JP4350872B2 JP2000141804A JP2000141804A JP4350872B2 JP 4350872 B2 JP4350872 B2 JP 4350872B2 JP 2000141804 A JP2000141804 A JP 2000141804A JP 2000141804 A JP2000141804 A JP 2000141804A JP 4350872 B2 JP4350872 B2 JP 4350872B2
Authority
JP
Japan
Prior art keywords
construction
information
management ledger
site
equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP2000141804A
Other languages
Japanese (ja)
Other versions
JP2001325560A (en
Inventor
正文 寺脇
勇 鈴木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sanki Engineering Co Ltd
Original Assignee
Sanki Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sanki Engineering Co Ltd filed Critical Sanki Engineering Co Ltd
Priority to JP2000141804A priority Critical patent/JP4350872B2/en
Publication of JP2001325560A publication Critical patent/JP2001325560A/en
Application granted granted Critical
Publication of JP4350872B2 publication Critical patent/JP4350872B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Air Conditioning Control Device (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は機器の施工方法に関するものである。
【0002】
【従来の技術】
例えば、空調工事のファンコイルユニット(FCU)やバリアブルエアボリューム(VAV)等の端末機器の施工においては、機器の管理台帳を用意しておくと共に、同一の情報が書込まれた2枚のバーコードシールを備えたバーコードを現地に搬入される機器に貼付けておき、現地での機器設置後に、バーコードからバーコードシールを1枚剥いで、管理台帳の前記機器についての情報が記入されている行に設けてあるバーコードシール貼付位置に貼付け、どの機器が施工図上のどの位置へ設置されたか把握するようにしている。
【0003】
【発明が解決しようとする課題】
しかしながら、従来は機器の搬入設置時と施工完了前の機器調整運転時では、機器設置位置の施工間違いや機器搬入設置後の施主よりのレイアウト変更等が原因して機器の設置位置が異なり、施工図上の所定位置に予定された機器がないことがある。而して、斯かる状態は施工完了前の機器調整運転時に不便なだけでなく、その後の調整、メンテナンスにおいても不便である。従って、施工された機器の設置位置を正確に把握し得るようにすることが必要である。
【0004】
本発明は、斯かる実情に鑑み、機器の設置位置を正確に把握し得るようにした機器の施工方法を提供することを目的としてなしたものである。
【0005】
【課題を解決するための手段】
本発明の機器の施工方法は、建設中の現場へ搬入設置される機器の情報である、機器の種類と当該機器の施工図上の平面図アドレスと制御ネットワークアドレスである仮想ネットワークIDと認識番号と、を各行に記載する管理台帳に対して、前記各行に各記載情報を記入する管理台帳の一次作成をおこなうステップと、
3枚のバーコードシールに同一の実機器特定ID情報が書込まれたバーコードを予め工場にて貼付けてある前記各機器を前記現場に搬入設置した際に、前記3枚のバーコードシールの内から1枚を剥がして、前記管理台帳の当該機器の情報が記載されている前記各行の所定の欄に貼付けることで施工時の管理台帳の作成完了を行うステップと、
制御ネットワーク上のデータ通信、施工図上の平面図アドレスや仮想ネットワークIDである前記各機器のアドレス情報、仮想機器のネットワーク接続情報、及び仮想ネットワークの制御情報を含むソフトウエア上の仮想ネットワークファイルである施工データファイルを、現場外の端末を用いて仮想ネットワーク及び仮想機器を繋ぎ作成するステップと、
作成完了した前記施工時の管理台帳に貼付しているバーコードシールからバーコードリーダにより前記各機器の実機器特定IDの情報を読み取り前記現場外の端末に転送することで、前記仮想ネットワーク上の仮想機器と実際の前記各機器とを関連付けて実機器が制御ネットワークにて作動可能なように施工データファイルを完成させるステップと、
現場に設置された前記各機器の運転制御を行うための制御ネットワーク情報となっている完成した施工データファイルを現場の端末にインストールするステップと、
前記制御ネットワーク情報を現場の端末から制御ネットワークを介して前記各機器へ転送して各機器を稼働し得る状態にするステップと、
前記現場の端末により機器の調整運転を行なう際に、当該機器に貼付けてあるバーコードから更に1枚のバーコードシールを剥がして、前記施工時の管理台帳の調整運転を行った機器の情報が記入されている行の所定の欄に貼付けて管理台帳を完成させるステップと、
を経るものである。
【0006】
又、本発明の機器の施工方法は、現場の端末により機器の調整運転を行う際に、当該機器が管理台帳に記入された所定のアドレスにない場合には、前記施工時の管理台帳のアドレスを修正した後現場に設置した機器の調整運転を行なうものである。
【0007】
本発明の機器の施工方法においては、前記各機器を前記現場に搬入した際に、管理台帳に記載された機器の認識番号を表記した認識番号用シールを、対象となる機器表面の、作業者が下から見える位置に貼付けるものである。
【0009】
本発明によれば、機器設置位置の施工間違いや機器搬入設置後の施主よりのレイアウト変更等が原因して機器の設置位置が異なり、施工図上の所定位置に予定された機器がない場合でも、機器の調整運転時に管理台帳の平面的なアドレスの修正を行うことができるため、施工された機器の設置位置を正確に把握することができ、従って、その後の機器の調整やメンテナンスを行う際にも便利である。
【0010】
【発明の実施の形態】
以下、本発明の実施の形態を図示例と共に説明する。
【0011】
図1〜図9は本発明を実施する形態の一例である。
【0012】
図1は、本発明の方法を行う際に用いる施工図の平面図で、施工図1には、横方向をX軸、縦方向をY軸として座標OY10、OY11、OY13・・・,OX3、OX4・・・が書込まれている。又、施工図1には例えばバリアブルエアボリューム(VAV)等、施工される各機器2,3,4等が記入されている。
【0013】
図2は本発明の方法を行う際に用いる管理台帳の平面図であり、管理台帳5には複数の行が設けられ、各行には、施工される機器の設置されるフロア、系統、機器の種類、施工図上の平面図アドレス(座標)が記入し得るようになっている。
【0014】
又、管理台帳5の各行には、ドメインID,サブネットID,ノードIDを一組とした制御ネットワークアドレスが仮想ネットワークIDとして記入されるようになっている。制御ネットワークはLanと同様、コンピュータネットワークの一種で、制御ネットワークアドレスは、インテリジェントゲートウェイを介して中央監視装置等の上位コントローラにより機器を特定するために必要なものである。
【0015】
更に、管理台帳5の各行には、各機器毎に実機器特定ID等の情報が書込まれたバーコードシールを貼付けるための欄が一つの行に対し上下2箇所ずつ設けられている。而して、上の欄は機器の施工時に貼付ける欄であり、下の欄は、機器の調整運転後に貼付ける欄である。
【0016】
更に又、管理台帳5の各行には、機器の認識番号を記入する欄が設けられている。
【0017】
図3は本発明の方法を行う際に用いるバーコードの平面図であり、バーコード6は、同一の情報が書込まれた3枚のバーコードシール6aが台紙に対し剥がし得るよう貼付けられている。而して、バーコードシール6aのうち1枚は設置された機器に貼付けられたままで、他の2枚は剥がして管理台帳5のバーコードシールを貼付けるための欄に貼付け得るようになっている。バーコードシール6aに書込まれている情報は、バーコードシール6aが貼付けられていた機器の仕様、性能等、実機器特定IDである。
【0018】
図4は本発明の方法を行う際に用いる認識番号用シールの平面図であり、認識番号用シール7は台紙から剥がして現場に設置された実際の機器に貼付け得るようになっている。
【0019】
図5は本発明の方法において、機器を室内の所定の位置に設置した状態を示す斜視図で、図中、8は施工図に従い室内9の所定位置に設置された機器である。機器8としては、VAVの他にインテリジェントゲートウェイ(IG)、エアハンドリングユニット(AHU)、エアバランシングユニット(ABU)、ファンコイルユニット(FCU)等がある。
【0020】
図6は本発明の方法においてバーコードリーダにより、管理台帳の各機器に対応して行の上欄に貼付けたバーコードシールの情報を読取る状態を示す斜視図で、図中、10は現場で作成された管理台帳5に貼付けられたバーコードシール6a,6a’の情報を読取るためのバーコードリーダである。
【0021】
図7は本発明の方法において、バーコードリーダで読取られた情報を現場以外の場所、例えば、サポートセンタにあるパソコンに転送する状態を示す斜視図で、図中、11はサポートセンタにあるパソコンである。而して、施工データファイルを作成する際に、パソコン11にはバーコードリーダ10に読取られた情報をインプットし得るようになっている。
【0022】
図8は本発明の方法において、設置された機器を調整する際に現場のパソコンにより制御ネットワークを介し設置された各機器に指令を与える状態を示す斜視図で、図中、12は現場のパソコン、13はパソコン12からの指令を各機器2,3,4,8に与えるための制御ネットワークである。
【0023】
図9は本発明の方法において、各機器の調整運転終了後に管理台帳の各機器に対応した行の下欄に機器の実際の設置位置を特定するためにバーコードシールを貼付けた状態を示す斜視図であり、図中、前記各図に示す符号と同一のものには同一の符号が付してある。
【0024】
次に、本発明の方法の具体的な手順について、上述の図1〜図9、及び図10〜図14のフローチャートを参照しつつ説明する。なお、以下の説明においては、図1〜図9に示されている符号がどの図に示されているか、原則的には言及しない。
【0025】
本発明の方法は大きく分けて、図10に示すように、現場における機器の設置時に管理台帳5を作成するステップ(S1)と、現場外のパソコン11で施工データファイルを作成するステップ(S2)と、現場のパソコン12に制御ネットワークのインストールを行うステップ(S3)と、現場のパソコン12により機器の調整運転を行うステップ(S4)とから成る。
【0026】
次に図10に示す各ステップ(S1)〜(S4)について詳述する。
【0027】
I.現場における機器の設置時に管理台帳5を作成するステップ(S1)の詳細な手順(図11参照)
現場における機器の設置時に管理台帳5を作成する際には、先ず、工場において機器2,3,4,8にバーコード6が貼付けられる(ステップ(S1−1))と共に、管理台帳5の一次作成が行なわれる(ステップ(S1−2))。管理台帳5の一次作成は、施工図1を参照してフロア、系統、機器の種類、機器番号、平面図アドレス、ドメインID及びサブネットID並びにノードIDを一組とした制御ネットワークアドレスにより構成される仮想ネットワークID、認識番号を記入することにより行われるが、各行のバーコードシール6aを貼付ける欄は上下欄何れも空欄のままとしておく。
【0028】
認識番号は、系統毎に割付けられる。例えば、一つの系統でVAVがN台ある場合には、VAVには1からNの認識番号が順次割付けられ、AHUに(N+1)の番号が割付けられ、最後の機器に(N+2)の認識番号が割付けられる。
【0029】
管理台帳5の一次作成が完了したら、次いで、機器2,3,4,8及び管理台帳5を現場へ搬入し(ステップ(S1−3))、管理台帳5を参照しつつ搬入した順に機器2,3,4,8を所定の位置に設置する(ステップ(S1−4))。又、機器2,3,4,8を設置した後は各機器2,3,4,8が所定の位置に設置されているか否か、施工図1の平面図上のアドレスにより確認する(ステップ(S1−5))。
【0030】
続いて、設置した機器2,3,4,8に貼付けてあるバーコード6よりバーコードシール6aを1枚剥がし、設置した機器2,3,4,8の実際のアドレスと一致する管理台帳5上の平面図アドレスのある行のうち上欄、すなわち施工時貼付の欄に剥がしたバーコードシール6aを図6に示すように貼付ける(ステップ(S1−6))。なお、管理台帳5の行が異なれば、機器が異なるため、貼付けるバーコードシールは異なる情報が書込まれたバーコードシール6a’となる。又、設置された各機器2,3,4,8には、作業員が下から見える位置に認識番号用シール7を貼付ける(ステップ(S1−7))。このように、設置された機器2,3,4,8に認識番号用シール7を貼付けるのは、調整運転時に機器2,3,4,8の実際に設置された機器本体及びその位置と管理台帳5上の当該機器2,3,4,8及びその位置を確認し得るようにするためである。
【0031】
而して、機器2,3,4,8の設置が全て完了するまでは、ステップ(S1−4)からステップ(S1−7)の手順を継続し、全ての機器2,3,4,8の設置が完了することにより、施工時の管理台帳5の作成が完了する(ステップ(S1−8))。又、施工時の管理台帳5の作成が完了したら、次の施工データファイルの作成に移る。
【0032】
II.施工データファイルを作成するステップ(S2)の詳細な手順(図12参照)
施工データファイルの作成は現場以外の場所、例えばサポートセンタで行われるが、その際には、データファイル作成場所には1セットの標準システム或いは実機器を予め搬入しておく。標準システムとしては、基本的には夫々の機器の仕様、性能等の情報をソフト的に抽象化してプログラム化した施工データ作成用のCD−ROM等の電子ファイルが用いられるが、電子ファイルがない場合には、実機器が必要となる。而して、この場合には、実機器のマイコンにおけるメモリにインプットされている機器の仕様、性能等の情報を読出すことになる。
【0033】
電子ファイルを用いるときも実機器を用いるときも、一つのフロアに設置される各機器の全ての情報が必要となるわけではなく、例えば、一つのフロアに(AHU・1台+VAV・15台+IG・1台)×3系統のシステムが設置される場合、AHU・1台、VAV・1台、IG・1台についての電子ファイル若しくは実機器が必要となる。
【0034】
施工データファイルを作成する場合には、図12に示すように現場外のパソコン11に上述の電子ファイルの情報或いは、実機器のマイコンのメモリにインプットされている情報が作業員によりインストールされ、パソコン11に一つの制御ネットワーク分の雛形が作成される(ステップ(S2−1))。而して、施工データファイルは、制御ネットワーク13上のデータ通信、機器2,3,4,8の位置情報すなわちアドレス情報、仮想機器のネットワーク接続情報、制御情報等を含むソフトウエア上の仮想ネットワークファイルを含み、ネットワークデータベースとなる。
【0035】
仮想ネットワークの制御情報としては、各機器2,3,4,8の制御特性データ(ノードのコミッション)、運転時にどの機器とどの機器2,3,4,8とをソフト上の仮想の端子で接続して運転するか(ネットワーク変数の接続)、機器2,3,4,8の仮想の端子を接続したり切り離したりするか、これらの接続、切り離しの操作を行う際に何回ごとに所定のデータをパソコン11へ送るか(デバイス、ネットワークの最適化)といったことが挙げられる。
【0036】
次いで、ステップ(S2−1)で作成された施工データファイルをパソコン11のコピー機能を用いコピーして(ステップ(S2−2))、各フロア毎に新しい施工データファイルを作成し、パソコン11に保存する。この際、ドメインIDは管理台帳5を参照しつつ手入力する。
【0037】
続いて、現場ではバーコードリーダ10により、管理台帳5に貼付けてある全てのバーコードシール6a,6a’(バーコードシール6aと6a’では書込まれている情報が異なる)における実機器特定IDの情報を読取り(ステップ(S2−3))、読取った全ての情報を現場外のパソコン11に転送する(ステップ(S2−4))。なお、バーコードリーダ10による管理台帳5に貼付けてあるバーコードシール6aの情報の読取りは、現場で管理台帳5を作成する際に行うようにしても良い。
【0038】
バーコードリーダ10で読取られた実機器特定IDの情報が現場外のパソコン11に転送されると、実機器特定IDの情報は雛形のコピーとして作成された施工データファイルにインプットされ、雛形のコピーとしての施工データファイルに含まれている機器2,3,4,8の仮想の位置情報(平面図アドレス)と機器2,3,4,8の実際の位置情報(実際のアドレス)とが、各機器2,3,4,8の機器特定IDとドメインIDにより関連付けられる(ステップ(S2−5))。
【0039】
すなわち、パソコン11に仮想ネットワークが構築されたら、パソコン11において仮想ネットワークと仮想の機器を線で繋ぐことにより、施工データファイルが作成される。
【0040】
施工データファイルを制御ネットワーク上にインストールすると、上述のように、仮想ネットワーク上の仮想機器と実ネットワーク上の実機器とが機器特定IDにより関連付けられ、施工データファイル内に記録されている制御内容により実機器が作動可能な状態になる。
【0041】
以上で施工データファイルの作成が完了するが、完了していない場合は上述の施工データファイルの作成作業を続行する。
【0042】
III.制御ネットワークをインストールするステップ(S3)の詳細な手順(図13参照)
ステップ(S2)で施工データファイルが作成されたら、現場のパソコン12により制御ネットワークのインストールを行う。すなわち、図13に示すように、現場外のパソコン11から現場のパソコン12に施工データファイルを転送し(ステップ(S3−1))、現場のパソコン12により施工データファイルをインストールするためのソフトを開く(ステップ(S3−2))。施工データファイルの転送は適切な通信回線又はMO等の記録媒体による。
【0043】
続いて、現場のパソコン12に転送された施工データファイルは現場のパソコン12に開かれたインストール用のソフトにより読込まれ(ステップ(S3−3))、読込まれた施工データファイルの制御ネットワーク情報はパソコン12から制御ネットワーク13を経由して実際の機器2,3,4,8に転送される(ステップ(S3−4))。これにより、制御ネットワーク13及び機器2,3,4,8が稼動し得る状態になる(ステップ(S3−5))。
【0044】
IV.機器の調整運転を行うステップ(S4)の詳細な手順(図14参照)
制御ネットワーク13及び機器2,3,4,8が稼動し得るようになったら、現場のパソコン11により機器2,3,4,8の調整を開始する。この際には、先ず作業員が調整しようとする機器についての管理台帳5の認識番号に従い、その認識番号が付されている設置済みの所定の機器の下に赴き(ステップ(S4−1))、機器が正しいアドレスに設置されているかどうか管理台帳5の平面図アドレスにより確認する(ステップ(S4−2))。
【0045】
而して、機器が正しいアドレスに設置されている場合には、作業員は現場のパソコン12により、機器の調整作業を行い(ステップ(S4−3))、調整終了後、調整した機器に貼付けてあるバーコード6からバーコードシール6aを1枚剥がし、対応する機器が記載されている管理台帳5の所定の行の下の欄(調整時貼付の欄)に剥がしたバーコードシール6aを貼付ける(ステップ(S4−4))。
【0046】
機器が正しいアドレスに設置されていない場合には、管理台帳5に記載されている平面図アドレスを設置されている機器の実際のアドレスに修正し(ステップ(S4−5))、然る後、機器の調整作業を行い(ステップ(S4−3))、調整終了後、調整した機器に貼付けてあるバーコード6からバーコードシール6aを1枚剥がし、対応する機器が記載されている管理台帳5の所定の行の下の欄(調整時貼付の欄)に剥がしたバーコードシール6aを貼付ける(ステップ(S4−4))。而して、上述の手順に従い全ての機器について調整作業を行えば、作業は完了する。なお、管理台帳5の行が異なれば、機器が異なるため、貼付けるバーコードシールは異なる情報が書込まれたバーコードシール6a’となる。
【0047】
本発明の図示例によれば、機器設置位置の施工間違いや機器搬入設置後の施主よりのレイアウト変更等が原因して機器の設置位置が異なり、施工図上の所定位置に予定された機器がない場合でも、機器の調整運転時に管理台帳5の平面図アドレスの修正を行うことができるため、施工された機器の設置位置を正確に把握することができ、従って、その後の機器の調整やメンテナンスを行う際にも便利である。
【0048】
なお、本発明は、上述の図示例にのみ限定されるものではなく、本発明の要旨を逸脱しない範囲内において種々変更を加え得ることは勿論である。
【0049】
【発明の効果】
以上、説明したように本発明の請求項1〜3記載の機器の施工方法によれば、機器設置位置の施工間違いや機器搬入設置後の施主よりのレイアウト変更等が原因して機器の設置位置が異なり、施工図上の所定位置に予定された機器がない場合でも、機器の調整運転時に管理台帳の平面的なアドレスの修正を行うことができるため、施工された機器の設置位置を正確に把握することができ、従って、その後の機器の調整やメンテナンスを行う際にも便利である、等優れた効果を奏し得る。
【図面の簡単な説明】
【図1】 本発明の方法を行う際に用いる施工図の平面図である。
【図2】 本発明の方法を行う際に用いる管理台帳の平面図である。
【図3】 本発明の方法を行う際に用いるバーコードの平面図である。
【図4】 本発明の方法を行う際に用いる認識番号用シールの平面図である。
【図5】 本発明の方法において、機器を室内の所定の位置に設置した状態を示す斜視図である。
【図6】 本発明の方法において、バーコードリーダにより管理台帳の各機器に対応した行の上欄に貼付けたバーコードシールの情報を読取る状態を示す斜視図である。
【図7】 本発明の方法において、バーコードリーダで読取られた情報を現場以外の場所、例えば、サポートセンタにあるパソコンに転送する状態を示す斜視図である。
【図8】 本発明の方法において、設置された機器を調整する際に現場のパソコンにより制御ネットワークを介して、設置された各機器に指令を与える状態を示す斜視図である。
【図9】 本発明の方法において、各機器の調整終了後に管理台帳の各機器に対応した下欄に機器の実際の設置位置を特定するためにバーコードシールを貼付けた状態を示す斜視図である。
【図10】 本発明の方法において、ステップの概要を示すフローチャートである。
【図11】 本発明の方法において、現場における機器の設置時に管理台帳を作成するステップの詳細な手順を示すフローチャートである。
【図12】 本発明の方法において、施工データファイルを作成するステップの詳細な手順を示すフローチャートである。
【図13】 本発明の方法において、制御ネットワークをインストールするステップの詳細な手順を示すフローチャートである。
【図14】 本発明の方法において、機器の調整運転を行うステップの詳細な手順を示すフローチャートである。
【符号の説明】
施工図
2 機器
3 機器
4 機器
5 管理台帳
6 バーコード
6a バーコードシール
6a' バーコードシール
認識番号用シール
8 機器
10 バーコードリーダ
11 パソコン(端末)
12 パソコン(端末)
S1 ステップ
S2 ステップ
S3 ステップ
S4 ステップ
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to construction how the equipment.
[0002]
[Prior art]
For example, in the construction of a terminal device such as a fan coil unit (FCU) or variable air volume (VAV) for air conditioning work, a management ledger is prepared and two bars with the same information written are prepared. A barcode with a code sticker is affixed to the equipment to be brought into the field. After installing the equipment on the site, one barcode sticker is peeled off from the barcode, and information on the equipment in the management ledger is entered. It is pasted at the bar code sticker pasting position provided in the line, and it is made to grasp which device is installed at which position on the construction drawing.
[0003]
[Problems to be solved by the invention]
However, in the past, when installing equipment and when adjusting the equipment before completion of construction, the installation position of the equipment is different due to incorrect construction of the equipment installation position or layout changes from the owner after installation of the equipment. There may be no device scheduled in a predetermined position on the figure. Thus, such a state is not only inconvenient during the device adjustment operation before the completion of construction, but also in the subsequent adjustment and maintenance. Therefore, it is necessary to be able to accurately grasp the installation position of the constructed equipment.
[0004]
The present invention has no view of the above circumstances, to provide a construction how the equipment was adapted to accurately grasp the installation position of the device for the purpose.
[0005]
[Means for Solving the Problems]
The equipment construction method of the present invention is information on equipment that is carried into the construction site and is a type of equipment, a plan view address on the construction drawing of the equipment, a virtual network ID that is a control network address, and an identification number. And, for the management ledger described in each row, a step of performing primary creation of the management ledger for entering each written information in each row;
When the above-mentioned devices that have been pasted at the factory in advance with the barcodes in which the same actual device identification ID information is written on the three barcode seals are brought into the site, the three barcode seals Removing one sheet from the inside, and completing the creation of the management ledger at the time of construction by pasting it to a predetermined column of each row in which the information of the device of the management ledger is described,
A virtual network file on software that includes data communication on the control network, address information of each device that is a plan view address and virtual network ID on the construction drawing, network connection information of the virtual device, and control information of the virtual network Creating a construction data file by connecting a virtual network and a virtual device using a terminal outside the site;
By reading the information on the actual device identification ID of each device from the barcode sticker attached to the completed management ledger at the time of creation and transferring it to the terminal outside the site, Associating the virtual device with each actual device to complete the construction data file so that the actual device can operate on the control network;
A step of installing a completed construction data file, which is control network information for performing operation control of each device installed on the site, on the site terminal;
Transferring the control network information from a terminal in the field to each of the devices via a control network so that each device can be operated;
When performing the adjustment operation of the device by the terminal in the field, the information of the device that performed the adjustment operation of the management ledger at the time of construction was further removed by peeling off one barcode seal from the barcode attached to the device. A step of pasting in a predetermined column of the filled-in line to complete the management ledger;
It goes through .
[0006]
In addition, the equipment construction method according to the present invention is the address of the management ledger at the time of construction when the equipment is not located at a predetermined address entered in the management ledger when performing the adjustment operation of the equipment by the terminal at the site. After the correction, the adjustment operation of the equipment installed at the site is performed.
[0007]
In the equipment construction method of the present invention , when each equipment is carried into the site, an identification number seal indicating the equipment identification number described in the management ledger is provided on the surface of the equipment. Is pasted where it can be seen from below.
[0009]
According to the present invention, the installation position of the equipment is different due to a construction error at the equipment installation position or a layout change from the owner after equipment installation and installation, even when there is no equipment scheduled at a predetermined position on the construction drawing. Because it is possible to correct the two-dimensional address of the management ledger during the adjustment operation of the equipment, it is possible to accurately grasp the installation position of the installed equipment, and therefore when performing subsequent equipment adjustment and maintenance Also useful.
[0010]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, embodiments of the present invention will be described with reference to the drawings.
[0011]
1 to 9 are examples of embodiments for carrying out the present invention.
[0012]
FIG. 1 is a plan view of a construction drawing used when performing the method of the present invention. The construction drawing 1 includes coordinates OY10, OY11, OY13... OX3, where the horizontal direction is the X axis and the vertical direction is the Y axis. OX4... Is written. In addition, in the construction drawing 1, for example, each equipment 2, 3 and 4 to be constructed such as a variable air volume (VAV) is entered.
[0013]
FIG. 2 is a plan view of a management ledger used when performing the method of the present invention. The management ledger 5 is provided with a plurality of rows, and each row includes a floor, a system, and a device on which construction equipment is installed. Type and floor plan address (coordinates) on construction drawings can be entered.
[0014]
In each row of the management ledger 5, a control network address including a domain ID, a subnet ID, and a node ID as a set is entered as a virtual network ID. Like Lan, the control network is a kind of computer network, and the control network address is necessary for specifying a device by a host controller such as a central monitoring device via an intelligent gateway.
[0015]
Further, each row of the management ledger 5 is provided with two columns at the top and bottom of one row for pasting bar code stickers in which information such as an actual device identification ID is written for each device. Thus, the upper column is a column to be pasted at the time of construction of the device, and the lower column is a column to be pasted after the adjustment operation of the device.
[0016]
Furthermore, each line of the management ledger 5 is provided with a column for entering a device identification number.
[0017]
