特定される標準リソース量×優先順位から特定されるリソース予約率で算出して、リソース管理テーブルにおいて、工事決定日以外の工事希望日における予約済リソース量を必要リソース量だけ減ずる。そしてステップS60に移行する。   If it is possible to secure the resource on the construction decision date in step S53, the construction resource confirmation / unnecessary resource release unit 57 performs necessary resource securing processing on the construction decision date (step S55). In the resource management table, the fixed resource amount registered for the construction decision date included in the request for securing construction resource / unnecessary resource release or the construction decision date specified by the decision priority is only the standard resource amount specified by the construction type. increase. In addition, a reservation resource release process for the construction decision date is performed (step S57). In the resource management table, the required resource amount (= specified by the construction type) from the reserved resource amount registered for the construction decision date included in the request for securing construction resources / unnecessary resources release or the construction decision date specified by the decision priority. Standard resource amount x resource reservation rate specified from priority). Furthermore, a reservation resource release process on a day other than the construction decision date is performed (step S59). The desired construction date other than the construction decision date is identified from the reservation information read in step S43, and the required resource amount on that day is calculated by the standard resource amount identified by the construction type × the resource reservation rate identified from the priority order. In the resource management table, the reserved resource amount on the desired construction date other than the construction decision date is reduced by the necessary resource amount. Then, control goes to a step S60.

図22に示すように、第2優先順位(2008年2月14日)が工事決定日である場合には、2008年2月14日における予約済リソース量を、必要リソース量(6×0.3=1.8)だけ減じて、確保済リソース量を標準リソース量「6」だけ増加させる。余裕リソース量は、6−1.8=4.2だけ減少する。また、第1優先順位の日(2008年2月12日)については、予約済リソース量が、必要リソース量=標準リソース量だけ減ぜられる。   As shown in FIG. 22, when the second priority (February 14, 2008) is the construction decision date, the reserved resource amount on February 14, 2008 is set to the required resource amount (6 × 0. 3 = 1.8), and the reserved resource amount is increased by the standard resource amount “6”. The marginal resource amount is reduced by 6-1.8 = 4.2. On the first priority day (February 12, 2008), the reserved resource amount is reduced by the required resource amount = the standard resource amount.

また、ステップS53で、工事決定日のリソース確保が不可能である場合には、工事リソース確定・不要リソース開放部57は、他の優先順位の工事希望日で、リソース確保が可能であるか判断する(ステップS63)。基本的な処理内容はステップS53と同じであるが、他の優先順位の工事希望日をステップS43で読み出した予約情報から特定し、リソース管理テーブルにおいて、当該工事希望日について登録されている予約済リソース量から必要リソース量(=工事種別で特定される標準リソース量×優先順位から特定されるリソース予約率)を減じ、工事希望日について登録されている確定済リソース量を工事種別で特定される標準リソース量だけ増加させた場合に、予約済リソース量+確定済リソース量が、総リソース量以下であるか判断する。   In step S53, if it is not possible to secure the resource on the construction decision date, the construction resource confirmation / unnecessary resource release unit 57 determines whether it is possible to secure the resource on the construction priority date of another priority order. (Step S63). Although the basic processing contents are the same as in step S53, the desired construction date with another priority order is identified from the reservation information read out in step S43, and the reserved date registered for the desired construction date in the resource management table The required resource amount (= standard resource amount specified by construction type x resource reservation rate specified from priority order) is subtracted from the resource amount, and the confirmed resource amount registered for the desired construction date is specified by construction type When the standard resource amount is increased, it is determined whether the reserved resource amount + confirmed resource amount is equal to or less than the total resource amount.

リソース確保可能な工事希望日が存在する場合には、工事リソース確保・不要リソース開放部57は、リソース確保可能な工事希望日を工事決定日に設定し(ステップS65)、ステップS55に移行する。   If there is a desired construction date on which resources can be secured, the construction resource securing / unnecessary resource release unit 57 sets a desired construction date on which resources can be secured (step S65), and proceeds to step S55.

一方、リソース確保可能な工事希望日が存在しない場合には、工事リソース確定・不要リソース開放部57は、工事リソース確保・不要リソース開放依頼に係る管理番号に関する全ての予約リソースを開放する処理を実施する(ステップS67)。具体的には、ステップS43で読み出された予約情報から、各工事希望日及び優先順位を特定し、各工事希望日について必要リソース量を、工事種別で特定される標準リソース量×優先順位から特定されるリソース予約率で算出し、リソース管理テーブルにおいて、各工事希望日における予約済リソース量を、必要リソース量だけ減ずる。   On the other hand, when there is no desired construction date for which resources can be secured, the construction resource confirmation / unnecessary resource release unit 57 performs processing to release all reserved resources related to the management number related to the construction resource securing / unnecessary resource release request. (Step S67). Specifically, the desired construction date and priority are specified from the reservation information read in step S43, and the required resource amount for each desired construction date is determined from the standard resource amount specified by the construction type × priority order. The resource reservation rate is calculated, and the reserved resource amount on each desired construction date is reduced by the necessary resource amount in the resource management table.

さらに、工事リソース確定・不要リソース開放部57は、失敗を表す工事リソース確保・不要リソース開放結果通知を、工事日決定受信部56に出力する(ステップS69)。   Further, the construction resource confirmation / unnecessary resource release unit 57 outputs a construction resource securing / unnecessary resource release result notification indicating failure to the construction date determination reception unit 56 (step S69).

図17の説明に戻って、ステップS61又はS69が、ステップ(14)の工事リソース確保・不要リソース開放結果の返信に相当する。この通知は、例えば図23のようなデータを含む。図23の例では、管理番号、結果、工事決定日(成功の場合のみ。優先順位でもよい。)、失敗(NG)の場合の原因、エラー詳細情報などが含まれる。工事日決定受信部56は、工事リソース確定・不要リソース開放部57から、工事リソース確保・不要リソース開放結果通知を受信し、仲介装置3に転送する(ステップ(15))。   Returning to the description of FIG. 17, step S61 or S69 corresponds to the reply of the construction resource securing / unnecessary resource releasing result of step (14). This notification includes data as shown in FIG. 23, for example. In the example of FIG. 23, a management number, a result, a construction determination date (only in case of success, priority may be used), a cause in case of failure (NG), detailed error information, and the like are included. The construction date determination receiving unit 56 receives the construction resource securing / unnecessary resource release result notification from the construction resource confirmation / unnecessary resource releasing unit 57 and transfers it to the mediation apparatus 3 (step (15)).

