JP4357729B2 - Coupler structure for connecting PC steel - Google Patents

Coupler structure for connecting PC steel Download PDF

Info

Publication number
JP4357729B2
JP4357729B2 JP2000309033A JP2000309033A JP4357729B2 JP 4357729 B2 JP4357729 B2 JP 4357729B2 JP 2000309033 A JP2000309033 A JP 2000309033A JP 2000309033 A JP2000309033 A JP 2000309033A JP 4357729 B2 JP4357729 B2 JP 4357729B2
Authority
JP
Japan
Prior art keywords
sheath
coupler
cone
steel material
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP2000309033A
Other languages
Japanese (ja)
Other versions
JP2002115370A (en
Inventor
喜之 松原
洋一 高山
稔 崎中
敏彦 仁木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sumitomo SEI Steel Wire Corp
Original Assignee
Sumitomo SEI Steel Wire Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sumitomo SEI Steel Wire Corp filed Critical Sumitomo SEI Steel Wire Corp
Priority to JP2000309033A priority Critical patent/JP4357729B2/en
Publication of JP2002115370A publication Critical patent/JP2002115370A/en
Application granted granted Critical
Publication of JP4357729B2 publication Critical patent/JP4357729B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Reinforcement Elements For Buildings (AREA)
  • Mutual Connection Of Rods And Tubes (AREA)

