JP4782509B2 - Cable construction plan information management system - Google Patents
Cable construction plan information management system Download PDFInfo
- Publication number
- JP4782509B2 JP4782509B2 JP2005241469A JP2005241469A JP4782509B2 JP 4782509 B2 JP4782509 B2 JP 4782509B2 JP 2005241469 A JP2005241469 A JP 2005241469A JP 2005241469 A JP2005241469 A JP 2005241469A JP 4782509 B2 JP4782509 B2 JP 4782509B2
- Authority
- JP
- Japan
- Prior art keywords
- cable
- equipment
- cutting
- original
- record
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Electric Cable Installation (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Description
本発明は、光ケーブル等のネットワーク配線設備に関する工事計画情報の管理技術に関し、特に、互いに相関する複数の工事計画情報を効率的に管理することができるケーブル工事計画情報管理システムに関する。 The present invention relates to a technique for managing construction plan information related to network wiring equipment such as an optical cable, and more particularly to a cable construction plan information management system capable of efficiently managing a plurality of construction plan information correlated with each other.
従来、光ケーブル等のネットワーク配線設備に関するケーブル工事計画情報を、データベースによって管理する技術として、例えば、下記特許文献1及び特許文献2に記載の技術が知られている。
Conventionally, for example, techniques described in Patent Document 1 and
下記特許文献1に記載の技術は、設備単位で属性を管理する設備管理データベースを設け、ある1個の図面内に書かれている複数の設備に変更があった場合に、図面全体の更新完了を待たずに個別の設備のデータを設備単位で更新することができ、さらに、関連する全ての図面に対して、その更新内容を即時に反映できるものである。 The technology described in Patent Document 1 below provides an equipment management database that manages attributes in units of equipment, and when there is a change in multiple equipment written in a single drawing, the update of the entire drawing is completed The data of individual equipment can be updated in units of equipment without waiting, and the updated contents can be immediately reflected on all related drawings.
また、下記特許文献2に記載の技術は、既存の設備管理データベースに加え、工事管理データベースとして、工事によって新設又は撤去される設備を管理する手段を設け、中央処理装置によってそれらのデータベースを制御し、工事計画情報を時系列的に蓄積していくことにより、既存の設備のデータと工事計画により更新されるべきデータの両方について、データ間の時系列的な整合性を保障しつつ管理する技術である。
In addition to the existing equipment management database, the technology described in
しかしながら、上記特許文献1に記載の技術は、最新の設備情報を記載した図面を管理することはできるが、将来施工する工事の計画に基づいて、まだ現実には設置されていない設備を仮に図面上に配置しておき、現実に即した図面が必要になったときにはまた元に戻すといった操作が困難であるという問題がある。 However, although the technique described in Patent Document 1 can manage a drawing that describes the latest facility information, the facility that is not actually installed based on a plan for construction to be performed in the future is temporarily tentatively drawn. There is a problem in that it is difficult to perform the operation of arranging it above and returning it to the original drawing when a realistic drawing is required.
また、上記特許文献2に記載の技術では、2本のケーブル内の心線を互いに接続したり、接続を解除したりするような工事の計画に関しては、計画用のデータを作成する手段も、また計画用のデータを元に戻す手段も考慮されている。しかしながら、1本の長いケーブルを途中で物理的に切断し、その中の心線を接続し直すという工事の計画用のデータについては考慮されていない。
Further, in the technique described in the above-mentioned
ところが、実際には、回線を分岐させる目的で上記のような工事がしばしば行われる。このような工事を計画する場合に、従来のシステムを用いても、例えば、切断予定の地点に工事設計のクロージャを配置して、元のケーブルを撤去した後、同じ場所に新しい2本のケーブルを配置する操作を行えば、擬似的にデータの構築は可能である。 However, in practice, the above-described construction is often performed for the purpose of branching the line. When planning such construction, even if the conventional system is used, for example, after placing the construction design closure at the point where cutting is planned and removing the original cable, two new cables at the same location If the operation of arranging the data is performed, it is possible to construct data in a pseudo manner.
しかしながら、切断前のケーブルと切断後のケーブルとは物理的には同じものであるにもかかわらず、データとしては全く別のケーブルとして扱うことになり、工事の前後でケーブルのデータの関連性が失われてしまうという問題がある。また、工事計画を中止あるいは工事内容が変更になって、ケーブルの切断を取り消すことになった場合、同じケーブルを再び別の場所で切断するような別件の工事を計画する場合では、操作も煩雑になり、データの管理が困難になってくる。 However, although the cable before cutting and the cable after cutting are physically the same, they are handled as completely different cables as data, and there is a relationship between the cable data before and after construction. There is a problem of being lost. Also, if the construction plan is canceled or the construction content is changed and the cable cut is cancelled, the operation is complicated when planning another construction that cuts the same cable again at another location. As a result, data management becomes difficult.
特に、1本のケーブルに係る複数の工事を計画している間に、その中の途中の工事計画だけが中止又は変更になるような場合に、データの管理が困難になるという問題がある。例えば、ある1本のケーブルをそれぞれ別の場所で切断する工事として、工事A、工事B、工事Cの3回の工事を計画し、工事の順番通りにデータを作成し、データの更新履歴を記録したとする。その後に、工事Bの計画だけを中止する場合を考える。この場合に、最終的には、「工事Aと工事Cによって切断されたケーブル」というデータを構成して、そのようなケーブルを作図した図面を出力する必要がある。ところが、ケーブルの撤去、新設といった工事計画情報を履歴として時系列的に蓄積していく従来の方法では、このような状況に対応することが困難である。すなわち、工事Bを取り消し、更新履歴を参照して工事計画前のデータを復元しようとしても、工事Bによって作成した新設ケーブルのデータは既に工事Cの計画によって削除されているため、削除することができない。 In particular, there is a problem that data management becomes difficult when a plurality of construction works related to one cable are planned and only a construction work in the middle is canceled or changed. For example, as a work to cut one cable at different locations, plan three works, Work A, Work B, and Work C, create data according to the work order, and keep the data update history Suppose you record. Then, consider a case where only the plan for the construction B is to be canceled. In this case, finally, it is necessary to construct data “cable cut by construction A and construction C” and output a drawing of such a cable. However, it is difficult to deal with such a situation with the conventional method of accumulating construction plan information such as cable removal and new construction as a history in time series. That is, even if the construction B is canceled and the data before the construction plan is restored by referring to the update history, the data of the new cable created by the construction B has already been deleted by the construction C plan. Can not.
また、工事Bによって撤去したケーブルのデータを再作成すると、今度は工事Cによって切断されたはずのケーブルが、切断されていない状態で復元されてしまうことになり、「工事Aと工事Cによって切断したケーブル」というデータを構築することができないという問題がある。 In addition, if the data of the cable removed by the construction B is recreated, the cable that should have been cut by the construction C will be restored in an uncut state. There is a problem that it is not possible to build data called “cable”.
本発明の目的は、1本のケーブルの物理的な切断、再接続といった工事計画を複数回行う場合に途中の工事計画が中止又は変更になった場合に、工事計画の順番に関係なく、その工事を行わなかった場合のデータを極めて容易に取得できるシステムを提供することにある。 The object of the present invention is that when a construction plan such as physical disconnection and reconnection of a single cable is performed a plurality of times, the construction plan in the middle is canceled or changed, regardless of the order of the construction plan. An object of the present invention is to provide a system that can very easily acquire data when construction is not performed.
また、現実に即した図面が必要になった場合、工事計画を見直したい場合などのために、1本のケーブルを切断する工事計画を全て取り消す場合、取り消す順番に関係なく、切断前のケーブルのデータを容易に元通りに再現できるシステムを提供することにある。 Also, when you need to have a realistic drawing, or when you want to review the construction plan, if you cancel the entire construction plan that cuts one cable, regardless of the order of cancellation, The object is to provide a system that can easily reproduce data.
本発明の一観点によれば、ケーブルと該ケーブルにおける設備とを、ケーブルIDと、ケーブルの一端と他端とにそれぞれ設けられる端1設備ID及び端2設備IDと、に基づいて管理するケーブルテーブルを有する設備管理データベースと、ケーブルの切断工事計画に関連し、切断用設備IDと、前記ケーブルIDを参照可能な元ケーブル設備ID及び切断後ケーブル設備IDとによりケーブル切断工事に管理を行うケーブル切断工事管理テーブルを有する工事計画管理データベースと、前記設備管理データベースと前記工事計画管理データベースとを参照してケーブルの切断に関する処理を実行するケーブル切断処理部とを有しており、前記ケーブル切断処理部は、ケーブルを切断する場合に、前記端1設備側又は前記端2設備側のいずれか一方のケーブルに切断前の元ケーブルIDを付与し、他方のケーブルに新たな切断後ケーブルIDを付与し、前記ケーブル切断工事管理テーブルを更新する処理を行うことを特徴とするケーブル工事計画情報管理システムが提供される。
According to one aspect of the present invention, a cable and a facility in the cable are managed based on a cable ID and an end 1 facility ID and an
ケーブルを切断する場合に、前記端1設備側又は前記端2設備側のいずれか一方のケーブルに切断前の元ケーブルIDを付与し、他方のケーブルに新たな切断後ケーブルIDを付与し、前記ケーブル切断工事管理テーブルを更新する処理を行うことにより、切断を繰り返しても、「端1設備側」、「端2設備側」の方向が一貫するように引き継がれる。切断後に形成される2本のケーブルのレコードのうち1個のレコードは、ケーブルIDとして切断前のIDをそのまま継続して使用する。そのため、ケーブル切断工事管理テーブルのレコードは、この「切断後ケーブルID」と「元ケーブルID」によって、切断後の2本のケーブルのレコードにリンクする。
When cutting a cable, give the original cable ID before cutting to one of the end 1 equipment side or the
さらに、ケーブル切断取り消し処理部を有しており、該ケーブル切断取り消し処理部は、切断したケーブルを結合させる場合に、前記元ケーブルIDをケーブルIDとして残し、切断後ケーブルIDを消去し、前記ケーブル切断工事管理テーブルを更新することが好ましい。 Furthermore, the cable cutting cancellation processing unit has a cable cutting cancellation processing unit that, when connecting the cut cables, leaves the original cable ID as a cable ID, erases the cable ID after cutting, and It is preferable to update the cutting work management table.
ケーブルの切断を取り消す際には、管理しているケーブル同士を結合させて「元ケーブルID」のケーブルのデータとして残し、「切断後ケーブルID」のケーブルのデータを消去することで、復元が簡単にできる。 When canceling the cable disconnection, the managed cables are joined together and left as “original cable ID” cable data, and the data of the “cable ID after disconnection” is deleted, making restoration easy. Can be.
さらに、前記ケーブル切断工事管理テーブルは、ケーブルを全く切断していない状態におけるケーブル属性である元ケーブル属性を有することが好ましい。元ケーブル属性に基づいて、切断が全く行われていない状態に簡単に復元することができる。 Furthermore, it is preferable that the cable cutting work management table has an original cable attribute which is a cable attribute in a state where no cable is cut. Based on the original cable attribute, it can be easily restored to a state in which no cutting is performed.
本発明によれば、1本のケーブルを物理的に切断し、再接続する工事計画の立案の際に、その計画を中止あるいは変更したい場合には、工事においてケーブルを切断しなかった場合のデータを呼び戻すことができる。また、ある1本のケーブルに係る全ての工事計画を取り消すことによって、元のケーブルのデータを完全に復元することも可能である。 According to the present invention, when planning a construction plan in which one cable is physically cut and reconnected, if it is desired to cancel or change the plan, the data when the cable was not cut during the construction. Can be recalled. It is also possible to completely restore the original cable data by canceling all the construction plans for a single cable.
さらに、元のケーブルのデータを復元するためのデータ量を少なくすることにより、効率良く、計画を立案することができるという利点がある。 Furthermore, there is an advantage that a plan can be made efficiently by reducing the amount of data for restoring the original cable data.
本明細書において、「切断用設備キー」は、ケーブルを切断する際、切断箇所に設置する設備を一意に識別するためのキーであり、設備属性管理テーブルの外部キーである。設置する設備の例としてはクロージャが挙げられる。「元ケーブル設備キー」は、切断前のケーブルを一意に識別するためのキーである。「切断後ケーブル設備キー」は、切断後のケーブルを一意に識別するためのキーである。「元ケーブル属性」はケーブルを一度も切断していない時点でのケーブル属性をコピーしたものである。1本のケーブルに係る切断工事計画をすべて取り消す際に、元のケーブルのデータを完全に復元するために用いられる。
以下、本発明の一実施の形態によるケーブル工事計画情報管理システムについて図面を参照しつつ詳細に説明する。
In the present specification, the “cutting equipment key” is a key for uniquely identifying equipment to be installed at a cutting location when cutting a cable, and is an external key of the equipment attribute management table. An example of equipment to be installed is a closure. The “original cable equipment key” is a key for uniquely identifying the cable before cutting. The “cable equipment key after cutting” is a key for uniquely identifying the cable after cutting. The “original cable attribute” is a copy of the cable attribute when the cable has never been cut. This is used to completely restore the original cable data when canceling the entire cutting plan for a single cable.
Hereinafter, a cable construction plan information management system according to an embodiment of the present invention will be described in detail with reference to the drawings.
図1は、本実施の形態によるケーブル工事計画情報管理システムの一構成例を示す機能ブロック図である。 FIG. 1 is a functional block diagram showing a configuration example of a cable construction plan information management system according to the present embodiment.
