JP4618074B2 - Heat pump water heater - Google Patents
Heat pump water heater Download PDFInfo
- Publication number
- JP4618074B2 JP4618074B2 JP2005275736A JP2005275736A JP4618074B2 JP 4618074 B2 JP4618074 B2 JP 4618074B2 JP 2005275736 A JP2005275736 A JP 2005275736A JP 2005275736 A JP2005275736 A JP 2005275736A JP 4618074 B2 JP4618074 B2 JP 4618074B2
- Authority
- JP
- Japan
- Prior art keywords
- temperature
- heating
- predetermined
- hot water
- heat exchanger
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B30/00—Energy efficient heating, ventilation or air conditioning [HVAC]
- Y02B30/12—Hot water central heating systems using heat pumps
Landscapes
- Steam Or Hot-Water Central Heating Systems (AREA)
Description
本発明は、ヒートポンプ給湯器に関するものであり、特に床暖房機能を備えるものである。 The present invention relates to a heat pump water heater, and particularly has a floor heating function.
従来、この種のヒートポンプ給湯器は、ホットダッシュ運転時暖房二次サイクルの湯水温度を規定するものである(例えば、特許文献1参照)。 Conventionally, this type of heat pump water heater regulates the hot water temperature of the secondary heating cycle during hot dash operation (see, for example, Patent Document 1).
ホットダッシュ運転とは、例えば図6に示すような形態であり、ホットダッシュ運転時には通常の床暖房運転よりも暖房二次サイクルの湯水に高温の湯水を流すことによって、床表面温度を急速に上昇させるものである。 The hot dash operation is, for example, a form as shown in FIG. 6, and during hot dash operation, the floor surface temperature is rapidly increased by flowing hot water in hot water in the secondary heating cycle than in normal floor heating operation. It is something to be made.
また、図7は、特許文献1に記載された従来のヒートポンプ給湯器における制御方法であって、ホットダッシュ運転時暖房二次サイクルの湯水温度は一定温度になるように制御される。その後、床暖房運転時においても暖房二次サイクルの湯水温度はホットダッシュ運転時の湯水温度よりも低い一定温度となるように制御される。なお、図7の横軸は床暖房使用時の経過時間、縦軸は暖房二次出口温度を示す。
しかしながら、上記従来の構成では、ホットダッシュ運転時暖房二次出口温度を一定で高温な湯水で制御し、ホットダッシュ運転終了後は床暖房運転時暖房二次出口温度をホットダッシュ運転時より低い湯水で制御する。その結果、ホットダッシュ運転から床暖房運転への床暖パネル表面温度がなだらかに推移せず、肌に不快感を与えるという課題があった。 However, in the above-described conventional configuration, the heating secondary outlet temperature during hot dash operation is controlled with a constant and high temperature hot water, and the hot secondary outlet temperature during floor heating operation is lower than that during hot dash operation after hot dash operation ends. To control. As a result, the floor warm panel surface temperature from the hot dash operation to the floor heating operation did not smoothly change, and there was a problem that the skin was uncomfortable.
また、ホットダッシュ運転時の床暖房パネルの種類や床暖房パネルの上に敷いたフローリング材の厚みに応じて暖房二次出口温度を変えることができなかったため、肌に不快感を与え、床暖パネルに必要以上の熱量を与えるという課題もあった。 In addition, the heating secondary outlet temperature could not be changed according to the type of floor heating panel during hot dash operation and the thickness of the flooring material laid on the floor heating panel. There was also a problem of giving the panel more heat than necessary.
例えば、図8は横軸を床暖房運転経過時間、縦軸を床表面温度として示しており、図7に記載された制御を行ったことによる床表面温度の推移を表したものである。ホットダッシュ運転時、床暖パネルの表面温度は床暖リモコンによる設定温度よりも高くなりホットダッシュ運転から床暖房運転に切り替わる時床暖パネルの表面温度は急激に低下している。 For example, FIG. 8 shows the floor heating operation elapsed time on the horizontal axis and the floor surface temperature on the vertical axis, and represents the transition of the floor surface temperature due to the control described in FIG. During the hot dash operation, the surface temperature of the warm floor panel is higher than the temperature set by the warm floor remote controller, and the surface temperature of the warm floor panel rapidly decreases when the hot dash operation is switched to the floor heating operation.
また、必要以上に熱量を使用するため、貯湯タンクに戻される温水も高くなり、ヒートポンユニットの入水温度も高くなるため、加熱能力やCOPも低下する。 Further, since the amount of heat is used more than necessary, the hot water returned to the hot water storage tank is also increased, and the incoming temperature of the heat pump unit is also increased, so that the heating capacity and COP are also reduced.
前記従来の課題を解決するために、本発明のヒートポンプ給湯器は、圧縮機と冷媒熱交換器を有する冷凍サイクルと、前記冷媒熱交換器により貯湯タンク下部の水を加熱した後に前記貯湯タンク上部に戻す加熱サイクルと、暖房1次循環ポンプにより前記貯湯タンク上部の湯水を水熱交換器により熱交換を行った後に前記貯湯タンク下部に戻す暖房1次側サイクルと、暖房2次循環ポンプと前記水熱交換器と床暖房パネルを有する暖房二次側サイクルとを備え、前記水熱交換器の暖房二次出口側にサーミスタを配し、床暖房運転の初期時に前記サーミスタによる検知温度が一定値を保つように前記暖房1次ポンプを制御するホットダッシュ運転時において、前記サーミスタの検知温度が、所定の第1温度を検知するように前記暖房1次ポンプは制御され、かつ、所定時間経過後には、前記第1温度よりも低温である所定の第2温度を検知するように前記暖房1次ポンプは制御されるとともに、前記サーミスタの検知時間は、前記所定の第1温度の検知時間よりも、前記所定の第2温度の検知時間の方が長いことを特徴とするものである。 In order to solve the above-described conventional problems, the heat pump water heater of the present invention includes a refrigeration cycle having a compressor and a refrigerant heat exchanger, and heating the water in the lower part of the hot water tank by the refrigerant heat exchanger, and then the upper part of the hot water tank. A heating cycle for returning to water, a heating primary cycle for returning hot water in the upper part of the hot water storage tank to the lower part of the hot water storage tank after exchanging heat with a water heat exchanger by a heating primary circulation pump, a heating secondary circulation pump, and the A water heat exchanger and a heating secondary side cycle having a floor heating panel, a thermistor is disposed on the heating secondary outlet side of the water heat exchanger, and the temperature detected by the thermistor is constant at the initial stage of floor heating operation a hot dash during operation for controlling the heating primary pump so as to maintain the detection temperature of the thermistor, the heating primary pump so as to detect the predetermined first temperature The heating primary pump is controlled so as to detect a predetermined second temperature that is lower than the first temperature after a predetermined time is controlled, and the detection time of the thermistor is set to the predetermined temperature. The detection time of the predetermined second temperature is longer than the detection time of the first temperature .
これにより、ホットダッシュ運転時の床暖パネルの表面温度は肌に不快感を与えなくなる。さらに、床暖パネルに必要以上の熱量を与えずに済むため、貯湯タンクに戻される温水が低くなりヒートポンユニットの入水温度も低くなるため、加熱能力やCOPも向上する。 As a result, the surface temperature of the warm floor panel during hot dash operation does not cause discomfort to the skin. Furthermore, since it is not necessary to give more heat than necessary to the warm floor panel, the warm water returned to the hot water storage tank is lowered and the incoming temperature of the heat pump unit is lowered, so that the heating capacity and COP are improved.
これによって、ホットダッシュ時に床表面温度が設定温度よりも高く温度上昇することが無く、さらに、肌への不快感を与えることを未然に防ぐことができる。As a result, the floor surface temperature does not rise higher than the set temperature during hot dash, and it is possible to prevent the skin from being uncomfortable.
これによって、ホットダッシュ運転時に床暖パネルでの温度変化時において肌に不快感を与えずに設定温度への運転ができる。As a result, during hot dash operation, operation to the set temperature can be performed without causing discomfort to the skin when the temperature changes on the warm floor panel.
本発明のヒートポンプ給湯器は、ホットダッシュ運転時暖房二次側サイクルにおいて時間経過と共に暖房二次出口サーミスタにより検知温度が段階的に切り替わるように制御するため、ホットダッシュ運転中の床暖パネルは肌への不快感を与えず、さらに床暖房パネルは温まりやすくなる。これにより床暖パネルに必要以上の熱量を与えずに済むため、貯湯タンクに戻される温水が低くなりヒートポンユニットの入水温度も低くなるため、加熱能力やCOPも向上する。 The heat pump water heater of the present invention controls the detected temperature to change stepwise by the heating secondary outlet thermistor over time in the heating secondary side cycle during hot dash operation. The floor heating panel is more likely to get warm. As a result, it is not necessary to apply an excessive amount of heat to the warm floor panel, so that the warm water returned to the hot water storage tank is lowered and the incoming temperature of the heat pump unit is lowered, so that the heating capacity and COP are improved.
第1の発明は、圧縮機と冷媒熱交換器を有する冷凍サイクルと、前記冷媒熱交換器により貯湯タンク下部の水を加熱した後に前記貯湯タンク上部に戻す加熱サイクルと、暖房1次循環ポンプにより前記貯湯タンク上部の湯水を水熱交換器により熱交換を行った後に前記貯湯タンク下部に戻す暖房1次側サイクルと、暖房2次循環ポンプと前記水熱交換器と床暖房パネルを有する暖房二次側サイクルとを備え、前記水熱交換器の暖房二次出口側にサーミスタを配し、床暖房運転の初期時に前記サーミスタによる検知温度が一定値を保つように前記暖房1次ポンプを制御するホットダッシュ運転時において、前記サーミスタの検知温度が、所定の第1温度を検知するように前記暖房1次ポンプは制御され、かつ、所定時間経過後には、前記第1温度よりも低温である所定の第2温度を検知するように前記暖房1次ポンプは制御されるとともに、前記サーミスタの検知時間は、前記所定の第1温度の検知時間よりも、前記所定の第2温度の検知時間の方が長いことを特徴とするヒートポンプ給湯器である。 According to a first aspect of the present invention, there is provided a refrigeration cycle having a compressor and a refrigerant heat exchanger, a heating cycle in which water in the lower part of the hot water tank is heated by the refrigerant heat exchanger and then returned to the upper part of the hot water tank, and a heating primary circulation pump A heating primary cycle in which hot water in the upper part of the hot water storage tank is heat-exchanged by a water heat exchanger and then returned to the lower part of the hot water storage tank, a heating secondary circulation pump, the water heat exchanger, and a floor heating panel having a floor heating panel. A secondary cycle, and a thermistor is arranged on the heating secondary outlet side of the water heat exchanger, and the heating primary pump is controlled so that the temperature detected by the thermistor maintains a constant value at the initial stage of floor heating operation. a hot dash during operation, the detection temperature of the thermistor, the heating primary pump so as to detect the predetermined first temperature is controlled, and, after a predetermined time has elapsed, the first temperature The heating primary pump is controlled to detect a predetermined second temperature that is lower than the predetermined temperature, and the detection time of the thermistor is greater than the detection time of the predetermined first temperature. The heat pump water heater is characterized in that the temperature detection time is longer .
これによって、ホットダッシュ運転時において床暖パネル温度が設定温度よりも高く上昇することが無く、床暖パネルに必要以上の熱量を与えずに済み、貯湯タンクに戻される温水が低くなりヒートポンユニットの入水温度も低くなるため、加熱能力やCOPも向上する。 As a result, the floor warming panel temperature does not rise higher than the set temperature during hot dash operation, and it is not necessary to give more heat than necessary to the floor warming panel. Since the incoming water temperature is lowered, the heating capacity and COP are also improved .
これによって、ホットダッシュ時に床表面温度が設定温度よりも高く温度上昇することが無く、さらに、肌への不快感を与えることを未然に防ぐことができる。 This allows, without that the floor surface temperature is higher temperature rise than the set temperature at the time of hot dash, further, it is possible to prevent that the discomfort to the skin.
これによって、ホットダッシュ運転時に床暖パネルでの温度変化時において肌に不快感を与えずに設定温度への運転ができる。As a result, during hot dash operation, operation to the set temperature can be performed without causing discomfort to the skin when the temperature changes on the warm floor panel.
第2の発明は、圧縮機と冷媒熱交換器を有する冷凍サイクルと、前記冷媒熱交換器により貯湯タンク下部の水を加熱した後に前記貯湯タンク上部に戻す加熱サイクルと、暖房1次循環ポンプにより前記貯湯タンク上部の湯水を水熱交換器により熱交換を行った後に前記貯湯タンクに戻す暖房1次側サイクルと、暖房2次循環ポンプと前記水熱交換器と床暖房パネルを有する暖房二次側サイクルとを備え、前記水熱交換器の暖房二次出口側にサーミスタを配し、床暖房運転の初期時に前記サーミスタによる検知温度が一定値を保つように前記暖房1次ポンプを制御するホットダッシュ運転時において、前記サーミスタの検知温度が、所定の第1温度を検知するように前記暖房1次ポンプは制御され、かつ、所定時間経過後には、前記第1温度よりも低温である所定の第2温度、前記第2温度よりも低温である所定の第3温度を検知するように前記暖房1次ポンプは制御されるとともに、前記所定の第1温度と前記所定の第2温度との温度差は、前記所定の第2温度と前記所定の第3温度との温度差よりも大きいことを特徴とするヒートポンプ給湯器である。According to a second aspect of the present invention, there is provided a refrigeration cycle having a compressor and a refrigerant heat exchanger, a heating cycle in which water in the lower part of the hot water storage tank is heated by the refrigerant heat exchanger and then returned to the upper part of the hot water storage tank, and a heating primary circulation pump Heating secondary cycle having a primary heating cycle for returning the hot water in the upper part of the hot water storage tank to the hot water storage tank after exchanging heat with a water heat exchanger, a heating secondary circulation pump, the water heat exchanger, and a floor heating panel And a hot water that controls the heating primary pump so that the temperature detected by the thermistor maintains a constant value at the initial stage of floor heating operation. During the dash operation, the heating primary pump is controlled so that the temperature detected by the thermistor detects the predetermined first temperature, and after the predetermined time has elapsed, The heating primary pump is controlled so as to detect a predetermined second temperature that is also low temperature and a predetermined third temperature that is lower than the second temperature, and the predetermined first temperature and the predetermined temperature The heat pump water heater is characterized in that a temperature difference from the second temperature is larger than a temperature difference between the predetermined second temperature and the predetermined third temperature.
これによって、ホットダッシュ運転時に床暖パネルでの温度変化時において肌に不快感を与えずに設定温度への運転ができる。また、ホットダッシュ運転時に貯湯タンクに戻される温水が低くなりヒートポンユニットの入水温度も低くなるため、加熱能力やCOPも向上する。As a result, during hot dash operation, operation to the set temperature can be performed without causing discomfort to the skin when the temperature changes on the warm floor panel. Moreover, since the hot water returned to the hot water storage tank during the hot dash operation is lowered and the incoming water temperature of the heat pump unit is lowered, the heating capacity and COP are also improved.
第3の発明は、特に、第1または第2の発明において所定の第1温度は、床暖房パネルの種類または床暖房パネルの上に敷いたフローリング材の厚みに応じて設定されるものである。 In the third invention, in particular, the predetermined first temperature in the first or second invention is set according to the type of the floor heating panel or the thickness of the flooring material laid on the floor heating panel. .
これによって、床暖房パネルの種類または床暖房パネルの上に敷いたフローリング材の厚みに応じて暖房二次出口温度を変え、それぞれの床暖パネルの最適温度を決めることができる。 Thereby, the heating secondary outlet temperature can be changed according to the type of the floor heating panel or the thickness of the flooring material laid on the floor heating panel, and the optimum temperature of each floor warming panel can be determined.
第4の発明は、特に、第1または第2の発明において、床暖房パネルから放熱される熱量を入力するパネル温度設定手段を備え、所定の第2温度は、パネル温度設定手段による入力値に応じて設定されるものである。 In particular, the fourth invention includes panel temperature setting means for inputting an amount of heat radiated from the floor heating panel in the first or second invention, and the predetermined second temperature is an input value by the panel temperature setting means. It is set accordingly.
これによって、床暖リモコンによる設定温度に応じて所定の第2温度を決定されるため、第2温度は温度変更をすることが可能である。 Accordingly, since the predetermined second temperature is determined according to the set temperature by the floor warming remote controller, the second temperature can be changed .
以下、本発明の実施の形態について、図面を参照しながら説明する。なお、この実施の形態によって本発明が限定されるものではない。 Hereinafter, embodiments of the present invention will be described with reference to the drawings. In addition, this invention is not limited by this embodiment.
(実施の形態1)
図1は、本発明の実施の形態におけるヒートポンプ給湯器の図を示すものである。
(Embodiment 1)
FIG. 1 shows a diagram of a heat pump water heater in an embodiment of the present invention.
図1において、ヒートポンプ給湯器1は、冷凍サイクル2と加熱サイクル3と暖房1次サイクル4と暖房2次サイクル5から構成されている。
In FIG. 1, the heat
冷凍サイクル2は、圧縮機6と冷媒熱交換器7と膨張弁8と蒸発器9から構成されており、冷凍サイクル2内には冷媒が循環している。冷媒は二酸化炭素冷媒を用いる。なお、冷媒としては、他にもR410a等のフロン系冷媒、プロパン等の炭化水素系冷媒などが挙げられる。
The
加熱サイクル3は、貯湯タンク10と冷媒熱交換器7と積層ポンプ11から構成されている。加熱サイクル3内では、貯湯タンク10の下部の水を冷媒熱交換器7に通して貯湯タンク10の上部に湯水を戻す。
The heating cycle 3 includes a hot
暖房1次サイクル4は貯湯タンク10と水熱交換器12と暖房1次循環ポンプ13から構成されており、床暖房運転時貯タンク1上部の湯水は水熱交換器12を通り貯タンク10の下部に水を戻す。
The heating primary cycle 4 includes a hot
暖房2次サイクル5は、水熱交換器12と暖房2次サーミスタ14と暖房2次循環ポンプ15と床暖パネル16から構成されている。また、暖房2次サイクル5は、前記暖房2次サーミスタ14の検知温度に応じて暖房1次循環ポンプ13を制御する。
The heating secondary cycle 5 includes a
次に、図1に基づいて貯湯運転、暖房運転についてそれぞれ説明する。 Next, a hot water storage operation and a heating operation will be described based on FIG.
まず、貯湯運転では、積層ポンプ11を起動させることによって貯湯タンク10下部の水を冷媒熱交換器7に供給する。そして、冷媒熱交換器7において加熱された湯水は貯湯タンク10上部に戻される。このようにして、高温の湯水は貯湯タンク10の上部から積層状に蓄積される。この貯湯運転は、貯湯タンク10内に高温の湯水で満たされるまで続けられる。
First, in the hot water storage operation, the water in the lower part of the hot
また、暖房運転では、暖房1次循環ポンプ13を起動させることによって貯湯タンク10上部の湯水を水熱交換器12へ供給し、水熱交換器12を介して暖房2次サイクル5内を循環する湯水と熱交換を行う。水熱交換器12で放熱された湯水は貯湯タンク10の下部へ戻される。
In heating operation, the heating
一方、暖房2次循環ポンプ15によって暖房2次サイクル5を循環する湯水は、水熱交換器12で吸熱することにより温度上昇し、その後に床暖パネル16により放熱される。ここで、暖房1次循環ポンプ13は暖房2次サーミスタ14の検知温度に応じて流量を制御するので、床暖パネル16で放熱される放熱量は適温に調整される。
On the other hand, the hot water circulating in the heating secondary cycle 5 by the heating
ところで、暖房起動運転時は暖房2次サイクル5を循環する湯水が比較的低温である場合が多いことから、設定温度に達するまでに多くの時間を要する。そこで、暖房運転を行うまでにホットダッシュ運転を行い、上記暖房起動運転時に生じる問題の解決を図っている。 By the way, since the hot water circulating through the heating secondary cycle 5 is often at a relatively low temperature during the heating start-up operation, it takes a long time to reach the set temperature. Therefore, the hot dash operation is performed before the heating operation is performed to solve the problem that occurs during the heating start operation.
ホットダッシュ運転とは、暖房運転中に暖房2次サイクル5を循環する湯水(例えば、40〜55℃)よりも高温の湯水(例えば、55〜60℃)を一時的に暖房2次サイクル5に流すことによって、床暖パネル16での放熱量を急激に増加させて、定められた時間内に床暖パネル16を所定温度にするものである。
Hot dash operation refers to hot water (for example, 55 to 60 ° C.) that is hotter than hot water (for example, 40 to 55 ° C.) circulating in the heating secondary cycle 5 during heating operation. By flowing, the amount of heat released from the
具体的に図2を用いて説明すると、例えば暖房運転中では暖房2次サーミスタ14の検知温度が40度で一定となるように暖房1次循環ポンプ13を制御するが、ホットダッシュ運転中では、40度よりも高温である温度を暖房2次サーミスタ14が検知するように暖房1次循環ポンプ13を制御する。
Specifically, referring to FIG. 2, for example, the heating
なお、図2において、縦軸には暖房2次サーミスタ14が検知する温度を示し、横軸にはホットダッシュ運転開始時から暖房運転継続時の経過時間を示すことによって、経過時間における暖房2次出口サーミスタ14の温度分布を表した。そして、図2によれば、ホットダッシュ運転開始時は、暖房2次サーミスタ14が60度を検出するように暖房1次循環ポンプ13を制御し、所定時間経過後には暖房2次サーミスタ14が55度を検出するように暖房1次循環ポンプ13を制御し、このような制御を繰り返すことによって、最終的にはホットダッシュ完了時までに暖房2次サーミスタ14が40度を検出するまで続けられる。
In FIG. 2, the vertical axis indicates the temperature detected by the heating
なお、図2では、暖房2次サーミスタ14による検知温度が段階的に低下するように示されているが、連続的に60度から40度まで低下していくような形態であってもよい。
In FIG. 2, the temperature detected by the heating
そして、上記図2による制御を行うことにより、図3のような結果となる。図3は、縦軸を床暖パネル16の表面温度とし、横軸をホットダッシュ運転開始時から暖房運転継続時の経過時間とすることによって、床暖パネル16の表面温度の時間推移を実線31で表しており、比較対象のため段階的に流量温度を低下させない従来の場合を点線32で表している。
Then, by performing the control according to FIG. 2, the result as shown in FIG. 3 is obtained. In FIG. 3, the vertical axis represents the surface temperature of the
このように、実施の形態1では、ホットダッシュ運転時において暖房2次サーミスタが検知する温度を時間の経過とともに段階的に低下させていくので、床暖パネル16が設定温度以上に上昇することが抑えられ、肌に不快感を与えない。
As described above, in the first embodiment, the temperature detected by the heating secondary thermistor during the hot dash operation is gradually reduced with time, so that the
なお、図2において、ホットダッシュ運転開始時には暖房2次サーミスタ14が60度を検知するように制御するとしたが、この温度は床暖房パネル16の種類や床暖房パネル16の上に敷いたフローリング材の厚みに応じて適宜変更してもよい。
In FIG. 2, the heating
例えば、床暖房パネル16素材が薄いパネルを用いた場合であれば、ホットダッシュ運転開始時には暖房2次サーミスタ14が85度を検知するように制御すれば、暖房運転の立ち上がりをよくすることができる。
For example, if the
また、図2において、ホットダッシュ運転終了時には、暖房2次サーミスタ14が40度を検知するように制御すると記載したが、これは使用者が設定する床暖房温度設定によって変化する。例えば、使用者が床暖房温度を30度となるように設定したときは、ホットダッシュ運転終了時に暖房2次サーミスタ14が35度となるように、ホットダッシュ運転中に暖房1次循環ポンプ13を制御すればよい。これによって、ホットダッシュ運転から暖房運転への切り替わりに床暖パネル16の表面温度がなだらかに推移し、肌に不快感を与えない。また、ホットダッシュ運転時に貯湯タンクに戻される温水が低くなりヒートポンユニットの入水温度も低くなるため、加熱能力やCOPも向上する。
In FIG. 2, it is described that the
(実施の形態2)
実施の形態1においては、図2で示したようにホットダッシュ運転時において暖房2次サーミスタ14が検知する温度を時間の経過とともに段階的に低下させたが、例えば以下に示す図4や図5のような形態であってもよい。
(Embodiment 2)
In the first embodiment, as shown in FIG. 2, the temperature detected by the heating
図4は、運転経過時間における暖房2次出口サーミスタ14の温度分布を表したもので、縦軸には暖房2次サーミスタ14が検知する温度を示し、横軸にはホットダッシュ運転開始時から暖房運転継続時の経過時間を示した。
FIG. 4 shows the temperature distribution of the heating
そして、図4によれば、ホットダッシュ運転開始時は、暖房2次サーミスタ14が80度を検出するように暖房1次循環ポンプ13を制御し、所定時間経過後には暖房2次サーミスタ14が60度、55度、50度を検出するように時間経過と共に暖房1次循環ポンプ13を制御し、このような時間経過と共に暖房2次サーミスタ14の温度幅を小さくなる制御を繰り返すことによって、時間経過と共に最終的には暖房2次サーミスタ14が40度を検出するまで続けられる。これによりホットダッシュ運転から床暖房運転への床暖パネル16の表面温度がなだらかに推移し、肌に不快感を与えない。
Then, according to FIG. 4, when the hot dash operation is started, the heating
また、図5は、運転経過時間における暖房2次サーミスタ14の温度分布を表したもので、縦軸には暖房2次サーミスタ14が検知する温度を示し、横軸にはホットダッシュ運転開始時から暖房運転継続時の経過時間を示した。
FIG. 5 shows the temperature distribution of the heating
そして、図5によれば、ホットダッシュ運転開始時は、暖房2次サーミスタ14が60度を検出するように暖房1次循環ポンプ13を制御し、所定時間経過後には暖房2次サーミスタ14が55度を検出するように暖房1次循環ポンプ13を制御し、このような制御を繰り返すことによって、最終的には暖房2次サーミスタ14が40度を検出するまで続けられる。このとき、暖房2次サーミスタ14が60度から55度を検出する時間をT1、55度から50度を検出する時間をT2、50度から45度を検出する時間をT3とすれば、時間経過と共にT1≦T2≦T3になるように時間幅は大きくなる。
According to FIG. 5, at the start of the hot dash operation, the heating
以上のように、実施の形態2では、ホットダッシュ運転時において暖房2次サーミスタ14が検知する温度を時間の経過とともに段階的に低下させていく中で、時間経過と共に所定時間までの温度幅を小さく、時間経過と共に所定温度までの時間幅を大きくすることでホットダッシュ運転から床暖房運転への床暖パネル16の表面温度がなだらかに推移し、肌に不快感を与えない。さらに、床暖パネル16の表面温度分布のなだらかさは自由に変えることができる。また、ホットダッシュ運転時に貯湯タンクに戻される温水が低くなりヒートポンユニットの入水温度も低くなるため、加熱能力やCOPも向上する。
As described above, in the second embodiment, during the hot dash operation, the temperature detected by the heating
以上のように、本発明にかかるヒートポンプ給湯器は、ホットダッシュ運転時に床暖パネルに必要な熱量を与えずに済むために床暖房を効率よく運転可能となり運転効率の改善に大きな効果がありランニングコストを大幅に改善できる。 As described above, the heat pump water heater according to the present invention does not give the necessary amount of heat to the floor warming panel during the hot dash operation, so that the floor heating can be operated efficiently, and the running efficiency is greatly improved. Cost can be greatly improved.
1 ヒートポンプ給湯器
2 冷凍サイクル
3 加熱サイクル
4 暖房1次サイクル
5 暖房2次サイクル
6 圧縮機
7 冷媒熱交換器
10 貯湯タンク
12 水熱交換器
13 暖房1次循環ポンプ
14 暖房2次サーミスタ
15 暖房2次循環ポンプ
16 床暖パネル
DESCRIPTION OF
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2005275736A JP4618074B2 (en) | 2005-09-22 | 2005-09-22 | Heat pump water heater |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2005275736A JP4618074B2 (en) | 2005-09-22 | 2005-09-22 | Heat pump water heater |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2007085662A JP2007085662A (en) | 2007-04-05 |
JP4618074B2 true JP4618074B2 (en) | 2011-01-26 |
Family
ID=37972802
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2005275736A Expired - Fee Related JP4618074B2 (en) | 2005-09-22 | 2005-09-22 | Heat pump water heater |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP4618074B2 (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4661855B2 (en) * | 2007-11-15 | 2011-03-30 | ダイキン工業株式会社 | Floor heating system |
KR101234528B1 (en) * | 2010-11-23 | 2013-02-19 | 주식회사 경동원 | Method for controlling heating of boiler and apparatus thereof |
JP5812755B2 (en) * | 2011-08-18 | 2015-11-17 | リンナイ株式会社 | Hot water floor heater |
JP6573488B2 (en) | 2015-06-05 | 2019-09-11 | リンナイ株式会社 | Heating system |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS61197936A (en) * | 1985-02-28 | 1986-09-02 | Toshiba Corp | Air conditioner |
JP2003114053A (en) * | 2001-10-04 | 2003-04-18 | Denso Corp | Reservoir type hot-water supply device |
JP2005016835A (en) * | 2003-06-26 | 2005-01-20 | Yukio Inoguchi | Floor heating control system |
JP2005037101A (en) * | 2003-07-18 | 2005-02-10 | Denso Corp | Hot water storage type water heater with heating function |
-
2005
- 2005-09-22 JP JP2005275736A patent/JP4618074B2/en not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS61197936A (en) * | 1985-02-28 | 1986-09-02 | Toshiba Corp | Air conditioner |
JP2003114053A (en) * | 2001-10-04 | 2003-04-18 | Denso Corp | Reservoir type hot-water supply device |
JP2005016835A (en) * | 2003-06-26 | 2005-01-20 | Yukio Inoguchi | Floor heating control system |
JP2005037101A (en) * | 2003-07-18 | 2005-02-10 | Denso Corp | Hot water storage type water heater with heating function |
Also Published As
Publication number | Publication date |
---|---|
JP2007085662A (en) | 2007-04-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP6320633B2 (en) | Heat pump equipment | |
JP3977382B2 (en) | Hot water storage water heater | |
JP4295241B2 (en) | Water heater | |
JP2008025945A (en) | Brine radiation type heater | |
JP4618074B2 (en) | Heat pump water heater | |
JP2006329570A (en) | Heating device | |
JP4692180B2 (en) | Heat pump water heater | |
JP2008032291A (en) | Heat pump type hot water supply heating device | |
JP6427380B2 (en) | Heat pump system | |
JP6438765B2 (en) | Thermal equipment | |
JP4239922B2 (en) | Floor heating system | |
JP2009097826A (en) | Heat pump hot water supply device | |
JP4226533B2 (en) | Hot water storage water heater | |
JP2016070630A (en) | Hot water supply heating device | |
JP4134969B2 (en) | Hot water storage type heat pump water heater | |
JP4455518B2 (en) | Heat pump water heater | |
JP2006226593A (en) | Water heater | |
JP3644373B2 (en) | Heat pump floor heating system | |
JP2009204300A (en) | Hot water storage type heater and water heater | |
JP2009068818A (en) | Hot water storage type water heater | |
JP2004205140A (en) | Reheating device for bath | |
JP4354389B2 (en) | Hot water storage water heater | |
JP5741256B2 (en) | Hot water storage water heater | |
JP4351967B2 (en) | Hot water storage water heater | |
JP7236333B2 (en) | Water heater |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20080723 |
|
RD01 | Notification of change of attorney |
Free format text: JAPANESE INTERMEDIATE CODE: A7421 Effective date: 20091126 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20100715 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20100727 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20100831 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20100928 |
|
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20101011 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20131105 Year of fee payment: 3 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20131105 Year of fee payment: 3 |
|
LAPS | Cancellation because of no payment of annual fees |