JP3913199B2 - Formwork for producing wall spacers for rebar construction, and method for producing wall spacers for rebar construction - Google Patents

Formwork for producing wall spacers for rebar construction, and method for producing wall spacers for rebar construction Download PDF

Info

Publication number
JP3913199B2
JP3913199B2 JP2003194687A JP2003194687A JP3913199B2 JP 3913199 B2 JP3913199 B2 JP 3913199B2 JP 2003194687 A JP2003194687 A JP 2003194687A JP 2003194687 A JP2003194687 A JP 2003194687A JP 3913199 B2 JP3913199 B2 JP 3913199B2
Authority
JP
Japan
Prior art keywords
formwork
mold
mold body
reinforcing bar
recess
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP2003194687A
Other languages
Japanese (ja)
Other versions
JP2005030016A (en
Inventor
憲治 笹浪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP2003194687A priority Critical patent/JP3913199B2/en
Publication of JP2005030016A publication Critical patent/JP2005030016A/en
Application granted granted Critical
Publication of JP3913199B2 publication Critical patent/JP3913199B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Description

【0001】
【発明の属する技術分野】
本発明は、鉄筋工事用ウォールスペーサーを作製するための型枠、及び鉄筋工事用ウォールスペーサーを作製するための方法に関する。
【0002】
【従来の技術】
鉄筋コンクリート構造物の施工時には、型枠を設置した後に型枠内の所定個所に鉄筋を組み立てたり、所定個所に鉄筋を組み立てた後に型枠を設置したりする必要があるが、その際、型枠内面と鉄筋との間隔(かぶり)を設計図通りに保持するため、スペーサーが用いられる。本発明者の共同事業者は、このような鉄筋工事の際に用いられる、取り付け易く、外れにくい、新規なスペーサーを提案している(特許文献1参照)。
【0003】
【特許文献1】
特願2003−124634号
【0004】
【発明が解決しようとする課題】
上述のスペーサーは、鉄筋工事関連業者の間で、好評をもって迎えられている。本発明は、上述のスペーサーを作製する際に、脱型作業が容易であり、多量のスペーサーを同時に作製することができる型枠及び方法を提案するものである。
【0005】
【課題を解決するための手段】
本願請求項1に記載の鉄筋工事用ウォールスペーサーを作製するための型枠は、N個の型枠本体と、(N+1)個の型枠側板(ここで、N≧1)とを備え、前記型枠本体が、矩形のプレートのほぼ上半部に半円形又は半円形の一部を切除した切欠きを有するように形作られ、前記型枠側板が、前記型枠本体を形作る矩形のプレートとほぼ同じ寸法をもつ矩形のプレートとなるように形作られており、前記型枠本体及び前記型枠本体の両側に配置された前記型枠側板を長さ方向において固定するための長さ方向固定具と、前記型枠本体及び前記型枠本体の両側に配置された前記型枠側板を横断方向において固定するための横断方向固定具とを更に備え、前記横断方向固定具が、鉄筋を所望個所に位置決めさせるため、その高さが前記型枠本体及び前記型枠側板の縦寸法よりも高くなるように選定され、かつ、その上面にウォールスペーサーの作製時に鉄筋を一時的に固定すべく、鉄筋を差し込むための凹部が設けられていることを特徴とするものである。
【0006】
本願請求項2に記載の鉄筋工事用ウォールスペーサーを作製するための方法は、前記請求項1に記載の型枠本体及び型枠側板を準備する段階と、前記型枠本体の各々の両側に前記型枠側板をそれぞれ配置し、前記請求項1に記載の前記長さ方向固定具を用いて長さ方向、前記請求項1に記載の前記横断方向固定具を用いて横断方向において固定する段階と、前記鉄筋を差し込むための凹部に載置されるように、前記切欠きによって形成される型枠本体の凹部の所定個所に鉄筋を配置した後にモルタル又はコンクリートを流し込むか、或いは、前記切欠きによって形成される型枠本体の凹部にモルタル又はコンクリートを流し込んだ後に、前記鉄筋を差し込むための凹部に載置されるように、鉄筋を配置する段階と、前記モルタル又はコンクリートが硬化した後、前記固定を解除する段階とを含むことを特徴とするものである。
【0007】
【発明の実施の形態】
次に図面を参照して、本発明の好ましい実施の形態に係る型枠について詳細に説明する。図1は本発明の好ましい実施の形態に係る型枠の分解斜視図である。図1及び図2において全体として参照符号10で示される本発明の好ましい実施の形態に係る型枠は、N個の型枠本体12と、(N+1)個の型枠側板14とを備えている(N≧1、図1では、N=1の場合を図示)。
【0008】
型枠本体12及び型枠側板14は、木材で形成してもよく、合成樹脂材料で形成してもよいが、資源の有効活用とコスト低減の観点から、廃材を利用して形成するのが好ましい。
【0009】
型枠本体12は、厚さDの矩形(縦H×横L)のプレートのほぼ上半部に半円形の切欠き12aを有するように形作られている。一方、型枠側板14は、型枠本体12を形作る矩形のプレートとほぼ同じ寸法をもつ矩形のプレート(縦H×横L)となるように形作られている。型枠側板14の厚さD1 は通常、型枠本体12の厚さDよりも小さくなるように選定されている。
【0010】
図2は、型枠本体12の両側に型枠側板14を配置した状態を示した斜視図である。型枠本体12と型枠側板14とを図2に示されるように配置することによって、型枠10の中央部に半円板形の凹部が形成され、この凹部に鉄筋を配置してモルタル又はコンクリートを流し込むことにより、半円板形のウォールスペーサーが形成される。
【0011】
次に、以上のように構成された型枠10を使用して、鉄筋工事用ウォールスペーサーを作製するための方法について説明する。まず、N個の型枠本体12及び(N+1)個の型枠側板14を準備する(図3(a)参照)。そして、各型枠本体12の両側に型枠側板14をそれぞれ配置して(図3(b)参照)、型枠10を構成する。次いで、型枠10を長さ方向(X方向)において固定するための長さ方向固定具16を用いて、型枠10を長さ方向において固定するとともに、型枠10を横断方向(Y方向)において固定するための横断方向固定具18を用いて、型枠10を横断方向において固定する。
【0012】
なお、長さ方向固定具16は、最も端に位置する型枠側板にそれぞれ接触させ、図3(c)の矢印Aで示されるように、互いの方に押しつけることによって、型枠本体12と型枠側板14とが一体となるように構成されている。或いは、最も端に位置する型枠側板のうち一方を固定壁に接触させ(図示せず)、最も端に位置する型枠側板のうち他方を前記一方の型枠側板の方に押しつけることによって、型枠本体12と型枠側板14とが一体となるように構成してもよい。
【0013】
横断方向固定具18の高さH1 は、鉄筋を所望個所に位置決めさせるため、型枠本体12及び型枠側板14の縦寸法Hよりも高くなるように選定されている(図4参照)。また、横断方向固定具18の上面には、ウォールスペーサーの作製時に鉄筋を一時的に固定すべく、鉄筋を差し込むための凹部18aが設けられている。このように構成された横断方向固定具18を、横方向から型枠10にそれぞれ接触させ、図3(c)の矢印Bで示されるように、互いの方に押しつけることによって、型枠本体12と型枠側板14とが一体となるように構成されている。或いは、型枠10の横方向の一方の側を固定壁に接触させ(図示せず)、型枠10の横方向の他方の側を前記一方の側に押しつけることによって、型枠本体12と型枠側板14とが一体となるように構成してもよい。
