Prior art keywords
information
processing
status information
window
status
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP2001388561A
Other languages
Japanese (ja)
Other versions
JP2003186535A (en
Inventor
大寿 村上
友也 中村
英嗣 古市
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Idemitsu Kosan Co Ltd
Original Assignee
Idemitsu Kosan Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Idemitsu Kosan Co Ltd filed Critical Idemitsu Kosan Co Ltd
Priority to JP2001388561A priority Critical patent/JP4040870B2/en
Publication of JP2003186535A publication Critical patent/JP2003186535A/en
Application granted granted Critical
Publication of JP4040870B2 publication Critical patent/JP4040870B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E30/00Energy generation of nuclear origin
    • Y02E30/30Nuclear fission reactors
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • General Factory Administration (AREA)
  • Testing And Monitoring For Control Systems (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Monitoring And Testing Of Nuclear Reactors (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、原材料を所定の条件で処理して生産物を取得するための処理装置の処理を支援するための操業支援システム、その方法、そのプログラムおよび処理プラントに関する。
【0002】
【背景技術】
従来、例えば製油産業、コンクリート工業、セラミックス工業などの製造プラントや、発電所、変電所、水・ゴミ処理施設などの処理プラントにおいて、プラントの停止および始動の際には大きなエネルギを要するとともに、その間では安定した品質の製品が得られなくなるので、一般的に連続運転が実施されている。この連続運転では、例えば作業者の3勤交替制などによりプラントの運転制御および保守管理を実施している。そして、作業者は、安定した連続運転が得られるように、運転状態や保守管理した内容を次の時間帯の作業者に確実に伝える必要がある。このために、引継の際に打ち合わせをしたり、運転状態や保守管理した内容を書き留めた書類や伝票などの記録を用いて引継している。
【0003】
しかしながら、引継毎に打ち合わせをする場合、運転状態や保守管理した内容などの膨大な情報量を引き継ぐこととなり、打ち合わせに長時間を要する。さらに、引継内容に漏れが生じるおそれもある。また、書類や伝票などの記録を引き継ぐ場合には、作業者が記録を作成することとなる。このため、作業者毎に異なる記載内容となり、十分な内容の引継ができなくなるおそれがあるとともに、作業者間で同様の記載内容が重複する場合も生じ、効率よ引継のための記録が効率よく作成できないおそれもある。
【0004】
一方、近年の電子制御技術の向上や各種材料の品質向上などに伴って、プラントの運転を自動的に制御したり運転状態の集中管理が容易となっている。したがって、生産効率の向上のために、作業者の少人数化が進んでいる。このことにより、作業者がプラントの停止や始動などのプラントの運転に関する経験が少なくなくなり、例えば停止や始動、異常発生などの稀な事例に対して十分に対応できなくなるおそれがある。
【0005】
【発明が解決しようとする課題】
上述したように、プラントの運転状態や保守管理した内容の漏れのない引継が煩雑で、効率よく引き継ぎできない。また、プラントの運転制御の自動化や少人数化により作業者の熟練度が次第に低下し、稀な事例に対して十分に対応できなくなるおそれがある。
【0006】
本発明は、このような点に鑑みて、引継が容易で、操業に対して十分に対応でき安定して操業できる操業支援システム、その方法、そのプログラムおよび処理プラントを提供することを目的とする。
【0007】
【課題を解決するための手段】
請求項1に記載の発明は、処理プラントにおける処理装置に関する各種データを、ネットワークを介して取得するとともに、前記ネットワークを介して接続する端末コンピュータへ前記データを出力可能に複数記憶し、前記処理装置の操業を支援する操業支援システムであって、前記端末コンピュータから前記ネットワークを介して取得された、原材料を所定の条件で処理する処理装置の所定時間後の処理予定情報と、前記処理装置における数値情報を含む処理状況情報および前記処理装置の数値情報を含む保守管理状況情報のうちの少なくともいずれか一方、これら処理状況情報および保守管理状況情報が生じた時刻情報前記処理予定情報と前記処理状況情報前記保守管理状況情報の内容の属性を示す分類内容情報一体的に関連付けて複数記憶する記憶手段と、この記憶手段に記憶された複数の前記処理予定情報と前記処理状況情報前記保守管理状況情報を分類内容情報に基づいて同一属性毎に分類分けし、これら分類分けした同一属性の前記処理状況情報および前記保守管理状況情報が生じた時刻情報に基づいて、同一属性における前記処理状況情報および前記保守管理状況情報の発生頻度を演算するとともに、処理基準の数値情報に対する、処理状況および保守管理状況における数値情報の偏差を演算して得られた偏差が所定の偏差を超えるか否かを演算し、前記処理予定情報と前記処理状況情報および前記保守管理状況情報との照合により処理状況を評価し、前記ネットワークを介して接続する前記端末コンピュータからの前記処理状況情報および前記保守管理状況情報のうちの少なくともいずれか一方の開示要求を認識すると、前記同一属性における前記処理状況情報および前記保守管理状況情報の発生頻度の演算結果と、前記演算により得られた偏差が所定の偏差を超える前記数値情報を含む前記処理状況情報および前記保守管理状況情報と、前記処理予定情報と前記演算により得られた偏差が所定の偏差を超える前記数値情報を含む前記処理状況情報および前記保守管理状況情報との評価結果とを、前記ネットワークを介して接続する前記端末コンピュータへ表示可能に送信する制御手段と、を具備したことを特徴とした操業支援システムである。
【0008】
この発明では、端末コンピュータからネットワークを介して取得され、原材料を所定の条件で処理する処理装置の所定時間後の処理予定情報と、処理装置における数値情報を含む処理状況情報および処理装置の数値情報を含む保守管理状況情報のうちの少なくともいずれか一方と、処理状況情報および保守管理状況情報が生じた時刻情報と、処理予定情報と前記処理状況情報前記保守管理状況情報の内容の属性を示す分類内容情報とを一体的に関連付けて、1つの記録情報であるレコードとして記憶手段に複数記憶する。そして、制御手段により、記憶された複数の処理予定情報と処理状況情報と保守管理状況情報を分類内容情報に基づいて同一属性毎に分類分けし、これら分類分けした同一属性の処理状況情報および保守管理状況情報が生じた時刻情報に基づいて、同一属性における処理状況情報および保守管理状況情報の発生頻度を演算する。さらに、制御手段により、処理状況情報および保守管理状況情報に含まれる数値情報の偏差を演算するとともに、所定の偏差を超えるか否かを演算し、処理状況情報および保守管理状況情報と処理予定情報との照合により処理状況を評価する。そして、制御手段は、ネットワークを介して接続する端末コンピュータからの処理状況情報および保守管理状況情報のうちの少なくともいずれか一方の開示要求を認識すると、演算結果の発生頻度、所定の偏差を超える数値情報を含む処理状況情報および保守管理状況情報、処理予定情報と所定の偏差を超える数値情報を含む処理状況情報および保守管理状況情報との評価結果を、ネットワークを介して接続する端末コンピュータへ表示可能に送信する。
このことにより、処理装置を安定して良好に操業するための引継事項となる処理状況や保守管理状況がデータベース化され、各情報の取扱が容易となるとともに、これら処理状況や保守管理状況を利用して今後の処理状況や保守管理状況が容易に予測され、良好な操業が容易に得られる。
さらに、今後の処理状況および保守管理状況の予測がより安定して得られる。
また、所定時間後の処理予定情報により、スケジュール管理が容易にできる。また、処理が予定された時間で実施されたか否か、および従前に蓄積された処理予定情報との照合による処理内容の評価を実施するので、適宜進捗状況などを容易に確認することができる。このことにより、事前に設定入力された情報の進捗状態が容易に認識できるとともに、例えば、ウェッブブラウザで所属部署や関連部署もその情報を容易に認識でき、進捗状況に対応した操業も容易にできる。
そして、処理内容の良否判断とともに、プラント設備や運転操作基準書マニュアルの改善の是非などの判断も容易にできる。
また、マニュアルあるいは処理装置の操作・作業内容などの処理状況および保守管理状況のデータベースとしての機能のみならず、入力設定される情報の予測としても利用でき、離れた箇所からでも利用でき、操業支援システムが広く利用でき、利便性が向上する。
【0009】
請求項2に記載の発明は、請求項1に記載の操業支援システムを操業支援方法に展開したもので、処理プラントにおける原材料を所定の条件で処理する処理装置に関する各種データを、ネットワークを介して取得するとともに、前記ネットワークを介して接続する端末コンピュータへ前記データを出力可能に複数記憶し、前記処理装置の操業をコンピュータにより支援する操業支援方法であって、前記端末コンピュータから前記ネットワークを介して取得された、前記処理装置の所定時間後の処理予定情報と、前記処理装置における数値情報を含む処理状況情報および前記処理装置の数値情報を含む保守管理状況情報のうちの少なくともいずれか一方、これら処理状況情報および保守管理状況情報が生じた時刻情報前記処理予定情報と前記処理状況情報前記保守管理状況情報の内容の属性を示す分類内容情報一体的に関連付けて記憶手段に複数記憶する処理工程と、前記記憶手段に記憶された複数の前記処理予定情報と前記処理状況情報前記保守管理状況情報を分類内容情報に基づいて同一属性毎に分類分けする処理工程と、これら分類分けした同一属性の前記処理状況情報および前記保守管理状況情報が生じた時刻情報に基づいて、同一属性における前記処理状況情報および前記保守管理状況情報の発生頻度を演算するとともに、処理基準の数値情報に対する、処理状況および保守管理状況における数値情報の偏差を演算して得られた偏差が所定の偏差を超えるか否かを演算し、前記処理予定情報と前記処理状況情報および前記保守管理状況情報との照合により処理状況を評価する処理工程と、前記ネットワークを介して接続する前記端末コンピュータからの前記処理状況情報および前記保守管理状況情報のうちの少なくともいずれか一方の開示要求を認識すると、前記演算により得られた前記同一属性における前記処理状況情報および前記保守管理状況情報の発生頻度の演算結果と、前記演算により得られた偏差が所定の偏差を超える前記数値情報を含む前記処理状況情報および前記保守管理状況情報と、前記処理予定情報と前記演算により得られた偏差が所定の偏差を超える前記数値情報を含む処理状況情報および保守管理状況情報との評価結果とを、前記ネットワークを介して接続する前記端末コンピュータへ表示可能に送信する処理工程と、を具備したことを特徴とすることにより、請求項1に記載の発明と同様の作用効果を享受する。
【0010】
請求項3に記載の発明は、請求項に記載の操業支援方法をコンピュータに実行させることを特徴とする操業支援プログラムである。
【0011】
この発明では、例えば汎用のコンピュータを利用してコンピュータにインストールすることにより請求項に記載の操業支援方法をコンピュータに実行させることができ、本発明の利用促進を大幅に図ることができる。
【0012】
なお、請求項に記載の発明において、コンピュータは、1つに限らず、例えば複数のコンピュータをネットワーク状に組み合わせた構成なども含む。
【0013】
請求項に記載の発明は、原材料を所定の条件で処理する処理装置と、請求項1に記載の操業支援システムと、を具備したことを特徴とした処理プラントである。
【0014】
この発明では、処理装置に、マニュアルあるいは処理装置の操作内容のデータベースとしての機能のみならず熟練度の低い作業者でも容易に作業を実施できるための請求項1に記載の操業支援システムを設ける。このことにより、良好な操業が得られ、安定した原材料の処理が良好に得られる。
【0015】
【発明の実施の形態】
以下、本発明の実施の一形態を図面に基づいて説明する。なお、本実施の形態では、処理プラントとして製油プラントを用いて説明する。図1は、製油プラントの構成を示す模式図である。なお、処理プラントとしては、製油プラントに限らず、発電所や変電所、水・ゴミ処理などの処理施設、コンクリート工業やセラミックス工業などの製造施設などでも適用できる。
【0016】
〔製油プラントの構成〕
図1に示すように、製油プラント1は、処理装置としての製油装置2と、操業管理センタ3と、操業支援システムとしての情報処理システム4とを備えている。
(製油装置の構成)
製油装置2は、原材料としての原油を貯留する原油タンク5を備えている。原油は、タンカ6などの輸送手段から原油タンク5内に流入される。そして、原油タンク5には、原油を各種成分に分留する反応塔7が接続されている。そして、この反応塔7には、分留した各種分留物を貯留する分留物貯留タンク8が接続されている。
【0017】
さらに、分留物貯留タンク8には、分留物をさらに精製・あるいは合成するための処理塔9が接続されている。そして、処理塔9には、処理された処理物を貯留する処理物貯留タンク10が接続されている。
【0018】
また、製油装置2には、添加剤を貯留する添加剤貯留タンク11が設けられている。さらに、製油装置2には、製品タンク12が設けられている。この製品タンク12は、分留貯留タンク8に貯留された分留物や処理物貯留タンク10に貯留された処理物、添加剤貯留タンク11に貯留された添加物が、単独あるいは適宜混合された混合物を生産物としての製品として貯留する。そして、製品タンク12内の製品は、タンカ6やタンクローリ車13などの輸送手段にて各利用施設に搬送される。
【0019】
(操業管理センタの構成)
操業管理センタ3は、製油装置2の運転を制御するものである。この操業管理センタ3は、高度監視システム21と、異常措置ガイダンス手段22と、図示しない入力手段としての入力設定手段と、表示手段23と、運転制御手段24とを備えている。
【0020】
高度監視システム21は、製油装置2の各部位に設けられた図示しない各種センサからの検出した信号に基づいて製油装置2の運転状態を監視する。この高度監視システム21は、読み取った製油装置2の運転状態の内容およびその監視状態を出力する。
【0021】
異常措置ガイダンス手段22は、例えば高度監視システム21で監視する製油装置2の運転状態に異常が発生したか否かを認識する。そして、異常が発生したことを認識することにより、異常に対応して措置するためのガイダンスを図示しないスピーカなどの発音手段からガイダンスさせる。
【0022】
入力設定手段は、各種スイッチなどを有し、作業者が各種スイッチの入力操作にて製油装置2の運転状態を制御・監視するための運転条件や監視条件などの処理状況を設定入力するためのものである。
【0023】
表示手段23は、例えば操業管理状態や異常発生箇所、異常状態などを画面表示するためのものである。
【0024】
運転制御手段24は、製油装置2の運転状態を制御・監視するものである。そして、運転制御手段24は、原油性状把握手段25と、流出入量推定手段26と、製品性状推定手段27と、安定化制御手段28と、運転自動化手段29と、リアルタイム制御手段30とを備えている。
【0025】
原油性状把握手段25は、原油タンク5に流入される原油の性状を各種センサなどからの検出した信号に基づいて認識し、その認識した原油の性状を適宜出力する。
【0026】
流出入量推定手段26は、原油タンク5、反応塔7、分留物貯留タンク8、処理塔9、処理物貯留タンク10、添加剤貯留タンク11および製品タンク12における原油や分留物、処理物、添加剤、製品の流出入量の検出および予測流出入量の演算を実行する。
【0027】
製品性状推定手段27は、得られた製品の性状を各種センサなどからの検出した信号に基づいて認識し、この認識した製品の性状を適宜出力する。
【0028】
安定化制御手段28は、例えば反応塔7における分留処理や処理塔9における処理を安定して進行させるためのものである。例えば、各種センサを用いて触媒量や温度、流量などを検出し、安定した性状の分留物や処理物が安定して得られるように制御する。
【0029】
運転自動化手段29は、例えば安定化制御手段28による安定した反応塔7における分留処理や処理塔9における処理を自動的に制御するためのものである。すなわち、適切な触媒量や温度、流量などを演算して安定化制御手段28にフィードバックさせ、安定化制御手段28にて製油装置2の安定した運転を制御させる。
【0030】
リアルタイム制御手段30は、例えば安定化制御手段28による安定した反応塔における分留処理や処理塔における処理を実行させるために、運転自動化手段29にて自動的に制御するための運転条件が、時間差なく原油の処理にフィードバックさせるためのものである。
【0031】
(情報処理システムの構成)
情報処理システム4は、操業支援装置としての情報処理装置31と、例えばネットワークを構成するサーバ32とを備えている。このネットワークは、例えばTCP/IP(Transmission Control Protocol / Internet Protocol)などの汎用のプロトコルに基づくインターネットやイントラネットなどとして構成される。そして、情報処理装置31は、ネットワークを介して操業管理センタ3や技術センタ33、各種外部サーバに接続されている。
【0032】
外部サーバとして具体的には、作業者や管理者などの図示しない端末コンピュータと情報を送受可能に接続するPCネットワークを構成する外部サーバ34、情報の収集や制御をする図示しない分散制御装置(Distributed Control System:DCS)がネットワークで構成されたDCSネットワークを構成する外部サーバ35、工業上の諸過程を遠方で監視するために使用される図示しない専用テレビジョンである産業用テレビジョン(industrial television:ITV)がネットワークを構成して接続されたITVネットワークを構成する外部サーバ36、例えば会議などに利用するために図示しない携帯テレビがネットワークを構成して接続された携帯TV会議ネットワークを構成する外部サーバ37、製油装置2で製造した製品を販売する販売店でネットワークが構築され各販売店の情報を処理・蓄積する外部サーバ38、各工場の製油装置2でネットワークが構築され各製造装置2の操業に関する情報を処理・蓄積する外部サーバ39、他の製油会社とによりネットワークが構築され各製油会社の情報や会合情報などを処理・蓄積する外部サーバ40などである。
【0033】
なお、情報処理装置31とサーバ32との接続、サーバ32と操業管理センタ3や技術センタ33、各種外部サーバ34〜40との接続は、ネットワークを介した接続に限らず、有線や無線などにより接続することもできる。
【0034】
そして、情報処理装置31は、情報を適宜処理して集積するとともに、集積した情報を適宜処理して出力する。この情報処理装置31は、記憶手段としてのナレッジバンク41と、情報処理手段42とを備えている。
【0035】
ナレッジバンク41は、製油装置2の操業に関する各種データを読み出し可能に記憶する。このナレッジバンク41は、第2の記憶手段としての運転基準データベース43と、第1の記憶手段としてのP&I(Piping And Instrument diagram(配管・計装図))/設備図書データベース44と、安全フォーラムデータベース45とを備えている。
【0036】
運転基準データベース43は、製油装置2の操業に関する情報であって製油装置2の処理状況や保守管理状況を蓄積する。この運転基準データベース43は、例えば製油装置2の処理における作業内容に関する情報である処理状況、あるいは、保守管理により生じた実際の作業内容に関する情報である保守管理状況をそれぞれ1つの独立した記録情報であるレコードとして記録したテーブル構造のデータベースとして構成される。なお、処理状況としては、例えば実際の高度監視システム21で得られた各種センサにて検出した測定結果である温度、反応時間、流量、原油性状、製品性状、触媒量などの製油装置2の運転状態などの実測値である。また、保守管理状況としては、例えば製油装置2の調整や改造・補修、部品交換、潤滑油の補充などである。
【0037】
なお、これら処理状況および保守管理状況である操業に関する情報は、例えば作業者が引き継ぎや自己管理、操業進捗管理などのために入力操作による設定入力にて記録される後述の電子引継簿を構成する情報の一部である。ここで、作業者としては、例えば操業管理センタ3の作業者、すなわち運転に携わるオペレータや、製油装置2の保守管理に携わる工務者、あるいは品質管理に携わる品質管理者、各部署を統括する統括管理者などである。
【0038】
P&I/設備図書データベース44は、製油装置2を操業するための基準操作方法や基準保守管理方法である設備に関する情報を蓄積する。このP&I/設備図書データベース44は、例えば、製油装置2の構造や性状、図面、使用している部品などの基準保守管理方法である設備の情報や、各製油装置2毎、および、製油装置2を構成する原油タンク5、反応塔7、処理塔9などの各構成部位毎にそれぞれ運転操作するための操作方法や目標値など操業に関する情報としての基準操作方法である基準書マニュアルに関する情報を1つの記録情報であるレコードとして記録したテーブル構造のデータベースとして構成されている。
【0039】
設備情報としては、製油装置2全体の性能や特性、設備の特性や入手経路などの情報の他、CAD(Computer-Aided Design)データやイメージ画像データなどが1つの記録情報であるレコードとして蓄積されたり、基本書マニュアルや目標値と組み合わせて1つの記録情報であるレコードとして蓄積される。これらの情報も上述の作業内容の情報と同様に、作業者の設定入力により蓄積される。
【0040】
安全フォーラムデータベース45は、製油装置2の操業に関した安全基準や異常に対する対処方法、安全フォーラムにおける議事録などを蓄積する。この安全フォーラムデータベース45は、安全基準の項目、異常対処方法の項目あるいは議事録の文書などの製油装置2の安全運転のための情報を1つの記録情報であるレコードとして記録したテーブル構造を有している。
【0041】
具体的には、ヒヤリハットとなる内容である件名、このヒヤリハットが発見された日付、ヒヤリハットを発見した作業グループ名、ヒヤリハットに対し対策を講じて解決した日付などの情報が1つの記録情報であるレコードとして通し番号が付されて複数蓄積するテーブル構造となっている。なお、製油装置2の安全運転のための情報は、上述したように、作業者の設定入力により蓄積される。ここで、ヒヤリハットは、例えば作業の実施の際に作業者が危険を感じた事項のほか、このままでは危険な作業となるであろう作業前の事項も含む。
【0042】
情報処理手段42には、ネットワークを介して送信される情報を処理する。この情報処理手段42は、図示しない計時手段や各種演算手段、検索手段である検索エンジンを有し、上述した各データベース43〜45が接続され、取得した情報を適宜処理して各データベース43〜45に蓄積させ、また蓄積されたデータを適宜読み出して処理する。すなわち、情報処理手段42は、ネットワークを介して送信される情報を後述する電子引継簿として有機的に関連付けする処理をして各データベースに蓄積させる。例えば、情報処理手段42は、操業管理センタ3からの情報、技術センタ33からの情報、外部サーバ34〜40からの情報に基づいて、電子引継簿を作成する。
【0043】
各情報としては、例えばPCネットワークからの設定入力すなわちPCネットワークを構成する外部サーバ34に接続された端末コンピュータにより後述する所定のフォームに入力操作で設定入力された情報や、DCSネットワークからの入力すなわちDCSで収集した情報、技術センタ33で検討された操業プロセス検討情報33a、製油装置2で用いる触媒の開発情報33b、原油の品質検討情報33c、情報処理システム4の情報処理あるいは操業管理センタ3の運転制御手段24による運転制御のシステムのためのシステム開発情報33d、作業者の技術研修情報33e、設備検査評価情報33fなどである。
【0044】
すなわち、電子引継簿を構成する上述した運転基準データベース43の作業内容のデータ、P&I/設備図書データベース44の基準となる製油装置2の設備や運転目標値に関するデータ、安全フォーラムデータベース45の製油装置2の安全操業のためのデータにて、各種情報に処理する。具体的には、図1に示すように、作業者が製油装置2の運転に利用する技術資料情報42a、作業者のランセンサ情報42b、製油装置2の事故故障分析情報42c、製油装置2の設備の交換時期などを予測するための予測的設備管理情報42d、各種要領書類情報42e、他社情報42fなどに処理する。
【0045】
また、情報処理システム4は、例えばサーバ32に接続された端末コンピュータ51や操業管理センタ3、技術センタ33、各種外部サーバ34〜40からの要求に対し、検索手段により要求する検索事項に対応する情報を、蓄積する情報から検索して出力させる処理をする。
【0046】
(電子引継簿の構成)
ここで、電子引継簿の構成について図面を参照して説明する。電子引継簿は、上述したように、ネットワークを介して取得した情報により構成され、例えば交替勤務のように互いに引き継いで行く業務において、操業が順調に継続するために作業内容の事項が確実に引き継がれる形態で構成されている。すなわち、電子引継簿の入力事項としては、例えば以下に示す項目(情報)などがある。これらの項目が適宜ナレッジバンク41の各データベース43〜45に蓄積され、情報処理手段42にて有機的に関連付けされて適宜電子引継簿として出力される。
【0047】
(1)業務の発生時刻および担当者
(2)現在の運転状況
(3)補修や改造などの工事である保守点検の予定、進捗状況、結果内容
(不具合・補修内容)
(4)前の勤務帯より引き継ぎ作業が完了した事項
(5)前の勤務帯より引き継いで作業が継続中の事項
a)継続事項の目的
b)進捗状況
c)方法・手段
d)懸念事項
e)次の操作や仕事の予定時刻
(6)新たに発生した業務の事項
a)業務の目的
b)進捗状況
c)方法・手段
d)次の操作や仕事の予定時刻
(7)警報の発報状態とその対応
(8)シーケンスのバイパスや計装関係のマニュアル運転状況
(9)他の部署に連絡する事項の完了・未了の状況
a)他の部署への連絡事項
b)他の部署への依頼事項
c)他の部署からの依頼事項
d)他の部署からの確認事項
e)他の部署からの依頼業務の内容と依頼者および進捗状況
(10)部署内の通達・連絡事項の有無
(11)その他の各部署のオプション事項
【0048】
そして、電子引継簿は、具体的には、例えば図2のウエッブブラウザ(Web browser)による表示画面で示される情報を設定入力するための入力メニューウィンド61に基づいて設定入力される。なお、ウエッブブラウザから設定入力する場合に限らず、例えば端末コンピュータが接続するデータベースに蓄積し、このデータベースから情報を収集するなど、データベースとの組み合わせの構成から設定入力するなどしてもできる。
【0049】
この入力メニューウィンド61には、データ入力、データ編集、データ出力、データ管理などの複数の頁(ウィンド)が切替可能に対応する複数のタグ61a,61b,61c,61dを備えている。そして、電子引継簿は、図2に示すデータ入力のタグウィンド62の表示に従った設定入力により作成される。
【0050】
具体的には、データ入力のタグウィンド62には、設定入力する日付のテキストボックス62aと、作業者が作業する勤務時間帯の種別、例えば三勤交代制の場合に1直、2直および3直のうちのいずれかを選択して設定入力する勤務帯リストボックス62bと、運転や保守管理の対象となるいずれかの製油装置2を選択して設定入力する装置リストボックス62cとを有している。また、データ入力のタグウィンド62には、それぞれ入力する内容で分類された複数のウィンドにリンクするための対応する複数のコマンドボタン62d,62e,62fが設けられている。
【0051】
さらに、入力メニューウィンド61には、データ(情報)を検索するためのウィンドにハイパーリンクするためのコマンドボタン61eと、この入力メニューウィンド61を閉じるためのコマンドボタン61fと、本情報処理システムによる情報処理を終了させるためのコマンドボタン61gとが設けられている。
【0052】
そして、データ入力のタグウィンド62のコマンドボタン62dの操作により、図3に示す処理状況としての運転状態に関する情報を設定入力するための基本運転データ入力ウィンド63にリンクされる。この基本運転データ入力ウィンド63は、図3のウエッブブラウザ(Web browser)による表示画面で示される構成となっている。
【0053】
すなわち、基本運転データ入力ウィンド63には、上述した図2に示すタグウィンド62で入力した日付および勤務時間帯が表示されるテキストボックス63a,63bが設けられている。すなわち、これらテキストボックス63a,63bは、図2に示すタグウィンド62のテキストボックス62a,62bにリンクされている。
【0054】
また、基本運転データ入力ウィンド63には、作業者や関連する担当者、例えば直長、補佐、現場担当、工事担当、ボードマンを設定入力するリストボックス63cが設けられている。さらに、基本運転データ入力ウィンド63には、図2に示すタグウィンド62でテキストボックス62cに設定入力した対応する製油装置2の運転状態、例えば原材料の原油の種類、原料タンクの番号、貯留量、分留物の種類、生産量、性状(例えば動粘度など)などの数値情報を含む処理状況である運転状態を設定入力する複数のテキストボックス63dが設けられている。
【0055】
さらに、基本運転データ入力ウィンド63には、電子引継簿としての通し番号が上記タグウィンド62の設定入力により自動的に設定されるテキストボックス63eが設けられている。また、基本運転データ入力ウィンド63には、選択したデータを削除するためのコマンドボタン63f、および、基本運転データ入力ウィンド63の画面を閉じるためのコマンドボタン63gが設けられている。
【0056】
そして、基本運転データ入力ウィンド63の設定入力により、所定の電子引継簿として通し番号が付されて1つの記録情報であるレコードとして運転基準データベース43に蓄積される。なお、この基本運転データ入力ウィンド63は、データ入力のタグウィンド62の製油装置2を選択して設定入力する装置リストボックス62cの数、すなわち複数の製油装置2毎に設けられ、それぞれが1つの記録情報であるレコードとして運転基準データベース43に蓄積させる。
【0057】
また、データ入力のタグウィンド62のコマンドボタン62fの操作により、図4に示す処理状況である運転のための操作内容に関する情報を設定入力するための運転内容データ入力ウィンド64にリンクされる。この運転内容データ入力ウィンド64は、図4のウエッブブラウザ(Web browser)による表示画面で示される構成となっている。
【0058】
すなわち、運転内容データ入力ウィンド64には、上述した図2に示すタグウィンド62のテキストボックス62aおよびリストボックス62bにリンクし入力された日付および勤務時間帯が表示されるテキストボックス64a,64bがそれぞれ設けられている。また、運転内容データ入力ウィンド64には、引継内容にかかわる製油装置2の構成部位を設定するリストボックス64cと、引継内容が発生した時刻情報となる時刻を設定入力するテキストボックス64dと、引継内容の作業の内容の属性を示す分類内容情報となる進捗状況を設定入力するリストボックス64eとが設けられている。進捗状況は、例えば作業完了した旨の「■実施済」、作業未了である旨の「□実施未」、作業継続である旨の「△実施継続」の3つの記号により表示される。
【0059】
また、運転内容データ入力ウィンド64には、引継内容である作業内容を設定入力するテキストボックス64fと、作業内容に関するメモ書きなど引継事項として添付する画像データの画像ファイル名を設定入力するテキストボックス64gとが設けられている。
【0060】
さらに、運転内容データ入力ウィンド64には、引継事項である作業内容の種類すなわち内容の属性を示す分類内容情報を設定入力する複数のチェックボックス64hが設けられている。例えば、設定入力した内容が、既に行ったもしくは行う予定の操作内容でありその操作手順の変更の禁止を促す引継事項である「禁止事項」、操業において社内・社外を問わず過去に発生した重大な災害に対しその歯止めを明確にした管理項目に該当し既に行ったもしくは行う予定の操作内容でありその操作を行う上での歯止め・危機管理の明確化を促す引継事項である「重災項目」、経験の少ないもしくは経験のない作業内容いわゆる非定常業務的な内容である旨の引継事項である「非定常」、懸案事項である旨の引継事項である「懸案事項」、情報処理システム4の情報処理あるいは操業管理センタ3の運転制御手段24による運転制御のシステムの改訂に関する内容である旨の引継事項である「OS改訂」、製油装置2の設備の改訂に関する内容である旨の引継事項である「P&I改訂」、設定入力された事項が引継事項である旨の「引継簿」、作業内容の特性にかかわる引継事項である旨の「パフォ」、作業内容が保全内容である旨の引継事項である「カルテ」、ヒヤリハットに関する引継事項である旨の「ヒヤリ」、特定の補修が必要な不具合である旨の引継事項である「SDM補修」、日常の補修内容である旨の引継事項である「日常補修」、危機管理に関する内容である旨の引継事項である「危機管理」、自主保全(保全部門に頼らず運転部門にて対応する引継事項である旨の「自主保全」、委託した業務に関する内容である旨の引継事項である「IP業務」である。ここで、ヒヤリハットに関する情報とは、例えば作業の実施の際に作業者が危険を感じた事項およびその対応などのノウハウ的な情報である。
【0061】
また、運転内容データ入力ウィンド64には、設定入力した内容が、各部署における重要度や引用・参考性が高いか否かを設定入力する内容の属性を示す分類内容情報となるチェックボックス64iが設けられている。例えば、勤務時間帯の作業者を統括する担当者がチェックする直長ピックアップ、運転管理に関する作業者がチェックする運管ピックアップ、設備管理に関する作業者がチェックする設管ピックアップがある。そして、このチェックにより、この設定入力された情報がしおり状、すなわちブックマークを付け、一覧表示やレポート作成の際の利用などが容易にできるようになっている。
【0062】
さらに、運転内容データ入力ウィンド64には、選択したデータを削除するためのコマンドボタン64j、この運転内容データ入力ウィンド64を閉じるためのコマンドボタン64k、および、添付する画像データを表示させるためのコマンドボタン64lが設けられている。
【0063】
そして、運転内容データ入力ウィンド64は、これら設定入力された情報がそれぞれ1つの独立した記録情報であるレコードとして運転基準データベース4に蓄積される。なお、この運転内容データ入力ウィンド64は、データ入力のタグウィンド62の製油装置2を選択して設定入力する装置リストボックス62cの数、すなわち複数の製油装置2毎に設けられ、それぞれが1つの独立した記録情報であるレコードとして運転基準データベース43に蓄積させる。
【0064】
さらに、データ入力のタグウィンド62のコマンドボタン62eの操作により、図5に示す保守点検状況である保守点検の作業内容に関する情報を設定入力するための工事内容データ入力ウィンド65にリンクされる。この工事内容データ入力ウィンド65は、図5のウエッブブラウザ(Web browser)による表示画面で示される構成となっている。
【0065】
すなわち、工事内容データ入力ウィンド65には、上述した図2に示すタグウィンド62のテキストボックス62aおよびリストボックス62b,62cにリンクし入力された時刻情報となる日付、勤務時間帯および対象となる製油装置2が表示されるテキストボックス65aおよびリストボックス65b,65cがそれぞれ設けられている。また、工事内容データ入力ウィンド65には、引継内容である作業内容を設定入力するテキストボックス65dと、引継内容である改修内容を設定するテキストボックス65eと、引継内容の作業の進捗状況を上述した記号により設定入力するリストボックス65fと、作業内容に関するメモ書きなど引継事項として添付する画像データの画像ファイル名を設定入力するテキストボックス65gとが設けられている。
【0066】
さらに、工事内容データ入力ウィンド65には、引継事項である作業内容の種類を設定入力する上述したものと同様の内容の属性を示す分類内容情報となるチェックボックス65hと、設定入力した内容が、各部署における重要度や引用・参考性が高いか否かを設定入力、例えば勤務時間帯の作業者を統括する担当者がチェックする内容の属性を示す分類内容情報となる直長ピックアップのチェックボックス65iとが設けられている。また、工事内容データ入力ウィンド65には、上記ウィンド64と同様に、選択したデータを削除するためのコマンドボタン65j、工事内容データ入力ウィンド65を閉じるためのコマンドボタン65k、および、添付する画像データを表示させるためのコマンドボタン65lが設けられている。
【0067】
そして、工事内容データ入力ウィンド65は、これら設定入力された情報がぞぞれ1つの独立した記録情報であるレコードとして運転基準データベース43に蓄積される。なお、この工事内容データ入力ウィンド65は、本情報処理システム4に接続して入力メニューウィンド61を開く際に設定入力する本人である接続作業者の所属部署毎に設けられ、それぞれが1つの独立した記録情報であるレコードとして運転基準データベース43に蓄積させる。
【0068】
このようにして、各引継内容が設定入力されることにより、電子引継簿が作成される。この電子引継簿は、情報処理手段42の処理により、例えば図6のウエッブブラウザ(Web browser)による表示画面で示される運転支援メニューウィンド71として表示される。
【0069】
この運転支援メニューウィンド71には、電子引継簿を構成する別のウィンドを呼び出すためのウィンドを設定する画面設定ボックス71aが設けられている。この画面設定ボックス71aは、表示される所望のウィンドを選択すれば所望のウィンドが表示されるリストボックスにて構成されている。さらに、運転支援メニューウィンド71には、検索する語句を設定入力するためのテキストボックス71bと、テキストボックス71bに設定入力した語句で検索を実行させるコマンドボタン71cとが設けられている。
【0070】
また、運転支援メニューウィンド71には、全製油装置2の最近の処理状況や保守管理状況などの特記事項の要約を表示する特記事項開示ボックス71dが設けられている。この特記事項開示ボックス71dには、例えば図7に示すように、例えば最近3日間の運転状態や運転操作状態などの各製油装置2の運転状態や運転操作状態などの処理状況および保守点検状況などの特記事項の要約が表示される。また、電子引継簿を構成する他の引継事項のウィンドにリンクするためのコマンドボタン71d1が設けられている。すなわち、これらコマンドボタン71d1の操作により、その要約内容に関連する事項が記載されたウィンドにリンクする。
【0071】
さらに、運転支援メニューウィンド71には、画面設定ボックス71aのリスト項目と同一で所望のウィンドを表示させるためのハイパーリンク71e〜71oが複数設けられている。
【0072】
画面設定ボックス71aのリスト項目およびハイパーリンク7eの操作により、電子引継簿を構成する例えば図8および図9に示す期間条件ウィンド72が表示される。この期間条件ウィンド72は、図8に示す製油装置2の処理状況である運転内容が所定の期間の情報で一覧表示された領域72aと、図9に示す保守管理状況である工事内容が所定の期間の情報で一覧表示された領域72bとを有している。なお、図8中の72cは、ペンをモチーフとしたカーソルである。
【0073】
具体的には、運転支援メニューウィンド71の最近の特記事項開示ボックス71dにリンクされて表示される所定期間での運転状態や保守管理状況の要約情報72a1,72b1や、各製油装置2全体および各製油装置2を構成する反応塔7や処理塔などの各部位での所定期間での作業内容の情報72a2、各製油装置2の保守点検により改修した状況などの所定期間での改修情報72b2などが表示される。要約情報72a1,72b1には、日付、勤務帯、運転状況などが記載される。作業内容の情報72a2には、日付、勤務帯、作業内容、作業時間などが表示される。改修情報72b2には、日付、勤務帯、設備の状態、改修内容などが表示される。
【0074】
さらに、作業内容の情報72a2および改修情報72b2には、その進捗状況を各種記号により表示する進捗状況表示記号72dが表示されている。この進捗状況表示記号72dは、上述した作業完了した旨の「■実施済」、作業未了である旨の「□実施未」、作業継続である旨の「△実施継続」の3つの記号が用いられる。
【0075】
すなわち、期間条件ウィンド72は、上述した入力メニューウィンド61から設定入力されて記憶された複数の各情報が、設定された所定期間において、運転内容と工事内容とのまとまり、および製油装置2毎にまとめられて一覧表示される。なお、期間条件ウィンド72には、図示しないが、上記運転内容の領域72aおよび工事内容の領域72bには、それぞれの情報を表としての表示形態に切り替えるための表示切替コマンドボタンがそれぞれ設けられている。
【0076】
さらに、画面設定ボックス71aのリスト項目およびハイパーリンク7fの操作により、電子引継簿を構成する例えば図10に示す日付条件ウィンド73が表示される。この日付条件ウィンド73は、図10に示す製油装置2の処理状況である運転内容が所定の日付の情報で一覧表示された領域73aと、図9に示す期間条件ウィンド72の領域72bと同様に、保守管理状況である工事内容が所定の日付の情報で一覧表示された図示しない領域とを有している。
【0077】
具体的には、期間条件ウィンド72と同様に、運転支援メニューウィンド71の最近の特記事項開示ボックス71dにリンクされて表示される所定日付での運転状態や保守管理状況の要約情報73a1や、各製油装置2全体および各製油装置2を構成する反応塔7や処理塔などの各部位での所定日付での作業内容の情報73a2、各製油装置2の保守点検により改修した状況などの所定日付での図示しない改修情報などが表示される。さらに、期間条件ウィンド72と同様に、進捗状況表示記号72dが表示されている。
【0078】
このように、日付条件ウィンド73は、期間条件ウィンド72と同様に、上述した入力メニューウィンド61から設定入力されて記憶された複数の各情報が、設定された所定日付において、運転内容と工事内容とのまとまり、および製油装置2毎にまとめられて一覧表示される。なお、この日付条件ウィンド73にも、図示しない表示切替コマンドボタンが設けられている。
【0079】
また、画面設定ボックス71aのリスト項目およびハイパーリンク7gの操作により、電子引継簿を構成する例えば図11に示すツールボックスミーティング(以下、TBM(Tool Box Meeting)という。)ウィンド74が表示される。このTBMウィンド74は、各製油装置2を選択して設定するリストボックスの構成の装置設定入力ボックス74aおよび製油装置2を選択するコマンドボタン74bなどが設けられている。また、日付および勤務時間帯の情報が表示される。この表示される日付および勤務時間帯の情報は、例えば本情報処理システム4に接続して運転支援メニューウィンド71を開く際に設定入力する接続作業者の所属部署やパスワードなどに基づいて、接続する日付とその接続作業者と同一の勤務時間帯や部署とに関連する情報が設定されて表示される。
【0080】
そして、各製油装置2のTBMウィンド74には、上記設定された日付および作業時間帯において、上述した期間条件ウィンド72および日付条件ウィンド73と同様に、装置設定入力ボックス74aで設定した製油装置2の処理状況である運転内容が一覧表示される領域74cと、保守管理状況である工事内容が一覧表示される領域74dとを有している。
【0081】
具体的には、装置設定入力ボックス74aに設定された製油装置2、設定された日付および勤務時間帯の条件であって、運転支援メニューウィンド71の最近の特記事項開示ボックス71dにリンクされて表示される運転状態や保守管理状態の要約情報74c1,74d1や、各製油装置2全体および各製油装置2を構成する反応塔7や処理塔などの各部位での作業内容の情報74c2、保守管理による改修した状況などの改修情報74d2が表示される。また、運転内容の領域74cおよび工事内容の領域74dには、それぞれの情報を表としての表示形態に切り替えるための表示切替コマンドボタン74eがそれぞれ設けられている。
【0082】
そして、作業内容の情報74c2および改修情報74d2には、運転操作した内容の情報、その時間、進捗状況表示記号、および、この情報の種別の情報が表示される。情報の種別としては、例えば、上述したように、引継事項である旨の「引継簿」、運転全体の各部署への引継事項である旨の「運転統括」、自主保全(保全部門に頼らず運転部門にて対応する引継事項である旨の「自主保全」、既に行ったもしくは行う予定の操作内容でありその操作手順の変更の禁止を促す引継事項である「禁止」、操作内容に関して作業の応援を要請する旨の引継事項である「応援要」、作業内容がノウハウ的要素である旨の引継事項である「KY」、作業内容が機器の運転経歴・操作経歴に関する内容である旨の引継事項である「カルテ」などである。
【0083】
さらに、TBMウィンド74には、関連するヒヤリハットを検索するためのコマンドボタン74fが設けられている。このコマンドボタン74fの操作により、電子引継簿を構成する例えば図12に示すヒヤリ一覧ウィンド75が表示される。
【0084】
このヒヤリ一覧ウィンド75は、安全フォーラムデータベース45に蓄積された複数のヒヤリハットに関する情報を一覧表示する。具体的には、図12に示すように、ヒヤリハットとなる内容である件名、このヒヤリハットが発見された日付、ヒヤリハットを発見した作業グループ名、ヒヤリハットに対し対策を講じて解決した日付、通し番号であるフォローシートID番号などである。
【0085】
また、このヒヤリ一覧ウィンド75には、一覧表示された情報量が多すぎる場合に、さらに条件を加えて一覧表示される情報量を少なくさせる絞込検索をする絞込検索機能75aが設けられている。この絞込検索機能75aには、図12に示すように、引継内容を検索する期間を入力するために日付を設定入力するテキストボックス75a1が設けられている。また、絞込検索機能75aには、引継事項を設定入力する際に、基本運転データ入力ウィンド63、運転内容データ入力ウィンド64および工事内容データ入力ウィンド65の作業内容の種類を設定入力するチェックボックスでチェックした項目で検索する条件を設定する複数のチェックボックス75a2が設けられている。これらチェックボックスにより設定される条件としては、例えば「懸案事項」、「ヒヤリ」、「特定補修候補」、「日常補修候補」、「規程類改訂候補」である。
【0086】
さらに、絞込検索機能75aには、キーワードにて検索するためのキーワードを設定入力するテキストボックス75a3と、キーワード検索する条件を設定、例えばかつ/または(AND/OR)のラジオボタン75a4とが設けられている。そして、絞込検索機能75aには、検索対象となる範囲、すなわち製油装置2の種類などを設定入力するためのリストボックス75a5と、設定した条件で検索を実行させて情報を一覧表示させるためのコマンドボタン75a6とが設けられている。
【0087】
また、画面設定ボックス71aのリスト項目およびハイパーリンク7hの操作により、電子引継簿を構成する例えば図13に示す一覧検索ウィンド76が表示される。この一覧検索ウィンド76には、引継内容を検索する期間を入力するために日付を設定入力するテキストボックス76aが設けられている。また、一覧検索ウィンド76には、ブックマークが付けられた情報を一覧表示させるための検索する条件を設定する複数のラジオボタン76bが設けられている。これらラジオボタン76bにより設定される条件としては、例えば上述した「直長ピックアップ」、「運管ピックアップ」、「設管ピックアップ」である。さらに、一覧検索ウィンド76には、検索対象となる範囲、すなわち製油装置2の種類などを設定入力するためのリストボックス76cが設けられている。そして、この一覧検索ウィンド76には、設定した条件で検索を実行させて情報を一覧表示させるためのコマンドボタン76dが設けられている。
【0088】
そして、この一覧検索ウィンド76により、例えば図14および図15に示すような情報一覧ウィンド77が表示される。すなわち、画面設定ボックス71aのリスト項目およびハイパーリンク7hの操作により、例えばレポートの作成のためなどにブックマークが付けられた情報を一覧表示させる情報一覧ウィンド77が表示される。
【0089】
この情報一覧ウィンド77は、情報を図14に示す運転内容の情報の領域77aと、図15に示す工事内容の情報の領域77bにそれぞれまとめて表示する。そして、各領域77a,77bでの表示としては、例えば対象の製油装置2の情報、引継事項である運転内容や工事内容の情報、この引継事項の情報が発生した日付、勤務時間帯などが表示される。そして、引継事項の情報が表示される部分には、その情報に関してより詳細で具体的に表示する上述した期間条件ウィンド72や日付条件ウィンド73などの引継簿ウィンドを開示するコマンドボタン77cが設けられている。また、運転内容の情報の領域77および工事内容の情報の領域77bには、表示切替コマンドボタンが設けられている。
【0090】
さらに、情報一覧ウィンド77には、一覧表示された情報量が多すぎる場合に、さらに条件を加えて一覧表示される情報量を少なくさせる絞込検索をする上述したものと同一の絞込検索機能77dが設けられている。この絞込検索機能77dには、例えば装置順で一覧表示させるのか日付順で一覧表示させるのかを設定するためのラジオボタン77d1も設けられている。
【0091】
画面設定ボックス71aのリスト項目およびハイパーリンク71iの操作により、電子引継簿を構成する例えば図16に示すキーワード検索ウィンド78が表示される。このキーワード検索ウィンド78は、上述した図15に示す絞込検索機能と同一の構成で形成され、図14および図15に示すような情報一覧ウィンド77を表示させる。
【0092】
画面設定ボックス71aのリスト項目およびハイパーリンク71jの操作により、電子引継簿を構成する例えば図17に示す運転条件検索ウィンド79が表示される。この運転条件検索ウィンド79は、運転条件で操業に関する情報を検索するためのもので、引継内容を検索する期間を入力するために日付を設定入力するテキストボックス79aが設けられている。さらに、運転条件検索ウィンド79には、原油の種類、および、分留物や処理物あるいは製品の種類で検索する条件を設定入力するリストボックス79bがそれぞれ設けられている。また、運転条件検索ウィンド79には、流量や反応温度などの運転条件で検索する条件を設定入力する複数のテキストボックス79cが設けられている。そして、運転条件検索ウィンド79には、設定した条件で検索を実行させて情報を一覧表示させるためのコマンドボタン79dとが設けられている。
【0093】
そして、この運転条件検索ウィンド79により、例えば図18に示すような運転情報一覧ウィンド80が表示される。この運転情報一覧ウィンド80には、上述した設定入力されて所定の引継簿の通し番号が付されて1つの記録情報であるレコードとなった図3に示す基本運転データ入力ウィンド3の引継事項が一覧表示される。また、図18に示すように、各表示には、上述した表示内容に関連した情報の引継簿ウィンドを開示するコマンドボタン77cがそれぞれ設けられている。
【0094】
画面設定ボックス71aのリスト項目およびハイパーリンク71kの操作により、電子引継簿を構成する例えば図19に示す進捗グラフウィンド81が表示される。この進捗グラフウィンド81は、上述した設定入力されて1つの記録情報であるレコードとなった複数例えば全運転内容データ入力ウィンドにおける製油装置2毎あるいは作業グループ毎で、進捗状態である3つの「■実施済」、「□実施未」および「△実施継続」の記号で分類してグラフ化および数値化表示したものである。そして、各グラフの領域82aを選択、すなわちクリックすることにより、それらに関する上述した図14および図15に示すような情報一覧ウィンド77が表示される。
【0095】
画面設定ボックス71aのリスト項目およびハイパーリンク71lの操作により、電子引継簿を構成する例えば図20に示す自主保全グラフウィンド82が表示される。この自主保全グラフウィンド82は、上述した設定入力されて1つの記録情報であるレコードとなった複数、例えば図4に示す全運転内容データ入力ウィンド64における自主保全のチェックボックス64hがチェックされたものを、例えば製油装置2の種類毎、月毎および作業グループ毎で分類して、図19に示す進捗グラフウィンド81と同様の形態でグラフ化および数値化したものである。なお、同様に、グラフの領域82aを選択、すなわちクリックすることにより、それらに関する上述した図14および図15に示すような情報一覧ウィンド77が表示される。
【0096】
画面設定ボックス71aのリスト項目およびハイパーリンク71mの操作により、電子引継簿を構成する図示しない個人進捗情報ウィンドが表示される。この個人進捗情報ウィンドは、上述した設定入力されて1つの記録情報であるレコードとなった全運転内容データ入力ウィンドおよび工事内容データ入力ウィンドのうち、例えば本情報処理システム4を利用するために設定入力するID番号やパスワードなどの個人情報において、図20に示す自主保全グラフウィンド82と同様の形態で進捗状況をグラフ化および数値化したものである。なお、同様に、グラフの領域82aを選択、すなわちクリックすることにより、それらに関する上述した図14および図15に示すような情報一覧ウィンド77が表示される。
【0097】
画面設定ボックス71aのリスト項目およびハイパーリンク71nの操作により、本情報処理システム4の概要やその利用方法などの説明を表示するヘルプ機能と同様な図示しない説明ウィンドが表示される。
【0098】
画面設定ボックス71aのリストおよびハイパーリンク71oの操作により、例えば図21のウエッブブラウザによる表示画面で示されるヒヤリメニューウィンド83が表示される。このヒヤリメニューウィンド83は、電子引継簿を構成する特にノウハウ的引継事項であるヒヤリハットに関する記載事項で構成されている。
【0099】
このヒヤリメニューウィンド83には、電子引継簿を構成する別のウィンドを呼び出すためのウィンドを設定する画面設定ボックス83aが設けられている。この画面設定ボックス83aは、所望のウィンドを選択して決定すれば所望のウィンドが表示されるリストボックスにて構成されている。また、ヒヤリメニューウィンド83aには、検索する語句を設定入力するためのテキストボックス83bと、このテキストボックス83bに設定入力した語句で検索を実行させるコマンドボタン83cとが設けられている。さらに、ヒヤリメニューウィンド83には、画面設定ボックス83aのリストと同一で所望のウィンドを表示させるためのハイパーリンク83dが複数設けられている。
【0100】
画面設定ボックス83aのリスト項目およびハイパーリンク83dの操作により、電子引継簿を構成する例えば上述した図12に示すヒヤリ一覧ウィンド75が表示される。すなわち、図6に示す運転支援メニューウィンド71の場合と同様に、ヒヤリ一覧ウィンド75は、例えば期間や特定の月日で一覧表示したり、進捗状況である未完了の情報についてグラフ化表示させたり、絞込検索にて一覧表示させるなど、それぞれ所望される分類・組み合わせで表示される。
【0101】
画面設定ボックス83aのリスト項目およびハイパーリンク83eの操作により、本情報処理システム4へのアクセス権の発行または解除を設定するための図示しないアクセス権管理ウィンドが表示される。
【0102】
〔情報処理システムの動作〕
次に、上記一実施の形態の情報処理システム4の動作について図面に基づいて説明する。
【0103】
製油装置2の運転や保守管理を実施した作業者は、端末コンピュータを適宜操作し、この端末コンピュータをネットワークを介して情報処理システム4に接続すなわちアクセスさせる。この端末コンピュータの情報処理システム4へのアクセスの際、情報処理システム4の情報処理手段42は端末コンピュータからのアクセス権の有無を確認する。例えば、情報処理システム4へアクセスする作業者の名前、および、アクセスするためのパスワードやIDなどを入力設定するためのテキストボックスを端末コンピュータの表示装置に表示させる。
【0104】
そして、情報処理手段42は、アクセス権がない者のアクセス要求がなされた場合には、本情報処理システム4へのアクセス拒否を端末コンピュータに出力、例えば端末コンピュータの表示装置に名前あるいはパスワードなどが不適切である旨を表示させるとともにアクセスできない旨を表示させる。また、アクセス権がある者のアクセス要求であることを認識すると、情報処理手段42は端末コンピュータを情報処理システム4と接続させ、例えば図6に示す運転支援メニューウィンド71、図21に示すヒヤリメニューウィンド83、図2に示す入力メニューウィンド61、図示しない運転操作基準書マニュアルウィンドなどを開くためのメインメニューウィンドを端末コンピュータの表示装置に表示させる。
【0105】
このメインメニューウィンドを確認した作業者は、電子引継簿を作成するために、製油装置2の運転状態や保守管理を実施した作業内容などの操業に関する情報を入力するために、入力メニューウィンド61を選択して開く。さらに、この入力メニューウィンド61のデータ入力のタグウィング62を選択して開く。そして、作業者は、各テキストボックス62a〜62cに所定の情報、すなわち日付、勤務時間帯の種別および製油装置2の種別を設定入力するとともに、図3に示す基本運転データ入力ウィンド63、図4に示す運転内容データ入力ウィンド64および図5に示す工事内容データ入力ウィンド65を適宜選択して開き、図22に示すように、各ウィンド63〜65に製油装置2の操業に関する情報を適宜設定入力する(処理S1)。
【0106】
この設定入力により、図22に示すように、情報処理手段42は端末コンピュータからの設定入力を認識し、設定入力された情報にID番号を付して1つの記録情報であるレコードとしてナレッジバンク41を構成する運転基準データベース43に記憶させる(処理S2)。このようにして、電子引継簿を構成する情報が設定入力される。
【0107】
また、例えば製油装置2の運転や保守管理を実施した作業者が、例えばその所属する部署での打ち合わせ、あるいは作業の進捗状態の確認、報告書の作成、今後の操業における予測データの確認などのため、電子引継簿を確認する場合がある。この場合には、上述したように端末コンピュータを情報処理システム4に接続させ、端末コンピュータの表示装置にメインメニューを表示させる。そして、作業者は、図6に示す運転支援メニューウィンド71を選択して開き、さらに運転支援メニューウィンド71から適宜電子引継簿を開示させる。
【0108】
すなわち、運転支援メニューウィンド71の画面設定ボックス71aや特記事項開示ボックス71d、各種ハイパーリンク71e〜71oを操作して所望のウィンドを開く。この作業者による所望のウィンドの開示要求により、情報処理手段42は適宜ナレッジバンク41の各データベース43〜45から所定の操業に関する情報を呼び出す。そして、情報処理手段42は、上述したウィンドの所定の表示形態で端末コンピュータの表示装置に作業者が要求する情報を表示させる制御をする。このことにより、作業者は、知りたい情報を確認することができる。
【0109】
一方、例えばこれから製油装置2の運転や保守管理を実施しようとする作業者は、まず電子引継簿を確認する。すなわち、前の勤務時間帯の作業者からの引継内容を確認する。具体的には、作業者は、上述したように端末コンピュータを情報処理システム4に接続させ、端末コンピュータの表示装置にメインメニューを表示させる。そして、作業者は、運転支援メニューウィンド71を選択して開き、さらに運転支援メニューウィンド71から電子引継簿を開示させる。すなわち、画面設定ボックス71aや特記事項開示ボックス71d、各種ハイパーリンク71e〜71oを操作して上述した所望のウィンドを開き、情報処理手段42により作業者が要求する情報を上述したウィンドの適宜所定の形態で開示させ、引継内容を確認する。
【0110】
また、作業者が製油装置2の運転に際して、製油装置2の構成部位を操作する場合に、その操作方法を知りたい場合には、同様にしてメインメニューを開き、運転操作基準書マニュアルウィンドを開き、知りたい操作方法の開示要求を設定入力する。このことにより、情報処理手段42は、P&I/設備図書データベース44から、設定入力された開示要求に対応する操作方法の情報を、所定の表示形態で端末コンピュータの表示装置に表示させる制御をする。このことにより、作業者は、知りたい操作方法を認識することができる。
【0111】
さらに、情報処理手段42は、作業者の要求に応じて、あるいは自動的に、適宜P&I/設備図書データベース44から対応する製油装置2の図面や設備に関する情報を表示させたり、電子引継簿を構成する引継内容における関連する作業内容の情報を表示させたり、操作内容に対応したヒヤリハットに関する情報を表示させてもよい。このことにより、作業者は、知りたい操作方法を確実に詳細で分かりやすく認識できるとともに、熟練を要する操作でも確実で安定した操作が容易に実現できる。
【0112】
このように、本実施の形態の情報処理システム4によれば、引継内容を電子化して統括管理・処理するので、使い勝手がよく操業に関する情報が容易に取り扱いできる良好なデータベースとして利用することができる。
【0113】
また、本実施の形態の情報処理システム4は、若手社員がベテラン社員と同様に運転技術を習得することができるためのシステムとしても利用できる。
【0114】
すなわち、情報処理手段42は、順次設定入力されて記憶される処理状況や保守管理状況に基づいて学習し、ナレッジバンク41に記憶された製油装置2の運転状態や作業内容などの処理状況、あるいは工事内容などの保守管理状況を、より良好な操業が得られるように適宜設定変更してより良好な情報を蓄積させる。このことにより、この情報処理システム4の情報を利用することにより、必然的にノウハウが盛り込まれた情報を利用することができ、ベテラン社員と同様の運転技術を習得できることとなる。
【0115】
具体的には、情報処理手段42は、図22に示すように、例えば技術センタ33や操業管理センタ3からの要求、あるいは自動的に、P&I/設備図書データベース44に蓄積した情報と、運転基準データベース43に蓄積された情報とを照合する(処理S3)。そして、照合した結果、運転基準データベース43の情報がP&I/設備図書データベース44の情報と一致、すなわち作業内容がマニュアル通りに作業されていると判断した場合には、例えば一致した作業内容を分類して一覧表示可能に運転基準データベース43の情報に基準書マニュアル通りである旨の情報と1つの記録情報であるレコードとして更新・蓄積させる(処理S4)。
【0116】
処理S3で運転基準データベース43に蓄積された情報とP&I/設備図書データベース44に蓄積された情報とが一致していないと判断した場合、製油装置2の設備の補修・改造がなされているか否かを判断する(処理S5)。この判断としては、例えば図5に示す工事内容データ入力ウィンド65から入力されて、工事内容が引継内容として電子引継簿を構成する情報としてP&I改訂のチェックボックス65hのチェックの有無など、既に設定入力されているか否かを、運転基準データベース43に蓄積された操業に関する情報から検索する(処理S6)。
【0117】
そして、既に補修・改造されていると判断した場合には、例えば技術センタ33のシステム管理部署の作業者が情報処理システム4にアクセスした際に既に設備の改造があり、運転操作基準書マニュアルの情報を改訂する必要がある旨を表示などにより報知する。そして、例えばシステム管理部署の作業者が情報処理システム4に接続して、運転操作基準書マニュアルの情報が改訂される(処理S7)。
【0118】
なお、この処理S5において、設備の補修・改造の有無の判断の代わりに補修・改造の是非を判断させるようにしてもよい。すなわち、例えば、一致しない情報が一致する情報と合わせた全体に対する割合がある程度多いと判断した場合、あるいは技術センタ33や操業管理センタ3の作業者の設定入力により(処理S6)、設備を補修・改造する必要があると判断する。そして、設備の補修・改造が必要であると判断した場合、例えば設備の保全部署の作業者にその旨を情報処理システム4にアクセスした際に表示などにより報知して、補修・改造を促してもよい。
【0119】
さらに、処理S5において、設備の補修・改造がなされていないと判断した場合、一致しない作業内容が安定した作業の遂行が困難であるか否かを判断する(処理S8)。例えば運転基準データベース43に蓄積され一致しない作業内容の情報が、例えばヒヤリハットとしてチェックボックス64h,65hのチェックがなされているなどを基準として判断する。そして、例えば運転基準データベース42の一致しない作業内容の情報が危険を伴う作業であると判断された場合には、その旨を1つの記録情報であるレコードとして、安全フォーラムデータベース45などに更新・蓄積させる(処理S9)。
【0120】
そして、情報処理手段42は、例えば設備の保全部署の作業者にその旨を情報処理システム4にアクセスした際に表示などにて報知させ、設備の補修・改造が必要である旨を表示させる。このことにより、設備の補修・改造がなされ、その旨を例えばシステム管理部署の作業者が認識することにより、処理S7が実施され、運転操作基準書マニュアルが改訂される。
【0121】
また、処理S5および処理S8において、運転基準データベース43に蓄積された情報がP&I/設備図書データベース44の情報と一致しないと判断された情報については、例えば暫定措置として情報処理システム4にアクセスした全作業者が認識できるように設定する(処理S10)。
【0122】
このように、P&I/設備図書データベース44に蓄積された情報は適宜改訂され、この蓄積された情報うちの運転操作基準マニュアルに基づいて作業を実行することにより、上述したように、熟練を要する作業でも容易に安定して確実に実施できる。
【0123】
そして、電子引継簿を構成する情報を、例えば運転内容データ入力ウィンド64および工事内容データ入力ウィンド65にて設定入力する際、チェックボックス64h,65hを適宜チェックさせて引継内容の性質の設定を促している。このため、マニュアル的情報の分類が容易にでき、マニュアル的情報の管理および利用が容易で短時間にできる。
【0124】
また、本実施の形態の情報処理システム4は、製油装置2の操業に関する予測システムとしても機能する。
【0125】
すなわち、情報処理手段42は、運転基準データベース43に蓄積された情報を同一内容(属性)毎に分類する。この分類は、電子引継簿の作成の際に設定入力される分類内容情報、例えば製油装置2の種別毎、製油装置2を構成する各部位や設備毎、製油装置2の運転状態毎、作業内容毎、作業者の勤務時間毎、部署単位毎、各種チェックボックス64h,65hのチェックの有無に基づいて分類される。
【0126】
そして、情報処理手段42は、図23に示すように、内容の発生頻度と時間経過との関係、あるいは蓄積された内容の数値情報の平均に対する設定入力された内容との不一致状態などにより、分類毎に製油装置2の設備、運転状態、作業者の操作内容などを予測する。例えば、部品の交換や調整などの同一作業内容の時間間隔が次第に短くなったり、給油する潤滑油の量が次第に多くなったり、製品の生産量が次第に減少したり、反応塔7の温度が次第に低くなるなど、計時手段や演算手段を利用して作業内容の傾向が導き出せる。この導き出された傾向から、運転状態や保守管理状態が予測、すなわち改造や補修、調整の有無、作業内容の変更の有無などが予測される。
【0127】
具体的には、上述したように、作業者が端末コンピュータを用いて設定入力した処理状況や保守管理状況を、情報処理手段42がネットワークを介して取得し、ナレッジバンク41に適宜蓄積する。そして、処理状況や保守管理状況を確認するために情報処理システム4にアクセスして、所望する情報を開示させる。この情報の開示の際、所望する情報とともに同一内容を一覧表示させる。このことにより、同一内容の経過時間が次第に、例えば指数関数的に短くなったり、略同一状態で蓄積された情報と異なる状態であることを容易に判断、すなわち予測できる(処理S11)。
【0128】
この予測された結果は、例えば関連する作業者が上述したように情報処理システム4にアクセスした際に表示などにより報知させる。なお、判断した作業者が、情報に関する関連部署に対して改造や補修、調整の有無、作業内容の変更の有無などを促す情報を引継事項として設定入力してもよい。
【0129】
このように、製油装置2の運転状態や保守管理に反映させたり、作業者の操作内容に反映させる(処理S12)。なお、予測結果に基づいて、作業者の作業内容の管理にも利用できる。
【0130】
従って、良好に引継内容を伝えるための電子引継簿を構成する操業に関する情報を適宜時間経過や運転内容・作業内容で処理することにより、操業に関する予測もできる予測システムとして利用することができる。
【0131】
さらに、電子引継簿を構成する情報を、例えば運転内容データ入力ウィンド64および工事内容データ入力ウィンド65にて設定入力する際、分類内容情報であるチェックボックス64h,65hを適宜チェックさせて引継内容の性質の設定を促している。このため、予測するためのデータの分類が容易にでき、予測が容易で短時間にでき、予測するためのシステムの構成も簡略化できる。
【0132】
この予測システムとしての構成において、同一作業内容を表示させて作業内容の傾向を予測する構成の他、情報処理手段42にて実際に予測させる構成としてもよい。
【0133】
例えば、作業者が端末コンピュータを用いて設定入力した処理状況や保守管理状況を、情報処理手段42がネットワークを介して取得し、この情報の種別を分類内容情報であるチェックボックス64i,65iの内容に基づいて判断する。そして、同一内容の情報をナレッジバンク41に蓄積された情報と照合させる。同一内容がない場合には、そのままナレッジバンク41に蓄積する。同一内容がある場合には、その従前の同一内容が生じた時刻からの経過時間を演算する。そして、情報処理手段42は、同一内容の経過時間が次第に、例えば指数関数的に短くなったり、略同一状態で蓄積された情報と異なる状態であることを判断、すなわち予測する。
【0134】
なお、予測した結果を、例えば関係部署に報知あるいは関係部署の作業者が本情報処理システム4にアクセスした際に報知して、適宜対処を促すようにしてもよい。
【0135】
そして、電子引継簿を構成する情報を、例えば運転基準データ入力ウィンド63、運転内容データ入力ウィンド64および工事内容データ入力ウィンド65にて設定入力する際、勤務時間帯の設定入力を促している。このことにより、例えば作業内容や操作内容、運転内容などを事前に設定入力することで、本情報処理システム4をスケジュール管理としても容易に利用できる。
【0136】
すなわち、図24に示すように、例えばスケジュール管理したい作業者は、運転基準データ入力ウィンド63、運転内容データ入力ウィンド64および工事内容データ入力ウィンド65を用いて、スケジュール情報である作業内容予定や操作内容予定、運転内容予定などを事前に設定入力する(処理S31)。そして、情報処理手段42にて情報の内容が対応するナレッジバンク41の各データベース43〜45に適宜記憶させる(処理S32)。
【0137】
そして、情報処理手段42は、事前に設定入力された情報を計時手段により時間管理する(処理S33)。また、作業者が実際に作業し、その情報を運転基準データ入力ウィンド63、運転内容データ入力ウィンド64および工事内容データ入力ウィンド65を用いて設定入力されると(処理S34)、情報処理手段42は予定された時間で実施されたか否か、および従前に蓄積された作業内容との照合による作業内容の評価を実施する(処理S35)。そして、情報処理手段4は、その評価内容を、実際に作業した内容で設定入力された情報と関連付けしてナレッジバンク41に記憶させる(処理S36)。
【0138】
そして、作業者が例えば運転支援メニューウィンド71を開いて、適宜進捗状況などを容易に確認することができる。このことにより、事前に設定入力された情報の進捗状態が容易に認識できるとともに、ウェッブブラウザで所属部署や関連部署もその情報を容易に認識でき、進捗状況に対応した操業も容易にできる。
【0139】
さらに、実際の作業内容を従前のナレッジバンク41に蓄積された関連する作業内容と照合させてその作業内容を評価することにより、作業内容の良否とともに、プラント設備や運転操作基準書マニュアルの改善の是非などの判断も容易にできる。このため、上述したように、プラント設備や運転操作基準書マニュアルに関係する作業者が本情報システム4にアクセスことにより、その状態が容易に認識でき、プラント設備の保守管理や運転操作基準書マニュアルの改訂などが施され(処理S37)、あるいはその対応について事前に入力設定することにより(処理S38)、関連する作業者にも報知でき、より良好な操業が得られる。
【0140】
また、電子引継簿を構成する情報を、例えば運転内容データ入力ウィンド64および工事内容データ入力ウィンド65にて設定入力する際、設定入力した内容が、各部署における重要度や引用・参考性が高いか否かを設定入力する分類内容情報であるチェックボックス64i,65iのチェックを促し、引継内容にしおりすなわちブックマークを付け、一覧表示やレポート作成の際の利用などが容易にできるようにしている。
【0141】
すなわち、図25の概念図に示すように、ナレッジバンク41に蓄積した情報を、適宜情報処理手段42が電子引継簿として処理して本情報処理システム4にアクセスした作業者が利用したい情報を所望する形態で表示させる処理をする。このため、各作業者に対応して同じ内容でも複数の表示形態で表示させるために、同一内容を複数設定入力する必要がなく、また必要な情報を容易に取得することができ、本情報処理システム4のシステム構造の簡素化が容易にできるとともに、ナレッジバンク41として情報の蓄積が容易で簡素化でき、データベースとしての利便性を向上でき、スケジュール管理や予測も容易にできるとともに、本情報処理システム4の構築および保守管理も容易にできる。
【0142】
〔情報処理システムの効果〕
上述したように、上記実施の形態によれば、以下に示すような効果を奏する。
【0143】
(1)製油装置2における処理状況および保守管理状況である作業内容が設定入力されと、情報処理手段42にてナレッジバンク41に記憶させる。そして、情報処理手段42により、あらかじめナレッジバンク41に蓄積した処理装置の処理を実施させるための基準操作方法および基準保守管理方法である運転操作基準書マニュアルにそれぞれ対応して照合させて一致状態を判断し、一致しない運転操作基準書マニュアル、あるいは、作業内容を報知させる。このため、単に運転操作基準書マニュアルを記憶するデータベース、もしくは、引継事項として製油装置2における作業内容の確認や記録などのためのデータベースとしての機能のみならず、実際の製油装置2の作業内容に応じて、例えば製油装置2の調整や改造などの必要性を認識させるために報知させることにより、製油装置2の調整や改造などに対応して運転操作基準書マニュアルが改訂されてより良好なもの更新されることとなり、また、正しい運転操作基準書マニュアルを報知して実際の作業内容が誤っていることを報知するなどにより誤った作業内容が是正されることとなり、仮に熟練を要するような煩雑で困難な作業を熟練度の低い作業者でも確実で容易に安定した作業可能となる良好なデータベースを得ることができる。
【0144】
(2)情報処理手段42により、作業内容が一致しない運転操作基準書マニュアルについて改訂を促す報知をする。このため、実際の製油装置2の作業内容が一致しない運転操作基準書マニュアルを報知させて、促された改訂を実施することにより、より良好な運転操作基準書マニュアルが得られ、製油装置2の操業がより確実で容易に安定して実現させることができる。
【0145】
(3)情報処理手段42により、作業内容が一致しない運転操作基準書マニュアルに対応する製油装置2の設備の改善を促す報知をする。このため、実際の製油装置2の操作内容が運転操作基準書マニュアルに一致しない製油装置2の設備の不具合が改善されることとなり、より良好な製油装置2が得られ、より良好に操業できる。
【0146】
(4)本情報処理システム4にネットワークを介して接続する端末コンピュータなどから、運転操作基準書マニュアルを改訂する内容の設定入力を認識することにより、情報処理手段42により蓄積されている運転操作基準書マニュアルに代えて改訂の内容を記憶させて更新処理する。このため、容易に製油装置2を操業できるための運転操作基準書マニュアルが簡単な構成で容易に改訂できる。さらには、例えば実際に製油装置2を操業させる操業管理センタ3や、操業に関して検討などする技術センタ33から直接改訂のための操作が容易にでき、保守管理の利便性を向上できるとともに、迅速に対応でき良好な操業ができる。
【0147】
(5)操業に関する情報を設定入力する際に、その内容の性質の設定を促す分類内容情報であるチェックボックス64h,65hや、内容が各部署における重要度や引用・参考性が高いか否かの設定を促す分類内容情報である属性情報としてのチェックボックス64i,65iを設けている。このため、情報処理手段42による情報の分類、検索が短時間で容易にでき、例えば操業に関する懸案とすべき情報の分類や検索および情報処理、操業のヒヤリハットなどのノウハウ的な内容の分類や検索および情報処理、操業の予測のための分類や検索および情報処理、あるいは特定の作業者に対応して要求する情報を開示させるための分類や検索および情報処理などが容易にでき、情報処理手段42の構成を簡略化でき、情報処理システム4の構築や保守管理が容易にできる。
【0148】
(6)操業に関する情報を適宜時間経過や運転内容・作業内容で処理する。このため、操業に関しての予測システムあるいはスケジュール管理としても利用できる。
【0149】
(7)操業に関する処理状況および保守管理状況の情報を同一内容で分類し、時刻に基づいた発生頻度や、同一内容の情報の数値情報の偏差に基づき所定の偏差との対比により今後の操業に関する処理状況や保守管理状況が導き出される、すなわち予測できる。このため、製油装置2を安定して良好に操業するための引継事項となる処理状況や保守管理状況がデータベース化され、各情報の取扱が容易となるとともに、これら処理状況や保守管理状況を利用して今後の処理状況や保守管理状況を容易に予測でき、良好な操業を容易に得ることができる。
【0150】
(8)複数のスケジュール情報である操業に関する処理状況および保守管理状況の情報をその内容の属性を示す分類内容情報である各種チェック項目の情報とを1つの記録情報として関連付けし、スケジュール情報を同一内容で分類して要求に対応した形態で出力、すなわち表示させる。このため、スケジュール情報が分類内容情報に基づいて管理され、所望のスケジュール情報が分類内容情報の設定により容易に取扱、例えば確認でき、膨大なスケジュール情報でも所望のスケジュール情報が容易に利用でき、スケジュール管理としての利便性を向上できるとともに、スケジュール情報の傾向も容易に判断、すなわち予測でき、スケジュール管理とともに情報の内容の対応も容易にでき、良好な操業を得ることができる。
【0151】
(9)チェック項目を複数設けて適宜複数チェック可能として情報の内容(属性)を設定可能とする。このため、1つの記録情報のうちの情報でも複数の内容の属性として取扱でき、スケジュール管理や予測など情報の取扱性を向上できる。
【0152】
(10)スケジュール管理として実際の作業内容や時間について評価処理する。このため、例えば危機管理や危険予知、その内容などを容易に広く開示でき、さらなる良好な操業が得られる。
【0153】
(11)情報として作業完了した旨の「■実施済」、作業未了である旨の「□実施未」、作業継続である旨の「△実施継続」の3つの記号による進捗状況の設定を促している。このことにより、容易に作業内容の進捗状況を判断できるとともに、情報処理手段42にて情報を適宜処理する際の分類や検索、情報処理が容易にでき、情報処理手段42の構成を簡略化でき、情報処理システム4の構築や保守管理が容易にできる。
【0154】
(12)情報として設定入力する作業内容とともに、添付ファイルとして写真やグラフなどの画像ファイルを一体的に関連付けして蓄積させ処理をする。このため、ノウハウ的情報をさらに具体的に明確で容易に利用できるとともに、関連付けして蓄積させるので、これら添付ファイルとしては別途設けたデータベースやネットワークを介して取得する構成とすることもでき、情報処理システム4の構築や保守管理が容易にできる。
【0155】
(13)操業に関する情報にブックマークを付け、このブックマークに基づいて処理する。このため、一覧表示やレポート作成の必要とする情報の開示が容易にでき、利便性を向上できる。
【0156】
(14)情報処理手段42により、例えば電子引継簿として構成される運転支援メニューウィンド71からハイパーリンクされるTBMウィンド74を設け、本情報処理システム4に接続して運転支援メニューウィンド71を開く際に設定入力する接続作業者の所属部署やパスワードなどに基づいて、接続する日付とその接続作業者と同一の勤務時間帯や部署とに関連した情報を一覧表示させる処理をする。このことにより、例えば一日の業務予定や業務結果を部署内で検討してより良好な操業の作業内容が容易に導き出せるようにすることにも利用でき、利便性および操業性を向上できる。
【0157】
(15)例えば汎用のコンピュータを利用してコンピュータにインストールすることにより上述した操業支援のための情報処理システム4で制御するための動作をコンピュータに実行させることができ、本発明の利用促進を大幅に図ることができる。
【0158】
〔他の実施の形態〕
なお、本発明は、上記実施の形態に限定されるものではなく、実施の際の具体的な構造および形状、方法など、本発明の目的を達成できる範囲で様々に応用しその変形をも含むものである。
【0159】
【発明の効果】
本発明によれば、端末コンピュータからネットワークを介して取得され、分類内容情報に基づいて同一属性毎に分類分けした同一属性の処理状況情報および保守管理状況情報を、時刻情報に基づいて発生頻度を演算する。さらに、同一属性の処理状況情報および保守管理状況情報の数値情報の偏差を演算する。そして、ネットワークを介して接続する端末コンピュータからの処理状況情報および保守管理状況情報のうちの少なくともいずれか一方の開示要求を認識すると、演算結果の発生頻度とともに所定の偏差を超える数値情報を含む処理状況情報および保守管理状況情報を、ネットワークを介して接続する端末コンピュータへ表示可能に送信する。
このため、処理装置を安定して良好に操業するための引継事項となる処理状況や保守管理状況がデータベース化され、各情報の取扱が容易となるとともに、これら処理状況や保守管理状況を利用して今後の処理状況や保守管理状況が容易に予測され、良好な操業が容易に得られる。
さらに、今後の処理状況および保守管理状況の予測がより安定して得られる。
また、マニュアルあるいは処理装置の操作・作業内容などの処理状況および保守管理状況のデータベースとしての機能のみならず、入力設定される情報の予測としても利用でき、離れた箇所からでも利用でき、操業支援システムが広く利用でき、利便性が向上する。
【図面の簡単な説明】
【図1】 本発明の一実施の形態に係る製油プラントの概略構成を示すブロック図である。
【図2】 前記一実施の形態における処理制御システムの操業に関する情報を入力するためのウィンド構成を示す表示画面図である。
【図3】 前記一実施の形態における操業に関する情報のうちの運転状態に関する情報を入力するためのウィンド構成を示す表示画面図である。
【図4】 前記一実施の形態における操業に関する情報のうちの運転操作の作業内容に関する情報を入力するためのウィンド構成を示す表示画面図である。
【図5】 前記一実施の形態における操業に関する情報のうちの工事内容に関する情報を入力するためのウィンド構成を示す表示画面図である。
【図6】 前記一実施の形態における電子引継簿のメニューウィンドとなる運転支援メニューウィンドを示す表示画面図である。
【図7】 前記一実施の形態における特記事項開示ボックスの内容を示す表示画面図である。
【図8】 前記一実施の形態における電子引継簿のうちの期間条件ウィンドの運転内容の領域を示す表示画面図である。
【図9】 前記一実施の形態における電子引継簿のうちの期間条件ウィンドの工事内容の領域を示す表示画面図である。
【図10】 前記一実施の形態における電子引継簿のうちの日付条件ウィンドを示す表示画面図である。
【図11】 前記一実施の形態における電子引継簿のうちのTBMウィンドを示す表示画面図である。
【図12】 前記一実施の形態における電子引継簿のうちのヒヤリ一覧ウィンドを示す表示画面図である。
【図13】 前記一実施の形態における操業に関する情報でブックマークが付された情報を一覧表示させるために検索する一覧検索ウィンドを示す表示画面図である。
【図14】 前記一実施の形態における一覧検索ウィンドで検索された電子引継簿のうちの情報一覧ウィンドの運転内容を示す表示画面図である。
【図15】 前記一実施の形態における一覧検索ウィンドで検索された電子引継簿のうちの情報一覧ウィンドの工事内容および絞込検索機能を示す表示画面図である。
【図16】 前記一実施の形態における操業に関する情報をキーワードで検索するためのキーワード検索ウィンドを示す表示画面図である。
【図17】 前記一実施の形態における操業に関する情報を運転条件で検索するための運転条件検索ウィンドを示す表示画面図である。
【図18】 前記一実施の形態における運転条件検索ウィンドで検索された電子引継簿のうちの運転情報一覧ウィンドを示す表示画面図である。
【図19】 前記一実施の形態における電子引継簿のうちの進捗グラフウィンドを示す表示画面図である。
【図20】 前記一実施の形態における電子引継簿のうちの自主保全グラフウィンドを示す表示画面図である。
【図21】 前記一実施の形態における電子引継簿のメニューウィンドとなるヒヤリメニューウィンドを示す表示画面図である。
【図22】 前記一実施の形態における情報処理システムが熟練度の低い作業者でも容易に作業可能にする機能の概要を説明するための説明図である。
【図23】 前記一実施の形態における情報処理システムが予測システムとして機能する概要を説明するための説明図である。
【図24】 前記一実施の形態における情報処理システムがスケジュール管理システムとして機能する概要を説明するための説明図である。
【図25】 前記一実施の形態における情報処理システムが情報を作業者に対応して分類、検索、情報処理する機能の概要を説明するための説明図である。
【符号の説明】
1 処理プラントとして製油プラント
4 操業支援システムとしての情報処理システム
31 操業支援装置としての情報処理装置
32 サーバ
47 記憶手段としてのナレッジバンク
[0001]
BACKGROUND OF THE INVENTION
  The present invention provides a processing apparatus for processing raw materials under predetermined conditions to obtain a product.SetOperational support to support processingsystem, Its method, its programandIt relates to a processing plant.
[0002]
[Background]
  Conventionally, for example, in manufacturing plants such as the oil refinery industry, concrete industry, ceramics industry, and processing plants such as power plants, substations, water / garbage treatment facilities, a large amount of energy is required to stop and start the plant. In this case, since stable quality products cannot be obtained, continuous operation is generally performed. In this continuous operation, plant operation control and maintenance management are carried out, for example, by an operator's three-shift system. The worker needs to reliably convey the operating state and the contents of maintenance management to the worker in the next time zone so that stable continuous operation can be obtained. For this reason, meetings are made at the time of takeover, and takeover is performed using records such as documents and slips in which the operating state and the contents of maintenance management are written down.
[0003]
  However, when a meeting is held for each takeover, an enormous amount of information such as the operating state and the contents of maintenance management is taken over, and it takes a long time for the meeting. Furthermore, there is a possibility that leakage will occur in the contents to be taken over. In addition, when taking over records of documents, slips, etc., an operator creates a record. For this reason, the description contents differ for each worker, and there is a possibility that sufficient contents cannot be taken over, and the same description contents may be duplicated among the workers.NoThere is also a possibility that the record for transfer cannot be created efficiently.
[0004]
  On the other hand, along with recent improvements in electronic control technology and quality improvements of various materials, the operation of the plant is automatically controlled and centralized management of the operation state is facilitated. Therefore, the number of workers is decreasing in order to improve production efficiency. As a result, the operator has little experience with respect to plant operation such as stopping and starting the plant, and there is a risk that it will not be possible to sufficiently handle rare cases such as stopping, starting, and abnormal occurrence.
[0005]
[Problems to be solved by the invention]
  As described above, it is difficult to take over the leakage of the operating state of the plant and the contents of maintenance management, and it cannot be taken over efficiently. In addition, the level of skill of workers gradually decreases due to the automation of the operation control of the plant and the reduction in the number of people, and there is a risk that it will not be possible to sufficiently handle rare cases.
[0006]
  In view of these points, the present invention is an operation support that is easy to take over, can sufficiently handle operations, and can be stably operated.system, Its method, its programMuAnd to provide a treatment plant.
[0007]
[Means for Solving the Problems]
  The invention according to claim 1 acquires various data related to a processing apparatus in a processing plant via a network, and stores a plurality of the data so that the data can be output to a terminal computer connected via the network. Is an operation support system for supporting the operation of the raw material, and the raw material obtained from the terminal computer via the network is processed under a predetermined condition.Processing schedule information after a predetermined time of the processing apparatus, andAt least one of processing status information including numerical information in the processing device and maintenance management status information including numerical information of the processing deviceWhenThe time information when these processing status information and maintenance management status information occurredWhen,The processing schedule information andThe processing status informationWhenMaintenance management status informationWhenClassification content information indicating the attributes of the contents ofWhenTheIntegrallyA plurality of storage means associated with the storage means and a plurality of storage means stored in the storage means;The processing schedule information andThe processing status informationWhenMaintenance management status informationWhenAre classified into the same attributes based on the classification content information, and the processing status information in the same attribute and the processing status information of the same attribute that has been classified and the time information when the maintenance management status information occurred While calculating the occurrence frequency of maintenance management status information,Deviation of numerical information in processing status and maintenance management status relative to processing standard numerical informationTo calculate whether the deviation obtained by calculating exceeds a predetermined deviation,Evaluating the processing status by comparing the processing schedule information with the processing status information and the maintenance management status information,When the disclosure request of at least one of the processing status information and the maintenance management status information from the terminal computer connected via the network is recognized, the processing status information and the maintenance management status information in the same attribute Of frequency of occurrenceWhen,The processing status information and the maintenance management status information including the numerical information in which the deviation obtained by the calculation exceeds a predetermined deviationAnd the processing schedule information and the evaluation result of the processing status information and the maintenance management status information including the numerical information in which the deviation obtained by the calculation exceeds a predetermined deviation,And a control unit that transmits the information to the terminal computer connected via the network in a displayable manner.
[0008]
  In the present invention, raw materials obtained from a terminal computer via a network are processed under predetermined conditions.Processing schedule information after a predetermined time of the processing device;At least one of processing status information including numerical information in the processing device and maintenance management status information including numerical information of the processing device, time information when the processing status information and maintenance management status information occurred,Processing schedule information andThe processing status informationWhenMaintenance management status informationWhenClassification content information indicating the attributes of the content ofIntegrallyIn association with each other, a plurality of records as one record information are stored in the storage means. And the control means stores a plurality of storedProcessing schedule information andProcessing status informationNews andMaintenance status informationWhenAre classified into the same attributes based on the classification content information, and the processing status information and the maintenance management status information for the same attributes are based on the time information when the processing status information and the maintenance management status information of the same attributes are classified. The occurrence frequency is calculated. Furthermore, the control means calculates the deviation of the numerical information included in the processing status information and the maintenance management status information, and calculates whether or not a predetermined deviation is exceeded,Evaluate processing status by comparing processing status information and maintenance management status information with processing schedule information. When the control means recognizes at least one of the disclosure request of the processing status information and the maintenance management status information from the terminal computer connected via the network, the calculation result occurrence frequency, a numerical value exceeding a predetermined deviation Information and maintenance status information including information, The evaluation result of the processing status information including the processing schedule information and numerical information exceeding the predetermined deviation and the maintenance management status information,It is transmitted so that it can be displayed to the terminal computer connected via the network.
  This makes it possible to create a database of processing status and maintenance management status that will be taken over for stable and good operation of the processing equipment, making it easy to handle each type of information and using these processing status and maintenance management status. Thus, future processing status and maintenance management status can be easily predicted, and good operation can be easily obtained.
  Furthermore, prediction of future processing status and maintenance management status can be obtained more stably.
  Further, schedule management can be facilitated by processing schedule information after a predetermined time. In addition, since the evaluation of the processing content is performed by checking whether or not the processing has been performed at the scheduled time and the processing schedule information accumulated in the past, it is possible to easily check the progress status as appropriate. This makes it possible to easily recognize the progress status of information that has been set and input in advance, and for example, the department and related departments can easily recognize the information using a web browser, and operations corresponding to the progress status can be easily performed. .
In addition to determining the quality of processing contents, it is possible to easily determine whether or not to improve the plant equipment and the operation manual manual.
  In addition to functions as a database of processing status and maintenance management status such as manual or processing equipment operation / work contents, it can also be used as a prediction of information to be input and set, it can be used from a distant place, operation support The system can be used widely and convenience is improved.
[0009]
  Invention of Claim 2 expands the operation support system of Claim 1 to the operation support method, The various data regarding the processing apparatus which processes the raw material in a processing plant on predetermined conditions are transmitted via a network. An operation support method for acquiring and storing a plurality of the data so as to be output to a terminal computer connected via the network and supporting the operation of the processing device by the computer, from the terminal computer via the network Acquired,Processing schedule information after a predetermined time of the processing device;At least one of processing status information including numerical information in the processing device and maintenance management status information including numerical information of the processing deviceWhenThe time information when these processing status information and maintenance management status information occurredWhen,The processing schedule information andThe processing status informationWhenMaintenance management status informationWhenClassification content information indicating the attributes of the contents ofWhenTheIntegrallyA plurality of processing steps associated with each other and stored in the storage means; and a plurality of processing steps stored in the storage meansThe processing schedule information andThe processing status informationWhenMaintenance management status informationWhenThe processing status for the same attribute based on the processing step for classifying the same attribute based on the classification content information, and the processing status information of the same attribute classified and the time information when the maintenance management status information occurred Calculating the occurrence frequency of the information and the maintenance management status information,In the processing status and maintenance management status for numerical information of processing standardsCalculates whether the deviation obtained by calculating the deviation of numerical information exceeds a predetermined deviationThe processing status is evaluated by comparing the processing schedule information with the processing status information and the maintenance management status information.When recognizing a disclosure request for at least one of a processing step and the processing status information and the maintenance management status information from the terminal computer connected via the network, in the same attribute obtained by the calculation Calculation result of occurrence frequency of the processing status information and the maintenance management status informationWhen,The processing status information and the maintenance management status information including the numerical information in which the deviation obtained by the calculation exceeds a predetermined deviationAnd an evaluation result of the processing schedule information and the processing status information and the maintenance management status information including the numerical information in which the deviation obtained by the calculation exceeds a predetermined deviation,And a processing step of transmitting to the terminal computer connected via the network in a displayable manner. Thus, the same effect as that of the first aspect of the invention can be enjoyed.
[0010]
  The invention according to claim 3 is the claim2An operation support program characterized by causing a computer to execute the operation support method described in (1).
[0011]
  In the present invention, for example, it is claimed by installing on a computer using a general-purpose computer.2The operation support method described in (1) can be executed by a computer, and the use promotion of the present invention can be greatly promoted.
[0012]
  Claims3In the invention described in (1), the number of computers is not limited to one.Mu
[0013]
  Claim4The invention described in claim 1 is a processing apparatus for processing raw materials under predetermined conditions;1Operation support describedsystemAnd a processing plant characterized by comprising:
[0014]
  According to the present invention, the processing device is not only capable of functioning as a manual or a database of operation contents of the processing device, but also capable of easily performing work even by an unskilled worker.1Operation support describedsystemIs provided. As a result, good operation can be obtained and stable raw material processing can be obtained well.The
[0015]
DETAILED DESCRIPTION OF THE INVENTION
  Hereinafter, an embodiment of the present invention will be described with reference to the drawings. In the present embodiment, description will be made using an oil refinery plant as a processing plant. FIG. 1 is a schematic diagram showing the configuration of an oil refinery plant. The processing plant is not limited to a refinery plant, but can also be applied to a power plant, a substation, a processing facility such as water / garbage processing, a manufacturing facility such as a concrete industry or a ceramics industry.
[0016]
[Composition of refinery plant]
  As shown in FIG. 1, the refinery plant 1 includes an oil refiner 2 as a processing device, an operation management center 3, and an information processing system 4 as an operation support system.
    (Configuration of oil refinery)
  The oil refiner 2 includes a crude oil tank 5 that stores crude oil as a raw material. Crude oil flows into the crude oil tank 5 from transportation means such as the tanker 6. The crude oil tank 5 is connected to a reaction tower 7 for fractionating crude oil into various components. The reaction tower 7 is connected to a fraction storage tank 8 for storing various fractions that have been fractionated.
[0017]
  Further, the fraction storage tank 8 is connected to a treatment tower 9 for further purifying or synthesizing the fraction. The processing tower 9 is connected to a processed product storage tank 10 for storing processed processed products.
[0018]
  Further, the oil refiner 2 is provided with an additive storage tank 11 for storing the additive. Further, the oil refiner 2 is provided with a product tank 12. In the product tank 12, the fractions stored in the fraction storage tank 8, the processed product stored in the processed product storage tank 10, and the additive stored in the additive storage tank 11 are singly or appropriately mixed. The mixture is stored as a product as a product. And the product in the product tank 12 is conveyed to each utilization facility by transport means, such as the tanker 6 or the tank truck 13.
[0019]
    (Operation management center configuration)
  The operation management center 3 controls the operation of the oil refiner 2. The operation management center 3 includes an altitude monitoring system 21, an abnormal measure guidance unit 22, an input setting unit as an input unit (not shown), a display unit 23, and an operation control unit 24.
[0020]
  The altitude monitoring system 21 monitors the operating state of the oil refiner 2 based on signals detected from various sensors (not shown) provided in each part of the oil refiner 2. This altitude monitoring system 21 outputs the read contents of the operating state of the oil refiner 2 and its monitoring state.
[0021]
  The abnormal measure guidance means 22 recognizes whether an abnormality has occurred in the operating state of the oil refiner 2 monitored by the altitude monitoring system 21, for example. Then, by recognizing that an abnormality has occurred, guidance for taking measures in response to the abnormality is guided from a sounding means such as a speaker (not shown).
[0022]
  The input setting means has various switches and the like for an operator to set and input processing conditions such as operating conditions and monitoring conditions for controlling and monitoring the operating state of the oil refiner 2 by input operations of the various switches. Is.
[0023]
  The display means 23 is for displaying, for example, an operation management state, an abnormality occurrence location, an abnormal state, and the like.
[0024]
  The operation control means 24 controls and monitors the operation state of the oil refiner 2. The operation control unit 24 includes a crude oil property grasping unit 25, an inflow / outflow amount estimation unit 26, a product property estimation unit 27, a stabilization control unit 28, an operation automation unit 29, and a real time control unit 30. ing.
[0025]
  The crude oil property grasping means 25 recognizes the properties of the crude oil flowing into the crude oil tank 5 based on signals detected from various sensors, and appropriately outputs the recognized properties of the crude oil.
[0026]
  The inflow / outflow amount estimation means 26 is a crude oil tank, a reaction tower 7, a fraction storage tank 8, a processing tower 9, a treatment product storage tank 10, an additive storage tank 11, and a product tank 12. Detecting the inflow / outflow amount of products, additives, and products, and calculating the predicted inflow / outflow amount.
[0027]
  The product property estimation means 27 recognizes the properties of the obtained product based on signals detected from various sensors and outputs the recognized product properties as appropriate.
[0028]
  The stabilization control means 28 is for, for example, allowing the fractionation treatment in the reaction tower 7 and the treatment in the treatment tower 9 to proceed stably. For example, the amount of catalyst, temperature, flow rate, and the like are detected using various sensors, and control is performed so that a fraction with a stable property and a processed product are stably obtained.
[0029]
  The operation automation means 29 is for automatically controlling, for example, a stable fractionation process in the reaction tower 7 by the stabilization control means 28 and a process in the treatment tower 9. That is, an appropriate catalyst amount, temperature, flow rate, and the like are calculated and fed back to the stabilization control means 28, and the stabilization control means 28 controls stable operation of the oil refiner 2.
[0030]
  The real-time control means 30 has an operating condition for automatically controlling by the operation automation means 29 in order to execute, for example, a stable fractionation treatment in the reaction tower by the stabilization control means 28 or a treatment in the treatment tower. It is for feeding back to crude oil processing.
[0031]
    (Configuration of information processing system)
  The information processing system 4 includes an information processing device 31 as an operation support device, and a server 32 configuring a network, for example. This network is configured, for example, as the Internet or an intranet based on a general-purpose protocol such as TCP / IP (Transmission Control Protocol / Internet Protocol). The information processing device 31 is connected to the operation management center 3, the technical center 33, and various external servers via a network.
[0032]
  Specifically, as an external server, an external server 34 that constitutes a PC network that connects a terminal computer (not shown) such as an operator or an administrator so as to be able to send and receive information, a distributed control device (Distributed) that collects and controls information An external server 35 constituting a DCS network in which a control system (DCS) is constituted by a network, an industrial television (industrial television) which is a dedicated television (not shown) used for remotely monitoring various industrial processes. ITV) constitutes a network and is connected to an external server 36 that constitutes an ITV network, for example, an external server that constitutes a mobile TV conference network in which a portable TV (not shown) is connected to form a network. 37. At a store that sells products manufactured by the oil refiner 2, An external server 38 for constructing a work and processing / accumulating information of each dealer, an external server 39 for processing / accumulating information related to the operation of each manufacturing apparatus 2 by establishing a network with the refinery apparatus 2 of each factory, and other oil refineries And the external server 40 that processes and stores information on each refinery company and meeting information.
[0033]
  The connection between the information processing apparatus 31 and the server 32, and the connection between the server 32 and the operation management center 3, the technical center 33, and the various external servers 34 to 40 are not limited to connection via a network, but may be wired or wireless. It can also be connected.
[0034]
  Then, the information processing apparatus 31 appropriately processes and accumulates information, and appropriately processes and outputs the accumulated information. The information processing apparatus 31 includes a knowledge bank 41 as storage means and information processing means 42.
[0035]
  The knowledge bank 41 stores various data relating to the operation of the oil refiner 2 so as to be readable. This knowledge bank 41 includes an operation standard database 43 as a second storage means, a P & I (Piping And Instrument diagram) / equipment book database 44 as a first storage means, and a safety forum database. 45.
[0036]
  The operation reference database 43 is information related to the operation of the oil refiner 2, and stores the processing status and maintenance management status of the oil refiner 2. The operation reference database 43 includes, for example, processing status that is information about work contents in processing of the oil refiner 2 or maintenance management status that is information about actual work contents generated by maintenance management, as one piece of independent record information. It is configured as a database with a table structure recorded as a record. As the processing status, for example, the operation of the oil refiner 2 such as temperature, reaction time, flow rate, crude oil property, product property, catalyst amount, etc., which are measurement results detected by various sensors obtained by the actual altitude monitoring system 21. It is a measured value such as a state. The maintenance management status includes, for example, adjustment, remodeling / repairing of the oil refiner 2, replacement of parts, and replenishment of lubricating oil.
[0037]
  In addition, the information regarding the operation, which is the processing status and the maintenance management status, constitutes an electronic takeover book, which will be described later, recorded by setting input by an input operation for the operator to take over, self-management, operation progress management, etc. Part of the information. Here, as an operator, for example, an operator of the operation management center 3, that is, an operator who is in charge of operation, a worker who is in charge of maintenance management of the oil refiner 2, or a quality manager who is in charge of quality control, a head that oversees each department. For example, an administrator.
[0038]
  The P & I / facility book database 44 accumulates information related to facilities that are standard operation methods and standard maintenance management methods for operating the oil refiner 2. This P & I / equipment book database 44 is, for example, information on equipment that is a standard maintenance management method such as the structure and properties of the oil refiner 2, drawings, and parts used, and each oil refiner 2 and the oil refiner 2 1 for information on a standard manual that is a standard operation method for operating information such as an operation method and a target value for each component such as a crude oil tank 5, a reaction tower 7 and a processing tower 9 constituting It is configured as a database with a table structure recorded as a record which is one piece of recording information.
[0039]
  As facility information, information such as the performance and characteristics of the entire refinery apparatus 2, the characteristics of the facility, and the route of acquisition, as well as CAD (Computer-Aided Design) data and image image data are stored as one record record. Or is stored as a record, which is one piece of recording information, in combination with a basic manual or target value. These pieces of information are also accumulated by the operator's setting input in the same manner as the above-described work content information.
[0040]
  The safety forum database 45 accumulates safety standards and countermeasures for abnormalities relating to the operation of the oil refiner 2, minutes of the safety forum, and the like. The safety forum database 45 has a table structure in which information for safe operation of the oil refiner 2 such as items of safety standards, items of countermeasures for anomalies or documents of minutes is recorded as one record record. ing.
[0041]
  Specifically, the record that contains information such as the subject that is the content of the near-miss, the date the near-miss was discovered, the name of the work group that discovered the near-miss, and the date that the near-hat was resolved by taking measures As shown in FIG. 2, a serial number is assigned and a plurality of tables are stored. In addition, the information for the safe driving | operation of the oil refiner 2 is accumulate | stored by an operator's setting input as mentioned above. Here, the near-miss includes, for example, matters before the work that would be dangerous work as it is, in addition to matters that the worker felt dangerous when carrying out the work.
[0042]
  The information processing means 42 processes information transmitted via the network. This information processing means 42 includes a time measuring means (not shown), various calculation means, and a search engine which is a search means. Each of the databases 43 to 45 described above is connected, and the acquired information is appropriately processed to each of the databases 43 to 45. In addition, the stored data is appropriately read and processed. That is, the information processing means 42 performs processing for organically associating information transmitted via the network as an electronic takeover book described later and accumulates the information in each database. For example, the information processing means 42 creates an electronic takeover book based on information from the operation management center 3, information from the technology center 33, and information from the external servers 34 to 40.
[0043]
  Each information includes, for example, setting input from the PC network, that is, information set and input by a terminal computer connected to the external server 34 that constitutes the PC network by an input operation, or input from the DCS network. Information collected by DCS, operation process review information 33a studied by the technology center 33, catalyst development information 33b used in the oil refiner 2, crude oil quality review information 33c, information processing system 4 information processing or operation management center 3 The system development information 33d for the operation control system by the operation control means 24, the technical training information 33e of the worker, the equipment inspection evaluation information 33f, and the like.
[0044]
  That is, data on the work contents of the above-mentioned operation standard database 43 constituting the electronic takeover book, data on the equipment and operation target values of the oil refiner 2 as a reference of the P & I / equipment book database 44, and the oil refiner 2 of the safety forum database 45 It is processed into various information with data for safe operation. Specifically, as shown in FIG. 1, technical data information 42 a used by an operator for operation of the oil refiner 2, operator run sensor information 42 b, accident failure analysis information 42 c of the oil refiner 2, equipment of the oil refiner 2 Are processed into predictive equipment management information 42d, various types of document information 42e, other company information 42f, and the like.
[0045]
  In addition, the information processing system 4 responds to search items requested by the search means in response to requests from the terminal computer 51, the operation management center 3, the technology center 33, and the various external servers 34 to 40 connected to the server 32, for example. A process for retrieving information from the stored information and outputting it.
[0046]
    (Structure of electronic transfer book)
  Here, the configuration of the electronic transfer book will be described with reference to the drawings. As described above, the electronic transfer book is composed of information acquired via the network. For example, in operations that take over from one another, such as shift work, the items of the work contents are reliably transferred to ensure that operations continue smoothly. It is configured in the form. That is, the items to be entered in the electronic transfer book include, for example, the following items (information). These items are appropriately stored in the respective databases 43 to 45 of the knowledge bank 41, are organically related by the information processing means 42, and are appropriately output as an electronic transfer book.
[0047]
    (1) Work occurrence time and person in charge
    (2) Current driving situation
    (3) Maintenance inspection schedule, progress, and results of repairs and modifications
            (Defects and repair details)
    (4) Matters for which transfer work has been completed from the previous work zone
    (5) Matters for which work has been continued from the previous work zone
        a) Purpose of continuing matters
        b) Progress
        c) Methods and means
        d) Concerns
        e) Scheduled time for the next operation or work
    (6) Newly generated business matters
        a) Purpose of business
        b) Progress
        c) Methods and means
        d) Next operation or scheduled work time
    (7) Alarm status and response
    (8) Sequence bypass and instrumentation related manual operation status
    (9) Completion or incomplete status of matters to be communicated to other departments
        a) Matters to be communicated to other departments
        b) Requests to other departments
        c) Requests from other departments
        d) Items to be confirmed from other departments
        e) Contents of request work from other departments, requesters and progress
    (10) Notifications and notifications within the department
    (11) Other optional items
[0048]
  The electronic transfer book is specifically set and inputted based on an input menu window 61 for setting and inputting information shown on the display screen of the web browser of FIG. The setting is not limited to the case of setting input from a web browser. For example, the setting may be input from a combination with the database such as storing in a database connected to a terminal computer and collecting information from the database.
