JP4106290B2 - Bending machine - Google Patents

Bending machine Download PDF

Info

Publication number
JP4106290B2
JP4106290B2 JP2003044069A JP2003044069A JP4106290B2 JP 4106290 B2 JP4106290 B2 JP 4106290B2 JP 2003044069 A JP2003044069 A JP 2003044069A JP 2003044069 A JP2003044069 A JP 2003044069A JP 4106290 B2 JP4106290 B2 JP 4106290B2
Authority
JP
Japan
Prior art keywords
mold
center
center mold
die
replacement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2003044069A
Other languages
Japanese (ja)
Other versions
JP2004249349A (en
Inventor
晋 小林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Amada Co Ltd
Original Assignee
Amada Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Amada Co Ltd filed Critical Amada Co Ltd
Priority to JP2003044069A priority Critical patent/JP4106290B2/en
Publication of JP2004249349A publication Critical patent/JP2004249349A/en
Application granted granted Critical
Publication of JP4106290B2 publication Critical patent/JP4106290B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Mounting, Exchange, And Manufacturing Of Dies (AREA)
  • Bending Of Plates, Rods, And Pipes (AREA)

Description

【0001】
【発明の属する技術分野】
この発明は、折曲げ加工機に関する。
【0002】
【従来の技術】
従来の折曲げ加工機の金型交換装置には、上下動可能なフレームの下端に設けられた金型支持用ビームの長手方向のほぼ中心部に、センタ金型交換ユニットが旋回自在に設けられている。また、上記の上部フレームの前側には金型マガジンが設けられており、この金型マガジンを正面からみて左右両側に複数のセンタ金型を格納した一対のドラムが設けられている。この一対のドラムの金型交換位置に前記センタ金型交換ユニットのセンタアームが旋回され、左右方向へ移動されて所望のセンタ金型が交換される。
【0003】
上記のセンタ金型交換ユニットにより交換されたセンタ金型とこのセンタ金型の左右部にスライド自在に設けられた多数の分割金型とからトップダイが構成され、このトップダイに対向してボトムダイが配置されている。前記トップダイとボトムダイとの協働によりワークが押圧固定された状態のもとで、トップダイ、ボトムダイから後方へ突出したワークが上方向又は下方向へ折曲げられる。
【0004】
上記の折曲げ加工を行う際には、ワークの曲げ長さに応じてセンタ金型が金型マガジンから選択されてセンタ金型交換ユニットにより着脱交換され、その後に折曲げ加工が行われる。ちなみに、上記のドラム式の金型マガジンには例えば7.5mmピッチで14個の金型が格納されており、次の金型交換要求を受けると、現在セットされている金型がドラムに格納された後に、次の金型が選定されて装着される(例えば、特許文献1参照。)。
【0005】
【特許文献1】
特開平7−112215号公報(〔0039〕〜〔0047〕、図1,図3,図7,図8)。
【0006】
【発明が解決しようとする課題】
ところで、従来の折曲げ加工機の金型交換装置においては、センタ金型が交換される際に、現在セットされているセンタ金型がドラム式の金型マガジンのドラムに格納された後に、次のセンタ金型が選定されてからトップダイのセンタ金型装着部に装着されるのでどうしても金型交換時間がかかってしまうという問題点があった。
【0007】
例えば、現在セットされている金型は、自動金型交換装置のATCが外寄せされてから金型交換ユニットのセンタアームが旋回上昇して金型マガジンのドラムに格納される。次に、金型チャックが開き、ドラム回転が回転して次のセンタ金型がクランプされる。次のセンタ金型はセンタアームが旋回下降してセッティングされ、一方、ATCの外寄せが戻される。このときの金型交換時間は例えば20秒ほどであった。
【0008】
現在の多品種小ロットの折曲げ加工が要望される中にあって、生産性を向上させるには折曲げ加工機の稼働率を上げることが必須である。しかしながら、上述したように金型交換時間がかかると、機械停止時間が増えて生産性が低下してしまうので、高速交換可能なATCが必要になる。但し、内蔵式の金型交換装置では、例えば金型損傷等の不意なアクシデントによるリカバリーが非常に大変になるので、あくまでも外段取り方式の高速ATCが望ましい。
【0009】
この発明は上述の課題を解決するためになされたもので、その目的は、金型交換時間を少なくして折曲げ加工の生産性を向上すべく高速で金型交換を可能とする折曲げ加工機を提供することにある。
【0010】
【課題を解決するための手段】
本発明は、前述のごとき問題に鑑みてなされたもので、左右方向に長いボトムダイ(19)を上部に備えた下部フレーム前板(17)の上方に、前記ボトムダイ(19)と対向してワークを押圧固定するトップダイ(23)を下部に交換可能に備えた上部フレーム前板(21)を上下動可能に備え、前記ボトムダイ(19)とトップダイ(23)によって固定されたワークの折曲げ加工を行う曲げ金型(35)を上下動可能に備え、前記トップダイ(23)として左右方向の中央部に交換可能なセンタ金型(C)を備え、このセンタ金型(C)の左右両側部に複数の分割金型を左右方向へ移動可能に備え、かつ前記センタ金型(C)の交換を行うための金型交換装置(55)を左右方向の中央部に備えた折曲げ加工機において、前記金型交換装置(55)によって交換される複数のセンタ金型を収納するセンタ金型収納部を左右方向に長くかつ複数段に備えたセンタ金型収納ラック(57)を、前記上部フレーム前板(21)に左右方向へ移動可能に備えていることを特徴とするものである。
【0022】
【発明の実施の形態】
以下、本発明の折曲げ加工方法及びその装置の実施の形態について、しごき折曲げ加工機を例にとって図面を参照して説明する。
【0023】
図3を参照するに、本実施の形態に係る折曲げ加工機1の前側にはワークテーブル装置3が配置されている。ワークテーブル装置3はすでに例えば特開平1−309729号公報などで知られているように公知であるから、詳細な説明を省略するが、ワークテーブル装置3(マニピュレータ)のワークテーブル5上にワークが搬入されて載置される。ワークテーブル装置3に備えられたワーククランプ装置7でワークをクランプすると共に、ワーク旋回装置9で必要に応じて旋回されるものである。
【0024】
したがって、ワークテーブル5上に搬入されて載置されたワークは、ワークのほぼ真中をワーククランプ装置7でクランプされて折曲げ加工機1側へ必要な移動量だけ移動されることにより、ワークの一辺に折曲げ加工が行われる。次いで、ワークを後退させると共にワーク旋回装置9で例えば90度旋回させた後、前進させてワークの他辺に折曲げ加工が行われる。上述の要領でワークの四辺に折曲げ加工が行われることにより、例えば箱形状の曲げ製品が得られるのである。
【0025】
折曲げ加工機1は下部フレーム11を備えており、この下部フレーム11の上方には枢軸13を支点として上部フレーム15が図3において上下方向へ揺動自在に設けられている。
【0026】
下部フレーム11の前部(図3において左部)には下部フレーム前板17が画定されており、この下部フレーム前板17上には左右方向(図3において紙面に対して直交した方向)へ延伸した固定金型としてのボトムダイ19が設けられている。上部フレーム15の前部には上部フレーム前板21が固定されており、この上部フレーム前板21の下部はボトムダイ19と対向した可動金型としての交換可能なトップダイ23が設けられている。このトップダイ23のほぼ中央部には図4に示されているようにセンタ金型装着部25が設けられている。
【0027】
上部フレーム15の上部には例えばクランク軸27を備えた上下動駆動機構27が設けられている。この上下動駆動機構27には上記のクランク軸27を回転駆動する駆動モータ(図示省略)が設けられている。上下動機構27にはクランク軸27のクランク部29にコネクティングアーム31の一端が軸承されていると共にコネクティングアーム31の他端が下部フレーム前板17に枢軸33でもって装着されている。
【0028】
上記構成により、駆動モータを駆動せしめると、クランク軸27が回転されるのでクランク部29が回転される。このクランク部29の回転によりコネクティングアーム31が枢軸33を支点として揺動し、コネクティングアーム31の上端のクランク部29の回転に伴ってクランク軸27が上下動するので、上部フレーム15が上下動する。上部フレーム15が下降されることにより、上部フレーム前板21を介してトップダイ23が下降されることになる。したがって、ボトムダイ19上に載置されたワークは、トップダイ23の下降で、ボトムダイ19とトップダイ23との協働で押圧固定されることとなる。
【0029】
下部フレーム11,上部フレーム15にはそれぞれ回動可能な上曲げ金型35Uと下曲げ金型35Dを備えた曲げ金型35が設けられている。この曲げ金型35にはベンドビーム37の一端が設けられており、このベンドビーム37の他端が前後動(図3において左右動)自在な曲げフレーム39に設けられている。ベンドビーム37が上下動される駆動機構はすでに公知であるから説明を省略する。
【0030】
上記構成により、ボトムダイ19とトップダイ23とで押圧固定されたワークに、ベンドビーム37を上下方向に揺動せしめることによって、上曲げ金型35Uあるいは下曲げ金型35Dが揺動されて正曲げあるいは逆曲げの折曲げ加工が行われる。
【0031】
上部フレーム前板21の下部には、図4に示されているように、金型支持用ビーム41が設けられている。この金型支持用ビーム41の長手方向すなわち図4において左右方向におけるほぼ中央部にはセンタ金型装着部25に交換可能なセンタ金型Cが設けられている。センタ金型Cとしては例えば5mm単位毎のセンタ金型C1〜C20を備えて交換可能となっている。
【0032】
図5を参照するに、センタ金型C及びセンタ金型装着部25についてより詳しくは、センタ金型装着部25には例えばアリ溝43が設けられており、このアリ溝43に嵌合可能な嵌合部45が各センタ金型Cの上部に設けられている。なお、センタ金型装着部25の正面及び裏面には装着されたセンタ金型Cを固定するための開閉自在なシャッタ47が設けられており、センタ金型装着部25の少なくとも一方の側面には開閉自在なシャッタ49が設けられている。
【0033】
再び図4を参照するに、上記の交換可能なセンタ金型Cの左右部における金型支持用ビーム41は左側中抜き用金型L0を介してトップダイの分割金型としての例えば左側基準金型L1〜L13が、また右側中抜き金型R0を介して右側基準金型R1〜R13が設けられている。
【0034】
各左側,右側基準金型L1〜L13,R1〜R13の上部には多数の分割金型を移動せしめるための分割金型移動手段としての例えば金型選択シリンダ51が設けられている。また、金型支持用ビーム41には開閉用シリンシダ53L,53Rが備えられており、この開閉用シリンダ53L,53Rを作動させて各金型選択シリンダ51を選択し、作動せしめることによって、左側、右側基準金型L1〜L13、R1〜R13のうちのどれかがそれぞれ選択されて、基準金型の長さが所望の長さに決定されるものである。
【0035】
交換可能なセンタ金型Cは、上部フレーム前板21のほぼ中央部に設けられた金型交換装置55で交換される。
【0036】
次に、この実施の形態の主要部を構成する金型交換装置55について説明する。
【0037】
図1を併せて参照するに、センタ金型Cの各種交換用センタ金型C1〜C20の例えば20個はセンタ金型装着部25の上方における上部フレーム前板21に取付けられたセンタ金型収納部としての例えばセンタ金型収納ラック57に収納されている。このセンタ金型収納ラック57は交換用のセンタ金型Cが2段に収納されるように構成されており、上部フレーム前板21にリニアガイド59を介してX方向(図1において左右方向)に移動可能であり、所望のセンタ金型Cを所定の交換位置に移動するために図示せざる駆動手段としてのサーボモータ等によりX方向に移動位置決め自在に設けられている。
【0038】
また、上部フレーム前板21には、センタ金型収納ラック57の交換用センタ金型Cnと前記センタ金型装着部25の使用済みセンタ金型Cwとを交換すべく上下方向に移動せしめるためのセンタ金型移動装置61が設けられている。このセンタ金型移動装置61としては、図1において上下方向に延伸されたベースフレーム63が上部フレーム前板21のX方向のほぼ中央位置に取付けられ、このベースフレーム63の前面にはL字形状をなす昇降駆動部65が図示せざる駆動手段としてのサーボモータ等によりリニアガイド67を介してZ方向(図1において上下方向)に移動位置決め自在に設けられている。したがって、センタ金型装着・脱着位置、ラック交換位置の上部と下部の3位置に位置決めされる。
【0039】
また、ベースフレーム63の前面には後述するセンタ金型交換ユニット69の交換金型チャック部材71及びセンタ金型Cが挿通可能な挿通穴部73が設けられている。さらに、ベースフレーム63の両側面にはセンタ金型収納ラック57がX方向に通過可能な開口部75が設けられている。
【0040】
また、昇降駆動部65の下面にはセンタ金型交換ユニット69が設けられており、このセンタ金型交換ユニット69の交換金型チャック部材71には交換すべき使用済みセンタ金型Cwをセンタ金型装着部25から取り外すための金型脱着用把持部としての例えばセンタ金型脱着爪77と、次に使用される交換用センタ金型Cnをセンタ金型装着部25に装着するための金型装着用把持部としての例えばセンタ金型装着爪79が備えられている。
【0041】
より詳しくは、ユニットベース81が昇降駆動部65の下面に図示せざる駆動手段としてのサーボモータ等によりリニアガイド83を介してY方向(X、Z方向に対して直交する前後方向)に移動位置決め自在に設けられており、前記ユニットベース81の下面には平板状の交換金型チャック部材71がほぼ水平方向に旋回軸85により旋回自在に設けられており、センタ金型脱着爪77とセンタ金型装着爪79が交換金型チャック部材71の両端に設けられている。なお、センタ金型脱着爪77とセンタ金型装着爪79は上記の旋回軸85を対称に位置している。
【0042】
したがって、センタ金型交換ユニット69としては、センタ金型脱着爪77とセンタ金型装着爪79とを切り換えるべく旋回自在で、上記の各把持用の爪77,79がセンタ金型装着部25に向けて前後動可能に構成されている。
【0043】
なお、図1のセンタ金型Cの装着部の構造は、図5に示すセンタ金型Cの構造とは異なっており、図1ではアリ溝になっており、これに伴ってセンタ金型装着部25が上記のアリ溝に挿入可能な形状になっている。上記のセンタ金型交換ユニット69の各把持用の爪77,79も同様に、センタ金型Cの装着部のアリ溝を把持する形状になっている。
【0044】
上記構成により、センタ金型Cの交換動作を説明する。
【0045】
図2(A)を併せて参照するに、折曲げ加工機でワークを折曲げ加工中は、センタ金型移動装置61が上昇して、予め次に使用される交換用センタ金型Cをセンタ金型収納ラック57からセンタ金型交換ユニット69に備えたセンタ金型装着爪79で把持し、トップダイ23に近い上方位置で待機している。このときの交換用センタ金型Cは横向きにされた状態である。
【0046】
なお、センタ金型収納ラック57から所望の交換用センタ金型Cnが選定されてセンタ金型交換ユニット69で把持される工程としては、所望の交換用センタ金型Cnがベースフレーム63の挿通穴部73の後方の金型交換位置に位置するように、センタ金型収納ラック57がX方向に移動位置決めされる。一方、センタ金型移動装置61の昇降駆動部65が上昇してセンタ金型交換ユニット69のセンタ金型装着爪79が前記交換用センタ金型Cnの位置に移動位置決めされる。
【0047】
ユニットベース81が所望の交換用センタ金型Cに向けてY方向に前進し、交換金型チャック部材71が挿通穴部73を通過してセンタ金型装着爪79により所望の交換用センタ金型Cnが把持される。ユニットベース81が後退することにより交換用センタ金型Cnが挿通穴部73を通過して昇降駆動部65の下側に把持された状態となる。次いで、昇降駆動部65が下降してから、交換金型チャック部材71が90°旋回し、前述したように交換用センタ金型Cnは横向きにされた状態で待機する。
【0048】
図2(B)を参照するに、折曲げ加工終了後に、ユニットベース81が図においてY方向の左側へ後退し、交換金型チャック部材71が後退する。これと同時に、ワークはワークテーブル装置3により後方へ搬出される。この時から金型交換動作の開始となり、この後退動作の所要時間は例えば1秒である。
【0049】
図2(C)を参照するに、昇降駆動部65が下降してセンタ金型交換ユニット69を下降せしめ、交換金型チャック部材71がセンタ金型装着部25と同じ高さに位置する。これと同時に、交換金型チャック部材71が90°旋回されてセンタ金型脱着爪77がセンタ金型装着部25に向けた側の前方に位置し、交換用センタ金型Cnは交換金型チャック部材71の後方に位置する。この動作の所要時間は例えば1秒で、累積時間は1.5秒である。
【0050】
図2(D)を参照するに、ユニットベース81が図2(D)においてY方向の右側へ前進し、センタ金型脱着爪77がセンタ金型装着部25の使用済みセンタ金型Cwを把持する。この動作の所要時間は例えば1秒で、累積時間は2.5秒である。
【0051】
次いで、ユニットベース81が図2(D)においてY方向の左側へ後退し、センタ金型脱着爪77がセンタ金型装着部25の使用済みセンタ金型Cwを抜脱する。この動作の所要時間は例えば1秒で、累積時間は3.5秒である。
【0052】
図2(E)を参照するに、交換金型チャック部材71が180°旋回されてセンタ金型装着爪79の交換用センタ金型Cnがセンタ金型装着部25に向けた側の前方に位置し、使用済みセンタ金型Cwは交換金型チャック部材71の後方に位置する。この旋回動作の所要時間は例えば0.5秒で、累積時間は4.0秒である。
【0053】
図2(F)を参照するに、ユニットベース81が図2(F)においてY方向の右側へ前進し、センタ金型装着爪79の交換用センタ金型Cnがセンタ金型装着に装着される。この動作の所要時間は例えば1秒で、累積時間は5.0秒である。
【0054】
図2(G)を参照するに、ユニットベース81が図2(G)においてY方向の左側へ後退する。この動作の所要時間は例えば1秒で、累積時間は6.0秒である。次いで、二点鎖線で示されているように昇降駆動部65が上昇してセンタ金型交換ユニット69を上昇せしめ、センタ金型脱着爪77の使用済みセンタ金型Cwがセンタ金型収納ラック57へ収める動作が行われる。なお、昇降駆動部65が上昇した時点で、ワークがワークテーブル装置3により折曲げ加工機に搬入され、折曲げ加工が開始されるので、センタ金型C交換の工程が終了する。上記の上昇動作の所要時間は例えば1秒で、累積時間は7.0秒である。
【0055】
以上のように、この発明の実施の形態の金型交換方法ではセンタ金型C交換の所要時間は7秒となるが、この3割程度の幅を持たせたとしても、9秒程度になるので、従来の所要時間の例えば20秒と比較すると、大幅に短縮され、折曲げ加工の生産性が向上することになる。
【0056】
図6を参照するに、前述した実施の形態のセンタ金型交換ユニット69では、交換金型チャック部材71の長さ方向の一端にセンタ金型脱着爪77を設け、他端にセンタ金型装着爪79を設け、さらにセンタ金型脱着爪77とセンタ金型装着爪79とのほぼ中央の旋回軸85で旋回するように構成されているが、この図6が示す他の実施の形態のセンタ金型交換ユニット69としては、上記と同様の構造のセンタ金型脱着爪87とセンタ金型装着爪89が交換金型チャック部材91の一端側にほぼ水平方向に並列に設けられており、交換金型チャック部材91自体がY方向に前後動するよう構成されている。
【0057】
この場合は、センタ金型脱着爪87とセンタ金型装着爪89がそれぞれ、センタ金型装着部25に向けて移動されるようにするために、交換金型チャック部材91がセンタ金型装着部25に対して左右方向(X方向)に移動位置決めする必要がある。そのためには、前述したセンタ金型移動装置61のベースフレーム63が全体として例えばリニアガイドを介して上部フレーム前板21の前面に左右方向(X方向)に移動自在に設けられても構わない。あるいは、交換金型チャック部材91自体がセンタ金型装着部25に対して左右方向(X方向)に移動位置決め自在に設けられても構わない。
【0058】
また、上述したようにセンタ金型移動装置61のベースフレーム63が上部フレーム前板21の前面に全体として左右方向(X方向)に移動自在に設けられた場合は、前述した実施の形態のセンタ金型収納ラック57が上部フレーム前板21に固定されていても構わない。
【0059】
次に、この発明の他の実施の形態の金型交換装置93について、前述した実施の形態の金型交換装置55と同様の部分は同符号にて説明する。
【0060】
図7を参照するに、金型交換装置93においてセンタ金型収納部としての例えばセンタ金型収納ラック57は、図7では多段式で5段が設けられており、各段には3ポジションの交換用のセンタ金型Cが収納されており、所望の交換用センタ金型Cnを所定の交換位置に移動するために、上部フレーム前板21にリニアガイド59を介してX方向(図7において左右方向)に移動位置決め自在に設けられている。
【0061】
また、上部フレーム前板21にはセンタ金型移動装置95が設けられており、図7において上下方向に延伸されたほぼ門型形状をなすベースフレーム97が上部フレーム前板21のX方向のほぼ中央付近でリニアガイド99を介してX方向(図7において左右方向)に移動位置決め自在に設けられている。さらに、ベースフレーム97は略門型にセンタ金型収納ラック57がX方向に通過可能な開口部101が設けられている。
【0062】
前記ベースフレーム97の前面には昇降駆動部103が図示せざる駆動装置によりリニアガイド部材105を介してベースフレーム97の前面に上下方向へ延伸して設けられたガイドレール106に案内されてZ方向(図7において上下方向)に移動位置決め自在に設けられており、センタ金型装着・脱着位置、ラック交換位置の各段に位置決めされる。
【0063】
また、昇降駆動部103にはセンタ金型交換ユニット107が設けられており、このセンタ金型交換ユニット107は、金型脱着用把持部としての例えばセンタ金型脱着爪77をセンタ金型装着部25又はセンタ金型収納ラック57に向けてY方向に前後動自在に設けた金型脱着用ユニット109と、金型装着用把持部としての例えばセンタ金型装着爪79をセンタ金型装着部25又はセンタ金型収納ラック57に向けてY方向に前後動自在に設けた金型装着用ユニット111と、から構成され、前記金型脱着用ユニット109と金型装着用ユニット111が左右方向(X方向)に並列に配置されている。
【0064】
より詳しくは、金型脱着用ユニット109はY方向に延伸する金型脱着用ガイド体113が昇降駆動部103の図7において右側に取り付けられており、金型脱着用ガイド体113の下面には金型脱着用可動部115がガイドレール117を介してY方向に前後動自在に設けられている。一方、金型装着用ユニット111はY方向に延伸する金型装着用ガイド体119が昇降駆動部103の図7において左側に取り付けられており、金型装着用ガイド体119の下面には金型装着用可動部121がガイドレール123を介してY方向に前後動自在に設けられている。なお、金型脱着用可動部115の先端にはセンタ金型脱着爪77が備えられており、金型装着用可動部121の先端にはセンタ金型装着爪79が備えられている。
【0065】
上記構成により、センタ金型Cの交換動作を説明する。
【0066】
まず、折曲げ加工機でワークを折曲げ加工中は、センタ金型移動装置95が上昇して、予め次に使用される交換用センタ金型Cnをセンタ金型収納ラック57からセンタ金型交換ユニット107に備えたセンタ金型装着爪79で把持し、トップダイのセンタ金型装着部25に近い上方位置で待機している。
【0067】
なお、センタ金型収納ラック57から所望の交換用センタ金型Cnが選定されセンタ金型交換ユニット107に把持される工程としては、センタ金型移動装置95の昇降駆動部103が上昇してセンタ金型交換ユニット107の金型装着用ユニット111が前記交換用センタ金型Cnのあるラックの段に移動位置決めされると共に、センタ金型収納ラック57がX方向に移動位置決めされて交換用センタ金型Cnがセンタ金型装着爪79に対向するように位置する。
【0068】
金型装着用可動部121が交換用センタ金型Cnに向けてY方向に前進し、センタ金型装着爪79により前記交換用センタ金型Cnが把持される。金型装着用可動部121が後退し、前述したように昇降駆動部103が下降し、交換用センタ金型Cn並びに金型脱着用ユニット109がトップダイのセンタ金型装着部25に近い上方位置で待機する。
【0069】
折曲げ加工終了後に、ワークはワークテーブル装置3により後方へ搬出される。この時から金型交換動作が開始となり、センタ金型移動装置95の昇降駆動部103が下降し、金型脱着用ユニット109がセンタ金型装着部25に位置する。この動作の所要時間は例えば0.5秒である。
【0070】
次いで、金型脱着用ユニット109の金型脱着用可動部115がセンタ金型装着部25に向けてY方向に前進し、使用済みセンタ金型Cwがセンタ金型脱着爪77に把持される。この動作の所要時間は例えば1秒で、累積時間は1.5秒である。
【0071】
金型脱着用可動部115がY方向に後退し、使用済みセンタ金型Cwがセンタ金型装着部25から取り外される。この動作の所要時間は例えば1秒で、累積時間は2.5秒である。
【0072】
ベースフレーム97がX方向に移動して金型装着用ユニット111がセンタ金型装着部25に位置するようX方向にシフトする。この動作の所要時間は例えば1秒で、累積時間は3.5秒である。
【0073】
金型装着用可動部121がセンタ金型装着部25に向けてY方向に前進し、次に使用される交換用センタ金型Cnがセンタ金型装着部25に装着される。この動作の所要時間は例えば1秒で、累積時間は4.5秒である。
【0074】
金型装着用可動部121がY方向に後退する。この動作の所要時間は例えば1秒で、累積時間は5.5秒である。
【0075】
次いで、昇降駆動部103が上昇してセンタ金型交換ユニット107を上昇せしめ、金型脱着用ユニット109の使用済みセンタ金型Cwをセンタ金型収納ラック57へ収める動作が行われる。なお、昇降駆動部103が上昇した時点で、ワークがワークテーブル装置3により折曲げ加工機に搬入され、折曲げ加工が開始されるので、センタ金型交換の工程が終了する。上記の上昇動作の所要時間は例えば1秒で、累積時間は6.5秒である。
【0076】
以上のように、この発明の他の実施の形態の金型交換方法ではセンタ金型交換の所要時間は6.5秒となるが、これに3割程度の余裕を持たせたとしても、8.45秒程度になるので、従来の所要時間の20秒と比較すると、大幅に短縮され、折曲げ加工の生産性が向上することになる。
【0077】
なお、この発明は、前述した実施例に限定されることなく、適宜な変更を行うことにより、その他の態様で実施できるものである。
【0078】
【発明の効果】
以上のごとき発明の実施の形態の説明から理解されるように、本発明によれば、短時間でセンタ金型の交換を行うことができ、折曲げ加工の生産性を向上できる。
【図面の簡単な説明】
【図1】この発明の実施の形態の金型交換装置の斜視図である。
【図2】(A)〜(G)は、金型交換装置による金型交換の工程図である。
【図3】本発明の実施の形態で用いられる折曲げ加工機の右側面図である。
【図4】図3のおける矢視IVを示す折曲げ加工機の部分的な正面図である。
【図5】トップダイのセンタ金型装着部とセンタ金型との装着状態を説明する斜視図である。
【図6】他の実施の形態のセンタ金型交換ユニットの斜視図である。
【図7】この発明の他の実施の形態の金型交換装置の斜視図である。
【符号の説明】
1 折曲げ加工機
15 上部フレーム
19 ボトムダイ
21 上部フレーム前板
23 トップダイ
25 センタ金型装着部
35 曲げ金型
55 金型交換装置
57 センタ金型収納ラック(センタ金型収納部)
61 センタ金型移動装置
65 昇降駆動部
69 センタ金型交換ユニット
71 交換金型チャック部材
77,87 センタ金型脱着爪(金型脱着用把持部)
79,89 センタ金型装着爪(金型装着用把持部)
85 旋回軸
93 金型交換装置
95 センタ金型移動装置
103 昇降駆動部
107 センタ金型交換ユニット
109 金型脱着用ユニット
111 金型装着用ユニット
[0001]
BACKGROUND OF THE INVENTION
  This inventionFor bending machineRelated.
[0002]
[Prior art]
In a conventional mold changer for a bending machine, a center mold change unit is pivotally provided at substantially the center in the longitudinal direction of a mold support beam provided at the lower end of a vertically movable frame. ing. In addition, a mold magazine is provided on the front side of the upper frame, and a pair of drums storing a plurality of center molds are provided on both the left and right sides when the mold magazine is viewed from the front. The center arm of the center mold exchanging unit is turned to the mold exchanging position of the pair of drums and moved in the left-right direction to exchange a desired center mold.
[0003]
A top die is composed of a center die exchanged by the center die exchange unit and a plurality of divided dies slidably provided on the left and right sides of the center die, and a bottom die is opposed to the top die. Is arranged. Under the state where the work is pressed and fixed by the cooperation of the top die and the bottom die, the work protruding backward from the top die and the bottom die is bent upward or downward.
[0004]
When performing the above bending process, the center mold is selected from the mold magazine according to the bending length of the workpiece, and is attached and detached and replaced by the center mold exchanging unit, and then the bending process is performed. By the way, the above-mentioned drum-type mold magazine stores, for example, 14 molds at a pitch of 7.5 mm, and when the next mold replacement request is received, the currently set mold is stored in the drum. Then, the next mold is selected and mounted (see, for example, Patent Document 1).
[0005]
[Patent Document 1]
Japanese Unexamined Patent Publication No. 7-112215 ([0039] to [0047], FIGS. 1, 3, 7, and 8).
[0006]
[Problems to be solved by the invention]
By the way, in the conventional mold changer of a bending machine, when the center mold is replaced, the center mold currently set is stored in the drum of the drum mold magazine, and then After the center mold is selected, it is mounted on the center mold mounting portion of the top die, so that there is a problem that it takes time to replace the mold.
[0007]
For example, the currently set mold is stored in the mold magazine drum after the ATC of the automatic mold changer is moved outside and the center arm of the mold change unit is turned up. Next, the mold chuck is opened, the drum rotation is rotated, and the next center mold is clamped. The next center mold is set with the center arm pivoting down, while the ATC is moved back. The mold exchange time at this time was, for example, about 20 seconds.
[0008]
In the current demand for bending of a wide variety of small lots, it is essential to increase the operating rate of the bending machine in order to improve productivity. However, as described above, when the mold replacement time is required, the machine stop time increases and the productivity is lowered, so that an ATC capable of high-speed replacement is required. However, in a built-in mold exchanging apparatus, recovery due to an unexpected accident such as mold damage becomes very difficult, so an external setup high-speed ATC is desirable.
[0009]
  The present invention has been made to solve the above-mentioned problems, and its object is to enable high-speed mold replacement in order to reduce mold replacement time and improve bending productivity.Folding machineIt is to provide.
[0010]
[Means for Solving the Problems]
  The present invention has been made in view of the above-described problems. A workpiece facing the bottom die (19) is disposed above a lower frame front plate (17) provided with a bottom die (19) that is long in the left-right direction. An upper frame front plate (21) having a top die (23) that presses and fixes the upper die so as to be exchangeable at the lower portion is provided so as to be movable up and down, and the workpiece fixed by the bottom die (19) and the top die (23) is bent A bending die (35) for processing is provided so as to be movable up and down, and a replaceable center die (C) is provided as the top die (23) at the center in the left-right direction. Bending process including a plurality of divided molds on both sides so as to be movable in the left-right direction, and a mold exchanging device (55) for exchanging the center mold (C) at the center in the left-right direction. In the machine, the mold change A center mold storage rack (57) provided with a plurality of center mold storage sections that store a plurality of center molds to be exchanged by the device (55) in the left-right direction is provided in the upper frame front plate (21). It is characterized in that it can be moved in the left-right direction.
[0022]
DETAILED DESCRIPTION OF THE INVENTION
DESCRIPTION OF THE PREFERRED EMBODIMENTS Embodiments of a bending method and apparatus according to the present invention will be described below with reference to the drawings by taking an iron bending machine as an example.
[0023]
Referring to FIG. 3, a work table device 3 is disposed on the front side of the bending machine 1 according to the present embodiment. Since the work table device 3 is known as already known, for example, in Japanese Patent Laid-Open No. 1-309729, a detailed description is omitted, but a work is placed on the work table 5 of the work table device 3 (manipulator). It is loaded and placed. The workpiece is clamped by a workpiece clamping device 7 provided in the workpiece table device 3 and is turned by a workpiece turning device 9 as necessary.
[0024]
Therefore, the work carried in and placed on the work table 5 is clamped by the work clamping device 7 in the middle of the work and moved to the bending machine 1 side by a necessary amount of movement. Bending is performed on one side. Next, the work is moved backward and turned by, for example, 90 degrees by the work turning device 9 and then moved forward to bend the other side of the work. For example, a box-shaped bent product can be obtained by bending the four sides of the workpiece in the manner described above.
[0025]
The bending machine 1 includes a lower frame 11, and an upper frame 15 is provided above the lower frame 11 so as to be swingable in the vertical direction in FIG.
[0026]
A lower frame front plate 17 is demarcated at the front portion (left portion in FIG. 3) of the lower frame 11, and on the lower frame front plate 17 in the left-right direction (a direction orthogonal to the paper surface in FIG. 3). A bottom die 19 is provided as an extended fixed mold. An upper frame front plate 21 is fixed to the front portion of the upper frame 15, and a replaceable top die 23 as a movable mold facing the bottom die 19 is provided at the lower portion of the upper frame front plate 21. As shown in FIG. 4, a center mold mounting portion 25 is provided at a substantially central portion of the top die 23.
[0027]
On the upper part of the upper frame 15, for example, a vertical movement drive mechanism 27 including a crankshaft 27 is provided. This vertical movement drive mechanism 27 is provided with a drive motor (not shown) for rotating the crankshaft 27. In the vertical movement mechanism 27, one end of a connecting arm 31 is supported on the crank portion 29 of the crankshaft 27, and the other end of the connecting arm 31 is mounted on the lower frame front plate 17 with a pivot 33.
[0028]
With the above configuration, when the drive motor is driven, the crankshaft 27 is rotated, so that the crank portion 29 is rotated. The rotation of the crank portion 29 causes the connecting arm 31 to swing about the pivot 33, and the crankshaft 27 moves up and down with the rotation of the crank portion 29 at the upper end of the connecting arm 31, so that the upper frame 15 moves up and down. . When the upper frame 15 is lowered, the top die 23 is lowered via the upper frame front plate 21. Therefore, the work placed on the bottom die 19 is pressed and fixed by the cooperation of the bottom die 19 and the top die 23 when the top die 23 is lowered.
[0029]
Each of the lower frame 11 and the upper frame 15 is provided with a bending die 35 having a rotatable upper bending die 35U and a lower bending die 35D. The bending die 35 is provided with one end of a bend beam 37, and the other end of the bend beam 37 is provided on a bending frame 39 that can freely move back and forth (left and right in FIG. 3). Since the drive mechanism for moving the bend beam 37 up and down is already known, the description thereof is omitted.
[0030]
With the above configuration, the upper bend die 35U or the lower bend die 35D is oscillated forwardly by causing the bend beam 37 to oscillate in the vertical direction on the work pressed and fixed by the bottom die 19 and the top die 23. Alternatively, reverse bending is performed.
[0031]
As shown in FIG. 4, a die support beam 41 is provided at the lower portion of the upper frame front plate 21. A center mold C replaceable with the center mold mounting portion 25 is provided in a longitudinal direction of the mold support beam 41, that is, in a substantially central portion in the left-right direction in FIG. As the center mold C, for example, center molds C1 to C20 in units of 5 mm are provided and can be exchanged.
[0032]