図1において、入出力装置1は、ユーザからのオペレーションの入力や、図面の出力を行う装置である。中央処理装置2は、ユーザからのオペレーションを受けてデータベースを操作し、また、データベースから取得したデータをもとに各種図面を入出力装置1に送る装置である。符号3は設備管理データベースである。符号4は工事計画管理データベースであり、中央処理装置2とともに、本発明の根幹を成す部分である。符号5はケーブル切断プログラム、符号6はケーブル切断取り消しプログラムであり、それぞれ中央処理装置2が実行するプログラムである。符号7は設備属性管理テーブルである。設備属性管理テーブル7は、ケーブルを接続する箇所に配置されるクロージャのデータを管理するためのクロージャテーブル7a、ケーブルのデータを管理するためのケーブルテーブル7b、図面上において電柱やマンホールといったケーブルを敷設するポイントとなる設備の間に作図される線分や折れ線とケーブルのデータを結びつけるためのケーブル図形テーブル7cなどに細分化される。符号8は本実施の形態において新規に設けられたケーブル切断工事管理テーブルである。
In FIG. 1, an input / output device 1 is a device that inputs an operation from a user and outputs a drawing. The
ケーブル切断プログラム5とケーブル切断取り消しプログラム6とは、それぞれ、設備属性管理テーブル7と、ケーブル切断工事管理ケーブル8とを参照可能になっている。 The cable cutting program 5 and the cable cutting cancellation program 6 can refer to the equipment attribute management table 7 and the cable cutting work management cable 8, respectively.
図2は、図1における設備管理データベース3と工事計画管理データベース4において管理されている各データの関連を示す図である。図2において、矢印は、データの参照関係を示す。以下、図2に関して説明を行う。まず、設備属性管理テーブル7における主要なテーブルと項目とについて説明する。クロージャテーブルは、ケーブルの端に取り付けられる代表的な設備であるクロージャの属性を管理するテーブルである。クロージャは電柱の上などに設置されるが、設置設備IDという項目によって、取り付け箇所である電柱などのレコードにリンクしている(L1)。 FIG. 2 is a diagram showing the relationship between the data managed in the facility management database 3 and the construction plan management database 4 in FIG. In FIG. 2, arrows indicate data reference relationships. Hereinafter, a description will be given with reference to FIG. First, main tables and items in the equipment attribute management table 7 will be described. The closure table is a table that manages attributes of a closure, which is a typical facility attached to the end of a cable. The closure is installed on a utility pole or the like, but is linked to a record such as a utility pole as an attachment location by an item of installation equipment ID (L1).
ケーブルテーブルは、ケーブルの属性を管理するテーブルである。このテーブルには、端1設備ID、端2設備IDという項目がある。これらの項目は、ケーブルの両端に取り付けられている設備のレコードにリンクしている。図2では、クロージャのレコードにリンクしている(L2)。心線数はケーブルの中に入っている光ファイバの本数を示す項目である。実長はケーブル全体の長さを示す項目であり、図面上の座標などから自動計算可能である。
The cable table is a table for managing cable attributes. This table includes items of end 1 equipment ID and
ケーブル図形テーブルは、ケーブルを作図するための図形を、電柱と電柱との間というような区間の単位で管理するためのテーブルである。いくつかのケーブル図形テーブルのレコードが集まって、1本のケーブルを表すことになる。ケーブル図形テーブルの端1設備ID、端2設備IDという項目は、ケーブル図形の端となる電柱などのテーブルにリンクしている(L3)。これらの項目は、ケーブルテーブルの端1設備ID、端2設備IDとは項目名が同じであるが直接的な関係は無い。
The cable graphic table is a table for managing a graphic for drawing a cable in units of sections such as between utility poles. Several cable graphic table records gather to represent a single cable. The items of the end 1 equipment ID and the
尚、設備属性管理テーブル7で管理している設備を実際に図面上に作図するためには、図2で示されるデータの他に、図面上の座標や図形、色などの作図情報が必要である。作図情報を管理する手段としては、上記特許文献1のように、クロージャテーブルやケーブル図形テーブルの中に作図情報を属性として埋め込んでも良いし、上記特許文献2のように、設備属性管理テーブル7とは別に、属性レコードと作図情報とをリンクさせるためのリンクテーブルを使用しても良い。いずれの手段を選択しても、本発明を実施するに場合に本質的な相違は無いが、リンクテーブルを使用すると、設備属性管理テーブル7を編集することなく、作図したい図面又は使用したい入出力装置ごとに最適化したテーブルを作成することができるなど、取り扱いが柔軟であるという利点がある。
In addition, in order to actually plot the equipment managed by the equipment attribute management table 7 on the drawing, drawing information such as coordinates, graphics, and colors on the drawing is required in addition to the data shown in FIG. is there. As means for managing the drawing information, the drawing information may be embedded as an attribute in the closure table or the cable graphic table as in the above-mentioned Patent Document 1, or the equipment attribute management table 7 as in the above-mentioned
ケーブル切断工事管理テーブル8は、「切断用設備ID」、「元ケーブルID」、「切断後ケーブルID」、「元ケーブル属性」の各項目を有する。このテーブル8は、ケーブルの切断を取り消した場合に、どのケーブルとどのケーブルとを結合させれば元のデータが復元できるか、又は、その切断が無かった場合のデータが作成できるかを管理するためのテーブルである。 The cable cutting work management table 8 has items of “cutting equipment ID”, “original cable ID”, “cable ID after cutting”, and “original cable attribute”. This table 8 manages whether the original data can be restored by connecting which cable and which cable can be restored when the cutting of the cable is cancelled, or whether the data can be created when the cutting is not performed. It is a table for.
「切断用設備ID」は上記「切断用設備キー」に相当するものであり、ケーブルを切断した箇所において、切断したケーブルの端に取り付けるクロージャなどの設備のレコードにリンクするための項目である。図2では、クロージャIDを保持している。
「元ケーブルID」は上記「元ケーブル設備キー」に相当するものであり、切断前のケーブルのIDを保持している。「切断後ケーブルID」は上記「切断後ケーブル設備キー」に相当するものであり、切断して新しく作成されたケーブルのIDを保持している。
The “cutting equipment ID” corresponds to the “cutting equipment key”, and is an item for linking to a record of equipment such as a closure attached to the end of the cut cable at a location where the cable is cut. In FIG. 2, the closure ID is held.
The “original cable ID” corresponds to the “original cable equipment key”, and holds the ID of the cable before cutting. The “cable ID after cutting” corresponds to the “cable equipment key after cutting”, and holds the ID of the cable newly created by cutting.
上記構成において、切断後に形成される2本のケーブルのレコードのうち1個のレコードは、ケーブルIDとして切断前のIDをそのまま継続して使用する。そのため、ケーブル切断工事管理テーブルのレコードは、この「切断後ケーブルID」と上記「元ケーブルID」によって、切断後の2本のケーブルのレコードにリンクする。また、ケーブルの切断を取り消す際には、これらの項目で管理しているケーブル同士を結合させて、それを「元ケーブルID」のケーブルのデータとして残し、「切断後ケーブルID」のケーブルのデータを消去すればよい。 In the above configuration, one of the two cable records formed after cutting uses the ID before cutting as the cable ID. Therefore, the record of the cable cutting work management table is linked to the record of the two cables after cutting by the “cable ID after cutting” and the “original cable ID”. Also, when canceling the cable cut, the cables managed in these items are joined together, leaving it as the data of the “original cable ID” cable, and the data of the “cable ID after cut” cable Can be deleted.