【0014】
次いで、横断方向固定具18の凹部18aに鉄筋を差し込む(図3(d)、(e)参照)。しかる後、型枠本体12の凹部12aにコンクリート又はモルタルを流し込む(図3(f))。そして、コンクリート又はモルタルが硬化した後、長さ方向固定具16及び横方向固定具18を外す(図3(g))と、ウォールスペーサーが得られる(図3(h))。
【0015】
或いは、前記実施の形態のように鉄筋を配置した後にコンクリート又はモルタルを凹部12aに流し込む代わりに、図5に示されるように、鉄筋を配置する前に凹部12aにコンクリート又はモルタルを流し込み(図5(d)参照)、その後に鉄筋を所定個所に配置する(図5(e)参照)ようにしてもよい。
【0016】
なお、型枠側板14の側面に剥離剤を塗布しておくことにより、型枠の脱型を容易に行うことができる。
【0017】
本発明は、以上の発明の実施の形態に限定されることなく、特許請求の範囲に記載された発明の範囲内で、種々の変更が可能であり、それらも本発明の範囲内に包含されるものであることはいうまでもない。
【0018】
たとえば、前記実施の形態に示した型枠では、半円板形の形状のウォールスペーサーが形成されるが、図6(a)に示されるように、型枠本体12の切欠き12aを半円板形の一部を切除した形状にすることにより、半円板形の一部を切除した形状を有するウォールスペーサーが得られる(図6(b)参照)。
【0019】
【発明の効果】
本発明によれば、型枠10の構成部品12、14がそれぞれ別個に作られているため、脱型作業が極めて容易であり、かつ、多量のウォールスペーサーを同時に作製することが可能である。
【図面の簡単な説明】
【図1】 本発明の好ましい実施の形態に係る型枠の分解斜視図である。
【図2】 型枠本体の両側に型枠側板をそれぞれ配置した状態を示した斜視図である。
【図3】 鉄筋工事用ウォールスペーサーを作製するための方法を示した一連の図である。
【図4】 鉄筋工事用ウォールスペーサーを作製するための方法の一部を示した拡大斜視図である。
【図5】 鉄筋工事用ウォールスペーサーを作製するための別の方法を示した一連の図である。
【図6】 図6(a)は型枠の変形形態を示した分解斜視図、図6(b)は図6(a)の型枠を用いて作製したウォールスペーサーの斜視図である。
【符号の説明】
10 型枠
12 型枠本体
14 型枠側板
16 長さ方向固定具
18 横断方向固定具
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a mold for producing a wall spacer for reinforcing bar construction, and a method for producing a wall spacer for reinforcing bar construction.
[0002]
[Prior art]
When constructing a reinforced concrete structure, it is necessary to assemble a reinforcing bar at a predetermined location in the mold after installing the mold, or install a mold after assembling a reinforcing bar at a predetermined location. A spacer is used to keep the distance (cover) between the inner surface and the reinforcing bar as designed. The inventor of the present inventor has proposed a new spacer that is used for such a reinforcing bar construction and is easy to attach and difficult to come off (see Patent Document 1).
[0003]
[Patent Document 1]
Japanese Patent Application No. 2003-124634
[Problems to be solved by the invention]
The above-mentioned spacer is greeted with popularity among rebar construction companies. The present invention proposes a mold and a method capable of easily removing a mold when producing the above-mentioned spacer and capable of producing a large amount of spacers at the same time.
[0005]
[Means for Solving the Problems]
A formwork for producing a wall spacer for reinforcing bar construction according to claim 1 of the present application comprises N formwork bodies and (N + 1) formwork side plates (where N ≧ 1), The mold body is shaped to have a semicircular or semi-circular cutout in a substantially upper half of a rectangular plate, and the mold side plate forms a rectangular plate that forms the mold body. Longitudinal fixture for fixing the mold body and the formwork side plates arranged on both sides of the mold body in the longitudinal direction, which are formed into rectangular plates having substantially the same dimensions. And a transverse fixture for fixing the mold body and the mold side plates disposed on both sides of the mold body in the transverse direction, wherein the transverse fixture has a reinforcing bar at a desired location. For positioning, the height of the mold body and It is selected so as to be higher than the vertical dimension of the formwork side plate, and a concave portion for inserting the reinforcing bar is provided on the upper surface thereof so as to temporarily fix the reinforcing bar when the wall spacer is manufactured. To do.
[0006]
A method for producing a wall spacer for reinforcing bar construction according to claim 2 of the present application includes the steps of preparing the formwork body and the formwork side plate according to claim 1, and the both sides of each of the formwork bodies. Placing each of the formwork side plates and fixing in the longitudinal direction using the longitudinal direction fixture according to claim 1 and in the transverse direction using the transverse direction fixture according to claim 1; The mortar or concrete is poured after placing the reinforcing bar in a predetermined part of the concave part of the mold body formed by the notch so as to be placed in the concave part for inserting the reinforcing bar, or by the notch After pouring mortar or concrete into the recess of the mold body to be formed, placing the reinforcing bar so as to be placed in the recess for inserting the reinforcing bar, and the mortar or concrete After bets it has been cured and is characterized in that it comprises a step of releasing the fixing.
[0007]
DETAILED DESCRIPTION OF THE INVENTION
Next, with reference to drawings, the formwork which concerns on preferable embodiment of this invention is demonstrated in detail. FIG. 1 is an exploded perspective view of a mold according to a preferred embodiment of the present invention. The formwork according to a preferred embodiment of the present invention, indicated as a whole by the reference numeral 10 in FIGS. 1 and 2, includes N formwork bodies 12 and (N + 1) formwork side plates 14. (N ≧ 1, FIG. 1 shows the case where N = 1).
[0008]
The formwork body 12 and the formwork side plate 14 may be made of wood or may be made of a synthetic resin material. However, from the viewpoint of effective use of resources and cost reduction, the formwork body 12 and the formwork side plate 14 may be formed using waste materials. preferable.
[0009]
The mold body 12 is shaped so as to have a semicircular notch 12a in a substantially upper half of a rectangular (vertical H × horizontal L) plate having a thickness D. On the other hand, the formwork side plate 14 is formed to be a rectangular plate (vertical H × horizontal L) having substantially the same dimensions as the rectangular plate forming the formwork body 12. The thickness D 1 of the mold side plate 14 is usually selected to be smaller than the thickness D of the mold body 12.
[0010]
FIG. 2 is a perspective view showing a state in which the formwork side plates 14 are arranged on both sides of the formwork body 12. By arranging the mold body 12 and the mold side plate 14 as shown in FIG. 2, a semicircular disk-shaped recess is formed at the center of the mold 10, and a reinforcing bar is placed in the recess to form a mortar or By pouring the concrete, a semi-disc shaped wall spacer is formed.
[0011]
Next, a method for producing a wall spacer for reinforcing bar construction using the mold 10 configured as described above will be described. First, N mold body 12 and (N + 1) mold side plates 14 are prepared (see FIG. 3A). And the formwork side plate 14 is each arrange | positioned on both sides of each formwork main body 12 (refer FIG.3 (b)), and the formwork 10 is comprised. Next, the mold frame 10 is fixed in the length direction using the length direction fixture 16 for fixing the mold frame 10 in the length direction (X direction), and the mold frame 10 is crossed in the transverse direction (Y direction). The mold 10 is secured in the transverse direction using a transverse fixture 18 for securing in
[0012]
In addition, the length direction fixing tool 16 is brought into contact with the mold side plate located at the end most and pressed toward each other as indicated by an arrow A in FIG. It is comprised so that the formwork side plate 14 may become united. Alternatively, by contacting one of the mold end side plates located at the end in contact with the fixed wall (not shown) and pressing the other end of the end frame located at the end toward the one form plate side plate, The mold body 12 and the mold side plate 14 may be integrated.
[0013]
The height H 1 of the transverse fixture 18 is selected to be higher than the longitudinal dimension H of the mold body 12 and the mold side plate 14 in order to position the reinforcing bar at a desired location (see FIG. 4). Further, a concave portion 18a for inserting a reinforcing bar is provided on the upper surface of the transverse fixture 18 so as to temporarily fix the reinforcing bar when the wall spacer is manufactured. The transverse fixture 18 thus configured is brought into contact with the mold 10 from the lateral direction and pressed toward each other as shown by an arrow B in FIG. And the formwork side plate 14 are integrated. Alternatively, one side in the horizontal direction of the mold 10 is brought into contact with a fixed wall (not shown), and the other side in the horizontal direction of the mold 10 is pressed against the one side to thereby form the mold body 12 and the mold. You may comprise so that the frame side board 14 may become united.
[0014]
Next, a reinforcing bar is inserted into the recess 18a of the transverse fixture 18 (see FIGS. 3D and 3E). Thereafter, concrete or mortar is poured into the recess 12a of the mold body 12 (FIG. 3 (f)). And after concrete or mortar hardens | cures, a wall spacer will be obtained (FIG.3 (h)) if the length direction fixing tool 16 and the horizontal direction fixing tool 18 are removed (FIG.3 (g)).
[0015]
Alternatively, instead of pouring concrete or mortar into the recess 12a after placing the reinforcing bars as in the embodiment, as shown in FIG. 5, the concrete or mortar is poured into the recess 12a before placing the reinforcing bars (FIG. 5). (Refer to (d)), and then the reinforcing bars may be arranged at predetermined locations (see FIG. 5 (e)).
[0016]
It should be noted that the mold can be easily removed by applying a release agent to the side surface of the mold side plate 14.
[0017]
The present invention is not limited to the embodiments of the invention described above, and various modifications can be made within the scope of the invention described in the claims, and these are also included in the scope of the present invention. Needless to say, it is something.
[0018]
For example, in the mold shown in the above embodiment, a wall spacer having a semi-disc shape is formed. However, as shown in FIG. 6A, the notch 12a of the mold body 12 is formed in a semicircle. A wall spacer having a shape obtained by cutting a part of a semicircular disk is obtained by making a shape obtained by cutting a part of the plate (see FIG. 6B).
[0019]
【The invention's effect】
According to the present invention, since the component parts 12 and 14 of the mold 10 are made separately, the demolding operation is extremely easy, and a large amount of wall spacers can be produced simultaneously.
[Brief description of the drawings]
FIG. 1 is an exploded perspective view of a mold according to a preferred embodiment of the present invention.
FIG. 2 is a perspective view showing a state in which formwork side plates are arranged on both sides of the formwork body.
FIG. 3 is a series of diagrams showing a method for producing a wall spacer for reinforcing bars.
FIG. 4 is an enlarged perspective view showing a part of a method for producing a wall spacer for reinforcing bar construction.
FIG. 5 is a series of diagrams showing another method for producing a wall spacer for reinforcing bar construction.
6 (a) is an exploded perspective view showing a modified form of the mold, and FIG. 6 (b) is a perspective view of a wall spacer produced using the mold of FIG. 6 (a).
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 10 Formwork 12 Formwork body 14 Formwork side plate 16 Length direction fixing tool 18 Cross direction fixing tool

Claims (2)

鉄筋工事用ウォールスペーサーを作製するための型枠であって、
N個の型枠本体と、
(N+1)個の型枠側板(ここで、N≧1)とを備え、
前記型枠本体が、矩形のプレートのほぼ上半部に半円形又は半円形の一部を切除した切欠きを有するように形作られ、前記型枠側板が、前記型枠本体を形作る矩形のプレートとほぼ同じ寸法をもつ矩形のプレートとなるように形作られており、
前記型枠本体及び前記型枠本体の両側に配置された前記型枠側板を長さ方向において固定するための長さ方向固定具と、
前記型枠本体及び前記型枠本体の両側に配置された前記型枠側板を横断方向において固定するための横断方向固定具とを更に備え、
前記横断方向固定具が、鉄筋を所望個所に位置決めさせるため、その高さが前記型枠本体及び前記型枠側板の縦寸法よりも高くなるように選定され、かつ、その上面にウォールスペーサーの作製時に鉄筋を一時的に固定すべく、鉄筋を差し込むための凹部が設けられていることを特徴とする型枠。
A formwork for making a wall spacer for rebar construction,
N formwork bodies,
(N + 1) pieces of formwork side plates (where N ≧ 1),
The mold body is shaped to have a semicircular or semi-circular cutout in a substantially upper half of a rectangular plate, and the mold side plate forms a rectangular plate that forms the mold body. It is shaped to be a rectangular plate with almost the same dimensions as
A length direction fixture for fixing the mold body side plates and the mold side plates disposed on both sides of the mold body in the length direction;
A transverse direction fixture for fixing in a transverse direction the mold body and the mold side plates disposed on both sides of the mold body;
The transverse fixture is selected so that its height is higher than the vertical dimensions of the mold body and the mold side plate in order to position the reinforcing bar at a desired location, and the wall spacer is formed on the upper surface thereof. A formwork characterized in that a recess for inserting a reinforcing bar is provided to sometimes temporarily fix the reinforcing bar.
鉄筋工事用ウォールスペーサーを作製するための方法であって、
前記請求項1に記載の型枠本体及び型枠側板を準備する段階と、
前記型枠本体の各々の両側に前記型枠側板をそれぞれ配置し、前記請求項1に記載の前記長さ方向固定具を用いて長さ方向、前記請求項1に記載の前記横断方向固定具を用いて横断方向において固定する段階と、
前記鉄筋を差し込むための凹部に載置されるように、前記切欠きによって形成される型枠本体の凹部の所定個所に鉄筋を配置した後にモルタル又はコンクリートを流し込むか、
或いは、前記切欠きによって形成される型枠本体の凹部にモルタル又はコンクリートを流し込んだ後に、前記鉄筋を差し込むための凹部に載置されるように、鉄筋を配置する段階と、
前記モルタル又はコンクリートが硬化した後、前記固定を解除する段階と、
を含むことを特徴とする方法。
A method for producing a wall spacer for rebar construction,
Preparing the formwork body and formwork side plate according to claim 1;
The said formwork side board is each arrange | positioned on each both sides of the said formwork main body, and it uses the said length direction fixing tool of the said length direction, and uses the length direction and the said transverse direction fixing tool of the said Claim 1. Fixing in the transverse direction using
Pour mortar or concrete after placing the rebar in a predetermined position of the recess of the mold body formed by the notch so that it is placed in the recess for inserting the rebar,
Alternatively, after pouring mortar or concrete into the recess of the mold body formed by the notch, placing the reinforcing bar so as to be placed in the recess for inserting the reinforcing bar,
Releasing the fixation after the mortar or concrete is cured;
A method comprising the steps of:
JP2003194687A 2003-07-10 2003-07-10 Formwork for producing wall spacers for rebar construction, and method for producing wall spacers for rebar construction Expired - Lifetime JP3913199B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2003194687A JP3913199B2 (en) 2003-07-10 2003-07-10 Formwork for producing wall spacers for rebar construction, and method for producing wall spacers for rebar construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2003194687A JP3913199B2 (en) 2003-07-10 2003-07-10 Formwork for producing wall spacers for rebar construction, and method for producing wall spacers for rebar construction

Publications (2)

Publication Number Publication Date
JP2005030016A JP2005030016A (en) 2005-02-03
JP3913199B2 true JP3913199B2 (en) 2007-05-09

Family

ID=34205758

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2003194687A Expired - Lifetime JP3913199B2 (en) 2003-07-10 2003-07-10 Formwork for producing wall spacers for rebar construction, and method for producing wall spacers for rebar construction

Country Status (1)

Country Link
JP (1) JP3913199B2 (en)

Also Published As

Publication number Publication date
JP2005030016A (en) 2005-02-03

Similar Documents

Publication Publication Date Title
JP4697834B2 (en) Precast concrete board, method for producing the same, and method for constructing slab
JP3913199B2 (en) Formwork for producing wall spacers for rebar construction, and method for producing wall spacers for rebar construction
JP2974605B2 (en) Manufacturing method of segment for tunnel lining
JP2982987B2 (en) Foundation structure
JP3342433B2 (en) Manufacturing method of precast concrete board
JPH0238735B2 (en) PCBUZAINOSEIZOHOHO
JP3609369B2 (en) Spacer block for reinforced concrete structures
JP2947328B2 (en) Construction method of precast concrete foundation structure
JP3119262B2 (en) Form of concrete segment, method of manufacturing the same, method of manufacturing concrete segment using the form, and concrete segment manufactured by the form
KR200167952Y1 (en) Mold for fish-house
JP3487444B2 (en) Method of forming piping hole in substructure and sleeve
JP5027830B2 (en) Beam structure and method for constructing beam structure
JPH11320532A (en) Form for molding building material block
KR200347345Y1 (en) A form
JP2733752B2 (en) Concrete foundation for building and its construction method
JP2965508B2 (en) Formwork equipment for concrete product molding
JP3043426U (en) Gate-shaped gutter structure receiving frame
JPS5929073Y2 (en) Assembly structure for pouring concrete, etc.
JP3012326U (en) Integral discard formwork in masonry format
JPH0999425A (en) Manufacture of semi-pc member
JPH05179677A (en) Construction method for concrete structure
JPH07229291A (en) Form for construction
JP4591966B2 (en) Manufacturing or construction method of an object having a plurality of recesses or protrusions
JP3372239B2 (en) Precast concrete board, curved board, and method of manufacturing precast concrete board
JPH0524317U (en) Reinforcing bar holding spacer for mold

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20050518

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20060821

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20060929

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20061120

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20070123

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20070130

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

Ref document number: 3913199

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110209

Year of fee payment: 4

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110209

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120209

Year of fee payment: 5

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140209

Year of fee payment: 7

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term