pipe
concrete
concrete pump
joint
support arm
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP09223399A
Other languages
Japanese (ja)
Other versions
JP2000282686A (en
Inventor
信行 三浦
昌樹 西村
Original Assignee
石川島建機株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 石川島建機株式会社 filed Critical 石川島建機株式会社
Priority to JP09223399A priority Critical patent/JP4051647B2/en
Publication of JP2000282686A publication Critical patent/JP2000282686A/en
Application granted granted Critical
Publication of JP4051647B2 publication Critical patent/JP4051647B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/02Conveying or working-up concrete or similar masses able to be heaped or cast
    • E04G21/04Devices for both conveying and distributing
    • E04G21/0418Devices for both conveying and distributing with distribution hose
    • E04G21/0436Devices for both conveying and distributing with distribution hose on a mobile support, e.g. truck

Description

【0001】
【発明の属する技術分野】
本発明はコンクリートポンプによるコンクリート打設作業の終了後にコンクリート輸送用配管の洗浄作業を行う際に取り外すようにしてある配管を支持するための配管支持装置に関するものである。
【0002】
【従来の技術】
たとえば、コンクリート輸送用配管をブームに沿わせて支持させた型式のブーム付コンクリートポンプ車は、従来より高所へのコンクリート打設、遠隔地へのコンクリート打設において広く採用されている。
【0003】
ブーム付コンクリートポンプ車は、図3にその一例の概略を示す如く、車体のデッキ1上に、コンクリートホッパ2と該ホッパ2内にあるコンクリートを吸入して吐出するように作動するコンクリートポンプ3を搭載し、且つ旋回テーブル4を旋回自在に載置して、該旋回テーブル4上に、たとえば、3段連結構造とした多段式のブーム5を起伏可能に装備させ、更に、上記コンクリートポンプ3によってホッパ2内から吸入して吐出されたコンクリートを輸送するためのコンクリート輸送用配管7を、コンクリートポンプ3からデッキ1に沿わせた後、上記各段のブーム5に沿わせて支持させ、該コンクリート輸送用配管7の先端に接続した可撓性を有するホース6を、最上段のブーム5の先端より垂下させ、更に、該ホース6に先端ホース8を接続し、該先端ホース8の先端吐出口をコンクリート打設個所まで導いてコンクリートを打設するようにしてある。
【0004】
かかるブーム付コンクリートポンプ車でブーム5に沿わせてあるコンクリート輸送用配管7内を通しコンクリートを圧送させることによりコンクリートの打設作業を行った場合、該作業の終了時毎に、上記コンクリート輸送用配管7内の残留コンクリートを排出させるための洗浄が必要となる。
【0005】
従来、上記コンクリート輸送用配管7の洗浄は、コンクリート輸送用配管7の基端側を取り外してスポンジ等による詰物をした後、空気圧縮機から導いた圧縮空気又は水ポンプから圧送される圧力水を上記コンクリート輸送用配管7に導入することにより、上記詰物を先端ホース8側へ圧送させて、コンクリート輸送用配管7内の残留コンクリートを押し出して排出させるようにしているが、この配管洗浄作業に先立ち、上記詰物をコンクリート輸送用配管7内に挿入したり、圧縮空気や圧力水を導くための洗浄用レデューサを配管7の基端側に接続したりするために、コンクリート輸送用配管7の基端部とコンクリートポンプ3の吐出口9との間に位置する連結管としての曲り管10をコンクリートポンプ3の吐出口9から取り外すようにしている。
【0006】
上記曲り管10は、図4に示す如く、基端部に設けたフランジ12を、コンクリートポンプ3の吐出口9に設けたフランジ11に突き合わせて、継手13を用いて固定するようにしてあり、継手13を取り外すことにより曲り管10を取り外すことができるようにしてある。又、取り外した曲り管10は、再取り付けし易いように、配管支持装置14に保持させるようにしてある。該配管支持装置14は、上記吐出口9の近傍位置に一側方部へ張り出すように設けたブラケット15と、該ブラケット15にピン17により基端部を水平方向へ回動自在に取り付けた所要長さのサポートアーム16と、該サポートアーム16の先端部に曲り管10の中間部を固定保持させるように取り付けた固定バンド18と、サポートアーム16の基端部付近及びブラケット15の所要個所に設けたピン孔19及び20とからなり、継手13を取り外してサポートアーム16を二点鎖線の位置へ回動させて固定用ピンをピン孔19と20に差し込むことにより曲り管10を二点鎖線で示す如き待機位置に保持させるようにした構成としてある。
【0007】
【発明が解決しようとする課題】
ところが、上記継手13は重量が重く、その取り外し、取り付けは、作業者が中腰姿勢で継手13を保持しながら行わなければならないため、多大な労力を要し、又、取り外した継手13を一旦地面に置くようにしているため、その上げ下ろしにも労力を要することから、連結管としての曲り管10の取り外し、取り付け作業が重労働となるという問題がある。
【0008】
そこで、本発明は、継手を作業員が持ち上げたりする必要をなくして連結管の取り外し、取り付け作業に要する労力を大幅に軽減させることができるようにしようとするものである。
【0009】
【課題を解決するための手段】
本発明は、上記課題を解決するために、コンクリート輸送用配管の基端部を連結管を介して接続させるようにしてあるコンクリートポンプの吐出口の横に、所要の長さとしたサポートアームの基端部を水平方向へ回動自在に取り付け、該サポートアームの先端部に、上記連結管を固定保持させるようにしてあるコンクリートポンプの配管支持装置において、上記連結管と吐出口とを突き合わせて着脱可能に接続するための配管継手を、上記サポートアームの中間部に支持させてなる構成とする。
【0010】
連結管を取り外す場合は、配管継手による吐出口との接続を解除した後、サポートアームを外方の待機位置まで回動させることによって連結管を取り外すようにする。この際、配管継手もサポートアームと一体に移動することになる。
【0011】
又、配管継手を、連結管と吐出口の突き合わせ面に対して直角な向きとなるようにサポートアームの中間部に取り付けた支軸と、該支軸に上下方向へ開閉できるように基端部を取り付けた一対一組からなる半環形状の上下の継手部材と、該上下の継手部材の先端部同士を締結する締結部材とからなる構成とした場合は、締結部材の締結、解除により連結管の取り付け、取り外し作業を容易に行うことができるようになる。
【0012】
【発明の実施の形態】
以下、本発明の実施の形態を図面を参照して説明する。
【0013】
図1(イ)(ロ)は本発明のコンクリートポンプの配管支持装置の実施の一形態を示すもので、図4に示したと同様に、コンクリート輸送用配管7の基端部に位置する連結管としての曲り管10を接続させるようにしてあるコンクリートポンプ3の吐出口9の一側方部に、所要の長さとしたサポートアーム16の基端部を水平方向へ回動自在に取り付け、該サポートアーム16の先端部に、上記曲り管10を固定バンド18を介して固定保持させるようにしてある構成において、上記サポートアーム16の中間部に、上記曲り管10と吐出口9との突き合わせ面と平行となるような平行部16aを折り曲げ形成して、上記曲り管10と吐出口9とを突き合わせて着脱可能に接続するための配管継手21を、上記サポートアーム16の平行部16aに支持させてなる構成とする。
【0014】
詳述すると、上記配管継手21は、コンクリートポンプ3の吐出口9先端部のフランジ11と、曲り管10の基端部のフランジ12とを突き合わせた状態で受け入れて嵌合させるためのテーパ溝の如き溝25が内側面に設けてある一対一組の半環形状の上継手部材22と下継手部材23との基端部同士を、上記各フランジ11,12の突き合わせ面と直角な向きとなるようにサポートアーム16の中間平行部16aの内側に取り付けた支軸24に、上下方向へ開閉自在に取り付けて、全体を開環及び閉環状態とすることができるようにし、一方、上下の継手部材22と23の各先端部には、所定間隔で横方向に対峙する二叉状突部26と27をそれぞれ設けて、下継手部材23の二叉状突部27間に、ねじロッド28の一端部を上下方向に回動できるように枢着し、閉環状態とした際に、上記ねじロッド28の自由端側となる他端側を上方へ回動させることにより、上継手部材22の二叉状突部26間に挿入配置できるようにし、挿入後にねじロッド28の他端部に、二叉状突部26の上方からナット29を螺合させて締め付けることにより、上下の継手部材22,23を締結することができるようにしてある。
【0015】
なお、本実施の形態では、サポートアーム16に角パイプを採用し、該角パイプのホッパ2に面する側の壁部にナット30にて支軸24を取り付けるようにしており、そのため、ナット30の組み付け用の開口部31が平行部16aの外側の壁部に穿設してある。その他、図4に示したものと同一のものには同一符号が付してある。
【0016】
コンクリート輸送用配管7の洗浄作業に先立ち、曲り管10の取り外し作業を行う場合は、先ず、ねじロッド28に螺合させてあるナット29を緩めた後、該ねじロッド28を二叉状突部26間から外して下方へ回動させることにより、上下の継手部材22,23の締結を解除し、次に、図1(ロ)に一点鎖線で示す如く、上継手部材22と下継手部材23とを支軸24を中心にそれぞれ上下に回動させて配管継手21を開環状態としてコンクリートポンプ3の吐出口9と曲り管10との突き合わせ部の接続を解除し、次いで、サポートアーム16を支軸24を支点に図1(イ)に一点鎖線で示す待機位置まで水平方向へ回動させるようにすることにより、曲り管10を吐出口9から取り外してコンクリート輸送用配管7の基端側を開放させるようにする。この際、配管継手21も支軸24を介してサポートアーム16と一体化されているため曲り管10の取り外しと同時に、待機位置まで回動変位させられる。したがって、上記待機位置において、各ピン孔19,20に図示しない固定用ピンを挿入して曲り管10を固定した後、コンクリート輸送用配管7に詰物をして、該詰物の圧送による配管洗浄作業を行わせるようにする。
【0017】
配管洗浄作業の終了後は、上記手順を逆に行うことにより、曲り管10の取り付け作業を行うようにする。
【0018】
このように、配管洗浄作業に伴う曲り管10の取り外し、取り付け作業の際、コンクリートポンプ3の吐出口9と曲り管10との突き合わせ部の接続を解除した配管継手21を、取り外した曲り管10と共にサポートアーム16によって支持させることができ、これにより、従来の如く、作業員が中腰姿勢で継手を保持する必要を無くすことができて、曲り管10の取り外し、取り付け作業に要する労力を従来に比して大幅に軽減させることができ、作業者の高齢化に対しても有利となる。
【0019】
次に、図2は本発明の他の実施の形態を示すもので、図1に示したと同様な構成としてある配管サポート装置において、配管継手21の支軸24を、図4に示したと同様の直線形状のサポートアーム16の中間位置に、三角柱形状の取付部材32を介して取り付けたものである。
【0020】
本実施の形態によっても、上記実施の形態と同様の効果を得ることができ、サポートアーム16に折り曲げ加工を施さなくて済む利点がある。
【0021】
なお、本発明は上記実施の形態のみに限定されるものではなく、配管継手21の上下の継手部材22,23の先端部同士の締結手段としては図示した以外の任意の構造を採用できること、又、曲り管10を取り外す場合について説明したが、曲り管10とコンクリート輸送用配管との間に更に短管がある場合に該短管と共に取り外す場合にも適用できること、その他、本発明の要旨を逸脱しない範囲内において種々変更を加え得ることは勿論である。
【0022】
【発明の効果】
以上述べた如く、本発明のコンクリートポンプの配管支持装置によれば、コンクリート輸送用配管の基端部を連結管を介して接続させるようにしてあるコンクリートポンプの吐出口の横に、所要の長さとしたサポートアームの基端部を水平方向へ回動自在に取り付け、該サポートアームの先端部に、上記連結管を固定保持させるようにしてあるコンクリートポンプの配管支持装置において、上記連結管と吐出口とを突き合わせて着脱可能に接続するための配管継手を、上記サポートアームの中間部に支持させてなる構成としてあるので、配管洗浄作業に伴う連結管の取り外し、取り付け作業の際、コンクリートポンプの吐出口と連結管との突き合わせ部の接続を解除した配管継手を、取り外した連結管と一体にサポートアームにより支持させることができ、したがって、従来の如く、作業者が中腰姿勢で重量の重い継手を保持する必要を無くすことができて、連結管の取り外し、取り付け作業に要する労力を従来に比して大幅に軽減させることができ、又、配管継手を、連結管と吐出口の突き合わせ面に対して直角な向きとなるようにサポートアームの中間部に取り付けた支軸と、該支軸に上下方向へ開閉できるように基端部を取り付けた一対一組からなる半環形状の上下の継手部材と、該上下の継手部材の先端部同士を締結する締結部材とからなる構成とすることにより、連結管の取り付け、取り外し作業を容易に行うことができるという優れた効果を発揮する。
【図面の簡単な説明】
【図1】本発明のコンクリートポンプの配管支持装置の実施の一形態を示すもので、(イ)は概略平面図、(ロ)は一部切断概略正面図である。
【図2】本発明の実施の他の形態を示す概略平面図である。
【図3】ブーム付コンクリートポンプ車の一例の概略を示す斜視図である。
【図4】従来の配管支持装置を示す概略平面図である。
【符号の説明】
2 コンクリートホッパ
3 コンクリートポンプ
7 コンクリート輸送用配管
9 吐出口
10 曲り管(連結管)
16 サポートアーム
21 配管継手
22 上継手部材
23 下継手部材
24 支軸
28 ねじロッド(締結部材)
29 ナット(締結部材)
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a pipe support device for supporting a pipe that is to be removed when a concrete transportation pipe is cleaned after completion of a concrete placing work by a concrete pump.
[0002]
[Prior art]
For example, a boom type concrete pump truck in which a concrete transport pipe is supported along a boom has been widely used in concrete placement at a high place and concrete placement at a remote place.
[0003]
A concrete pump vehicle with a boom has a concrete hopper 2 and a concrete pump 3 that operates to suck and discharge the concrete in the hopper 2 on a deck 1 of a vehicle body, as schematically shown in FIG. The turning table 4 is mounted so as to be turnable, and a multi-stage boom 5 having, for example, a three-stage connection structure is mounted on the turn table 4 so as to be able to rise and fall. A concrete transport pipe 7 for transporting the concrete sucked and discharged from the hopper 2 is placed along the deck 1 from the concrete pump 3, and then supported along the booms 5 of the respective steps. A flexible hose 6 connected to the distal end of the transportation pipe 7 is suspended from the distal end of the uppermost boom 5, and further, the distal end hoses 6 are connected to the hose 6. Connect 8, it is the tip end outlet of the tip hose 8 so that concrete is led to concrete 設個 plants.
[0004]
When a concrete placement work is performed by pumping concrete through the concrete transport pipe 7 along the boom 5 with such a concrete pump vehicle with a boom, the concrete transport vehicle is used at the end of the work. Cleaning for discharging residual concrete in the pipe 7 is required.
[0005]
Conventionally, the concrete transport pipe 7 is washed by removing the base end side of the concrete transport pipe 7 and filling it with a sponge or the like, and then using compressed air led from an air compressor or pressure water pumped from a water pump. By introducing into the concrete transport pipe 7, the filling is pumped to the tip hose 8 side, and the residual concrete in the concrete transport pipe 7 is pushed out and discharged, but prior to this pipe cleaning work. The base end of the concrete transport pipe 7 is used to insert the filling into the concrete transport pipe 7 or to connect a cleaning reducer for guiding compressed air or pressure water to the base end side of the pipe 7. The bent pipe 10 as a connecting pipe located between the outlet and the discharge port 9 of the concrete pump 3 is removed from the discharge port 9 of the concrete pump 3. To have.
[0006]
As shown in FIG. 4, the bent pipe 10 is configured such that the flange 12 provided at the base end is abutted against the flange 11 provided at the discharge port 9 of the concrete pump 3 and is fixed by using a joint 13. The bent pipe 10 can be removed by removing the joint 13. The removed bent pipe 10 is held by the pipe support device 14 so that it can be easily reattached. The pipe support device 14 is provided with a bracket 15 provided so as to protrude to one side portion in the vicinity of the discharge port 9, and a base end portion attached to the bracket 15 by a pin 17 so as to be rotatable in the horizontal direction. A support arm 16 having a required length, a fixing band 18 attached so as to fix and hold an intermediate portion of the bent tube 10 at the distal end portion of the support arm 16, a vicinity of the base end portion of the support arm 16 and a required portion of the bracket 15 Pin holes 19 and 20 are provided, the joint 13 is removed, the support arm 16 is rotated to the position of the two-dot chain line, and the fixing pin is inserted into the pin holes 19 and 20 to place the bent tube 10 at two points. It is configured to be held at a standby position as indicated by a chain line.
[0007]
[Problems to be solved by the invention]
However, the joint 13 is heavy, and removal and attachment of the joint 13 must be performed while the operator holds the joint 13 in a middle waist position. Therefore, a great amount of labor is required, and the removed joint 13 is temporarily removed from the ground. Therefore, it takes a lot of effort to raise and lower the tube, and therefore, there is a problem that the work of removing and attaching the bent tube 10 as a connecting tube becomes a heavy labor.
[0008]
Therefore, the present invention is intended to greatly reduce the labor required to remove and attach the connecting pipe without requiring the operator to lift the joint.
[0009]
[Means for Solving the Problems]
In order to solve the above problems, the present invention provides a support arm base having a required length next to a discharge port of a concrete pump in which the base end of a concrete transport pipe is connected via a connecting pipe. In a concrete pump pipe support device in which the end is pivotably attached in the horizontal direction and the connection pipe is fixedly held at the tip of the support arm, the connection pipe and the discharge port are brought into contact with each other and attached or detached. A pipe joint for enabling connection is configured to be supported by an intermediate portion of the support arm.
[0010]
When removing the connecting pipe, after releasing the connection with the discharge port by the pipe joint, the connecting pipe is removed by rotating the support arm to the outside standby position. At this time, the pipe joint also moves together with the support arm.
[0011]
The pipe joint has a support shaft attached to the middle part of the support arm so as to be perpendicular to the abutting surface of the connecting pipe and the discharge port, and a base end portion so that the support shaft can be opened and closed vertically. In the case of a configuration comprising a semi-annular upper and lower joint member consisting of a pair of one and a pair of fastening members that fasten the tip portions of the upper and lower joint members, the connecting pipe is connected by fastening and releasing the fastening member. Can be easily attached and detached.
[0012]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, embodiments of the present invention will be described with reference to the drawings.
[0013]
FIGS. 1 (a) and 1 (b) show an embodiment of a concrete pump pipe support device of the present invention. As shown in FIG. 4, a connecting pipe located at the base end of a concrete transport pipe 7 is shown. A base end portion of a support arm 16 having a required length is attached to one side portion of the discharge port 9 of the concrete pump 3 to which the bent pipe 10 is connected so as to be rotatable in the horizontal direction. In the configuration in which the bent tube 10 is fixedly held at the distal end portion of the arm 16 via the fixing band 18, the abutting surface between the bent tube 10 and the discharge port 9 is provided at the intermediate portion of the support arm 16. A pipe joint 21 for connecting the bent pipe 10 and the discharge port 9 so as to be detachable is formed by bending a parallel part 16a that is parallel to the parallel part 1 of the support arm 16. It is supported in a a configuration formed by.
[0014]
More specifically, the pipe joint 21 has a tapered groove for receiving and fitting the flange 11 at the distal end portion of the discharge port 9 of the concrete pump 3 and the flange 12 at the proximal end portion of the bent pipe 10 in abutment state. A pair of semi-annular upper joint members 22 and lower joint members 23 each having a groove 25 provided on the inner surface thereof are oriented at right angles to the abutting surfaces of the flanges 11 and 12. The support arm 16 is attached to the inner side of the intermediate parallel part 16a of the support arm 16 so that it can be opened and closed in the vertical direction so that the whole can be opened and closed, while the upper and lower joint members Bifurcated protrusions 26 and 27 that face each other at a predetermined interval are provided at the distal ends of 22 and 23, respectively, and one end of a screw rod 28 is interposed between the bifurcated protrusions 27 of the lower joint member 23. Turn the part up and down When the ring is closed so that it can be closed, the other end side, which is the free end side of the screw rod 28, is rotated upward to be inserted between the bifurcated protrusions 26 of the upper joint member 22. The upper and lower joint members 22 and 23 can be fastened by screwing and tightening a nut 29 from above the bifurcated protrusion 26 to the other end of the screw rod 28 after insertion. It is.
[0015]
In the present embodiment, a square pipe is used for the support arm 16, and the support shaft 24 is attached to the wall portion of the square pipe facing the hopper 2 with the nut 30. Therefore, the nut 30 The assembling opening 31 is formed in the outer wall portion of the parallel portion 16a. Other components that are the same as those shown in FIG.
[0016]
When removing the bent pipe 10 prior to the cleaning work of the concrete transport pipe 7, first, the nut 29 screwed to the screw rod 28 is loosened, and then the screw rod 28 is moved into a bifurcated projection. The upper and lower joint members 22 and 23 are released from each other by turning them downward and turned downward, and then the upper joint member 22 and the lower joint member 23 as shown by a one-dot chain line in FIG. Are pivoted up and down around the support shaft 24 to open the pipe joint 21 so that the connection between the discharge port 9 of the concrete pump 3 and the bent pipe 10 is released. By rotating the support shaft 24 in the horizontal direction to the standby position shown by the alternate long and short dash line in FIG. 1 (a) with the support shaft 24 as a support point, the bent pipe 10 is removed from the discharge port 9 and the base end side of the concrete transport pipe 7 Let open So as to. At this time, since the pipe joint 21 is also integrated with the support arm 16 via the support shaft 24, the pipe joint 21 is rotationally displaced to the standby position simultaneously with the removal of the bent pipe 10. Therefore, in the standby position, after inserting a fixing pin (not shown) into each of the pin holes 19 and 20 to fix the bent pipe 10, the concrete transport pipe 7 is filled and the pipe cleaning work is performed by pumping the filling. To do.
[0017]
After the pipe cleaning operation is completed, the bent tube 10 is attached by performing the above procedure in reverse.
[0018]
As described above, the pipe joint 21 in which the connection of the butt portion between the discharge port 9 of the concrete pump 3 and the bent pipe 10 is released at the time of removing and attaching the bent pipe 10 accompanying the pipe cleaning work is removed. In addition, the support arm 16 can support the joint, thereby eliminating the need for the operator to hold the joint in the middle waist position as in the prior art, so that the labor required to remove and attach the bent tube 10 can be reduced. Compared with this, it can be greatly reduced, and it is advantageous for the aging of workers.
[0019]
Next, FIG. 2 shows another embodiment of the present invention. In the pipe support device having the same configuration as shown in FIG. 1, the support shaft 24 of the pipe joint 21 is the same as that shown in FIG. It is attached to the intermediate position of the linear support arm 16 via a triangular prism-shaped attachment member 32.
[0020]
According to the present embodiment, the same effect as the above embodiment can be obtained, and there is an advantage that the support arm 16 does not need to be bent.
[0021]
The present invention is not limited only to the above-described embodiment, and any structure other than the illustrated one can be adopted as the fastening means between the upper and lower joint members 22, 23 of the pipe joint 21. The case where the bent pipe 10 is removed has been described. However, when there is a further short pipe between the bent pipe 10 and the concrete transport pipe, the present invention can be applied to the case where the bent pipe 10 is removed together with the short pipe. Of course, various modifications can be made within the range not to be performed.
[0022]
【The invention's effect】
As described above, according to the concrete pump pipe support device of the present invention, the required length is provided next to the discharge port of the concrete pump which is connected to the base end of the concrete transport pipe via the connecting pipe. In a concrete pump pipe support device in which the base end of the support arm is pivotably attached in the horizontal direction and the connection pipe is fixedly held at the tip of the support arm. The pipe joint for detachably connecting to the outlet is supported by the intermediate part of the support arm. Therefore, when removing and installing the connecting pipe accompanying the pipe cleaning work, the concrete pump Support the pipe joint, which has been released from the connection between the discharge port and connecting pipe, with the support arm together with the removed connecting pipe. Therefore, it is possible to eliminate the need for an operator to hold a heavy joint with a middle waist posture as in the past, and the labor required to remove and attach the connecting pipe is greatly reduced compared to the conventional case. The pipe joint can be opened and closed vertically with respect to the support shaft attached to the intermediate portion of the support arm so as to be oriented at right angles to the connecting surface of the connecting pipe and the discharge port. As shown in the figure, the upper and lower joint members having a semi-annular shape with a base end attached thereto and the fastening member for fastening the distal ends of the upper and lower joint members to each other are attached. It exhibits an excellent effect that the removal work can be easily performed.
[Brief description of the drawings]
FIG. 1 shows an embodiment of a pipe support device for a concrete pump according to the present invention, in which (A) is a schematic plan view, and (B) is a partially cut schematic front view.
FIG. 2 is a schematic plan view showing another embodiment of the present invention.
FIG. 3 is a perspective view schematically showing an example of a boom-equipped concrete pump truck.
FIG. 4 is a schematic plan view showing a conventional pipe support device.
[Explanation of symbols]
2 Concrete hopper 3 Concrete pump 7 Concrete transport pipe 9 Discharge port 10 Curved pipe (connecting pipe)
16 Support arm 21 Piping joint 22 Upper joint member 23 Lower joint member 24 Support shaft 28 Screw rod (fastening member)
29 Nut (fastening member)

Claims (2)

コンクリート輸送用配管の基端部を連結管を介して接続させるようにしてあるコンクリートポンプの吐出口の横に、所要の長さとしたサポートアームの基端部を水平方向へ回動自在に取り付け、該サポートアームの先端部に、上記連結管を固定保持させるようにしてあるコンクリートポンプの配管支持装置において、上記連結管と吐出口とを突き合わせて着脱可能に接続するための配管継手を、上記サポートアームの中間部に支持させてなる構成を有することを特徴とするコンクリートポンプの配管支持装置。Next to the discharge port of the concrete pump that is designed to connect the base end of the concrete transportation pipe via a connecting pipe, the base end of the support arm with the required length is attached to be rotatable in the horizontal direction. In the concrete pump pipe support device in which the connecting pipe is fixedly held at the tip of the support arm, a pipe joint for detachably connecting the connecting pipe and the discharge port is provided. A pipe support device for a concrete pump, characterized in that it has a configuration that is supported by an intermediate part of an arm. 配管継手を、連結管と吐出口の突き合わせ面に対して直角な向きとなるようにサポートアームの中間部に取り付けた支軸と、該支軸に上下方向へ開閉できるように基端部を取り付けた一対一組からなる半環形状の上下の継手部材と、該上下の継手部材の先端部同士を締結する締結部材とからなる構成とした請求項1記載のコンクリートポンプの配管支持装置。A support shaft attached to the middle part of the support arm so that the pipe joint is oriented at right angles to the abutment surface of the connecting pipe and the discharge port, and a base end is attached to the support shaft so that it can be opened and closed vertically 2. The pipe support device for a concrete pump according to claim 1, comprising a semi-annular upper and lower joint member comprising a pair of one pair and a fastening member for fastening the distal ends of the upper and lower joint members.
JP09223399A 1999-03-31 1999-03-31 Pipe support device for concrete pump Expired - Lifetime JP4051647B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP09223399A JP4051647B2 (en) 1999-03-31 1999-03-31 Pipe support device for concrete pump

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP09223399A JP4051647B2 (en) 1999-03-31 1999-03-31 Pipe support device for concrete pump

Publications (2)

Publication Number Publication Date
JP2000282686A JP2000282686A (en) 2000-10-10
JP4051647B2 true JP4051647B2 (en) 2008-02-27

Family

ID=14048730

Family Applications (1)

Application Number Title Priority Date Filing Date
JP09223399A Expired - Lifetime JP4051647B2 (en) 1999-03-31 1999-03-31 Pipe support device for concrete pump

Country Status (1)

Country Link
JP (1) JP4051647B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20200077986A (en) * 2018-12-21 2020-07-01 주식회사 에버다임 Double Lock for Hopper Flap Elbow of Concrete Pump

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108194710A (en) * 2018-02-13 2018-06-22 泰兴建建设集团有限公司 A kind of high-rise total concrete pump pipe corner fixing support rack
DE102018106758B3 (en) * 2018-03-22 2019-07-25 Putzmeister Engineering Gmbh End hose holder for distribution booms of concrete pumps, concrete pump with end hose holder and procedure for mounting a hose end holder
CN114086766B (en) * 2021-12-03 2023-04-07 上海建工集团股份有限公司 Autoregression bilateral open-close type arm support pump pipe
CN114992390B (en) * 2022-06-22 2023-05-09 中建五局华东建设有限公司 Supporting device for inclined pump pipe with height difference

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20200077986A (en) * 2018-12-21 2020-07-01 주식회사 에버다임 Double Lock for Hopper Flap Elbow of Concrete Pump

Also Published As

Publication number Publication date
JP2000282686A (en) 2000-10-10

Similar Documents

Publication Publication Date Title
JP2001501689A (en) Adjustable mount for showerhead
JP4051647B2 (en) Pipe support device for concrete pump
US6648748B1 (en) Vacuum conduit system for removal of fumes and air borne particulate matter
CN210505228U (en) Die steel handling safety protection frame
WO1999003650A1 (en) Industrial robot
US6813806B2 (en) Hose attachment device
JP4601568B2 (en) Tube fixing device and tube fixing device
JP3769502B2 (en) A ceiling mount for an air conditioner outdoor unit
CN214889341U (en) Supporting hanger type pipeline fixing device
CN210474054U (en) Superclean bench for biological medicine test
JP2553584Y2 (en) Bending boom type concrete pump truck
JP2515248Y2 (en) Support structure of connecting pipe in low tank
US20060162750A1 (en) Adjustable-angle pipe and rod pushing device
CN216603132U (en) Water tank structure and telescopic portable tooth washing device
CN219530136U (en) Telescopic component and high-pressure union
CN219990130U (en) Water storage tank convenient to connect and capable of avoiding water deterioration
CN219755578U (en) Quick assembled air pipe
JP3052827U (en) Cleaning equipment for air conditioners
JP3084906U (en) Pressure relief device
JPH029147B2 (en)
JPH0994819A (en) Method for supporting concrete placing front hose and its holding tool
JP3774157B2 (en) Medium push jack handling device
JP2008201579A (en) Winding device for hose
CN206297008U (en) Blowpit lengthening section support and concrete mixing and transporting car
US2638255A (en) Sprayer tank

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20060127

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20071106

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20071120

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20071122

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101214

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101214

Year of fee payment: 3

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111214

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111214

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121214

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121214

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131214

Year of fee payment: 6

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term