JP3908110B2 - Box construction tool and box device - Google Patents

Box construction tool and box device Download PDF

Info

Publication number
JP3908110B2
JP3908110B2 JP2002206412A JP2002206412A JP3908110B2 JP 3908110 B2 JP3908110 B2 JP 3908110B2 JP 2002206412 A JP2002206412 A JP 2002206412A JP 2002206412 A JP2002206412 A JP 2002206412A JP 3908110 B2 JP3908110 B2 JP 3908110B2
Authority
JP
Japan
Prior art keywords
box
pair
pitch
mounting plate
locking pieces
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2002206412A
Other languages
Japanese (ja)
Other versions
JP2004044321A (en
Inventor
建世 古田
真之 安田
寿幸 西脇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mirai Kogyo KK
Original Assignee
Mirai Kogyo KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mirai Kogyo KK filed Critical Mirai Kogyo KK
Priority to JP2002206412A priority Critical patent/JP3908110B2/en
Publication of JP2004044321A publication Critical patent/JP2004044321A/en
Application granted granted Critical
Publication of JP3908110B2 publication Critical patent/JP3908110B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Description

【0001】
【発明の属する技術分野】
本発明は、コンクリート打設前に、これに埋設されるボックスを鉄筋類に固定するためのボックス架設具、及びボックス装置に関するものである。
【0002】
【従来の技術】
コンクリート打設前において、コンクリート埋設されるボックスの前面開口を型枠に密着した状態で、このボックスを鉄筋類に固定するのに使用される架設具の一つとして、特公平4−19336号公報に開示されているものがある。この架設具の基本構成は、コンクリート埋設されるボックスを、その底壁を当接させて取付けるための取付け板と、該取付け板の上下端部に横方向に取付けられて、両端部を奥側に折り曲げて鉄筋類に固定することにより突張り力を発生させる支持バーとを備え、前記取付け板には、ボックスの底壁に設けられた後述の孔に挿通係止されて、該取付け板にボックスを取付けるための一対の係止片が前面側に切り起こして形成されたものである。
【0003】
そして、架設具の取付け板に前面側に切り起こされた一対の係止片のピッチ(間隔)は、ボックスの底壁に設けられた釘等を挿入するための一対(又は複数)の孔のピッチ(間隔)と対応している。そして、ボックスは、自身の底壁に設けられた前記孔を利用して、前記架設具を介して周辺の支持材に架設される。ここで、ボックスの底壁に設けられる一対(又は複数)の孔のピッチは、JIS・C8340に規定されていて、例えば、アウトレットボックスの場合には、その大きさに対応して、一対の孔のピッチは、通常は65mmであるが、これよりも僅かに小さなボックスでは、60mmとなっている。
【0004】
よって、従来の架設具では、その取付け板に設けられた一対の係止片のピッチは一定であるので、上記したように、底壁に設けられた一対(又は複数)の孔のピッチが僅かに異なる場合においても、これに対応した2種類の架設具が必要となる不具合があった。
【0005】
【発明が解決しようとする課題】
本発明の課題は、取付け板に切り起こされた一対の係止片のピッチを、僅かに異なる2種類のいずれかに選択可能な構造にして、一対又は複数の係止片挿通孔のピッチの異なる2種類のボックスを架設できるボックス架設具、及びボックス装置の提供である。
【0006】
【課題を解決するための手段】
上記の課題を解決するための請求項1の発明は、ボックスを取付ける取付け板と、該取付け板の上下部に横方向に固着されて、両端部が周辺の支持材に固定される支持バーとを備え、前記取付け板には、ボックスの底壁に貫通された一対の係止片挿通孔に挿通して折り曲げることにより係止されて、該取付け板にボックスを取付ける一対の係止片前面側に切り起こして形成されたボックス架設具であって、前記取付け板における各係止片の基端部には、一対の係止片挿通孔のピッチの異なる第1及び第2の各ボックスを取付け可能にすべく、一対の係止片のピッチを変更するための切込みが、切起し方向に延長して設けられ、初期の一対の係止片のピッチは、第1ボックスの第1ピッチと合致していると共に、ペンチ等の把持工具を使用して、前記切込みの部分において一対の係止片を最大に切り起こした後の一対の係止片のピッチは、第2ボックスの第2ピッチと合致するように構成されていることを特徴としている。請求項1の発明によれば、取付け板に前面側に向けて切り起こされた初期の一対の係止片のピッチは、前記取付け板の前面の当接面に取付けられるボックスに設けられた一対の係止片挿通孔のピッチに対応して、前記切込みが残っている第1ピッチと、各係止片を切込みに沿って最大に切り起こして形成されて、前記第1ピッチと僅かに大きさの異なる第2ピッチとの2種類のいずれか一方が選択される。よって、1種類の架設具によって、一対の係止片挿通孔のピッチの異なる2種類のボックスの架設が可能となる。このため、保有すべき架設具の種類が少なくなって、施工、架設具の管理等が容易となる。
【0007】
また、請求項2の発明は、請求項1の発明において、前記一対の係止片は、取付け板の内側に向けて切り起こされていることを特徴としている。請求項2の発明によれば、引寄せ具が螺合される取付け板の中央部に近い部分に、前記係止片の切起し溝が残らないので、取付け板の強度の低下を防止できる。
【0008】
また、請求項3の発明は、請求項1の発明を、当該請求項1の発明に係るボックス架設具と、当該ボックス架設具に取付け可能であって、一対の係止片挿通孔のピッチの異なる2種類のボックスとの組み合わせとして把握したものであって、実質的には、請求項1の発明と同一である。
【0009】
【発明の実施の形態】
以下、実施形態を挙げて、本発明について更に詳細に説明する。図1は、本発明の第1実施形態のボックス架設具K1 の斜視図であり、図2は、ボックス架設具K1 と、これに取付けられるボックスBとが分離された状態の斜視図であり、図3は、ボックス架設具K1 の正面図であり、図4は、図3のX─X線断面図であり、図5は、ボックス架設具K1 を使用してボックスBを架設した状態の平面図であり、図6は、図5のY−Y線拡大断面図である。
【0010】
図1ないし図4において、ボックス架設具(以下、単に「架設具」と略す)1 は、その前面にボックスBの底壁1が当接される取付け板10と、該取付け板10の上下の両端部に固着される一対の支持バー30とで構成される。取付け板10は、金属板をプレス成形した後に、カール成形を施して形成される。即ち、取付け板10の中心部には、バーリング成形により短円筒状の雌ねじ形成筒部11が背面側に向けて突出して形成され、取付け板10は、前記雌ねじ形成筒部11に対して左右に同一量だけずれた部分にそれぞれ上下の各取付け板部10a,10b が連続して形成されている。よって、上下の各取付け板部10a,10b は、縦長の長方形状をなしているが、その接続部は、ボックスBの底壁1のノックアウト孔6に接続される電線管(図示せず)の外径に対応した円弧状に形成されている。即ち、取付け板10の全体形状は、非長方形状であって、これを構成する各取付け板部10a,10b は、中心部の前記雌ねじ形成筒部11に対して点対称形状(各取付け板部10a,10b のいずれか一方を雌ねじ形成筒部11を中心にして半回転させると、他方に合致する形状)となっている。
【0011】
上下の各取付け板部10a,10b における雌ねじ形成筒部11の直上及び直下の対称位置には、一対の係止片12が、前面の当接面13の側であって、しかも内側(雌ねじ形成筒部11の側)に向けて切り起こされている。このため、一対の係止片12は、雌ねじ形成筒部11から上下方向に沿って同一位置に位置しており、上下の各取付け板部10a,10b に対しては、それぞれ幅方向(横方向)に沿って互いに反対側の端部に偏って形成されている。
【0012】
また、取付け板10における一対の係止片12の側方には、それぞれ直線リブ14が背面側に膨出して上下方向に形成されていると共に、雌ねじ形成筒部11の外周には、リングリブ15が同じく背面側に膨出して形成され、両リブ14,15は、互いに接続している。取付け板10に直線リブ14及びリングリブ15を設けることにより、該取付け板10の全体が補強される。この雌ねじ形成筒部11には、後述の引寄せボルト44の先端部を螺合させる雌ねじ16(図4参照)が形成されている。
【0013】
また、プレス成形時には、取付け板10の上下の端部であって、しかも当該部分の幅方向の両端部に、支持バー30を挿通して固着する支持バー挿通固着部17を形成するための長方形状をした上下に2個ずつの計4個の板状部(図示せず)が同時に打抜き形成される。そして、プレス成形後において、4つの前記各板状部を取付け板10の前面側に向けて断面略リング形にカール成形することにより、取付け板10の上下の各端部に、横方向に所定間隔をおいた2個ずつの計4個の支持バー挿通固着部17が形成される。支持バー挿通固着部17は、支持バー30を挿通して固着するための部分であって、成形後の内径は、支持バー30を挿通可能にするために、その外径よりも僅かに大きくなっており、上下の各支持バー30を横方向に沿って所定間隔をおいた一対の支持バー挿通固着部17に挿通した後に、この支持バー挿通固着部17をかしめて僅かに変形させることにより、取付け板10に対して支持バー30が一体に固着される。なお、図1ないし図4において、18は、一対の係止片12を切り起こすことにより、取付け板10に形成された切起し溝であり、19は、中央の雌ねじ形成筒部11の両側に形成されたタッピンねじ挿通孔であり、図1ないし図3、図7及び図8において、21は、支持バー挿通固着部17の表面に残った「かしめ痕」を示す。
【0014】
また、図1ないし図4に示されているように、取付け板10のプレス成形後においては、初期の一対の係止片12のピッチ(間隔)は、標準ピッチ(P1)であって、取付け板10における各係止片12の基端部には、該係止片12の切起し方向(取付け板10の内側方向)に沿って一対の切込み22が前記切起し溝18に接続して設けられている。そして、この切込み22の長さ(L)〔図3参照〕は、図7に示されるように、ペンチ等の把持工具Tを使用して、一対の係止片12を切起し方向に最大に切り起こした場合に、切起し後の一対の係止片12’の特殊ピッチ(P2)〔図4及び図8参照〕が前記標準ピッチ(P1)よりも大きな目的のピッチとなるような長さに定められている。例えば、アウトレットボックスの場合においては、前記標準ピッチ(P1)は、60mmであって、特殊ピッチ(P2)は、65mmである。
【0015】
また、支持バー30は、直径4mm程度の鉄線で構成されて、手で折り曲げ可能であって、図5に示されるように、取付け板10の上下端部にそれぞれ形成された一対の支持バー挿通固着部17にそれぞれ支持バー30が挿通されて、各支持バー挿通固着部17がかしめられることにより、上下一対の支持バー30は、その中央部が取付け板10に一体に固着されている。
【0016】