「元ケーブル属性」は一度も切断していない最初のケーブルの属性を保持するための項目である。この項目は最初のケーブルのデータを完全に復元するためのバックアップとして使用する。但し、データの管理効率を上げるため、全てのケーブル属性を保持していなくても良い。例えば、型番や心線数のような、ケーブルを切断しても変わらない項目については、保持していない。また、実長のような、他のデータをもとに計算可能な項目についても保持していない。これらの工夫によって、図2の例に示すように、ケーブル名称のみ保持しておけば、完全に最初のケーブルのデータが復元することができる。 The “original cable attribute” is an item for holding the attribute of the first cable that has never been cut. Use this item as a backup to fully restore the original cable data. However, not all cable attributes need to be retained in order to improve data management efficiency. For example, items that do not change even when the cable is cut, such as the model number and the number of core wires, are not retained. It also does not hold items that can be calculated based on other data, such as actual length. With these ideas, as shown in the example of FIG. 2, if only the cable name is retained, the data of the first cable can be completely restored.
次に、各プログラムの機能について説明する。
図3は、ケーブル切断プログラムの機能を説明するために、1本のケーブルを3回切断する工事計画を立案し、それぞれの計画に沿った図面を作成する過程を示す図である。図3において、丸印は電柱を表し、正方形はクロージャを表し、太い線分はケーブル図形を表す。クロージャ111は電柱101に設置されており、クロージャ112は電柱105に設置されている。
Next, the function of each program will be described.
FIG. 3 is a diagram showing a process of creating a construction plan for cutting one cable three times and creating a drawing according to each plan in order to explain the function of the cable cutting program. In FIG. 3, circles represent utility poles, squares represent closures, and thick line segments represent cable figures. The
図3(a)は、工事対象のケーブル21を一度も切断していない最初の状態を示す図である。ケーブル21(ケーブルID「AAA」、ケーブル名称「ケーブルA」)はケーブル図形11〜14から構成されており、クロージャ111を端1設備、クロージャ112を端2設備と称する。
FIG. 3A is a diagram illustrating an initial state in which the
図3(b)は、図3(a)の状態から、電柱104においてケーブル21を切断し、そこにクロージャ113を設置する工事計画を立案した様子を示す図である。切断後の2本のケーブル22と23に付与されるケーブルIDを、元のケーブル21で言えば端1設備側のケーブル22は切断前のケーブル21のID「AAA」を引き継ぎ、端2設備側のケーブル23では、システムによって新しいID(ここでは「BBB」とする)が自動生成されて割り振られる。また、それぞれのケーブルの端1設備IDと端2設備IDについては、端1設備側のケーブル22では、端1設備IDにはケーブル21の端1設備ID「C1」が引き継がれ、端2設備IDには新しいクロージャ113のID「C3」が設定される。端2設備側のケーブル23では、端1設備IDには新しいクロージャ113のID「C3」が設定され、端2設備IDにはケーブル21の端2設備ID「C2」が引き継がれる。このようなIDの引き継ぎ方によって、ケーブルの「端1設備側」、「端2設備側」という方向を示す用語に関しては、最初のケーブルから一貫して同じ方向を示すことになる。尚、新しいケーブル22と23との属性で、実長など再計算が必要な項目は、必要に応じて再計算して更新しておくことができる。ケーブル名称については、システムが決めた適当な名称にするか、ユーザが入力するか、そのいずれかをユーザが選択できる。
FIG. 3B is a diagram illustrating a state in which a construction plan for cutting the
そして、ケーブル切断工事管理テーブルに新しいレコード(図3(b)の右図参照)を登録する。そのレコードの切断用設備IDには、クロージャ113のID「C3」が登録され、元ケーブルIDには、切断前のケーブルID「AAA」が登録され、切断後ケーブルIDには、新しく生成されたケーブルID「BBB」が登録される。旧ケーブル名称には、切断前のケーブルの名称「ケーブルA」が登録される。
Then, a new record (see the right diagram in FIG. 3B) is registered in the cable cutting work management table. The ID “C3” of the
以上のデータ操作によって、ケーブル切断工事管理テーブルに登録されたレコードが、切断によって分割された2本のケーブルにそれぞれリンクを持つことになる。また、最初のケーブルのバックアップデータをも管理することになる。 As a result of the above data operation, the record registered in the cable cutting work management table has links to the two cables divided by cutting. It also manages backup data for the first cable.
図3(c)は、図3(b)の状態から、さらに電柱102においてケーブル22を切断し、そこにクロージャ114を設置する工事計画を立案した様子を示す図である。切断後のケーブル24と25とのケーブルIDの決め方は、図3(b)の場合と同様に、端1設備側のケーブル24が切断前のケーブル22のID「AAA」を引き継ぎ、端2設備側のケーブル25に新しいID(ここでは「CCC」とする)が与えられる。端1設備IDと端2設備IDとの引き継ぎ方も、図3(b)の場合と同様であり、切断を繰り返しても、「端1設備側」、「端2設備側」の方向が一貫するように引き継ぐ。
FIG. 3C is a diagram showing a state in which a construction plan for further cutting the
ここで、ケーブル切断工事管理テーブルを検索し、切断前のケーブル22のID「AAA」を元ケーブルIDに持つレコードがないか調べる。検索の結果見つかったレコード(図3(b)で登録したもの)に対し、元ケーブルIDを「AAA」から新しいID「CCC」に更新し、図面とデータとの整合性をとる。すなわち、図3(c)の状態でクロージャ113(IDはC3)におけるケーブルの切断を取り消す場合、結合すべきケーブルはIDが「AAA」と「BBB」のケーブルではなく、「CCC」と「BBB」のケーブルであって、取り消し後に残すべきケーブルIDは端一設備側の「CCC」ということにする。そして、ケーブル切断工事管理テーブルに新しいレコードを登録する。図3(b)の場合と同様に、そのレコードの切断用設備IDには、クロージャ114のID「C4」が登録され、切断用設備IDと元ケーブルIDには、「CCC」と「AAA」とが登録される。但し、旧ケーブル名称の更新方法は、図3(b)の場合と異なる。すなわち、前述のケーブル切断工事管理テーブルの検索で見つかったレコードから旧ケーブル名称のデータを移動させて、新しいレコードに登録する。そして、移動元のレコードの旧ケーブル名称には例えばnullを登録してデータをクリアする。これによって、最初のケーブル21のIDを「元ケーブルID」として管理しているケーブル切断工事管理テーブルのレコードが、そのバックアップデータも管理していることになる。言い換えれば、ケーブル切断工事管理テーブルのレコードでは、元ケーブルIDとバックアップしている属性(旧ケーブル名称)とワンセットになって、ケーブルレコードのバックアップデータを保持しているということである。
Here, the cable cutting construction management table is searched to check whether there is a record having the original cable ID of the ID “AAA” of the
図3(d)は、図3(c)の状態から、さらに電柱103においてケーブル25を切断し、そこにクロージャ115を設置する工事計画を立案した様子を示す図である。切断後のケーブル26と27とのIDおよび属性の登録方法は、図3(c)におけるケーブル24と25との登録方法と同様である。また、その後のケーブル切断工事管理テーブルの検索および同テーブルへのレコードの登録、更新も、図3(c)の場合と全く同様に行う。但し、ケーブル切断工事管理テーブルにおいて、切断前のケーブル25のID「CCC」を持つレコードの旧ケーブル名称を新しく登録するレコードに移動する際、当該項目は元々クリアされているため、移動してもその内容は変化しない。
FIG. 3D is a diagram showing a state in which a construction plan for further cutting the
図3(d)において、図面とデータとの整合性をとるためのケーブル切断工事管理テーブルの検索・更新処理において、切断後ケーブルIDをキーとして同テーブルを検索し、更新する処理が不要であるという点は、重要である。不要である理由は、ケーブル切断工事管理テーブルに追加されたレコード数にかかわらず、元のケーブルの端1設備側から順に、元ケーブルID→切断後ケーブルID→元ケーブルID→切断後ケーブルID→…のように、IDによってレコードとレコードとが一方向のリンクにより繋がっており、そのため同じ切断後ケーブルIDを持つ切断工事管理テーブルのレコードはただ1個しかないことが保障されているからである。これは、「端1設備側」「端2設備側」の方向を一貫させたためである。もし一貫させていない場合には、切断後ケーブルIDをキーとして同テーブルを検索し、更新する処理が必要になり、処理がより煩雑になる。「端1設備側」、「端2設備側」の方向を一貫させているのは、このように検索・更新処理が容易になるからである。 In FIG. 3D, in the cable cutting construction management table search / update process for ensuring consistency between the drawing and the data, there is no need to search and update the table using the cable ID after cutting as a key. That is important. The reason is unnecessary regardless of the number of records added to the cable cutting work management table, in order from the end 1 equipment side of the original cable, the original cable ID → the cable ID after cutting → the original cable ID → the cable ID after cutting → This is because the records are connected to each other by a one-way link as in the case of ..., so that it is guaranteed that there is only one record in the cutting work management table having the same cable ID after cutting. . This is because the directions of “end 1 equipment side” and “end 2 equipment side” are made consistent. If they are not consistent, it is necessary to search and update the table using the cable ID after disconnection as a key, and the processing becomes more complicated. The reason why the directions of “end 1 equipment side” and “end 2 equipment side” are made consistent is that the search / update processing becomes easier in this way.
以上の処理によって、最初の1本のケーブルから、4本のケーブルに切断する工事計画の図面が作成される。作成されたケーブル切断工事管理テーブルのレコードを見ると、ケーブルIDが、最初のケーブルの端1設備側から、元ケーブルID、切断後ケーブルID、元ケーブルID、切断後ケーブルID、のように整然として続いている。 Through the above processing, a drawing of a construction plan for cutting the first cable into four cables is created. Looking at the record of the created cable cutting construction management table, the cable ID is neatly arranged from the end 1 equipment side of the first cable, such as the original cable ID, the cable ID after cutting, the original cable ID, and the cable ID after cutting. It continues as.
図4は、ケーブル切断取り消しプログラムの動作を説明するために、図3(d)の状態から、全てのケーブル切断の工事計画を順次取り消していく過程を示す図である。 FIG. 4 is a diagram showing a process of sequentially canceling all cable cutting work plans from the state shown in FIG. 3D in order to explain the operation of the cable cutting cancellation program.
図4(a)は、図3(d)の状態から、クロージャ114におけるケーブルの切断を取り消す処理の様子を示す図である。処理としては、まず、ケーブル切断工事管理テーブルを検索し、クロージャ114のID「C4」を切断用設備IDとして持つレコードを取得する。そのレコードを参照すると、切断取り消し後に残すべきケーブルIDすなわち元ケーブルIDが、ケーブル24のID「AAA」で、破棄すべきケーブルIDすなわち切断後ケーブルIDが、ケーブル26のID「CCC」となっている。
FIG. 4A is a diagram showing a state of processing for canceling the cutting of the cable in the
次に、これから削除するケーブル26のID「CCC」を元ケーブルIDとして持つケーブル切断工事管理テーブルのレコードを検索する。検索で見つかったレコード(クロージャ115(IDはC5)における切断工事管理情報を持つレコード)に対し、元ケーブルIDを「CCC」から「AAA」に更新し、ケーブル26を削除した後の図面とデータとが整合するようにする。また、バックアップデータである旧ケーブル名称も、先に取得したクロージャ114のID「C4」を持つケーブル切断工事管理テーブルのレコードから移し変える。すなわち、端一設備側のIDを残すのが原則である。
Next, the record of the cable cutting work management table having the ID “CCC” of the
次に、ケーブルIDが「AAA」であるケーブル24と、ケーブルIDが「CCC」であるケーブル26とを結合する。すなわち、ケーブル24のレコードの端2設備IDに、ケーブル26のレコードの端2設備ID「C5」(クロージャ115のID)を入れて更新し、ケーブル26のレコードを削除する。ケーブル24の属性で、実長など再計算が必要な項目は、必要に応じて再計算して更新する。ケーブル名称については、バックアップデータの旧ケーブル名称がnullであり、まだケーブルのデータが完全に元に戻るわけではないため、システムが決めた適当な名称にするか、ユーザが入力するか、そのどちらかをユーザが選択する。
Next, the
次に、ケーブルの切断に使われたクロージャ114のレコードを削除し、同時に、クロージャ114のID「C4」を持つケーブル切断工事管理テーブルのレコードも不要になったため、これを削除する。
Next, the record of the
以上の処理によって、クロージャ114によるケーブルの切断が取り消され、図4(b)に示すケーブル28のある図面が作成できる。この図面は、図3の中には無かったもので、図3(b)と図3(d)に示すケーブル切断は行ったが、その間の図3(c)に示すケーブル切断は行わなかった場合の図面である。このような図面を、最小限のユーザオペレーションによって、自動的に作成できる点が重要である。
With the above processing, the cutting of the cable by the
図4(b)は、図4(a)の状態から、さらにクロージャ113におけるケーブルの切断を取り消す処理の様子を示す図である。処理としては、図4(a)の場合と同様、まずケーブル切断工事管理テーブルを検索し、クロージャ113のID「C4」を切断用設備IDとして持つレコードを取得する。次に、これから削除するケーブル23のID「BBB」を元ケーブルIDとして持つケーブル切断工事管理テーブルのレコードを検索する。そのようなレコードは無い。そのため、ケーブル切断工事管理テーブルの更新処理は、削除処理以外は必要がない。
FIG. 4B is a diagram showing a state of processing for canceling the cutting of the cable in the
次に、ケーブルIDが「DDD」であるケーブル24と、ケーブルIDが「CCC」であるケーブル26を結合する。手順は図4(a)の場合と同様である。次に、クロージャ113のレコードを削除し、クロージャ113と同じID「C4」を持つケーブル切断工事管理テーブルのレコードを削除する。
Next, the
以上の処理によって、クロージャ113によるケーブルの切断が取り消され、図4(c)に示すケーブル29のある図面が作成できる。図4(c)は、図4(b)の状態から、さらにクロージャ115におけるケーブルの切断を取り消す処理を示す図である。処理手順は、図4(b)の場合と同様である。ただし、この場合は、バックアップデータの旧ケーブル名称がnullではなく、最初のケーブル21のケーブル名称「ケーブルA」が入っている。そのため、ケーブル28と29とを結合させる段階で、結合後のケーブルのケーブル名称は、ユーザに選択してもらうのではなく、入っている値をそのまま登録する。
With the above processing, the cutting of the cable by the
以上の処理によって、クロージャ115によるケーブルの切断が取り消され、図4(d)に示すケーブル30のある図面が作成できる。この図面は、図3(a)に示すケーブル21を一度も切断していない最初の状態と一致する図面である。
With the above processing, the cutting of the cable by the
以上に示したように、本実施の形態によるシステムによれば、全てのケーブル切断工事計画を取り消すことによって、取り消す順番に関係なく、元のケーブルのデータを完全に復元することができる。 As described above, according to the system according to the present embodiment, by canceling all cable cutting work plans, the original cable data can be completely restored regardless of the order of cancellation.
図5は、ケーブル切断プログラムの処理の流れをまとめたフローチャート図である。以下、このフローチャート図について説明する。 FIG. 5 is a flowchart summarizing the processing flow of the cable cutting program. Hereinafter, this flowchart will be described.
まず、切断対象のケーブル、切断する箇所(切断対象のケーブルが通過している電柱に限る)をユーザに選択してもらい、そのケーブルIDおよび電柱IDを取得する(ステップ1001)。 First, the user selects a cable to be cut and a portion to be cut (limited to a power pole through which the cable to be cut passes), and acquires the cable ID and the power pole ID (step 1001).
次に、ステップ1001で取得した電柱IDを設置設備IDとして、クロージャテーブルに新しくレコードを登録する。登録するクロージャのIDは連番などで自動生成する。他の属性は、ユーザに入力してもらう(ステップ1002)。
Next, a new record is registered in the closure table with the utility pole ID acquired in
次に、ケーブルテーブルに新しくレコードを登録する。ケーブルのIDは連番などで自動生成する。端1設備IDはステップ1002で登録したクロージャのIDとし、端2設備IDは切断対象のケーブルの端2設備IDをそのまま引き継ぐ。新しいケーブルのケーブル名称は、システムが適当に決めたものにするか、ユーザに入力してもらうかを、ユーザの判断で選択してもらう。他の属性については、型番などは切断対象のケーブルからコピーして、実長などはケーブル図形の座標などから自動計算して登録する(ステップ1003)。
Next, a new record is registered in the cable table. The cable ID is automatically generated using a serial number. The end 1 equipment ID is the closure ID registered in
次に、切断対象のケーブルのレコードを切断後のデータに変更して更新する。このとき、端1設備IDはそのまま変更せず、端2設備IDを1002で登録したクロージャのIDに変更する。切断後のケーブル名称は、システムが適当に決めたものにするか、ユーザに入力してもらうかを、ユーザの判断で選択してもらう。他の属性については、型番などは変更せず、実長などはケーブル図形の座標などから自動計算して登録する(ステップ1004)。
Next, the record of the cable to be cut is changed to the data after cutting and updated. At this time, the end 1 facility ID is not changed as it is, and the
次に、ケーブル切断工事管理テーブルを検索し、元ケーブルIDの項目に、切断対象のケーブルのIDを保持しているレコードがあるかどうか調べ、切断対象のケーブルのIDを保持しているレコードがあればそのレコードを取得する(ステップ1005)。 Next, the cable cutting construction management table is searched to check whether there is a record holding the ID of the cable to be cut in the item of the original cable ID, and the record holding the ID of the cable to be cut is found. If there is, the record is acquired (step 1005).
ステップ1005の検索でレコードが取得できたか否かの判定を行い、レコードが取得できた場合(YES)、そのレコードから旧ケーブル名を取得する。そして、そのレコードの元ケーブルIDをステップ1003で登録した新しいケーブルのIDに変更し、旧ケーブル名にnullを入れてクリアする(ステップ1006、1007)。
It is determined whether or not the record can be acquired by the search in
最後に、ケーブル切断工事管理テーブルに新しくレコードを登録する。登録するレコードの切断用設備IDにはステップ1002で登録したクロージャのIDを入れ、元ケーブルIDには切断対象のケーブルのIDを入れ、切断後ケーブルIDにはステップ1003で登録したケーブルのIDを入れる。旧ケーブル名に入れるデータは以下のようにして決める。ステップ1005の検索でレコードが取得できた場合は、ステップ1006で取得した旧ケーブル名を入れる。ステップ1005の検索でレコードが取得できなかった場合は(NO)、さらに、ケーブル切断工事管理テーブルを検索し、切断対象のケーブルのIDを切断後ケーブルIDの項目に保持しているレコードがあるかどうか調べる。レコードがあれば、切断対象のケーブルは既に他の工事によって切断されているということであるため、旧ケーブル名称にはnullを入れる。レコードが無ければ、そのケーブルを切断するのは今回が最初ということなので、旧ケーブル名称には切断前のケーブル名称を入れる(ステップ1008)。以上の処理によって、ケーブルの切断が完了する。
Finally, a new record is registered in the cable cutting work management table. Enter the closure ID registered in
図6は、ケーブル切断取り消しプログラムの処理の流れをまとめたフローチャート図である。以下、このフローチャートについて説明する。まず、切断を取り消す箇所のクロージャをユーザに選択してもらい、そのクロージャIDを取得する(ステップ1101)。次に、ケーブル切断工事管理テーブルを検索し、切断用設備IDの項目に、ステップ1101で取得したクロージャのIDを保持しているレコードを取得する。クロージャがケーブル切断取り消しプログラムによって登録されたものであれば、このレコードは存在するはずである(ステップ1102)。
FIG. 6 is a flowchart summarizing the processing flow of the cable disconnection cancellation program. Hereinafter, this flowchart will be described. First, the user selects a closure at a location where cutting is to be canceled, and obtains the closure ID (step 1101). Next, the cable cutting construction management table is searched, and a record holding the closure ID acquired in
次に、ケーブル切断工事管理テーブルを検索し、元ケーブルIDの項目に、1102で取得したレコードの切断用設備IDを持つレコードがあるかを調べ、あればそのレコードを取得する(ステップ1103)。 Next, the cable cutting construction management table is searched to check whether there is a record having the cutting equipment ID of the record acquired in 1102 in the item of the original cable ID, and if there is, the record is acquired (step 1103).
ステップ1103の検索でレコードが取得できたか否かの判定を行い(ステップ1104)、レコードが取得できた場合(YES)、そのレコードから旧ケーブル名を取得する。そして、そのレコードの元ケーブルIDをステップ1102で取得したレコードの切断後ケーブルIDに変更する。また、旧ケーブル名称も、ステップ1102で取得したレコードの旧ケーブル名称に変更する。ステップ1102で取得したレコードの旧ケーブル名称がnullであっても、構わず変更する(ステップ1105)。
It is determined whether or not the record can be acquired by the search in step 1103 (step 1104). If the record can be acquired (YES), the old cable name is acquired from the record. Then, the original cable ID of the record is changed to the cable ID after cutting the record acquired in
次に、ケーブルの結合処理を行う。詳しくは、まず、ステップ1102で取得したレコードの元ケーブルIDおよび切断後ケーブルIDに対するケーブルレコードをそれぞれ取得する。そして、元ケーブルIDに対するレコードの端2設備IDを、切断後ケーブルIDに対するレコードの端2設備IDに変更する。そして、元ケーブルIDに対するレコードのケーブル名称を以下のように変更する。ステップ1105でnullでない旧ケーブル名を取得できた場合は、取得したケーブル名に変更する。それ以外の場合は、変更するケーブル名をシステムが適当に決めたものにするか、ユーザに入力してもらうかを、ユーザの判断で選択してもらう。その他、実長など再計算が必要な属性を再計算して変更する。さらに、切断後ケーブルIDに対するレコードを削除する(ステップ1106)。
Next, cable connection processing is performed. Specifically, first, cable records for the original cable ID and the cut cable ID of the record acquired in
最後に、ステップ1101で取得したクロージャIDに対するクロージャレコードを削除し、ステップ1102で取得したケーブル切断工事管理テーブルのレコードを削除する(ステップ1107)。以上の処理によって、ケーブル切断の取り消しが完了する。
Finally, the closure record for the closure ID acquired at
以上に説明したように、本発明の実施の形態によれば、1本の長いケーブルを物理的に切断し、再接続する工事計画のイメージを容易に作成することができ、その計画に従った図面を出力することができる。また、ケーブル切断工事の計画を中止あるいは変更したいとき、既にケーブルを別の場所で切断する計画を行った後であっても、極めて容易に、当該工事においてケーブルを切断しなかった場合のデータを構築し、その場合のケーブルを作図した図面を出力することができる。 As described above, according to the embodiment of the present invention, it is possible to easily create an image of a construction plan in which one long cable is physically cut and reconnected, and the plan is followed. Drawings can be output. In addition, when you want to cancel or change the cable cutting work plan, even if you have already planned to cut the cable at another location, it is very easy to obtain data when the cable is not cut during the work. You can build and output a drawing of the cable in that case.
また、ある1本のケーブルに係る全ての工事計画を取り消すことによって、元のケーブルのデータを完全に復元することができる。さらに、元のケーブルのデータを復元するために格納しておくデータは、切断に関係する各設備のキーと元のケーブルの属性のみに限られており、その切断を取り消した場合に、その後の同ケーブルに係る工事内容を踏まえて最終的に作成すべきデータを逐一格納しておくわけではないので、少ないデータ量で効率良く目的を達成することができる。 Also, by canceling all the construction plans related to a single cable, the original cable data can be completely restored. Furthermore, the data to be stored to restore the original cable data is limited only to the key of each facility related to the disconnection and the attribute of the original cable. Since the data to be finally created is not stored one by one based on the construction contents related to the cable, the purpose can be achieved efficiently with a small amount of data.
本発明は、光ケーブルの工事計画立案ツールとして利用できる。 The present invention can be used as a construction planning tool for optical cables.
1…入出力装置、2…中央処理装置、3…設備管理データベース、4…工事計画管理データベース、5…ケーブル切断プログラム、6…ケーブル切断取り消しプログラム、7…設備属性管理テーブル、8…ケーブル切断工事管理テーブル。 DESCRIPTION OF SYMBOLS 1 ... Input / output device, 2 ... Central processing unit, 3 ... Equipment management database, 4 ... Construction plan management database, 5 ... Cable cutting program, 6 ... Cable cutting cancellation program, 7 ... Equipment attribute management table, 8 ... Cable cutting construction Management table.
Claims (4)
ケーブルの切断工事計画に関連し、切断用設備IDと、前記ケーブルIDを参照可能な元ケーブルID及び切断後ケーブルIDとによりケーブル切断工事の管理を行うケーブル切断工事管理テーブルを有する工事計画管理データベースと、
前記設備管理データベースと前記工事計画管理データベースとを参照してケーブルの切断に関する処理を実行するケーブル切断処理部とを有しており、
前記ケーブル切断処理部は、
ケーブルを切断する場合に、前記ケーブルテーブルにおいて、前記端1設備側又は前記端2設備側のいずれか一方のケーブルに切断前の元ケーブルIDを引き継ぎ、他方のケーブルに新たな切断後ケーブルIDを自動的に付与するとともに、前記端1設備IDと前記端2設備IDについては、前記端1設備側のケーブルでは、前記端1設備IDには前記元ケーブルの端1設備IDが引き継がれ、前記端2設備IDには新しい設備のIDが追加で設定されるとともに、前記端2設備側のケーブルでは、前記端1設備IDには前記新しい設備のIDが追加で設定され、前記端2設備IDには前記元ケーブルの前記端2設備IDが引き継がれ、
前記ケーブル切断工事管理テーブルにおいても、前記端1設備側又は前記端2設備側のいずれか一方のケーブルに切断前の元ケーブルIDを引き継ぎ、他方のケーブルに新たな切断後ケーブルIDを追加で自動的に付与するとともに、前記端1設備IDと前記端2設備IDについては、前記端1設備側のケーブルでは、前記端1設備IDには前記元ケーブルの端1設備IDが引き継がれ、前記端2設備IDには追加で新しい設備のIDが設定されるとともに、前記端2設備側のケーブルでは、前記端1設備IDには前記新しい設備のIDが追加で設定され、前記端2設備IDには前記元ケーブルの前記端2設備IDが引き継がれるように更新する処理を行うことを特徴とするケーブル工事計画情報管理システム。 A facility management database having a cable table for managing a cable and facilities in the cable based on a cable ID and an end 1 facility ID and an end 2 facility ID respectively provided at one end and the other end of the cable;
A work plan management database having a cable cutting work management table for managing cable cutting work by using a cutting equipment ID, a source cable ID that can refer to the cable ID, and a cable ID after cutting, related to the cable cutting work plan When,
A cable cutting processing unit that executes processing related to cable cutting with reference to the facility management database and the construction plan management database;
The cable cutting processing unit
When cutting a cable, in the cable table, the original cable ID before cutting is taken over to either the end 1 equipment side or the end 2 equipment side, and a new post-cutting cable ID is assigned to the other cable. The end 1 equipment ID and the end 2 equipment ID are automatically assigned, and in the end 1 equipment side cable, the end 1 equipment ID of the original cable is taken over by the end 1 equipment ID. The new equipment ID is additionally set in the end 2 equipment ID, and the new equipment ID is additionally set in the end 1 equipment ID in the end 2 equipment side cable. Is taken over by the end 2 equipment ID of the original cable,
Also in the cable cutting work management table, the original cable ID before cutting is inherited to either the end 1 equipment side or the end 2 equipment side, and a new after-cutting cable ID is automatically added to the other cable. For the end 1 equipment ID and the end 2 equipment ID, in the end 1 equipment side cable, the end 1 equipment ID of the original cable is succeeded to the end 1 equipment ID. The new equipment ID is additionally set in the 2 equipment ID, and the new equipment ID is additionally set in the end 1 equipment ID, and the end 2 equipment ID is set in the end 2 equipment ID. Performs a process of updating so that the end 2 equipment ID of the original cable is taken over.
ケーブルの切断を繰り返す際に、前記端1設備側、前記端2設備側の方向が一貫するように、前記端1設備側又は前記端2設備側のいずれか一方のケーブルに切断前の元ケーブルIDを付与するとともに他方のケーブルに新たな切断後ケーブルIDを付与することを特徴とする請求項1に記載のケーブル工事計画情報管理システム。 The cable cutting processing unit
When repeating the cutting of the cable, the original cable before being cut to either the end 1 equipment side or the end 2 equipment side so that the direction of the end 1 equipment side and the end 2 equipment side is consistent. The cable construction plan information management system according to claim 1, wherein an ID is assigned and a new cable ID is given to the other cable.
該ケーブル切断取り消し処理部は、切断したケーブルを結合させる場合に、前記ケーブルテーブルの前記切断後ケーブルIDを消去して前記元ケーブルIDを前記ケーブルテーブルのケーブルIDとして残すとともに、前記端2設備IDに前記切断後ケーブルIDの端2設備IDを入れて更新し、前記ケーブルの切断に使われた設備のIDを削除し、
前記ケーブル切断工事管理テーブルにおいても、前記切断後ケーブルIDを消去して前記元ケーブルIDを前記ケーブル切断工事管理テーブルのケーブルIDとして残すとともに、前記端2設備IDに前記切断後ケーブルIDの端2設備IDを入れて更新し、前記ケーブルの切断に使われた設備のIDを削除することにより更新することを特徴とする請求項1又は2に記載のケーブル工事計画情報管理システム。 In addition, it has a cable cutting cancellation processing section,
The cable cutting cancellation processing unit deletes the cable ID after the cutting of the cable table and leaves the original cable ID as the cable ID of the cable table when the cut cables are combined. And update the end 2 equipment ID of the cable ID after the cut, delete the ID of the equipment used for cutting the cable,
Also in the cable cutting work management table, the cable ID after cutting is erased and the original cable ID is left as the cable ID of the cable cutting work management table, and the end 2 of the cable ID after cutting is added to the end 2 facility ID. The cable construction plan information management system according to claim 1 or 2, wherein the equipment construction ID is updated by putting in the equipment ID and deleting the equipment ID used for cutting the cable.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2005241469A JP4782509B2 (en) | 2005-08-23 | 2005-08-23 | Cable construction plan information management system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2005241469A JP4782509B2 (en) | 2005-08-23 | 2005-08-23 | Cable construction plan information management system |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2007058434A JP2007058434A (en) | 2007-03-08 |
JP4782509B2 true JP4782509B2 (en) | 2011-09-28 |
Family
ID=37921904
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2005241469A Expired - Fee Related JP4782509B2 (en) | 2005-08-23 | 2005-08-23 | Cable construction plan information management system |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP4782509B2 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112186613B (en) * | 2020-09-30 | 2021-12-10 | 国网北京市电力公司 | Cable management method, device and system |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003099572A (en) * | 2001-09-25 | 2003-04-04 | Hitachi Software Eng Co Ltd | Data management method and data management system |
JP2004112853A (en) * | 2002-09-13 | 2004-04-08 | Mitsubishi Heavy Ind Ltd | Cable laying construction management system |
JP4101713B2 (en) * | 2003-08-29 | 2008-06-18 | 中国電力株式会社 | Cable connection diagram creation device, cable connection diagram creation method, and program |
JP4825471B2 (en) * | 2005-08-17 | 2011-11-30 | 株式会社日立ソリューションズ | Cable core management system |
-
2005
- 2005-08-23 JP JP2005241469A patent/JP4782509B2/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
JP2007058434A (en) | 2007-03-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JPH1010970A (en) | Map data updating system | |
KR102175326B1 (en) | Version management of modular process models to improve overall process model operability | |
CN108920566A (en) | Operating method, device and the equipment of a kind of pair of SQLite database | |
CN114385816A (en) | Conversation flow mining method and device, electronic equipment and computer storage medium | |
JP4782509B2 (en) | Cable construction plan information management system | |
JP5009599B2 (en) | Cable core management system | |
JP4051765B2 (en) | Version management apparatus and management method | |
JP3709984B2 (en) | Fieldbus system construction equipment | |
CN110852571A (en) | House resource management method for franchisee, computer-readable storage medium, and server | |
WO2008022573A1 (en) | System and method of circuit cutting and connecting | |
JP2006190115A (en) | Program and system for designing/managing conductor path of optical cable | |
JP4101713B2 (en) | Cable connection diagram creation device, cable connection diagram creation method, and program | |
JP2011100238A (en) | Business process structure estimation method, program, and device | |
JP3736467B2 (en) | Cable management system and management method | |
JP2000192528A (en) | Tray network creation method for wiring | |
EP1024439A2 (en) | Data transfer method, apparatus, and recording medium for use in hierarchical system | |
CN116186815B (en) | Data processing method, device, medium and equipment for grid pattern editing | |
CN117171935B (en) | Pipe network topology structure repairing method, equipment, system and chip | |
JP2003099572A (en) | Data management method and data management system | |
JP4825471B2 (en) | Cable core management system | |
JP3644701B2 (en) | Extractable area extraction method and apparatus therefor | |
JPH056272A (en) | Software designing device | |
JP2010182215A (en) | Time series map data management system, terminal device, time series map data management method, and time series map data management program | |
JP3671542B2 (en) | Time series work plan management method | |
JP2008269281A (en) | Software development support system, development support method and program |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20071221 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20101013 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20101026 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20101206 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20110329 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20110520 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20110607 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20110614 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20110705 |
|
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20110707 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20140715 Year of fee payment: 3 |
|
R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
LAPS | Cancellation because of no payment of annual fees |