JP4168246B2 - Pipe suspension device - Google Patents
Pipe suspension device Download PDFInfo
- Publication number
- JP4168246B2 JP4168246B2 JP2002308632A JP2002308632A JP4168246B2 JP 4168246 B2 JP4168246 B2 JP 4168246B2 JP 2002308632 A JP2002308632 A JP 2002308632A JP 2002308632 A JP2002308632 A JP 2002308632A JP 4168246 B2 JP4168246 B2 JP 4168246B2
- Authority
- JP
- Japan
- Prior art keywords
- pipe
- suspension device
- adjustment rod
- rod
- clamp
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Sewage (AREA)
- Supports For Pipes And Cables (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は、地面を掘削して形成される溝に下水道管等のパイプを敷設する作業において使用するパイプ吊下装置に関するものである。
【0002】
【従来の技術】
一般に、下水道管を敷設する工事では、精密な勾配で敷設することが要求される。そのため、従来では掘削した溝を跨いだ路面に、門構えの形状をした丁張を所定の間隔ごとに測量器等を使用して指定された勾配となるように設置した後、この丁張の勾配に合わせて丁張り糸(水糸)を張り渡す工程を必要としている。
【0003】
そして、上記作業の後、所定長さの棒を使用して溝に挿入した下水道管の最上部と丁張り糸との間隔を一定にするため、下水道管の下部に板等を敷いて調整する作業をした後、下水道管を固定して土砂を埋め戻していた。
【0004】
しかし、最近ではレーザー照準器を使用し、発射されるレーザー光線を基準として敷設されるパイプの勾配を精密に設定する方法も普及してきている。
【0005】
また、本出願人は、特願2002−15845号及び特願2002−98489号に記載のパイプ吊下装置を開発している。例えば特願2002−98489号に記載のパイプ吊下装置は、図5に示すように、地面を掘削して形成される溝の両壁に設置された土留パネル又は矢板間に下水道管等を敷設する作業で使用するパイプ吊下装置1であって、該パイプ吊下装置1は、パイプ26の周壁を挟持するパイプホルダー部2と、該パイプホルダー部2の上方に位置する吊下装置本体3と、該吊下装置本体3と前記パイプホルダー部2とを連結するクランプ部4と、前記吊下装置本体3から前記土留パネル又は矢板を押圧する方向に延出する伸縮自在の支持杆5aと該支持杆5aの先端に押圧片5bが設置されてなるジャッキを備えた突っ張り部6とを有しており、前記パイプホルダー部2は、パイプ嵌合プレート2aと、紐状のパイプ保持部材2cと、該パイプ保持部材の係止手段2bとを有しているものである。
【0006】
そして、パイプ吊下装置1のみで位置決めを行った後、パイプ26をパイプホルダー部2に吊下げ固定することによってパイプ26の位置決めがなされるのである。
【0007】
この発明によって、パイプの敷設作業が容易になると共に、敷設後の埋め戻し作業も簡易化することができるようになった。
【0008】
【発明が解決しようとする課題】
ここで、クランプ部4は連結片4aによって上下方向の調整棒3aの下端に、この上下方向の調整棒3aの軸周りに回動可能に固定されている。これは、ジャッキを備えた突っ張り部6,6が左右の土留パネルの平面に対して垂直方向に設置されていない場合であっても、クランプ部4を回動させることによって敷設すべきパイプの進行方向に一致させることができるようにするためのものである。
【0009】
しかしながら、吊下げられるパイプ26が大型のパイプである場合にはパイプ26の自重によって、上下方向の調整棒3aも下方向に引っ張られるため、位置決めハンドル3cのねじ山及びねじ溝と上下方向の調整棒3aのねじ溝及びねじ山とが強く噛み合い一体化された状態となってしまうためパイプ26を吊下げた後に位置決めの微調整を行いたい場合に、位置決めハンドル3cを回転させると、上下方向の調整棒3aも同時に回転することとなり、上下方向の微調整ができず位置決め作業が困難なこともあった。
【0010】
本発明は上記点に鑑み、大型のパイプであってもパイプ吊下げ時の位置決めを容易に行うことができ、作業性も向上させることができるパイプ吊下装置を提供することを目的とする。
【0011】
【課題を解決するための手段】
請求項1の発明は、後述する最良形態で使用する符号を付して説明すると、
「地面を掘削して形成される溝の両壁に設置された土留パネル又は矢板間にパイプ26を敷設する作業で使用するパイプ吊下装置10であって、
