JP4278093B2 - Temporary road construction method using sandbags - Google Patents

Temporary road construction method using sandbags Download PDF

Info

Publication number
JP4278093B2
JP4278093B2 JP2003369853A JP2003369853A JP4278093B2 JP 4278093 B2 JP4278093 B2 JP 4278093B2 JP 2003369853 A JP2003369853 A JP 2003369853A JP 2003369853 A JP2003369853 A JP 2003369853A JP 4278093 B2 JP4278093 B2 JP 4278093B2
Authority
JP
Japan
Prior art keywords
temporary road
sandbags
sandbag
road
temporary
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2003369853A
Other languages
Japanese (ja)
Other versions
JP2005133405A (en
Inventor
安史 松本
弘毅 真鍋
剛史 重冨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sekisui House Ltd
Original Assignee
Sekisui House Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sekisui House Ltd filed Critical Sekisui House Ltd
Priority to JP2003369853A priority Critical patent/JP4278093B2/en
Publication of JP2005133405A publication Critical patent/JP2005133405A/en
Application granted granted Critical
Publication of JP4278093B2 publication Critical patent/JP4278093B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Description

本発明は、土のうを用いた仮設道路築造方法に関し、詳しくは、道路よりも低い田や畑に道路と略等しい高さとなるように土のうを積み重ねて仮設道路を築造する土のうを用いた仮設道路築造方法に関するものである。   The present invention relates to a method for building a temporary road using a sandbag, and more particularly, to build a temporary road using a sandbag that builds a temporary road by stacking sandbags on a field or a field lower than the road so as to be approximately the same height as the road. It is about the method.

図7に示すように、上面及び下面が直角二等辺三角形に形成された複数の床盤51をヒンジ装置52を介して着脱自在且つ上下方向に回動自在に連結するとともに、各床盤51の頂点を土のう53で支持することにより構成された仮設道路54がある(例えば、特許文献1参照。)。   As shown in FIG. 7, a plurality of floor boards 51 whose upper and lower surfaces are formed into right-angled isosceles triangles are connected via a hinge device 52 so as to be detachable and rotatable in the vertical direction. There is a temporary road 54 configured by supporting the top with a sandbag 53 (see, for example, Patent Document 1).

この仮設道路54では、各々の床盤51同士がヒンジ装置52を介して上下方向に回動可能に連結されているため、地盤が沈下した場合など一方の床盤51がヒンジ装置52を介して他方の床盤51に対して上下方向に回動して傾斜するため、床盤51間に段差ができるのを防止することができる。
特開平10−121405号公報
In the temporary road 54, the floor boards 51 are connected to each other so as to be pivotable in the vertical direction via the hinge device 52. Therefore, when the ground sinks, one floor board 51 is connected via the hinge device 52. Since it is tilted by rotating in the vertical direction with respect to the other floor board 51, it is possible to prevent a step between the floor boards 51.
Japanese Patent Laid-Open No. 10-121405

しかしながら、上記の仮設道路54を例えば畑のような畝と谷によって凹凸が形成されているような場所に築造する場合、各床盤51の頂点にあたる部分を土のう53で安定して支持することができないという問題点がある。   However, when the above-described temporary road 54 is constructed in a place where unevenness is formed by, for example, vineyards and valleys, a portion corresponding to the apex of each floor board 51 can be stably supported by a soil pad 53. There is a problem that it is not possible.

また、土のう53の土のう袋が破れて中詰め材が流出した場合、床盤51を安定して支持できないだけでなく、仮設道路54を築造した場所の土壌に悪影響を及ぼすおそれがある。   Further, when the sandbag 53 of the sandbag 53 is torn and the filling material flows out, not only the floor board 51 can be stably supported but also the soil at the place where the temporary road 54 is built may be adversely affected.

本発明は、かかる課題に鑑みてなされたものであり、凹凸がある場所であっても仮設道路を築造でき、且つ仮設道路を築造した場所の土壌に影響を与えることなく仮設道路を築造できる土のうを用いた仮設道路築造方法を提供することを目的とする。   The present invention has been made in view of such a problem, and can be used to build a temporary road even in an uneven area, and can be used to build a temporary road without affecting the soil where the temporary road is built. The purpose is to provide a method for building a temporary road.