仲介装置3の工事日決定部38は、工事会社装置5から工事リソース確保・不要リソース開放結果通知を受信し、成功の場合には、通知に含まれる工事決定日に関する情報を管理番号に対応して工事管理DB36の確定優先順位欄に登録する。また、顧客のメールアドレス及び工事担当者のメールアドレスを例えば工事管理DB36から読み出し、工事リソース確保・不要リソース開放結果通知と共に工事日決定通知部39に出力する。   The construction date determination unit 38 of the intermediary device 3 receives the construction resource securing / unnecessary resource release result notification from the construction company device 5 and, in the case of success, corresponds to the management number the information related to the construction determination date included in the notification. Are registered in the final priority column of the construction management DB 36. Further, for example, the customer's mail address and the mail address of the person in charge of the construction are read from the construction management DB 36 and output to the construction date determination notification unit 39 together with the construction resource securing / unnecessary resource release result notice.

工事日決定通知部39は、工事日決定部38から顧客のメールアドレス及び工事担当者のメールアドレスと共に工事リソース確保・不要リソース開放結果通知を受信し、成功の場合には工事決定日を通知するメールを生成して、顧客のメールアドレス及び工事担当者のメールアドレス宛に送信する(ステップ(16)及び(17))。また、失敗の場合には、顧客には再度工事申し込みを行うように依頼するメールを生成して、顧客のメールアドレス宛に送信する。また、工事担当者には工事がキャンセルされた旨を通知するメールを生成して、工事担当者のメールアドレス宛に送信する(ステップ(16)及び(17))。   The construction date determination notification unit 39 receives a construction resource securing / unnecessary resource release result notification together with the customer's email address and the construction person's email address from the construction date determination unit 38, and notifies the construction determination date in the case of success. A mail is generated and transmitted to the mail address of the customer and the mail address of the person in charge of construction (steps (16) and (17)). In the case of failure, an email requesting the customer to apply for the construction again is generated and transmitted to the customer's email address. Further, an e-mail notifying the construction person in charge that the construction has been canceled is generated and transmitted to the e-mail address of the construction person (steps (16) and (17)).

以上のような処理を実施することによって、第1優先順位の日に工事を実行できる場合には、そのままリソースを確保することができるので、他の優先順位の日のリソースを開放する。一方、第2優先順位以下の場合には、リソースを確保できない可能性もあるので、確認してからリソースの確保及び不要なリソースの開放を行う。   By carrying out the processing as described above, when construction can be executed on the first priority order, resources can be secured as they are, so resources on other priority orders are released. On the other hand, in the case of the second priority or lower, there is a possibility that the resource cannot be secured. Therefore, after confirmation, the resource is secured and unnecessary resources are released.

なお、このようにして工事日が決定されると、その日に工事が実施されるようになる。工事日が決定できない場合には、顧客は再度工事申し込みを実施する必要がある。但し、工事希望日を多めに指定すれば、このような事態を回避できる可能性が高まる。   When the construction date is determined in this way, the construction is performed on that day. If the construction date cannot be determined, the customer needs to apply for the construction again. However, if a larger number of desired construction dates are specified, the possibility of avoiding this situation increases.

次に、図24を用いて、下位優先度候補日用リソース予約率算出部58の処理について説明する。下位優先度候補日用リソース予約率算出部58は、例えば工事会社の管理者などによる過去実績データ読み込み期間設定を受け付ける(ステップS71)。例えば、過去実績データ読み込み期間の開始日と終了日の指定を受け付ける。そして、リソース管理DB55の工事予約管理テーブルから、過去実績データ読み込み期間における過去の実績データを読み込む(ステップS73)。そして、優先順位毎に確定優先順位として決定された回数をカウントする(ステップS75)。その後、第2優先順位以下の優先順位毎に、カウント値/全カウント値で比率を算出し、メインメモリなどの記憶装置に格納する(ステップS77)。単純にこの比率をそのままリソース予約率にしても良いが、例えば切り上げ又は切り下げを行ったり、所定の係数を加算又は乗算するようにしてもよい。   Next, processing of the lower priority candidate day resource reservation rate calculation unit 58 will be described with reference to FIG. The lower priority candidate day resource reservation rate calculation unit 58 accepts the past performance data reading period setting by the manager of the construction company, for example (step S71). For example, designation of the start date and end date of the past performance data reading period is accepted. And the past performance data in the past performance data reading period is read from the construction reservation management table of the resource management DB 55 (step S73). Then, the number of times determined as the fixed priority for each priority is counted (step S75). Thereafter, the ratio is calculated by the count value / total count value for each priority order lower than the second priority order, and stored in a storage device such as a main memory (step S77). This ratio may be simply used as the resource reservation rate, but may be rounded up or down, or may be added or multiplied by a predetermined coefficient.

そして、下位優先度候補日用リソース予約率算出部58は、第2優先順位以下の各優先順位比率に基づくリソース予約率を、過去実績データ読み込み期間及びカウント値などと共にリソース管理DB55のリソース予約率テーブルに登録する(ステップS79)。   Then, the lower-priority candidate daily resource reservation rate calculation unit 58 sets the resource reservation rate based on each priority ratio below the second priority order together with the past actual data reading period, the count value, and the like in the resource management DB 55. Register in the table (step S79).

このように第2優先順位以下の優先順位の工事希望日が採用される実際の確率に応じて、リソース予約率を算出するので、予約時には適切な必要リソース量が確保されるようになる。   As described above, the resource reservation rate is calculated according to the actual probability that the desired construction date having the second priority or lower is adopted, so that an appropriate required resource amount is ensured at the time of reservation.

以上本発明の一実施の形態を説明したが、本発明はこれに限定されるものではない。例えば、図2A及び図3に示した機能ブロック図は一例であって、必ずしも実際のプログラム構成とは一致しない場合がある。また、処理フローについても処理結果が変化しない限りにおいて、順番を入れ替えることが可能である。例えば、ステップS47乃至S51は、入れ替え可能である。   Although one embodiment of the present invention has been described above, the present invention is not limited to this. For example, the functional block diagrams shown in FIGS. 2A and 3 are examples, and may not necessarily match the actual program configuration. Further, the order of processing flow can be changed as long as the processing result does not change. For example, steps S47 to S51 can be interchanged.