該パイプ吊下装置10を、パイプ26の周壁を挟持するパイプホルダー部11と、該パイプホルダー部11の上方に位置する吊下装置本体12と、該吊下装置本体12と前記パイプホルダー部11とを連結するクランプ部13と、前記吊下装置本体12から前記土留パネル又は矢板を押圧する方向に延出する伸縮自在の支持杆と該支持杆の先端に押圧片が設置されてなるジャッキを備えた突っ張り部14とを有したものとし、
前記吊下装置本体12を、中空円筒状のパイプ部と、該パイプ部に挿入され表面にねじ切りがされた上下方向の調整棒20と、該調整棒20に螺合し前記中空円筒状のパイプ部の上方及び下方に位置する位置決めハンドル21a・21bとを備えたものとし、
前記クランプ部13を、前記調整棒20の下端が回動可能に貫通されて連結される上下方向の貫通孔13eを穿設した連結部13aと、この連結部13aに穿設された横方向の孔13dに螺合して、先端が調整棒20の端部に当接する蝶ねじ13bを有したものとして、この蝶ねじ13bを緩めておいたときにはクランプ部13を調整棒20に対して回動させることができ、この蝶ねじ13bを締め付けておいたときにはクランプ部13を調整棒20に対して固定するようにしたこと」
に特徴を有する。
【0012】
【発明の実施の形態】
次に、本発明の実施の形態を図面に基づいて説明する。図1は本発明に係るパイプ吊下装置の全体を示す説明図である。このパイプ吊下装置10は、パイプ26の周壁を挟持するパイプホルダー部11と、このパイプホルダー部11の上方に位置する吊下装置本体12と、この吊下装置本体12とパイプホルダー部11とを連結するクランプ部13と、突っ張り部14とを有する構成としている。
【0013】
そして、突っ張り部14は、吊下装置本体12から土留パネルを押圧する方向(図面上は左右方向)に延出する伸縮自在の支持杆14aと、この支持杆14aの先端に押圧片14bが設置されてなるジャッキからなる構成としている。尚、支持杆14aは、外筒と、この外筒に挿入されている伸縮棒とからなるものであり(図示せず)、伸縮棒の先端に押圧片14bが設置されているのである。また、伸縮棒の表面にはねじ切りがされていて、この伸縮棒に固定ハンドル15を螺合する構成としているのである。
【0014】
尚、図2(イ)に示すように、一方の伸縮棒16aはねじ切りがされていない中空のパイプに間隔をおいて複数の貫通孔16b,16b・・を開け、支持杆の外筒14aの一端にも貫通孔14cを開けておき、この両方の貫通孔14c,16bに固定ピン16cを矢印Aの方向に差し込んだ後、この固定ピン16cの頭部に回動自在に設置されているフック161cを矢印Bの方向に倒すことによって、固定してもよい。そして、図2(ロ)に示すように、他方の支持杆の外筒14aの側壁にねじ切りがされた穿設孔141aを穿設し、これに螺合する固定ねじ142aを設ける構成とすればパイプ吊下げ作業が終了した後の運搬時に伸縮棒17が伸び縮みせず便利である。
【0015】
ここで、土留パネルとは2枚のパネルを切梁サポート(図示せず)により所定の間隔で連結して掘削部位に設置して、掘削部位を所定の幅寸法に保持するものであり、詳しくは本出願人の出願である特開2000−45283号公報等に記載されている。尚、土留パネルに代えて矢板の場合でも本発明を実施することができることは言うまでもない。
【0016】
そして、突っ張り部14の下方には、左右位置調整部18が設けられている。この左右位置調整部18は、ねじ切りされた左右方向の調整棒18aと、この左右方向の調整棒18aに螺合する可動管18bと調整棒18aに螺合する位置決めハンドル19,19とからなるものであり、調整棒18aは支持杆14aに対して平行に配設されている。また、可動管18bは吊下装置本体12に溶接されていて、可動管18bが調整棒18a上を動くことによって、吊下装置本体12と、これに連結するパイプホルダー部11とが図面上、左右方向に動いて左右方向の位置調整ができるようになっているのである。
【0017】
また、吊下装置本体12は、中空円筒状のパイプとなっており、表面がねじ切りされた上下方向の調整棒20が挿入されている。そして、位置決めハンドル21a,21bが吊下装置本体12の上方及び下方の位置で上下方向の調整棒20に螺合している。したがって、上下方向の調整棒20は吊下装置本体12に対して上下動することによって、上下方向の調整棒20に連結するパイプホルダー部11が図面上、上下方向に動いて上下方向の位置調整ができるようになっているのである。
【0018】
そして、上方に位置する位置決めハンドル21aは図3に示すように側面にねじ切りがされた孔21cが穿設されており、この孔21cに蝶ねじ等の固定ねじ22が螺合することによって、上下方向の調整棒20と上方に位置する位置決めハンドル21aとが固定されるのである。
【0019】
次に、クランプ部13は連結部13aと固定ねじ13bと嵌合プレート固定ピン13cとを有し、連結部13aは図4に示すように上下方向の調整棒20の一端が貫通する上下方向の貫通孔13eが穿設されており、上下方向の調整棒20の一端はワッシャ付きボルト13fによって連結部13aに回動可能に連結されるのである。そして、調整棒20は連結部13aに穿設され、ねじ切りがされた横方向の孔13dに蝶ねじ13bが螺合し蝶ねじ13bの先端が調整棒20の端部に当接することによって固定されるのである。
【0020】
したがって、蝶ねじ13bを緩めておけばクランプ部13を回動させることができるのでパイプを敷設すべき方向と一致させることができる。そして、蝶ねじ13bを締め付けておけばパイプ嵌合プレート23にパイプ26が固定された後に位置決めハンドル21a,21bを回転させても上下方向の調整棒20が一緒に回転することがないので、位置決めの微調整を容易に行うことができるのである。尚、嵌合プレート固定ピン13cにはパイプ嵌合プレート23が着脱可能に取り付けられている。このパイプ嵌合プレート23は図示していないがパイプ26の長手方向に所定の間隔をあけてもう1枚が設置される構成としてもよい。これにより、後述する紐状のパイプ保持部材24によってパイプ26を保持したときの安定性を良くすることもできるのである。
【0021】
そして、クランプ部13とパイプ嵌合プレート23とには位置決めのためにレーザー照準器から発射されるレーザー光線が照射されるターゲットを保持するターゲットホルダー24が着脱可能に設置される構造となっている。
【0022】
次に、パイプホルダー部24はパイプ嵌合プレート23と、紐状のパイプ保持部材24と、紐状のパイプ保持部材24の係止手段25とで構成されている。そして、パイプ嵌合プレート23はパイプ26の径と略一致する略半円の嵌合溝23aを有している。また、パイプ保持部材の係止手段は図示していないが、紐状のパイプ保持部材24の折り返された部分の一部を収容し、パイプ嵌合プレート23に固定する構成としている。そして、パイプ保持部材24の他方の係止手段25は紐状のパイプ保持部材24を通した溝付きのスロット25aをラチェット機構により回転させ、このスロット25aに紐状のパイプ保持部材24を巻き付け、且つスロット25aの溝にストッパが係合して紐状のパイプ保持部材24が緩むことがないようにした荷締機を利用したものである。この係止手段はラチェット機構のレバー25bを上方(吊下装置本体方向)へ押し上げることによって紐状のパイプ保持部材24を巻き取り且つ、巻き取られた紐状のパイプ保持部材24を緩むことなく係止するものである。
【0023】
尚、本発明の趣旨を逸脱しない範囲において、種々の実施形態をとるこができることは言うまでもない。例えば、上記実施形態の位置決めハンドル21aに穿設され、ねじ切りがされた孔21c又はクランプ部の連結部13aに穿設され、ねじ切りがされた孔13dには蝶ねじ22又は13bを螺合する構成としているがこれに限定されるものではなく、六角ボルト等の固定ねじ又は他の固定手段であってもよいものである。また、直接パイプ嵌合プレート23にねじ切りがされた孔を穿設して、固定ねじによって上下方向の調整棒20を固定する構成としてもよいものである。
【0024】
さらに、図1に示すように吊下装置本体12の側壁にねじ切りがされた穿設孔を穿設し、これに螺合する固定ねじ27を設ける構成とすることもできる。この構成により位置決めの際に、吊下装置本体12の内壁と、これに挿入されている上下方向の調整棒20とを常に同じ位置で接触させておくことができるので、上下方向の調整棒20が吊下装置本体12内でがたつくこと防ぎ位置決め精度のよいパイプ吊下げ作業を行うことができるのである。
【0025】
【発明の効果】
請求項1の発明は、
「地面を掘削して形成される溝の両壁に設置された土留パネル又は矢板間にパイプ26を敷設する作業で使用するパイプ吊下装置10であって、
該パイプ吊下装置10を、パイプ26の周壁を挟持するパイプホルダー部11と、該パイプホルダー部11の上方に位置する吊下装置本体12と、該吊下装置本体12と前記パイプホルダー部11とを連結するクランプ部13と、前記吊下装置本体12から前記土留パネル又は矢板を押圧する方向に延出する伸縮自在の支持杆と該支持杆の先端に押圧片が設置されてなるジャッキを備えた突っ張り部14とを有したものとし、
前記吊下装置本体12を、中空円筒状のパイプ部と、該パイプ部に挿入され表面にねじ切りがされた上下方向の調整棒20と、該調整棒20に螺合し前記中空円筒状のパイプ部の上方及び下方に位置する位置決めハンドル21a・21bとを備えたものとし、
前記クランプ部13を、前記調整棒20の下端が回動可能に貫通されて連結される上下方向の貫通孔13eを穿設した連結部13aと、この連結部13aに穿設された横方向の孔13dに螺合して、先端が調整棒20の端部に当接する蝶ねじ13bを有したものとして、この蝶ねじ13bを緩めておいたときにはクランプ部13を調整棒20に対して回動させることができ、この蝶ねじ13bを締め付けておいたときにはクランプ部13を調整棒20に対して固定するようにしたこと」
に特徴を有するので、大型のパイプを吊下げる場合でもパイプの自重によって位置決めハンドルと上下方向の調整棒とが共に回転することを防ぐことができ、パイプの位置決めを精度よく行うことができる。つまり、蝶ねじ13bを緩めておけばクランプ部13を回動させることができるのでパイプを敷設すべき方向と一致させることができるし、蝶ねじ13bを締め付けておけばパイプ嵌合プレート23にパイプ26が固定された後に位置決めハンドル21a,21bを回転させても上下方向の調整棒20が一緒に回転することがないので、位置決めの微調整を容易に行うことができるのである。
【図面の簡単な説明】
【図1】 本発明に係るパイプ吊下装置の説明図である。
【図2】 伸縮棒の固定手段を示す説明図である。
【図3】 位置決めハンドル及び固定ねじを示す説明図である。
【図4】 上下方向の調整棒の端部を固定する手段を示す説明図である。
【図5】 従来のパイプ吊下装置の説明図である。
【符号の説明】
10 パイプ吊下装置
11 パイプホルダー部
12 吊下装置本体
13 クランプ部
13a 連結部
13b,22 蝶ねじ
13d 横方向の穴
13e 上下方向の貫通孔
14 突っ張り部
15 固定ハンドル
18 左右位置調整部
20 上下方向の調整棒
21a,21b 位置決めハンドル
23 パイプ嵌合プレート[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a pipe suspension device used in an operation of laying a pipe such as a sewer pipe in a groove formed by excavating the ground.
[0002]
[Prior art]
In general, in the construction of laying sewer pipes, it is required to lay with a precise gradient. For this reason, after installing a stringer in the shape of a gate on the road straddling the excavated groove so that it has a specified gradient using a surveying instrument at predetermined intervals, the gradient of this stringer It is necessary to have a process of stretching the string (water thread) according to the situation.
[0003]
And after the above work, in order to make the distance between the uppermost part of the sewer pipe inserted into the groove and the stringer string using a rod of a predetermined length, adjust by placing a plate or the like on the lower part of the sewer pipe After working, the sewer pipe was fixed and the earth and sand were backfilled.
[0004]
However, recently, a method of using a laser sighting device and precisely setting the gradient of a pipe laid on the basis of the emitted laser beam has become widespread.
[0005]
Further, the present applicant has developed a pipe suspension device described in Japanese Patent Application Nos. 2002-15845 and 2002-98489. For example, in the pipe suspension device described in Japanese Patent Application No. 2002-98489, as shown in FIG. 5, a sewer pipe or the like is installed between earth retaining panels or sheet piles installed on both walls of a groove formed by excavating the ground. A pipe suspending device 1 for use in a work to be performed, the pipe suspending device 1 including a
[0006]
Then, after positioning is performed only by the pipe suspension device 1, the
[0007]
According to the present invention, the pipe laying work is facilitated, and the backfilling work after laying can be simplified.
[0008]
[Problems to be solved by the invention]
Here, the
[0009]
However, when the
[0010]
In view of the above points, an object of the present invention is to provide a pipe suspending device that can easily perform positioning even when a large pipe is suspended and can improve workability.
[0011]
[Means for Solving the Problems]
The invention of claim 1 will be described with reference numerals used in the best mode described below.
“The
The
The suspension device
The
It has the characteristics.
[0012]
DETAILED DESCRIPTION OF THE INVENTION
Next, embodiments of the present invention will be described with reference to the drawings. FIG. 1 is an explanatory view showing the entire pipe suspending device according to the present invention. The
[0013]
The
[0014]
As shown in FIG. 2 (a), one of the
[0015]
Here, the earth retaining panel is a panel in which two panels are connected at a predetermined interval by a beam support (not shown) and installed at a drilling site to hold the drilling site at a predetermined width. Is described in Japanese Patent Application Laid-Open No. 2000-45283, which is an application of the present applicant. In addition, it cannot be overemphasized that it replaces with a earth retaining panel and this invention can be implemented also in the case of a sheet pile.
[0016]
A left and right
[0017]
Moreover, the suspension device
[0018]
As shown in FIG. 3, the
[0019]
Next, the
[0020]
Therefore, if the
[0021]
The
[0022]
Next, the
[0023]
In addition, it cannot be overemphasized that various embodiment can be taken in the range which does not deviate from the meaning of this invention. For example, the
[0024]
Further, as shown in FIG. 1, a threaded hole may be formed in the side wall of the suspension device
[0025]
【The invention's effect】
The invention of claim 1
“The
The
The suspension device
The
Therefore, even when a large pipe is suspended, it is possible to prevent the positioning handle and the vertical adjustment rod from rotating together due to the weight of the pipe, and the pipe can be positioned with high accuracy. That is, if the
[Brief description of the drawings]
FIG. 1 is an explanatory diagram of a pipe suspension apparatus according to the present invention.
FIG. 2 is an explanatory view showing a fixing means for the telescopic rod.
FIG. 3 is an explanatory view showing a positioning handle and a fixing screw.
FIG. 4 is an explanatory view showing a means for fixing the end of the adjustment bar in the vertical direction.
FIG. 5 is an explanatory diagram of a conventional pipe suspending device.
[Explanation of symbols]
DESCRIPTION OF
13d lateral hole
13e Vertical through
Claims (1)
該パイプ吊下装置を、パイプの周壁を挟持するパイプホルダー部と、該パイプホルダー部の上方に位置する吊下装置本体と、該吊下装置本体と前記パイプホルダー部とを連結するクランプ部と、前記吊下装置本体から前記土留パネル又は矢板を押圧する方向に延出する伸縮自在の支持杆と該支持杆の先端に押圧片が設置されてなるジャッキを備えた突っ張り部とを有したものとし、
前記吊下装置本体を、中空円筒状のパイプ部と、該パイプ部に挿入され表面にねじ切りがされた上下方向の調整棒と、該調整棒に螺合し前記中空円筒状のパイプ部の上方及び下方に位置する位置決めハンドルとを備えたものとし、
前記クランプ部を、前記調整棒の下端が回動可能に貫通されて連結される上下方向の貫通孔を穿設した連結部と、この連結部に穿設された横方向の孔に螺合して、先端が調整棒の端部に当接する蝶ねじを有したものとして、この蝶ねじを緩めておいたときにはクランプ部を調整棒に対して回動させることができ、この蝶ねじを締め付けておいたときにはクランプ部を調整棒に対して固定するようにしたことを特徴とするパイプ吊下装置。 A pipe suspension device used in an operation of laying a pipe between earth retaining panels or sheet piles installed on both walls of a groove formed by excavating the ground,
The pipe suspension device includes a pipe holder portion that sandwiches the peripheral wall of the pipe, a suspension device body that is positioned above the pipe holder portion, and a clamp portion that connects the suspension device body and the pipe holder portion. A telescopic support rod extending in the direction of pressing the earth retaining panel or sheet pile from the suspension device main body, and a strut portion provided with a jack in which a pressing piece is installed at the tip of the support rod age,
The suspension device body includes a hollow cylindrical pipe portion, a vertical adjustment rod inserted into the pipe portion and threaded on the surface thereof, and an upper portion of the hollow cylindrical pipe portion screwed into the adjustment rod. And a positioning handle located below,
Said clamp portion, and a connecting portion for the lower end of the adjusting rod is bored transmembrane hole in the vertical direction that will be connected is penetrated rotatably, threadably in transverse holes formed in the connecting portion Then, assuming that the tip has a thumbscrew that abuts the end of the adjustment rod, the clamp can be rotated relative to the adjustment rod when the thumbscrew is loosened. when it had been the pipe hanging equipment being characterized in that so as to secure the clamping part against the adjustment rod.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2002308632A JP4168246B2 (en) | 2002-10-23 | 2002-10-23 | Pipe suspension device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2002308632A JP4168246B2 (en) | 2002-10-23 | 2002-10-23 | Pipe suspension device |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2004143760A JP2004143760A (en) | 2004-05-20 |
JP4168246B2 true JP4168246B2 (en) | 2008-10-22 |
Family
ID=32454722
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2002308632A Expired - Lifetime JP4168246B2 (en) | 2002-10-23 | 2002-10-23 | Pipe suspension device |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP4168246B2 (en) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100937157B1 (en) | 2009-04-14 | 2010-01-15 | 우주쎄미텍 주식회사 | Pipe connecting apparatus |
JP5371675B2 (en) * | 2009-10-08 | 2013-12-18 | 株式会社Nsp Ks | Pipe suspension device |
CN111894105A (en) * | 2020-08-10 | 2020-11-06 | 马鞍山市新桥工业设计有限公司 | Sewage pipeline burying device for municipal engineering and implementation method thereof |
CN113028147B (en) * | 2021-02-26 | 2022-06-21 | 重庆泽足水务投资建设有限公司 | Adjustable installation mechanism for water supply system pipeline |
CN113513070B (en) * | 2021-05-08 | 2022-12-13 | 武汉市水务建设工程有限公司 | Installation and construction method for cement culvert pipe of water conservancy and sewage engineering |
CN113511581B (en) * | 2021-05-08 | 2022-09-06 | 贵港新奥燃气工程有限公司 | Pipeline positioning device for gas engineering |
-
2002
- 2002-10-23 JP JP2002308632A patent/JP4168246B2/en not_active Expired - Lifetime
Also Published As
Publication number | Publication date |
---|---|
JP2004143760A (en) | 2004-05-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US4304078A (en) | Adjustable support apparatus | |
JP4168246B2 (en) | Pipe suspension device | |
CN110142438B (en) | Hole site deviation prevention drilling device for field installation and use method thereof | |
JP2010043468A (en) | Anchor bolt setting apparatus and construction method of foundation | |
US3861046A (en) | Batter board construction | |
JP2009138439A (en) | Pile structure and protective fence using the same | |
JP2013019525A (en) | Pipe mounting device for pipe suspension device | |
JP2004144168A (en) | Pipe suspender | |
JP3700131B2 (en) | Pipe suspension device | |
JPS5922038B2 (en) | underground drilling equipment | |
JP2019155659A (en) | Drilling machine | |
CN212535666U (en) | Angle-adjustable leading small catheter guiding device | |
US7878469B2 (en) | Quick release screed bar holder | |
US7740060B2 (en) | Method and device at rock drilling | |
JP2004100219A (en) | Pipe suspending device | |
US2624950A (en) | Gauge for aligning a string of pipe with a grade line | |
CN112146529B (en) | Rock drill directional control device for tunnel blasting construction and use method thereof | |
CN214997745U (en) | Tunnel engineering lock foot stock and leading little pipe construction assistance-localization real-time ware | |
CN215281604U (en) | Lower supporting beam adjusting device for external pressure load test of drain pipe | |
CN212613830U (en) | Accurate installation device for embedded steel plates of reinforced concrete wall and column | |
JP2003315044A (en) | Level mount | |
US4546835A (en) | Horizontal earth boring directional guide | |
JP2003213777A (en) | Hanging device for pipe and method of laying pipe using the same | |
CN216405019U (en) | Reinforcing apparatus of steady basic unit construction template of water that closes on side ditch | |
CN217965553U (en) | Stirrup interval positioner |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20051021 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20071003 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20071009 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20071204 |
|
RD02 | Notification of acceptance of power of attorney |
Free format text: JAPANESE INTERMEDIATE CODE: A7422 Effective date: 20071204 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20080303 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20080428 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20080701 |
|
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20080722 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110815 Year of fee payment: 3 |
|
R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 Ref document number: 4168246 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110815 Year of fee payment: 3 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20140815 Year of fee payment: 6 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
EXPY | Cancellation because of completion of term |