JP4769767B2 - Diameter expansion excavation bucket, intermediate expansion portion excavation method, and bottom expansion portion excavation method - Google Patents

Diameter expansion excavation bucket, intermediate expansion portion excavation method, and bottom expansion portion excavation method Download PDF

Info

Publication number
JP4769767B2
JP4769767B2 JP2007170322A JP2007170322A JP4769767B2 JP 4769767 B2 JP4769767 B2 JP 4769767B2 JP 2007170322 A JP2007170322 A JP 2007170322A JP 2007170322 A JP2007170322 A JP 2007170322A JP 4769767 B2 JP4769767 B2 JP 4769767B2
Authority
JP
Japan
Prior art keywords
expanded
diameter
bucket
excavation
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2007170322A
Other languages
Japanese (ja)
Other versions
JP2009007835A (en
Inventor
芳雄 平井
修一 若井
正人 中島
雅路 青木
光生 伊藤
光範 洗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Takenaka Corp
Original Assignee
Takenaka Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Takenaka Corp filed Critical Takenaka Corp
Priority to JP2007170322A priority Critical patent/JP4769767B2/en
Publication of JP2009007835A publication Critical patent/JP2009007835A/en
Application granted granted Critical
Publication of JP4769767B2 publication Critical patent/JP4769767B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Description

本発明は、杭孔に拡径部を形成する拡径掘削用バケット、中間拡径部を形成する中間拡径部の掘削方法、及び拡底部を形成する拡底部の掘削方法に関する。   TECHNICAL FIELD The present invention relates to an enlarged diameter excavation bucket for forming an enlarged diameter portion in a pile hole, an intermediate diameter enlarged portion excavation method for forming an intermediate enlarged diameter portion, and an expanded bottom portion excavating method for forming an expanded bottom portion.

建築物の大型化や高層化に伴い、高い鉛直支持性能が基礎杭に要求されている。そこで、図35に示すように、基礎杭500の先端部502を拡径した拡底部を形成することによって鉛直支持力を大きくする場所打ちコンクリート杭が採用されている。   With the increase in size and height of buildings, high vertical support performance is required for foundation piles. Therefore, as shown in FIG. 35, a cast-in-place concrete pile is adopted in which the vertical support force is increased by forming an expanded bottom portion in which the tip end portion 502 of the foundation pile 500 is expanded.

さらに、図36に示すように、基礎杭504の先端部506だけでなく、中間にも拡径した中間拡径部508を設けた場所打ちコンクリート杭が提案されている。この杭は、中間拡径部508が地中でネジ山のような働きをするので、周囲の地盤から大きな鉛直支持力及び引抜抵抗力を得ることができる。   Furthermore, as shown in FIG. 36, a cast-in-place concrete pile is proposed in which an intermediate enlarged portion 508 having an enlarged diameter is provided not only at the tip portion 506 of the foundation pile 504. In this pile, since the intermediate enlarged diameter portion 508 functions like a screw thread in the ground, a large vertical support force and pulling resistance force can be obtained from the surrounding ground.

図35、36に示すような場所打ちコンクリート杭は、杭径を小さくしても十分な鉛直支持力及び引抜抵抗力が得られるので、建設副産物となる掘削土や杭施工時に使用する孔壁安定液を削減でき、環境負荷低減を図ることができる。   Cast-in-place concrete piles such as those shown in Figs. 35 and 36 can provide sufficient vertical support and pull-out resistance even if the pile diameter is reduced. The liquid can be reduced and the environmental load can be reduced.

また、杭材料であるコンクリートや鉄筋を削減することができるので、コスト低減や工期短縮を図ることができる。   Moreover, since concrete and a reinforcing bar which are pile materials can be reduced, cost reduction and construction period shortening can be aimed at.

図37(A)に示す、特許文献1の分割バケット型回転掘削装置512では、ケリーバ514の下端に連結された角筒状の外筒516の内側に、スライド可能に嵌合された角筒状の内筒518が設けられている。そして、内筒518の下端部には、下面にビット(不図示)が配設された底板520が水平に取付けられている。   In the split bucket rotary excavator 512 of Patent Document 1 shown in FIG. 37A, a rectangular tube shape that is slidably fitted inside a rectangular tube-shaped outer tube 516 that is connected to the lower end of the Kelly bar 514. The inner cylinder 518 is provided. A bottom plate 520 having a bit (not shown) on the lower surface is horizontally attached to the lower end portion of the inner cylinder 518.

外筒516の内部には、外筒516の頂部に後端部が回転可能に連結された油圧シリンダ526が備えられており、油圧シリンダ526のピストンロッド528の先端部に設けられたピン530によってピストンロッド528の先端部と内筒518の下端部が連結されているので、油圧シリンダ526のピストンロッド528を伸縮させることにより、内筒518が伸縮する。   Inside the outer cylinder 516, a hydraulic cylinder 526 having a rear end rotatably connected to the top of the outer cylinder 516 is provided, and a pin 530 provided at the tip of the piston rod 528 of the hydraulic cylinder 526 is provided. Since the tip end portion of the piston rod 528 and the lower end portion of the inner cylinder 518 are connected, the inner cylinder 518 expands and contracts when the piston rod 528 of the hydraulic cylinder 526 expands and contracts.

外筒516及び内筒518の周りには、外壁面にビット(不図示)が配設された湾曲側壁板522が設けられており、外筒516及び内筒518と、湾曲側壁板522とが平行リンク機構524によって連結されている。   Around the outer cylinder 516 and the inner cylinder 518, a curved side wall plate 522 having a bit (not shown) disposed on the outer wall surface is provided. The outer cylinder 516, the inner cylinder 518, and the curved side wall plate 522 are provided. They are connected by a parallel link mechanism 524.

よって、油圧シリンダ526のピストンロッド528が最長の状態になると、湾曲側壁板522は平行リンク機構524の作用によって内側に平行移動するので、バケットの径は図37(A)のように最小になる。   Therefore, when the piston rod 528 of the hydraulic cylinder 526 is in the longest state, the curved side wall plate 522 is translated inward by the action of the parallel link mechanism 524, so the diameter of the bucket is minimized as shown in FIG. .

そして、この状態の分割バケット型回転掘削装置512を拡径する杭孔の底部に載置し、回転駆動装置(不図示)によりケリーバ514を介して分割バケット型回転掘削装置512を回転させると共に、油圧シリンダ526のピストンロッド528を縮めながら、分割バケット型回転掘削装置512を沈下させていくと杭孔の底部は拡径掘削される。そして、分割バケット型回転掘削装置512は図37(B)のような全開状態になる。   Then, the split bucket type rotary excavator 512 in this state is placed on the bottom of the pile hole that expands the diameter, and the rotary bucket drive rotary excavator 512 is rotated via the kelly bar 514 by a rotation driving device (not shown). When the split bucket type rotary excavator 512 is lowered while the piston rod 528 of the hydraulic cylinder 526 is contracted, the bottom of the pile hole is excavated in diameter. Then, the split bucket rotary excavator 512 is fully opened as shown in FIG.

杭孔底部の拡径掘削により掘削された土砂は、湾曲側壁板522を再び図37(A)の状態に戻すことによって、全閉状態となったバケット内に収容される。そして、分割バケット型回転掘削装置512は、クレーンによって地上に吊り上げられた後にバケット内に収容した土砂を地上に排出する。   The earth and sand excavated by the diameter expansion excavation at the bottom of the pile hole is accommodated in the fully closed bucket by returning the curved side wall plate 522 to the state shown in FIG. And the division | segmentation bucket type | mold rotary excavation apparatus 512 discharges | emits the earth and sand accommodated in the bucket, after being lifted on the ground by the crane.

ここで、1回の掘削ステップで排出できる掘削土砂量はバケット容量に依存する。特許文献1の分割バケット型回転掘削装置512のように、バケットの側壁(湾曲側壁板522)が土砂掘削のカッターの役割りを兼ねる装置では、バケット容量を大きくするために側壁を高くすると掘削負荷が大きくなってしまうので好ましくない。   Here, the amount of excavated sediment that can be discharged in one excavation step depends on the bucket capacity. In a device in which the side wall of the bucket (curved side wall plate 522) also serves as a cutter for earth and sand excavation, such as the split bucket type rotary excavator 512 of Patent Document 1, if the side wall is increased in order to increase the bucket capacity, the excavation load Is unfavorable because of an increase in size.

よって、特許文献1の分割バケット型回転掘削装置512では、1回の掘削ステップで排出できる掘削土砂量を大きくすることが難しく、このようなバケット容量の小さい分割バケット型回転掘削装置512で拡径掘削を行う場合、掘削土砂を地上に排出するための分割バケット型回転掘削装置512の昇降回数を多くしなければならないので施工効率が低下してしまう。   Therefore, it is difficult for the divided bucket rotary excavator 512 of Patent Document 1 to increase the amount of excavated sediment that can be discharged in one excavation step, and the split bucket rotary rotary excavator 512 with a small bucket capacity expands the diameter. When excavation is performed, since the number of times of lifting and lowering of the divided bucket rotary excavator 512 for discharging excavated earth and sand to the ground has to be increased, the construction efficiency is lowered.

また、杭孔中間に中間拡径部を形成した後に杭孔底部の拡底掘削を行う場合、杭孔底部の掘削土砂を地上に排出するための分割バケット型回転掘削装置512の昇降回数が多くなると、掘削が完了した中間拡径部の法尻等に分割バケット型回転掘削装置512が接触して崩落し、杭孔の品質が低下することが懸念される。   In addition, when performing bottom-expanded excavation of the bottom of the pile hole after forming an intermediate diameter enlarged portion in the middle of the pile hole, when the number of times of lifting and lowering of the divided bucket rotary excavator 512 for discharging excavated sediment at the bottom of the pile hole to the ground increases There is a concern that the split bucket-type rotary excavator 512 may come into contact with the tail end of the intermediate enlarged diameter portion where excavation has been completed and collapse and the quality of the pile hole may deteriorate.

ここで、容量の大きな土砂回収用バケットを分割バケット型回転掘削装置512の湾曲側壁板522の下方に別途設けることが考えられるが、例えば、中間拡径部の下部に傾斜面を形成するために、湾曲側壁板522の下端部にカッターを取り付けようとする場合、土砂回収用バケットは、このカッターの下端よりも下に設けられることになるので、分割バケット型回転掘削装置512の機械高さがかなり大きくなり、クレーンによって吊り上げるのが困難になってしまう。   Here, it is conceivable to separately provide a large-capacity earth and sand collection bucket below the curved side wall plate 522 of the split bucket type rotary excavator 512. For example, in order to form an inclined surface at the lower portion of the intermediate enlarged diameter portion When the cutter is attached to the lower end portion of the curved side wall plate 522, the earth and sand collection bucket is provided below the lower end of the cutter. It becomes quite large and difficult to lift with a crane.

また、拡底部を形成する場合には、土砂回収用バケットが邪魔になって、拡底部の下部を形成することができない。
特開昭60−242292号公報
Moreover, when forming an expanded bottom part, the bucket for earth and sand collection becomes obstructive, and the lower part of an expanded bottom part cannot be formed.
JP-A-60-242292

本発明は係る事実を考慮し、杭孔の中間拡径部又は拡底部を形成することができると共に、地上に掘削物を排出するための拡径掘削用バケットの昇降回数を減らすことができる拡径掘削用バケット、中間拡径部の掘削方法、及び拡底部の掘削方法を提供することを課題とする。   In consideration of such facts, the present invention can form an intermediate diameter expanded portion or a bottom expanded portion of a pile hole and can increase the number of times of lifting of a diameter expanded excavation bucket for discharging excavated material to the ground. It is an object of the present invention to provide a diameter excavation bucket, an intermediate diameter expanded portion excavation method, and a bottom expanded portion excavation method.

請求項1に記載の発明は、掘削機本体に懸架されて回転する回転軸に設けられ、拡縮して縦孔の孔壁を掘削し、前記縦孔に拡径部を形成する拡翼部と、前記拡翼部の下端部に着脱可能に取り付けられ、前記拡径部の下部に前記縦孔の下方中心に向う傾斜面を形成するアーム部と、前記アーム部の下端に開口面が位置するように設けられる受け皿と前記拡翼部の下端に開口面が位置するように設けられる桶状容器とを前記回転軸の下端部に交換可能に取り付ける連結手段と、を備え、前記受け皿及び前記桶状容器は前記縦孔の孔壁に外周が接触する大きさであり、前記桶状容器の側壁は前記受け皿の側壁よりも高いことを特徴としている。   An invention according to claim 1 is provided on a rotating shaft that is suspended and rotated by a main body of an excavator, expands and contracts to excavate a hole wall of a vertical hole, and forms an expanded portion in the vertical hole. The arm portion is detachably attached to the lower end portion of the expanded wing portion, and forms an inclined surface toward the lower center of the vertical hole at the lower portion of the expanded diameter portion, and the opening surface is located at the lower end of the arm portion And a connecting means for detachably attaching to the lower end portion of the rotating shaft, a tray-like container provided so that an opening surface is positioned at the lower end of the wing expansion portion, and the saucer and the bowl The container has a size such that the outer periphery contacts the hole wall of the vertical hole, and the side wall of the bowl-shaped container is higher than the side wall of the tray.

請求項1に記載の発明では、掘削機本体に懸架されて回転する回転軸に拡翼部が設けられている。拡翼部は拡縮することによって縦孔の孔壁を掘削し、縦孔に拡径部を形成する。   In the first aspect of the present invention, the blade expansion portion is provided on the rotating shaft that is suspended and rotated by the excavator body. By expanding and contracting the expanded wing portion, the hole wall of the vertical hole is excavated, and an enlarged diameter portion is formed in the vertical hole.

拡翼部の下端部には、アーム部が着脱可能に取り付けられている。アーム部は、拡翼部の拡縮によって拡径部の下部に縦孔の下方中心に向う傾斜面を形成する。   An arm part is detachably attached to the lower end part of the expanded wing part. An arm part forms the inclined surface which goes to the downward center of a vertical hole in the lower part of an enlarged diameter part by expansion / contraction of a blade expansion part.

そして、連結手段によって、受け皿と桶状容器とが回転軸の下端部に交換可能に取り付けられる。   And a saucer and a bowl-shaped container are attached to the lower end part of a rotating shaft so that replacement | exchange is possible by a connection means.

受け皿は、アーム部の下端に開口面が位置するように設けられ、桶状容器は、拡翼部の下端に開口面が位置するように設けられる。   The tray is provided so that the opening surface is located at the lower end of the arm portion, and the bowl-shaped container is provided so that the opening surface is located at the lower end of the wing expansion portion.

受け皿及び桶状容器は縦孔の孔壁に外周が接触する大きさになっている。また、桶状容器の側壁の高さは、受け皿の側壁の高さよりも高い。   The saucer and the bowl-shaped container are sized such that the outer periphery contacts the hole wall of the vertical hole. Moreover, the height of the side wall of the bowl-shaped container is higher than the height of the side wall of the tray.

よって、受け皿が連結手段によって回転軸の下端部に取り付けられている状態では、拡翼部及びアーム部によって掘削された孔壁の掘削物を受け皿が回収し、桶状容器が連結手段によって回転軸の下端部に取り付けられている状態では、拡翼部によって掘削された孔壁の掘削物を桶状容器が回収するので、縦孔の底部に落ちて溜まる掘削物をなくす、又は少なくすることができる。   Therefore, in a state where the tray is attached to the lower end portion of the rotating shaft by the connecting means, the receiving tray collects the excavated material of the hole wall excavated by the wing expanding portion and the arm portion, and the bowl-shaped container is rotated by the connecting means. In the state of being attached to the lower end of the slab, since the bowl-shaped container collects the drilled material of the hole wall drilled by the wing expansion part, it is possible to eliminate or reduce the drilled material that falls and accumulates at the bottom of the vertical hole. it can.

これにより、縦孔の底部に溜まった掘削物を地上に排出するために土砂回収用バケットを昇降させる作業をなくす、又は土砂回収用バケットを昇降させる回数を減らすことができる。   Thereby, the operation | work which raises / lowers the earth and sand collection | recovery bucket in order to discharge | emits the excavation accumulated in the bottom part of the vertical hole can be eliminated, or the frequency | count of raising / lowering the earth and sand collection bucket can be reduced.

また、拡径部の下部の傾斜面を形成するときには、受け皿を連結手段によって回転軸の下端部に取り付けてアーム部を取り付けられるようにし、それ以外の掘削のときには、アーム部を取り付けずに受け皿よりも1回の掘削ステップで多くの掘削物を回収することができる桶状容器を連結手段によって回転軸の下端部に取り付ける。   Further, when forming the inclined surface at the lower part of the enlarged diameter portion, the tray can be attached to the lower end portion of the rotating shaft by the connecting means so that the arm portion can be attached, and at the time of other excavation, the arm portion is not attached. A cage-like container capable of collecting a large amount of excavated material in one excavation step is attached to the lower end portion of the rotating shaft by a connecting means.

これにより、アーム部により拡径部の下部に傾斜面を形成することができると共に、地上に掘削物を排出するための拡径掘削用バケットの昇降回数を減らすことができ、施工効率が向上する。   Thereby, while being able to form an inclined surface in the lower part of an enlarged diameter part by an arm part, the raising / lowering frequency | count of the enlarged diameter excavation bucket for discharging excavated material on the ground can be reduced, and construction efficiency improves. .

また、桶状容器は、拡翼部の下端との間にアーム部を設けずに、拡翼部の下端に開口面が位置するように回転軸の下端部に取り付けられるので、受け皿の側壁よりも側壁が高い桶状容器を取り付けたときの拡径掘削用バケットの機械高さを、アーム部及び受け皿を取り付けたときの拡径掘削用バケットの機械高さ程度に抑えることが可能になる。   In addition, the bowl-shaped container is attached to the lower end of the rotating shaft so that the opening surface is located at the lower end of the wing expansion part without providing an arm part between the lower end of the wing expansion part. In addition, the mechanical height of the enlarged diameter excavation bucket when the bowl-shaped container having a high side wall is attached can be suppressed to the mechanical height of the enlarged diameter excavation bucket when the arm portion and the tray are attached.

これにより、アーム部及び受け皿を設けた拡径掘削用バケットを懸架する掘削機本体(例えば、クレーン)によって、桶状容器を設けた拡径掘削用バケットを地上で吊り上げることができる。   Thereby, the large-diameter excavation bucket provided with the bowl-shaped container can be lifted on the ground by the excavator body (for example, a crane) that suspends the large-diameter excavation bucket provided with the arm portion and the tray.

また、拡径掘削用バケットを縦孔の上から下に移動させながら孔壁の掘削を行う場合に、受け皿及び桶状容器が回転軸の中心を縦孔の中心位置にガイドするので、拡径部の真円度を高めることができる。また、桶状容器の側壁の高さは、受け皿の側壁の高さよりも高いので、孔壁に接触する周面積が大きくなる。   In addition, when excavating the hole wall while moving the enlarged diameter excavation bucket from the top to the bottom of the vertical hole, the saucer and the bowl-shaped container guide the center of the rotating shaft to the center position of the vertical hole. The roundness of the part can be increased. Moreover, since the height of the side wall of a bowl-shaped container is higher than the height of the side wall of a saucer, the surrounding area which contacts a hole wall becomes large.

これにより、拡径掘削用バケットの回転をより安定させることができる。   Thereby, rotation of the bucket for diameter expansion excavation can be stabilized more.

請求項2に記載の発明は、縦孔の孔壁を掘削して前記縦孔の中間部に中間拡径部を形成する中間拡径部の掘削方法において、掘削機本体に懸架されて回転する回転軸に設けられた拡翼部の下端部にアーム部を取り付け、かつ前記アーム部の下端に開口面が位置するように前記回転軸の下端部に受け皿を取り付けた状態で、前記拡翼部を拡縮して前記アーム部により前記中間拡径部の下部傾斜面の形成を行う中間拡径下部形成工程と、前記アーム部が取り外された前記拡翼部の下端に開口面が位置するように前記回転軸の下端部に桶状容器を取り付けた状態で、前記拡翼部を拡縮して該拡翼部により前記中間拡径部の上部傾斜面及び鉛直面の形成を行う中間拡径上中部形成工程と、を有し、前記受け皿及び前記桶状容器は前記縦孔の孔壁に外周が接触する大きさであり、前記桶状容器の側壁は前記受け皿の側壁よりも高いことを特徴としている。   According to a second aspect of the present invention, there is provided an intermediate diameter expanding portion excavating a hole wall of a vertical hole to form an intermediate diameter expanded portion at an intermediate portion of the vertical hole. In the state where the arm portion is attached to the lower end portion of the wing expanding portion provided on the rotating shaft, and the tray is attached to the lower end portion of the rotating shaft so that the opening surface is located at the lower end of the arm portion. An intermediate diameter expanded lower portion forming step of forming a lower inclined surface of the intermediate diameter expanded portion by the arm portion, and an opening surface is positioned at the lower end of the blade expanding portion from which the arm portion has been removed. Middle diameter expanded upper middle part that expands and contracts the blade expansion part and forms the upper inclined surface and the vertical surface of the intermediate diameter expanded part by the blade expansion part with the bowl-shaped container attached to the lower end of the rotating shaft. A forming step, and the tray and the bowl-shaped container Is sized to contact the side walls of the tub-shaped container is characterized by higher than the side wall of the pan.

請求項2に記載の発明では、中間拡径下部形成工程と中間拡径上中部形成工程とによって、縦孔の孔壁を掘削して縦孔の中間部に中間拡径部を形成する。   In the second aspect of the invention, the intermediate enlarged diameter portion is formed in the middle portion of the vertical hole by excavating the hole wall of the vertical hole by the intermediate enlarged diameter lower portion forming step and the intermediate enlarged upper portion forming step.

中間拡径下部形成工程では、掘削機本体に懸架されて回転する回転軸に設けられた拡翼部の下端部にアーム部を取り付け、さらに、アーム部の下端に開口面が位置するように回転軸の下端部に受け皿を取り付ける。   In the intermediate enlarged diameter lower part forming process, the arm part is attached to the lower end part of the expanded blade part provided on the rotating shaft suspended and rotated by the excavator body, and further rotated so that the opening surface is positioned at the lower end of the arm part. Attach a saucer to the lower end of the shaft.

そして、この状態で拡翼部を拡縮してアーム部により中間拡径部の下部傾斜面の形成を行う。   Then, in this state, the expanded blade portion is expanded and contracted, and the lower inclined surface of the intermediate expanded portion is formed by the arm portion.

中間拡径上中部形成工程では、アーム部が取り外された拡翼部の下端に開口面が位置するように回転軸の下端部に桶状容器を取り付ける。   In the intermediate diameter expanding upper middle forming step, the bowl-shaped container is attached to the lower end of the rotating shaft so that the opening surface is positioned at the lower end of the expanded blade from which the arm is removed.

そして、この状態で拡翼部を拡縮してこの拡翼部により中間拡径部の上部傾斜面及び鉛直面の形成を行う。   In this state, the expanded wing portion is expanded and contracted, and the upper inclined surface and the vertical surface of the intermediate expanded portion are formed by the expanded wing portion.

ここで、受け皿及び桶状容器は縦孔の孔壁に外周が接触する大きさになっている。さらに、桶状容器の側壁の高さは、受け皿の側壁の高さよりも高い。   Here, the saucer and the bowl-shaped container are sized such that the outer periphery contacts the hole wall of the vertical hole. Furthermore, the height of the side wall of the bowl-shaped container is higher than the height of the side wall of the tray.

よって、中間拡径部の下部傾斜面を形成するときには、受け皿を回転軸の下端部に取り付けてアーム部が取り付けられるようにし、中間拡径部の上部傾斜面及び鉛直面を形成するときには、アーム部を取り付けずに受け皿よりも1回の掘削ステップで多くの掘削物を回収することができる桶状容器を回転軸の下端部に取り付ける。   Therefore, when forming the lower inclined surface of the intermediate enlarged portion, the arm is attached by attaching the tray to the lower end portion of the rotating shaft, and when forming the upper inclined surface and the vertical surface of the intermediate enlarged portion, the arm is attached. A bowl-like container that can collect a large amount of excavated material in a single excavation step than the saucer without attaching the part is attached to the lower end of the rotating shaft.

これにより、アーム部により中間拡径部の下部傾斜面を形成できると共に、地上に掘削物を排出するための拡径掘削用バケットの昇降回数を減らすことができ、施工効率が向上する。   Thereby, while being able to form the lower inclined surface of an intermediate | middle enlarged diameter part with an arm part, the frequency | count of raising / lowering of the enlarged diameter excavation bucket for discharging | emitting excavation material on the ground can be reduced, and construction efficiency improves.

また、桶状容器は、拡翼部の下端との間にアーム部を設けずに、拡翼部の下端に開口面が位置するように回転軸の下端部に取り付けられるので、受け皿よりも側壁の高さが高い桶状容器を取り付けたときの拡径掘削用バケットの機械高さを、アーム部及び受け皿を取り付けたときの拡径掘削用バケットの機械高さ程度に抑えることが可能になる。   Further, the bowl-shaped container is attached to the lower end portion of the rotating shaft so that the opening surface is located at the lower end of the wing expansion portion without providing the arm portion between the lower end of the wing expansion portion, so that the side wall is more than the tray. It is possible to suppress the mechanical height of the enlarged diameter excavation bucket when the bowl-shaped container having a high height is attached to the mechanical height of the enlarged diameter excavation bucket when the arm portion and the saucer are attached. .

これにより、アーム部及び受け皿を設けた拡径掘削用バケットを懸架する掘削機本体(例えば、クレーン)によって、桶状容器を設けた拡径掘削用バケットを地上で吊り上げることができる。   Thereby, the large-diameter excavation bucket provided with the bowl-shaped container can be lifted on the ground by the excavator body (for example, a crane) that suspends the large-diameter excavation bucket provided with the arm portion and the tray.

請求項3に記載の発明は、縦孔の孔壁を掘削して前記縦孔の底部に拡底部を形成する拡底部の掘削方法において、掘削機本体に懸架されて回転する回転軸に設けられた拡翼部の下端に開口面が位置するように前記回転軸の下端部に桶状容器を取り付けた状態で、前記拡翼部を拡縮して該拡翼部により前記拡底部の上部を形成する拡底上部形成工程と、前記拡翼部の下端に上面が位置するように前記回転軸の下端部に板状の底蓋部材を取り付けた状態で、前記拡翼部を拡縮して該拡翼部により前記拡底部の下部を形成する拡底下部形成工程と、を有し、前記受け皿及び前記底蓋部材は、前記縦孔の孔壁に外周が接触する大きさであることを特徴としている。   According to a third aspect of the present invention, there is provided a method of excavating a bottom of a vertical hole to form an expanded base at the bottom of the vertical hole, and the rotary shaft is provided on a rotating shaft that is suspended and rotated by an excavator body. With the bowl-shaped container attached to the lower end of the rotating shaft so that the opening surface is located at the lower end of the expanded wing portion, the upper wing portion is expanded and contracted to form the upper portion of the expanded bottom portion. And a step of expanding the wing portion in a state where a plate-like bottom cover member is attached to the lower end portion of the rotating shaft so that the upper surface is located at the lower end of the wing portion. And a bottom-up bottom forming step of forming a bottom part of the bottom-up part by a portion, wherein the tray and the bottom cover member are sized so that the outer periphery contacts the hole wall of the vertical hole.

請求項3に記載の発明では、拡底上部形成工程と拡底下部形成工程とによって、縦孔の孔壁を掘削して縦孔の底部に拡底部を形成する。   In the third aspect of the invention, the bottom wall is formed at the bottom of the vertical hole by excavating the hole wall of the vertical hole by the bottom-up top forming step and the bottom-up bottom forming step.

拡底上部形成工程では、掘削機本体に懸架されて回転する回転軸に設けられた拡翼部の下端に開口面が位置するように回転軸の下端部に桶状容器を取り付ける。   In the step of forming the expanded bottom, the bowl-shaped container is attached to the lower end of the rotating shaft so that the opening surface is positioned at the lower end of the expanded blade provided on the rotating shaft that is suspended and rotated by the excavator body.

そして、この状態で拡翼部を拡縮してこの拡翼部により前記拡底部の上部を形成する。   In this state, the expanded wing portion is expanded and contracted to form the upper portion of the expanded bottom portion.

拡底下部形成工程では、掘削機本体に懸架されて回転する回転軸に設けられた拡翼部の下端に上面が位置するように回転軸の下端部に板状の底蓋部材を取り付ける。   In the bottom expanded bottom forming step, a plate-like bottom lid member is attached to the lower end of the rotating shaft so that the upper surface is positioned at the lower end of the blade expanding portion provided on the rotating shaft suspended and rotated by the excavator body.

そして、この状態で拡翼部を拡縮してこの拡翼部により拡底部の下部を形成する。   In this state, the expanded wing portion is expanded and contracted to form a lower portion of the expanded bottom portion.

ここで、桶状容器及び底蓋部材は縦孔の孔壁に外周が接触する大きさになっている。   Here, the bowl-shaped container and the bottom lid member are sized such that the outer periphery contacts the hole wall of the vertical hole.

よって、拡底部の上部を形成するときには、拡翼部と底蓋部材とによって形成されるバケットよりも1回の掘削ステップで多くの掘削物を回収することができる桶状容器を取り付け、拡底部の下部を形成するときには底蓋部材を取り付ける。   Therefore, when forming the upper part of the expanded bottom part, a bowl-shaped container that can collect more excavated material in one excavation step than the bucket formed by the expanded wing part and the bottom lid member is attached, and the expanded bottom part A bottom cover member is attached when forming the lower part of.

これにより、拡底部の下部を形成できると共に、地上に掘削物を排出するための拡径掘削用バケットの昇降回数を減らすことができ、施工効率が向上する。   Thereby, while being able to form the lower part of an expanded bottom part, the raising / lowering frequency | count of the diameter expansion excavation bucket for discharging | emitting excavation material on the ground can be reduced, and construction efficiency improves.

本発明は上記構成としたので、杭孔の中間拡径部又は拡底部を形成することができると共に、地上に掘削物を排出するための拡径掘削用バケットの昇降回数を減らすことができる。   Since this invention set it as the said structure, while being able to form the intermediate diameter expansion part or bottom expansion part of a pile hole, the raising / lowering frequency | count of the diameter expansion excavation bucket for discharging excavation material on the ground can be reduced.

図面を参照しながら、本発明の実施形態に係る拡径掘削用バケットを説明する。   A diameter-excavation bucket according to an embodiment of the present invention will be described with reference to the drawings.

図1には、場所打ちコンクリート杭を構築するための杭孔20の中間に中間拡径部を形成する掘削機10の全体構成が示されている。   FIG. 1 shows an overall configuration of an excavator 10 that forms an intermediate expanded portion in the middle of a pile hole 20 for constructing a cast-in-place concrete pile.

ケリーバ12が、掘削機本体としてのクレーン16のワイヤー88に接続されて懸架されている。また、ケリーバ12の途中には旋回装置14が設けられており、ケリーバ12の上下方向の移動を拘束せずに、ケリーバ12を回転させる。   A kelly bar 12 is connected to and suspended from a wire 88 of a crane 16 as an excavator body. Further, a turning device 14 is provided in the middle of the kelly bar 12, and the kelly bar 12 is rotated without restricting the vertical movement of the kelly bar 12.

クレーン16の前方から張出した位置決めアーム18は、旋回装置14の水平位置を調整し、縦孔としての杭孔20の中心位置にケリーバ12を配置する。   The positioning arm 18 projecting from the front of the crane 16 adjusts the horizontal position of the turning device 14 and arranges the kelly bar 12 at the center position of the pile hole 20 as a vertical hole.

図9(C)に示すように、回転軸としての固定ポスト24の上端部には、軸部材60が接続されている。そして、この軸部材60上に設けられた連結ブラケット26にケリーバ12がピン連結されている。   As shown in FIG. 9C, a shaft member 60 is connected to the upper end portion of the fixed post 24 serving as a rotating shaft. The kelly bar 12 is pin-connected to the connection bracket 26 provided on the shaft member 60.

なお、図1の杭孔20は、事前にケリーバ用のドリリングバケットによって地盤28を掘削して形成したものであり、杭孔20内には孔壁の倒壊を防止するベントナイト等の安定液Lが満たされている。   The pile hole 20 in FIG. 1 is formed by previously excavating the ground 28 with a drilling bucket for Keriba, and a stabilizing liquid L such as bentonite that prevents the collapse of the hole wall is contained in the pile hole 20. be satisfied.

拡径掘削用バケット22は、図2に示すように、上部スタビライザ部36、拡縮バケット部38、下部スタビライザ部40によって構成され、上からこの順に配置されている。   As shown in FIG. 2, the enlarged diameter excavation bucket 22 includes an upper stabilizer portion 36, an expansion / contraction bucket portion 38, and a lower stabilizer portion 40, which are arranged in this order from the top.

上部スタビライザ部36は、図3の平面図に示すように、軸部材60を囲む円弧状のガイド部材42を対角状に4つ配置したものである。   As shown in the plan view of FIG. 3, the upper stabilizer portion 36 includes four arcuate guide members 42 that surround the shaft member 60 in a diagonal shape.

各ガイド部材42の内側には、角筒状のスライド部材44の後端部が固定され、スライド部材44の先端部は軸部材60に向っている。スライド部材44は、軸部材60の各コーナー部から外側に張出した角筒状の支持部材46の内側に、スライド可能に嵌合されている。これにより、図3の状態よりも外側(矢印Nの方向)にガイド部材42を拡げることができる。   Inside each guide member 42, the rear end portion of the rectangular tubular slide member 44 is fixed, and the front end portion of the slide member 44 faces the shaft member 60. The slide member 44 is slidably fitted inside a rectangular tube-like support member 46 projecting outward from each corner portion of the shaft member 60. Thereby, the guide member 42 can be expanded outside (the direction of arrow N) rather than the state of FIG.

支持部材46にはボルト48を通す2つの貫通孔50が開けられており、スライド部材44にはボルト48を通す7つの貫通孔52が等間隔に開けられている。   The support member 46 has two through holes 50 through which the bolts 48 pass, and the slide member 44 has seven through holes 52 through which the bolts 48 pass at equal intervals.

杭孔20の孔壁面とガイド部材42の間にわずかな隙間を残す程度に、スライド部材44をスライドさせてガイド部材42の位置を調整し、貫通孔50と貫通孔52が一致する位置で、2本のボルト48によって固定する。   The slide member 44 is slid to adjust the position of the guide member 42 to such an extent that a slight gap is left between the hole wall surface of the pile hole 20 and the guide member 42, and the through hole 50 and the through hole 52 coincide with each other. It is fixed with two bolts 48.

このとき、各スライド部材44のスライド量を等しくすることによって、軸部材60に接続された固定ポスト24の中心を杭孔20の中心位置にガイドすることができる。   At this time, by making the slide amount of each slide member 44 equal, the center of the fixed post 24 connected to the shaft member 60 can be guided to the center position of the pile hole 20.

図2に示すように、拡縮バケット部38には、固定ポスト24を囲む拡翼部としての側壁板30が4つ設けられている。4つの側壁板30はすべて同形状であり、側壁板30の平断面は円弧状になっている。また、側壁板30の下部30Bは略鉛直面を形成しており、側壁板30の上部30Aは内側に傾斜している。   As shown in FIG. 2, the expansion / contraction bucket portion 38 is provided with four side wall plates 30 as wing expansion portions surrounding the fixed post 24. All of the four side wall plates 30 have the same shape, and the flat cross section of the side wall plate 30 has an arc shape. Further, the lower portion 30B of the side wall plate 30 forms a substantially vertical surface, and the upper portion 30A of the side wall plate 30 is inclined inward.

各側壁板30の回転方向(矢印Mの方向)先頭側の端部には、掘削ビット32が上下方向に等間隔で配設されている。掘削ビット32は、図2のA−A断面図の図4に示すように、杭孔20の孔壁面に向って尖った形状をしている。よって、旋回装置14によりケリーバ12を介して固定ポスト24を矢印Mの方向に回転させ、側壁板30が杭孔20の孔壁面側に移動することにより、杭孔20の孔壁が掘削されて中間拡径部が形成される。   Excavation bits 32 are arranged at equal intervals in the vertical direction at the leading end of the rotation direction of each side wall plate 30 (in the direction of arrow M). As shown in FIG. 4 of the AA sectional view of FIG. 2, the excavation bit 32 has a sharp shape toward the hole wall surface of the pile hole 20. Therefore, when the fixed post 24 is rotated in the direction of the arrow M by the turning device 14 via the kelly bar 12, and the side wall plate 30 moves to the hole wall surface side of the pile hole 20, the hole wall of the pile hole 20 is excavated. An intermediate enlarged portion is formed.

図2の各側壁板30の下端部には、先端部が下方内側に向うように、アーム部としてのアーム部材34が着脱可能に取付けられている。対向するアーム部材34の長さは同じであり、隣り合うアーム部材34同士の長さは異なっている。すなわち、対向する1組のアーム部材34の長さは長く、対向するもう1組のアーム部材34の長さは短くなっている。これにより、拡径掘削用バケット22のバケット径が最小のときに、長い方のアーム部材34は交差し、短い方のアーム部材34は、この交差した長い方のアーム部材34にぶつからないようになっている。図5に示すように、側壁板30の下部30Bは、鉛直線62と略平行な鉛直面を形成しており、側壁板30の上部30Aは、鉛直線62に対して角度Eだけ内側に傾斜している。この角度Eが、中間拡径部56を掘削した際の中間拡径部上部の傾斜面56Aの傾斜角度になる。   An arm member 34 as an arm portion is detachably attached to the lower end portion of each side wall plate 30 in FIG. 2 so that the front end portion is directed downward and inward. The lengths of the opposing arm members 34 are the same, and the lengths of the adjacent arm members 34 are different. That is, the length of the opposing arm member 34 is long, and the length of the opposing arm member 34 is short. As a result, when the bucket diameter of the large-diameter excavation bucket 22 is minimum, the longer arm member 34 intersects, and the shorter arm member 34 does not collide with the intersecting longer arm member 34. It has become. As shown in FIG. 5, the lower portion 30 </ b> B of the side wall plate 30 forms a vertical plane substantially parallel to the vertical line 62, and the upper portion 30 </ b> A of the side wall plate 30 is inclined inward by an angle E with respect to the vertical line 62. is doing. This angle E becomes the inclination angle of the inclined surface 56A at the upper part of the intermediate expanded portion when the intermediate expanded portion 56 is excavated.

また、アーム部材34は、鉛直線62に対して角度Fだけ内側に傾斜するように、側壁板30の内側に設けられたブラケット74の下端部に固定されている。この角度Fが、中間拡径部56を掘削した際の中間拡径部下部の傾斜面56Cの傾斜角度になる。   The arm member 34 is fixed to a lower end portion of a bracket 74 provided on the inner side of the side wall plate 30 so as to be inclined inward by an angle F with respect to the vertical line 62. This angle F becomes the inclination angle of the inclined surface 56 </ b> C at the lower portion of the intermediate enlarged portion when the intermediate enlarged portion 56 is excavated.

図5のアーム部材34を外側から見た正面図の図6(A)に示すように、アーム部材34にも、側壁板30の掘削ビット32と同様の掘削ビット58が上下方向に等間隔で配設されている。   As shown in FIG. 6A, which is a front view of the arm member 34 shown in FIG. 5 as viewed from the outside, the arm member 34 also has the same excavation bit 58 as the excavation bit 32 of the side wall plate 30 at equal intervals in the vertical direction. It is arranged.

掘削ビット58は、図6(A)のB−B断面図の図6(B)に示すように、中間拡径部下部の傾斜面56C側に尖った形状をしている。よって、旋回装置14によりケリーバ12を介して固定ポスト24を矢印Mの方向に回転させ、側壁板30と共にアーム部材34が外側に移動することにより杭孔20の孔壁が削られ、中間拡径部下部の傾斜面56Cが形成される。   As shown in FIG. 6B of the BB cross-sectional view of FIG. 6A, the excavation bit 58 has a sharp shape toward the inclined surface 56C side of the lower portion of the intermediate enlarged diameter portion. Therefore, the fixed post 24 is rotated in the direction of the arrow M by the turning device 14 via the kelly bar 12, and the arm member 34 moves outward together with the side wall plate 30, so that the hole wall of the pile hole 20 is shaved, and the intermediate diameter is increased. An inclined surface 56C at the lower part is formed.

アーム部材34は、図7に示す構造によって側壁板30の下端部に着脱可能に取り付けられる。アーム部材34の上端部に設けられたブラケット160には、ボルト163の貫通孔161A、161Bが形成されている。   The arm member 34 is detachably attached to the lower end portion of the side wall plate 30 by the structure shown in FIG. Through holes 161 </ b> A and 161 </ b> B of bolts 163 are formed in the bracket 160 provided at the upper end portion of the arm member 34.

側壁板30の内側に設けられたブラケット74にも、ボルト163の貫通孔162A、162Bが形成されており、アーム部材34を側壁板30の下端部に装着してブラケット160をブラケット74に添わせたときに、貫通孔162A、162Bは貫通孔161A、161Bと一致する。   Through holes 162A and 162B of bolts 163 are also formed in the bracket 74 provided inside the side wall plate 30, and the arm member 34 is attached to the lower end portion of the side wall plate 30 so that the bracket 160 is attached to the bracket 74. The through holes 162A and 162B coincide with the through holes 161A and 161B.

そして、図7の右図に示すように、貫通孔161A、161Bと貫通孔162A、162Bの位置を合わせてボルト163を通し、ナットで締め付けてアーム部材34を固定する。   Then, as shown in the right diagram of FIG. 7, the positions of the through holes 161A and 161B and the through holes 162A and 162B are aligned, the bolts 163 are passed, and the arm member 34 is fixed by tightening with nuts.

なお、このアーム部材34の取付け構造は、アーム部材34の着脱が容易にでき、かつ杭孔の孔壁をアーム部材34が掘削できる程度にしっかりと固定できるものであればよく、図8のような構造にしてもよい。   The arm member 34 may be attached in any structure as long as the arm member 34 can be easily attached and detached and the hole wall of the pile hole can be firmly fixed to such an extent that the arm member 34 can be excavated, as shown in FIG. Any structure may be used.

図8では、アーム部材34の上端部に設けられたブラケット164に、ボルト168の貫通孔165A、165Bが上向きに形成されている。   In FIG. 8, through holes 165 </ b> A and 165 </ b> B of the bolt 168 are formed upward in the bracket 164 provided at the upper end portion of the arm member 34.

ブラケット74の下端部に設けられたブラケット166にも、ボルト168の貫通孔167A、167Bが下向きに形成されており、アーム部材34を側壁板30の下端部に装着したときに、貫通孔167A、167Bは貫通孔165A、165Bと一致する。   Through holes 167A and 167B of bolts 168 are also formed downward in the bracket 166 provided at the lower end portion of the bracket 74, and when the arm member 34 is attached to the lower end portion of the side wall plate 30, the through holes 167A, 167B coincides with the through holes 165A and 165B.

そして、図8の右図に示すように、貫通孔165A、165Bと貫通孔167A、167Bの位置を合わせてボルト168を通し、ナット169で締め付けてアーム部材34を固定する。   Then, as shown in the right view of FIG. 8, the positions of the through holes 165A and 165B and the through holes 167A and 167B are aligned, the bolt 168 is passed, and the arm member 34 is fixed by tightening with the nut 169.

側壁板30及びアーム部材34は、図9に示すリンク機構66によって拡縮される。   The side wall plate 30 and the arm member 34 are expanded and contracted by a link mechanism 66 shown in FIG.

図9(C)に示すように、ケリーバ12の下端部が、軸部材60上の連結ブラケット26にピン連結されている。そして、この軸部材60は、拡径掘削用バケット22の回転軸としての角筒状の固定ポスト24の上端部に接続されている。   As shown in FIG. 9C, the lower end portion of the kelly bar 12 is pin-connected to the connection bracket 26 on the shaft member 60. The shaft member 60 is connected to an upper end portion of a rectangular tube-shaped fixed post 24 as a rotation shaft of the diameter-excavation bucket 22.

固定ポスト24の外側には、角筒状の昇降ポスト64が設けられている。昇降ポスト64の長さは固定ポスト24の長さよりも短く、固定ポスト24の長さ方向に沿って昇降ポスト64がスライドするように、昇降ポスト64の内側に固定ポスト24が嵌合されている。   On the outside of the fixed post 24, a rectangular tube-shaped lifting post 64 is provided. The length of the lift post 64 is shorter than the length of the fixed post 24, and the fixed post 24 is fitted inside the lift post 64 so that the lift post 64 slides along the length direction of the fixed post 24. .

昇降ポスト64の左右には、ブラケット68が固定されており、ブラケット68の上部には、ブラケット72がさらに外側に食み出るように設けられている。そして、油圧シリンダ70の中央部は、このブラケット72に回転可能に連結されている。   Brackets 68 are fixed to the left and right of the elevating post 64, and a bracket 72 is provided above the bracket 68 so as to protrude further outward. The central portion of the hydraulic cylinder 70 is rotatably connected to the bracket 72.

リンク部材76の両端は、ブラケット68の外側中央部と、側壁板30の内側に設けられたブラケット74の上部にそれぞれ回転可能に連結されており、このリンク部材76と平行になるように設けられたリンク部材78の両端は、ブラケット68の下部と、ブラケット74の下部に回転可能に連結されている。   Both ends of the link member 76 are rotatably connected to the outer central portion of the bracket 68 and the upper portion of the bracket 74 provided inside the side wall plate 30, and are provided so as to be parallel to the link member 76. Both ends of the link member 78 are rotatably connected to the lower part of the bracket 68 and the lower part of the bracket 74.

リンク部材80の両端は、リンク部材76、78の略中央部にそれぞれ回転可能に連結されており、リンク部材82の両端は、リンク部材80の下端部と、固定ポスト24の下端部に設けられたブラケット84にそれぞれ回転可能に連結されている。   Both ends of the link member 80 are rotatably connected to substantially the center portions of the link members 76 and 78, and both ends of the link member 82 are provided at the lower end portion of the link member 80 and the lower end portion of the fixed post 24. Each bracket 84 is rotatably connected to each other.

略三角形状のブラケット90はリンク部材78と連動するように、その下辺がリンク部材78に固定されており、ブラケット90の頂部連結部92は、油圧シリンダ70のピストンロッド86の先端部と回転可能に連結されている。   The substantially triangular bracket 90 is fixed to the link member 78 so that the bracket 90 is interlocked with the link member 78, and the top connecting portion 92 of the bracket 90 is rotatable with the tip of the piston rod 86 of the hydraulic cylinder 70. It is connected to.

ここで、図9(A)に示すような、拡径掘削用バケット22のバケット径が最小の状態において、油圧シリンダ70を作動させ、油圧シリンダ70のピストンロッド86を矢印Pの方向に縮めるとブラケット90の頂部連結部92は、リンク部材78のブラケット68との連結部78Aを回転中心として矢印Qの方向に回転する。   Here, when the hydraulic cylinder 70 is operated and the piston rod 86 of the hydraulic cylinder 70 is contracted in the direction of the arrow P in the state where the bucket diameter of the large-diameter excavation bucket 22 is minimum as shown in FIG. The top connection portion 92 of the bracket 90 rotates in the direction of the arrow Q with the connection portion 78A of the link member 78 connected to the bracket 68 as the rotation center.

すると、このブラケット90の動きに連動して、リンク部材76、78が矢印Rの方向に旋回し、これに伴って昇降ポスト64は矢印Sの方向へ、側壁板30は矢印Tの方向へ移動し、図9(B)の状態になる。   Then, in conjunction with the movement of the bracket 90, the link members 76 and 78 turn in the direction of arrow R, and accordingly, the lifting post 64 moves in the direction of arrow S and the side wall plate 30 moves in the direction of arrow T. Then, the state shown in FIG.

さらに、油圧シリンダ70のピストンロッド86を矢印Pの方向に縮めると、最終的には図9(C)に示すような、拡径掘削用バケット22のバケット径が最大の状態になる。   Further, when the piston rod 86 of the hydraulic cylinder 70 is contracted in the direction of the arrow P, the bucket diameter of the expanded excavation bucket 22 is finally maximized as shown in FIG.

このように、図9(A)、(B)、(C)の順に動作することによって拡径掘削用バケット22は拡径し、また、この逆の動作手順(図9(C)、(B)、(A))によって拡径掘削用バケット22は縮径する。   Thus, by operating in the order of FIGS. 9 (A), (B), (C), the diameter-excavation bucket 22 is expanded, and the reverse operation procedure (FIGS. 9 (C), (B) ), (A)), the diameter-excavation bucket 22 is reduced in diameter.

このようなリンク機構66によって、油圧シリンダ70がリンク機構66内にコンパクトに収めることができるので、大きな拡径率(孔杭の拡径部と軸部との断面積の比率)の中間拡径部を孔杭の中間に形成することができる。   By such a link mechanism 66, the hydraulic cylinder 70 can be accommodated in the link mechanism 66 in a compact manner, so that an intermediate diameter expansion with a large diameter expansion ratio (ratio of the cross-sectional area between the diameter expansion portion and the shaft portion of the hole pile). The part can be formed in the middle of the hole pile.

従来の拡径掘削用バケットで掘削できるのは、3.2以下程度の拡径率の拡径部であったが、本実施形態の拡径掘削用バケット22においては、リンク機構66を用いることによって最大で約5.0程度の拡径率の拡径部の掘削を行うことができる。   The conventional diameter-expanded excavation bucket can excavate an expanded portion with an expansion rate of about 3.2 or less. However, in the diameter-expanded excavation bucket 22 of the present embodiment, a link mechanism 66 is used. Therefore, excavation of the expanded portion having a diameter expansion ratio of about 5.0 at the maximum can be performed.

また、油圧シリンダ70をリンク機構66に組込んだ構造としたことで、拡縮バケット部38の高さを低く抑えることができるので、拡径掘削用バケット22の機械高さを小さくすることができる。   Further, since the hydraulic cylinder 70 is incorporated in the link mechanism 66, the height of the expansion / contraction bucket portion 38 can be kept low, so that the mechanical height of the diameter-excavation bucket 22 can be reduced. .

また、側壁板30の支持アームとなるリンク部材78を油圧シリンダ70で直接動作させるので、伝達力のロスがなく、機械効率を向上させることができる。   Further, since the link member 78 serving as the support arm of the side wall plate 30 is directly operated by the hydraulic cylinder 70, there is no loss of transmission force, and mechanical efficiency can be improved.

なお、図9では2つの油圧シリンダ70のみが示されているが、4つの側壁板30のそれぞれに油圧シリンダ70及びリンク機構66が設けられている。すなわち、拡縮バケット部38には4つの油圧シリンダ70が搭載されている。   Although only two hydraulic cylinders 70 are shown in FIG. 9, the hydraulic cylinder 70 and the link mechanism 66 are provided on each of the four side wall plates 30. That is, the four hydraulic cylinders 70 are mounted on the expansion / contraction bucket portion 38.