Description

【0001】
【発明の属する技術分野】
本発明はプレストレストコンクリート工法に用いるPC鋼材接続用カップラー構造と、このカップラー構造に用いるPC鋼材の端部構造およびシースキャップに関するものである。
【0002】
【従来の技術】
外ケーブル工法による橋梁などで、カップラー構造によりPC鋼材の接続が行われる。図17は従来のカップラー構造の部分断面図である。これは、既にコンクリート内に埋設されたPC鋼材10の端部を定着する一次施工側(図の左側)に二次施工側(図の右側)のPC鋼材20を接続する構造である。
【0003】
一次施工側は、コンクリート構造物内に緊張されたPC鋼材10が埋設され、このPC鋼材の端部をオスコーン11とメスコーン12で保持してアンカープレート15に定着している。
【0004】
二次施工側は、まず円筒状のカップラー30と、シース50およびシースキャップ60をPC鋼材20の外周に通しておく。続いて、PC鋼材20の端部に一次施工側と同様にオスコーン21とメスコーン22を装着する。
【0005】
カップラー一端側の内面には雌ネジが形成され、この雌ネジを一次施工側のメスコーン12の外周に形成された雄ネジにねじ込む。カップラー他端側は内径が小さく構成され、カップラー30のねじ込みに伴って二次施工側のメスコーン22を一次施工側に押圧し、一次施工側のPC鋼材10と二次施工側のPC鋼材20とが接続される。
【0006】
カップラー30の外周にシース50を配置し、シース一端をアンカープレート15に当接し、他端(二次施工側)にシースキャップ60をはめ込む。シースキャップ60は中心にPC鋼材の挿通孔が形成されると共に樹脂充填孔63を有する環状部材である。そして、シース50とアンカープレート15との間、シース50とシースキャップ60との間およびシースキャップ60とPC鋼材20の樹脂被覆との間をシールして、樹脂充填孔63から樹脂を注入し、カップラー30とシース50との間の空間に樹脂を充填する。
【0007】
【発明が解決しようとする課題】
しかし、上記のカップラー構造では、現場作業が煩雑で、接続の確実性も不十分な場合が考えられる。
【0008】
PC鋼材端部にオスコーンとメスコーンを装着する作業はPC鋼材を接続する現場で行われている。通常、オスコーンは複数に分割できる円錐状の金属片であり、メスコーンへの装着時に各金属片にずれができたりすると、定着の確実性が損なわれる恐れがある。また、カップラーを一次施工側のメスコーンにねじ込んだ後に二次施工側のオスコーンがメスコーンから抜けることも考えられ、接続が確実に行われたかどうかを確認できる専用の付属部品も具備されていない。
【0009】
さらに、シースキャップは一体構造であり、予め二次施工側PC鋼材の外周にはめ込んでおいたものを一次施工側に手繰り寄せなければならず施工性に劣る。
【0010】
従って、本発明の主目的は、施工性と接続の確実性に優れるPC鋼材接続用カップラー構造を提供することにある。また、本発明の他の目的は、このPC鋼材接続用カップラー構造に用いるPC鋼材の端部構造およびシースキャップを提供することにある。
【0011】
【課題を解決するための手段】
本発明は、PC鋼材端部にオスコーンやメスコーンを予め組み合わせておくと共にシースキャップを分割式とすることで上記の目的を達成する。
【0012】
すなわち、本発明PC鋼材接続用カップラー構造は、PC鋼材を把持したオスコーンをメスコーンにはめ込んで構成される一対の定着部と、両定着部を連結するカップラーと、カップラーの外周を覆うシースと、シース端面に装着されるシースキャップとを具えるPC鋼材接続用カップラー構造である。ここで、オスコーンの端面にはメスコーンからオスコーンの抜けを防止する押え板を配置する。シースキャップは環状体で、複数の円弧片に分割自在であることを特徴とする。さらに両定着部の間にスペーサを介在しても良い。
【0013】
また、本発明は上記カップラー構造に用いられる構成部材をも特徴とするものである。
【0014】
すなわち、本発明PC鋼材の端部構造は、PC鋼材と、PC鋼材の端部が挿通されるメスコーンと、PC鋼材の端部を把持してメスコーンにはめ込まれるオスコーンと、オスコーンの端面に配置されてメスコーンからオスコーンの抜けを防止する押え板とを具えることを特徴とする。
【0015】
また、本発明シースキャップは、PC鋼材接続用のシースの端面に装着される環状体で、複数の円弧片に分割自在であることを特徴とする。
【0016】
このシースキャップにおいて、隣接する円弧片の接合面には、互いに係合する凸部と凹部とを具えることが好ましい。凸部と凹部の係合により、ずれを生じることなく確実かつ容易にシースキャップの円弧片を組み合わせることができる。凸部と凹部は棒状突起と嵌合孔などの他、波型面でも構わない。
【0017】
予め工場などでオスコーンとメスコーンとをPC鋼材の端部に確実に組み合わせ、押え板によりオスコーンの抜けを防止することで、接続現場における定着部の装着作業を省略できる。
【0018】
押え板はPC鋼材の接続前、接続後のいずれにおいてもオスコーンがメスコーンから抜け出ることを防止し、確実な定着構造を実現できる。
【0019】
カップラー内において一次施工側・二次施工側の定着部の間にスペーサを介在させた場合は、オスコーンの抜け防止にも寄与する。また、スペーサはカップラー内における空間を減少させることで、空間内に残留する空気(酸素)を減少させて耐食特性を向上させる。
【0020】
従来のシースキャップでは予め鋼材を通しておく必要があったが、シースキャップを分割構造にすることで、一次施工側と二次施工側のPC鋼材を接続した後にPC鋼材の外周側から簡単に装着することができる。
【0021】
【発明の実施の形態】
以下、本発明の実施の形態を説明する。
(カップラー構造の概略)
図1は本発明カップラー構造の部分断面図である。このカップラー構造は、既にコンクリート内に埋設されたPC鋼材10の端部を定着する一次施工側(図の左側)に二次施工側(図の右側)のPC鋼材20をカップラー30を用いて接続する構造である。
【0022】
(一次施工側)
一次施工側は、コンクリート構造物内に緊張されたPC鋼材10が埋設され、このPC鋼材の端部にオスコーン11とメスコーン12を装着した定着部がアンカープレート15に定着されている。
【0023】
一次施工側のオスコーン11とメスコーン12の部分断面図を図2に示す。オスコーン11は複数に分割可能な円錐状の金属片で、軸方向にPC鋼材がはめ込まれる溝が形成されている。
【0024】
メスコーン12は、円錐状に組み合わせてPC鋼材を把持したオスコーン11が挿入される円錐孔を有する筒状体である。このメスコーン12の外周面には後述するカップラー30がねじ込まれる雄ネジ12Aが形成されている。
【0025】
アンカープレート15は、図3に示すように、コンクリート構造物の端面に配置される矩形板15Aの表面にガイド筒15Bを溶接したものである。
【0026】
PC鋼材10には、例えば複数の素線を撚り合わせた撚り線上にエポキシ樹脂を被覆し、さらにポリエチレンで被覆したもの(例えば住友電工製:アフターボンド「登録商標」)が利用できる。ポリエチレン樹脂の表面は凹凸状に成形されているため、コンクリートとの高い付着強度が得られる。後述する二次施工側のPC鋼材20は、このPC鋼材10と同一である。
【0027】
(二次施工側)
二次施工側もオスコーン21とメスコーン22をPC鋼材20の端部に装着した定着部を有する。この定着部は現場ではなく、予め工場などで組み立てられる。単にオスコーン21でPC鋼材20を把持してメスコーン22にはめ込んだだけでは、PC鋼材20の搬送中などにオスコーン21が抜け落ちることが考えられる。そこで、図4に示すように、オスコーン21の端面に押え板23を設け、この押さえ板23をメスコーン22にボルト24で固定することで、オスコーン21の抜け落ちを防止している。
【0028】
押え板23は環状の金属板で、外径がオスコーン21の最大外径よりも大きく、内径がオスコーン21の最大外径よりも小さい。この押え板23をオスコーン21の端面に同軸状に配置すると、オスコーン21よりも外周側に押え板がはみ出す。このはみ出した個所にボルト貫通孔を設けておき、メスコーン22の端面にもボルトネジ孔を形成しておいてボルト24のねじ込みを行えば、押え板23をメスコーン22に固定してオスコーン21の抜けを確実に防止することができる。オスコーン21のPC鋼材20への装着・メスコーン22へのはめ込みは全て工場内で適正な品質管理の下で行われるため、メスコーン22に対してオスコーン21のずれが起こると言った不具合は解消できる。
【0029】
(カップラー)
カップラー30は、一次施工側の定着部と二次施工側の定着部を覆って連結するもので、一端側の内周に雌ネジ31を有し、他端側に内径が小さい小径部32を具える筒状体である(図5)。この雌ネジ31は一次施工側メスコーンの雄ネジ12Aに対応する。他端側の小径部32はPC鋼材20の外径よりも大きく、メスコーン22の外径よりも小さい内径に形成されている。このようなカップラー30は、二次施工側のPC鋼材20に予めはめ込んでおく。
【0030】
(スペーサ)
一次施工側と二次施工側の定着部の間にはスペーサ40が配置される。このスペーサ40は一次施工側のオスコーン11と二次施工側のボルト24との間に挟み込まれるサイズの円筒部材である(図6)。ゴムなどの弾性材料で構成することが好ましい。本例ではスペーサ40を用いたが、このスペーサ40がなくともカップラー構造として何ら支障なく機能する。
【0031】
(シース)
カップラー30の外周には円筒状のシース50がはめ込まれる。このシース50とカップラー30との隙間には、後に樹脂が充填されるため、樹脂の充填状況が外から見えやすいように透明または半透明の材料で構成することが好ましい。本例では透明のポリエチレンを用いたが、塩化ビニルを用いることもできる。
【0032】
また、シース50には樹脂の排出孔51が設けられている(図7)。シース用透明材料としてアクリル樹脂などの利用も考えられるが、アクリル樹脂はポリエチレン樹脂に比べて可撓性に乏しく、排出孔51の形成時にクラックを生じ易い。さらに、後述するシースキャップ60と同一材料である方が両者の接着が行いやすい。
【0033】
(シースキャップ)
シース50の端部(二次施工側)にはシースキャップ60がはめ込まれる。このシースキャップ60は、一端側にシースへの接合部61、他端側にPC鋼材の挿通部62が突出されている環状部材である(図8)。さらに樹脂充填孔63も具えられている。本例では、このシースキャップ60を2つの円弧片にわかれる分割式とした。一方の円弧片の接合面に一対の棒状突起64を有し、他方の円弧片の接合面には前記棒状突起64がはめ込まれる一対の嵌合孔65を有する。棒状突起64を嵌合孔65にはめ込むことで、容易かつ確実に円弧片を組み合わせて環状のシースキャップ60を構成できる。本例ではポリエチレンでシースキャップを構成したが、塩化ビニルなどを用いることもできる。
【0034】
(カップラー構造の組み立て手順)
(1)緊張および定着を実施した一次施工側定着部の余長をメスコーン12の端面から適切な長さ(例えば30mm)に切断する(図9)。切断にはグラインダーを用いる。
【0035】
(2)二次施工側のPC鋼材20にはカップラー30が予めはめ込まれると共に端部にオスコーンとメスコーンを装着して押え板で固定したものを用意する。このPC鋼材の外周にはシース50もはめ込んでおく。
【0036】
(3)このカップラー30の内部にスペーサ40を挿入し、カップラーの雌ネジ31を一次施工側メスコーンの雄ネジ12Aにねじ込む(図10)。このねじ込みにより、カップラー小径部32の内端面は二次施工側メスコーン22の端面を押圧し、一次施工側オスコーン11の端面と二次施工側ボルト24との間でスペーサ40を圧縮する。
【0037】
(4)シース一端の外周に接着剤を塗布する(図11)。そして、アンカープレートのガイド筒15Bにシース一端を差し込んで、シース50とガイド筒15Bをテープ70で接続する(図12)。このとき、樹脂の排出孔51が上方に向くようにシース50の向きを配置する。
【0038】
(5)シース他端の外周とシースキャップ60における接合部内面とに接着剤を塗布する(図13)。PC鋼材の外周からシースキャップ60の2つの円弧片を組み合せ、接合面の棒状突起を嵌合孔にはめ込んでシースキャップ60をシース他端に取り付ける。シースキャップ60は樹脂充填孔63が下方に位置するように装着する。
【0039】
(6)続いてシース50とシースキャップの接合部61との間にテープ72を巻く。さらに、シースキャップ60におけるPC鋼材の挿通部62とPC鋼材20のポリエチレン樹脂被覆との隙間にはシール材74を充填後、テープ75を巻く(図14)。
【0040】
(7)塗布した接着剤および充填したシール材74が硬化したことを確認後、樹脂充填孔63にビニルホース80を介してポンプノズル81を接続し、シース内に樹脂を注入する(図15)。このとき、樹脂の充填状況は透明のシース50の外部から確認できる。
【0041】
(8)シース50とカップラー30との隙間が完全に樹脂で充填され、排出孔51から樹脂が排出されたことを確認する。下方の充填孔63から樹脂注入を行い、上方の排出孔51より樹脂をあふれさせることで、内部の気体を排出させやすくし、確実に樹脂の充填を行う。
【0042】
(9)ビニルホース80の結束を行うと共に、排出孔用栓82をセットし、テープで押え処理する(図16)。
【0043】
【発明の効果】
以上説明したように、本発明カップラー構造によれば、オスコーンでPC鋼材を把持してメスコーンにはめ込む作業を工場において行っておくことで、現場作業を省略でき、確実なカップラー構造を実現できる。
【0044】
また、押え板、ゴムスペーサーを取り付けることでオスコーンが外れない構造を実現できる。
【0045】
さらに、シースキャップを分割式にすることで、一次施工側と二次施工側のPC鋼材を接続した後にPC鋼材の外周側から簡単に装着することができる。
【図面の簡単な説明】
【図1】本発明カップラー構造の部分断面図である。
【図2】一次施工側オスコーンとメスコーンの部分断面図である。
【図3】(A)はアンカープレートの平面図、(B)はその部分断面図である。
【図4】二次施工側オスコーンとメスコーンの部分断面図である。
【図5】(A)はカップラーの部分断面図、(B)はその端面図である。
【図6】(A)はスペーサの端面図、(B)はその部分断面図である。
【図7】シースの部分断面図である。
【図8】(A)はシースキャップの端面図、(B)はその部分断面図である。
【図9】一次施工側PC鋼材の端部を示す説明図である。
【図10】カップラの一次施工側への装着状態を示す説明図である。
【図11】アンカープレートにシースを装着する際の説明図である。
【図12】アンカープレートにシースを装着してテーピングした状態の説明図である。
【図13】シースにシースキャップを装着する際の説明図である。
【図14】シースにシースキャップを装着してテーピングした状態の説明図である。
【図15】シースキャップにポンプノズルを接続した状態を示す説明図である。
【図16】樹脂充填完了後のカップラー構造の説明図である。
【図17】従来のカップラー構造の部分断面図である。
【符号の説明】
10 PC鋼材
11 オスコーン
12 メスコーン
12A 雄ネジ
15 アンカープレート
15A 矩形板
15B ガイド筒
20 PC鋼材
21 オスコーン
22 メスコーン
23 押え板
24 ボルト
30 カップラー
31 雌ネジ
32 小径部
40 スペーサ
50 シース
51 排出孔
60 シースキャップ
61 接合部
62 挿通部
63 樹脂充填孔
64 棒状突起
65 嵌合孔
70 テープ
72 テープ
74 シール材
75 テープ
80 ビニルホース
81 ポンプノズル
82 排出孔用栓
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a coupler structure for connecting a PC steel material used in a prestressed concrete method, an end structure of a PC steel material used in this coupler structure, and a sheath cap.
[0002]
[Prior art]
PC steel is connected by a coupler structure in bridges using the outer cable method. FIG. 17 is a partial cross-sectional view of a conventional coupler structure. This is a structure in which the PC steel material 20 on the secondary construction side (right side in the figure) is connected to the primary construction side (left side in the figure) that fixes the end of the PC steel material 10 already embedded in the concrete.
[0003]
On the primary construction side, a strained PC steel material 10 is embedded in the concrete structure, and the ends of the PC steel material are held by the male cone 11 and the female cone 12 and fixed to the anchor plate 15.
[0004]
On the secondary construction side, first, the cylindrical coupler 30, the sheath 50 and the sheath cap 60 are passed through the outer periphery of the PC steel material 20. Subsequently, the male cone 21 and the female cone 22 are attached to the end of the PC steel material 20 in the same manner as the primary construction side.
[0005]
A female screw is formed on the inner surface of one end of the coupler, and this female screw is screwed into a male screw formed on the outer periphery of the female cone 12 on the primary construction side. The other end side of the coupler is configured to have a small inner diameter, and as the coupler 30 is screwed in, the female cone 22 on the secondary construction side is pressed to the primary construction side, and the PC steel material 10 on the primary construction side and the PC steel material 20 on the secondary construction side Is connected.
[0006]
The sheath 50 is disposed on the outer periphery of the coupler 30, one end of the sheath is brought into contact with the anchor plate 15, and the sheath cap 60 is fitted to the other end (secondary construction side). The sheath cap 60 is an annular member having a PC steel insertion hole formed at the center and a resin filling hole 63. Then, between the sheath 50 and the anchor plate 15, between the sheath 50 and the sheath cap 60 and between the sheath cap 60 and the resin coating of the PC steel material 20, the resin is injected from the resin filling hole 63, The space between the coupler 30 and the sheath 50 is filled with resin.
[0007]
[Problems to be solved by the invention]
However, with the coupler structure described above, there are cases where field work is complicated and connection reliability is insufficient.
[0008]
The work of attaching male and female cones to the edge of PC steel is done at the site where PC steel is connected. Usually, the male cone is a conical metal piece that can be divided into a plurality of pieces, and if the metal pieces are displaced when attached to the female cone, the reliability of fixing may be impaired. Further, it is conceivable that after the coupler is screwed into the female cone on the primary construction side, the male cone on the secondary construction side may come off from the female cone, and there is no dedicated accessory for confirming whether the connection has been made reliably.
[0009]
Furthermore, the sheath cap has an integral structure, and it is inferior in workability because it has to be brought to the primary construction side after being previously fitted in the outer periphery of the PC steel material on the secondary construction side.
[0010]
Therefore, a main object of the present invention is to provide a coupler structure for connecting a PC steel material that is excellent in workability and connection reliability. Another object of the present invention is to provide an end structure of a PC steel material and a sheath cap used in this coupler structure for connecting a PC steel material.
[0011]
[Means for Solving the Problems]
The present invention achieves the above object by combining a male cone and a female cone in advance with a PC steel material end and making the sheath cap split.
[0012]
That is, the coupler structure for connecting a PC steel material according to the present invention includes a pair of fixing parts configured by fitting a male cone holding a PC steel material into a female cone, a coupler for connecting both fixing parts, a sheath covering the outer periphery of the coupler, and a sheath It is a coupler structure for connecting PC steel, which includes a sheath cap attached to the end face. Here, a holding plate for preventing the male cone from coming off from the female cone is disposed on the end face of the male cone. The sheath cap is an annular body and can be divided into a plurality of arc pieces. Furthermore, a spacer may be interposed between the fixing portions.
[0013]
The present invention is also characterized by the structural members used in the coupler structure.
[0014]
That is, the end structure of the present invention PC steel is arranged on the end surface of the PC steel, the female cone through which the end of the PC steel is inserted, the male cone that holds the end of the PC steel and is fitted into the female cone, and the male cone. And a presser plate that prevents the male cone from coming off from the female cone.
[0015]
In addition, the sheath cap of the present invention is an annular body attached to the end surface of the PC steel material connection sheath, and can be divided into a plurality of arc pieces.
[0016]
In this sheath cap, it is preferable that the joining surface of the adjacent arc pieces has a convex portion and a concave portion that engage with each other. Due to the engagement between the convex portion and the concave portion, the arc pieces of the sheath cap can be combined reliably and easily without causing a shift. The convex portion and the concave portion may be corrugated surfaces other than rod-like protrusions and fitting holes.
[0017]
By attaching the male cone and female cone to the end of the PC steel in advance at the factory, and preventing the male cone from coming off with the presser plate, the fixing work at the connection site can be omitted.
[0018]
The presser plate prevents the male cone from coming out of the female cone before and after connecting the PC steel material, and can realize a reliable fixing structure.
[0019]
In the coupler, when a spacer is interposed between the fixing portions on the primary construction side and the secondary construction side, it contributes to prevention of the male cone from coming off. In addition, the spacer reduces the space in the coupler, thereby reducing the air (oxygen) remaining in the space and improving the corrosion resistance.
[0020]
In the conventional sheath cap, it was necessary to pass the steel material in advance, but by connecting the PC steel material of the primary construction side and the secondary construction side by connecting the sheath cap in a split structure, it can be easily attached from the outer periphery side of the PC steel material be able to.
[0021]
DETAILED DESCRIPTION OF THE INVENTION
Embodiments of the present invention will be described below.
(Outline of coupler structure)
FIG. 1 is a partial cross-sectional view of the coupler structure of the present invention. This coupler structure uses a coupler 30 to connect the PC steel 20 on the secondary construction side (right side of the figure) to the primary construction side (left side of the figure) that fixes the end of the PC steel 10 already embedded in the concrete. It is a structure to do.
[0022]
(Primary construction side)
On the primary construction side, a strained PC steel material 10 is embedded in the concrete structure, and a fixing portion in which the male cone 11 and the female cone 12 are attached to the end portion of the PC steel material is fixed to the anchor plate 15.
[0023]
FIG. 2 shows a partial cross-sectional view of the male cone 11 and the female cone 12 on the primary construction side. The male cone 11 is a conical metal piece that can be divided into a plurality of pieces, and has a groove into which a PC steel material is fitted in the axial direction.
[0024]
The female cone 12 is a cylindrical body having a conical hole into which the male cone 11 holding a PC steel material in a conical shape is inserted. On the outer peripheral surface of the female cone 12, a male screw 12A into which a coupler 30 described later is screwed is formed.
[0025]
As shown in FIG. 3, the anchor plate 15 is obtained by welding a guide tube 15B to the surface of a rectangular plate 15A disposed on the end surface of the concrete structure.
[0026]
As the PC steel material 10, for example, an epoxy resin coated on a stranded wire obtained by twisting a plurality of strands and further coated with polyethylene (for example, manufactured by Sumitomo Electric: Afterbond “registered trademark”) can be used. Since the surface of the polyethylene resin is formed in a concavo-convex shape, high adhesion strength with concrete can be obtained. The PC steel material 20 on the secondary construction side to be described later is the same as the PC steel material 10.
[0027]
(Secondary construction side)
The secondary construction side also has a fixing portion in which the male cone 21 and the female cone 22 are attached to the end of the PC steel material 20. This fixing unit is not assembled at the site but assembled in advance in a factory or the like. If the PC steel material 20 is simply held by the male cone 21 and fitted into the female cone 22, the male cone 21 may fall off during the transportation of the PC steel material 20 or the like. Therefore, as shown in FIG. 4, a holding plate 23 is provided on the end surface of the male cone 21, and the holding plate 23 is fixed to the female cone 22 with a bolt 24 to prevent the male cone 21 from falling off.
[0028]
The presser plate 23 is an annular metal plate having an outer diameter larger than the maximum outer diameter of the male cone 21 and an inner diameter smaller than the maximum outer diameter of the male cone 21. When the presser plate 23 is coaxially arranged on the end surface of the male cone 21, the presser plate protrudes to the outer peripheral side of the male cone 21. If a bolt through hole is provided at the protruding part and a bolt screw hole is formed on the end face of the female cone 22 and the bolt 24 is screwed in, the presser plate 23 is fixed to the female cone 22 and the male cone 21 is removed. It can be surely prevented. The fitting of the male cone 21 to the PC steel material 20 and the fitting to the female cone 22 are all performed under proper quality control in the factory, so that the problem that the deviation of the male cone 21 from the female cone 22 occurs can be solved.
[0029]
(Coupler)
The coupler 30 covers and connects the fixing portion on the primary construction side and the fixing portion on the secondary construction side, and has a female screw 31 on the inner periphery on one end side and a small diameter portion 32 having a small inner diameter on the other end side. It is a provided cylindrical body (FIG. 5). The female screw 31 corresponds to the male screw 12A of the primary construction side female cone. The small diameter portion 32 on the other end side is formed to have an inner diameter that is larger than the outer diameter of the PC steel material 20 and smaller than the outer diameter of the female cone 22. Such a coupler 30 is fitted in the PC steel material 20 on the secondary construction side in advance.
[0030]
(Spacer)
A spacer 40 is disposed between the fixing portions on the primary construction side and the secondary construction side. The spacer 40 is a cylindrical member having a size that is sandwiched between the male cone 11 on the primary construction side and the bolt 24 on the secondary construction side (FIG. 6). It is preferable to use an elastic material such as rubber. In this example, the spacer 40 is used, but even if the spacer 40 is not provided, it functions as a coupler structure without any trouble.
[0031]
(sheath)
A cylindrical sheath 50 is fitted on the outer periphery of the coupler 30. Since the gap between the sheath 50 and the coupler 30 is filled with resin later, it is preferable to use a transparent or translucent material so that the resin filling state can be easily seen from the outside. In this example, transparent polyethylene is used, but vinyl chloride can also be used.
[0032]
The sheath 50 is provided with a resin discharge hole 51 (FIG. 7). The use of an acrylic resin or the like as a transparent material for the sheath is conceivable. However, the acrylic resin is less flexible than the polyethylene resin, and cracks are easily generated when the discharge holes 51 are formed. Furthermore, the same material is used for the sheath cap 60, which will be described later.
[0033]
(Sheath cap)
A sheath cap 60 is fitted into the end of the sheath 50 (secondary construction side). The sheath cap 60 is an annular member in which a joining portion 61 to the sheath is projected on one end side, and a PC steel insertion portion 62 is projected on the other end side (FIG. 8). Furthermore, a resin filling hole 63 is also provided. In this example, the sheath cap 60 is divided into two arc pieces. One arc piece has a pair of rod-like protrusions 64 on the joining surface, and the other arc piece has a pair of fitting holes 65 into which the rod-like protrusions 64 are fitted. By fitting the rod-like protrusion 64 into the fitting hole 65, the annular sheath cap 60 can be configured easily and reliably by combining the arc pieces. In this example, the sheath cap is made of polyethylene, but vinyl chloride or the like can also be used.
[0034]
(Assembly procedure of coupler structure)
(1) Cut the extra length of the fixing portion on the primary construction side where the tension and fixing are performed to an appropriate length (for example, 30 mm) from the end face of the female cone 12 (FIG. 9). A grinder is used for cutting.
[0035]
(2) Prepare a coupler 30 fitted in advance to the PC steel material 20 on the secondary construction side and fitted with a male cone and a female cone at the end and fixed with a presser plate. A sheath 50 is also fitted on the outer periphery of the PC steel material.
[0036]
(3) The spacer 40 is inserted into the coupler 30, and the female screw 31 of the coupler is screwed into the male screw 12A of the primary construction side female cone (FIG. 10). By this screwing, the inner end surface of the coupler small diameter portion 32 presses the end surface of the secondary construction side female cone 22 and compresses the spacer 40 between the end surface of the primary construction side male cone 11 and the secondary construction side bolt 24.
[0037]
(4) Apply adhesive to the outer periphery of one end of the sheath (Figure 11). Then, one end of the sheath is inserted into the guide tube 15B of the anchor plate, and the sheath 50 and the guide tube 15B are connected with the tape 70 (FIG. 12). At this time, the sheath 50 is oriented so that the resin discharge hole 51 faces upward.
[0038]
(5) Adhesive is applied to the outer periphery of the other end of the sheath and the inner surface of the joint portion of the sheath cap 60 (FIG. 13). The two arc pieces of the sheath cap 60 are combined from the outer periphery of the PC steel material, and the sheath cap 60 is attached to the other end of the sheath by fitting the rod-shaped protrusion on the joint surface into the fitting hole. The sheath cap 60 is mounted so that the resin filling hole 63 is positioned below.
[0039]
(6) Subsequently, the tape 72 is wound between the sheath 50 and the joined portion 61 of the sheath cap. Further, a sealing material 74 is filled in a gap between the PC steel material insertion portion 62 in the sheath cap 60 and the polyethylene resin coating of the PC steel material 20, and then a tape 75 is wound (FIG. 14).
[0040]
(7) After confirming that the applied adhesive and the filled sealing material 74 are cured, the pump nozzle 81 is connected to the resin filling hole 63 via the vinyl hose 80, and the resin is injected into the sheath (FIG. 15). . At this time, the resin filling state can be confirmed from the outside of the transparent sheath 50.
[0041]
(8) Confirm that the gap between the sheath 50 and the coupler 30 is completely filled with resin, and the resin is discharged from the discharge hole 51. By injecting the resin from the lower filling hole 63 and overflowing the resin from the upper discharge hole 51, it is easy to discharge the internal gas, and the resin is reliably filled.
[0042]
(9) The vinyl hose 80 is bundled, and the discharge hole stopper 82 is set and pressed with tape (FIG. 16).
[0043]
【The invention's effect】
As described above, according to the coupler structure of the present invention, the work of gripping the PC steel material with the male cone and fitting it into the female cone is performed in the factory, so that the field work can be omitted and a reliable coupler structure can be realized.
[0044]
Moreover, the structure which a male cone does not remove | deviate by attaching a press plate and a rubber spacer is realizable.
[0045]
Furthermore, by making the sheath cap into a split type, it is possible to easily attach from the outer peripheral side of the PC steel after connecting the PC steel on the primary construction side and the secondary construction side.
[Brief description of the drawings]
FIG. 1 is a partial cross-sectional view of a coupler structure of the present invention.
FIG. 2 is a partial cross-sectional view of a primary construction side male cone and a female cone.
3A is a plan view of an anchor plate, and FIG. 3B is a partial cross-sectional view thereof.
FIG. 4 is a partial cross-sectional view of a secondary construction side male cone and a female cone.
5A is a partial cross-sectional view of a coupler, and FIG. 5B is an end view thereof.
6A is an end view of a spacer, and FIG. 6B is a partial cross-sectional view thereof.
FIG. 7 is a partial cross-sectional view of a sheath.
8A is an end view of a sheath cap, and FIG. 8B is a partial cross-sectional view thereof.
FIG. 9 is an explanatory view showing an end portion of a primary construction side PC steel material.
FIG. 10 is an explanatory diagram showing a mounting state of the coupler on the primary construction side.
FIG. 11 is an explanatory diagram when a sheath is attached to an anchor plate.
FIG. 12 is an explanatory diagram of a state where a sheath is attached to an anchor plate and taping is performed.
FIG. 13 is an explanatory diagram when a sheath cap is attached to the sheath.
FIG. 14 is an explanatory view of a state where a sheath cap is attached to the sheath and taped.
FIG. 15 is an explanatory view showing a state in which a pump nozzle is connected to a sheath cap.
FIG. 16 is an explanatory diagram of a coupler structure after completion of resin filling.
FIG. 17 is a partial cross-sectional view of a conventional coupler structure.
[Explanation of symbols]
10 PC steel
11 Oscorn
12 female cone
12A male thread
15 Anchor plate
15A rectangular plate
15B Guide tube
20 PC steel
21 Oscone
22 female cone
23 Presser plate
24 volts
30 coupler
31 Female thread
32 Small diameter part
40 Spacer
50 sheath
51 Discharge hole
60 sheath cap
61 Joint
62 Insertion section
63 Resin filling hole
64 Rod projection
65 Mating hole
70 tapes
72 tapes
74 Sealing material
75 tapes
80 vinyl hose
81 Pump nozzle
82 Drain hole plug

Claims (2)

PC鋼材を把持したオスコーンをメスコーンにはめ込んで構成される一対の定着部と、両定着部を連結するカップラーと、カップラーの外周を覆うシースと、シース端面に装着されるシースキャップとを具えるPC鋼材接続用カップラー構造であって、
前記オスコーンの端面にはメスコーンからオスコーンの抜けを防止する押え板が配置され、
前記シースキャップは環状体で、複数の円弧片に分割自在であり、
さらに両定着部の間にスペーサが介在されることを特徴とするPC鋼材接続用カップラー構造。
A PC comprising a pair of fixing parts configured by fitting a male cone holding a PC steel material into a female cone, a coupler connecting both fixing parts, a sheath covering the outer periphery of the coupler, and a sheath cap attached to the sheath end face It is a coupler structure for connecting steel materials,
On the end face of the male cone, a press plate for preventing the male cone from coming off from the female cone is arranged,
The sheath cap is annular body, Ri divided freely der into a plurality of arc pieces,
Furthermore , a coupler structure for connecting PC steel, characterized in that a spacer is interposed between both fixing parts .
前記押え板は、ボルトにより貫通されると共に、そのボルトを一方の定着具のメスコーンの端面にねじ込むことで当該メスコーンに固定され、  The pressing plate is penetrated by a bolt and fixed to the female cone by screwing the bolt into the end surface of the female cone of one fixing tool.
前記スペーサは、このボルトと他方の定着部のオスコーンとの間に介在されることを特徴とする請求項1に記載のPC鋼材接続用カップラー構造。  The coupler structure for connecting a PC steel material according to claim 1, wherein the spacer is interposed between the bolt and the male cone of the other fixing portion.
JP2000309033A 2000-10-10 2000-10-10 Coupler structure for connecting PC steel Expired - Lifetime JP4357729B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000309033A JP4357729B2 (en) 2000-10-10 2000-10-10 Coupler structure for connecting PC steel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000309033A JP4357729B2 (en) 2000-10-10 2000-10-10 Coupler structure for connecting PC steel

Publications (2)

Publication Number Publication Date
JP2002115370A JP2002115370A (en) 2002-04-19
JP4357729B2 true JP4357729B2 (en) 2009-11-04

Family

ID=18789259

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000309033A Expired - Lifetime JP4357729B2 (en) 2000-10-10 2000-10-10 Coupler structure for connecting PC steel

Country Status (1)

Country Link
JP (1) JP4357729B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008045280A (en) * 2006-08-10 2008-02-28 Sumitomo Denko Steel Wire Kk Prestressing strand connection structure and method of forming the same
JP2010174423A (en) * 2009-01-30 2010-08-12 Sumitomo Denko Steel Wire Kk Inspectable polyethylene-coated epoxy strand
KR100934608B1 (en) 2009-06-24 2009-12-31 김형중 A steel wire anchoring device and precast box, the method of assembling precast box using the same
US20240141647A1 (en) * 2021-06-28 2024-05-02 Holmes Solutions Limited Partnership A coupling system, coupler tools and methods of use thereof

Also Published As

Publication number Publication date
JP2002115370A (en) 2002-04-19

Similar Documents

Publication Publication Date Title
US6425782B1 (en) End connector for coaxial cable
KR101959076B1 (en) A rebar coupler
KR101988611B1 (en) non-slip steel bar reinforcement coupler
JPH0610215Y2 (en) Plastic tube fittings
JP2767249B2 (en) Clamp assembly and mounting method of exterior clamp
JP4357729B2 (en) Coupler structure for connecting PC steel
JP2008045280A (en) Prestressing strand connection structure and method of forming the same
KR101926125B1 (en) Coupler apparatus for connecting reinforcing bar using sleeve with flat internal thread, and reinforcing bar connecting method using the same
GB2255385A (en) A wedge-chuck connector
KR101918014B1 (en) Coupler apparatus for connecting reinforcing bar using sleeve with tapered internal thread, and reinforcing bar connecting method using the same
KR20150004637A (en) Large diameter steel reinforcement connectors
KR102201374B1 (en) Pipe fittings and pipe connecting method using the same
JP3832114B2 (en) Insulator, center conductor, and connection structure of the lead portion using them
JPH019188Y2 (en)
JPS63104005A (en) Ferrule for optical fiber
KR101131815B1 (en) Connector for plastic pipe
JP2001349001A (en) Connector of pc steel wire
JP2961713B2 (en) Seal connector
KR19990078398A (en) For connection fixing tool and tension material
JP3827609B2 (en) PC steel wire fixing tool grout cover
JP3481475B2 (en) Intermediate part clamp structure of coated cable and intermediate part clamp fitting
CN210040584U (en) Cable assembly and cable joint thereof
JPS6128172Y2 (en)
JP3972287B2 (en) Sleeve type fitting
JP4116602B2 (en) Fixing device for PC tendon

Legal Events

Date Code Title Description
A625 Written request for application examination (by other person)

Free format text: JAPANESE INTERMEDIATE CODE: A625

Effective date: 20071005

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20090415

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20090424

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20090617

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20090724

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20090805

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120814

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 4357729

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130814

Year of fee payment: 4

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250