FIG. 3 is a plan view of a bar code used in carrying out the method of the present invention. The bar code 6 is attached so that three bar code stickers 6a on which the same information is written can be peeled off from the mount. Yes. Thus, one of the bar code stickers 6a can be pasted on the installed device, and the other two can be peeled off and pasted on the column for pasting the bar code sticker of the management ledger 5. Yes. The information written in the barcode seal 6a is an actual device identification ID such as the specification and performance of the device to which the barcode seal 6a is attached.
[0018]
FIG. 4 is a plan view of a recognition number sticker used in carrying out the method of the present invention. The recognition number sticker 7 can be peeled off from the mount and attached to an actual device installed on the site.
[0019]
FIG. 5 is a perspective view showing a state in which the apparatus is installed at a predetermined position in the room according to the method of the present invention. In the figure, 8 is an apparatus installed at a predetermined position in the room 9 according to the construction drawing. As the device 8, in addition to the VAV, there are an intelligent gateway (IG), an air handling unit (AHU), an air balancing unit (ABU), a fan coil unit (FCU), and the like.
[0020]
FIG. 6 is a perspective view showing a state in which the information on the bar code sticker attached to the upper column of the row corresponding to each device in the management ledger is read by the bar code reader in the method of the present invention. This is a bar code reader for reading the information on the bar code stickers 6a and 6a 'affixed to the created management ledger 5.
[0021]
FIG. 7 is a perspective view showing a state in which information read by a bar code reader is transferred to a place other than the site, for example, a personal computer in a support center in the method of the present invention. In FIG. 7, 11 is a personal computer in the support center. It is. Thus, when the construction data file is created, the information read by the barcode reader 10 can be input to the personal computer 11.
[0022]
FIG. 8 is a perspective view showing a state in which a command is given to each device installed through a control network by a personal computer at the site when adjusting the installed device in the method of the present invention. , 13 is a control network for giving commands from the personal computer 12 to the devices 2, 3, 4 and 8.
[0023]
FIG. 9 is a perspective view showing a state in which a bar code seal is pasted in the lower column of the row corresponding to each device in the management ledger after the adjustment operation of each device is completed in the method of the present invention to specify the actual installation position of the device. It is a figure, and the same code | symbol is attached | subjected to the same thing as the code | symbol shown to each said figure in the figure.
[0024]
Next, a specific procedure of the method of the present invention will be described with reference to the above-described flowcharts of FIGS. 1 to 9 and FIGS. In the following description, in principle, the reference numerals shown in FIGS. 1 to 9 are not referred to.
[0025]
As shown in FIG. 10, the method of the present invention is roughly divided into a step (S1) for creating a management ledger 5 at the time of installation of equipment on the site and a step (S2) for creating a construction data file on the personal computer 11 outside the site. And a step (S3) of installing a control network in the personal computer 12 on the site, and a step (S4) of adjusting the device by the personal computer 12 on the site.
[0026]
Next, each step (S1) to (S4) shown in FIG. 10 will be described in detail.
[0027]
I. Detailed procedure of step (S1) for creating the management ledger 5 at the time of equipment installation in the field (see FIG. 11)
When the management ledger 5 is created at the time of equipment installation in the field, first, the barcode 6 is pasted on the equipment 2, 3, 4 and 8 in the factory (step (S1-1)), and the primary management ledger 5 is primary. Creation is performed (step (S1-2)). The primary creation of the management ledger 5 is made up of a control network address with a set of floor, system, device type, device number, plan view address, domain ID and subnet ID, and node ID with reference to the construction diagram 1 This is done by entering the virtual network ID and the identification number, but the column where the bar code seal 6a of each row is pasted is left blank.
[0028]
A recognition number is assigned to each system. For example, when there are N VAVs in one system, recognition numbers 1 to N are sequentially assigned to VAVs, (N + 1) is assigned to AHU, and (N + 2) is assigned to the last device. Is assigned.
[0029]
When the primary creation of the management ledger 5 is completed, the devices 2, 3, 4, 8 and the management ledger 5 are then carried to the site (step (S <b> 1-3)), and the devices 2 are loaded in the order of carrying in with reference to the management ledger 5. , 3, 4 and 8 are installed at predetermined positions (step (S1-4)). After installing the devices 2, 3, 4 and 8, it is confirmed by the address on the plan view of the construction drawing 1 whether each device 2, 3, 4 and 8 is installed at a predetermined position (step) (S1-5)).
[0030]
Subsequently, one bar code sticker 6a is peeled off from the bar code 6 attached to the installed devices 2, 3, 4, and 8, and the management ledger 5 that matches the actual address of the installed devices 2, 3, 4, and 8 is removed. The bar code seal 6a that has been peeled off is pasted as shown in FIG. 6 (step (S1-6)) in the upper column, that is, the column for pasting at the time of construction. Note that, if the lines of the management ledger 5 are different, since the devices are different, the bar code sticker to be pasted becomes the bar code sticker 6a ′ in which different information is written. Further, the identification number seal 7 is pasted on each of the installed devices 2, 3, 4 and 8 at a position where the worker can see from below (step (S1-7)). In this way, the identification number seal 7 is affixed to the installed devices 2, 3, 4, and 8 because the device main body and the position of the devices 2, 3, 4, and 8 that are actually installed during the adjustment operation. This is because the devices 2, 3, 4, 8 and their positions on the management ledger 5 can be confirmed.
[0031]
Thus, the procedure from step (S1-4) to step (S1-7) is continued until the installation of the devices 2, 3, 4, 8 is completed, and all the devices 2, 3, 4, 8 are continued. Is completed, the creation of the management ledger 5 during construction is completed (step (S1-8)). When the creation of the management ledger 5 at the time of construction is completed, the next construction data file is created.
[0032]
II. Detailed procedure of step (S2) for creating construction data file (see FIG. 12)
The construction data file is created at a place other than the site, for example, at a support center. In this case, a set of standard systems or actual devices are brought into the data file creation place in advance. As a standard system, an electronic file such as a CD-ROM for creating construction data, which is basically a software abstraction of information such as specifications and performance of each device, is used, but there is no electronic file. In some cases, real equipment is required. Thus, in this case, information such as the specification and performance of the device input to the memory in the microcomputer of the actual device is read out.
[0033]
Whether using an electronic file or an actual device, not all information of each device installed on one floor is required. For example, (AHU, 1 unit + VAV, 15 units + IG on one floor) When one system x 3 systems is installed, electronic files or actual devices for AHU, one VAV, and one IG are required.
[0034]
When creating the construction data file, as shown in FIG. 12, the above-mentioned electronic file information or information input to the memory of the actual microcomputer is installed in the personal computer 11 outside the site by the worker, and the personal computer 11 is created for one control network (step (S2-1)). Thus, the construction data file is a virtual network on software including data communication on the control network 13, position information of the devices 2, 3, 4 and 8, that is, address information, virtual device network connection information, control information, etc. Contains files and becomes a network database.
[0035]
As control information of the virtual network, control characteristic data (node commission) of each device 2, 3, 4, and 8 and which device and which device 2, 3, 4, and 8 at the time of operation are virtual terminals on the software Whether to connect and operate (connection of network variables), connect or disconnect the virtual terminals of devices 2, 3, 4 and 8, or how many times when connecting and disconnecting Or sending data to the personal computer 11 (device and network optimization).
[0036]
Next, the construction data file created in step (S2-1) is copied using the copy function of the personal computer 11 (step (S2-2)), and a new construction data file is created for each floor. save. At this time, the domain ID is manually input while referring to the management ledger 5.
[0037]
Subsequently, the actual device identification ID in all the bar code stickers 6a and 6a '(the information written in the bar code stickers 6a and 6a' is different) pasted on the management ledger 5 by the bar code reader 10 at the site. (Step (S2-3)), and all the read information is transferred to the personal computer 11 outside the site (step (S2-4)). In addition, you may make it read the information of the barcode sticker 6a stuck on the management ledger 5 by the barcode reader 10 when producing the management ledger 5 on the spot.
[0038]
When the information on the actual device identification ID read by the barcode reader 10 is transferred to the off-site personal computer 11, the information on the actual device identification ID is input to the construction data file created as a template copy, and the template copy is made. The virtual position information (plan view address) of the devices 2, 3, 4, and 8 included in the construction data file and the actual position information (actual address) of the devices 2, 3, 4, and 8, The device identification ID of each device 2, 3, 4 and 8 is associated with the domain ID (step (S2-5)).
[0039]
That is, when a virtual network is constructed in the personal computer 11, the construction data file is created by connecting the virtual network and the virtual device with a line in the personal computer 11.
[0040]
When the construction data file is installed on the control network, as described above, the virtual device on the virtual network and the real device on the real network are associated with each other by the device identification ID, and depending on the control contents recorded in the construction data file. The actual device is ready for operation.
[0041]
The creation of the construction data file is completed as described above. If the construction data file is not completed, the construction data file creation operation described above is continued.
[0042]
III. Detailed procedure of installing the control network (S3) (see FIG. 13)
When the construction data file is created in step (S2), the control network is installed by the personal computer 12 at the site. That is, as shown in FIG. 13, the construction data file is transferred from the off-site personal computer 11 to the on-site personal computer 12 (step (S3-1)), and software for installing the construction data file by the on-site personal computer 12 is installed. Open (step (S3-2)). The construction data file is transferred by an appropriate communication line or a recording medium such as MO.
[0043]
Subsequently, the construction data file transferred to the on-site personal computer 12 is read by the installation software opened on the on-site personal computer 12 (step (S3-3)), and the control network information of the read construction data file is The data is transferred from the personal computer 12 to the actual devices 2, 3, 4, and 8 via the control network 13 (step (S3-4)). As a result, the control network 13 and the devices 2, 3, 4, and 8 are ready to operate (step (S3-5)).
[0044]
IV. Detailed procedure of step (S4) for adjusting the device (see FIG. 14)
When the control network 13 and the devices 2, 3, 4, and 8 can be operated, the adjustment of the devices 2, 3, 4, and 8 is started by the personal computer 11 on site. At this time, first, according to the identification number of the management ledger 5 for the device to be adjusted by the worker, the worker is struck under the predetermined device having the identification number attached (step (S4-1)). Whether the device is installed at the correct address is confirmed by the plan view address of the management ledger 5 (step (S4-2)).
[0045]
Thus, when the device is installed at the correct address, the worker performs the device adjustment work by using the personal computer 12 at the site (step (S4-3)), and after the adjustment is completed, it is attached to the adjusted device. One bar code sticker 6a is peeled off from the bar code 6 and the bar code sticker 6a is pasted on the column below the predetermined line (the column for pasting at the time of adjustment) of the management ledger 5 on which the corresponding device is described. (Step (S4-4)).
[0046]
If the device is not installed at the correct address, the plan view address described in the management ledger 5 is corrected to the actual address of the installed device (step (S4-5)). The device adjustment work is performed (step (S4-3)). After the adjustment is completed, one barcode sticker 6a is peeled off from the barcode 6 attached to the adjusted device, and the management ledger 5 in which the corresponding device is described. The bar code seal 6a that has been peeled off is pasted to the column below the predetermined line (the column for pasting during adjustment) (step (S4-4)). Thus, if the adjustment work is performed for all devices according to the above-described procedure, the work is completed. Note that, if the lines of the management ledger 5 are different, since the devices are different, the bar code sticker to be pasted becomes the bar code sticker 6a ′ in which different information is written.
[0047]
According to the illustrated example of the present invention, the installation position of the equipment is different due to a mistake in the construction of the equipment installation position or a layout change from the owner after the equipment is installed, and the equipment scheduled at a predetermined position on the construction drawing is different. Even when there is no device, it is possible to correct the floor plan address of the management ledger 5 during the adjustment operation of the device, so that the installation position of the installed device can be accurately grasped, and therefore the subsequent adjustment and maintenance of the device It is also useful when doing.
[0048]
It should be noted that the present invention is not limited to the illustrated examples described above, and it is needless to say that various modifications can be made without departing from the scope of the present invention.
[0049]
【The invention's effect】
As described above, according to the apparatus construction method according to claims 1 to 3 of the present invention, the installation position of the apparatus due to a construction error in the apparatus installation position or a layout change from the owner after installation and installation of the equipment. However, even when there is no planned device at the specified position on the construction drawing, the planar address of the management ledger can be corrected during the adjustment operation of the device, so the installation position of the installed device can be accurately determined. Therefore, it is possible to obtain an excellent effect such as being convenient when performing adjustment and maintenance of the device thereafter.
[Brief description of the drawings]
FIG. 1 is a plan view of a construction drawing used in carrying out the method of the present invention.
FIG. 2 is a plan view of a management ledger used when performing the method of the present invention.
FIG. 3 is a plan view of a bar code used when performing the method of the present invention.
FIG. 4 is a plan view of a recognition number seal used when performing the method of the present invention.
FIG. 5 is a perspective view showing a state in which an apparatus is installed at a predetermined position in a room in the method of the present invention.
FIG. 6 is a perspective view showing a state in which information on a bar code sticker pasted on an upper column of a row corresponding to each device of a management ledger is read by a bar code reader in the method of the present invention.
FIG. 7 is a perspective view showing a state in which information read by a bar code reader is transferred to a place other than the site, for example, a personal computer in a support center in the method of the present invention.
FIG. 8 is a perspective view showing a state in which a command is given to each installed device through a control network by a personal computer in the field when adjusting the installed device in the method of the present invention.
FIG. 9 is a perspective view showing a state in which a bar code seal is pasted in the lower column corresponding to each device in the management ledger after the adjustment of each device is completed in the method of the present invention in order to specify the actual installation position of the device. is there.
FIG. 10 is a flowchart showing an outline of steps in the method of the present invention.
FIG. 11 is a flowchart showing a detailed procedure of a step of creating a management ledger when equipment is installed on site in the method of the present invention.
FIG. 12 is a flowchart showing a detailed procedure of a step of creating a construction data file in the method of the present invention.
FIG. 13 is a flowchart showing a detailed procedure of installing a control network in the method of the present invention.
FIG. 14 is a flowchart showing a detailed procedure of steps for adjusting the device in the method of the present invention.
[Explanation of symbols]
1 Construction drawing 2 Equipment 3 Equipment 4 Equipment 5 Management ledger 6 Bar code 6a Bar code sticker 6a 'Bar code sticker
7 Identification number seal 8 Equipment
10 Bar code reader 11 PC (terminal)
12 PC (terminal)
S1 step S2 step S3 step S4 step

Claims (3)

建設中の現場へ搬入設置される機器の情報である、機器の種類と当該機器の施工図上の平面図アドレスと制御ネットワークアドレスである仮想ネットワークIDと認識番号と、を各行に記載する管理台帳に対して、前記各行に各記載情報を記入する管理台帳の一次作成をおこなうステップと、
3枚のバーコードシールに同一の実機器特定ID情報が書込まれたバーコードを予め工場にて貼付けてある前記各機器を前記現場に搬入設置した際に、前記3枚のバーコードシールの内から1枚を剥がして、前記管理台帳の当該機器の情報が記載されている前記各行の所定の欄に貼付けることで施工時の管理台帳の作成完了を行うステップと、
制御ネットワーク上のデータ通信、施工図上の平面図アドレスや仮想ネットワークIDである前記各機器のアドレス情報、仮想機器のネットワーク接続情報、及び仮想ネットワークの制御情報を含むソフトウエア上の仮想ネットワークファイルである施工データファイルを、現場外の端末を用いて仮想ネットワーク及び仮想機器を繋ぎ作成するステップと、
作成完了した前記施工時の管理台帳に貼付しているバーコードシールからバーコードリーダにより前記各機器の実機器特定IDの情報を読み取り前記現場外の端末に転送することで、前記仮想ネットワーク上の仮想機器と実際の前記各機器とを関連付けて実機器が制御ネットワークにて作動可能なように施工データファイルを完成させるステップと、
現場に設置された前記各機器の運転制御を行うための制御ネットワーク情報となっている完成した施工データファイルを現場の端末にインストールするステップと、
前記制御ネットワーク情報を現場の端末から制御ネットワークを介して前記各機器へ転送して各機器を稼働し得る状態にするステップと、
前記現場の端末により機器の調整運転を行なう際に、当該機器に貼付けてあるバーコードから更に1枚のバーコードシールを剥がして、前記施工時の管理台帳の調整運転を行った機器の情報が記入されている行の所定の欄に貼付けて管理台帳を完成させるステップと、
を経ることを特徴とする機器の施工方法。
A management ledger that describes information on the equipment that is brought into the construction site, such as the equipment type, the plan view address on the construction drawing of the equipment, the virtual network ID that is the control network address, and the identification number in each row On the other hand, the primary creation of a management ledger that fills in each entry information in each row,
When the above-mentioned devices that have been pasted at the factory in advance with the barcodes in which the same actual device identification ID information is written on the three barcode seals are brought into the site, the three barcode seals Removing one sheet from the inside, and completing the creation of the management ledger at the time of construction by pasting it to a predetermined column of each row in which the information of the device of the management ledger is described,
A virtual network file on software that includes data communication on the control network, address information of each device that is a plan view address and virtual network ID on the construction drawing, network connection information of the virtual device, and control information of the virtual network Creating a construction data file by connecting a virtual network and a virtual device using a terminal outside the site;
By reading the information on the actual device identification ID of each device from the barcode sticker attached to the completed management ledger at the time of creation and transferring it to the terminal outside the site, Associating the virtual device with each actual device to complete the construction data file so that the actual device can operate on the control network;
A step of installing a completed construction data file, which is control network information for performing operation control of each device installed on the site, on the site terminal;
Transferring the control network information from a terminal in the field to each of the devices via a control network so that each device can be operated;
When performing the adjustment operation of the device by the terminal in the field, the information of the device that performed the adjustment operation of the management ledger at the time of construction was further removed by peeling off one barcode seal from the barcode attached to the device. A step of pasting in a predetermined column of the filled-in line to complete the management ledger;
The construction method of the equipment characterized by going through .
請求項1に記載の機器の施工方法において、
現場の端末により機器の調整運転を行う際に、当該機器が管理台帳に記入された所定のアドレスにない場合には、前記施工時の管理台帳のアドレスを修正した後現場に設置した機器の調整運転を行なうことを特徴とする機器の施工方法。
In the construction method of the apparatus of Claim 1,
When performing adjustment operation of a device with a terminal at the site, if the device is not at the specified address entered in the management ledger, adjust the address of the management ledger at the time of construction and then adjust the device installed at the site A construction method of equipment characterized by operating .
請求項1又は2に記載の機器の施工方法において、In the construction method of the apparatus of Claim 1 or 2,
前記各機器を前記現場に搬入した際に、管理台帳に記載された機器の認識番号を表記した認識番号用シールを、対象となる機器表面の、作業者が下から見える位置に貼付けることを特徴とする機器の施工方法。When each device is brought into the field, a sticker for the identification number indicating the device identification number described in the management ledger is pasted on the surface of the target device at a position where the operator can see from below. Characteristic equipment construction method.
JP2000141804A 2000-05-15 2000-05-15 Equipment construction method Expired - Lifetime JP4350872B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000141804A JP4350872B2 (en) 2000-05-15 2000-05-15 Equipment construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000141804A JP4350872B2 (en) 2000-05-15 2000-05-15 Equipment construction method

Publications (2)

Publication Number Publication Date
JP2001325560A JP2001325560A (en) 2001-11-22
JP4350872B2 true JP4350872B2 (en) 2009-10-21

Family

ID=18648873

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000141804A Expired - Lifetime JP4350872B2 (en) 2000-05-15 2000-05-15 Equipment construction method

Country Status (1)

Country Link
JP (1) JP4350872B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FI20095964A (en) * 2009-09-18 2011-03-19 Flaekt Woods Ab METHOD FOR PRESENTATION OF VENTILATION TECHNICAL DATA AND VENTILATION ACCESSORY
FI124863B (en) * 2009-09-18 2015-02-27 Fläkt Woods AB Method for displaying the setting values of a ventilation device's airflow
JP6566776B2 (en) * 2015-08-10 2019-08-28 日立造船株式会社 Traceability management system

Also Published As

Publication number Publication date
JP2001325560A (en) 2001-11-22

Similar Documents

Publication Publication Date Title
US4885694A (en) Automated building control design system
JP4350872B2 (en) Equipment construction method
JP3636883B2 (en) Simulation device, simulation method, and computer-readable recording medium on which simulation program is recorded
US6345370B1 (en) Method for debugging error in a computer system
JP2012133599A (en) Production management system, production management method, control program and readable storage medium
GB2283588A (en) A process control data processing apparatus
JP2004062371A (en) Method and device for managing data of programmable controller
JP2004237364A (en) Creation method of robot teaching data
JP2004220495A (en) Plant system configuration support tool
JP2004094421A (en) System for performing input/output definition of data in control controller
JP2003143759A (en) Management system and management method of power plant
JP4127958B2 (en) Air conditioning system and method for setting centralized management device in air conditioning system
JP2535644B2 (en) Data processing system
JP3610592B2 (en) Method and system for controlling booklet stacking apparatus
JPH07146887A (en) Process control method
JPH06214766A (en) Generation system for hardware constitution information
JPH0738291A (en) Electronic component packaging machine
TWI287745B (en) Universal programmable controller and its programming method
JP3954412B2 (en) Monitoring control device manufacturing database, monitoring control device system construction method and monitoring control device engineering method
Nardone Direct Digital Control Systems: Application· Commissioning
JPH09198368A (en) Device and method for simulation
WO1989005008A1 (en) Data transfer method
JPH0720930A (en) Production management device and production managing method using the same
JPH1165908A (en) Monitor-control device
JP2865887B2 (en) Method for confirming connection path configuration of magnetic disk drive

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20061114

RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20061114

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20081111

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20090109

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20090707

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20090723

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120731

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 4350872

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120731

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130731

Year of fee payment: 4

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130731

Year of fee payment: 4

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130731

Year of fee payment: 4

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140731

Year of fee payment: 5

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term