[0049]
  The input menu window 61 includes a plurality of tags 61a, 61b, 61c, 61d corresponding to a plurality of pages (windows) for data input, data editing, data output, data management, and the like that can be switched. Then, the electronic transfer book is created by setting input according to the display of the data input tag window 62 shown in FIG.
[0050]
  More specifically, the data input tag window 62 includes a text box 62a for setting and inputting a date, and a type of working hours in which the worker works, for example, one shift, two shifts, and three in the case of three shifts. There is a work list box 62b for selecting and setting one of the direct and a device list box 62c for selecting and setting and inputting any of the refinery devices 2 to be operated and maintained. Yes. The tag window 62 for data input is provided with a plurality of corresponding command buttons 62d, 62e, and 62f for linking to a plurality of windows classified according to input contents.
[0051]
  Further, the input menu window 61 includes a command button 61e for hyperlinking to a window for retrieving data (information), a command button 61f for closing the input menu window 61, and information by the information processing system. A command button 61g for ending the process is provided.
[0052]
  Then, the operation of the command button 62d of the data input tag window 62 is linked to the basic operation data input window 63 for setting and inputting information relating to the operation state as the processing state shown in FIG. The basic operation data input window 63 has a configuration shown on a display screen by a web browser in FIG.
[0053]
  That is, the basic operation data input window 63 is provided with text boxes 63a and 63b in which the date and work hours entered in the tag window 62 shown in FIG. 2 are displayed. That is, these text boxes 63a and 63b are linked to the text boxes 62a and 62b of the tag window 62 shown in FIG.
[0054]
  In addition, the basic operation data input window 63 is provided with a list box 63c for setting and inputting an operator and a related person in charge, for example, a straight length, an assistant, a site person in charge, a construction person in charge, and a board man. Further, in the basic operation data input window 63, the operating state of the corresponding oil refiner 2 set and input in the text box 62c in the tag window 62 shown in FIG. 2, for example, the type of raw material crude oil, the number of the raw material tank, the storage amount, A plurality of text boxes 63d are provided for setting and inputting an operation state that is a processing state including numerical information such as the type of fraction, production amount, and properties (for example, kinematic viscosity).
[0055]
  Further, the basic operation data input window 63 is provided with a text box 63e in which a serial number as an electronic transfer book is automatically set by the setting input of the tag window 62. The basic operation data input window 63 is provided with a command button 63f for deleting selected data and a command button 63g for closing the screen of the basic operation data input window 63.
[0056]
  Then, according to the setting input in the basic operation data input window 63, a serial number is assigned as a predetermined electronic transfer book, and is stored in the operation reference database 43 as a record which is one piece of record information. The basic operation data input window 63 is provided for the number of device list boxes 62c for selecting and inputting the oil refiner 2 of the data input tag window 62, that is, for each of the plurality of oil refiners 2. It is stored in the operation reference database 43 as a record which is record information.
[0057]
  Further, the operation of the command button 62f of the data input tag window 62 is linked to the operation content data input window 64 for setting and inputting information related to the operation content for the operation which is the processing state shown in FIG. The operation content data input window 64 has a configuration shown on a display screen by a web browser in FIG.
[0058]
  Ie drivingContentThe data input window 64 is provided with text boxes 64a and 64b, respectively, for displaying the input date and working hours linked to the text box 62a and the list box 62b of the tag window 62 shown in FIG. . Further, in the operation content data input window 64, a list box 64c for setting the constituent parts of the oil refiner 2 related to the takeover content, a text box 64d for setting and inputting a time as time information when the takeover content occurs, and the takeover content And a list box 64e for setting and inputting a progress status as classification content information indicating the attribute of the content of the work. The progress status is, for example, “"“□ Not implemented” indicating that work has not been completed."It is displayed with three symbols of “△ Continue” indicating that the work is continued.
[0059]
  Further, in the operation content data input window 64, a text box 64f for setting and inputting work contents as transfer contents, and a text box 64g for setting and inputting image file names of image data to be attached as transfer items such as memos concerning the work contents. And are provided.
[0060]
  Furthermore, the operation content data input window 64 is provided with a plurality of check boxes 64h for setting and inputting classification content information indicating the type of work content that is a transfer item, that is, the content attribute. For example, the contents that have been set and entered are the contents of operations that have already been or are scheduled to be performed, and “prohibited matters” that are inherited matters that urge the prohibition of changing the operating procedures. This is a management item that clarifies the stopping for a major disaster, and is the operation content that has already been or is scheduled to be performed, and is a succession item that promotes the clarification of stopping and crisis management in performing that operation. "Work content with little or no experience" So-called "unsteady" that is a matter of non-stationary work, "Wait matter" that is a matter of success, information processing system 4 “OS revision”, which is a takeover matter to the effect that the content is related to revision of the operation control system 24 by the operation control means 24 of the information processing or operation management center 3, and revision of the equipment of the oil refiner 2 “P & I revision”, which is a takeover matter to the effect that it is a content to be carried out, “Performance book” that the input item is a takeover item, “Performance” to be a takeover matter related to the characteristics of the work content, work content "Karte", which is a succession item to indicate that it is a maintenance content, "Hiyari", which is a succession item related to near-miss, "SDM repair", which is a succession item that indicates that a specific repair is required, and daily repairs “Daily repair”, which is a succession item to be content, “Crisis management”, which is a succession matter to be content related to crisis management, and voluntary maintenance (that it is a succession item that is handled by the operation department without relying on the maintenance department) “Independent maintenance”, “IP work”, which is a takeover item to the effect that it is related to the outsourced work, where the information about the near-miss is, for example, a matter that the worker felt dangerous when performing the work And Its corresponding is the know-how information such as.
[0061]
  Further, the operation content data input window 64 has a check box 64i which is classification content information indicating the attribute of the content to be set and input whether the set input content is high in importance or citation / reference in each department. Is provided. For example, there are a straight-length pickup checked by a person in charge of workers in the working hours, a pipe pickup checked by a worker related to operation management, and a pipe pickup checked by a worker related to equipment management. By this check, the input information is bookmarked, that is, bookmarked, and can be easily used for list display or report creation.
[0062]
  Further, the operation content data input window 64 has a command button 64j for deleting the selected data, a command button 64k for closing the operation content data input window 64, and a command for displaying the attached image data. A button 64l is provided.
[0063]
  The operation content data input window 64 is a record in which each of the set and inputted information is one independent record information.3Accumulated in. The operation content data input window 64 is provided for the number of device list boxes 62c for selecting and inputting the oil refiner 2 of the data input tag window 62, that is, for each of the plurality of oil refiners 2. It is stored in the operation reference database 43 as a record which is independent record information.
[0064]
  Further, the operation of the command button 62e of the tag window 62 for data input links to a construction content data input window 65 for setting and inputting information related to the maintenance inspection work content which is the maintenance inspection state shown in FIG. The construction content data input window 65 has a configuration shown on a display screen by a web browser in FIG.
[0065]
  That is, the construction content data input window 65 is linked with the text box 62a and the list boxes 62b and 62c of the tag window 62 shown in FIG. A text box 65a in which the apparatus 2 is displayed and list boxes 65b and 65c are provided. In the construction content data input window 65, the text box 65d for setting and inputting the work content that is the transfer content, the text box 65e for setting the repair content that is the transfer content, and the progress status of the work of the transfer content are described above. There are provided a list box 65f for setting and inputting by symbols, and a text box 65g for setting and inputting an image file name of image data to be attached as a succeeding matter such as a note about work contents.
[0066]
  Further, in the construction content data input window 65, a check box 65h serving as classification content information indicating the attribute of the same content as described above for setting and inputting the type of work content that is a transfer item, and the content that has been set and input, Setting input for whether the degree of importance and citation / reference in each department are high, for example, a check box for a straight-length pickup that indicates classification contents information indicating the attributes of the contents to be checked by the person in charge of workers in the working hours 65i is provided. Similarly to the window 64, the construction content data input window 65 includes a command button 65j for deleting the selected data, a command button 65k for closing the construction content data input window 65, and attached image data. Is provided with a command button 65l.
[0067]
  The construction content data input window 65 is stored in the operation standard database 43 as records each of which is set and input as independent record information. The construction content data input window 65 is provided for each department to which the connected worker who is the person who inputs the setting when opening the input menu window 61 by connecting to the information processing system 4 is assigned to each information processing system 4. As a record which is the recorded information, it is stored in the operation reference database 43.
[0068]
  In this way, an electronic takeover book is created by setting and inputting each takeover content. This electronic transfer book is displayed as a driving assistance menu window 71 shown on a display screen by a web browser in FIG.
[0069]
  The driving support menu window 71 is provided with a screen setting box 71a for setting a window for calling another window constituting the electronic transfer book. The screen setting box 71a includes a list box in which a desired window is displayed when a desired window to be displayed is selected. Further, the driving support menu window 71 is provided with a text box 71b for setting and inputting a word to be searched and a command button 71c for executing a search with the word set and input in the text box 71b.
[0070]
  The driving support menu window 71 is provided with a special note disclosure box 71d for displaying a summary of special notes such as recent processing statuses and maintenance management statuses of all the oil refiners 2. In this special note disclosure box 71d, for example, as shown in FIG. 7, for example, the processing status and maintenance status of each refinery device 2 such as the operating status and operating status of the last three days, etc. A summary of the disclaimer will be displayed. In addition, a command button 71d1 is provided for linking to a window of other transfer items constituting the electronic transfer book. In other words, by operating these command buttons 71d1, a link is made to a window in which items related to the summary content are described.
[0071]
  Further, the driving support menu window 71 is provided with a plurality of hyperlinks 71e to 71o that are the same as the list items in the screen setting box 71a and display a desired window.
[0072]
  List item and hyperlink 7 of screen setting box 71a1By the operation e, for example, a period condition window 72 shown in FIGS. 8 and 9 constituting the electronic transfer book is displayed. In this period condition window 72, an area 72a in which the operation contents that are the processing status of the oil refiner 2 shown in FIG. 8 are displayed in a list with information of a predetermined period, and the construction contents that are the maintenance management status shown in FIG. And an area 72b displayed as a list with period information. In addition, 72c in FIG. 8 is a cursor having a pen as a motif.
[0073]
  Specifically, summary information 72a1 and 72b1 of the operation state and maintenance management status in a predetermined period displayed linked to the recent special note disclosure box 71d of the driving support menu window 71, the entire refineries 2 and each Reaction tower 7 and processing tower constituting oil refiner 29The information 72a2 of the work content in the predetermined period in each part, the repair information 72b2 in the predetermined period such as the situation repaired by the maintenance inspection of each oil refiner 2, etc. are displayed. The summary information 72a1 and 72b1 describes the date, work band, driving status, and the like. The work content information 72a2 displays the date, work band, work content, work time, and the like. The repair information 72b2 displays the date, work zone, equipment status, repair content, and the like.
[0074]
  Further, the work content information 72a2 and the repair information 72b2 display a progress status display symbol 72d for displaying the progress status with various symbols. This progress status display symbol 72d indicates that “■ Implemented”"“□ Not implemented” indicating that work has not been completed."Three symbols of “△ Continue execution” indicating that the work is continued are used.
[0075]
  That is, in the period condition window 72, a plurality of pieces of information set and input from the input menu window 61 described above are stored for each refinery device 2 and a set of operation contents and construction contents in a set predetermined period. Listed together. Although not shown in the period condition window 72, the operation content area 72a and the construction content area 72b are each provided with a display switching command button for switching each information to a display form as a table. Yes.
[0076]
  Furthermore, the list item and hyperlink 7 in the screen setting box 71a1By the operation f, for example, a date condition window 73 shown in FIG. 10 constituting the electronic transfer book is displayed. This date condition window 73 is similar to the area 73a in which the operation contents, which are the processing status of the oil refiner 2 shown in FIG. In addition, there is a region (not shown) in which the construction contents that are the maintenance management status are displayed as a list with information of a predetermined date.
[0077]
  Specifically, similar to the period condition window 72, the summary information 73a1 of the operation state and maintenance management status on a predetermined date displayed linked to the recent special item disclosure box 71d of the driving support menu window 71, The entire oil refiner 2 and reaction towers 7 and processing towers constituting each oil refiner 29The information 73a2 of the work content on a predetermined date in each part and the like, the repair information (not shown) on the predetermined date, such as the situation where the oil refiner 2 has been repaired by maintenance and inspection, and the like are displayed. Further, similarly to the period condition window 72, a progress display symbol 72d is displayed.
[0078]
  As described above, the date condition window 73 is similar to the period condition window 72 in that a plurality of pieces of information set and input from the input menu window 61 described above are stored on the predetermined date when the operation content and the work content are set. And a list of the oil refiners 2. The date condition window 73 is also provided with a display switching command button (not shown).
[0079]
  In addition, the list item of the screen setting box 71a and the hyperlink 71By the operation of g, for example, a tool box meeting (hereinafter referred to as TBM (Tool Box Meeting)) window 74 shown in FIG. 11 constituting the electronic transfer book is displayed. The TBM window 74 is provided with a device setting input box 74a having a list box configuration for selecting and setting each oil refiner 2, a command button 74b for selecting the oil refiner 2, and the like. In addition, date and working time information is displayed. The displayed date and working time zone information is connected based on, for example, the department or password of the connecting worker that is set and input when connecting to the information processing system 4 and opening the driving support menu window 71. Information related to the date and working hours and departments that are the same as the connected worker is set and displayed.
[0080]
  In the TBM window 74 of each oil refiner 2, the oil refiner 2 set in the device setting input box 74a is set in the set date and work time zone in the same manner as the period condition window 72 and the date condition window 73 described above. The area 74c displays a list of operation details that are the processing status of the process, and the area 74d displays a list of construction details that are the status of maintenance management.
[0081]
  Specifically, the refinery device 2 set in the device setting input box 74a, the set date and working time conditions, which are linked to the recent special item disclosure box 71d of the driving support menu window 71 and displayed. Summary information 74 c 1, 74 d 1 of the operating state and maintenance management state to be performed, the entire oil refiner 2, and the reaction tower 7 and the processing tower constituting each oil refiner 29The information 74c2 of the work content in each part and the like, and the repair information 74d2 such as the repair status by maintenance management are displayed. The operation content area 74c and the construction content area 74d are each provided with a display switching command button 74e for switching each information to a display form as a table.
[0082]
  Then, in the work content information 74c2 and the renovation information 74d2, information on the content of the driving operation, its time, a progress status display symbol, and information on the type of this information are displayed. As the type of information, for example, as described above, “handover book” indicating that it is a transfer item, “operation supervision” indicating that it is a transfer item to all departments of the entire operation, self-maintenance (without relying on the maintenance department) “Self-maintenance” to indicate that it is a transfer item that is handled by the operation department, “Prohibition” that is a transfer item that has already been or is scheduled to be performed and prohibits the change of the operation procedure, and “Support required” which is a succession item for requesting support, “KY” which is a succession item that the work content is a know-how element, and succession that the work content is related to the operation history / operation history of the equipment For example, “medical record”.
[0083]
  Further, the TBM window 74 is provided with a command button 74f for searching for a related near-miss. By operating the command button 74f, a near list window 75 shown in FIG. 12, for example, constituting the electronic transfer book is displayed.
[0084]
  The near miss window 75 displays a list of information on a plurality of near misses accumulated in the safety forum database 45. Specifically, as shown in FIG. 12, the subject that is the content of the near-miss, the date when the near-miss was discovered, the name of the work group that found the near-miss, the date resolved by taking measures against the near-miss, and the serial number Follow sheet ID number.
[0085]
  Further, the near-list window 75 is provided with a narrowing search function 75a for performing a narrowing search for reducing the amount of information displayed in the list by adding a condition when the amount of information displayed in the list is too large. Yes. As shown in FIG. 12, the narrow search function 75a is provided with a text box 75a1 in which a date is set and input in order to input a period for searching for handed over contents. In addition, the narrow search function 75a has a check box for setting and inputting the type of work content in the basic operation data input window 63, the operation content data input window 64, and the construction content data input window 65 when setting and inputting the transfer items. A plurality of check boxes 75a2 are provided for setting conditions for searching with the items checked in. The conditions set by these check boxes are, for example, “concerned matter”, “near incident”, “specific repair candidate”, “daily repair candidate”, and “rules revision candidate”.
[0086]
  Further, the narrow search function 75a is provided with a text box 75a3 for setting and inputting a keyword for searching by keyword and a radio button 75a4 for setting a keyword search condition and / or (AND / OR), for example. It has been. The refinement search function 75a has a list box 75a5 for setting and inputting a range to be searched, that is, the type of the refinery apparatus 2, and a list for displaying information by executing the search under the set conditions. A command button 75a6 is provided.
[0087]
  In addition, the list item of the screen setting box 71a and the hyperlink 71By the operation h, for example, a list search window 76 shown in FIG. 13 constituting the electronic transfer book is displayed. The list search window 76 is provided with a text box 76a for setting and inputting a date in order to input a period for searching for handed over contents. The list search window 76 is provided with a plurality of radio buttons 76b for setting search conditions for displaying a list of bookmarked information. The conditions set by these radio buttons 76b are, for example, the above-mentioned “straight-length pickup”, “transport pickup”, and “installation pickup”. Furthermore, the list search window 76 is provided with a list box 76c for setting and inputting a range to be searched, that is, the type of the oil refiner 2. The list search window 76 is provided with a command button 76d for executing a search under a set condition and displaying a list of information.
[0088]
  The list search window 76 displays an information list window 77 as shown in FIGS. 14 and 15, for example. That is, the list item of the screen setting box 71a and the hyperlink 71By the operation h, an information list window 77 for displaying a list of bookmarked information, for example, for creating a report is displayed.
[0089]
  The information list window 77 displays the information collectively in the operation content information area 77a shown in FIG. 14 and the construction content information area 77b shown in FIG. As the display in each of the regions 77a and 77b, for example, information on the target refinery apparatus 2, information on operation details and construction details that are transfer items, dates when the information on the transfer items occurred, working hours, and the like are displayed. Is done. A command button 77c for disclosing a takeover book window such as the above-described period condition window 72 and date condition window 73, which is displayed in more detail and specifically with respect to the information, is provided in the portion where the information on the transfer items is displayed. ing. Further, a display switching command button is provided in the operation content information area 77 and the construction content information area 77b.
[0090]
  Further, in the information list window 77, when the amount of information displayed in the list is too large, the same refined search function as described above for performing a refined search for further reducing the amount of information displayed in the list by adding conditions. 77d is provided. The narrow search function 77d is also provided with a radio button 77d1 for setting whether to display a list in the order of devices or a list in order of date, for example.
[0091]
  For example, the keyword search window 78 shown in FIG. 16 constituting the electronic transfer book is displayed by the operation of the list item in the screen setting box 71a and the hyperlink 71i. The keyword search window 78 is formed with the same configuration as the above-described narrow search function shown in FIG. 15, and displays an information list window 77 as shown in FIGS.
[0092]
  By operating the list item in the screen setting box 71a and the hyperlink 71j, for example, an operating condition search window 79 shown in FIG. 17 constituting the electronic takeover book is displayed. The operation condition search window 79 is used for searching for information related to operation under the operation conditions, and is provided with a text box 79a for setting and inputting a date in order to input a period for searching for takeover contents. Further, the operating condition search window 79 is provided with a list box 79b for setting and inputting conditions for searching for the type of crude oil and the type of fraction, processed product or product. Further, the operating condition search window 79 is provided with a plurality of text boxes 79c for setting and inputting conditions for searching with operating conditions such as flow rate and reaction temperature. The operation condition search window 79 is provided with a command button 79d for executing a search under the set conditions and displaying a list of information.
[0093]
  Then, the operation condition search window 79 displays an operation information list window 80 as shown in FIG. The operation information list window 80 is a basic operation data input window shown in FIG. 3 which has been set and input as described above and is given a serial number of a predetermined takeover book to form a record as one record information.63 items to be transferred are displayed in a list. Further, as shown in FIG. 18, each display is provided with a command button 77c for disclosing a takeover window of information related to the above-described display contents.
[0094]
  By operating the list item in the screen setting box 71a and the hyperlink 71k, for example, a progress graph window 81 shown in FIG. 19 constituting the electronic transfer book is displayed. The progress graph window 81 has three "■" that are in progress for each of the plurality of oil refiners 2 or each work group in the plurality of operation content data input windows that have been set and inputted as one record information. The graphs and numerical values are displayed by classifying them with the symbols “Implemented”, “□ Not Implemented”, and “Δ Continued”. Then, by selecting, that is, clicking each graph area 82a, an information list window 77 as shown in FIGS. 14 and 15 is displayed.
[0095]
  By operating the list item in the screen setting box 71a and the hyperlink 71l, for example, a voluntary maintenance graph window 82 shown in FIG. 20 constituting the electronic transfer book is displayed. The self-maintenance graph window 82 is a plurality of records that have been set and input as described above and become one record information record, for example, the self-maintenance check box 64h in the entire operation content data input window 64 shown in FIG. 4 is checked. Are classified into graphs and values in the same form as the progress graph window 81 shown in FIG. Similarly, when the graph area 82a is selected, that is, clicked, an information list window 77 as shown in FIGS. 14 and 15 is displayed.
[0096]
  By operating the list item in the screen setting box 71a and the hyperlink 71m, a personal progress information window (not shown) constituting the electronic transfer book is displayed. This personal progress information window is set to use, for example, the information processing system 4 out of the entire operation content data input window and the construction content data input window that have been set and input as described above and become one record information record. In the personal information such as the ID number and password to be input, the progress status is graphed and digitized in the same form as the self-maintenance graph window 82 shown in FIG. Similarly, when the graph area 82a is selected, that is, clicked, an information list window 77 as shown in FIGS. 14 and 15 is displayed.
[0097]
  By operating the list item in the screen setting box 71a and the hyperlink 71n, an explanation window (not shown) similar to the help function for displaying an outline of the information processing system 4 and a method of using the information processing system 4 is displayed.
[0098]
  By operating the list of the screen setting box 71a and the hyperlink 71o, a near menu window 83 shown on the display screen by the web browser in FIG. 21 is displayed, for example. The near menu window 83 is composed of description items relating to near-misses that are particularly know-how items that constitute the electronic takeover book.
[0099]
  The near menu window 83 is provided with a screen setting box 83a for setting a window for calling another window constituting the electronic transfer book. The screen setting box 83a includes a list box in which a desired window is displayed when a desired window is selected and determined. Further, the near menu window 83a is provided with a text box 83b for setting and inputting a word to be searched, and a command button 83c for executing a search with the word set and input in the text box 83b. Further, the near menu window 83 is provided with a plurality of hyperlinks 83d that are the same as the list in the screen setting box 83a and display a desired window.
[0100]
  By operating the list item in the screen setting box 83a and the hyperlink 83d, for example, the near list window 75 shown in FIG. That is, similar to the case of the driving support menu window 71 shown in FIG. 6, the near-list window 75 displays, for example, a list of periods or specific dates, or displays a graph of incomplete information that is the progress status. Each list is displayed in a desired classification / combination, for example, a list is displayed by a narrow search.
[0101]
  By operating the list item in the screen setting box 83a and the hyperlink 83e, an access right management window (not shown) for setting whether to issue or release the access right to the information processing system 4 is displayed.
[0102]
[Operation of information processing system]
  Next, the operation of the information processing system 4 according to the embodiment will be described with reference to the drawings.
[0103]
  An operator who has performed operation and maintenance management of the oil refiner 2 appropriately operates the terminal computer, and connects the terminal computer to the information processing system 4 via the network. When the terminal computer accesses the information processing system 4, the information processing means 42 of the information processing system 4 confirms the presence or absence of access rights from the terminal computer. For example, the name of the worker who accesses the information processing system 4 and a text box for inputting and setting a password and ID for access are displayed on the display device of the terminal computer.
[0104]
  The information processing means 42 outputs an access refusal to the information processing system 4 to the terminal computer when an access request is made by a person who does not have access rights, for example, a name or password is displayed on the display device of the terminal computer. It is displayed that it is inappropriate and that it cannot be accessed. Further, when recognizing that the access request is issued by a person with access rights, the information processing means 42 connects the terminal computer to the information processing system 4, and for example, the driving support menu window 71 shown in FIG. 6 and the near menu shown in FIG. A main menu window for opening a window 83, an input menu window 61 shown in FIG. 2, a driving operation standard manual window (not shown), etc. is displayed on the display device of the terminal computer.
[0105]
  The operator who has confirmed the main menu window sets the input menu window 61 in order to input information related to operations such as the operation state of the refinery apparatus 2 and the work contents for which maintenance management has been performed in order to create an electronic takeover book. Select and open. Further, the data input tag wing 62 in the input menu window 61 is selected and opened. Then, the operator sets and inputs predetermined information, that is, the date, the type of working hours, and the type of the oil refiner 2 in each of the text boxes 62a to 62c, as well as the basic operation data input window 63 shown in FIG. The operation content data input window 64 shown in FIG. 5 and the work content data input window 65 shown in FIG. 5 are selected and opened as appropriate, and as shown in FIG. (Process S1).
[0106]
  By this setting input, as shown in FIG. 22, the information processing means 42 recognizes the setting input from the terminal computer, attaches an ID number to the set input information, and records the knowledge bank 41 as one record information. Is stored in the operation reference database 43 (processing S2). In this way, information constituting the electronic transfer book is set and input.
[0107]
  In addition, for example, an operator who has performed operation and maintenance management of the oil refiner 2 may have a meeting in the department to which he / she belongs, confirmation of the progress of work, creation of a report, confirmation of predicted data in future operations, etc. Therefore, the electronic transfer book may be confirmed. In this case, the terminal computer is connected to the information processing system 4 as described above, and the main menu is displayed on the display device of the terminal computer. Then, the operator selects and opens the driving support menu window 71 shown in FIG. 6, and further discloses the electronic transfer book from the driving support menu window 71 as appropriate.
[0108]
  That is, a desired window is opened by operating the screen setting box 71a, the special note disclosure box 71d, and the various hyperlinks 71e to 71o of the driving assistance menu window 71. In response to a request for disclosure of a desired window by the operator, the information processing means 42 appropriately calls information on a predetermined operation from each of the databases 43 to 45 of the knowledge bank 41. Then, the information processing means 42 controls to display information requested by the worker on the display device of the terminal computer in the above-described predetermined display form of the window. As a result, the worker can confirm the information he wants to know.
[0109]
  On the other hand, for example, an operator who intends to carry out operation and maintenance management of the oil refiner 2 first checks the electronic takeover book. That is, the contents taken over from the worker in the previous working hours are confirmed. Specifically, the worker connects the terminal computer to the information processing system 4 as described above, and displays the main menu on the display device of the terminal computer. Then, the operator selects and opens the driving support menu window 71 and further discloses the electronic transfer book from the driving support menu window 71. That is, the desired window described above is opened by operating the screen setting box 71a, the special notice disclosure box 71d, and the various hyperlinks 71e to 71o, and the information requested by the operator by the information processing means 42 is appropriately set in the aforementioned window. Disclose it in the form and confirm the contents of the transfer.
[0110]
  When an operator operates the components of the oil refiner 2 when operating the oil refiner 2, if he wants to know the operation method, the main menu is opened in the same manner, and the operation operation manual manual window is opened. Set and input the disclosure request for the operation method you want to know. As a result, the information processing means 42 controls the display of the operation method corresponding to the disclosure request set and input from the P & I / facility book database 44 on the display device of the terminal computer in a predetermined display form. Thus, the operator can recognize the operation method he wants to know.
[0111]
  Further, the information processing means 42 displays the information on the drawing and equipment of the corresponding oil refiner 2 from the P & I / equipment book database 44 as needed or automatically according to the operator's request, or configures the electronic transfer book. Information on related work contents in the contents to be taken over may be displayed, or information on near-miss information corresponding to the operation contents may be displayed. Thus, the operator can surely recognize the operation method he wants to know in detail and in an easy-to-understand manner, and can easily realize a reliable and stable operation even for an operation requiring skill.
[0112]
  As described above, according to the information processing system 4 of the present embodiment, since the takeover contents are digitized and integratedly managed and processed, it can be used as a good database that is easy to use and can easily handle information related to operations. .
[0113]
  The information processing system 4 according to the present embodiment can also be used as a system for allowing young employees to learn driving skills in the same way as experienced employees.
[0114]
  That is, the information processing means 42 learns based on the processing status and the maintenance management status that are sequentially set and input and stored, and the processing status such as the operating status and work content of the oil refiner 2 stored in the knowledge bank 41, or The maintenance management status such as construction contents is appropriately changed so that better operation can be obtained and better information is accumulated. As a result, by using the information of the information processing system 4, it is possible to use information in which know-how is inevitably incorporated, and it is possible to acquire the same driving technique as an experienced employee.
[0115]
  Specifically, as shown in FIG. 22, the information processing means 42, for example, requests from the technical center 33 and the operation management center 3, or information automatically stored in the P & I / equipment book database 44, and operation standards The information stored in the database 43 is collated (processing S3). As a result of the collation, if it is determined that the information in the operation reference database 43 matches the information in the P & I / equipment book database 44, that is, the work contents are being worked according to the manual, for example, the matched work contents are classified. Then, the information in the operation standard database 43 is updated and stored as information indicating that it is in accordance with the manual of the standard manual and as one record information so that the list can be displayed (process S4).
[0116]
  If it is determined in step S3 that the information stored in the operation standard database 43 and the information stored in the P & I / equipment book database 44 do not match, whether or not the equipment of the oil refiner 2 has been repaired or modified. Is determined (step S5). For this determination, for example, input is made from the construction content data input window 65 shown in FIG. 5, and the construction content is already set and input, such as whether or not the P & I revision check box 65h is checked as information constituting the electronic takeover book as the takeover content. It is searched from the information about the operation stored in the operation reference database 43 whether or not it is performed (processing S6).
[0117]
  If it is determined that the repair / remodeling has already been performed, for example, when an operator of the system management department of the technical center 33 accesses the information processing system 4, the facility has already been remodeled, and the operation standard manual Notify by a display that information needs to be revised. Then, for example, an operator in the system management department connects to the information processing system 4 and the information in the driving operation manual is revised (processing S7).
[0118]
  In this process S5, it may be determined whether repair or remodeling is appropriate, instead of determining whether or not the equipment is repaired or remodeled. That is, for example, when it is determined that the ratio of the mismatched information to the total of the matching information is somewhat large, or by the setting input by the operator of the technical center 33 or the operation management center 3 (processing S6), the equipment is repaired / Judge that it needs to be modified. When it is determined that the equipment needs to be repaired or modified, for example, when the information processing system 4 is accessed to the worker in the maintenance department of the equipment, the information is displayed to prompt the repair or modification. Also good.
[0119]
  Furthermore, when it is determined in the process S5 that the equipment has not been repaired or remodeled, it is determined whether or not it is difficult to perform a stable operation with work contents that do not match (process S8). For example, it is determined on the basis that the information of the work contents accumulated in the operation reference database 43 does not match, for example, the check boxes 64h and 65h are checked as a near miss. For example, when it is determined that the information on the work content that does not match in the operation standard database 42 is a work that involves danger, the fact is updated and stored in the safety forum database 45 or the like as one record information. (Processing S9).
[0120]
  Then, the information processing means 42, for example, informs the worker in the maintenance department of the facility that the information processing system 4 has been accessed by displaying it to display that the facility needs to be repaired or modified. As a result, the equipment is repaired or remodeled, and for example, when the operator of the system management department recognizes that fact, processing S7 is performed, and the operation standard manual is revised.
[0121]
  In addition, in the processing S5 and the processing S8, for information that is determined that the information accumulated in the operation reference database 43 does not match the information in the P & I / equipment book database 44, for example, all the information that has accessed the information processing system 4 as a provisional measure. Settings are made so that the worker can recognize them (step S10).
[0122]
  In this way, the information accumulated in the P & I / facility book database 44 is revised as appropriate, and by performing the work based on the driving operation standard manual of the accumulated information, as described above, work requiring skill is required. But it can be done easily and reliably.
[0123]
  Then, when setting and inputting information constituting the electronic transfer book, for example, in the operation content data input window 64 and the work content data input window 65, the check boxes 64h and 65h are appropriately checked to prompt the setting of the nature of the transfer content. ing. Therefore, manual information can be easily classified, and manual information can be easily managed and used in a short time.
[0124]
  Further, the information processing system 4 of the present embodiment also functions as a prediction system related to the operation of the oil refiner 2.
[0125]
  That is, the information processing means 42 classifies the information accumulated in the operation reference database 43 for each identical content (attribute). This classification includes classification content information set and input at the time of creation of the electronic takeover book, for example, for each type of the oil refiner 2, for each part or facility constituting the oil refiner 2, for each operation state of the oil refiner 2, and for the work content Classification is performed based on whether or not each of the check boxes 64h and 65h is checked.
[0126]
  Then, as shown in FIG. 23, the information processing means 42 is classified according to the relationship between the frequency of occurrence of content and the passage of time, or the inconsistent state with the set input content with respect to the average of the numerical information of the accumulated content. Every time, the equipment of the refinery apparatus 2, the operating state, the operator's operation content, etc. are predicted. For example, DepartmentThe time interval of the same work content such as product replacement and adjustment is gradually shortened, the amount of lubricating oil supplied is gradually increased, the product production amount is gradually decreased, and the temperature of the reaction tower 7 is gradually decreased. The tendency of the work contents can be derived by using the time measuring means and the calculating means. From this derived tendency, the operation state and the maintenance management state are predicted, that is, whether or not there is modification, repair, or adjustment, whether or not the work content is changed, or the like.
[0127]
  Specifically, as described above, the processing status and maintenance management status set and input by the operator using the terminal computer are acquired by the information processing means 42 via the network and stored in the knowledge bank 41 as appropriate. Then, in order to confirm the processing status and the maintenance management status, the information processing system 4 is accessed to disclose desired information. When this information is disclosed, the same contents are displayed as a list together with the desired information. As a result, it is possible to easily determine, that is, to predict that the elapsed time of the same content gradually decreases, for example, exponentially or is different from the information stored in substantially the same state (processing S11).
[0128]
  This predicted result is notified by display or the like when, for example, a related worker accesses the information processing system 4 as described above. Note that the determined worker may set and input information that prompts the related department regarding the information as to whether or not to modify, repair, adjust, and whether or not the work content has been changed.
[0129]
  In this way, it is reflected in the operation state and maintenance management of the oil refiner 2, or is reflected in the operation content of the operator (processing S12). In addition, based on a prediction result, it can utilize also for management of an operator's work content.
[0130]
  Therefore, it can be used as a prediction system that can also predict the operation by appropriately processing the information related to the operation that constitutes the electronic transfer book for transmitting the transfer details in the appropriate time passage, operation details, and operation details.
[0131]
  Further, when setting and inputting information constituting the electronic takeover book, for example, in the operation content data input window 64 and the construction content data input window 65, the check boxes 64h and 65h which are classification content information are appropriately checked so that the contents of the takeover content can be checked. Prompts the setting of properties. Therefore, classification of data for prediction can be easily performed, prediction can be performed easily and in a short time, and the configuration of the system for prediction can be simplified.
[0132]
  In the configuration as the prediction system, the information processing means 42 may be configured to predict the actual work content in addition to the configuration in which the same work content is displayed to predict the tendency of the work content.
[0133]
  For example, the processing status and maintenance management status set and input by the operator using a terminal computer are acquired by the information processing means 42 via the network, and the type of this information is the content of the check boxes 64i and 65i which are classification content information. Judgment based on. Then, information having the same content is collated with information stored in the knowledge bank 41. If there is no identical content, it is stored in the knowledge bank 41 as it is. If there is the same content, the elapsed time from the time when the previous same content occurred is calculated. Then, the information processing means 42 determines, that is, predicts, that the elapsed time of the same content is gradually shortened exponentially, for example, or is different from the information stored in substantially the same state.
[0134]
  Note that the predicted result may be notified to, for example, the related department or when an operator of the related department accesses the information processing system 4 to appropriately take measures.
[0135]
  Then, when setting and inputting the information constituting the electronic transfer book in, for example, the operation reference data input window 63, the operation content data input window 64, and the construction content data input window 65, the user is prompted to input the setting of the working hours. Thereby, for example, the information processing system 4 can be easily used for schedule management by setting and inputting work content, operation content, operation content, and the like in advance.
[0136]
  That is, as shown in FIG. 24, for example, an operator who wants to manage a schedule uses the operation reference data input window 63, the operation content data input window 64, and the construction content data input window 65 to schedule work operations and operations that are schedule information. The content schedule, the operation content schedule, etc. are set and input in advance (processing S31). Then, the information processing means 42 appropriately stores the information in the databases 43 to 45 of the knowledge bank 41 corresponding to the content of the information (processing S32).
[0137]
  And the information processing means 42 carries out time management of the information set and input in advance by the time measuring means (processing S33). Further, when the worker actually works and the information is set and inputted using the operation reference data input window 63, the operation content data input window 64, and the construction content data input window 65 (processing S34), the information processing means 42 is entered. Evaluates the work content by checking whether or not the work has been performed at the scheduled time and collating with the work content accumulated previously (processing S35). Then, the information processing means 4 stores the evaluation contents in the knowledge bank 41 in association with the information set and input with the actual work contents (process S36).
[0138]
  Then, for example, the operator can open the driving support menu window 71 and easily check the progress status as appropriate. This makes it possible to easily recognize the progress status of information that has been set and input in advance, and also allows the departments and related departments to easily recognize the information using a web browser, thereby facilitating operations corresponding to the progress status.
[0139]
  Furthermore, by comparing the actual work contents with the related work contents stored in the previous knowledge bank 41 and evaluating the work contents, the quality of the work contents and the improvement of the plant equipment and the operation standard manual are improved. Judgment can be made easily. For this reason, as described above, the worker who is related to the plant equipment and the operation standard manual can access the information system 4 so that the state can be easily recognized. Or the like (step S37), or by inputting and setting the correspondence in advance (step S38), it is possible to notify related workers and obtain a better operation.
[0140]
  In addition, when the information constituting the electronic transfer book is set and input in, for example, the operation content data input window 64 and the construction content data input window 65, the set input content has high importance, citation and reference in each department. The check boxes 64i and 65i, which are classification content information for setting whether to enter or not, are urged to check, and bookmarks are added to the inherited contents, that is, bookmarks can be easily displayed for use in list display or report creation.
[0141]
  That is, as shown in the conceptual diagram of FIG. 25, the information stored in the knowledge bank 41 is appropriately processed by the information processing means 42 as an electronic transfer book, and the information that the operator who accesses the information processing system 4 wants to use is desired. To display in the form of For this reason, in order to display the same content in a plurality of display forms corresponding to each worker, it is not necessary to input and set a plurality of the same content.MustNecessary information can be easily obtained, the system structure of the information processing system 4 can be simplified, and the information bank can be easily and simplified as a knowledge bank 41, improving the convenience as a database. In addition, the schedule management and prediction can be facilitated, and the construction and maintenance management of the information processing system 4 can be facilitated.
[0142]
[Effect of information processing system]
  As described above, according to the above embodiment, the following effects can be obtained.
[0143]
  (1) When work contents that are processing status and maintenance management status in the oil refiner 2 are set and inputted, the information processing means 42 stores them in the knowledge bank 41. Then, the information processing means 42 collates correspondingly with the driving operation standard manual which is the standard operation method and the standard maintenance management method for executing the processing of the processing apparatus stored in the knowledge bank 41 in advance, and the matching state is confirmed. Judgment is made, and the operation standard manual or work content that does not match is notified. For this reason, not only functions as a database for simply storing the operation standard manual or a database for confirming or recording work contents in the oil refiner 2 as a takeover item, but also to actual work contents of the oil refiner 2. Accordingly, for example, by informing in order to recognize the necessity of adjustment or modification of the oil refiner 2, the operation standard manual has been revised in response to the adjustment or modification of the oil refiner 2 and better.InIt will be updated, and the correct operation details will be corrected by notifying the correct driving operation manual and notifying that the actual operation details are incorrect. Therefore, it is possible to obtain a good database that makes it possible to perform a difficult and difficult work even if a worker with a low level of skill can perform the work reliably and easily.
[0144]
  (2) The information processing means 42 notifies the driver's operation manual that does not match the work content to urge revision. For this reason, by informing the operation standard manual that does not match the actual work contents of the oil refiner 2 and performing the urged revision, a better operation standard manual can be obtained. Operation can be realized more reliably, easily and stably.
[0145]
  (3) The information processing means 42 notifies that the improvement of the equipment of the oil refiner 2 corresponding to the driving operation standard manual that does not match the work content. For this reason, the malfunction of the equipment of the oil refiner 2 whose actual operation content of the oil refiner 2 does not match the operation manual manual is improved, and a better oil refiner 2 is obtained and can be operated more favorably.
[0146]
  (4) A driving operation standard accumulated by the information processing means 42 is recognized by recognizing a setting input for revising the driving operation standard manual from a terminal computer connected to the information processing system 4 via a network. The revision contents are stored in place of the manual and updated. For this reason, the operation reference manual for easily operating the oil refiner 2 can be easily revised with a simple configuration. Furthermore, for example, the operation for the revision can be easily performed directly from the operation management center 3 that actually operates the oil refiner 2 and the technical center 33 that considers the operation, thereby improving the convenience of maintenance management and quickly It can respond and perform well.
[0147]
  (5) When setting and inputting information related to operations, check boxes 64h and 65h, which are classification content information that prompts the setting of the nature of the content, and whether the content has high importance, citation / reference or not. Check boxes 64i and 65i are provided as attribute information that is classification content information that prompts the user to set the item. For this reason, information classification and retrieval by the information processing means 42 can be easily performed in a short time. For example, classification and retrieval of know-how contents such as classification and retrieval of information that should be a concern for operation, information processing, and near-running operations. Further, classification, retrieval and information processing for information processing, operation prediction, or classification, retrieval and information processing for disclosing information requested in response to a specific worker can be easily performed. The information processing system 4 can be easily constructed and maintained.
[0148]
  (6) Information related to operations is appropriately processed with the passage of time, operation details, and work details. For this reason, it can be used as a prediction system or schedule management for operations.
[0149]
  (7) Information on the processing status and maintenance management status related to operations is classified by the same content, and the frequency of occurrence based on the time, and the comparison with a predetermined deviation based on the deviation of numerical information of the information of the same content, regarding future operations The processing status and maintenance management status can be derived, that is, predicted. For this reason, the processing status and maintenance management status, which are the transfer items for stable and good operation of the oil refiner 2, are made into a database, making it easy to handle each information, and using these processing status and maintenance management status Thus, the future processing status and maintenance management status can be easily predicted, and good operation can be easily obtained.
[0150]
  (8) The processing status and maintenance management status information relating to operation, which is a plurality of schedule information, are associated with information of various check items, which are classification content information indicating the attributes of the content, as one record information, and the schedule information is the same The contents are classified and output, that is, displayed in a form corresponding to the request. Therefore, the schedule information is managed based on the classification content information, the desired schedule information can be easily handled, for example, confirmed by setting the classification content information, and the desired schedule information can be easily used even with a large amount of schedule information. The convenience of management can be improved, the tendency of the schedule information can be easily judged, that is, predicted, the information contents can be easily handled together with the schedule management, and a favorable operation can be obtained.
[0151]
  (9) A plurality of check items are provided, and information contents (attributes) can be set so that a plurality of check items can be appropriately checked. For this reason, even information in one piece of recorded information can be handled as attributes of a plurality of contents, and information handling properties such as schedule management and prediction can be improved.
[0152]
  (10) Evaluate actual work contents and time as schedule management. For this reason, for example, crisis management, risk prediction, and the contents thereof can be easily and widely disclosed, and further good operation can be obtained.
[0153]
  (11) “■ Completed” indicating that the work has been completed as information"“□ Not implemented” indicating that work has not been completed."It is urged to set the progress status with the three symbols “Continue Execution” to indicate that the work is continued. This makes it possible to easily determine the progress status of the work content, facilitate classification, retrieval, and information processing when information is appropriately processed by the information processing means 42, and simplify the configuration of the information processing means 42. The information processing system 4 can be easily constructed and maintained.
[0154]
  (12) Along with the work content to be set and inputted as information, an image file such as a photograph or graph is integrated and stored as an attached file. For this reason, know-how information can be used more specifically and easily, and it is stored in association with each other. Therefore, these attached files can be acquired via a separately provided database or network. The processing system 4 can be easily constructed and maintained.
[0155]
  (13) A bookmark is attached to the information regarding the operation, and processing is performed based on the bookmark. For this reason, it is easy to disclose information required for list display and report creation, and convenience can be improved.
[0156]
  (14) When the TBM window 74 hyperlinked from the driving support menu window 71 configured as, for example, an electronic transfer book is provided by the information processing means 42 and connected to the information processing system 4 to open the driving support menu window 71 Based on the department, password, etc. of the connection worker set and input in the above, processing for displaying a list of information related to the date of connection and the same working hours and department as the connection worker is performed. As a result, for example, it is possible to use it so that the work contents of better operation can be easily derived by examining the daily work schedule and work results within the department, and the convenience and operability can be improved.
[0157]
  (15) For example, by installing in a computer using a general-purpose computer, it is possible to cause the computer to execute the operation to be controlled by the information processing system 4 for operation support described above, greatly promoting the use of the present invention. Can be aimed at.
[0158]
[Other Embodiments]
  Note that the present invention is not limited to the above-described embodiment, and includes various modifications and modifications in a range that can achieve the object of the present invention, such as a specific structure, shape, and method at the time of implementation. It is a waste.
[0159]
【The invention's effect】
  According to the present invention,Obtained from the terminal computer over the network,Occurrence frequency is calculated based on time information of processing status information and maintenance management status information of the same attribute classified for each same attribute based on the classification content information.Furthermore, the deviation of the numerical information of the processing status information of the same attribute and the maintenance management status information is calculated. Then, when recognizing at least one of the processing status information and the maintenance management status information from the terminal computer connected via the network, processing including numerical information exceeding a predetermined deviation together with the frequency of occurrence of the calculation result Status information and maintenance management status information are transmitted to a terminal computer connected via a network so as to be displayed.
For this reason,The processing status and maintenance management status, which are the transfer items for stable and good operation of the processing equipment, are made into a database, making it easy to handle each information, and using these processing status and maintenance management status in the future The processing status and maintenance management status are easily predicted, and good operation can be easily obtained.
  In addition, predictions of future processing status and maintenance management status can be obtained more stably.The
  In addition to functions as a database of processing status and maintenance management status such as manual or processing equipment operation / work contents, it can be used as prediction of information to be input and set, it can be used from a remote place, operation support The system can be used widely and convenience is improved.
[Brief description of the drawings]
FIG. 1 is a block diagram showing a schematic configuration of an oil refinery plant according to an embodiment of the present invention.
FIG. 2 is a display screen diagram showing a window configuration for inputting information relating to operation of the processing control system in the embodiment;
FIG. 3 is a display screen diagram illustrating a window configuration for inputting information relating to an operation state among information relating to operation in the embodiment.
FIG. 4 is a display screen diagram showing a window configuration for inputting information related to the work content of the driving operation among the information related to the operation in the embodiment.
FIG. 5 is a display screen diagram showing a window configuration for inputting information relating to construction contents among information relating to operations in the embodiment;
FIG. 6 is a display screen diagram showing a driving support menu window serving as a menu window for the electronic takeover book in the embodiment.
FIG. 7 is a display screen diagram showing the contents of a special notice disclosure box in the embodiment.
FIG. 8 is a display screen diagram showing an operation content area of a period condition window in the electronic transfer book in the embodiment;
FIG. 9 is a display screen diagram showing a construction content area of a period condition window in the electronic transfer book in the embodiment;
FIG. 10 is a display screen diagram showing a date condition window in the electronic transfer book in the embodiment.
FIG. 11 is a display screen diagram showing a TBM window in the electronic transfer book in the embodiment.
FIG. 12 is a display screen diagram showing a near list window in the electronic transfer book in the embodiment.
FIG. 13 is a display screen diagram showing a list search window for searching for displaying a list of information with bookmarks associated with operations in the embodiment.
FIG. 14 is a display screen diagram showing the operation content of the information list window in the electronic transfer book searched in the list search window in the embodiment.
FIG. 15 is a display screen diagram showing a construction content and a narrow search function of the information list window in the electronic transfer book searched in the list search window in the embodiment;
FIG. 16 is a display screen diagram showing a keyword search window for searching for information related to operation in the embodiment by keyword.
FIG. 17 is a display screen diagram showing an operating condition search window for searching for information related to operation in the embodiment by operating conditions.
FIG. 18 is a display screen diagram showing an operation information list window in the electronic transfer book searched in the operation condition search window in the embodiment.
FIG. 19 is a display screen diagram showing a progress graph window in the electronic transfer book in the embodiment.
FIG. 20 is a display screen diagram showing a self-maintenance graph window in the electronic transfer book in the embodiment.
FIG. 21 is a display screen view showing a near menu window serving as a menu window for the electronic takeover book in the embodiment.
FIG. 22 is an explanatory diagram for explaining an outline of a function that enables an information processing system in the embodiment to easily perform work even for an operator having a low skill level;
FIG. 23 is an explanatory diagram for explaining an overview of how the information processing system according to the embodiment functions as a prediction system;
FIG. 24 is an explanatory diagram for explaining an outline in which the information processing system according to the embodiment functions as a schedule management system;
FIG. 25 is an explanatory diagram for explaining an outline of a function for the information processing system according to the embodiment to classify, search, and process information according to an operator;
[Explanation of symbols]
        1 Refinery plant as a processing plant
        4 Information processing system as an operation support system
      31 Information processing equipment as operation support equipment
      32 servers
      47 Knowledge Bank as Memory

Claims (4)

処理プラントにおける処理装置に関する各種データを、ネットワークを介して取得するとともに、前記ネットワークを介して接続する端末コンピュータへ前記データを出力可能に複数記憶し、前記処理装置の操業を支援する操業支援システムであって、
前記端末コンピュータから前記ネットワークを介して取得された、原材料を所定の条件で処理する処理装置の所定時間後の処理予定情報と、前記処理装置における数値情報を含む処理状況情報および前記処理装置の数値情報を含む保守管理状況情報のうちの少なくともいずれか一方、これら処理状況情報および保守管理状況情報が生じた時刻情報前記処理予定情報と前記処理状況情報前記保守管理状況情報の内容の属性を示す分類内容情報一体的に関連付けて複数記憶する記憶手段と、
この記憶手段に記憶された複数の前記処理予定情報と前記処理状況情報前記保守管理状況情報を分類内容情報に基づいて同一属性毎に分類分けし、これら分類分けした同一属性の前記処理状況情報および前記保守管理状況情報が生じた時刻情報に基づいて、同一属性における前記処理状況情報および前記保守管理状況情報の発生頻度を演算するとともに、処理基準の数値情報に対する、処理状況および保守管理状況における数値情報の偏差を演算して得られた偏差が所定の偏差を超えるか否かを演算し、前記処理予定情報と前記処理状況情報および前記保守管理状況情報との照合により処理状況を評価し、前記ネットワークを介して接続する前記端末コンピュータからの前記処理状況情報および前記保守管理状況情報のうちの少なくともいずれか一方の開示要求を認識すると、前記同一属性における前記処理状況情報および前記保守管理状況情報の発生頻度の演算結果と、前記演算により得られた偏差が所定の偏差を超える前記数値情報を含む前記処理状況情報および前記保守管理状況情報と、前記処理予定情報と前記演算により得られた偏差が所定の偏差を超える前記数値情報を含む前記処理状況情報および前記保守管理状況情報との評価結果とを、前記ネットワークを介して接続する前記端末コンピュータへ表示可能に送信する制御手段と、を具備したことを特徴とした操業支援システム。
An operation support system for acquiring various data related to a processing apparatus in a processing plant via a network, storing a plurality of the data so as to be output to a terminal computer connected via the network, and supporting the operation of the processing apparatus There,
Processing schedule information including processing schedule information after a predetermined time of a processing apparatus that processes raw materials under a predetermined condition, acquired from the terminal computer via a network, processing status information including numerical information in the processing apparatus, and numerical values of the processing apparatus the contents of one and at least one of the maintenance status information including information, and time information such processing status information and maintenance status information has occurred, the processing schedule information and the processing status information and the maintenance status information storage means for storing a plurality in association with classification contents information indicating the attribute integrally,
A plurality of the processing schedule information, the processing status information, and the maintenance management status information stored in the storage unit are classified into the same attributes based on the classification content information, and the processing statuses of the classified attributes are classified. The occurrence frequency of the processing status information and the maintenance management status information in the same attribute is calculated based on the information and the time information when the maintenance management status information occurs , and the processing status and the maintenance management status for the numerical information of the processing standard To calculate whether or not the deviation obtained by calculating the deviation of the numerical information exceeds a predetermined deviation, and evaluate the processing status by comparing the processing schedule information with the processing status information and the maintenance management status information At least one of the processing status information and the maintenance status information from the terminal computer connected through the network Including the deviation or recognizing one disclosure requirements, and the operation result of the occurrence frequency of the processing status information and the maintenance status information in the same attribute, the numerical information obtained deviation exceeds a predetermined deviation by the arithmetic Evaluation results of the processing status information and the maintenance management status information , the processing schedule information and the processing status information including the numerical information in which the deviation obtained by the calculation exceeds a predetermined deviation, and the maintenance management status information; and operation support system characterized by comprising a control means for transmitting can be displayed to the terminal computers connected via the network.
処理プラントにおける原材料を所定の条件で処理する処理装置に関する各種データを、ネットワークを介して取得するとともに、前記ネットワークを介して接続する端末コンピュータへ前記データを出力可能に複数記憶し、前記処理装置の操業をコンピュータにより支援する操業支援方法であって、
前記端末コンピュータから前記ネットワークを介して取得された、前記処理装置の所定時間後の処理予定情報と、前記処理装置における数値情報を含む処理状況情報および前記処理装置の数値情報を含む保守管理状況情報のうちの少なくともいずれか一方
これら処理状況情報および保守管理状況情報が生じた時刻情報前記処理予定情報と前記処理状況情報前記保守管理状況情報の内容の属性を示す分類内容情報一体的に関連付けて記憶手段に複数記憶する処理工程と、
前記記憶手段に記憶された複数の前記処理予定情報と前記処理状況情報前記保守管理状況情報を分類内容情報に基づいて同一属性毎に分類分けする処理工程と、
これら分類分けした同一属性の前記処理状況情報および前記保守管理状況情報が生じた時刻情報に基づいて、同一属性における前記処理状況情報および前記保守管理状況情報の発生頻度を演算するとともに、処理基準の数値情報に対する、処理状況および保守管理状況における数値情報の偏差を演算して得られた偏差が所定の偏差を超えるか否かを演算し、前記処理予定情報と前記処理状況情報および前記保守管理状況情報との照合により処理状況を評価する処理工程と、
前記ネットワークを介して接続する前記端末コンピュータからの前記処理状況情報および前記保守管理状況情報のうちの少なくともいずれか一方の開示要求を認識すると、前記演算により得られた前記同一属性における前記処理状況情報および前記保守管理状況情報の発生頻度の演算結果と、前記演算により得られた偏差が所定の偏差を超える前記数値情報を含む前記処理状況情報および前記保守管理状況情報と、前記処理予定情報と前記演算 により得られた偏差が所定の偏差を超える前記数値情報を含む処理状況情報および保守管理状況情報との評価結果とを、前記ネットワークを介して接続する前記端末コンピュータへ表示可能に送信する処理工程と、
を具備したことを特徴とする操業支援方法。
A variety of data related to a processing apparatus that processes raw materials in a processing plant under predetermined conditions is acquired via a network, and a plurality of the data are stored so as to be output to a terminal computer connected via the network. An operation support method for supporting operation by a computer,
Maintenance schedule information including processing schedule information obtained after a predetermined time of the processing device, processing status information including numerical information in the processing device, and numerical information of the processing device obtained from the terminal computer via the network one at least one of,
And time information these process status information and maintenance status information has occurred, the processing schedule information and the processing status information and integrally associated with the storage means and the classification contents information indicating an attribute of the contents of said maintenance status information A plurality of processing steps stored in
A processing step of classification for each same attribute on the basis of the classification detail information a plurality of said processing schedule information stored in the storage means and the processing status information and the maintenance status information,
Based on the processing status information of the same attribute classified and the time information when the maintenance management status information occurs, the occurrence frequency of the processing status information and the maintenance management status information in the same attribute is calculated , It is calculated whether or not a deviation obtained by calculating a deviation of the numerical information in the processing status and the maintenance management status with respect to the numerical information exceeds a predetermined deviation, and the processing schedule information, the processing status information, and the maintenance management status are calculated. A processing step for evaluating the processing status by collating with information ;
When the disclosure request of at least one of the processing status information and the maintenance management status information from the terminal computer connected via the network is recognized, the processing status information in the same attribute obtained by the calculation and and occurrence frequency of the operation result of the maintenance status information, the deviation obtained by the calculation and the processing status information and the maintenance status information including the numerical information exceeds a predetermined deviation, and the processing schedule information the A processing step of transmitting the processing status information including the numerical information and the evaluation result of the maintenance management status information obtained by calculation exceeding the predetermined deviation in a displayable manner to the terminal computer connected via the network When,
An operation support method characterized by comprising:
請求項2に記載の操業支援方法をコンピュータに実行させる
ことを特徴とする操業支援プログラム。
An operation support program that causes a computer to execute the operation support method according to claim 2.
原材料を所定の条件で処理する処理装置と、
請求項1に記載の操業支援システムと、
を具備したことを特徴とした処理プラント。
A processing apparatus for processing raw materials under predetermined conditions;
The operation support system according to claim 1;
The processing plant characterized by comprising.
JP2001388561A 2001-12-20 2001-12-20 Operation support system, method thereof, program thereof and processing plant Expired - Lifetime JP4040870B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001388561A JP4040870B2 (en) 2001-12-20 2001-12-20 Operation support system, method thereof, program thereof and processing plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001388561A JP4040870B2 (en) 2001-12-20 2001-12-20 Operation support system, method thereof, program thereof and processing plant

Publications (2)

Publication Number Publication Date
JP2003186535A JP2003186535A (en) 2003-07-04
JP4040870B2 true JP4040870B2 (en) 2008-01-30

Family

ID=27597022

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001388561A Expired - Lifetime JP4040870B2 (en) 2001-12-20 2001-12-20 Operation support system, method thereof, program thereof and processing plant

Country Status (1)

Country Link
JP (1) JP4040870B2 (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5539640B2 (en) * 2008-10-10 2014-07-02 出光興産株式会社 Receipt / shipment management device, receipt / shipment management program, and recording medium recording the program
SG163452A1 (en) * 2009-01-23 2010-08-30 Yokogawa Electric Corp An apparatus and method for managing task information of a plant
JP4964275B2 (en) * 2009-07-07 2012-06-27 中国電力株式会社 Maintenance history management system and maintenance history management method
JP5896934B2 (en) * 2013-02-01 2016-03-30 三菱電機株式会社 Supervisory control system
WO2018216746A1 (en) * 2017-05-25 2018-11-29 コスモ石油株式会社 Method, server, computer-readable command, and recording medium for providing recommended operation condition for plant
WO2020256092A1 (en) * 2019-06-20 2020-12-24 コニカミノルタ株式会社 Maintenance management method, maintenance management device and maintenance management program
JP6900055B2 (en) * 2019-07-19 2021-07-07 株式会社サープス Maintenance information management system, maintenance information management device, maintenance information management method, and program
CN111290311A (en) * 2020-02-14 2020-06-16 华南农业大学 System and method for monitoring effluent data after wastewater treatment
JP7505231B2 (en) * 2020-03-31 2024-06-25 三浦工業株式会社 Remote Management System

Also Published As

Publication number Publication date
JP2003186535A (en) 2003-07-04

Similar Documents

Publication Publication Date Title
CN1324419C (en) Remote analysis of process control plant data
CN1312548C (en) Remote-data analysis in process plant
JP6377691B2 (en) Method and apparatus for displaying process control search results, tangible product storing machine-readable instructions
Moran Process plant layout
US7698076B2 (en) System to manage maintenance of a pipeline structure, program product, and related methods
JP2019149199A (en) System, method commodity, and program for providing search service to process control system
US7039575B2 (en) Methods and systems for the evaluation of power generating facilities
JP4040870B2 (en) Operation support system, method thereof, program thereof and processing plant
CN1761919A (en) Asset optimization reporting in a process plant
US8521676B1 (en) System to build, analyze and manage a real world model in software of a safety instrumented system architecture for safety instrumented systems in a facility
US11500350B2 (en) Operation evaluation device, operation evaluation method, and non-transitory computer readable storage medium
CN101763583A (en) Work sheet management module for EAM system of power plant
US8732106B1 (en) Computer instructions to build, analyze and manage a real world model in software of a safety instrumented system architecture for safety instrumented systems in a facility
JP4028226B2 (en) Operation support system, method thereof, program thereof and processing plant
EP1665107A2 (en) System and methods for determining a knowledge management for crude oil refining
JP3954243B2 (en) Plant operation support system
US8954369B1 (en) Method to build, analyze and manage a safety instrumented model in software of a safety instrumented system architecture for safety instrumented systems in a facility
JP2003186533A (en) Data processing device, its method, its system and its program
JP2002099605A (en) Method for managing facility, equipment and the like
JP2003187043A (en) Schedule control device, its method, its system and its program
CN1777906A (en) Automated quality compliance system.
Imanian et al. Monitoring and control of bottomhole pressure during surge and swab operations using statistical process control
JP2005142754A (en) Remote monitoring system
JP5033110B2 (en) Maintenance work support system
WO2024161757A1 (en) Information management system, information management device, and information management method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20040909

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20061220

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20070116

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20070315

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20070515

RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20070703

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20070717

RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20070810

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20071023

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20071108

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101116

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 4040870

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101116

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111116

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121116

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131116

Year of fee payment: 6

EXPY Cancellation because of completion of term