Referring to FIG. 5, the center mold C and the center mold mounting portion 25 will be described in more detail. For example, the center mold mounting portion 25 is provided with a dovetail groove 43, and can be fitted into the dovetail groove 43. A fitting portion 45 is provided on the upper portion of each center mold C. An openable / closable shutter 47 for fixing the mounted center mold C is provided on the front surface and the back surface of the center mold mounting section 25, and at least one side surface of the center mold mounting section 25 is provided. A shutter 49 that can be freely opened and closed is provided.
[0033]
Referring to FIG. 4 again, the mold support beams 41 at the left and right portions of the replaceable center mold C are, for example, the left reference mold as a split mold of the top die through the left hollow mold L0. The molds L1 to L13 are provided with the right reference molds R1 to R13 via the right hollow mold R0.
[0034]
For example, a mold selection cylinder 51 as a split mold moving means for moving a large number of split molds is provided above each of the left and right reference molds L1 to L13 and R1 to R13. The mold support beam 41 is provided with open / close cylinders 53L, 53R. By operating the open / close cylinders 53L, 53R to select and operate the respective mold selection cylinders 51, the left side, Any one of the right reference molds L1 to L13 and R1 to R13 is selected, and the length of the reference mold is determined to be a desired length.
[0035]
The replaceable center mold C is replaced by a mold exchanging device 55 provided substantially at the center of the upper frame front plate 21.
[0036]
Next, the mold exchanging device 55 constituting the main part of this embodiment will be described.
[0037]
Referring also to FIG. 1, for example, 20 of the various replacement center molds C1 to C20 of the center mold C are stored in the center mold mounted on the upper frame front plate 21 above the center mold mounting portion 25. For example, it is stored in a center mold storage rack 57 as a part. The center mold storage rack 57 is configured so that replacement center molds C are stored in two stages, and is arranged in the X direction (left and right direction in FIG. 1) via the linear guide 59 on the upper frame front plate 21. In order to move a desired center mold C to a predetermined replacement position, it can be moved and positioned in the X direction by a servo motor or the like as a driving means (not shown).
[0038]
The upper frame front plate 21 is moved up and down to exchange the replacement center mold Cn of the center mold storage rack 57 and the used center mold Cw of the center mold mounting portion 25. A center mold moving device 61 is provided. As the center mold moving device 61, a base frame 63 extending in the vertical direction in FIG. 1 is attached to a substantially central position in the X direction of the upper frame front plate 21, and an L-shape is formed on the front surface of the base frame 63. A lift drive unit 65 is provided so as to be movable and positionable in the Z direction (vertical direction in FIG. 1) via a linear guide 67 by a servo motor or the like as drive means (not shown). Therefore, it is positioned at the upper and lower positions of the center mold mounting / removal position and the rack replacement position.
[0039]
Further, a replacement mold chuck member 71 of a center mold replacement unit 69 described later and an insertion hole 73 through which the center mold C can be inserted are provided on the front surface of the base frame 63. Further, openings 75 through which the center mold storage rack 57 can pass in the X direction are provided on both side surfaces of the base frame 63.
[0040]
In addition, a center mold exchanging unit 69 is provided on the lower surface of the elevation drive unit 65, and the used center mold Cw to be exchanged is replaced by a center mold on the exchange mold chuck member 71 of the center mold exchanging unit 69. For example, a center mold attaching / detaching claw 77 as a mold attaching / detaching gripping part for removing from the mold attaching part 25 and a mold for attaching the replacement center mold Cn to be used next to the center mold attaching part 25. For example, a center mold mounting claw 79 as a mounting gripping part is provided.
[0041]
More specifically, the unit base 81 is moved and positioned in the Y direction (front-rear direction orthogonal to the X and Z directions) via the linear guide 83 by a servo motor or the like as a driving means (not shown) on the lower surface of the elevating drive unit 65. On the lower surface of the unit base 81, a flat plate-shaped exchange mold chuck member 71 is pivoted in a substantially horizontal direction by a pivot shaft 85, and a center mold detachment claw 77 and a center mold are provided. Mold mounting claws 79 are provided at both ends of the replacement mold chuck member 71. The center mold attaching / detaching claw 77 and the center mold attaching claw 79 are positioned symmetrically with respect to the turning shaft 85 described above.
[0042]
Therefore, the center mold exchanging unit 69 is pivotable so as to switch between the center mold attaching / detaching claw 77 and the center mold attaching claw 79, and the gripping claws 77, 79 are attached to the center mold attaching part 25. It is configured to be able to move back and forth.
[0043]
1 is different from the structure of the center mold C shown in FIG. 5, and has a dovetail groove in FIG. 1, and the center mold is attached accordingly. The portion 25 has a shape that can be inserted into the dovetail. Similarly, the gripping claws 77 and 79 of the center mold exchanging unit 69 are configured to grip the dovetail groove of the mounting portion of the center mold C.
[0044]
The replacement operation of the center mold C will be described with the above configuration.
[0045]
Referring also to FIG. 2 (A), while the workpiece is being bent by the bending machine, the center mold moving device 61 is lifted to place the replacement center mold C used next in advance. It is held by the center mold mounting claw 79 provided in the center mold exchanging unit 69 from the mold storage rack 57 and stands by at an upper position near the top die 23. The replacement center mold C at this time is in a state of being turned sideways.
[0046]
As a process of selecting a desired replacement center mold Cn from the center mold storage rack 57 and gripping it by the center mold replacement unit 69, the desired replacement center mold Cn is inserted into the insertion hole of the base frame 63. The center mold storage rack 57 is moved and positioned in the X direction so as to be positioned at the mold replacement position behind the portion 73. On the other hand, the raising / lowering drive unit 65 of the center mold moving device 61 is raised, and the center mold mounting claw 79 of the center mold exchanging unit 69 is moved and positioned to the position of the replacement center mold Cn.
[0047]
The unit base 81 advances in the Y direction toward the desired replacement center mold C, and the replacement mold chuck member 71 passes through the insertion hole 73 and is inserted into the desired replacement center mold by the center mold mounting claw 79. Cn is gripped. When the unit base 81 moves backward, the replacement center mold Cn passes through the insertion hole 73 and is held under the lifting drive unit 65. Next, after the raising / lowering drive unit 65 is lowered, the replacement mold chuck member 71 is turned 90 °, and the replacement center mold Cn stands by in a state of being turned sideways as described above.
[0048]
Referring to FIG. 2B, after the bending process is completed, the unit base 81 is retracted to the left in the Y direction in the drawing, and the replacement mold chuck member 71 is retracted. At the same time, the work is carried out backward by the work table device 3. From this time, the mold exchanging operation is started, and the time required for the retreating operation is, for example, 1 second.
[0049]
Referring to FIG. 2C, the elevation drive unit 65 is lowered to lower the center die replacement unit 69, and the replacement die chuck member 71 is positioned at the same height as the center die mounting portion 25. At the same time, the replacement mold chuck member 71 is turned 90 ° so that the center mold attaching / detaching claw 77 is positioned in front of the center mold mounting portion 25 and the replacement center mold Cn is the replacement mold chuck. Located behind the member 71. The time required for this operation is, for example, 1 second, and the accumulated time is 1.5 seconds.
[0050]
Referring to FIG. 2D, the unit base 81 advances to the right in the Y direction in FIG. 2D, and the center mold attaching / detaching claw 77 grips the used center mold Cw of the center mold mounting portion 25. To do. The time required for this operation is 1 second, for example, and the accumulated time is 2.5 seconds.
[0051]
Next, the unit base 81 is retracted to the left in the Y direction in FIG. 2D, and the center mold attaching / detaching claw 77 pulls out the used center mold Cw of the center mold mounting portion 25. The time required for this operation is, for example, 1 second, and the accumulated time is 3.5 seconds.
[0052]
Referring to FIG. 2 (E), the replacement mold chuck member 71 is rotated 180 ° so that the replacement center mold Cn of the center mold mounting claw 79 is positioned in front of the side facing the center mold mounting portion 25. The used center mold Cw is positioned behind the replacement mold chuck member 71. The time required for this turning operation is 0.5 seconds, for example, and the accumulated time is 4.0 seconds.
[0053]
Referring to FIG. 2 (F), the unit base 81 advances to the right in the Y direction in FIG. 2 (F), and the replacement center mold Cn of the center mold mounting claw 79 is mounted to the center mold mounting. . The time required for this operation is, for example, 1 second, and the accumulated time is 5.0 seconds.
[0054]
Referring to FIG. 2G, the unit base 81 moves backward to the left in the Y direction in FIG. The time required for this operation is 1 second, for example, and the accumulated time is 6.0 seconds. Next, as shown by a two-dot chain line, the raising / lowering drive unit 65 rises to raise the center die replacement unit 69, and the used center die Cw of the center die attaching / detaching claw 77 becomes the center die receiving rack 57. The operation to fit is performed. Since the work is carried into the bending machine by the work table device 3 and the bending process is started when the elevating drive unit 65 is raised, the process of exchanging the center mold C is completed. The time required for the above ascending operation is, for example, 1 second, and the accumulated time is 7.0 seconds.
[0055]
As described above, in the mold exchanging method according to the embodiment of the present invention, the time required for exchanging the center mold C is 7 seconds. Even if this width is about 30%, it takes about 9 seconds. Therefore, compared with the conventional required time of, for example, 20 seconds, the time is significantly shortened, and the productivity of the bending process is improved.
[0056]
Referring to FIG. 6, in the center mold exchanging unit 69 of the above-described embodiment, a center mold attaching / detaching claw 77 is provided at one end in the length direction of the exchange mold chuck member 71 and the center mold is mounted at the other end. A claw 79 is provided, and the chamfer 79 is further pivoted by a pivot 85 at the center of the center mold attaching / detaching claw 77 and the center mold mounting claw 79. The center of another embodiment shown in FIG. As the mold exchanging unit 69, a center mold attaching / detaching claw 87 and a center mold attaching claw 89 having the same structure as described above are provided on one end side of the exchange mold chuck member 91 in parallel in a substantially horizontal direction. The mold chuck member 91 itself is configured to move back and forth in the Y direction.
[0057]
In this case, the replacement mold chuck member 91 is arranged so that the center mold attaching / detaching claw 87 and the center mold attaching claw 89 are moved toward the center mold attaching part 25, respectively. 25, it is necessary to move and position in the left-right direction (X direction). For this purpose, the base frame 63 of the center mold moving device 61 described above may be provided so as to be movable in the left-right direction (X direction) on the front surface of the upper frame front plate 21 as a whole via a linear guide, for example. Alternatively, the replacement mold chuck member 91 itself may be provided so as to be movable and positionable in the left-right direction (X direction) with respect to the center mold mounting portion 25.
[0058]
Further, as described above, when the base frame 63 of the center mold moving device 61 is provided on the front surface of the upper frame front plate 21 as a whole so as to be movable in the left-right direction (X direction), the center of the above-described embodiment. The mold storage rack 57 may be fixed to the upper frame front plate 21.
[0059]
Next, in the mold exchanging apparatus 93 according to another embodiment of the present invention, the same parts as those of the mold exchanging apparatus 55 according to the above-described embodiment will be described with the same reference numerals.
[0060]
Referring to FIG. 7, for example, a center mold storage rack 57 as a center mold storage unit in the mold exchanging apparatus 93 is multistage in FIG. 7 and is provided with five stages, and each stage has three positions. A replacement center mold C is accommodated, and in order to move a desired replacement center mold Cn to a predetermined replacement position, the upper frame front plate 21 is moved in the X direction (in FIG. 7 through a linear guide 59). It is provided so that it can be moved and positioned in the left-right direction).
[0061]
Further, the upper frame front plate 21 is provided with a center mold moving device 95, and a base frame 97 having a substantially gate shape extending in the vertical direction in FIG. Near the center, the linear guide 99 is provided so as to be movable and positionable in the X direction (left and right in FIG. 7). Furthermore, the base frame 97 is provided with an opening 101 through which the center mold storage rack 57 can pass in the X direction in a substantially gate shape.
[0062]
An elevating drive unit 103 is guided on a front surface of the base frame 97 by a guide device 106 which extends vertically from the front surface of the base frame 97 via a linear guide member 105 by a driving device (not shown). It can be moved and positioned in the vertical direction (in FIG. 7), and is positioned at each stage of the center die mounting / removal position and rack replacement position.
[0063]
Further, the elevating drive unit 103 is provided with a center mold exchanging unit 107. The center mold exchanging unit 107 includes, for example, a center mold attaching / detaching claw 77 serving as a mold attaching / detaching gripping part. 25, or a mold detaching unit 109 provided so as to be movable back and forth in the Y direction toward the center mold storage rack 57, and a center mold mounting claw 79 as a mold mounting gripping part, for example, a center mold mounting part 25. Alternatively, the mold mounting unit 111 is provided so as to be movable back and forth in the Y direction toward the center mold storage rack 57. The mold detaching unit 109 and the mold mounting unit 111 are arranged in the left-right direction (X In parallel).
[0064]
More specifically, in the mold detachment unit 109, a mold detachment guide body 113 extending in the Y direction is attached to the right side in FIG. A mold detachable movable portion 115 is provided to be movable back and forth in the Y direction via a guide rail 117. On the other hand, in the mold mounting unit 111, a mold mounting guide body 119 extending in the Y direction is mounted on the left side in FIG. 7 of the lifting drive unit 103, and a mold is mounted on the lower surface of the mold mounting guide body 119. A mounting movable portion 121 is provided to be movable back and forth in the Y direction via a guide rail 123. A center mold attaching / detaching claw 77 is provided at the tip of the mold attaching / detaching movable portion 115, and a center mold attaching claw 79 is provided at the tip of the mold attaching movable portion 121.
[0065]
The replacement operation of the center mold C will be described with the above configuration.
[0066]
First, while the workpiece is being bent by the bending machine, the center mold moving device 95 is raised, and the replacement center mold Cn to be used next is exchanged from the center mold storage rack 57 to the center mold. The unit 107 is held by a center mold mounting claw 79 provided in the unit 107 and is waiting at an upper position near the center mold mounting part 25 of the top die.
[0067]
As a process of selecting a desired replacement center mold Cn from the center mold storage rack 57 and gripping it by the center mold replacement unit 107, the elevating drive unit 103 of the center mold moving device 95 is raised and the center mold is moved. The mold mounting unit 111 of the mold exchanging unit 107 is moved and positioned to the stage of the rack where the replacement center mold Cn is located, and the center mold receiving rack 57 is moved and positioned in the X direction to replace the center mold for replacement. The mold Cn is positioned so as to face the center mold mounting claw 79.
[0068]
The mold mounting movable portion 121 advances in the Y direction toward the replacement center mold Cn, and the replacement center mold Cn is gripped by the center mold mounting claw 79. As described above, the mold mounting movable part 121 moves backward, the lifting drive unit 103 descends, and the replacement center mold Cn and the mold detaching unit 109 are located at an upper position close to the center mold mounting part 25 of the top die. Wait at.
[0069]
After the bending process is finished, the work is carried out backward by the work table device 3. At this time, the mold exchanging operation is started, the raising / lowering drive unit 103 of the center mold moving device 95 is lowered, and the mold detaching unit 109 is positioned at the center mold mounting unit 25. The time required for this operation is, for example, 0.5 seconds.
[0070]
Next, the mold detachable movable portion 115 of the mold detachment unit 109 advances in the Y direction toward the center mold mounting portion 25, and the used center mold Cw is held by the center mold detachment claw 77. The time required for this operation is, for example, 1 second, and the accumulated time is 1.5 seconds.
[0071]
The mold attaching / detaching movable portion 115 is retracted in the Y direction, and the used center die Cw is removed from the center die attaching portion 25. The time required for this operation is 1 second, for example, and the accumulated time is 2.5 seconds.
[0072]
The base frame 97 moves in the X direction and shifts in the X direction so that the mold mounting unit 111 is positioned at the center mold mounting portion 25. The time required for this operation is, for example, 1 second, and the accumulated time is 3.5 seconds.
[0073]
The mold mounting movable part 121 advances in the Y direction toward the center mold mounting part 25, and the replacement center mold Cn to be used next is mounted on the center mold mounting part 25. The time required for this operation is, for example, 1 second, and the accumulated time is 4.5 seconds.
[0074]
The mold mounting movable part 121 moves backward in the Y direction. The time required for this operation is 1 second, for example, and the accumulated time is 5.5 seconds.
[0075]
Next, the raising / lowering drive unit 103 is raised to raise the center mold exchanging unit 107, and the operation of storing the used center mold Cw of the mold detaching unit 109 in the center mold storage rack 57 is performed. Since the work is carried into the bending machine by the work table device 3 when the elevating drive unit 103 is raised and the bending process is started, the center die replacement process is completed. The time required for the above ascending operation is 1 second, for example, and the accumulated time is 6.5 seconds.
[0076]
As described above, in the mold exchanging method according to another embodiment of the present invention, the time required for exchanging the center mold is 6.5 seconds, but even if a margin of about 30% is provided for this, Since it is about 45 seconds, it is significantly shortened compared to the conventional required time of 20 seconds, and the productivity of the bending process is improved.
[0077]
In addition, this invention is not limited to the Example mentioned above, By implementing an appropriate change, it can implement in another aspect.
[0078]
【The invention's effect】
  As can be understood from the description of the embodiments of the invention as described above,According to the present invention,The center mold can be exchanged in a short time, and the productivity of the bending process can be improved.
[Brief description of the drawings]
FIG. 1 is a perspective view of a mold exchanging apparatus according to an embodiment of the present invention.
FIGS. 2A to 2G are process diagrams of mold exchange by a mold exchange apparatus.
FIG. 3 is a right side view of a bending machine used in the embodiment of the present invention.
4 is a partial front view of the bending machine showing an arrow IV in FIG. 3. FIG.
FIG. 5 is a perspective view for explaining a mounting state between a center mold mounting portion and a center mold of a top die.
FIG. 6 is a perspective view of a center mold exchanging unit according to another embodiment.
FIG. 7 is a perspective view of a mold exchanging apparatus according to another embodiment of the present invention.
[Explanation of symbols]
1 Bending machine
15 Upper frame
19 Bottom die
21 Upper frame front plate
23 Top die
25 Center mold mounting part
35 Bending mold
55 Mold changer
57 Center mold storage rack (Center mold storage section)
61 Center mold moving device
65 Lifting drive
69 Center mold change unit
71 Replacement die chuck member
77,87 Center mold attachment / detachment claw (mold attachment / detachment gripping part)
79, 89 Center mold mounting claw (mold mounting grip)
85 Rotating axis
93 Mold changer
95 Center mold moving device
103 Lifting drive
107 Center mold change unit
109 Mold removal unit
111 Die mounting unit

Claims (1)

左右方向に長いボトムダイ(19)を上部に備えた下部フレーム前板(17)の上方に、前記ボトムダイ(19)と対向してワークを押圧固定するトップダイ(23)を下部に交換可能に備えた上部フレーム前板(21)を上下動可能に備え、前記ボトムダイ(19)とトップダイ(23)によって固定されたワークの折曲げ加工を行う曲げ金型(35)を上下動可能に備え、前記トップダイ(23)として左右方向の中央部に交換可能なセンタ金型(C)を備え、このセンタ金型(C)の左右両側部に複数の分割金型を左右方向へ移動可能に備え、かつ前記センタ金型(C)の交換を行うための金型交換装置(55)を左右方向の中央部に備えた折曲げ加工機において、前記金型交換装置(55)によって交換される複数のセンタ金型を収納するセンタ金型収納部を左右方向に長くかつ複数段に備えたセンタ金型収納ラック(57)を、前記上部フレーム前板(21)に左右方向へ移動可能に備えていることを特徴とする折曲げ加工機。A top die (23) that presses and fixes the workpiece opposite to the bottom die (19) is provided above the lower frame front plate (17) having a bottom die (19) that is long in the left-right direction at the top, and is replaceable at the bottom. The upper frame front plate (21) is provided to be movable up and down, and a bending die (35) for bending the workpiece fixed by the bottom die (19) and the top die (23) is provided to be movable up and down. The top die (23) is provided with a replaceable center die (C) at the center in the left-right direction, and a plurality of divided dies are provided on the left and right sides of the center die (C) so as to be movable in the left-right direction. In a bending machine provided with a mold exchanging device (55) for exchanging the center mold (C) at the center in the left-right direction, a plurality of exchanging units are performed by the mold exchanging device (55). Collect the center mold A center mold storage rack (57) having a plurality of center mold storage sections that are long in the left-right direction is provided on the upper frame front plate (21) so as to be movable in the left-right direction. Bending machine.
JP2003044069A 2003-02-21 2003-02-21 Bending machine Expired - Fee Related JP4106290B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2003044069A JP4106290B2 (en) 2003-02-21 2003-02-21 Bending machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2003044069A JP4106290B2 (en) 2003-02-21 2003-02-21 Bending machine

Publications (2)

Publication Number Publication Date
JP2004249349A JP2004249349A (en) 2004-09-09
JP4106290B2 true JP4106290B2 (en) 2008-06-25

Family

ID=33026884

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2003044069A Expired - Fee Related JP4106290B2 (en) 2003-02-21 2003-02-21 Bending machine

Country Status (1)

Country Link
JP (1) JP4106290B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106424235A (en) * 2016-10-28 2017-02-22 安徽鲲鹏装备模具制造有限公司 Multi-die-head driven numerical control bending machine

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7272840B2 (en) * 2019-03-26 2023-05-12 コマツ産機株式会社 punch press machine

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106424235A (en) * 2016-10-28 2017-02-22 安徽鲲鹏装备模具制造有限公司 Multi-die-head driven numerical control bending machine

Also Published As

Publication number Publication date
JP2004249349A (en) 2004-09-09

Similar Documents

Publication Publication Date Title
JP4558852B2 (en) Mold and mold changer
US7213430B2 (en) Tube bending machine and its right and/or left bending device
JP4106290B2 (en) Bending machine
JP2023153124A (en) Mold storage device and bending work system
JP4465712B2 (en) Machine Tools
JP3485688B2 (en) Die changing equipment in bending equipment
JP3268909B2 (en) Mold changing device of bending machine
JP4048893B2 (en) Press brake
JP2005319491A (en) Apparatus and method for changing die
JPH0157969B2 (en)
JP2004136412A (en) Tool replacing device in machine tool
JP2523080Y2 (en) Die holding device in punch press equipped with die changing device
JPH067851A (en) Device for storing and changing die in bending machine
JP2818463B2 (en) Band sawing machine with automatic band saw blade changing device
JP2004237287A (en) Center die replacing apparatus in ironing and bending machine
JP3126167B2 (en) Turret punch press and composite turret punch press
JP2593813Y2 (en) Press machine
JP4460240B2 (en) Center mold changer in iron bending machine
JP2818465B2 (en) Band sawing machine with automatic band saw blade changing device
JP3295248B2 (en) Bending equipment
JP4152524B2 (en) Bending machine
JPH10109119A (en) Device for separating die
JPH04238633A (en) Device for transferring transfer press
JP2626723B2 (en) Automatic tool changer
JP2523075Y2 (en) Replacement mold storage device

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20060131

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20071128

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20071211

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20080206

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20080325

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20080331

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110404

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110404

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120404

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130404

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140404

Year of fee payment: 6

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

LAPS Cancellation because of no payment of annual fees