図2に示すように、スタビライザ部としての下部スタビライザ部40は、吊り支柱94と、受け皿としての土砂回収用バケット96とによって構成されている。土砂回収用バケット96は、底板100を有する円筒状の容器であり、杭孔20の孔壁に外周が接触する大きさになっている。すなわち、土砂回収用バケット96の外径は、土砂回収用バケット96の側壁面と杭孔20の孔壁の間に若干の隙間が形成される程度に、杭孔20の径よりも小さくなっている。   As shown in FIG. 2, the lower stabilizer part 40 as a stabilizer part is comprised by the suspension support | pillar 94 and the earth and sand collection bucket 96 as a saucer. The earth and sand collection bucket 96 is a cylindrical container having a bottom plate 100, and has a size such that the outer periphery contacts the hole wall of the pile hole 20. That is, the outer diameter of the earth and sand collection bucket 96 is smaller than the diameter of the pile hole 20 so that a slight gap is formed between the side wall surface of the earth and sand collection bucket 96 and the hole wall of the pile hole 20. Yes.

図10に示すように、スタビライザ部としての下部スタビライザ部40は、回転軸としての固定ポスト24の下端部に着脱可能に設けられている。4つの吊り支柱94の上端部が、固定ポスト24の下端部に着脱可能に取付けられた連結手段としての接続部材98の下面に接合され、下方外側に向かって四方に広がっている。吊り支柱94の下端部は、土砂回収用バケット96の側壁上部に接合されている。   As shown in FIG. 10, the lower stabilizer part 40 as a stabilizer part is provided in the lower end part of the fixed post 24 as a rotating shaft so that attachment or detachment is possible. The upper end portions of the four suspension posts 94 are joined to the lower surface of a connection member 98 as a connecting means that is detachably attached to the lower end portion of the fixed post 24, and spreads in all directions downward. The lower end portion of the suspension column 94 is joined to the upper portion of the side wall of the earth and sand collection bucket 96.

図11に示すように、下部スタビライザ部40の接続部材98上部は、円筒状の嵌入部170となっている。また、嵌入部170にはボルト174の貫通孔171が形成されている。   As shown in FIG. 11, the upper portion of the connection member 98 of the lower stabilizer portion 40 is a cylindrical insertion portion 170. Further, a through hole 171 of a bolt 174 is formed in the fitting portion 170.

回転軸としての固定ポスト24下部には、嵌入部170の嵌入孔172が設けられている。嵌入孔172の上方は、嵌入した嵌入部170の頂部が当って止まるように、角筒状の固定ポスト24の中空部分が埋められている。また、固定ポスト24下部には、嵌入部170が嵌入孔172に完全に嵌入されたときの貫通孔171と一致するように、貫通孔173が形成されている。   An insertion hole 172 of the insertion portion 170 is provided at the lower portion of the fixed post 24 as a rotation shaft. Above the insertion hole 172, the hollow portion of the square cylindrical fixing post 24 is buried so that the top of the inserted insertion portion 170 hits and stops. Further, a through hole 173 is formed in the lower portion of the fixed post 24 so as to coincide with the through hole 171 when the fitting portion 170 is completely fitted into the fitting hole 172.

そして、図11の右図に示すように、貫通孔171と貫通孔173の位置を合わせてボルト174を通し、ナット175で締め付けて嵌入部170を固定ポスト24に連結する。このとき、土砂回収用バケット96の開口面はアーム部材34の下端に位置するように設けられる(図9参照のこと)。なお、土砂回収用バケット96は、図9に示すように、土砂回収用バケット96の開口面が常にアーム部材34の先端部よりも低い位置になるように取付けられていればよい。   Then, as shown in the right figure of FIG. 11, the positions of the through hole 171 and the through hole 173 are aligned, the bolt 174 is passed, and the nut 175 is tightened to connect the fitting portion 170 to the fixed post 24. At this time, the opening surface of the earth and sand collection bucket 96 is provided so as to be positioned at the lower end of the arm member 34 (see FIG. 9). As shown in FIG. 9, the earth and sand collection bucket 96 may be attached so that the opening surface of the earth and sand collection bucket 96 is always lower than the tip of the arm member 34.

なお、この下部スタビライザ部40の取付け構造は、固定ポスト24下端部への着脱が容易にでき、かつ固定ポスト24下端部にしっかりと下部スタビライザ部40を固定できるものであればよく、ピンによって固定ポスト24と嵌入部170を連結してもよい。   The attachment structure of the lower stabilizer portion 40 may be any structure as long as it can be easily attached to and detached from the lower end portion of the fixing post 24 and can firmly fix the lower stabilizer portion 40 to the lower end portion of the fixing post 24. You may connect the post | mailbox 24 and the insertion part 170. FIG.

図10に示すように、土砂回収用バケット96の蓋となる円盤状の底板100は、土砂回収用バケット96の側壁下部の内側に設けられたヒンジ102によって矢印Vの方向に開閉可能に連結されている。この開閉によって、土砂回収用バケット96に積載された掘削土砂を地上にて排出する。   As shown in FIG. 10, a disk-like bottom plate 100 that serves as a lid for the earth and sand collection bucket 96 is connected to the inside of the lower part of the side wall of the earth and sand collection bucket 96 so as to be openable and closable in the direction of arrow V. ing. By this opening and closing, the excavated earth and sand loaded in the earth and sand collecting bucket 96 is discharged on the ground.

土砂回収用バケット96のヒンジ102と対向する側壁付近には、底板100のロック機構104が設けられている。土砂回収用バケット96の側壁下部及び上部に設けられ、内側に張出した上部サポート106及び下部サポート108に、丸棒110が回転可能に支持されて、蓋をした状態の底板100の水平面に対して略垂直に立設している。   A lock mechanism 104 for the bottom plate 100 is provided in the vicinity of the side wall facing the hinge 102 of the earth and sand recovery bucket 96. A round bar 110 is rotatably supported by an upper support 106 and a lower support 108 that are provided at the lower and upper side walls of the earth and sand collecting bucket 96 and projecting inward, and with respect to the horizontal plane of the bottom plate 100 in a covered state. Stands vertically.

丸棒110の上端部にはハンドル112が設けられており、下端部にはロック部材114が設けられている。ロック部材114の下部は、図12に示すような、傾斜面114A、114Bを有する形状をしている。   A handle 112 is provided at the upper end of the round bar 110, and a lock member 114 is provided at the lower end. The lower part of the lock member 114 has a shape having inclined surfaces 114A and 114B as shown in FIG.

土砂回収用バケット96を上から見た図13に示すように、ハンドル112の略中央部と、上部サポート106から張出したブラケット120との間にはスプリング118が設けられており、矢印Wと逆の方向にハンドル112を付勢している。このとき、上部サポート106の上面に固定されたストッパー部材122にハンドル112が当たるので、ハンドル112はこの位置よりもさらにブラケット120側に回ることはない。さらに、上部サポート106の上面には、ハンドル112が矢印Wの方向に回って符号112Aの位置に達したときに当たるストッパー部材126が固定されている。   As shown in FIG. 13 when the earth and sand collection bucket 96 is viewed from above, a spring 118 is provided between the substantially central portion of the handle 112 and the bracket 120 protruding from the upper support 106, and is opposite to the arrow W. The handle 112 is urged in the direction of. At this time, since the handle 112 hits the stopper member 122 fixed to the upper surface of the upper support 106, the handle 112 does not turn further to the bracket 120 side than this position. Further, a stopper member 126 is fixed to the upper surface of the upper support 106. The stopper member 126 contacts when the handle 112 rotates in the direction of arrow W and reaches the position 112A.

底板100には、ロック部材114の平面外形(幅d)よりも若干大きい開口部124(幅d)が形成されている。この開口部124は、ハンドル112を矢印Wの方向に回しストッパー部材126に当たったときにロック部材114と嵌合する位置に形成されている。 An opening 124 (width d 2 ) slightly larger than the planar outer shape (width d 1 ) of the lock member 114 is formed in the bottom plate 100. The opening 124 is formed at a position where the handle 112 is fitted in the lock member 114 when the handle 112 is rotated in the direction of the arrow W and hits the stopper member 126.

図13(A)では、ロック部材114の角部と、これに対向するロック部材114のもう一方の角部との間の長さdが開口部124の幅dよりも大きくなっているので、ロック部材114が開口部124の縁に引掛かりロックされる。これによって、底板100が閉まった状態を維持する。 In FIG. 13A, the length d 3 between the corner of the lock member 114 and the other corner of the lock member 114 facing the lock member 114 is larger than the width d 2 of the opening 124. Therefore, the lock member 114 is hooked on the edge of the opening 124 and locked. As a result, the bottom plate 100 is kept closed.

スプリング118に抗してハンドル112を矢印Wの方向に回すと、図13(B)に示すように、ロック部材114が開口部124と嵌合する位置(d>d)に配置されてロックが解除される。 Turning the handle 112 against the spring 118 in the direction of arrow W, as shown in FIG. 13 (B), the locking member 114 is disposed in the opening 124 and the fitting position (d 2> d 1) The lock is released.

そして、土砂の重量によってヒンジ102を回転中心にして矢印Yの方向に底板100が回転して開放される。   Then, the bottom plate 100 is rotated and opened in the direction of the arrow Y with the hinge 102 as the center of rotation by the weight of the earth and sand.

開放した底板100を閉じるには、底板100を外力によって押し上げるか、又は拡径掘削用バケット22を地上に下ろせば、装置の自重によって底板100が閉じられる。   To close the opened bottom plate 100, the bottom plate 100 is pushed up by an external force, or the diameter-excavation bucket 22 is lowered to the ground, and the bottom plate 100 is closed by its own weight.

底板100を下から見た平面図の図14に示すように、底板100が押し上げられると開口部124の縁部128の裏側がロック部材114の傾斜面114A、114B、と接し(図14(A)参照のこと)、さらに底板100を押し上げることによってロック部材114が、丸棒110の中心を軸としてスプリング118に抗して回転し(図14(B)参照のこと)、ついにロック部材114が開口部124と嵌合する位置になったときに(図14(C)参照のこと)開口部124がロック部材114を通過して底板100が閉じられる。   14, when the bottom plate 100 is pushed up, the back side of the edge portion 128 of the opening 124 comes into contact with the inclined surfaces 114A and 114B of the lock member 114 (see FIG. 14A). )), By further pushing up the bottom plate 100, the lock member 114 rotates against the spring 118 about the center of the round bar 110 (see FIG. 14B), and finally the lock member 114 is When the position where the opening 124 is fitted (see FIG. 14C), the opening 124 passes through the lock member 114 and the bottom plate 100 is closed.

開口部124を通過したロック部材114は、スプリング118の付勢力により図14(A)と同じ位置に戻り底板100が自動的にロックされる(図14(D)参照のこと)。   The lock member 114 that has passed through the opening 124 is returned to the same position as in FIG. 14A by the urging force of the spring 118, and the bottom plate 100 is automatically locked (see FIG. 14D).

図15には、スタビライザ部としての下部スタビライザ部101を固定ポスト24の下端部に取り付けた拡径掘削用バケット23が示されている。また、図16に示すように、下部スタビライザ部101は、支持部材103と、桶状容器としての土砂回収用バケット105とによって構成されている。   FIG. 15 shows a diameter-excavation bucket 23 in which a lower stabilizer 101 as a stabilizer is attached to the lower end of the fixed post 24. Moreover, as shown in FIG. 16, the lower stabilizer part 101 is comprised by the supporting member 103 and the earth and sand collection | recovery bucket 105 as a bowl-shaped container.

土砂回収用バケット105は、土砂回収用バケット96と同様の底板100を有する円筒状の容器であり、杭孔20の孔壁に外周が接触する大きさになっている。すなわち、土砂回収用バケット105の外径は、土砂回収用バケット105の側壁面と杭孔20の孔壁の間に若干の隙間が形成される程度に、杭孔20の径よりも小さくなっている。また、土砂回収用バケット105の側壁の高さは、土砂回収用バケット96の高さよりも高くなっており、土砂回収用バケット96よりも多くの掘削土砂を積載することができる。   The earth and sand collection bucket 105 is a cylindrical container having a bottom plate 100 similar to the earth and sand collection bucket 96, and has a size such that the outer periphery contacts the hole wall of the pile hole 20. That is, the outer diameter of the earth and sand collection bucket 105 is smaller than the diameter of the pile hole 20 so that a slight gap is formed between the side wall surface of the earth and sand collection bucket 105 and the hole wall of the pile hole 20. Yes. The height of the side wall of the earth and sand collection bucket 105 is higher than the height of the earth and sand collection bucket 96, and more excavated earth and sand can be loaded than the earth and sand collection bucket 96.

図16に示すように、下部スタビライザ部101は、回転軸としての固定ポスト24の下端部に着脱可能に設けられている。4つの支持部材103の一端は、固定ポスト24の下端部に着脱可能に取付けられた連結手段としての接続部材98の下部に突設された軸部材107に接合され、土砂回収用バケット105の側壁に向かって放射状に配置されている。また、支持部材の103の他端は、土砂回収用バケット105側壁の内側に接合されている。このとき、土砂回収用バケット105の開口面は側壁板30の下端に位置するように設けられる(図16参照のこと)。   As shown in FIG. 16, the lower stabilizer portion 101 is detachably provided at the lower end portion of the fixed post 24 serving as a rotating shaft. One end of each of the four support members 103 is joined to a shaft member 107 projecting from a lower portion of a connection member 98 as a connecting means detachably attached to the lower end portion of the fixed post 24, and the side wall of the earth and sand recovery bucket 105 It is arranged radially toward. The other end of the support member 103 is joined to the inside of the side wall of the earth and sand collection bucket 105. At this time, the opening surface of the earth and sand collection bucket 105 is provided so as to be positioned at the lower end of the side wall plate 30 (see FIG. 16).

接続部材98及びこの接続部材98によって固定ポスト24の下端部に取り付けられる方法は図11と同様なので、説明を省略する。なお、この下部スタビライザ部101の取付け構造は、着脱が容易にでき、かつ固定ポスト24下部にしっかりと下部スタビライザ部101を固定できるものであればよく、ピンによって固定ポスト24と嵌入部170を連結してもよい。   Since the connecting member 98 and the method of attaching to the lower end portion of the fixed post 24 by the connecting member 98 are the same as those in FIG. The attachment structure of the lower stabilizer portion 101 may be any structure as long as it can be easily attached and detached and can firmly fix the lower stabilizer portion 101 to the lower portion of the fixing post 24. The fixing post 24 and the fitting portion 170 are connected by a pin. May be.

また、底板100を開閉させるロック機構104についても、図10に示したロック機構104と同じなので、説明を省略する。但し、下部スタビライザ101のロック機構104に設けられた丸棒110は、土砂回収用バケット105及び側壁板30を通過して、ハンドル112が側壁板30の上端部よりも上方に位置するような長さになっている。   The locking mechanism 104 for opening and closing the bottom plate 100 is the same as the locking mechanism 104 shown in FIG. However, the round bar 110 provided in the lock mechanism 104 of the lower stabilizer 101 passes through the earth and sand collection bucket 105 and the side wall plate 30 so that the handle 112 is positioned above the upper end of the side wall plate 30. It has become.

このように、土砂回収用バケット96と土砂回収用バケット105とは、連結手段としての接続部材98によって交換可能に取り付けられる。   Thus, the earth and sand collection bucket 96 and the earth and sand collection bucket 105 are attached so as to be replaceable by the connection member 98 as a connecting means.

図17には、図1の杭孔20に中間拡径部56を形成した杭孔154において、この底部に拡底部を形成する掘削機130の全体構成が示されている。   FIG. 17 shows an overall configuration of an excavator 130 that forms an enlarged bottom portion at the bottom of the pile hole 154 in which the intermediate diameter enlarged portion 56 is formed in the pile hole 20 of FIG. 1.

杭孔の底部に配置された拡径掘削用バケット132以外の構成は、図1とほぼ同様であるので、同符号を付すると共に、適宜省略して説明する。   Since the configuration other than the enlarged-diameter excavation bucket 132 arranged at the bottom of the pile hole is substantially the same as that shown in FIG.

ケリーバ12の下端部は、拡径掘削用バケット132の固定ポスト24の上端部に接続された軸部材60上の連結ブラケット26にピン連結されている。   The lower end portion of the kelly bar 12 is pin-connected to the connection bracket 26 on the shaft member 60 connected to the upper end portion of the fixed post 24 of the diameter-excavation bucket 132.

杭孔154は、拡径掘削されていない軸部54と拡径掘削用バケット22によって掘削された中間拡径部56とによって構成されている。また、この中間拡径部56は、上部傾斜面56A、鉛直面56B、下部傾斜面56Cからなり、杭孔154の中間2箇所に形成されている。   The pile hole 154 includes a shaft portion 54 that has not been subjected to diameter expansion excavation and an intermediate diameter expansion portion 56 that has been excavated by the bucket 22 for diameter expansion excavation. The intermediate enlarged diameter portion 56 includes an upper inclined surface 56A, a vertical surface 56B, and a lower inclined surface 56C, and is formed at two intermediate positions of the pile hole 154.

拡径掘削用バケット132は、図18に示すように、上部スタビライザ部36、拡縮バケット部136、底蓋部138によって構成され、上からこの順に配置されている。   As shown in FIG. 18, the enlarged diameter excavation bucket 132 includes an upper stabilizer portion 36, an expansion / contraction bucket portion 136, and a bottom lid portion 138, which are arranged in this order from the top.

拡縮バケット部136は、図2の拡縮バケット部38のアーム部材34と下部スタビライザ部40を外して、着脱可能な底蓋部138を取付けたものである。   The expansion / contraction bucket portion 136 is obtained by removing the arm member 34 and the lower stabilizer portion 40 of the expansion / contraction bucket portion 38 of FIG. 2 and attaching a detachable bottom lid portion 138.

そして、図19に示すような、図9と同様の動作手順で、側壁板30の拡縮が行われる。   Then, the side wall plate 30 is expanded and contracted in the same operation procedure as shown in FIG. 9 as shown in FIG.

図20(A)に示すように、固定ポスト24の下端部に支持部材140が着脱可能に固定されている。そして、支持部材140の端部に設けられたヒンジ142に底蓋部材としての底蓋144が回転可能に連結されている。図21に示すように、支持部材140の上面に嵌入部170が設けられており、下部スタビライザ40と同様の構造によって、回転軸としての固定ポスト24に底蓋部138が着脱可能に取付けられている。このとき、底蓋144の上面が側壁板30の下端に位置するように、底蓋144は固定ポスト24の下端部に取り付けられている(図20参照のこと)。   As shown in FIG. 20A, the support member 140 is detachably fixed to the lower end portion of the fixed post 24. And the bottom cover 144 as a bottom cover member is connected with the hinge 142 provided in the edge part of the support member 140 rotatably. As shown in FIG. 21, a fitting portion 170 is provided on the upper surface of the support member 140, and a bottom lid portion 138 is detachably attached to a fixed post 24 as a rotating shaft by the same structure as the lower stabilizer 40. Yes. At this time, the bottom lid 144 is attached to the lower end portion of the fixed post 24 so that the upper surface of the bottom lid 144 is positioned at the lower end of the side wall plate 30 (see FIG. 20).

また、底蓋144の径は、杭孔154の径とほほ等しく、側壁板30の内壁が底蓋144の外周に接触した状態で、この側壁板30の外周が杭孔154の孔壁に接触する大きさになっている。   The diameter of the bottom lid 144 is substantially equal to the diameter of the pile hole 154, and the outer periphery of the side wall plate 30 contacts the hole wall of the pile hole 154 in a state where the inner wall of the side wall plate 30 is in contact with the outer periphery of the bottom lid 144. It is a size.

図20(A)に示すように、板状の底蓋144は下方向に尖った円錐形状になっており、ヒンジ142によって矢印Kの方向に開閉可能になっている。これによって、拡縮バケット部136に積載された掘削土砂を地上にて排出する。   As shown in FIG. 20A, the plate-like bottom lid 144 has a conical shape pointed downward, and can be opened and closed in the direction of arrow K by a hinge 142. Thereby, the excavated earth and sand loaded in the expansion / contraction bucket part 136 is discharged on the ground.

底蓋144のロック機構104は、土砂回収用バケット96に設けられたものと同じなので説明を省略する。   Since the lock mechanism 104 of the bottom lid 144 is the same as that provided in the earth and sand collection bucket 96, description thereof is omitted.

ヒンジ142は底蓋144の直径方向において、約1/4ほど内側の位置に設けられているので、底蓋144を開放したときに、拡縮バケット部136の下端から地上面までの距離を小さくすることができる。よって、土砂排出時の拡径掘削用バケット132の機械高を小さくすることができるので、掘削土砂の排出を容易にするために底蓋を大きくした場合でも拡径掘削用バケット132の機械高は大きくならない。   Since the hinge 142 is provided at a position about 1/4 in the diameter direction of the bottom lid 144, the distance from the lower end of the expansion / contraction bucket portion 136 to the ground surface is reduced when the bottom lid 144 is opened. be able to. Therefore, since the machine height of the enlarged-diameter excavation bucket 132 at the time of discharging the earth and sand can be reduced, even if the bottom cover is enlarged to facilitate the discharge of the excavated earth and sand, the machine height of the enlarged-diameter bucket 132 is Does not grow.

底蓋144を下から見た平面図である図20(B)に示すように、底蓋144には底蓋144の中心に対して対称な位置に2つの略扇状の開口部146が形成されている。開口部146の回転方向端部の一方には長尺な掘削ビット148が取付けられており、さらに、底蓋144には、開口部146を底蓋144の上面側から覆う開閉板150が設けられている。   As shown in FIG. 20B, which is a plan view of the bottom lid 144 as viewed from below, the bottom lid 144 is formed with two substantially fan-shaped openings 146 at symmetrical positions with respect to the center of the bottom lid 144. ing. A long excavation bit 148 is attached to one end of the opening 146 in the rotational direction. Further, the bottom lid 144 is provided with an opening / closing plate 150 that covers the opening 146 from the upper surface side of the bottom lid 144. ing.

開閉板150は、図20(B)のC−C断面図である図22に示すように、掘削ビット148に対向するように開口部146の縁部付近に設けられたヒンジ152によって矢印Gの方向に開閉する。   As shown in FIG. 22 which is a CC cross-sectional view of FIG. 20B, the opening / closing plate 150 is indicated by an arrow G by a hinge 152 provided in the vicinity of the edge of the opening 146 so as to face the excavation bit 148. Open and close in the direction.

掘削ビット148は下方に尖った形状をしている。よって、旋回装置14によりケリーバ12を介して固定ポスト24を矢印Mの方向に回転させ、側壁板30と共に底蓋144を回転させると、孔底に溜まっている掘削土砂、及び掘削ビット148によって掘削された土砂は、矢印Jの方向に流れ、これによって底蓋144上に掘削土砂が集められる。   The excavation bit 148 has a shape pointed downward. Therefore, when the fixed post 24 is rotated in the direction of the arrow M by the swivel device 14 through the kelly bar 12 and the bottom cover 144 is rotated together with the side wall plate 30, excavation is performed by the excavation soil and the excavation bit 148 accumulated at the bottom of the hole. The earth and sand flowed in the direction of the arrow J, whereby the excavated earth and sand are collected on the bottom lid 144.

土砂排出のために拡径掘削用バケット132をクレーン16で地上へ持ち上げる際には、開閉板150上に載った土砂の自重で開閉板150は閉まった状態になるので、開口部146から土砂がこぼれ落ちることはない。   When the diameter-excavation bucket 132 is lifted to the ground by the crane 16 for discharging earth and sand, since the opening and closing plate 150 is closed by the dead weight of the earth and sand placed on the opening and closing plate 150, the earth and sand are removed from the opening 146. There is no spillage.

次に、本発明の実施形態に係る拡径掘削用バケットの作用及び効果について説明する。   Next, the operation and effect of the diameter-excavation bucket according to the embodiment of the present invention will be described.

図23〜27の施工手順図に示すように、本実施形態では、まず中間拡径部の掘削を行い、最後に拡底部の掘削を行う。   As shown in the construction procedure diagrams of FIGS. 23 to 27, in the present embodiment, first, the intermediate diameter enlarged portion is excavated, and finally, the bottom expanded portion is excavated.

まず、図23(A)においては、事前にケリーバ用のドリリングバケットによって地盤28を掘削して孔杭20を形成する。そして、孔壁の倒壊を防止するベントナイト等の安定液Lで満たされた孔杭20内の中間拡径部を形成する位置に拡径掘削用バケット23を配置する。このときの拡径掘削用バケット23には、下部スタビライザ部101が設けられ、アーム部材34は取り付けられていない。   First, in FIG. 23A, the ground pile 28 is formed by excavating the ground 28 in advance with a drilling bucket for Keriba. And the bucket 23 for diameter expansion excavation is arrange | positioned in the position which forms the intermediate | middle enlarged diameter part in the hole pile 20 filled with the stabilizing liquid L, such as bentonite which prevents collapse of a hole wall. At this time, the lower-diameter excavation bucket 23 is provided with the lower stabilizer portion 101, and the arm member 34 is not attached thereto.

ここで、拡径掘削用バケット23上部に設けられた上部スタビライザ部36は、杭孔20の孔壁とガイド部材42の間にわずかな隙間を残す程度に、スライド部材44をスライドさせてガイド部材42の位置を調整し、貫通孔50と貫通孔52が一致する位置で、2本のボルト48によって固定されている。また、全てのスライド部材44のスライド量は等しくなっている。   Here, the upper stabilizer portion 36 provided on the upper portion of the diameter-excavation bucket 23 slides the slide member 44 to such an extent that a slight gap is left between the hole wall of the pile hole 20 and the guide member 42. 42 is adjusted, and is fixed by two bolts 48 at a position where the through hole 50 and the through hole 52 coincide with each other. Moreover, the slide amount of all the slide members 44 is equal.

これにより、ガイド部材42が、杭孔20の孔壁に接触して、軸部材60に接続された固定ポスト24の中心を杭孔20の中心位置にガイドする。よって、上部スタビライザ部36により、回転軸となる固定ポスト24の中心が常に杭孔20の中心位置にあるので、下から上へ中間拡径部を掘削したときの真円度を高めることができる。   Thereby, the guide member 42 contacts the hole wall of the pile hole 20 and guides the center of the fixed post 24 connected to the shaft member 60 to the center position of the pile hole 20. Therefore, since the center of the fixed post 24 serving as the rotation axis is always at the center position of the pile hole 20 by the upper stabilizer portion 36, the roundness when the intermediate enlarged portion is excavated from the bottom to the top can be increased. .

また、アーム部材34の下方にも下部スタビライザ部101が設けられている。この下部スタビライザ部101の土砂回収用バケット105の側壁面が、杭孔20の孔壁に接触して固定ポスト24の中心を杭孔20の中心位置にガイドする。よって、下部スタビライザ部101により、固定ポスト24の中心が常に杭孔20の中心位置にあるので、上から下へ中間拡径部を掘削したときの真円度を高めることができる。   A lower stabilizer portion 101 is also provided below the arm member 34. The side wall surface of the earth and sand recovery bucket 105 of the lower stabilizer portion 101 contacts the hole wall of the pile hole 20 to guide the center of the fixed post 24 to the center position of the pile hole 20. Therefore, since the center of the fixed post 24 is always at the center position of the pile hole 20 by the lower stabilizer portion 101, the roundness when the intermediate diameter enlarged portion is excavated from the top to the bottom can be increased.

次に、図23(B)においては、図9と同様の動作手順に従い、旋回装置14によりケリーバ12を介して固定ポスト24を矢印Mの方向に回転させながら側壁板30を外側に拡げていく。   Next, in FIG. 23B, the side wall plate 30 is expanded outward while rotating the fixed post 24 in the direction of the arrow M through the kelly bar 12 by the swiveling device 14 according to the same operation procedure as in FIG. .

このとき、側壁板30の掘削ビット32が杭孔20の孔壁を掘削し、中間拡径部56の上部傾斜面としての傾斜面56A及び鉛直面56Bが形成される。側壁板30に設けられた掘削ビット32によって掘削された土砂は、土砂回収用バケット105に流れ込む(図9(C)の矢印Uを参照のこと)。このとき、土砂回収用バケット105の側壁面と杭孔20の孔壁の間の隙間が小さい方が、この隙間からこぼれ落ちる土砂も少なくなるので、土砂回収用バケット105の外径は杭孔20の径に出来るだけ近い長さであることが好ましい。   At this time, the excavation bit 32 of the side wall plate 30 excavates the hole wall of the pile hole 20, and the inclined surface 56 </ b> A and the vertical surface 56 </ b> B are formed as the upper inclined surface of the intermediate diameter enlarged portion 56. The earth and sand excavated by the excavation bit 32 provided on the side wall plate 30 flows into the earth and sand collection bucket 105 (see arrow U in FIG. 9C). At this time, the smaller the gap between the side wall surface of the earth and sand collecting bucket 105 and the hole wall of the pile hole 20, the smaller the amount of earth and sand that spills from this gap, so the outer diameter of the earth and sand collecting bucket 105 is the pile hole 20. It is preferable that the length is as close as possible to the diameter.

流れ込んだ掘削土砂で土砂回収用バケット105が一杯になったら、図23(C)に示すようにクレーン16により拡径掘削用バケット23を地上に引上げて、下部スタビライザ部101の底板100を開放し、掘削土砂を排出する。   When the earth and sand collection bucket 105 is filled with the excavated earth and sand that has flowed in, as shown in FIG. 23C, the diameter-excavation bucket 23 is pulled up to the ground by the crane 16, and the bottom plate 100 of the lower stabilizer 101 is opened. , Discharging excavated soil.

そして、図23(B)、(C)の作業を適宜繰返し、中間拡径部56の傾斜面56A及び鉛直面56Bの形成が終了したならば、図24(D)に示すように、拡径掘削用バケット23の下部スタビライザ部101を外し、固定ポスト24の下端部に下部スタビライザ部40を取り付け、側壁板30の下端部にアーム部材34を取り付ける。   Then, when the operations of FIGS. 23B and 23C are repeated as appropriate to form the inclined surface 56A and the vertical surface 56B of the intermediate expanded portion 56, the expanded diameter is obtained as shown in FIG. The lower stabilizer portion 101 of the excavation bucket 23 is removed, the lower stabilizer portion 40 is attached to the lower end portion of the fixed post 24, and the arm member 34 is attached to the lower end portion of the side wall plate 30.

そして、図24(E)に示すように、孔杭20内の中間拡径部の傾斜面56Cを形成する位置に拡径掘削用バケット22を配置し、旋回装置14によりケリーバ12を介して固定ポスト24を矢印Mの方向に回転させながら側壁板30を外側に拡げていく。   Then, as shown in FIG. 24 (E), the enlarged diameter excavation bucket 22 is disposed at a position where the inclined surface 56C of the intermediate enlarged diameter portion in the hole pile 20 is formed, and is fixed via the kelly bar 12 by the turning device 14. While rotating the post 24 in the direction of the arrow M, the side wall plate 30 is expanded outward.

このとき、アーム部材34の掘削ビット58が杭孔20の孔壁を掘削し、中間拡径部56の下部傾斜面56Cが形成される。アーム部材34の掘削ビット58によって掘削された土砂は、土砂回収用バケット96に流れ込む(図9(C)の矢印Uを参照のこと)。このとき、土砂回収用バケット96の側壁面と杭孔20の孔壁の間の隙間が小さい方が、この隙間からこぼれ落ちる土砂も少なくなるので、土砂回収用バケット96の外径は杭孔20の径に出来るだけ近い長さであることが好ましい。   At this time, the excavation bit 58 of the arm member 34 excavates the hole wall of the pile hole 20, and the lower inclined surface 56C of the intermediate enlarged diameter portion 56 is formed. The earth and sand excavated by the excavation bit 58 of the arm member 34 flows into the earth and sand collection bucket 96 (see arrow U in FIG. 9C). At this time, the smaller the gap between the side wall surface of the earth and sand collecting bucket 96 and the hole wall of the pile hole 20, the smaller the amount of earth and sand that spills from the gap, so the outer diameter of the earth and sand collecting bucket 96 is the pile hole 20. It is preferable that the length is as close as possible to the diameter.

流れ込んだ掘削土砂で土砂回収用バケット96が一杯になったら、図24(F)に示すようにクレーン16により拡径掘削用バケット22を地上に引上げて、下部スタビライザ部101の底板100を開放し、掘削土砂を排出する。   When the earth and sand collection bucket 96 is filled with the excavated earth and sand that has flowed in, as shown in FIG. 24 (F), the enlarged diameter excavation bucket 22 is pulled up to the ground by the crane 16 and the bottom plate 100 of the lower stabilizer portion 101 is opened. , Discharging excavated soil.

そして、図24(E)、(F)の作業を適宜繰返し、中間拡径部56の傾斜面56Cを形成する。   24E and 24F are appropriately repeated to form the inclined surface 56C of the intermediate enlarged diameter portion 56.

このように、中間拡径部56は、段階掘削によって行う。段階掘削とは、中間拡径部56を鉛直方向に複数回に分けて掘削する方法である。この段階掘削による中間拡径部56の掘削方法には、図28、29に示すような、上から下へ掘削する方法と、図30、31に示すような、下から上へ掘削する方法がある。どちらの方法を用いるかは、中間拡径部の形状、土質、拡縮回数等を考慮して適宜決めればよい。   Thus, the intermediate diameter enlarged portion 56 is performed by step excavation. The step excavation is a method of excavating the intermediate enlarged diameter portion 56 in a plurality of times in the vertical direction. As the excavation method of the intermediate expanded portion 56 by this stage excavation, there are a method of excavating from the top to the bottom as shown in FIGS. 28 and 29 and a method of excavating from the bottom to the top as shown in FIGS. is there. Which method is used may be appropriately determined in consideration of the shape of the intermediate enlarged portion, the soil quality, the number of times of expansion / contraction.

図28(A)に示すように、まず、下部スタビライザ部101が設けられた拡径掘削用バケット23の径を最小にした状態で、クレーン16により拡径掘削用バケット23を所定の位置まで下ろして配置する。   As shown in FIG. 28A, first, the diameter-extended excavation bucket 23 is lowered to a predetermined position by the crane 16 with the diameter of the diameter-extended excavation bucket 23 provided with the lower stabilizer portion 101 being minimized. Arrange.

次に、図28(B)に示すように、固定ポスト24、及び側壁板30を回転させながら、予定した中間拡径部上部の傾斜面56Aの位置まで側壁板30を拡げていく。この掘削が終わった後に、拡径掘削用バケット22の径を最小にした図28(A)の状態に戻し、次の掘削位置まで拡径掘削用バケット23を下ろす。   Next, as shown in FIG. 28 (B), while rotating the fixed post 24 and the side wall plate 30, the side wall plate 30 is expanded to the position of the inclined surface 56A at the upper portion of the intermediate enlarged diameter portion. After the excavation is completed, the diameter-extended bucket 22 is returned to the state shown in FIG. 28A where the diameter of the enlarged-excavation bucket 22 is minimized, and the enlarged-diameter bucket 23 is lowered to the next excavation position.

そして、この位置で、図28(B)のときと同じような掘削を行い(図28(C)参照のこと)、この手順(図28(B)、28(C))を繰返し、図28(D)の状態になる(側壁板30の下端が中間拡径部56の傾斜面56Cの上端部に達する)まで拡径掘削用バケット23を徐々に下方へ移動させて行き、中間拡径部56の傾斜面56A及び鉛直面56Bを形成する。   Then, at this position, excavation similar to that in FIG. 28B is performed (see FIG. 28C), and this procedure (FIGS. 28B and 28C) is repeated, and FIG. The intermediate diameter expanded portion is gradually moved downward until the diameter increasing excavation bucket 23 is moved to the state (D) (the lower end of the side wall plate 30 reaches the upper end portion of the inclined surface 56C of the intermediate diameter expanded portion 56). 56 inclined surfaces 56A and vertical surfaces 56B are formed.

このように、中間拡径上中部形成工程(図28(A)〜(D))では、アーム部材34が取り外された側壁板30の下端に開口面が位置するように固定ポスト24の下端部に土砂回収用バケット105を取り付けた状態で、側壁板30を拡縮してこの側壁板30により中間拡径部56の傾斜面56A及び鉛直面56Bの形成を行う。   In this way, in the intermediate diameter expanding upper middle forming step (FIGS. 28A to 28D), the lower end portion of the fixed post 24 so that the opening surface is positioned at the lower end of the side wall plate 30 from which the arm member 34 has been removed. With the earth and sand recovery bucket 105 attached thereto, the side wall plate 30 is expanded and contracted to form the inclined surface 56 </ b> A and the vertical surface 56 </ b> B of the intermediate enlarged diameter portion 56.

次に、図29(E)に示すように、下部スタビライザ部101を取り外して、アーム部材34及び下部スタビライザ部40が設けられた拡径掘削用バケット22の径を最小にした状態で、アーム部材34の上端部が中間拡径部56の傾斜面56Cの上端部の高さに位置するように、クレーン16により拡径掘削用バケット22を下ろす。   Next, as shown in FIG. 29 (E), the lower stabilizer portion 101 is removed, and the arm member 34 and the lower stabilizer portion 40 are provided with the diameter of the enlarged diameter excavation bucket 22 minimized. The diameter-extended excavation bucket 22 is lowered by the crane 16 so that the upper end portion of 34 is positioned at the height of the upper end portion of the inclined surface 56 </ b> C of the intermediate enlarged-diameter portion 56.

次に、図29(F)に示すように、固定ポスト24、側壁板30、及びアーム部材34を回転させながら、予定した中間拡径部下部の傾斜面56Cの位置まで側壁板30を拡げていく。この掘削が終わった後に、拡径掘削用バケット22の径を最小にした図29(E)の状態に戻し、次の掘削位置まで拡径掘削用バケット22を下ろす。   Next, as shown in FIG. 29 (F), while rotating the fixed post 24, the side wall plate 30, and the arm member 34, the side wall plate 30 is expanded to the position of the inclined surface 56C at the lower portion of the intermediate enlarged diameter portion. Go. After this excavation is completed, the diameter of the expanded excavation bucket 22 is returned to the state shown in FIG. 29E where the diameter is minimized, and the expanded excavation bucket 22 is lowered to the next excavation position.

そして、この位置で、図29(F)のときと同じような掘削を行い、この手順を繰返し、図29(G)の状態になる(中間拡径部56の傾斜面56Cの形成が完了する)まで拡径掘削用バケット22を徐々に下方へ移動させて行く。すなわち、アーム部材34によって、中間拡径部56下部に杭孔20の下方中心に向う傾斜面56Cを形成する。   At this position, excavation similar to that shown in FIG. 29F is performed, and this procedure is repeated until the state shown in FIG. 29G is reached (the formation of the inclined surface 56C of the intermediate expanded portion 56 is completed). ), The diameter-excavation bucket 22 is gradually moved downward. That is, the arm member 34 forms an inclined surface 56 </ b> C toward the lower center of the pile hole 20 at the lower portion of the intermediate enlarged diameter portion 56.

このように、中間拡径下部形成工程(図29(E)〜(G))では、側壁板30の下端部にアーム部材34を取り付け、かつアーム部材34の下端に開口面が位置するように固定ポスト24の下端部に土砂回収用バケット96を取り付けた状態で、側壁板30を拡縮してこのアーム部材34により中間拡径部56の傾斜面56Cの形成を行う。   Thus, in the intermediate diameter enlarged lower portion forming step (FIGS. 29E to 29G), the arm member 34 is attached to the lower end portion of the side wall plate 30 and the opening surface is positioned at the lower end of the arm member 34. With the earth and sand collection bucket 96 attached to the lower end of the fixed post 24, the side wall plate 30 is expanded and contracted to form the inclined surface 56C of the intermediate expanded portion 56 by the arm member 34.

よって、中間拡径部上部の傾斜面56Aは側壁板上部30Aの掘削ビット32によって掘削され、中間拡径部56の最も大きな径の部分の鉛直面56Bは側壁板下部30Bの鉛直な壁面に設けられた掘削ビット32によって削られ、中間拡径部56下部の傾斜面56Cはアーム部材34に設けられた掘削ビット58によって掘削される。   Therefore, the inclined surface 56A at the upper portion of the intermediate enlarged portion is excavated by the excavation bit 32 of the upper portion of the sidewall plate 30A, and the vertical surface 56B of the largest diameter portion of the intermediate enlarged portion 56 is provided on the vertical wall surface of the lower portion of the sidewall plate 30B. The inclined surface 56 </ b> C below the intermediate enlarged diameter portion 56 is excavated by the excavation bit 58 provided on the arm member 34.

図30、31においては、図28、29とほぼ逆の手順で、下から上へ中間拡径部56を掘削していく。   In FIGS. 30 and 31, the intermediate diameter enlarged portion 56 is excavated from the bottom to the top in substantially the reverse procedure of FIGS.

なお、本実施形態では、掘削予定の位置まで一度に側壁板30及びアーム部材34を拡げたが、拡径掘削用バケット22を中間拡径部56の上下範囲に渡って上下に複数回往復させて、少しずつ拡径するような横分割の掘削を併用してもよい。   In the present embodiment, the side wall plate 30 and the arm member 34 are expanded at a time to the position where the excavation is planned. However, the enlarged diameter excavation bucket 22 is reciprocated up and down a plurality of times over the vertical range of the intermediate expanded portion 56. Therefore, it is also possible to use a horizontal division excavation that gradually increases the diameter.

また、中間拡径部56は、杭孔20の必要な箇所に、必要な数だけ形成すればよい。   Moreover, what is necessary is just to form the intermediate | middle enlarged diameter part 56 by the required number in the required location of the pile hole 20. FIG.

すべての中間拡径部56の掘削が終了したならば、図25(G)に示すように、拡径掘削用バケット22のアーム部材34及び下部スタビライザ部40を取り外し、下部スタビライザ部101を取付けて拡径掘削用バケット23とし、拡径掘削用バケット23の径を最小にした状態でクレーン16によって杭孔の底部まで下ろす。   When the excavation of all the intermediate enlarged diameter portions 56 is completed, the arm member 34 and the lower stabilizer portion 40 of the enlarged diameter excavation bucket 22 are removed, and the lower stabilizer portion 101 is attached, as shown in FIG. The diameter-extended excavation bucket 23 is used, and the crane 16 is lowered to the bottom of the pile hole with the diameter of the diameter-extended excavation bucket 23 minimized.

次に、図25(H)、(I)に示すように、固定ポスト24、及び側壁板30を回転させながら、図19と同様の動作手順で拡底部158上部の拡底掘削を行う。側壁板30に設けられた掘削ビット32によって掘削された土砂は、土砂回収用バケット105に流れ込む(図9(C)の矢印Uを参照のこと)。   Next, as shown in FIGS. 25 (H) and (I), bottom-up excavation of the upper part of the bottom-up portion 158 is performed by the same operation procedure as in FIG. 19 while rotating the fixed post 24 and the side wall plate 30. The earth and sand excavated by the excavation bit 32 provided on the side wall plate 30 flows into the earth and sand collection bucket 105 (see arrow U in FIG. 9C).

次に、回収した土砂が、土砂回収用バケット105の最大積載量に達したときに、側壁板30を内側に移動させて拡径掘削用バケット23の径を最小の状態にし、図26(J)に示すように、クレーン16にて拡径掘削用バケット23を地上に引上げて、底蓋100を開放し、掘削土砂を排出する。   Next, when the collected earth and sand reaches the maximum load capacity of the earth and sand collecting bucket 105, the side wall plate 30 is moved inward to minimize the diameter of the enlarged diameter excavation bucket 23, and FIG. ), The crane 16 pulls up the diameter-excavation bucket 23 to the ground, opens the bottom cover 100, and discharges the excavated soil.

土砂を地上に排出した後には、拡径掘削用バケット23を再び杭孔154の底部に下ろし、拡底掘削を行う。そして、図25(H)、(I)、図26(J)の作業を繰返して拡底部158上部を形成し、拡径掘削用バケット23に取り付けられた下部スタビライザ部101の底板100の底面が杭孔154の底面付近に到達したときに、地上にて拡径掘削用バケット23の下部スタビライザ部101を取り外して、底蓋部138を取り付ける(図26(K)参照のこと)。   After the earth and sand are discharged to the ground, the enlarged diameter excavation bucket 23 is lowered again to the bottom of the pile hole 154, and the expanded bottom excavation is performed. 25 (H), (I), and FIG. 26 (J) are repeated to form the upper portion of the bottom expanded portion 158, and the bottom surface of the bottom plate 100 of the lower stabilizer portion 101 attached to the diameter expanding excavation bucket 23 is When the vicinity of the bottom surface of the pile hole 154 is reached, the lower stabilizer portion 101 of the diameter-excavation bucket 23 is removed on the ground, and the bottom lid portion 138 is attached (see FIG. 26 (K)).

このように、拡底上部形成工程(図25(H)、(I)、図26(J))では、側壁板30の下端に開口面が位置するように固定ポスト24の下端部に土砂回収用バケット105を取り付けた状態で、側壁板30を拡縮してこの側壁板30により拡底部158の上部の形成を行う。   Thus, in the bottom-up top forming step (FIGS. 25 (H), (I), and FIG. 26 (J)), the bottom post of the fixed post 24 is for collecting earth and sand so that the opening surface is located at the lower end of the side wall plate 30. With the bucket 105 attached, the side wall plate 30 is expanded and contracted, and the upper portion of the expanded bottom portion 158 is formed by the side wall plate 30.

次に、図26(L)に示すように、拡径掘削用バケット132の径を最小にした状態でクレーン16によって杭孔の底部まで下ろす。   Next, as shown in FIG. 26 (L), the crane 16 is lowered to the bottom of the pile hole in a state where the diameter of the expanded excavation bucket 132 is minimized.

次に、図27(M)に示すように、固定ポスト24、側壁板30、及び底蓋144を回転させながら、図19と同様の動作手順で拡底部158下部の拡底掘削を行う。側壁板30に設けられた掘削ビット32によって掘削された土砂は、土砂回収用バケット105に流れ込み(図9(C)の矢印Uを参照のこと)、また、杭孔154の底部に溜まっている掘削土砂、及び底蓋144に設けられた掘削ビット148によって掘削された土砂は図20、22の矢印Jの方向に流れて底蓋144上に溜まる。   Next, as shown in FIG. 27 (M), bottom expansion excavation of the bottom of the bottom expansion portion 158 is performed by the same operation procedure as in FIG. 19 while rotating the fixed post 24, the side wall plate 30, and the bottom lid 144. The earth and sand excavated by the excavation bit 32 provided on the side wall plate 30 flows into the earth and sand collection bucket 105 (see the arrow U in FIG. 9C) and is accumulated at the bottom of the pile hole 154. The excavated earth and sand and the earth and sand excavated by the excavating bit 148 provided on the bottom lid 144 flow in the direction of arrow J in FIGS. 20 and 22 and accumulate on the bottom lid 144.

次に、回収した土砂が、拡径掘削用バケット132の最大積載量に達したときに、側壁板30を内側に移動させて拡径掘削用バケット132の径を最小の状態にし、図27(N)に示すように、クレーン16にて拡径掘削用バケット132を地上に引上げて、底蓋144を開放し、掘削土砂を排出する。そして、図27(M)、(N)の作業を繰返して拡底部158下部を形成し、図27(O)に示すような、多段に拡径された杭孔156を構築する。   Next, when the collected earth and sand reaches the maximum load capacity of the expanded excavation bucket 132, the side wall plate 30 is moved inward to minimize the diameter of the expanded excavation bucket 132, and FIG. As shown in N), the crane 16 pulls up the expanded excavation bucket 132 to the ground, opens the bottom lid 144, and discharges excavated earth and sand. 27 (M) and (N) are repeated to form the lower portion of the bottom expanded portion 158, and a pile hole 156 having a multi-stage expanded diameter as shown in FIG. 27 (O) is constructed.

このように、拡底下部形成工程(図26(L)、図27(M)、(N))では、側壁板30の下端に上面が位置するように固定ポスト24の下端部に底蓋144を取り付けた状態で、側壁板30を拡縮してこの側壁板30により拡底部158の下部の形成を行う。   In this way, in the bottom expanded bottom forming step (FIGS. 26L, 27M, and N), the bottom lid 144 is attached to the lower end of the fixed post 24 so that the upper surface is located at the lower end of the side wall plate 30. In the attached state, the side wall plate 30 is expanded / contracted, and the lower portion of the expanded bottom portion 158 is formed by the side wall plate 30.

図25(H)、(I)、図26(J)〜(L)、図27(M)〜(O)に示したように、拡底部158は中間拡径部56と同様に段階掘削によって行う。この段階掘削による拡底部158の掘削方法には、図32に示すような、上から下へ((A)から(D)へ)掘削する方法と、図33に示すような、下から上へ((A)から(D)へ)掘削する方法がある。どちらの方法を用いるかは、中間拡径部の形状、土質、拡縮回数等を考慮して適宜決めればよい。   25 (H), (I), FIGS. 26 (J) to (L), and FIGS. 27 (M) to (O), the bottom expanded portion 158 is formed by step excavation in the same manner as the intermediate diameter expanded portion 56. Do. The excavation method of the expanded bottom portion 158 by this stage excavation includes a method of excavating from the top to the bottom (from (A) to (D)) as shown in FIG. 32 and a method from the bottom to the top as shown in FIG. There is a method of excavation (from (A) to (D)). Which method is used may be appropriately determined in consideration of the shape of the intermediate enlarged portion, the soil quality, the number of times of expansion / contraction.

なお、拡径掘削用バケット132の油圧シリンダ70は伸びる動作のときの方が大きなパワーを出力することができる。また、杭孔の孔壁を掘削する際の側壁板30の拡径動作よりも掘削土砂を中央に集める縮径動作の際に大きなパワーを必要とする。よって、リンク機構66は、油圧シリンダ70のピストンロッド86が伸びたときに側壁板30が縮径する機構なので、油圧シリンダ70を有効に作用させることができる。   The hydraulic cylinder 70 of the enlarged diameter excavation bucket 132 can output a larger power during the extending operation. Further, a larger power is required for the diameter reducing operation for collecting excavated earth and sand in the center than for the diameter expanding operation of the side wall plate 30 when excavating the hole wall of the pile hole. Therefore, since the link mechanism 66 is a mechanism in which the side wall plate 30 is reduced in diameter when the piston rod 86 of the hydraulic cylinder 70 is extended, the hydraulic cylinder 70 can be effectively operated.

これまで述べたように、本実施形態では、以下の(1)、(2)の効果を得ることができる。   As described above, in this embodiment, the following effects (1) and (2) can be obtained.

(1)拡径掘削用バケットに、下部スタビライザ部40、101、及びアーム部材34が着脱可能なので、下部スタビライザ部40、101、及びアーム部材34を外して、固定ポスト24の下端部に拡底掘削用の着脱可能な底蓋部138を取付けることが可能となる。これにより、1つの拡径掘削用バケットで中間拡径と拡底の両方の掘削を行うことができるので、施工機械の低コスト化を図ることができる。   (1) Since the lower stabilizer portions 40 and 101 and the arm member 34 can be attached to and detached from the bucket for enlarged diameter excavation, the lower stabilizer portions 40 and 101 and the arm member 34 are removed, and the bottom extension excavation is performed at the lower end portion of the fixed post 24. It becomes possible to attach the detachable bottom cover 138 for use. As a result, both the intermediate diameter expansion and the bottom expansion can be excavated with a single diameter expansion excavation bucket, so that the cost of the construction machine can be reduced.

(2)上部スタビライザ部36及び下部スタビライザ部40、101により、回転する固定ポスト24の中心を杭孔の中心位置にガイドすることができるので、中間拡径部56や拡底部158の真円度を高めることができる。   (2) Since the center of the rotating fixed post 24 can be guided to the center position of the pile hole by the upper stabilizer portion 36 and the lower stabilizer portions 40 and 101, the roundness of the intermediate diameter enlarged portion 56 and the bottom enlarged portion 158 Can be increased.

また、中間拡径部56の形成においては、以下の(3)〜(8)の効果を得ることができる。   Moreover, in the formation of the intermediate enlarged portion 56, the following effects (3) to (8) can be obtained.

(3)アーム部材34が側壁板30の下端部に着脱可能に設けられているので、掘削予定の中間拡径部56下部の傾斜面に合ったアーム部材34を装着することによって、中間拡径部下部のさまざまな傾斜面56Cの掘削に対応することができる。   (3) Since the arm member 34 is detachably provided at the lower end portion of the side wall plate 30, by mounting the arm member 34 that matches the inclined surface of the lower portion of the intermediate enlarged portion 56 to be excavated, the intermediate enlarged diameter is provided. It is possible to cope with excavation of various inclined surfaces 56C in the lower part.

(4)傾斜面56Cを有する中間拡径部56を形成することができるので、掘削後の中間拡径部56下部の法尻の崩落を防止し、孔壁安定液中のスライム等が中間拡径部56下部に堆積しないようにすることができる。   (4) Since the intermediate enlarged portion 56 having the inclined surface 56C can be formed, collapse of the bottom of the bottom of the intermediate enlarged portion 56 after excavation is prevented, and slime or the like in the hole wall stabilizing liquid is intermediate enlarged. It is possible not to deposit on the lower portion of the diameter portion 56.

(5)土砂回収用バケット96が接続部材98によって取り付けられている状態では、側壁板30及びアーム部材34によって掘削された孔壁の掘削物を土砂回収用バケット96が回収し、土砂回収用バケット105が接続部材98によって取り付けられている状態では、側壁板30によって掘削された孔壁の掘削物を土砂回収用バケット105が回収するので、杭孔の底部に落ちて溜まる掘削物をなくす、又は少なくすることができる。これにより、杭孔の底部に溜まった掘削物を地上に排出するためのバケットを昇降させる作業をなくす、又はバケットを昇降させる回数を減らすことができる。   (5) In a state where the earth and sand collection bucket 96 is attached by the connecting member 98, the earth and sand collection bucket 96 collects the excavated material of the hole wall excavated by the side wall plate 30 and the arm member 34, and the earth and sand collection bucket In a state in which 105 is attached by the connecting member 98, the earth and sand collecting bucket 105 collects the excavated material of the hole wall excavated by the side wall plate 30, so that the excavated material that falls and accumulates at the bottom of the pile hole is eliminated, or Can be reduced. Thereby, the operation | work which raises / lowers the bucket for discharging the excavated material accumulated in the bottom part of a pile hole to the ground can be eliminated, or the frequency | count of raising / lowering a bucket can be reduced.

(6)中間拡径部56の下部の傾斜面56Cを形成するときには、土砂回収用バケット96を接続部材98によって取り付けてアーム部材34を取り付けられるようにし、それ以外の掘削のときには、アーム部材34を取り付けずに土砂回収用バケット96よりも1回の掘削ステップで多くの掘削物を回収することができる土砂回収用バケット105を接続部材98によって取り付ける。これにより、アーム部材34により中間拡径部56の下部に傾斜面56Cを形成することができると共に、地上に掘削物を排出するための拡径掘削用バケットの昇降回数を減らすことができ、施工効率が向上する。   (6) When forming the inclined surface 56C of the lower part of the intermediate diameter enlarged portion 56, the earth and sand recovery bucket 96 is attached by the connecting member 98 so that the arm member 34 can be attached, and at other times of excavation, the arm member 34 is attached. The earth and sand collection bucket 105 that can collect more excavated material in one excavation step than the earth and sand collection bucket 96 is attached by the connecting member 98 without attaching the earth and sand. Thus, the arm member 34 can form the inclined surface 56C at the lower part of the intermediate enlarged diameter portion 56, and can reduce the number of times the enlarged diameter excavation bucket is raised and lowered for discharging the excavated material to the ground. Efficiency is improved.

(7)土砂回収用バケット105は、側壁板30の下端との間にアーム部材34を設けずに、側壁板30の下端に開口面が位置するように固定ポスト24の下端部に取り付けられるので、土砂回収用バケット96よりも側壁の高さが高い土砂回収用バケット105を取り付けたときの拡径掘削用バケット23の機械高さ(図34(B)参照のこと)を、アーム部材34及び土砂回収用バケット96を取り付けたときの拡径掘削用バケット22の機械高さ(図34(C)参照のこと)程度のHに抑えることが可能になる。これにより、アーム部材34及び土砂回収用バケット96を設けた拡径掘削用バケット22を懸架するクレーン16によって、土砂回収用バケット105を取り付けた拡径掘削用バケット23を地上で吊り上げることができる。拡翼部の下端部にアーム部材34を設けた状態で土砂回収用バケット105を設けると、拡径掘削用バケットの機械高さHは高すぎてしまうか(図34(A)参照のこと)、又は土砂回収用バケット105にアーム部材34が干渉してしまう(図34(C)参照のこと)。 (7) The earth and sand recovery bucket 105 is attached to the lower end portion of the fixed post 24 so that the opening surface is located at the lower end of the side wall plate 30 without providing the arm member 34 between the lower end of the side wall plate 30. The mechanical height (see FIG. 34 (B)) of the enlarged diameter excavation bucket 23 when the earth and sand collection bucket 105 having a sidewall height higher than that of the earth and sand collection bucket 96 is attached to the arm member 34 and machine height diameter excavating bucket 22 when mounted sediment collecting bucket 96 it is possible to suppress in H 2 of about (FIG. 34 (C) see). Thus, the crane for suspending the large-diameter excavation bucket 22 provided with the arm member 34 and the sediment-collecting bucket 96 can lift the large-diameter excavation bucket 23 attached with the sediment-collecting bucket 105 on the ground. The provision of sediment collecting bucket 105 in a state in which a arm member 34 to the lower end of the拡翼portion, or expanded diameter machine height H 1 of the excavating bucket excessively high (FIG. 34 (A) see ), Or the arm member 34 interferes with the earth and sand collection bucket 105 (see FIG. 34C).

(8)拡径掘削用バケットを杭孔の上から下に移動させながら孔壁の掘削を行う場合に、土砂回収用バケット96、105が固定ポスト24の中心を縦孔の中心位置にガイドするので、中間拡径部の真円度を高めることができる。また、土砂回収用バケット105の側壁の高さは、土砂回収用バケット96の側壁の高さよりも高いので、孔壁に接触する周面積が大きくなる。これにより、拡径掘削用バケットの回転をより安定させることができる。   (8) When excavating the hole wall while moving the enlarged diameter excavation bucket from above the pile hole, the earth and sand collection buckets 96 and 105 guide the center of the fixed post 24 to the center position of the vertical hole. Therefore, the roundness of the intermediate enlarged portion can be increased. Moreover, since the height of the side wall of the earth and sand collection bucket 105 is higher than the height of the side wall of the earth and sand collection bucket 96, the peripheral area in contact with the hole wall is increased. Thereby, rotation of the bucket for diameter expansion excavation can be stabilized more.

また、拡底部158の形成においては、以下の(9)の効果を得ることができる。   Moreover, in the formation of the expanded bottom portion 158, the following effect (9) can be obtained.

(9)拡底部158の上部を形成するときには、側壁板30と底蓋144とによって形成されるバケットよりも1回の掘削ステップで多くの掘削物を回収することができる土砂回収用バケット105を取り付け、拡底部158の下部を形成するときには、底蓋144を取り付けるので、拡底部158の下部を形成できると共に、地上に掘削物を排出するための拡径掘削用バケットの昇降回数を減らすことができ、施工効率が向上する。   (9) When forming the upper portion of the expanded bottom portion 158, the earth and sand collection bucket 105 that can collect more excavated material in one excavation step than the bucket formed by the side wall plate 30 and the bottom lid 144 is provided. When the lower portion of the expanded bottom portion 158 is attached, the bottom lid 144 is attached, so that the lower portion of the expanded bottom portion 158 can be formed and the number of times of lifting of the enlarged diameter excavation bucket for discharging excavated material to the ground can be reduced. This improves construction efficiency.

このように、本実施形態の拡径掘削用バケット22、23、132を用いることによって、杭孔に中間拡径部や拡底部を形成することができるので、この杭孔に杭を構築したときに中間拡径部や拡底部が地中でネジ山のような働きをして周囲の地盤から大きな鉛直支持力と引抜抵抗力を得ることができる。そして、杭の径を小さくしても十分な鉛直支持力と引抜抵抗力が得られるので、建設副産物となる掘削土や杭施工時に使用する孔壁安定液を削減でき、環境負荷低減を図ることができる。   As described above, by using the enlarged diameter excavation buckets 22, 23, and 132 according to the present embodiment, an intermediate diameter expanded portion or a bottom expanded portion can be formed in the pile hole. In addition, the intermediate expanded portion and the expanded bottom portion act like a screw thread in the ground, and a large vertical support force and pulling resistance force can be obtained from the surrounding ground. And even if the pile diameter is reduced, sufficient vertical support force and pull-out resistance force can be obtained, so it is possible to reduce excavated soil that is a construction by-product and hole wall stabilizer used during pile construction, and to reduce environmental impact Can do.

さらに、杭の材料であるコンクリートや鉄筋を削減することができるので、コスト低減や工期短縮を図ることができる。高強度コンクリートは、杭自体の強度を上げることができるので、高拡径率の中間拡径部や拡底部を有する杭の材料として適している。   Furthermore, since the concrete and reinforcing bar which are materials of a pile can be reduced, cost reduction and construction period shortening can be aimed at. High-strength concrete can increase the strength of the pile itself, and is therefore suitable as a material for a pile having an intermediate expanded portion and a bottom expanded portion with a high expansion ratio.

なお、本実施形態において、中間拡径部56の掘削を行った後に拡底部158の掘削を行った例を示したが、これに限らずに、拡底部158の掘削を行った後に中間拡径部56の掘削を行ってもよい。中間拡径部の掘削を行った後に拡底部の掘削を行う場合、杭孔の底部に溜まった掘削土砂を最後にまとめて回収することができる。   In the present embodiment, the example in which the bottom-expanded portion 158 is excavated after the intermediate-diameter expanded portion 56 is excavated has been shown. The portion 56 may be excavated. When excavating the bottom expanded portion after excavating the intermediate diameter expanded portion, the excavated earth and sand collected at the bottom of the pile hole can be collected together last.

また、事前にケリーバ用のドリリングバケットによって地盤28を掘削して孔杭20のすべてを形成した後に中間拡径部56及び拡底部158を掘削する例を示したが、孔杭を段階的に掘り進めながら、中間拡径部を掘削するようにしてもよい。すべての孔杭を形成した後に中間拡径部及び拡底部を掘削する方が、掘削が完了した中間拡径部を掘削用バケットが通過する回数を減らすことができるので、掘削が完了した中間拡径部の法尻等の崩落を防ぐことができる。   Moreover, although the example which excavates the intermediate | middle enlarged diameter part 56 and the bottom expanded part 158 after excavating the ground 28 with the drilling bucket for kelly bar in advance and forming all of the hole piles 20 was shown, a hole pile is dug in steps. You may make it excavate an intermediate diameter enlarged part, advancing. Excavation of the intermediate expanded portion and the expanded bottom portion after forming all the hole piles can reduce the number of times the excavation bucket passes through the intermediate expanded portion where the excavation has been completed. It is possible to prevent collapse of the lip of the diameter portion.

また、杭孔20は、拡径掘削用バケット132によって掘削してもよい。   Further, the pile hole 20 may be excavated by the diameter-excavation bucket 132.

また、4つの側壁板30を設けた例を示したが、側壁板30は分割できるように2つ以上で構成されていればよい。側壁板30が2つの場合、拡縮する力が2方向に偏ってしまって十分な真円度の確保が難しく、また、側壁板30を多くすると構造が複雑になり多くの油圧シリンダを必要とするので、側壁板30は4つとするのが好ましい。   Moreover, although the example which provided the four side wall board 30 was shown, the side wall board 30 should just be comprised by two or more so that it can be divided | segmented. When there are two side wall plates 30, the expansion / contraction force is biased in two directions, making it difficult to ensure sufficient roundness, and increasing the number of side wall plates 30 complicates the structure and requires many hydraulic cylinders. Therefore, the number of side wall plates 30 is preferably four.

また、掘削ビット32、58、148は、地盤を掘削できるものであればよく、大きさや配置等については、必要に応じて適宜決めればよい。   Further, the excavation bits 32, 58, and 148 only need to be capable of excavating the ground, and the size, arrangement, and the like may be appropriately determined as necessary.

また、底板100の開閉を行うヒンジ102は、土砂回収用バケット96の側壁下部の内側に設けられているが、構造的に可能であれば、底蓋144のようにヒンジをさらに内側に入った位置に設けてもよい。これにより、底板100を開放したときに、土砂回収用バケット96、105の下端から地上面までの距離を小さくすることができるので、掘削土砂を排出し易くするために大きな底板100を用いた場合においても、土砂排出時の拡径掘削用バケット22、23の機械高は大きくならない。   Further, the hinge 102 for opening and closing the bottom plate 100 is provided inside the lower portion of the side wall of the earth and sand collecting bucket 96. However, if structurally possible, the hinge is further inserted inside like the bottom lid 144. You may provide in a position. Thereby, when the bottom plate 100 is opened, the distance from the lower end of the earth and sand collection buckets 96 and 105 to the ground surface can be reduced. Therefore, when the large bottom plate 100 is used in order to easily discharge the excavated earth and sand. However, the machine height of the diameter-excavation buckets 22 and 23 at the time of discharging the earth and sand does not increase.

また、拡縮バケット部38は、下部スタビライザ部、アーム部、及び底蓋部が着脱可能に取付けられ、拡翼部が拡縮するものであればよく、リンク機構66を用いたものでなくてもよい。   Moreover, the expansion / contraction bucket part 38 should just be a thing in which a lower stabilizer part, an arm part, and a bottom cover part are attached so that attachment or detachment is possible, and an wing expansion part expands / contracts, and does not need to use the link mechanism 66. .

また、拡径掘削用バケット22は、掘削予定の中間拡径部下部の傾斜面に合ったアーム部材34を装着することによって、中間拡径部下部のさまざまな傾斜面の掘削に対応することができるものであるが、中間拡径部下部の傾斜面の傾斜角は45度程度であることが施工及び構造的に好ましい。   Also, the bucket 22 for expanded diameter excavation can be adapted to excavate various inclined surfaces at the lower portion of the intermediate enlarged portion by mounting the arm member 34 that matches the inclined surface at the lower portion of the intermediate enlarged portion to be excavated. Although it is possible, it is preferable in terms of construction and structure that the inclination angle of the inclined surface at the lower portion of the intermediate enlarged portion is about 45 degrees.

また、杭孔20の中間の2箇所に中間拡径部56を形成した例を示したが、中間拡径部の配置や数は、杭に求められる鉛直支持性能等に応じて適宜決めればよい。   Moreover, although the example which formed the intermediate | middle enlarged diameter part 56 in the middle two places of the pile hole 20 was shown, what is necessary is just to determine suitably arrangement | positioning and number of intermediate enlarged parts according to the vertical support performance etc. which are calculated | required by a pile. .

また、油圧シリンダ70は、ピストンロッド86に相当する部材を伸縮する装置であればよい。   The hydraulic cylinder 70 may be any device that expands and contracts a member corresponding to the piston rod 86.

また、吊り支柱94や支持部材103は、土砂回収用バケット96、105を固定ポスト24の下端部に、固定ポスト24を杭孔の中心位置にガイドする強度を確保するように取付けられ、掘削土砂が入り込めるものであればよい。   Further, the suspension column 94 and the support member 103 are attached so as to ensure the strength to guide the earth and sand collection buckets 96 and 105 to the lower end portion of the fixed post 24 and the fixed post 24 to the center position of the pile hole. Anything that can enter.

また、上部スタビライザ部36は、拡径掘削用バケット22、23、132の回転軸を杭孔の中心位置にガイドできるものであれば、どのような形状でもよく、拡径部の十分な真円度が得られる掘削が可能であれば上部スタビライザ部36はなくてもよい。   Further, the upper stabilizer portion 36 may have any shape as long as it can guide the rotation shafts of the enlarged diameter excavation buckets 22, 23, and 132 to the center position of the pile hole. The upper stabilizer 36 may not be provided as long as excavation with a sufficient degree is possible.

また、下部スタビライザ部40、101にガイド機能を持たせなくてもよい場合には、下部スタビライザ部40、101の径を小さくしてもよいし、平面視にて正方形や多角形等の他の形状にしてもよい。   Further, when the lower stabilizer portions 40 and 101 do not need to have a guide function, the diameter of the lower stabilizer portions 40 and 101 may be reduced, and other shapes such as a square and a polygon may be used in a plan view. You may make it a shape.

また、連結手段としての接続部材98は、土砂回収用バケット96と土砂回収用バケット105とを回転軸の下端部に交換可能に取り付けることができるものであれば、他の接続部材や接続方法を用いてもよい。   The connecting member 98 as the connecting means can be replaced with another connecting member or connecting method as long as the earth and sand collecting bucket 96 and the earth and sand collecting bucket 105 can be attached to the lower end of the rotating shaft in a replaceable manner. It may be used.

以上、本発明の実施形態について説明したが、本発明はこうした実施形態に何等限定されるものでなく、本発明の要旨を逸脱しない範囲において、種々なる態様で実施し得ることは勿論である。   As mentioned above, although embodiment of this invention was described, this invention is not limited to such embodiment at all, Of course, in the range which does not deviate from the summary of this invention, it can implement in a various aspect.

本発明の実施形態に係る掘削機を示す概略図である。It is the schematic which shows the excavator which concerns on embodiment of this invention. 本発明の実施形態に係る拡径掘削用バケットを示す斜視図である。It is a perspective view which shows the bucket for diameter expansion excavation which concerns on embodiment of this invention. 本発明の実施形態に係る上部スタビライザ部を示す平面図である。It is a top view which shows the upper stabilizer part which concerns on embodiment of this invention. 図2のA−A断面図である。It is AA sectional drawing of FIG. 本発明の実施形態に係る拡径掘削用バケットを示す正面図である。It is a front view which shows the bucket for diameter expansion excavation which concerns on embodiment of this invention. 本発明の実施形態に係るアーム部材を示す正面図及び断面図である。It is the front view and sectional drawing which show the arm member which concerns on embodiment of this invention. 本発明の実施形態に係るアーム部材の着脱方法を示す説明図である。It is explanatory drawing which shows the attachment / detachment method of the arm member which concerns on embodiment of this invention. 本発明の実施形態に係るアーム部材の着脱方法を示す説明図である。It is explanatory drawing which shows the attachment / detachment method of the arm member which concerns on embodiment of this invention. 本発明の実施形態に係る拡径掘削用バケットの拡縮動作を示す説明図である。It is explanatory drawing which shows the expansion / contraction operation | movement of the bucket for diameter expansion excavation which concerns on embodiment of this invention. 本発明の実施形態に係る下部スタビライザ部を示す正面図である。It is a front view which shows the lower stabilizer part which concerns on embodiment of this invention. 本発明の実施形態に係る下部スタビライザ部の着脱方法を示す説明図である。It is explanatory drawing which shows the attachment or detachment method of the lower stabilizer part which concerns on embodiment of this invention. 本発明の実施形態に係る下部スタビライザ部のロック部材を示す斜視図である。It is a perspective view which shows the locking member of the lower stabilizer part which concerns on embodiment of this invention. 本発明の実施形態に係る下部スタビライザ部のロック機構を示す説明図である。It is explanatory drawing which shows the locking mechanism of the lower stabilizer part which concerns on embodiment of this invention. 本発明の実施形態に係る下部スタビライザ部のロック機構を示す説明図である。It is explanatory drawing which shows the locking mechanism of the lower stabilizer part which concerns on embodiment of this invention. 本発明の実施形態に係る拡径掘削用バケットを示す斜視図である。It is a perspective view which shows the bucket for diameter expansion excavation which concerns on embodiment of this invention. 本発明の実施形態に係る下部スタビライザ部を示す正面図である。It is a front view which shows the lower stabilizer part which concerns on embodiment of this invention. 本発明の実施形態に係る掘削機を示す概略図である。It is the schematic which shows the excavator which concerns on embodiment of this invention. 本発明の実施形態に係る拡径掘削用バケットを示す斜視図である。It is a perspective view which shows the bucket for diameter expansion excavation which concerns on embodiment of this invention. 本発明の実施形態に係る拡径掘削用バケットの拡縮動作を示す説明図である。It is explanatory drawing which shows the expansion / contraction operation | movement of the bucket for diameter expansion excavation which concerns on embodiment of this invention. 本発明の実施形態に係る底蓋部を示す正面図及び平面図である。It is the front view and top view which show the bottom cover part which concerns on embodiment of this invention. 本発明の実施形態に係る底蓋部の着脱方法を示す説明図である。It is explanatory drawing which shows the attachment or detachment method of the bottom cover part which concerns on embodiment of this invention. 本発明の実施形態に係る拡径掘削用バケットの土砂回収方法を示す説明図である。It is explanatory drawing which shows the earth and sand collection | recovery method of the bucket for diameter expansion excavation which concerns on embodiment of this invention. 本発明の実施形態に係る拡径掘削用バケットの施工手順を示す説明図である。It is explanatory drawing which shows the construction procedure of the bucket for diameter expansion excavation which concerns on embodiment of this invention. 本発明の実施形態に係る拡径掘削用バケットの施工手順を示す説明図である。It is explanatory drawing which shows the construction procedure of the bucket for diameter expansion excavation which concerns on embodiment of this invention. 本発明の実施形態に係る拡径掘削用バケットの施工手順を示す説明図である。It is explanatory drawing which shows the construction procedure of the bucket for diameter expansion excavation which concerns on embodiment of this invention. 本発明の実施形態に係る拡径掘削用バケットの施工手順を示す説明図である。It is explanatory drawing which shows the construction procedure of the bucket for diameter expansion excavation which concerns on embodiment of this invention. 本発明の実施形態に係る拡径掘削用バケットの施工手順を示す説明図である。It is explanatory drawing which shows the construction procedure of the bucket for diameter expansion excavation which concerns on embodiment of this invention. 本発明の実施形態に係る中間拡径部の掘削方法を示す説明図である。It is explanatory drawing which shows the excavation method of the intermediate diameter expansion part which concerns on embodiment of this invention. 本発明の実施形態に係る中間拡径部の掘削方法を示す説明図である。It is explanatory drawing which shows the excavation method of the intermediate diameter expansion part which concerns on embodiment of this invention. 本発明の実施形態に係る中間拡径部の掘削方法を示す説明図である。It is explanatory drawing which shows the excavation method of the intermediate diameter expansion part which concerns on embodiment of this invention. 本発明の実施形態に係る中間拡径部の掘削方法を示す説明図である。It is explanatory drawing which shows the excavation method of the intermediate diameter expansion part which concerns on embodiment of this invention. 本発明の実施形態に係る拡底部の掘削方法を示す説明図である。It is explanatory drawing which shows the excavation method of the bottom expanded part which concerns on embodiment of this invention. 本発明の実施形態に係る拡底部の掘削方法を示す説明図である。It is explanatory drawing which shows the excavation method of the bottom expanded part which concerns on embodiment of this invention. 本発明の実施形態に係る拡径掘削用バケットの機械高さを示す説明図である。It is explanatory drawing which shows the machine height of the bucket for diameter expansion excavation which concerns on embodiment of this invention. 従来の拡底杭を示す概略図である。It is the schematic which shows the conventional bottom expanded pile. 従来の中間拡径杭を示す概略図である。It is the schematic which shows the conventional intermediate diameter enlarged pile. 従来の分割バケット型回転掘削装置を示す概略図であるIt is the schematic which shows the conventional division | segmentation bucket type | mold rotary excavation apparatus.

符号の説明Explanation of symbols

16 クレーン(掘削機本体)
20、154 杭孔(縦孔)
22、23、132 拡径掘削用バケット
24 固定ポスト(回転軸)
30 側壁板(拡翼部)
34 アーム部材(アーム部)
56 中間拡径部(拡径部)
56C 傾斜面
96 土砂回収用バケット(受け皿)
98 接続部材(連結手段)
105 土砂回収用バケット(桶状容器)
144 底蓋(底蓋部材)
158 拡底部
16 Crane (Excavator body)
20, 154 Pile hole (vertical hole)
22, 23, 132 Diameter-excavation bucket 24 Fixed post (rotating shaft)
30 Side wall plate (wing expansion part)
34 Arm member (arm part)
56 Intermediate expanded part (expanded part)
56C Inclined surface 96 Sediment collection bucket (dish)
98 Connection member (connection means)
105 Sediment collection bucket (container)
144 Bottom lid (bottom lid member)
158 Expanded bottom

Claims (3)

掘削機本体に懸架されて回転する回転軸に設けられ、拡縮して縦孔の孔壁を掘削し、前記縦孔に拡径部を形成する拡翼部と、
前記拡翼部の下端部に着脱可能に取り付けられ、前記拡径部の下部に前記縦孔の下方中心に向う傾斜面を形成するアーム部と、
前記アーム部の下端に開口面が位置するように設けられる受け皿と前記拡翼部の下端に開口面が位置するように設けられる桶状容器とを前記回転軸の下端部に交換可能に取り付ける連結手段と、
を備え、
前記受け皿及び前記桶状容器は前記縦孔の孔壁に外周が接触する大きさであり、前記桶状容器の側壁は前記受け皿の側壁よりも高いことを特徴とする拡径掘削用バケット。
An wing part provided on a rotating shaft suspended and rotated by an excavator body, excavating a hole wall of a vertical hole by expanding and contracting, and forming an enlarged diameter part in the vertical hole;
An arm portion that is detachably attached to a lower end portion of the expanded wing portion, and that forms an inclined surface toward a lower center of the vertical hole at a lower portion of the expanded diameter portion;
A connection that replaces a receiving tray provided so that an opening surface is positioned at the lower end of the arm portion and a bowl-shaped container provided such that an opening surface is positioned at the lower end of the wing expanding portion on the lower end portion of the rotating shaft. Means,
With
The diameter-enlarged excavation bucket, wherein the saucer and the bowl-shaped container are sized so that the outer periphery contacts the hole wall of the vertical hole, and the side wall of the bowl-shaped container is higher than the side wall of the saucer.
縦孔の孔壁を掘削して前記縦孔の中間部に中間拡径部を形成する中間拡径部の掘削方法において、
掘削機本体に懸架されて回転する回転軸に設けられた拡翼部の下端部にアーム部を取り付け、かつ前記アーム部の下端に開口面が位置するように前記回転軸の下端部に受け皿を取り付けた状態で、前記拡翼部を拡縮して前記アーム部により前記中間拡径部の下部傾斜面の形成を行う中間拡径下部形成工程と、
前記アーム部が取り外された前記拡翼部の下端に開口面が位置するように前記回転軸の下端部に桶状容器を取り付けた状態で、前記拡翼部を拡縮して該拡翼部により前記中間拡径部の上部傾斜面及び鉛直面の形成を行う中間拡径上中部形成工程と、
を有し、
前記受け皿及び前記桶状容器は前記縦孔の孔壁に外周が接触する大きさであり、前記桶状容器の側壁は前記受け皿の側壁よりも高いことを特徴とする中間拡径部の掘削方法。
In the excavation method of the intermediate diameter expansion part that excavates the hole wall of the vertical hole to form an intermediate diameter expansion part in the intermediate part of the vertical hole,
An arm portion is attached to the lower end portion of the wing expansion portion provided on the rotating shaft that is suspended and rotated by the excavator body, and a saucer is attached to the lower end portion of the rotating shaft so that the opening surface is located at the lower end of the arm portion. In the attached state, the intermediate expanded lower portion forming step of expanding and contracting the expanded blade portion and forming the lower inclined surface of the intermediate expanded portion by the arm portion;
In the state where the bowl-like container is attached to the lower end of the rotating shaft so that the opening surface is located at the lower end of the wing expansion part from which the arm part is removed, the wing expansion part is expanded and contracted by the wing expansion part. An intermediate enlarged upper middle forming step for forming the upper inclined surface and the vertical surface of the intermediate enlarged portion,
Have
An excavation method for an intermediate diameter-expanded portion characterized in that the saucer and the bowl-shaped container are sized such that the outer periphery contacts the hole wall of the vertical hole, and the side wall of the bowl-shaped container is higher than the side wall of the saucer. .
縦孔の孔壁を掘削して前記縦孔の底部に拡底部を形成する拡底部の掘削方法において、
掘削機本体に懸架されて回転する回転軸に設けられた拡翼部の下端に開口面が位置するように前記回転軸の下端部に桶状容器を取り付けた状態で、前記拡翼部を拡縮して該拡翼部により前記拡底部の上部を形成する拡底上部形成工程と、
前記拡翼部の下端に上面が位置するように前記回転軸の下端部に板状の底蓋部材を取り付けた状態で、前記拡翼部を拡縮して該拡翼部により前記拡底部の下部を形成する拡底下部形成工程と、
を有し、
前記受け皿及び前記底蓋部材は、前記縦孔の孔壁に外周が接触する大きさであることを特徴とする拡底部の掘削方法。
In the excavation method of the bottom expanded portion that excavates the hole wall of the vertical hole to form the expanded bottom portion at the bottom of the vertical hole
The wing expansion part is expanded and contracted with a bowl-like container attached to the lower end of the rotary shaft so that the opening surface is positioned at the lower end of the wing expansion part provided on the rotary shaft that is suspended and rotated by the excavator body. And an expanded bottom upper portion forming step of forming the upper portion of the expanded bottom portion by the expanded blade portion,
With the plate-like bottom cover member attached to the lower end of the rotating shaft so that the upper surface is located at the lower end of the wing expansion part, the wing expansion part is expanded and contracted, and the wing expansion part lowers the bottom expansion part. An expanded bottom forming step for forming
Have
The method of excavating a bottom portion, wherein the receiving tray and the bottom lid member are sized so that an outer periphery thereof is in contact with a hole wall of the vertical hole.
JP2007170322A 2007-06-28 2007-06-28 Diameter expansion excavation bucket, intermediate expansion portion excavation method, and bottom expansion portion excavation method Active JP4769767B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2007170322A JP4769767B2 (en) 2007-06-28 2007-06-28 Diameter expansion excavation bucket, intermediate expansion portion excavation method, and bottom expansion portion excavation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2007170322A JP4769767B2 (en) 2007-06-28 2007-06-28 Diameter expansion excavation bucket, intermediate expansion portion excavation method, and bottom expansion portion excavation method

Publications (2)

Publication Number Publication Date
JP2009007835A JP2009007835A (en) 2009-01-15
JP4769767B2 true JP4769767B2 (en) 2011-09-07

Family

ID=40323187

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2007170322A Active JP4769767B2 (en) 2007-06-28 2007-06-28 Diameter expansion excavation bucket, intermediate expansion portion excavation method, and bottom expansion portion excavation method

Country Status (1)

Country Link
JP (1) JP4769767B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6085198B2 (en) * 2013-03-14 2017-02-22 戸田建設株式会社 Drill hole processing equipment
JP6829420B2 (en) * 2017-03-17 2021-02-10 株式会社長谷工コーポレーション Drilling hole diameter expander
JP7213488B2 (en) * 2019-03-27 2023-01-27 大成建設株式会社 Construction method of pile hole for diameter expansion pile

Also Published As

Publication number Publication date
JP2009007835A (en) 2009-01-15

Similar Documents

Publication Publication Date Title
CN109653682B (en) Drill bit with adjustable drill diameter and hole digging machine
JP6099955B2 (en) Nakabori excavator
JP2007291850A (en) Drilling device and method for constructing underground constructed pile
KR920005499B1 (en) Divided-bucket type rotary excavator
JP2014237939A (en) Center drilling excavator
JP4769767B2 (en) Diameter expansion excavation bucket, intermediate expansion portion excavation method, and bottom expansion portion excavation method
JP4949756B2 (en) Expanded excavation bucket
CN214497638U (en) Soil cleaning device of trenching machine
JP2009161980A (en) Earth retaining object installation and collecting type foundation vertical pile construction system
JP5773523B2 (en) Construction device for on-site construction pile and construction method for on-site construction pile
JP4769768B2 (en) Diameter expansion excavation bucket, intermediate expansion portion excavation method, and bottom expansion portion excavation method
JPH10168880A (en) Removing device for obstacle to underground structure and removing method for the obstacle
CN206860102U (en) A kind of drill hammer and percussive drill
JP6162356B1 (en) Method for excavating pile bottom sediment and stirring in hole and rotary table device used therefor
CN214940531U (en) Dash grab bucket structure convenient to unload soil
JP2008150787A (en) Excavating machinery and excavation method
JP2530905B2 (en) Drill bit gravel crusher
CN215711622U (en) Pile foundation engineering is with turning over sediment soil collecting box
CN218439224U (en) Mechanical reaming device for replacing manual reaming of bored pile
JP2024002371A (en) Earth removal device and pile driver
JP2006316612A (en) Bucket for lifting excavated soil and device for lifting excavated soul using the same
JP2018091094A (en) Pile hole drilling head
CN107091056A (en) A kind of drill hammer and percussive drill
KR20010089228A (en) Excavating method and excavating apparatus
JP4755361B2 (en) Vertical shaft construction method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20100329

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20110531

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20110614

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20110620

R150 Certificate of patent or registration of utility model

Ref document number: 4769767

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140624

Year of fee payment: 3