請求項1記載の土のうを用いた仮設道路築造方法は、道路よりも低い場所に土のうを用いて仮設道路を築造する土のうを用いた仮設道路築造方法であって、前記仮設道路を築造する前記道路よりも低い仮設道路築造予定地に、該仮設道路築造予定地よりも大きいシートを敷設した後、前記仮設道路築造予定地の範囲内で前記シート上に土のうを敷き並べる敷き並べ作業を繰り返し行って前記道路と略等しい高さとなるように前記土のうを積み重ね、積み重ねた土のう全体の側面を覆うように前記シートの周縁を上方に折り曲げ、さらに、最上層の土のうの上面を覆うように折り曲げることを特徴としている。 The temporary road building method using a sandbag according to claim 1 is a temporary road building method using a sandbag for building a temporary road using a sandbag in a place lower than the road, and the road for building the temporary road. After laying a sheet larger than the temporary road construction planned site on the lower temporary road construction planned site, repeatedly performing the laying work of laying sandbags on the sheet within the range of the temporary road building planned site stacking the sandbags so as to be substantially equal to the height and the road, the periphery of the sheet so as to cover the side surfaces of the entire stacked sandbags a bent upward, further, the Rukoto folded so as to cover the upper surface of the uppermost sandbags It is a feature.

請求項2記載の土のうを用いた仮設道路築造方法は、請求項1に記載の土のうを用いた仮設道路築造方法において、前記仮設道路築造予定地に凹凸面が形成されている場合に、該仮設道路築造予定地の凹部に土のうを敷き並べて凸部の上面と前記凹部に敷き並べた土のうにより平面を形成した後に、該平面上に前記土のうの敷き並べ作業を行うことを特徴としている。   The temporary road building method using the sandbag according to claim 2 is the temporary road building method using the sandbag according to claim 1, wherein the temporary road building planned land is provided with an uneven surface. The present invention is characterized in that, after a sandbag is laid out in the recesses of the road construction planned site and a flat surface is formed by the sandbags laid in the upper surface of the convex portion and the recesses, the sandbags are laid out on the plane.

請求項3記載の土のうを用いた仮設道路築造方法は、請求項1又は2記載の土のうを用いた仮設道路築造方法において、前記土のうの中詰め材が、砂であることを特徴としている。   The temporary road building method using the sandbag according to claim 3 is the temporary road building method using the sandbag according to claim 1 or 2, wherein the filling material of the sandbag is sand.

請求項1に記載の土のうを用いた仮設道路築造方法によれは、土のうを積み重ねることにより盛土を行って仮設道路を築造するため、盛土が仮設道路を築造した場所の土と混合されることなく仮設道路を築造することができ、仮設道路の築造により土壌に影響を与えるのを防止することができる。また、万が一土のう袋が破れて中詰め材が外部に流出した場合でも、積み重ねられた土のうがシートによって土壌と縁切りされているので、盛土が土と混合されてしまうのを確実に防止することができる。そのため、田や小川などの水が張られているような場所であっても仮設道路を築造することが可能である。   According to the method for building a temporary road using sandbags according to claim 1, the temporary road is built by stacking the sandbags, so that the banking is not mixed with the soil where the temporary road was built. A temporary road can be constructed, and the construction of the temporary road can prevent the soil from being affected. In addition, even if the dirt bag breaks and the filling material flows out, the piled sandbags are cut off from the soil by the sheets, so that it is possible to reliably prevent the embankment from being mixed with the soil. it can. Therefore, it is possible to build a temporary road even in places where water is stretched such as rice fields and streams.

請求項2に記載の土のうを用いた仮設道路築造方法によれば、例えば畑のように畝と谷によって凹凸が形成されている場所に仮設道路を築造する場合に、畝を破壊することなく仮設道路を築造することができる。また、この土のうを用いた仮設道路築造方法によって築造された仮設道路を撤去する場合、盛土の手掘りなどを行う必要がないため、畝を破壊することなく仮設道路を容易に撤去することができる。   According to the method for building a temporary road using sandbags according to claim 2, for example, when a temporary road is built in a place where unevenness is formed by reeds and valleys, such as in a field, the temporary road is not destroyed. A road can be built. In addition, when removing a temporary road built by the method of building a temporary road using sandbags, it is not necessary to dig up the embankment, so the temporary road can be easily removed without destroying the fence. .

請求項3に記載の土のうを用いた仮設道路築造方法によれば、例えば水田に築造した仮設道路の土のうの撤去作業などにおいて、あやまって土のう袋から中詰め材が水田に流出してしまったとしても、水田の水質や稲に影響を与えることがないという利点がある。   According to the temporary road building method using the sandbag according to claim 3, for example, in the removal work of the sandbag of the temporary road built in the paddy field, the filling material has accidentally flowed out of the sandbag into the paddy field. However, there is an advantage that it does not affect the water quality of the paddy field or rice.

以下、本発明の実施の形態に係る土のうを用いた仮設道路築造方法について、図面に基づいて説明する。図1は、土のうを用いた仮設道路築造方法によって仮設道路を築造する仮設道路築造予定地1、道路2、道路3、及び住宅等を建築する建築予定地4の関係を示したものである。道路2と建築予定地4との間に位置する仮設道路築造予定地1は、本実施の形態においては道路2、道路3、及び建築予定地4と段差hがある畑である。この仮設道路築造予定地1に道路2や建築予定地4と略等しい高さとなるように仮設道路を築造する方法について以下で説明する。   Hereinafter, the temporary road construction method using the sandbag which concerns on embodiment of this invention is demonstrated based on drawing. FIG. 1 shows the relationship between a temporary road construction planned site 1, a road 2, a road 3, and a planned building site 4 for building a house, etc., for constructing a temporary road by a temporary road construction method using a sandbag. The temporary road construction planned site 1 located between the road 2 and the planned building site 4 is a field having a step h with the road 2, the road 3, and the planned building site 4 in the present embodiment. A method for constructing a temporary road on the temporary road construction planned site 1 so as to be approximately the same height as the road 2 and the planned building site 4 will be described below.

この畑である仮設道路築造予定地1には、畝(凸部)5と谷部(凹部)6によって凹凸面が形成されている。このように凹凸面が形成された仮設道路築造予定地1に敷き並べる土のう7を用意する。この土のう7は、図2に示すように、土のう袋8に図外の中詰め材を所定量投入して紐9で縛ることにより形成されたものである。ここで、土のう袋8に投入する中詰め材は、土やこれに類するものであれば特に限定されるものではなく、例えばクラッシャラン、砕石、まき土、砂質土等を用いることができる。なお、中詰め材として仮設道路築造予定地1の土壌と同じ砂を用いることにより、万が一、土のう7から中詰め材が流出した場合でも、仮設道路築造予定地1の土壌に影響を与えるのを防止することができる。また、この土のう袋8に入れる中詰め材の量を調整することにより、土のう7を配置した際の土のう7の高さを調整することが可能である。   An uneven surface is formed by a ridge (convex portion) 5 and a valley portion (concave portion) 6 on the temporary road construction planned site 1 which is this field. Thus, a sandbag 7 is prepared to be laid out on the temporary road construction planned site 1 on which the uneven surface is formed. As shown in FIG. 2, the sandbag 7 is formed by putting a predetermined amount of unfilled filling material into the sandbag 8 and tying it with a string 9. Here, the filling material to be put into the sandbag 8 is not particularly limited as long as it is similar to soil or the like, and for example, crusheran, crushed stone, firewood, sandy soil or the like can be used. In addition, by using the same sand as the soil of the temporary road construction site 1 as the filling material, even if the filling material flows out from the sandbag 7, it will affect the soil of the temporary road construction site 1 Can be prevented. Further, by adjusting the amount of filling material to be put in the sandbag 8, it is possible to adjust the height of the sandbag 7 when the sandbag 7 is arranged.

このようにして仮設道路を築造するために必要な数だけ土のう7を用意しておき、まず始めに仮設道路築造予定地1の表面全体を覆うようにシート10を敷設する。このシート10は、仮設道路築造予定地1の土と土のう7との縁切りをするためのものであり、撥水性を有するものである。また、このシート10は、後に説明するがシート10の上に複数層積み重ねられた土のう7全体の側面を覆うようにその周縁が上方に折り曲げられるため、このことを考慮して仮設道路築造予定地1よりも広くなるように形成されたものを用いることとする。   In this way, as many sandbags 7 as necessary for constructing the temporary road are prepared, and the sheet 10 is first laid so as to cover the entire surface of the temporary road construction planned site 1. This sheet 10 is for cutting off the soil of the temporary road construction planned site 1 and the sandbag 7 and has water repellency. In addition, as will be described later, the peripheral edge of the sheet 10 is bent upward so as to cover the entire side surface of the sandbag 7 stacked on the sheet 10 in a plurality of layers. Those formed so as to be wider than 1 are used.

続いて、仮設道路築造予定地1の範囲内でシート10の上に土のう7を敷き並べる。ここで、この仮設道路築造予定地1である畑には、上記の通り畝5と谷部6とによって凹凸面が形成されている。したがって、ここでは図3に示すように、畝5と畝5の間の谷部6のシート10の上に一層目の土のう7を敷き並べる。なおこの際、畝5の上面と谷部6に敷き並べられた一層目の土のう7によって平面が形成されるように、敷き並べた土のう7を上方からプレートランマで3回程度転圧する。   Subsequently, a sandbag 7 is laid on the sheet 10 within the range of the temporary road construction planned site 1. Here, in the field which is the temporary road construction planned site 1, an uneven surface is formed by the ridges 5 and the valleys 6 as described above. Therefore, here, as shown in FIG. 3, the first sandbag 7 is laid on the sheet 10 of the valley 6 between the ridges 5. At this time, the arranged sandbags 7 are rolled by the plate runner about three times from above so that a flat surface is formed by the first sandbag 7 placed on the upper surface of the trough 5 and the valley 6.

このようにして谷部6に一層目の土のう7を敷き並べて、畝5の上面と谷部6に敷き並べられた土のう7とによって平面を形成した後、図4に示すように、この平面上に二層目の土のう7をバランスよく敷き並べる敷き並べ作業を行う。この二層目の土のう7の敷き並べ作業が完了した後、土のう7同士の隙間に例えばクラッシャランなどの目詰め材11を撒き出す。この目詰め材11の撒き出し作業が完了した後、土のう7が損傷しないように注意して二層目の土のう7をプレートランマにて転圧する。このとき、敷き並べた土のう7の高さが等しくなるようにレベル管理を行いながら転圧作業を行う。   In this way, a first layer of sandbags 7 is laid on the valley 6 and a plane is formed by the upper surface of the ridge 5 and the sandbag 7 laid on the valley 6, and then, as shown in FIG. Laying the second layer of sandbags 7 in a balanced manner is performed. After the second layer of sandbags 7 has been laid out, a packing material 11 such as a crusher orchid is spread out in the gap between the sandbags 7. After the completion of the operation of squeezing the packing material 11, the second layer of sandbag 7 is rolled with a plate runner, taking care not to damage the sandbag 7. At this time, the rolling operation is performed while performing level control so that the heights of the sandbags 7 arranged are equal.

以降、二層目の土のう7の敷き並べ作業から転圧作業までの作業を繰り返し行って、道路2や建築予定地4の地面と略等しい高さとなるように土のう7を積み重ねる。図5は、このようにして積み重ねられた土のう7を示した図である。図示するように、道路2及び建築予定地4の底面と略等しい高さとなるように土のう7が積み重ねられている。なお、土のう7を積み重ねる際に、その端部が側方に突出するような場合には、中詰め材の量を半分にした調整用土のう12を用いて調整し、また各層の土のう7の積み重ねは、荷重分散を効率よく行うために、調整用土のう12を用いて千鳥配置となるように行う。   Thereafter, the work from the laying work of the second layer of sandbags 7 to the rolling work is repeatedly performed, and the sandbags 7 are stacked so that the height is substantially equal to the ground of the road 2 or the planned construction site 4. FIG. 5 is a view showing the sandbags 7 stacked in this manner. As shown in the figure, sandbags 7 are stacked so as to have a height substantially equal to the bottom surface of the road 2 and the planned construction site 4. In addition, when the sandbags 7 are stacked, if the end portion protrudes to the side, adjustment is performed using the adjustment sandbag 12 in which the amount of the filling material is halved, and the sandbags 7 of each layer are stacked. Is performed in a staggered arrangement using the adjustment sandbag 12 in order to efficiently distribute the load.

このようにして土のう7の積み重ね作業が完了した後、一層目の土のう7を敷き並べる前に仮設道路築造予定地1に敷設したシート10を積み重ねた土のう7全体の側面を全て覆うように上方に折り曲げる。そして最後に、上方に折り曲げたシート10を更に折り曲げ、シート10の周縁を固定するとともに、最上層の土のう7の上面を覆うように鉄板13を敷き並べて作業を完了する。なお、鉄板13に代えてゴムシートを敷き並べるようにしてもよい。   After completion of the stacking of the sandbags 7 in this way, before the first sandbag 7 is laid out, the upper side of the entire sandbag 7 on which the sheets 10 laid on the temporary road construction planned site 1 are stacked is covered. Bend it. Finally, the sheet 10 folded upward is further folded to fix the peripheral edge of the sheet 10 and the iron plate 13 is laid out so as to cover the upper surface of the uppermost sandbag 7 to complete the operation. A rubber sheet may be laid out in place of the iron plate 13.

図6は、上記の作業により築造された仮設道路14の断面形状を示したものである。畝5と畝5の間の谷部6を埋めるように、一層目の土のう7が敷き並べられて畝5の上面と一段目の土のう7によって平面が形成された後、二層目以降の土のう7が道路2、道路3、及び建築予定地4とほぼ同じ高さまで積み重ねられた後、その上面に鉄板13が配置されている。このようにして築造された仮設道路14を介して、道路2又は道路3から建築資材を運搬する車両等が建築予定地4に進入できるようになっている。なお、畝5と畝5の間の谷部6に一層目の土のう7を敷き並べることにより、二層目以降の土のう7を積み重ねたことによりその荷重が畝5に集中して畝5を破壊してしまうのを防止することができる。また、土のう7を積み重ねて形成された仮設道路14は、その底面及び側面がシート10によって覆われ、最上層の土のう7の上面は鉄板13によって覆われている。したがって、例え土のう袋8が破損して中詰め材が外部に流出したとしても、中詰め材が畑の土と混合されて土壌に悪影響を及ぼすのを防止することができる。また、紫外線等による土のう袋8の劣化を防止することができる。   FIG. 6 shows a cross-sectional shape of the temporary road 14 built by the above-described work. After filling the valley 6 between the ridges 5 and 5, a first layer of sandbags 7 is laid and a plane is formed by the upper surface of the ridge 5 and the first level of sandbags 7, and then the second and subsequent layers of soilbags After 7 is stacked up to approximately the same height as road 2, road 3, and planned construction site 4, an iron plate 13 is disposed on the upper surface thereof. A vehicle or the like for transporting building materials from the road 2 or the road 3 can enter the planned construction site 4 through the temporary road 14 constructed in this way. In addition, by placing the first layer of sandbags 7 in the valley 6 between the cages 5 and 5, the piles of the second and subsequent soilbags 7 are stacked, so that the load concentrates on the cage 5 and destroys the cage 5. Can be prevented. Further, the temporary road 14 formed by stacking the sandbags 7 is covered with the sheet 10 at the bottom and side surfaces thereof, and the top surface of the top sandbag 7 is covered with the iron plate 13. Therefore, even if the soil bag 8 is damaged and the filling material flows out to the outside, it is possible to prevent the filling material from being mixed with the soil in the field and adversely affecting the soil. Moreover, deterioration of the sandbag 8 due to ultraviolet rays or the like can be prevented.

なお、仮設道路14の撤去作業は、まず仮設道路14の上面の鉄板13を撤去し、続けて積み重ねた土のう7を一層ずつ撤去する。この土のう7には上記の通り紐9がついているため、この紐9をクレーンのフックに引っ掛け、複数の土のう7をまとめて撤去することが可能である。そして、積み重ねた土のう7を全て撤去すると、土のう7と土のう7の隙間に撒き出した目詰め材11がシート10上に飛散するため、この目詰め材11がシート10の外に流出して畑の土と混合されないように注意しながらシート10を撤去する。また、撤去した土のう7やシート10は撤去後も再利用が可能であり、土のう袋8が劣化した場合でも中詰め材は再利用できる。   The temporary road 14 is removed by first removing the iron plate 13 on the upper surface of the temporary road 14 and then removing the piles 7 one after another. Since the sandbag 7 has the string 9 as described above, it is possible to hook the string 9 on the hook of the crane and remove the plurality of sandbags 7 together. Then, when all the piles 7 are removed, the filling material 11 sprinkled into the gap between the sandbags 7 and 7 is scattered on the sheet 10, so that the filling material 11 flows out of the sheet 10 and flows into the field. The sheet 10 is removed while being careful not to mix with the soil. Further, the removed sandbag 7 and the sheet 10 can be reused after removal, and the filling material can be reused even when the sandbag 8 is deteriorated.

以上説明した土のうを用いた仮設道路築造方法によって仮設道路14を築造する場所は、畑に限定されるものではなく、例えば田や小川などであってもよく、凹凸面の有無に関わらず様々な場所に築造することができる。また、この仮設道路14は、その底面及び側面がシート10によって覆われているため、水が張られている時期の田にも築造することが可能である。なお、小川に築造する場合には、複数のシート10を所定の間隔を隔てて敷設して土のう7を積み重ねることにより、水路を確保しながら仮設道路14を築造することが可能である。また、本実施の形態においては、地面の高さが等しい道路2と建築予定地4との間の畑に土のう7を用いて仮設道路14を築造する場合について説明したが、例えば、建築予定地4が道路2よりも高い位置にある場合には、建築予定地4側に積み重ねる土のう7の数を道路2側よりも多くすることにより、傾斜をつけた仮設道路14を築造することも当然可能である。   The place where the temporary road 14 is constructed by the method for constructing the temporary road using the sandbag described above is not limited to the field, and may be, for example, a rice field or a stream. Can be built on site. Moreover, since the bottom and side surfaces of the temporary road 14 are covered with the sheet 10, the temporary road 14 can be built even in a field where water is stretched. In addition, when constructing in a creek, it is possible to construct the temporary road 14 while securing a water channel by laying a plurality of sheets 10 at a predetermined interval and stacking sandbags 7. Moreover, in this Embodiment, although the case where the temporary road 14 was built using the sandbag 7 in the field between the road 2 and the construction planned land 4 with the same ground height was demonstrated, for example, a construction planned site When 4 is higher than the road 2, it is natural that the sloped temporary road 14 can be built by increasing the number of sandbags 7 stacked on the planned construction site 4 side than the road 2 side. It is.

道路よりも低い田、畑、小川などの場所に仮設道路を築造する場合に適用可能である。   This is applicable when a temporary road is constructed in a place such as a rice field, a field, or a stream that is lower than the road.

土のうを用いた仮設道路築造方法により仮設道路を設置する仮設道路築造予定地を示した図である。It is the figure which showed the temporary road construction planned site which installs a temporary road with the temporary road construction method using a sandbag. 仮設道路を築造するための土のうを示した図である。It is the figure which showed the sandbag for building a temporary road. 畝と畝の間の谷に敷き並べられた一層目の土のうを示した図である。It is the figure which showed the sandbag of the 1st layer laid in the valley between the ridges. 二層目の土のうが敷き並べられた仮設道路築造予定地を示した図である。It is the figure which showed the temporary road construction planned site where the sandbag of the 2nd layer was arranged. 道路及び建築予定地と同じ高さまで敷き並べられた土のうを示した斜視図である。It is the perspective view which showed the sandbag laid to the same height as a road and a construction planned site. 仮設道路の概略断面図である。It is a schematic sectional drawing of a temporary road. 従来の仮設道路を示した図である。It is the figure which showed the conventional temporary road.

符号の説明Explanation of symbols

1 仮設道路築造予定地
2、3 道路
4 建築予定地
5 畝
6 谷部
7 土のう
8 土のう袋
10 シート
12 調整用土のう
14 仮設道路
1 Temporary road construction site 2, 3 Road 4 Construction site 5 6 6 Valley 7 Doug 8 Doug bag 10 Sheet 12 Adjustment sandbag 14 Temporary road

Claims (3)

道路よりも低い場所に土のうを用いて仮設道路を築造する土のうを用いた仮設道路築造方法であって、
前記仮設道路を築造する前記道路よりも低い仮設道路築造予定地に、該仮設道路築造予定地よりも大きいシートを敷設した後、前記仮設道路築造予定地の範囲内で前記シート上に土のうを敷き並べる敷き並べ作業を繰り返し行って前記道路と略等しい高さとなるように前記土のうを積み重ね、積み重ねた土のう全体の側面を覆うように前記シートの周縁を上方に折り曲げ、さらに、最上層の土のうの上面を覆うように折り曲げることを特徴とする土のうを用いた仮設道路築造方法。
A method for building a temporary road using a sandbag, which uses a sandbag in a place lower than the road,
Lower temporary road construction planned site than the road construction the temporary road, after laying the larger sheet than the temporary road construction planned site, laid sandbags on the sheet within the range of the temporary road construction planned site By repeatedly performing the laying and laying work, the sandbags are stacked so as to have a height substantially equal to the road, the periphery of the sheet is folded upward so as to cover the entire side surface of the stacked sandbags, and the top surface of the topmost sandbag temporary road construction method using sandbags, characterized in Rukoto folded so as to cover the.
前記仮設道路築造予定地に凹凸面が形成されている場合に、該仮設道路築造予定地の凹部に土のうを敷き並べて凸部の上面と前記凹部に敷き並べた土のうにより平面を形成した後に、該平面上に前記土のうの敷き並べ作業を行うことを特徴とする請求項1記載の土のうを用いた仮設道路築造方法。   When an uneven surface is formed on the temporary road construction site, after forming a flat surface by placing sandbags on the concave portions of the temporary road construction site and forming sandstones on the top surface of the convex portions and the concave portions, 2. The temporary road building method using sandbags according to claim 1, wherein the sandbags are laid out on a plane. 前記土のうの中詰め材が、砂であることを特徴とする請求項1又は2記載の土のうを用いた仮設道路築造方法。   The temporary road building method using a sandbag according to claim 1 or 2, wherein the filling material of the sandbag is sand.
JP2003369853A 2003-10-30 2003-10-30 Temporary road construction method using sandbags Expired - Fee Related JP4278093B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2003369853A JP4278093B2 (en) 2003-10-30 2003-10-30 Temporary road construction method using sandbags

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2003369853A JP4278093B2 (en) 2003-10-30 2003-10-30 Temporary road construction method using sandbags

Publications (2)

Publication Number Publication Date
JP2005133405A JP2005133405A (en) 2005-05-26
JP4278093B2 true JP4278093B2 (en) 2009-06-10

Family

ID=34647037

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2003369853A Expired - Fee Related JP4278093B2 (en) 2003-10-30 2003-10-30 Temporary road construction method using sandbags

Country Status (1)

Country Link
JP (1) JP4278093B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2465386C1 (en) * 2011-05-03 2012-10-27 Общество с ограниченной ответственностью "Конструкторское бюро точного приборостроения" Method of road construction
JP7200045B2 (en) * 2019-05-21 2023-01-06 鹿島建設株式会社 Vibration reduction structure, vibration reduction method, enclosure

Also Published As

Publication number Publication date
JP2005133405A (en) 2005-05-26

Similar Documents

Publication Publication Date Title
RU2196864C2 (en) Cellular retention structure
JP4940674B2 (en) Block mat
JPS6124488B2 (en)
US4269537A (en) Revetment unit
US20050100418A1 (en) Ecological block and vegetation bank protection
JP4278093B2 (en) Temporary road construction method using sandbags
JP6192763B1 (en) Geogrid / Honeycomb Retaining Wall
KR102219062B1 (en) Folding-terraced geomat for slope vegetation
US11555284B1 (en) Integrating articulated concrete blocks with gabion/reno cages
KR200457052Y1 (en) Vegetation shore protection block and connecting structure thereof
JPH08338027A (en) Construction of slope of embankment
JP4264487B2 (en) Construction method of drainage layer in stabilization method of sandy beach
JP7221366B2 (en) Anti-scouring structures and crushing units
JP7266086B2 (en) honeycomb reinforced slope
JP6573188B1 (en) River structure
JP4521491B2 (en) Foundation structure of offshore structure and its construction method
JP3058521U (en) Construction surface laying block
JP2878676B2 (en) Seawall structure
JP2623517B2 (en) Building seismic support structure
JP5408725B2 (en) Symbiotic revetment panel material and symbiotic revetment
JP6007017B2 (en) Underwater foundation and construction method of underwater foundation
JP3983696B2 (en) Slope protection structure such as dike
US875480A (en) Means for protecting river-banks.
JP4066030B2 (en) Seawall block
JP4042136B2 (en) Articulated block

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20051108

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20071116

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20071129

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20071226

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20090305

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20090306

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120319

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees