JP4610124B2 - Gas shut-off device - Google Patents

Gas shut-off device Download PDF

Info

Publication number
JP4610124B2
JP4610124B2 JP2001163220A JP2001163220A JP4610124B2 JP 4610124 B2 JP4610124 B2 JP 4610124B2 JP 2001163220 A JP2001163220 A JP 2001163220A JP 2001163220 A JP2001163220 A JP 2001163220A JP 4610124 B2 JP4610124 B2 JP 4610124B2
Authority
JP
Japan
Prior art keywords
gas
date
time
unit
shut
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2001163220A
Other languages
Japanese (ja)
Other versions
JP2002357468A (en
Inventor
毅史 縄田
卓久 大谷
康雄 木場
恵 岩川
訓弘 藤本
宏 石田
幸雄 木村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Panasonic Corp
Osaka Gas Co Ltd
Toho Gas Co Ltd
Panasonic Holdings Corp
Original Assignee
Panasonic Corp
Osaka Gas Co Ltd
Toho Gas Co Ltd
Matsushita Electric Industrial Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Panasonic Corp, Osaka Gas Co Ltd, Toho Gas Co Ltd, Matsushita Electric Industrial Co Ltd filed Critical Panasonic Corp
Priority to JP2001163220A priority Critical patent/JP4610124B2/en
Publication of JP2002357468A publication Critical patent/JP2002357468A/en
Application granted granted Critical
Publication of JP4610124B2 publication Critical patent/JP4610124B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Description

【0001】
【発明の属する技術分野】
本発明は、ガスの使用上の安全性を確保するガス遮断装置に関するものである。
【0002】
【従来の技術】
従来この種のガス遮断装置は、図10(本発明の第6実施例を示す図を参酌する。)のような機能ブロック図となっている。この図において、遮断事由発生部1はガスの遮断を行う事由を発生する機能を有し、ガス遮断部2はガスを遮断する機能を有し、制御部3は、ガス遮断装置11の動作を制御し、遮断事由発生部1でガスを遮断する事由が発生したときに、ガス遮断部2でガスを遮断させる機能を有する。
【0003】
前記遮断事由発生部1では、ガスの使用における危険な状態に対して一定の日にちや時間の余裕がある時点で遮断事由を発生するようになっており、その遮断事由の発生した時点で、制御部3がガス遮断部2でガスを遮断させている。
【0004】
【発明が解決しようとする課題】
上記従来のガス遮断装置では、遮断事由発生部1が遮断事由を発生した場合には即時に制御部3がガス遮断部2でガスを遮断させていた。つまり遮断事由が発生したとき、危険な状態に対して一定の日にちや時間の余裕がある場合でも、時間帯、休日、曜日などに関わらず遮断事由が発生した時点で即座にガスが遮断される。したがって、ガスの保守業者がガスを使用できるように処置をするまでガスの利用者がガスを使用できなくなる場合や、ガスの利用者が頻繁にガスを使用する時間帯、休日、曜日などで急にガスが使用できなくなる場合があり、ガスの利用者に不便を強いるという問題を有していた。
【0005】
本発明は、上記のような従来の問題を解決するもので、発生した遮断事由が危険な状態に対して一定の日にちや時間の余裕を持って発生するようになっている場合において、ガスの保守業者が処置できない時間帯、休日、曜日を外してガスを遮断したり、一時的に開栓(ガス遮断の解除)することによって、使用中にガスが急に使用できなくなることによる不便さを解消したガス遮断装置を提供することを目的とする。
【0006】
【課題を解決するための手段】
本発明のガス遮断装置は、上記目的を達成するために、ガスを遮断するガス遮断部と、ガスの遮断を行う事由を発生する遮断事由発生部と、時間または日付または曜日を計測する時計部と、前記時計部の時間または日付または曜日を入力して遮断を行う遮断時間または遮断日付または遮断曜日を出力する遮断設定日時保持部と、前記遮断事由発生部で遮断を行う事由が発生したときに時計部から時間または日付または曜日を取得し、取得した時間または日付または曜日を、遮断設定日時保持部に入力して遮断時間または遮断日付または遮断曜日を取得し、時計部の時間または日付または曜日が、遮断設定日時保持部の遮断時間または遮断日付または遮断曜日に一致したときに前記ガス遮断部でガスを遮断させる制御部とを備えたことを特徴としている。
【0007】
これによって、遮断事由発生部で遮断事由が発生した後に、遮断設定日時保持部が保持する遮断日時と時計部の日時が一致すれば、ガス遮断部でガスを遮断することによって、ガスの保守業者がすぐに処置を行える時間帯、休日以外、曜日に遮断するようにでき、またガスの利用者がガスを頻繁に使用する時間帯、休日、曜日を避けるため、ガスの利用者の利便性が高くなる。
【0008】
【発明の実施の形態】
請求項1に記載の発明は、ガスを遮断するガス遮断部と、ガスの遮断を行う事由を発生する遮断事由発生部と、時間または日付または曜日を計測する時計部と、前記時計部の時間または日付または曜日を入力して遮断を行う遮断時間または遮断日付または遮断曜日を出力する遮断設定日時保持部と、前記遮断事由発生部で遮断を行う事由が発生したときに時計部から時間または日付または曜日を取得し、取得した時間または日付または曜日を、遮断設定日時保持部に入力して遮断時間または遮断日付または遮断曜日を取得し、時計部の時間または日付または曜日が、遮断設定日時保持部の遮断時間または遮断日付または遮断曜日に一致したときに前記ガス遮断部でガスを遮断させる制御部とを備えたことにより、ガスの利用者がガスを頻繁に使用する時間または日付または曜日に一致しないと遮断時間または遮断日付または遮断曜日にガスが遮断されるようにすることによって、ガスの保守業者がガスの使用状態を妨げずに作業をできるようにし、ガスの利用者が頻繁にガスを使用する時間または日付または曜日に、急なガス遮断によってガスの利用者に不便を強いることを避けることができる。
【0009】
請求項2に記載の発明は、ガスを遮断するガス遮断部と、ガスの遮断を行う事由を発生する遮断事由発生部と、時間または日付または曜日を計測する時計部と、遮断を許可する時間または日付または曜日それぞれの範囲である時間帯または日付帯または曜日帯をそれぞれ保持する遮断日時帯保持部と、前記時計部の時間または日付または曜日を入力して遮断を行う遮断時間または遮断日付または遮断曜日を出力する遮断設定日時保持部と、前記遮断事由発生部で遮断を行う事由が発生したときに時計部から時間または日付または曜日を取得し、取得した時間または日付または曜日が、遮断日時帯保持部の時間帯または日付帯または曜日帯に含まれるときには、即時にガス遮断部でガスを遮断させ、前記時間または日付または曜日が、遮断日時帯保持部の時間帯または日付帯または曜日帯に含まれないときには、時計部から時間または日付または曜日を取得し、取得した時間または日付または曜日を、遮断設定日時保持部に入力して遮断時間または遮断日付または遮断曜日を取得し、時計部の時間または日付または曜日が、遮断設定日時保持部の遮断時間または遮断日付または遮断曜日に一致したときに前記ガス遮断部でガスを遮断させる制御部とを備えたことにより、ガスの利用者がガスを頻繁に使用する時間または日付または曜日それぞれの範囲である遮断日時帯(時間帯または日付帯または曜日帯)に含まれなければ、ガスが即時に遮断されるようにして安全性を確保する一方、前記遮断日時帯以外であれば、請求項1記載の発明と同様の遮断日時にガスが遮断されるようにすることによって、ガスの保守業者がガスの使用状態を妨げずに作業をできるようにし、ガスの利用者が頻繁にガスを使用する時間または日付または曜日に、急なガス遮断によってガスの利用者に不便を強いることを避けることができる。
【0010】
請求項3に記載の発明は、ガスを遮断するガス遮断部と、ガスの遮断を行う事由を発生する遮断事由発生部と、時間または日付または曜日を計測する時計部と、遮断後に開栓を許可する時間または日付または曜日それぞれの範囲である時間帯または日付帯または曜日帯をそれぞれ保持する開栓許可日時帯保持部と、開栓を許可する開栓許可状態または開栓を許可しない開栓不許可状態を保持する開栓許可状態保持部と、遮断後に開栓を受け付ける開栓受付部と、前記遮断事由発生部で遮断を行う事由が発生したときに時計部から時間または日付または曜日を取得し、取得した時間または日付または曜日が、前記開栓許可日時帯保持部の時間帯または日付帯または曜日帯に含まれるときには、開栓許可状態保持部に前記開栓許可状態を保持させて前記ガス遮断部でガスを遮断させ、時計部の時間または日付または曜日が、前記開栓許可日時帯保持部の時間帯または日付帯または曜日帯に含まれないときには、開栓許可状態保持部に前記開栓不許可状態を保持させて前記ガス遮断部でガスを遮断させ、遮断後に開栓受付部で前記開栓を受け付けたときに開栓許可状態保持部が開栓許可状態を保持している場合にはガス遮断部の遮断を解除させ、開栓許可状態保持部が開栓不許可状態を保持している場合にはガス遮断部の遮断を解除させない制御部とを備えたことにより、ガスの保守業者が出動できる日時帯(時間帯または日付帯または曜日帯)に含まれない日時帯にガスが遮断されても、時計部の現在日時が、開栓許可日時帯保持部の日時に含まれるときには、開栓許可状態で保存されているので、例えばガスの利用者がガス保守業者からの指示によりガスの遮断を解除が可能となり、ガスの利用者が頻繁にガスを使用する日時帯に、一時的に開栓できるので、急なガス遮断によってガスの利用者に不便を強いることを避けることができる。
【0011】
請求項4に記載の発明は、請求項3に記載の発明において、ガスの流量を計測するガス流量計測部を持ち、遮断事由発生部で遮断を行う事由が発生した後、ガス流量計測部からガス流量を取得し、前記ガス流量が規定流量未満から規定流量以上に変化したときに、制御部が、時計部から時間または日付または曜日を取得することにより、上記同様の動作を、遮断事由の発生後にガス流量計測部からの規定流量の変化によってガスが使用中であるかを判断した後に行い、開栓許可状態に設定されていれば、ガス遮断後に一時的にその解除を可能とすることによって、ガスの利用者に不便を強いることを効率的に避けることができる。
【0012】
請求項5に記載の発明は、ガスを遮断するガス遮断部と、ガスの遮断を行う事由を発生する遮断事由発生部と、ガスの流量を計測するガス流量計測部と、時間または日付または曜日を計測する時計部と、遮断を許可する時間または日付または曜日それぞれの範囲である時間帯または日付帯または曜日帯をそれぞれ保持する遮断日時帯保持部と、前記遮断事由発生部で遮断を行う事由が発生した後、前記ガス流量計測部からガス流量を取得し、前記ガス流量が規定流量未満から規定流量以上に変化したときに、時計部から時間または日付または曜日を取得し、取得した時間または日付または曜日が、遮断日時帯保持部の時間帯または日付帯または曜日帯に含まれるときに前記ガス遮断部でガスを遮断させる制御部とを備えたことにより、遮断事由の発生後にガス流量計測部からの規定流量の変化によってガスの使用中であるか否かを判断した後に、時計部から現在日時の取得を行い、ガスの保守業者が出動できる時間帯または日付帯または曜日帯にガスを遮断することができる。
【0013】
請求項6に記載の発明は、ガスを遮断するガス遮断部と、ガスの遮断を行う事由を発生する遮断事由発生部と、ガスの流量を計測するガス流量計測部と、前記遮断事由発生部で遮断を行う事由が発生した後、前記ガス流量計測部からガス流量を取得し、前記ガス流量が規定流量未満になったときに、前記ガス遮断部でガスを遮断させる制御部とを備えたことにより、遮断事由の発生後にガス流量計測部で規定流量未満になってガスの利用者がガスを使用し終わったと判断した後に、ガスが遮断されるようになり、ガスの利用者がガスを使用している途中に急にガスが使用できなくなることを避けることができる。
【0014】
【実施例】
以下本発明の実施例について、図面を参照しながら説明する。
【0015】
(第1実施例)
図1は、本発明の第1実施例におけるガス遮断装置の機能ブロック図であり、図2は第1実施例におけるガス遮断装置の動作を示すフロー図である。
【0016】
図1において、11はガスの使用量の計測やガスの使用状態を監視し、異常時にはガスを遮断するガス遮断装置であり、ガスの利用者である各家庭に設置される。1は、ガスの使用における危険な状態に対して一定の日にちや時間の余裕がある時点で、ガスの遮断を行う事由を発生する遮断事由発生部であり、遮断事由としては例えば、極めて微少なガスの漏れを検知する漏洩状態や、徐々に減少する電池電圧の低下状態や、ガス安全遮断器具としての検定満了期日前の状態などがある。2は、ガスを遮断するガス遮断部であり、3は、ガス遮断装置11の動作を制御する制御部であり、遮断事由発生部1でガスを遮断する事由が発生したときに、ガス遮断部2でガスを遮断させる。4は現在日時を計測する時計部であり、現在日時としては例えば、年月日時分秒および曜日を保持し、秒単位で逐次更新する。5は遮断事由発生部1で遮断事由が発生した後、時計部4が計測した時間または日付または曜日を入力してガスを遮断する遮断時間または遮断日付または遮断曜日を出力する遮断設定日時保持部である。例えば、遮断設定日時保持部5に時間として「19時48分」のような値を入力すると、遮断時間として次に訪れる「10時0分0秒」を出力する。また、日付として「12月31日」を入力すると、遮断日付として正月休暇明けの「1月4日9時0分0秒」を出力し、日付として「5月2日」を入力すると遮断日付として、ゴールデンウィーク明けの「5月6日9時0分0秒」を出力する。また、曜日として「土曜日」を入力すると、遮断曜日として「月曜日」を出力する。
【0017】
次に図2のフロー図を用いてガス遮断装置11の制御部3の動作、作用について説明する。
【0018】
このフロー図では、まず遮断事由発生部1が遮断事由を発生することにより動作を開始するものである。尚、現在日時(時間または日付または曜日)のうち時間を入力値とし、それによって遮断日時(遮断時間または遮断日付または遮断曜日)として遮断時間を出力した例で説明する。
【0019】
ステップ101は、遮断設定日時保持部5の遮断時間の元になる現在の時間を時計部4から取得する処理で、時間を取得後ステップ102に進む。例えば時間として「19時48分39秒」を取得する。
【0020】
ステップ102は遮断時間を取得する処理で、ステップ101で取得した時間を元に遮断設定日時保持部5から次回遮断を行う遮断時間「10時0分0秒」を取得し、ステップ103へ進む。
【0021】
ステップ103は、遮断設定日時保持部5の遮断時間と比較するために現在の時間を時計部4から取得する処理で、時間を取得後ステップ104へ進む。
【0022】
ステップ104は現在の時間がステップ102で取得した遮断時間「10時0分0秒」に一致するかどうかを判定する処理で、一致しない場合はステップ103に戻り、一致した場合はステップ105へ進む。
【0023】
ステップ105は遮断処理で、ガス遮断部2に遮断の命令を出力し、ガス遮断部2がガスを遮断し、すべての処理を終了する。
【0024】
(第2実施例)
図3は、本発明の第2実施例におけるガス遮断装置の機能ブロック図であり、図4は第2実施例におけるガス遮断装置の動作を示すフロー図である。
【0025】
図3において、11はガスの使用量の計測やガスの使用状態を監視し、異常時にはガスを遮断するガス遮断装置であり、ガスの利用者である各家庭に設置される。1は、ガスの使用における危険な状態に対して一定の日にちや時間の余裕がある時点で、ガスの遮断を行う事由を発生する遮断事由発生部であり、遮断事由としては例えば、極めて微少なガスの漏れを検知する漏洩状態や、徐々に減少する電池電圧の低下状態や、ガス安全遮断器具としての検定満了期日前の状態などがある。2は、ガスを遮断するガス遮断部であり、3は、ガス遮断装置11の動作を制御する制御部であり、遮断事由発生部1でガスを遮断する事由が発生したときに、ガス遮断部2でガスを遮断させる。4は現在日時を計測する時計部であり、現在日時としては例えば、年月日時分秒および曜日を保持し、秒単位で逐次更新する。5は遮断事由発生部1で遮断事由が発生した後、時計部4が計測した時間または日付または曜日を入力してガスを遮断する遮断時間または遮断日付または遮断曜日を出力する遮断設定日時保持部である。例えば、遮断設定日時保持部5に時間として「19時48分」のような値を入力すると、遮断時間として次に訪れる「10時0分0秒」を出力する。また、日付として「12月31日」を入力すると、遮断日付として正月休暇明けの「1月4日9時0分0秒」を出力し、日付として「5月2日」を入力すると遮断日付として、ゴールデンウィーク明けの「5月6日9時0分0秒」を出力する。また、曜日として「土曜日」を入力すると、遮断曜日として「月曜日」を出力する。6は、遮断を許可する時間の範囲である時間帯または日付帯または曜日帯を保持する遮断日時帯保持部、例えば時間帯としてはガスの利用者がガスをあまり頻繁に使用せず、またガスの保守業者の営業中である「9時〜18時」で、日付帯としては年末年始の「12月29日〜1月3日」や盆の「8月14日〜16日」以外の日付で、曜日帯としてはガスの保守業者が営業中である「月曜日〜土曜日」などがある。
【0026】
次に図4のフロー図を用いてガス遮断装置11の制御部3の動作、作用について説明する。
【0027】
このフロー図では、まず遮断事由発生部1が遮断事由を発生することにより動作を開始するものである。尚、現在日時(時間または日付または曜日)のうち時間を入力値とし、それによって遮断日時(遮断時間または遮断日付または遮断曜日)として遮断時間を出力した例で説明する。
【0028】
ステップ201は、遮断日時帯保持部6の遮断時間帯と比較処理を行うために現在の時間を時計部4から取得する処理で、時間を取得後ステップ202に進む。例えば時間として「19時48分39秒」を取得する。
【0029】
ステップ202は、ステップ201で取得した時間が遮断日時帯保持部6に保持されている時間帯「9時〜18時」に含まれるかどうかを判定する処理で、含まれる場合はステップ206に進み、含まれない場合はステップ203に進む。
【0030】
ステップ203は遮断時間を取得する処理で、ステップ201で取得した時間を元に遮断設定日時保持部5から次回遮断を行う遮断時間を取得し、ステップ204へ進む。
【0031】
ステップ204は、遮断設定日時保持部5の遮断時間と比較するために現在の時間を時計部4から取得する処理で、時間を取得後ステップ205へ進む。
【0032】
ステップ205は現在の時間がステップ203で取得した遮断時間に一致するかどうかを判定する処理で、一致しない場合はステップ204に戻り、一致した場合はステップ206へ進む。
【0033】
ステップ206は遮断処理で、ガス遮断部2に遮断の命令を出力し、ガス遮断部2がガスを遮断し、すべての処理を終了する。
【0034】
尚、上記第1、第2実施例で示したように、時計部4の現在時間と遮断設定日時保持部5の遮断時間との一致を判定(第1実施例ではステップ104、第2実施例ではステップ205)するためには、遮断時間を保持して随時時計部4の時間と比較する方法のほか、現在時刻から遮断時間まで差分の時間を保持してタイマで計数し、差分の時間の経過で判定するなどの方法がある。
【0035】
(第3実施例)
図5は、本発明の第3実施例におけるガス遮断装置の機能ブロック図であり、図6は第3実施例におけるガス遮断装置の動作を示すフロー図である。
【0036】
図5において、11はガスの使用量の計測やガスの使用状態を監視し、異常時にはガスを遮断するガス遮断装置であり、ガスの利用者である各家庭に設置される。1は、ガスの使用における危険な状態に対して一定の日にちや時間の余裕がある時点で、ガスの遮断を行う事由を発生する遮断事由発生部であり、遮断事由としては例えば、極めて微少なガスの漏れを検知する漏洩状態や、徐々に減少する電池電圧の低下状態や、ガス安全遮断器具としての検定満了期日前の状態などがある。2は、ガスを遮断するガス遮断部であり、3は、ガス遮断装置11の動作を制御する制御部であり、遮断事由発生部1でガスを遮断する事由が発生したときに、ガス遮断部2でガスを遮断させる。4は現在日時を計測する時計部であり、現在日時としては例えば、年月日時分秒および曜日を保持し、秒単位で逐次更新する。7は遮断後に開栓を許可する時間の範囲である時間帯または日付帯または曜日帯を保持する開栓許可日時帯保持部であり、例えば時間帯としてはガスの利用者がガスを頻繁に使用する可能性があり、ガスの保守業者の営業中でない「18時〜9時」で、日時帯としては年末年始の「12月29日〜1月3日」や盆の「8月14日〜16日」の日付で、曜日帯としてはガスの保守業者が営業中でない「日曜日」などがある。8は遮断したガス遮断部2の開栓の要求を受け付ける開栓受付部である。9は遮断したガス遮断部2の開栓が許可されている開栓許可状態または開栓が許可されていない開栓不許可状態を保持する開栓許可状態保持部である。
【0037】
次に図6のフロー図を用いてガス遮断装置11の制御部3の動作、作用について説明する。
【0038】
このフロー図では、まず遮断事由発生部1が遮断事由を発生することにより動作を開始するものである。尚、現在日時(時間または日付または曜日)のうち時間を入力値とし、それによって遮断日時(遮断時間または遮断日付または遮断曜日)として遮断時間を出力した例で説明する。
ステップ301は、開栓許可日時帯保持部7の時間帯と比較処理を行うために現在の時間を時計部4から取得する処理で、時間を取得後ステップ302に進む。
【0039】
ステップ302は、ステップ301で取得した時間が開栓許可日時帯保持部7に保持されている時間帯に含まれているかどうかを判定する処理で、含まれる場合はステップ303に進み、含まれない場合はステップ304へ進む。
【0040】
ステップ303は開栓許可状態保持部9へ開栓許可状態を保持させるための設定処理で、ステップ305へ進む。
【0041】
ステップ304は開栓許可状態保持部9へ開栓不許可状態を保持させるための設定処理で、ステップ305へ進む。
【0042】
ステップ305は遮断処理で、ガス遮断部2でガスを遮断させた後、ステップ306へ進む。
【0043】
ステップ306は開栓受付部8から開栓の要求を待機する処理で、要求を受け付けたときにステップ307へ進む。
【0044】
ステップ307は開栓許可状態保持部9に保持してある状態が、開栓許可状態であるかどうかを判定する処理で、開栓許可状態であれば開栓を受付けてステップ308へ進み、開栓不許可状態であれば開栓を受け付けずステップ306へ戻る。
【0045】
ステップ308はガス遮断解除処理で、開栓を受け付けてガス遮断部2のガス遮断状態を解除させ、すべての処理を終了する。
【0046】
(第4実施例)
本発明の第4実施例におけるガス遮断装置の機能ブロック図は、第3実施例で示した図5を利用して説明する。図7は本発明の第4実施例におけるガス遮断装置の動作を示すフロー図である。
【0047】
において、11はガスの使用量の計測やガスの使用状態を監視し、異常時にはガスを遮断するガス遮断装置であり、ガスの利用者である各家庭に設置される。1は、ガスの使用における危険な状態に対して一定の日にちや時間の余裕がある時点で、ガスの遮断を行う事由を発生する遮断事由発生部であり、遮断事由としては例えば、極めて微少なガスの漏れを検知する漏洩状態や、徐々に減少する電池電圧の低下状態や、ガス安全遮断器具としての検定満了期日前の状態などがある。2は、ガスを遮断するガス遮断部であり、3は、ガス遮断装置11の動作を制御する制御部であり、遮断事由発生部1でガスを遮断する事由が発生したときに、ガス遮断部2でガスを遮断させる。4は現在日時を計測する時計部であり、現在日時としては例えば、年月日時分秒および曜日を保持し、秒単位で逐次更新する。7は遮断後に開栓を許可する時間の範囲である時間帯または日付帯または曜日帯を保持する開栓許可日時帯保持部であり、例えば時間帯としてはガスの利用者がガスを頻繁に使用する可能性があり、ガスの保守業者の営業中でない「18時〜9時」で、日時帯としては年末年始の「12月29日〜1月3日」や盆の「8月14日〜16日」の日付で、曜日帯としてはガスの保守業者が営業中でない「日曜日」などがある。8は遮断したガス遮断部2の開栓の要求を受け付ける開栓受付部である。9は遮断したガス遮断部2の開栓が許可されている開栓許可状態または開栓が許可されていない開栓不許可状態を保持する開栓許可状態保持部である。10はガスの流量を検出するガス流量計測部であり、単位時間当たりの通過ガス量あるいは単位体積当りの通過時間をガスの通過流量として検出する。
【0048】
次に図7のフロー図を用いてガス遮断装置11の制御部3の動作、作用について説明する。
【0049】
このフロー図では、まず遮断事由発生部1が遮断事由を発生することにより動作を開始するものである。
【0050】
ステップ401ではガス流量計測部10によりガスの流量を計測し、規定の流量未満を計測したらステップ402へ進み、そうでない場合はステップ401へ戻る。
【0051】
ステップ402ではガス流量計測部10によりガスの流量を計測し、規定の流量以上を計測したらステップ403へ進み、そうでない場合はステップ402へ戻る。
【0052】
ステップ403は、開栓許可日時帯保持部7の時間帯と比較処理を行うために現在の時間を時計部4から取得する処理で、時間を取得後ステップ404に進む。
【0053】
ステップ404は、ステップ403で取得した時間が開栓許可日時帯保持部7に保持されている時間帯に含まれているかどうかを判定する処理で、含まれる場合はステップ405に進み、含まれない場合はステップ406へ進む。
【0054】
ステップ405は開栓許可状態保持部9へ開栓許可状態を保持させるための設定処理で、ステップ407へ進む。
【0055】
ステップ406は開栓許可状態保持部9へ開栓不許可状態を保持させるための設定処理で、ステップ407へ進む。
【0056】
ステップ407は遮断処理で、ガス遮断部2によりガスを遮断させた後、ステップ408へ進む。
【0057】
ステップ408は開栓受付部8から開栓の要求を待機する処理で、要求を受け付けたときにステップ409へ進む。
【0058】
ステップ409は開栓許可状態保持部9に保持してある状態が、開栓許可状態であるかどうかを判定する処理で、開栓許可状態であれば開栓を受付けてステップ410へ進み、開栓不許可状態であれば開栓を受け付けずステップ408へ戻る。
【0059】
ステップ410はガス遮断解除処理で、開栓を受け付けてガス遮断部2のガス遮断状態を解除させ、すべての処理を終了する。
【0060】
(第5実施例)
図8は、本発明の第5実施例におけるガス遮断装置の機能ブロック図であり、図9は第5実施例におけるガス遮断装置の動作を示すフロー図である。
【0061】
図8において、11はガスの使用量の計測やガスの使用状態を監視し、異常時にはガスを遮断するガス遮断装置であり、ガスの利用者である各家庭に設置される。1は、ガスの使用における危険な状態に対して一定の日にちや時間の余裕がある時点で、ガスの遮断を行う事由を発生する遮断事由発生部であり、遮断事由としては例えば、極めて微少なガスの漏れを検知する漏洩状態や、徐々に減少する電池電圧の低下状態や、ガス安全遮断器具としての検定満了期日前の状態などがある。2は、ガスを遮断するガス遮断部であり、3は、ガス遮断装置11の動作を制御する制御部であり、遮断事由発生部1でガスを遮断する事由が発生したときに、ガス遮断部2でガスを遮断させる。4は現在日時を計測する時計部であり、現在日時としては例えば、年月日時分秒および曜日を保持し、秒単位で逐次更新する。6は、遮断を許可する時間の範囲である時間帯または日付帯または曜日帯を保持し、例えば時間帯としてはガスの利用者がガスをあまり頻繁に使用せず、またガスの保守業者の営業中である「9時〜18時」で、日付帯としては年末年始の「12月29日〜01月3日」や盆の「8月14日〜16日」以外の日付で、曜日帯としてはガスの保守業者が営業中である「月曜日〜土曜日」などがある。10はガスの流量を検出するガス流量計測部であり、単位時間当たりの通過時間をガスの通過流量として検出する。
【0062】
次に図9のフロー図を用いてガス遮断装置11の制御部3の動作、作用について説明する。
【0063】
このフロー図では、まず遮断事由発生部1が遮断事由を発生することにより動作を開始するものである。尚、現在日時(時間または日付または曜日)のうち時間を入力値とし、それによって遮断日時(遮断時間または遮断日付または遮断曜日)として遮断時間を出力した例で説明する。
【0064】
ステップ501ではガス流量計測部10でガスの流量を計測し、規定の流量未満を計測したらステップ502へ進み、そうでない場合はステップ501へ戻る。
【0065】
ステップ502ではガス流量計測部10でガスの流量を計測し、規定の流量以上を計測したらステップ503へ進み、そうでない場合はステップ502へ戻る。
【0066】
ステップ503は、遮断日時帯保持部6の時間帯と比較処理を行うために現在の時間を時計部4から取得する処理で、時間を取得後ステップ504に進む。
【0067】
ステップ504は、ステップ503で取得した時間が遮断日時帯保持部6に保持されている時間帯「9時〜18時」に含まれるかどうかを判定する処理で、含まれる場合はステップ505に進み、含まれない場合はステップ501へ戻る。
【0068】
ステップ505は遮断処理で、ガス遮断部2に遮断の命令を出力し、ガス遮断部2がガスを遮断し、すべての処理を終了する。
【0069】
(第6実施例)
図10は、本発明の第6実施例におけるガス遮断装置の機能ブロック図であり、図11は第6実施例におけるガス遮断装置の動作を示すフロー図である。
【0070】
図10において、11はガスの使用量の計測やガスの使用状態を監視し、異常時にはガスを遮断するガス遮断装置であり、ガスの利用者である各家庭に設置される。1は、ガスの使用における危険な状態に対して一定の日にちや時間の余裕がある時点で、ガスの遮断を行う事由を発生する遮断事由発生部であり、遮断事由としては例えば、極めて微少なガスの漏れを検知する漏洩状態や、徐々に減少する電池電圧の低下状態や、ガス安全遮断器具としての検定満了期日前の状態などがある。2は、ガスを遮断するガス遮断部であり、3は、ガス遮断装置11の動作を制御する制御部であり、遮断事由発生部1でガスを遮断する事由が発生したときに、ガス遮断部2でガスを遮断させる。10はガスの流量を検出するガス流量計測部であり、単位時間当たりの通過ガス量あるいは単位体積当りの通過時間をガスの通過流量として検出する。
【0071】
次に図11のフロー図を用いてガス遮断装置11の制御部3の動作、作用について説明する。
【0072】
このフロー図では、まず遮断事由発生部1が遮断事由を発生することにより動作を開始するものである。
【0073】
ステップ601ではガス流量計測部10でガスの流量を計測し、規定の流量未満を計測したらステップ602へ進み、そうでない場合はステップ601へ戻る。
【0074】
ステップ602は遮断処理で、ガス遮断部2に遮断の命令を出力し、ガス遮断部2がガスを遮断し、すべての処理を終了する。
【0075】
【発明の効果】
以上のように、請求項1〜6に記載の発明によれば、ガスの保守業者が処理できない時間または日付または曜日を外してガスを遮断したり、遮断しても一時的に遮断状態を解除でき、ガスの利用者が頻繁にガスを使用する時間帯または休日または曜日などでガスを使用できなくなることを避けることができるので、ガスの保守業者、ガスの利用者の双方の利便性を向上することができる。
【図面の簡単な説明】
【図1】本発明の第1実施例におけるガス遮断装置の機能ブロック図。
【図2】本発明の第1実施例におけるガス遮断装置の制御部のフロー図。
【図3】本発明の第2実施例におけるガス遮断装置の機能ブロック図。
【図4】本発明の第2実施例におけるガス遮断装置の制御部のフロー図。
【図5】本発明の第3実施例および第4実施例におけるガス遮断装置の機能ブロック図。
【図6】本発明の第3実施例におけるガス遮断装置の制御部のフロー図。
【図7】本発明の第4実施例におけるガス遮断装置の制御部のフロー図。
【図8】本発明の第5実施例におけるガス遮断装置の機能ブロック図。
【図9】本発明の第5実施例におけるガス遮断装置の制御部のフロー図。
【図10】本発明の第6実施例におけるガス遮断装置の機能ブロック図。
【図11】本発明の第6実施例におけるガス遮断装置の制御部のフロー図。
【符号の説明】
1 遮断事由発生部
2 ガス遮断部
3 制御部
4 時計部
5 遮断設定日時保持部
6 遮断日時帯保持部
7 開栓許可日時帯保持部
8 開栓受付部
9 開栓許可状態保持部
10 ガス流量計測部
11 ガス遮断装置
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a gas shut-off device that ensures safety in use of gas.
[0002]
[Prior art]
Conventionally, this type of gas shut-off device is a functional block diagram as shown in FIG. 10 (refer to the diagram showing the sixth embodiment of the present invention). In this figure, the shut-off event generating unit 1 has a function of generating a reason for shutting off the gas, the gas shut-off unit 2 has a function of shutting off the gas, and the control unit 3 operates the gas shut-off device 11. The gas shut-off unit 2 has a function of shutting off the gas when a reason for shutting off the gas is generated.
[0003]
The shut-off event generation unit 1 generates a shut-off event when there is a certain date or time allowance for a dangerous state in the use of gas, and the control is performed when the shut-off event occurs. The unit 3 blocks the gas at the gas blocking unit 2.
[0004]
[Problems to be solved by the invention]
In the conventional gas shut-off device, when the shut-off event generating unit 1 generates a shut-off reason, the control unit 3 immediately shuts off the gas at the gas shut-off unit 2. In other words, when a shut-down event occurs, gas is shut off immediately when the shut-off event occurs regardless of the time of day, holiday, day of the week, etc. . Therefore, when the gas user cannot use the gas until the gas maintenance company takes measures so that the gas can be used, or when the gas user frequently uses the gas, it is sudden in the time zone, holidays, days of the week, etc. In some cases, the gas cannot be used, which causes inconvenience to the gas user.
[0005]
The present invention solves the above-mentioned conventional problems, and in the case where the generated interruption event occurs with a certain date and time allowance for a dangerous state, Inconvenience caused by sudden loss of gas during use by shutting off the gas by removing the time, holidays, and days of the week when the maintenance contractor cannot take action, or by temporarily opening the plug (releasing the gas shutoff). It aims at providing the gas cutoff device which eliminated.
[0006]
[Means for Solving the Problems]
In order to achieve the above object, the gas shut-off device of the present invention includes a gas shut-off unit that shuts off the gas, a shut-off cause generating unit that generates the reason for shutting off the gas, and a clock unit that measures time, date, or day of the week. When the occurrence of the interruption occurs at the interruption setting date and time holding unit that outputs the interruption time or the interruption date or the interruption day of the week when the time, date or day of the clock is input The time or date or day of the week is acquired from the clock, and the acquired time or date or day of the week is input to the cutoff time setting unit to obtain the cutoff time or cutoff date or day of the week. And a control unit that shuts off the gas at the gas shut-off unit when the day of the week coincides with the shut-off time or shut-off date or shut-off day of the shut-off setting date and time holding unit. To have.
[0007]
As a result, after a shut-off event has occurred in the shut-off cause generating unit, if the shut-off date and time held by the shut-off setting date and time holding unit matches the date and time of the clock unit, the gas shut-off unit shuts off the gas, and the gas maintenance company Can be cut off on the day of the week except when it can be treated immediately, and on holidays, and the gas user avoids the hours, holidays, and days of the week when the gas is used frequently. Get higher.
[0008]
DETAILED DESCRIPTION OF THE INVENTION
The invention according to claim 1 includes a gas shut-off unit that shuts off gas, a shut-off event generating unit that generates a reason for shutting off the gas, a clock unit that measures time, date, or day of the week, and a time of the clock unit. Or, the date or day of the week is entered to enter the cutoff time or cutoff date or cutoff day and the cutoff setting date and time holding unit, and the time or date from the clock unit when the cutoff event occurrence unit occurs Or, get the day of the week, enter the acquired time or date or day of the week in the cutoff setting date and time holding part to get the cutoff time or cutoff date or blocking day of the week, and keep the time or date or day of the clock in the cutoff setting date and time. And a control unit that shuts off the gas at the gas shut-off part when it coincides with the shut-off time or the shut-off date or the shut-off day of the part. By ensuring that the gas is shut off at the shut-off time or shut-off date or day of the week if it does not match the time or date or day of the week used, the gas maintainer can work without disturbing the gas usage, It can be avoided that the gas user is inconvenienced by sudden gas shutoff at the time or date or day of the week when the gas user frequently uses the gas.
[0009]
The invention according to claim 2 is a gas blocking unit that blocks gas, a blocking event generating unit that generates a reason for blocking gas, a clock unit that measures time, date, or day of the week, and a time during which blocking is permitted. Alternatively, a shut-off date / time zone holding unit that holds a time zone, a date zone, or a day of the week, each of which is a range of a date or a day of the week, and a shut-off time or a cut-off date for performing a cut-off by inputting the time, date, or day of the clock The cutoff setting date and time holding unit that outputs the cutoff day of the week, and the time or date or day of the week is acquired from the clock unit when the reason for blocking occurs in the cutoff event generation unit, and the acquired time or date or day of the week is the cutoff date and time When it is included in the time zone or date zone or day of the week of the belt holding unit, the gas cutoff unit immediately shuts off the gas, and the time, date or day of the week is the cutoff date and time. When it is not included in the time zone or date zone or day of the week of the holding unit, the time or date or day of the week is acquired from the clock unit, and the acquired time or date or day of the week is input to the cutoff setting date and time holding unit. A control unit that acquires a shut-off date or a shut-off day, and shuts off the gas by the gas shut-off unit when the time or date or day of the clock unit matches the shut-off time or shut-off date or shut-off day of the shut-off setting date and time holding unit; If the gas user does not fall within the cutoff time zone (time zone, date zone, or day of the week) that is the range of the time, date, or day of the week that the gas user frequently uses the gas, the gas is immediately While the safety is ensured by being shut off, the gas is shut off at the same shut-off date and time as in the invention of claim 1 except for the shut-off date and time zone. This allows gas maintenance personnel to work without interfering with gas usage conditions, and to prevent gas users from being shut off suddenly at times, dates, or days of the week when they use gas frequently. You can avoid inconvenience.
[0010]
The invention described in claim 3 includes a gas shut-off unit that shuts off the gas, a shut-off event generating unit that generates the reason for shutting off the gas, a clock unit that measures time, date, or day of the week, and an opener after the shut-off. Opening permission date / time zone holding part that holds the time zone, date range, or day of the week that is in the range of the permitted time, date, or day of the week, and the opening permission state that allows the opening or the opening that does not allow the opening The time or date or day of the week is displayed from the clock when a reason for shutting off occurs at the opening permitting state holding part that holds the non-permitted state, the opening accepting part that accepts opening after shutting off, and the shutting off reason generating part. When the acquired time or date or day of the week is included in the time zone or date band or day of the week of the opening permission time / date holding unit, the opening permission state holding unit holds the opening permission state. Gas is shut off by the gas shut-off unit, and when the time or date or day of the clock is not included in the time zone or date or day of the open permission date / time holding unit, The gas blocking section keeps the unplugging permission state, and the gas blocking section blocks the gas. When the opening is received by the plug receiving section after the blocking, the opening permission state holding section holds the opening permission state. When the gas blocking unit is released, the opening control unit is provided with a control unit that does not cancel the blocking of the gas blocking unit when the opening permitting state holding unit holds the opening prohibition state. Even if the gas is shut off in a date / time zone that is not included in the date / time zone (time zone, date zone, or day of the week) in which the gas maintenance agent can be dispatched, the current date / time of the clock will be the same as the date / time of the opening permit time zone holding unit. When it is included, it is stored in the open-open permission state. Therefore, for example, a gas user can release the gas shut-off according to an instruction from a gas maintenance company, and the gas user can temporarily open the plug at a date and time when the gas is frequently used. It is possible to avoid inconvenience to the gas user by shutting off the gas.
[0011]
According to a fourth aspect of the present invention, in the third aspect of the present invention, the gas flow measurement unit has a gas flow measurement unit that measures the gas flow rate. When the gas flow rate is acquired, and the gas flow rate changes from less than the specified flow rate to the specified flow rate or more, the control unit acquires the time, date, or day of the week from the clock unit, so that the same operation as described above can be performed. After the occurrence, it will be done after judging whether the gas is in use by the change in the specified flow rate from the gas flow measurement unit. This effectively avoids inconvenience to the gas user.
[0012]
The invention according to claim 5 includes a gas shut-off unit that shuts off the gas, a shut-off event generating unit that generates a reason for shutting off the gas, a gas flow rate measuring unit that measures the flow rate of the gas, and time, date, or day of the week A timepiece that measures the time, a date and a day of the week or a day of the week or a day of the week or a day of the week or a day of the week that holds the day of the week and a day of the week. Is generated, the gas flow rate is acquired from the gas flow rate measurement unit, and when the gas flow rate is changed from less than the specified flow rate to the specified flow rate or more, the time or date or day of the week is acquired from the clock unit, and the acquired time or And a control unit that shuts off the gas at the gas shut-off unit when the date or day of the week is included in the time zone or date zone or day-of-week zone of the shut-off date and time zone holding unit. After determining whether or not the gas is in use by changing the specified flow rate from the gas flow rate measurement unit, obtain the current date and time from the clock unit, and the time zone or date range in which the gas maintenance contractor can be dispatched Alternatively, the gas can be shut off during the day of the week.
[0013]
The invention according to claim 6 is a gas blocking unit that blocks gas, a blocking event generating unit that generates a reason for blocking gas, a gas flow rate measuring unit that measures a flow rate of gas, and the blocking event generating unit A control unit that acquires a gas flow rate from the gas flow rate measurement unit after the occurrence of a shut-off event at the gas flow rate, and shuts off the gas at the gas cutoff unit when the gas flow rate is less than a specified flow rate. As a result, after the shut-down event occurs, the gas flow measuring unit becomes less than the specified flow rate and the gas user determines that the gas has been used, and then the gas is shut off. It can be avoided that the gas suddenly becomes unusable during use.
[0014]
【Example】
Embodiments of the present invention will be described below with reference to the drawings.
[0015]
(First embodiment)
FIG. 1 is a functional block diagram of the gas shut-off device in the first embodiment of the present invention, and FIG. 2 is a flowchart showing the operation of the gas shut-off device in the first embodiment.
[0016]
In FIG. 1, reference numeral 11 denotes a gas shut-off device that measures the amount of gas used and monitors the gas use state, and shuts off the gas when an abnormality occurs, and is installed in each household that is a user of the gas. Reference numeral 1 denotes a shut-off event generating unit that generates a reason for shutting off a gas when there is a certain date or time allowance for a dangerous state in the use of the gas. There are a leak state in which gas leak is detected, a battery voltage drop state that gradually decreases, a state before the expiration date of the test as a gas safety shut-off device, and the like. Reference numeral 2 denotes a gas shut-off unit that shuts off the gas, and reference numeral 3 denotes a control unit that controls the operation of the gas shut-off device 11, and when the reason for shutting off the gas occurs in the shut-off event generating unit 1, the gas shut-off unit 2 to shut off the gas. Reference numeral 4 denotes a clock unit that measures the current date and time. For example, year / month / day / hour / minute / second and day of the week are held as the current date / time, and are sequentially updated in units of seconds. 5 is a cutoff setting date and time holding unit that outputs the cutoff time, cutoff date, or cutoff day of the week when the cutoff time occurrence unit 1 generates a cutoff event and inputs the time, date, or day of the week measured by the clock unit 4 It is. For example, when a value such as “19:48” is input as the time to the cutoff setting date and time holding unit 5, “10:00:00” is output as the cutoff time. When “December 31” is input as the date, “January 4th 9:00:00” is output as the cutoff date, and “May 2” is input as the cutoff date. "May 6th 9:00:00" after Golden Week is output. If “Saturday” is input as the day of the week, “Monday” is output as the cutoff day.
[0017]
Next, operation | movement and an effect | action of the control part 3 of the gas cutoff device 11 are demonstrated using the flowchart of FIG.
[0018]
In this flow chart, first, the operation of the interruption cause generation unit 1 is started when an interruption event is generated. An example will be described in which the time of the current date and time (time or date or day of the week) is used as an input value, and the cutoff time is output as the cutoff date and time (blocking time or date or day of the week).
[0019]
Step 101 is a process of acquiring from the clock unit 4 the current time that is the basis of the cutoff time of the cutoff setting date and time holding unit 5, and proceeds to Step 102 after acquiring the time. For example, “19:48:39” is acquired as the time.
[0020]
Step 102 is a process for acquiring the blocking time. Based on the time acquired in Step 101, the blocking time “10: 0: 0” for the next blocking is acquired from the blocking setting date and time holding unit 5, and the process proceeds to Step 103.
[0021]
Step 103 is a process of acquiring the current time from the clock unit 4 for comparison with the cutoff time of the cutoff setting date and time holding unit 5, and proceeds to step 104 after acquiring the time.
[0022]
Step 104 is a process for determining whether or not the current time matches the cut-off time “10: 0: 0” acquired in Step 102. If they do not match, the process returns to Step 103. If they match, the process proceeds to Step 105. .
[0023]
Step 105 is a shut-off process in which a shut-off command is output to the gas shut-off unit 2, the gas shut-off unit 2 shuts off the gas, and all the processes are completed.
[0024]
(Second embodiment)
FIG. 3 is a functional block diagram of the gas cutoff device in the second embodiment of the present invention, and FIG. 4 is a flowchart showing the operation of the gas cutoff device in the second embodiment.
[0025]
In FIG. 3, reference numeral 11 denotes a gas shut-off device that measures the amount of gas used and monitors the gas use state, and shuts off the gas when there is an abnormality, and is installed in each household that is a user of the gas. Reference numeral 1 denotes a shut-off event generating unit that generates a reason for shutting off a gas when there is a certain date or time allowance for a dangerous state in the use of the gas. There are a leak state in which gas leak is detected, a battery voltage drop state that gradually decreases, a state before the expiration date of the test as a gas safety shut-off device, and the like. Reference numeral 2 denotes a gas shut-off unit that shuts off the gas, and reference numeral 3 denotes a control unit that controls the operation of the gas shut-off device 11, and when the reason for shutting off the gas occurs in the shut-off event generating unit 1, the gas shut-off unit 2 to shut off the gas. Reference numeral 4 denotes a clock unit that measures the current date and time. For example, year / month / day / hour / minute / second and day of the week are held as the current date / time, and are sequentially updated in units of seconds. 5 is a cutoff setting date and time holding unit that outputs the cutoff time, cutoff date, or cutoff day of the week when the cutoff time occurrence unit 1 generates a cutoff event and inputs the time, date, or day of the week measured by the clock unit 4 It is. For example, when a value such as “19:48” is input as the time to the cutoff setting date and time holding unit 5, “10:00:00” is output as the cutoff time. When “December 31” is input as the date, “January 4th 9:00:00” is output as the cutoff date, and “May 2” is input as the cutoff date. "May 6th 9:00:00" after Golden Week is output. If “Saturday” is input as the day of the week, “Monday” is output as the cutoff day. 6 is a shut-off date / time zone holding unit that holds a time zone, a date zone, or a day of the week, which is a time range in which the cutoff is permitted. For example, as a time zone, the gas user does not use the gas very frequently, "9 am to 6 pm", which is currently in operation by a maintenance company in Japan, and date ranges other than "December 29-January 3" during the year-end and New Year holidays and "August 14-16" in Bon As a day of the week, there are “Monday to Saturday” where a gas maintenance company is operating.
[0026]
Next, operation | movement and an effect | action of the control part 3 of the gas cutoff device 11 are demonstrated using the flowchart of FIG.
[0027]
In this flow chart, first, the operation of the interruption cause generation unit 1 is started when an interruption event is generated. An example will be described in which the time of the current date and time (time or date or day of the week) is used as an input value, and the cutoff time is output as the cutoff date and time (blocking time or date or day of the week).
[0028]
Step 201 is a process of acquiring the current time from the clock unit 4 in order to perform a comparison process with the cutoff time zone of the cutoff date / time zone holding unit 6, and proceeds to Step 202 after acquiring the time. For example, “19:48:39” is acquired as the time.
[0029]
Step 202 is a process for determining whether or not the time acquired in Step 201 is included in the time zone “9:00 to 18:00” held in the block date / time zone holding unit 6. If not included, the process proceeds to step 203.
[0030]
Step 203 is a process for acquiring a blocking time. Based on the time acquired in Step 201, the blocking time for the next blocking is acquired from the blocking setting date and time holding unit 5, and the process proceeds to Step 204.
[0031]
Step 204 is a process of acquiring the current time from the clock unit 4 for comparison with the cutoff time of the cutoff setting date and time holding unit 5, and proceeds to step 205 after acquiring the time.
[0032]
Step 205 is a process for determining whether or not the current time matches the shut-off time acquired in step 203. If they do not match, the process returns to step 204. If they match, the process proceeds to step 206.
[0033]
Step 206 is a shut-off process in which a shut-off command is output to the gas shut-off unit 2, the gas shut-off unit 2 shuts off the gas, and all the processes are completed.
[0034]
As shown in the first and second embodiments, it is determined whether the current time of the clock unit 4 matches the shut-off time of the shut-off setting date and time holding unit 5 (step 104 in the first embodiment, second embodiment). In step 205), in addition to the method of holding the cutoff time and comparing it with the time of the clock unit 4 as needed, the difference time from the current time to the cutoff time is held and counted by a timer. There are methods such as judging by progress.
[0035]
(Third embodiment)
FIG. 5 is a functional block diagram of the gas cutoff device in the third embodiment of the present invention, and FIG. 6 is a flowchart showing the operation of the gas cutoff device in the third embodiment.
[0036]
In FIG. 5, reference numeral 11 denotes a gas shut-off device that measures the amount of gas used and monitors the state of use of the gas, and shuts off the gas in the event of an abnormality. Reference numeral 1 denotes a shut-off event generating unit that generates a reason for shutting off a gas when there is a certain date or time allowance for a dangerous state in the use of the gas. There are a leak state in which gas leak is detected, a battery voltage drop state that gradually decreases, a state before the expiration date of the test as a gas safety shut-off device, and the like. Reference numeral 2 denotes a gas shut-off unit that shuts off the gas, and reference numeral 3 denotes a control unit that controls the operation of the gas shut-off device 11, and when the reason for shutting off the gas occurs in the shut-off event generating unit 1, the gas shut-off unit 2 to shut off the gas. Reference numeral 4 denotes a clock unit that measures the current date and time. For example, year / month / day / hour / minute / second and day of the week are held as the current date / time, and are sequentially updated in units of seconds. 7 is an opening / closing time / date holding unit for holding a time zone, a date zone, or a day of the week, which is a time range for permitting opening after shutting off. For example, a gas user frequently uses gas as a time zone. There is a possibility that the gas maintenance company is not in operation, “18 o'clock to 9 o'clock”, as the date and time of the year-end and New Year “December 29-January 3” and the Bon “August 14- On the date of “16th”, the day of the week includes “Sunday” when the gas maintenance company is not in operation. Reference numeral 8 denotes an opening acceptance unit that accepts a request for opening of the shut off gas blocking unit 2. Reference numeral 9 denotes an opening permission state holding unit that holds an opening permission state in which the opening of the blocked gas blocking unit 2 is permitted or an unpermitted state in which opening is not permitted.
[0037]
Next, operation | movement and an effect | action of the control part 3 of the gas cutoff device 11 are demonstrated using the flowchart of FIG.
[0038]
In this flow chart, first, the operation of the interruption cause generation unit 1 is started when an interruption event is generated. An example will be described in which the time of the current date and time (time or date or day of the week) is used as an input value, and the cutoff time is output as the cutoff date and time (blocking time or date or day of the week).
Step 301 is a process of acquiring the current time from the clock unit 4 in order to perform a comparison process with the time zone of the opening / closing permitted time zone holding unit 7, and after the time is acquired, the process proceeds to Step 302.
[0039]
Step 302 is a process of determining whether or not the time acquired in step 301 is included in the time zone held in the opening permission time zone holding unit 7. If included, the process proceeds to step 303 and is not included. If so, go to Step 304.
[0040]
Step 303 is a setting process for causing the opening permission state holding unit 9 to hold the opening permission state, and the process proceeds to step 305.
[0041]
Step 304 is a setting process for causing the unplugging permission state holding unit 9 to hold the unplugging permission state, and the process proceeds to Step 305.
[0042]
Step 305 is a shut-off process. After the gas is shut off by the gas shut-off unit 2, the process proceeds to Step 306.
[0043]
Step 306 is a process of waiting for a request for opening of the plug from the opening receiving part 8, and the process proceeds to step 307 when the request is received.
[0044]
Step 307 is a process for determining whether or not the state held in the opening permission state holding unit 9 is an opening permission state. If the opening is permitted, the opening is accepted and the process proceeds to Step 308. If the plug is not permitted, the process returns to step 306 without accepting the opening.
[0045]
Step 308 is a gas cutoff release process, accepts opening, releases the gas cutoff state of the gas cutoff unit 2, and ends all the processes.
[0046]
(Fourth embodiment)
A functional block diagram of the gas cutoff device in the fourth embodiment of the present invention will be described with reference to FIG. 5 shown in the third embodiment. FIG. 7 is a flowchart showing the operation of the gas cutoff device in the fourth embodiment of the present invention.
[0047]
Figure 5 , 11 is a gas shut-off device that measures the amount of gas used and monitors the state of gas use, and shuts off the gas in the event of an abnormality, and is installed in each household that is a user of the gas. Reference numeral 1 denotes a shut-off event generating unit that generates a reason for shutting off a gas when there is a certain date or time allowance for a dangerous state in the use of the gas. There are a leak state in which gas leak is detected, a battery voltage drop state that gradually decreases, a state before the expiration date of the test as a gas safety shut-off device, and the like. Reference numeral 2 denotes a gas shut-off unit that shuts off the gas, and reference numeral 3 denotes a control unit that controls the operation of the gas shut-off device 11, and when the reason for shutting off the gas occurs in the shut-off event generating unit 1, the gas shut-off unit 2 to shut off the gas. Reference numeral 4 denotes a clock unit that measures the current date and time. For example, year / month / day / hour / minute / second and day of the week are held as the current date / time, and are sequentially updated in units of seconds. 7 is an opening / closing time / date holding unit for holding a time zone, a date zone, or a day of the week, which is a time range for permitting opening after shutting off. For example, a gas user frequently uses gas as a time zone. There is a possibility that the gas maintenance company is not in operation, “18 o'clock to 9 o'clock”, as the date and time of the year-end and New Year “December 29-January 3” and the Bon “August 14- On the date of “16th”, the day of the week includes “Sunday” when the gas maintenance company is not in operation. Reference numeral 8 denotes an opening acceptance unit that accepts a request for opening of the shut off gas blocking unit 2. Reference numeral 9 denotes an opening permission state holding unit that holds an opening permission state in which the opening of the blocked gas blocking unit 2 is permitted or an unpermitted state in which opening is not permitted. Reference numeral 10 denotes a gas flow rate measuring unit that detects a gas flow rate, and detects a passing gas amount per unit time or a passing time per unit volume as a gas passing flow rate.
[0048]
Next, operation | movement and an effect | action of the control part 3 of the gas cutoff device 11 are demonstrated using the flowchart of FIG.
[0049]
In this flow chart, first, the operation of the interruption cause generation unit 1 is started when an interruption event is generated.
[0050]
In step 401, the gas flow rate measuring unit 10 measures the gas flow rate. If the flow rate is less than the prescribed flow rate, the process proceeds to step 402, and if not, the process returns to step 401.
[0051]
In step 402, the gas flow rate measurement unit 10 measures the gas flow rate. If the gas flow rate is measured above the specified flow rate, the process proceeds to step 403.
[0052]
Step 403 is a process of acquiring the current time from the clock unit 4 in order to perform a comparison process with the time zone of the opening permission time zone holding unit 7, and after the time is acquired, the process proceeds to step 404.
[0053]
Step 404 is a process for determining whether or not the time acquired in Step 403 is included in the time zone held in the opening permission time zone holding unit 7. If included, the process proceeds to Step 405 and is not included. If so, go to Step 406.
[0054]
Step 405 is a setting process for causing the opening permission state holding unit 9 to hold the opening permission state, and the process proceeds to step 407.
[0055]
Step 406 is a setting process for causing the unplugging permission state holding unit 9 to hold the unplugging permission state, and the process proceeds to Step 407.
[0056]
Step 407 is a shut-off process. After the gas is shut off by the gas shut-off unit 2, the process proceeds to step 408.
[0057]
Step 408 is a process of waiting for an opening request from the opening acceptance unit 8. When a request is accepted, the process proceeds to step 409.
[0058]
Step 409 is a process for determining whether or not the state held in the unplugging permission state holding unit 9 is the unplugging permission state. If the plug is not permitted, the plug is not accepted and the process returns to step 408.
[0059]
Step 410 is a gas cutoff release process, accepts opening, releases the gas cutoff state of the gas cutoff unit 2, and ends all the processes.
[0060]
(5th Example)
FIG. 8 is a functional block diagram of the gas cutoff device in the fifth embodiment of the present invention, and FIG. 9 is a flowchart showing the operation of the gas cutoff device in the fifth embodiment.
[0061]
In FIG. 8, reference numeral 11 denotes a gas shut-off device that measures the amount of gas used and monitors the state of use of the gas, and shuts off the gas in the event of an abnormality, and is installed in each household that is a user of the gas. Reference numeral 1 denotes a shut-off event generating unit that generates a reason for shutting off a gas when there is a certain date or time allowance for a dangerous state in the use of the gas. There are a leak state in which gas leak is detected, a battery voltage drop state that gradually decreases, a state before the expiration date of the test as a gas safety shut-off device, and the like. Reference numeral 2 denotes a gas shut-off unit that shuts off the gas, and reference numeral 3 denotes a control unit that controls the operation of the gas shut-off device 11, and when the reason for shutting off the gas occurs in the shut-off event generating unit 1, the gas shut-off unit 2 to shut off the gas. Reference numeral 4 denotes a clock unit that measures the current date and time. For example, year / month / day / hour / minute / second and day of the week are held as the current date / time, and are sequentially updated in units of seconds. 6 holds a time zone, a date zone, or a day of the week that is a range of time for which the shut-off is permitted. For example, the gas user does not use the gas very frequently as the time zone, and the operation of the gas maintenance company The date range is “9:00 to 18:00” and the date range is “December 29 to January 3” during the year-end and New Year holidays and “August 14 to 16” in the Bon Festival. There are "Monday to Saturday" where gas maintenance companies are in operation. Reference numeral 10 denotes a gas flow rate measuring unit that detects a gas flow rate, and detects a passage time per unit time as a gas passage flow rate.
[0062]
Next, operation | movement and an effect | action of the control part 3 of the gas cutoff device 11 are demonstrated using the flowchart of FIG.
[0063]
In this flow chart, first, the operation of the interruption cause generation unit 1 is started when an interruption event is generated. An example will be described in which the time of the current date and time (time or date or day of the week) is used as an input value, and the cutoff time is output as the cutoff date and time (blocking time or date or day of the week).
[0064]
In step 501, the gas flow rate measurement unit 10 measures the gas flow rate, and if less than the prescribed flow rate is measured, the process proceeds to step 502, and if not, the process returns to step 501.
[0065]
In step 502, the gas flow rate measurement unit 10 measures the gas flow rate, and when the flow rate exceeds the specified flow rate, the process proceeds to step 503, and if not, the process returns to step 502.
[0066]
Step 503 is a process of acquiring the current time from the clock unit 4 in order to perform a comparison process with the time zone of the shut-off date / time zone holding unit 6, and proceeds to Step 504 after acquiring the time.
[0067]
Step 504 is a process of determining whether or not the time acquired in step 503 is included in the time zone “9:00 to 18:00” held in the cutoff date and time zone holding unit 6. If included, the process proceeds to step 505. If not included, the process returns to step 501.
[0068]
Step 505 is a shut-off process in which a shut-off command is output to the gas shut-off unit 2, the gas shut-off unit 2 shuts off the gas, and all the processes are completed.
[0069]
(Sixth embodiment)
FIG. 10 is a functional block diagram of the gas cutoff device in the sixth embodiment of the present invention, and FIG. 11 is a flowchart showing the operation of the gas cutoff device in the sixth embodiment.
[0070]
In FIG. 10, reference numeral 11 denotes a gas shut-off device that measures the amount of gas used and monitors the gas use state, and shuts off the gas in the event of an abnormality, and is installed in each household that is a user of the gas. Reference numeral 1 denotes a shut-off event generating unit that generates a reason for shutting off a gas when there is a certain date or time allowance for a dangerous state in the use of the gas. There are a leak state in which gas leak is detected, a battery voltage drop state that gradually decreases, a state before the expiration date of the test as a gas safety shut-off device, and the like. Reference numeral 2 denotes a gas shut-off unit that shuts off the gas, and reference numeral 3 denotes a control unit that controls the operation of the gas shut-off device 11, and when the reason for shutting off the gas occurs in the shut-off event generating unit 1, the gas shut-off unit 2 to shut off the gas. Reference numeral 10 denotes a gas flow rate measuring unit that detects a gas flow rate, and detects a passing gas amount per unit time or a passing time per unit volume as a gas passing flow rate.
[0071]
Next, operation | movement and an effect | action of the control part 3 of the gas cutoff device 11 are demonstrated using the flowchart of FIG.
[0072]
In this flow chart, first, the operation of the interruption cause generation unit 1 is started when an interruption event is generated.
[0073]
In step 601, the gas flow rate measuring unit 10 measures the flow rate of the gas. If less than the prescribed flow rate is measured, the process proceeds to step 602. Otherwise, the process returns to step 601.
[0074]
Step 602 is a shut-off process in which a shut-off command is output to the gas shut-off unit 2, the gas shut-off unit 2 shuts off the gas, and all the processes are completed.
[0075]
【The invention's effect】
As described above, according to the first to sixth aspects of the present invention, the gas maintenance company shuts off the gas by removing the time, date, or day of the week that cannot be processed, or temporarily cancels the shut-off state even if the gas is shut off. It is possible to prevent the gas users from using the gas frequently during the time when the gas is used frequently, on holidays, or on days of the week, thus improving the convenience of both the gas maintenance company and the gas user. can do.
[Brief description of the drawings]
FIG. 1 is a functional block diagram of a gas cutoff device according to a first embodiment of the present invention.
FIG. 2 is a flowchart of the control unit of the gas cutoff device in the first embodiment of the present invention.
FIG. 3 is a functional block diagram of a gas cutoff device in a second embodiment of the present invention.
FIG. 4 is a flowchart of a control unit of a gas cutoff device according to a second embodiment of the present invention.
FIG. 5 is a functional block diagram of a gas cutoff device in a third embodiment and a fourth embodiment of the present invention.
FIG. 6 is a flowchart of a control unit of a gas cutoff device in a third embodiment of the present invention.
FIG. 7 is a flow diagram of a control unit of a gas cutoff device in a fourth embodiment of the present invention.
FIG. 8 is a functional block diagram of a gas cutoff device in a fifth embodiment of the present invention.
FIG. 9 is a flowchart of a control unit of a gas cutoff device in a fifth embodiment of the present invention.
FIG. 10 is a functional block diagram of a gas cutoff device according to a sixth embodiment of the present invention.
FIG. 11 is a flowchart of a control unit of a gas cutoff device in a sixth embodiment of the present invention.
[Explanation of symbols]
1 Blocking event occurrence part
2 Gas barrier
3 Control unit
4 Clock part
5 Blocking setting date and time holding section
6 Blocking date and time zone holding part
7 Opening permit date and time holding section
8 Opening reception desk
9 Opening permission holding part
10 Gas flow measurement unit
11 Gas shut-off device

Claims (6)

ガスを遮断するガス遮断部と、ガスの遮断を行う事由を発生する遮断事由発生部と、時間または日付または曜日を計測する時計部と、前記時計部の時間または日付または曜日を入力して遮断を行う遮断時間または遮断日付または遮断曜日を出力する遮断設定日時保持部と、前記遮断事由発生部で遮断を行う事由が発生したときに時計部から時間または日付または曜日を取得し、取得した時間または日付または曜日を、遮断設定日時保持部に入力して遮断時間または遮断日付または遮断曜日を取得し、時計部の時間または日付または曜日が、遮断設定日時保持部の遮断時間または遮断日付または遮断曜日に一致したときに前記ガス遮断部でガスを遮断させる制御部とを備えたことを特徴とするガス遮断装置。A gas shut-off unit that shuts off the gas, a shut-off event generating unit that generates a reason for shutting off the gas, a clock unit that measures time, date, or day of the week, and a time, date, or day of the clock part that is input and shut off The cutoff time / date holding unit that outputs the cutoff time or cutoff date or cutoff day for performing the shutdown, and the time / date / day of the week obtained from the clock unit when the shutdown event occurs in the cutoff event occurrence unit. Alternatively, enter the date or day of the week in the block setting date and time holding section to obtain the block time or block date or block day, and the clock time or date or day of the week will be the block time or block date or block of the block setting date and time holding section. A gas shut-off device, comprising: a control unit that shuts off the gas at the gas shut-off unit when the day of the week is reached. ガスを遮断するガス遮断部と、ガスの遮断を行う事由を発生する遮断事由発生部と、時間または日付または曜日を計測する時計部と、遮断を許可する時間または日付または曜日それぞれの範囲である時間帯または日付帯または曜日帯をそれぞれ保持する遮断日時帯保持部と、前記時計部の時間または日付または曜日を入力して遮断を行う遮断時間または遮断日付または遮断曜日を出力する遮断設定日時保持部と、前記遮断事由発生部で遮断を行う事由が発生したときに時計部から時間または日付または曜日を取得し、取得した時間または日付または曜日が、遮断日時帯保持部の時間帯または日付帯または曜日帯に含まれるときには、即時にガス遮断部でガスを遮断させ、前記時間または日付または曜日が、遮断日時帯保持部の時間帯または日付帯または曜日帯に含まれないときには、時計部から時間または日付または曜日を取得し、取得した時間または日付または曜日を、遮断設定日時保持部に入力して遮断時間または遮断日付または遮断曜日を取得し、時計部の時間または日付または曜日が、遮断設定日時保持部の遮断時間または遮断日付または遮断曜日に一致したときに前記ガス遮断部でガスを遮断させる制御部とを備えたことを特徴とするガス遮断装置。The range of the gas shut-off unit that shuts off the gas, the shut-off event occurrence unit that generates the reason for shutting off the gas, the clock unit that measures the time, date, or day of the week, and the time, date, or day of the week that is allowed to shut off. Blocking date and time zone holding unit that holds the time zone, date zone, and day of the week, respectively, and the cutoff time or date that shuts off by inputting the time, date, or day of the clock, and the cutoff setting date and time that outputs the cutoff date or day of the week And the time or date or day of the week is acquired from the clock unit when an event for blocking occurs in the blocking event generating unit, and the acquired time or date or day of the week is the time zone or date band of the blocking date / time holding unit. Alternatively, when included in the day of the week, the gas cutoff unit immediately shuts off the gas, and the time or date or day of the week is the time zone or day of the cutoff date / time holding unit. When it is not included in the time zone or day of the week, the time or date or day of the week is obtained from the clock part, and the obtained time or date or day of the week is entered in the cutoff setting date and time holding part to obtain the cutoff time or cutoff date or cutoff day of the week. And a control unit that shuts off the gas at the gas shut-off unit when the time or date or day of the clock unit coincides with the shut-off time or shut-off date or shut-off day of the shut-off setting date and time holding unit. Gas shut-off device. ガスを遮断するガス遮断部と、ガスの遮断を行う事由を発生する遮断事由発生部と、時間または日付または曜日を計測する時計部と、遮断後に開栓を許可する時間または日付または曜日それぞれの範囲である時間帯または日付帯または曜日帯をそれぞれ保持する開栓許可日時帯保持部と、開栓を許可する開栓許可状態または開栓を許可しない開栓不許可状態を保持する開栓許可状態保持部と、遮断後に開栓を受け付ける開栓受付部と、前記遮断事由発生部で遮断を行う事由が発生したときに時計部から時間または日付または曜日を取得し、取得した時間または日付または曜日が、前記開栓許可日時帯保持部の時間帯または日付帯または曜日帯に含まれるときには、開栓許可状態保持部に前記開栓許可状態を保持させて前記ガス遮断部でガスを遮断させ、時計部の時間または日付または曜日が、前記開栓許可日時帯保持部の時間帯または日付帯または曜日帯に含まれないときには、開栓許可状態保持部に前記開栓不許可状態を保持させて前記ガス遮断部でガスを遮断させ、遮断後に開栓受付部で前記開栓を受け付けたときに開栓許可状態保持部が開栓許可状態を保持している場合にはガス遮断部の遮断を解除させ、開栓許可状態保持部が開栓不許可状態を保持している場合にはガス遮断部の遮断を解除させない制御部とを備えたことを特徴とするガス遮断装置。A gas shut-off unit that shuts off gas, a shut-off event generating unit that generates a reason for shutting off gas, a clock unit that measures time, date, or day of week, and a time, date, or day of week that permits opening after shut-off Opening permission date and time zone holding part that holds the time zone or date range or day of the week that is the range, and the opening permission that holds the opening permission state that permits opening or the unpermitted state that does not allow opening. The time holding unit, the opening receiving unit that receives the plug after being shut off, and the time or date or day of the week when the reason for shutting off occurs in the blocking event generating unit, When the day of the week is included in the time zone or date zone or day of the week of the opening permission time / date holding unit, the opening permission state holding unit holds the opening permission state, and the gas blocking unit supplies gas. When the time or date or day of the clock part is not included in the time zone or date or day of the opening permission date / time holding part, the opening permission state holding part is set to the unopening permission state. The gas shut-off unit is configured to shut off the gas at the gas shut-off unit, and when the cap-opening-permitted state holding unit holds the plug-opening-permitted state when the plug-opening accepting unit is received after the shut-off. And a control unit that does not release the block of the gas blocking unit when the plug opening permission state holding unit holds the plug opening non-permitted state. ガスの流量を計測するガス流量計測部を持ち、制御部が、時計部から時間または日付または曜日を取得するのは、遮断事由発生部で遮断を行う事由が発生した後、ガス流量計測部からガス流量を取得し、前記ガス流量が規定流量未満から規定流量以上に変化したときである請求項3記載のガス遮断装置。It has a gas flow measurement unit that measures the gas flow rate, and the control unit acquires the time, date, or day of the week from the clock unit from the gas flow measurement unit after the occurrence of the shutdown event occurs. The gas shut-off device according to claim 3, wherein a gas flow rate is acquired and the gas flow rate is changed from less than a specified flow rate to more than a specified flow rate. ガスを遮断するガス遮断部と、ガスの遮断を行う事由を発生する遮断事由発生部と、ガスの流量を計測するガス流量計測部と、時間または日付または曜日を計測する時計部と、遮断を許可する時間または日付または曜日それぞれの範囲である時間帯または日付帯または曜日帯をそれぞれ保持する遮断日時帯保持部と、前記遮断事由発生部で遮断を行う事由が発生した後、前記ガス流量計測部からガス流量を取得し、前記ガス流量が規定流量未満から規定流量以上に変化したときに、時計部から時間または日付または曜日を取得し、取得した時間または日付または曜日が、遮断日時帯保持部の時間帯または日付帯または曜日帯に含まれるときに前記ガス遮断部でガスを遮断させる制御部とを備えたことを特徴とするガス遮断装置。The gas shut-off unit that shuts off the gas, the shut-off event generating unit that generates the reason for shutting off the gas, the gas flow rate measuring unit that measures the gas flow rate, the clock unit that measures the time, date or day of the week, and the shut-off The gas flow rate measurement after the occurrence of the shut-off event occurrence unit and the shut-off date / time zone holding unit for holding the time zone, the date zone, or the day of the week, which is the range of the permitted time, date, or day of the week, respectively. When the gas flow rate changes from less than the specified flow rate to more than the specified flow rate, the time, date, or day of the week is acquired from the clock unit, and the acquired time, date, or day of the week holds the shut-off date and time zone. And a control unit that shuts off the gas at the gas shut-off unit when included in a time zone, a date zone, or a day of the week. ガスを遮断するガス遮断部と、ガスの遮断を行う事由を発生する遮断事由発生部と、ガスの流量を計測するガス流量計測部と、前記遮断事由発生部で遮断を行う事由が発生した後、前記ガス流量計測部からガス流量を取得し、前記ガス流量が規定流量未満になったときに、前記ガス遮断部でガスを遮断させる制御部とを備えたことを特徴とするガス遮断装置。After the occurrence of a gas shut-off part that shuts off the gas, a shut-off reason generating part that generates the reason for shutting off the gas, a gas flow rate measuring part that measures the flow rate of the gas, and a shut-off reason generating part A gas shut-off device comprising: a control unit that obtains a gas flow rate from the gas flow rate measuring unit and shuts off the gas at the gas shut-off unit when the gas flow rate becomes less than a specified flow rate.
JP2001163220A 2001-05-30 2001-05-30 Gas shut-off device Expired - Fee Related JP4610124B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001163220A JP4610124B2 (en) 2001-05-30 2001-05-30 Gas shut-off device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001163220A JP4610124B2 (en) 2001-05-30 2001-05-30 Gas shut-off device

Publications (2)

Publication Number Publication Date
JP2002357468A JP2002357468A (en) 2002-12-13
JP4610124B2 true JP4610124B2 (en) 2011-01-12

Family

ID=19006234

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001163220A Expired - Fee Related JP4610124B2 (en) 2001-05-30 2001-05-30 Gas shut-off device

Country Status (1)

Country Link
JP (1) JP4610124B2 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63168178A (en) * 1986-12-29 1988-07-12 松下電器産業株式会社 Gas blocking apparatus
JPH08189852A (en) * 1995-01-10 1996-07-23 Tokyo Gas Co Ltd Gas meter
JPH10103546A (en) * 1996-09-30 1998-04-21 Matsushita Electric Ind Co Ltd Gas-blast circuit breaking device
JP2000146168A (en) * 1998-11-05 2000-05-26 Matsushita Electric Ind Co Ltd Gas metering shut-off device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63168178A (en) * 1986-12-29 1988-07-12 松下電器産業株式会社 Gas blocking apparatus
JPH08189852A (en) * 1995-01-10 1996-07-23 Tokyo Gas Co Ltd Gas meter
JPH10103546A (en) * 1996-09-30 1998-04-21 Matsushita Electric Ind Co Ltd Gas-blast circuit breaking device
JP2000146168A (en) * 1998-11-05 2000-05-26 Matsushita Electric Ind Co Ltd Gas metering shut-off device

Also Published As

Publication number Publication date
JP2002357468A (en) 2002-12-13

Similar Documents

Publication Publication Date Title
JP4610124B2 (en) Gas shut-off device
JP2007240072A (en) Gas cutoff system
JP3334373B2 (en) Gas shut-off device
JP3986104B2 (en) Gas shut-off device
CN103901872A (en) Safety instrument system and method for permitting PST
JP2004279096A (en) Gas meter
JPH11190447A (en) Gas shutoff device
JP2004271223A (en) Gas meter
JP3542219B2 (en) Gas shut-off device
JP2001033289A (en) Gas cutoff device and gas cutoff method
JP4568970B2 (en) Gas security device
JP2007101466A (en) Prepaid gas meter
JP3531042B2 (en) Gas shut-off device
JPH0674806A (en) Gas stopper device
JP3032356B2 (en) Gas shut-off device with calendar learning function
JP2000347703A (en) Gas safety device
JP2010266231A (en) Gas meter
JP4697237B2 (en) Gas shut-off device
JP2023013378A (en) Gas shut-off device
JP4099881B2 (en) Gas shut-off device
JP2000146168A (en) Gas metering shut-off device
JP3075036B2 (en) Gas shut-off device
JP4697236B2 (en) Gas shut-off device
JPH06139474A (en) Gas supply equipment abnormality detecting device
JPS60208675A (en) Fluid cutting-off apparatus equipped with closing function when applied with vibration or rolling

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20070510

RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20091126

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20091126

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20100712

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20100720

RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20100913

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20100914

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20101005

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20101012

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131022

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees