JP2023013378A - Gas shut-off device - Google Patents

Gas shut-off device Download PDF

Info

Publication number
JP2023013378A
JP2023013378A JP2021117519A JP2021117519A JP2023013378A JP 2023013378 A JP2023013378 A JP 2023013378A JP 2021117519 A JP2021117519 A JP 2021117519A JP 2021117519 A JP2021117519 A JP 2021117519A JP 2023013378 A JP2023013378 A JP 2023013378A
Authority
JP
Japan
Prior art keywords
closing
opening
flow rate
unit
gas
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2021117519A
Other languages
Japanese (ja)
Inventor
光男 横畑
Mitsuo Yokohata
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Panasonic Intellectual Property Management Co Ltd
Original Assignee
Panasonic Intellectual Property Management Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Panasonic Intellectual Property Management Co Ltd filed Critical Panasonic Intellectual Property Management Co Ltd
Priority to JP2021117519A priority Critical patent/JP2023013378A/en
Publication of JP2023013378A publication Critical patent/JP2023013378A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Measuring Volume Flow (AREA)
  • Feeding And Controlling Fuel (AREA)

Abstract

To provide a gas shut-off device that can secure safety while securing convenience by closing a valve at the time of non-use.SOLUTION: A gas shut-off device includes: an opening-closing part 4 for opening and closing a gas flow channel 3; an operation part 6 for performing an operation to instruct opening the opening-closing part 4; a closing period setting part 7 for setting a closing period T of the opening-closing part 4; and a control unit 8 for performing opening-closing control of the opening-closing part 4. The control unit 8 operates so as to open the opening-closing part 4 by operating the operation part 6 and closing the opening-closing part 4 at start time Ts of the closing period T.SELECTED DRAWING: Figure 1

Description

本開示は、ガスを遮断することで安全性を確保するガス遮断装置に関する。 The present disclosure relates to a gas shutoff device that ensures safety by shutting off gas.

特許文献1は、瞬時流量が計測可能な超音波式の流量計測方法を用い、ガス器具の使用開始時の流量を検知してガス遮断弁を開栓し、ガス器具停止時にガス流量が0となった場合にガス遮断弁を開栓することで、ガス器具の使用時以外はガスを遮断することで安全性を確保したガス遮断装置を開示する。 Patent document 1 uses an ultrasonic flow rate measuring method capable of measuring an instantaneous flow rate, detects the flow rate at the start of use of a gas appliance, opens a gas cutoff valve, and when the gas appliance is stopped, the gas flow rate becomes 0. Disclosed is a gas shutoff device that ensures safety by shutting off gas except when a gas appliance is in use by opening a gas shutoff valve when a gas shutoff valve is used.

特許文献2は、ガスを遮断する時間を設定し、この設定時間以外はガスを使用できないようにすることで、安全性を確保したガス遮断装置を開示する。 Patent Literature 2 discloses a gas shutoff device that ensures safety by setting a time for shutting off the gas and disabling the use of the gas outside the set time.

特開2012-251880号公報JP 2012-251880 A 特開平3-69879号公報JP-A-3-69879

本開示は、利便性を確保しつつ、ガス漏れ等に対する安全性を確保可能なガス遮断装置を提供する。 The present disclosure provides a gas cutoff device capable of ensuring safety against gas leakage and the like while ensuring convenience.

本開示のガス遮断装置は、ガスの流路を開閉する開閉部と、前記開閉部の開栓を指示する操作部と、前記開閉部の閉栓期間を設定する閉栓期間設定部と、前記開閉部の開閉制御を行う制御部と、を備え、前記制御部は、前記操作部の操作により前記開閉部を開栓し、前記閉栓期間の開始時刻に前記開閉部を閉栓することを特徴とする。 The gas cutoff device of the present disclosure includes an opening/closing portion for opening and closing a gas flow path, an operation portion for instructing opening of the opening/closing portion, a closed period setting portion for setting a closing period of the opening/closing portion, and the opening/closing portion. and a control unit that controls the opening and closing of the valve, wherein the control unit opens the opening and closing portion by operating the operation portion, and closes the opening and closing portion at the start time of the closing period.

本開示のガス遮断装置は、ガスの使用時は、操作部の操作により開栓し、閉栓期間に設定された時間になると閉栓し、閉栓期間であっても開栓操作により使用ができるとともに使用後も自動で閉栓することで、利便性を確保しつつ、安全性を確保することが出来る。 The gas cutoff device of the present disclosure opens the gas by operating the operation unit when using the gas, closes it at the time set in the closing period, and can be used by opening the plug even during the closing period. By automatically closing the cap afterward, it is possible to ensure safety while ensuring convenience.

実施の形態1におけるガス遮断装置の構成図Configuration diagram of the gas cutoff device according to Embodiment 1 実施の形態1における制御部の動作を説明するタイミングチャート4 is a timing chart for explaining the operation of the control unit according to the first embodiment; 実施の形態2におけるガス遮断装置の構成図Configuration diagram of a gas cutoff device according to Embodiment 2 実施の形態2における制御部の動作を説明するタイミングチャートTiming chart for explaining the operation of the control unit in the second embodiment 実施の形態2における制御部の動作を説明するタイミングチャートTiming chart for explaining the operation of the control unit in the second embodiment

(本開示の基礎となった知見等)
都市ガスやLPガスなどのガス使用に際しては、ガス漏れ等の事故防止のため、ガス器具を使用しない際はガス栓を閉めることが推奨されている。
(Knowledge, etc. on which this disclosure is based)
When using gas such as city gas or LP gas, it is recommended to close the gas valve when the gas appliance is not in use in order to prevent accidents such as gas leakage.

しかしながら、ガス栓の閉め忘れ、あるいは、面倒である等の理由から開栓した状態で放置される場合があり、手動のガス栓では十分な安全性を確保することは困難である。 However, there are cases where the user forgets to turn off the gas valve or leaves the gas valve open because it is troublesome, and it is difficult to ensure sufficient safety with the manual gas valve.

このような不安全な状態を解消するために、特許文献に挙げた構成が提案されているが、特許文献1のようにガスの流量を検知する方法では、配管の影響を考慮する必要があったり、漏れとの違いを判別する必要はあるなどの課題もあり、実用化に至っていない。また、特許文献2の方法では、簡単な構成で安全性を確保することが出来るが、使用しない場合でも時間になったら開栓してしまう、或いは、遮断時間に設定された時間帯以外では使用できないといった利便性において課題があった。 In order to eliminate such an unsafe state, the configurations listed in the patent documents have been proposed. However, it has not yet been put to practical use because of the need to distinguish it from leaks. In addition, in the method of Patent Document 2, safety can be ensured with a simple configuration, but even if it is not used, it will be opened when the time comes, or it will be used outside the time zone set as the cutoff time. There was a problem in the convenience that it could not be done.

そこで、開栓時の安全性を確保する為には、使用者は手動で開栓することが最も好ましいこと、即ち、漏れ等が発生しても人が居れば気づくことができることから、開栓は人の存在を条件とすることを必須とし、閉栓を自動化して閉栓忘れをカバーできるようにすることで、安全性を確保しつつ、利便性を向上することができることを見出し、本開示の主題を構成するに至った。 Therefore, in order to ensure safety when opening the plug, it is most preferable for the user to manually open the plug. It is essential that the presence of a person is a condition, and by automating the closure to cover forgetting to close the closure, it is possible to improve convenience while ensuring safety. I have come up with a topic.

以下、図面を参照しながら実施の形態を詳細に説明する。但し、必要以上に詳細な説明は省略する場合がある。例えば、既によく知られた事項の詳細説明、または、実質的に同一の構成に対する重複説明を省略する場合がある。 Hereinafter, embodiments will be described in detail with reference to the drawings. However, more detailed description than necessary may be omitted. For example, detailed descriptions of well-known matters or redundant descriptions of substantially the same configurations may be omitted.

なお、添付図面および以下の説明は、当業者が本開示を十分に理解するために提供されるのであって、これらにより特許請求の範囲に記載の主題を限定することを意図していない。 It should be noted that the accompanying drawings and the following description are provided to allow those skilled in the art to fully understand the present disclosure and are not intended to limit the claimed subject matter thereby.

(実施の形態1)
以下、図1、図2を用いて、実施の形態1を説明する。
(Embodiment 1)
Embodiment 1 will be described below with reference to FIGS. 1 and 2. FIG.

[1-1.構成]
図1は、本開示の第1の実施の形態におけるガス遮断装置の構成を示すブロック図である。図に示す様に、ガス遮断装置1は、ガス供給用の上流側配管2に接続されるガス流路3と、ガス流路3を開閉する開閉部4と、開閉部4の開操作を行う為の操作部6と、開閉部4の閉栓期間を設定する閉栓期間設定部7と、及び、操作部6による操作状態、閉栓期間設定部7で設定された閉栓期間に基づき、開閉部4を制御する制御部8とで構成されている。また、ガス流路3の出口側は、ガス器具A(例えば、コンロ)10Aやガス器具B(例えば、給湯器)10Bにガスを供給する下流側配管9に接続されている。
[1-1. Constitution]
FIG. 1 is a block diagram showing the configuration of the gas cutoff device according to the first embodiment of the present disclosure. As shown in the figure, the gas cutoff device 1 includes a gas channel 3 connected to an upstream pipe 2 for gas supply, an opening/closing unit 4 for opening and closing the gas channel 3, and an opening operation of the opening/closing unit 4. , a closing period setting unit 7 for setting the closing period of the opening/closing part 4 , and the opening/closing part 4 based on the operating state of the operation part 6 and the closing period set by the closing period setting part 7 . It is composed of a control unit 8 for controlling. The outlet side of the gas flow path 3 is connected to a downstream pipe 9 that supplies gas to a gas appliance A (for example, a stove) 10A and a gas appliance B (for example, a water heater) 10B.

ここで、閉栓期間設定部7は、開閉部4の閉栓期間の開始時刻と終了時刻が設定されている。この開栓期間は、例えば、レストラン等の場合、定休日であれは、開始時刻、終了時刻共に設定されず終日が閉栓期間に設定され、営業日であれば、午前6時から午後12時というように営業時間に合わせて設定されるもので、曜日毎に設定されたり、毎日決まった期間の繰り返しに設定されるなど、使用者が任意に設定できるものである。 Here, in the closed period setting section 7, the start time and end time of the closed period of the opening/closing section 4 are set. For example, in the case of a restaurant or the like, if it is a regular holiday, neither the start time nor the end time is set, and the whole day is set as the closed period. The user can arbitrarily set the time, such as setting for each day of the week, setting for repetition of a fixed period every day, and the like.

[1-2.動作]
次に、図2を用いて、本実施の形態の動作を説明する。図2は、開閉部4の開閉状態と、閉栓期間設定部7による閉栓期間Tの開始時刻Tsと終了時刻Te、及び、操作部6による開操作(逆三角形で示す)のタイミングSとの関係を示している。
[1-2. motion]
Next, the operation of this embodiment will be described with reference to FIG. FIG. 2 shows the relationship between the opening/closing state of the opening/closing unit 4, the start time Ts and end time Te of the closing period T set by the closing period setting unit 7, and the timing S of the opening operation (indicated by an inverted triangle) by the operation unit 6. is shown.

図2(a)は、閉栓後に、操作部6による開操作が全く行われない場合で、開閉部4は、閉栓期間Tに関係なく閉栓状態が継続する。即ち、操作部6に開操作が行われない限り開栓することがない。 FIG. 2(a) shows a case where the operation part 6 is not operated to open after closing, and the opening/closing part 4 continues to be closed regardless of the closing period T. FIG. That is, the plug is not opened unless the operation portion 6 is operated to open.

図2(b)は、閉栓期間Tの開始時刻Tsより前に、操作部6に開操作が行われた場合
であり、タイミングSで操作部6の開操作が行われることで、開閉部4の閉栓が行われ、その後、閉栓期間Tの開始時刻Tsに閉栓される。
FIG. 2B shows a case where the opening operation is performed on the operation unit 6 before the start time Ts of the closed period T, and the opening operation of the operation unit 6 is performed at the timing S, After that, the plug is closed at the start time Ts of the plugging period T.

図2(c)、(d)、(e)は、何れも、閉栓期間Tの期間中に操作部6の開操作が行われた場合であり、これは、突発的なガスの使用を考慮した場合の動作を示している。このように閉栓期間T中にタイミングSで開栓操作が行われた場合は、開栓操作から所的時間t後が、閉栓期間T中であるかどうかで動作が異なる。 FIGS. 2(c), (d), and (e) all show cases in which the operation unit 6 is opened during the period of the closed period T, considering the sudden use of gas. It shows the operation when When the unplugging operation is performed at the timing S during the unplugging period T in this way, the operation differs depending on whether the unplugging period T is within the predetermined time t after the unplugging operation.

まず、図2(c)に示す様に、開栓操作から所的時間t後がまだ閉栓期間T中であれば、開閉部4を閉栓する。 First, as shown in FIG. 2(c), if a predetermined time t has passed since the unplugging operation and the plugging period T is still in progress, the opening/closing section 4 is closed.

また、図2(d)に示す様に、開栓操作から所的時間t後がまだ閉栓期間Tの終了時刻Teを過ぎていれば、開栓状態を継続する。 Further, as shown in FIG. 2(d), if the end time Te of the closed period T has passed after the predetermined time t from the unplugging operation, the unplugged state is continued.

更に、図2(e)に示す様に、開栓操作から所的時間t後が閉栓期間T中であっても、終了時刻Teまでの時間uが予め設定した時間以内であれば、閉栓せずに開栓状態を継続するようにすると、本来、開栓したい時刻に再度閉栓する手間を省くことが出来、利便性が向上する。 Furthermore, as shown in FIG. 2(e), even if the predetermined time t after the opening operation is during the closing period T, if the time u until the end time Te is within the preset time, the closing is not performed. If the unplugged state is continued without stopping, it is possible to save the trouble of closing the plug again at the originally desired time, thereby improving the convenience.

なお、所定時間tや時間uは、使用者の事情に応じて任意に設定することが出来る。 Note that the predetermined time t and the time u can be arbitrarily set according to the circumstances of the user.

[1-3.効果等]
以上の様に、本実施の形態において、ガス遮断装置1は、ガスの流路(ガス流路3)を開閉する開閉部4と、開閉部4の開栓を指示する操作部6と、開閉部4の閉栓期間Tを設定する閉栓期間設定部7と、開閉部4の開閉制御を行う制御部8と、を備え、制御部8は、操作部6の操作により開閉部4を開栓し、閉栓期間の開始時刻に開閉部4を閉栓することにより、開栓は、使用者が手動で開栓することで、開栓は人の存在を条件とし、閉栓を自動化することで閉栓忘れをカバーできるので、安全性を確保しつつ、利便性を向上することができる。
[1-3. effects, etc.]
As described above, in the present embodiment, the gas cutoff device 1 includes the opening/closing unit 4 for opening and closing the gas flow path (gas flow path 3), the operation unit 6 for instructing the opening of the opening/closing unit 4, and the opening/closing unit. A closing period setting section 7 for setting a closing period T of the section 4 and a control section 8 for controlling opening and closing of the opening/closing section 4 are provided. , By closing the opening and closing part 4 at the start time of the closing period, the opening is manually opened by the user, and the opening is conditional on the presence of a person, and the closing is automated to prevent forgetting to close. Since it can be covered, convenience can be improved while ensuring safety.

また、制御部8は、閉栓期間Tの開始時刻Tsに開閉部4を閉栓した後、操作部6の操作により開閉部4を開栓した場合、開栓から所定時間tの経過後に閉栓期間中であれば、開閉部を閉栓することで、閉栓期間中に突発的にガスを使用する場合でも、所定時間後に閉栓することで、安全性を確保することができる。 Further, if the control unit 8 closes the opening/closing unit 4 at the start time Ts of the closing period T and then opens the opening/closing unit 4 by operating the operation unit 6, the control unit 8 controls the closing period T after a predetermined time t has passed since the opening. In this case, by closing the opening/closing part, safety can be ensured by closing the valve after a predetermined period of time even if the gas is suddenly used during the period of closing the valve.

(実施の形態2)
以下、図3、図4を用いて、実施の形態2を説明する。
(Embodiment 2)
Embodiment 2 will be described below with reference to FIGS. 3 and 4. FIG.

[2-1.構成]
図3は、本開示の第2の実施の形態におけるガス遮断装置11の構成を示すブロック図である。図に示す様に、ガス遮断装置11は、基本的な構成は実施の形態1と同様であり、ガス流路3を流れるガスの流量を計測する流量計測部5を設けた点が異なっている。
[2-1. Constitution]
FIG. 3 is a block diagram showing the configuration of the gas cutoff device 11 according to the second embodiment of the present disclosure. As shown in the figure, the gas cutoff device 11 has the same basic configuration as that of the first embodiment, except that a flow rate measurement unit 5 for measuring the flow rate of the gas flowing through the gas flow path 3 is provided. .

流量計測部5におけるガスの流量の計測方法は、特に限定されず公知の方法を採用できるが、瞬時流量の計測が可能な超音波式が好ましい。また、以降の説明で、ガスの流量の有無とは、ガスの流量が実質的に0である所定流量を閾値として、この閾値以上であれば流量「有」、閾値未満であれば流量「無」としている。なお、この閾値は、ガス器具の使用を判定できる流量を閾値としても良い。 A method for measuring the gas flow rate in the flow rate measuring unit 5 is not particularly limited, and a known method can be employed, but an ultrasonic method capable of measuring an instantaneous flow rate is preferable. In the following description, the presence or absence of a gas flow rate is defined as a predetermined flow rate at which the gas flow rate is substantially 0 as a threshold. ”. It should be noted that this threshold value may be a flow rate at which the use of the gas appliance can be determined.

[2-2.動作]
次に、図4、図5を用いて、本実施の形態の動作を説明する。図4、図5は、開閉部4の開閉状態と、閉栓期間設定部7による閉栓期間Tの開始時刻Tsと終了時刻Te、操作部6による開操作(逆三角形で示す)のタイミングS、及び、流量計測部5により計測されたガスの流量の有無(即ち、ガスの使用の有無)の関係を示している。
[2-2. motion]
Next, the operation of this embodiment will be described with reference to FIGS. 4 and 5. FIG. 4 and 5 show the opening/closing state of the opening/closing unit 4, the start time Ts and end time Te of the closing period T by the closing period setting unit 7, the timing S of the opening operation (indicated by an inverted triangle) by the operation unit 6, and , shows the relationship between the presence or absence of the flow rate of gas measured by the flow rate measuring unit 5 (that is, the presence or absence of use of gas).

図4(a)は、通常の使用状態を示しており、タイミングSで操作部6により開栓操作が行われて開閉部4が開栓し、閉栓期間Tの開始時刻Tsに自動的に閉栓されるまでの期間中にガスが使用される場合であり、開始時刻Ts時点でガスの使用が無い場合は、閉栓する。 FIG. 4(a) shows a normal usage state, in which the opening operation is performed by the operation unit 6 at timing S, the opening/closing unit 4 is opened, and the opening/closing unit 4 is automatically closed at the start time Ts of the closing period T. When the gas is used during the period until the start time Ts, and the gas is not used at the start time Ts, the valve is closed.

図4(b)、(c)は、何れも、閉栓期間T中にタイミングSで操作部6により開栓操作が行われて開閉部4が開栓し、ガスが使用される場合である。 4B and 4C both show the case where the operation unit 6 performs the unplugging operation at the timing S during the plugging period T, the opening/closing unit 4 is opened, and the gas is used.

まず、図4(b)に示す様に、ガスの使用停止後、所定時間t1の後、閉栓期間T中であれば、閉栓することで、閉栓期間T中の突発的なガスの使用時の安全性を確保することができる。 First, as shown in FIG. 4(b), after a predetermined time t1 after stopping the use of the gas, if it is during the plugging period T, the plug is closed. Safety can be ensured.

また、図4(c)に示す様に、ガスの使用停止後、直ちに閉栓することで、閉栓期間T中の突発的なガスの使用時の安全性を確保することができる。 Further, as shown in FIG. 4(c), by closing the valve immediately after stopping the use of the gas, it is possible to ensure safety during the sudden use of the gas during the closing period T.

なお、ガスの使用停止が、閉栓期間Tの終了時刻Teの後であれば、開栓を継続することは言うまでもない。 Needless to say, if the use of gas is stopped after the end time Te of the plugging period T, the plugging is continued.

図5(a)、(b)は、何れも、タイミングSで操作部6により開栓操作が行われて開閉部4が開栓し、閉栓期間Tの開始時刻Tsになってもガスが使用されている場合である。 5(a) and 5(b), the opening operation is performed by the operation unit 6 at the timing S, the opening/closing unit 4 is opened, and the gas is used even at the start time Ts of the closing period T. This is the case when

まず、 図5(a)に示す様に、ガスの使用が停止した後、所定時間t2の後、閉栓することで、ガスの使用中であれば継続使用でき、勝手にガスを遮断することはないので、利便性が向上する。なお、所定時間t2は、ガスの使用停止から余裕を持った期間に適宜設定することが出来、0に設定して、ガスの使用停止時に閉栓するようにしても良い。 First, as shown in FIG. 5(a), by closing the valve after a predetermined time t2 after stopping the use of the gas, it is possible to continue using the gas as long as it is in use, and it is not possible to cut off the gas arbitrarily. There is no such thing, so convenience is improved. It should be noted that the predetermined time t2 can be appropriately set to a period with a margin after gas use is stopped, and may be set to 0 so that the plug is closed when gas use is stopped.

また、図5(b)に示す様に、閉栓期間の開始時刻Tsから所定時間t3の後、強制的に閉栓することで、ガスの使用中であっても強制的にガスを遮断することで、消し忘れ等における安全性を確保する場合に有効である。 Further, as shown in FIG. 5(b), by forcibly closing the plug after a predetermined time t3 from the start time Ts of the plugging period, the gas can be forcibly shut off even when the gas is in use. , and is effective in ensuring safety in case of forgetting to turn off the light.

図5(c)は、タイミングSで操作部6により開栓操作が行われて開閉部4が開栓し、その後ガスが使用された場合、ガスの使用停止から所定時間t4は、閉栓期間Tの開始時刻Tsにかかわらず、開閉部4を閉栓しないもので、ガス器具の使用を停止した後、所定時間は再使用を可能とすることで、利便性が向上する。 FIG. 5(c) shows that when the opening operation is performed by the operation unit 6 at the timing S, the opening/closing unit 4 is opened, and the gas is used after that, the predetermined time t4 after stopping the use of the gas is the closing period T The opening/closing part 4 is not closed irrespective of the start time Ts of , so that the gas appliance can be reused for a predetermined period of time after use is stopped, thereby improving convenience.

なお、所定時間t1、t2、t3、t4は、使用者の事情に応じて任意に設定することが出来る。 Note that the predetermined times t1, t2, t3, and t4 can be arbitrarily set according to the circumstances of the user.

[2-3.効果等]
以上の様に、実施の形態1の構成に加え、ガスの流量を計測する流量計測部5を備え、制御部8は、閉栓期間Tの開始時刻Tsに、流量計測部5でガス使用の有無を判定する所定流量以上の流量が計測されない場合は、開閉部を閉栓するものであり、ガスの使用無しを条件とすることで、勝手にガスを遮断することはない。
[2-3. effects, etc.]
As described above, in addition to the configuration of Embodiment 1, the flow rate measurement unit 5 for measuring the gas flow rate is provided. When a flow rate equal to or higher than a predetermined flow rate for judging is not measured, the opening/closing part is closed, and by setting no use of gas as a condition, gas is not arbitrarily shut off.

また、実施の形態1の構成に加え、ガスの流量を計測する流量計測部5を備え、制御部8は、閉栓期間Tの開始時刻Tsに開閉部4を閉栓した後、操作部6の操作により開閉部4を開栓した場合、流量計測部5で所定流量以上の流量が計測されなくなってから所定時間t4経過後に閉栓期間中であれば、開閉部4を閉栓するものであり、閉栓期間中におけるガス使用時の安全性を確保することができる。 Further, in addition to the configuration of Embodiment 1, a flow rate measurement unit 5 for measuring the gas flow rate is provided, and the control unit 8 closes the opening/closing unit 4 at the start time Ts of the plugging period T, and then operates the operation unit 6. When the opening/closing portion 4 is opened by the flow rate measurement portion 5, the opening/closing portion 4 is closed after a predetermined time t4 has passed since the flow rate measuring portion 5 stopped measuring a flow rate equal to or higher than the predetermined flow rate. It is possible to ensure safety when using gas inside.

また、実施の形態1の構成に加え、ガスの流量を計測する流量計測部5を備え、制御部8は、閉栓期間Tの開始時刻Tsに流量計測部5で所定流量以上の流量が計測された場合、流量計測部5で所定流量未満の流量が計測された時点で開閉部4を閉栓するものであり、閉栓期間中におけるガス使用時の安全性を確保することができる。 Further, in addition to the configuration of Embodiment 1, the control unit 8 is provided with a flow rate measuring unit 5 for measuring the flow rate of the gas, and the control unit 8 measures a flow rate equal to or higher than a predetermined flow rate in the flow rate measuring unit 5 at the start time Ts of the plugging period T. In this case, the opening/closing portion 4 is closed when the flow rate measuring portion 5 measures a flow rate less than the predetermined flow rate, and safety during gas use during the closed period can be ensured.

また、実施の形態1の構成に加え、ガスの流量を計測する流量計測部5を備え、制御部8は、閉栓期間Tの開始時刻Tsに流量計測部5で所定流量以上の流量が計測された場合、閉栓期間Tの開始時刻Tsから所定時間後に、開閉部4を閉栓することで、閉栓期間T中の突発的なガスの使用時の安全性を確保することができる。 Further, in addition to the configuration of Embodiment 1, the control unit 8 is provided with a flow rate measuring unit 5 for measuring the flow rate of the gas, and the control unit 8 measures a flow rate equal to or higher than a predetermined flow rate in the flow rate measuring unit 5 at the start time Ts of the plugging period T. In this case, by closing the opening/closing part 4 after a predetermined time from the start time Ts of the closed period T, safety during sudden use of the gas during the closed period T can be ensured.

また、実施の形態1の構成に加え、ガスの流量を計測する流量計測部5を備え、制御部は8は、閉栓期間Tの開始時刻Tsに流量計測部5で所定流量以上の流量が計測された場合、開始時刻Tsから所定時間t2後に開閉部4を閉栓するもので、閉栓期間T中の突発的なガスの使用時の安全性を確保することができる。 In addition to the configuration of Embodiment 1, a flow rate measurement unit 5 for measuring the flow rate of gas is provided, and the control unit 8 measures a flow rate equal to or higher than a predetermined flow rate with the flow rate measurement unit 5 at the start time Ts of the plugging period T. In this case, the opening/closing part 4 is closed after a predetermined time t2 from the start time Ts, and safety during sudden use of gas during the closing period T can be ensured.

更に、実施の形態1の構成に加え、ガスの流量を計測する流量計測部5を備え、制御部8は、流量計測部5で所定流量未満の流量が検出されてから所定時間t4は、閉栓期間Tの開始時刻Tsに関わらず、開閉部4を閉栓しないことで、安全性を確保しつつ、利便性を向上することができる。 Furthermore, in addition to the configuration of Embodiment 1, a flow rate measurement unit 5 for measuring the flow rate of gas is provided, and the control unit 8 keeps the plug closed for a predetermined time t4 after the flow rate measurement unit 5 detects a flow rate less than a predetermined flow rate. By not closing the opening/closing unit 4 regardless of the start time Ts of the period T, convenience can be improved while ensuring safety.

なお、上述の実施の形態は、本開示における技術を例示するためのものであるから、特許請求の範囲またはその均等の範囲において種々の変更、置き換え、付加、省略などを行うことができる。 Note that the above-described embodiment is for illustrating the technology in the present disclosure, and various changes, replacements, additions, omissions, etc. can be made within the scope of the claims or equivalents thereof.

以上のように、本発明にかかる遮断装置によると利便性を確保しつつ、人の不在時のガス漏れ等を防止することができるもので、ガスメータの機能として組みこむことも可能となる。 As described above, according to the shutoff device of the present invention, it is possible to prevent gas leakage or the like in the absence of a person while ensuring convenience, and it is possible to incorporate it as a function of a gas meter.

1、11 ガス遮断装置
4 開閉部
5 流量計測部
6 操作部
7 閉栓期間設定部
8 制御部
REFERENCE SIGNS LIST 1, 11 gas cutoff device 4 opening/closing unit 5 flow rate measurement unit 6 operation unit 7 plugging period setting unit 8 control unit

Claims (8)

ガスの流路を開閉する開閉部と、
前記開閉部の開栓を指示する操作部と、
前記開閉部の閉栓期間を設定する閉栓期間設定部と、
前記開閉部の開閉制御を行う制御部と、
を備え、
前記制御部は、前記操作部の操作により前記開閉部を開栓し、
前記閉栓期間の開始時刻に前記開閉部を閉栓することを特徴とするガス遮断装置。
an opening and closing part for opening and closing the gas flow path;
an operation unit for instructing opening of the opening/closing unit;
a plugging period setting unit that sets a plugging period of the opening/closing unit;
a control unit that performs opening/closing control of the opening/closing unit;
with
The control unit opens the opening/closing unit by operating the operation unit,
A gas cutoff device, wherein the opening/closing portion is closed at the start time of the closing period.
前記制御部は、前記閉栓期間の開始時刻に前記開閉部を閉栓した後、前記操作部の操作により前記開閉部を開栓した場合、開栓から所定時間経過後に前記閉栓期間中であれば、前記開閉部を閉栓することを特徴とする請求項1記載のガス遮断装置。 When the control unit closes the opening and closing unit at the start time of the closing period and then opens the opening and closing unit by operating the operation unit, if it is during the closing period after a predetermined time has passed since opening, 2. The gas cutoff device according to claim 1, wherein said open/close portion is closed. 更に、ガスの流量を計測する流量計測部を備え、
前記制御部は、前記閉栓期間の開始時刻に、前記流量計測部で所定流量以上の流量が計測されない場合は、前記開閉部を閉栓することを特徴とする請求項1または2に記載のガス遮断装置。
Furthermore, it has a flow measurement unit that measures the flow rate of the gas,
3. The gas cutoff according to claim 1, wherein the control unit closes the open/close unit when the flow rate measurement unit does not measure a flow rate equal to or higher than a predetermined flow rate at the start time of the plugging period. Device.
更に、ガスの流量を計測する流量計測部を備え、
前記制御部は、前記閉栓期間の開始時刻に前記開閉部を閉栓した後、前記操作部の操作により前記開閉部を開栓した場合、前記流量計測部で所定流量以上の流量が計測されなくなってから所定時間経過後に前記閉栓期間中であれば、前記開閉部を閉栓することを特徴とする請求項1または2に記載のガス遮断装置。
Furthermore, it has a flow measurement unit that measures the flow rate of the gas,
After closing the opening/closing portion at the start time of the closing period, the control portion is configured such that when the opening/closing portion is opened by operating the operation portion, the flow rate measurement portion stops measuring a flow rate equal to or higher than a predetermined flow rate. 3. The gas cutoff device according to claim 1 or 2, wherein the opening/closing portion is closed after a predetermined time has elapsed since the opening and closing period.
更に、ガスの流量を計測する流量計測部を備え、
前記制御部は、前記閉栓期間の開始時刻に前記流量計測部で所定流量以上の流量が計測された場合、前記流量計測部で所定流量以下の流量が計測された時点で前記開閉部を閉栓することを特徴とする請求項1または2に記載のガス遮断装置。
Furthermore, it has a flow measurement unit that measures the flow rate of the gas,
When the flow rate measuring unit measures a flow rate equal to or higher than a predetermined flow rate at the start time of the plugging period, the control unit closes the opening/closing unit when the flow rate measuring unit measures a flow rate equal to or lower than a predetermined flow rate. 3. The gas cutoff device according to claim 1 or 2, characterized in that:
更に、ガスの流量を計測する流量計測部を備え、
前記制御部は、前記閉栓期間の開始時刻に前記流量計測部で所定流量以上の流量が計測された場合、前記閉栓期間の開始時刻から所定時間後に、前記開閉部を閉栓することを特徴とする請求項1または2に記載のガス遮断装置。
Furthermore, it has a flow measurement unit that measures the flow rate of the gas,
The control unit is characterized in that, when the flow rate measuring unit measures a flow rate equal to or higher than a predetermined flow rate at the start time of the plugging period, the control unit closes the opening/closing unit after a predetermined time from the start time of the plugging period. The gas cutoff device according to claim 1 or 2.
更に、ガスの流量を計測する流量計測部を備え、
前記制御部は、前記閉栓期間の開始時刻に前記流量計測部で所定流量以上の流量が計測された場合、前記開始時刻から所定時間後に前記開閉部を閉栓することを特徴とする請求項1または2に記載のガス遮断装置。
Furthermore, it has a flow measurement unit that measures the flow rate of the gas,
2. The control unit closes the opening/closing unit after a predetermined time from the start time when the flow rate measuring unit measures a flow rate equal to or higher than a predetermined flow rate at the start time of the plugging period. 2. The gas cutoff device according to 2.
更に、ガスの流量を計測する流量計測部を備え、
前記制御部は、前記流量計測部で所定流量以下の流量が検出されてから所定時間は、前記閉栓期間の開始時刻に関わらず、前記開閉部を閉栓しないことを特徴とする請求項1または2に記載のガス遮断装置。
Furthermore, it has a flow measurement unit that measures the flow rate of the gas,
3. The control unit does not close the opening/closing unit for a predetermined time after the flow rate measuring unit detects a flow rate equal to or lower than a predetermined flow rate, regardless of the start time of the plugging period. Gas cutoff device according to.
JP2021117519A 2021-07-16 2021-07-16 Gas shut-off device Pending JP2023013378A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2021117519A JP2023013378A (en) 2021-07-16 2021-07-16 Gas shut-off device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2021117519A JP2023013378A (en) 2021-07-16 2021-07-16 Gas shut-off device

Publications (1)

Publication Number Publication Date
JP2023013378A true JP2023013378A (en) 2023-01-26

Family

ID=85129175

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021117519A Pending JP2023013378A (en) 2021-07-16 2021-07-16 Gas shut-off device

Country Status (1)

Country Link
JP (1) JP2023013378A (en)

Similar Documents

Publication Publication Date Title
JP2018072291A (en) Water leakage detection system
JP2023013378A (en) Gas shut-off device
JP3069266B2 (en) Gas safety equipment
JP2020159565A (en) Water heater
TWI557376B (en) Safety and Leakage Control Method for Gas Pipeline
JP3064160B2 (en) Gas meter
JP4069853B2 (en) Water heater
JP3064159B2 (en) Gas meter
JP2010009330A (en) Decompression device
JPH06348343A (en) Gas safety device
KR200287192Y1 (en) The apparatus for intercepting the gas by timer
JP5251428B2 (en) Combustion device and hot water supply device
JP2020046166A (en) Bath device
JP2006317122A (en) Hot-water supply unit
JP2010266231A (en) Gas meter
JP2020051934A (en) Gas meter and control method thereof
JP2009257623A (en) Hot water storage type water heater
JP3542219B2 (en) Gas shut-off device
JP2018031545A (en) Hot water/water mixing hot water supply device
JP2007232239A (en) Gas security device
JP2503848B2 (en) Water heater
JP3794054B2 (en) Gas shut-off device
JPH0771993A (en) Gas meter
JP2007113632A (en) Gas shut-off device
JP2992473B2 (en) Water heater

Legal Events

Date Code Title Description
RD01 Notification of change of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7421

Effective date: 20221021

RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20221118

RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20221124

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20240215