さらに、上で述べた例では第1優先順位の場合には必ずリソースが確保されるような構成を採用しているが、例えば第1優先順位の場合においてもリソース予約率を1未満に定義して、必要リソース量を算出するようにしても良い。この場合には、第1優先順位についても、工事決定日とされた場合リソース確保が可能であるかを確認する必要があり、さらに第2優先順位以下の工事希望日に変更される場合も出てくる。   Further, in the example described above, a configuration is employed in which resources are always secured in the case of the first priority, but for example, the resource reservation rate is defined to be less than 1 even in the case of the first priority. Thus, the required resource amount may be calculated. In this case, it is necessary to confirm whether the resource can be secured for the first priority as well, if it is set as the construction decision date. Come.

また、仲介装置3は、複数のサービスの複数の工事種別に対応することができる。すなわち、工事会社装置5を適切に特定してメッセージを振り分けることができればよい。さらに、上で述べた例では管理の単位時間は1日であるが、例えば半日や6時間など適切に区分することが可能である。   Further, the intermediary device 3 can cope with a plurality of construction types of a plurality of services. That is, it suffices if the construction company apparatus 5 is appropriately identified and messages can be distributed. Further, in the example described above, the unit time of management is one day, but it can be appropriately divided, for example, half a day or six hours.

さらに、仲介装置3を用いる例を示したが、工事会社が直接顧客から工事申し込みを受けるような業務フローの場合、仲介装置3の顧客端末7等に対してインターフェースとなる機能については、工事会社装置5と一体化して、仲介装置3を設けない場合もある。   Furthermore, although the example using the mediation apparatus 3 was shown, in the case of a business flow in which the construction company receives a construction application directly from a customer, the construction company has a function as an interface to the customer terminal 7 of the mediation apparatus 3 and the like. In some cases, the intermediary device 3 is not provided integrally with the device 5.

なお、仲介装置3、工事会社装置5、顧客端末7、工事担当者端末9は、コンピュータ装置であって、このコンピュータ装置においては、図25に示すように、メモリ2501(記憶部)とCPU2503(処理部)とハードディスク・ドライブ(HDD)2505と表示装置2509に接続される表示制御部2507とリムーバブル・ディスク2511用のドライブ装置2513と入力装置2515とネットワークに接続するための通信制御部2517とがバス2519で接続されている。OS及びWebブラウザを含むアプリケーション・プログラムは、HDD2505に格納されており、CPU2503により実行される際にはHDD2505からメモリ2501に読み出される。必要に応じてCPU2503は、表示制御部2507、通信制御部2517、ドライブ装置2513を制御して、必要な動作を行わせる。また、処理途中のデータについては、メモリ2501に格納され、必要があればHDD2505に格納される。このようなコンピュータは、上で述べたCPU2503、メモリ2501などのハードウエアとOS及び必要なアプリケーション・プログラムとが有機的に協働することにより、上で述べたような各種機能を実現する。   The intermediary device 3, the construction company device 5, the customer terminal 7, and the construction worker terminal 9 are computer devices. In this computer device, as shown in FIG. 25, a memory 2501 (storage unit) and a CPU 2503 ( Processing unit), a hard disk drive (HDD) 2505, a display control unit 2507 connected to the display device 2509, a drive device 2513 for the removable disk 2511, an input device 2515, and a communication control unit 2517 for connecting to the network. They are connected by a bus 2519. Application programs including the OS and the Web browser are stored in the HDD 2505, and are read from the HDD 2505 to the memory 2501 when executed by the CPU 2503. If necessary, the CPU 2503 controls the display control unit 2507, the communication control unit 2517, and the drive device 2513 to perform necessary operations. Further, data in the middle of processing is stored in the memory 2501 and stored in the HDD 2505 if necessary. Such a computer realizes various functions as described above by organically cooperating hardware such as the CPU 2503 and the memory 2501 described above with the OS and necessary application programs.

なお、上記実施例では、工事という用語を使用しているが、建設工事、土木工事などだけではなく、事前にリソースの確保が必要であって、未来においてリソースを使う必要性が発生した時点では、該リソースを必要とする日時にスケジュールが決定できない作業全般に適用が可能である。   In the above embodiment, the term “construction” is used. However, not only construction work and civil engineering work, but it is necessary to secure resources in advance, and when it becomes necessary to use resources in the future. The present invention can be applied to all operations in which the schedule cannot be determined at the date and time when the resource is required.

(付記1)
各単位時間において利用可能な最大リソース量と予約中リソース量と確保済リソース量とを管理し、優先度に応じたリソース予約割合のデータとを格納するリソース管理データ格納部と、
複数の工事実行候補単位時間と各前記工事実行候補単位時間についての優先度とを含む工事予約データを受信する予約受信手段と、
各前記工事実行候補単位時間において、前記リソース管理データ格納部で管理されている前記最大リソース量と前記予約中リソース量及び前記確保済リソース量との差で特定される余裕リソース量が、前記リソース管理データ格納部に格納されている、各前記工事実行候補単位時間についての優先度に応じたリソース予約割合と工事に必要なリソース量との積によって特定される必要リソース量以上存在する場合には、前記リソース管理データ格納部において各前記工事実行候補単位時間について前記必要リソース量だけ前記予約中リソース量を増加させる予約手段と、
を有する工事予約装置。
(Appendix 1)
A resource management data storage unit that manages the maximum resource amount, the reserved resource amount, and the reserved resource amount that can be used in each unit time, and stores resource reservation ratio data according to priority;
Reservation receiving means for receiving construction reservation data including a plurality of construction execution candidate unit times and priorities for each of the construction execution candidate unit times;
In each construction execution candidate unit time, a margin resource amount specified by a difference between the maximum resource amount managed by the resource management data storage unit, the reserved resource amount, and the reserved resource amount is the resource amount. When there is more than the necessary resource amount specified by the product of the resource reservation ratio according to the priority for each construction execution candidate unit time stored in the management data storage unit and the resource amount necessary for construction Reservation means for increasing the reserved resource amount by the required resource amount for each construction execution candidate unit time in the resource management data storage unit;
Construction reservation device with

(付記2)
前記予約受信手段が、
前記予約手段が前記必要リソース量だけ前記予約中リソース量を増加させた場合、前記工事予約データを前記リソース管理データ格納部に格納し、
特定の工事予約データについて工事決定単位時間又は工事決定優先度を指定する通知を受信する工事日程受信手段と、
前記リソース管理データ格納部において、前記工事決定優先度により前記特定の工事予約データから特定される前記工事決定単位時間又は指定の前記工事決定単位時間に対応して登録されている前記予約中リソース量を、前記工事決定単位時間についての優先度に応じたリソース予約割合と前記特定の工事予約データについての工事に必要なリソース量との積によって特定される必要リソース量だけ減じて、前記確保済リソース量を前記特定の工事予約データについての工事に必要なリソース量だけ増加させるリソース確保手段と、
前記リソース管理データ格納部において、前記特定の工事予約データに含まれる、前記工事決定単位時間以外の前記工事実行候補単位時間に対応して登録されている前記予約中リソース量を、当該工事決定単位時間以外の工事実行候補単位時間の優先度に応じたリソース予約割合と前記特定の工事予約データについての工事に必要なリソース量との積によって特定される必要リソース量だけ減ずるリソース開放手段と、
をさらに有する
付記1記載の予約装置。
(Appendix 2)
The reservation receiving means
When the reservation means increases the reserved resource amount by the required resource amount, the construction reservation data is stored in the resource management data storage unit,
A construction schedule receiving means for receiving a notification specifying a construction decision unit time or construction decision priority for specific construction reservation data;
In the resource management data storage unit, the reserved resource amount registered corresponding to the construction determination unit time specified from the specific construction reservation data by the construction determination priority or the designated construction determination unit time Is reduced by the required resource amount specified by the product of the resource reservation ratio according to the priority for the construction determination unit time and the resource amount required for the construction for the specific construction reservation data, and the reserved resource is reduced. Resource securing means for increasing the amount by a resource amount necessary for the construction for the specific construction reservation data;
In the resource management data storage unit, the reserved resource amount registered corresponding to the construction execution candidate unit time other than the construction determination unit time included in the specific construction reservation data is set as the construction determination unit. Resource release means for reducing the required resource amount specified by the product of the resource reservation ratio according to the priority of the construction execution candidate unit time other than the time and the resource amount necessary for the construction for the specific construction reservation data;
The reservation device according to attachment 1, further comprising:

(付記3)
前記リソース確保手段及び前記リソース開放手段が、
前記リソース管理データ格納部において格納されている前記特定の工事予約データから前記工事決定単位時間により特定される前記工事決定優先度又は指定の前記工事決定優先度が最も高い優先度より低い優先度である場合には、
前記工事決定単位時間に対応して登録されている前記予約中リソース量を、前記工事決定単位時間についての優先度に応じたリソース予約割合と前記特定の工事予約データについての工事に必要なリソース量との積によって特定される必要リソース量だけ減じて、前記確保済リソース量を前記特定の工事予約データについての工事に必要なリソース量だけ増加させた場合に、前記予約中リソース量と前記確保済リソース量との和が前記工事決定単位時間に対応する前記最大リソース量以下であれば動作する
付記2記載の予約装置。
(Appendix 3)
The resource securing means and the resource releasing means are
The construction decision priority specified by the construction decision unit time from the specific construction reservation data stored in the resource management data storage unit or the designated construction decision priority is lower than the highest priority. If there is
The reserved resource amount registered corresponding to the construction determination unit time is determined by using the resource reservation ratio according to the priority for the construction determination unit time and the resource amount necessary for the construction for the specific construction reservation data. Is reduced by the necessary resource amount specified by the product, and the reserved resource amount is increased by the resource amount necessary for the construction for the specific construction reservation data, the reserved resource amount and the reserved resource amount The reservation device according to claim 2, wherein the reservation device operates when a sum of the amount of resources is equal to or less than the maximum resource amount corresponding to the construction determination unit time.

(付記4)
前記工事日程受信手段が、
前記リソース確保手段及び前記リソース開放手段とが動作した場合、前記リソース管理データ格納部において前記特定の工事予約データに対応して前記工事決定単位時間又は前記工事決定優先度を登録し、
前記リソース管理データ格納部において前記工事予約データに対応して登録されている前記工事決定単位時間から特定される前記工事決定優先度又は指定の前記工事決定優先度の発生割合に応じて、前記リソース予約割合を算出する手段
をさらに有する付記3記載の予約装置。
(Appendix 4)
The construction schedule receiving means is
When the resource securing unit and the resource releasing unit are operated, the construction management unit time or the construction decision priority is registered corresponding to the specific construction reservation data in the resource management data storage unit,
According to the construction decision priority specified from the construction decision unit time registered corresponding to the construction reservation data in the resource management data storage unit or the occurrence rate of the designated construction decision priority, the resource The reservation apparatus according to appendix 3, further comprising means for calculating a reservation ratio.

(付記5)
前記予約中リソース量と前記確保済リソース量との和が前記工事決定単位時間に対応する前記最大リソース量を超えてしまう場合、
前記リソース確保手段又は前記リソース開放手段が、
前記リソース管理データ格納部において格納されている前記特定の工事予約データから前記工事決定単位時間により特定される前記工事決定優先度又は指定の前記工事決定優先度より低い優先度の工事実行候補単位時間を特定し、
前記リソース管理データ格納部において、当該工事実行候補単位時間に対応して登録されている前記予約中リソース量を、前記工事実行候補単位時間についての優先度に応じたリソース予約割合と前記特定の工事予約データについての工事に必要なリソース量との積によって特定される必要リソース量だけ減じて、前記確保済リソース量を前記特定の工事予約データについての工事に必要なリソース量だけ増加させた場合に、前記予約中リソース量と前記確保済リソース量との和が、特定された前記工事実行候補単位時間に対応する前記最大リソース量以下であるか確認し、
前記予約中リソース量と前記確保済リソース量との和が、特定された前記工事実行候補単位時間に対応する前記最大リソース量以下である場合に、
前記リソース管理データ格納部において、特定された前記工事実行候補単位時間に対応して登録されている前記予約中リソース量を、前記工事実行候補単位時間についての優先度に応じたリソース予約割合と前記特定の工事予約データについての工事に必要なリソース量との積によって特定される必要リソース量だけ減じて、前記確保済リソース量を前記特定の工事予約データについての工事に必要なリソース量だけ増加させる
付記3記載の予約装置。
(Appendix 5)
When the sum of the reserved resource amount and the reserved resource amount exceeds the maximum resource amount corresponding to the construction determination unit time,
The resource securing means or the resource releasing means is
The construction execution candidate unit time with a priority lower than the construction decision priority specified by the construction decision unit time or the designated construction decision priority from the specific construction reservation data stored in the resource management data storage unit Identify
In the resource management data storage unit, the reserved resource amount registered in correspondence with the construction execution candidate unit time is determined based on the resource reservation ratio and the specific construction according to the priority for the construction execution candidate unit time. When the required resource amount specified by the product of the resource amount required for the construction of the reservation data is reduced and the reserved resource amount is increased by the resource amount required for the construction of the specific construction reservation data Confirming that the sum of the reserved resource amount and the reserved resource amount is equal to or less than the maximum resource amount corresponding to the identified construction execution candidate unit time,
When the sum of the reserved resource amount and the reserved resource amount is equal to or less than the maximum resource amount corresponding to the specified construction execution candidate unit time,
In the resource management data storage unit, the reserved resource amount registered in correspondence with the identified construction execution candidate unit time, the resource reservation ratio according to the priority for the construction execution candidate unit time, and the Decrease by the necessary resource amount specified by the product of the resource amount necessary for the construction for the specific construction reservation data, and increase the reserved resource amount by the resource amount necessary for the construction for the specific construction reservation data. The reservation device according to attachment 3.

(付記6)
各単位時間について利用可能な最大リソース量と予約中リソース量と確保済リソース量とを管理し、優先度に応じたリソース予約割合のデータとを格納するリソース管理データ格納部にアクセス可能なコンピュータによって実行される工事予約処理方法であって、
複数の工事実行候補単位時間と各前記工事実行候補単位時間についての優先度とを含む工事予約データを受信する予約受信ステップと、
各前記工事実行候補単位時間において、前記リソース管理データ格納部で管理されている前記最大リソース量と前記予約中リソース量及び前記確保済リソース量との差で特定される余裕リソース量が、前記リソース管理データ格納部に格納されている、各前記工事実行候補単位時間についての優先度に応じたリソース予約割合と工事に必要なリソース量との積によって特定される必要リソース量以上存在する場合には、前記リソース管理データ格納部において各前記工事実行候補単位時間について前記必要リソース量だけ前記予約中リソース量を増加させる予約ステップと、
を含む工事予約処理方法。
(Appendix 6)
A computer that has access to a resource management data storage unit that manages the maximum available resource amount, reserved resource amount, and reserved resource amount for each unit time, and stores resource reservation ratio data according to priority A construction reservation processing method to be executed,
Reservation receiving step for receiving construction reservation data including a plurality of construction execution candidate unit times and priorities for each of the construction execution candidate unit times;
In each construction execution candidate unit time, a margin resource amount specified by a difference between the maximum resource amount managed by the resource management data storage unit, the reserved resource amount, and the reserved resource amount is the resource amount. When there is more than the necessary resource amount specified by the product of the resource reservation ratio according to the priority for each construction execution candidate unit time stored in the management data storage unit and the resource amount necessary for construction A reservation step for increasing the reserved resource amount by the required resource amount for each construction execution candidate unit time in the resource management data storage unit;
Construction reservation processing method including

(付記7)
各単位時間において利用可能な最大リソース量と予約中リソース量と確保済リソース量とを管理し、優先度に応じたリソース予約割合のデータとを格納するリソース管理データ格納部にアクセス可能なコンピュータに、
複数の工事実行候補単位時間と各前記工事実行候補単位時間についての優先度とを含む工事予約データを受信する予約受信ステップと、
各前記工事実行候補単位時間において、前記リソース管理データ格納部で管理されている前記最大リソース量と前記予約中リソース量及び前記確保済リソース量との差で特定される余裕リソース量が、前記リソース管理データ格納部に格納されている、各前記工事実行候補単位時間についての優先度に応じたリソース予約割合と工事に必要なリソース量との積によって特定される必要リソース量以上存在する場合には、前記リソース管理データ格納部において各前記工事実行候補単位時間について前記必要リソース量だけ前記予約中リソース量を増加させる予約ステップと、
を実行させるための工事予約処理プログラム。
(Appendix 7)
A computer that has access to a resource management data storage unit that manages the maximum amount of resources that can be used in each unit time, the amount of reserved resources, and the amount of reserved resources, and stores the resource reservation ratio data according to priority ,
Reservation receiving step for receiving construction reservation data including a plurality of construction execution candidate unit times and priorities for each of the construction execution candidate unit times;
In each construction execution candidate unit time, a margin resource amount specified by a difference between the maximum resource amount managed by the resource management data storage unit, the reserved resource amount, and the reserved resource amount is the resource amount. When there is more than the necessary resource amount specified by the product of the resource reservation ratio according to the priority for each construction execution candidate unit time stored in the management data storage unit and the resource amount necessary for construction A reservation step for increasing the reserved resource amount by the required resource amount for each construction execution candidate unit time in the resource management data storage unit;
A construction reservation processing program for executing

本発明の実施の形態に係るシステム概要図である。It is a system outline figure concerning an embodiment of the invention. 仲介装置の機能ブロック図である。It is a functional block diagram of an intermediary device. 工事管理DBに格納されるデータ例を示す図である。It is a figure which shows the example of data stored in construction management DB. 工事会社装置の機能ブロック図である。It is a functional block diagram of a construction company apparatus. メインの処理フローを示す図である。It is a figure which shows the main processing flow. 工事可能日問い合わせのデータ例を示す図である。It is a figure which shows the example of data of a construction possible day inquiry. 工事可能日検索・回答処理の処理フローを示す図である。It is a figure which shows the process flow of construction day search / answer process. 工事可能日回答のデータ例を示す図である。It is a figure which shows the example of data of a construction possible day reply. 工事希望日リソース予約処理の処理フローを示す図である。It is a figure which shows the processing flow of a construction desired day resource reservation process. 工事希望日データのデータ例を示す図である。It is a figure which shows the example of data of construction desired date data. 工事リソース予約部54の処理フローを示す図である。It is a figure which shows the processing flow of the construction resource reservation part. リソース予約率テーブルの一例を示す図である。It is a figure which shows an example of a resource reservation rate table. 標準リソース量についてのテーブルの一例を示す図である。It is a figure which shows an example of the table about a standard resource amount. リソース管理テーブルの状態を示す図である。It is a figure which shows the state of a resource management table. リソース管理テーブルの状態を示す図である。It is a figure which shows the state of a resource management table. 工事予約管理テーブルの状態を示す図である。It is a figure which shows the state of a construction reservation management table. 工事リソース予約結果のデータ例を示す図である。It is a figure which shows the example of data of a construction resource reservation result. 工事リソース確保処理のシーケンス図を示す図である。It is a figure which shows the sequence diagram of a construction resource securing process. 工事日決定通知のデータフォーマット例を示す図である。It is a figure which shows the data format example of a construction day determination notification. 工事リソース確定・不要リソース開放の処理フローを示す図である。It is a figure which shows the processing flow of construction resource determination and unnecessary resource release. リソース管理テーブルの状態を示す図である。It is a figure which shows the state of a resource management table. 工事予約管理テーブルの状態を示す図である。It is a figure which shows the state of a construction reservation management table. リソース管理テーブルの状態を示す図である。It is a figure which shows the state of a resource management table. 工事リソース確保・不要リソース開放結果通知のデータフォーマット例を示す図である。It is a figure which shows the example of a data format of construction resource securing / unnecessary resource release result notification. 下位優先度候補日用リソース予約率算出部の処理フローを示す図である。It is a figure which shows the processing flow of the resource reservation rate calculation part for lower priority candidate days. コンピュータの機能ブロック図である。It is a functional block diagram of a computer.

符号の説明Explanation of symbols

1 ネットワーク 3 仲介装置 5 工事会社装置
7 顧客端末 9 工事担当者端末
31 申込受付部 32 工事可能日問い合わせ部
33 工事日選択部 34 工事可能日受信部
35 工事希望日通知部 36 工事管理DB
37 現地調査依頼部 38 工事日決定部
39 工事日決定通知部
51 工事可能日問い合わせ受信・返信部
52 工事可能日検索・回答部
53 工事希望日受信・確認返信部
54 工事リソース予約部
55 リソース管理DB
56 工事日決定受信部
57 工事リソース確定・不要リソース開放部
58 下位優先度候補日用リソース予約率算出部
DESCRIPTION OF SYMBOLS 1 Network 3 Mediation apparatus 5 Construction company apparatus 7 Customer terminal 9 Construction person terminal 31 Application reception part 32 Construction possible day inquiry part 33 Construction day selection part 34 Construction possible day reception part 35 Construction desired day notification part 36 Construction management DB
37 Site Survey Requesting Section 38 Construction Date Determination Unit 39 Construction Date Determination Notification Unit 51 Work Date Inquiry Receiving / Replying Unit 52 Work Date Search / Reply Unit 53 Construction Date Receiving / Confirmation Reply Unit 54 Construction Resource Reserving Unit 55 Resource Management DB
56 Construction date determination reception unit 57 Construction resource confirmation / unnecessary resource release unit 58 Lower priority candidate date resource reservation rate calculation unit

Claims (7)

各単位時間において利用可能な最大リソース量と予約中リソース量と確保済リソース量とを管理し、優先度に応じたリソース予約割合のデータとを格納するリソース管理データ格納部と、
複数の工事実行候補単位時間と各前記工事実行候補単位時間についての優先度とを含む工事予約データを受信する予約受信手段と、
各前記工事実行候補単位時間において、前記リソース管理データ格納部で管理されている前記最大リソース量と前記予約中リソース量及び前記確保済リソース量との差で特定される余裕リソース量が、前記リソース管理データ格納部に格納されている、各前記工事実行候補単位時間についての優先度に応じたリソース予約割合と工事に必要なリソース量との積によって特定される必要リソース量以上存在する場合には、前記リソース管理データ格納部において各前記工事実行候補単位時間について前記必要リソース量だけ前記予約中リソース量を増加させる予約手段と、
を有する工事予約装置。
A resource management data storage unit that manages the maximum resource amount, the reserved resource amount, and the reserved resource amount that can be used in each unit time, and stores resource reservation ratio data according to priority;
Reservation receiving means for receiving construction reservation data including a plurality of construction execution candidate unit times and priorities for each of the construction execution candidate unit times;
In each construction execution candidate unit time, a margin resource amount specified by a difference between the maximum resource amount managed by the resource management data storage unit, the reserved resource amount, and the reserved resource amount is the resource amount. When there is more than the necessary resource amount specified by the product of the resource reservation ratio according to the priority for each construction execution candidate unit time stored in the management data storage unit and the resource amount necessary for construction Reservation means for increasing the reserved resource amount by the required resource amount for each construction execution candidate unit time in the resource management data storage unit;
Construction reservation device with
前記予約受信手段が、
前記予約手段が前記必要リソース量だけ前記予約中リソース量を増加させた場合、前記工事予約データを前記リソース管理データ格納部に格納し、
特定の工事予約データについて工事決定単位時間又は工事決定優先度を指定する通知を受信する工事日程受信手段と、
前記リソース管理データ格納部において、前記工事決定優先度により前記特定の工事予約データから特定される前記工事決定単位時間又は指定の前記工事決定単位時間に対応して登録されている前記予約中リソース量を、前記工事決定単位時間についての優先度に応じたリソース予約割合と前記特定の工事予約データについての工事に必要なリソース量との積によって特定される必要リソース量だけ減じて、前記確保済リソース量を前記特定の工事予約データについての工事に必要なリソース量だけ増加させるリソース確保手段と、
前記リソース管理データ格納部において、前記特定の工事予約データに含まれる、前記工事決定単位時間以外の前記工事実行候補単位時間に対応して登録されている前記予約中リソース量を、当該工事決定単位時間以外の工事実行候補単位時間の優先度に応じたリソース予約割合と前記特定の工事予約データについての工事に必要なリソース量との積によって特定される必要リソース量だけ減ずるリソース開放手段と、
をさらに有する
請求項1記載の予約装置。
The reservation receiving means
When the reservation means increases the reserved resource amount by the required resource amount, the construction reservation data is stored in the resource management data storage unit,
A construction schedule receiving means for receiving a notification specifying a construction decision unit time or construction decision priority for specific construction reservation data;
In the resource management data storage unit, the reserved resource amount registered corresponding to the construction determination unit time specified from the specific construction reservation data by the construction determination priority or the designated construction determination unit time Is reduced by the required resource amount specified by the product of the resource reservation ratio according to the priority for the construction determination unit time and the resource amount required for the construction for the specific construction reservation data, and the reserved resource is reduced. Resource securing means for increasing the amount by a resource amount necessary for the construction for the specific construction reservation data;
In the resource management data storage unit, the reserved resource amount registered corresponding to the construction execution candidate unit time other than the construction determination unit time included in the specific construction reservation data is set as the construction determination unit. Resource release means for reducing the required resource amount specified by the product of the resource reservation ratio according to the priority of the construction execution candidate unit time other than the time and the resource amount necessary for the construction for the specific construction reservation data;
The reservation device according to claim 1.
前記リソース確保手段及び前記リソース開放手段が、
前記リソース管理データ格納部において格納されている前記特定の工事予約データから前記工事決定単位時間により特定される前記工事決定優先度又は指定の前記工事決定優先度が最も高い優先度より低い優先度である場合には、
前記工事決定単位時間に対応して登録されている前記予約中リソース量を、前記工事決定単位時間についての優先度に応じたリソース予約割合と前記特定の工事予約データについての工事に必要なリソース量との積によって特定される必要リソース量だけ減じて、前記確保済リソース量を前記特定の工事予約データについての工事に必要なリソース量だけ増加させた場合に、前記予約中リソース量と前記確保済リソース量との和が前記工事決定単位時間に対応する前記最大リソース量以下であれば動作する
請求項2記載の予約装置。
The resource securing means and the resource releasing means are
The construction decision priority specified by the construction decision unit time from the specific construction reservation data stored in the resource management data storage unit or the designated construction decision priority is lower than the highest priority. If there is
The reserved resource amount registered corresponding to the construction determination unit time is determined by using the resource reservation ratio according to the priority for the construction determination unit time and the resource amount necessary for the construction for the specific construction reservation data. Is reduced by the necessary resource amount specified by the product, and the reserved resource amount is increased by the resource amount necessary for the construction for the specific construction reservation data, the reserved resource amount and the reserved resource amount The reservation apparatus according to claim 2, wherein the reservation apparatus operates when a sum with a resource amount is equal to or less than the maximum resource amount corresponding to the construction determination unit time.
前記工事日程受信手段が、
前記リソース確保手段及び前記リソース開放手段とが動作した場合、前記リソース管理データ格納部において前記特定の工事予約データに対応して前記工事決定単位時間又は前記工事決定優先度を登録し、
前記リソース管理データ格納部において前記工事予約データに対応して登録されている前記工事決定単位時間から特定される前記工事決定優先度又は指定の前記工事決定優先度の発生割合に応じて、前記リソース予約割合を算出する手段
をさらに有する請求項3記載の予約装置。
The construction schedule receiving means is
When the resource securing unit and the resource releasing unit are operated, the construction management unit time or the construction decision priority is registered corresponding to the specific construction reservation data in the resource management data storage unit,
According to the construction decision priority specified from the construction decision unit time registered corresponding to the construction reservation data in the resource management data storage unit or the occurrence rate of the designated construction decision priority, the resource The reservation apparatus according to claim 3, further comprising means for calculating a reservation ratio.
前記予約中リソース量と前記確保済リソース量との和が前記工事決定単位時間に対応する前記最大リソース量を超えてしまう場合、
前記リソース確保手段又は前記リソース開放手段が、
前記リソース管理データ格納部において格納されている前記特定の工事予約データから前記工事決定単位時間により特定される前記工事決定優先度又は指定の前記工事決定優先度より低い優先度の工事実行候補単位時間を特定し、
前記リソース管理データ格納部において、当該工事実行候補単位時間に対応して登録されている前記予約中リソース量を、前記工事実行候補単位時間についての優先度に応じたリソース予約割合と前記特定の工事予約データについての工事に必要なリソース量との積によって特定される必要リソース量だけ減じて、前記確保済リソース量を前記特定の工事予約データについての工事に必要なリソース量だけ増加させた場合に、前記予約中リソース量と前記確保済リソース量との和が、特定された前記工事実行候補単位時間に対応する前記最大リソース量以下であるか確認し、
前記予約中リソース量と前記確保済リソース量との和が、特定された前記工事実行候補単位時間に対応する前記最大リソース量以下である場合に、
前記リソース管理データ格納部において、特定された前記工事実行候補単位時間に対応して登録されている前記予約中リソース量を、前記工事実行候補単位時間についての優先度に応じたリソース予約割合と前記特定の工事予約データについての工事に必要なリソース量との積によって特定される必要リソース量だけ減じて、前記確保済リソース量を前記特定の工事予約データについての工事に必要なリソース量だけ増加させる
請求項3記載の予約装置。
When the sum of the reserved resource amount and the reserved resource amount exceeds the maximum resource amount corresponding to the construction determination unit time,
The resource securing means or the resource releasing means is
The construction execution candidate unit time with a priority lower than the construction decision priority specified by the construction decision unit time or the designated construction decision priority from the specific construction reservation data stored in the resource management data storage unit Identify
In the resource management data storage unit, the reserved resource amount registered in correspondence with the construction execution candidate unit time is determined based on the resource reservation ratio and the specific construction according to the priority for the construction execution candidate unit time. When the required resource amount specified by the product of the resource amount required for the construction of the reservation data is reduced and the reserved resource amount is increased by the resource amount required for the construction of the specific construction reservation data Confirming that the sum of the reserved resource amount and the reserved resource amount is equal to or less than the maximum resource amount corresponding to the identified construction execution candidate unit time,
When the sum of the reserved resource amount and the reserved resource amount is equal to or less than the maximum resource amount corresponding to the specified construction execution candidate unit time,
In the resource management data storage unit, the reserved resource amount registered in correspondence with the identified construction execution candidate unit time, the resource reservation ratio according to the priority for the construction execution candidate unit time, and the Decrease by the necessary resource amount specified by the product of the resource amount necessary for the construction for the specific construction reservation data, and increase the reserved resource amount by the resource amount necessary for the construction for the specific construction reservation data. The reservation apparatus according to claim 3.
各単位時間について利用可能な最大リソース量と予約中リソース量と確保済リソース量とを管理し、優先度に応じたリソース予約割合のデータとを格納するリソース管理データ格納部にアクセス可能なコンピュータによって実行される工事予約処理方法であって、
複数の工事実行候補単位時間と各前記工事実行候補単位時間についての優先度とを含む工事予約データを受信する予約受信ステップと、
各前記工事実行候補単位時間において、前記リソース管理データ格納部で管理されている前記最大リソース量と前記予約中リソース量及び前記確保済リソース量との差で特定される余裕リソース量が、前記リソース管理データ格納部に格納されている、各前記工事実行候補単位時間についての優先度に応じたリソース予約割合と工事に必要なリソース量との積によって特定される必要リソース量以上存在する場合には、前記リソース管理データ格納部において各前記工事実行候補単位時間について前記必要リソース量だけ前記予約中リソース量を増加させる予約ステップと、
を含む工事予約処理方法。
A computer that has access to a resource management data storage unit that manages the maximum available resource amount, reserved resource amount, and reserved resource amount for each unit time, and stores resource reservation ratio data according to priority A construction reservation processing method to be executed,
Reservation receiving step for receiving construction reservation data including a plurality of construction execution candidate unit times and priorities for each of the construction execution candidate unit times;
In each construction execution candidate unit time, a margin resource amount specified by a difference between the maximum resource amount managed by the resource management data storage unit, the reserved resource amount, and the reserved resource amount is the resource amount. When there is more than the necessary resource amount specified by the product of the resource reservation ratio according to the priority for each construction execution candidate unit time stored in the management data storage unit and the resource amount necessary for construction A reservation step for increasing the reserved resource amount by the required resource amount for each construction execution candidate unit time in the resource management data storage unit;
Construction reservation processing method including
各単位時間において利用可能な最大リソース量と予約中リソース量と確保済リソース量とを管理し、優先度に応じたリソース予約割合のデータとを格納するリソース管理データ格納部にアクセス可能なコンピュータに、
複数の工事実行候補単位時間と各前記工事実行候補単位時間についての優先度とを含む工事予約データを受信する予約受信ステップと、
各前記工事実行候補単位時間において、前記リソース管理データ格納部で管理されている前記最大リソース量と前記予約中リソース量及び前記確保済リソース量との差で特定される余裕リソース量が、前記リソース管理データ格納部に格納されている、各前記工事実行候補単位時間についての優先度に応じたリソース予約割合と工事に必要なリソース量との積によって特定される必要リソース量以上存在する場合には、前記リソース管理データ格納部において各前記工事実行候補単位時間について前記必要リソース量だけ前記予約中リソース量を増加させる予約ステップと、
を実行させるための工事予約処理プログラム。
A computer that has access to a resource management data storage unit that manages the maximum amount of resources that can be used in each unit time, the amount of reserved resources, and the amount of reserved resources, and stores the resource reservation ratio data according to priority ,
Reservation receiving step for receiving construction reservation data including a plurality of construction execution candidate unit times and priorities for each of the construction execution candidate unit times;
In each construction execution candidate unit time, a margin resource amount specified by a difference between the maximum resource amount managed by the resource management data storage unit, the reserved resource amount, and the reserved resource amount is the resource amount. When there is more than the necessary resource amount specified by the product of the resource reservation ratio according to the priority for each construction execution candidate unit time stored in the management data storage unit and the resource amount necessary for construction A reservation step for increasing the reserved resource amount by the required resource amount for each construction execution candidate unit time in the resource management data storage unit;
A construction reservation processing program for executing
JP2008067378A 2008-03-17 2008-03-17 Construction reservation device, construction reservation processing method and program Expired - Fee Related JP5035048B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2008067378A JP5035048B2 (en) 2008-03-17 2008-03-17 Construction reservation device, construction reservation processing method and program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2008067378A JP5035048B2 (en) 2008-03-17 2008-03-17 Construction reservation device, construction reservation processing method and program

Publications (2)

Publication Number Publication Date
JP2009223618A JP2009223618A (en) 2009-10-01
JP5035048B2 true JP5035048B2 (en) 2012-09-26

Family

ID=41240322

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2008067378A Expired - Fee Related JP5035048B2 (en) 2008-03-17 2008-03-17 Construction reservation device, construction reservation processing method and program

Country Status (1)

Country Link
JP (1) JP5035048B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6296956B2 (en) * 2014-10-06 2018-03-20 エヌ・ティ・ティ・コムウェア株式会社 Schedule management system, method, and program
JP2020166595A (en) * 2019-03-29 2020-10-08 日本瓦斯株式会社 Method to deal with inappropriate security matters

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4054650B2 (en) * 2002-10-03 2008-02-27 株式会社エヌ・ティ・ティ・ドコモ Resource allocation method, and base station, mobile station, and radio packet communication system to which this resource allocation method is applied

Also Published As

Publication number Publication date
JP2009223618A (en) 2009-10-01

Similar Documents

Publication Publication Date Title
US20070282656A1 (en) Dynamic appointment tracking
US20130090963A1 (en) Method and system for optimizing dispatch workflow information
US8150022B2 (en) Call center queue management
JP2005517234A (en) Automatic message processing systems and processes
US20130332207A1 (en) System and method for intelligent management of appointment waiting list
US8331250B2 (en) System and method for strategic network planning
US7953853B2 (en) System and method for providing access and utilization of context information
US10817809B2 (en) Systems and methods for customizable route optimization
JP5440780B2 (en) Message notification method, business management apparatus, and computer program
JP5035048B2 (en) Construction reservation device, construction reservation processing method and program
Geng et al. Optimal patient assignment for W queueing network in a diagnostic facility setting
US20180144407A1 (en) Supplemental electronic note data message distribution in near real-time
JP6793447B2 (en) Management equipment, management methods and programs
US20130031186A1 (en) Systems and methods for secure message delivery to a transient recipient in a dynamically routed network
US20170147962A1 (en) Method and system for assigning service requests
JP6599926B2 (en) Management apparatus, management method, and management program
JP6176553B1 (en) System usage fee management apparatus and system usage fee management method
JP7118305B1 (en) Apparatus, method and program for managing use of multiple applications in enterprise
JP3983182B2 (en) Program to support mediation between job seekers and job seekers
JP4959529B2 (en) Visit notification system and visit notification method
JP6364253B2 (en) Candidate schedule output device, candidate schedule output method, program, and system
WO2001088786A1 (en) Schedule managing system, schedule managing method, and recorded medium
JP2023161643A (en) Device for managing use of a plurality of applications in company, method and program therefor
US9424343B2 (en) Management of an electronic calendar using short message service (SMS)
JP2023012303A (en) Attendance management system

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20101018

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20120517

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20120605

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20120618

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150713

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees