JP4329056B2 - Deck plate laying suspension and deck plate laying method - Google Patents

Deck plate laying suspension and deck plate laying method Download PDF

Info

Publication number
JP4329056B2
JP4329056B2 JP2000306747A JP2000306747A JP4329056B2 JP 4329056 B2 JP4329056 B2 JP 4329056B2 JP 2000306747 A JP2000306747 A JP 2000306747A JP 2000306747 A JP2000306747 A JP 2000306747A JP 4329056 B2 JP4329056 B2 JP 4329056B2
Authority
JP
Japan
Prior art keywords
deck plate
deck
laying
claws
claw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2000306747A
Other languages
Japanese (ja)
Other versions
JP2002115398A (en
Inventor
忍 山崎
光 古口
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Corp
Original Assignee
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Corp filed Critical Shimizu Corp
Priority to JP2000306747A priority Critical patent/JP4329056B2/en
Publication of JP2002115398A publication Critical patent/JP2002115398A/en
Application granted granted Critical
Publication of JP4329056B2 publication Critical patent/JP4329056B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、デッキプレートの敷設を容易にするデッキプレート敷設用吊り具と、このデッキプレート敷設用吊り具を用いてなるデッキプレートの敷設方法に関する。
【0002】
【従来の技術】
波形をした薄鋼板からなるデッキプレート(床鋼板)は、サポートが不要なことなどから、特に高層建築物の床に多く用いられている。このようなデッキプレートの敷設作業は、通常2〜3人が1組となり、その人力によって行っているのが現状である。
【0003】
すなわち、この作業では、まず、クレーン等によりデッキプレートを10枚前後重ねた状態で、敷設位置近傍に仮置きしておき、その後、作業者によってこれを1枚ずつ敷設する。敷設の作業は、複数(通常は2人)の作業者がそれぞれデッキプレートの両端部を持ち上げ、下層のデッキプレート上、および鉄骨梁上をなかば滑らせながら所定の位置にまで移送し、そこに置くといった方法で行われる。
このとき、少なくともデッキ両端部には作業者のための作業用足場が必要であり、そのため、通常は鉄骨上に足場板を仮設している。
【0004】
【発明が解決しようとする課題】
ところで、このようなデッキプレートの敷設は、作業者の熟練度によっても差があるものの、作業自体は比較的短時間で行われる。しかしながら、この作業は、狭い仮設足場や鉄骨上で50〜80kg程度のデッキプレートを運ぶものであるため、作業者に不安定で無理な姿勢を強いることとなり、安全衛生面からもその改善が望まれている。
【0005】
また、足場材の設置盛替えを含め、仮設安全養生作業に多くの労務が必要となっているといった問題や、さらにこれらの安全養生作業自体が高所作業になっているといった問題もある。
【0006】
また、作業者の労働負荷低減の観点からは、吸着吊り具をクレーンフックに装着させたものや、専用のハンドリングロボットを用いるものなどが提供され一部に使用されている。しかしながら、いずれのものも、段積みされたデッキプレート束の最上位の一枚をハンドリングする形態をとり、デッキプレートの把持または吸着、位置決めと解放、移動の工程を繰り返すもので、作業効率が人力による作業に比べ著しく劣っており、したがって工期短縮の観点からは大きな不満があった。
【0007】
本発明は、前記事情に鑑みてなされたもので、その目的とするところは、デッキプレートの敷設を容易にしてその労働負荷を低減し、しかも作業効率を高めることのできるデッキプレート敷設用吊り具と、このデッキプレート敷設用吊り具を用いてなるデッキプレートの敷設方法を提供することにある。
【0008】
【課題を解決するための手段】
本発明のデッキプレート敷設用吊り具では、クレーン等の吊り上げ装置に吊られる箇所となる吊り上げ部と、段積みされたデッキプレートの束を一括して保持する保持手段と、保持したデッキプレートの束からその最下位にある一枚のデッキプレートのみを選択し、これを脱落させる選択脱落手段とを備えてなり、
前記保持手段は、デッキプレートの底面の幅より広い間隔で対向して設けられた下部フレームのそれぞれに、内側に向けて進退可能に設けられて前進した際、デッキプレートの底面の側部を支持する下部爪によってなり、
前記選択脱落手段は、前記下部爪と、デッキプレート一枚分の厚さとほぼ同じ長さ分前記下部爪のそれぞれより高い位置に、内側に向けて進退可能に設けられて前進した際、デッキプレートの底面の側部を支持する上部爪と、これら下部爪および上部爪の進退を制御する制御部とからなり、
対向して配設された前記下部爪および前記上部爪のそれぞれの側に、デッキプレートの幅より僅かに広い間隔で対向した状態にガイドフレームが設けられていることを前記課題の解決手段とした。
【0009】
このデッキプレート敷設用吊り具によれば、段積みされたデッキプレートの束を一括して保持手段で保持し、吊り上げ部を利用して吊り上げ装置でこれを所望位置に移送した後、選択脱落手段によって保持したデッキプレートの束からその最下位にある一枚のデッキプレートのみを選択、脱落させることができる。したがって、従来人力で行ってきたデッキプレートの敷設を機械で行うことが可能になり、しかもデッキプレートを複数枚一括して移送することができることから、移送に要する時間を短縮して作業効率の向上が図れる。
【0010】
本発明のデッキプレートの敷設方法では、クレーン等の吊り上げ装置に吊られる箇所となる吊り上げ部と、段積みされたデッキプレートの束を一括して保持する保持手段と、保持したデッキプレートの束からその最下位にある一枚のデッキプレートのみを選択し、これを脱落させる選択脱落手段とを備え、前記保持手段は、デッキプレートの底面の幅より広い間隔で対向して設けられた下部フレームのそれぞれに、内側に向けて進退可能に設けられて前進した際、デッキプレートの底面の側部を支持する下部爪によってなり、前記選択脱落手段は、前記下部爪と、デッキプレート一枚分の厚さとほぼ同じ長さ分前記下部爪のそれぞれより高い位置に、内側に向けて進退可能に設けられて前進した際、デッキプレートの底面の側部を支持する上部爪と、これら下部爪および上部爪の進退を制御する制御部とからなる、デッキプレート敷設用吊り具を用い、
まず、下部爪および上部爪を制御部により後退させておき、その状態で段積みされたデッキプレートの束の最下位のデッキプレートの底面より下の両側に下部爪を位置させ、その状態で制御部により下部爪を前進させ、
続いて、吊り上げ部をクレーン等の吊り上げ装置で吊ることによってデッキプレートの束を下部爪によって一括して保持し、その状態で所望する位置にまで移送し、
その後、制御部により上部爪を前進させて最下位のデッキプレートのすぐ上に位置するデッキプレ−トの底部の側部を支持させ、続いて制御部により下部爪を後退させて最下位にある一枚のデッキプレートのみを選択してこれを脱落させ、敷設することを前記課題の解決手段とした。
【0011】
このデッキプレートの敷設方法によれば、前記のデッキプレート敷設用吊り具を用いることにより、段積みされたデッキプレートの束を一括して保持、移送し、保持したデッキプレートの束からその最下位にある一枚のデッキプレートのみを選択、脱落させることによりこれを所望箇所に敷設することができ、したがって、従来人力で行ってきたデッキプレートの敷設を機械で行うことが可能になり、また、デッキプレートの移送に要する時間を短縮して作業効率の向上が図れる。
【0012】
【発明の実施の形態】
以下、本発明を詳しく説明する。
図1(a)、(b)は本発明のデッキプレート敷設用吊り具の一実施形態例を示す図であり、これらの図において符号1はデッキプレート敷設用吊り具である。このデッキプレート敷設用吊り具1は、矩形枠状の上部フレーム2と、この上部フレーム2の四隅のそれぞれの底面から下方に向けて設けられた下部フレーム3…と、これら下部フレーム3…の近傍に配設されたガイドフレーム4…と、クレーン等の吊り上げ装置のフックHに吊られる箇所となる吊り環(吊り上げ部)5と、上部フレーム2に設けられたハンドル6と、下部フレーム3…にそれぞれ設けられた進退装置7とを備えてなるものである。
【0013】
上部フレーム2は、その矩形枠の内部において、長辺フレーム2a、2aの中央部間に補強フレーム2cが渡されて設けられており、この補強フレーム2cの中心部に、前記吊り環5を固定した構造となっている。また、この上部フレーム2には、図1(a)に示すようにその矩形枠の短辺フレーム2bの底面に、ゴム等からなる当て板8、8が貼着されている。これら当て板8、8は、後述するようにデッキプレート敷設用吊り具1で段積みされたデッキプレートを一括保持した際、最上位にあるデッキプレートの上面が上部フレーム2に直接当たり、損傷するのを防止するためのものである。
【0014】
下部フレーム3は、後述するように一括して保持する段積みされた状態のデッキプレートの高さより、十分に長く形成されたもので、これにより段積みされた状態のデッキプレートの束を、後述するように進退装置7によって保持することができるようになっている。
【0015】
ガイドフレーム4…は、図1(b)に示すように上部フレーム2の長辺フレーム2aにおいて、それぞれ下部フレーム3…より少し内側(中心側)に配設された板状のもので、図1(a)に示すように上部フレーム2の短辺フレーム2bの長さ方向において対向したガイドフレーム4、4間の間隔が、デッキプレートの幅より僅かに広くなるように配置されたものである。また、これらガイドフレーム4…は、下部フレーム3より長く(高く)形成されたものとなっており、これによってガイドフレーム4…は、その下端が接地するようになることにより、デッキプレート敷設用吊り具1の脚体として機能するようになっている。また、これらガイドフレーム4…には、それぞれの下端部に外側に開いた形状となる案内部4aが形成されており、これにより、後述するように対向するガイドフレーム4、4間にデッキプレートを納める際、対向する案内部4a、4aによってデッキプレートの両側を容易に挟むことができるようになっている。
【0016】
ハンドル6は、図1(b)に示すように上部フレーム2の一方の長辺フレーム2aに固定されたコ字状のもので、図1(a)に示すようにその上部側が、下部側に対して外側に折曲して形成されたものとなっている。そして、このような構成によりハンドル6の把持部分となる操作バー6aは、上部フレーム2より十分に外側に位置するようになり、これによりこの操作バー6aを持つことによるデッキプレート敷設用吊り具1の操作がし易くなっている。
【0017】
進退装置7は、下部フレーム3の下端部の外面側に設けられたもので、図1(b)に示すように下部進退装置7aと上部進退装置7bとが横に並んで配置され構成されたものである。下部進退装置7aは、図1(a)に示すように下部爪9を進退させるものであり、また上部進退装置7bは、上部爪10を進退させるものである。これら下部爪9および上部爪10は、いずれも棒状あるいは板状でその先端側がくさび状に尖って形成されたもので、後退時においては図1(a)中実線で示すようにその先端がガイドフレーム4より外側に位置し、前進時には図1(b)中二点鎖線で示すようにその先端がガイドフレーム4より内側に突出することにより、後述するようにデッキプレートの底面を支持するよう構成されたものである。
【0018】
なお、これら下部爪9および上部爪10は、上部フレーム2の上に設けられた動力ユニット11によってそれぞれ独立して駆動されるようになっている。ここで、このような進退の駆動は、電気油圧あるいは電動による駆動方式でなされるようになっている。また、これら下部爪9および上部爪10の進退は、上部フレーム2の上に設けられた制御盤(制御部)12により、制御されるようになっている。
【0019】
また、このような進退装置7において、下部進退装置7aと上部進退装置7bとは、上部進退装置7bが下部進退装置7aより上に位置するように配設されている。すなわち、これら下部進退装置7aと上部進退装置7bとは、上部進退装置7bの上部爪10が下部進退装置7aの下部爪9より、デッキプレート一枚分の厚さとほぼ同じ長さ分高い位置に配設されているのである。ここで、本発明においてデッキプレート一枚分の厚さとは、上下に直接重ねられたデッキプレートの、下側のデッキプレートの底面と上側のデッキプレートの底面との間の距離をいう。
このような構成のもとに、下部爪9から本発明における保持手段が構成され、また、この下部爪9と上部爪10と制御盤12とから、本発明における選択脱落手段が構成されている。
【0020】
前記ハンドル6の操作バー6aには、前記制御盤12に接続して進退装置7の動作を操作するための操作スイッチ13が設けられており、また、前記吊り上げ装置のクレーンを操作するためのクレーン用スイッチ14が着脱自在に設けられている。
【0021】
次に、このような構成のデッキプレート敷設用吊り具1の使用方法を基に、本発明のデッキプレートの敷設方法の一例を説明する。なお、ここで説明する例は、図2に示すように、鉄骨造の超高層ビルを積層工法で施工する際、タワークレーンの負荷を低減する目的で手動操作により簡単に荷の水平移動がようにした、簡易天井クレーン20に備えられた電動チェーンブロック21を吊り上げ装置とした場合の例である。
【0022】
デッキプレートの敷設方法の説明に先立ち、簡易天井クレーン20について説明する。この簡易天井クレーン20は、デッキプレートPを敷設する階の上に設けられた上部架構22と、この上部架構22の梁部分(水平部分)に設けられた走行レール23と、この走行レール23に移動可能に設けられた横行レール24と、この横行レール24に懸装された前記電動チェーンブロック21とを備えてなるものである。
【0023】
走行レール23は、複数のレールが十分な距離をおいて階の全体をカバーできるように配置されてなるものである。横行レール24は、複数のレールからなる走行レール23間に略直交した状態で渡されて配設されたもので、走行レール23の長さ方向に電動であるいは人力で容易に移動可能に懸装されたものである。電動チェーンブロック21は、横行レール24の長さ方向に電動で移動するよう構成され、かつ、そのチェーンブロックを巻き上げあるいは巻き下げることにより、フックHに吊り下げた本発明のデッキプレート敷設用吊り具1を、吊り上げあるいは吊り下げることができるように構成されたものである。
【0024】
なお、前記横行レール24に、電動チェーンブロック21とは別に従動式のトロリを設けておき、これに敷設作業者の親綱25を設け、さらにこの親綱25に安全帯を取り付けるようにすることもできる。
【0025】
このような構成からなる簡易天井クレーン20の電動チェーンブロック21を利用してデッキプレートの敷設するには、まず、電動チェーンブロック21のフックHにデッキプレート敷設用吊り具1の吊り環5を取り付ける。
また、これとは別に、予め図3(a)、(b)に示すように、複数枚(例えば5〜7枚程度)のデッキプレートP…をさん木からなるスペーサS上に段積みしておく。
【0026】
そして、電動チェーンブロック21によりデッキプレート敷設用吊り具1を吊り上げた状態で、クレーン用スイッチ14を操作し、さらにハンドル6の操作バー6aを操作することにより、図4(a)に示すように段積みされて置かれたデッキプレートP…の上にデッキプレート敷設用吊り具1を合わせる。続いて、クレーン用スイッチ14を操作してデッキプレート敷設用吊り具1を下降させ、その対向するガイドフレーム4、4間にデッキプレートP…の両側を納める。このとき、ガイドフレーム4…には案内部4a、4aが形成されているので、デッキプレートP…の両側を容易に案内してこれらの間に挟むことができる。なお、この操作のときには、上部進退装置7aの上部爪10、および下部進退装置7bの下部爪9については、当然ながらいずれも後退させておく。
【0027】
このようにして段積みされたデッキプレートP…をガイドフレーム4…間に挟み込み、これによりデッキプレートP…を位置決めしたら、操作スイッチ13を操作して下部進退装置7bを動作させ、その下部爪9を前進させてデッキプレートP…の最下位のものの底面の下側にまで突出させる。そして、この状態で電動チェーンブロック21によりデッキプレート敷設用吊り具1を上昇させることにより、図4(b)に示すように段積みしたデッキプレートPの束を下部爪9…により一括して保持する。
【0028】
次いで、この状態のまま電動チェーンブロック21および横行レール24を走行させ、デッキプレートPの束を所望する位置、すなわちデッキプレートPの敷設位置にまで移動させる。
続いて、操作スイッチ13を操作して上部進退装置7aを動作させ、図4(c)に示すようにその上部爪10を前進させる。すると、上部爪10は、下部爪9よりデッキプレートP一枚分の厚さに相当する分高く配置されていることから、前進した上部爪10は、最下位のデッキプレートPのすぐ上に位置するデッキプレ−トPの底部の側部を支持するようになり、結果としてこのデッキプレートPとその上に位置するデッキプレートP…とを一括して保持するようになる。
【0029】
ここで、段積みされたデッキプレートP…の各層間は、デッキプレートP自体が薄くねじれやすいことや折り曲げ加工精度がもともと高くないことなどから一定ではないものの、デッキプレートPの束の最下位のものの底面を保持すれば、最下位のデッキプレートPとそのすぐ上のデッキプレートPとの層間位置は少なくともほぼ一定となり、したがって、この層間に上部爪10を確実に差し込むことができる。
【0030】
そして、この状態から操作スイッチ13を操作して下部進退装置7bを動作させ、図4(d)に示すようにその下部爪9を後退させることにより、最下位にある一枚のデッキプレートPのみを選択し、これを脱落させて所望箇所に敷設する。なお、このように下部爪9を後退させてデッキプレートPを脱落させ、敷設すると、このデッキプレートPの落下(脱落)により当然振動や騒音が起こることから、上端爪10を前進させた際、その操作に連動して警報が鳴るように、操作スイッチ13を構成しておくのが好ましい。
【0031】
このようにして最下位にあるデッキプレートPを敷設したら、次の準備として、再度下部爪9を前進させる。そして、その状態から上部爪10を後退させ、これにより上部爪10…上に保持していたデッキプレートP…を落下させて図4(b)に示した状態と同じ状態、すなわち下部爪9…上に保持した状態とする。なお、このときもデッキプレートP…の落下に伴って振動や騒音が起こることから、この動作が終了するまでは前記の警報がそのまま鳴っているようにしておくのが好ましい。
【0032】
下部爪9…によって再度デッキプレートP…を保持したら、図5に示すようにこの状態のまま再度電動チェーンブロック21を走行させ、デッキプレートPの束を所望する位置、すなわちデッキプレートPの次の敷設位置にまで移動させる。そして、前述した場合と同様にして最下位にある一枚のデッキプレートPのみを選択し、これを脱落させて所望箇所に敷設する。以下、図4(b)から図4(d)に示した操作を順次繰り返すことにより、保持したデッキプレートPを全て敷設する。
そしてさらに、図4(a)に示したように段積みされた新たなデッキプレートP…の束を保持し、下側から順に敷設していくことにより、デッキプレートの敷設を終了する。
【0033】
このようなデッキプレート敷設用吊り具1とこれを用いてなるデッキプレートの敷設方法にあっては、段積みされたデッキプレートP…の束を一括して下部爪9…で保持し、吊り環5を利用して電動チェーンブロック21でこれを所望位置に移送した後、上部爪10…と下部爪9…とこれらの動作を制御する制御盤12とにより、保持したデッキプレートP…の束からその最下位にある一枚のデッキプレートのみを選択して脱落させ、所望箇所に敷設することができる。
【0034】
したがって、従来2人以上の人力で行ってきたデッキプレートPの敷設を、吊り具1の操作を行う1人で行うことができ、これにより省人化を進めて作業効率を著しく向上することができる。
また、デッキプレートPを複数枚一括して移送することができることから、移送に要する時間を短縮して作業効率の向上を図ることができる。
また、重量物であるデッキプレートPを直接人力で持ち上げ移動するといった、高負荷の作業を不要にしたため、労働負荷を大幅に低減することができる。
【0035】
また、図5に示したように作業者Mは、立ったままの状態でデッキプレート敷設用吊り具1を操作し、作業することができることから、安定した既設デッキ上を足場にできることにより、従来のようにデッキプレートP…を運ぶための仮設足場を不要にし、足場の仮設や移動に係る労務と高所作業とを削減することができる。
【0036】
なお、本発明のデッキプレート敷設用吊り具1は前記実施形態例に限定されることなく、種々の設計的変更が可能であり、例えば、上部フレーム2の短辺フレーム2bの長さ、すなわちデッキプレートPの幅方向となる長さが伸縮可能となるよう、この短辺フレーム2bを、大径のパイプに小径のパイプが摺動可能に挿通された構造としてもよい。このように、デッキプレートPの幅方向となる長さを伸縮可能となるようにすれば、デッキプレートPの幅寸法が変更された場合にも、これに対応してそのまま使用することができるようになる。
【0037】
また、例えば上部進退装置7aの位置(高さ)を可変とし、下部進退装置7bの下部爪9と上部爪10との間の距離を可変にしておけば、、デッキプレートPの端部形状が変わってその厚さ、すなわち上下に直接重ねられたデッキプレートP、Pの、下側のデッキプレートPの底面と上側のデッキプレートPの底面との間の距離が変わった場合にも、これに対応してそのまま使用することができるようになる。
【0038】
【発明の効果】
以上説明したように本発明のデッキプレート敷設用吊り具は、段積みされたデッキプレートの束を一括して保持手段で保持し、吊り上げ部を利用して吊り上げ装置でこれを所望位置に移送した後、選択脱落手段によって保持したデッキプレートの束からその最下位にある一枚のデッキプレートのみを選択、脱落させることができるようにしたものであり、構造が単純であることによって安価に製造可能なものである。
【0039】
また、本発明のデッキプレートの敷設方法は、前記のデッキプレート敷設用吊り具を用いることにより、段積みされたデッキプレートの束を一括して保持、移送し、保持したデッキプレートの束からその最下位にある一枚のデッキプレートのみを選択、脱落させることによりこれを所望箇所に敷設することができるようにしたものである。
【0040】
したがって、このデッキプレート敷設用吊り具とこれを用いてなるデッキプレートの敷設方法にあっては、従来2人以上の人力で行ってきたデッキプレートの敷設を、吊り具の操作を行う1人で行うことができ、これにより省人化を進めて作業効率を著しく向上することができる。
また、デッキプレートを複数枚一括して移送することができることから、移送に要する時間を短縮して作業効率の向上を図ることができる。
また、重量物であるデッキプレートを直接人力で持ち上げ移動するといった、高負荷の作業を不要にしたため、労働負荷を大幅に低減することができる。
【0041】
また、立ったままの状態でデッキプレート敷設用吊り具を操作し、作業することができることから、安定した既設デッキ上を足場にできることにより、従来のようにデッキプレートP…を運ぶための仮設足場を不要にし、足場の仮設や移動に係る労務と高所作業とを削減することができる。
そして、このように労働負荷を低減することができ、また作業の足場を作業用の仮設足場でなく既設の足場にすることができることから、労働環境を大幅に改善することができる。
【図面の簡単な説明】
【図1】 本発明のデッキプレート敷設用吊り具の一実施形態例の概略構成を示す図であり、(a)は側面図、(b)は正面図である。
【図2】 図1に示したデッキプレート敷設用吊り具の使用箇所の一例を説明するための図である。
【図3】 複数枚のデッキプレートをスペーサ上に段積みした状態を示す図であり、(a)は正面図、(b)は側面図である。
【図4】 (a)〜(d)は、図1に示したデッキプレート敷設用吊り具の使用方法を、操作順に説明するための側面図である。
【図5】 図1に示したデッキプレート敷設用吊り具を使用した作業の説明図である。
【符号の説明】
1…デッキプレート敷設用吊り具、2…上部フレーム、3…下部フレーム、4…ガイドフレーム、5…吊り環(吊り上げ部)、9…下部爪、10…上部爪、12…制御盤(制御部)、20…簡易天井クレーン、21…電動チェーンブロック、P…デッキプレート。
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a deck plate laying device that facilitates laying a deck plate, and a deck plate laying method that uses the deck plate laying device.
[0002]
[Prior art]
Deck plates (floor steel plates) made of corrugated thin steel plates are often used especially for the floors of high-rise buildings because they do not require support. Such a deck plate laying operation is usually performed by two to three persons as one set, and is performed by the human power.
[0003]
That is, in this work, first, about 10 deck plates are stacked with a crane or the like and temporarily placed in the vicinity of the laying position, and then laid one by one by the operator. The laying work is carried out by multiple (usually two) workers lifting each end of the deck plate to a predetermined position while sliding on the lower deck plate and steel beam. This is done by placing it.
At this time, work scaffolds for workers are required at least at both ends of the deck. Therefore, usually, scaffolding plates are temporarily provided on the steel frame.
[0004]
[Problems to be solved by the invention]
By the way, although such a laying of the deck plate is different depending on the skill level of the worker, the work itself is performed in a relatively short time. However, this work involves carrying a deck plate of about 50 to 80 kg on a narrow temporary scaffold or a steel frame, which forces the worker to be unstable and unreasonable, and is expected to be improved in terms of safety and health. It is rare.
[0005]
In addition, there is a problem that a lot of labor is required for the temporary safety curing work, including the replacement of the scaffolding material, and a problem that these safety curing work itself is a high place work.
[0006]
Also, from the viewpoint of reducing the labor load on workers, a device in which a suction hanger is attached to a crane hook, a device using a dedicated handling robot, and the like are provided and used in part. However, each one takes the form of handling the uppermost one of the stacked deck plate bundles, and repeats the steps of gripping or sucking, positioning, releasing, and moving the deck plate. Compared with the work by, it was significantly inferior from the viewpoint of shortening the construction period.
[0007]
The present invention has been made in view of the above circumstances, and an object of the present invention is to suspend a deck plate that can easily lay a deck plate, reduce its labor load, and increase work efficiency. Another object of the present invention is to provide a deck plate laying method using the deck plate laying suspension.
[0008]
[Means for Solving the Problems]
In the hanging device for laying a deck plate according to the present invention, a lifting portion that is a portion to be hung by a lifting device such as a crane, a holding means that collectively holds a bundle of stacked deck plates, and a bundle of held deck plates to select only one of the deck plate in its lowest from, Ri Na and a selection dropping means for dropping it,
The holding means is provided so as to be able to advance and retreat inward in each of the lower frames provided facing each other at a wider interval than the width of the bottom surface of the deck plate, and supports the side portion of the bottom surface of the deck plate when moving forward. Made by lower nails,
The selective drop-off means is provided at a position higher than each of the lower claws and the lower claws by a length substantially the same as the thickness of one deck plate so as to be able to advance and retreat toward the inside. An upper claw that supports the side portion of the bottom surface, and a control unit that controls the advancement and retreat of the lower claw and the upper claw,
Means for solving the above problem is that a guide frame is provided on each side of the lower claws and the upper claws arranged to face each other with a gap slightly wider than the width of the deck plate . .
[0009]
According to the hanging device for laying the deck plate, the stack of stacked deck plates is collectively held by the holding means, and after being transferred to a desired position by the lifting device using the lifting portion, the selective dropping means is used. Only one deck plate at the lowest level can be selected and dropped from the bundle of deck plates held by. Therefore, it is possible to lay the deck plate that has been done manually by a machine, and more than one deck plate can be transferred at a time, reducing the time required for transfer and improving work efficiency. Can be planned.
[0010]
In the deck plate laying method according to the present invention, a lifting portion that is a portion to be hung by a lifting device such as a crane, a holding means that collectively holds a bundle of stacked deck plates, and a bundle of held deck plates And a selective drop-off means for selecting only one deck plate at the lowest level and dropping it off, and the holding means is a lower frame provided opposite to each other at a width wider than the width of the bottom surface of the deck plate. Each is provided with a lower claw that supports the side of the bottom surface of the deck plate when it is provided so as to be able to advance and retreat inward, and the selective drop-off means has a thickness equivalent to the lower claw and one deck plate. The upper side of the bottom plate of the deck plate supports the side portion of the bottom surface of the deck plate when it moves forward by being moved forward and backward at a position higher than the lower claws by approximately the same length. A pawl, and a control unit for controlling the advance and retreat of the lower claw and an upper claw, hangers used for deck plates laid,
First, the lower claws and upper claws are retracted by the control unit, and the lower claws are positioned on both sides below the bottom surface of the bottom deck plate of the stack of deck plates stacked in that state, and controlled in that state. The lower nail is advanced by the part,
Then, the bundle of deck plates is held together by the lower claws by hanging the lifting part with a lifting device such as a crane, and transferred to a desired position in that state,
Thereafter, the upper claw is advanced by the control unit to support the side portion of the bottom of the deck plate located immediately above the lowest deck plate, and then the lower claw is moved backward by the control unit so that the lowest one is located. The solution to the above problem is to select only one deck plate, drop it, and lay it.
[0011]
According to this deck plate laying method, by using the above-described deck plate laying suspender, a stack of stacked deck plates is held and transferred in a lump, and the lowest deck plate bundle is stored in the lowest order. By selecting and dropping only one deck plate, it can be laid at a desired location, so that it is possible to lay the deck plate that has been done manually by a machine, The time required for transferring the deck plate can be shortened and work efficiency can be improved.
[0012]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, the present invention will be described in detail.
1 (a) and 1 (b) are diagrams showing an embodiment of a deck plate laying suspension according to the present invention. In these drawings, reference numeral 1 denotes a deck plate laying suspension. The deck plate laying suspender 1 includes a rectangular frame-shaped upper frame 2, lower frames 3 provided downward from the bottom surfaces of the four corners of the upper frame 2, and the vicinity of the lower frames 3. On the guide frame 4, the suspension ring (lifting portion) 5 which is a portion to be hung on the hook H of a lifting device such as a crane, the handle 6 provided on the upper frame 2, and the lower frame 3. Each is provided with an advancing / retreating device 7 provided.
[0013]
The upper frame 2 is provided with a reinforcing frame 2c provided between the central portions of the long side frames 2a and 2a inside the rectangular frame, and the suspension ring 5 is fixed to the central portion of the reinforcing frame 2c. It has a structure. Further, as shown in FIG. 1A, the upper frame 2 has adhesive plates 8 and 8 made of rubber or the like attached to the bottom surface of the short side frame 2b of the rectangular frame. As will be described later, when the deck plates stacked on the deck plate suspending device 1 are collectively held, the upper surfaces of the uppermost deck plates directly contact the upper frame 2 and are damaged. This is intended to prevent this.
[0014]
As will be described later, the lower frame 3 is formed to be sufficiently longer than the height of the stacked deck plates that are held together, so that a stack of deck plates stacked in this manner will be described later. In this way, it can be held by the advance / retreat apparatus 7.
[0015]
As shown in FIG. 1B, the guide frames 4 are plate-like ones arranged slightly inside (center side) of the lower frame 3 in the long frame 2a of the upper frame 2, respectively. As shown to (a), it arrange | positions so that the space | interval between the guide frames 4 and 4 which opposed in the length direction of the short side frame 2b of the upper frame 2 may become slightly wider than the width | variety of a deck plate. Further, these guide frames 4 are formed longer (higher) than the lower frame 3, so that the lower ends of the guide frames 4 are grounded so that the deck plate is suspended. It functions as a leg of the tool 1. Each of the guide frames 4 is formed with a guide portion 4a having an open shape at the lower end portion of each of the guide frames 4, so that a deck plate is interposed between the opposing guide frames 4 and 4 as will be described later. When storing, both sides of the deck plate can be easily sandwiched by the opposing guide portions 4a and 4a.
[0016]
The handle 6 is a U-shaped one fixed to one long side frame 2a of the upper frame 2 as shown in FIG. 1 (b), and its upper side is directed to the lower side as shown in FIG. 1 (a). On the other hand, it is formed by bending outward. With this configuration, the operation bar 6a serving as a gripping portion of the handle 6 is positioned sufficiently outside the upper frame 2, whereby the deck plate laying suspender 1 having the operation bar 6a is provided. It is easy to operate.
[0017]
The advancing / retreating device 7 is provided on the outer surface side of the lower end portion of the lower frame 3, and as shown in FIG. 1 (b), the lower advancing / retreating device 7a and the upper advancing / retreating device 7b are arranged side by side. Is. As shown in FIG. 1A, the lower advancing / retreating device 7a is for advancing and retracting the lower claw 9, and the upper advancing / retreating device 7b is for advancing and retracting the upper claw 10. These lower claws 9 and upper claws 10 are both rod-shaped or plate-shaped, and the tip side thereof is pointed in a wedge shape, and when retracted, the tip is guided as shown by the solid line in FIG. It is located outside the frame 4 and is configured to support the bottom surface of the deck plate as will be described later by advancing the tip thereof from the guide frame 4 as indicated by a two-dot chain line in FIG. It has been done.
[0018]
The lower claws 9 and the upper claws 10 are independently driven by a power unit 11 provided on the upper frame 2. Here, such forward / backward driving is performed by an electrohydraulic or electric drive system. The advancement and retraction of the lower claws 9 and the upper claws 10 are controlled by a control panel (control unit) 12 provided on the upper frame 2.
[0019]
In such an advance / retreat apparatus 7, the lower advance / retreat apparatus 7a and the upper advance / retreat apparatus 7b are arranged so that the upper advance / retreat apparatus 7b is located above the lower advance / retreat apparatus 7a. That is, the lower advancing / retracting device 7a and the upper advancing / retreating device 7b are such that the upper claw 10 of the upper advancing / retreating device 7b is higher than the lower claw 9 of the lower advancing / retreating device 7a by approximately the same length as the thickness of one deck plate. It is arranged. Here, in the present invention, the thickness of one deck plate refers to the distance between the bottom surface of the lower deck plate and the bottom surface of the upper deck plate of the deck plates directly stacked one above the other.
Based on such a configuration, the holding means in the present invention is constituted by the lower claws 9, and the selective dropping means in the present invention is constituted by the lower claws 9, the upper claws 10 and the control panel 12. .
[0020]
The operation bar 6a of the handle 6 is provided with an operation switch 13 that is connected to the control panel 12 to operate the operation of the advance / retreat apparatus 7, and a crane for operating the crane of the lifting device. A switch 14 is detachably provided.
[0021]
Next, an example of the deck plate laying method of the present invention will be described based on the method of using the deck plate laying suspension 1 having such a configuration. In the example described here, as shown in FIG. 2, when constructing a steel-framed skyscraper by the laminating method, the horizontal movement of the load can be easily performed manually for the purpose of reducing the load on the tower crane. This is an example in which the electric chain block 21 provided in the simple overhead crane 20 is used as a lifting device.
[0022]
Prior to the description of the deck plate laying method, the simple overhead crane 20 will be described. The simple overhead crane 20 includes an upper frame 22 provided on the floor on which the deck plate P is laid, a traveling rail 23 provided on a beam portion (horizontal portion) of the upper frame 22, and the traveling rail 23. The traverse rail 24 is provided so as to be movable, and the electric chain block 21 is suspended from the traverse rail 24.
[0023]
The traveling rail 23 is arranged such that a plurality of rails can cover the entire floor with a sufficient distance. The traversing rail 24 is arranged so as to pass between the traveling rails 23 composed of a plurality of rails in a substantially orthogonal state, and is suspended so that it can be easily moved electrically or manually in the length direction of the traveling rail 23. It has been done. The electric chain block 21 is configured to move electrically in the length direction of the traversing rail 24 and is suspended from the hook H by hoisting or lowering the chain block. 1 is constructed so that it can be lifted or hung.
[0024]
It should be noted that a driven trolley is provided on the traverse rail 24 separately from the electric chain block 21, a master rope 25 for the laying operator is provided thereon, and a safety belt is attached to the master rope 25. You can also.
[0025]
In order to lay the deck plate using the electric chain block 21 of the simple overhead crane 20 having such a configuration, first, the suspension ring 5 of the deck plate laying suspension 1 is attached to the hook H of the electric chain block 21. .
Separately, as shown in FIGS. 3A and 3B, a plurality of (for example, about 5 to 7) deck plates P are stacked on a spacer S made of wood. deep.
[0026]
As shown in FIG. 4A, the crane switch 14 is operated while the deck plate laying suspension 1 is lifted by the electric chain block 21, and the operation bar 6a of the handle 6 is further operated. The deck plate laying suspender 1 is put on the deck plate P placed in a stacked manner. Subsequently, the crane switch 14 is operated to lower the hanging device 1 for laying the deck plate, and both sides of the deck plate P are placed between the opposing guide frames 4 and 4. At this time, since guide portions 4a and 4a are formed on the guide frames 4 ..., both sides of the deck plate P ... can be easily guided and sandwiched between them. In this operation, the upper claw 10 of the upper advancing / retreating device 7a and the lower claw 9 of the lower advancing / retreating device 7b are naturally retracted.
[0027]
When the deck plates P stacked in this manner are sandwiched between the guide frames 4 and the deck plates P are positioned thereby, the operation switch 13 is operated to operate the lower advancing / retracting device 7b, and the lower claws 9 are operated. Is advanced to project to the lower side of the bottom surface of the bottom plate of the deck plate P. In this state, the deck plate laying suspension 1 is lifted by the electric chain block 21, whereby the bundle of deck plates P stacked in a stacked manner is held by the lower claws 9 as shown in FIG. 4 (b). To do.
[0028]
Next, the electric chain block 21 and the traverse rail 24 are allowed to travel in this state, and the bundle of deck plates P is moved to a desired position, that is, the laying position of the deck plate P.
Subsequently, the operation switch 13 is operated to operate the upper advancing / retreating device 7a, and the upper claw 10 is advanced as shown in FIG. Then, since the upper claw 10 is disposed higher than the lower claw 9 by an amount corresponding to the thickness of one deck plate P, the advanced upper claw 10 is positioned immediately above the lowest deck plate P. As a result, the deck plate P and the deck plates P positioned on the deck plate P are held together.
[0029]
Here, the layers between the stacked deck plates P are not constant because the deck plate P itself is thin and easily twisted and the bending accuracy is not high originally. If the bottom surface of the object is held, the interlayer position between the lowest deck plate P and the deck plate P immediately above it is at least substantially constant, so that the upper claw 10 can be reliably inserted between the layers.
[0030]
Then, from this state, the operation switch 13 is operated to operate the lower advancing / retreating device 7b and the lower claw 9 is moved backward as shown in FIG. Is selected and dropped and laid at a desired location. When the lower claw 9 is moved backward to drop the deck plate P and laid, vibration and noise naturally occur due to the fall (dropping) of the deck plate P. When the upper end claw 10 is moved forward, It is preferable to configure the operation switch 13 so that an alarm sounds in conjunction with the operation.
[0031]
When the bottommost deck plate P is laid in this way, the lower pawl 9 is advanced again as the next preparation. And the upper nail | claw 10 is retracted from the state, thereby dropping the deck plate P ... held on the upper claw 10 ..., the same state as the state shown in FIG. The state held above. At this time, since the vibration and noise occur with the fall of the deck plate P, it is preferable that the alarm be sounded as it is until the operation is finished.
[0032]
When the deck plate P is held again by the lower claws 9, the electric chain block 21 is run again in this state as shown in FIG. 5, and the bundle of the deck plate P is desired, that is, the next to the deck plate P. Move to the laying position. Then, in the same manner as described above, only the bottom deck plate P is selected, and this is dropped and laid at a desired location. Thereafter, the operations shown in FIGS. 4B to 4D are sequentially repeated to lay all the deck plates P held.
Furthermore, as shown in FIG. 4 (a), the stack of new deck plates P ... stacked in layers is held and laid in order from the lower side, thereby ending the deck plate.
[0033]
In such a hanging device 1 for laying a deck plate and a method for laying a deck plate using the same, a bundle of stacked deck plates P is collectively held by lower claws 9 and suspended. 5 is transferred to a desired position by the electric chain block 21, and then the upper claw 10 ..., the lower claw 9 ... and the control panel 12 for controlling these operations are used to remove the held deck plate P ... from the bundle. Only one deck plate at the lowest level can be selected and dropped and laid at a desired location.
[0034]
Accordingly, it is possible to lay the deck plate P, which has conventionally been performed by two or more people, by one person who operates the hanging tool 1, thereby promoting labor saving and significantly improving work efficiency. it can.
In addition, since a plurality of deck plates P can be transferred at a time, the time required for the transfer can be shortened and work efficiency can be improved.
Moreover, since the heavy load work such as lifting and moving the deck plate P, which is a heavy object, directly by hand is unnecessary, the labor load can be significantly reduced.
[0035]
Further, as shown in FIG. 5, the worker M can operate and work the deck plate laying suspender 1 while standing, so that a stable existing deck can be used as a scaffold. Thus, there is no need for a temporary scaffold for carrying the deck plates P... And labor and altitude work related to the temporary construction and movement of the scaffold can be reduced.
[0036]
The deck plate laying device 1 of the present invention is not limited to the above-described embodiment, and various design changes are possible. For example, the length of the short side frame 2b of the upper frame 2, that is, the deck The short side frame 2b may have a structure in which a small-diameter pipe is slidably inserted into a large-diameter pipe so that the length in the width direction of the plate P can be expanded and contracted. As described above, if the length in the width direction of the deck plate P can be expanded and contracted, even if the width dimension of the deck plate P is changed, it can be used as it is. become.
[0037]
For example, if the position (height) of the upper advancing / retracting device 7a is variable and the distance between the lower claw 9 and the upper claw 10 of the lower advancing / retreating device 7b is variable, the end plate shape of the deck plate P can be changed. Even if the thickness changes, that is, the distance between the bottom surface of the lower deck plate P and the bottom surface of the upper deck plate P of the deck plates P, P directly stacked one above the other is changed. Correspondingly, it can be used as it is.
[0038]
【The invention's effect】
As described above, the deck plate laying device of the present invention holds the stack of stacked deck plates in a lump by the holding means, and transfers it to a desired position by the lifting device using the lifting unit. Later, only the bottom deck plate can be selected and removed from the stack of deck plates held by the selective drop-off means, and can be manufactured inexpensively due to its simple structure. Is something.
[0039]
Further, the deck plate laying method of the present invention uses the above-described deck plate laying suspending device to hold and transfer a stack of stacked deck plates in a lump. By selecting and dropping only one deck plate at the bottom, this can be laid at a desired location.
[0040]
Therefore, in this hanging device for laying a deck plate and a method for laying a deck plate using the same, the laying of the deck plate which has been conventionally performed by two or more people is performed by one person who operates the hanging device. As a result, labor saving can be promoted and work efficiency can be remarkably improved.
In addition, since a plurality of deck plates can be transferred at once, the time required for the transfer can be shortened and the work efficiency can be improved.
In addition, since a heavy load work such as lifting and moving a heavy deck plate directly by hand is unnecessary, the labor load can be greatly reduced.
[0041]
In addition, since it is possible to operate and work on the hanging means for laying the deck plate while standing, it can be used as a scaffold on a stable existing deck, so that a temporary scaffold for carrying the deck plate P ... as in the past. Can be eliminated, and labor and altitude work related to temporary construction and movement of the scaffold can be reduced.
In addition, the labor load can be reduced in this way, and the work environment can be greatly improved since the work scaffold can be an existing scaffold instead of a temporary work scaffold.
[Brief description of the drawings]
BRIEF DESCRIPTION OF DRAWINGS FIG. 1 is a diagram showing a schematic configuration of an embodiment of a deck plate laying suspension according to the present invention, in which (a) is a side view and (b) is a front view.
FIG. 2 is a diagram for explaining an example of a use location of the deck plate laying suspension shown in FIG. 1;
FIGS. 3A and 3B are diagrams showing a state in which a plurality of deck plates are stacked on a spacer, where FIG. 3A is a front view and FIG. 3B is a side view.
FIGS. 4A to 4D are side views for explaining the usage method of the deck plate laying suspension shown in FIG. 1 in the order of operation;
FIG. 5 is an explanatory diagram of an operation using the hanging device for laying the deck plate shown in FIG. 1;
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1 ... Deck plate laying tool, 2 ... Upper frame, 3 ... Lower frame, 4 ... Guide frame, 5 ... Suspension ring (lifting part), 9 ... Lower nail, 10 ... Upper nail, 12 ... Control panel (control part) ), 20 ... simple overhead crane, 21 ... electric chain block, P ... deck plate.

Claims (3)

クレーン等の吊り上げ装置に吊られる箇所となる吊り上げ部と、段積みされたデッキプレートの束を一括して保持する保持手段と、保持したデッキプレートの束からその最下位にある一枚のデッキプレートのみを選択し、これを脱落させる選択脱落手段とを備えてなり、
前記保持手段は、デッキプレートの底面の幅より広い間隔で対向して設けられた下部フレームのそれぞれに、内側に向けて進退可能に設けられて前進した際、デッキプレートの底面の側部を支持する下部爪によってなり、
前記選択脱落手段は、前記下部爪と、デッキプレート一枚分の厚さとほぼ同じ長さ分前記下部爪のそれぞれより高い位置に、内側に向けて進退可能に設けられて前進した際、デッキプレートの底面の側部を支持する上部爪と、これら下部爪および上部爪の進退を制御する制御部とからなり、
対向して配設された前記下部爪および前記上部爪のそれぞれの側に、デッキプレートの幅より僅かに広い間隔で対向した状態にガイドフレームが設けられていることを特徴とするデッキプレート敷設用吊り具。
A lifting part that is a place to be hung by a lifting device such as a crane, a holding means that collectively holds a stack of stacked deck plates, and a deck plate at the lowest level from the bundle of deck plates that are held select only, Ri Na and a selection dropping means for dropping it,
The holding means is provided so as to be able to advance and retract inward in each of the lower frames provided facing each other at a wider interval than the width of the bottom surface of the deck plate, and supports the side portion of the bottom surface of the deck plate when moving forward. Made by lower nails,
The selective drop-off means is provided at a position higher than each of the lower claws and the lower claws by a length substantially the same as the thickness of one deck plate so as to be able to advance and retreat toward the inside. An upper claw that supports the side portion of the bottom surface, and a control unit that controls the advancement and retreat of the lower claw and the upper claw,
For laying a deck plate, characterized in that a guide frame is provided on each side of the lower claws and the upper claws arranged to face each other with a gap slightly wider than the width of the deck plate. Hanging tool.
請求項1記載のデッキプレート敷設用吊り具を用いてデッキプレートを敷設する方法であって、A method of laying a deck plate using the hanging device for laying a deck plate according to claim 1,
まず、下部爪および上部爪を制御部により後退させておき、その状態で段積みされたデッキプレートの束の最下位のデッキプレートの底面より下の両側に下部爪を位置させ、その状態で制御部により下部爪を前進させ、First, the lower claws and upper claws are moved backward by the control unit, and the lower claws are positioned on both sides below the bottom surface of the bottom deck plate of the stack of deck plates stacked in that state, and controlled in that state. The lower nail is advanced by the part,
続いて、吊り上げ部をクレーン等の吊り上げ装置で吊ることによってデッキプレートの束を下部爪によって一括して保持し、その状態で所望する位置にまで移送し、Then, the bundle of deck plates is held together by the lower claws by hanging the lifting part with a lifting device such as a crane, and transferred to a desired position in that state,
その後、制御部により上部爪を前進させて最下位のデッキプレートのすぐ上に位置するデッキプレ−トの底部の側部を支持させ、続いて制御部により下部爪を後退させて最下位にある一枚のデッキプレートのみを選択してこれを脱落させ、敷設することを特徴とするデッキプレートの敷設方法。Thereafter, the upper claw is advanced by the control unit to support the side portion of the bottom of the deck plate located immediately above the lowest deck plate, and then the lower claw is moved backward by the control unit so that the lowest one is located. A deck plate laying method characterized in that only a single deck plate is selected and dropped and laid.
吊り上げ装置が、荷の水平移動ができる簡易天井クレーンに備えられた電動チェーンブロックであることを特徴とする請求項2記載のデッキプレートの敷設方法。3. The deck plate laying method according to claim 2, wherein the lifting device is an electric chain block provided in a simple overhead crane capable of horizontally moving a load.
JP2000306747A 2000-10-05 2000-10-05 Deck plate laying suspension and deck plate laying method Expired - Fee Related JP4329056B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000306747A JP4329056B2 (en) 2000-10-05 2000-10-05 Deck plate laying suspension and deck plate laying method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000306747A JP4329056B2 (en) 2000-10-05 2000-10-05 Deck plate laying suspension and deck plate laying method

Publications (2)

Publication Number Publication Date
JP2002115398A JP2002115398A (en) 2002-04-19
JP4329056B2 true JP4329056B2 (en) 2009-09-09

Family

ID=18787383

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000306747A Expired - Fee Related JP4329056B2 (en) 2000-10-05 2000-10-05 Deck plate laying suspension and deck plate laying method

Country Status (1)

Country Link
JP (1) JP4329056B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100818863B1 (en) * 2007-01-05 2008-04-02 이창남 Lift and installing method of preassembled truss decks at ground level
CN113062552A (en) * 2021-03-19 2021-07-02 北京益盛建设工程有限公司 Paving device and paving method for oversized stone floor
CN115741912A (en) * 2022-11-28 2023-03-07 福建和其昌竹业股份有限公司 Full-automatic plate arranging production line for container plates

Also Published As

Publication number Publication date
JP2002115398A (en) 2002-04-19

Similar Documents

Publication Publication Date Title
CN210528272U (en) Hoisting equipment for prefabricated parts
JPH0821100A (en) Heavy hoist device, and carrying method of constructing material using this device
CN109719698A (en) A kind of robot equipped system for building and control method
JP4329056B2 (en) Deck plate laying suspension and deck plate laying method
JP2014047479A (en) Method for lifting demolishing heavy machine to building to be demolished
JP4509875B2 (en) Material transfer system for building exterior wall construction
JP4808015B2 (en) Electric lifting device
JPH0554490U (en) Supporting device for high places such as piping
JP2012001894A (en) Continuous lifting device
JPS63415A (en) Brick laying apparatus for converter
KR20090103021A (en) Salvare unit with constructing care and constructing method using the same
JP3994458B2 (en) Operation method of vertical and horizontal transfer device
CN221095901U (en) ALC wallboard installation vehicle
JP2018159183A (en) Panel construction method
CN212715858U (en) Lifting type operating platform used in closed space
JPH074058A (en) Method and equipment for lifting pc wall slab of multistoried building
JP7172549B2 (en) Overhead crane replacement method and cart
JP5410322B2 (en) Structure building method and structure building jig used therefor
JPS63201268A (en) Large stacked stone assembling apparatus
JPH05113026A (en) Temporary scaffold structure
JPS5842329Y2 (en) Panel conveyance device
JPH10140839A (en) Device for vertically hoisting form material and pipe support
KR20020078342A (en) Car for elevator rail equipment
JP2022149393A (en) lifting system
JPH0510037A (en) Fitting method for external wall board

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20070426

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20090115

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20090127

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20090325

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20090507

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20090604

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120626

Year of fee payment: 3

LAPS Cancellation because of no payment of annual fees