face
mud
ground
water
shield method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP2001319687A
Other languages
Japanese (ja)
Other versions
JP2003120174A (en
Inventor
博一 杉山
茂 後藤
雅好 岡崎
信悦 大友
幸善 渡辺
忠 原
岳 加藤
知範 西丸
克豊 安井
進 高橋
一男 小林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Corp
Tokyu Construction Co Ltd
Original Assignee
Shimizu Corp
Tokyu Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Corp, Tokyu Construction Co Ltd filed Critical Shimizu Corp
Priority to JP2001319687A priority Critical patent/JP3905348B2/en
Publication of JP2003120174A publication Critical patent/JP2003120174A/en
Application granted granted Critical
Publication of JP3905348B2 publication Critical patent/JP3905348B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、切羽を良好に保持し、安定した掘削作業を行うことが可能なシールド工法における切羽安定方法、及び切羽保持用泥水に関する。
【0002】
【従来の技術】
シールド工法では、切羽を安定させて掘進することが工事を安全に行うため、またトンネル周辺地盤への影響を抑止するために重要である。しかし、粒径がそろった砂地盤や固結していない砂礫地盤は、自立性が乏しいため切羽の崩壊が生じやすく、工事におけるトラブルや周辺へ影響を及ぼすことが少なくなかった。
【0003】
シールド工法の主流である泥水式シールドでは、図5に示すように、連続地中壁と同様に掘進に用いる泥水24が、切羽23の表面に泥膜21を形成し、この泥膜21を介して泥水圧を地盤22に伝達することにより、地盤22を安定させるものである。
【0004】
【発明が解決しようとする課題】
しかし、シールド工法では、シールドマシンのカッタが地盤22の表面を常に切削しているために切羽23の表面に形成した泥膜21を保持することができず、粒径がそろった砂地盤や固結していない砂礫地盤等の土質条件では切羽23の崩落などが生じやすかった。
【0005】
上記事情に鑑み、本発明は、切羽を良好に保持し、安定した掘削作業を行うことが可能なシールド工法における切羽安定方法、及び切羽保持用泥水を提供することを目的としている。
【0006】
【課題を解決するための手段】
請求項1に記載のシールド工法における切羽安定方法は、切羽の安定状態を継続させるシールド工法における切羽安定方法であって、掘削した地盤に含まれる細粒分や粘土と、水と、ベントナイトと、該ベントナイトの粒子を凝集させるアクリルアミド系高分子凝集剤のみを配合するとともに地盤への浸透性を有する切羽保持用泥水を切羽に加圧供給して切羽から地盤に浸透させることにより、該切羽保持用泥水が浸透した地盤の浸透領域全体を地盤改良して当該浸透地盤全体に固化現象をおこさせて自立性を持たせることを特徴としている。
請求項2に記載のシールド工法における切羽安定方法は、請求項1に記載のシールド工法における切羽安定方法であって、アクリルアミド系高分子凝集剤は油中水型エマルジョンの形態を有することを特徴としている。
【0007】
請求項3に記載のシールド工法における切羽保持用泥水は、請求項1に記載のシールド工法における切羽安定方法に用いるシールド工法における切羽保持用泥水であって、掘削した地盤に含まれる細粒分や粘土と、水と、ベントナイトと、該ベントナイトの粒子を凝集させるアクリルアミド系高分子凝集剤のみが配合され、地盤への浸透性を有していることを特徴としている。
請求項4に記載のシールド工法における切羽保持用泥水は、請求項3に記載のシールド工法における切羽保持用泥水において、アクリルアミド系高分子凝集剤は油中水型エマルジョンの形態を有することを特徴としている。
【0008】
すなわち、本発明は、泥水シールド工法において切羽保持のために使用する泥水として、掘削した地盤に含まれる細粒分や粘土と水との他には、ベントナイトと、そのベントナイトの粒子を凝集させるためのアクリルアミド系高分子凝集剤のみを配合した泥水を使用することを要旨とするものであって、その切羽保持用泥水を所定泥水圧で切羽に供給することのみで、泥水中のベントナイト粒子が自ずと凝集してある程度の大きな粒径となって切羽前方の地盤中に浸透していって、それによりその浸透領域の地盤に固化現象がおこって掘進可能な程度に地盤改良され、それによって切羽を自立せしめることが可能である。しかも、掘進に伴って切羽保持用泥水の浸透領域(つまり地盤改良領域)は自ずと漸次前進していくので切羽を常に安定に自立させながら掘進を行うことが可能なものである。
したがって本発明によれば、切羽に単に泥膜が形成されるに過ぎない従来一般の泥水シールド工法による場合に比べて、切羽を常に良好に保持してその崩落を防止しつつ安定した掘削作業を行うことが可能である。
なお、本発明の切羽保持用泥水は、上記のように切羽前方の地盤に自ずと浸透していき、かつそこで地盤に固化現象がおこって切羽を自立させる程度の地盤改良効果が得られるものであれば良く、そのためには掘削した地盤に含まれる細粒分や粘土と水との他には、ベントナイトとアクリルアミド系高分子凝集剤のみを配合した泥水を用いれば良いのであって、その泥水における各成分の具体的な組成やその配合、泥水としての性状(比重や粘性等)、切羽において保持するべき泥水圧等は特に限定されるものではなく、それらは原地盤の状況や施工性、その他の諸条件を考慮して適宜設定すれば良い。
本発明の切羽保持用泥水の一具体例を挙げれば、請求項5に記載のシールド工法における切羽保持用泥水のように、たとえば前記切羽保持用泥水を構成するアクリルアミド系高分子凝集剤は、分子量が100万以上、イオン化度が0〜100モル%であるアクリル系高分子からなる分散粒子径が100μm以下の油中水型エマルジョンの形態を有する高分子凝集剤が考えられ、それに用いるアクリル系高分子として、ノニオン性としては、ポリアクリルアミド、アニオン性としては、アクリル酸、メタアクリル酸、イタコン酸、マレイン酸、アクリルアミド2−メチルプロパンスルフォン酸、ビニルスルフォン酸、スチレンスルフォン酸、などの単独重合体あるいはアクリルアミドとの共重合体、カチオン性としては、アクリル酸ジメチルアミノエチル、メタクリル酸ジメチルアミノプロピルメタアクリルアミド、アクリロイルエキシエチルトリメチルアンモニウムクロリド、メタアクリロイルオキシエチルトリメチルアンモニウムクロイド、アクリロイルアミノプロピルトリメチルアンモニウムクロリド、メタアクリロイルアミノプロピルトリメチルアンモニウムクロリド、アクリロイル2−ヒドロキシプロピルリド、などの単独重合体あるいはアクリルアミドとの共重合体のいずれかを用いることが考えられる。
【0009】
【発明の実施の形態】
以下、本発明に係るシールド工法における切羽安定方法、及び切羽保持用泥水について、図1から図4を用いて説明する。
【0010】
トンネル8は、図4に示すような泥水式シールドマシン9を用いた工法により築造されている。この泥水式シールドマシン9を用いた泥水式シールド工法は、一般に、切羽3と前記泥水式シールドマシン9の隔壁10との間に、送泥管11を介して加圧した切羽保持用泥水4を満たし、切羽3の安定を図るとともに、掘削した土砂を前記切羽保持用泥水4中に取り込み、排泥水として排泥管5を介して流体輸送するものである。
本実施の形態では、礫層におけるトンネル8の築造において、掘削した地盤に含まれる細粒分や粘土と泥水の他には、ベントナイト6と、アクリルアミド系高分子凝集剤7のみが配合された前記切羽保持用泥水4を用いるものである。
【0011】
前記切羽保持用泥水4は、前記排泥管5を介して流体輸送された掘削した土砂を含む排泥水が、図示しない泥水処理プラントに送られ、ここで排泥水に含まれる土砂が分級処理されて、所定の性状に調泥され、前記送泥管11により再度加圧されて前記切羽3と前記隔壁10との間に、流体輸送されるものである。つまり、切羽保持用泥水4は、新たな材料を用いて泥水とするわけではなく、掘削している地盤2に含まれる細粒分を利用しているものである。
【0012】
該切羽保持用泥水4に配合される前記ベントナイト6は、モンモリロナイトを主成分とする一種の粘土鉱物であり、水に混ぜると粘性や比重を増し、増量するとゲル状になる。従来より、井戸や連続地中壁を掘削するときの泥水工法において、ベントナイト安定液として用いられているものである。
【0013】
同じく、前記切羽保持用泥水4に配合される前記アクリルアミド系高分子凝集剤7は、高分子中に反応性に富む酸アミド基を含んでおり、容易に種々の誘導体をつくることができるなどの特徴を有している。また、各種モノマー(親水性〜疎水性)との共重合や構造制御も可能であり、幅広いニーズに対応することの可能な水溶性機能ポリマーである。従来より、懸濁廃水の凝集沈殿、砂利、砕石、石洗浄土木工事濁水の処理、弱酸性〜中性廃水の処理、等に用いられている。
【0014】
本実施の形態では、アクリルアミド系高分子凝集剤7として、分子量が100万以上、イオン化度が0〜100モル%であるアクリル系高分子からなる分散粒子径が100μm以下の油中水型エマルジョンの形態を有する高分子凝集剤で、アクリル系高分子が、ノニオン性としてはポリアクリルアミド、アニオン性としては、アクリル酸、メタアクリル酸、イタコン酸、マレイン酸、アクリルアミド2−メチルプロパンスルフォン酸、ビニルスルフォン酸、スチレンスルフォン酸、などの単独重合体あるいはアクリルアミドとの共重合体、カチオン性としては、アクリル酸ジメチルアミノエチル、メタクリル酸ジメチルアミノプロピルメタアクリルアミド、アクリロイルエキシエチルトリメチルアンモニウムクロリド、メタアクリロイルオキシエチルトリメチルアンモニウムクロイド、アクリロイルアミノプロピルトリメチルアンモニウムクロリド、メタアクリロイルアミノプロピルトリメチルアンモニウムクロリド、アクリロイル2−ヒドロキシプロピルリド、などの単独重合体あるいはアクリルアミドとの共重合体のいずれかを用いればよい。
なお、もっとも好ましいものは、イオン化度が0〜30モル%のノニオン性、アニオン性あるいはカオチン性の水溶性重合体である。
【0015】
このような材料による切羽保持用泥水4の性状は、比重が1〜1.5、ファンネル係数が60秒以下を目安に作泥するものである。従来より泥水式シールド工法に用いられる泥水の性状が、一般に、比重が1.15〜1.25、ファンネル粘性25〜30s程度であることを鑑みると、本実施の形態で用いる切羽保持用泥水4の性状は、従来の泥水とほぼ同様のものであるといえる。
【0016】
なお、ファンネル粘性とは、泥水の性質を良好に維持する上での目安として一般に用いられている指標で、一定量の泥水が流化する時間を測定することにより、その粘性の度合いを評価するものである。
【0017】
このような材料を配合した前記切羽保持用泥水4は、前記切羽3に泥膜を形成することなく地盤2中の粒子間へ浸透していくが、図2に示すように、その浸透領域1は有限であり、切羽保持用泥水4が地盤2中に逃げるような逸泥といった現象が起こることはない。該浸透領域1は、前記切羽保持用泥水4が前記地盤2中の粒子間へ浸透していく際に生じる浸透抵抗力と、切羽保持用泥水4の泥水圧により決定され、浸透抵抗力と泥水圧のバランスが保持されたときに、浸透は終了する。
【0018】
つまり、図1に示すように、切羽3の掘削を進行している場合にも、前記切羽保持用泥水4が常に浸透抵抗力と泥水圧とのバランスを保持するために掘削した距離と同じ長さだけ、切羽保持用泥水4の地盤への浸透が進むこととなる。したがって、切羽3の掘削を連続しても、常に該浸透領域1は浸透幅Lを有する状態を保っていることとなる。
【0019】
また、前記浸透領域1は、泥水に前記ベントナイト6と、前記アクリルアミド系高分子凝集剤7のみを配合したことにより固化現象が現れ、自立性を有する改良地盤体を形成する。なお、前記切羽保持用泥水4へのアクリルアミド系高分子凝集剤7の配合量は、容積比に換算して0.05%以下であり、これを超える量を配合すると、切羽保持用泥水4は泥水工法として泥水の機能を果たすことができない。
【0020】
なお、ここに示す本実施の形態は、あくまでも一つの例示であり、本発明の趣旨を逸脱しない限り、本実施の形態に限定されずに、いかなる形態をも採用しうることは言うまでもない。
【0021】
上述する構成によれば、図2に示すように、前記切羽3を含む近傍に浸透幅Lを有する浸透領域1が存在するため、前記切羽保持用泥水4の泥水圧と、浸透領域1自らの自立性により、シールド掘進においても切羽3が崩壊することなく保持され、常に安定した掘削を得ることが可能となった。
【0022】
これに伴い、前記切羽3と前記泥水式シールドマシン9の隔壁10との間に、送泥管11を介して満たされる加圧した切羽保持用泥水4が、地盤2に逃げる逸泥現象を低減することができた。
【0023】
また、前記切羽3の崩壊による土砂の巻き込みが減少するため、泥水式シールドマシン9を構成し、掘削した土砂を切羽保持用泥水4と混合するアジテータ12が過負荷で停止する現象を低減することが可能となった。
【0024】
前記切羽保持用泥水4の効果を明確にするため、模擬的に礫率が60%程度の砂礫地盤を形成し、実際の切羽と同じ応力状態を再現し、前記切羽保持用泥水4を浸透させる実験を行った。前記切羽保持用泥水4の配合を表1に示す。なお、該切羽保持用泥水4には、掘削した地盤に含まれる細粒分に相当する粘土や水の他には、ベントナイト6、及びアクリルアミド高分子凝集剤7のみを用いている。これら切羽保持用泥水4の性状は、比重1.11、ファンネル粘性30sである。
【0025】
【表1】

Figure 0003905348
【0026】
その結果、図3に示すように、前記切羽保持用泥水4が浸透した浸透領域1について、切羽保持用泥水4による泥水圧を除荷させて、地盤2を安定状態から崩壊させた場合の崩壊時の泥水圧力を測定すると、地盤2の間隙水圧と等しい時点であることがわかる。
【0027】
これらは、切羽3における泥土圧の下限値は、一般に主働土圧+地盤の間隙水圧、つまり地盤2が切羽3に及ぼす圧力と地盤の間隙を満たす間隙水の水圧との総和、とされているが、この実験結果より上記切羽保持用泥水4を地盤2に浸透させて前記浸透領域1を形成することにより、主働土圧が0、つまり地盤2が切羽3に及ぼす圧力の影響がない程度に切羽3近傍の地盤2が改良されたこととなる。
【0028】
【発明の効果】
請求項1および2に記載のシールド工法における切羽安定方法によれば、シールド工法において切羽の安定状態を継続させるシールド工法の切羽安定工法であって、掘削した地盤に含まれる細粒分や粘土と水の他にはベントナイトと該ベントナイトの粒子を凝集させるアクリルアミド系高分子凝集剤のみが配合されることにより、地盤への浸透性を有し、かつ地盤改良効果を有する切羽保持用泥水を切羽から地盤に浸透させて、該切羽保持用泥水が浸透した地盤の浸透領域全体に自立性を持たせることから、切羽保持用泥水の泥水圧と、浸透領域自らの自立性により、シールド掘進においても切羽が崩壊することなく保持され、常に安定した掘削を得ることが可能となった。
また、前記切羽と前記泥水式シールドマシンの隔壁との間に満たされた切羽保持用泥水が、地盤に逃げる逸泥現象を低減することができた。
さらに、前記切羽の崩壊による土砂の巻き込みが減少するため、泥水式シールドマシンを構成し、掘削した土砂を切羽保持用泥水と混合するアジテータが過負荷で停止する現象を低減することが可能となった。
【0029】
請求項3および4に記載のシールド工法における切羽保持用泥水によれば、掘削した地盤に含まれる細粒分や粘土と、水と、ベントナイトと、アクリルアミド系高分子凝集剤のみとを配合させることから、切羽から地盤の浸透領域には自立性を有する改良地盤体を形成することが可能となった。
【0030】
請求項5に記載のシールド工法における切羽保持用泥水によれば、前記切羽保持用泥水を構成するアクリルアミド系高分子凝集剤は、分子量が100万以上、イオン化度が0〜100モル%であるアクリル系高分子からなる分散粒子径が100μm以下の油中水型エマルジョンの形態を有する高分子凝集剤であって、用いるアクリル系高分子として、ノニオン性としては、ポリアクリルアミド、アニオン性としては、アクリル酸、メタアクリル酸、イタコン酸、マレイン酸、アクリルアミド2−メチルプロパンスルフォン酸、ビニルスルフォン酸、スチレンスルフォン酸、などの単独重合体あるいはアクリルアミドとの共重合体、カチオン性としては、アクリル酸ジメチルアミノエチル、メタクリル酸ジメチルアミノプロピルメタアクリルアミド、アクリロイルエキシエチルトリメチルアンモニウムクロリド、メタアクリロイルオキシエチルトリメチルアンモニウムクロイド、アクリロイルアミノプロピルトリメチルアンモニウムクロリド、メタアクリロイルアミノプロピルトリメチルアンモニウムクロリド、アクリロイル2−ヒドロキシプロピルリド、などの単独重合体あるいはアクリルアミドとの共重合体のいずれかを用いることから、切羽保持用泥水は泥水工法として泥水としての機能を果たしながら、自立性を有する改良地盤体を形成することが可能となった。
【図面の簡単な説明】
【図1】 本発明に係るシールド工法における切羽安定方法の概念図を示す図である。
【図2】 本発明に係るシールド工法における切羽安定方法を用いた切羽部の詳細を示す図である。
【図3】 本発明に係るシールド工法における切羽安定方法を用いた切羽部の泥水圧力の状況を示す図である。
【図4】 本発明に係るシールド工法における切羽安定方法に用いられる泥水式シールドマシンの概略を示す図である。
【図5】 従来のシールド工法における切羽部の詳細を示す図である。
【符号の説明】
1 浸透領域
2 地盤
3 切羽
4 切羽保持用泥水
5 排泥管
6 ベントナイト
7 アクリルアミド系高分子凝集剤
8 トンネル
9 泥水式シールドマシン
10 隔壁
11 送泥管
12 アジテータ
21 泥膜
22 地盤
23 切羽
24 泥水[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a method for stabilizing a face in a shield method that can hold a face well and perform stable excavation work, and a mud for holding face.
[0002]
[Prior art]
In the shield method, it is important to stabilize the face and excavate for safe construction and to suppress the influence on the ground around the tunnel. However, sand ground with a uniform particle size and unconsolidated gravel ground are not self-supporting, so the face is likely to collapse, and there are many problems affecting construction and surroundings.
[0003]
In the muddy water type shield which is the mainstream of the shield construction method, as shown in FIG. 5, the muddy water 24 used for excavation forms a mud film 21 on the surface of the face 23 as in the case of the continuous underground wall, Thus, the ground 22 is stabilized by transmitting the muddy water pressure to the ground 22.
[0004]
[Problems to be solved by the invention]
However, in the shield method, since the cutter of the shield machine always cuts the surface of the ground 22, the mud film 21 formed on the surface of the face 23 cannot be held, and the sand ground or hard solid with a uniform particle size cannot be retained. In soil conditions such as ungraved gravel ground, the face 23 was liable to collapse.
[0005]
In view of the above circumstances, an object of the present invention is to provide a face stabilization method in a shield method that can hold a face well and perform stable excavation work, and a face holding mud.
[0006]
[Means for Solving the Problems]
The face stabilization method in the shield method according to claim 1 is a face stabilization method in the shield method that continues the stable state of the face, and includes fine particles and clay contained in the excavated ground, water, bentonite, It contains only the acrylamide polymer flocculant for agglomerating the bentonite particles, and pressurizes and supplies the face holding muddy water having permeability to the ground to infiltrate the face from the face. It is characterized in that the entire infiltration area of the ground infiltrated with muddy water is improved to cause the entire infiltration ground to solidify and have independence.
The face stabilization method in the shield method according to claim 2 is the face stabilization method in the shield method according to claim 1, wherein the acrylamide polymer flocculant has a form of a water-in-oil emulsion. Yes.
[0007]
The face retaining mud in the shield construction method according to claim 3 is the face retaining mud in the shield construction method used in the face stabilization method in the shield construction method according to claim 1, wherein fine particles contained in the excavated ground Only clay, water, bentonite, and an acrylamide polymer flocculant that agglomerates the bentonite particles are blended, and are characterized by having permeability to the ground.
The face retaining mud in the shield method according to claim 4 is the face retaining mud in the shield method according to claim 3, wherein the acrylamide polymer flocculant has the form of a water-in-oil emulsion. Yes.
[0008]
That is, in the present invention, in order to agglomerate bentonite and its bentonite particles in addition to fine particles and clay and water contained in the excavated ground as muddy water used for holding the face in the muddy water shield method. The main point is to use muddy water containing only the acrylamide polymer flocculant of the above, and the bentonite particles in the muddy water are naturally only supplied by supplying the muddy water for holding the face to the face at a predetermined muddy water pressure. Agglomerates to a certain large particle size and penetrates into the ground in front of the face, thereby solidifying the ground in the infiltrated area and improving the ground so that it can be excavated, thereby making the face independent It is possible to dampen. In addition, since the infiltration region (that is, the ground improvement region) of the face retaining mud gradually advances along with the excavation, the excavation can be performed while the face is always stably standing independently.
Therefore, according to the present invention, stable excavation work can be performed while keeping the face always good and preventing its collapsing as compared with the case of the conventional general mud shield method in which the mud film is merely formed on the face. Is possible.
In addition, the muddy water for holding a face according to the present invention is able to obtain a ground improvement effect to the extent that it naturally penetrates into the ground in front of the face as described above, and the solidification phenomenon occurs there and the face becomes independent. For that purpose, in addition to fine particles contained in the excavated ground, clay and water, it is sufficient to use muddy water containing only bentonite and acrylamide polymer flocculant. There are no particular limitations on the specific composition of the ingredients, their composition, the properties of the muddy water (specific gravity, viscosity, etc.), the muddy water pressure to be retained in the face, etc. What is necessary is just to set suitably in consideration of various conditions.
If the specific example of the mud for holding face of this invention is given, the acrylamide polymer flocculent which comprises the mud for holding face , for example like the mud for holding face in the shield construction method according to claim 5 has a molecular weight. Is a polymer flocculant having the form of a water- in- oil emulsion having a dispersed particle size of 100 μm or less, which is made of an acrylic polymer having an ionization degree of 0 to 100 mol%. As a molecule, polyacrylamide is used as nonionic, and homopolymers such as acrylic acid, methacrylic acid, itaconic acid, maleic acid, acrylamide 2-methylpropane sulfonic acid, vinyl sulfonic acid, and styrene sulfonic acid are used as anionic. Or a copolymer with acrylamide, and as cationic, dimethyl acrylate Noethyl, dimethylaminopropyl methacrylate, acryloyl exciethyltrimethylammonium chloride, methacryloyloxyethyltrimethylammonium chloride, acryloylaminopropyltrimethylammonium chloride, methacryloylaminopropyltrimethylammonium chloride, acryloyl 2-hydroxypropylide, etc. It is conceivable to use either a polymer or a copolymer with acrylamide.
[0009]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, the face stabilization method and the face holding mud in the shield method according to the present invention will be described with reference to FIGS. 1 to 4.
[0010]
The tunnel 8 is constructed by a construction method using a muddy water type shield machine 9 as shown in FIG. In general, the muddy water type shield method using the muddy water type shield machine 9 is a method in which the muffled water 4 for holding the face pressed between the face 3 and the partition wall 10 of the muddy water type shield machine 9 is pressed through a mud pipe 11. In addition to satisfying and stabilizing the face 3, the excavated earth and sand are taken into the face retaining mud 4 and fluidly transported through the mud pipe 5 as waste water.
In this embodiment, in the construction of a tunnel 8 in gravel, in addition to the fine grain fraction and clay and mud contained in the excavated soil, bentonite 6, only acrylamide polymer flocculant 7 is blended the The face retaining mud 4 is used.
[0011]
In the face retaining mud 4, waste mud containing the excavated earth and sand transported through the mud pipe 5 is sent to a mud treatment plant (not shown), and the earth and sand contained in the waste mud is classified. Thus, the mud is adjusted to a predetermined property, pressurized again by the mud pipe 11 and fluid transported between the face 3 and the partition wall 10. That is, the face retaining mud 4 is not made into mud using a new material, but utilizes fine particles contained in the ground 2 being excavated.
[0012]
The bentonite 6 blended in the face retaining mud 4 is a kind of clay mineral mainly composed of montmorillonite. When mixed with water, the bentonite 6 increases in viscosity and specific gravity, and increases in amount to become a gel. Conventionally, it is used as a bentonite stabilization liquid in the muddy water method when excavating a well or a continuous underground wall.
[0013]
Similarly, the acrylamide-based polymer flocculant 7 blended in the face retaining mud 4 contains acid amide groups rich in reactivity in the polymer, and can easily produce various derivatives. It has characteristics. Further, it is a water-soluble functional polymer that can be copolymerized with various monomers (hydrophilic to hydrophobic) and can control the structure, and can meet a wide range of needs. Conventionally, it is used for the coagulation sedimentation of suspended wastewater, gravel, crushed stone, stone washing civil engineering muddy water treatment, weak acidity to neutral wastewater treatment, and the like.
[0014]
In the present embodiment, the acrylamide polymer flocculant 7 is a water- in- oil emulsion having a dispersed particle diameter of 100 μm or less made of an acrylic polymer having a molecular weight of 1 million or more and an ionization degree of 0 to 100 mol% . A polymer flocculant having a form , wherein the acrylic polymer is non-ionic polyacrylamide, and anionic is acrylic acid, methacrylic acid, itaconic acid, maleic acid, acrylamide 2-methylpropane sulfonic acid, vinyl sulfone Homopolymers such as acid, styrene sulfonic acid, etc. or copolymers with acrylamide, and cationic properties include dimethylaminoethyl acrylate, dimethylaminopropyl methacrylate, acryloyl exciethyltrimethylammonium chloride, methacryloyloxy Trimethylammonium click Lloyd, acryloyl aminopropyl trimethylammonium chloride, methacryloyloxy aminopropyl trimethylammonium chloride, it may be used any of a copolymer of homopolymer or acrylamide acryloyl 2-hydroxypropyl chloride, and the like.
Most preferred is a nonionic, anionic or chaotic water-soluble polymer having an ionization degree of 0 to 30 mol%.
[0015]
The properties of the mud water 4 for retaining the face made of such a material is that mud is produced with a specific gravity of 1 to 1.5 and a funnel coefficient of 60 seconds or less. In view of the fact that the properties of the muddy water conventionally used in the muddy water type shield method are generally about 1.15 to 1.25 and the funnel viscosity is about 25 to 30 s, the properties of the muddy water 4 for holding the face used in the present embodiment are: It can be said that it is almost the same as the conventional muddy water.
[0016]
Funnel viscosity is an index that is generally used as a guideline for maintaining the quality of muddy water. By measuring the time for a certain amount of muddy water to flow, the degree of viscosity is evaluated. Is.
[0017]
The face retaining mud 4 containing such a material penetrates between the particles in the ground 2 without forming a mud film on the face 3, but as shown in FIG. Is limited, and there is no such phenomenon that the mud water 4 for retaining the face escapes into the ground 2. The permeation region 1 is determined by the permeation resistance generated when the face retaining mud 4 penetrates between the particles in the ground 2 and the mud pressure of the face retaining mud 4. Osmosis ends when the water pressure balance is maintained.
[0018]
That is, as shown in FIG. 1, even when the face 3 is being excavated, the face holding mud 4 has the same length as the distance excavated in order to always maintain the balance between the permeation resistance and the mud pressure. Now, the penetration of the face retaining mud 4 into the ground will proceed. Therefore, even if the face 3 is continuously excavated, the permeation region 1 always maintains a state having a permeation width L.
[0019]
Moreover, the said infiltration area | region 1 shows the solidification phenomenon by mix | blending only the said bentonite 6 and the said acrylamide type polymer flocculant 7 in muddy water, and forms the improved ground body which has self-supporting property. In addition, the blending amount of the acrylamide polymer flocculant 7 in the face retaining mud 4 is 0.05% or less in terms of volume ratio, and if the amount exceeding this is blended, the face retaining mud 4 is the mud construction method. Can not fulfill the function of muddy water.
[0020]
Note that the present embodiment shown here is merely an example, and it goes without saying that any form can be adopted without being limited to the present embodiment unless departing from the gist of the present invention.
[0021]
According to the configuration described above, as shown in FIG. 2, since there is an infiltration region 1 having an infiltration width L in the vicinity including the face 3, the mud pressure of the face retaining mud 4 and the infiltration region 1 own Due to the independence, the face 3 was maintained without collapsing even during shield digging, and it became possible to always obtain stable excavation.
[0022]
Along with this, the pressurized mud retaining pressure 4 filled through the mud pipe 11 between the face 3 and the partition wall 10 of the muddy water shield machine 9 reduces the phenomenon of mud escape to the ground 2. We were able to.
[0023]
Moreover, since the entrainment of the earth and sand due to the collapse of the face 3 is reduced, the phenomenon that the agitator 12 that configures the muddy water type shield machine 9 and mixes the excavated earth and sand with the face holding mud 4 is stopped due to overload is reduced. Became possible.
[0024]
In order to clarify the effect of the face retaining mud 4, a gravel ground having a gravel ratio of about 60% is formed in a simulated manner, the same stress state as the actual face is reproduced, and the face retaining mud 4 is infiltrated. The experiment was conducted. Table 1 shows the composition of the mud water 4 for retaining the face. In addition, only the bentonite 6 and the acrylamide polymer flocculant 7 are used for the face retaining mud 4 in addition to clay and water corresponding to fine particles contained in the excavated ground . The properties of the face retaining mud 4 are a specific gravity of 1.11 and a funnel viscosity of 30 s.
[0025]
[Table 1]
Figure 0003905348
[0026]
As a result, as shown in FIG. 3 , with respect to the infiltration region 1 into which the face retaining mud 4 has permeated, the mud pressure caused by the face retaining mud 4 is unloaded and the ground 2 collapses from a stable state. When the muddy water pressure at the time is measured, it is understood that the time is equal to the pore water pressure of the ground 2.
[0027]
The lower limit value of the mud pressure at the face 3 is generally the main earth pressure + the pore water pressure of the ground, that is, the sum of the pressure exerted on the face 3 by the ground 2 and the water pressure of the pore water filling the gap of the ground. However, from this experimental result, the work holding pressure 4 is infiltrated into the ground 2 to form the infiltration region 1, so that the main earth pressure is 0, that is, there is no influence of the pressure exerted on the face 3 by the ground 2. The ground 2 near the face 3 is improved.
[0028]
【The invention's effect】
According to the face stabilization method in the shield method according to claim 1 and 2, the face stabilization method of the shield method in which the stable state of the face is continued in the shield method, and the fine particles and clay contained in the excavated ground In addition to water, only the bentonite and the acrylamide polymer flocculant that agglomerates the bentonite particles are blended, so that the face retaining mud water having the ground improvement effect and the ground improvement effect can be obtained from the face. Since the entire infiltration area of the ground into which the face retaining mud has penetrated is infiltrated into the ground, the mud water pressure of the face retaining mud and the independence of the infiltration area itself can also be used in shield excavation. Is maintained without collapsing, making it possible to always obtain a stable excavation.
Further, the mud phenomenon for retaining the face filled between the face and the partition wall of the muddy water type shield machine could reduce the phenomenon of mud escape to the ground.
Furthermore, since the entrapment of earth and sand due to the collapse of the face is reduced, it is possible to reduce the phenomenon that an agitator that constitutes a mud type shield machine and mixes the excavated earth and sand with the face holding mud stops due to overload. It was.
[0029]
According to the mud for the working face holding the shield method according to claim 3 and 4, a fine fraction and clay contained in the excavated soil, water, bentonite and, thereby compounding the only acrylamide polymer flocculant Therefore, it became possible to form an improved ground body having independence in the infiltration region from the face to the ground.
[0030]
According to the face retaining mud in the shield method according to claim 5, the acrylamide polymer flocculant constituting the face retaining mud is an acrylic having a molecular weight of 1 million or more and an ionization degree of 0 to 100 mol%. A polymer flocculant having a dispersed particle size of 100 μm or less made of a polymer and having a form of a water- in- oil emulsion. The acrylic polymer used is non-ionic polyacrylamide, and anionic is acrylic. Homopolymers such as acid, methacrylic acid, itaconic acid, maleic acid, acrylamide 2-methylpropane sulfonic acid, vinyl sulfonic acid, styrene sulfonic acid, etc., or copolymers with acrylamide, and as cationic property, dimethylamino acrylate Ethyl, dimethylaminopropyl methacrylate methacrylate , Acryloyl exciethyltrimethylammonium chloride, methacryloyloxyethyltrimethylammonium chloride, acryloylaminopropyltrimethylammonium chloride, methacryloylaminopropyltrimethylammonium chloride, acryloyl 2-hydroxypropylide, and other homopolymers or copolymerized with acrylamide Since any one of the coalescence is used, it becomes possible to form an improved ground body having a self-supporting property while the mud water for retaining the face functions as a muddy water as a mud construction method.
[Brief description of the drawings]
FIG. 1 is a diagram showing a conceptual diagram of a face stabilization method in a shield method according to the present invention.
FIG. 2 is a diagram showing details of a face portion using a face stabilization method in the shield method according to the present invention.
FIG. 3 is a diagram showing the state of muddy water pressure in the face portion using the face stabilization method in the shield method according to the present invention.
FIG. 4 is a diagram showing an outline of a muddy water type shield machine used in a face stabilization method in the shield method according to the present invention.
FIG. 5 is a diagram showing details of a face part in a conventional shield method.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1 Infiltration area 2 Ground 3 Face 4 Face holding mud 5 Drain pipe 6 Bentonite 7 Acrylamide polymer flocculant 8 Tunnel 9 Mud type shield machine 10 Bulkhead 11 Mud pipe 12 Agitator 21 Mud film 22 Ground 23 Face 24 Mud water

Claims (5)

切羽の安定状態を継続させるシールド工法における切羽安定方法であって、
掘削した地盤に含まれる細粒分や粘土と、水と、ベントナイトと、該ベントナイトの粒子を凝集させるアクリルアミド系高分子凝集剤のみを配合するとともに地盤への浸透性を有する切羽保持用泥水を切羽に加圧供給して切羽から地盤に浸透させることにより、該切羽保持用泥水が浸透した地盤の浸透領域全体を地盤改良して当該浸透地盤全体に固化現象をおこさせて自立性を持たせることを特徴とするシールド工法における切羽安定方法。
A face stabilization method in the shield method that keeps the stable state of the face,
A fine fraction and clay contained in the excavated soil, water, bentonite and, cutting face of the cutting face holding mud having permeability into the ground together with formulating only acrylamide polymer flocculant to agglomerate the particles of the bentonite By applying pressure to the face and infiltrating the ground from the face, the entire infiltration area of the ground infiltrated with the muddy water for retaining the face is improved and the solidification phenomenon is caused in the entire infiltration ground to have independence. The face stabilization method in the shield method characterized by
請求項1に記載のシールド工法における切羽安定方法であって、A face stabilization method in the shield method according to claim 1,
アクリルアミド系高分子凝集剤は油中水型エマルジョンの形態を有することを特徴とするシールド工法における切羽安定方法。  The face stabilization method in the shield method, wherein the acrylamide polymer flocculant has the form of a water-in-oil emulsion.
請求項1に記載のシールド工法における切羽安定方法に用いるシールド工法における切羽保持用泥水であって、
掘削した地盤に含まれる細粒分や粘土と、水と、ベントナイトと、該ベントナイトの粒子を凝集させるアクリルアミド系高分子凝集剤のみが配合され、地盤への浸透性を有していることを特徴とするシールド工法における切羽保持用泥水。
It is a muddy water for holding the face in the shield method used in the face stabilization method in the shield method according to claim 1,
Only fine particles and clay contained in excavated ground, water, bentonite, and acrylamide polymer flocculant that aggregates the bentonite particles are blended, and has a permeability to the ground The muddy water for holding the face in the shield method.
請求項3に記載のシールド工法における切羽保持用泥水において、In the muddy water for holding the face in the shield method according to claim 3,
アクリルアミド系高分子凝集剤は油中水型エマルジョンの形態を有することを特徴とするシールド工法における切羽保持用泥水。  A mud for retaining face in shield method, wherein the acrylamide polymer flocculant has a form of water-in-oil emulsion.
請求項4に記載のシールド工法における切羽保持用泥水において、
前記切羽保持用泥水を構成するアクリルアミド系高分子凝集剤は、分子量が100万以上、イオン化度が0〜100モル%であるアクリル系高分子からなる分散粒子径が100μm以下の油中水型エマルジョンの形態を有する高分子凝集剤であって、用いるアクリル系高分子として、
ノニオン性としては、ポリアクリルアミド、
アニオン性としては、アクリル酸、メタアクリル酸、イタコン酸、マレイン酸、アクリルアミド2−メチルプロパンスルフォン酸、ビニルスルフォン酸、スチレンスルフォン酸、などの単独重合体あるいはアクリルアミドとの共重合体、
カチオン性としては、アクリル酸ジメチルアミノエチル、メタクリル酸ジメチルアミノプロピルメタアクリルアミド、アクリロイルエキシエチルトリメチルアンモニウムクロリド、メタアクリロイルオキシエチルトリメチルアンモニウムクロイド、アクリロイルアミノプロピルトリメチルアンモニウムクロリド、メタアクリロイルアミノプロピルトリメチルアンモニウムクロリド、アクリロイル2−ヒドロキシプロピルリド、
などの単独重合体あるいはアクリルアミドとの共重合体のいずれかを用いることを特徴とするシールド工法における切羽保持用泥水。
In the mud for retaining face in the shield method according to claim 4,
The acrylamide polymer flocculent constituting the face retaining mud is a water- in- oil emulsion having a molecular weight of 1,000,000 or more and a dispersed particle size of an acrylic polymer having an ionization degree of 0 to 100 mol% of 100 μm or less. As a polymer flocculant having the form of:
Nonionic properties include polyacrylamide,
As an anionic property, a homopolymer such as acrylic acid, methacrylic acid, itaconic acid, maleic acid, acrylamide 2-methylpropane sulfonic acid, vinyl sulfonic acid, styrene sulfonic acid, or a copolymer with acrylamide,
Cationic properties include dimethylaminoethyl acrylate, dimethylaminopropyl methacrylate, acryloyl exciethyltrimethylammonium chloride, methacryloyloxyethyltrimethylammonium chloride, acryloylaminopropyltrimethylammonium chloride, methacryloylaminopropyltrimethylammonium chloride, acryloyl. 2-hydroxypropylide,
A muddy water for holding a face in a shield method, characterized by using either a homopolymer such as styrene or a copolymer with acrylamide.
JP2001319687A 2001-10-17 2001-10-17 Face stabilization method in shield method, and mud for holding face Expired - Lifetime JP3905348B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001319687A JP3905348B2 (en) 2001-10-17 2001-10-17 Face stabilization method in shield method, and mud for holding face

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001319687A JP3905348B2 (en) 2001-10-17 2001-10-17 Face stabilization method in shield method, and mud for holding face

Publications (2)

Publication Number Publication Date
JP2003120174A JP2003120174A (en) 2003-04-23
JP3905348B2 true JP3905348B2 (en) 2007-04-18

Family

ID=19137201

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001319687A Expired - Lifetime JP3905348B2 (en) 2001-10-17 2001-10-17 Face stabilization method in shield method, and mud for holding face

Country Status (1)

Country Link
JP (1) JP3905348B2 (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009179971A (en) * 2008-01-29 2009-08-13 Ohbayashi Corp Excavated soil disposal method and processing water
JP6057687B2 (en) * 2012-12-05 2017-01-11 株式会社クラレ Polymer flocculant and drilling mud
JP6892347B2 (en) * 2017-07-28 2021-06-23 株式会社奥村組 Judgment method of face ground in shield excavator
JP6901611B2 (en) * 2017-07-28 2021-07-14 株式会社奥村組 Bit vibration tester
CN113756833A (en) * 2021-09-26 2021-12-07 中交第三航务工程局有限公司 Method for preventing spiral conveyor of earth pressure balance shield machine from gushing
JP7455440B2 (en) 2022-06-23 2024-03-26 丸十工業株式会社 Method for preventing collapse of face when propulsion is stopped in closed shield propulsion method
CN116398242B (en) * 2023-04-21 2024-03-29 中交隧道工程局有限公司 Evaluation method for long-time shutdown slurry shield excavation face mud film service life

Also Published As

Publication number Publication date
JP2003120174A (en) 2003-04-23

Similar Documents

Publication Publication Date Title
ES2263247T3 (en) COMPOSITIONS FLUID POLYMERICAS FOR LAND STABILIZATION AND PROCEDURE FOR USE.
JP3905348B2 (en) Face stabilization method in shield method, and mud for holding face
JP5478386B2 (en) Improving method for ground with underground cavity
JP6830632B2 (en) Treatment method of mud generated by mud pressure shield method
EP3301078B1 (en) Method for treating dredged material or sludge
JP6679030B1 (en) Method for modifying mud soil such as soil mixed with drilling additives
Jefferis et al. Polymer systems for fluid supported excavations
JP2007332722A (en) Method for improving slime left in cast-in-place concrete pile
JPH08199160A (en) Excavation additive
JP4970547B2 (en) Preparation method of bubble stabilizer and bubble drilling method
JP2001207436A (en) Slurry composition
JP3027064B2 (en) Water-permeable composition with excellent pumpability
JP3158940B2 (en) Lost mud prevention method in muddy water method
JP3523702B2 (en) Drilling additives for shield method
JP3682554B2 (en) Underwater filling method
JP2856771B2 (en) Injection chemical and injection method for soil stabilization
JP7133816B2 (en) Disposal method of mud generated by the mud pressure shield construction method
JPS59213897A (en) Shield drilling apparatus
JP5133450B1 (en) Subsurface continuum creation method using in situ soil
JP7025614B2 (en) Method of reforming mixed soil with bubbles
JP2862996B2 (en) How to stabilize the land
JP2829549B2 (en) Lubricants for civil engineering
JPH0639875B2 (en) Additive for mud pressure shield
JPH10317878A (en) Mud shield method
JP2023125140A (en) Excavator for soil cement underground continuous wall, and construction method using the same

Legal Events

Date Code Title Description
RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20040507

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20040512

A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A711

Effective date: 20041109

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20041109

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20050124

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20051115

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20051206

RD03 Notification of appointment of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7423

Effective date: 20060112

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20060203

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20060112

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20060418

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20060619

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20061212

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20070111

R150 Certificate of patent or registration of utility model

Ref document number: 3905348

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100119

Year of fee payment: 3

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313117

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100119

Year of fee payment: 3

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100119

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130119

Year of fee payment: 6

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130119

Year of fee payment: 6

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130119

Year of fee payment: 6

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130119

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140119

Year of fee payment: 7

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250