また、コンクリート内に埋設されるボックス(アウトレットボックス)Bは、図2に示されるように、その底壁1の中央部に引寄せボルト44を挿通するボルト挿通孔2が形成され、該ボルト挿通孔2を中心として、その上下に一対の係止片挿通孔3が形成されている。この一対の係止片挿通孔3のピッチは、該ボックスBを架設する前記架設具K1 の取付け板10にプレス成形時に設けられた一対の係止片12の標準ピッチP1 と同一である。また、底壁1には、前記ボルト挿通孔2を中心にして計4個のタッピンねじ下孔4が周方向に等間隔で形成されている。このタッピンねじ下孔4は、架設具K1 の取付け板10の前面に一対の係止片12によってボックスBを取付ける際に、その取付強度が不足する場合には、取付け板10の前記タッピンねじ挿通孔19に挿通したタッピンねじをねじ込んで、前記取付強度の不足を補うためのものである。また、ボックスBの底壁1及び周壁5には、多数のノックアウト孔6が形成されていて、使用しないものは、閉塞蓋7で覆われている。
【0017】
そして、前記架設具K1 を使用して、コンクリート内に埋設されるボックスBを所定位置に配置するには、以下のようにして行う。まず、ボックスBの底壁1の裏面を、架設具K1 の取付け板10の前面の当接面13に当接させて、該取付け板10に設けられた標準ピッチ(P1)の一対の係止片12を、ボックスBの底壁1に設けられた標準ピッチ(P1)の一対の係止片挿通孔3に挿通して、底壁1の内面から突出した部分を、該底壁1の中心側に向けて折り曲げる(図6参照)。これにより、一対の係止片12を介して取付け板10の前面の当接面13にボックスBが取付けられる。なお、一対の係止片12のみでは、取付強度が不足する場合には、取付け板10に設けられたタッピンねじ挿通孔19に挿通されたタッピンねじを、ボックスBのタッピンねじ下孔4に螺合して、強度不足を補うことは、上記した通りである。
【0018】
次に、図5に示されるように、架設具K1 を構成する上下一対の支持バー30の両端部30aを奥側に折り曲げて、その近傍の鉄筋41に針金45等を使用して固定し、前記支持バー30を奥側に折り曲げることにより発生する突張り力によって、ボックスBの前面開口は、コンクリート打設位置に立てかけた型枠42の内面側に密着して、この状態が維持される。また、型枠42に設けられたボルト挿通孔43から引寄せボルト44を内部に挿入して、その先端を、取付け板10の中央部に成形された雌ねじ形成筒部11の内周面の雌ねじ16に螺合させることにより、ボックスBを型枠42の側に引き寄せて、該ボックスBの開口端面を型枠42の内面に確実に密着させる。この状態で、型枠の内側にコンクリートを打設すると、その硬化後において、ボックスBは、コンクリート内に埋設される。なお、支持バー30の両端部を奥側に折り曲げることにより発生する「突張り力」のみによって、コンクリートが流入しない密着力を有して、ボックスBの開口端面が型枠42の内面に密着する場合には、前記引寄せボルト44を使用する必要はない。
【0019】
一方、底壁に設けられた一対の係止片挿通孔のピッチが前記標準ピッチ(P1)よりも僅かに小さな特殊ピッチ(P2)の別のボックスを取付ける場合には、図7に示されるように、ペンチ等の把持工具Tを使用して、取付け板10の前面側に突出している一対の係止片12を把持して、該係止片12の切起し方向(第1実施形態では、内側)に向けて前記係止片12を最大に切り起こす。取付け板10には、そのプレス成形時において、切起し溝18の幅方向の端縁に連続する2本の切込み22が設けられているため、前記係止片12は、図8に示されるように、前記切込み22の長さ(L)に対応した分だけ、更に切り起こされて、切起し後における一対の係止片12’のピッチは、特殊ピッチ(P2)となる。
【0020】
よって、各係止片12を最大に切り起こして、一対の係止片12’のピッチを特殊ピッチ(P2)とすることにより、同一の架設具K1 を使用して、底壁に設けられた一対の係止片挿通孔のピッチが前記標準ピッチ(P1)よりも僅かに小さな特殊ピッチ(P2)の別のボックスを取付けることが可能となる。よって、一つの架設具K1 によって、2種類のボックスを取付けることができる。
【0021】
また、上記第1実施形態の架設具K1 は、取付け板10に設けられる一対の係止片12は、内側に向けて切り起こされているために、引寄せボルト44が螺合される取付け板10の中心部に切起し溝18が形成されないために、取付け板10の強度の低下が少ない利点がある。しかし、図9に示される本発明の第2実施形態の架設具K2 のように、一対の係止片12は、外側に切り起こして形成されて、切起し溝18に連続して、その外側に切込み22が設けられた構成のものも考えられる。この架設具K2 は、プレス成形時の一対の係止片12の標準ピッチ(P11) は、前記一対の係止片12を切起し溝18に沿って最大に外側に切り起こして形成された一対の係止片12’の特殊ピッチ(P12) よりも小さい。
【0022】
また、取付け板10の全体形状に関しても、長方形状のものであってもよい。
【0023】
また、上記施工例は、ボックスBがコンクリート内に埋設される場合であって、架設具K1 を構成する一対の支持バー30は、その両端部を奥側に折り曲げて周辺の鉄筋41に固定することにより、突張り力を発生させ、この突張り力により型枠42の裏面側にボックスBを当接させるものである。しかし、本発明に係る架設具は、軽量間仕切り壁を構成していて相隣接する2本の間柱の間にボックスを配設する施工例においても、使用可能である。この施工例の場合には、架設具を構成する上下一対の各支持バー30の両端部は、折り曲げることなく、そのままの真っ直ぐな状態で前記2本の間柱に固定される。更に、具体的には、前記2本の間柱の各対向板部に穿孔した挿通孔に支持バー30の端部が挿通固定される。後者の施工例の場合でも、2本の間柱の間に配設されるボックスの底壁に設けられた一対(又は複数)の係止片挿通孔3のピッチが僅かに異なる場合には、前者の施工例の場合と同様にして、取付け板10の前面に突出した一対の係止片12を切込み22に沿って更に切り起こして、そのピッチを僅かに変更させればよい。
【0024】
更に、上記各架設具K1,K2 は、いずれも取付け板10の上下端部に一対(2本)の独立した支持バー30が固定された構成であって、ボックスBに対して両側に位置する支持バー30の両端部が周辺の支持材(前者の施工例では、鉄筋41であり、後者の施工例では、軽量間仕切り壁を構成する2本の間柱である)に固定される例である。しかし、本発明の架設具を構成する「支持バー」は、必ずしも独立した2本で構成される必要はなく、1本の鉄線をコの字形に折り曲げて、互いに平行となった部分を取付け板の上下端部に固定するものも含まれる。この構成では、支持バーの「両端部」は、これを構成する1本の鉄線の両端部であって、コの字形に折り曲げられているために、所定位置に配設されたボックスの片側に位置することになる。換言すれば、ボックスは、1本の鉄線をコの字形に折り曲げた支持バーに片持ち状となって支持される。
【0025】
【発明の効果】
本発明に係るボックス架設具は、取付け板における各係止片の基端部に、一対の係止片のピッチを変更するための切込みが、切起し方向に延長して設けられていて、前記切込みに沿って一対の係止片を最大に切り起こすことにより、一対の係止片のピッチを変更させられて、同一の架設具が、異なる2種類のピッチの係止片を有することとなる。よって、架設具を構成する取付け板に設けられた一対の係止片の有する2種類のピッチのいずれかを選択することにより、一対の係止片挿通孔のピッチの異なる2種類のボックスを架設できる。
【図面の簡単な説明】
【図1】 本発明の第1実施形態のボックス架設具K1 の斜視図である。
【図2】 ボックス架設具K1 と、これに取付けられるボックスBとが分離された状態の斜視図である。
【図3】 ボックス架設具K1 の正面図である。
【図4】 図3のX─X線断面図である。
【図5】 ボックス架設具K1 を使用してボックスBを架設した状態の平面図である。
【図6】 図5のY−Y線拡大断面図である。
【図7】 把持工具Tを使用して、一対の係止片12を更に切り起こして、そのピッチを特殊ピッチ(P2)としている途中を示すボックス架設具K1 の斜視図である。
【図8】 同じく切起し後の状態のボックス架設具K1 の斜視図である。
【図9】 本発明の第2実施形態のボックス架設具K2 の斜視図である。
【符号の説明】
B:ボックス
1,K2 ボックス架設具
1,P11:一対の係止片の標準ピッチ(第1ピッチ)
2,P12:一対の係止片の特殊ピッチ(第2ピッチ)
1:ボックスの底壁
3:係止片挿通孔
10:取付け板
12:係止片
22:切込み
30:支持バー
41:鉄筋(支持材)
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a box erection tool and a box device for fixing a box embedded in a concrete rebar before placing concrete.
[0002]
[Prior art]
Japanese Patent Publication No. 4-19336 as one of the construction tools used to fix the box to the reinforcing bars with the front opening of the box buried in concrete in close contact with the formwork before placing the concrete. Are disclosed. The basic structure of this installation tool consists of a mounting plate for mounting a concrete-embedded box with its bottom wall in contact with the mounting plate, and a horizontal mounting on the upper and lower ends of the mounting plate. And a support bar that generates a tensile force by being bent to be fixed to the reinforcing bars, and the mounting plate is inserted and locked in a hole described later provided in the bottom wall of the box , and is attached to the mounting plate. A pair of locking pieces for attaching the box is formed by cutting and raising the front side.
[0003]
The pitch (interval) of the pair of locking pieces cut and raised on the front surface side of the mounting plate of the construction tool is equal to the pair (or plural) holes for inserting nails or the like provided on the bottom wall of the box. Corresponds to pitch (interval). Then, the box is installed on the surrounding support material via the installation tool using the hole provided in the bottom wall of the box. Here, the pitch of a pair (or a plurality of) holes provided in the bottom wall of the box is defined in JIS C8340. For example, in the case of an outlet box, a pair of holes The pitch is normally 65 mm, but in a box slightly smaller than this, it is 60 mm.
