JP4446814B2 - Prop bracket - Google Patents

Prop bracket Download PDF

Info

Publication number
JP4446814B2
JP4446814B2 JP2004195911A JP2004195911A JP4446814B2 JP 4446814 B2 JP4446814 B2 JP 4446814B2 JP 2004195911 A JP2004195911 A JP 2004195911A JP 2004195911 A JP2004195911 A JP 2004195911A JP 4446814 B2 JP4446814 B2 JP 4446814B2
Authority
JP
Japan
Prior art keywords
pipe
hook
pipe member
portions
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2004195911A
Other languages
Japanese (ja)
Other versions
JP2006016856A (en
Inventor
義晴 内橋
Original Assignee
平和技研株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 平和技研株式会社 filed Critical 平和技研株式会社
Priority to JP2004195911A priority Critical patent/JP4446814B2/en
Publication of JP2006016856A publication Critical patent/JP2006016856A/en
Application granted granted Critical
Publication of JP4446814B2 publication Critical patent/JP4446814B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Description

本発明は、くさび緊結式足場に使用する支柱金具に関する。 The present invention relates to a post fitting used for a wedge-tight scaffold.

従来、くさび緊結式足場を構成する支柱は、所定の長さ(例えば、900mm、1900mm、2090mm、2850mm、及び3800mm等)の鋼管で形成される支柱パイプに、水平部材(例えば、ブラケット、跳ね出しブラケット、腕木材、及び手摺り等)に設けられたくさび状のフック部を取付け可能な複数、例えば2又は4個のフック取付部が所定間隔(例えば、450mm間隔又は475mm間隔)で溶接されている(例えば、特許文献1参照)。また、支柱パイプのフック取付部に取付けられる水平部材は、所定長さの鋼管で形成される水平パイプの一端又は両端にフック部が溶接されて形成されている。 Conventionally, struts constituting a wedge-tightened scaffold are horizontally disposed on a strut pipe formed of a steel pipe having a predetermined length (for example, 900 mm, 1900 mm, 2090 mm, 2850 mm, and 3800 mm). A plurality of, for example, two or four hook mounting portions that can be attached to the wedge-shaped hook portions provided on the bracket, arm wood, handrail, etc., are welded at predetermined intervals (for example, 450 mm intervals or 475 mm intervals). (For example, refer to Patent Document 1). Moreover, the horizontal member attached to the hook attachment part of a support | pillar pipe is formed by welding a hook part to the one end or both ends of the horizontal pipe formed with the steel pipe of predetermined length.

特開2001−173222号公報JP 2001-173222 A

しかしながら、支柱及び水平部材は、それぞれ寸法が決まっているので取付け時の融通性がないという問題があった。また、支柱には支柱パイプにフック取付部が、また、水平部材には水平パイプにフック部がそれぞれ鋼管に溶接して取付けられているので、溶接時に歪みが発生すると共に、収納時に嵩張るという問題もあった。更に、支柱を上下に接続するためには、支柱の上端と他の支柱の下端とを係合させるための係合部を設けなければならないという問題があった。 However, since the dimensions of the support column and the horizontal member are determined, there is a problem in that there is no flexibility in mounting. In addition, since the hook attachment part is attached to the steel pipe and the hook attachment part is attached to the pillar pipe and the horizontal pipe is attached to the horizontal member, the problem is that distortion occurs at the time of welding and bulky at the time of storage. There was also. Furthermore, in order to connect the support column vertically, there has been a problem that an engaging portion for engaging the upper end of the support column with the lower end of another support column has to be provided.

本発明はかかる事情に鑑みてなされたもので、コンパクトで融通性のある支柱金具を提供することを目的とする。 The present invention has been made in view of such circumstances, and an object of the present invention is to provide a compact and flexible support bracket.

前記目的に沿う請求項1記載の支柱金具は、使用にあっては支柱パイプに取付けられる長さが180mm以上で450mm以下のパイプ部材と、
前記パイプ部材の外側の左右にそれぞれ対向して取付けられた第3、第4のフック取付部、及び前記パイプ部材の外側の前後に前記第3、第4のフック取付部とは段違いで下にそれぞれ対向して設けられた第1、第2のフック取付部と、
前記パイプ部材の上下にそれぞれ設けられ、第1及び第2の雌ねじと該第1及び第2の雌ねじにそれぞれ螺合する第1及び第2のボルトとを備え該第1及び第2のボルトが該パイプ部材の内側まで挿通し、該パイプ部材に挿入される前記支柱パイプを締め付け可能な第1及び第2の支柱パイプ締付部と
前記第1〜第4のフック取付部に嵌入可能なくさび状のフック部、該フック部が先端側に設けられた短管、及び該短管の基端側に設けられ該短管に内側まで挿入される水平パイプを締め付ける第3のボルトを螺合させる第3の雌ねじを有するフック形成金具とを有し、
しかも、前記第1の雌ねじはそれぞれ前記第1、第2のフック取付部の上方で、該第1、第2のフック取付部に前記フック部が嵌入可能な位置に、前記第2の雌ねじはそれぞれ前記第3、第4のフック取付部の下方で、該第3、第4のフック取付部に嵌入する前記フック部が該第2の雌ねじに当接しない位置に設けられている。
The strut metal fitting according to claim 1, which meets the purpose, a pipe member having a length of 180 mm or more and 450 mm or less attached to the strut pipe in use ;
Third and fourth hook mounting portions attached to the left and right sides of the pipe member opposite to each other, and the third and fourth hook mounting portions on the front and rear sides of the pipe member. First and second hook mounting portions provided to face each other ;
Respectively provided above and below the pipe member, and first and second bolts screwed to the first and second internal thread and the first and second internal thread, the first and second bolts Are inserted to the inside of the pipe member, and first and second strut pipe tightening portions capable of tightening the strut pipe inserted into the pipe member ;
A wedge-shaped hook portion that can be fitted into the first to fourth hook mounting portions, a short tube having the hook portion provided on the distal end side, and a proximal end side of the short tube to the inside of the short tube A hook-forming metal fitting having a third female screw for screwing a third bolt for tightening a horizontal pipe to be inserted;
Moreover, the first female screw is located above the first and second hook mounting portions, respectively, at a position where the hook portion can be fitted into the first and second hook mounting portions, and the second female screw is Below the third and fourth hook attachment portions, the hook portions that fit into the third and fourth hook attachment portions are provided at positions that do not contact the second female screw.

請求項1記載の支柱金具において、パイプ部材には、例えば、一般構造用炭素鋼鋼管及び機械構造用炭素鋼鋼管のいずれか一方又は双方が使用でき、パイプ部材の内径より小さい外径を有する鋼管、例えば、一般構造用炭素鋼鋼管及び機械構造用炭素鋼鋼管のいずれか一方又は双方からなる支柱パイプを挿入することができる。また、第1〜第4のフック取付部は、フック部を上から嵌入するために、上下開放となった筒状に形成されている。なお、フック取付部は、箱状に形成すると雨等によって内部に水が溜まり錆が発生することがあるので、筒状に形成するのが好ましい。 2. The strut fitting according to claim 1, wherein the pipe member can be, for example, one or both of a general structural carbon steel pipe and a mechanical structural carbon steel pipe, and has an outer diameter smaller than the inner diameter of the pipe member. For example, it is possible to insert a support pipe made of one or both of a general structural carbon steel pipe and a mechanical structural carbon steel pipe. Moreover, the 1st-4th hook attaching part is formed in the cylinder shape opened up and down in order to insert a hook part from the top. In addition, since a hook attachment part may form water inside by rain etc. when it forms in a box shape and rust may generate | occur | produce, it is preferable to form in a cylinder shape.

請求項1記載の支柱金具において、第1及び第2の雌ねじは、それぞれ2ずつ設ける。この雌ねじにそれぞれ螺合する第1及び第2のボルトは、先端が尖っているのが好ましい。これによって、パイプ部材を支柱パイプに強固に固定することができる。ここで、第1及び第2の雌ねじは、パイプ部材に設けられる貫通孔と、この貫通孔に連通して溶接され、第1及び第2のボルトがそれぞれ螺合するナットとで構成してもよく、この場合、貫通孔はタップを切って雌ねじ止めを形成してもよい。また、第1及び第2の雌ねじは、パイプ部材にタップを切って雌ねじ止めを形成した貫通孔のみで構成し、この貫通孔に第1及び第2のボルトを直接螺合してもよい。 2. The support bracket according to claim 1, wherein two each of the first and second female threads are provided. The first and second bolts that are respectively screwed into the female screw preferably have pointed ends. As a result, the pipe member can be firmly fixed to the support pipe. Here, the first and second female screws may be constituted by a through hole provided in the pipe member and a nut that is welded in communication with the through hole and the first and second bolts are respectively screwed together. In this case, the through hole may be tapped to form a female screw stop. Further, the first and second female screws may be configured only by a through hole in which a pipe member is tapped and a female screw is formed, and the first and second bolts may be directly screwed into the through hole.

請求項記載の支柱金具は、請求項記載の支柱金具において、前記パイプ部材は、内径が42mm以上で54mm以下である。
パイプ部材に挿入する支柱パイプとしては、内径がパイプ部材よりも小さい、例えば、40mm〜50mmのものが好適に使用される。
The support bracket according to claim 2 is the support bracket according to claim 1 , wherein the pipe member has an inner diameter of 42 mm or more and 54 mm or less.
As the support pipe inserted into the pipe member, one having an inner diameter smaller than that of the pipe member, for example, 40 mm to 50 mm is preferably used.

短管に挿入して水平部材を構成する水平パイプとしては、例えば、一般構造用炭素鋼鋼管及び機械構造用炭素鋼鋼管のいずれか一方又は双方が使用できる。また、水平パイプの一端又は両端に水平部材を取付けて、例えば、ブラケット、跳ね出しブラケット、腕木材、及び手摺りのいずれか1の水平部材を形成することができる。 As a horizontal pipe which constitutes a horizontal member by inserting into a short pipe, for example, either or both of a general structural carbon steel pipe and a mechanical structural carbon steel pipe can be used. Moreover, a horizontal member can be attached to one end or both ends of a horizontal pipe, for example, and any one horizontal member of a bracket, a jumping bracket, arm timber, and a handrail can be formed.

請求項1及びこれに従属する請求項2記載の支柱金具は、パイプ部材と支柱パイプが分離しているので、コンパクトで、しかも、収納及び運搬時に嵩張らない。また、パイプ部材に支柱パイプを挿入する構造であるので、支柱金具を様々な間隔で支柱パイプに固定することができる。更に、パイプ部材の上下に支柱パイプ締付部がそれぞれ設けられているので、支柱パイプに支柱金具を強固に取付けることができると共に、パイプ部材の内側で2本の支柱パイプを接続できる。 Since the pipe member and the support pipe are separated from each other, the support metal fitting according to claim 1 and dependent claim 2 is compact and is not bulky during storage and transportation. In addition, since the support pipe is inserted into the pipe member, the support bracket can be fixed to the support pipe at various intervals. Furthermore, since the column pipe tightening portions are respectively provided above and below the pipe member, the column metal fitting can be firmly attached to the column pipe and two column pipes can be connected inside the pipe member.

請求項記載の支柱金具は、パイプ部材が、内径が42mm以上で54mm以下、かつ、長さが180mm以上で450mm以下であるので、非常にコンパクトである。 Since the pipe member has an inner diameter of 42 mm or more and 54 mm or less and a length of 180 mm or more and 450 mm or less, the post fitting according to claim 2 is very compact.

また、請求項記載の支柱金具は、水平部材がフック部、及びフック部が先部側に設けられ、基部側から水平パイプを挿入可能な短管を備えたフック形成金具を有しているので、水平部材の長さを変えることができる。また、フック形成金具には、短管の内側まで挿通して水平パイプを締め付ける第3のボルトを備えるので、水平パイプを強固に固定することができる。 Moreover, the support | pillar metal fitting of Claim 1 has a hook formation metal fitting provided with the short member in which a horizontal member is provided in a hook part and a hook part is provided in the front part side, and a horizontal pipe can be inserted from the base part side. Therefore, the length of the horizontal member can be changed. In addition, the hook formed fitting, since the inserted to the inside of the short pipe obtain Bei the third bolt tightening the horizontal pipe, it is possible to firmly fix the horizontal pipe.

続いて、添付した図面を参照しつつ、本発明を具体化した実施の形態につき説明し、本発明の理解に供する。
ここで、図1は本発明の第1の実施の形態に係る支柱金具を用いた支柱装置の側面図、図2は同支柱金具の平面図、図3は本発明の第2の実施の形態に係る支柱金具の説明図、図4(A)は本発明の第3の実施の形態に係る支柱金具の斜視図、(B)は同支柱金具のバンド機構の説明図、図5は同支柱金具の変形例に係るバンド機構の説明図である。
Next, embodiments of the present invention will be described with reference to the accompanying drawings for understanding of the present invention.
Here, FIG. 1 is a side view of a strut device using a strut fitting according to the first embodiment of the present invention, FIG. 2 is a plan view of the strut fitting, and FIG. 3 is a second embodiment of the present invention. FIG. 4A is a perspective view of the support bracket according to the third embodiment of the present invention, FIG. 4B is an explanatory view of the band mechanism of the support bracket, and FIG. It is explanatory drawing of the band mechanism which concerns on the modification of a metal fitting.

図1及び図2を参照して、本発明の第1の実施の形態に係る支柱金具10を使用した支柱14及び支柱装置11について説明する。
支柱金具10は、外径が48.6mmの一般構造用炭素鋼鋼管で形成された支柱パイプ13に所定の間隔(例えば、475mm)で取付けられ、図示しないくさび緊結式足場に使用される支柱14を構成している。支柱金具10は、内径が42mm以上で54mm以下、かつ、長さが180mm以上で450mm(本実施の形態では、例えば、内径が52.5mm、長さが200mm、及び厚みが4mm)の一般構造用炭素鋼鋼管で形成されたパイプ部材15を有している。
With reference to FIG.1 and FIG.2, the support | pillar 14 and the support | pillar apparatus 11 which use the support | pillar metal fitting 10 which concerns on the 1st Embodiment of this invention are demonstrated.
The strut 10 is attached to a strut pipe 13 formed of a general structural carbon steel pipe having an outer diameter of 48.6 mm at a predetermined interval (for example, 475 mm), and is used for a wedge-tight scaffold (not shown). Is configured. The strut fitting 10 has a general structure with an inner diameter of 42 mm or more and 54 mm or less, and a length of 180 mm or more and 450 mm (in this embodiment, for example, the inner diameter is 52.5 mm, the length is 200 mm, and the thickness is 4 mm). It has the pipe member 15 formed with the carbon steel pipe for use.

また、パイプ部材15の外側の中央部には、くさび緊結式足場に使用される水平部材の一例である手摺り41の端に取付けたくさび状のフック部43が上方から嵌入される第1〜第4のフック取付部16〜19が、軸心を垂直に配置したパイプ部材15の前後左右、すなわち、パイプ部材15の軸心を中央として円周方向に90度間隔で設けられ、しかも、前後の第1及び第2のフック取付部16、17及び左右の第3及び第4のフック取付部18、19をそれぞれ対向させて設け、前後に配置される第1及び第2のフック取付部16、17が、左右に配置される第3及び第4のフック取付部18、19よりも下方に、段違いに設置されている(以下の実施の形態についても同様である)。 In addition, a wedge-shaped hook 43 attached to the end of a handrail 41, which is an example of a horizontal member used in a wedge-binding scaffold, is fitted into the center portion outside the pipe member 15 from above. The fourth hook mounting portions 16 to 19 are provided at intervals of 90 degrees in the circumferential direction with the axial center of the pipe member 15 arranged in the vertical direction, that is, the axial center of the pipe member 15 at the center. The first and second hook mounting portions 16 and 17 and the left and right third and fourth hook mounting portions 18 and 19 are provided so as to face each other, and the first and second hook mounting portions 16 arranged in the front and rear are provided. , 17 are installed below the third and fourth hook attachment portions 18, 19 arranged on the left and right sides (the same applies to the following embodiments).

また、第1〜第4のフック取付部16〜19は、それぞれ鋼板を平面視して断面コ字状となるように折り曲げて形成され、手摺り41のフック部43を係止する係止部20と係止部20の両側に設けられた側壁部21、22とを有している。係止部20は、幅が少なくとも係合するフック部43の幅よりも大きく、正面視して矩形に形成されている。また、第1〜第4のフック取付部16〜19は、パイプ部材15に上下が開放となるように、側壁部21、22の端部をパイプ部材15に溶接されている。なお、側壁部21、22の幅は上部よりも下部が短くなるように形成され、係止部20がパイプ部材15の軸心と、例えば、5度以上で30度以下の角度を有して傾斜して配置されている。 The first to fourth hook attachment portions 16 to 19 are each formed by bending the steel plate so as to have a U-shaped cross section when seen in plan view, and for locking the hook portion 43 of the handrail 41. 20 and side wall portions 21 and 22 provided on both sides of the locking portion 20. The locking portion 20 has a width that is at least larger than the width of the hook portion 43 to be engaged, and is formed in a rectangular shape when viewed from the front. The first to fourth hook attachment portions 16 to 19 are welded to the pipe member 15 at the end portions of the side wall portions 21 and 22 so that the pipe member 15 is open at the top and bottom. The side walls 21 and 22 are formed so that the lower part is shorter than the upper part, and the locking part 20 has an angle of, for example, 5 degrees or more and 30 degrees or less with the axis of the pipe member 15. It is arranged at an angle.

図2に示すように、パイプ部材15の上部及び下部には、パイプ部材15の内側まで挿通してタップを切って雌ねじ止めを形成した貫通孔23、及び貫通孔23に連通して溶接されたナット24とをそれぞれ有する第1の雌ねじ25、26、及び第2の雌ねじ27、28が、例えば、1又は2以上(ここでは、2つずつ)設けられている。第1の雌ねじ25、26には第1のボルト29、30が螺合し、第2の雌ねじ27、28には第2のボルト31、32が螺合する。第1及び第2のボルト29〜32は先端が尖った形状に形成され、第1及び第2のボルト29〜32をパイプ部材15内に挿入された支柱パイプ13に押し付けて強固に固定することができる。 As shown in FIG. 2, the upper and lower portions of the pipe member 15 are welded to the through hole 23 that is inserted to the inside of the pipe member 15 and is tapped to form a female screw, and to the through hole 23. For example, one or two (here, two) first female screws 25 and 26 each having a nut 24 and second female screws 27 and 28 are provided. First bolts 29 and 30 are screwed into the first female screws 25 and 26, and second bolts 31 and 32 are screwed into the second female screws 27 and 28. The 1st and 2nd volt | bolts 29-32 are formed in the shape where the front-end | tip sharpened, and the 1st and 2nd volt | bolts 29-32 are pressed against the support | pillar pipe 13 inserted in the pipe member 15, and are firmly fixed. Can do.

ここで、第1の雌ねじ25、26と第1のボルト29、30とによってパイプ部材15の上部に設けられる第1の支柱パイプ締付部33が構成され、第2の雌ねじ27、28と第2のボルト31、32とによってパイプ部材15の下部に設けられる第2の支柱パイプ締付部34が構成される。ここで、第1の雌ねじ25、26は、それぞれ第1及び第2のフック取付部16、17の上方で、しかも、第1及び第2のフック取付部16、17に手摺り41のフック部43を嵌入可能な位置に形成されている。また、第2の雌ねじ27、28は、それぞれ第3及び第4のフック取付部18、19の下方で、しかも、第3及び第4のフック取付部18、19に手摺り41のフック部43を嵌入する際に、フック部43が第2の雌ねじ27、28に接触しない位置に形成されている。 Here, the first female threads 25, 26 and the first bolts 29, 30 constitute a first support pipe fastening portion 33 provided on the upper portion of the pipe member 15, and the second female threads 27, 28 and the first Two bolts 31 and 32 constitute a second support pipe fastening portion 34 provided at the lower portion of the pipe member 15. Here, the first female screws 25 and 26 are respectively located above the first and second hook mounting portions 16 and 17, and the hook portions of the handrail 41 on the first and second hook mounting portions 16 and 17. 43 is formed at a position where it can be inserted. Further, the second female screws 27 and 28 are respectively below the third and fourth hook mounting portions 18 and 19, and the hook portions 43 of the handrail 41 on the third and fourth hook mounting portions 18 and 19 respectively. The hook portion 43 is formed at a position where it does not come into contact with the second female screws 27, 28.

なお、第1の雌ねじ25、26及び第2の雌ねじ27、28として、貫通孔23に連通して溶接されたナット24が取付けられているので、貫通孔23にはタップを切らなくてもよい。また、パイプ部材が肉厚(例えば、雌ねじが3ピッチ以上形成可能)である場合、第1及び第2の雌ねじとしては、パイプ部材の内側まで挿通してタップを切って雌ねじ止めを形成した貫通孔のみで構成し、ナットを取付けなくてもよい。 In addition, since the nut 24 communicated and welded to the through hole 23 is attached as the first female screws 25 and 26 and the second female screws 27 and 28, the through hole 23 may not be cut. . In addition, when the pipe member is thick (for example, the female screw can be formed with three or more pitches), the first and second female screws are penetrated to the inside of the pipe member and the tap is cut to form the female screw stopper. It consists only of holes and does not have to be fitted with nuts.

支柱装置11は、支柱金具10と手摺り41の端部に取付けられたフック形成金具40とで構成される。フック形成金具40は、支柱金具10の第1〜第4のフック取付部16〜19のいずれにも取付けることができ、例えば、外径が42.7mmで長さが1200mmの一般構造用炭素鋼鋼管で形成された水平パイプ42の両端に取付けられて手摺り41を構成している。なお、水平部材は、手摺りの他に、フック形成金具を両端又は一端に取付けたブラケット、跳ね出しブラケット、及び腕木材のいずれかであってもよい。 The column device 11 includes a column metal fitting 10 and a hook forming metal fitting 40 attached to the end of the handrail 41. The hook-forming metal fitting 40 can be attached to any of the first to fourth hook attachment portions 16 to 19 of the support metal fitting 10, for example, a general structural carbon steel having an outer diameter of 42.7 mm and a length of 1200 mm. A handrail 41 is configured by being attached to both ends of a horizontal pipe 42 formed of a steel pipe. In addition to the handrail, the horizontal member may be any one of a bracket in which a hook forming bracket is attached to both ends or one end, a jump bracket, and an arm wood.

フック形成金具40は、支柱金具10の第1〜第4のフック取付部16〜19に上部から嵌入され、下方に折れ曲がって設けられ上部から下部へと厚みが小さくなるくさび状のフック部43と、フック部43が先部側に設けられ、例えば、内径が水平パイプ42を挿入可能である44mmで、長さが200mmの一般構造用炭素鋼鋼管で形成された短管44とを有している。また、短管44の基部側下部には、短管44の内側まで挿通して雌ねじ止めされた貫通孔45と、貫通孔45に連通して短管44に溶接されたナット46とをそれぞれ有する第3の雌ねじ47が例えば、1又は2以上(ここでは、1つ)設けられている。 The hook-forming metal fitting 40 is inserted into the first to fourth hook attachment portions 16 to 19 of the support metal fitting 10 from the upper part, is bent downward and is provided with a wedge-shaped hook part 43 that decreases in thickness from the upper part to the lower part. The hook portion 43 is provided on the front portion side, and has, for example, a short pipe 44 formed of a general structural carbon steel pipe having an inner diameter of 44 mm and a length of 200 mm into which the horizontal pipe 42 can be inserted. Yes. Further, at the lower part on the base side of the short tube 44, there are a through hole 45 inserted to the inside of the short tube 44 and fixed with a female screw, and a nut 46 connected to the through hole 45 and welded to the short tube 44, respectively. For example, the third female screw 47 is provided with one or more (here, one).

また、第3の雌ねじ47には、先端が尖った形状に形成された第3のボルト48が螺合し、第3のボルト48を短管44に挿入された水平パイプ42に押し付けて強固に固定することができる。第3の雌ねじ47及び第3のボルト48によって、水平パイプ締付部49が構成される。また、短管が肉厚(例えば、雌ねじが3ピッチ以上形成可能)である場合には、第3の雌ねじを短管に形成される雌ねじ止めで構成し、第3のボルトを雌ねじ止めに直接螺合させて水平パイプ締付部としてもよい。 Further, the third female screw 47 is screwed with a third bolt 48 formed with a pointed tip, and the third bolt 48 is pressed against the horizontal pipe 42 inserted into the short tube 44 to be strong. Can be fixed. A horizontal pipe fastening portion 49 is configured by the third female screw 47 and the third bolt 48. Further, when the short pipe is thick (for example, the female screw can be formed with 3 pitches or more), the third female screw is configured by a female screw formed on the short pipe, and the third bolt is directly connected to the female screw. It is good also as a horizontal pipe fastening part by screwing.

図3を参照して、本発明の第2の実施の形態に係る支柱金具60について説明する。なお、支柱金具10と同一の構成要素については同一の番号を付してその詳しい説明を省略する。
支柱金具60は、パイプ部材15と、パイプ部材15の外側中央部の前後及び左右に設けられる第1〜第4のフック取付部16〜19と、パイプ部材15の上端部及び下端部にそれぞれ設けられ、パイプ部材15に挿入される支柱パイプ13を周囲から緊結する第1及び第2の緊結手段の一例である第1及び第2の単管クランプ61、62とを有している。
With reference to FIG. 3, the support | pillar metal fitting 60 concerning the 2nd Embodiment of this invention is demonstrated. In addition, about the component same as the support | pillar metal fitting 10, the same number is attached | subjected and the detailed description is abbreviate | omitted.
The struts 60 are provided on the pipe member 15, first to fourth hook mounting portions 16 to 19 provided on the front and rear and on the left and right of the outer central portion of the pipe member 15, and the upper end portion and the lower end portion of the pipe member 15, respectively. The first and second single tube clamps 61 and 62 are examples of first and second fastening means for fastening the support pipe 13 inserted into the pipe member 15 from the periphery.

第1及び第2の単管クランプ61、62はそれぞれ、断面円形の支柱パイプ13の当接面に実質的に一致させた凹部63を内側に有して支柱パイプ13の半円周を囲み、パイプ部材15に溶接して取付けられる固定金具部材64を有している。固定金具部材64の基端部には、一端部が回動自在にピン(リベットピン)65を介して回動可能に連結され、支柱パイプ13の残りの半分を囲む可動金具部材66が取付けられている。可動金具部材66は、他端部にU字状の切欠き67aが形成されて、切欠き67aに固定金具部材64の先端部に回動自在にピン(リベットピン)67を介して取付けられた雄ねじ棒68が嵌入され、これに螺着するナット69によって、固定金具部材64及び可動金具部材66を締め付け、第1及び第2の単管クランプ61、62で支柱パイプ13を緊結できる。 Each of the first and second single tube clamps 61 and 62 has a concave portion 63 which is substantially matched with the contact surface of the column pipe 13 having a circular cross section, and surrounds the semicircular circumference of the column pipe 13. The fixing member 64 is attached to the pipe member 15 by welding. One end of a fixed metal member 64 is rotatably connected via a pin (rivet pin) 65 and a movable metal member 66 surrounding the remaining half of the column pipe 13 is attached to the base end of the fixed metal member 64. ing. The movable metal member 66 has a U-shaped notch 67a formed at the other end, and is attached to the notch 67a via a pin (rivet pin) 67 so as to be rotatable at the tip of the fixed metal member 64. The fixed fitting member 64 and the movable fitting member 66 are fastened by the nut 69 into which the male screw rod 68 is inserted and screwed thereto, and the support pipe 13 can be fastened by the first and second single tube clamps 61 and 62.

図4(A)、(B)を参照して、本発明の第3の実施の形態に係る支柱金具70について説明する。なお、支柱金具10、60と同一の構成要素については同一の番号を付してその詳しい説明を省略する。
支柱金具70は、上端及び下端を所定高さで断面円弧状に切り取って切欠部71を形成したパイプ部材72と、パイプ部材72の外側中央部の前後及び左右に設けられる第1〜第4のフック取付部16〜19と、パイプ部材72の上端部及び下端部にそれぞれ設けられ、パイプ部材72に挿入される支柱パイプ13を周囲から緊結する第1及び第2の緊結手段の一例である第1及び第2のバンド機構73、74とを有している。
With reference to FIGS. 4A and 4B, a column metal fitting 70 according to a third embodiment of the present invention will be described. In addition, about the component same as the support | pillar metal fittings 10 and 60, the same number is attached | subjected and the detailed description is abbreviate | omitted.
The column metal fitting 70 includes a pipe member 72 in which an upper end and a lower end are cut into a circular arc shape at a predetermined height to form a notch 71, and first to fourth front and rear and left and right of the outer central portion of the pipe member 72. Hook attaching portions 16 to 19 and first and second fastening means that are provided at the upper end portion and the lower end portion of the pipe member 72, respectively, and fasten the column pipe 13 inserted into the pipe member 72 from the periphery. 1 and second band mechanisms 73 and 74.

第1及び第2のバンド機構73、74は、パイプ部材72の切欠部71と対となる突出部75の内側面に溶接されて、パイプ部材72に挿入される断面円形の支柱パイプ13の半円周を囲む固定金具部材76を有している。固定金具部材76は、厚みがパイプ部材72の内側半径と支柱パイプ13の外側半径の差と実質的に同じであって、高さが突出部75の切欠部71からの突出高さと実質的に同じであり、中央が突出部75に沿って断面円弧状に形成されている。また、固定金具部材76は、外側面がパイプ部材72の突出部75に溶接され、内側面が支柱パイプ13に当接する当接部77となっている。当接部77の両端は、半径方向外側に折り曲げられて第1及び第2の結合部78、79が形成されている。また、第1の結合部78には、ボルト80を係止する第1の係止孔81が設けられ、第2の結合部79には、その上方からリベット82が挿入可能な第1の回動部83が形成されるように実質的に断面円形に折り曲げられている。 The first and second band mechanisms 73 and 74 are welded to the inner surface of the projecting portion 75 that is paired with the notched portion 71 of the pipe member 72 and are inserted into the pipe member 72. A fixing member 76 surrounding the circumference is provided. The fixing metal member 76 has a thickness that is substantially the same as the difference between the inner radius of the pipe member 72 and the outer radius of the support pipe 13, and the height is substantially the same as the protruding height of the protruding portion 75 from the notch 71. It is the same, and the center is formed in the cross-sectional arc shape along the protrusion part 75. FIG. Further, the fixing metal member 76 has an outer surface welded to the projecting portion 75 of the pipe member 72, and an inner surface serving as a contact portion 77 that contacts the support pipe 13. Both ends of the contact portion 77 are bent outward in the radial direction to form first and second coupling portions 78 and 79. In addition, the first coupling portion 78 is provided with a first locking hole 81 for locking the bolt 80, and the second coupling portion 79 has a first rotation in which a rivet 82 can be inserted from above. The moving part 83 is bent into a substantially circular shape so as to be formed.

また、第1及び第2のバンド機構73、74は、それぞれ一端にリベット82を介して、第1の回動部83と回動自在に取付けられる第2の回動部84と、他端に第1の係止孔81と対となる第2の係止孔85とが設けられた締結部材(可動金具部材)86を有している。ここで、固定金具部材76の第1の係止孔81、締結部材86の第2の係止孔85、ボルト80、及びナット87によって、ねじ手段が構成され、第1及び第2の係止孔81、85にボルト80を挿入し、ナット87を締め付けてパイプ部材72に挿入された支柱パイプ13を固定することができる。 In addition, the first and second band mechanisms 73 and 74 have a second rotating portion 84 that is rotatably attached to the first rotating portion 83 and a second end thereof via a rivet 82 at one end, respectively. It has a fastening member (movable fitting member) 86 provided with a first locking hole 81 and a second locking hole 85 to be paired. Here, the first locking hole 81 of the fixing metal member 76, the second locking hole 85 of the fastening member 86, the bolt 80, and the nut 87 constitute screw means, and the first and second locking holes. Bolts 80 can be inserted into the holes 81 and 85, and the nut 87 can be tightened to fix the support pipe 13 inserted into the pipe member 72.

なお、第1及び第2のバンド機構73、74は、第1の係止孔81及び第2の係止孔85に連通するナットをその外側に溶接してもよい。また、固定金具部材76及び締結部材86のいずれか一方又は双方が肉厚(例えば、雌ねじが3ピッチ以上形成可能)である場合、第1の係止孔又は第2の係止孔はタップを切って雌ねじ止めを形成し、雌ねじ止めされた係止孔がボルトの先部となるように螺着してもよい(以下の実施の形態でも同様である)。 In addition, the 1st and 2nd band mechanisms 73 and 74 may weld the nut connected to the 1st locking hole 81 and the 2nd locking hole 85 to the outer side. When either one or both of the fixing metal member 76 and the fastening member 86 are thick (for example, the female screw can be formed with three or more pitches), the first locking hole or the second locking hole is tapped. It may be cut to form a female screw, and may be screwed so that the female screwed locking hole becomes the tip of the bolt (the same applies to the following embodiments).

なお、図5に示すように、固定金具部材76をパイプ部材72に溶接する代わりに、パイプ部材72aの切欠部90の断面が、例えば、円弧角を180度未満となるように円弧状に切り取って形成した突出部91の中央側を当接部92とし、突出部91の両端部をそれぞれ半径方向外側に折り曲げて第1の結合部95及び第2の結合部97として、固定部93を形成してもよい。突出部91の他端部の第1の結合部95には、図示しないボルトを係止する第1の係止孔94が形成され、突出部91の一端部の第2の結合部97にはその上方から図示しないリベットが挿入可能な第1の回動部96が形成され、固定部93の第2の結合部97に締結部材86の一端部を回動可能に設け、固定部93の第1の結合部95と締結部材86の他端部をねじ手段で結合することにより、支柱パイプを固定することができる。 As shown in FIG. 5, instead of welding the fixing metal member 76 to the pipe member 72, the cross section of the notch 90 of the pipe member 72a is cut into an arc shape so that the arc angle is less than 180 degrees, for example. The fixed portion 93 is formed as a first coupling portion 95 and a second coupling portion 97 by bending the center side of the projecting portion 91 formed in this way into a contact portion 92 and bending both end portions of the projecting portion 91 outward in the radial direction. May be. A first locking hole 94 for locking a bolt (not shown) is formed in the first coupling portion 95 at the other end of the projecting portion 91, and the second coupling portion 97 at one end of the projecting portion 91 is formed in the second coupling portion 97. A first rotating portion 96 into which a rivet (not shown) can be inserted is formed from above, and one end portion of the fastening member 86 is rotatably provided at the second coupling portion 97 of the fixing portion 93. The strut pipe can be fixed by connecting the first connecting portion 95 and the other end of the fastening member 86 with a screw means.

本発明は、前記した実施の形態に限定されるものではなく、本発明の要旨を変更しない範囲での変更は可能であり、例えば、前記したそれぞれの実施の形態や変形例の一部又は全部を組み合わせて本発明の支柱金具を構成する場合も本発明の権利範囲に含まれる。 The present invention is not limited to the above-described embodiment, and can be changed without changing the gist of the present invention. For example, some or all of the above-described embodiments and modifications are possible. The combination of the above and the support metal fitting of the present invention is also included in the scope of the right of the present invention.

本発明の第1の実施の形態に係る支柱金具を用いた支柱装置の側面図である。It is a side view of the support | pillar apparatus using the support | pillar metal fitting which concerns on the 1st Embodiment of this invention. 同支柱金具の平面図である。It is a top view of the column metal fitting. 本発明の第2の実施の形態に係る支柱金具の説明図である。It is explanatory drawing of the support | pillar metal fitting which concerns on the 2nd Embodiment of this invention. (A)は本発明の第3の実施の形態に係る支柱金具の斜視図、(B)は同支柱金具のバンド機構の説明図である。(A) is a perspective view of the support | pillar metal fitting which concerns on the 3rd Embodiment of this invention, (B) is explanatory drawing of the band mechanism of the support | pillar metal fitting. 同支柱金具の変形例に係るバンド機構の説明図である。It is explanatory drawing of the band mechanism which concerns on the modification of the support | pillar metal fitting.

10:支柱金具、11:支柱装置、13:支柱パイプ、14:支柱、15:パイプ部材、16:第1のフック取付部、17:第2のフック取付部、18:第3のフック取付部、19:第4のフック取付部、20:係止部、21、22:側壁部、23:貫通孔、24:ナット、25、26:第1の雌ねじ、27、28:第2の雌ねじ、29、30:第1のボルト、31、32:第2のボルト、33:第1の支柱パイプ締付部、34:第2の支柱パイプ締付部、40:フック形成金具、41:手摺り、42:水平パイプ、43:フック部、44:短管、45:貫通孔、46:ナット、47:第3の雌ねじ、48:第3のボルト、49:水平パイプ締付部、60:支柱金具、61:第1の単管クランプ、62:第2の単管クランプ、63:凹部、64:固定金具部材、65:ピン、66:可動金具部材、67:ピン、67a:切欠き、68:雄ねじ棒、69:ナット、70:支柱金具、71:切欠部、72、72a:パイプ部材、73:第1のバンド機構、74:第2のバンド機構、75:突出部、76:固定金具部材、77:当接部、78:第1の結合部、79:第2の結合部、80:ボルト、81:第1の係止孔、82:リベット、83:第1の回動部、84:第2の回動部、85:第2の係止孔、86:締結部材、87:ナット、90:切欠部、91:突出部、92:当接部、93:固定部、94:第1の係止孔、95:第1の結合部、96:第1の回動部、97:第2の結合部 10: support bracket, 11: support device, 13: support pipe, 14: support, 15: pipe member, 16: first hook mounting portion, 17: second hook mounting portion, 18: third hook mounting portion , 19: fourth hook mounting portion, 20: locking portion, 21, 22: side wall portion, 23: through hole, 24: nut, 25, 26: first female screw, 27, 28: second female screw, 29, 30: first bolt, 31, 32: second bolt, 33: first strut pipe tightening portion, 34: second strut pipe tightening portion, 40: hook forming bracket, 41: handrail , 42: horizontal pipe, 43: hook part, 44: short pipe, 45: through hole, 46: nut, 47: third internal thread, 48: third bolt, 49: horizontal pipe tightening part, 60: support Metal fitting, 61: 1st single pipe clamp, 62: 2nd single pipe clamp, 63: Recessed part, 6 : Fixed metal member, 65: Pin, 66: Movable metal member, 67: Pin, 67a: Notch, 68: Male screw rod, 69: Nut, 70: Post metal fitting, 71: Notch part, 72, 72a: Pipe member, 73: 1st band mechanism, 74: 2nd band mechanism, 75: Projection part, 76: Fixing metal member, 77: Contact part, 78: 1st coupling part, 79: 2nd coupling part, 80 : Bolt, 81: first locking hole, 82: rivet, 83: first rotating part, 84: second rotating part, 85: second locking hole, 86: fastening member, 87: Nut, 90: notch, 91: protrusion, 92: abutment, 93: fixing part, 94: first locking hole, 95: first coupling part, 96: first rotation part, 97 : Second coupling part

Claims (2)

使用にあっては支柱パイプに取付けられる長さが180mm以上で450mm以下のパイプ部材と、
前記パイプ部材の外側の左右にそれぞれ対向して取付けられた第3、第4のフック取付部、及び前記パイプ部材の外側の前後に前記第3、第4のフック取付部とは段違いで下にそれぞれ対向して設けられた第1、第2のフック取付部と、
前記パイプ部材の上下にそれぞれ設けられ、第1及び第2の雌ねじと該第1及び第2の雌ねじにそれぞれ螺合する第1及び第2のボルトとを備え該第1及び第2のボルトが該パイプ部材の内側まで挿通し、該パイプ部材に挿入される前記支柱パイプを締め付け可能な第1及び第2の支柱パイプ締付部と
前記第1〜第4のフック取付部に嵌入可能なくさび状のフック部、該フック部が先端側に設けられた短管、及び該短管の基端側に設けられ該短管に内側まで挿入される水平パイプを締め付ける第3のボルトを螺合させる第3の雌ねじを有するフック形成金具とを有し、
しかも、前記第1の雌ねじはそれぞれ前記第1、第2のフック取付部の上方で、該第1、第2のフック取付部に前記フック部が嵌入可能な位置に、前記第2の雌ねじはそれぞれ前記第3、第4のフック取付部の下方で、該第3、第4のフック取付部に嵌入する前記フック部が該第2の雌ねじに当接しない位置に設けられていることを特徴とする支柱金具。
In use, a pipe member having a length of 180 mm or more and 450 mm or less attached to the support pipe ;
Third and fourth hook mounting portions attached to the left and right sides of the pipe member opposite to each other, and the third and fourth hook mounting portions on the front and rear sides of the pipe member. First and second hook mounting portions provided to face each other ;
Respectively provided above and below the pipe member, and first and second bolts screwed to the first and second internal thread and the first and second internal thread, the first and second bolts Are inserted to the inside of the pipe member, and first and second strut pipe tightening portions capable of tightening the strut pipe inserted into the pipe member ;
A wedge-shaped hook portion that can be fitted into the first to fourth hook mounting portions, a short tube having the hook portion provided on the distal end side, and a proximal end side of the short tube to the inside of the short tube A hook-forming metal fitting having a third female screw for screwing a third bolt for tightening a horizontal pipe to be inserted;
Moreover, the first female screw is located above the first and second hook mounting portions, respectively, at a position where the hook portion can be fitted into the first and second hook mounting portions, and the second female screw is The hook portions to be fitted into the third and fourth hook attachment portions are respectively provided below the third and fourth hook attachment portions at positions where they do not contact the second female screw. Prop metal fittings.
請求項記載の支柱金具において、前記パイプ部材は、内径が42mm以上で54mm以下であることを特徴とする支柱金具。 2. The support bracket according to claim 1 , wherein the pipe member has an inner diameter of 42 mm or more and 54 mm or less.
JP2004195911A 2004-07-01 2004-07-01 Prop bracket Active JP4446814B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2004195911A JP4446814B2 (en) 2004-07-01 2004-07-01 Prop bracket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2004195911A JP4446814B2 (en) 2004-07-01 2004-07-01 Prop bracket

Publications (2)

Publication Number Publication Date
JP2006016856A JP2006016856A (en) 2006-01-19
JP4446814B2 true JP4446814B2 (en) 2010-04-07

Family

ID=35791384

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2004195911A Active JP4446814B2 (en) 2004-07-01 2004-07-01 Prop bracket

Country Status (1)

Country Link
JP (1) JP4446814B2 (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5135276B2 (en) * 2009-04-13 2013-02-06 平和技研株式会社 Pipe connection mechanism
JP2014031633A (en) * 2012-08-02 2014-02-20 Krh Kk Support post structure
JP6676363B2 (en) * 2015-12-17 2020-04-08 鹿島建設株式会社 Connecting members for assembling temporary structures
JP6476244B2 (en) * 2017-07-19 2019-02-27 晃輝 平山 Wedge-tight scaffolding strut and strut structure using the same
JP7385925B2 (en) 2020-12-10 2023-11-24 平和技研株式会社 temporary scaffolding

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6314757U (en) * 1986-07-15 1988-01-30
JPH1162216A (en) * 1997-08-12 1999-03-05 Shinwa Kk Expansion handrail for footing
JP2000038835A (en) * 1998-07-23 2000-02-08 Toshiba Plant Kensetsu Co Ltd Annular scaffold assembly
JP2000314234A (en) * 1999-04-30 2000-11-14 Alinco Inc Device of mounting cargo receiving stage for single tube scaffolding
JP3095170U (en) * 2002-07-29 2003-07-25 稔 松岡 Connection fittings for simple buildings and temporary structures using single pipes

Also Published As

Publication number Publication date
JP2006016856A (en) 2006-01-19

Similar Documents

Publication Publication Date Title
US8276854B2 (en) Clamp for circular objects
JP5006216B2 (en) T-bolt clamp quick attach latch
US6679460B2 (en) Pipe clamp arrangement
KR20140053809A (en) Ductwork
JP4446814B2 (en) Prop bracket
US8206070B2 (en) Weld adapter
JP6097121B2 (en) Brace mounting bracket
JP4851490B2 (en) Arrangement body support
JP5433119B2 (en) Arrangement body support
JP4717301B2 (en) Support device for non-average forces in pipes
JP5133302B2 (en) Hole down hardware
JP5164778B2 (en) Pile head joint structure
JP2019007593A (en) Fixing bracket
JP4547710B2 (en) Rack steady rest bracket
JP6210613B1 (en) Temporary scaffolding connection
JP3488353B2 (en) Pipe connection fitting
JP3114414U (en) Wall tether fitting
JP6220189B2 (en) Outer plate mounting device and mounting bracket
JP5061012B2 (en) Connector
JP4230987B2 (en) Rope crossing fastener
US20070124897A1 (en) Clamp for circular objects
JP2006299715A (en) Separator mounting fixture, fastener for separator mounting fixture and separator mounting structure
JP4799960B2 (en) Bicycle post member tightening structure
JPH09203116A (en) Column connection structure
JPH0215951Y2 (en)

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20070612

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20090911

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20090929

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20091125

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20091222

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20100119

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130129

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 4446814

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140129

Year of fee payment: 4

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250