JP4614774B2 - Underground line construction design support system - Google Patents
Underground line construction design support system Download PDFInfo
- Publication number
- JP4614774B2 JP4614774B2 JP2005004587A JP2005004587A JP4614774B2 JP 4614774 B2 JP4614774 B2 JP 4614774B2 JP 2005004587 A JP2005004587 A JP 2005004587A JP 2005004587 A JP2005004587 A JP 2005004587A JP 4614774 B2 JP4614774 B2 JP 4614774B2
- Authority
- JP
- Japan
- Prior art keywords
- construction
- data
- unit price
- work
- section
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims description 209
- 238000013461 design Methods 0.000 title claims description 113
- 239000000463 material Substances 0.000 claims description 50
- 238000009412 basement excavation Methods 0.000 claims description 47
- 238000000034 method Methods 0.000 claims description 30
- 238000004891 communication Methods 0.000 claims description 7
- 238000005553 drilling Methods 0.000 claims description 3
- 238000012545 processing Methods 0.000 description 28
- 230000010354 integration Effects 0.000 description 15
- 238000003860 storage Methods 0.000 description 14
- 101710127489 Chlorophyll a-b binding protein of LHCII type 1 Proteins 0.000 description 9
- 101710184917 Chlorophyll a-b binding protein of LHCII type I, chloroplastic Proteins 0.000 description 9
- 229920006217 cellulose acetate butyrate Polymers 0.000 description 9
- 230000005540 biological transmission Effects 0.000 description 7
- 230000006870 function Effects 0.000 description 7
- 239000002689 soil Substances 0.000 description 7
- 238000010586 diagram Methods 0.000 description 6
- 238000009825 accumulation Methods 0.000 description 5
- 230000015556 catabolic process Effects 0.000 description 4
- 238000005520 cutting process Methods 0.000 description 4
- 239000004744 fabric Substances 0.000 description 4
- 238000002360 preparation method Methods 0.000 description 4
- 238000009434 installation Methods 0.000 description 3
- 238000012986 modification Methods 0.000 description 3
- 230000004048 modification Effects 0.000 description 3
- 239000010426 asphalt Substances 0.000 description 2
- 238000012937 correction Methods 0.000 description 2
- 101100390698 Arabidopsis thaliana FH1 gene Proteins 0.000 description 1
- 229910000831 Steel Inorganic materials 0.000 description 1
- 238000007792 addition Methods 0.000 description 1
- 230000001174 ascending effect Effects 0.000 description 1
- 239000011248 coating agent Substances 0.000 description 1
- 238000000576 coating method Methods 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 238000012217 deletion Methods 0.000 description 1
- 230000037430 deletion Effects 0.000 description 1
- 238000009826 distribution Methods 0.000 description 1
- 239000003673 groundwater Substances 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
- 150000003839 salts Chemical class 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 239000004575 stone Substances 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Description
本発明は、地中への電力線埋設工事の際の工事や資材の単価(以下、地中線単価という)を積算する地中線単価積算システムに関する。 The present invention relates to a underground unit price integration system that integrates unit prices of construction work and materials (hereinafter referred to as underground unit price) in power line burying work underground.
従来、地中線単価を積算するには、設計された図面を基に管路材の選定や数量の算定、掘削範囲による掘削土の計算、道路であればアスファルト量の算定、工事にかかる工数の算定などを計算により見積もりを行っていた。 Conventionally, to calculate the unit price of underground cable, selection of pipe material and calculation of quantity based on the designed drawings, calculation of excavated soil by excavation area, calculation of asphalt amount if road, man-hour for construction work It was estimated by calculation.
この工事の計算は、たとえば道路を掘削する場合は、工事区間の掘削量に工事単価を積算して行っているが、掘削量については、掘削幅に掘削深さを掛けて掘削断面積を出し、これに掘削区間の長さ(区間長)を掛けて掘削量を算していた。また、資材費用については、単位長さあたりの資材単価に区間長を掛け合わせて算出していた。 For example, when excavating a road, this work is calculated by multiplying the excavation amount in the construction section by the construction unit price. The amount of excavation was calculated by multiplying this by the length of the excavation section (section length). In addition, the material cost was calculated by multiplying the material unit price per unit length by the section length.
しかしながら、実際の工事は、掘削予定位置の周囲を削ったり、土留め工や残土処理など多岐にわたる工事を行っている。このため、従来は、この諸々の工事の発生を予想して工事単価を設定し、それを積算することによって工事の見積もりを行っていた。 However, the actual construction works are diversified, such as cutting around the planned excavation position, earth retaining work and residual soil treatment. For this reason, conventionally, the construction cost is estimated by setting the construction unit price in anticipation of the occurrence of these various constructions, and accumulating them.
この見積りを工事単価で調整するという方法は、見積りと実際の工事内容との違いによっては、その違いを吸収できず、予想した利益を得られないという問題を生じていた。また、確実に利益を確保するために単価を過大に設定するという問題もあった。 The method of adjusting the estimate by the construction unit price has caused a problem that the difference between the estimate and the actual construction content cannot be absorbed and the expected profit cannot be obtained. There is also a problem that the unit price is set excessively in order to ensure profits.
これに対して、工事見積りを精度よく算出するために、工事原価、利益率などを入力して利益管理や原価管理を厳格に行う技術も提案されている。(例えば、特許文献1、2を参照)。
ところで、一般に地中線の工事の見積もりにおいては、土木工事とケーブルその他用品の管理が必要となるが、見積もりを正確に行おうとすると入力項目が多岐にわたり入力作業が煩雑になるという問題がある。 By the way, in general, it is necessary to manage civil engineering work and cables and other items in the estimation of underground work, but there is a problem in that input items are diverse and complicated in order to estimate accurately.
また、上述の従来の技術では、各項目の入力を行うためには工事設計を正確に行う必要があり、見積もりに多大な労力を要してしまうという問題もある。 Further, in the above-described conventional technique, it is necessary to accurately perform construction design in order to input each item, and there is a problem that much labor is required for estimation.
本発明は、かかる事情に鑑みてなされたものであり、地中線の工事において、効率の良いデータ入力を可能にして精度の高い見積算定を行うことができる地中線単価積算システムを提供することを目的とする。 The present invention has been made in view of such circumstances, and provides an underground unit price integration system capable of performing highly accurate estimation calculation by enabling efficient data input in underground line construction. For the purpose.
本発明の主な特徴は、地中線の工事区間を工事形態別に複数のパターン(工事種別)に分類し、工事種別ごとに必要な作業項目を規定して、この作業項目の見積り金額を工事区間の基本的な寸法データ(幅、深さ、長さのデータ)に関連付けて求めるようにしたことである。 The main feature of the present invention is that the construction section of the underground line is classified into a plurality of patterns (construction types) according to the construction form, the necessary work items are defined for each construction type, and the estimated amount of this work item is set in the construction This is obtained in association with basic dimension data (width, depth, length data) of the section.
具体的には、本発明に係わる地中線工事設計支援システムは、地中線工事の見積費用を演算する地中線工事設計支援システムであって、工事種別ごとに定義された作業項目の作業量を掘削断面における寸法識別情報および工事区間長を用いて表した設計情報を記憶する手段と、前記作業項目の単価を設定または更新する単価入力手段と、地中線工事範囲を工事種別に基づいて複数の区分に分割した当該区分ごとに前記寸法識別情報および前記工事区間長に対応する寸法データを入力する工事データ入力手段と、この寸法データおよび前記単価を用いて地中線工事の見積費用を演算する工事費用演算手段と、この演算結果を出力する設計書出力手段と、を備えたことを特徴とする。 Specifically, the underground line work design support system according to the present invention is an underground line work design support system for calculating the estimated cost of underground line work, and works for work items defined for each work type. A means for storing design information in which the amount is expressed using dimension identification information and construction section length in the excavation section, a unit price input means for setting or updating the unit price of the work item, and the underground work range based on the construction type The construction data input means for inputting the dimension identification information and the dimension data corresponding to the construction section length for each of the sections divided into a plurality of sections, and the estimated cost of underground line construction using the dimension data and the unit price It is characterized by comprising construction cost calculation means for calculating the calculation result and design document output means for outputting the calculation result.
地中線工事範囲を工事種別ごとに区分し、掘削幅、影響幅、管理者指示幅などの数法識別情報や区間長を用いて、工事種別に基づいて必要となる作業項目の作業量を演算する。そして、この作業量に各作業項目に対応する単価を掛けてその作業項目の見積費用を算出する。これによって、掘削断面のデータと区間長を入力することで見積設計書が得られるため、見積もり作業の労力を軽減することができる。 Divide the underground work range by work type, and use the number identification information such as excavation width, impact width, manager instruction width and section length to determine the work amount of work items required based on the work type Calculate. Then, the work cost is multiplied by the unit price corresponding to each work item to calculate the estimated cost of the work item. Thereby, since the estimated design document can be obtained by inputting the data of the excavation cross section and the section length, the labor of the estimation work can be reduced.
好ましくは、前記工事種別は、管路工事、引き込み工事、マンホール工事、ハンドホール工事、ケーブルボック内装工事に分けるとよい。工事種別としてこれらを区分することによって精度の高い見積もりが可能となる。 Preferably, the construction type is divided into pipeline construction, lead-in construction, manhole construction, handhole construction, and cable box interior construction. By classifying these as construction types, it is possible to estimate with high accuracy.
また、本発明に係わる地中線工事設計支援システムは、ユーザ端末および工事請負業者のコンピュータ装置と通信ネットワークを介して接続するサーバによって地中線工事の見積費用を演算する地中線工事設計支援システムであって、工事種別ごとに定義された作業項目の作業量を掘削断面における寸法識別情報および工事区間長を用いて表した設計情報を記憶する手段と、前記コンピュータ装置から送られてくる前記作業項目の単価の設定または更新データを受信する単価入力手段と、前記ユーザ端末から送られてくる地中線工事範囲を工事種別に基づいて複数の区分に分割した区分情報と、当該区分ごとの前記寸法識別情報および前記工事区間長に対応する寸法データとを受信する工事データ入力手段と、 この寸法データおよび前記単価を用いて地中線工事の見積費用を演算する工事費用演算手段と、この演算結果を該ユーザ端末へ送信する設計書出力手段と、を備えたことを特徴とする。好ましくは、前記単価入力手段と前記工事データ入力手段は、夫々他の各手段に対して独立起動可能に構成する。 The underground line construction design support system according to the present invention is an underground line construction design support system that calculates an estimated cost of underground line work by a server connected to a user terminal and a computer device of a construction contractor via a communication network. A system for storing design information representing a work amount of a work item defined for each construction type using dimension identification information on a cross section and construction section length; Unit price input means for receiving unit price setting or update data for work items, section information obtained by dividing the underground line construction range sent from the user terminal into a plurality of sections based on construction types, and for each section Construction data input means for receiving the dimension identification information and dimension data corresponding to the construction section length; Characterized by comprising the construction cost calculating means for calculating the estimated cost of the underground line construction, a design document output means for transmitting the operation result to the user terminal, via the use of an. Preferably, the unit price input means and the construction data input means are configured to be independently activated with respect to each other means.
工事データの入力や単価を入力を端末装置を介して行うことによって、現地で測量してデータを入力したり、工事費用の管轄部門が高いセキュリティによって単価情報の管理を行う場合など、独立した作業が可能となりシステムの利便性が向上する。 Independent work, such as entering construction data and unit prices via a terminal device, surveying and entering data on site, or managing the unit price information with high security by the department responsible for construction costs And the convenience of the system is improved.
さらに、本発明に係わる地中線工事設計支援システムは、前記工事費用演算手段は、前記寸法データを用いて区分ごと作業項目ごとの作業量を演算すると共に該作業量を見積対象の複数の区分について足し合わせることによって見積対象全体の作業量を演算し、さらに、当該作業量に作業項目ごとの単価を掛け合わせて見積費用を算出することを特徴とする。 Further, in the underground line construction design support system according to the present invention, the construction cost calculation means calculates a work amount for each work item for each section using the dimension data, and a plurality of sections for estimating the work amount. The amount of work for the entire estimation target is calculated by adding together, and the estimated cost is calculated by multiplying the amount of work by the unit price for each work item.
寸法データを用いて区分ごと作業項目ごとの作業量を演算することによって、区分ごとの作業量の把握が可能となり、さらに作業量を見積対象の複数の区分について足し合わせることによって工事全体の作業量の把握が可能となる。この作業量に作業項目ごとの単価を掛け合わせて見積費用を算出することができる。好ましくは、区分ごとに作業スケジュールを保存可能にするとよい。 By calculating the work amount for each work item for each category using the dimensional data, it becomes possible to grasp the work amount for each category, and by adding the work amount for multiple categories to be estimated, the work amount for the entire work Can be grasped. The estimated cost can be calculated by multiplying the work amount by the unit price for each work item. Preferably, the work schedule can be saved for each section.
工事種別ごとの基本的な寸法データによって作業量の管理ができるため、区分ごとのスケジューリングが容易になり、スケジュールを含めた見積設計書の作成が可能となる。 Since the amount of work can be managed by basic dimension data for each construction type, scheduling for each section is facilitated, and an estimated design document including a schedule can be created.
また、本発明に係わる地中線工事設計支援システムの前記単価入力手段は、資材の単位寸法あたりの単価を設定または更新可能であって、地中線工事の区分ごとに、必要な資材項目を設定する資材データ入力手段と、前記工事費用演算手段は、前記資材単価および前記寸法データを用いて、区分ごと資材項目ごとの資材数量および該資材の費用を演算することを特徴とする。 Further, the unit price input means of the underground line construction design support system according to the present invention can set or update the unit price per unit dimension of the material, and the necessary material items are classified for each category of the underground line construction. The material data input means to be set and the construction cost calculation means calculate the material quantity for each material item and the cost of the material by using the material unit price and the dimension data.
資材費用についても工事種別によって分けられた区分ごとに管理することによって、精度の高い見積もりが可能となると共に資材の手配書作成等においても有効に利用できる。 By managing the material costs for each category divided according to the construction type, it is possible to estimate with high accuracy and to effectively use it in preparation of material arrangements.
また、本発明に係わる地中線工事設計支援方法は、ユーザ端末および工事請負業者のコンピュータ装置と通信ネットワークを介して接続するサーバによって地中線工事の見積費用を演算する地中線工事設計支援方法であって、工事種別ごとに定義された作業項目の作業量を掘削断面における寸法識別情報および工事区間長を用いて表した設計情報を記憶するステップと、ユーザ情報および工事請負業者情報を記憶するステップと、前記コンピュータ装置から送られてくる前記作業項目の単価の設定または更新データを受信して前記工事請負業者情報に関連付けて記憶するステップと、前記ユーザ端末から送られてくる地中線工事を工事種別ごとに複数の区分に分割した区分情報と、該区分ごとの前記寸法識別情報および前記工事区間長に対応する寸法データとを受信して前記ユーザ情報に関連付けて記憶するステップと、この寸法データおよび前記単価を用いて前記設計情報に基づいて地中線工事の見積費用を演算するステップと、この演算結果を該ユーザ端末へ送信するステップと、を含むことを特徴とする。 Also, the underground line construction design support method according to the present invention is an underground line construction design support method for calculating an estimated cost of underground line work by a server connected to a user terminal and a computer device of a construction contractor via a communication network. A step of storing design information representing the amount of work of work items defined for each construction type using dimension identification information and construction section length in excavation sections, and storing user information and construction contractor information A step of receiving unit price setting or update data of the work item sent from the computer device and storing it in association with the construction contractor information, and a ground line sent from the user terminal Corresponds to the division information divided into multiple divisions for each construction type, the dimension identification information for each division, and the construction section length Receiving the dimension data to be stored in association with the user information, calculating the estimated cost of the underground work based on the design information using the dimension data and the unit price, and the calculation result Transmitting to the user terminal.
複数の工事請負業者について、夫々の単価情報を保存することによってによって、相見積りが可能となる。また、設計情報はサーバにおき、工事請負業者は単価を変更することで見積金額を変更するため、工事の質を担保することができる。なお、工事種別ごとに複数のパターンを設けるようにして、工事請負業者はそのパターンを指定して単価情報を入力するようにしてもよい。 By storing the unit price information for each of a plurality of construction contractors, a phase estimate can be made. Moreover, since the design information is stored on the server and the construction contractor changes the estimated amount by changing the unit price, the quality of the construction can be ensured. Note that a plurality of patterns may be provided for each construction type, and the construction contractor may designate the patterns and input unit price information.
好ましくは、前記見積費用は、工事請負業者ごとに演算し、演算結果として夫々の工事請負業者の見積設計書情報を当該ユーザ端末へ送信し、ユーザ端末から送られてくる一の見積設計書に対する発注情報を受信して、該見積設計書に対する工事請負業者のコンピュータ装置へ発注指示を送信するようにする。これにより、見積用データの入力から見積設計書の作成、さらに、発注指示までの作業を円滑に行うことができる。 Preferably, the estimated cost is calculated for each construction contractor, the estimated design document information of each construction contractor is transmitted to the user terminal as a calculation result, and the estimated cost for one estimated design document sent from the user terminal is calculated. The order information is received, and an order instruction is transmitted to the construction contractor's computer device for the estimated design document. Thereby, it is possible to smoothly perform operations from the input of the estimation data to the creation of the estimate design document and further the ordering instruction.
なお、工事請負業者は、請負可能地域を設定しておき、ユーザは工事地域を設定して見積用データを入力し、ユーザの工事地域が請負可能地域に含まれるものについて、見積設計書を作成するようにしてもよい。 In addition, the construction contractor sets the contractable area, the user sets the construction area and inputs the estimation data, and creates an estimated design document for the case where the user's construction area is included in the contractable area. You may make it do.
また、本発明に係わるプログラムは、地中線工事の見積費用を演算するためのプログラムであって、工事種別ごとに定義された作業項目の作業量を掘削断面における寸法識別情報および工事区間長を用いて表した設計情報を保存する処理と、前記作業項目の単価を設定または更新する処理と、地中線工事範囲を工事種別に基づいて複数の区分に分割した当該区分ごとに前記寸法識別情報および前記工事区間長に対応する寸法データを入力する処理と、この寸法データおよび前記単価を用いて地中線工事の見積費用を演算する処理と、 この演算結果を出力する処理と、をコンピュータに実行させることを特徴とする。 Further, the program according to the present invention is a program for calculating the estimated cost of underground work, and the work amount of the work item defined for each work type is obtained from the dimension identification information and the work section length in the excavation section. The process of storing design information expressed using, the process of setting or updating the unit price of the work item, and the dimension identification information for each section obtained by dividing the underground line construction range into a plurality of sections based on the construction type And a process of inputting dimension data corresponding to the construction section length, a process of calculating an estimated cost of underground work using the dimension data and the unit price, and a process of outputting the calculation result to a computer. It is made to perform.
本発明によれば、地中線の工事を複数の工事種別に分類し、工事種別ごとに必要な基本項目を規定して、他の項目は基本項目のデータをもとに演算するようにしたので、少ないデータ入力で精度の高い見積が可能となる。 According to the present invention, the construction of underground lines is classified into a plurality of construction types, the basic items required for each construction type are specified, and other items are calculated based on the data of the basic items. Therefore, it is possible to estimate with high accuracy with less data input.
以下、本発明の第1の実施の形態を説明する。本実施の形態による地中線工事設計支援システムは、パーソナルコンピュータなどのコンピュータ装置上で動作するプログラムとして実現されるものである。以下、図1を用いて、地中線工事設計支援システム1の構成を説明する。 Hereinafter, a first embodiment of the present invention will be described. The underground line construction design support system according to the present embodiment is realized as a program that operates on a computer device such as a personal computer. Hereinafter, the configuration of the underground line construction design support system 1 will be described with reference to FIG.
この図において、地中線工事設計支援支援システム1は、データの入出力を行うための入力部12と出力部13、データの演算処理を実行する中央演算処理部11、データを記憶するための記憶部14から構成されている。 In this figure, the underground line construction design support system 1 includes an input unit 12 and an output unit 13 for inputting / outputting data, a central processing unit 11 for performing data processing, and a data storing unit. The storage unit 14 is configured.
さらに、中央演算処理部11は、入力部12および出力部13との間でデータの受け渡しを行う入出力処理手段21、見積もり設計のための基本情報を記憶部14へ登録する設計情報登録手段24、入力部12から入力された見積もり用の管路工事に関するデータを記憶部14へ保存する管路工事データ入力手段26、同様に入力部12から入力された資材データを記憶部14へ保存する資材データ入力手段27、管路工事データと資材データを用いて工事費用を計算する工事費用演算手段28、演算して得た見積費用などの設計書を出力部13へ出力する設計書出力手段29、入力部12から入力された工事単価や資材単価を記憶部14へ保存する単価入力手段30を有している。 Further, the central processing unit 11 includes an input / output processing unit 21 that exchanges data between the input unit 12 and the output unit 13, and a design information registration unit 24 that registers basic information for estimation design in the storage unit 14. , Pipe construction data input means 26 for saving the data related to the estimate pipe work input from the input unit 12 to the storage unit 14, and similarly the material for saving the material data input from the input unit 12 to the storage unit 14 A data input means 27; a construction cost calculation means 28 for calculating the construction cost using the pipe construction data and the material data; a design document output means 29 for outputting a design document such as an estimated cost obtained by the calculation to the output unit 13; Unit price input means 30 for storing the construction unit price and material unit price input from the input unit 12 in the storage unit 14 is provided.
また、記憶部14は、見積もり設計のための基本情報を保存する設計情報データベース(DB)42、単価情報を記憶する単価情報データベース(DB)43、および、管路工事データ、資材データ、および、工事費用演算手段28の演算結果を保存する見積設計書ファイル44を備えている。 The storage unit 14 includes a design information database (DB) 42 that stores basic information for estimation design, a unit price information database (DB) 43 that stores unit price information, pipe construction data, material data, and An estimated design document file 44 for storing the calculation result of the construction cost calculation means 28 is provided.
次に、図2を用いて、地中線工事設計支援システム1の処理(機能)の概要を説明する。この図において、地中線工事設計支援システム1の主要な処理として、管路積算処理、ケーブル積算処理、設計書作成処理がある。また見積もり作成や作業管理に必要な処理として単価更新処理、設計進捗状況出力処理、設計情報登録処理などを実行する。 Next, the outline of the processing (function) of the underground line construction design support system 1 will be described with reference to FIG. In this figure, main processes of the underground line construction design support system 1 include a pipe line accumulation process, a cable accumulation process, and a design document creation process. Also, unit price update processing, design progress status output processing, design information registration processing, and the like are executed as processing necessary for estimate creation and work management.
積算業務を開始する場合は、不正アクセスを防ぐためにキーディスクをセットして(S101)、システムを起動する(S102)。そして、新規データの入力か、前回の継続入力かを選択しる(S103〜S105)。次に、主要機能を起動する場合は、件名の入力(S114)、必要により工事概要の登録・修正を行い(S115)、管路積算等のメニューの選択を行う(S116)。各メニュ−は、起動されると、データの入力を受付け、入力されたデータをもとに所定の演算処理を行ってその演算結果を出力する(S127〜S135)。以下、詳細を説明する。 When starting the accumulation work, a key disk is set to prevent unauthorized access (S101), and the system is activated (S102). Then, it is selected whether the input is new data or the previous continuous input (S103 to S105). Next, when the main function is activated, the subject is input (S114), the construction summary is registered / corrected if necessary (S115), and the menu such as the pipe total is selected (S116). When each menu is activated, it accepts data input, performs predetermined arithmetic processing based on the input data, and outputs the arithmetic results (S127 to S135). Details will be described below.
[設計情報登録処理]
まず準備段階として、設計情報登録手段24によって、地中線工事の種別ごとに設計情報を保存する。この設計情報は、掘削断面において工事の内容に基づいて管理すべき長さ、幅、深さ、厚さなど(これらを総称して「寸法」という)を定義し、その寸法記号(寸法識別情報)を用いて、各作業項目の作業量を規定するものである。
工事種別としては、管路工事、引き込み工事、マンホール工事、ハンドホール工事、ケーブルボック内装工事などに分けるとよい。
[Design information registration process]
First, as a preparation stage, design information is stored by design information registration means 24 for each type of underground line construction. This design information defines the length, width, depth, thickness, etc. (collectively referred to as “dimensions”) that should be managed based on the construction details in the excavation section, and the dimension symbol (dimension identification information) ) To define the amount of work for each work item.
The types of construction may be divided into pipeline construction, lead-in construction, manhole construction, handhole construction, cable box interior construction, and the like.
以下、管路工事を例にとって、その設計情報について説明する。図3は、管路工事における管理項目(管理すべき寸法)の説明図である。 In the following, the design information will be described taking pipe construction as an example. FIG. 3 is an explanatory diagram of management items (dimensions to be managed) in pipeline construction.
この図は、管路工事区間の長さ方向に対する断面を示している。区間長Lに対して、掘削幅W、影響幅W1、布掘幅W2、掘削深さH1:H2、舗装全体厚さT1、アスファルト(As)、コンクリート(Co)厚さST1、その他図3に示すように寸法記号が定義され、後述の管路積算機能によって夫々の寸法記号に対応してデータが入力される。なお、掘削深さは、区間の長さ方向に渡って深さが異なる場合があるので、掘削深さの始点をH1、掘削深さの終点をH2とする。
さらに、入力された寸法データを用いて、以下の作業項目の量(体積)ないし見積もり金額算出可能な体積等価な値が演算できるようにその関係式の情報が保存されている。
This figure has shown the cross section with respect to the length direction of a pipeline construction area. Excavation width W, influence width W1, cloth excavation width W2, excavation depth H1: H2, pavement overall thickness T1, asphalt (As), concrete (Co) thickness ST1, etc. As shown, dimension symbols are defined, and data corresponding to each dimension symbol is input by a pipe integration function described later. Since the digging depth may vary in the length direction of the section, the digging depth start point is H1 and the digging depth end point is H2.
Furthermore, information on the relational expression is stored so that the volume (volume) of the following work items or a volume equivalent value capable of calculating the estimated amount can be calculated using the input dimension data.
(a)舗装切断工LH1
・舗装復旧「しない」場合、または、舗装復旧「する」、影響部の考慮「考慮しない」、管理者指示幅「0」の場合
LH1=L*2
・舗装復旧「する」、影響部の考慮「両側」の場合、または、舗装復旧「する」、管理者指示幅「0以外」の場合
LH1=L*4
・舗装復旧「する」、影響部の考慮「片側」、管理者指示幅「0」の場合
LH1=L*3
この舗装切断工は、見積もり金額を算出するための体積等価値として保存される。
(A) Pavement cutting worker LH1
・ When pavement restoration is “not done”, or when pavement restoration is “taken”, consideration of affected parts is “not considered”, and administrator instruction width is “0” LH1 = L * 2
・ When pavement restoration is “Yes”, affected area is considered “Both sides”, or when pavement restoration is “Yes”, and administrator instruction width is other than “0” LH1 = L * 4
・ When pavement restoration is “Yes”, the affected area is considered “one side”, and the administrator instruction width is “0” LH1 = L * 3
This pavement cutting work is stored as a volume equivalent value for calculating an estimated amount.
(b)舗装版破砕処理
・通常掘削の場合
HS1=L*W
・矢板先行掘削の場合
HS2=L*(W+W2*2)
(B) Pavement plate crushing treatment ・ In the case of normal excavation HS1 = L * W
・ In the case of sheet pile advanced excavation HS2 = L * (W + W2 * 2)
(c)掘削VK
・通常掘削の場合
VK1=L*W*((H1+H2)/2−T1)
・矢板先行掘削の場合
VK2=L*(W+W2*2)*(T2−T1)+L*(W+W2*2)*T2
+L*W*((H1+H2)/2−T2)
ここで、矢板打込み時の布堀幅(片側)W2の値は0.7、矢板打込み時の布堀深T2の値は0.8を用いる。
(C) Drilling VK
・ In the case of normal excavation VK1 = L * W * ((H1 + H2) / 2−T1)
・ In the case of sheet pile advanced excavation VK2 = L * (W + W2 * 2) * (T2-T1) + L * (W + W2 * 2) * T2
+ L * W * ((H1 + H2) / 2−T2)
Here, the value of cloth moat width (one side) W2 at the time of sheet pile driving is 0.7, and the value of cloth moat depth T2 at the time of sheet pile driving is 0.8.
(d)砂床VST
VST=L*W
(D) Sandbed VST
VST = L * W
(e)埋戻しVR
・通常掘削の場合
VR1=上記(c)の条件の総掘削体積[VK]―VST*0.05
−管路体積[VKT]
・矢板先行掘削
VR2=L*(W+W2*2)*(T2−0.03)
+L*(W+W2*2)*(T2−T1)
+L*W*((H1+H2)/2−T2)
−VST*0.05−VKT
ここで、良質土を用いた埋戻しの場合は、管路体積*4.8の値を用いる。また、再用土を用いた埋戻しの場合は、総埋戻し数量から良質土を用いた埋戻しの数量を差引いた値を用いる。
(E) Backfill VR
・ In the case of normal excavation VR1 = total excavation volume [VK] −VST * 0.05 under the above condition (c)
-Pipe volume [VKT]
-Sheet pile advanced excavation VR2 = L * (W + W2 * 2) * (T2-0.03)
+ L * (W + W2 * 2) * (T2-T1)
+ L * W * ((H1 + H2) / 2−T2)
-VST * 0.05-VKT
Here, in the case of backfilling using high-quality soil, the value of pipe volume * 4.8 is used. In the case of backfilling using reused soil, a value obtained by subtracting the number of backfilling using high-quality soil from the total backfilling amount is used.
(f)残土処理
ZS=総掘削体積―埋戻し(再用土)
(F) Residual soil treatment ZS = total excavation volume-backfill (reuse soil)
(g)管路敷設(管路)
KL=L*管路条数[NK]
(G) Pipeline laying (pipeline)
KL = L * number of pipelines [NK]
(h)コンクリート防護板設置
NB=資材数量より計上
(H) Install concrete guard plate NB = Calculated from material quantity
(i)土留工
LSV=L*2
(I) Earth retaining work LSV = L * 2
(j)覆工板設置
AH=INT(L+0.99)*INT(W+W3*2+0.99)
または2.0の大きい方
ここで、掘削ラインから覆工板端までの距離W3は0.4mとする
(J) Lining board installation AH = INT (L + 0.99) * INT (W + W3 * 2 + 0.99)
Or the larger one of 2.0 Here, the distance W3 from the excavation line to the edge of the lining plate is 0.4 m.
(k)覆工板開閉工
AHK=AH*3
(K) Covering plate opening / closing work AHK = AH * 3
(l)水替
NW=INT(VK/NJ+0.99)
掘削深さが地下水位以下となる区間のみ計上する。また、1日の平均掘削量NJは20m3とする。
(L) Water change NW = INT (VK / NJ + 0.99)
Only sections where the excavation depth is below the groundwater level are counted. The average daily drilling amount NJ is 20 m 3 .
(m)他者埋設吊り防護
NTB=区間データの入力値より計上する。
(M) Other person's buried suspension protection NTB = Calculated from the input value of section data.
(n)仮舗装
・通常掘削の場合
AKK1=舗装版破砕処理免責[HS1] (使用舗装構成分)
・矢板先行掘削
AKK2=舗装版破砕処理免責[HS2] (As 3cm分)
=舗装版破砕処理免責[HS2] (使用舗装構成分)
(N) Temporary pavement ・ In the case of normal excavation AKK1 = Pavement plate crushing disclaimer [HS1] (Used pavement component)
・ Sheet prior excavation AKK2 = Disclaimer for paving plate crushing treatment [HS2] (As 3 cm)
= Paving plate crushing treatment exemption [HS2] (for used paving components)
(o)舗装復旧(掘削部)
舗装復旧「する」場合のみ計上する。
・通常掘削
AFK1=L*W
・矢板先行掘削
AFK2=L*(W+W2*2)
(O) Pavement restoration (excavation part)
Recorded only when pavement is restored.
・ Normal drilling AFK1 = L * W
-Sheet pile advanced excavation AFK2 = L * (W + W2 * 2)
(p)舗装復旧(影響部)
舗装復旧「する」、影響部の考慮「両側」または「片側」の場合のみ計上する。
・影響部の考慮「両側」の場合
AFE1=L*W1*2
・影響部の考慮「片側」の場合
AFE2=L*W1
(P) Pavement restoration (affected part)
Recorded only when pavement restoration is “Yes” and affected areas are considered “Both sides” or “One side”.
・ In the case of “both sides” considering the affected area AFE1 = L * W1 * 2
・ In the case of “one side” considering the affected area AFE2 = L * W1
(q)舗装復旧(管理者指示部)
舗装復旧「する」、管理者指示幅>0の場合のみ計上する。
AFH1=L*W4−(AFK+AFE)
(Q) Pavement restoration (administrator instruction department)
Only when the pavement restoration is “Yes” and the manager's specified range is> 0.
AFH1 = L * W4- (AFK + AFE)
以上、管路工事の寸法データをもとに見積もりに必要な作業量を求める際の関係式を示した。
この関係式の情報は、設計情報DB42に保存される。図8は、設計情報DB42のデータ構成例である。工事種別ごとに作業項目が定義され、各作業項目は、算出条件ごとに見積式のデータが保存されている。
In the above, the relational expression when calculating the work amount necessary for the estimation based on the dimension data of the pipe work was shown.
Information on this relational expression is stored in the design information DB 42. FIG. 8 is a data configuration example of the design information DB 42. Work items are defined for each construction type, and for each work item, estimation formula data is stored for each calculation condition.
同様に、引込み工事(直堀、掘削勾配の場合)、マンホール工事、ハンドホール工事などの他の工事種別についても掘削断面における寸法データと区間長をもとに見積もりを行うための作業項目の関係式の情報を保存する。
なお、工事種別によって、掘削方法が異なり、管理する寸法データが異なるので、これを図4〜図7に示す。
Similarly, for other construction types such as lead-in construction (in the case of direct excavation, excavation slope), manhole construction, handhole construction, etc. Save expression information.
In addition, since the excavation method differs and the dimension data to be managed differ depending on the construction type, this is shown in FIGS.
マンホール工事については、掘削深さを首高さとマンホール(MH)高さに分け、また、MH下部については、基礎砕石暑さと均しコンクリート厚さに分けて管理を行う。
埋め戻しの量については、総掘削体積に対して、埋設するMHの体積と基礎砕石および均コンクリートの体積を除いた量が埋め戻し量となる。
For manhole construction, the excavation depth is divided into neck height and manhole (MH) height, and the lower part of MH is divided into basic crushed heat and leveled concrete thickness.
About the amount of backfilling, the amount excluding the volume of MH to be buried and the volume of foundation crushed stone and uniform concrete is the backfilling amount with respect to the total excavation volume.
ハンドホール(HH)工事については、MHに比べて、布掘幅を取らないこととし、影響幅のみと管理者指示幅によって、舗装切断工を管理する。 As for handhole (HH) construction, compared to MH, we will not take the cloth width, and we will manage the pavement cutting work only by the influence width and the manager instruction width.
[単価入力・更新処理]
単価入力手段30によって、夫々の作業項目の作業量に対する単価を入力または更新する。入力・更新された単価情報は、単価情報DB43に保存される。図9は、単価情報DB43のデータ構成例である。ここで、単価情報は、作業項目の識別情報に関連付けて保存されている。
[Unit price input / update processing]
The unit price input means 30 inputs or updates the unit price for the work amount of each work item. The entered / updated unit price information is stored in the unit price information DB 43. FIG. 9 is a data configuration example of the unit price information DB 43. Here, the unit price information is stored in association with the identification information of the work item.
次に、主要な処理である管路積算処理、ケーブル積算処理、設計書作成処理の詳細について図10〜図12を用いて説明する。 Next, the details of the main processes, namely, the pipe integration process, the cable integration process, and the design document creation process will be described with reference to FIGS.
[管路積算処理](図10参照)
工事データ入力手段26を起動して、管路積算処理を実行する(S201)。この機能では、まず、算出条件の設定、区間データの入力、帳票出力というサブメニューを選択する(S202)。そして、算出条件の設定サブメニューでは、使用管種の設定、舗装構成の指定、CAB断面の設定、土留め工の設定ができるようになっている(S204)。
[Pipe accumulation processing] (See Fig. 10)
The construction data input means 26 is activated to execute the pipe integration process (S201). In this function, first, submenus for setting calculation conditions, inputting section data, and outputting a form are selected (S202). In the calculation condition setting submenu, it is possible to set the type of pipe used, specify the pavement configuration, set the CAB section, and set the earth retaining work (S204).
また、区間データの入力サブメニューでは、新規・継続入力処理として、区間タイトルの入力、工種選択、施工時間の選択ができるようになっている(S207)。工種の選択では、幹線・供給管路、引込み管路、マンホール設置、ハンドホール設置、CAB工事が選択できる。また、施工時間では、昼間か夜間かの選択ができるようになっている。 In the section data input submenu, section title input, work type selection, and construction time selection can be performed as new / continuous input processing (S207). In the selection of the type of work, the main line / supply pipeline, the service pipeline, manhole installation, handhole installation, and CAB construction can be selected. The construction time can be selected between daytime and nighttime.
これらの各データを入力し(S208)、入力完了によりサブメニューに戻る(S209)。また、過去に入力したデータの修正・追加・削除もできるようになっている(S210)。 Each of these data is input (S208), and the input returns to the submenu upon completion of input (S209). In addition, correction, addition, and deletion of data input in the past can be performed (S210).
[ケーブル積算処理](図11参照)
資材データ入力手段27によって、ケーブル積算処理を実行する(S301)。まず、区間データの入力、帳票出力というサブメニューを選択する(S302)。区間データの入力サブメニューを選択すると、新規・継続入力処理としてケーブル亘長・敷設工数のデータ入力、その他、マンホール・CAB、変電所、装柱、路上機器、引込み線工事の分けて各データの入力を行う(S306、S307)。
[Cable integration processing] (See Fig. 11)
A cable integration process is executed by the material data input means 27 (S301). First, sub-menus such as section data input and form output are selected (S302). When the section data input submenu is selected, data input for cable length and laying man-hours as new / continuous input processing, manholes / CABs, substations, mounting poles, roadside equipment, and service line construction are separated. Input is performed (S306, S307).
その他、データの修正等、帳票出力については、管路積算機能と同様である。 In addition, the form output, such as data correction, is the same as the pipe integration function.
[設計書作成処理](図12参照)
工事費用演算手段28によって、設計書作成処理を実行する(S401)。この処理では、まず、請負代の作成・修正、資材代の作成・修正、または、設計書出力サブメニューを選択する(S402)。請負代、資材代のサブメニューを選択したときは、次に、勘定科目として、管路、ケーブル、保安開閉装置、変圧器、管またはケーブルの引込み等の指定を行う(S403)。ケーブルについては、区分長を足し合わせてケーブル長を算定し、さらに単価を掛け合わせてケーブルの見積費用を算出する。管路についても同様である(S404)。
[Design document creation process] (See Fig. 12)
The construction cost calculation means 28 executes a design document creation process (S401). In this process, first, creation / modification of contract fee, creation / modification of material fee, or design document output submenu is selected (S402). When the sub-menu of contract fee and material fee is selected, next, the designation of pipe line, cable, security switchgear, transformer, pipe or cable pull-in is performed as the account item (S403). For cables, the cable length is calculated by adding the segment lengths, and the estimated cost of the cable is calculated by multiplying the unit price. The same applies to the pipeline (S404).
工事数量の演算では、工事種別を管路工事、引込み工事、マンホール工事、ハンドホール工事等に区分して演算を行う。 In the calculation of the construction quantity, the construction type is divided into pipeline construction, lead-in construction, manhole construction, handhole construction, etc.
具体的には、設計情報DB42を参照して、寸法データを用いて区分ごと作業項目ごとの作業量を演算し、この作業量を見積対象の複数の区分について足し合わせることによって見積対象全体の作業量を算出する。その後、単価情報DB43を参照してこの作業量に作業項目ごとの単価を掛け合わせて見積費用を算出する。演算結果は、必要な編集を行い(S405、S406)設計書出力手段29によって、プリンタやディスプレイなどの出力部12に出力される(S407、S408)。 Specifically, referring to the design information DB 42, the amount of work for each work item is calculated for each category using the dimension data, and the work amount of the estimation target as a whole is calculated by adding this work amount to a plurality of categories to be estimated. Calculate the amount. Thereafter, the estimated cost is calculated by multiplying the work amount by the unit price for each work item with reference to the unit price information DB 43. The calculation result is subjected to necessary editing (S405, S406) and output to the output unit 12 such as a printer or a display by the design document output means 29 (S407, S408).
[ユーザインタフェース]
次に、上述の煩雑なデータを円滑かつ安全に入力するための入力画面について説明する。このユーザインタフェースは、機能分割とデータ入力手順が特徴となっている。
[User interface]
Next, an input screen for smoothly and safely inputting the above complicated data will be described. This user interface is characterized by functional division and data input procedures.
図13にメインメニューの画面例を示す。ここで、機能分割として、単価データ更新については、他の機能のアクセス権限と分けて特定権限者のみがアクセスできるようにするとよい。 FIG. 13 shows an example of the main menu screen. Here, as the function division, the unit price data update may be made accessible to only a specific authorized person separately from the access authority of other functions.
(管路積算)
管路積算データの入力は、積算条件の設定と区間データの入力に分けられている。
また積算条件の設定は、さらに、使用管種の指定、舗装構成の指定、CAB断面の設定、土留め工の設定を夫々行うことが出来るようになっている。
(Pipe accumulation)
The input of pipe integration data is divided into setting of integration conditions and input of section data.
In addition, the setting of the integration condition can be further performed by specifying the type of pipe used, specifying the pavement configuration, setting the CAB section, and setting the earth retaining work.
使用管種の指定では、図14に示すように、工事で使用する管種、(主管材、可とう管材)の指定を配電、送電、自治体などの用途別に行う。 In the designation of the pipe type to be used, as shown in FIG. 14, the pipe type to be used in the construction (main pipe material, flexible pipe material) is designated according to usage such as power distribution, power transmission, and local government.
舗装構成の指定では、標準で設定されている舗装構成以外の舗装を使用している場合は、図15に示す画面でその舗装構成の登録を行う。この図において、舗装品質は、塗装厚t1、As厚t2、Co厚t3、影響幅Wによって定められ、品質ごとに単価が決められる。ここで、指定された舗装構成は、区間データ入力の際に舗装構成選択ウィンドウに表示されるようになっている。 In the designation of the pavement configuration, when a pavement other than the standard pavement configuration is used, the pavement configuration is registered on the screen shown in FIG. In this figure, the pavement quality is determined by the coating thickness t1, the As thickness t2, the Co thickness t3, and the influence width W, and the unit price is determined for each quality. Here, the designated pavement configuration is displayed in the pavement configuration selection window when the section data is input.
CAB断面の設定は、工事で使用するCABタイプの登録を行う。図16において、CAB断面の指定は、標準部、ボックス部、管路部ごとにタイプ別に指定することが出来るようになっている。たとえば、標準部では、ケーブル受棚段数、底部配管施設条数、底部配管支持金物などが設定可能になっており、ボックス部では、管路条数、底部配管支持金物、上部配管指示バンド、施工区分として自治体(または他社)か自社か、資材区分として支給元の指定ができるようになっている。また、管路部では、管孔数などの指定を行う。 The CAB section is set by registering the CAB type used in the construction. In FIG. 16, the CAB cross section can be specified for each type for each standard part, box part, and pipe part. For example, in the standard part, the number of cable racks, the number of bottom piping facilities, the bottom pipe support hardware, etc. can be set, and in the box part, the number of pipe lines, bottom pipe support hardware, upper pipe instruction band, construction You can specify the locality (or other company) or your company as the classification, or supply source as the material classification. In the pipeline section, the number of pipe holes is specified.
土留め工の設定は、本工事で使用する打ち込み矢板の登録を行う。図17において、土留め工は、矢板種類、矢板長、最低掘削幅、工法が入力可能になっている。最低掘削幅は、区間データの掘削幅入力の際、条件に合わないとエラーメッセージが出力される。 The earth retaining work is set by registering the driving sheet pile used in this work. In FIG. 17, as for the earth retaining work, a sheet pile type, a sheet pile length, a minimum excavation width, and a construction method can be input. If the minimum excavation width does not meet the conditions when the excavation width of the section data is input, an error message is output.
次に区間データの入力画面について説明する。
区間データの入力は、図18に示すように施工区間、幹線・供給管路等の工種選択、昼・夜等の施工時間を入力する。工種選択は、工事種別を選択ウィンドウによって選択可能になっている。
Next, the section data input screen will be described.
As shown in FIG. 18, the section data is input by selecting a construction section, selecting a work type such as a main line and a supply pipeline, and a construction time such as day and night. In the work type selection, the work type can be selected by a selection window.
以下、区間データの入力について、図19に示す管路工事の区間データ入力画面を例にとって説明する。
ここで、区間データは、上記の掘削作業に関する基本データ(区間長、掘削幅、掘削深さなど)が入力可能になっている。また、ケーブル種別が用途別に入力可能になっている。これらを、工事区間に渡って区分した区間ごとに工事種別を入力し、マンホールやハンドホールなど各工事種別に対応した基本データを入力する。
Hereinafter, the input of section data will be described by taking the section data input screen for pipe construction shown in FIG. 19 as an example.
Here, as the section data, basic data (section length, excavation width, excavation depth, etc.) related to the excavation work can be input. Also, the cable type can be input for each application. The construction type is input for each section divided into the construction sections, and basic data corresponding to each construction type such as a manhole or a handhole is input.
(ケーブル積算)
次に、ケーブルデータの入力処理について説明する。
ケーブルデータとしては、ケーブル亘長・敷設工数、マンホール・CAB内データ、変電所(CB、洞道)データ、装柱データ、路上機器データ、引込線工事データが入力可能になっている。
(Cable integration)
Next, cable data input processing will be described.
As cable data, cable length / laying man-hours, data in manholes / CAB, substation (CB, tunnel) data, column data, roadside equipment data, and service line construction data can be input.
ケーブル亘長・敷設工数の設定は、図20に示すように、ケーブル亘長や敷設工数の計算に必要なデータを敷設形態別に入力する。
マンホール・CAB内データは、図21〜図23に示す入力画面で、マンホール等で使用する金物やケーブル付属品等のデータを入力する
As shown in FIG. 20, the cable length and man-hours are set by inputting data necessary for calculating the cable length and man-hours for each laying configuration.
For manhole / CAB data, input data such as hardware and cable accessories used in manholes, etc. on the input screens shown in FIGS.
変電所データは、図24〜図26に示す入力画面で、変電所(CB、洞道)内で使用する金物やケーブル付属品等を入力する。
装柱データは、図27、図28の入力画面で、立上鋼管の径、ケーブル付属品、塩害地区か一般地区か等のデータを入力する。
For the substation data, hardware and cable accessories used in the substation (CB, tunnel) are input on the input screens shown in FIGS.
As for the column data, data such as the diameter of the rising steel pipe, the cable accessory, whether the salt damage area or the general area is input on the input screens of FIGS.
路上機器データは、図29の入力画面で、路上機器の種類、既存設備か新設か等のデータを入力する。
引込線工事データは、図30の入力画面で、引き込みケーブルのサイズ、亘長、および屋側敗戦のサイズ、長さ等のデータを入力する。
The road equipment data is input on the input screen of FIG. 29, such as the type of road equipment, existing equipment or new equipment.
As for the service line construction data, data such as the size and length of the service cable and the size and length of the shop side defeat are input on the input screen of FIG.
請負代は、管路、ケーブル、保安開閉装置、変圧器、引込作業(管路、ケーブル)など勘定科目をクリックすることによって、土工数量集計データが読み込まれ、作業項目ごとの請負単価を掛け合わせることによって、工事請負費用の見積もりが算出される。
同様に資材代についても勘定科目ごとに指定され、資材数量集計データが読み込まれ、資材単価と掛け合わせることによって、設計書内訳書が自動生成される。
By clicking on account items such as pipelines, cables, security switchgears, transformers, and pull-in work (pipelines, cables), the contract amount is read and the unit price for each work item is multiplied. Thus, an estimate of the construction contract cost is calculated.
Similarly, the material cost is specified for each account item, the material quantity summary data is read, and the design document breakdown is automatically generated by multiplying it with the material unit price.
見積設計書ファイル44のデータは、設計内訳書として出力される。図31は、設計内訳書の画面例である。ここで、名称欄には、見積対象の作業項目名が表示され、項目ごとに単位、数量、単価、金額等の欄が設けられ、それぞれ上段には、工事費用演算手段28による演算結果が表示され、下段は、手入力によって修正可能になっている。 The data of the estimated design document file 44 is output as a design breakdown. FIG. 31 is a screen example of a design breakdown. Here, in the name column, the work item name to be estimated is displayed, and a column for units, quantity, unit price, amount of money, etc. is provided for each item, and the calculation result by the construction cost calculation means 28 is displayed in each upper row. The lower part can be corrected by manual input.
なお、帳票出力フォーマットとしては、全区間、指定区間ごとなど必要により設定可能にするようにしてもよい。
また、作業進捗管理として、図32のように現状の入力区間状況を表示し、図33のように区間ごとの設計進捗状況を表示する。
It should be noted that the form output format may be settable as necessary, such as for all sections or for each specified section.
As work progress management, the current input section status is displayed as shown in FIG. 32, and the design progress status for each section is displayed as shown in FIG.
本実施の形態によれば、地中線の工事を複数の工事種別に分類し、工事種別ごとに必要な基本項目を規定して、他の項目は基本項目のデータをもとに演算するようにしたので、少ないデータ入力で精度の高い見積が可能となる。また、工数の管理を作業と資材に分け、区間ごとに工事種別を設定し、区間断面に対して、工事種別ごとに必要な基本情報を定め、これを区間長に渡って作業体積もしくは体積等価値を演算し、これに作業項目ごとの単価を掛け合わせて作業工数の見積もりを行い、さらに、資材については、区間長を利用して、ケーブル長さをもとめ、ケーブル種別ごとの単価を掛け合わせて資材見積もりを行うようにしたので、少ないデータ項目で精度の高い見積もりの算出が可能となる。 According to this embodiment, the construction of underground lines is classified into a plurality of construction types, the basic items necessary for each construction type are specified, and other items are calculated based on the data of the basic items. Therefore, it is possible to estimate with high accuracy with a small amount of data input. Also, man-hour management is divided into work and materials, construction type is set for each section, basic information necessary for each construction type is defined for section section, and this is the work volume or volume over the section length. Calculate the value and multiply this by the unit price for each work item to estimate the work man-hours. For materials, use the section length to determine the cable length and multiply the unit price for each cable type. Therefore, it is possible to calculate a highly accurate estimate with a small number of data items.
次に第2の実施の形態を説明する。第1の実施の形態の地中線工事支援システム1は、スタンドアロンのコンピュータ装置で実現したが、本実施の形態による地中線工事設計支援システムは、通信ネットワークを介したサーバ・クライアント型のコンピュータシステムで実現するものである。図34は、本実施の形態に係わるコンピュータシステムの機能ブロック図である。 Next, a second embodiment will be described. The underground line construction support system 1 of the first embodiment is realized by a stand-alone computer device. However, the underground line construction support system according to the present embodiment is a server / client type computer via a communication network. It is realized by the system. FIG. 34 is a functional block diagram of the computer system according to the present embodiment.
この図において、地中線工事設計支援システム1は、ユーザ端末2、業者サーバ3、および、これらと通信ネットワーク4を介して繋がる地中線工事設計支援サーバ10から構成されている。 In this figure, the underground line construction design support system 1 includes a user terminal 2, a trader server 3, and an underground line construction design support server 10 connected to these via a communication network 4.
ここで、地中線工事設計支援サーバ10は、地中線工事の設計支援サービス及び地中線工事請負業者との仲介サービスを行う業者が運営するサーバである。業者サーバ3は、通常ユーザの位置する地域に近い地中線工事請負業者のサーバである。 Here, the underground line construction design support server 10 is a server operated by a contractor that provides an underground line construction design support service and an intermediary service with the underground line contractor. The trader server 3 is a server of an underground line construction contractor close to the area where the user is usually located.
地中線工事設計支援サーバ10は、データの入出力を行うための入力部12と出力部13、データの演算処理を実行する中央演算処理部11、データを記憶するための記憶部14、および、通信ネットワーク4を介して他の機器と通信を行うための送受信部15から構成されている。 The underground line construction design support server 10 includes an input unit 12 and an output unit 13 for inputting / outputting data, a central processing unit 11 for executing data processing, a storage unit 14 for storing data, and The transmission / reception unit 15 is configured to communicate with other devices via the communication network 4.
さらに、中央演算処理部11は、送受信処理を実行する送受信処理手段22、入力部12および出力部13との間でデータの受け渡しを行う入出力処理手段21、入力部12を介して入力されたユーザ情報を記憶部14へ登録するユーザ情報登録手段23、見積もり設計のための基本情報を記憶部14へ登録する設計情報登録手段24、ユーザ端末2から送られてくる見積もり用の管路工事に関する情報を受信して記憶部14へ保存する工事データ入力手段26、同様にユーザ端末2から送られてくる資材データを記憶部14へ保存する資材データ入力手段27、管路工事データと資材データを用いて工事費用を計算する工事費用演算手段28、演算して得た見積データを含む設計書をユーザ端末2へ送信する設計書出力手段29、業者サーバ3から送られてくる工事単価または資材単価を受信して記憶部14へ保存する単価入力手段30を有している。 Further, the central processing unit 11 is input via the transmission / reception processing unit 22 that performs transmission / reception processing, the input / output processing unit 21 that transfers data between the input unit 12 and the output unit 13, and the input unit 12. User information registration means 23 for registering user information in the storage unit 14, design information registration means 24 for registering basic information for estimate design in the storage unit 14, and pipe work for estimation sent from the user terminal 2 Construction data input means 26 that receives information and stores it in the storage unit 14, similarly material data input means 27 that stores material data sent from the user terminal 2 in the storage unit 14, pipe construction data and material data A construction cost calculation means 28 for calculating the construction cost by using, a design document output means 29 for transmitting a design document including estimated data obtained by the calculation to the user terminal 2, and a contractor service Sent from 3 coming construction bids or receive material unit price has a unit price input means 30 to store the memory unit 14.
また、記憶部14は、ユーザ情報を保存するユーザ情報データベース(DB)41、見積もり設計のための基本情報を保存する設計情報データベース(DB)42、業者から送られてくる単価情報を記憶する単価情報データベース(DB)43、および、ユーザの送信してきた管路工事データ、資材データ、および、工事費用演算手段28の演算結果を保存する見積設計書ファイル44を備えている。 The storage unit 14 also stores a user information database (DB) 41 for storing user information, a design information database (DB) 42 for storing basic information for estimation design, and a unit price for storing unit price information sent from a supplier. An information database (DB) 43 and an estimated design document file 44 for storing pipeline construction data, material data, and calculation results of the construction cost calculation means 28 transmitted by the user are provided.
次に、地中線工事設計支援システム1の動作を説明する。
[基本情報登録処理]
まず、入力部12からユーザ情報を入力する。このユーザ情報としては、本サービスのユーザである見積依頼者のみでなく、工事を行う業者も含まれる。入力部12から入力されたユーザ情報は、ユーザ情報登録手段23によって、ユーザ情報DB41に記憶される。ユーザ情報としては、ユーザID、パスワード、ユーザの氏名、住所、電子メールアドレスなどの属性情報がある。
Next, the operation of the underground line construction design support system 1 will be described.
[Basic information registration process]
First, user information is input from the input unit 12. This user information includes not only an estimate requester who is a user of this service but also a contractor who performs construction work. The user information input from the input unit 12 is stored in the user information DB 41 by the user information registration unit 23. User information includes attribute information such as a user ID, password, user name, address, and e-mail address.
また、見積もり設計のための基本情報は、入力部12から入力され設計情報登録手段24によって設計情報DBによって設計情報DB42に保存される。設計情報登録処理や設計情報DB42の構成は、第1の実施の形態と同様である。 Further, basic information for estimation design is input from the input unit 12 and stored in the design information DB 42 by the design information registration means 24 by the design information DB. The configuration of the design information registration process and the design information DB 42 is the same as that of the first embodiment.
[単価入力・更新処理]
業者サーバ3から送られてきた請負単価または資材単価は、単価入力手段30によって記憶部14の単価情報DB43に保存される。この単価情報は、請負単価と資材単価で構成され、業者別に保存されている。
[Unit price input / update processing]
The contract unit price or material unit price sent from the trader server 3 is stored in the unit price information DB 43 of the storage unit 14 by the unit price input means 30. This unit price information includes a contract unit price and a material unit price, and is stored for each trader.
[データ入力処理]
ユーザは、ユーザ端末2から管路工事データと資材データを入力する。この入力された情報は、工事データ入力手段26および資材データ入力手段27を介して、見積設計書ファイルに保存される。
[Data input processing]
The user inputs pipeline construction data and material data from the user terminal 2. This input information is stored in the estimated design document file via the construction data input means 26 and the material data input means 27.
なお、工事データ入力手段26と資材データ入力手段27は、中央演算処理部11の他の手段とは独立して起動可能にし、かつユーザ認証を実行してセキュリティレベルの高いものにしておく必要がある。入力に関するユーザインタフェースは、第1の実施の形態と同様である。 Note that the construction data input means 26 and the material data input means 27 need to be activated independently of other means of the central processing unit 11 and have a high security level by executing user authentication. is there. The user interface related to input is the same as in the first embodiment.
[見積設計書作成処理]
一連のデータ入力が終了すると、工事費用演算手段28が起動され、入力されているデータを用いて見積の計算が行われる。この計算結果は、見積設計書ファイル44に保存される。
[Quotation design document creation process]
When a series of data input is completed, the construction cost calculation means 28 is activated, and an estimate is calculated using the input data. This calculation result is stored in the estimated design document file 44.
なお、この見積設計書は、業者の設定した単価を用いて、業者ごとに作成する。なお、業者は、サービスのテリトリとなる地域情報を入力するようにしておき、この地域をサポートする業者について作成するようにしても良い。 The estimated design document is created for each trader using the unit price set by the trader. It should be noted that the trader may input regional information serving as a service territory and create a trader that supports this region.
[見積設計書送信処理]
見積設計書ファイル44に保存されている内容は、該当するユーザの端末2へ送信される。なお、見積設計書は、所定の優先順位としてたとえば価格の安い順に番号が付されている。
[Quote design document transmission process]
The contents stored in the estimated design document file 44 are transmitted to the terminal 2 of the corresponding user. The estimated design documents are numbered in ascending order of price, for example, as a predetermined priority.
[工事注文受付処理]
なお、図34には図示していないが、見積金額を指定して工事注文受付手段を設けて、ユーザからの工事注文を受け付けるようにしておいてもよい。
[Construction order acceptance processing]
Although not shown in FIG. 34, a construction order receiving means may be provided by specifying an estimated amount so as to receive a construction order from the user.
この注文では、ユーザはどの見積に対する注文かを明確にするため、見積設計書を指定して注文を行うようにする。 In this order, the user designates a quote design document and places an order in order to clarify which quote the order is for.
[工事指示出力処理]
ユーザの指定した見積設計書の業者に対して工事指示を出力する。
[Construction instruction output processing]
A construction instruction is output to the contractor of the estimated design document specified by the user.
本実施の形態によれば、実際は複雑な工法に対して、単価を変更して見積もりを行うのではなく、基本作業をもとに作業項目と関連付けて、工数を自動算出するようにして、それぞれの作業に対する単価を掛け合わせて見積もりを計算するようにしたので、精度の高い見積もりが可能となる。 According to the present embodiment, instead of performing an estimate by changing the unit price for an actually complicated construction method, the man-hour is automatically calculated in association with the work item based on the basic work, Since the estimate is calculated by multiplying the unit price for the work, it is possible to estimate with high accuracy.
また、ユーザは、所定の優先順位で出された見積設計書を確認して工事発注を行うことができ、工事請負業者は、個々の工事項目の単価を調整することによって見積り額を変更することができる。このため、全体の見積り額を直接変更するのに比べて、利益管理を行い易く、受注後赤字になるような事態を回避することができる。 In addition, the user can confirm the estimated design document issued in a predetermined priority order and place an order for the construction. The construction contractor can change the estimated amount by adjusting the unit price of each construction item. Can do. For this reason, it is easier to manage profits compared to directly changing the total estimated amount, and it is possible to avoid a situation in which a loss occurs after receiving an order.
なお、本発明は、その趣旨を逸脱しない範囲で種々変更して実施できることは明らかである。たとえば、工事費用演算手段28によって見積設計書が完成し、見積設計書ファイル44に保存された時点で、その見積設計書の担当業者のサーバへ通知し、その業者は見積もり額を確認して、受注可能かどうかを判定して受注不可能な場合は、当該見積設計書を削除するなど辞退出来るようにしてもよい。 It is apparent that the present invention can be implemented with various modifications without departing from the spirit of the present invention. For example, when the estimated design document is completed by the construction cost calculation means 28 and saved in the estimated design document file 44, the server of the supplier in charge of the estimated design document is notified, and the supplier confirms the estimated amount, If it is determined whether the order can be received and the order cannot be received, the estimated design document may be deleted or the like may be declined.
また、ユーザが管路工事データと資材データを入力する際に工事現場の写真も添付するようにしておき、見積設計書作成完了後、該当する業者がその写真を確認して見積り額を変更できるようにしてもよい。 In addition, when the user enters the pipeline construction data and material data, a photograph of the construction site is also attached, and after the estimate design document is completed, the corresponding contractor can check the photograph and change the estimated amount You may do it.
1 地中線工事設計支援システム
2 ユーザ端末
3 業者サーバ(または業者端末)
4 通信ネットワーク
10 地中線工事設計支援サーバ
11 中央演算処理部
12 入力部
13 出力部
14 記憶部
15 送受信部
21 入出力手段
22 送受信部
23 ユーザ情報登録手段
24 設計情報登録手段
26 工事データ入力手段
27 資材データ入力手段
28 工事費用演算手段
29 設計書出力手段
30 単価入力手段
41 ユーザ情報DB
42 設計情報DB
43 単価情報DB
44 見積設計書ファイル
1 underground line construction design support system 2 user terminal 3 supplier server (or supplier terminal)
4 communication network 10 underground line construction design support server 11 central processing unit 12 input unit 13 output unit 14 storage unit 15 transmission / reception unit 21 input / output unit 22 transmission / reception unit 23 user information registration unit 24 design information registration unit 26 construction data input unit 27 Material data input means 28 Construction cost calculation means 29 Design document output means 30 Unit price input means 41 User information DB
42 Design information DB
43 Unit price information DB
44 Estimated design document file
Claims (4)
前記サーバは、
工事種別ごとに定義された作業項目ごとに、掘削断面における寸法と区間長と前記寸法または前記区間長にかかる係数であって工法によって定まる係数とを用いて表わされる体積等価値を算出するための関係式データを保存する設計情報DBと、
業者の端末装置から送られてくる前記作業項目ごとの単価の設定または更新データを受信して単価情報DBへ保存すると共に、業者の端末装置から送られてくる単位寸法あたりの資材の単価の設定または更新データを受信して前記単価情報DBへ保存する単価入力手段と、
ユーザの端末装置を介して、地中線工事範囲を工事種別に基づいて複数の区分に分割した区分情報と、当該区分ごとの掘削断面における寸法と区間長と工法とを入力する工事データ入力手段と、
ユーザの端末装置を介して、前記区分ごとに必要な資材項目を設定する資材データ入力手段と、
前記工事データ入力手段によって入力した工法に対応する前記関係式データと前記工事データ入力手段によって入力した区分ごとの掘削断面における寸法と区間長とを用いて、区分ごと作業項目ごとの体積等価値を演算し、該体積等価値に前記単価情報DBに保存されている作業項目ごとの単価を掛け合わせて地中線工事の見積費用を演算する一方、前記資材データ入力手段により設定された区分ごとの資材項目をもとに、区分長を足し合わせて資材の寸法を算出し、この寸法に前記単価情報DBに保存されている該資材の単価を掛け合わせて資材の見積費用を演算し、この演算の結果を見積設計書ファイルに保存する工事費用演算手段と、
該見積設計書ファイルの内容をユーザの端末装置へ送信する設計書出力手段と、
を備えたことを特徴とする地中線工事設計支援システム。 One or a more terminals D, is constituted by a server connected via a communication network terminal device, an underground line construction design support system for calculating the estimated costs of the underground line construction,
The server
For each work item defined for each work type, for calculating the volume equivalent value represented by using a coefficient determined by the method A factor according to the size or the interval length between dimensions and the section length in the drilling section A design information DB for storing relational data ;
The unit price setting or update data for each work item sent from the vendor terminal device is received and stored in the unit price information DB, and the unit price of the material per unit dimension sent from the vendor terminal device is set. Or unit price input means for receiving update data and storing it in the unit price information DB ;
Construction data input means for inputting section information obtained by dividing the underground line construction range into a plurality of sections based on the construction type, and the dimensions, section lengths and construction methods in the excavation section for each section via the user's terminal device When,
Material data input means for setting necessary material items for each of the categories via the user terminal device,
Using the relational expression data corresponding to the construction method input by the construction data input means and the dimensions and section lengths of the excavation cross sections for each section input by the construction data input means, the volume equivalent value for each work item for each section is obtained. While calculating and multiplying the volume equivalent value by the unit price for each work item stored in the unit price information DB, the estimated cost of underground work is calculated, while for each category set by the material data input means Based on the material item, the material length is calculated by adding the division lengths, and the estimated cost of the material is calculated by multiplying this size by the unit price of the material stored in the unit price information DB. A construction cost calculation means for saving the result of this in the estimate design file ,
Design document output means for transmitting the contents of the estimated design document file to the user terminal device;
Underground line construction design support system characterized by having.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2005004587A JP4614774B2 (en) | 2005-01-11 | 2005-01-11 | Underground line construction design support system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2005004587A JP4614774B2 (en) | 2005-01-11 | 2005-01-11 | Underground line construction design support system |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2006195597A JP2006195597A (en) | 2006-07-27 |
JP4614774B2 true JP4614774B2 (en) | 2011-01-19 |
Family
ID=36801654
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2005004587A Expired - Fee Related JP4614774B2 (en) | 2005-01-11 | 2005-01-11 | Underground line construction design support system |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP4614774B2 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4769832B2 (en) * | 2008-03-21 | 2011-09-07 | 株式会社日立情報システムズ | Test support system and test support program for integration work system |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001209740A (en) * | 2000-01-24 | 2001-08-03 | Kyokuto Sanki Co Ltd | Interior and exterior construction order reception and execution system |
JP2002183247A (en) * | 2000-12-19 | 2002-06-28 | Masanori Wakai | Device for estimating metal construction work and estimation program for metal construction work |
JP2003345835A (en) * | 2002-05-23 | 2003-12-05 | Kenzo Matsuo | System and program for construction estimation, and computer-readable recording medium having the program recorded thereon |
JP2004038786A (en) * | 2002-07-05 | 2004-02-05 | Cross Culture Ltd | Simplified estimation system and simplified estimation server |
JP2004178530A (en) * | 2002-11-27 | 2004-06-24 | Ken Takeuchi | Estimation method of software production cost |
JP2005004594A (en) * | 2003-06-13 | 2005-01-06 | Casio Comput Co Ltd | Data processor and program |
-
2005
- 2005-01-11 JP JP2005004587A patent/JP4614774B2/en not_active Expired - Fee Related
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001209740A (en) * | 2000-01-24 | 2001-08-03 | Kyokuto Sanki Co Ltd | Interior and exterior construction order reception and execution system |
JP2002183247A (en) * | 2000-12-19 | 2002-06-28 | Masanori Wakai | Device for estimating metal construction work and estimation program for metal construction work |
JP2003345835A (en) * | 2002-05-23 | 2003-12-05 | Kenzo Matsuo | System and program for construction estimation, and computer-readable recording medium having the program recorded thereon |
JP2004038786A (en) * | 2002-07-05 | 2004-02-05 | Cross Culture Ltd | Simplified estimation system and simplified estimation server |
JP2004178530A (en) * | 2002-11-27 | 2004-06-24 | Ken Takeuchi | Estimation method of software production cost |
JP2005004594A (en) * | 2003-06-13 | 2005-01-06 | Casio Comput Co Ltd | Data processor and program |
Also Published As
Publication number | Publication date |
---|---|
JP2006195597A (en) | 2006-07-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CA2750923C (en) | Systems, methods and apparatus relating to generation, transmission, access and storage of virtual white line (vwl) images and data for excavation projects | |
US8306836B2 (en) | Management of materials on a construction site | |
Jung et al. | Evaluation of trenchless technology methods for municipal infrastructure system | |
KR20100056138A (en) | The system and means for providing the information of excavation methods for the construction of building substructure | |
JP2002108975A (en) | Construction quantity managing system | |
JP4614774B2 (en) | Underground line construction design support system | |
JP2007004497A (en) | Ground facility information management system | |
JP2984262B1 (en) | Underground line support system | |
JP2005160046A (en) | Operating environment setting system for mobile communication terminal | |
Kung et al. | Application of lean thinking to improve the productivity of water and sewer service installations | |
VanDemark et al. | Designating responsible parties for drainage within 1.5 m of a building | |
JP5485035B2 (en) | License management support device | |
JP5283412B2 (en) | Unit price type process management system, method and program thereof | |
JP4179911B2 (en) | Bidding system for paving work | |
US8635095B2 (en) | Method and apparatus for tracking an intent | |
US7096225B2 (en) | Communication conduit setting managing method, system thereof, storing medium storing communication conduit setting managing program, communication conduit maintenance managing method, system thereof, storing medium storing communication conduit maintenance managing program, and communication conduit managing system | |
JP2003176693A (en) | Method and system for planning construction work using road | |
JP2003296404A (en) | System for updating map according to construction, method of the update, and method of providing map update service | |
JP7129364B2 (en) | Road restoration support system, road restoration support method and road restoration support program | |
WO2024084771A1 (en) | Conduit construction management system, management server, conduit construction management method, and conduit construction management program | |
KR100961512B1 (en) | The composition method for site | |
Arnold et al. | So, You Want to be a Utility Coordinator? | |
Monahan Sr et al. | Pipeline engineering and practice: Installing a steam pipeline | |
Bernold | Automatic as-built generation with utility trenchers | |
JP2006063750A (en) | Management system for manhole installation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20071221 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20100506 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20100705 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20101019 |
|
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20101019 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 4614774 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20131029 Year of fee payment: 3 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20131029 Year of fee payment: 3 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
LAPS | Cancellation because of no payment of annual fees |