[0004]
Therefore, in the conventional installation tool, since the pitch of the pair of locking pieces provided on the mounting plate is constant, as described above, the pitch of the pair (or plural) holes provided on the bottom wall is slight. However, there is a problem that two types of installation tools corresponding to this are required.
[0005]
[Problems to be solved by the invention]
The problem of the present invention is that the pitch of the pair of locking pieces cut and raised on the mounting plate can be selected from two slightly different types, and the pitch of the one or more locking piece insertion holes can be selected. The present invention is to provide a box erection tool and a box device capable of erection of two different types of boxes.
[0006]
[Means for Solving the Problems]
The invention of claim 1 for solving the above-described problems includes a mounting plate for mounting the box , a support bar fixed to the upper and lower portions of the mounting plate in the lateral direction, and both ends fixed to the surrounding support material, wherein the the mounting plate, is engaged by bending is inserted into the pair of engaging pieces insertion hole passing through in the bottom wall of the box, the front pair of locking pieces for attaching the box to the mounting plate A box construction tool formed by cutting and raising to the side, wherein the first and second boxes having different pitches of the pair of locking piece insertion holes are provided at the base end portion of each locking piece in the mounting plate. In order to enable attachment, a notch for changing the pitch of the pair of locking pieces is provided extending in the cut-and-raised direction, and the pitch of the initial pair of locking pieces is the first pitch of the first box. Use a gripping tool such as pliers. , The pitch of the pair of locking pieces after cutting and raising the maximum a pair of locking pieces in the portion of the cut is characterized by being configured to match the second pitch in the second box. According to the first aspect of the present invention, the pitch of the pair of initial locking pieces cut and raised toward the front surface of the mounting plate is a pair of boxes provided on the box mounted on the contact surface of the front surface of the mounting plate. In correspondence with the pitch of the locking piece insertion holes, the first pitch in which the cut remains, and the locking pieces are formed by cutting and raising the locking pieces to the maximum along the cut, and are slightly larger than the first pitch. One of the two types of different second pitches is selected. Therefore, two types of boxes with different pitches of the pair of locking piece insertion holes can be installed with one type of installation tool. For this reason, the kind of installation tools which should be held decreases, and construction, management of installation tools, etc. become easy.
[0007]
The invention of claim 2 is characterized in that, in the invention of claim 1, the pair of locking pieces are cut and raised toward the inside of the mounting plate. According to the invention of claim 2, since the cut and raised groove of the locking piece does not remain in the portion near the center of the mounting plate to which the attracting tool is screwed, it is possible to prevent the strength of the mounting plate from being lowered. .
[0008]
Further, the invention of claim 3 can attach the invention of claim 1 to the box construction tool according to the invention of claim 1 and the box construction tool, and the pitch of the pair of locking piece insertion holes can be adjusted. It is grasped as a combination with two different types of boxes, and is substantially the same as the invention of claim 1.
[0009]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, the present invention will be described in more detail with reference to embodiments. FIG. 1 is a perspective view of a box framing tool K 1 according to the first embodiment of the present invention, and FIG. 2 is a perspective view of a state where the box framing tool K 1 and a box B attached thereto are separated. 3 is a front view of the box construction tool K 1 , FIG. 4 is a cross-sectional view taken along the line XX of FIG. 3, and FIG. 5 is a construction of the box B using the box construction tool K 1. FIG. 6 is an enlarged sectional view taken along line YY of FIG. 5.
[0010]
1 to 4, a box installation tool (hereinafter simply referred to as “installation tool”) K 1 includes a mounting plate 10 with which the bottom wall 1 of the box B abuts the front surface thereof, and upper and lower portions of the mounting plate 10. It is comprised with a pair of support bar 30 fixed to the both ends. The mounting plate 10 is formed by press forming a metal plate and then performing curl forming. That is, a short cylindrical female thread forming tube portion 11 is formed at the center of the mounting plate 10 so as to protrude toward the back side by burring, and the mounting plate 10 is formed on the left and right sides of the female screw forming tube portion 11. The upper and lower mounting plate portions 10a and 10b are successively formed at portions shifted by the same amount. Therefore, each of the upper and lower mounting plate portions 10a and 10b has a vertically long rectangular shape, and its connecting portion is a conduit (not shown) connected to the knockout hole 6 of the bottom wall 1 of the box B. It is formed in an arc shape corresponding to the outer diameter. That is, the overall shape of the mounting plate 10 is a non-rectangular shape, and each of the mounting plate portions 10a and 10b constituting the mounting plate 10 has a point-symmetrical shape (each mounting plate portion When one of 10a and 10b is half-rotated around the female thread forming cylinder portion 11, the shape matches the other.
[0011]
A pair of locking pieces 12 are located on the side of the abutment surface 13 on the front surface and on the inner side (internal thread formation) at the symmetrical positions directly above and below the internal thread forming cylinder 11 in the upper and lower mounting plate portions 10a and 10b. It is cut and raised toward the cylindrical portion 11 side. For this reason, the pair of locking pieces 12 are located at the same position along the vertical direction from the female thread forming cylinder portion 11, and the width direction (lateral direction) is set to each of the upper and lower mounting plate portions 10 a and 10 b. ) Along the opposite ends of each other.
[0012]
Further, linear ribs 14 bulge to the back side and are formed in the vertical direction on the sides of the pair of locking pieces 12 in the mounting plate 10, and ring ribs 15 are formed on the outer periphery of the female thread forming cylinder portion 11. Are also formed to bulge to the back side, and the ribs 14 and 15 are connected to each other. By providing the mounting plate 10 with the linear rib 14 and the ring rib 15, the entire mounting plate 10 is reinforced. A female screw 16 (see FIG. 4) is formed in the female screw forming cylinder portion 11 for screwing a leading end portion of a pulling bolt 44 described later.
[0013]
Further, at the time of press molding, a rectangular shape for forming support bar insertion fixing portions 17 which are upper and lower ends of the mounting plate 10 and which are fixed by inserting the support bars 30 at both ends in the width direction of the portions. A total of four plate-like parts (not shown) are formed by punching at the same time. Then, after the press molding, the four plate-like portions are curled in a substantially ring shape in cross section toward the front surface side of the mounting plate 10, and predetermined in the lateral direction at the upper and lower ends of the mounting plate 10. A total of four support bar insertion fixing portions 17 are formed, each having two spaces. The support bar insertion fixing portion 17 is a portion for inserting and fixing the support bar 30, and the inner diameter after molding is slightly larger than the outer diameter so that the support bar 30 can be inserted. The upper and lower support bars 30 are inserted into a pair of support bar insertion fixing portions 17 with a predetermined interval along the horizontal direction, and then the support bar insertion fixing portions 17 are caulked to slightly deform, The support bar 30 is integrally fixed to the mounting plate 10. In FIG. 1 to FIG. 4, reference numeral 18 denotes a cut-and-raised groove formed in the mounting plate 10 by cutting and raising the pair of locking pieces 12, and 19 denotes both sides of the central female screw forming cylinder portion 11. In FIG. 1 to FIG. 3, FIG. 7 and FIG. 8, reference numeral 21 denotes “caulking traces” remaining on the surface of the support bar insertion fixing portion 17.
[0014]
As shown in FIGS. 1 to 4, after the press molding of the mounting plate 10, the initial pitch (interval) of the pair of locking pieces 12 is a standard pitch (P 1 ), A pair of cuts 22 are connected to the cut and raised grooves 18 along the cutting and raising direction of the locking pieces 12 (inward direction of the mounting plate 10) at the base end portion of each locking piece 12 in the mounting plate 10. Is provided. The length (L) of the incision 22 (see FIG. 3) is the maximum in the direction in which the pair of locking pieces 12 are raised and raised using a gripping tool T such as pliers as shown in FIG. , The special pitch (P 2 ) (see FIGS. 4 and 8) of the pair of locking pieces 12 ′ after the cut and raise becomes a target pitch larger than the standard pitch (P 1 ). It is set to such a length. For example, in the case of an outlet box, the standard pitch (P 1 ) is 60 mm, and the special pitch (P 2 ) is 65 mm.
[0015]
Further, the support bar 30 is made of an iron wire having a diameter of about 4 mm and can be bent by hand. As shown in FIG. 5, a pair of support bar insertions formed at the upper and lower ends of the mounting plate 10, respectively. The support bars 30 are respectively inserted into the fixing portions 17 and the support bar insertion fixing portions 17 are caulked so that the center portions of the pair of upper and lower support bars 30 are integrally fixed to the mounting plate 10.
[0016]
Further, as shown in FIG. 2, the box (outlet box) B embedded in the concrete is formed with a bolt insertion hole 2 through which a pulling bolt 44 is inserted at the center of the bottom wall 1, and the bolt insertion. A pair of locking piece insertion holes 3 are formed above and below the hole 2 as a center. The pitch of the pair of locking piece insertion holes 3 is the same as the standard pitch P 1 of the pair of locking pieces 12 provided at the time of press molding on the mounting plate 10 of the installation tool K 1 for mounting the box B. . Further, a total of four tapping screw lower holes 4 are formed in the bottom wall 1 at equal intervals in the circumferential direction with the bolt insertion hole 2 as the center. When the box B is attached to the front surface of the mounting plate 10 of the installation tool K 1 by a pair of locking pieces 12 when the mounting strength is insufficient, the tapping screw pilot hole 4 is provided on the mounting plate 10. The tapping screw inserted through the insertion hole 19 is screwed in to compensate for the insufficient mounting strength. A large number of knockout holes 6 are formed in the bottom wall 1 and the peripheral wall 5 of the box B, and those not used are covered with a closing lid 7.
[0017]
Then, using the erection device K 1, to place the box B to be embedded in the concrete in a predetermined position is performed as follows. First, the back surface of the bottom wall 1 of the box B is brought into contact with the contact surface 13 on the front surface of the mounting plate 10 of the mounting tool K 1 , and a pair of standard pitches (P 1 ) provided on the mounting plate 10 is provided. The locking piece 12 is inserted into a pair of locking piece insertion holes 3 having a standard pitch (P 1 ) provided in the bottom wall 1 of the box B, and the portion protruding from the inner surface of the bottom wall 1 is the bottom wall. 1 is bent toward the center side (see FIG. 6). Thereby, the box B is attached to the contact surface 13 on the front surface of the mounting plate 10 via the pair of locking pieces 12. If the mounting strength is insufficient with only the pair of locking pieces 12, the tapping screw inserted into the tapping screw insertion hole 19 provided in the mounting plate 10 is screwed into the tapping screw lower hole 4 of the box B. In combination, the shortage of strength is compensated as described above.
[0018]
Next, as shown in FIG. 5, both end portions 30a of the pair of upper and lower support bars 30 constituting the erection device K 1 by folding the back side, using a wire 45 or the like fixed to the reinforcing bar 41 in the vicinity thereof The front opening of the box B is brought into close contact with the inner surface side of the mold 42 leaning against the concrete placement position by the tension generated by bending the support bar 30 to the back side, and this state is maintained. . Further, the drawing bolt 44 is inserted into the inside through a bolt insertion hole 43 provided in the mold frame 42, and the tip thereof is a female screw on the inner peripheral surface of the female screw forming cylinder portion 11 formed at the center of the mounting plate 10. 16, the box B is pulled toward the mold frame 42, and the open end surface of the box B is securely adhered to the inner surface of the mold frame 42. In this state, when concrete is placed inside the formwork, the box B is embedded in the concrete after the hardening. It should be noted that the opening end surface of the box B is in close contact with the inner surface of the mold frame 42 with an adhesion force that does not allow the concrete to flow in only by “stretching force” generated by bending both ends of the support bar 30 to the back side. In some cases, it is not necessary to use the pulling bolt 44.
[0019]
On the other hand, when attaching another box having a special pitch (P 2 ) slightly smaller than the standard pitch (P 1 ), the pair of locking piece insertion holes provided in the bottom wall is shown in FIG. As shown, a pair of locking pieces 12 projecting to the front surface side of the mounting plate 10 are gripped using a holding tool T such as pliers, and the direction in which the locking pieces 12 are raised (first embodiment) In the form, the locking piece 12 is cut up to the maximum inward. Since the mounting plate 10 is provided with two cuts 22 that are continuous to the edge in the width direction of the cut and raised groove 18 at the time of press molding, the locking piece 12 is shown in FIG. As described above, the pitch of the pair of locking pieces 12 ′ is further cut and raised by an amount corresponding to the length (L) of the cut 22 and becomes a special pitch (P 2 ).
[0020]
Therefore, each locking piece 12 is cut and raised to the maximum, and the pitch of the pair of locking pieces 12 ′ is set to the special pitch (P 2 ), so that the same installation tool K 1 is used to provide the bottom wall. It is possible to attach another box having a special pitch (P 2 ) in which the pitch between the pair of engaging piece insertion holes is slightly smaller than the standard pitch (P 1 ). Thus, by one erection tool K 1, it is possible to attach the two boxes.
[0021]
Further, in the construction tool K 1 of the first embodiment, the pair of locking pieces 12 provided on the mounting plate 10 are cut and raised toward the inside, so that the drawing bolts 44 are screwed together. Since the cut and raised groove 18 is not formed at the center of the plate 10, there is an advantage that the strength of the mounting plate 10 is hardly lowered. However, like the construction tool K 2 of the second embodiment of the present invention shown in FIG. 9, the pair of locking pieces 12 are formed by being cut and raised outward, and are continuous with the cut and raised groove 18. The thing of the structure provided with the notch 22 in the outer side is also considered. The bridge member K 2 has a standard pitch (P 11 ) of the pair of locking pieces 12 at the time of press molding, and is formed by cutting and raising the pair of locking pieces 12 and maximally outward along the grooves 18. It is smaller than the special pitch (P 12 ) of the pair of locking pieces 12 ′.
[0022]
Also, the overall shape of the mounting plate 10 may be rectangular.
[0023]
Moreover, the construction example is a case where the box B are embedded in the concrete, a pair of support bars 30 constituting the erection device K 1 is fixed to the periphery of the reinforcing bar 41 by bending both ends thereof to the rear side Thus, a tensile force is generated, and the box B is brought into contact with the back surface side of the mold frame 42 by the tensile force. However, the installation tool according to the present invention can also be used in a construction example in which a box is disposed between two adjacent pillars that constitute a lightweight partition wall. In the case of this construction example, both ends of the pair of upper and lower support bars 30 constituting the installation tool are fixed to the two studs in a straight state without being bent. Further, specifically, the end portion of the support bar 30 is inserted and fixed in the insertion hole drilled in each opposing plate portion of the two studs. Even in the case of the latter construction example, when the pitch of the pair (or plural) of locking piece insertion holes 3 provided on the bottom wall of the box disposed between the two studs is slightly different, the former Similarly to the case of the construction example, the pair of locking pieces 12 protruding from the front surface of the mounting plate 10 may be further cut and raised along the cuts 22 to slightly change the pitch.
[0024]
Further, each of the construction tools K 1 and K 2 has a configuration in which a pair (two) of independent support bars 30 are fixed to the upper and lower ends of the mounting plate 10, In the example where both ends of the support bar 30 positioned are fixed to the surrounding support material (in the former construction example, the reinforcing bar 41 and in the latter construction example, the two pillars constituting the lightweight partition wall). is there. However, the "support bar" constituting the installation tool of the present invention does not necessarily need to be composed of two independent pieces, but one iron wire is bent into a U-shape and the parts parallel to each other are attached to the mounting plate. What is fixed to the upper and lower ends of is also included. In this configuration, the “both ends” of the support bar are both ends of one iron wire that constitutes the support bar, and are bent in a U shape so that they are located on one side of the box disposed at a predetermined position. Will be located. In other words, the box is supported in a cantilever manner by a support bar in which one iron wire is bent into a U-shape.
[0025]
【The invention's effect】
The box construction tool according to the present invention is provided with a notch for changing the pitch of the pair of locking pieces at the base end portion of each locking piece in the mounting plate, extending in the cutting and raising direction, The pitch of the pair of locking pieces is changed by maximally raising the pair of locking pieces along the cut, and the same installation tool has locking pieces of two different pitches. Become. Therefore, two types of boxes with different pitches of the pair of locking piece insertion holes are installed by selecting one of the two types of pitches of the pair of locking pieces provided on the mounting plate constituting the installation tool. it can.
[Brief description of the drawings]
FIG. 1 is a perspective view of a box framing tool K1 according to a first embodiment of the present invention.
FIG. 2 is a perspective view showing a state in which a box framing tool K 1 and a box B attached thereto are separated.
FIG. 3 is a front view of a box framing tool K 1 .
4 is a cross-sectional view taken along the line XX of FIG.
FIG. 5 is a plan view showing a state where a box B is installed using the box installation tool K 1 .
6 is an enlarged sectional view taken along line YY in FIG.
FIG. 7 is a perspective view of the box framing tool K 1 in the middle of further cutting and raising the pair of locking pieces 12 using the gripping tool T and setting the pitch to a special pitch (P 2 ).
FIG. 8 is a perspective view of the box framing tool K 1 in the same state after being cut and raised.
FIG. 9 is a perspective view of a box framing tool K 2 according to a second embodiment of the present invention.
[Explanation of symbols]
B: Box
K 1 , K 2 : Box installation tool
P 1 , P 11 : Standard pitch of the pair of locking pieces (first pitch)
P 2 , P 12 : Special pitch of the pair of locking pieces (second pitch)
1: Bottom wall of box
3: Locking piece insertion hole
10: Mounting plate
12: Locking piece
22: Cutting
30: Support bar
41: Rebar (support material)

Claims (3)

ボックスを取付ける取付け板と、該取付け板の上下部に横方向に固着されて、両端部が周辺の支持材に固定される支持バーとを備え、
前記取付け板には、ボックスの底壁に貫通された一対の係止片挿通孔に挿通して折り曲げることにより係止されて、該取付け板にボックスを取付ける一対の係止片前面側に切り起こして形成されたボックス架設具であって、
前記取付け板における各係止片の基端部には、一対の係止片挿通孔のピッチの異なる第1及び第2の各ボックスを取付け可能にすべく、一対の係止片のピッチを変更するための切込みが、切起し方向に延長して設けられ、
初期の一対の係止片のピッチは、第1ボックスの第1ピッチと合致していると共に、ペンチ等の把持工具を使用して、前記切込みの部分において一対の係止片を最大に切り起こした後の一対の係止片のピッチは、第2ボックスの第2ピッチと合致するように構成されていることを特徴とするボックス架設具。
A mounting plate for mounting the box, and a support bar fixed laterally to the upper and lower portions of the mounting plate and having both ends fixed to surrounding supporting materials,
The mounting plate is locked by being inserted and bent through a pair of locking piece insertion holes penetrating the bottom wall of the box , and the pair of locking pieces for attaching the box to the mounting plate is cut to the front side. A box construction tool formed by raising,
The pitch of the pair of locking pieces is changed so that the first and second boxes having different pitches of the pair of locking piece insertion holes can be attached to the base end portion of each locking piece on the mounting plate. The incision to do is extended in the cutting and raising direction,
The pitch of the initial pair of locking pieces matches the first pitch of the first box, and using a gripping tool such as pliers, the pair of locking pieces is cut and raised to the maximum at the cut portion. A box construction tool characterized in that the pitch of the pair of locking pieces after the second pitch is configured to match the second pitch of the second box.
前記一対の係止片は、取付け板の内側に向けて切り起こされていることを特徴とする請求項1に記載のボックス架設具The box construction tool according to claim 1, wherein the pair of locking pieces are cut and raised toward the inside of the mounting plate. 第1ピッチからなる一対の係止片挿通孔を備えた第1ボックスと、前記第1ピッチとは異なる第2ピッチからなる一対の係止片挿通孔を備えた第2ボックスと、請求項1に記載のボックス架設具とから成り、The 1st box provided with a pair of locking piece insertion hole which consists of a 1st pitch, The 2nd box provided with a pair of locking piece insertion hole which consists of the 2nd pitch which is different from the 1st pitch, The claim 1 It consists of the box construction tool described in
前記架設具の初期の一対の係止片のピッチは、前記第1ボックスの第1ピッチと合致していると共に、ペンチ等の把持工具を使用して、切込みの部分において一対の係止片を最大に切り起こした後の一対の係止片のピッチは、前記第2ボックスの第2ピッチと合致していることを特徴とするボックス装置。The pitch of the initial pair of locking pieces of the installation tool matches the first pitch of the first box, and a pair of locking pieces are formed at the incision portion using a gripping tool such as pliers. The box device characterized in that the pitch of the pair of locking pieces after being cut and raised to the maximum matches the second pitch of the second box.
JP2002206412A 2002-07-16 2002-07-16 Box construction tool and box device Expired - Fee Related JP3908110B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002206412A JP3908110B2 (en) 2002-07-16 2002-07-16 Box construction tool and box device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002206412A JP3908110B2 (en) 2002-07-16 2002-07-16 Box construction tool and box device

Publications (2)

Publication Number Publication Date
JP2004044321A JP2004044321A (en) 2004-02-12
JP3908110B2 true JP3908110B2 (en) 2007-04-25

Family

ID=31711403

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002206412A Expired - Fee Related JP3908110B2 (en) 2002-07-16 2002-07-16 Box construction tool and box device

Country Status (1)

Country Link
JP (1) JP3908110B2 (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006257668A (en) * 2005-03-15 2006-09-28 Mirai Ind Co Ltd Installation method for joint or box in concrete wall, recess forming box body, and plate body
JP2006336252A (en) * 2005-05-31 2006-12-14 Mirai Ind Co Ltd Box mounting tool
JP5466413B2 (en) * 2009-03-09 2014-04-09 未来工業株式会社 Attaching the box support
EP2626484B1 (en) * 2012-02-10 2019-02-20 Christoph Morach Assembly aid for installing concrete walls
JP5752219B2 (en) * 2013-12-12 2015-07-22 未来工業株式会社 Box support, box support device, and method of attaching box support
KR101638934B1 (en) * 2016-03-11 2016-07-12 주식회사 이린 Fixing Implement for Terminal Box of Apartment House

Also Published As

Publication number Publication date
JP2004044321A (en) 2004-02-12

Similar Documents

Publication Publication Date Title
US6812405B1 (en) Electrical bracket
US7118254B2 (en) Recessed downlight mounting fixture
JP4192199B1 (en)
JP3908110B2 (en) Box construction tool and box device
US7549549B1 (en) Universal low voltage box bracket
JP4049664B2 (en) Outlet box mounting bracket
JP3913672B2 (en) Box construction tools
JP5185215B2 (en) Gas stopper mounting bracket
KR200236524Y1 (en) An outlet box
JP3201518B2 (en) Sleeve support for equipment construction
JP3861955B2 (en) Box fittings
JP3474418B2 (en) Wiring and piping box
KR100978960B1 (en) Cast-in-channel of bending steel for fixing non-structural element
JP4617291B2 (en) Through hole closing jig
KR20180066712A (en) Fixing hook for euro-form support pipe type
KR200334656Y1 (en) Fixer for wiring box
JP6377901B2 (en) Wiring and piping material support
KR200223959Y1 (en) A loy type electric wiring box
JP6647968B2 (en) Embedded rails for exterior wall panels
JP4539993B2 (en) Arrangement body support device
KR200379060Y1 (en) Fixing structure of outlet box
KR200362877Y1 (en) Fixing structure for concrete form
JP4080238B2 (en) Concrete buried device provided with bar material for supporting concrete buried material
JP4380869B2 (en) Make-up tile rod mounting structure and make-up tile rod
KR200203608Y1 (en) A Device for attaching upper channel of patition wall

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20050210

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20060831

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20060912

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20061020

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20070116

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20070117

R150 Certificate of patent or registration of utility model

Ref document number: 3908110

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100126

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100126

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110126

Year of fee payment: 4

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110126

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120126

Year of fee payment: 5

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120126

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130126

Year of fee payment: 6

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130126

Year of fee payment: 6

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees