JP3917057B2 - Welding spark curing device and its replacement method - Google Patents

Welding spark curing device and its replacement method Download PDF

Info

Publication number
JP3917057B2
JP3917057B2 JP2002326961A JP2002326961A JP3917057B2 JP 3917057 B2 JP3917057 B2 JP 3917057B2 JP 2002326961 A JP2002326961 A JP 2002326961A JP 2002326961 A JP2002326961 A JP 2002326961A JP 3917057 B2 JP3917057 B2 JP 3917057B2
Authority
JP
Japan
Prior art keywords
front frame
curing device
column
guide member
welding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2002326961A
Other languages
Japanese (ja)
Other versions
JP2004162297A (en
Inventor
年晴 岩田
敦徳 石原
晃一 宮上
政記 播摩
勝衛 山本
孝 今和泉
元 市村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toda Corp
Original Assignee
Toda Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toda Corp filed Critical Toda Corp
Priority to JP2002326961A priority Critical patent/JP3917057B2/en
Publication of JP2004162297A publication Critical patent/JP2004162297A/en
Application granted granted Critical
Publication of JP3917057B2 publication Critical patent/JP3917057B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、溶接火花養生装置とその盛替え方法に係り、詳しくは、溶接火花の飛散をコンパクトな装置によって防止し、更に、上階への盛替えを軽量化と小型化によって容易にする養生装置とその盛替え方法に関する。
【0002】
【従来の技術】
従来において、建物の構築において、図8に示すように、鉄骨柱2と大梁11,12との接合において、鉄骨の溶接や切断の作業における溶接火花の飛散防止には、例えば、鉄骨柱2において、各フロアー毎に設けられるコラムステージ3の手摺りに防炎シート6を取り付けて、飛散防止対策としている。更に外側には養生ネット13が配設されている。
【0003】
また、本願出願人による、昇降ガイド枠体により昇降自在な昇降基台を駆動手段で養生ネットを昇降させていくものが知られている(例えば、特許文献1参照。)。
【0004】
【特許文献1】
特開平11−44095号公報(第1頁〜7頁、第1図)
【0005】
【発明が解決しようとする課題】
しかしながら、防炎シートをコラムステージの手摺りに取付けるのでは、各節の建方毎に、前記防炎シートの結束を外して盛替えしなければならず手間が掛かる。また、風に対しても防炎シートが煽られてばたつき、前記手摺りから当該シートが外れてしまうおそれもある。更に、階高によっては高さ調整が必要となる場合もある。その他、前記防炎シートが繰り返して転用するうちに溶接火花により焦げて取り替える必要もある。一方、自動昇降装置による養生ネットでは、全体として大がかりな装置となって、コストが嵩むものとなる。本発明にかかる溶接火花養生装置とその盛替え方法は、このような課題を解決するために提案されたものである。
【0006】
【課題を解決するための手段】
上記課題を解決するために、本発明に係る溶接火花養生装置の要旨は、建築中の鉄骨柱のコラムステージに取り付けて溶接火花の飛散を防止する養生装置であって、上下方向に複数階に亘って架設される正面枠体と、前記正面枠体にヒンジを介して側面側に回動自在に支持されて、前記正面枠体に対して重畳可能で且つ側面側に展開可能な側面枠体と、前記正面枠体の上階における複数階のコラムステージに架設して取付けられるガイド部材であると共に前記正面枠体にそのガイド部材の下部が摺動自在に係合され、前記正面枠体の上階への昇降ガイドをする盛替えガイド部材と、前記コラムステージに設置されて前記正面枠体における縦枠に駆動手段が係合して当該正面枠体を上昇させる巻上げ装置と、前記正面枠体と前記側面枠体との各外面側に張設される防炎シートとからなることである。
【0007】
また、前記正面枠体と側面枠体との内面側には、石綿シートが張設されていること、;
更に、前記正面枠体は、取付対象の鉄骨柱に対して、左右に2分割されていて、分割された正面枠体の各々が前記鉄骨柱に対して上階へ盛替えられること、;を含むものである。
【0008】
本発明に係る溶接火花養生装置の盛替え方法の要旨は、前記溶接火花養生装置を鉄骨柱に取り付けて溶接作業を行った後に、盛替えガイド部材を上階の複数階のコラムステージに架設し、巻上げ装置をコラムステージに設置し、側面型枠をヒンジを介して正面型枠に折り畳み、前記巻上げ装置により前記折り畳まれた正面型枠を前記盛替えガイド部材によりガイドさせながら上昇させて上階のコラムステージに取付け、前記側面型枠を正面型枠に重畳された状態から側面側に展開させることである。
【0009】
本発明に係る溶接火花養生装置とその盛替え方法によれば、溶接作業対象の鉄骨柱に対して、コンパクトな養生装置を取り付けて、溶接火花の飛散が防止される。また、折り畳みが容易であって、養生装置の全体を小さく畳んで上階に盛替えができる。それにより、巻上げ装置も小さなもので済み、コラムステージに脱着自在にできる小形の装置となる。更に、台風時の強風が心配されるときにおいても、前記養生装置を折り畳んでコンパクトにすることで、強風の被害を避けることができる。
【0010】
【発明の実施の形態】
次に、本発明に係る溶接火花養生装置1とその盛替え方法について、図面を参照して説明する。なお、発明の理解を容易にするため、従来例に対応する部分には従来例と同一の符号を付けて説明する。
【0011】
溶接火花養生装置1は、図1乃至図2に示すように、建築中の鉄骨柱2のコラムステージ3に取り付けて、溶接火花の飛散を防止する養生装置であって、上下方向に複数階、例えば、3階分に亘って架設される正面枠体4がある。この正面枠体4は、アルミニウム製の角パイプ1aで縦に細長く、四角形状に形成されている。
【0012】
前記正面枠体4には、前記取付対象の鉄骨柱2に対して、左右に2分割されていて、分割された正面枠体4の各々が前記鉄骨柱2に対して上階へ盛替えられるものである。
【0013】
更に、前記正面枠体4には、ヒンジを介して、前記正面枠体4よりも幅の狭い回動自在な重畳枠体4aが設けられている。そして、前記正面枠体4にヒンジを介して側面側に回動自在に支持されて、前記正面枠体4に対して重畳可能で且つ側面側に展開可能な側面枠体5が設けられる。この側面枠体5も、アルミニウム製の角パイプ1aで縦に細長く、四角形状に形成されている。
【0014】
前記正面枠体4と、重畳枠体4aと、側面枠体5とにおける、それぞれの外面側に養生シートとして、防炎シート6が全面に亘って張設される。
【0015】
また、前記正面枠体4と、重畳枠体4aと、側面枠体5とにおける、その内面側においては、その上下方向において各階のコラムステージ3に対応する部分の範囲に亘って、石綿シート7が各々張設されている。
【0016】
更に、建物の階高が上階に行くに従って変更される場合や、他の建物に転用する際に階高が異なる場合には、養生装置1の前記各枠体の高さを調節する必要があるので、前記正面枠体4と、重畳枠体4aと、側面枠体5との上下方向の位置調整は、それぞれの縦枠をスライド自在にしておいて、高さ調節できるようにしておくものである。
【0017】
更に、図3乃至図5に示すように、前記正面枠体4の上階における複数階のコラムステージ3に架設して取付けられるガイド部材であると共に、上階への盛替えの際には前記正面枠体4にそのガイド部材の下部8aが摺動自在に係合され、前記正面枠体4の上階への昇降ガイドをする盛替えガイド部材8が設けられている。該盛替えガイド部材8は、アルミニウム製の軽量材で形成され、矩形状の筒状体でその一側面に上下方向に沿ってスリットがあるものである。
【0018】
前記ガイド部材8の内部空間には、上下方向の移動をガイドして左右方向の位置決めをするガイドローラ9が嵌合される。該ガイドローラ9は、コラムステージ3から突出させた支持軸で回転自在に支持されている。
【0019】
前記コラムステージ3に設置され、前記正面枠体4における縦枠4bに駆動手段が係合して当該正面枠体4を上昇させる巻上げ装置10が設けられる。この巻上げ装置10には、例えば、図6に示すように、縦枠4bに刻設されたラックに噛合する歯車10aと伝達部材10bと、駆動歯車10cと該駆動歯車を回転させるハンドル10d等の上昇駆動機構が設けられているものである。なお、上昇駆動機構としては、これに限らず、公知の機構が採用されるものである。
【0020】
この巻上げ装置10は、前記縦枠4bのラックに対して着脱自在であり、正面枠体4を上昇させるときにだけ、図3乃至図4に示すように、コラムステージ3にセットされるものである。
【0021】
更に、溶接火花養生装置1は、図1乃至図2に示すように、コンパクト化と軽量化とのために、正面枠体4は、取付対象の鉄骨柱2に対して、左右対象に2分割されていて、分割された両方の正面枠体4,4の各々が前記鉄骨柱2に対して上階へ盛替えられるようにしてある。これにより、全体の重量が軽くなり、作業者にとって取り扱いやすいものとなり、上階への盛替え作業が容易になるものである。
【0022】
以上のようにして成る本発明の溶接火花養生装置1より、防炎シート6を上階に盛替えていく様子を図7を参照して説明する。まず、図7(A)に示すように、建築中の建物の3階分に亘って、溶接火花養生装置1を左右対称にしてコ字型にセットして、溶接作業を行う。正面枠体4に対して、側面枠体5が側面に展開され、重畳枠体4aが正面に展開されて、図4に示すように、鉄骨柱2に対して、平面視で全体としてコ字型に囲うように配設されている。なお、外側には、養生ネット13が配設されている。
【0023】
前記鉄骨柱2に対するN節の溶接作業が終了したなら、図7(B)に示すように、N+1節のコラムステージ3に対して、盛替えガイド部材8を上階のコラムステージ3に各々架設して、上端をその手摺りに取り付ける(図中のA部)。この盛替えガイド部材8の下部8aは、正面枠体4の上部に位置するコラムステージ3にまで配設してガイドローラ9に係合させる。
【0024】
そして、縦枠4bのラックに歯車10aを噛合させて、巻上げ装置10を前記コラムステージ3にセットする。次に、側面枠体5をヒンジで回転させて正面枠体4に重畳させ、更に、重畳枠体4aをヒンジで回転させて前記正面枠体4に重畳させる(図3に示す状態)。クランプ等で、扇動されないように正面枠体4に固定する。
【0025】
次に、前記巻上げ装置10のハンドル10dを作業員が巻き上げ方向に回転させる。よって、図6及び図7(C)に示すように、前記歯車10aの回転によりラックを押し上げられて縦枠4bが上昇し、正面枠体4が上昇する。図7(D)に示すように、正面枠体4がN+1節の3階に亘るコラムステージ3に到達したなら、手摺り等に固定する。その後、巻上げ装置10と盛替えガイド部材8は撤去する。また、不要となったN節のコラムステージ3を各々撤去する。
【0026】
正面枠体4から、重畳枠体4aを展開させ、更に、側面枠体5を側面側に展開させて、コラムステージ3の手摺り等に各々固定する。こうして、溶接火花養生装置1の盛替え作業が完了する。
【0027】
前記養生装置1を上階に盛替えるに従って階高が変わるときには、縦枠をスライドさせて高さを調節する。このようにして、折り畳んで重畳させた正面枠体4を、巻上げ装置10で盛替えていくものである。また、台風時の強風に対しては、正面枠体4に側面枠体5と重畳枠体4aとを折り畳むことで、煽られないようにできるものである。
【0028】
【発明の効果】
上記説明したように、本発明に係る溶接火花養生装置は、建築中の鉄骨柱のコラムステージに取り付けて溶接火花の飛散を防止する養生装置であって、上下方向に複数階に亘って架設される正面枠体と、前記正面枠体にヒンジを介して側面側に回動自在に支持されて、前記正面枠体に対して重畳可能で且つ側面側に展開可能な側面枠体と、前記正面枠体の上階における複数階のコラムステージに架設して取付けられるガイド部材であると共に前記正面枠体にそのガイド部材の下部が摺動自在に係合され、前記正面枠体の上階への昇降ガイドをする盛替えガイド部材と、前記コラムステージに設置されて前記正面枠体における縦枠に駆動手段が係合して当該正面枠体を上昇させる巻上げ装置と、前記正面枠体と前記側面枠体との各外面側に張設される防炎シートとからなるので、折り畳むことで軽量且つコンパクトな枠体となって、盛り替作業が容易となると言う優れた効果を奏するものである。前記正面枠体を上昇させる巻き上げ装置も簡易な構成で、コラムステージに着脱自在で、取扱いが容易である。
【0029】
本発明に係る溶接火花養生装置の盛替え方法は、前記溶接火花養生装置を鉄骨柱に取り付けて溶接作業を行った後に、盛替えガイド部材を上階の複数階のコラムステージに架設し、巻上げ装置をコラムステージに設置し、側面型枠をヒンジを介して正面型枠に折り畳み、前記巻上げ装置により前記折り畳まれた正面型枠を前記盛替えガイド部材によりガイドさせながら上昇させて上階のコラムステージに取付け、前記側面型枠を正面型枠に重畳された状態から側面側に展開させる盛替え方法なので、盛替え対象の正面枠体がコンパクトで軽量にしてから巻き上げることができて作業が容易となるという効果がある。
【図面の簡単な説明】
【図1】本発明に係る溶接火花養生装置1の斜視図である。
【図2】同本発明に係る溶接火花養生装置1の使用状態の正面図である。
【図3】同本発明に係る溶接火花養生装置1の使用状態の一部斜視図である。
【図4】同本発明に係る溶接火花養生装置1の使用状態の一部平面図である。
【図5】盛替えガイド部材8の斜視図である。
【図6】巻上げ装置10の概略構成を示す説明図である。
【図7】本発明に係る溶接火花養生装置1による盛替え方法を示す説明図(A)〜(D)である。
【図8】従来例に係る溶接火花の防炎シートの実施例を示す説明図である。
【符号の説明】
1 溶接火花養生装置、 2 鉄骨柱、
3 コラムステージ、 4 正面枠体、
4a 重畳枠体、 4b 縦枠、
5 側面枠体、 6 防炎シート、
7 石綿シート、 8 盛替えガイド部材、
9 ガイドローラ、 10 巻上げ装置、
11,12 大梁、 13 養生ネット。
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a welding spark curing device and a refilling method thereof, and more particularly, a curing that prevents welding sparks from being scattered by a compact device and further facilitates refilling to an upper floor by reducing the weight and size. The present invention relates to an apparatus and a replacement method thereof.
[0002]
[Prior art]
Conventionally, in building construction, as shown in FIG. 8, in the joining of the steel column 2 and the large beams 11, 12, in order to prevent welding sparks from being scattered in the work of welding or cutting the steel frame, for example, in the steel column 2 The flameproof sheet 6 is attached to the handrail of the column stage 3 provided for each floor to prevent scattering. Further, a curing net 13 is disposed outside.
[0003]
In addition, there is known a system in which a curing net is moved up and down by a driving means on a lifting base that can be lifted and lowered by a lifting guide frame by the applicant of the present application (see, for example, Patent Document 1).
[0004]
[Patent Document 1]
Japanese Patent Laid-Open No. 11-44095 (pages 1 to 7, FIG. 1)
[0005]
[Problems to be solved by the invention]
However, in order to attach the flameproof sheet to the handrail of the column stage, it is necessary to remove the binding of the flameproof sheet and replace it for each construction method. Further, the flameproof sheet may be beaten and fluttered against the wind, and the sheet may come off from the handrail. In addition, height adjustment may be required depending on the floor height. In addition, it is necessary to burn and replace the flameproof sheet with welding sparks while it is repeatedly used. On the other hand, the curing net by the automatic lifting device becomes a large-scale device as a whole, and the cost increases. The welding spark curing device and its replacement method according to the present invention have been proposed in order to solve such problems.
[0006]
[Means for Solving the Problems]
In order to solve the above-mentioned problems, the gist of the welding spark curing device according to the present invention is a curing device that is attached to a column stage of a steel column under construction and prevents the scattering of welding sparks, and is arranged in a plurality of floors in the vertical direction. A front frame that spans the frame, and a side frame that is pivotally supported on the side of the front frame via a hinge, can be superimposed on the front frame, and can be deployed on the side And a guide member that is erected and attached to a plurality of column stages on the upper floor of the front frame body, and a lower portion of the guide member is slidably engaged with the front frame body, A refilling guide member that guides up and down to the upper floor, a hoisting device that is installed on the column stage and engages a vertical frame in the front frame to raise the front frame, and the front frame Each of the body and the side frame It is to consist of a flameproof sheet to be stretched on the side.
[0007]
Also, asbestos sheets are stretched on the inner surfaces of the front frame and the side frame;
Further, the front frame body is divided into left and right parts with respect to the steel column to be attached, and each of the divided front frame bodies is replaced with an upper floor with respect to the steel column; Is included.
[0008]
The gist of the refilling method of the welding spark curing device according to the present invention is that the welding spark curing device is attached to a steel column and welded, and then the refilling guide member is installed on the column stage on the upper floor. The hoisting device is installed on the column stage, the side formwork is folded into the front formwork via the hinge, and the folded front formwork is raised while being guided by the refill guide member by the hoisting device. It is attached to the column stage, and the side mold is developed from the state superimposed on the front mold to the side.
[0009]
According to the welding spark curing device and the refilling method thereof according to the present invention, a compact curing device is attached to the steel column to be welded to prevent welding sparks from being scattered. Moreover, it is easy to fold, and the whole curing device can be folded small and replaced to the upper floor. As a result, the hoisting device can be small, and the device can be made small and detachable from the column stage. Furthermore, even when strong winds are feared during a typhoon, damage to the strong winds can be avoided by folding the curing device to make it compact.
[0010]
DETAILED DESCRIPTION OF THE INVENTION
Next, the welding spark curing device 1 according to the present invention and its replacement method will be described with reference to the drawings. In order to facilitate understanding of the invention, portions corresponding to the conventional example are denoted by the same reference numerals as those of the conventional example.
[0011]
As shown in FIGS. 1 to 2, the welding spark curing device 1 is a curing device that is attached to the column stage 3 of the steel column 2 under construction to prevent the welding sparks from being scattered, and has a plurality of floors in the vertical direction. For example, there is a front frame 4 constructed over three floors. The front frame body 4 is elongated in the vertical direction by a square pipe 1a made of aluminum, and is formed in a square shape.
[0012]
The front frame body 4 is divided into left and right parts with respect to the steel column 2 to be attached, and each of the divided front frame bodies 4 is replaced with an upper floor with respect to the steel column 2. Is.
[0013]
Further, the front frame body 4 is provided with a rotatable overlapping frame body 4a having a narrower width than the front frame body 4 via a hinge. A side frame 5 is provided on the front frame 4 so as to be rotatable on the side surface via a hinge, and can be superimposed on the front frame 4 and can be developed on the side. The side frame 5 is also elongated in the vertical direction with a square pipe 1a made of aluminum, and is formed in a quadrangular shape.
[0014]
A flameproof sheet 6 is stretched over the entire surface of each of the front frame body 4, the superimposed frame body 4 a, and the side frame body 5 as a curing sheet.
[0015]
Further, on the inner surface side of the front frame body 4, the overlapping frame body 4 a, and the side surface frame body 5, the asbestos sheet 7 extends over the range corresponding to the column stage 3 on each floor in the vertical direction. Are stretched.
[0016]
Furthermore, when the floor height of the building is changed as it goes to the upper floor, or when the floor height is different when diverted to another building, it is necessary to adjust the height of each frame of the curing device 1. Therefore, the vertical position adjustment of the front frame body 4, the superposed frame body 4a, and the side surface frame body 5 is such that each vertical frame is slidable and the height can be adjusted. It is.
[0017]
Further, as shown in FIGS. 3 to 5, the guide member is installed on the column stage 3 on the upper floor of the front frame body 4 and is mounted on the upper floor. A lower part 8a of the guide member is slidably engaged with the front frame body 4, and a refill guide member 8 is provided for guiding the raising and lowering of the front frame body 4 to the upper floor. The refilling guide member 8 is formed of a lightweight material made of aluminum, and is a rectangular cylindrical body having a slit along one side of the vertical direction.
[0018]
In the inner space of the guide member 8, a guide roller 9 for guiding the movement in the vertical direction and positioning in the horizontal direction is fitted. The guide roller 9 is rotatably supported by a support shaft that protrudes from the column stage 3.
[0019]
A hoisting device 10 that is installed on the column stage 3 and that lifts the front frame 4 by driving means engaging with the vertical frame 4b of the front frame 4 is provided. As shown in FIG. 6, the hoisting device 10 includes, for example, a gear 10a meshing with a rack carved in the vertical frame 4b, a transmission member 10b, a driving gear 10c, and a handle 10d for rotating the driving gear. A raising drive mechanism is provided. In addition, as a raising drive mechanism, not only this but a well-known mechanism is employ | adopted.
[0020]
The hoisting device 10 is detachable from the rack of the vertical frame 4b, and is set on the column stage 3 only when the front frame 4 is raised, as shown in FIGS. is there.
[0021]
Furthermore, as shown in FIGS. 1 and 2, the welding spark curing device 1 is divided into two parts, the left and right objects, with respect to the steel column 2 to be attached, in order to reduce the size and weight. Each of the divided front frame bodies 4 and 4 is adapted to be refilled to the upper floor with respect to the steel column 2. As a result, the overall weight is reduced, it is easy for the operator to handle, and the replacement work to the upper floor is facilitated.
[0022]
The manner in which the flameproof sheet 6 is replaced with the upper floor from the welding spark curing device 1 of the present invention configured as described above will be described with reference to FIG. First, as shown in FIG. 7 (A), welding work is performed by setting the welding spark curing device 1 symmetrically over the third floor of the building under construction so as to be symmetrical. With respect to the front frame body 4, the side frame body 5 is developed on the side surface, the overlapping frame body 4a is developed on the front surface, and as shown in FIG. It is arranged so as to surround the mold. In addition, the curing net 13 is arrange | positioned on the outer side.
[0023]
When the welding operation of the N section with respect to the steel column 2 is completed, as shown in FIG. 7 (B), the refilling guide members 8 are installed on the column stage 3 on the upper floor with respect to the column stage 3 of the N + 1 section. Then, the upper end is attached to the handrail (A portion in the figure). The lower part 8 a of the refilling guide member 8 is disposed up to the column stage 3 positioned at the upper part of the front frame 4 and is engaged with the guide roller 9.
[0024]
Then, the gear 10 a is engaged with the rack of the vertical frame 4 b, and the winding device 10 is set on the column stage 3. Next, the side frame 5 is rotated by a hinge so as to be superimposed on the front frame 4, and further, the superimposed frame 4 a is rotated by a hinge so as to be superimposed on the front frame 4 (state shown in FIG. 3). It fixes to the front frame 4 with a clamp etc. so that it may not be agitated.
[0025]
Next, an operator rotates the handle 10d of the winding device 10 in the winding direction. Therefore, as shown in FIGS. 6 and 7C, the rack is pushed up by the rotation of the gear 10a, the vertical frame 4b rises, and the front frame 4 rises. As shown in FIG. 7D, when the front frame 4 reaches the column stage 3 extending over the third floor of the N + 1th section, it is fixed to a handrail or the like. Thereafter, the winding device 10 and the refilling guide member 8 are removed. In addition, each column stage 3 of section N that has become unnecessary is removed.
[0026]
From the front frame body 4, the overlapping frame body 4a is developed, and the side frame body 5 is further developed on the side surface side, and fixed to the handrail or the like of the column stage 3, respectively. In this way, the replacement work of the welding spark curing device 1 is completed.
[0027]
When the floor height changes as the curing device 1 is replaced with the upper floor, the vertical frame is slid to adjust the height. In this way, the front frame body 4 folded and superimposed is replaced by the hoisting device 10. Further, against strong winds during a typhoon, the side frame body 5 and the overlapping frame body 4a can be folded on the front frame body 4 so as not to be beaten.
[0028]
【The invention's effect】
As described above, the welding spark curing device according to the present invention is a curing device that is attached to a column stage of a steel column under construction to prevent scattering of welding sparks, and is constructed across a plurality of floors in the vertical direction. A front frame body, a side frame body that is rotatably supported on the side surface side via a hinge on the front frame body, can be superimposed on the front frame body, and can be deployed on the side surface side, and the front surface It is a guide member that is erected and attached to a column stage on a plurality of floors on the upper floor of the frame body, and a lower portion of the guide member is slidably engaged with the front frame body, to the upper floor of the front frame body A refilling guide member for raising and lowering a guide, a hoisting device that is installed on the column stage and engages a vertical frame in the front frame to raise the front frame, and the front frame and the side surface Stretched on each outer surface side with the frame Since the consisting of flameproof sheet, become a lightweight and compact frame by folding, in which excellent effects say primes replacement work is facilitated. The hoisting device for raising the front frame body is also simple in structure, and is detachable from the column stage, and is easy to handle.
[0029]
According to the refilling method of the welding spark curing device according to the present invention, after the welding spark curing device is attached to a steel column and performing welding work, the refilling guide member is installed on the column stage on the upper floor and wound up. The apparatus is installed on the column stage, the side formwork is folded into the front formwork via the hinge, and the folded front formwork is raised while being guided by the refill guide member by the hoisting device, and the upper floor column It is a refilling method that attaches to the stage and unfolds the side formwork from the state superimposed on the front formwork to the side, so it can be rolled up after making the front face frame to be refilled compact and lightweight. It has the effect of becoming.
[Brief description of the drawings]
FIG. 1 is a perspective view of a welding spark curing device 1 according to the present invention.
FIG. 2 is a front view of the welding spark curing device 1 according to the present invention in use.
FIG. 3 is a partial perspective view of the welding spark curing device 1 according to the present invention in use.
FIG. 4 is a partial plan view of the welding spark curing device 1 according to the present invention in use.
5 is a perspective view of a refill guide member 8. FIG.
FIG. 6 is an explanatory diagram showing a schematic configuration of the winding device 10;
FIGS. 7A to 7D are explanatory views (A) to (D) showing a refilling method by the welding spark curing device 1 according to the present invention. FIGS.
FIG. 8 is an explanatory diagram showing an example of a flameproof sheet for welding sparks according to a conventional example.
[Explanation of symbols]
1 welding spark curing device, 2 steel column,
3 column stage, 4 front frame,
4a superimposed frame, 4b vertical frame,
5 side frame, 6 flameproof sheet,
7 Asbestos sheet, 8 Refill guide member,
9 Guide roller, 10 Winding device,
11, 12 Ohashi, 13 Curing net.

Claims (4)

建築中の鉄骨柱のコラムステージに取り付けて溶接火花の飛散を防止する養生装置であって、
上下方向に複数階に亘って架設される正面枠体と、
前記正面枠体にヒンジを介して側面側に回動自在に支持されて、前記正面枠体に対して重畳可能で且つ側面側に展開可能な側面枠体と、
前記正面枠体の上階における複数階のコラムステージに架設して取付けられるガイド部材であると共に前記正面枠体にそのガイド部材の下部が摺動自在に係合され、前記正面枠体の上階への昇降ガイドをする盛替えガイド部材と、
前記コラムステージに設置されて前記正面枠体における縦枠に駆動手段が係合して当該正面枠体を上昇させる巻上げ装置と、
前記正面枠体と前記側面枠体との各外面側に張設される防炎シートとからなること、
を特徴とする溶接火花養生装置。
A curing device that is attached to the column stage of a steel column under construction to prevent the scattering of welding sparks,
A front frame constructed across a plurality of floors in the vertical direction;
A side frame that is rotatably supported on the side surface via a hinge on the front frame, can be superimposed on the front frame, and can be deployed on the side;
A guide member that is erected and attached to a plurality of column stages on the upper floor of the front frame body, and a lower portion of the guide member is slidably engaged with the front frame body; Refilling guide member to raise and lower to,
A hoisting device which is installed on the column stage and engages with a vertical frame in the front frame to raise the front frame;
It consists of a flameproof sheet stretched on each outer surface side of the front frame and the side frame,
Welding spark curing device characterized by.
正面枠体と側面枠体との内面側には、石綿シートが張設されていること、
を特徴とする請求項1に記載の溶接火花養生装置。
Asbestos sheets are stretched on the inner surfaces of the front and side frames,
The welding spark curing device according to claim 1.
正面枠体は、取付対象の鉄骨柱に対して、左右に2分割されていて、分割された正面枠体の各々が前記鉄骨柱に対して上階へ盛替えられること、
を特徴とする請求項1または2に記載の溶接火花養生装置。
The front frame is divided into left and right with respect to the steel column to be attached, and each of the divided front frames is replaced with the upper floor with respect to the steel column,
The welding spark curing device according to claim 1 or 2.
請求項1に記載の溶接火花養生装置を鉄骨柱に取り付けて溶接作業を行った後に、
盛替えガイド部材を上階の複数階のコラムステージに架設し、
巻上げ装置をコラムステージに設置し、
側面型枠をヒンジを介して正面型枠に折り畳み、
前記巻上げ装置により前記折り畳まれた正面型枠を前記盛替えガイド部材によりガイドさせながら上昇させて上階のコラムステージに取付け、
前記側面型枠を正面型枠に重畳された状態から側面側に展開させること、
を特徴とする溶接火花養生装置の盛替え方法。
After performing the welding work by attaching the welding spark curing device according to claim 1 to the steel column,
A refill guide member is installed on the column stage on the upper floor,
Install the hoisting device on the column stage,
Fold the side formwork to the front formwork via the hinge,
The front formwork folded by the hoisting device is lifted while being guided by the refill guide member and attached to the upper column stage,
Unfolding the side mold from the state superimposed on the front mold to the side,
Refilling method for welding spark curing device.
JP2002326961A 2002-11-11 2002-11-11 Welding spark curing device and its replacement method Expired - Fee Related JP3917057B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002326961A JP3917057B2 (en) 2002-11-11 2002-11-11 Welding spark curing device and its replacement method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002326961A JP3917057B2 (en) 2002-11-11 2002-11-11 Welding spark curing device and its replacement method

Publications (2)

Publication Number Publication Date
JP2004162297A JP2004162297A (en) 2004-06-10
JP3917057B2 true JP3917057B2 (en) 2007-05-23

Family

ID=32805755

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002326961A Expired - Fee Related JP3917057B2 (en) 2002-11-11 2002-11-11 Welding spark curing device and its replacement method

Country Status (1)

Country Link
JP (1) JP3917057B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7321833B2 (en) * 2019-08-23 2023-08-07 株式会社竹中工務店 curing device
JP7410697B2 (en) * 2019-11-29 2024-01-10 株式会社竹中工務店 Construction method

Also Published As

Publication number Publication date
JP2004162297A (en) 2004-06-10

Similar Documents

Publication Publication Date Title
KR100892059B1 (en) Bending machine
JP2009113989A (en) Unwinding device for winding roll
GB1564983A (en) Storage tank construction procedures
JP3917057B2 (en) Welding spark curing device and its replacement method
CN113415738A (en) Hydraulic lifting device for chimney installation
JP4750745B2 (en) Round stage equipment
JP2023114229A (en) Lifting device and lifting method of post-fitting panel
CN213268822U (en) Sliding type overhanging hard protection construction platform convenient to operate
JP6268640B2 (en) Installation assistance device
JP3498097B2 (en) Curing net stretching apparatus and method
JP2934944B2 (en) Mobile workbench
KR102392643B1 (en) Recuperation instrument mounted temporary tent winder and temporary tent construction method for slab recuperation using the same
JP4486931B2 (en) Laminate paper transfer assist device
JP3498118B2 (en) Temporary roof
JP5079455B2 (en) Remaining core recovery device for winding sheet type automatic guided vehicle
CN218869700U (en) Foldable training table
JP4180821B2 (en) Weight structure of lifting equipment for cardboard box incision
JP2905067B2 (en) Openable temporary roof
JPH07150768A (en) Opening/closing type temporary roof
JP3055878B2 (en) Mobile scaffolding for curved roofs
JP3517571B2 (en) Integrated acoustic reflector
JP3017857U (en) Telescopic mobile bleachers
JPH0743366Y2 (en) Mobile safety net erection device
JPH06135694A (en) Elevator device and working bench
CN116289622A (en) T-beam and box Liang Zhongge plate construction operation structure and construction operation method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20051101

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20070125

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20070129

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20070207

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees