JP4447097B2 - Structure gap closing structure cover - Google Patents

Structure gap closing structure cover Download PDF

Info

Publication number
JP4447097B2
JP4447097B2 JP36459199A JP36459199A JP4447097B2 JP 4447097 B2 JP4447097 B2 JP 4447097B2 JP 36459199 A JP36459199 A JP 36459199A JP 36459199 A JP36459199 A JP 36459199A JP 4447097 B2 JP4447097 B2 JP 4447097B2
Authority
JP
Japan
Prior art keywords
cover
gap
structure housing
closing
headboard
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP36459199A
Other languages
Japanese (ja)
Other versions
JP2001182259A (en
Inventor
幹元 佐久間
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Bunka Shutter Co Ltd
Original Assignee
Bunka Shutter Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bunka Shutter Co Ltd filed Critical Bunka Shutter Co Ltd
Priority to JP36459199A priority Critical patent/JP4447097B2/en
Publication of JP2001182259A publication Critical patent/JP2001182259A/en
Application granted granted Critical
Publication of JP4447097B2 publication Critical patent/JP4447097B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Description

【0001】
【発明の属する技術分野】
本発明は、構造物躯体に被せられるカバーとその構造物躯体との間にできる隙間を塞ぐための塞ぎ構造及びその塞ぎ構造に使用する塞ぎ材に係り、例えば、建物の手摺り壁や腰壁、パラペット、さらには建物基礎、塀等のカバーが被せられる構造物躯体に利用できるものである。
【0002】
【背景技術】
集合住宅等の建物に突堤形状で形成されるバルコニ用手摺り壁の上面には、構造物躯体になっているこの手摺り壁の上面カバーとしての笠木が被せられ、この笠木は、手摺り壁の側面と対面する側面部を有している。笠木は手摺り壁の上面に固定されたブラケットを介して手摺り壁に取り付けられ、このブラケットの長さは手摺り壁の厚さ寸法よりも大きく、したがってブラケットは手摺り壁のバルコニ内外方向の両方の側面から突出する長さとなっている。このため、このようなブラケットを使用して手摺り壁に笠木を取り付けると、笠木の側面部と手摺り壁の側面との間に隙間ができる。
【0003】
このような隙間が笠木の側面部と手摺り壁の側面との間に生じていても、通常の雨天時の雨水は笠木の上面部から側面部に沿って流れ、そのまま滴下するため、雨水が笠木の内側に入ってブラケットの上面に乗ったり手摺り壁の内部に侵入したりすることはない。このため、手摺り壁の通常時の防水性はこの笠木で充分である。
【0004】
【発明が解決しようとする課題】
しかし、台風等の暴風を伴う雨天時には雨水が手摺り壁の側面に沿って吹き上がることがある。このような場合には、笠木の側面部と手摺り壁の側面との間の隙間が下向きに開口していても、この隙間から雨水が笠木の内側に侵入することが考えられる。このため、このような場合にも手摺り壁の防水性を確保できる構造が望まれ、このような高度の防水性は、手摺り壁が木質製である場合に特にその必要性が高まる。
【0005】
一方、笠木の内側へ雨水が侵入するのを防止するためには、上記隙間にシール剤を充填して完全に塞げばよい。しかし、これによると、笠木内側の通気性が損なわれてしまうことになり、手摺り壁等の耐久性に影響が生じ、好ましくない。
【0006】
本発明の目的は、笠木等のカバーと、このカバーが被せられる手摺り壁等の構造物躯体との間の隙間を通気性を確保して塞ぐことができ、この隙間に求められる防水性と通気性の両方を満足する構造物躯体カバーの隙間塞ぎ構造及びその塞ぎ材を提供するところにある。
【0007】
【課題を解決するための手段】
本発明に係る構造物躯体カバーの隙間塞ぎ構造は、突堤形状になっている構造物躯体の先端面にカバーが被せられ、このカバーの側面部が前記構造物躯体の側面と隙間を開けて対面しているとともに、この隙間に塞ぎ材が、前記カバーの側面部と前記構造物躯体の側面とのうちの少なくとも一方との間に通気部を残して配置されていることを特徴とするものである。
【0008】
この構造物躯体カバーの隙間塞ぎ構造によると、カバーの側面部と構造物躯体の側面との間にできる隙間は塞ぎ材で塞がれるため、防水性を確保できる。また、この塞ぎ材は隙間を完全に塞ぐものではなく、カバーの側面部と構造物躯体の側面とのうちの少なくとも一方との間に通気部を残すものとなっているため、隙間の通気性も確保できる。
【0009】
この構造物躯体カバーの隙間塞ぎ構造において、塞ぎ材は通気性を有しないものでもよく、通気性を有するものでもよい。また、塞ぎ材はこれらの性質を有するそれぞれの部分からなるものでもよく、構造物躯体カバーの隙間塞ぎ構造においてこれらの性質を有する2種類の塞ぎ材を並設使用してもよい。
【0010】
また、本発明に係る構造物躯体カバーの隙間塞ぎ構造は、突堤形状になっている構造物躯体の先端面にカバーが被せられ、このカバーの側面部が前記構造物躯体の側面と隙間を開けて対面しているとともに、この隙間に通気性を有する塞ぎ材が配置されていることを特徴とするものである。
【0011】
この構造物躯体カバーの隙間塞ぎ構造によると、カバーの側面部と構造物躯体の側面との間にできる隙間に通気性を有する塞ぎ材が配置されるため、隙間の防水性は塞ぎ材の配置によって確保できるとともに、隙間の通気性は塞ぎ材自身の通気性によって確保できる。
【0012】
この構造物躯体カバーの隙間塞ぎ構造において、塞ぎ材は、カバーの側面部と構造物躯体の側面との両方に対して通気部を残さないで上記隙間に配置されてもよく、カバーの側面部と構造物躯体の側面とのうちの少なくとも一方との間に通気部を残して上記隙間に配置されてもよい。
【0013】
以上のそれぞれの構造物躯体カバーの隙間塞ぎ構造において、塞ぎ材が通気性を有するものとする場合には、その塞ぎ材は、例えば、発泡樹脂やスポンジ等による多孔質体によるでもよく、樹脂毛や動物毛等で形成された多毛質体、すなわちモヘヤ等によるものでもよい。
【0014】
また、それぞれの構造物躯体カバーの隙間塞ぎ構造において、塞ぎ材がカバーの側面部との間に通気部を残してカバーの側面部と構造物躯体の側面との間の隙間に配置され、かつ、カバーの側面部の端部に構造物躯体側に屈曲した屈曲部が形成されている場合には、塞ぎ材を、この屈曲部に対し、突堤形状の構造物躯体の突出方向に離間していてこの構造物躯体の厚さ方向には重複しているものとしてもよい。
【0015】
このようにすると、上記隙間の通気性が、塞ぎ材とカバーの側面部との間の通気部や、塞ぎ材と屈曲部との間の構造物躯体突出方向の間隔によって形成される通気路で確保されるととともに、この塞ぎ材と屈曲部は構造物躯体の厚さ方向に重複しているため、上記通気路を構造物躯体の厚さ方向に蛇行したものとさせることができる。
【0016】
これによると、雨水のカバー内側への侵入をこの蛇行した通気路によって一層有効に阻止することができ、カバーと塞ぎ材による構造物躯体の防水性を高めることができる。
【0017】
本発明に係る構造物躯体カバーの隙間塞ぎ材は、突堤形状になっている構造物躯体の先端面に被せられるカバーの側面部と前記構造物躯体の側面との間の隙間に、前記カバーの側面部と前記構造物躯体の側面とのうちの少なくとも一方との間に通気部を残して配置されることを特徴とするものである。
【0018】
この構造物躯体カバーの隙間塞ぎ材によると、カバーの側面部と構造物躯体の側面との間の隙間に配置されるため、この隙間の防水性を確保できるとともに、この塞ぎ材の配置は、カバーの側面部と構造物躯体の側面とのうちの少なくとも一方との間に通気部を残して行われるため、上記隙間の通気性を確保できる。
【0019】
この構造物躯体カバーの隙間塞ぎ材において、塞ぎ材自体は通気性を有していなくてもよく、有していてもよい。また、塞ぎ材はこれらの性質を有するそれぞれの部分からなるものでもよく、これらの性質を有する2種類の塞ぎ材を並設使用することにより構造物躯体とカバーとの間を防水性と通気性を確保して塞ぐようにしてもよい。
【0020】
また、本発明に係る構造物躯体カバーの隙間塞ぎ材は、突堤形状になっている構造物躯体の先端面に被せられるカバーの側面部と前記構造物躯体の側面との間の隙間に配置され、かつ通気性を有していることを特徴とするものである。
【0021】
この構造物躯体カバーの隙間塞ぎ材も、カバーの側面部と構造物躯体の側面との間の隙間に配置されるため、この隙間の防水性を確保できるとともに、この塞ぎ材はそれ自身で通気性を有しているため、この通気性により上記隙間の通気性を確保できることになる。
【0022】
この構造物躯体カバーの隙間塞ぎ材において、塞ぎ材は、カバーの側面部と構造物躯体の側面との両方に対して通気部を残さないで上記隙間に配置されるものでもよく、カバーの側面部と構造物躯体の側面とのうちの少なくとも一方との間に通気部を残して上記隙間に配置されるものでもよい。
【0023】
以上のそれぞれの構造物躯体カバーの隙間塞ぎ材において、塞ぎ材を通気性を有するものとする場合には、その塞ぎ材を、例えば、発泡樹脂やスポンジ等による多孔質体で形成されたものとしてよく、樹脂毛や動物毛等による多毛質体、すなわちモヘヤ等で形成されたものしてもよい。
【0024】
また、それぞれの構造物躯体カバーの隙間塞ぎ材において、塞ぎ材はカバーの側面部に取り付けてもよく、構造物躯体の側面に取り付けてもよく、カバーの側面部に取り付けたものと構造物躯体の側面に取り付けたものとの両方としてもよい。
【0025】
塞ぎ材をカバーの側面部に取り付けるものとした場合には、カバーが構造物躯体の先端面に被せられる以前のカバーの側面部に予め塞ぎ材を取り付けておくことが好ましい。
【0026】
このように塞ぎ材をカバーが構造物躯体の先端面に被せられる以前のカバーの側面部に予め取り付けておくと、構造物躯体の先端面にカバーを取り付ける作業を行うことによりカバーの側面部と構造物躯体の側面との間の隙間に塞ぎ材を自ずと配置できるようになり、この配置作業の容易化を達成できる。
【0027】
以上の本発明に係る構造物躯体カバーの隙間塞ぎ構造及びその塞ぎ材において、構造物躯体は、例えば、建物の手摺り壁でもよく、腰壁でもよく、パラペットでもよく、建物基礎でもよく、塀でもよく、突堤形状であって、その先端面に笠木等のカバーが被せられるものであれば、任意なものでよい。
【0028】
また、構造物躯体が建物の手摺り壁や腰壁である場合に、その手摺り壁や腰壁はバルコニを形成するものでもよく、外階段を形成するものでもよく、さらには、建物以外の構築物、例えば、横断歩道橋を形成するものでもよい。
【0029】
さらに、先端面にカバーが被せられる突堤形状の構造物躯体は、上方に突出するものでもよく、水平方向に突出するものでもよく、これらの方向に対して傾斜した方向に突出するものでもよい。そして、構造物躯体の先端面は、水平面でもよく、鉛直面でもよく、これらの面に対して傾斜した面でもよい。さらに、構造物躯体の先端面は、鋭角又は鈍角の屈曲面でもよく、湾曲面でもよい。
【0030】
また、カバーの側面部及びこの側面部が対面する構造物躯体の側面は、構造物躯体の長手方向に延びる面でもよく、長手方向と直角等の角度をなす面でもよい。さらに、これらのカバーの側面部と構造物躯体の側面は鉛直面でもよく、鉛直方向に対して傾斜した面でもよい。
【0031】
また、構造物躯体は木質製でもよく、コンクリート製でもよく、金属製でもよく、これらのうちの少なくとも2つが複合されて形成されたものでもよく、任意な材質のものでよい。
【0032】
本発明に係る構造物躯体カバーの隙間塞ぎ構造及びその塞ぎ材を適用する場合におけるカバーの側面部と構造物躯体の側面とに間に隙間ができる理由は、任意でよい。
【0033】
構造物躯体が手摺り壁であって、カバーが笠木である場合には、笠木の側面部と手摺り壁の側面との間に隙間ができる理由は、手摺り壁の上面に手摺り壁の両方の側面から突出する長さのブラケットが固定され、このブラケットを介して笠木が手摺り壁の上面に取り付けられるからであり、上記隙間は、手摺り壁の側面からのブラケットの突出した長さのためにできることになる。
【0034】
このようなブラケット等の中間部材を介して笠木等のカバーを手摺り壁等の構造物躯体に取り付ける場合には、塞ぎ材はこの中間部材の配置箇所を除いて部分的又は断続的に配置してもよく、中間部材の配置箇所を含めて連続的に配置してもよい。
【0035】
本発明に係る構造物躯体カバーの隙間塞ぎ構造及びその塞ぎ材は、このようなブラケット等の中間部材を使用しないでカバーを構造物躯体に取り付ける場合にも、もちろん適用できる。
【0036】
【発明の実施の形態】
以下に本発明の実施形態を図面に基づいて説明する。これから説明するそれぞれの実施形態は、構造物躯体が建物のバルコニ用手摺り壁であって、カバーが、この手摺り壁の先端面である上面に被せられる笠木の場合である。
【0037】
初めに、この手摺り壁の構造を図1及び図2で説明する。図1はこの手摺り壁1及び笠木10の内部構造を示す縦断面図であり、図2は、笠木10等を一部破断して示した手摺り壁1の平面図である。突堤形状の手摺り壁1は、木質製であり、したがって、手摺り壁1は、図2では省略され、手摺り壁1の長手方向両端に配置されている両端柱と、これらの両端柱の間に立設された中柱2と、両端柱と中柱の上端間に架設された上端部材3とで骨組みが形成され、両端柱と中柱2のそれぞれのバルコニ内外方向の両側面には縦胴縁4が固定されている。手摺り壁1の室外側の側面に配置された縦胴縁4及び室内側の側面に配置された縦胴縁4には、それぞれの表面材5が取り付けられ、これらの表面材5は、例えば、サイディングであり、あるいは、タイル付き面材である。なお、手摺り壁1の表面はこれに限らず、例えば、モリタル塗りによる湿式仕上げとしてもよい。
【0038】
上方へ突出する突堤形状になっている手摺り壁1の先端面である上面には、笠木10を手摺り壁1に取り付けるためのブラケット6が配置され、このブラケット6は、図2で示されているように、手摺り壁1の長手方向に所定間隔で複数配置されるとともに、図1で示すとおり、上端部材3にビス、釘等による止着具7で固定される。この固定はブラケット6の本体部6Aで行われ、この本体部6Aの手摺り壁1の厚さ方向長さは手摺り壁1の厚さ寸法よりも大きく、手摺り壁1の両方の側面1A,1Bから突出している本体部6Aのそれぞれの端部には、上方延出部6Bと下方延出部6Cが形成されている。
【0039】
手摺り壁1の全長に亘る笠木10は、手摺り壁1の上面全部を覆うとともに、バルコニ外側が高くなった水勾配を有する本体部10Aと、この本体部10Aのバルコニ外側端部、バルコニ内側端部から下方へ延び、手摺り壁1の側面1A、1Bと対面する側面部10B、10Cと、これらの側面部10B、10Cの端部から手摺り壁1側に屈曲した屈曲部10D,10Eとからなる。両方の側面部10B、10Cを少し開きながら笠木10を上方から手摺り壁1に被せ、本体部10Aをブラケット6の上方延出部6Bに載せるとともに、側面部10B、10Cをもとの状態に閉じて屈曲部10D,10Eをブラケット6の下方延出部6Cの下端に係止することにより、笠木10はブラケット6を介して手摺り壁1に取り付けられる。
【0040】
なお、笠木10に図1の想像線で示す手摺り15が立設される場合には、この手摺り15の支柱及びこの支柱の内部に挿入される中子は、笠木10やブラケット6にビス等の止着具で固定される。
【0041】
笠木10の側面部10B,10Cは手摺り壁1の側面1A,1Bと間隔を開けて対面し、側面部10B、10Cからの屈曲部10D,10Eの屈曲量を含めても、これらの側面部10B,10Cと側面1A,1Bとの間には、手摺り壁1の両方の側面1A,1Bから突出したブラケット6の本体部6Aの長さ分に対応する隙間Sが生じている。
【0042】
図1には、これらの隙間Sに配置された第1実施形態に係る塞ぎ材20が示され、この塞ぎ材20は、図2に示されているように、手摺り壁1の長手方向に連続するものになっている。図3には、手摺り壁1の室外側の隙間Sに配置された塞ぎ材20が拡大されて示されている。
【0043】
図2では、手摺り壁1の室外側の隙間Sと室内側の隙間Sの両方に塞ぎ材20が配置されている。塞ぎ材20は、このように両方の隙間Sに配置してもよく、室外側の隙間Sだけに配置してよい。これは、図4以降の図面で説明する他の実施形態に係る塞ぎ材についても同じである。
【0044】
次ぎに、第1実施形態の塞ぎ材20を図3により説明する。この塞ぎ材20は、鉛直方向に延びる板状の取付部21と、取付部21の下部に笠木10の側面部10B側に突設された箱部22と、箱部22の内部に設けられた弁部23とからなる。箱部22の下辺部22Aには孔22Bが形成されているとともに、上辺部22Cには開口部22Dが形成されている。この開口部22Dは手摺り壁1の長手方向に連続し、孔22Bはこの長手方向に間隔を開けて多数形成されている。
【0045】
弁部23は、例えば、ゴム又は軟質合成樹脂等による可撓性の弾性材料で形成されており、また、手摺り壁1の長手方向に連続した長さを有している。弁部23の上端は箱部22の内面に結合されており、弁部23は、通常時には笠木10の側面部10B側へ下向き傾斜している。そして、弁部23が上端を中心に上向きに回動したときには、弁部23の厚肉部分が、想像線で示されているとおり、塞ぎ材20の箱部22の開口部22Dを閉じるようになっている。
【0046】
また、塞ぎ材20の箱部22の下辺部22Aには、笠木10の側面部10B側へ突出した延長部25が形成されている。
【0047】
このような形状、構造となっている塞ぎ材20は、笠木10が手摺り壁1の上面に被せられる前に、取付部21が手摺り壁1の側面1Aにシール部材26を介してビス等の止着具27で固定されることにより、手摺り壁1に取り付けられる。この後、笠木10を前述のようにブラケット6で手摺り壁1に取り付けたときには、延長部25の位置は、笠木10の屈曲部10Dに対し、上方へ突出した突堤形状となっている手摺り壁1の突出方向へ離間した位置、すなわち上方へ離間した位置であって、手摺り壁1の厚さ方向には重複した位置となっている。また、このときには、延長部25を含めた塞ぎ材20は、笠木10の側面部10Bとの間に通気部28を残した位置(ブラケット6が配置されている箇所では、ブラケット6の下方延出部6Cとの間にも通気部を残した位置)に配置されている。
【0048】
以上の第1実施形態の塞ぎ材20によると、台風等の暴風を伴う雨天時に手摺り壁1の側面1Aに沿って強風が吹き上がると、塞ぎ材20の孔22Bから箱部22内に侵入した強風により弁部23が上端を中心に上向きに回動し、この結果、弁部23の厚肉部分で箱部22の開口部22Dが閉じられる。このため、強風と共に雨水が箱部22の内部に入っても、雨水が、それ以上に笠木10の内側に侵入してブラケット6の上面に乗ったり手摺り壁1の表面材5の裏側隙間に侵入したりすることを防止できる。
【0049】
また、塞ぎ材20と笠木10の側面部10Bとの間には通気部28が設けられているが、この通気部28の下部には、手摺り壁1の厚さ方向に重複した塞ぎ材20の延長部25と笠木10の屈曲部10Dとが設けられているため、屈曲部10Dの高さ位置における隙間Sから通気部28に至る通気路29は、これらの重複した塞ぎ材20の延長部25と笠木10の屈曲部10Dとにより、手摺り壁1の厚さ方向に蛇行したものとなっている。このため、暴風と共に雨水がこの通気路29、通気部28を通って笠木10の内側に侵入することはできず、雨水は屈曲部10Dや延長部25で遮られて下方へ落下することになり、笠木10の内側へ侵入することはない。
【0050】
したがって、手摺り壁1の側面1Aと笠木10の側面部10Bとの間に隙間Sがあっても、この隙間Sの防水性を確保することができる。
【0051】
一方、晴天時には、笠木10の内側は塞ぎ材20の開口部22Dと孔22B、及び通気部28と上記通気路29を介して笠木10の外部と連通しているため、通気性が確保されている。したがって、晴天時には、手摺り壁1の内部から蒸発する水分等を笠木10の外部に排出することができ、手摺り壁1等の耐久性を向上させることができる。
【0052】
次ぎに、本発明の他の実施形態に係る各種塞ぎ材を説明する。これらの塞ぎ材は、前記実施形態の塞ぎ材と同じく、手摺り壁1の長手方向に連続する長さを有する。
【0053】
図4で示した第2実施形態に係る塞ぎ材30は、塞ぎ材本体31と、塞ぎ材本体31の下端から垂設された垂下部材32とからなる。塞ぎ材本体31は、手摺り壁1の側面1Aにシール部材36を介して止着具37で固定された板状の取付部31Aと、この取付部31Aの下端から笠木10の側面部10B側へ水平に延びる水平延出部31Bとからなるアングル材で形成され、水平延出部31Bの先端に垂下部材32が垂設されており、この垂下部材32はゴム又は軟質合成樹脂等による可撓性弾性材料からなる。そして、垂下部材32の下端と笠木10の屈曲部10Dとの間には間隔があいている。
【0054】
また、塞ぎ材本体31の水平延出部31Bの先端と垂下部材32の位置は、笠木10の側面部10Bとの間に通気部38を残した位置となっている。
【0055】
この実施形態では、暴風を伴う雨天時に手摺り壁1の側面1Aに沿って強風が吹き上がると、この強風により垂下部材32が塞ぎ材本体31との接続部である上端を中心に笠木10の側面部10B側へ回動する。これにより、垂下部材32の先端は、ブラケット6が配置されていない箇所では、笠木10の側面部10Bの内面に接触し、ブラケット6が配置されている箇所では、ブラケット6の下方延出部6Cの内面に接触する。この結果、強風と共に雨水が笠木10の内側に侵入しようとしても、この侵入は、このように回動する垂下部材32、及び笠木10の側面部10Bと手摺り壁1の側面1Aとの間の隙間Sに配置されている塞ぎ材本体31の水平延出部31Bにより、阻止されることになり、隙間Sの防水性が確保される。
【0056】
一方、晴天時には、笠木10の内外は上記通気部38を介して連通しているため、第1実施形態と同じく、通気性は確保される。
【0057】
図5には、第3実施形態に係る塞ぎ材40が示されている。この塞ぎ材40は、手摺り壁1の側面1Aにシール部材46を介して止着具47で固定された板状の取付部40Aと、この取付部40Aの下端から笠木10の側面部10B側へ水平に延びる水平延出部40Bとからなるアングル材で形成され、水平延出部40Bの先端の位置は、笠木10の側面部10Bとの間に通気部48を残した位置(ブラケット6が配置されている箇所では、ブラケット6の下方延出部6Cとの間にも通気部を残した位置)となっている。
【0058】
また、水平延出部40Bは、笠木10の屈曲部10Dに対し、手摺り壁1の突出方向である上方に僅かに離間していて手摺り壁1の厚さ方向には重複している。このため、屈曲部10D高さ位置における隙間Sから通気部48に至る通気路49は、手摺り壁1の厚さ方向に蛇行したものとなっている。
【0059】
暴風を伴う雨天時において、手摺り壁1の側面1Aに沿って雨水が強風と共に吹き上がった場合には、この雨水は、笠木10の側面部10Bと手摺り壁1の側面1Aとの間の隙間Sに配置されている塞ぎ材40の水平延出部40Bで遮断され、また、通気部48に至る上記通気路49は手摺り壁1の厚さ方向に蛇行しているため、この通気路49と通気部48を通って雨水が笠木10の内側に侵入することも阻止され、防水性が確保される。
【0060】
そして、晴天時には、笠木10の内外は通気部48と通気路49を介して連通していることから、通気性は確保される。
【0061】
図6は、第4実施形態に係る塞ぎ材50を示す。この塞ぎ材50は発泡樹脂やスポンジ等による弾性力を有する多孔質体で形成され、したがって、塞ぎ材50はそれ自身で通気性を有する。塞ぎ材50は、笠木10が手摺り壁1の上面に被せられる前に笠木10の側面部10Bの内面に接着剤等で取り付けられる。また、塞ぎ材50における手摺り壁1の厚さ方向の自然寸法は、笠木10の側面部10Bの内面から手摺り壁1の側面1Aまでの寸法よりも大き目に設定されている。このため、笠木10を手摺り壁1に上方から被せてブラケット6で手摺り壁1に取り付けると、ブラケット6が配置されていない箇所では、塞ぎ材50の手摺り壁1側の端部が手摺り壁1の側面1Aの弾性接触して塞ぎ材50は少し圧縮変形し、ブラケット6が配置されている箇所では、塞ぎ材50はブラケット6の下方延出部6Cの外面に押圧されることにより大きく圧縮変形する。
【0062】
暴風を伴う雨天時に雨水が手摺り壁1の側面1Aに沿って吹き上がると、ブラケット6が配置されていない箇所では、笠木10の側面部10Bと手摺り壁1の側面1Aとの間の隙間Sは塞ぎ材50で塞がれているため、雨水がブラケット6よりも高位置に達することはなく、ブラケット6が配置されている箇所では、雨水はブラケット6の下方延出部6Cの内側に入るが、その上は手摺り壁1の側面1Aから突出したブラケット6の本体6Aで遮断された状態となっているため、この箇所でも雨水がブラケット6よりも高位置に達することはない。したがって、笠木10の側面部10Bと手摺り壁1の側面1Aとの間の隙間Sのうち、ブラケット6の本体6Aよりも高位置についての防水性は確保される。
【0063】
一方、晴天時には、塞ぎ材50自身が通気性を有する多孔質体で形成されているため、塞ぎ材50よりも上側空間での笠木10の内側と笠木10の外側との間の通気性は確保される。
【0064】
また、この実施形態によると、塞ぎ材50は笠木10が手摺り壁1に取り付けられる以前に予め笠木10の側面部10Bの内面に固定されるため、笠木10を手摺り壁1にブラケット6を介して取り付ける作業を行うことにより、塞ぎ材50は自ずと所定位置に配置されることになり、塞ぎ材50のこの配置作業を容易に行える。
【0065】
図7及び図8には、第5実施形態に係る塞ぎ材60が示されている。この塞ぎ材60は、手摺り壁1の側面1Aにシール部材66を介して止着具67で固定される板状の取付部61と、取付部61の下端から笠木10の側面部10B側へ突出する突出部62とからなり、突出部62はゴム又は軟質合成樹脂等による弾性材料で形成されている。
【0066】
図7は、笠木10の側面部10Bと手摺り壁1の側面1Aとの間隔が大きい寸法L1となっている場合を示す。この場合には、突出部62の先端は笠木10の側面部10Bまで届かず、ブラケット6の下方延出部6Cに届く程度である。
【0067】
図7において、笠木10の側面部10Bと手摺り壁1の側面1Aとの間隔方向における隙間Sの大部分は、塞ぎ材60の突出部62で塞がれ、かつ、笠木10の屈曲部10Dから上方に離間しているこの突出部62は、屈曲部10Dと手摺り壁1の厚さ方向には重複しているため、雨水が手摺り壁1の側面1Aに沿って吹き上がっても、屈曲部10Dよりも手摺り壁1側の位置で側面1Aに沿って吹き上がることになるこの雨水は、突出部62よりも高位置に上がることを阻止される。このため、突出部62よりも高位置についての隙間Sの防水性は確保される。
【0068】
一方、晴天時には、塞ぎ材60の突出部62の先端が届いていない笠木10の側面部10Bの内側には通気部68が残されているため、この通気部68により笠木10の内外の通気性は確保される。
【0069】
図8は、笠木10の側面部10Bと手摺り壁1の側面1Aとの間隔が小さい寸法L2となっている場合である。この場合には、突出部62の先端は笠木10の側面部10まで届き、ブラケット6が配置された箇所では、突出部62はブラケット6の下方延出部6Cに当たって下方へ撓み変形している。
【0070】
図8の場合には、雨天時に雨水が手摺り壁1の側面1Aに沿って吹きあがっても、この雨水は塞ぎ材60の突出部62で遮断され、それ以上に上がるのを阻止される。このため、突出部62よりも高位置についての隙間Sの防水性は確保される。
【0071】
晴天時には、塞ぎ材60の弾性材料で形成された突出部62はブラケット6の下方延出部6Cに弾性接触しているだけであって、この下方延出部6Cの幅方向(図8の表裏方向)両側には、突出部62と下方延出部6Cと笠木10の側面部10Bとの間で通気部68'ができているため、この通気部68'により笠木10の内外の通気性が確保される。
【0072】
そして、この第5実施形態の塞ぎ材60によると、突出部62は弾性材料で形成されているため、笠木10の側面部10Bと手摺り壁1の側面1Aとの間隔が異なる各種タイプの手摺り壁に共通して使用できるという効果を得られる。
【0073】
図9は、第6実施形態に係る塞ぎ材70,80を示す。これらの塞ぎ材70,80のうち、塞ぎ材70はゴム又は軟質合成樹脂等による弾性材料で形成され、塞ぎ材80は、塞ぎ材70と同じ材料又は硬質合成樹脂等の硬質材料で形成されている。また、塞ぎ材70は、手摺り壁1の上面に被せられる以前の笠木10の側面部10Bの内面に予め取り付けられ、塞ぎ材80は、手摺り壁1の側面1Aに取り付けられている。
【0074】
笠木10をブラケット6を介して手摺り壁1の上面に取り付けたときには、塞ぎ材70は、ブラケット6が配置されていない箇所では、手摺り壁1の側面1Aと通気部78を残して対面し、ブラケット6が配置されている箇所では、ブラケット6の下方延出部6Cで大きく圧縮変形される。また、塞ぎ材70よりも低い位置にある塞ぎ材80は、ブラケット6が配置されていない箇所では、笠木10の側面部10Bと通気部88を残して対面し、ブラケット6が配置されている箇所では、ブラケット6の下方延出部6Cと接触し又は下方延出部6Cから僅かに離間している。また、手摺り壁1の突出方向である手摺り壁1の高さ方向に離間しているこれらの塞ぎ材70と80は、ブラケット6が配置されていない箇所では、手摺り壁1の厚さ方向に重複している。
【0075】
このため、手摺り壁1の側面1Aに沿って雨水が吹き上がった場合、ブラケット6が配置されていない箇所では、雨水は塞ぎ材70と80によりこれらの塞ぎ材70,80の配置高さ以上に上がるのを阻止され、ブラケット6が配置されている箇所では、塞ぎ材80で阻止されるとともに、たとえこの塞ぎ材80の配置高さ以上に上がっても、手摺り壁1の側面1Aから突出しているブラケット6の本体6Aにより、ブラケット6よりも高位置まで上がるのを阻止される。このため、防水性を確保することができる。
【0076】
一方、晴天時には、上記通気部78と88により笠木10の内外の通気性は確保される。
【0077】
図10〜図12は、第7実施形態に係る塞ぎ材90を示す。この塞ぎ材90はスポンジ等の弾性を有する多孔質体で形成されているとともに、図10で示すとおり、笠木10が手摺り壁1の上面に取り付けられる以前に、笠木10の本体部10Aと側面部10Bとで形成される屈曲部の内面に両面テープ又は接着剤等で固定されている。図11及び図12は笠木10をブラケット6を介して手摺り壁1の上面に取り付けたときを示し、図11は、ブラケット6が配置された箇所での手摺り壁1と笠木10の縦断面図で、図12は、ブラケット6が配置されていない箇所での手摺り壁1と笠木10の縦断面図である。
【0078】
この実施形態では、笠木10をブラケット6を介して手摺り壁1の上面に取り付ける作業は、塞ぎ材90をブラケット6の上方延出部6Bで圧縮変形させながら行われる。この取付作業後、塞ぎ材90の手摺り壁1側の下角部近辺は、図12で示すブラケット6が配置されていない箇所については、手摺り壁1の側面1Aと上面に弾性接触し、図11で示すブラケット6が配置されている箇所については、ブラケット6の上方延出部6Bから外れた手摺り壁1の上面に弾性接触する。
【0079】
暴風を伴う雨天時に雨水が手摺り壁1の側面1Aに沿って吹き上がると、ブラケット6が配置されていない箇所では、前記隙間Sのうちの手摺り壁1の上面近くの上部が塞ぎ材90で塞がれているため、手摺り壁1の上面まで雨水が侵入することはなく、また、ブラケット6が配置されている箇所では、手摺り壁1の側面1Aからブラケット6の本体6Aが突出しているため、この本体6Aで雨水が手摺り壁1の上面まで達することが阻止され、防水性が確保される。
【0080】
一方、晴天時には、塞ぎ材90は多孔質体からなり、それ自身で通気性を有するため、塞ぎ材90が笠木10の内部に設けられていても、笠木10の内外の通気性は確保される。
【0081】
以上説明した実施形態は、図13で示す笠木10のバルコニ内外方向における側面部10B、10Cについてであったが、前記各実施形態は、手摺り壁1に掘り込み部1Cがある場合などのように、笠木10に手摺り壁1の長手方向と角度をなす側面部10Fがある場合には、この側面部10Fにも適用できる。
【0082】
【発明の効果】
本発明によると、笠木等のカバーと、このカバーが被せられる手摺り壁等の構造物躯体との間の隙間を通気性を確保して塞ぐことができ、この隙間に求められる防水性と通気性の両方を満足できるようになる。
【図面の簡単な説明】
【図1】本発明の第1実施形態に係る塞ぎ材が適用された構造物躯体である手摺り壁及びカバーである笠木を示す縦断面図である。
【図2】笠木等を一部破断して示した図1の手摺り壁の平面図である。
【図3】第1実施形態の塞ぎ材の配置部分を示す図1の一部拡大図である。
【図4】第2実施形態の塞ぎ材を示す図3と同様の図である。
【図5】第3実施形態の塞ぎ材を示す図3と同様の図である。
【図6】第4実施形態の塞ぎ材を示す図3と同様の図である。
【図7】第5実施形態の塞ぎ材を示す図3と同様の図である。
【図8】第5実施形態の塞ぎ材について、手摺り壁の側面と笠木の側面部との間隔が図7とは異なる場合を示す図3と同様の図である。
【図9】第6実施形態の塞ぎ材を示す図3と同様の図である。
【図10】第7実施形態の塞ぎ材を示す図で、構造物躯体である手摺り壁の上面に取り付けられる前のカバーである笠木の要部を示す縦断面図である。
【図11】第7実施形態の塞ぎ材を示す図3と同様の図である。
【図12】第7実施形態の塞ぎ材について、図11とは手摺り壁の長手方向に異なる箇所で示した縦断面図である。
【図13】手摺り壁に形成される掘り込み部の部分を示す斜視図である。
【符号の説明】
1 構造物躯体である手摺り壁
1A,1B, 側面
6 ブラケット
10 カバーである笠木
10B,10C,10F 側面部
10D,10E 屈曲部
20,30,40、50,60,70,80,90 塞ぎ材
28,38,48,68,68',78,88 通気部
29,49 通気路
S 隙間
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a closing structure for closing a gap formed between a cover placed on a structure housing and the structure housing, and a closing material used for the closing structure, for example, a handrail wall or a waist wall of a building. It can be used for structural bodies that are covered with covers such as parapets, building foundations, and fences.
[0002]
[Background]
The upper surface of the handrail wall for balconi formed in the shape of a jetty in a building such as an apartment house is covered with a headboard as a top cover of the handrail wall that is a structure frame. A side surface portion facing the side surface. The headboard is attached to the handrail wall through a bracket fixed to the upper surface of the handrail wall, and the length of this bracket is larger than the thickness dimension of the handrail wall. The length protrudes from both sides. For this reason, when the headboard is attached to the handrail wall using such a bracket, a gap is formed between the side face portion of the headboard and the side face of the handrail wall.
[0003]
Even if such a gap occurs between the side of the headboard and the side of the handrail wall, rainwater during normal rain flows from the top of the headboard along the side and dripped as it is. It does not enter the headboard and get on the top surface of the bracket or enter the inside of the handrail wall. For this reason, this headboard is sufficient for the water resistance of the handrail wall in the normal state.
[0004]
[Problems to be solved by the invention]
However, in rainy weather accompanied by storms such as typhoons, rainwater may blow up along the side of the handrail wall. In such a case, even if the gap between the side portion of the headboard and the side surface of the handrail wall opens downward, it is considered that rainwater enters the inside of the headboard through this gap. For this reason, the structure which can ensure the waterproofness of a handrail wall also in such a case is desired, and the necessity for such high waterproofness increases especially when the handrail wall is made of wood.
[0005]
On the other hand, in order to prevent rainwater from entering the inside of the headboard, the gap may be filled with a sealing agent and completely closed. However, according to this, the air permeability inside the headboard is impaired, and the durability of the handrail wall is affected, which is not preferable.
[0006]
The object of the present invention is to ensure the air permeability and to close the gap between the cover such as the headboard and the structure housing such as the handrail wall on which the cover is covered. It is an object of the present invention to provide a gap closing structure for a structure housing cover that satisfies both the air permeability and the closing material.
[0007]
[Means for Solving the Problems]
The gap closing structure of the structure housing cover according to the present invention is such that the front end surface of the structure housing having a jetty shape is covered, and the side surface portion of the cover faces the side surface of the structure housing with a gap. In addition, the plugging material for the gap is disposed leaving a ventilation portion between at least one of the side surface portion of the cover and the side surface of the structure housing. is there.
[0008]
According to the gap closing structure of the structure housing cover, the gap formed between the side surface portion of the cover and the side surface of the structure housing is closed with the closing material, so that waterproofness can be secured. In addition, this plugging material does not completely block the gap, but leaves a vent between at least one of the side surface of the cover and the side surface of the structure housing. Can also be secured.
[0009]
In the gap closing structure of the structural body cover, the closing material may not have air permeability or may have air permeability. Further, the closing material may be composed of respective portions having these properties, and two types of closing materials having these properties may be used in parallel in the gap closing structure of the structural body cover.
[0010]
Further, the gap closing structure of the structure housing cover according to the present invention is such that the front end surface of the structure housing having a jetty shape is covered, and the side surface portion of the cover opens a gap with the side surface of the structure housing. And a sealing material having air permeability is disposed in the gap.
[0011]
According to the gap closing structure of the structure housing cover, the airtight sealing material is disposed in the gap formed between the side surface portion of the cover and the side surface of the structure housing, so that the waterproof property of the gap is the arrangement of the sealing material. The air permeability of the gap can be ensured by the air permeability of the plugging material itself.
[0012]
In the structure for closing the gap of the structure housing cover, the closing material may be disposed in the gap without leaving a ventilation portion with respect to both the side surface portion of the cover and the side surface of the structure housing. And at least one of the side surfaces of the structural housing may be disposed in the gap leaving a ventilation portion.
[0013]
In the gap closing structure of each of the above structural body covers, in the case where the closing material is air permeable, the closing material may be a porous material such as foamed resin or sponge, or resin hair. Or a polychaete body formed of animal hair or the like, that is, mohair or the like.
[0014]
Further, in each structure housing cover gap closing structure, the closing material is disposed in the gap between the side surface portion of the cover and the side surface of the structure housing, leaving a ventilation portion between the side surface portion of the cover, and When a bent portion bent toward the structure housing side is formed at the end of the side surface portion of the cover, the plugging material is separated from the bent portion in the protruding direction of the jetty-shaped structure housing. It is good also as what overlaps in the thickness direction of this lever housing.
[0015]
In this way, the air permeability of the gap is a ventilation path formed by a ventilation portion between the closing material and the side surface portion of the cover, or a gap in the structure body projecting direction between the closing material and the bent portion. In addition to being secured, the plugging material and the bent portion overlap in the thickness direction of the structure housing, and therefore, the air passage can be meandered in the thickness direction of the structure housing.
[0016]
According to this, intrusion of rainwater into the cover inner side can be further effectively prevented by the meandering air passage, and the waterproofness of the structure housing by the cover and the plugging material can be enhanced.
[0017]
A gap closing material for a structure housing cover according to the present invention is provided in a gap between a side surface portion of a cover that covers a tip surface of a structure housing having a jetty shape and a side surface of the structure housing. It is characterized by being arranged leaving a ventilation part between at least one of the side part and the side face of the structure housing.
[0018]
According to the gap closing material of this structure enclosure cover, since it is arranged in the gap between the side surface portion of the cover and the side face of the structure enclosure, it is possible to ensure the waterproof property of this gap, and the arrangement of this closing material is Since the ventilation portion is left between at least one of the side surface portion of the cover and the side surface of the structure housing, the air permeability of the gap can be ensured.
[0019]
In the gap plugging material for the structural body cover, the plugging material itself may or may not have air permeability. In addition, the closing material may be composed of respective parts having these properties, and by using two types of closing materials having these properties in parallel, a waterproof and breathable structure is provided between the structure housing and the cover. May be secured and closed.
[0020]
Further, the gap closing material for the structure housing cover according to the present invention is disposed in a gap between the side surface portion of the cover that covers the tip end surface of the structure housing having a jetty shape and the side surface of the structure housing. And it has air permeability.
[0021]
Since the gap closing material for the structure casing cover is also arranged in the gap between the side surface of the cover and the side face of the structure casing, it is possible to secure the waterproofness of the gap, and the sealing material can be ventilated by itself. Therefore, the air permeability of the gap can be secured by this air permeability.
[0022]
In the gap closing material for the structure housing cover, the closing material may be disposed in the gap without leaving a ventilation portion with respect to both the side surface portion of the cover and the side surface of the structure housing. It may be arranged in the gap leaving a ventilation part between at least one of the part and the side surface of the structure housing.
[0023]
In the gap closing material of each of the above structural body covers, when the closing material has air permeability, it is assumed that the closing material is formed of a porous material such as foamed resin or sponge, for example. Of course, it may be formed of a polychromatic body such as resin hair or animal hair, that is, mohair.
[0024]
Further, in the gap closing material of each structure housing cover, the closing material may be attached to the side surface portion of the cover, may be attached to the side surface of the structure housing, and the structure housing and the structure housing attached to the side surface portion of the cover. It is good also as what was attached to the side of this.
[0025]
When the closing material is attached to the side surface portion of the cover, it is preferable that the closing material is attached in advance to the side surface portion of the cover before the cover is put on the front end surface of the structure housing.
[0026]
If the cover is attached in advance to the side surface of the cover before the cover is put on the front end surface of the structure housing, the side surface portion of the cover can be obtained by attaching the cover to the front end surface of the structure housing. It becomes possible to automatically arrange the plugging material in the gap between the side surfaces of the structure housing, and this arrangement work can be facilitated.
[0027]
In the gap closing structure and the closing material for the structure casing cover according to the present invention described above, the structure casing may be, for example, a handrail wall of a building, a waist wall, a parapet, a building foundation, However, any shape may be used as long as it has a shape of a jetty and covers a tip such as a headboard.
[0028]
In addition, when the structural frame is a handrail wall or waist wall of a building, the handrail wall or waist wall may form a balconi, may form an external staircase, and It may be a structure, for example one that forms a pedestrian overpass.
[0029]
Furthermore, the jetty-shaped structure housing with the cover on the tip surface may protrude upward, may protrude in the horizontal direction, or may protrude in a direction inclined with respect to these directions. The front end surface of the structure housing may be a horizontal surface, a vertical surface, or a surface inclined with respect to these surfaces. Furthermore, the distal end surface of the structure housing may be an acute or obtuse bent surface or a curved surface.
[0030]
Further, the side surface portion of the cover and the side surface of the structure housing that the side surface portion faces may be a surface extending in the longitudinal direction of the structure housing, or a surface that forms an angle such as a right angle with the longitudinal direction. Further, the side surfaces of these covers and the side surfaces of the structure housing may be vertical surfaces or surfaces inclined with respect to the vertical direction.
[0031]
Further, the structural body may be made of wood, concrete, metal, or a composite of at least two of these, or any material.
[0032]
The reason why a gap is formed between the side surface portion of the cover and the side surface of the structure housing in the case of applying the gap closing structure for the structure housing cover and the closing material thereof according to the present invention may be arbitrary.
[0033]
When the structure frame is a handrail wall and the cover is a headboard, the reason why there is a gap between the side surface of the headboard and the side surface of the handrail wall is that This is because brackets with a length protruding from both side surfaces are fixed, and the headboard is attached to the upper surface of the handrail wall through the bracket, and the gap is the length of the bracket protruding from the side surface of the handrail wall. Will be able to.
[0034]
When attaching a cover such as a headboard to a structural frame such as a handrail wall via an intermediate member such as a bracket, the closing material is disposed partially or intermittently except for the location of the intermediate member. Alternatively, the intermediate member may be continuously arranged including the place where the intermediate member is arranged.
[0035]
The gap closing structure for the structure housing cover and the closing material thereof according to the present invention can of course be applied even when the cover is attached to the structure housing without using such an intermediate member as a bracket.
[0036]
DETAILED DESCRIPTION OF THE INVENTION
Embodiments of the present invention will be described below with reference to the drawings. Each of the embodiments to be described below is a case where the structural frame is a handrail wall for a balconi of a building, and the cover is covered with a headboard that covers an upper surface that is a front end surface of the handrail wall.
[0037]
First, the structure of the handrail wall will be described with reference to FIGS. FIG. 1 is a longitudinal sectional view showing the internal structure of the handrail wall 1 and the headboard 10, and FIG. 2 is a plan view of the handrail wall 1 with the headboard 10 and the like partially cut away. The jetty-shaped balustrade wall 1 is made of wood. Therefore, the balustrade wall 1 is omitted in FIG. 2 and both end columns disposed at both ends in the longitudinal direction of the handrail wall 1 and the both end columns. A frame is formed by the middle pillar 2 erected between the two pillars and the upper end member 3 constructed between the two pillars and the upper ends of the middle pillars. The vertical trunk edge 4 is fixed. The surface material 5 is attached to the vertical trunk edge 4 arranged on the outdoor side surface of the handrail wall 1 and the vertical trunk edge 4 arranged on the indoor side surface, and these surface materials 5 are, for example, Siding, or tiled face. In addition, the surface of the handrail wall 1 is not restricted to this, For example, it is good also as wet finishing by mortar coating.
[0038]
A bracket 6 for attaching the headboard 10 to the railing wall 1 is disposed on the upper surface, which is the tip end surface of the railing wall 1 that protrudes upward, and this bracket 6 is shown in FIG. As shown in FIG. 1, a plurality of rails are arranged at predetermined intervals in the longitudinal direction of the handrail wall 1, and are fixed to the upper end member 3 with screws 7, nails or the like as shown in FIG. This fixing is performed by the main body portion 6A of the bracket 6, and the length in the thickness direction of the handrail wall 1 of the main body portion 6A is larger than the thickness dimension of the handrail wall 1, and both side surfaces 1A of the handrail wall 1 are used. , 1B, an upper extension 6B and a lower extension 6C are formed at each end of the main body 6A.
[0039]
The headboard 10 extending over the entire length of the handrail wall 1 covers the entire upper surface of the handrail wall 1 and has a main body 10A having a water gradient with a higher balcony outer side, a balconi outer end of the main body 10A, and a balcony inner Side portions 10B and 10C extending downward from the end portions and facing the side surfaces 1A and 1B of the handrail wall 1, and bent portions 10D and 10E bent toward the handrail wall 1 from the end portions of the side portions 10B and 10C. It consists of. Cover the handrail wall 1 from above with the side wall 10B, 10C slightly opened, place the main body 10A on the upper extension 6B of the bracket 6, and return the side 10B, 10C to the original state. By closing and locking the bent portions 10 </ b> D and 10 </ b> E to the lower end of the downward extending portion 6 </ b> C of the bracket 6, the headboard 10 is attached to the handrail wall 1 via the bracket 6.
[0040]
In addition, when the handrail 15 shown by the imaginary line in FIG. 1 is erected on the headboard 10, the support post of the handrail 15 and the core inserted into the support post are screwed into the headboard 10 and the bracket 6. It is fixed with fasteners such as.
[0041]
The side portions 10B and 10C of the headboard 10 face the side surfaces 1A and 1B of the handrail wall 1 with a space therebetween, and even if the bending amount of the bent portions 10D and 10E from the side portions 10B and 10C is included, these side portions A gap S corresponding to the length of the main body portion 6A of the bracket 6 protruding from both side surfaces 1A and 1B of the handrail wall 1 is formed between 10B and 10C and the side surfaces 1A and 1B.
[0042]
FIG. 1 shows a closing material 20 according to the first embodiment arranged in these gaps S. The closing material 20 is arranged in the longitudinal direction of the handrail wall 1 as shown in FIG. It is continuous. In FIG. 3, the closing material 20 disposed in the gap S on the outdoor side of the handrail wall 1 is shown enlarged.
[0043]
In FIG. 2, the closing material 20 is disposed in both the outdoor side gap S and the indoor side gap S of the handrail wall 1. Thus, the closing material 20 may be arrange | positioned in both the clearance gaps S, and may be arrange | positioned only in the clearance gap S of an outdoor side. The same applies to the closing material according to another embodiment described in the drawings after FIG.
[0044]
Next, the closing material 20 of the first embodiment will be described with reference to FIG. The closing member 20 is provided in a plate-shaped attachment portion 21 extending in the vertical direction, a box portion 22 projecting from the side portion 10B side of the headboard 10 at a lower portion of the attachment portion 21, and an inside of the box portion 22. It consists of a valve part 23. A hole 22B is formed in the lower side portion 22A of the box portion 22, and an opening portion 22D is formed in the upper side portion 22C. The opening 22D is continuous in the longitudinal direction of the handrail wall 1, and many holes 22B are formed at intervals in the longitudinal direction.
[0045]
The valve portion 23 is formed of, for example, a flexible elastic material such as rubber or soft synthetic resin, and has a length continuous in the longitudinal direction of the handrail wall 1. The upper end of the valve portion 23 is coupled to the inner surface of the box portion 22, and the valve portion 23 is inclined downward toward the side surface portion 10 </ b> B side of the headboard 10 at normal times. And when the valve part 23 rotates upwards centering on an upper end, as shown by the imaginary line, the thick part of the valve part 23 closes the opening part 22D of the box part 22 of the closing material 20 It has become.
[0046]
An extension 25 is formed on the lower side 22A of the box portion 22 of the closing material 20 and protrudes toward the side surface 10B of the headboard 10.
[0047]
The closing member 20 having such a shape and structure is configured such that the mounting portion 21 is screwed on the side surface 1A of the handrail wall 1 via the seal member 26 before the headboard 10 is put on the upper surface of the handrail wall 1. It is attached to the handrail wall 1 by being fixed with the fastening tool 27. Thereafter, when the headboard 10 is attached to the handrail wall 1 with the bracket 6 as described above, the extension portion 25 is located at the handrail having a jetty shape protruding upward with respect to the bent portion 10D of the headboard 10. It is a position separated in the protruding direction of the wall 1, that is, a position separated upward, and overlapped in the thickness direction of the handrail wall 1. Further, at this time, the closing material 20 including the extension portion 25 is located at a position where the ventilation portion 28 is left between the side surface portion 10B of the headboard 10 (at a place where the bracket 6 is disposed, the bracket 6 extends downward). It is arranged at a position where the ventilation part is left also between the part 6C.
[0048]
According to the above-described closing material 20 of the first embodiment, when strong wind blows up along the side surface 1A of the handrail wall 1 during rainy weather such as a typhoon, it enters the box portion 22 from the hole 22B of the closing material 20. Due to the strong wind, the valve portion 23 pivots upward about the upper end, and as a result, the opening 22D of the box portion 22 is closed by the thick portion of the valve portion 23. For this reason, even if rainwater enters the inside of the box portion 22 together with strong wind, the rainwater further enters the inside of the headboard 10 and rides on the upper surface of the bracket 6 or in the gap on the back side of the surface material 5 of the handrail wall 1. Intrusion can be prevented.
[0049]
In addition, a ventilation portion 28 is provided between the closing material 20 and the side surface portion 10B of the headboard 10, and the closing material 20 overlapping in the thickness direction of the handrail wall 1 is provided below the ventilation portion 28. Since the extending portion 25 and the bent portion 10D of the headboard 10 are provided, the air passage 29 from the gap S at the height position of the bent portion 10D to the vent portion 28 is an extended portion of these overlapping plugging materials 20. 25 and the bent portion 10 </ b> D of the headboard 10 meander in the thickness direction of the handrail wall 1. For this reason, rain water cannot enter the inside of the headboard 10 through the air passage 29 and the air passage 28 together with the storm, and the rain water is blocked by the bent portion 10D and the extension portion 25 and falls downward. , It does not enter the inside of the caps 10.
[0050]
Therefore, even if there is a gap S between the side surface 1A of the handrail wall 1 and the side surface portion 10B of the headboard 10, the waterproofness of the gap S can be ensured.
[0051]
On the other hand, in fine weather, the inside of the headboard 10 communicates with the outside of the headboard 10 through the opening 22D and the hole 22B of the plugging material 20 and the ventilation portion 28 and the ventilation passage 29, so that air permeability is ensured. Yes. Therefore, when the weather is fine, moisture or the like evaporating from the inside of the handrail wall 1 can be discharged to the outside of the headboard 10 and the durability of the handrail wall 1 and the like can be improved.
[0052]
Next, various plugging materials according to other embodiments of the present invention will be described. These plugging materials have the length which continues in the longitudinal direction of the handrail wall 1 like the plugging material of the said embodiment.
[0053]
The closing material 30 according to the second embodiment shown in FIG. 4 includes a closing material body 31 and a hanging member 32 that is suspended from the lower end of the closing material body 31. The closure material body 31 includes a plate-like attachment portion 31A fixed to the side surface 1A of the handrail wall 1 with a fastening member 37 via a sealing member 36, and the side portion 10B side of the headboard 10 from the lower end of the attachment portion 31A. The hanging member 32 is formed at an end of the horizontally extending portion 31B, and the hanging member 32 is made of a flexible material such as rubber or soft synthetic resin. Made of an elastic material. And there is a gap between the lower end of the drooping member 32 and the bent portion 10 </ b> D of the headboard 10.
[0054]
Further, the position of the tip of the horizontal extending portion 31 </ b> B of the closing material body 31 and the hanging member 32 is a position where the ventilation portion 38 is left between the side surface portion 10 </ b> B of the headboard 10.
[0055]
In this embodiment, when a strong wind blows up along the side surface 1A of the handrail wall 1 in rainy weather accompanied by a storm, the drooping member 32 is formed by the strong wind around the upper end that is a connection portion with the closing member body 31. It turns to the side surface portion 10B side. Thereby, the tip of the hanging member 32 is in contact with the inner surface of the side surface portion 10B of the headboard 10 at a location where the bracket 6 is not disposed, and the downward extending portion 6C of the bracket 6 at a location where the bracket 6 is disposed. Touch the inner surface. As a result, even if rainwater tries to enter the inside of the headboard 10 together with the strong wind, this intrusion occurs between the drooping member 32 that rotates in this way, and the side surface portion 10B of the headboard 10 and the side surface 1A of the handrail wall 1. It will be blocked by the horizontally extending portion 31B of the closing material body 31 disposed in the gap S, and the waterproofness of the gap S is ensured.
[0056]
On the other hand, when the weather is clear, the inside and outside of the headboard 10 communicate with each other via the ventilation portion 38, so that the air permeability is ensured as in the first embodiment.
[0057]
FIG. 5 shows a closing material 40 according to the third embodiment. The closing member 40 includes a plate-like mounting portion 40A fixed to the side surface 1A of the handrail wall 1 with a fastening member 47 via a sealing member 46, and the side surface portion 10B side of the headboard 10 from the lower end of the mounting portion 40A. The horizontal extension 40B is formed of an angle member that extends horizontally, and the position of the tip of the horizontal extension 40B is the position where the ventilation part 48 is left between the side face 10B of the headboard 10 (the bracket 6 is In the place where it is arranged, it is a position where the ventilation portion is left between the bracket 6 and the downward extending portion 6C.
[0058]
Further, the horizontal extension 40 </ b> B is slightly spaced upward from the bent portion 10 </ b> D of the headboard 10 in the protruding direction of the handrail wall 1 and overlaps in the thickness direction of the handrail wall 1. Therefore, the bent portion 10D of A ventilation path 49 extending from the gap S at the height position to the ventilation section 48 meanders in the thickness direction of the handrail wall 1.
[0059]
When rainwater blows up along with the strong winds along the side surface 1A of the handrail wall 1 during rainy weather, the rainwater flows between the side surface 10B of the headboard 10 and the side surface 1A of the handrail wall 1. Since the air passage 49 that is blocked by the horizontally extending portion 40B of the closing material 40 disposed in the gap S and leads to the air passage 48 is meandering in the thickness direction of the handrail wall 1, this air passage Intrusion of rain water into the inner side of the headboard 10 through 49 and the ventilation part 48 is also prevented, and waterproofness is secured.
[0060]
And, in fine weather, the inside and outside of the headboard 10 communicate with each other through the ventilation portion 48 and the ventilation passage 49, so that the air permeability is ensured.
[0061]
FIG. 6 shows a closing material 50 according to the fourth embodiment. The plugging material 50 is formed of a porous body having elasticity by foamed resin, sponge, or the like. Therefore, the plugging material 50 itself has air permeability. The closing material 50 is attached to the inner surface of the side surface portion 10B of the headboard 10 with an adhesive or the like before the headboard 10 is put on the upper surface of the handrail wall 1. The natural dimension in the thickness direction of the handrail wall 1 in the closing material 50 is set larger than the dimension from the inner surface of the side surface portion 10B of the headboard 10 to the side surface 1A of the handrail wall 1. For this reason, when the headboard 10 is put on the handrail wall 1 from above and attached to the handrail wall 1 with the bracket 6, the end of the closing material 50 on the handrail wall 1 side is the hand at the place where the bracket 6 is not disposed. The closing material 50 is slightly compressed and deformed by elastic contact with the side surface 1 </ b> A of the sliding wall 1, and the closing material 50 is pressed against the outer surface of the downwardly extending portion 6 </ b> C of the bracket 6 at the place where the bracket 6 is disposed. Largely deformed by compression.
[0062]
When rainwater blows up along the side surface 1A of the handrail wall 1 in rainy weather accompanied by a storm, the gap between the side surface portion 10B of the headboard 10 and the side surface 1A of the handrail wall 1 at a place where the bracket 6 is not disposed. Since S is blocked by the plug 50, the rainwater does not reach a position higher than the bracket 6, and the rainwater is located inside the downwardly extending portion 6C of the bracket 6 where the bracket 6 is disposed. However, rainwater does not reach a position higher than that of the bracket 6 even at this point because it is blocked by the main body 6A of the bracket 6 protruding from the side surface 1A of the handrail wall 1. Therefore, waterproofness is ensured at a position higher than the main body 6A of the bracket 6 in the gap S between the side surface portion 10B of the headboard 10 and the side surface 1A of the handrail wall 1.
[0063]
On the other hand, since the closing material 50 itself is formed of a porous material having air permeability during fine weather, air permeability between the inner side of the headboard 10 and the outer side of the headboard 10 in the space above the closing material 50 is ensured. Is done.
[0064]
Further, according to this embodiment, the closing member 50 is fixed to the inner surface of the side surface portion 10B of the headboard 10 before the headboard 10 is attached to the handrail wall 1, so that the headboard 10 is attached to the handrail wall 1 with the bracket 6. Thus, the closing material 50 is naturally placed at a predetermined position, so that the placement work of the closing material 50 can be easily performed.
[0065]
7 and 8 show a closing material 60 according to the fifth embodiment. The closing material 60 includes a plate-like attachment portion 61 that is fixed to the side surface 1A of the handrail wall 1 with a fastening member 67 via a seal member 66, and the lower end of the attachment portion 61 toward the side surface portion 10B of the headboard 10. The protruding portion 62 is made of an elastic material such as rubber or soft synthetic resin.
[0066]
FIG. 7 shows a case where the distance between the side surface portion 10B of the headboard 10 and the side surface 1A of the handrail wall 1 is a large dimension L1. In this case, the tip of the protrusion 62 does not reach the side surface 10 </ b> B of the headboard 10 but reaches the downward extension 6 </ b> C of the bracket 6.
[0067]
In FIG. 7, most of the gap S in the spacing direction between the side surface portion 10 </ b> B of the headboard 10 and the side surface 1 </ b> A of the handrail wall 1 is closed by the protruding portion 62 of the closing material 60 and the bent portion 10 </ b> D of the headboard 10. Since the protrusion 62 that is spaced upward from the overlap overlaps in the thickness direction of the bent portion 10D and the handrail wall 1, even if rainwater blows up along the side surface 1A of the handrail wall 1, This rainwater that is blown up along the side surface 1A at a position closer to the handrail wall 1 than the bent portion 10D is prevented from rising to a position higher than the protruding portion 62. For this reason, the waterproof property of the clearance gap S about a position higher than the protrusion part 62 is ensured.
[0068]
On the other hand, since the ventilation part 68 is left inside the side face part 10B of the headboard 10 where the tip of the protruding part 62 of the closing material 60 does not reach when the weather is clear, the ventilation part 68 allows the inside and outside of the headboard 10 to be ventilated. Is secured.
[0069]
FIG. 8 shows a case where the distance between the side surface portion 10B of the headboard 10 and the side surface 1A of the handrail wall 1 is a small dimension L2. In this case, the leading end of the protruding portion 62 reaches the side surface portion 10 of the headboard 10, and at the place where the bracket 6 is disposed, the protruding portion 62 hits the downward extending portion 6 </ b> C of the bracket 6 and is bent downward.
[0070]
In the case of FIG. 8, even when rainwater blows up along the side surface 1A of the handrail wall 1 during rainy weather, the rainwater is blocked by the protruding portion 62 of the closing material 60 and is prevented from rising further. For this reason, the waterproof property of the clearance gap S about a position higher than the protrusion part 62 is ensured.
[0071]
In fine weather, the projecting portion 62 formed of the elastic material of the closing material 60 is only in elastic contact with the downwardly extending portion 6C of the bracket 6, and the width direction of the downwardly extending portion 6C (front and back in FIG. 8). Direction) On both sides, a ventilation portion 68 ′ is formed between the projecting portion 62, the downward extending portion 6C, and the side surface portion 10B of the headboard 10. Therefore, the ventilation portion 68 ′ allows the inside and outside of the headboard 10 to be ventilated. Secured.
[0072]
And according to the closure material 60 of this 5th Embodiment, since the protrusion part 62 is formed with the elastic material, the various types of hand from which the space | interval of the side part 10B of the headboard 10 and the side surface 1A of the handrail wall 1 differs is different. The effect that it can be used in common with the sliding wall can be obtained.
[0073]
FIG. 9 shows blocking materials 70 and 80 according to the sixth embodiment. Of these plugging materials 70, 80, the plugging material 70 is formed of an elastic material such as rubber or a soft synthetic resin, and the plugging material 80 is formed of the same material as the plugging material 70 or a hard material such as a hard synthetic resin. Yes. Further, the closing material 70 is attached in advance to the inner surface of the side surface portion 10B of the headboard 10 before being covered with the upper surface of the handrail wall 1, and the closing material 80 is attached to the side surface 1A of the handrail wall 1.
[0074]
When the headboard 10 is attached to the upper surface of the handrail wall 1 via the bracket 6, the closing material 70 faces the side surface 1 </ b> A of the handrail wall 1 and the ventilation portion 78 at a place where the bracket 6 is not disposed. In the place where the bracket 6 is disposed, the bracket 6 is largely compressed and deformed by the downward extending portion 6C. Further, the closing material 80 located at a position lower than the closing material 70 faces the surface portion 10B of the headboard 10 and the ventilation portion 88 at a location where the bracket 6 is not disposed, and a location where the bracket 6 is disposed. Then, it contacts with the downward extension part 6C of the bracket 6 or is slightly separated from the downward extension part 6C. In addition, the blocking materials 70 and 80 that are separated in the height direction of the handrail wall 1, which is the protruding direction of the handrail wall 1, have a thickness of the handrail wall 1 at a place where the bracket 6 is not disposed. Duplicate in direction.
[0075]
For this reason, when rainwater blows up along the side surface 1A of the handrail wall 1, in locations where the bracket 6 is not disposed, the rainwater is not less than the arrangement height of these closing materials 70 and 80 by the closing materials 70 and 80. At the location where the bracket 6 is disposed, it is blocked by the closing material 80 and protrudes from the side surface 1A of the handrail wall 1 even if the height is higher than the arrangement height of the closing material 80. The main body 6 </ b> A of the bracket 6 is prevented from being raised to a position higher than the bracket 6. For this reason, waterproofness is securable.
[0076]
On the other hand, when the weather is fine, the ventilation portions 78 and 88 ensure the air permeability inside and outside the headboard 10.
[0077]
10 to 12 show a closing material 90 according to the seventh embodiment. The closing material 90 is formed of a porous material having elasticity such as sponge, and as shown in FIG. 10, before the headboard 10 is attached to the upper surface of the handrail wall 1, It is being fixed to the inner surface of the bending part formed with the part 10B with a double-sided tape or an adhesive agent. 11 and 12 show a state in which the headboard 10 is attached to the upper surface of the handrail wall 1 via the bracket 6, and FIG. 11 is a longitudinal section of the handrail wall 1 and the headboard 10 at the place where the bracket 6 is arranged. FIG. 12 is a vertical cross-sectional view of the handrail wall 1 and the headboard 10 at a location where the bracket 6 is not disposed.
[0078]
In this embodiment, the operation of attaching the headboard 10 to the upper surface of the handrail wall 1 via the bracket 6 is performed while compressing and deforming the closing material 90 at the upper extension portion 6B of the bracket 6. After this attachment work, the vicinity of the lower corner portion of the closing material 90 on the handrail wall 1 side is in elastic contact with the side surface 1A and the upper surface of the handrail wall 1 at a location where the bracket 6 shown in FIG. About the location where the bracket 6 shown by 11 is arrange | positioned, the upper surface of the handrail wall 1 removed from the upward extension part 6B of the bracket 6 is elastically contacted.
[0079]
When rainwater blows up along the side surface 1A of the handrail wall 1 in rainy weather accompanied by a storm, the upper portion of the gap S near the upper surface of the handrail wall 1 in the portion where the bracket 6 is not disposed is the closing material 90. Therefore, the rainwater does not enter the upper surface of the handrail wall 1 and the body 6A of the bracket 6 protrudes from the side surface 1A of the handrail wall 1 at the place where the bracket 6 is disposed. For this reason, the main body 6A prevents rainwater from reaching the upper surface of the handrail wall 1 and ensures waterproofness.
[0080]
On the other hand, during fine weather, the closing material 90 is made of a porous material and has air permeability by itself. Therefore, even if the closing material 90 is provided inside the headboard 10, air permeability inside and outside the headboard 10 is ensured. .
[0081]
The embodiment described above is about the side portions 10B and 10C in the balconi inside / outside direction of the headboard 10 shown in FIG. 13, but each of the above embodiments is the case where the handrail wall 1 has the dug portion 1C. In addition, if the headboard 10 has a side surface portion 10F that forms an angle with the longitudinal direction of the handrail wall 1, it can also be applied to this side surface portion 10F.
[0082]
【The invention's effect】
According to the present invention, it is possible to close a gap between a cover such as a headboard and a structure housing such as a handrail wall on which the cover is covered with air permeability. You will be able to satisfy both sex.
[Brief description of the drawings]
FIG. 1 is a longitudinal sectional view showing a handrail wall that is a structural frame to which a closing material according to a first embodiment of the present invention is applied and a headboard that is a cover.
FIG. 2 is a plan view of the handrail wall of FIG.
FIG. 3 is a partially enlarged view of FIG. 1 showing an arrangement portion of the closing material according to the first embodiment.
FIG. 4 is a view similar to FIG. 3 showing the closing material of the second embodiment.
FIG. 5 is a view similar to FIG. 3 showing the closing material of the third embodiment.
FIG. 6 is a view similar to FIG. 3 showing the closing material of the fourth embodiment.
FIG. 7 is a view similar to FIG. 3 showing the closing material of the fifth embodiment.
8 is a view similar to FIG. 3 showing a case where the distance between the side surface of the handrail wall and the side surface portion of the headboard is different from that of FIG. 7 in the closing material of the fifth embodiment.
FIG. 9 is a view similar to FIG. 3 showing the closing material of the sixth embodiment.
FIG. 10 is a view showing a closing material according to a seventh embodiment, and is a longitudinal sectional view showing a main part of a headboard that is a cover before being attached to the upper surface of a handrail wall that is a structural frame.
FIG. 11 is a view similar to FIG. 3 showing the closing material of the seventh embodiment.
12 is a longitudinal cross-sectional view of the plugging material according to the seventh embodiment, which is different from that in FIG. 11 in the longitudinal direction of the handrail wall. FIG.
FIG. 13 is a perspective view showing a portion of a dug portion formed on a handrail wall.
[Explanation of symbols]
Handrail wall that is 1 structure
1A, 1B, side
6 Bracket
10 Kasagi is the cover
10B, 10C, 10F Side part
10D, 10E bent part
20, 30, 40, 50, 60, 70, 80, 90 Sealing material
28,38,48,68,68 ', 78,88 Ventilation part
29,49 Airway
S clearance

Claims (5)

突堤形状になっている構造物躯体の先端面にカバーが被せられ、このカバーは、前記構造物躯体の上面全部を覆う本体部と、この本体部の端部から下方へ延び、前記構造物躯体の側面と隙間を開けて対面する側面部と、この側面部の端部から前記構造物躯体側に屈曲した屈曲部とからなり、
前記隙間に塞ぎ材が配置され、この塞ぎ材は、塞ぎ材本体と、この塞ぎ材本体の下端から垂設された垂下部材とからなり、前記塞ぎ材本体は、前記構造物躯体の前記側面に固定された取付部と、この取付部の下端から前記カバーの前記側面部側へ延びる延出部とからなり、この延出部の先端に可撓性弾性材料からなる前記垂下部材が垂設されており、
前記垂下部材の下端と前記カバーの前記屈曲部との間には間隔があいているとともに、前記延出部の先端と前記垂下部材の位置は、前記カバーの前記側面部との間に通気部を残した位置となっており、
前記垂下部材は、前記構造物躯体の前記側面に沿って吹き上がる強風で上端を中心に前記カバーの前記側面部側へ回動してこの側面部の内面に接触することを特徴とする構造物躯体カバーの隙間塞ぎ構造。
A cover is placed on the front end surface of the structure housing having a jetty shape. The cover extends over the entire upper surface of the structure housing, and extends downward from the end of the body portion. A side surface portion that faces the side surface of the structure and a bent portion that is bent from the end portion of the side surface portion toward the structure housing side,
A closing material is disposed in the gap, and the closing material includes a closing material body and a hanging member suspended from the lower end of the closing material body, and the closing material body is disposed on the side surface of the structural body. The hanging portion includes a fixed mounting portion and an extending portion extending from the lower end of the mounting portion toward the side surface portion of the cover, and the hanging member made of a flexible elastic material is suspended from the distal end of the extending portion. And
There is a gap between the lower end of the drooping member and the bent portion of the cover , and the tip of the extending portion and the position of the drooping member are located between the side portion of the cover and the ventilation portion. It is the position that left
The drooping member is turned to the side surface side of the cover around the upper end by a strong wind blowing along the side surface of the structure housing, and contacts the inner surface of the side surface portion. Structure for closing the gap of the housing cover.
突堤形状になっている構造物躯体の先端面にカバーが被せられ、このカバーは、前記構造物躯体の上面全部を覆う本体部と、この本体部の端部から下方へ延び、前記構造物躯体の側面と隙間を開けて対面する側面部と、この側面部の端部から前記構造物躯体側に屈曲した屈曲部とからなり、
前記隙間に塞ぎ材が配置され、この塞ぎ材は、前記構造物躯体の前記側面に固定された取付部と、この取付部の下端から前記カバーの前記側面部側へ延びる延出部とからなり、この延出部の先端の位置は、前記カバーの前記側面部との間に通気部を残した位置となっているとともに、前記延出部は、前記カバーの前記屈曲部に対し、上方に僅かに離間していてこの構造物躯体の厚さ方向には重複しており、
前記屈曲部の高さ位置における前記隙間から前記通気部に至る通気路が前記構造物躯体の厚さ方向に蛇行していることを特徴とする構造物躯体カバーの隙間塞ぎ構造。
A cover is placed on the front end surface of the structure housing having a jetty shape. The cover covers the entire upper surface of the structure housing, and extends downward from the end of the body portion. A side surface portion that faces the side surface of the structure, and a bent portion that is bent from the end portion of the side surface portion toward the structure housing side,
A closing material is disposed in the gap, and the closing material includes an attachment portion fixed to the side surface of the structural body and an extending portion extending from the lower end of the attachment portion toward the side surface portion of the cover. The position of the tip of the extension part is a position where a ventilation part is left between the side part of the cover and the extension part is located above the bent part of the cover. It is slightly separated and overlaps in the thickness direction of this structure housing,
A gap closing structure for a structure housing cover, wherein an air passage extending from the gap at the height position of the bent portion to the ventilation portion meanders in the thickness direction of the structure housing.
請求項1又は2に記載の構造物躯体カバーの隙間塞ぎ構造において、前記取付部は、前記構造物躯体の前記側面にシール部材を介して固定されていることを特徴とする構造物躯体カバーの隙間塞ぎ構造。  3. The structure housing cover according to claim 1 or 2, wherein the mounting portion is fixed to the side surface of the structure housing via a seal member. Gap closing structure. 請求項1〜3のいずれかに記載の構造物躯体カバーの隙間塞ぎ構造において、前記構造物躯体の前記先端面には、前記カバーを前記構造物躯体に取り付けるためのブラケットが配置され、このブラケットは、前記構造物躯体の前記先端面に固定され、前記構造物躯体の厚さ方向長さがこの構造物躯体の厚さ寸法よりも大きくなっている本体部と、この本体部における前記構造物躯体の前記側面から突出している端部に形成された上方延出部及び下方延出部とを有し、前記カバーの前記本体部が前記ブラケットの前記上方延出部に載せられ、前記カバーの前記屈曲部が前記ブラケットの前記下方延出部の下端に係止されていることを特徴とする構造物躯体カバーの隙間塞ぎ構造。  The gap closing structure of the structure housing cover according to any one of claims 1 to 3, wherein a bracket for attaching the cover to the structure housing is disposed on the front end surface of the structure housing. Is fixed to the front end surface of the structure housing, and the length of the structure housing in the thickness direction is larger than the thickness dimension of the structure housing, and the structure in the body portion An upper extension portion and a lower extension portion formed at an end portion protruding from the side surface of the housing, and the main body portion of the cover is placed on the upper extension portion of the bracket. A gap closing structure for a structure housing cover, wherein the bent portion is locked to a lower end of the downwardly extending portion of the bracket. 請求項1〜4のいずれかに記載の構造物躯体カバーの隙間塞ぎ構造において、前記構造物躯体は木質製であることを特徴とする構造物躯体カバーの隙間塞ぎ構造。  5. A gap closing structure for a structure casing cover according to claim 1, wherein the structure casing is made of wood.
JP36459199A 1999-12-22 1999-12-22 Structure gap closing structure cover Expired - Fee Related JP4447097B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP36459199A JP4447097B2 (en) 1999-12-22 1999-12-22 Structure gap closing structure cover

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP36459199A JP4447097B2 (en) 1999-12-22 1999-12-22 Structure gap closing structure cover

Publications (2)

Publication Number Publication Date
JP2001182259A JP2001182259A (en) 2001-07-03
JP4447097B2 true JP4447097B2 (en) 2010-04-07

Family

ID=18482194

Family Applications (1)

Application Number Title Priority Date Filing Date
JP36459199A Expired - Fee Related JP4447097B2 (en) 1999-12-22 1999-12-22 Structure gap closing structure cover

Country Status (1)

Country Link
JP (1) JP4447097B2 (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4993948B2 (en) * 2006-05-17 2012-08-08 文化シヤッター株式会社 Kasagi equipment
JP5065751B2 (en) * 2007-05-09 2012-11-07 トヨタホーム株式会社 Ventilation structure behind the hut
JP5774840B2 (en) * 2010-11-08 2015-09-09 株式会社トーコー Parapet ventilation structure
JP6205197B2 (en) * 2012-07-11 2017-09-27 ミサワホーム株式会社 Building ventilation structure
JP6235976B2 (en) * 2014-09-30 2017-11-22 大和ハウス工業株式会社 Kasagi installation structure
JP6529890B2 (en) * 2015-10-29 2019-06-12 Ykk Ap株式会社 Wall structure with Tochigi

Also Published As

Publication number Publication date
JP2001182259A (en) 2001-07-03

Similar Documents

Publication Publication Date Title
US5617683A (en) Shutter panel
JP4616353B2 (en) Rain closing method using air inflow prevention skirt
JP4447097B2 (en) Structure gap closing structure cover
JP4644116B2 (en) The eaves of the balcony
JP6882927B2 (en) Ventilation member end cap and outer wall structure
JP4478433B2 (en) Ventilation structure of building
JP2007016383A (en) Heat insulating screen
JP4027532B2 (en) Veranda doorway structure
JP3583111B2 (en) Ventilation building structure
JP7194967B2 (en) Vent ventilation material
JPH0334995Y2 (en)
JP3052428U (en) Base wall outer wall structure
JP3805568B2 (en) Dry joint structure of buildings
JP5676999B2 (en) Building outer wall structure
JP3301987B2 (en) Roof panel edge dressing material, roof valley structure using it
JP3407922B2 (en) Kasagi for rising part of overhang unit
JP2001140364A (en) Watertight structure around opening in building and watertight structure for sill of exterior wall of building
JP2640655B2 (en) Exterior wall structure around the opening
JP3096439B2 (en) Drainage structure of composite sash
JPS587023Y2 (en) Mounting structure of opening frame
JPH021388Y2 (en)
JP3072231U (en) Cover of the joint between the building structure and the Kasagi
JPH0526185Y2 (en)
JPH0543182Y2 (en)
JP5676998B2 (en) Building outer wall structure

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20060926

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20090105

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20090818

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20090914

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20091201

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20091208

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20100119

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20100120

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130129

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 4447097

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20160129

Year of fee payment: 6

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees